Quarterly Report • May 24, 2024
Quarterly Report
Open in ViewerOpens in native device viewer
Interim condensed consolidated financial statements for the period ended 31 March 2024
| Highlights | 3 |
|---|---|
| Key figures | 3 |
| Interim report | 4 |
| Strategic review and outlook | 4 |
| Solar PV power plant operations and revenues | 4 |
| Litigation activity review | 4 |
| Subsequent events | 6 |
| Financial review | 7 |
| Balance sheet | 7 |
| Going concern | 7 |
| Financial statements | 9 |
|---|---|
| Consolidated statement of comprehensive income | 10 |
| Consolidated statement of financial position | 11 |
| Consolidated cash flow statement | 12 |
| Consolidated statement of changes in equity | 13 |
| Notes to the interim consolidated financial statements | 14 |
| Note 01 Basis for preparation |
14 |
| Note 02 Significant accounting judgements |
14 |
| Note 03 Currency exposure |
15 |
| Note 04 Transactions with related parties |
15 |
| Note 05 Segment information |
16 |
| Note 06 Financial income and expenses |
16 |
| Note 07 Cash and cash equivalents |
16 |
| Note 08 Accounts receivables |
17 |
| Note 09 Property, plant and equipment |
17 |
| Note 10 Short- and long-term debt |
18 |
| Note 11 List of subsidiaries |
19 |
| Note 12 Operational costs break-down Q1 2024 |
20 |
| Note 13 Subsequent events |
20 |
CONTENTS · HIGHLIGHTS · INTERIM REPORT · FINANCIAL STATEMENTS
EAM Solar Q1 report 2024 2
| EUR 000' | Unaudited Q1 2024 |
Unaudited Q1 2023 |
Audited 2023 |
Audited 2022 |
|---|---|---|---|---|
| Revenues | 210 | 209 | 993 | 1 221 |
| Cost of operations | (58) | (53) | (237) | (814) |
| Sales, general and administration expenses | (114) | (347) | (743) | (950) |
| Legal costs | (42) | (125) | (983) | (1 387) |
| EBITDA | (3) | (315) | (971) | (1 929) |
| Depreciation, amortizations and write downs | (141) | (141) | (564) | (564) |
| EBIT | (144) | (457) | (1 535) |
(2 493) |
| Net financial items | 420 | 969 | 584 | 428 |
| Profit before tax | 276 | 512 | (951) | (2 065) |
| Income tax gain/(expense ) | (13) | - | (260) | (141) |
| Net income | 263 | 512 | (1 211) |
(2 206) |
| Earnings per share (fully diluted): | 0.04 | 0.07 | (0.18) | (0.32) |
| Distribution to shareholders per share | - | - | - | - |
| Dividend yield | - | - | - | - |
| Million no. of shares (fully diluted) | 6.85 | 6.85 | 6.85 | 6.85 |
| EBITDA adjusted | 39 | (191) | 12 | (542) |
EAM Solar ASA ("EAM", "EAM ASA", or "the Company") is a company listed on the Oslo Stock Exchange under the ticker "EAM". The Company's primary business is to own solar power plants and sell electricity under longterm fixed price sales contracts, and to pursue legal proceedings to restore company values. The Company owns four power plants in Italy, which are in the Puglia and Basilicata regions in Southern Italy. Energeia AS manages EAM under a long-term management agreement.
This interim report should be read in combination with the Annual Report 2023, and stock exchange notices in the reporting period.
The narrative on various legal proceedings have been reduced compared to previous interim reports.
The company is in its tenth year of litigation activity following the P31 fraud. Consequently, the company have lost out on opportunities within its initial core business activity in renewable energy.
Criminal complaints have been lodged in relevant jurisdictions against the involved parties in the P31 fraud against EAM Solar ASA. However, as of today, no police authority in these jurisdictions have conducted any investigation of the fraud.
At current, the only ongoing criminal proceeding related to the fraud is the criminal proceedings in the Court of Milan. The criminal proceedings have recommenced in the Criminal Court of Appeal of Milan November 2023 following the Italian Supreme Courts annulment of the previous appeal court decision of 2021.
The final hearing was held 16 May 2024 and a decision is expected on or before 13 June 2024.
Apart from the dividend distributed to the company's shareholders in October 2022 of 1 share in Energeia AS for each share in EAM Solar ASA, the Company does not foresee any business development activities beyond the litigation activities and operations of its four power plants in Italy until the litigation activities are finally resolved.
EAM ASA owned 4 power plants in the quarter. The 4 power plants have a combined installed capacity of 4.0 MW with an average annual power production of 5.4 GWh (P50 production).
Power production in the quarter was 956 MWh, 11.6 per cent below estimated production due to lower capacity of the power plants caused by thefts. 1st quarter power production represents approximately 12 per cent of full year budget production.
FIT revenues in the quarter were EUR 131 thousand. Market price revenues in the quarter were EUR 78 thousand representing an average market price of EUR 82 per MWh.
The P31 Acquisition fraud transformed EAM from an operational Solar PV YieldCo to a company where most activity and value depends on the outcome of various litigation processes. The following is a short status of ongoing litigation activities.
In January 2015 the prosecutor's Office of Milan filed a request for trial to the Criminal Court of Milan against 9 individuals for fraud against the State of Italy in conjunction with subsidized electricity sales contracts.
