AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

MPC Energy Solutions N.V.

Environmental & Social Information Dec 14, 2021

8188_rns_2021-12-14_d53c8c4c-85c3-49cd-a564-dfce3e12b13a.html

Environmental & Social Information

Open in Viewer

Opens in native device viewer

MPC Energy Solutions and Leclanché form strategic collaboration for utility-scale energy storage solutions

MPC Energy Solutions and Leclanché form strategic collaboration for utility-scale energy storage solutions

· The partnership starts with MPCES's participation in Leclanché' Green Power

Plant in St. Kitts and Nevis in the Caribbean, a landmark solar PV and battery

energy storage project

· The Green Power Plant will provide one third of St. Kitts' baseload needs

and reduce carbon emissions by more than 740,000 metric tonnes over its lifespan

· The project is the Caribbean´s largest combined solar power and battery

storage system and will integrate 35.7 MWp solar photovoltaic with 45MWh of

battery energy storage system to deliver 18.2 MW baseload green power to St.

Kitts

YVERDON-LES-BAINS, Switzerland; AMSTERDAM; OSLO, Norway - 14[th] December 2021 -

MPC Energy Solutions (http://www.mpc-energysolutions.com) (MPCES) has partnered

with Leclanché (https://www.leclanche.com) one of the world's leading energy

storage companies, publicly listed in Switzerland (SIX: LECN), to build the

previously announced 35.7 MWp solar photovoltaic (PV) and 18.2 MW battery energy

storage system (BESS) project designed with Leclanché Energy Management Software

(L-EMS) in St. Kitts' Basseterre Valley, next to the capital city of Basseterre.

The project requires about US$ 74 million of investment and MPCES has acquired

40% ownership in the project's holding company, in which Leclanché owns 60%.

MPCES will invest up to US$ 17million.

"At COP26 in Glasgow, St. Kitts and Nevis presented a remarkable plan to reduce

CO\2\ emissions by 61 percent by switching to 100 percent renewable energy. We

in MPC Energy Solutions are happy and proud to be part of this important

initiative through the development of this significant PV and battery project

near the country's capital. The project will cover one-third of St. Kitts

baseload needs for the next 20-25 years while reducing the carbon dioxide

emissions by more than 740,000 metric tonnes." said Martin Vogt, CEO at MPC

Energy Solutions.

"With our ongoing mission to help the region's transition to cleaner energies,

we seek to create strong partnerships that will reinforce our position as a

leader in the energy market of Latin America and the Caribbean. Its strong

technological expertise makes Leclanché a valuable partner that will undoubtedly

help us do just that. This landmark project marks our entry into utility-scale

hybrid projects that combine energy generation and storage. St Kitts and Nevis

is one of several other countries within the Caribbean region that are committed

to diversifying its generation base away from diesel-fueled thermal power, and

promoting smarter, greener and more resilient approaches that improve energy

generation," addedMartin Vogt.

Leclanché has a long and successful track record of concepting and building

innovative utility-scale installations including several projects with S4 Energy

in The Netherlands; the Cremzow, Germany system in collaboration with Enel Green

Power Germany and ENERTRAG; SWB, Germany; Marengo, Chicago, United States and

several Canadian projects.

The St. Kitts project, which is being built under an engineering, procurement

and construction (EPC) contract by Leclanché, has a 20-year USD-denominated

Power Purchase Agreement (PPA) with the St. Kitts Electric Company (SKELEC), the

only energy utility company on the island. The government of St. Kitts and Nevis

leased the land in the Basseterre Valley to Leclanché under a 20-year agreement

with the option of a five-year renewal. Groundbreaking of the project took place

in December 2020.

Anil Srivastava, CEO at Leclanché, said: "We are excited to partner with MPC

Energy Solutions for this landmark project in the Caribbean. This solar PV and

BESS project demonstrates the ability of renewable energies to provide baseload

power and competitively replace greenhouse gas emitting diesel-fuel power. The

project will create material savings for SKELEC with a strong positive impact on

the environment, CO\2\ emissions and the local communities.

We thank the government of St. Kitts and Nevis and SKELEC for their trust.

