Investor Presentation • Jul 7, 2021
Investor Presentation
Open in ViewerOpens in native device viewer
1
July 2021




Source: (1) Global Energy & CO2 Status Report 2019, IEA

Source: Company information



Source: Bloomberg New Energy Finance; Hawkins Wright, Black Pellet Market Outlook 2020; United States Department of Agriculture; Renewable Energy Institute, Japan; FutureMetrics, Japan Biomass Outlook, Fortum; Carbon Brief; S&P Global Market Intelligence


Source: Company information Note: 2) FSC = Forest Stewardship Council, PEFC = Programme for the Endorsement of Forest Certification, SBP = Sustainable Biomass Program Sequestration…


Source: Factset as of 10.05.2021; Bank of England; BP
Note: 1) Coal (API4) price per 21 April 2021, assumed calorific value of 25GJ/t, 2.9kg CO2 per kg coal and assumed coal plant efficiency of 45%; 2) ETS price per 21 April 2021 and assumed coal plant efficiency of 45%; 3) Expected production cost of ArbaCore for ArbaTwo

| ArbaCore advantages over white pellets for coal replacement | ArbaCore has been successfully verified in 14 coal power plants | |||
|---|---|---|---|---|
| Coal-fired power plants can switch to ArbaCore with minimal CAPEX compared to white pellets |
||||
| Water resistant – can be stored outdoors |
||||
| 40% lower volume for same energy content → lower logistics costs |
||||
| Safer handling | ||||
| Outstanding mechanical properties → lower particle size distribution |
||||
| Lower handling, storage and transport cost → can be handled similar to coal |
ArbaCore | can be stored outside, and coal firing power producers can utilize existing equipment |

Les Marshall, Senior Technical Officer, Ontario Power


9


10
Reduce suppliers and prefabricate modules assembled on site will reduce cost & lead time



Liquid markets that can easily absorb Arbaflame's production in the foreseeable future
Source: Grand View Reasearch; Maya Research Analysis 2020; Global Markets Insights; Research and Markets; Allied market research


Source: Company Information Note: Including 50,000 hours

Strong fundamental market drivers
Significant current demand for ArbaCore; existing coal-fueled power producers in Europe need to convert or to shut down(1)
Superior product with high ESG impact
ArbaCore has superior qualities and economics compared to available alternatives
Displacing coal with ArbaCore reduces CO2 emissions with >90%1
First full-scale project in operation 2021
Construction of ArbaOne completed in H1'2021 following 10 years of R&D and testing.
Capacity of 70,000 t ArbaCore and target volume of 2.825 t of bio-chemicals
Attractive project economics with high scalability
Standardized modular design driving down cost and ensuring scalability.
Several new projects in the pipeline
Proprietary process yielding high-quality bio-chemicals
ArbaRaf is a proprietary production process following ArbaCore with significant positive environmental impact and higher earnings capacity

Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.