The criminal proceedings commenced in June 2016, and in April 2019 the Criminal Court of Milan published its decision, where the indicted Aveleos directors, Mr Giorgi, and Mr Akhmerov, was found guilty of criminal contractual fraud against EAM Solar ASA in conjunction with the sale of the P31 portfolio and sentenced them to prison terms and provisional damages of EUR 5 million. Aveleos S.A., as civil liable party, was condemned to be financially responsible for the same provisional damage.
The 2019 ruling by the Criminal Court of Milan was appealed by several parties, and the appeal procedure in the Criminal Court of Appeal of Milan commenced with one hearing in October 2020 and two hearings in December 2020, and on 20 January 2021, the Criminal Appeal Court of Milan revoked the first instance judgement of the Criminal Court of Milan.
EAM Solar ASA joined with the Prosecutor's Office in Milan in appealing the Criminal Appeal Court of Milan decision to the Italian Supreme Court of Cassation in 2021.
On 7 October 2021 the Supreme Court of Italy decided to annul the acquittal decision of by the Criminal Appeal Court of Milan in its entirety.
The Supreme Court issued its full grounds for the annulment decision of the acquittal ruling in November 2021. The Supreme Court found that the Criminal Appeal Court of Milan did not fulfil its obligation to conduct a correct and comprehensive review of the factual evidence in the criminal case, resulting in an erroneous evaluation of the evidence with the effect that the acquittal decision was based on inconsistent and illogical arguments.
The Supreme Court sent the criminal proceedings back to a different chamber of the Criminal Appeal Court of Milan for new appeal proceedings to be conducted, with the requirement that the new court proceedings must be based on a complete review of the evidence, making correct application of the principles of law and the rules of logic as formulated in the Supreme Court decision.
On the fraud of EAM, the Supreme Court concluded that the evidenced withholding of essential information during the contractual negotiations constitutes a contractual fraud.
In July 2023, Section V of the Court of Appeal in Milan notified the parties that the appeal proceedings would continue and the first hearing took place on 30 November 2023. A final hearing was conducted 16 May 2024. The Court of Appeal has stated its intention to render its judgement in the case on 13 June 2024.
Following the final legal ruling by the Administrative Court of Lazio (TAR) in June 2016 that the 17 terminated FIT contracts were invalid, the Company summoned Aveleos S.A. to the Milan Chamber of Arbitration requesting the Share Purchase Agreement between the parties to be declared null and void based on fundamental breach of contract.
On 2 April 2019 a final award was made by the Arbitral Tribunal of the Milan Chamber of Arbitration. The Arbitration decision was not unanimous, with one of three arbitrators dissenting to dismissing the claims brought by EAM Solar ASA. The dissenting opinion was published together as an integrated part of the of the arbitration ruling.
On 4 July 2019 EAM Solar ASA filed an appeal against the Arbitration Tribunal decision in the civil Court of Appeal of Milan asking the court to annul the arbitration award of 2 April 2019 based on 12 different accounts of breach of Italian law in its conclusions and the basis for the arbitration award. On 23 June 2021 the Civil Court of Appeal of Milan decided to dismiss the request for the annulment of the Arbitration award. However, The Arbitration decision of 2019 is not yet final since EAM decided to appeal the dismissal by the Civil Appeal Court in Milan to the Supreme Court in Italy within the deadline on 22 September 2021.
On 5 October 2020, the Arbitration Chamber of Milan notified EAM Solar ASA and its subsidiary EAM Solar Italy Holding Srl that Aveleos SA had filed for two new arbitration proceedings in relation to the P31 SPA with reference to shareholder loans and corporate guarantees. The two proceedings have later been merged into one proceeding.
The Milan Chamber of Arbitration's final decision in the arbitration between EAM Solar ASA and Aveleos SA was received 29 February 2024. The arbitration court conclusion was a net amount in favour of EAM of between EUR 2 616 810 and EUR 2 939 814 after interest is applied.
A range is stated above due to a possible clerical error made in the Final Award. Aveleos has requested the Arbitration Chamber to correct the error and revise the stated interests. Aveleos has further challenged the application of other interest rates. The Tribunal resolved the issue by ruling dated 16 May 2024 determining the new amount in favour of EAM to be EUR 2 729 796 after interest as of 22 May 2024.
Further, Aveleos has until 18 June 2024 to submit an appeal of the Final Award.
In November 2018 EAM Solar ASA was served with a notice that UBI Leasing had requested the Court of Brescia for an injunction of EUR 6 million on EAM assets. The court of Brescia granted a preliminary non-enforceable injunction. EAM challenged the injunction. Court hearings in this matter has been ongoing since 2019 until this day.
EAM has requested UBI to provide both witnesses and documentation of the bank's handling of the leasing financing activities of the Solar PV power plants in 2010 and 2011 in the proceedings. On 10 November 2022 the Judge decided that UBI must submit certain documents on EAM's request. A hearing was conducted on 30 March 2023 where UBI submitted more documents.
The final hearing in this matter was heard on 4 March 2024. A decision is expected in May or June 2024.
No provisions are made in the accounts on this matter.
EAM Solar ASA filed a civil lawsuit in Luxembourg in July 2019 against the Aveleos shareholder, Enovos, along with the four Enovosemployed directors of Aveleos. This civil claim is subordinate to the original criminal complaint with civil action filed in 2016.
