www.fitzroyresources.com.au
FITZROY RESOURCES LTD 28 October 2011 ABN 43 145 590 110 Fast Facts - October 2011 - October 2011 Quarterly Report for the period ending 30 September 2011
Fast Facts - October 2011 - October 2011 Share Code ASX: FRY Shares on Issue 41 Million Options 11 Million Market Cap $5.3M @ $0.13c Cash at Bank $ 2.7M Directors and Management Tom Henderson, Chairman Will Dix, Managing Director Ric Vittino, Director
HIGHLIGHTS
-
Drilling continues to extend the mineralisation south of the Develin Creek Resource limits.
-
Narrow zones of mineralisation identified in 3 of 4 diamond holes.
-
Initial RC program completed at the Lygon Prospect
Projects Rookwood:
-
Regional exploration push gaining momentum
-
70km NW of Rockhampton
-
20km S of Marlborough
-
Total area approx. 390km[2] 1.75Mt @ 1.7% Cu, 2.1% Zn, 8.5 g/t Ag Inferred JORC Resource
Corporate
Fitzroy has on issue a total of 41,000,005 Shares and 11,000,000 unlisted 30 cent options. On 30 September 2011 3,937,500 were released from escrow which brings the total number of tradeable Fitzroy securities to 31,062,505.
Glentanna:
-
140km SW of Brisbane
-
Total area approx. 75km[2]
The Company continues to review additional projects both in Australia and offshore for value-accreting opportunities.
-
Greenfields Exploration
-
Drilling identified low level Cu/Zn mineralisation
-
Previous drilling intersected 12.3m @ 1.2% Cu and 8.9% Zn
Cash at the end of the quarter totalled $2.7 million
Exploration
==> picture [157 x 91] intentionally omitted <==
Rookwood Project (100% FRY)
Two drilling campaigns were completed in the September quarter to firstly follow up drilling from earlier in the year and secondly to test two of the regional targets identified from geophysical surveys.
==> picture [157 x 91] intentionally omitted <==
The follow up drilling program to that completed during the June quarter has successfully extended the mineralisation further south at the Sulphide City resource but failed to intersect economic widths. Three holes were drilled to follow up FRWD0002 which intersected 13m @ 3.3%Cu, 4% Zn and 30g/t and each returned narrow intersections of copper, zinc and silver mineralisation with the results tabulated in Table 1 and shown on the plan projection of the Sulphide City mineralisation in Figure 1.
Contact Details
Perth Office Lvl 2, 35 Havelock Street West Perth WA 6005 Postal Address PO BOX 839 West Perth WA 6872 T +61 8 9481 7111 F +61 8 9320 7501 E [email protected]
An additional 2 RC drillholes were completed a further 200m south of the sulphide city resource and one of these (FRWC0007) intersected a broad zone of disseminated to semi-massive sulphides. Analytical results from these holes are pending.
Even though drilling south of Sulphide City failed to intersect economic mineralisation it has continued to identify sulphides to the south of the limits of the resource confirming the mineralised system extends further than first thought. Follow up work to establish the limits of the resource
www.fitzroyresources.com.au
will continue however regional exploration will take a more prominent role going forward.
To the east of Develin Creek resource hole FRWD0006 was drilled into a geophysical target and intersected a broad hematite alteration zone but no mineralisation.
All diamond holes have been prepared for future downhole EM surveying.
4 RC drillholes were also drilled into EM and IP targets at the Lygon Prospect but failed to intersect any visible sulphide mineralisation. Analytical results for these holes are pending and the collar details are shown below in Table 2 and in Figure 2.
| Hole ID | Northing | Easting | Rl | From | Width | Cu | Zn | Ag | Au | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| FRWD0003 | 7450262 | 788954 | 134 | 174.00 | 0.8 | 2.9 | 3.4 | 26 | 0.2 | ||
| FRWD0004 | 7450321 | 789084 | 121 | 122.20 | 1.05 | 3.5 | 1.7 | 21 | 0.6 | ||
| FRWD0005 | 7450346 | 789035 | 126 | 142.92 | 0.3 | 4 | 0.03 | 12 | 0.3 | ||
| FRWC0007 | 7450210 | 789087 | 120 | Resultspending | |||||||
| FRWC0008 | 7450200 | 788923 | 115 | Resultspending |
Table 1 – Drilling details for holes completed at Sulphide City during the quarter.
