AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Enel

Annual Report Apr 22, 2024

4317_10-k-afs_2024-04-22_a550482e-0dbe-41c2-920f-fc9ea1307762.pdf

Annual Report

Open in Viewer

Opens in native device viewer

INTEGRATED ANNUAL REPORT 2023

We live in an increasingly interconnected world where the companies that will continue to thrive in the long run will be those able to act collectively, creating and sharing value with all stakeholders. This is what the graphic design of the Enel Group's Corporate Reporting expresses through the development of connected and balanced forms. Elements inspired by nature, whose movement offers a narration of harmony, growth and evolution.

INTEGRATED ANNUAL REPORT 2023

Paolo Scaroni Chairman

LETTER TO SHAREHOLDERS AND OTHER STAKEHOLDERS

Dear shareholders and stakeholders,

Last year was marked by an important change in the management of the Enel Group, with the election of the entire Board of Directors and the appointment of the new Chairman in the person of Paolo Scaroni. The Board of Directors in turn entrusted the position of Chief Executive Officer to Flavio Cattaneo.

The extraordinary events that have impacted the global geopolitical and macroeconomic environment have generated unprecedented volatility in the energy system and wrought structural changes in the energy market. In this context, our new management has delineated the new strategy underpinning the Group's 2024- 2026 Business Plan, which envisages: (i) the rigorous allocation of resources to boost the return on capital employed, together with the balancing of risk and return in investment decisions and models; (ii) greater efficiency and effectiveness in processes and organizational structure, seeking to increase accountability and free up financial resources to drive the industrial development

of the Group; and (iii) financial and environmental sustainability, confirming our commitments to the energy transition and the electrification of energy consumption, while ensuring a more balanced and sustainable financial structure.

In 2023, Enel confirmed its position as the largest private renewable power generator in the world, with 63 GW of managed capacity (including our growing and necessary battery energy storage capacity) and the largest private electricity distribution company at the global level, with over 70 million end users served by grids that will have to deliver increasing levels of resilience and digitalization to support the electrification of energy consumption. Furthermore, we have the largest customer base among private companies, with some 61 million electricity and gas customers.

The Group's leadership in sustainability has once again been recognized worldwide, underscored by its constant presence in various major sustainability rankings and indices.

The macroeconomic environment

In 2023, global growth proved more resilient than expected at the beginning of the year, thanks to a faster-than-expected reduction in inflation in many economies, supported by the gradual normalization of energy commodity prices and the gradual easing of supply chain bottlenecks. Many governments' energy support programs also helped mitigate the impacts of the turbulence on household incomes and support productive activity in many economies.

However, the results differed among countries: growth was solid in the United States, sustained by the recovery in public and private spending, and in Latin America, where inflation slowed and political and labor market conditions improved. Conversely, much of the euro area experienced an abrupt economic slowdown, reflecting both the restrictive monetary policy stance adopted by the European Central Bank in order to counter inflationary pressures and weak foreign demand, also accompanied by challenging geopolitical developments in the Middle East.

With regard to the energy industry, in 2023, the European gas market displayed a significant downward trend in prices, thanks to high levels of storage and declining demand, with the average reduction in TTF (Title Transfer Facility) prices exceeding 65% compared with 2022, reaching about €35/MWh in the last quarter of 2023. Coal-fired generation also declined, primarily discouraged by the rise in CO2 prices within the ETS (Emissions Trading System), despite coal prices plunging by 55.5% to an average of \$129/ton.

Compared with 2022, electricity prices in Italy and Spain fell sharply, reflecting the decline in energy commodity prices and, in part, growing renewables generation. More specifically, electricity prices in Italy decreased by 58% compared with the previous year, while in Spain they dropped by 48%.

In the metals sector, economic weakness adversely impacted the prices of aluminum and copper, with declines of 16.6% and 3.8% respectively compared with 2022. Metals associated with renewable energy technologies, such as lithium and polysilicon, experienced an even steeper slide in prices as demand contracted.

Performance

Thanks to management actions and our focus on the core business, the Group closed the 2023 financial year having achieved our full-year targets as revised upwards in the 3rd Quarter and announced to the market, with ordinary EBITDA of €22.0 billion and an ordinary net profit of €6.5 billion, up 12% and about 21%, respectively, compared with the previous year. The dividend that will be proposed to shareholders for 2023 amounts to €0.43 per share, 7.5% higher than that for 2022. In terms of cash generation, FFO in 2023 amounted to about €14.8 billion, up more than 60% compared with 2022. Net debt is equal to €60.2 billion, with the net debt to ordinary EBITDA ratio improving from 3.1x to 2.7x. This last indicator does not yet reflect the effects of the proceeds generated by divestments, already announced to investors and subject to binding agreements between the parties, carried out in 2023 as part of the extraordinary plan to reduce the Group's financial debt. Recall that the Plan approved in 2022 to restore a sustainable and balanced Group financial structure provided for the sale of Group investments and other assets of over €12 billion in 2023 alone.

Main events

In 2023, the Group confirmed its hard-won technological leadership in renewables generation and distribution grids.

On the power generation front, in 2023 Enel built out about 5.3 GW of new renewables capacity (including 934 MW of battery storage), reaching a total of approximately 63 GW of installed capacity and a volume of renewables generation of 140 TWh/year. The capacity we operate is also supported by a pipeline of projects in the advanced development phase of up to 160 GW.

In the power distribution segment, our strong commitment to modernizing and digitalizing electricity grids continues, both to increase their resilience to increasingly extreme and frequent climate events and to make them ready to play the role of enablers of the energy transition: during the year, Enel Grids activated almost 540,000 new

producer and prosumer(1) connections globally, adding about 8 GW of distributed renewables capacity connected to our grids, reaching a total of some 68 GW of capacity from approximately 2 million producer and prosumer connections.

The development of a portfolio of products dedicated to residential consumers, businesses and municipalities also confirmed the Group's leading role in fostering the energy transition and the electrification of consumption.

In 2023, Enel X Global Retail operated at full capacity with a new, more tightly integrated structure to reap the benefits of bundled packages of electricity, gas, electric mobility, energy efficiency and ultra-fast connectivity services. An example of this is the "Formidabile" offer, launched in Italy at the end of October 2023 and in Spain at the beginning of 2024. Our commitment to improving the customer experience also continues: in 2023 commercial complaints decreased by 12%(2) compared with the previous year, and in February the German Institute for Quality and Finance awarded Enel Energia its "Nr. 1 in Service" quality seal based on customer satisfaction in the electricity and gas sector, with a score of 74.2%, well above the category average of 55.9%.

The new Enel Global Service Function, which groups together Global Information & Communication Technologies, Global Procurement, Global Customer Operations and the newly established Workforce Evolution, continued the Group's digital transformation path, focusing on solutions and advanced technologies, such as artificial intelligence and quantum computing solutions. Thanks in part to the key skills we have developed internally, to date we have over 500 traditional and generative artificial intelligence applications in operation or in the development phase, mainly to support the Generation, Distribution and Retail businesses. Furthermore, the Workforce Evolution unit will promote the evolution of employee skills consistent with these new technological tools and with the strategic repositioning of the Group, in order to foster greater internal control over higher value activities and guarantee our distinctive positioning in the markets and sectors in which the Group is present.

The Group continues to follow the decarbonization roadmap in line with limiting global warming to below 1.5 ºC. In 2023, absolute direct and indirect greenhouse gas emissions along the Group's entire value chain, equal to 94.3 MtCO2eq, declined by 26.3% compared with 2022, and remain in line with the targets for 2030 and 2040 certified by the Science Based Targets initiative (SBTi).

The financial instruments employed by the Group are also closely linked to sustainability objectives. In 2023, Enel Finance International NV issued euro-denominated sustainability-linked bonds in the amount of €1.5 billion, using multiple key performance indicators (KPIs) to further strengthen Enel's commitment in accelerating the energy transition. For the first time, in fact, a tranche of a publicly placed bond involved the combination of a KPI linked to the EU taxonomy with a KPI linked to the United Nations Sustainable Development Goals (SDGs), while the other tranche of the bond was linked to two KPIs associated with the Group's full decarbonization trajectory through the reduction of direct and indirect greenhouse gas emissions.

These bond issues have enabled us to achieve a ratio between the sources of sustainable financing and the Group's total gross debt of approximately 64%, a level that will rise further over the period of the Plan.

In parallel, in order to reduce debt and strengthen the Group's financial structure, our new management team has revised the divestment plan referred to earlier with a view to portfolio rotation focused on maximizing the value of assets. In this context, the Argentine thermal generation companies Enel Generación Costanera SA and Inversora Dock Sud SA were sold during the year, and agreements were signed for the disposal of the Peruvian electricity distribution and supply company Enel Distribución Perú SAA, the advanced energy services company Enel X Perú SAC and the electricity generator Enel Generación Perú SAA. The divestment of all the investments held by the Group in Romania was also completed. Asset rotation transactions were also completed, including the sale of a portfolio of photovoltaic plants in Chile (416 MW) and the entire geothermal portfolio in the United States, as well as several small solar plants in that country. Finally, in line with the strategy presented to investors on our stewardship approach in non-core countries, acting through the subsidiary Enel Green Power SpA we completed the sale of 50% of the two companies that own all of the Group's renewables operations in Australia to INPEX Corporation, while the sale of 50% of Enel Green Power Hellas to Macquarie Asset Management was finalized.

(2) Reduction in new complaints for each 10,000 customers.

(1) "Prosumer", a contraction of "producer" and "consumer", is an individual or firm that not only consumes goods and services but also produces them, such as, for example, by installing photovoltaic panels to generate electricity.

Strategy and forecasts for 2024-2026

Short-term global uncertainties have forced electricity companies to increase their flexibility and improve the visibility and predictability of prospective returns.

In this context, over the 2024-2026 Plan period the Enel Group plans to focus on:

  • profitability, flexibility and resilience through selective capital allocation aimed at optimizing the Group's risk/ return profile;
  • efficiency and effectiveness as drivers of the Group's operations, based on process simplification, a leaner organization with defined responsibilities and a focus on core geographies in which the Group has an integrated position (Italy, Spain, Brazil, Chile, Colombia and the United States), as well as boosting operational efficiency in order to maximize cash generation and offset inflationary pressures and the higher cost of capital;
  • financial and environmental sustainability to pursue value creation with a balance and solid financial structure, addressing the challenges of climate change.

In this scenario, regulated businesses will be at the center of the Group's strategy, with a concentration of investment in geographical areas with a clear and predictable regulatory framework as well as stable macroeconomic environments. Investment decisions on renewables will be more selective, seeking to achieve a positioning that maximizes returns and mitigates risks at the same time. Finally, the Group plans to optimize its customer portfolio and end-to-end processes, enhancing efficiency in customer acquisition and management, improving customer loyalty through bundled offers and promoting the electrification of energy consumption. The generation and retail businesses will be managed in a more integrated manner, with a flexible approach to sourcing strategies in order to maximize profitability along the entire value chain.

In the 2024-2026 period, the Group's gross investments will amount to €35.8 billion, of which €18.6 billion will be allocated to Grids, €12.1 billion to Renewables and €3 billion to Customers.

Thanks to the implementation of a less capital- and risk-intensive business model, investments will have a smaller cash requirement, with expected net investments of about €26.2 billion thanks to access to European grants and financing (up to €3.5 billion) and the use of a diversified co-investment model for renewables projects (a total of about €6.1 billion).

Investments in distribution grids will increase their efficiency, flexibility and resilience: more than half will be allocated to grid strengthening, remote operation, automation and digitalization projects in order to deliver high standards of service quality and reduce power losses. In addition to managing assets, the remainder will be allocated to expanding hosting capacity(3) to meet customer demand for new connections and encourage the integration of distributed generation from renewable resources, all to support the energy transition and the electrification of final energy consumption.

Investments in renewables will add 13.4 GW of new capacity, bringing the Group's total to 73 GW (including energy storage systems) by 2026, with the share of zero-emissions generation growing from 75% to about 86%.

The push for innovation will continue to be a strategic driver: in generation, it will improve plant performance through the introduction of new technologies along the entire value chain. The use of repowering(4) and automation is also expected to increase the efficiency of plants and processes, as will testing of new battery technologies and energy storage systems, whose role will be increasingly important in ensuring the flexibility of electrical systems. In grids, digitalization, new automation models and the introduction of new technologies will enable new approaches to remuneration.

Finally, the Group will continue to pursue the evolution of new technologies that will mature over the medium and long term, such as hydrogen and new small and modular nuclear fission reactors or fusion power.

On the environmental sustainability front, the Group intends to continue reducing its direct and indirect greenhouse gas emissions by achieving the zero-emissions target for all Scopes by 2040, in line with the Paris Agreement and with the 1.5 ºC scenario, as certified by the SBTi.

Group ordinary EBITDA is expected to increase to between €23.6 and 24.3 billion in 2026, with a CAGR (Compound Average Growth Rate) of approximately 5%, while our ambition for Group ordinary profit is a rise to between €7.1 and 7.3 billion in 2026, with a CAGR of about 6% compared with 2023, net of differences in scope.

The organic and structural path of reducing the Group's net debt will enable us to achieve a ratio of net debt to EBITDA of about 2.3 by 2026, down from over 3 at the end of 2022.

Finally, as regards shareholder remuneration, the Group has decided to adopt a simple and attractive dividend policy with a minimum fixed DPS (dividend per share) of €0.43 for the 2024-2026 period, with a potential increase up to a payout of 70% of ordinary profit if cash neutrality is achieved.

(3) Capacity of the system to carry additional power.

(4) Upgrading a plant in order to increase efficiency, capacity and output.

CONTENTS

REPORT
ON OPERATIONS
1.
ENEL
GROUP
17
Highlights 19
Value creation and the
business model
23
Enel around the world 27

Enel shareholders 30
Corporate boards 32
The Enel corporate
governance system
34
Enel organizational model 41
Incentive system 43
Values and pillars
of corporate ethics
45
Letter to shareholders and other stakeholders 4
Basis of Presentation 10

Guide to navigating the report

To facilitate navigation, hyperlinks have been integrated into the document

Return to main menu

Go to...

Search

Print

Back/forward

Income Statement

Statement of Financial Position

Statement of Cash Flows

Statement of Changes in Equity

Statement of Comprehensive Income

Definition of performance measures 132
Performance of the Group 135
Value generated and distributed
for stakeholders
149
Analysis of the Group's financial
position and structure
150
Performance by primary segment
(Business Line) and secondary
segment (Geographical Area)
157
Enel shares 190
Innovation 192
People centricity 196
World Economic Forum (WEF) 208
European Union taxonomy 210
Significant events in 2023 235
Regulatory and rate issues 239

Consolidated financial statements 274
Notes to the consolidated
financial statements
281
Declaration of the Chief Executive
Officer and the officer in charge of
financial reporting of the Enel Group
452
Reports
Report of the Board
of Statutory Auditors
453
Report of the Audit Firm 468
Attachments
Subsidiaries, associates and
other significant equity
investments of the Enel Group
at December 31, 2023
474

9

BASIS OF PRESENTATION

Enel's approach to corporate reporting

The Integrated Annual Report of the Enel Group, consisting of the Report on Operations inspired by integrated thinking and the consolidated financial statements prepared in accordance with the IFRS/IAS international accounting standards, represents the "core" document of the Enel Group's integrated corporate reporting system, based on the transparency, effectiveness and accountability of information.

The objective of the Enel's Integrated Annual Report is to describe its strategic thinking and to present its results and the medium- and long-term outlook for an Integrated Businesses model that in recent years has fostered the creation of value in the context of the energy transition.

The Enel Group has drawn inspiration from the "Core & More" reporting approach, designing its own corporate reporting system at the service of stakeholders in a connected, logical and structured manner and developing its own concept for presenting economic, social, environmental and governance information, in accordance with specific regulations, recommendations and international best practices.

This "Core Report" seeks to provide a holistic view of the Group, its business model and the related medium/longterm value creation process, including the qualitative and quantitative financial and sustainability information considered most relevant on the basis of a materiality assessment that also considers the expectations of stakeholders. The "More Reports", on the other hand, include more detailed and additional information, partly in compliance with specific regulations, than that provided in the Core Report while being cross referenced to the latter.

CORPORATE REPORTING FRAMEWORK

The Core&More approach of the Enel Group

REPORT AND FINANCIAL STATEMENTS OF ENEL SPA

This is prepared in conformity with Aicle 9, paragraph 3, of Legislative Decree 38 of February 28, 2005

nected, logical and structured manner and developing its own concept for presenting economic, social, environmental and governance information, in accordance with specific regulations, recommendations and international

This "Core Report" seeks to provide a holistic view of the Group, its business model and the related medium/longterm value creation process, including the qualitative and quantitative financial and sustainability information considered most relevant on the basis of a materiality assessment that also considers the expectations of stakeholders. The "More Reports", on the other hand, include more detailed and additional information, partly in compliance with specific regulations, than that provided in the Core Report

while being cross referenced to the latter.

best practices.

SUSTAINABILITY REPORT

This includes the Consolidated Non-Financial Statement pursuant to Legislative Decree 254/2016 and presents Enel's sustainable business model for creating value for all stakeholders and contributing to achievement of the 17 Sustainable Development Goals of the United Nations

REPORT ON CORPORATE GOVERNANCE AND OWNERSHIP STRUCTURE

This describes the Enel corporate governance system pursuant to Aicle 123-bis of the Consolidated Law on Financial Intermediation and Aicle 144-decies of the CONSOB Issuers Regulation

REPORT ON THE REMUNERATION POLICY

This describes the Enel remuneration system, as provided for by Aicle 123-ter of the Consolidated Law on Financial Intermediation

The Integrated Annual Report and materiality analysis

As an expression of integrated thinking, the Integrated Annual Report seeks to represent the capacity of the business model to create value for stakeholders in the short, medium and long term, ensuring the connectivity of the information it contains.

The Group maintains ongoing relationships with stakeholders in order to understand and meet their reporting needs, taking account of the importance of the impact of the Group's business model for all interests involved.

The financial and sustainability information presented within the various documents of the corporate reporting system are selected based on their materiality determined on the basis of specific frameworks, methodologies and assessments.

The following represent the key principles underpinning the preparation of the Report on Operations, with the basis of preparation of the consolidated financial statements being discussed in the section "Form and content of the consolidated financial statements".

The Report on Operations includes financial and sustainability information selected on the basis of a materiality analysis that takes account of stakeholder information requirements, including Enel's contribution to achieving the United Nations Sustainable Development Goals (SDGs) (i.e. "Affordable and Clean Energy" (SDG 7), "Industry, Innovation and Infrastructure" (SDG 9), "Sustainable Cities and Communities" (SDG 11) and "Climate Action" (SDG 13)) and on the activities implemented to contribute to their achievement in order to meet the expectations of the main stakeholders in the Integrated Annual Report.

The Enel Group also performs a double materiality analysis, details on which are available in the Sustainability Report. In addition to the concept of materiality, the qualitative and quantitative financial and sustainability information reported in the Report on Operations have been prepared and presented in such a way as to ensure their completeness, accuracy, neutrality and comprehensibility.

The information contained in the Report on Operations is also consistent with the previous year.

Accordingly, the Group applies the same methodologies from year to year, unless otherwise specified, in compliance with international best practices for integrated reporting and sustainability reporting.

For the purposes of preparing sustainability information, especially quantitative information, the Group mainly applies the provisions of the Global Reporting Initiative (GRI) standards, in line with the Sustainability Report, and the "Aspects" of the GRI supplement dedicated to the Electric Utilities sector ("Electric Utilities Sector Disclosures"). Consideration was also given to the indicators proposed in the white paper "Toward Common Metrics and Consistent Reporting of Sustainable Value Creation" of the World Economic Forum (WEF), the details of which are highlighted in the section on the WEF and in the "Group Performance" chapter of this report.

The Report on Operations is organized into the following sections:

Taking account of the results of the priority matrix and the significant climate impacts on the Group's value creation process, each chapter (Governance, Group Strategy & Risk Management, Group Performance and Outlook) includes information relating to climate change as proposed by the Task Force on Climate-related Financial Disclosures (TCFD),(5) which published specific recommendations in June 2017 that were adopted by the Group in its voluntary reporting on the financial impacts of climate risks.

The Group also took account of the recommendations issued by the IASB in November 2019 "IFRS Standards and climate-related disclosures" and November 2020 "Effects of climate-related matters on financial statements", as updated in July 2023 with the issue of the educational material "Effects of climate-related matters on financial statements". These recommendations emphasize that climate-related risk must be considered in management's assumptions used in the exercise of its judgment in measuring items in the financial statements.

In order to ensure the connectivity of information and to communicate the way in which the progress achieved in sustainability contributes to enhancing current and future financial performance, clear and consistent relationships between key financial and sustainability information have been identified and presented in the Report on Operations for each of the four sections indicated above.

In addition, Enel's Integrated Annual Report has been published in the "Investors" section of the Enel website (www. enel.com).

Connectivity matrix

In order to provide an integrated representation of the Group and represent the connectivity of information, the Enel Group has prepared a matrix delineating the relationships between the governance, Group strategy and risk management, Group performance and the outlook for each business line.

(5) In 2023, the Financial Stability Board announced that the work of the TCFD was completed with the issue of international sustainability reporting standards IFRS S1 and IFRS S2, which were published at the end of June 2023 by the International Sustainability Standards Board (ISSB).