In September 2019, the Company received notice from GSE that they had suspended payments of electricity delivered under the feed-intariff contracts for ENFO 25. The Company appealed the order before the Administrative Court "TAR" in Lazio (Rome). Subsequent hearings in this matter have been conducted in TAR since in 2019.
In July 2021 TAR decided in a court ruling that the termination decision made by GSE on the FIT contract for ENFO25 in September 2019 is invalid and consequently cancelled.
GSE has not paid the FIT tariff for the electricity delivered by ENFO 25 since July 2019, and currently owe approximately EUR 1 060 thousand in unpaid electricity bills to ENFO 25. The Administrative Court also ordered GSE to cover the legal costs of EAM Solar ASA. How and when GSE will restore their contractual obligations is not yet determined.
Management evaluated the situation of ENFO 25 and its net receivable position against GSE in conjunction with the full year accounts 2022, concluding that it is more likely than not, that the net receivable against GSE will not be collected. Based on this conclusion the trade receivable against GSE and the corresponding provision of payable was written down and the net amount recognised as an operating cost, write down of trade receivables amounting to EUR 569 thousand at year-end 2022.
Revenues recognition and reporting of revenues for 2022 remained unchanged, however from 1 January 2023 the Company has not recognised Feed-In-Tariff revenues for ENFO 25.
In the first quarter 2024 EAM has instructed its lawyers to find a solution to this matter with GSE. The outcome of this effort remains to be seen.
In a ruling communicated in March 2017 the court decided that the Luxembourg civil proceedings regarding the standstill agreement shall be put to a halt until the award before the Arbitration Court of Milan is finalized.
In October 2022 the matter was brought for a renewal. The Judge reconfirmed stay of any proceedings.
On 25 April 2023, Aveleos requested permission from the Court to appeal the 2022 stay of the standstill proceedings. Aveleos alleged that its human rights had been violated by the court's decision to stay proceedings. On 2 May 2023, the Court heard arguments and on 5 May 2023 decided to reject Aveleos' appeal on the merits. Consequently, the 2022 decision remains in effect.
The Group is to a little extent affected by increased interest rates impact through the external leasing debt.
The war in Ukraine and the sanctions against Russia has had no direct impact on the Company's operations.
On 21 May Energeia AS issued a notice of termination of the management agreement of EAM Solar ASA. The termination period is 12 months. During this period Energeia AS will conduct the management tasks as defined by the prevailing management agreement and assist the Board of EAM Solar ASA in the establishment of a self-sufficient organisation.
In the extraordinary general meeting on 10 May 2024, Pål Hvammen and Elisabeth Dragseth was elected new members of the board of directors. They are elected as interim board members until the ordinary general meeting to be held 27 June 2024.
Revenues in the quarter were EUR 210 thousand, of which FIT revenues were EUR 131 thousand, EUR 78 thousand were from market sales of electricity and EUR 0.99 thousand were other revenues.
Management has evaluated the situation of ENFO 25 and its net receivable position against GSE at year end 2022, concluding that it is more likely than not, that the net receivable against GSE will not be collected. Based on this conclusion the trade receivable against GSE and the corresponding provision of payable was written down and the net amount recognised as an operating cost, write down of trade receivables amounting to EUR 569 thousand at year-end 2022. Revenues recognition and reporting of revenues for 2022 remained unchanged, however from 1 January 2023 the Company has not recognised Feed-In-Tariff revenues for ENFO 25.
Cost of operations in the quarter was EUR 58 thousand.
SG&A costs in the quarter were EUR 114 thousand.
In the quarter legal costs stemming from the P31 Acquisition were EUR 42.
EBITDA in the quarter was minus EUR 3 thousand, representing an EBITDA margin of minus 1.43 per cent.
Depreciation and amortization in the quarter were EUR 141 thousand, resulting in an operating profit of minus EUR 144 thousand.
Net financial items in the quarter were positive with EUR 420 thousand.
Pre-tax profit in the quarter was positive with EUR 276 thousand. Taxes in the quarter were 13 thousand. Reported net income in the quarter was EUR 263 thousand.
Cash flow from operations in the reporting period was positive with EUR 314 thousand. Investment activities were zero in the period and financing activities were negative with EUR 449 thousand in the period.
Restricted and unrestricted cash at the end of the quarter was EUR 257 thousand, of which EUR 176 thousand is restricted and EUR 62 thousand remains seized by the Prosecutors Office in Milan in companies not included in the criminal proceedings.
On a group level total assets at the end of the quarter were EUR 8.1 million with book equity of EUR 1.6 million representing an equity ratio of 19.4 per cent.
The Company's registered share capital at the end of the quarter was NOK 68 522 100 divided into 6 852 210 shares, each with a nominal value of NOK 10.
The first quarter 2024 report are prepared under the assumption of going concern.
However, although the Group's asset base and operating revenues covers ordinary operations, administration and service of operating assets debt obligations, the Group's liquidity is strained due to the significant legal costs relating to the litigation activities.
In the final award of 29 February 2024 in the Milan arbitration, EAM Solar ASA was awarded an estimated net compensation payable by Aveleos SA of EUR 2 729 796 after interest is applied as of 22 May 2024. However, the Company does not foresee to receive such amounts without further legal procedures in conjunction with international collection procedures.
