AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

SOUND ENERGY PLC

Regulatory Filings Dec 20, 2017

7926_rns_2017-12-20_449cea02-ba6c-4483-ad55-2f8d3b39c4c1.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

National Storage Mechanism | Additional information

You don't have Javascript enabled. For full functionality this page requires javascript to be enabled.

RNS Number : 8914Z

Sound Energy PLC

20 December 2017

20 December 2017

Sound Energy PLC

("Sound Energy" or the "Company")

Tendrara Volume Certification - Preliminary TE-5 Horst Results

Sound Energy, the African and European focused upstream gas company, is pleased to announce receipt of the preliminary results of the resources certification in relation to the TE-5 horst core volumes at the Company's Tendrara asset, onshore Morocco ("Certification").

The Certification, which will include a full technical review of the Tendrara project, is being conducted by RPS Energy Consultants Ltd ("RPS"). The Certification, which utilises the latest SPE Petroleum Resources Management System ("PRMS") approved definitions of Reserves and Resources, is a very important step towards concession application and a Final Investment Decision.

The preliminary results of the Certification (final results on the Tendrara area are expected to be available in early January 2017) provide volumetric estimates for the TAGI-1 and TAGI-2 reservoir units in the TE-5 Horst.

On 23 May 2017, the Company announced an internal preliminary mid case gross Gas Originally in Place ("GOIP") estimate for the TE-5 horst of 0.63 Tcf. 

Sound Energy is delighted to report that the preliminary results of the Certification validate this previous mid case GOIP (gross) estimate.   

Preliminary results of the RPS certification:

·      A mid case GOIP for the TE-5 horst alone of 0.65 Tcf

·      A 2C (mid case) recoverable, contingent resource for the TE-5 horst of 377 Bcf

The results of the Certification will be utilized for development planning and to advance development funding solutions, already under discussion.

The Certification was undertaken on an area of 250km2, which equates to around 1% of the total Eastern Morocco permit area of approximately 23,500km2. Planning for the Exploration drilling programme, announced on the 4 October 2017, continues in parallel with the development activity.  This programme is an important step in unlocking the Company's previously estimated unrisked GOIP potential across all the Eastern Moroccan acreage, of 17 Tcf mid case (31 Tcf upside case and 9 Tcf low case), as announced on the 1 February 2017.

The table below summarise the preliminary results of the Certification and present the discovered in-place plus Contingent Resources evaluated by RPS for the Tendrara TE-5 horst.

Discovered in-place volumes and contingent resources 

Segment name Discovered Gas Originally In Place (Bcf) Contingent Resources (Bcf)¹
Gross (100%) basis Gross (100%) basis
Low Mid High 1C 2C 3C
TE-5 Horst

(TAGI 1 and 2)
349 651 873 197 377 533

¹ Contingent Resources are technical volumes i.e.no economic limit test applied

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

For further information please contact:

Vigo Communications - PR Adviser

Patrick d'Ancona Chris McMahon Alexandra Roper

Tel: +44 (0)20 7830 9700

Sound Energy

James Parsons, Chief Executive Officer

[email protected]

Smith & Williamson - Nominated Adviser

Azhic Basirov David Jones Ben Jeynes

Tel: +44 (0)20 7131 4000

RBC Capital Markets - Broker

Matthew Coakes Martin Copeland Laura White

Tel: +44 (0)20 7653 4000

The information contained in this announcement has been reviewed by Sound Energy's Exploration Director, Brian Mitchener, a chartered petroleum geologist.  Bcf means billion standard cubic feet of gas; Tcf means trillion cubic feet of gas; and best case, high case and low case estimates are consistent with SPE (The Society of Petroleum Engineers) PRMS guidelines.

RPS Group PLC (http://www.rpsgroup.com/) are a global consultancy providing a range of services, including geological, geophysical and petroleum engineering services to the oil and gas industry. The inplace and contingent resource estimates within this note have been provided by RPS Group PLC.

Resources are all quantities of petroleum (recoverable and unrecoverable) naturally occurring on or within the Earth's crust, discovered and undiscovered, plus those quantities already produced. Contingent resources are those quantities of petroleum estimated, as at a given date, to be potentially recoverable from known accumulations but where the applicable project(s) are not yet considered mature enough for commercial development due to one or more contingencies.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCQBLBLDLFXFBZ

Talk to a Data Expert

Have a question? We'll get back to you promptly.