2024-2026 Strategic Plan (p. 266) • Pro tability, exibility and resilience through selective capital allocation, aimed at optimizing the Group's risk/return pro le.

• E ciency and e ectiveness as drivers of the Group's operations, based on process simpli cation, a leaner organization focused on core geographies,

challenges of climate change.

• Investment in distribution grids

in place, in pa icular in Italy. • Selective investment in renewables, aimed at maximizing the return on capital employed and minimizing risks.

• Financial and environmental sustainability to pursue value creation in addressing the

focusing on geographical areas that have fair and transparent regulatory frameworks

• Active management of the customer base through bundled multi-play o ers.

Financial and pe ormance targets underpinning the 2024-2026 Plan (p. 266)

and streamlined costs.

ENEL
BUSINESSES
VALUE CREATION AND
THE BUSINESS MODEL
GOVERNANCE GROUP STRATEGY
ENEL GREEN POWER AND
THERMAL GENERATION
&
GLOBAL ENERGY AND
COMMODY MANAGEMENT
Enel Green Power and
Thermal Generation
& Global Energy
and Commodity Management
(p. 42)
ENEL X
GLOBAL RETAIL
Enel X Global Retail (p. 42) • Enel shareholders (p. 30)
• Corporate boards (p. 32)
• The Enel corporate
governance system (p. 34)
• Enel organizational model
(p. 41)
• Incentive system (p. 43)
• Values and pillars of
corporate ethics (p. 45)
Determination of strategy (p. 78)
I.
Strategic Dialogue
II. Strategic Planning
III. Long-term positioning
IV. Analysis of ESG factors and assessment
of materiality in the eld of sustainability
Strategic Plan (p. 79)
• Response to the current climate (p. 79):
a ordability, security and sustainability
• The three pillars (p. 79):
I. pro tability, exibility and resilience
II. e ciency and e ectiveness
III. nancial and environmental sustainability
ENEL GRIDS
AND INNOVABILITY
Enel Grids (p. 42)

OUTLOOK
RISK MANAGEMENT GROUP PERFORMANCE
Value generated and distributed for stakeholders (p. 149)
ENEL GREEN POWER (p. 169)
Operations
• Net electricity generation
• Net e cient installed capacity
Pe ormance
• Revenue
• Ordinary gross operating pro t/(loss)
• Ordinary operating pro t/(loss)
• Capital expenditure
Strategic risks (p. 98) THERMAL GENERATION AND TRADING (p. 163)
• Legislative and regulatory Operations
developments • Net electricity generation
• Net e cient installed capacity
• Macroeconomic and geopolitical Pe ormance
trends • Revenue from thermal and nuclear generation
• Risks and strategic oppo unities • Revenue
• Ordinary gross operating pro t/(loss)
2024-2026 Strategic Plan (p. 266)
(p. 268)
associated with climate change • Ordinary operating pro t/(loss) • Pro tability, exibility and resilience
• Capital expenditure through selective capital allocation, aimed at
optimizing the Group's risk/return pro le.
• Competitive environment Innovation (p. 192)
People centricity (p. 196) • E ciency and e ectiveness
as drivers of the Group's operations,
based on process simpli cation, a leaner
Financial risks (p. 120) organization focused on core geographies,
• Interest rate and streamlined costs.
• Commodity • Financial and environmental sustainability
to pursue value creation in addressing the
• Currency challenges of climate change.
• Credit and counterpa y Value generated and distributed for stakeholders (p. 149)
• Liquidity END-USER MARKETS (p. 181)
Operations
• Electricity sales
2024 (p. 266)
(p. 268)
• Natural gas sales • Investment in distribution grids
Digital technology risks (p. 123) • Demand response, storage and lighting points
Pe ormance
focusing on geographical areas that have
fair and transparent regulatory frameworks
in place, in pa icular in Italy.
• Cyber security
• Digitalization, IT e ectiveness and
• Revenue
• Ordinary gross operating pro t/(loss)
• Selective investment in renewables,
service continuity • Ordinary operating pro t/(loss)
• Capital expenditure
aimed at maximizing the return on capital
employed and minimizing risks.
Innovation (p. 192) • Active management of the customer base
People centricity (p. 196) through bundled multi-play o ers.
Operational risks (p. 124)
• Health and safety
• Environment
• Procurement, logistics and supply
chain
Financial and pe ormance targets
underpinning the 2024-2026 Plan (p. 266)
(p. 268)
• People and organization
Value generated and distributed for stakeholders (p. 149)
Compliance risks (p. 128) ENEL GRIDS (p. 175)
• Data protection Operations
• Electricity distribution and transmission grid
• Average frequency of interruptions per customer
• Average duration of interruptions per customer
• Grid losses
Pe ormance
• Revenue
• Ordinary gross operating pro t/(loss)
• Ordinary operating pro t/(loss)
• Capital expenditure
Innovation (p. 192)
People centricity (p. 196)
  • Ordinary operating pro t/(loss)
  • Capital expenditure
  • Innovation (p. 192)

ENEL

BUSINESSES

ENEL GREEN POWER AND THERMAL GENERATION

GLOBAL ENERGY AND COMMODY MANAGEMENT

&

ENEL X GLOBAL RETAIL

ENEL GRIDS AND INNOVABILITY

People centricity (p. 196)

REPORT ON OPERATIONS

1. ENEL GROUP

Technological leadership

In 2023, the Group confirmed its hard-won technological leadership in renewables generation and distribution grids.

On the power generation front, in 2023 Enel built out about 5.3 GW of new renewables capacity (including 934 MW of battery storage), reaching a total of approximately 63 GW of installed capacity and a volume of renewables generation of 140 TWh/year.

In the power distribution segment, our strong commitment to modernizing and digitalizing electricity grids continues, both to increase their resilience to increasingly extreme and frequent climate events and to make them ready to play the role of enablers of the energy transition.

The value creation process

The integrated presentation of financial and sustainability information makes it possible to effectively communicate the business model and the value creation process both in terms of results and the short- and medium/long-term outlook.

Business model

Enel's business model is conceived to maximize long-term value creation for all stakeholders through the achievement of Group growth, development and efficiency objectives while at the same time minimizing business risks.

In order to fully benefit from all the opportunities emerging in the market environment in which it operates, the Group has identified three different business models (Ownership, Partnership and Stewardship) it can deploy depending on the geographical area and expected return.

HIGHLIGHTS

REVENUE

-32.0%

€95,565 million €140,517 in 2022

GROSS OPERATING PROFIT

+1.7%

€20,255 million €19,918 in 2022

ORDINARY GROSS OPERATING PROFIT +11.6%

€21,969million

€19,683 in 2022

PROFIT ATTRIBUTABLE TO OWNERS OF THE PARENT

€3,438 million €1,682 in 2022

ORDINARY PROFIT ATTRIBUTABLE TO OWNERS OF THE PARENT

+20.7%

€6,508 million €5,391 in 2022

NET FINANCIAL DEBT

-0.8%

€60,163 million €60,663in 2022(1)

CAPITAL EXPENDITURE

CASH FLOWS FROM OPERATING ACTIVITIES

+69.0%

€8,649in 2022(2)

CAPITAL EXPENDITURE ON PROPERTY, PLANT AND EQUIPMENT AND INTANGIBLE ASSETS(3)

-11.4%

€12,714 million €14,347 in 2022

NO. OF EMPLOYEES

NO. OF LIFE CHANGING ACCIDENTS (LCA) - ENEL(4)

  • in 2022

  • (1) In order to facilitate analysis of developments in Group net nancial debt, thereby ensuring greater comparability over time, management has decided to exclude the fair value of the cash ow hedge and fair value hedge derivatives used to hedge the exchange rate risk on loans. Accordingly, in order to improve the comparability of the gures, it was necessary to recalculate net nancial debt at December 31, 2022.

  • (2) In order to improve presentation, for comparative purposes only, realized nancial income and expense connected solely with borrowings have been reclassi ed from "Collections/(Payments) associated with derivatives connected with borrowings" in the section on cash ows from nancing activities to the items "Interest income and other nancial income collected" and "Interest expense and other nancial expense paid" included in cash ows from operating activities.
  • (3) Does not include €849 million regarding units classi ed as held for sale or discontinued operations (€156 million in 2022).
  • (4) Injuries whose consequences caused permanent changes in the life of the individual.

HIGHLIGHTS OF THE BUSINESS LINES

ENEL GREEN POWER AND THERMAL GENERATION

TOTAL NET EFFICIENT INSTALLED CAPACITY

81.4 GW

NET ELECTRICITY GENERATION(1)

207.33 TWh

227.77 in 2022

-9.0%

84.6 in 2022

-3.8%

NET EFFICIENT INSTALLED RENEWABLES CAPACITY

55.5 GW

53.6 in 2022

NET EFFICIENT INSTALLED RENEWABLES CAPACITY

68.2 % 63.3% in 2022 ADDITIONAL EFFICIENT INSTALLED RENEWABLES CAPACITY

4.96 in 2022

NET RENEWABLE ELECTRICITY GENERATION(1)

126.98 TWh 112.45 in 2022

INTENSITY OF SCOPE 1 GHG EMISSIONS RELATED TO POWER GENERATION(2)

160 gCO2eq/kWh 229 in 2022

INTENSITY OF SCOPE 1 AND SCOPE 3 GHG EMSSIONS RELATED TO INTEGRATED POWER(2)

-20.0%

168 gCO2eq/kWh 210 in 2022

(1) If net generation operated through joint ventures were also included, total generation at December 31, 2023 would amount to 220.6 TWh; similarly, generation from renewable sources would be equal to 140.3 TWh at December 31, 2023 (123.7 TWh at December 31, 2022).

(2) KPI corresponding to the target ce i ed by the Science Based Targets initiative (SBTi) in 2022.

ENEL GRIDS AND INNOVABILITY

END USERS 70,291,727 no. 72,655,170 in 2022 -3.3%

ELECTRICITY DISTRIBUTION AND TRANSMISSION GRID

-6.2%

ELECTRICITY TRANSPORTED ON ENEL'S DISTRIBUTION GRID

-3.6%

507.5 in 2022(3)

END USERS WITH ACTIVE SMART METERS(4)

1,899,419 km

2,024,038 in 2022

45,172,959 no. 45,824,963 in 2022

ENEL X GLOBAL RETAIL

ELECTRICITY SOLD BY ENEL

300.9 TWh

321.1 in 2022

-6.3%

RETAIL CUSTOMERS

-8.5%

61,118,024 no.

of which free market

-12.7%

27,864,392 in 2022

PUBLIC CHARGING POINTS(5)

+9.8%

24,281 no. 22,112 in 2022(3)

STORAGE 1,730 MW 760 in 2022

DEMAND RESPONSE CAPACITY +13.1%

66,784,895 in 2022

9,588 MW 8,476 in 2022

(3) The gure for 2022 re ects a more accurate calculation of the aggregate.

  • (4) Of which 28.7 million second-generation meters in 2023 and 25.2 million in 2022.
  • (5) If the gures also included charging points operated through joint ventures, the totals would amount to 25,337 at December 31, 2023 and 22,617 at December 31, 2022.

VALUE CREATION AND THE BUSINESS MODEL

The value creation process

The integrated presentation of financial and sustainability information makes it possible to effectively communicate the business model and the value creation process both in terms of results and the short- and medium/long-term outlook. The management of economic, environmental and social aspects is increasingly significant in terms of

assessing the ability to create value for stakeholders. The following graphical representation summarizes the value chain of the Enel Group: the main inputs used, how they are transformed into outcomes and value created for stakeholders.

|GOVERNANCE

|

|

GROUP STRATEGY & RISK MANAGEMENT

|OUTLOOK

|

VALUE CREATION AND THE BUSINESS MODEL

(1) Does not include €849 million regarding units classi ed as held for sale.

PRINCIPLES OF GOVERNANCE

||EXTERNAL ENVIRONMENT

R•

|GROUP PERFORMANCE

|

SI

KS A ND O PPORTUNITIES |

GROUP TRANSACTIONS

EFFICIENCY AND EFFECTIVENESS

2.

44.4% Women on the Board of Directors 207 Code of Ethics repo s (of which 41 violations)

Business model

Enel's business model is conceived to maximize long-term value creation for all stakeholders through the achievement of Group growth, development and efficiency objectives while at the same time minimizing business risks.

The Enel business model is structured along the entire value chain through global business lines for generation (Enel Green Power and Thermal Generation), commodity portfolio management (Global Energy and Commodity Management), distribution (Enel Grids and Innovability) and customer sales (Enel X Global Retail), supported by the Global Service Function and Staff Functions.

The current mission of each global business line can be summarized as follows:

  • Enel Green Power and Thermal Generation is engaged in the generation of electricity from renewables (through Enel Green Power) and conventional sources, seeking to accelerate the energy transition and managing the path of decarbonization;
  • Global Energy and Commodity Management operates in wholesale physical and financial markets for energy commodities (electricity, gas, emissions, oil and many others) and manages the Group's integrated portfolio through hedging with complex products in order to mitigate the risks of international commodity trading;
  • Enel Grids and Innovability is a world leader in electricity distribution, ensures the supply of electricity through increasingly efficient grids that are ever more resilient and secure against extreme and adverse events and more flexible thanks to enabling new business models for DSOs (distribution system operators).

In line with these objectives, Enel Grids' innovation effort has focused on resilience, operational excellence and security, seeking advanced solutions that can guarantee and improve an increasingly safe environment for workers and generate a positive and sustainable impact on the business;

• Enel X Global Retail operates in the supply of electricity, energy management services and public and private electric mobility, with a portfolio of value-added products and services to encourage more independent and sustainable use of energy.

Enel X Global Retail offers innovative solutions to improve people's lives, focusing on residential consumers, companies and government entities with modular and integrated offers built around customer needs, promoting the digitalization and electrification of energy use and transport as drivers to create new value.

By exploiting the synergies between the different business areas and implementing actions through the lever of innovation, the Enel Group seeks to develop solutions to drive sustainable progress, reduce environmental impact, meet the needs of customers and the local communities in which it operates and ensure high safety standards for employees and suppliers.

In order to fully benefit from all the opportunities emerging in the market environment in which it operates, the Group has identified three different business models (Ownership, Partnership and Stewardship) it can deploy depending on the geographical area and expected return:

  • the Ownership business model, in which the Group makes direct investments in renewables, grids and customers, benefitting from the financial performance generated by the continuous use of the assets involved. This model is mainly employed in countries where the entire value chain can already be leveraged, from generation to relationships with end users, especially where expected returns are the highest;
  • the Partnership business model, in which the Group makes investments with a partner in order to lower its exposure to the risks associated with the assets involved, while maintaining control and maximizing the productivity and flexibility of the capital employed;
  • the Stewardship business model, in which the Group invests in existing or new joint ventures and acquires or maintains minority stakes, benefitting from the development of the assets. This model will further enhance financial flexibility while significantly reducing the risk exposure of capital, increasing returns. Three geographical areas (Italy, Iberia and Rest of the World) are incorporated into this approach, each of which operates in its area in a matrix relationship with the broader and more global business lines, managing activities such as relations with local communities, regulation and local communication, while ensuring the integration of the business lines present in the country involved.

ENEL AROUND THE WORLD

The Enel Group has a presence in 43 countries on multiple continents around the world, with more than 1,000 subsidiaries.

The following map shows the distribution of the Enel Group across the globe.

REPORT ON OPERATIONS

  1. GOVERNANCE

  2. Corporate governance system oriented towards the goal of sustainable success.

  3. Governance model in line with international best practice.
  4. Transparency and fairness as founding values.

ENEL SHAREHOLDERS

At December 31, 2023, the fully subscribed and paid-up share capital of Enel SpA totaled €10,166,679,946, represented by the same number of ordinary shares with a par value of €1.00 each. Share capital is unchanged compared with that registered at December 31, 2022.

In implementation of the authorization of the Shareholders' Meeting of May 10, 2023 and the subsequent resolution of the Board of Directors adopted on October 5, 2023, Enel has completed a program for the purchase of treasury shares to serve the 2023 LTI Plan for the management of Enel and/or its subsidiaries pursuant to Article 2359 of the Italian Civil Code. More specifically, as a result of transactions carried out between October 16, 2023 and January 18, 2024 in execution of the aforementioned program, the Company has acquired a total of 4,200,000 treasury shares. Accordingly, considering the 7,153,795 treasury shares already held at December 31, 2022 and taking account of the disbursement on September 5, 2023 of 1,268,689 Enel shares to the beneficiaries of the 2019 LTI Plan and the 2020 LTI Plan, at the date of publication of this report the Company holds a total of 10,085,106 treasury shares; at December 31, 2023, during the implementation of the aforementioned program, Enel held a total of 9,262,330 treasury shares.

Significant shareholders

At December 31, 2023, based on the shareholders register and the notices submitted to CONSOB and received by the Company pursuant to Article 120 of Legislative Decree 58 of February 24, 1998, as well as other available information, shareholders with an interest of greater than 3% in the Company's share capital included the Ministry for the Economy and Finance (with a 23.585% stake) and Black-Rock Inc. (with a 5.023% stake held for asset management purposes).

Composition of shareholder base

Since 1999, Enel has been listed on the Euronext Milan market organized and operated by Borsa Italiana SpA. Enel's shareholders include leading international investment funds, insurance companies, pension funds and ethical funds.

With regard to Environmental, Social and Governance

(ESG) investors in Enel, at December 31, 2023, socially responsible investors (SRIs) held around 17.5% of the share capital (from 14.9% at December 31, 2022). Investors who have signed the Principles for Responsible Investment represent 42.8% of the share capital (compared with 42.1% at December 31, 2022).

CORPORATE BOARDS CORPORATE BOARDS

BOARD OF DIRECTORS

CHAIRMAN Paolo Scaroni

CHIEF EXECUTIVE OFFICER AND GENERAL MANAGER Flavio Ca aneo

SECRETARY Leonardo Bellodi

DIRECTORS

Johanna Arbib Mario Corsi Olga Cuccurullo Dario Frigerio Fiamme a Salmoni Alessandra Stabilini Alessandro Zehentner

BOARD OF STATUTORY AUDITORS

CHAIRMAN

Barbara Tadolini

AUDITORS

Luigi Borré Maura Campra

ALTERNATE AUDITORS

Carolyn A. Di meier Tiziano Onesti Piera Vitali

AUDIT FIRM

KPMG SpA

2023

COMPOSITION OF THE BOARD OF DIRECTORS

1executive director

1 in 2022

8non-executive directors

8 in 2022

of which 7 independent (1) 8 in 2022

(1) The gures for 2023 and 2022 refer to directors qualifying as independent pursuant to the Consolidated Law on Financial Intermediation and the Italian Corporate Governance Code (2020 edition).

(2) In accordance with the Diversity Policy adopted by the Enel Board of Directors, "international experience" is assessed on the basis of the managerial, professional, academic or institutional activities pe ormed by each director in international environments.

THE ENEL CORPORATE GOVERNANCE SYSTEM

The corporate governance system of Enel SpA ("Enel" or the "Company") is compliant with the principles set forth in the edition of the Italian Corporate Governance Code published on January 31, 2021,(6) adopted by the Company as a "large company" without "concentrated ownership",(7) and with international best practice. The corporate governance system adopted by Enel is aimed at achieving sustainable success, as it is aimed at creating value for the shareholders over the long term, taking into account the environmental and social importance of the Enel Group's business operations and the consequent need, in conducting such operations, to adequately consider the interests of all relevant stakeholders.

In compliance with Italian legislation governing listed companies, the Group's organization comprises the following bodies:

(6) Available from the website of Borsa Italiana (at https://www.borsaitaliana.it/comitato-corporate-governance/codice/2020-eng.en.pdf).

(7) The Corporate Governance Code defines a "large company" as any company whose capitalization was greater than €1 billion on the last Exchange business day of each of the previous three calendar years, while a "company with concentrated ownership" is any company in which a single shareholder (or a plurality of shareholders which participates in a shareholders' voting agreement) holds, directly or indirectly (through subsidiaries, trustees or third parties), the majority of the votes that can be exercised in the ordinary shareholders' meeting.

Shareholders'
Meeting
It is charged with deciding, among other things, in either ordinary or extraordinary session:

the appointment and removal of the members of the Board of Directors and the Board of Statu
tory Auditors and their compensation and undertaking any stockholder actions;

the approval of the financial statements and the allocation of profit;

the purchase and sale of treasury shares;

remuneration policy and its implementation;

share ownership plans;

amendments to the bylaws;

mergers and demergers;

the issue of convertible bonds.
Board of Directors
It is vested by the bylaws with the broadest powers for the ordinary and extraordinary manage

15

THE ENEL

SYSTEM

CORPORATE

GOVERNANCE

(6) Available from the website of Borsa Italiana (at https://www.borsaitaliana.it/comitato-corporate-governance/codice/2020-eng.en.pdf).

the majority of the votes that can be exercised in the ordinary shareholders' meeting.