The final award in the arbitration does, however, open for the possibility of releasing pledges relating to Aveleos on the SPV ENS1, thus enabling EAM Solar ASA to sell the four remaining power plants in Italy. Such sale will release a significant amount of liquidity for the Company. However, such sale may take between 9 and 18 months to conclude.
A final factor with regards to the assessment of going concern is the outcome of the ongoing criminal proceedings in Milan, scheduled for a decision on 13 June 2024. A court decision upholding the original
court decision of 2019 will secure going concern, an unfavourable decision for EAM Solar ASA may challenge the going concern assumption.
These circumstances imply that there will be a need for additional capital infusion. If this is not attainable, there will be a material uncertainty regarding the group's ability to continue as a going concern.
Pål Hvammen Non-executive director
Elisabeth Dragseth Non-executive director
Viktor Erik Jakobsen Chair
Oslo, 24 May 2024
Christian Hagemann CEO

| EUR | Note | Unaudited Q1 2024 |
Unaudited Q1 2023 |
Audited 2023 |
Audited 2022 |
|---|---|---|---|---|---|
| Revenues | 5, 12 | 210 470 |
208 760 |
992 716 |
1 221 073 |
| Cost of operations | 12 | (57 966) |
(52 515) |
(237 408) |
(813 734) |
| Sales, general and administration expenses | 12 | (113 766) |
(347 130) |
(743 296) |
(949 613) |
| Legal costs | 12 | (42 110) |
(124 568) |
(982 772) |
(1 386 837) |
| EBITDA | 5 | (3 373) |
(315 452) |
(970 760) |
(1 929 111) |
| Depreciation, amortizations and write downs | 9 | (141 071) |
(141 479) |
(564 108) |
(563 575) |
| EBIT | 5 | (144 443) |
(456 932) |
(1 534 869) |
(2 492 686) |
| Finance income | 6 | 489 703 |
1 025 692 |
1 404 806 |
1 192 570 |
| Finance costs | 6 | (69 428) |
(56 857) |
(820 867) |
(764 986) |
| Profit before tax | 275 832 |
511 903 |
(950 929) |
(2 065 101) |
|
| Income tax gain/(expense) | (13 298) |
(383) | (260 378) |
(140 582) |
|
| Profit after tax | 262 534 |
511 519 |
(1 211 308) |
(2 205 683) |
| EUR Note Q1 2024 Q1 2023 2023 Other comprehensive income Translation differences (1 052 683) (896 286) (686 (444 230) Other comprehensive income net of tax (444 230) (1 052 683) (896 286) (686 Total comprehensive income (541 164) (2 107 594) (2 891 (181 696) Profit for the year attributable to: Equity holders of the parent company 511 519 (1 211 308) (2 205 262 534 Equity holders of the parent company 511 519 (1 211 308) (2 205 262 534 Total comprehensive income attributable to: Equity holders of the parent company (541 164) (2 107 594) (2 891 (181 696) Equity holders of the parent company (541 164) (2 107 594) (2 891 (181 696) |
Audited |
|---|---|
| 2022 | |
| 065) | |
| 065) | |
| 748) | |
| 683) | |
| 683) | |
| 748) | |
| 748) | |
| Earnings per share: | |
| Continued operation | |
| - Basic 0.04 0.07 (0.18) |
(0.32) |
| - Diluted 0.04 0.07 (0.18) |
(0.32) |

| Unaudited | Audited | Audited | ||
|---|---|---|---|---|
| EUR | Note | 3M 2024 | 2023 | 2022 |
| ASSETS | ||||
| Property, plant and equipment | 9 | 5 288 974 |
5 429 870 |
5 987 981 |
| Intangible assets | 8 226 |
8 401 |
9 101 |
|
| Other long term assets | 187 547 |
200 290 |
324 297 |
|
| Deferred tax assets | 40 002 |
40 002 |
64 018 |
|
| Non-current assets | 5 524 749 |
5 678 563 |
6 385 396 |
|
| Current assets | ||||
| Trade and other receivables | 8 | 1 701 976 |
1 733 201 |
2 174 744 |
| Other current assets | 657 417 |
649 876 |
634 662 |
|
| Cash and cash equivalents | 7 | 257 047 |
391 720 |
1 464 397 |
| Current assets | 2 616 440 |
2 774 798 |
4 273 803 |
|
| TOTAL ASSETS | 8 141 189 |
8 453 361 |
10 659 199 |
| EUR | Note | Unaudited 3M 2024 |
Audited 2023 |
Audited 2022 |
Oslo, 24 May 2024 |
|---|---|---|---|---|---|
| EQUITY AND LIABILITIES | |||||
| Equity | |||||
| Paid in capital | Pål Hvammen Non-executive director |
||||
| Issued capital | 8 126 110 |
8 126 110 |
8 126 110 |
||
| Share premium | 27 603 876 |
27 603 876 |
27 603 876 |
||
| Paid in capital | 35 729 986 |
35 729 986 |
35 729 986 |
||
| Elisabeth Dragseth | |||||
| Other equity | Non-executive director | ||||
| Translation differences | (9 155 411) |
(8 711 181) |
(7 814 895) |
||
| Other equity | (24 997 866) |
(25 260 400) |
(24 049 092) |
||
| Other equity | (34 153 277) |
(33 971 581) |
(31 863 987) |
||
| Total equity | 1 576 709 |
1 758 405 |
3 865 999 |
Viktor Erik Jakobsen Chair |
|
| Non-current liabilities | |||||
| Leasing | 2 751 176 |
2 886 601 |
3 340 536 |
||
| Deferred tax liabilities | 937 504 |
974 368 |
804 250 |
Christian Hagemann | |
| Other non current liabilities | 343 887 |
343 887 |
343 887 |
CEO | |