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
| Hole ID | Prospect | Northing | Easting | Rl | Cu | Zn | Ag | Au | ||
|---|---|---|---|---|---|---|---|---|---|---|
| FRWD0006 | Sulphide CityEast | 7450318 | 789581 | 115 | Resultspending | |||||
| FRWC0009 | Mexico | 7449828 | 789264 | 125 | Hole Failed | |||||
| FRWC0010 | Lygon | 7444763 | 790781 | 115 | Resultspending | |||||
| FRWC0011 | Lygon | 7444705 | 790065 | 115 | Resultspending | |||||
| FRWC0012 | Lygon | 7445133 | 789966 | 115 | Resultspending |
Table 2 – Drilling details for regional holes completed during the quarter.
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
Most of the historic IP and gravity data has now been reviewed and has continued to identify areas that require further work. Specifically these include Jabiru, Mexico, Comanche and Glenroy. These areas will be the focus of much of the desktop work over the coming summer months. The areas can be seen on Figure 3.
==> picture [595 x 8] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
Further Work
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
Work during the next quarter and the wet summer months will include:
==> picture [595 x 7] intentionally omitted <==
-
Review and work program development of the Comanche area where previous work has identified secondary copper mineralisation at surface
-
Ongoing work on the large number of unresolved geophysical and geochemical anomalies specifically at Jabiru, Glenroy and Mexico.
-
Revision of the original stream sediment data and evaluation of this to create target basins
A combination of these can then be used to prioritise targets for follow-up, including additional surface geochem (additional stream sediment sampling if stream density allows or Niton soils) and/or RAB drilling over areas of cover.
www.fitzroyresources.com.au
Glentanna Project (FRY 100%)
A work program has been formulated for the Glentanna Project and timing is dependent on geophysical crew availability. It is expected that the survey will be completed late in the year or early next year.
ABOUT FITZROY :
Fitzroy Resources Ltd is an Australian based mineral exploration company, with two significantly underexplored Queensland base metals projects.
Fitzroy’s main focus is to rapidly evaluate the Rookwood project, containing the promising Develin Creek Resource (estimated 1.75Mt @1.7% Cu, 2.1% Zn, 8.5ppm Ag and 0.24ppm Au). Typical VHMS prospects such as Rookwood, often contain multiple ore systems, with Develin Creek the first system discovered to date in this terrain. Rookwood contains significant potential for the discovery of substantial copper/gold deposits beyond the existing resource.
The smaller Glentanna project, to the south, remains in the early exploration stages, with previous drilling suggesting strong potential. Focus on this project will include further first pass geophysics and drilling.
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
COMPETENT PERSONS STATEMENT :
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
The information in this document that relates to Mineral Resources has been compiled by Ms Fleur Muller. Ms Muller, who is a Member of the Australasian Institute of Mining and Metallurgy, is a full time employee of Geostat Services Pty Ltd and produced the Mineral Resource Estimate based on data and geological information supplied by Icon. Ms Muller has sufficient relevant experience to the style of mineralisation and type of deposit under consideration and to the activity that she is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code. Ms Muller consents to the inclusion in this document of the matters based on her information in the form and context in which it appears.
==> picture [595 x 7] intentionally omitted <==
The information in this document that relates to Exploration Results has been compiled by Mr William Dix. Mr Dix, who is a Member of the Australasian Institute of Mining and Metallurgy is a full time employee of the Company. Mr Dix has sufficient relevant experience to the style of mineralisation and type of deposit under consideration and to the activity that she is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code. Mr Dix consents to the inclusion in this document of the matters based on his information in the form and context in which it appears.
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 8] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 8] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
==> picture [595 x 7] intentionally omitted <==
www.fitzroyresources.com.au
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
Figure 1 – Plan projection showing the projection of the Sulphide City resource and the outline of massive sulphide mineralisation.
www.fitzroyresources.com.au
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 91] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
Figure 2 – Plan showing RC drillhole locations at the Lygon Prospect.
==> picture [568 x 59] intentionally omitted <==
----- Start of picture text -----
ASX: FRY
www.fitzroyresources.com.au
----- End of picture text -----
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 89] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 90] intentionally omitted <==
==> picture [489 x 89] intentionally omitted <==
Figure 3 - showing the areas of short to medium term regional exploration focus.