(7) The Corporate Governance Code defines a "large company" as any company whose capitalization was greater than €1 billion on the last Exchange business day of each of the previous three calendar years, while a "company with concentrated ownership" is any company in which a single shareholder (or a plurality of shareholders which participates in a shareholders' voting agreement) holds, directly or indirectly (through subsidiaries, trustees or third parties), meetings held by the Board in 2023, in 6 of which it addressed issues connected with climate and their impact on strategies and the associated approaches to implementation

  • It is vested by the bylaws with the broadest powers for the ordinary and extraordinary management of the Company and has the power to carry out all the actions it deems advisable to implement and achieve the corporate purpose.
  • It plays a central role in corporate governance, holds powers for strategic and organizational guidance and control of the Company and the Group, whose sustainable success it pursues. In this context, it examines and approves corporate strategy, including the annual budget and Business Plan (which incorporate the main objectives and planned actions, including with regard to sustainability,(8) to lead the energy transition and tackle climate change), taking account of the analysis of key issues for the generation of long-term value and therefore promoting a sustainable business model.
  • It also performs a policy-setting role and assesses the adequacy of the internal control and risk management system (ICRMS). More specifically, it determines the nature and level of risk compatible with the strategic objectives of the Company and the Group, incorporating in its assessments all factors that could be relevant to achieving the sustainable success of the Company. The ICRMS consists of the set of rules, procedures and organizational structures designed to enable the effective identification, measurement, management and monitoring of the main business risks to which the Group is exposed. These include the risks associated with climate change and, more generally, the risks that the Group's activities may engender in the areas of the environment, society, personnel and respect for human rights.
  • It determines the remuneration policy for directors, statutory auditors and key management personnel with a view to pursuing the Company's sustainable success, taking due account of the need to have, retain and motivate people with the skills and expertise required by the positions they hold, submitting this policy for approval by the Shareholders' Meeting.
  • Activities performed in 2023 included addressing climate-related issues on the occasion of (i) the examination and approval of the Business Plan of the Company and the Group; (ii) the determination of Enel's remuneration policy for 2023; (iii) the examination of the 2022 Sustainability Report, which incorporates the Consolidated Non-Financial Statement pursuant to Legislative Decree 254/2016 for the same year. In addition, it discussed climate- and environment-related issues as part of the analysis of transactions connected with decarbonization strategy and sustainable finance, as well as in relation to its engagement with investors. Finally, on the occasion of extreme climate events, the Board of Directors received extensive reporting on the immediate countermeasures adopted, as well as on any need for infrastructure adaptation measures to respond to the changed context.
  • With regard to enhancing gender diversity, it agreed on the introduction of a performance objective in the 2023 Long-Term Incentive Plan, represented by the percentage of women in top management succession plans at the end of 2025.
  • Finally, the Board of Directors received updates on cyber security and safety-related issues and human rights activities in the countries in which the Group operates, as well as timely information on developments in and the substance of the various forms of investor engagement.

(8) Sustainability comprises issues connected with climate change, atmospheric emissions, managing water resources, biodiversity, the circular economy, health and safety, diversity, management and development of employees, relations with communities and customers, the supply chain, ethical conduct and human rights.

In compliance with the provisions of the Italian Civil Code, the Board of Directors has delegated part of its management duties to the Chief Executive Officer and, in accordance with the recommendations of the Corporate Governance Code and the provisions of the applicable CON-SOB regulations, has appointed the following committees from among its members to provide recommendations and advice.

Corporate Governance and Sustainability Committee

7 meetings held by the Committee in 2023, in 5 of which it addressed issues connected with climate and their impact on strategies and the associated approaches to implementation

Control and Risk Committee

14 meetings held by the Committee in 2023, in 3 of which it addressed issues connected with climate and their impact on strategies and the associated approaches to implementation

  • A majority of its members are independent directors and in 2023 it was composed of the Chairman of the Board of Directors and two other directors, all of whom met independence requirements.
  • It assists the Board of Directors in assessment and decision-making activities concerning the corporate governance of the Company and the Group and sustainability, including climate change issues and the interaction of the Group with all stakeholders.
  • With regard to sustainability issues, it examines:
  • –the guidelines of the Sustainability Plan, including the climate objectives set out in the plan, and the materiality matrix, which specifies the priority themes for stakeholders in the light of the Group's business strategies;
  • –the approach to implementing the sustainability policy;
  • –the general approach and the structure of the content of the Consolidated Non-Financial Statement and the Sustainability Report – which may be presented in a single document – and the comprehensiveness and transparency of the disclosures they provide, including with regard to climate change, and their consistency with the principles envisaged in the reporting standard adopted, issuing a prior opinion to the Board of Directors, which is called upon to approve those documents.
  • Activities performed in 2023 included addressing climate-related issues on the occasion of the examination of: (i) the 2022 Sustainability Report, which incorporates the Consolidated Non-Financial Statement pursuant to Legislative Decree 254/2016 for the same year; (ii) the materiality analysis and the guidelines of the 2024-2026 Sustainability Plan; (iii) updates on the main sustainability activities performed by the Enel Group in 2023, on the state of implementation of the 2023-2025 Sustainability Plan and on the inclusion of Enel in the main sustainability indices.
  • It is composed of non-executive directors, the majority of whom (including its Chairman) are independent. In 2023 it was made up of:
    • until May 2023, four non-executive independent directors;
    • from June 2023, four non-executive directors, of which a majority are independent.
  • It has the task of supporting the assessments and decisions of the Board of Directors relating to the internal control and risk management system (ICRMS), as well as those relating to the approval of periodic financial and non-financial reports. In particular, it issues its prior opinion to the Board of Directors, inter alia: (i) on the guidelines of the ICRMS, so that the main risks concerning Enel and its subsidiaries – including the various risks that may be relevant from the perspective of sustainable success – are correctly identified and adequately measured, managed and monitored; (ii) on the degree of compatibility of the risks referred to in point (i) above with company operations consistent with the strategic objectives identified; and (iii) on the adequacy of the ICRMS with respect to the characteristics of the Company and the risk profile assumed, as well as the effectiveness of the system itself.
  • It evaluates whether periodic financial and non-financial reporting correctly represents the business model, the strategies of the Company and the Group it heads and the impact of company activities and the performance achieved, coordinating with the Corporate Governance and Sustainability Committee with regard to periodic non-financial reporting.
  • It examines the issues relevant to the ICRMS addressed in the Consolidated Non-Financial Statement pursuant to Legislative Decree 254/2016 and the Sustainability Report, which may be presented in a single document and contains corporate disclosures on climate issues, issuing a prior opinion on these aspects to the Board of Directors, which is called upon to approve these documents.
  • Activities performed in 2023 included addressing climate-related issues on the occasion of the examination of: (i) issues concerning the ICRMS dealt with in the 2022 Sustainability Report, which incorporates the Consolidated Non-Financial Statement pursuant to Legislative Decree 254/2016 for the same year; (ii) meetings with the head of the Enel Green Power and Thermal Generation Global Business Line concerning the activities carried out and the risks existing in its area of responsibility, as well as the tools used to mitigate their effects; (iii) the analysis of the compatibility of the main risks associated with the strategic objectives of the 2024-2026 Business Plan.
Nomination and
Compensation
Committee
14
meetings held by the
Committee in 2023

It is composed of non-executive directors, the majority of whom (including its Chairman) are indepen
dent. In 2023 it was made up of:

until May 2023, four non-executive independent directors;

from June 2023, five non-executive directors, of which a majority are independent.

It supports the Board of Directors in, inter alia, evaluations and decisions relating to the size and optimal
composition of the Board and its committees, as well as the remuneration of directors and key man
agement personnel. In this regard, the remuneration policy for 2023 provides that a significant portion
of the short- and long-term variable remuneration of the Chief Executive Officer/General Manager and
key management personnel shall be linked to sustainability-related performance objectives. In par
ticular, with regard to the long-term variable component of the remuneration of the Chief Executive
Officer/General Manager and key management personnel, the performance objectives of the 2023
Long-Term Incentive Plan included (i) an objective related to gender diversity, represented by the per
centage of women in top management succession plans at the end of 2025, as well as (ii) a target con
cerning the reduction of specific greenhouse gas emissions, consistent with the Group's decarbon
ization strategy, which provides for the progressive reduction of such emissions in line with the Paris
Agreement. As regards the short-term variable component of the remuneration of the Chief Executive
Officer/General Manager, 2023 remuneration policy is linked, among other things, to (i) a performance
objective for preserving workplace safety, as well as (ii) a performance objective measuring the level of
customer satisfaction through the annual number of commercial complaints filed at the Group level,
with the latter objective being associated with two gate objectives(9) for the number of commercial
complaints filed in the free commodity market in Italy and for the average annual duration of service
interruptions for low-voltage customers (System Average Interruption Duration Index - SAIDI).
Related Parties
Committee
6
meeting held by the
Committee in 2023

It is composed of independent non-executive directors. In 2023 it was made up of:

until May 2023, four non-executive independent directors;

from June 2023, three non-executive independent directors.

It performs the functions provided for in the relevant CONSOB regulations and in the specific Enel pro
cedure for transactions with related parties, essentially issuing particular reasoned opinions on the in
terest of Enel – and any direct or indirect subsidiary that may be involved – in carrying out transactions
with related parties, expressing its assessment of the benefits and substantive appropriateness of the
associated conditions, subject to receiving timely and comprehensive information on the transaction.
Board of Statutory
Auditors
24
meetings held by the
Board in 2023
It is charged with overseeing:

compliance with the law and the bylaws, as well as compliance with the principles of sound administra
tion in carrying out corporate activities;

the financial reporting process and the appropriateness of the organizational structure, the internal
control system and the administrative-accounting system of the Company;

the statutory audit of the annual accounts and the consolidated accounts, as well as the independence
of the Audit Firm;

the approach adopted in implementing the corporate governance rules envisaged by the Corporate
Governance Code.

(9) Achieving these is necessary to achieve the overall customer satisfaction target.

EMARKE
SDIR
CERTIFIED
Chairman of the
Board of Directors

The Chairman is vested by the bylaws with the powers to represent the Company and to sign on
its behalf.

The Chairman presides over Shareholders' Meetings.

The Chairman convenes the meetings of the Board of Directors, establishes the agenda and pre
sides over its proceedings.

The Chairman acts as a liaison between the executive directors and the non-executive directors
and, with the support of the Secretary of the Board of Directors, is responsible for the effective
operation of the Board. More specifically, the Chairman, with the support of the Board Secretary, is
responsible, among other things, for ensuring:

that information provided before Board meetings and supplementary information provided
during meetings enables the directors to act in an informed manner in the performance of their
duties; and

that the activity of the Board committees is coordinated with that of the Board of Directors.

The Chairman ensures that the Board of Directors is informed in a timely manner on developments
in and the substance of engagement activities with all shareholders.

The Chairman ascertains that the Board's resolutions are carried out.

Pursuant to a Board resolution of May 12, 2023, the Chairman has been vested with a number of
additional non-executive powers.

In the exercise of the function of stimulating and coordinating the activities of the Board of Direc
tors, the Chairman plays a proactive role in the process of approving and monitoring of corporate
and sustainability strategies, which are sharply focused on the decarbonization and electrification
of energy consumption.

During 2023, the Chairman also chaired the Corporate Governance and Sustainability Committee.
Chief Executive
Officer

Like the Chairman of the Board of Directors, the CEO is vested by the bylaws with the powers to
represent the Company and to sign on its behalf, and in addition is vested by a Board resolution
of May 12, 2023 with all powers for managing the Company, with the exception of those that are
otherwise assigned by law, regulation or the bylaws or that the aforesaid resolution reserves for
the Board of Directors (making the Chief Executive Officer the officer with primary responsibility
for managing the Company).

In the exercise of these powers, the CEO has defined a sustainable business model, delineating a
strategy to lead the energy transition towards a low-carbon model. The CEO is also responsible
for managing the business activities connected with Enel's efforts in combatting climate change.

The CEO reports to the Board of Directors on the activities performed in the exercise of the powers
granted to him, including business activities to maintain Enel's commitment to address climate
change.

The CEO represents Enel in various initiatives that deal with sustainability, holding positions of
leadership in international institutions such as the Global Investors for Sustainable Development
(GISD) Alliance launched by the United Nations in 2019.

As the officer with primary responsibility for managing the Company, the CEO has primary au
thority for engaging with institutional investors, providing them with any appropriate clarification
concerning matters that fall within the scope of the Chairman's management powers, in line with
the policy for engaging with institutional investors and with Enel's shareholders and bondholders
as a whole.

The CEO has also been designated as the director responsible for establishing and maintaining
the ICRMS.
Statutory audit of
the accounts

The statutory audit is performed by a specialized firm entered in the appropriate register of auditors,
which is appointed by the Shareholders' Meeting on the basis of a reasoned proposal from the Board
of Statutory Auditors.

Good corporate
governance
practices

Following the appointment of the Board of Directors by the ordinary Shareholders' Meeting of May
10, 2023 and taking account of the election of an entirely new Board, Enel organized a specific in
duction program to provide the directors with an understanding of the sectors in which the Group
operates, as well as insight into company dynamics and their evolution, market developments and
the applicable regulatory framework. Various induction initiatives were therefore held during 2023,
focusing on the corporate governance system of the Company and the Group, the electrical sys
tem and power generation, as well as closer analyses of certain business lines and the People and
Organization Staff Function.

At the end of 2023 and during the first two months of 2024, the Board of Directors carried out, with
the assistance of a specialized independent advisor, an assessment of the size, composition and
functioning of the Board and its committees (the "board review"), in line with the most advanced
corporate governance practices accepted at the international level and incorporated within the
Corporate Governance Code. The board review was also carried out using a "peer review" ap
proach, i.e. evaluating not only the operation of the body as a whole, but also the style and sub
stance of the contribution made by each of its members, and it was extended to include the Board
of Statutory Auditors. Among other issues, the board review also specifically sought to verify the
directors' perception of (i) the effectiveness of induction activities and (ii) the Board's involvement
with sustainability issues and their integration into corporate strategy, including climate change
issues. The findings of the board review are reported in Enel's Report on Corporate Governance
and Ownership Structure.

The Board of Directors and the Board of Statutory Auditors have approved, each within their own
sphere of competence, specific diversity policies that set out the characteristics considered op
timal for the members of these bodies, so that each can exercise their duties most effectively,
taking decisions that can effectively draw on the contribution of a plurality of qualified points of
view, able to examine the issues under discussion from different perspectives. The policy approved
by the Board of Directors establishes that with regard to the types of diversity and the associated
objectives:

the optimal composition of Board members should provide for a majority of independent di
rectors;

even when the regulatory provisions on gender balance expire, it is important to continue to
ensure that at least one-third of the Board of Directors, both at the time of appointment and
during its term of office, shall be made up of directors of the least represented gender;

the international scope of the Group's activities should be taken into consideration, ensuring
that at least one-third of directors should have adequate experience in the international arena,
which is also considered useful for preventing the standardization of opinions and the emer
gence of "group thought";

in order to achieve a balance between the need for continuity and renewal in management, it
would be necessary to ensure a balanced combination of people of differing seniority – and
age – within the Board of Directors;

non-executive directors should have a management and/or professional and/or academic and/
or institutional background such as to create a diverse and complementary set of skills and
experience;
in view of the differences in their roles, the Chairman and the CEO should have the appropriate

  • In July 2015 the Board of Directors also approved (and subsequently amended in February 2019) a number of recommendations aimed at strengthening the corporate governance of Enel subsidiaries with shares listed on regulated markets and at the same time ensuring the implementation of local best practices in this area by those companies. Among other issues, these recommendations concern the composition of the management body, with regard to which it is also suggested to integrate a diversity of professional and management experience and skills, combined, where possible, with a diversity of gender, age and seniority, without prejudice to the provisions of applicable local legislation.
  • In order to regulate the procedures for the Company's engagement with institutional investors and with its shareholders and bondholders as a whole, in March 2021 the Board of Directors adopted, acting on a proposal from the Chairman formulated in agreement with the Chief Executive Officer, a specific policy in this area (the "Engagement Policy"). It largely incorporates the practices already followed by Enel to ensure that this dialogue is based on principles of fairness and transparency and takes place in compliance with EU and national regulations concerning market abuse, as well as in line with international best practices. In drawing up the Engagement Policy, which was consistently applied during 2023, the best practices adopted in this field by institutional investors and reflected in "Stewardship" codes were taken into account.

For more detailed information on the corporate governance system, please see the Report on Corporate Governance and Ownership Structure of Enel, which has been published on the Company's website (http://www.enel. com, in the "Governance" section).

ENEL ORGANIZATIONAL MODEL

ENEL GROUP CHAIRMAN P. Scaroni

ENEL GROUP CEO F. Caaneo

STAFF FUNCTIONS

ADMINISTRATION, FINANCE AND CONTROL S. De Angelis

EXTERNAL RELATIONS N. Mardegan

AUDIT S. Fiori

CEO OFFICE AND STRATEGY

GLOBAL SERVICE FUNCTION M. Mossini

GLOBAL SERVICES S. Ciurli

PEOPLE AND ORGANIZATION E. Colacchia

LEGAL, CORPORATE, REGULATORY AND ANTITRUST AFFAIRS F. Puntillo

SECURITY V. Giardina

GLOBAL BUSINESS LINES GLOBAL ENERGY AND COMMODITY MANAGEMENT AND CHIEF PRICING OFFICER C. Machei ENEL GRIDS AND INNOVABILITY G.V. Armani ENEL GREEN POWER AND THERMAL GENERATION S. Bernabei ENEL X GLOBAL RETAIL F. Gostinelli COUNTRIES AND REGION ITALY N. Lanzea IBERIA J. Bogas Gálvez

REST OF THE WORLD A. De Paoli

The Enel Group structure is organized into a matrix that comprises:

Global Business
Lines
Global Business Lines, which are responsible for managing and developing assets, optimizing their
performance and the return on capital employed in the various geographical areas in which the
Group operates. In compliance with safety, protection and environmental policies and regulations,
they are tasked with maximizing the efficiency of the processes they manage and applying best
international practices, sharing responsibility for EBITDA, cash flows and revenue with the countries.
The Group, which also draws on the work of an Investment Committee,(10) benefits from a centralized
industrial vision of projects in the various business lines. Each project is assessed not only on the
basis of its financial return but also in relation to the best technologies available at the Group level.
Furthermore, each business line contributes to guiding Enel's leadership in the energy transition and
in the fight against climate change, managing the associated risks and opportunities in its area of
competence.
The following provides a brief summary of the primary objectives of each Global Business Line:

Enel Grids and Innovability: ensures the reliability and quality of electricity supply services through
efficient, resilient and digital grids; promotes, harmonizes and coordinates innovation and sustain
ability processes, supporting operations in the Global Business Lines and Countries.

Global Energy and Commodity Management and Chief Pricing Officer: optimizes the Group's mar
gin through the active management of its hedging strategy and exposure to commodity risk, taking
account of all commercial/market factors in order to maximize the integrated margin in the markets
in which we operate through the optimization of gas and fuel provisioning, and local dispatching of
thermal and renewable generation, while supporting Enel X Global Retail in defining the commercial
strategy.

Enel Green Power and Thermal Generation: provides guidance for a rapid and effective energy tran
sition, growing the portfolio of renewable generation facilities, and manages the corresponding
evolution of thermal generation and storage assets with a view to decarbonizing our energy mix in
order to meet the needs of customers in all the countries in which we operate.

Enel X Global Retail: defines the commercial strategy and manages the customer product range for
energy, products and services, including electric mobility, ensuring compliance with safety, protec
tion and environmental regulations, maximizing value for the customer and operational efficiency,
and supporting margin optimization with Global Energy and Commodity Management.
Region and
Countries
The Region and Countries are responsible for managing relationships with institutional bodies and
regulatory authorities, as well as handling distribution and electricity and gas sales, in their areas,
while also providing staff and other service support to the business lines. They are also charged with
promoting decarbonization and guiding the energy transition towards a low-carbon business mod
el within their areas of responsibility.

The following functions provide support to Enel's business operations:

Global Service
Function
The Global Service Function is responsible for managing information and communication technol
ogy activities, procurement at the Group level and managing global customer relationship activities.
The Global Service Function is also focused on the responsible adoption of measures that allow the
achievement of sustainable development objectives, in the specific in managing the supply chain
and developing digital solutions to support the development of enabling technologies for the ener
gy transition and the fight against climate change.
Holding Company
Staff Functions
The Holding Company Staff Functions are responsible for managing governance processes at the
Group level. More specifically, the Administration, Finance and Control Function is also responsi
ble for consolidating scenario analysis and managing the strategic and financial planning process
aimed among other things at promoting the decarbonization of the energy mix and the electrifica
tion of energy demand, key actions in the fight against climate change.

(10) The Group Investment Committee is made up of the heads of Administration, Finance and Control, Innovability, Legal, Corporate, Regulatory and Antitrust Affairs, Global Procurement, and the heads of the Geographical Areas and the Business Lines.

INCENTIVE SYSTEM

Enel's remuneration policy for 2023, which was adopted by the Board of Directors acting on a proposal of the Nomination and Compensation Committee and approved by the Shareholders' Meeting of May 10, 2023, was formulated on the basis of (i) the recommendations of the Italian Corporate Governance Code published on January 31, 2020; (ii) national and international best practice; (iii) the guidance provided by the favorable vote of the Shareholders' Meeting of May 19, 2022 on the remuneration policy for 2022; (iv) the results of the engagement activity on corporate governance issues pursued by the Company between January and February 2023 with the leading proxy advisors and some Enel's relevant institutional investors; (v) the findings of the benchmark analysis of the remuneration of the Chairman of the Board of Directors, the Chief Executive Officer/General Manager and the non-executive directors of Enel for 2022, which was performed by the independent consultant Mercer.