| Total non-current liabilities | 10 | 4 032 567 |
4 204 856 |
4 488 674 |
|
| Current liabilities | |||||
| Leasing | 477 842 |
453 731 |
430 836 |
||
| Trade and other payables | 2 046 374 |
2 035 127 |
1 873 690 |
||
| Tax payables | 7 696 |
1 242 |
|||
| Total current liabilities | 10 | 2 531 912 |
2 490 100 |
2 304 526 |
|
| Total liabilities | 6 564 479 |
6 694 956 |
6 793 200 |
||
| TOTAL EQUITY AND LIABILITIES | 8 141 189 |
8 453 361 |
10 659 199 |
||
| EUR | Note | 3M 2024 | 2023 |
|---|---|---|---|
| Cash flow from operations | |||
| Profit before income taxes | 275 832 |
(950 930) |
|
| Depreciation | 9 | 141 070 |
564 109 |
| Change in trade debtors | 8 | 24 992 |
86 181 |
| Change in trade creditors | 10 | 22 198 |
517 169 |
| Effect of exchange fluctuations | (478 220) |
(961 289) |
|
| Change in other provisions | 328 104 |
257 583 |
|
| Net cash flow from operations | 313 976 |
(487 178) |
| Note | 3M 2024 | 2023 |
|---|---|---|
| 9 | - | (5 300) |
| - | 185 000 |
|
| - | 179 700 |
|
| (431 041) |
||
| (337 339) |
(334 158) |
|
| (448 652) |
(765 199) |
|
| (134 676) |
(1 072 677) |
|
| 391 720 |
1 464 397 |
|
| 7 | 257 044 |
391 720 |
| (111 313) |
| EUR | Share capital | Share premium fund | Other equity | Currency translation reserve | Total equity |
|---|---|---|---|---|---|
| Equity as at 1 January 2023 | 8 126 110 |
27 603 876 |
(24 049 092) |
(7 814 895) |
3 865 999 |
| Profit (loss) After tax | (1 211 308) |
(1 211 308) |
|||
| Other comprehensive income | (896 286) |
(896 286) |
|||
| Equity as at 31 December 2023 | 8 126 110 |
27 603 876 |
(25 260 400) |
(8 711 181) |
1 758 405 |
| Equity as at 1 January 2024 | 8 126 110 |
27 603 876 |
(25 260 400) |
(8 711 181) |
1 758 405 |
| Profit (loss) After tax | 262 534 |
262 534 |
|||
| Other comprehensive income | (444 230) |
(444 230) |
|||
| Equity as at 31 March 2024 | 8 126 110 |
27 603 876 |
(24 997 866) |
(9 155 411) |
1 576 709 |
EAM is a public limited liability company, incorporated and domiciled in Norway, with registered office at Cort Adelers gate 33, 0254 Oslo, Norway. The Company was founded on 5 January 2011 and listed on the Oslo Stock Exchange under the ticker "EAM" in 2013.
The primary business activity of EAM is both to own solar photovoltaic power plants and sell electricity under long-term fixed price sales contracts, and to pursue legal proceedings to restore company values. EAM was structured to create a steady long-term dividend yield for its shareholders. Following the P31 Acquisition, the main value of EAM is dependent on the future outcome of litigation activities.
EAM currently owns 4 photovoltaic power plants and 2 subsidiaries in Italy. The Company has no employees.
Energeia AS manages the Company under a long-term management agreement. Energeia AS conducts the day-to-day operational tasks with own employees and using subcontractors.
These interim condensed consolidated financial statements for the quarter have been prepared in accordance with IAS 34 Interim Financial Reporting. The interim condensed consolidated financial statements do not include all the information and disclosures required in the annual financial statements. The quarterly report should therefore be read in conjunction with the Group's Annual Report 2023 that was published on 30 April 2024 and the stock exchange notices in the reporting period.
The accounting policies adopted in the preparation of the interim condensed consolidated financial statements are consistent with those followed in the preparation of the Group's annual financial statements for the year ended 31 December 2023.
The external leasing contracts has a floating interest rate.
Under normal circumstances the risk for losses is low, as the counterpart is the Italian state, but given the unpaid FIT amounts on ENFO 25, the management at year end 2022 decided to make a provision and write down the receivable against GSE, see note 2 and 8. The Group has not made any offsets or other derivative agreements to reduce the credit risk in EAM.
EAM Group's cash balance was EUR 257 thousand on 31 March 2024, of which EUR 176 thousand are restricted and EUR 62 thousand are seized by the Italian state.
One of the main risks of operations in Italy is related to regulatory risk. The contractual counterparty, the Government of Italy, has conducted unilateral and retroactive changes to the commercial electricity sales contracts to the detriment of the suppliers and they have also made changes to the operational regulatory regime governing power plants in Italy.
The Group is to a little extent affected by increased interest rates impact through the external leasing debt.