Leveraging the vast experience of our partner MPCES and teamwork with SKELEC, we

shall accelerate the construction and commissioning of this industry reference

project - the Caribbean regions' largest green power plant."

The St. Kitts project has been communicated as part of MPCES's advanced project

backlog.

"This represents another step forward for MPC Energy Solutions in becoming a

leading independent power producer in Latin America and the Caribbean. This is a

region with tremendous potential for renewable energy, and I am particularly

happy to announce this first project utilizing hybrid technology. This will

undoubtedly be a reference case for us and other renewable energy developers,"

Martin Vogt said.

About MPC Energy Solutions

MPC Energy Solutions ("MPCES") is a global provider of sustainable energy and

primarily focuses on low-carbon energy infrastructure, including solar and wind

assets, and other hybrid and energy efficiency solutions. The Company

participates in the full project lifecycle of renewable solutions, from early

-stage development through construction and operation. More details at www.mpc

-energysolutions.com

About Leclanché

Headquartered in Switzerland, Leclanché SA is a leading provider of high-quality

energy storage solutions designed to accelerate our progress towards a clean

energy future. Leclanché's history and heritage is rooted in over 100 years of

battery and energy storage innovation and the Company is a trusted provider of

energy storage solutions globally. This coupled with the Company's culture of

German engineering and Swiss precision and quality, continues to make Leclanché

the partner of choice for both disruptors, established companies and governments

who are pioneering positive changes in how energy is produced, distributed and

consumed around the world. The energy transition is being driven primarily by

changes in the management of our electricity networks and the electrification of

transport, and these two end markets form the backbone of our strategy and

business model. Leclanché is at the heart of the convergence of the

electrification of transport and the changes in the distribution network.

Leclanché is the only listed pure play energy storage company in the world,

organised along three business units: stationary storage solutions, e-Transport

solutions and specialty batteries systems. Leclanché is listed on the Swiss

Stock Exchange (SIX: LECN). For more information, please visit

www.leclanche.com.

SIX Swiss Exchange: ticker symbol LECN | ISIN CH 011 030 311 9

Disclaimer

This press release contains certain forward-looking statements relating to

Leclanché's business, which can be identified by terminology such as

"strategic", "proposes", "to introduce", "will", "planned", "expected",

"commitment", "expects", "set", "preparing", "plans", "estimates", "aims",

"would", "potential", "awaiting", "estimated", "proposal", or similar

expressions, or by expressed or implied discussions regarding the ramp up of

Leclanché's production capacity, potential applications for existing products,

or regarding potential future revenues from any such products, or potential

future sales or earnings of Leclanché or any of its business units. You should

not place undue reliance on these statements. Such forward-looking statements

reflect the current views of Leclanché regarding future events, and involve

known and unknown risks, uncertainties and other factors that may cause actual

results to be materially different from any future results, performance or

achievements expressed or implied by such statements. There can be no guarantee

that Leclanché's products will achieve any particular revenue levels. Nor can

there be any guarantee that Leclanché, or any of the business units, will

achieve any particular financial results.

Media contacts MPC Energy Solutions

MPC Energy Solutions N.V.

Investor Relations & Public Relations

Email: [email protected]

Norway

Jo Christian Lund-Steigedal

Corporate Communications AS

Phone: +47 415 08733

Email:  ( [email protected])[email protected] ( [email protected])

Americas

Perry Goldman

Montieth & Company

Phone: +1 (646) 8643568

Email: [email protected]

United Kingdom

Charles Font

Montieth & Company

Phone: +44 020 38575478

Email: [email protected]

Contacts Leclanché

Media Switzerland /Europe:Thierry MeyerT: +41 Media North America:Henry

(0) 79 785 35 81E-mail: [email protected] Feintuch / Ashley BlasT: +1-646

-753-5710 / +1-646-753-5713E

-mail:

[email protected]

Media Germany:Christoph MillerT: +49 Investor Contacts:Anil Srivastava /

(0) 711 947 670E-mail: Hubert AngleysT: +41 (0) 24 424 65

[email protected] 00E-mail:

[email protected]

Talk to a Data Expert

Have a question? We'll get back to you promptly.