This policy is intended to (i) foster Enel's sustainable success, which takes the form of creating long-term value for the benefit of shareholders, taking due consideration of the interests of other key stakeholders, so as to incentivize the achievement of strategic objectives; (ii) attract, retain and motivate personnel with the professional skills and experience required by the sensitive managerial duties entrusted to them, taking into account the remuneration and working conditions of the employees of the Company and the Enel Group; and (iii) promote the corporate mission and values.

The 2023 remuneration policy adopted for the Chief Executive Officer/General Manager and key management personnel envisages:

  • a fixed component;
  • a short-term variable component (MBO) that will be paid out on the basis of achievement of specific performance objectives. Namely:
    • for the CEO/General Manager, annual objectives have been set for the following components of the 2023 MBO mechanism:
      • consolidated net ordinary profit;
      • funds from operations/consolidated net financial debt;
  • commercial complaints received at the Group level, accompanied by the following gate objectives: (i) System Average Interruption Duration Index - SAIDI; (ii) commercial complaints on the free commodity market in Italy;
  • workplace injury frequency rate, accompanied by a gate objective represented by fatal injuries;
  • for key management personnel, the respective MBOs identify objective and specific annual goals connected with the Strategic Plan. They are determined jointly by the Administration, Finance and Control Function and the People and Organization Function;
  • a long-term variable component linked to participation in specific long-term incentive plans. In particular, for 2023 this component is linked to participation in the 2023 Long-Term Incentive Plan for the management of Enel SpA and/or its subsidiaries pursuant to Article 2359 of the Italian Civil Code (2023 LTI Plan), which establishes three-year performance targets for the following:
    • Enel's average TSR (Total Shareholder Return) compared with the average TSR for the EURO STOXX Utilities - EMU index for the 2023-2025 period;
    • ROIC (Return on Invested Capital) WACC (Weighted Average Cost of Capital), cumulative for 2023-2025;
    • intensity of Scope 1 and Scope 3 GHG emissions related to the Group's Integrated Power operations (gCO2eq/kWh) in 2025, accompanied by a gate objective represented by the intensity of Scope 1 GHG emissions related to the Group's power generation (gCO2eq/kWh) in 2025;
    • percentage of women in top management succession plans at the end of 2025.

The 2023 LTI Plan establishes that any bonus accrued is represented by an equity component, which can be supplemented – depending on the level of achievement of the various targets – by a cash component. More specifically, of the total incentive vested, the 2023 LTI Plan establishes that: (i) for the CEO/General Manager of Enel, the incentive shall be paid entirely in Enel shares up to 150% of the base value; (ii) for managers reporting directly to the CEO/ General Manager of Enel, including key management per-

sonnel, the incentive shall be paid entirely in Enel shares up to 100% of the base value; and (iii) for beneficiaries other than those specified under (i) and (ii), the incentive shall be paid entirely in Enel shares up to 65% of the base value. The 2023 LTI Plan provides that the shares to be disbursed pursuant to the latter provisions shall be purchased previously by Enel and/or its subsidiaries. In addition, the disbursement of a significant portion of long-term variable remuneration (70% of the total) is deferred to the second year following the three-year performance period covered by the 2023 LTI Plan.

For more information on the remuneration policy for 2023, please see Enel's "Report on the remuneration policy for 2023 and compensation paid in 2022", which is available on the Company's website (www.enel.com).

VALUES AND PILLARS OF CORPORATE ETHICS

A robust system of ethics underlies all activities of the Enel Group. This system is embodied in a dynamic set of rules constantly oriented towards incorporating national and international best practices that everyone who works for and with Enel must respect and apply in their daily activities. The system is based on specific compliance programs, including: the Code of Ethics, the Compliance Model under Legislative Decree 231/2001, the Enel Global Compliance Program, the "Zero-Tolerance-of-Corruption" Plan, the Human Rights Policy, and any other national compliance models adopted by Group companies in accordance with local laws and regulations.

Code of Ethics

In 2002, Enel adopted a Code of Ethics,(11) which expresses the Company's ethical responsibilities and commitments in conducting its affairs and operations, governing and standardizing corporate conduct on the basis of standards aimed to ensure the maximum transparency and fairness with all stakeholders. The Code of Ethics is valid for the whole Group, taking due account of the cultural, social and economic diversity of the various countries in which Enel operates. Enel also requires that all suppliers and partners adopt conduct that is in line with the general principles set out in the Code. Any violations or suspected violations of Enel Compliance Programs can be reported, including in anonymous form, through a single Group-level platform (the "Ethics Point").

The following table indicates total violation reports received through the whistleblowing platform and actual violations confirmed.

2023 2022(1) Change
Total reported violations of the Code of Ethics received
no.
207 168 39 23.2%
Confirmed violations of the Code of Ethics
no.
41 34 7 20.6%
- of which violations involving conflicts of interest/bribery
no.
7 10 (3) -30.0%

(1) The analysis of reports received in 2022 was completed in 2023. For that reason, the number of reports for 2022 was restated from 172 to 168 and the number of confirmed violations for 2022 was restated from 29 to 34. Among the five additional violations, one is attributable to a case of conflict of interest in Brazil.

Compliance Model under Legislative Decree 231/2001

Legislative Decree 231 of June 8, 2001 introduced into Italian law a system of administrative liability for companies for certain types of offenses committed by their directors, managers or employees on behalf of or to the benefit of the company. Enel was the first organization in Italy to adopt, back in 2002, this sort of compliance model that met the requirements of Legislative Decree 231/2001 (also known as "Model 231"). It has been constantly updated to reflect developments in the applicable regulatory framework and current organizational arrangements.

(11) Most recently updated in February 2021.

Enel Global Compliance Program (EGCP)

The Enel Global Compliance Program for the Group's foreign companies was approved by Enel in September 2016. It is a governance mechanism aimed at strengthening the Group's ethical and professional commitment to preventing the commission of crimes abroad that could result in criminal liability for the company and do harm to our reputation. Identification of the types of crime covered by the Enel Global Compliance Program – which encompasses standards of conduct and areas to be monitored for preventive purposes – is based on illicit conduct that is generally considered such in most countries, such as corruption, crimes against the government, false accounting, money laundering, violations of regulations governing safety in the workplace, environmental crimes, etc.

"Zero-Tolerance-of-Corruption" Plan and the anti-bribery management system

In compliance with the tenth principle of the Global Compact, according to which "businesses should work against corruption in all its forms, including extortion and bribery", Enel is committed to combating corruption. For this reason, in 2006 we adopted the "Zero-Tolerance-of-Corruption" Plan (ZTC Plan), confirming the Group's commitment, as described in both the Code of Ethics and the Model 231, to ensure propriety and transparency in conducting company business and operations and to safeguard our image and positioning, the work of our employees, the expectations of shareholders and all of the Group's stakeholders. Following receipt of the ISO 37001 anti-corruption certification by Enel SpA in 2017, the 37001 certification plan has gradually been extended to the main Italian and international subsidiaries of the Group.

The following table reports the average number of per capita training hours provided on anti-corruption policies and procedures.

2023 2022 Change
Training in anti-corruption policies and procedures no. 30,304 30,564 (260) -0.9%
% 49.6 46.9 2.7 5.8%
Training in anti-corruption policies and procedures by geographical area:
- Italy % 50.7 56.5 (5.8) -10.3%
- Iberia % 42.5 51.0 (8.5) -16.7%
- Latin America % 49.6 31.9 17.7 55.5%
- Europe % 94.2 12.0 82.2 -
- Africa, Asia and Oceania % 79.3 14.8 64.5 -
- North America % 54.2 80.1 (25.9) -32.3%

Human Rights Policy

Respect for human rights is part of the very foundation of sustainable progress. Enel's business model is based on the generation of sustainable value, together with its internal and external stakeholders, on continuous innovation, the pursuit of excellence and respect for human rights throughout the value chain. This translates into the rejection of practices such as modern slavery, forced labor and human trafficking, and the promotion of diversity, inclusion, equal opportunity and ensuring that people are treated with dignity and valued for their uniqueness, whether they work within the Company or elsewhere along the value chain in which the Group operates. The main international standards inspiring Enel's commitment are the United Nations framework "Protect, Respect, Remedy", outlined in the guiding principles on business and human rights, and the guidelines for multinational companies of the OECD. This commitment is clearly reflected in the human rights policy drawn up and adopted back in 2013. In 2021, this document was updated to take account of the evolution of international reference frameworks and the operational, organizational and management processes of the Group. The document strengthens and expands the commitments already present in other codes of conduct adopted by Enel such as the Code of Ethics, the "Zero-Tolerance-of-Corruption" Plan and global compliance models. The update was approved by the Board of Directors of

Enel SpA and then adopted by the subsidiaries. Enel undertakes to comply with these principles in every country in which it operates, respecting local cultural, social and economic diversity, requiring each stakeholder to adopt conduct in line with these principles, paying particular attention to high-risk environments or those exposed to conflicts.

Stakeholders are all those who have a direct or indirect interest in the activities of the Enel Group, such as customers, employees of any type or level, suppliers, contractors, partners, other companies and trade associations, the financial community, civil society, local communities and indigenous and tribal peoples, national and international institutions, the media, as well as the organizations and institutions that represent them.

The update, similar to the 2013 version, involved a process of consultation with stakeholders relevant to the Company (internal, other companies, suppliers, human rights experts, think tanks, NGOs) conducted in accordance with the criteria contained in the ''UN Global Compact Guide for Business: How to Develop a Human Rights Policy''.

The updated code identifies twelve principles (compared with the previous eight), again divided into two macro-themes: work practices and community relations. The Human Rights Policy is a commitment to:

  • proactively consider the needs and priorities of people and society in general because this makes it possible to innovate processes and products, a key factor in an increasingly competitive, inclusive and sustainable business model, including through the adoption of the principles of circularity, the protection of natural capital and biodiversity;
  • promote the engagement of our main external and internal stakeholders in order to enhance their awareness and develop a constructive dialogue that can provide a valuable contribution to the design of solutions to mitigate climate change.

In addition to the commitment to the contribution to achieving the United Nations Sustainable Development Goals, the updates include: (i) a reminder of how environmental degradation and climate change are interconnected with human rights, in that the implementation of measures to mitigate the effects of human activities on the environment cannot take place without taking account of their social impact; (ii) the strengthening of the principles of "respect for diversity and non-discrimination" and "health and safety" in the part relating to mental and physical well-being and work-life integration; (iii) an increase in the granularity of our commitment in our relations with communities, with particular regard to local communities, indigenous and tribal populations, privacy and communication.

Enel has undertaken to monitor application of the Human Rights Policy (i) by employing a specific due diligence process in the various countries in which we operate; (ii) by promoting conduct consistent with a just and inclusive transition; and (iii) by enhancing communication with regard to the action plans developed to prevent and remedy situations in which critical issues could arise.

More specifically, the due diligence process for the management system has been developed in accordance with the main international standards such as the United Nations Guiding Principles on Business and Human Rights and the OECD guidelines. It enables us to identify opportunities for improvement and develop specific action plans. Thanks to this process, 100% of policies and operational procedures adopted are evaluated to identify any direct or indirect risks in the management of our operations, covering the entire value chain and the establishment of new business relationships (for example, acquisitions, mergers, joint ventures, etc.). A new cycle of the process was begun in 2023.

With regard to the sustainability of the supply chain, Enel's purchasing processes are based on fairness, transparency and collaboration, and for this reason the Group's suppliers are required not only to guarantee the necessary quality standards but also to commit to adopting best practices for human rights and the impact of their activity on the environment. These include those concerning working conditions, health and safety, appropriate working hours, rejection of forced or child labor, respect for personal dignity, non-discrimination and the inclusion of diversity, freedom of association and collective bargaining and respect for privacy by design and by default. All of this is delineated by a clear framework of codes of conduct, including, in addition to the Human Rights Policy, the Code of Ethics, the "Zero-Tolerance-of-Corruption" Plan and global compliance programs. Furthermore, specific clauses are included in all contracts for works, services and supplies, updated periodically to take account of the regulatory developments and ensure alignment with international best practices. For more information, please see the section "Sustainable supply chain".

REPORT

ON OPERATIONS

  1. GROUP STRATEGY & RISK MANAGEMENT

Reference scenario and context

Short-term global uncertainties in macroeconomic conditions, energy, the climate and the energy transition are driving us to improve the visibility of returns and increase the flexibility of our businesses.

Strategic Plan

The new Strategic Plan focuses the Group's strategy on driving the profitability of investments, enhancing the effectiveness of organization and processes in order to rationalize costs and, finally, ensuring sustainability in the face of the financial and environmental challenges of climate change.

Analysis of risks and opportunities

The evaluation of climate and transition scenarios within a structured process is a key tool for translating data into useful information for maximizing opportunities and mitigating risks.

REFERENCE SCENARIO

The geopolitical environment

Global economic developments can have a significant impact on the Group's operations due to their direct effects on GDP growth rates, inflation rates and exchange rates in the countries in which Enel operates. In recent years, the stability of the euro area has been shaken by a number of adverse events, such as the COVID-19 pandemic and the more recent military conflict between Russia and Ukraine. Since the euro-area economies are among the most exposed to the war due to their geographical proximity to the conflict area and their strong dependence on gas imports from Russia, they have been severely impacted both in terms of slower GDP growth and higher inflation. The latter was initially triggered by the exponential increase in energy and commodity prices. Subsequently, the repercussions of the increase in the cost of firm's production factors on the prices of non-energy industrial goods fueled a persistent inflationary environment, one that still represents a risk factor requiring careful monitoring. The increase in inflation has eroded household purchasing power and has weighed on industrial production, particularly in more energy-intensive sectors. The easing of inflationary pressures in the second half of the year in the euro area – similarly to developments in the United States – prompted the European Central Bank to interrupt its series of interest rate increases after September. The greater persistence of core inflation (which excludes the most volatile goods) compared with general inflation, however, represents a source of uncertainty concerning the future path of monetary policy, which if kept restrictive for a longer period time could impact economic activity and monetary policy in the euro area.

The year 2024 will again be marked by geopolitical developments on a global scale. The continuation of the conflict between Russia and Ukraine, the more recent tensions that have emerged in the Middle East, the elections scheduled for 2024 in the European Union, the United States, the United Kingdom, India, Taiwan, Iran and many other countries, could all have a significant impact on the domestic and foreign policies of major global players.

On the budgetary policy front, in December 2023 the finance ministers of the European Union reached an agreement for the reform of the Stability and Growth Pact. The new fiscal rules are characterized by greater simplicity and an emphasis on more readily observable variables, with the aim of improving the effectiveness and credibility of the rules.

On the international trade front, systems of sanctions also remain in place, which can influence trade agreements between countries and industrial policies in various regions. Any introduction of new customs duties or export restrictions could further aggravate current macroeconomic conditions and make the geopolitical situation even more uncertain.

The main risks affecting energy commodities lie in the fragility of the natural gas market in Europe. Although commodity prices have fallen well below the highs recorded in 2022, market equilibria are very tenuous, and disruptions along the value chain, such as the loss of a supply route via the Suez Canal, could drive prices up. This would also have a sharp impact on coal and electricity prices, as these variables are strongly correlated with developments in gas prices. These considerations also hold for the oil market, whose flows also pass through countries close to the conflict areas and are strongly influenced by relations between the United States and the Middle East.

The current geopolitical and macroeconomic context, both in the West and in China, will also continue to influence demand in the industrial metals sector, which was affected last year by the slowdown in global economic growth and prolonged political and military tensions. In particular, in China – the global leader in metals markets – the recovery in demand in 2023 was weaker than analysts and experts had forecast, and future developments continue to depend heavily on the impact of government stimuli, which have not been as effective as expected so far, and on the recovery of demand in Western countries. As regards the metals most closely involved in renewable energy technologies, such as lithium and polysilicon, the recent environment of rapidly and sharply falling prices, undermined by disappointing demand for "green" solutions and a very large increase in the supply of both materials, is eroding the margins of producers, who are struggling to sustain investment in near-term price scenario that does not offer much room for growth.

Macroeconomic environment

The global macroeconomic environment in 2023 was characterized by a general slowdown in the real economy, continuing a downward trend that had already begun in the previous year. After a slowdown in global GDP growth to 3.1% on an annual basis in 2022, following the excellent performance of 6.4% growth recorded in 2021, real growth is expected to be even slower in 2023, at 3%. This decline reflects the lagged and continuing effects of the restrictive monetary policy stances adopted by central banks to counteract high inflationary pressures, the loss of consumer purchasing power, the deterioration in financial and credit conditions, and the decline in trade and investment at a global level. Additionally, the protracted military conflict between Russia and Ukraine, the more recent conflict in the Middle East, volatile US-China relations and the resulting global uncertainty have continued to adversely impact energy, commodity and food markets, slowing the normalization of inflationary pressures on a global scale.

In the United States, the economy performed well above market expectations in the 4th Quarter, with GDP expanding by 3.1% on an annual basis, compared with 2.9% in the 4th Quarter of 2022.

Private consumption spending began to realign with real incomes during the year, as excess savings accumulated during the pandemic continued to decline, especially among low-income households. However, a general easing in the inflationary pressures created by the surge in energy commodity prices in the previous year, a very resilient labor market and strong domestic demand buoyed GDP, which is expected to have grown by 2.5% on an annual basis, up from 1.9% the previous year.

In the euro area, macroeconomic conditions experienced a period of stagnation, dragged down by the restrictive monetary policy stance, the impact of high inflation on consumers' real incomes, weak external demand and industrial weakness. The real economy is expected to have entered a technical recession in the 4th Quarter, with a contraction of 0.1% on a quarterly basis in the last three months of the year confirming that already recorded in the previous period. With regard to inflationary pressures, final consumer good prices began to slow in the last quarter of the year thanks to the restrictive monetary policy stance implemented by the European Central Bank, weak domestic demand and falling energy prices, with inflation at 5.5% year-on-year, down from a peak of 8.4% in 2022.

In Italy, economic activity displayed clear signs of flagging, with GDP expected to grow by 0.7% on an annual basis after the strong rise of 3.9% recorded the previous year. Private consumption has been hit by high inflation, while tighter financial conditions have dragged down investment. Subdued external demand also affected exports. By contrast, consumer prices recorded positive signs, with inflation falling sharply in the last quarter thanks to significant base effects resulting from the moderation of energy prices.

In Spain, the economy performed better than the European average thanks to a strong contribution from services, with GDP expected to grow by 2.4%. After a substantial decline in inflationary pressures in the first half of the year driven by the normalization of energy prices, the second half of the year was characterized by rebound, with average annual inflation standing at 3.4% in 2023, compared with 8.3% in 2022.

In Latin America, inflation slowed in 2023, although the decline differed depending on the country. In Brazil, the economy registered faster-than-expected GDP growth in 2023, expanding by an estimated 2.9% on an annual basis. In the first half of the year, growth was driven by the extraordinary performance of the agricultural sector and by robust domestic demand driven by private consumption. The economy was resilient in the second half, sustained by an increase in exports and modest growth in household consumption, which benefited from more moderate inflation and an improvement in the labor market. Inflation decelerated sharply compared with 2022 (the annual inflation rate came to 4.6% in 2023), reflecting a restrictive monetary policy stance and a decline in energy and service prices.

In Chile, zero growth is expected for GDP in 2023, after the 2.5% growth recorded in 2022. In the first half of the year, the tightening of financial conditions due to the restrictive policy stance adopted by the central bank and the uncertainty connected with the constitutional reform process slowed economic activity. In the second half, however, growth was buoyed by the weakness of global demand and rapid disinflation (the annual inflation rate was 7.7% in 2023, compared with 11.6% in 2022), which prompted the Chilean central bank to cut interest rates by 300 basis points.

In Colombia, economic activity slowed sharply in 2023 compared with the previous year, with GDP growing by an estimated 1.0% on an annual basis, a sharp decline from the 7.3% registered in 2022. Persistent inflation, combined with high interest rates for a prolonged period, adversely impacted demand, accompanied by a slowdown in investment and a decline in exports. Inflation slipped below 10% only in December, posting an annual average of 11.8%. The slow process of disinflation enabled the central bank to reduce interest rates by only 25 basis points at the end of the year.

Peru saw the economy contract by an estimated 0.5% in 2023, after posting growth of 2.7% in 2022. Political and social instability, greater-than-expected climate anomalies associated with El Niño and high food prices due to lower agricultural production generated an especially sharp contraction in economic activity in the first half of

the year. The inflation rate was 6.3% in 2023, compared with 7.9% in 2022. This decline prompted the central bank to cut interest rates by 100 basis points in the second half of the year.

In Argentina, 2023 was characterized by a severe economic crisis that led to the devaluation of the Argentine peso and continued hyperinflation. GDP contracted by an estimated 1.2% on an annual basis, while inflation rose to 127.9%. The currency devaluations implemented at the end of 2023, which are intended to foster the country's export competitiveness, and the political uncertainty associated with the presidential elections in October have fueled the inflationary spiral.