In the process of applying the Group's accounting policies according to IFRS, management has made several judgements and estimates. All estimates are assessed to the most probable outcome based on the management's best knowledge. Changes in key assumptions may have significant effect and may cause material adjustments to the carrying amounts of assets and liabilities, equity, and the profit for the period. The Company's most important accounting estimates are the following:
The Group has receivables against various parties including the Italian state and companies involved in the criminal proceedings in Milano. It is uncertainty regarding the willingness or ability for these parties to pay. To the extent the Company or its subsidiary is aware of any doubt in the likelihood of collecting such receivable a provision has been made. Significant judgement is required in estimating the soundness of such receivable.
In the case of ENFO 25 where the Company received a GSE order to suspend the incentives and relevant payments of feed-in-tariff, the Company previously decided to recognise revenue in full.
The Administrative Court of Lazio (TAR) has decided in a court ruling on 12 July 2021 that the termination decision made by GSE on the FIT contract for ENFO25 in September 2019 is invalid and consequently cancelled.
GSE has not paid the FIT tariff for the electricity delivered by ENFO 25 since July 2019, and currently owe approximately EUR 1 060 thousand in unpaid electricity bills to ENFO 25. The Administrative Court also ordered GSE to cover the legal costs of EAM Solar ASA.
Management has evaluated the situation of ENFO 25 and its net receivable position against GSE at year end 2022, concluding that it is more likely than not, that the net receivable against GSE will not be collected. Based on this conclusion the trade receivable against GSE and the corresponding provision of payable was written down and the net amount recognised as an operating cost, write down of trade receivables amounting to EUR 569 thousand at year-end 2022. Revenues recognition and reporting of revenues for 2022 remained unchanged, however from 1 January 2023 the Company has not recognised Feed-In-Tariff revenues for ENFO 25.
The first quarter 2024 report are prepared under the assumption of going concern.
However, although the Group's asset base and operating revenues covers ordinary operations, administration and service of operating assets debt obligations, the Group's liquidity is strained due to the significant legal costs relating to the litigation activities.
In the final award of 29 February 2024 in the Milan arbitration, EAM Solar ASA was awarded an estimated net compensation payable by Aveleos SA of EUR 2 729 796 after interest is applied as of 22 May 2024. However, the Company does not foresee to receive such amounts without further legal procedures in conjunction with international collection procedures.
The final award in the arbitration does, however, open for the possibility of releasing pledges relating to Aveleos on the SPV ENS1, thus enabling EAM Solar ASA to sell the four remaining power plants in Italy. Such sale will release a significant amount of liquidity for the Company. However, such sale may take between 9 and 18 months to conclude.
A final factor with regards to the assessment of going concern is the outcome of the ongoing criminal proceedings in Milan, scheduled for a decision on 13 June 2024. A court decision upholding the original court decision of 2019 will secure going concern, an unfavourable decision for EAM Solar ASA may challenge the going concern assumption.
These circumstances imply that there will be a need for additional capital infusion. If this is not attainable, there will be a material uncertainty regarding the group's ability to continue as a going concern.
The war in Ukraine and the sanctions against Russia has had no direct impact on the Company's operations.
Most of EAM 's economic activities (revenues and costs) are in EUR. Some of the cost base is in NOK. The functional currency for the parent company is NOK.
Energeia AS is the manager of EAM. Energeia AS in Norway and Italy employs most of the personnel conducting the administrative services for EAM, whereas the technical services are done by subcontractors. Energeia AS owns 9.5 per cent of the shares in EAM.
All the transactions have been carried out as part of the ordinary operations and at arms -length prices.
Energeia AS invoice all billable hours at a predetermined rate for each consultant working on the assignment. Out-of-pocket expenses is billed separately at cost. The hourly rate per consultant will be adjusted yearly in conjunction with the budget process and approval in EAM Solar ASA.
Energeia AS' direct costs for the management of EAM was EUR 39 thousand in the first quarter of 2024, of which EUR 30 thousand was related to SG&A, and EUR 9 thousand was related to legal and litigation work in conjunction with the P31 Acquisition fraud.
The Group owns and operates four solar PV power plants in Italy at the end of the reporting period. They are reported as one business segment. The business is investing in and operating power plants that have similar economic characteristics.
During the period ended 31 March 2024 approximately EUR 131 thousand of the Group's external revenue was derived from sales to the Italian state, represented by GSE for the Feed in Tariff contracts.
Approximately EUR 78 thousand of the Group's external revenue was derived from sales to an international commodities trading house for the market price contracts.
| EUR | Q1 2024 | Q1 2023 |
|---|---|---|
| Financial income | ||
| Interest income | 445 | 3 237 |
| Foreign exchange gain | 489 258 |
1 022 454 |
| Total financial income | 489 703 |
1 025 692 |
| Financial expenses | ||
| Interest expense | (66 873) |
(61 592) |
| Foreign exchange losses | (764) | 5 586 |
| Other financial expenses | (1 791) |
(852) |
| Total financial expenses | (69 428) |
(56 857) |
| Net financial income (expenses) | 420 275 |
968 834 |
The average exchange rate used for the reporting period is EUR/NOK 11.411, whereas the exchange rate used on 31 March 2024 is EUR/ NOK 11.683.
| EUR | Q1 2024 | 2023 |
|---|---|---|
| Cash Norway | 24 595 |
73 255 |
| Cash Italy | 232 452 |
318 465 |
| Cash and cash equivalents | 257 047 |
391 720 |
| Restricted cash Norway | - | 16 378 |
| Restricted cash Italy | 175 800 |
228 804 |
| Seized cash Italy | 61 616 |
61 616 |
The Company had no unused credit facilities at the end of the quarter
The restricted cash in Italy of EUR 176 thousand is the debt service reserve account of ENS Solar One Srl. The EUR 62 thousand of the seized cash is taken from companies not included in the criminal proceedings.