% Inflation
2023 2022 Change
Italy 6.0 8.7 (2.7)
Spain 3.4 8.3 (4.9)
Russia 5.9 13.8 (7.9)
Romania 9.8 12.0 (2.2)
India 5.7 6.7 (1.0)
South Africa 5.9 6.9 (1.0)
Argentina 127.9 70.7 57.2
Brazil 4.6 9.3 (4.7)
Chile 7.7 11.6 (3.9)
Colombia 11.8 10.2 1.6
Mexico 5.6 7.9 (2.3)
Peru 6.3 7.9 (1.6)
United States 4.1 8.0 (3.9)
Canada 3.9 6.8 (2.9)
% GDP
2023 2022
Italy 0.7 3.9
Spain 2.4 5.8
Portugal 2.2 6.8
Greece 2.1 5.7
Argentina (1.2) 5.0
Romania 2.3 4.6
Russia 3.2 (2.1)
Brazil 2.9 3.1
Chile - 2.5
Colombia 1.0 7.3
Mexico 3.3 3.9
Peru (0.5) 2.7
Canada 1.0 3.8
United States 2.5 1.9
South Africa 0.5 1.9

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

2023 2022 Change
Euro/US dollar 1.08 1.05 2.86%
Euro/British pound 0.87 0.85 2.35%
Euro/Swiss franc 0.97 1.00 -3.00%
US dollar/Japanese yen 140.58 131.55 6.86%
US dollar/Canadian dollar 1.35 1.30 3.85%
US dollar/Australian dollar 1.51 1.44 4.86%
US dollar/Russian ruble 85.51 69.80 22.51%
US dollar/Argentine peso 295.62 130.87 125.89%
US dollar/Brazilian real 4.99 5.16 -3.29%
US dollar/Chilean peso 840.40 873.60 -3.80%
US dollar/Colombian peso 4,320.20 4,261.77 1.37%
US dollar/Peruvian sol 3.74 3.83 -2.35%
US dollar/Mexican peso 17.74 20.11 -11.79%
US dollar/Turkish lira 23.80 16.58 43.55%
US dollar/Indian rupee 82.60 78.63 5.05%
US dollar/South African rand 18.46 16.37 12.77%

The energy industry

Energy and other commodities in 2023

In 2023, prices on the European gas market registered a strong downward trend, reflecting high levels of storage and decreasing demand. On average, the TTF benchmark price decreased by more than 65% compared with the previous year, due to the easing of the supply risks that emerged in 2022, the year in which gas flows ceased from Russia, the main supplier to the European market.

However, the gas market remained highly volatile and very sensitive to the upward shocks recorded during the year, reflecting the fragility of the balance between supply and demand, although prices never touched the levels reached in 2022. Price volatility was moderated by the achievement of a high percentage of filled storage (above 90%) before the start of the winter season, which combined with mild temperatures in November and December led to a sharp reduction in gas prices in Europe in the final months of 2023, falling below €35/MWh.

The developments in gas prices, together with high levels of storage, in turn drove a decrease in coal prices, which in 2023 averaged \$129/ton (-55.5% on the previous year). The dynamics of the gas market have also made coal-fired generation less attractive, discouraging its consumption and encouraging accumulation of the commodity.

In the first half of 2023, oil prices declined in response to the normalization of supply and expectations of a weak recovery in demand. During the second half, however, prices jumped considerably, reaching a peak in September, reflecting the impact of additional cuts in supply combined with growing demand. In the last quarter of 2023 the price trend reversed again, with Brent prices falling below \$75 a barrel. In 2023, the European benchmark price averaged \$82 a barrel, 17% lower than the previous year.

2023 2022 Change
Brent \$/barrel 82 99 -17.2%
API2 \$/ton 129 290 -55.5%
TTF €/MWh 41 120 -65.8%
CO2 €/ton 84 81 3.7%
Copper \$/ton 8,495 8,831 -3.8%
Aluminum \$/ton 2,256 2,706 -16.6%
Lithium carbonate \$/ton 36,762 71,640 -48.7%
Polysilicon \$/ton 16,441 35,589 -53.8%

In contrast to developments in other energy commodities, 2023 saw a slight increase in CO2 prices in the ETS, which rose by about 4% compared with the previous year. On a monthly basis, prices displayed a downward trend in the second half of the year, mainly due to low demand for allowances from both ordinary market participants and speculative operators.

In the wake of developments in the second half of 2022, weak economic growth and the increasingly tense geopolitical context dominated metals markets in 2023, exacerbated in the final part of the year by the resurgence of conflict in the Middle East.

As often happens in commodity markets, China again had a decisive impact on market balances and price trends. Following the easing of logistical issues in 2022, fears of a slowdown in growth and the crisis in the construction sector dampened demand, and therefore prices, for the Asian giant as well.

As regards base metals such as aluminum and copper, the prices of which are highly correlated with economic and industrial activity, the weakness of economic conditions caused the prices of both to perform less strongly than expected. Copper prices recorded an overall decrease in the first half of 2023 before stabilizing from June onwards, recording an average price of \$8,495/ton in the year, down by 3.8% compared with 2022. Aluminum performed even worse, with the price remaining weak throughout the year, closing 2023 with an average of \$2,256/ton, down by 16.6% compared with the average for 2022.

A similar pattern was displayed by steel prices, which after an initial rise at the beginning of the year, quickly retreated and closed 2023 at an average price of \$580/ton, down by 15% compared with 2022.

As regards the metals most closely involved in renewable energy technologies, such as lithium for batteries or the polysilicon used in the manufacture of photovoltaic panels, 2023 prices showed declines compared with 2022 that were even larger than those registered by base metals. Lithium, which was adversely impacted by lower-than-expected demand for batteries and, above all, by a strong expansion of supply, both internally in China and from Australia and South America, saw 2023 prices fall constantly during the year to close at an average price of about \$36,000/ton, down by almost 50% compared with 2022. Similar developments were registered for polysilicon prices, which following sharp declines beginning in December 2022 remained very weak throughout 2023, posting an average of about \$16,000/ton, down by about 54% compared with 2022.

Electricity and natural gas markets

Electricity demand

Developments in electricity demand(1)

TWh
2023 2022 Change
Italy 306.1 315.0 -2.8%
Spain(2) 239.9 250.0 -4.0%
Romania 54.0 57.5 -6.1%
Argentina 145.9 144.0 1.3%
Brazil 653.8 611.0 7.0%
Chile 83.4 83.2 0.2%
Colombia 80.0 76.9 4.0%

(1) Gross of grid losses.

(2) National data.

Source: Enel based on TSO figures. The figures are the best estimate available at the publication date and could be revised by TSOs in the coming months.

Electricity consumption in Europe decreased in 2023, mainly reflecting high temperatures and a slowdown in economic activity.

Italian electricity demand closed 2023 with a contraction of 2.8% compared with 2022. Monthly electricity consumption in the first nine months of 2023 was consistently lower than the previous year, with a slight recovery in the last quarter that was not sufficient to offset the losses accumulated in the previous months, again reflecting mild temperatures and weak industrial activity. The decrease recorded in Spain was larger at 4.0%, reflecting the slowdown in the industrial and service sectors, combined with the effect of milder temperatures. Demand in Romania also fell sharply, recording a decrease of 6.1% compared with the previous year.

Latin American countries bucked the trend, with electricity demand increasing compared with 2022, mainly sustained by continuing favorable economic growth developments. Particularly large rises were posted in Brazil (+7.0%) and Colombia (+4.0%), while more modest increases were registered in Chile (+0.2%) and Argentina (+1.3%).

Electricity prices

Electricity prices

Average baseload
price 2023 (€/MWh)
Change in average
baseload price
2023-2022
Average peakload
price 2023 (€/MWh)
Change in average
peakload price
2023-2022
Italy 127.4 (175.7) 137.4 (200.3)
Spain 87.4 (80.3) 82.7 (86.3)

Electricity prices in Italy and Spain fell sharply in 2023 compared with 2022, reflecting the decrease in prices on energy commodity markets during the year. More specifically, a sharp decrease in the price of gas, together with an increase in renewable generation, caused electricity prices in Italy to decrease by 58% compared with the previous year. Less marked but still substantial was the decrease registered in Spain (-48%), where prices in 2022 had risen less than in other European countries, thanks to the

strong presence of renewable generation and, above all, to regulatory measures introduced to limit the impact of the increase in gas prices. Consumer prices per kWh also fell significantly compared with 2022, with the exception of residential prices in Italy, which rose in the first half of the year.

The table below summarizes final market prices for the main consumption segments.

Price developments in the main markets

Eurocents/kWh
2023 2022 Change
Final market (residential)(1)
Italy 0.3230 0.2932 10.2%
Spain 0.1534 0.2773 -44.7%
Final market (industrial)(2)
Italy 0.2031 0.2870 -29.2%
Spain 0.1085 0.1917 -43.4%

(1) Annual price net of taxes – annual consumption of between 2,500 kWh and 5,000 kWh.

(2) Annual price net of taxes – annual consumption of between 70,000 MWh and 150,000 MWh. Source: Eurostat.

Natural gas markets

Natural gas demand

Billions of m3
2023 2022 Change
Italy 60.7 67.5 (6.8) -10.1%
Spain 28.5 31.3 (2.8) -8.9%

The underlying factor in the decline in gas prices was a decrease in gas consumption. In 2023, demand contracted sharply compared with the previous year. In Italy and Spain, gas demand decreased by 10.1% and 8.9% respectively, reflecting the mild temperatures recorded during the year, an increase in electricity generation from renewable sources and the continued weakness of industrial production, which is still below pre-crisis levels.

Italy

Natural gas demand in Italy

Billions of m3
2023 2022 Change
Distribution grids 26.7 28.8 (2.1) -7.3%
Industry 11.5 11.9 (0.4) -3.4%
Thermal generation 21.2 25.1 (3.9) -15.5%
Other(1) 1.3 1.7 (0.4) -23.5%
Total 60.7 67.5 (6.8) -10.1%

(1) Includes other consumption and losses.

Source: Enel based on data from the Ministry for Economic Development and Snam Rete Gas.

In Italy, demand decreased by 10.1% compared with 2022. Analyzing consumption by sector, thermal generation registered a particularly large decline (-15.5%), mainly due to the replacement of gas generation with renewable generation. This is followed by distribution grids (-7.3%), where the decrease reflected mild temperatures in the first and fourth quarters. Less marked but still significant was the decrease recorded in industry (-3.4%).

Competitive and transition environment

Assessing the evolution of the energy transition process is a fundamental input in the definition of Enel's strategy. This assessment is particularly critical in the current environment, characterized, as discussed in earlier sections, by growing geopolitical tensions, high interest and inflation rates and supply chain difficulties. At the same time, the objectives of the Paris Agreement require an acceleration of the energy transition, in order to limit the increase in average global warming to 1.5 °C compared with pre-industrial levels. The recent COP 28 on climate change held in Dubai established the objective of gradually transitioning away from fossil fuels by 2050 and tripling renewables capacity by 2030 (11 TW vs 3.6 TW in 2022), in line with the International Energy Agency (IEA) Net Zero(12) and the International Renewable Energy Agency (IRENA) 1.5(13) scenarios.

The transition is shifting gears at the global level, as demonstrated in particular by the increase in renewables capacity, which saw over 500 GW of capacity installed in 2023 alone.(14) According to the IEA, the decline in all fossil fuels will begin within this decade under current policy scenarios.(15) Nonetheless, a broad gap persists between today's ambitions and holding the temperature increase to below 1.5 °C, as well as local differences in the pace of progress towards the goals that each country has set itself. This gap is largely connected with the need to introduce measures to implement the long-term objectives, with a view to increasing both the development of renewables and the rate of electrification of consumption in the short term. More specifically, in the IEA's announced pledges scenario (APS), capacity reaches a total of almost 10 TW, and is therefore still not consistent with the latest agreements.

Furthermore, while on the one hand we are witnessing a convergence of calls for energy security, accessibility and sustainability, which is guiding everyone – political decision-makers, citizens and companies – towards an acceleration of the clean electrification process, in reality the energy transition is proceeding along a path of disorderly policies ("disorderly transition" (16)) compared with expectations. In some geographical areas, the speed of the transition is not as rapid as expected, as measured by sales of electric cars and heat pumps – the main drivers of the increase in electricity demand. Although they are expanding steadily, they do not yet have a significant impact on global energy consumption.

In a year characterized by high interest rates, inflation and supply chain difficulties, the utilities sector, and integrated utilities in particular, has demonstrated resilience to external developments, thanks in part to the normalization of commodity prices, as well as the balance achieved between industry, with investments to expand renewable generation capacity and strengthen grid infrastructure, which lower risk. This positioning reaffirms the crucial role of utilities in the context of the transition and manifests the commitment to energy security.

(12) Source: IEA, 2023, World Energy Outlook.

(13) Source: IRENA, 2023, World Energy Transition Outlook.

(14) Source: IEA, 2023, Renewables Report.

(15) Stated Policies Scenario (STEPS). Source: IEA, 2023, World Energy Outlook.

(16) According to the definition of the Network for Greening the Financial System, 2022, "Scenarios for central banks and supervisors".

With the evolution of markets, the electricity generation and sales sector, together with related services and products, is experiencing an increase in competition, often a reflection of the strategic repositioning of companies in related sectors. Although this is producing a potentially more challeng-

Climate change and long-term scenarios

Enel promotes transparency in its climate-change impact disclosures and works to demonstrate to its stakeholders that it is tackling climate change with diligence and determination, consistent with the guidelines and requirements set out in the most recent disclosure standards. The Group was one of the first utilities to take on board the "Guidelines on reporting climate-related information" published by the European Commission in June 2019, which, together with sustainability reporting standards such as the GRI Standards, represent a benchmark for the Group's reporting on climate change issues.

Scenario analysis and planning

The Group develops short-, medium- and long-term scenarios for macroeconomic, financial, energy and climate developments in order to support planning, capital allocation, strategic positioning and the assessment of the risks and resilience of the strategy. Scenario-based planning involves defining alternative scenarios developed on the basis of a number of key uncertainty variables, such as achieving the goals of the Paris Agreement. The development of scenarios allows companies to explore and model plausible alternative futures, designing various paths forward with different timing and options, and ultimately to support strategic decision-making with a view to maximizing opportunities and mitigating risks.

To support analysis of scenarios and the evolution of the external context, the Group identifies and analyzes short-, medium- and long-term trends to develop an overview of how the structural forces and macro-trends are influencing the speed of the transition and of the expected impacts in the energy sector, especially in the businesses in which Enel operates. This mapping of trends provides a reference foundation for developing actions to orient the positioning of the business, seizing the opportunities offered by the context.

Scenario benchmarking

Benchmarking of external energy scenarios is a key starting point in order to build robust internal scenarios. There are many global, regional and national energy transition scenarios published by various providers and designed for a wide range of purposes, from government planning and policying competitive environment due to the presence of multiple operators, it also opens the way to new business opportunities, the identification of new areas of value, the creation of synergies and the development of potential partnerships.

making to the support of enterprise decision-making processes. Benchmarking entails analyzing external transition scenarios in order to compare results in terms of the energy mixes, trends in emissions, and technology decisions and to identify the main drivers of the energy transition for each.

Enel's benchmarking of external energy transition scenarios comprises the following steps.

  • 1. Analysis of the context of global and national scenarios for the countries in which we operate. The analysis of scenarios, as well as the study of reports and datasets, is supported by constant dialogue with the analysts of the main scenario providers. Global energy scenarios are typically grouped by family based on the degree of climate ambition, as follows:
  • Stated-policies scenarios: based on current policies, or Business-as-usual;
  • Paris-Aligned scenarios: these are aligned with the Paris Agreement, i.e. are compatible with the goal of limiting the increase in average global temperatures to "well below 2 °C" above pre-industrial levels;
  • Paris-Ambitious/Net Zero scenarios: global energy scenarios that take a path towards net-zero emissions by 2050, in line with the most ambitious goal of the Paris Agreement, i.e. to keep the average increase in global temperatures to 1.5 °C, albeit with various probability intervals.
  • 2. Data collection, data analysis and identification of scenario and energy transition drivers. The data regards all the main metrics of the energy system, including, for example: primary energy, total and sectoral final energy, electrical capacity by technology, electricity generation by technology, hydrogen production, electric vehicle fleet, etc. The data analysis gives each provider an understanding of the key elements of the Business-as-usual/ Stated-policies scenarios and leads to the identification of the drivers for accelerating the energy transition in the Paris-Aligned and Paris-Ambitious scenarios.
  • 3. Preparation of a summary of the data analysis and digital representation of the main metrics of external scenarios, to provide support for management in the decision-making process for the Group's scenario framework. This activity is an integral part of internal planning processes.

The main transition drivers: electrification and renewables

Analyzing the various external scenarios, the consensus among energy analysts is clearly that the main drivers for achieving climate objectives are electrifying final uses and increasing renewable generation in

both the medium and long term. In particular, in the scenarios that envisage containing the increase in the global average temperature to 1.5 °C, the rate of electrification of consumption rises to over 50% by 2050, compared with 20% in 2022,(17) while the share of renewable generation will reach around 90% of the global electricity mix, compared with 30% in 2022.(18)

RENEWABLE GENERATION AND ELECTRIFICATION IN GLOBAL TRANSITION SCENARIOS AT 2050

Source: based on data from IEA World Energy Outlook 2023, BNEF New Energy Outlook 2022, IRENA World Energy Transition Outlook 2023 and Enerdata Ene uture 2023.

(17) IEA, 2023, World Energy Outlook: 53%; IRENA, 2023, World Energy Transition Outlook: 51%. (18) IEA, 2023, World Energy Outlook: 89%; IRENA, 2023, World Energy Transition Outlook: 91%.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Enel΄s energy transition and climate change scenarios

Enel develops scenarios within an overall framework that ensures consistency between the energy transition scenario and the climate physical scenario:

• the "energy transition scenario" describes how energy production and generation evolve in the various sectors in a specific economic, social, policy and regulatory context;

• the issues connected with future trends in climate variables (in terms of acute and chronic manifestations) define the "physical scenario".

The acquisition and processing of the large volume of data and information needed to define the scenarios, and the identification of the methodologies and metrics necessary to interpret phenomena that are complex and – in the case of climate scenarios – at very high resolution, require a continuous dialogue with both external and Enel internal sources. In order to evaluate the effects of physical and transition phenomena on the energy system, the Group makes use of models that, for the main Group countries involved in the analysis, describe the energy system in terms of specific technological, socio-economic, policy and regulatory aspects.

The adoption of energy and physical scenarios and their integration into corporate processes take account of the most recent climate-change reporting standards and enable the assessment of the risks and opportunities connected with climate change. The process that translates scenario phenomena into useful information for industrial and strategic decisions can be summarized in five steps.

Identi
cation of trends and factors
relevant to the business (e.g., electrication of consumption, heat waves, etc.) 1.

Development of link functions connecting climate/ 2. transition scenarios and operating variables

Identication of risks 3. and oppounities

Calculation of impacts on business 4. (e.g., change in pe ormance, losses, Capex)

Strategic actions: denition and implementation 5. (e.g., capital allocation, resilience plans)

Enel's energy transition scenarios

An energy transition scenario describes how energy production and consumption can evolve in a specific geopolitical, macroeconomic and regulatory and competitive context consistent with the available technological options. This corresponds to a certain trend in greenhouse gas (GHG) emissions and a climate scenario and, therefore, a certain increase in temperature by the end of the century compared with pre-industrial levels. It should be noted that the resulting climate scenario is not deterministic with respect to carbon dioxide emissions. For each climate scenario, the IPCC also always provides both the median value for global warming in 2100 and the very likely range (i.e. the interval between the 5th and 95th percentiles).

The main assumptions considered in developing the Enel energy transition scenarios concern the macroeconomic and energy context, local policies and regulatory measures, the evolution, costs and adoption of energy production, conversion and consumption technologies.

The Reference scenario for planning is a Paris-Aligned scenario, calling for achievement of the objectives of the Paris Agreement, i.e. keeping the increase in the global average temperature below 2 °C compared with pre-industrial levels, with a level of climate ambition that is higher than Business-as-usual, but without necessarily assuming the global achievement of the Net Zero 2050 target, given the current global level of cumulative ambition and the deceleration of the energy transition caused by the impact on certain transition variables of current macroeconomic and energy conditions at the local level.

In order to assess the risks and opportunities inherent in the energy transition, alternative scenarios to the reference framework have been defined on the basis of the degree of climate ambition assumed at the global and local level. These comprise: a Slower Transition scenario, characterized by an energy transition in which the near-term slowdown in the transition in certain areas has a greater overall impact in the medium term, and an Accelerated Transition scenario, with greater ambition compared with the Reference scenario, in particular as regards certain variables.

The assumptions for trends in commodities prices underlying the Reference scenario are consistent with the external scenarios that achieve the objectives of the Paris Agreement. More specifically, we assume sustained growth in the price of CO2 through 2030, caused by a gradual reduction in the supply of allowances as demand

increases, as well as a significant decrease in the price of coal due to declining demand. As for gas, we expect pricing pressures to lessen in the coming years as we see a realignment between global supply and demand. Finally, we are forecasting a gradual stabilization in oil prices, with demand expected to peak by around 2030.

BRENT (\$/barrel) API2 (\$/ton)

129 ~83 ~85 ~110 ~60 2023(1) 2030

CO2 EU - ETS (€/ton) TTF (€/MWh)

(1) Actual.

(2) Sources: IEA - Sustainable Development Scenario and Net Zero Scenario; BNEF, IHS green case scenario; Enerdata green scenario. N.B. The scenarios used as benchmarks have been published at various points throughout the year and may not be up to date with the latest market trends.

The alternative scenarios envisage both an acceleration in decarbonization, driven by regulation, and at the same time a more rapid decline in demand for fossil fuels, which inevitably translates into lower prices for these commodities by 2030. In the case of a slower transition, fuel demand will reach its peak more gradually, and this will support energy commodity prices.

With regard to full achievement of the Paris Agreement objectives, i.e. to stabilize global average temperatures to within +1.5 °C, there remain uncertainties that a number of countries could remain on business-as-usual trajectories and not adopt effective measures to reduce their emissions in a timely manner, thereby slowing the decarbonization process towards net-zero emissions by 2050.

connected with retail energy sales (Scope 3).

Nevertheless, the Enel Group operates a business model and has defined strategic guidelines that are in line with the maximum ambition of the Paris Agreement objectives, i.e. they are consistent with an increase of 1.5 °C in the average global temperature by 2100, as certified by the Sci-

Local transition scenarios

The scenarios have been defined at the local level using two complementary approaches:

  • in the main countries in which we operate, the Group has developed dedicated models for the simulation of the long-term equilibrium of the entire energy system. The values of the scenario variables of relevance to the activities of the Group were then calculated using those models with a view to minimizing costs for the system, imposing a constraint on long-term CO2 emissions consistent with the achievement of the Paris Agreement objectives and interim constraints dictated by policies in existence or being adopted in each country, taking due account of short-term market dynamics and the diffusion of technologies particular to each of those countries;
  • for the rest of the countries involved, the main scenario variables were determined by applying statistical analysis to internal and consensus data in relation to external scenarios aligned with the objectives of the Paris Agreement as provided by national and international accredited bodies.

The definition of internal transition scenarios was prompted by the need for greater modeling flexibility and greater geographical and operational granularity for the main variables that impact Enel's different businesses compared with the scenarios that the main external providers can provide. The latter are typically produced and published at a global or regional level, with some exceptions for particularly large countries, which only rarely correspond to the countries in which the Group is present or has an interest.

Italy

For Italy, the Reference scenario takes account of the recent developments in European climate and energy legislation. The results at 2030 are therefore comparable with those contained in the draft National Integrated Energy and Climate Plan (NIECP), published in June 2023, with certain elements added to ensure greater fit with current market dynamics. The Slower Transition scenario has been constructed assuming a slower energy transition, with less rapid development of renewables capacity, electric mobility and green hydrogen production. The Accelerated Tran- sition scenario assumes a quicker reform of authorization processes and support mechanisms for renewable energy plants, which accelerates installation, and lower costs for green hydrogen production technologies.

ence Based Targets initiative (SBTi). Enel has set a goal for 2040 to achieve zero direct emissions (Scope 1), with totally renewable electricity generation and zero emissions

Spain

For Spain, the Reference scenario also envisages a level of climate ambition and objectives for renewables and energy efficiency that take account of recent developments in European climate and energy legislation and is therefore comparable with the draft NIECP published in June 2023. The scenario envisages rapid growth in renewables, particularly solar, in the next few years. It differs from the NIECP draft at 2030 in its assumption of slower development of green hydrogen.

The alternative Slower Transition scenario assumes a lag in the penetration of renewables, green hydrogen and electric technologies, in particular with regard to private automobiles and the electrification of domestic consumption. The Accelerated Transition scenario envisages a more rapid implementation of authorization procedures for renewables, increasing annual installation levels, and a development of green hydrogen consistent with the draft NIECP, as well as a further effort to achieve energy savings in buildings.

Brazil

For Brazil, the Reference scenario envisages an increase in electrification at 2030, with a growing level of renewables generation, in particular solar and wind, and the start of green hydrogen production after 2027, with a more ambitious view compared with the most recent energy plan.(19) In the transport sector, it takes account of biofuel incentive policies and assumes an increase in electrification. The Slower Transition scenario is constructed on the assumption of a less optimistic macroeconomic environment than the Reference scenario, especially in the years up to 2030, with slower expansion of renewables capacity and a consequent slower trend line in emissions reduction. The Accelerated Transition scenario goes beyond the ambition of the Reference scenario regarding the speed of decarbonization, mainly after 2030, assuming an acceleration in the penetration of renewables, green hydrogen and storage.

(19) Brazil's most recent energy plan is from 2022 (Plano Decenal de Energia 2031); an update is expected in 2024.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Chile

As far as Chile is concerned, the Reference scenario is consistent with the Net Zero scenario defined in the government's PELP document (Planificación Energética a Largo Plazo 2023-2027), published in 2021, in terms of emissions reductions, and includes ambitious targets for the production and export of green hydrogen. The Slower Transition scenario takes a more measured approach, using more conservative macroeconomic growth assumptions with no additional energy or climate policies beyond those already in place. The Accelerated Transition scenario achieves net-zero emissions by 2050 and, compared with the Reference scenario, provides for more ambitious goals for the export of green hydrogen, an acceleration in the electrification of the residential and industrial sectors, and the phase-out of coal by 2030.

Colombia

As for Colombia, the Reference scenario envisages reducing emissions by 40% by 2030 compared with 2021, a moderately less ambitious target than the National Determined Contribution (NDC) objective,(20) and close to zero emissions in the electricity sector by 2050. In the Reference scenario, renewables capacity increases considerably by 2030, and envisages further growth connected with green hydrogen after 2030, albeit more conservatively compared with the expectations set out in the national strategy.(21) The Slower Transition scenario is characterized by emissions trends consistent with the Actualización scenario in the government strategy document,(22) which assumes more conservative macroeconomic growth and no additional energy or climate policies beyond those already in place. The Accelerated Transition scenario envisages an acceleration of the electrification process in the residential and industrial sectors, together with greater growth expectations for the use of renewable sources.

The physical climate scenario for adaptation actions

Within the framework delineated above, each scenario narrative has been developed so as to ensure consistency between the energy transition scenarios and the climate scenarios.

Under the scenarios, the role of climate change is always the most important and generates effects both in terms of transitioning the economy towards net-zero emissions and in terms of physical impacts, which may be:

  • acute phenomena, namely short-lived but intense phenomena, such as flooding, hurricanes etc. with potential impacts on assets (e.g., physical losses and business interruptions);
  • chronic phenomena related to structural changes in the climate, such as the rising trend in temperatures, rising sea levels etc., which may cause persistent changes in the output of generation plants and in electricity consumption profiles in the residential and commercial sectors.

The projected future behavior of these phenomena is analyzed by selecting the best data available from the output data of climate models at different resolution levels and historical data.

The Group has selected three of the global climate pathways developed by the IPCC, which are in line with those of the IPCC's sixth Assessment Report (AR6). These scenarios are associated with emission patterns linked to a level of the Representative Concentration Pathway, each of which is connected to one of the five scenarios defined by the scientific community as Shared Socioeconomic Pathways (SSPs). The SSP scenarios include general assumptions concerning population, urbanization, etc. The three physical scenarios analyzed by the Group are as follows:

  • SSP1-RCP 2.6: compatible with a range of global warming below 2 °C from pre-industrial levels (1850-1900) by 2100 (the IPCC forecasts an average of about +1.8 °C from 1850-1900). In the analyses that consider both physical and transition variables, the Group associates the SSP1-RCP 2.6 scenario with the Reference and Accelerated Transition scenarios.
  • SSP2-RCP 4.5: compatible with an intermediate scenario that calls for an average temperature increase of about 2.7 °C by 2100 from pre-industrial levels. The RCP 4.5 scenario is the one that is most representative of the world's current climate and political landscape and correlated transition assumptions. This scenario forecasts global warming in line with the estimates of temperature increases that consider current policy around the world.(23) In the analyses that consider both physical and transition variables, the Group associates the SSP2-RCP 4.5 scenario with the Slower Transition scenario.
  • SSP5-RCP 8.5: compatible with a scenario where no particular measures to combat climate change are im-

(20) NDC presented by Colombia in 2020, which provides for a 49% reduction in emissions by 2030 compared with 2021.

(21) Hoja de Ruta del Hidrógeno Colombia, 2021.

(22) Hoja de Ruta de la Transición Energética Justa, 2023.

(23) Climate Action Tracker Thermometer, estimates of global heating at 2100 considering existing policies and actions, and 2030 targets only (December 2023 update).

plemented. This scenario forecasts an increase in global temperatures of about 4.4 °C from pre-industrial levels by 2100.

The Group considers RCP 8.5 to be a worst-case climate scenario used to assess the effects of physical phenomena in a context of particularly significant climate change, but it is currently deemed not very likely. This RCP 2.6 scenario is used both to assess physical phenomena and perform analyses that consider an energy transition consistent with most ambitious mitigation objectives.

The analyses carried out for the physical scenarios considered both chronic and acute phenomena. For the description of specific, complex events, the Group considers data and analyses of public bodies, universities, and private-sector entities.

The climate scenarios are global and must be analyzed at the local level in order to determine their impact in the areas of relevance to the Group. Among active partnerships, collaboration is under way with the Earth Sciences Department of the International Centre for Theoretical Physics (ICTP) in Trieste. As part of this collaboration, the ICTP provides projections for the major climate variables with a grid resolution of varying from about 12 km to 100 km and a forecast horizon running from 2020 to 2050.(24) The main variables are temperature, rain and snowfall, and solar radiation. Compared with past analyses, current studies are based on the use of multiple regional climate models: the one of the ICTP along with other simulations, which have been selected as being representative of the set of climate models currently available in the literature.(25) The output of this set is representative of the average of the various climate models. This technique is usually used in the scientific community to obtain a more robust and bias-free analysis, mediating the different assumptions that could characterize the individual model.

For certain specific climatic variables, such as wind gusts, the Group also uses other providers specialized in that particular phenomenon.

In this phase of the study, future projections have been analyzed for Italy, Spain and all countries of interest to the Group in South America, Central America, North America and Africa, obtaining – thanks to the use of the set of models – a more highly defined representation of the physical scenario. Similarly, the Group is also analyzing data related to climate projections for Africa, Southern Asia and Southeast Asia, thereby covering all of the main geographical areas in which the Group is present at the global level.

The ICTP is also providing science support to interpret all other climate data we gather. We are using climate scenarios for the countries of interest to the Group to allow for a uniform assessment of climate risk.

Some of these phenomena entail high levels of complexity, as they depend not only on climate trends but also on the specific characteristics of the territory and require further modeling to obtain a high-resolution representation. For this reason, in addition to the climate scenarios provided by ICTP, the Group also uses natural hazard maps. This tool makes it possible to obtain, with a high spatial resolution, recurrence intervals for a series of events, such as storms, hurricanes and floods. As described in the section "Risks and strategic opportunities associated with climate change", these maps are widely used within the Group, which already uses historical data to optimize insurance strategies. In addition, work is under way to be able to take advantage of this information developed in accordance with climate scenario projections.

Finally, the Group has acquired the tools and capabilities needed to autonomously gather and analyze the raw output published by the scientific community, so as to have a global, high-level view of the long-term trends in the climate variables of interest to us. These sources include the output from the climate and regional models CMIP6(26) and CORDEX.(27) CMIP6 is the sixth assessment of the Coupled Model Intercomparison Project (CMIP), which is a project of the World Climate Research Programme (WCRP) and of the Working Group of Coupled Modelling (WGCM), which provides raw climate data from global climate models. These are used to assess standard global measurements at a resolution of about 100x100 km. The Coordinated Regional Climate Downscaling Experiment (CORDEX) also falls within the scope of the WCRP and generates regional climate forecasts at a higher resolution.

(24) The climate forecasts mainly cover the RCP 2.6 and RCP 8.5 scenarios. Where available, the RCP 4.5 scenario is also provided. Otherwise, it is derived from the other scenarios using a pattern-scaling approach.

(25) The number of models used varies depending on the RCP scenario.

(26) https://www.wcrp-climate.org/wgcm-cmip/wgcm-cmip6. (27) https://cordex.org/.

Physical scenario analysis – Integration of climate scenarios within the Open Country Risk model

In addition to using high-resolution data to analyze the impact of physical phenomena, the Group has also designed a higher-level analysis framework that enables us to obtain a country-level assessment of trends in certain global climate hazards in a manner that is consistent across all regions. More specifically, we have adopted a modular approach that will enable us to progressively upgrade our analyses by including new physical phenomena and refining both the data and our methodologies. At present, four climate phenomena are included: two related to extreme temperatures; one related to intense rainfall; and one related to drought. The possibility of introducing other phe-

Physical scenario analyses

Acute phenomena

Heat waves

Extreme temperatures can be studied using the standard indicator "Warm Spell Duration Index" (WSDI). This metric considers heat waves characterized by at least six consecutive days with a maximum daily temperature above the 90th percentile of the historical distribution.(28)

In general, as can be seen in the following figure, in central and southern Europe the number of days of acute heat defined in accordance with the WSDI will increase in all future scenarios in the 2030-2050 period compared with the historical benchmark (1990-2020). In the RCP 2.6 scenario, most of the Italian peninsula will see an increase in the average number of days per year with heat waves (from +10 to +15 days) compared with a historical annual nomena such as extreme wind and sea level rise is also being evaluated. The phenomena are assigned a numerical index based on the global distribution to a resolution of about 100x100 km and are summarized in a composite index. This has enabled us to include a dimension related to climate change in the Open Country Risk model. This enables the tool to include both the aspects considered by the Open Country Risk models and those aspects related to the physical risks considered in the model as a cause of environmental and economic stress in a given country. The Open Country Risk model is described in greater detail in the section "Macroeconomic and geopolitical trends".

average of around 20-25 days. This increase will be larger in the Alpine areas bordering France and Switzerland and in some areas in southern Italy, with a change of +15 to +20 days. The situation in Italy is also worsening in the RCP 8.5 scenario, where the expected increases are up to +30 days compared with the 1990-2020 period. Spain will see similar changes, with heat waves also becoming more widespread geographically and more frequent in the 2030-2050 period. Compared with past years characterized by around 20 warm-spell days, in the RCP 2.6 scenario this phenomenon will increase by between +10 to +15 days in almost all of Spain.

In the RCP 8.5 scenario, the duration of heat waves will be even longer, especially in the southern part of the country (mainly from +20 to +25 days, with peaks of up to +37 days in certain coastal locations on the Mediterranean).

(28) The scientific literature offers various indicators for measuring the same physical phenomenon. Where necessary, Enel also calculates specific ad hoc metrics to analyze acute events relevant to the various global business lines.

RCP 2.6 RCP 8.5

Average change in number of days per year experiencing a heat wave (in accordance with WSDI definition) in the RCP 2.6 and RCP 8.5 (2030-2050) scenarios compared with the historical benchmark (1990-2020) in central and southern Europe.

The number of days characterized by heat waves calculated according to the WSDI is also expected to increase in the Americas in all future scenarios (see the following figure).

Comparing the 2030-2050 period with the 1990-2020 period, South America should already experience a significant increase in days of heat waves in the RCP 2.6 scenario, especially in certain areas of Brazil, Colombia and northern Chile. Central America, the western coast of North America and the southern part of the United States are also forecast to see a significant increase in days characterized by heat waves in the RCP 2.6 scenario in the 2030-2050 period compared with the benchmark.

In general, the increase in the number of days with heat waves will be even more pronounced in the RCP 8.5 scenario across the continent.

RCP 2.6 RCP 8.5

Average change in number of days per year experiencing a heat wave (in accordance with WSDI definition) in the RCP 2.6 and RCP 8.5 (2030-2050) scenarios compared with the historical benchmark (1990-2020) in the Americas.

Extreme precipitation

Intense rainfall can be analyzed by estimating the change in daily rainfall above the 95th percentile, calculated in terms of average annual millimeters in the reference periods.

In central and southern Europe, the expected change in acute precipitation in the 2030-2050 period compared with 1990-2020 varies from area to area and depending on the scenario considered.

Specifically, under the RCP 2.6 scenario, Italy is expected to experience a more significant increase in extreme rainfall in the north-east and along the Tyrrhenian coast, while the phenomenon is expected to decrease along the Adriatic coast, in the south and the islands. Under the RCP 8.5 scenario, extreme precipitation is expected to increase in most of Italy, except in the islands and some areas of the center and south-west, where the data point to a slight increase. In Spain, changes are expected in extreme precipitation in most of the territory already in the RCP 2.6 scenario. In particular, intense precipitation will increase slightly in some areas of the north, but will decrease in the south-east. In the RCP 8.5 scenario, heavy rainfall will decrease across the south of the country and the north-west.

Future changes in intense rainfall will differ considerably in the Americas as well. In some areas of South America, such as north and east Brazil, northern Argentina and central-southern Chile, reductions from the historical trends are projected to occur under the RCP 2.6 scenario. In other areas, however, such as in most of Colombia and other areas of Brazil, intense rainfall is forecast to increase. In almost all of North America, acute precipitation is expected to increase in the RCP 2.6 scenario compared with the historical average (although the magnitude of these increases varies from area to area). In Mexico, however, the future change varies depending on the area. Finally, under the RCP 2.6 scenario, intense rainfall will decrease in the central and southern areas of Central America. In other areas, rainfall levels will remain unchanged or increase slightly.

Fire risk

Fire risk can be studied using the Fire Weather Index (FWI), an indicator widely used internationally that takes account of temperature, humidity, rainfall, and wind in order to calculate an estimate of fire risk. Figures provided by the ICTP may be used to describe the trend in fire risk in order to support the business in properly managing this risk. To give a more complete representation of fire risk, we can supplement analysis on this acute phenomenon with a study of vegetation indices, since vegetation can serve as fuel and increase the probability of a fire spreading.(29) In central and southern Europe, the number of days per

year experiencing extreme fire risk (i.e. those with a FWI value > 45) will tend to increase almost everywhere in the 2030-2050 period compared with the 1990-2020 benchmark. The studies conducted for Italy show that the number of days at high risk increase in all scenarios, especially in the summer. This change will be even more accentuated under the RCP 8.5 scenario and mainly affect the islands and southern regions of the country. In general, in these areas the increase in the number of days at extreme risk ranges from approximately +6 to +11 days compared with the historical average. The area of Spain that will see the greatest increase in fire risk is the central south in all future scenarios. This increase is larger in the RCP 8.5 scenario than in the RCP 2.6 scenario.

In the Americas, the expected evolution of extreme fire risk varies from area to area. In South America, in the RCP 2.6 scenario the number of days at high first risk increases in most of Brazil and Chile and in the north-west and south of Argentina. In the remaining areas of the macroregion it remains unchanged or decreases slightly. In North and Central America, high fire risk remains essentially unchanged in most of the macroregion in the RCP 2.6 scenario. Only in the western areas of the United States and Mexico are increases in the number of days at high risk expected, with the increase rising as the scenario become more severe.

Cold snaps

A number of indicators can be used to measure extreme cold-related events.(30) One of these is the frost days index, i.e. the average number of frost days per year.(31)

Comparing the RCP 2.6 scenario (2030-2050) with the historical benchmark (1990-2020), in central and southern Europe the number of frost days will remain unchanged or decrease slightly in all countries. Only in some areas, such as the Alps in Italy and the Pyrenees in Spain, will the number of days of intense cold decrease (from -5 to -10 days compared with the historical benchmark). Under the RCP 8.5 scenario, the decrease in frost days is expected to be more geographically extensive. In northern Italy and in some Apennine areas of the peninsula and in part of northern and central Spain, the forecast is for a reduction of up to 15 days of frost per year, again compared with the benchmark period.

In most of the Americas, the number of frost days will remain unchanged under both RCP scenarios; only in some areas are decreases expected. Latin America will experience a decline in frost days in some central-western and southern areas, and the decrease will be larger under the RCP 8.5 scenario compared with the RCP 2.6. Frost days will decrease in North America and Central America, especially in the western part of the macroregion, with larger and more extensive declines under the RCP 8.5 scenario. Note that a decrease in frequency does not exclude an increase in the intensity of these acute events, an issue that the Group is currently investigating.

(29) One of the metrics used is obtained using NASA data for the Normalized Difference Vegetation Index (NDVI). NDVI quantifies vegetation by measuring the difference between near-infrared light (which vegetation reflects strongly) and red light (which vegetation absorbs). This is a good indicator of vegetation growth and density. The higher the NDVI, the more abundant and healthier the vegetation.

(30) In addition to the standard indices reported in the scientific literature, ad hoc metrics have also been developed to better study the phenomenon at the technology level.

(31) Frost days are days in which the minimum temperature (Tmin) is less than 0 °C.