| EUR | Q1 2024 | 2023 |
|---|---|---|
| Deferred revenue towards GSE | 106 948 |
131 940 |
| Other receivables | 1 595 027 |
1 601 261 |
| Accounts receivables | 1 701 976 |
1 733 201 |
Management evaluated the situation of ENFO 25 and its net receivable position against GSE at year end 2022, concluding that it is more likely than not, that the net receivable against GSE will not be collected. Based on this conclusion the trade receivable against GSE and the corresponding provision of payable was written down and the net amount recognised as an operating cost, write down of trade receivables amounting to EUR 569 thousand at year-end 2022. Revenues recognition and reporting of revenues for 2022 remained unchanged, however from 1 January 2023 the Company has not recognised Feed-In-Tariff revenues for ENFO 25. Please see note 2 for further information.
| 2024 | ||||
|---|---|---|---|---|
| EUR | Solar power plants | Solar power plants under lease |
Leashold improvements |
Total |
| Carrying value 1 January 2024 | 1 244 269 |
3 929 529 |
256 072 |
5 429 871 |
| Additions | - | - | - | - |
| Depreciation | (28 577) |
(103 250) |
(9 069) |
(140 896) |
| Carrying value 31 March 2024 | 1 215 692 |
3 826 279 |
247 003 |
5 288 975 |
| Solar power plants | Leashold | |||
|---|---|---|---|---|
| EUR | Solar power plants | under lease | improvements | Total |
| Carrying value 1 January 2023 | 1 356 652 |
4 342 529 |
288 800 |
5 987 981 |
| Additions | 1 750 |
- | 3 550 |
5 300 |
| Depreciation | (114 133) |
(412 999) |
(36 277) |
(563 409) |
| Carrying value 31 December 2023 | 1 244 269 |
3 929 529 |
256 072 |
5 429 871 |
Economic life of 20- 25 years and straight-line depreciation.
The implementation of IFRS 16 relates to land rent and surface rights for ENS 1.
| EUR | Q1 2024 | 2023 |
|---|---|---|
| Deferred tax liabilities | 937 504 |
974 368 |
| Other non current liabilities | 343 887 |
343 887 |
| Obligations under finance leases | 2 751 176 |
2 886 601 |
| Total non-current liabilities | 4 032 567 |
4 204 856 |
| Trade payables | 1 166 833 |
1 144 635 |
| Payables to GSE | 610 405 |
610 405 |
| Other payables | 51 077 |
80 674 |
| Social security | 1 | 1 |
| Taxes other than income taxes | 6 677 |
6 677 |
| Accrued liabilities | 211 382 |
192 736 |
| Trade and other payables | 2 046 374 |
2 035 127 |
| Current leasing | 477 842 |
453 731 |
| Tax payable | 7 696 |
- |
| Related to ordinary operations | 2 531 912 |
2 490 100 |
| Total current liabilities | 2 531 912 |
2 490 100 |
| Total liabilities | 6 564 479 |
6 694 956 |
On 29 March 2022, Law no. 25 (Sostegni ter Decree) entered into force. The Decree was initially intended to apply from February 2022 to the end of the year, but it was later extended to 30 June 2023. Following the Decree, the achieved market price of electricity was limited to EUR 56 per MWh for the Company's power plants in the South of Italy for this period. Relevant provisions are made but not yet paid as the Company is awaiting final decision in the Italian judicial system on the lawfulness of the Decree.
In conjunction with the "P31 acquisition", EAM Solar Italy Holding Srl entered into a so-called patronage letter and an equity contribution agreement with UBI Leasing and UniCredit respectively. These agreements may under certain circumstances require EAM Solar Italy Holding Srl to inject additional equity into the debt financed SPVs to cover any shortfall or breach of the debt repayment obligations of the SPVs.
The FIT contracts of the SPVs have been terminated by GSE due to a fraud against the State of Italy.
In November 2018 EAM Solar ASA was served with a notice that UBI Leasing had requested the Court of Brescia for an injunction of EUR 6 million on EAM assets. The court of Brescia granted a preliminary non-enforceable injunction. EAM challenged the injunction. Court hearings in this matter has been ongoing since 2019 until this day.
EAM has requested UBI to provide both witnesses and documentation of the bank's handling of the leasing financing activities of the Solar PV power plants in 2010 and 2011 in the proceedings. On 10 November 2022 the Judge decided that UBI must submit certain documents on EAM's request. A hearing was conducted on 30 March 2023 where UBI submitted more documents.
The final hearing in this matter was heard on 4 March 2024. The Judgement is expected in May or June 2024.
No provisions are made in the accounts on this matter.
The 2019 ruling by the Criminal Court of Milan was appealed by several parties, and the appeal procedure in the Criminal Court of Appeal of
Milan commenced with one hearing in October 2020 and two hearings in December 2020, and on 20 January 2021, the Criminal Appeal Court of Milan decided to revoke the first instance judgement of the Criminal Court of Milan.
EAM Solar ASA decided to join with the Prosecutor's Office in Milan in appealing the Criminal Appeal Court of Milan decision to the Italian Supreme Court of Cassation in 2021.