Europe: heat waves and climate change

In the summer of 2023, Europe was overwhelmed by heat waves, with exceptionally high temperatures combining with drought and wind to drive the spread of fires. These events fall within a pattern of a significant increase in extreme physical phenomena in recent decades. However, it is important to understand how and to what extent these events are connected to climate change driven by human activities. This is not an easy task, but studies of individual events can help. "Event attribution" science seeks to do just this, providing explanations based on science and thus avoiding the dissemination of misleading or false information. By studying surface pressure, temperature variables and past events, it is possible to establish that phenomena such as the long and intense heat wave of July 2023 (Cerberus) are above all attributable to natural climate variability. By contrast, the anomalous heat wave of August 2123 that hit central and western Europe was a unique event that can largely be attributed to anthropogenic climate change.(32)

In general, event attribution studies indicate that, on average, in Europe:

  • a heat wave that in the pre-industrial climate would have occurred 1 time every 10 years is now expected to occur 2.8 times within 10 years and will be 1.2 °C warmer. With a rise of +2 °C by 2100, it will occur 5.6 times and be 2.6 °C warmer;
  • a heat wave that in the pre-industrial climate would have occurred 1 time every 50 years is now expected to occur 4.8 times over 50 years and will be 1.2 °C warmer. With +2° C of global warming, it will occur 13.9 times and be 2.7 °C warmer.

It should be emphasized that these numbers refer to moderate heat waves. More extreme events may be up to a hundred times more likely due to climate change.

Chronic phenomena

Temperature

Chronic temperature changes can be analyzed to obtain information about the potential effects on the cooling and heating demand of local energy systems. The thermal requirement has been measured using Heating Degree Days (HDDs), i.e. the sum, for all days of the year with a Taverage ≤ 15 °C, of the differences between the internal temperature (with Tinternal assumed to be 18 °C) and the average temperature, and Cooling Degree Days (CDDs), i.e. the sum, for all days of the year with Taverage ≥ 24 °C, of the differences between Taverage and Tinternal (assumed to be 21 °C), respectively, for heating and cooling requirements. The country averages have been calculated as an average over the country, weighting each geographical node by population thanks to the use of the Shared Socioeconomic Pathways (SSPs) associated with each RCP scenario. Since CDD is the variable that experiences the greatest change, the figure shows CDDs at high resolution for the historical data and the average variation expected in the RCP 2.6 scenario in the 2030-2050 period for Europe and South America. The distribution of the population used as a weight for the calculation at the national level is also shown.

(32) The conclusions on the heat waves that occurred in the summer of 2023 were derived from analyses conducted by members of the scientific community using the experimental "ClimaMeter" framework. More information is available at the following link: https://www.climameter.org/home.

COOLING DEGREE DAYS (CDD)

POPULATION DISTRIBUTION

COOLING DEGREE DAYS (CDD)

Degree days per year historical

Δ degrees/year – RCP 2.6 vs historical

POPULATION DISTRIBUTION

4.8 • 9.8 9.8 • 22.5 22.5 • 4,927.4

In general, in 2030-2050 CDDs show a rising trend, always exceeding the historical data, with increases in all the various scenarios. This agrees with the increase in average temperatures predicted by climate models, which is then also reflected in an increase in cooling needs. Heating requirements also decline as temperatures increase, although the rise is less pronounced than that in the cooling requirement. The table reports the country-level percentage changes for the countries of greatest interest to the Group under the RCP 2.6, RCP 4.5 and RCP 8.5 scenarios.

CHILE

BRAZIL

ITALY

SPAIN

Precipitation

Another chronic phenomenon of interest is the change in total precipitation due to climate change, which could impact hydroelectric generation. Changes in this phenomenon in the areas of interest for the Group have therefore been analyzed. The analysis of European catchment areas, which compared the 2030-2050 forecast with 1990-2020, points to no significant change, with a generalized slightly downward trend in central and southern Italy and Spain under the RCP 2.6 scenario.

As regards South America, the analyses, which compare the same time intervals, show a downward trend in Ar-

Overall effect of the transition and physical scenarios on electricity demand

The use of integrated energy system models described in the section "Local transition scenarios" makes it possible to quantify the individual service demand of a country. This makes it possible to discriminate the specific longterm effects that a change in temperature can have on energy demand. For this purpose, the Reference, Slower Transition and Accelerated Transition scenarios described above have been expanded to include the effect that temperature increases have on energy demand (total, not just electricity) for residential and commercial heating and cooling, as measured in terms of Heating Degree Days (HDDs) and Cooling Degree Days (CDDs).

The definition of a benchmark scenario consistent with achieving the Paris objectives makes it possible to associate HDDs and CDDs consistent with the RCP 2.6 scenario to the Reference scenario and the Accelerated Transition scenario, which is characterized by a faster decline in emissions. HDDs and CDDs consistent with RCP 4.5 were instead associated with the Slower Transition scenario, because it corresponds to a slower decline in greenhouse gas emissions. To stress the analyses further, the latter scenario was also associated with RCP 8.5.

gentina and Colombia. Brazil is projected to experience a slight increase or decrease in total rainfall under the RCP 2.6 scenario depending on the group of catchment areas considered. Finally, as with Argentina and Colombia, the projections for Chile also point to a reduction in total rainfall in the scenario with the lowest emissions, but this may have already manifested itself in recent years (with a real decrease on historic norms).

Comparing the various RCPs (2030-2050) and the historical model (1990-2020), expected total annual rainfall tends to decline in Central America, while in North America it will remain the same or increase depending on the area.

Italy and Spain

For Italy, the change in the level of electricity demand between the two extreme scenarios considered (Slower and Accelerated Transition) due to transition phenomena is about 18 percentage points on average in the 2031-2050 period. Excluding the effect of electricity demand for green hydrogen production, the difference in electricity demand falls to 8%.

As regards Spain, the percentage differences due to transition phenomena are smaller than in Italy, since the existing National Energy Plan sets particularly ambitious climate objectives. Consequently, less variability is expected in the evolution of the energy system and therefore electricity demand in the 2031-2050 period. The delta between the two extreme cases considered (Slower and Accelerated Transition) is around 10 percentage points on average in 2031-2050. If we exclude the effect of electricity demand for hydrogen production, the difference narrows to around 2%.

For both countries, the speed of the energy transition has a much greater impact on the level of electricity demand than the effects of the increase in temperature deriving from climate change, as the analyses performed show how the latter causes demand to increase by less than one percentage point for both Italy and Spain.

ITALY

CLIMATE AND ENERGY TRANSITION SCENARIOS: IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

Baseline RCP 2.6 Reference Baseline RCP 4.5 Slower Transition -16.9% Transition e ect -17.8% Temperature e ect 0.9%

Reference RCP 2.6 to Slower Transition RCP 4.5

Reference RCP 2.6 to Slower Transition RCP 4.5

Reference RCP 2.6 to Accelerated Transition RCP 2.6

Baseline
RCP 2.6
Reference
0.8% 0.6%
Temperature
e ect
Transition
e ect
Baseline
RCP 2.6
Accelerated
Transition

Italy – Average impact on electricity demand (2031-2050) of the three transition scenarios coupled with the associated RCP 2.6 and 4.5 scenarios.

CLIMATE AND ENERGY TRANSITION SCENARIOS: IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

Reference RCP 2.6 to
Accelerated Transition RCP 2.6

Spain – Average impact on electricity demand (2031-2050) of the three transition scenarios coupled with the associated RCP 2.6 and 4.5 scenarios.

SPAIN

CLIMATE AND ENERGY TRANSITION SCENARIOS:

Transition e ect

-5.8%

Reference RCP 2.6 to Slower Transition RCP 4.5

Temperature e ect

0.2%

Baseline RCP 2.6 Reference

IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

Baseline RCP 4.5 Slower Transition

-5.5%

Reference RCP 2.6 to

Baseline RCP 2.6 Reference

Accelerated Transition RCP 2.6

Temperature e ect

BRAZIL

Baseline RCP 2.6 Accelerated Transition

Transition e ect

3.4% 0.1%

3.5%

In order to further investigate the effect of temperature on the transition scenarios and at the same time expand the range of assumptions regarding climate change, a sensitivity analysis was conducted by associating the Slower Transition scenario to RCP 8.5 in addition to RCP 4.5. The analysis found that on average the change in electricity demand due to a deterioration in the climate scenario in 2031-2050 was negligible.

Effect of temperature and transition on electricity demand, average over the specified period of temperature and transition contributions for different combinations of transition scenarios and climate pathways, with and without green hydrogen

Reference to Slower Transition RCP 4.5 Reference to Slower Transition RCP 8.5 Reference to Accelerated Transition
Transition Temperature
effect from
RCP 2.6 to
Total Transition Temperature
effect from
RCP 2.6 to
Total Transition Temperature
effect from
RCP 2.6 to
Total
effect RCP 4.5 impact effect RCP 8.5 impact effect RCP 2.6 impact
Italy 2024-2030
2031-2050
-4.0%
-17.8%
0.0%
0.9%
-4.0%
-16.9%
-4.0%
-17.8%
0.0%
0.9%
-4.0%
-16.9%
1.0%
0.8%
0.0%
-0.1%
1.0%
0.6%
Italy
without
H2V
2024-2030
2031-2050
-3.1%
-7.9%
0.0%
0.9%
-3.1%
-6.9%
-3.1%
-7.9%
0.0%
0.9%
-3.1%
-7.0%
1.0%
0.3%
0.0%
-0.1%
1.0%
0.2%
Spain 2024-2030
2031-2050
-4.2%
-5.9%
0.1%
0.7%
-4.1%
-5.1%
-4.2%
-5.9%
0.1%
0.7%
-4.0%
-5.2%
3.1%
4.6%
0.1%
0.0%
3.2%
4.6%
Spain
without
H2V
2024-2030
2031-2050
-2.7%
-5.6%
0.0%
0.8%
-2.7%
-4.8%
-2.7%
-5.6%
0.1%
0.7%
-2.6%
-4.9%
2.2%
2.2%
0.0%
0.1%
2.2%
2.3%

Note that in future years greater than expected electrification of heating in buildings could change both the sign and the size of the temperature effect in both countries. It is therefore necessary to monitor developments in the share of electrification of heating during the annual review.

Latin America

In Latin America, the impact of temperature trends, quantified through the Heating Degree Days (HDDs) and Cooling Degree Days (CDDs) metrics, was estimated using integrated energy system models for Brazil, Chile and Colombia, similar to the approach adopted for Italy and Spain, as discussed above. Econometric forecasting models based on historical elasticity were used for Argentina.

In the case of Brazil, the transition effect considered individually (i.e. excluding the impact of an increase in temperature), electricity demand in the Slower Transition scenario is approximately 6% lower on average in 2031-2050 compared with the Reference scenario, given the different levels of ambition of the two scenarios in both 2030 and 2050. In the Accelerated Transition scenario, the slightly higher ambition in the Reference scenario is achieved via faster electrification. Accordingly, the electricity demand delta in 2031-2050 averages around a positive 3-4%. Also in this case, the speed of the energy transition has a much greater impact on the level of electricity demand than the negligible effects of the increase in temperature deriving from climate change.

Reference RCP 2.6 to

CLIMATE AND ENERGY TRANSITION SCENARIOS: IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

BRAZIL

Brazil – Average impact on electricity demand (2031-2050) of the three transition scenarios coupled with the associated RCP 2.6 and 4.5 scenarios.

Here, too, a sensitivity analysis was carried out by associating the Slower Transition scenario with RCP 8.5 in addition to RCP 4.5. For Brazil, an assumption of a further temperature increase produces an increase in long-term

Reference RCP 2.6 to

demand of close to zero (2031-2050). The effect is not significant given that the delta in the CCDs for Brazil is one of the smallest among the countries analyzed.

Effect of temperature and transition on electricity demand, average over the specified period of temperature and transition contributions for different combinations of transition scenarios and climate pathways, with and without green hydrogen

Reference to Slower Transition RCP 4.5 Reference to Slower Transition RCP 8.5 Reference to Accelerated Transition
Temperature
effect from
Temperature
effect from
Temperature
effect from
Transition
effect
RCP 2.6 to
RCP 4.5
Total
impact
Transition
effect
RCP 2.6 to
RCP 8.5
Total
impact
Transition
effect
RCP 2.6 to
RCP 2.6
Total
impact
Brazil 2024-2030
2031-2050
-3.6%
-5.8%
0.1%
0.2%
-3.5%
-5.5%
-3.6%
-5.8%
0.3%
-0.2%
-3.3%
-5.9%
1.1%
3.4%
0.1%
0.1%
1.2%
3.5%
Brazil
without
H2V
2024-2030
2031-2050
-3.5%
-6.2%
0.1%
0.2%
-3.3%
-6.0%
-3.5%
-6.2%
0.3%
-0.2%
-3.2%
-6.4%
0.2%
3.4%
0.1%
0.1%
0.3%
3.5%

For Chile, electricity demand is reduced by transition effects considered individually by about 10% on average in 2031-2050 in the Slower Transition scenario compared with the Reference scenario, given the different levels of ambition of the two scenarios. This difference is mainly due to assumptions regarding the achievement of the country's ambitious targets for green hydrogen production after 2030 set out in the document Planificación Energética Nacional de Largo Plazo (PELP). If the effect of electricity demand for hydrogen production – for which the two scenarios have different levels of ambition in relation to the different decarbonization trajectories – is omitted, the difference declines to about 6%. In the Accelerated Transition scenario, the greater ambition of the en-

ergy transition is achieved through the implementation of more stringent decarbonization policies to achieve greater electrification, greater penetration of green hydrogen in industry and transport and increased exports of that hydrogen. This leads to an average increase of about 11% in electricity demand over the baseline of the Reference scenario in 2031-2050. Excluding the effect of electricity demand connected with the production of green hydrogen, electricity demand is an average of about 12% higher than in the Reference scenario in the 2031-2050 period. Once again, the speed of the energy transition has a much greater impact on the level of electricity demand than the increase in temperature caused by climate change.

CLIMATE AND ENERGY TRANSITION SCENARIOS: IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

CHILE

Reference RCP 2.6 to Slower Transition RCP 4.5

Baseline 11.1% 10.9%

Baseline RCP 2.6 Accelerated Transition Transition e ect Temperature e ect 0.2%

Chile - Average impact on electricity demand (2031-2050) of the three transition scenarios coupled with the associated RCP 2.6 and 4.5 scenarios.

To stress the analyses further, the Slower Transition scenario was also associated with RCP 8.5. For Chile, an assumption of that further temperature increase produces an increase in long-term demand of close to zero (2031-2050).

Effect of temperature and transition on electricity demand, average over the specified period of temperature and transition contributions for different combinations of transition scenarios and climate pathways, with and without green hydrogen

Reference to Slower Transition RCP 4.5 Reference to Slower Transition RCP 8.5 Reference to Accelerated Transition
Transition Temperature
effect from
RCP 2.6 to
Total Transition Temperature
effect from
RCP 2.6 to
Total Transition Temperature
effect from
RCP 2.6 to
Total
effect RCP 4.5
impact
effect RCP 8.5 impact effect RCP 2.6 impact
2024-2030 -1.5% 0.2% -1.3% -1.5% 0.2% -1.2% 1.5% 0.1% 1.6%
Chile 2031-2050 -10.3% 0.2% -10.1% -10.3% 0.3% -10.0% 10.9% 0.2% 11.1%
Chile
without
H2V
2024-2030
2031-2050
-0.5%
-6.2%
0.4%
0.4%
-0.2%
-5.8%
-0.5%
-6.2%
0.5%
0.5%
0.0%
-5.7%
2.7%
11.5%
0.2%
0.5%
2.9%
12.0%

In the case of Colombia, transition effects reduce electricity demand in the Slower Transition scenario by about 36% in the period 2031-2050 compared with the Reference scenario, mainly reflecting the significant difference in the ambition of the two scenarios. The Slower Transition was defined by taking as a starting point the most prudent scenario in the national government plan (Hoja de Ruta de la Transición Energética Justa), characterized by limited decarbonization, which therefore leads to a much lower level of electrification than in the Reference scenario. On the other hand, the difference between the Reference scenario and the Accelerated Transition scenario shows an increase of about 14% due to the transition alone, while the climate effect is less than 1%. This reflects the increase in electrification resulting from much more ambitious decarbonization goals. The effect of hydrogen is not particularly relevant in the scenarios analyzed.

CLIMATE AND ENERGY TRANSITION SCENARIOS: IMPACT OF TEMPERATURE AND TRANSITION ON ELECTRICITY DEMAND

COLOMBIA

Transition

13.7%

Reference RCP 2.6 to Slower Transition RCP 4.5

Reference RCP 2.6 to Accelerated Transition RCP 2.6

Baseline RCP 2.6 Reference Baseline RCP 2.6 Accelerated Transition e ect Temperature e ect 0.2%

13.5%

Colombia - Average impact on electricity demand (2031-2050) of the three transition scenarios coupled with the associated RCP 2.6 and 4.5 scenarios.

Effect of temperature and transition on electricity demand, average over the specified period of temperature and transition contributions for different combinations of transition scenarios and climate pathways, with and without green hydrogen

Reference to Slower Transition RCP 4.5 Reference to Slower Transition RCP 8.5 Reference to Accelerated Transition
Temperature
effect from
Temperature
effect from
Temperature
effect from
Transition
effect
RCP 2.6 to
RCP 4.5
Total
impact
Transition
effect
RCP 2.6 to
RCP 8.5
Total
impact
Transition
effect
RCP 2.6 to
RCP 2.6
Total
impact
Colombia 2024-2030
2031-2050
-2.3%
-36.3%
0.2%
0.1%
-2.0%
-36.3%
-2.3%
-36.3%
0.2%
0.1%
-2.1%
-36.3%
1.7%
13.5%
0.1%
0.2%
1.8%
13.7%
Colombia
without
H2V
2024-2030
2031-2050
-2.2%
-36.2%
0.2%
0.0%
-2.0%
-36.1%
-2.2%
-36.2%
0.2%
0.0%
-2.0%
-36.1%
1.7%
14.7%
0.1%
0.2%
1.7%
14.9%

Finally, as regards Argentina, the analyses performed show that an increase in temperature could increase electricity demand by between 0.4% and 0.8% (calculated as the average of demand forecasts for the 2031-2050 period). This estimate is highly dependent on the effect that macroeconomic conditions in the country might have on electricity demand. As a result, it is affected by a significant degree of uncertainty given the high volatility of the performance of the Argentine economy.

GROUP STRATEGY

Determination of the Group's strategy is based on an assessment of options that will enable the sustainable generation of value for all stakeholders, ensuring flexibility and focusing on risk mitigation.

Key to this is the assessment of the external environment and its evolution. To determine the framework in which we operate, we conduct in-depth scenario planning in order to be prepared to seize opportunities and manage future risks and uncertainties in the most robust manner possible. This analysis of what could happen in the external landscape is key to defining the Group's positioning within that landscape. We then define our long-term ambitions and design the strategic options that characterize our long-term planning.

In recent years, the increasing complexity of the rapidly changing context in which we operate has made it so that the process of defining the Group's strategies has also evolved in order to capture as much of this dynamism as possible, so as to make it an enabling factor in the definition of goals.

Today, this process is organized into the following main activities:

  • Strategic Dialogue: a continuous process of active dialogue throughout the year and across all Group functions, through which the strategic topics for the evolution and growth of the Group are identified, analyzed, discussed and addressed. This dialogue is part of a strategic design phase, where communication among executives makes a valuable contribution to developing new strategic options, with an emphasis on the need for cultural or organizational change and synergies between businesses.
  • Strategic Planning: this process, which is driven on an ongoing basis by feedback from the strategic dialogue, transforms the information to be processed into quantitative models in order to establish an overview of the industrial, economic and financial evolution of the Group, supplemented by possible active portfolio management. The evaluation of strategic options over a time horizon extends beyond that used in industrial

planning, with (i) the definition and the quantitative and qualitative development of alternative macroeconomic, energy and climate scenarios against which overall strategy can be assessed, and (ii) analyses based on stress testing for various factors, including the evolution of the industrial sector, technology, competitive structure, climate variables and policies.

  • Long-term positioning: consistent with the analyses and decisions described in the previous points, and basing on our ambitions for environmental and economic-financial sustainability and the opportunities to be seized on the market, the Group's positioning is defined with regard to the long-term industrial strategy.
  • Analysis of ESG factors and assessment of materiality in the field of sustainability: Enel assesses ESG issues in order to identify and evaluate priorities for stakeholders, conducting a double materiality analysis to determine the material issues that support the definition of the objectives to be included in the strategic sustainability planning. This analysis takes into consideration the ESRS standards of the European Sustainability Reporting Directive (CSRD) as well as numerous other international standards (for example, the Global Reporting Initiative - GRI, SASB, SDG Compass, etc.).

The strategy of the Enel Group has proven its ability to create sustainable long-term value, fully integrating the themes of sustainability and close attention to climate change issues while simultaneously ensuring increased profitability for stakeholders.

The Group is among the leaders guiding the energy transition through the decarbonization of electricity generation, digitalization of distribution grids and the electrification of final consumption, which represent opportunities to create value and to accelerate achievement of the Paris Agreement objectives and the Sustainable Development Goals set by the United National in the 2030 Agenda. The Group also supports the principles of a just transition, as defined in the Just Transition Guidelines of the International Labor Organization (ILO), so that no one is left behind, in light of the social impact that the decarbonization strategy entails, while ensuring respect for human rights throughout the value chain.

STRATEGIC PLAN

Response to the current climate

Short-term global uncertainties have forced power companies to increase flexibility and improve visibility of returns. In the medium and long term, grids will have to be able to cope with increased electricity demand as electrification expands, and the growing proportion of renewables in the energy mix (including through distributed generation). Furthermore, the expected growth in renewables capacity will require battery storage in order to balance supply and demand.