On 7 October 2021 the Supreme Court of Italy decided to annul the acquittal decision of by the Criminal Appeal Court of Milan in its entirety.
In November 2021 the Supreme Court issued its full grounds for the annulment decision of the acquittal ruling. The Supreme Court found that the Criminal Appeal Court of Milan did not fulfil its obligation to conduct a correct and comprehensive review of the factual evidence in the criminal case, resulting in an erroneous evaluation of the evidence with the effect that the acquittal decision was based on obvious inconsistent and illogical arguments.
The Supreme Court sent the criminal proceedings back to a different chamber of the Criminal Appeal Court of Milan for new proceedings to be conducted, with the requirement that the new court proceedings must be based on a complete review of the evidence, making correct application of the principles of law and the rules of logic as formulated in the Supreme Court decision.
On the fraud of EAM, the Supreme Court concluded that the evidenced withholding of essential information during the contractual negotiations constitutes a contractual fraud.
In July 2023, Section V of the Court of Appeal in Milan notified the parties that the appeal proceedings would continue and the first hearing took place on 30 November 2023. A final hearing was conducted 16 May 2024. The Court
of Appeal has stated its intention to render its judgement in the case on 13 June 2024.
The Company estimates its claim to be more than EUR 300 million. The claim is a contingent asset that will not be recognised in the balance sheet.
Based on the Share Purchase Agreement and the addendums, the Company is entitled to a payment from Aveleos due to the overpayment for ENS4 and the post-closing adjustments including interest. This amount has been confirmed by EY in a separate audit on the issue which later has been updated and reconfirmed by RSM.
In addition, the company has recognised a loan of EUR 2.5 million given by Aveleos in 2014.
EAM Solar Italy Holding Srl was on 10 December 2020 notified that Aveleos had filed a petition, without EAM's knowledge, to the Civil Court in Milano claiming payment of shareholder loans in the amount of EUR 12 683 721 under the Sale and Purchase Agreement of the P31 transaction.
EAM Solar ASA and its subsidiary is of the opinion that such claim does not exist and have third party expert opinions supporting this fact. The fact is that Aveleos SA owes EAM Solar ASA money following the SPA due to the non-transfer of 10 power plants.
EAM Solar Italy Holding Srl contested the decision in January 2021 and enrolled the case to Court. A hearing was expected to take place in June 2021 but ended up being scheduled for 7 September 2021. In the meantime, Aveleos adhered to our objection that an arbitration was already pending on the same issue, and accordingly decided to drop the case. This will bring the proceedings to an end.
No provisions are made in the accounts on this matter.
The following subsidiaries are included in the interim consolidated financial statements.
| Shareholder | ||||||||
|---|---|---|---|---|---|---|---|---|
| Company | Country | Main operation | Ownership | Vote | EBITDA | EBIT | Equity | loans |
| EAM Solar Italy Holding Srl | Italy | Holding company | 100% | 100% | (29 825) |
(29 825) |
(2 033 814) |
12 870 700 |
| Ens Solar One Srl | Italy | Solar power plant | 100% | 100% | 116 494 |
4 000 |
(41 676) |
3 032 994 |
| Energia Fotovoltaica 25 Srl | Italy | Solar power plant | 100% | 100% | (5 429) |
(34 006) |
(481 082) |
1 829 744 |
| Other & | |||
|---|---|---|---|
| EUR | EAM Solar Group | ENS1 & ENFO25 | Eliminations |
| Revenues | 210 470 |
210 470 |
- |
| Cost of operations | (57 966) |
(54 770) |
(3 195) |
| Land rent | - | - | - |
| Insurance | (19 657) |
(9 945) |
(9 712) |
| Operation & Maintenance | (16 983) |
(16 983) |
- |
| Other operations costs | (21 326) |
(27 843) |
6 516 |
| Sales, General & Administration | (113 766) |
(44 215) |
(69 551) |
| Accounting, audit & legal fees | (41 613) |
(8 312) |
(33 301) |
| IMU tax | (3 225) |
(3 225) |
- |
| Energeia adm costs | (81 684) |
(20 193) |
(61 491) |
| Other administrative costs | 12 755 |
(12 485) |
25 240 |
| Legal costs | (42 110) |
(419) | (41 691) |
| Legal costs | (32 655) |
- | (32 655) |
| Energeia legal costs | (9 036) |
- | (9 036) |
| Other non-recurring items | (419) | (419) | - |
| EBITDA | (3 373) |
111 065 |
(114 437) |
The Group is to a little extent affected by increased interest rates impact through the external leasing debt.
The war in Ukraine and the sanctions against Russia has had no direct impact on the Company's operations.
In the extraordinary general meeting on 10 May 2024, Pål Hvammen and Elisabeth Dragseth was elected new members of the board of directors. They are elected as interim board members until the ordinary general meeting to be held 27 June 2024.
On 21 May Energeia AS issued a notice of termination of the management agreement of EAM Solar ASA. The termination period is 12 months. During this period Energeia AS will conduct the management tasks as defined by the prevailing management agreement and assist the Board of EAM Solar ASA in the establishment of a self-sufficient organisation.

Cort Adelers gate 33 NO-0254 Oslo NORWAY
Phone: +47 916 110 09 E-mail: [email protected] Web: www.eam.no Layout/design: Teigens design