In this scenario, the Group plans to allocate its investments efficiently. Regulated businesses will be at the center of the Group's strategy, seeking to improve quality and resilience and integrating new renewables capacity, with the support of advantageous regulatory frameworks. Investment decisions in renewables will be more selective, aiming for a positioning that maximizes returns and mitigates risks, also leveraging Partnership business models. Finally, the Group plans to optimize its customer portfolio and end-to-end processes, increasing efficiency in customer acquisition and management, improving customer loyalty through bundled offers and promoting the electrification of consumption. Generation and retail will be managed together in a flexible approach to the sourcing strategy, with the aim of improving profitability.

The 2024-2026 Strategic Plan

The Group's 2024-2026 Strategic Plan is founded on three pillars:

  • profitability, flexibility and resilience through highly selective capital allocation, aimed at optimizing the Group's risk/return profile;
  • efficiency and effectiveness as drivers of the Group's operations, based on process simplification, leaner or-

ganization with defined responsibilities and a focus on core geographies, as well as the rationalization of costs in order to maximize cash generation and offset inflationary pressures and the higher cost of capital;

• financial and environmental sustainability to pursue value creation in addressing the challenges of climate change.

STRATEGIC PILLARS

Profitability, flexibility and resilience

Between 2024 and 2026, the Group has planned total gross investments of about €35.8 billion. Given the current scenario, to implement a business model with less capital and risk intensity, the Group plans to:

  • increase the focus on grids, in order to benefit from favorable regulatory environments and at the same time gain access to European financing, which is expected to contribute some €3.5 billion to the Group's total gross investments;
  • create partnerships for renewables projects in order to flexibly invest financial resources in a total amount of around €6.1 billion.

As a result, investments are expected to require less cash for the Group, with expected net investments of about €26.2 billion.

CUMULATIVE GROSS CAPITAL EXPENDITURE (€bn)

(1) Does not include "Other".

GROSS CAPITAL EXPENDITURE: OLD PLAN VS NEW PLAN (€bn)

2024-2026 PLAN: FROM GROSS CAPEX TO NET CAPEX (€bn)

(1) €6.1 billion includes: ~€4 billion cash-in from capacity to be built during plan period and ~€2 billion from existing capacity.

The Group confirms that it intends to focus its investments in six core countries, above all where it can leverage an integrated position: specifically Italy, Spain, Brazil, Chile, Colombia and the United States.

Grids – Between 2024 and 2026 the Group has planned gross investments of about €18.6 billion in Grids, of which about €15.2 billion net of grants. The allocation of capital in grids is adapted in accordance with the planned returns in each country, with a concentration of investment in geographical areas characterized by a more balanced and clearer regulatory framework, notably in Italy where the Group plans to allocate about €12.2 billion in gross investments. Thanks to this capital allocation, ordinary EBIT-DA connected with Grids is expected to reach about €8.4 billion in 2026.

GROSS CAPITAL EXPENDITURE

Integrated Businesses – The Group aims to increase margins in the Integrated Businesses by reducing provisioning costs.

In Renewables, the Group has planned gross investments of around €12.1 billion between 2024 and 2026. Specifi-

MAIN DRIVERS

Regulatory advocacy

Leverage regulatory frameworks that guarantee appropriate return on investment

Quality

Delivery high standards of service to customers together with low levels of losses with a view to enhancing pro tability

Optimize the asset base

Improve the grid po folio to maximize value and growth of RAB

cally, the Group plans to invest in onshore wind, solar and battery storage. A key factor will be innovation, using repowering to increase the efficiency of plants and reduce generation costs, as well as storage batteries to enhance the flexibility of the electricity system and load management.

GROSS CAPITAL EXPENDITURE

MAIN DRIVERS

Reduction of LCOE

Continued optimization of unit capex and opex

Improve risk/return pro le

Investments selected using a risk/return matrix di erentiated by technology and geographical area

Innovation

Focus on repowering and BESS to improve system exibility and congestion management

Pa nerships

Leverage the contribution of non-Group pa ners

(1) Does not include €0.3 billion in equity injections.

Furthermore, regarding the decarbonization process, the Plan envisages gradually eliminating investments in new carbon-intensive assets until their complete elimination in 2025. In particular, the Group expects to invest less than 3% of gross 2024-2026 investment in thermal generation, most of which will be dedicated to maintenance of existing plants, while investment in the development of new plants will be substantially limited to the conversion from coal to CCGT of the Fusina power plant, which is expected to be completed by 2024.

More than 90% of the Group's total investment in 2024- 2026 is in line with the United Nations Sustainable Development Goals (SDGs) and directly work towards SDGs 7 ("Affordable and Clean Energy"), 9 ("Industry, Innovation and Infrastructure") and 11 ("Sustainable Cities and Communities"), all of which help to achieve SDG 13 ("Climate Action"). The alignment of investments stated in the Group's Strategic Plan with the objectives of decarbonization and the reduction of greenhouse gases is based on a specific approach by which investment in renewables and retail power, by their nature, fall under SDG 7, investment in distribution networks fall under SDG 9, and investments by Enel X concern SDG 11. Of the above, more than 90% thereby excludes investment in conventional power generation (including maintenance) and in retail gas.

Furthermore, we expect that more than 80% of all Group

investment will continue to be in line with the EU taxonomy over the period covered by the Plan, given their substantial contribution to mitigating climate change.

Between 2024 and 2026, this new approach is expected to enable the Group to build approximately 13.4 GW of new renewables capacity across all the geographical areas in which it operates. In 2026, the Group's renewables capacity is expected to increase to approximately 73 GW, from about 62 GW in 2023, with the share of zero-emission generation reaching around 86%, compared with 75% in 2023 (including managed capacity).

In the Customer segment, the Group has planned gross investments of about €3 billion between 2024 and 2026. The main driver of the Group strategy in this segment will be the strengthening of customer centricity thanks to a single touchpoint for business-to-consumer (B2C) customers and small and medium-sized enterprises (SMEs), key accounts dedicated to the main business-to-business (B2B) and business-to-government (B2G) customers, as well as bundled offers.

Thanks to these initiatives, the ordinary EBITDA of the Integrated Businesses is expected to reach around €15.5 billion in 2026, with renewables as the main growth factor over the Plan period.

GROSS CAPEX

COMMERCIAL PROPOSITION

MAIN DRIVERS

Geographical rebalancing: focus on Italy, Iberia and Latam

Customer centricity: single touchpoint for B2C and SMEs; Key Account Manager for Top & Large commodities and services

Bundled o ers and leveraging cross sales to enhance customer experience

Prioritizing products that can accelerate electri cation, foster customer loyalty and increase margins

Optimization of processes to boost e ciency in customer acquisition and management

Efficiency and effectiveness

The Group's strategic actions will be guided by financial balance. Between 2024 and 2026, the Group expects to increase its cash generation, with total cash flows funds from operations (FFO) equal to about €43.8 billion, which are expected to fully meet cash requirements for net investments and dividends.

Compared with the cost baseline for 2022, the Group expects to achieve an overall cost reduction of approximately €1.2 billion in 2026, of which about €1 billion in efficiency gains achieved by reorganizing business processes, rationalizing organization, optimizing mix between insourcing and outsourcing as well as adopting standards and using better technologies to be adapted depending on the country involved. Further savings of about €0.2 billion are expected in regulated businesses.

These initiatives are also supported by the divestment plan, which has been partly redefined to focus on a portfolio rotation guided by asset value. The implementation of the divestment plan is expected to have a positive impact on net financial debt estimated at about €11.5 billion between 2023 and 2024.

Financial and environmental sustainability

The generation of cash flow, rationalization of costs and optimization of processes is expected to boost the Group's creditworthiness.

Over the next three years, the Group plans to reduce the average cost of gross borrowing by 20 basis points, despite the high interest rate environment, to about 3.8% in 2026, down from 4.0% at the end of 2023, mainly thanks to centralized refinancing.

On the environmental sustainability front, the Group intends to continue to reduce its direct and indirect green-

house gas emissions, in line with the Paris Agreement and with the 1.5 °C scenario, as certified by the Science Based Targets initiative (SBTi). Specifically, the Group confirms its objective of closing all remaining coal plants by 2027, subject to authorization from the competent authorities. As regards the conversion of coal plants, the Group will evaluate the best technologies available, based on the requirements indicated by transmission grid operators. The Group confirms its ambition to achieve zero emissions in all scopes by 2040.

Financial targets

Group ordinary EBITDA is expected to increase from €22 billion in 2023 to between €23.6 billion and €24.3 billion in 2026. Group ordinary profit is expected to increase from €6.5 billion in 2023 to between €7.1 billion and €7.3 billion in 2026.

The Group confirms its simple and attractive dividend policy with a minimum fixed DPS of €0.43 for the period 2024- 2026, with a potential increase up to a payout of 70% of ordinary profit if cash neutrality is achieved. Cash neutrality is achieved if FFO fully finance the Group's net investments and dividends beyond the minimum fixed DPS.

Financial targets

Profit growth 2023 2024 2026
Ordinary EBITDA (€ billions) 22.0 22.1-22.8 23.6-24.3
Ordinary profit (€ billions) 6.5 6.6-6.8 7.1-7.3
Value creation
0.43(1) 0.43(1)
DPS (€/share) 0.43 ordinary profit if cash neutrality is achieved(2) Increase in DPS up to a payout of 70%

(1) Minimum DPS.

(2) Cash neutrality is achieved if funds from operations (FFO) fully cover Group net investment plus dividends in excess of the fixed minimum dividend.

Climate change strategy

Overall framework and policies

Climate change is the world's primary challenge of our century. In a climate such as this, and as a global player in the energy market, Enel is on the front lines playing an active role in guiding the global energy transition towards zero emissions as a mitigating lever and working to determine the best ways to adapt to the changes that are inevitable to varying degrees of frequency and intensity.

Therefore, the work Enel is doing to combat climate change represents one of the pillars of the Group's shortand long-term strategy.

Mitigation efforts include all those initiatives aimed at reducing the impact that the activities of the Group and our stakeholders have on climate change, and first and foremost those that aim to reduce the emission of greenhouse gases.

Adaptations, on the other hand, include all actions that Enel implements to make assets more resilient, to increase our ability to react to extreme weather events, and to con-

Our zero-emissions ambition

Being among the first signatories of the "Business Ambition for 1.5 °C" campaign promoted by the United Nations and other organizations, the Enel Group has publicly declared its commitment to developing a business model in line with the goals of the Paris Agreement (COP 21) to limit the average global temperature increase to 1.5 °C.

Enel's commitment to combating climate change reached another historical milestone in 2022, with the Group defining a decarbonization roadmap covering both direct and indirect emissions throughout the Group's value chain. This roadmap includes four targets certified by the Science Based Targets initiative (SBTi) to be in line with limiting global warming to 1.5 °C.

Enel's new certified targets come on the back of our ambition declared in 2021, when we moved up our commitment to achieving zero emissions by 10 years, from 2050 to 2040.

Enel's ambition goes beyond the SBTi certified targets and aims to pave the way to becoming a zero-emission organization by 2040. Our certified roadmap currently calls for reducing all direct and indirect greenhouse-gas (GHG) emissions by about 99% from 2017 levels by 2040 throughout our value chain, which is well above the overall threshold set by international standards (of 90%). The ceive business models and other strategic options targeting various needs in this constantly changing climate.

In each of these two areas, the challenges present opportunities that we will seize through Group strategy. Here at Enel, adapting to climate change also means exploring new business opportunities to come out of the changing landscape, developing new technologies, and creating value from the capabilities acquired. The mitigation of climate change also involves investing in research into innovative technologies that will enable an economy that is green by design or that, for example, improve performance and circularity.

The experience we gain and our study of possible climate scenarios that have been seen above also play a crucial role in guiding both areas of action. As we will discuss in the section related to climate change risks and opportunities, the Group has also established internal policies for the assessment and management of these challenges.

Group also aims to reduce all emissions by 100% with a view to overcoming, over the short to medium term, all exogenous factors, such as the development of new technological solutions for the supply chain over a wide scale or the implementation of certain market-based and political strategies. Enel actively collaborates with vendors, customers and policymakers to promote solutions and accelerate necessary actions.

Enel's decarbonization roadmap is centered around promoting electrification solutions, accompanied by completing the full phase-out of fossil fuels and accelerating the development of renewables, as well as going digital and upgrading grids. Aware of the social impact that the decarbonization strategy entails, Enel supports the principles of a just transition, as defined in the Just Transition Guidelines of the International Labor Organization (ILO), which is expressed in terms of actions involving retraining, professional updating and self-learning for direct and indirect workers, providing support with a view to business diversification and greater resilience for the supply chain, job opportunities for communities in our area of influence and facilitating access to products and services for customers.

The decarbonization roadmap includes the following business milestones.

GHG EMISSIONS REDUCTION TARGETS CERTIFIED BY THE SBTi IN LINE WITH THE 1.5 ºC SCENARIO

accordance with the Net Zero Standard and aligned with the 1.5 ºC scenario

  • By 2026, Enel will bring renewables to around 78% of total capacity, including batteries and all managed capacity (Ownership, Partnership, Stewardship). In order to accelerate the development of renewable energy, for the period 2024-2026 the Group will invest €12.1 billion, installing 13.4 GW of new installed renewables capacity (leveraging the support of third parties) and reaching 73 GW of installed renewables capacity by 2026, with zero-emissions generation accounting for about 86% of the total (including managed generation). In addition, progress in grid digitalization will increase the share of digital customers to 71%.
  • By 2027, Enel expects to complete the full phase-out of all coal-fired plants, converting the sites to other

uses, taking account of the needs of the country system.

  • By 2030, continuing the investment trend already undertaken in recent years in order to continue accelerating the energy transition, Enel will achieve a renewables capacity of about 85% of the total (including managed generation), bringing the share of zero-emissions generation to about 90% (including managed generation), with 100% of grid customers being fully digital.
  • By 2040, generation will be 100% renewable, and the Group will have exited both gas-fueled generation and the retail sale of gas, with 100% of the electricity sold coming from renewable sources.

Primary business

Type of activity in value chain

Stakeholders impacted or involved

Sources of covered GHG (GHG Protocol)(1)

Time frame

% reduction on 2017

Primary drivers and

Results and main actions in 2023

% reduction on 2023 (repoing year)

activity Sale of electricity

GHG TARGET Intensity of Scope 1 and Scope 3 GHG emissions related to Integrated Power

(SBTi baseline) -59% -78% -100%

Climate scenario 1.5 °C(3) 1.5 °C (SBTi ceied) 1.5 °C (SBTi ceied)

Downstream in value chain (purchase of electricity from other generators for sale to end users)

42% of Scope 3 GHG emissions (corresponding to 78% of Scope 3 GHG emissions – category 3)

Sho term (2026) Medium term (2030) Long term (2040)

-20% -57% -100%

Continue the strategy of balancing supply and demand and increase the share of electricity sold at a xed price covered by carbon-free generation.

decarbonizing electricity generation, increasing zero-emissions generation to about 90% of the total in 2030. No use of carbon-removal technologies to achieve the target.

KPI achievement in 2023: 168 gCO2eq/kWh

7% reduction in 2023 compared with 2022 in the gap between sale of electricity to end users and own generation in the

13% increase in Group consolidated renewables generation in 2023 on 2022.

countries in which the Group has an integrated position.

Continue the process of

0 gCO2eq/kWh Zero emissions

By 2040, achieve 100% of electricity sales covered by renewables. No use of carbon-removal technologies to achieve the target.

Direct (electricity generation)

Customers and power consumers Electricity generators (peers) Society and environment

95% of Scope 1 GHG emissions

GHG target 135 gCO2eq/kWh 73 gCO2eq/kWh

actions • Increase the percentage of renewable energy sold to customers, while increasing the Group's renewables production and optimizing customer pofolio, continuing supply and demand balancing strategy. In Europe, increase the share of xed-price energy sales to end users covered by zero-emissions sources from about 65% in 2023 to more than

In Latin America, maintain 100% zero-emissions sales to end users (including through PPAs).

In Noh America, maintain 100% zeroemissions sales to end users. Continue the process of

decarbonizing electricity generation, increasing zero-emissions generation from 75% in 2023 (including managed capacity) to 86% of total in 2026, including consolidated and managed

80% in 2026.

capacity.

No use of carbon-removal technologies to achieve the target.

OUR ZERO-EMISSIONS AMBITION

Enel is commi ed to achieving zero emissions by 2040 and to developing a business model that is in line with the objectives of the Paris Agreement (COP 21) to limit the average increase in global temperatures

to 1.5 ºC. For this reason, the Group has developed a decarbonatization roadmap that covers both direct and indirect emissions throughout the value chain. The roadmap includes four targets ce i ed by the Science Based Targets initiative (SBTi) in December 2022 to be in line with the Net Zero Standard.

GHG TARGET Intensity of Scope 1 GHG emissions related to power generation
Primary business
activity
Electricity generation
Type of activity in
value chain
Direct
Stakeholders
impacted or
involved
• Customers and power consumers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
95% of Scope 1 GHG emissions(2)
Time frame Sho term (2026) Medium term (2030) Long term (2040)
GHG target
125 gCO2eq/kWh
72 gCO2eq/kWh 0 gCO2eq/kWh
Zero emissions
% reduction on 2017
(SBTi baseline)
-66% -80% -100%
% reduction on
2023 (repo ing
year)
-22% -55% -100%
Climate scenario 1.5 °C(3) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Gradual phase out of coal- red capacity
in 2024-2026, with planned closure of
the Federico II and Torrevaldaliga Nord
plants in Italy (with a total capacity of
about 3.6 GW).
• Invest €12.1 billion to accelerate the
development of renewable energy by
installing 13.4 GW of new renewables
capacity (about 11.3 GW of which at
the consolidated level) in 2024-2026,
reaching 73 GW of renewables capacity
(including BESS) by 2026.
• Continue the process of decarbonizing
electricity generation, with the
propo ion of renewables plants in the
Enel asset po folio reaching 78% in
2026, with zero-emissions generation
amounting to 86% of the total, including
consolidated and managed generation.
• Continue the process of decarbonizing
electricity generation, with Group
investments raising the propo ion of
renewables plants in the asset po folio
to about 85% in 2030, with zero
emissions generation amounting to 90%
of the total, including consolidated and
managed generation.
• Exit from coal- red generation, which is
expected to take place by 2027 globally.
• No use of carbon-removal technologies
to achieve the target.
• Exit from the thermal electricity
generation business, achieving a 100%
renewable energy mix.
• No use of carbon-removal technologies
to achieve the target.
• No use of carbon-removal technologies
to achieve the target.
Results and
main actions in
KPI achievement in 2023: 160 gCO2eq/kWh
• About €5.9 billion invested in renewables in 2023.
• New consolidated renewables capacity installed equal to 4 GW in 2023, bringing total consolidated capacity to 55.5 GW in
2023.
• Increase in consolidated renewables generation equal to 13% on 2022, representing 61% of total consolidated generation in
2023 2023.
• Reduction of thermal capacity by about 5.1 GW on 2022, including the closure of two coal- red plants (for a total of about 2
  • Reduction of thermal capacity by about 5.1 GW on 2022, including the closure of two coal- red plants (for a total of about 2 GW) and the sale of gas plants in Argentina (for a total of about 3 GW) and Colombia (for a total of about 0.2 GW).
  • Reduction of thermal generation by 38% on 2022 (speci cally, with a 45% reduction in coal- red generation), representing 27% of total generation in 2023.

GHG TARGET Intensity of Scope 1 and Scope 3 GHG emissions related to Integrated Power
Primary business
activity
Sale of electricity
Type of activity in
value chain
• Direct (electricity generation)
• Upstream in value chain (purchase of electricity from other generators for sale to end users)
• Customers and power consumers
• Electricity generators (peers)
• Society and environment
Stakeholders
impacted or
involved
Sources
of covered GHG
(GHG Protocol)(1)
• 95% of Scope 1 GHG emissions
• 42% of Scope 3 GHG emissions (corresponding to 78% of Scope 3 GHG emissions – category 3)
Time frame Sho term (2026) Medium term (2030) Long term (2040)
GHG target 135 gCO2eq/kWh 73 gCO2eq/kWh 0 gCO2eq/kWh
Zero emissions
% reduction on 2017
(SBTi baseline)
-59% -78% -100%
% reduction on
2023 (repo ing
year)
-20% -57% -100%
Climate scenario 1.5 °C(3) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Increase the percentage of renewable
energy sold to customers, while
increasing the Group's renewables
production and optimizing customer
po folio, continuing supply and
demand balancing strategy.
• In Europe, increase the share of
xed-price energy sales to end users
covered by zero-emissions sources
from about 65% in 2023 to more than
• Continue the strategy of balancing
supply and demand and increase the
share of electricity sold at a xed price
covered by carbon-free generation.
• Continue the process of
decarbonizing electricity generation,
increasing zero-emissions generation
to about 90% of the total in 2030.
• No use of carbon-removal
• By 2040, achieve 100% of electricity
sales covered by renewables.
• No use of carbon-removal
technologies to achieve the target.
80% in 2026.
• In Latin America, maintain 100%
zero-emissions sales to end users
(including through PPAs).
technologies to achieve the target.
• In No h America, maintain 100% zero
emissions sales to end users.
• Continue the process of
decarbonizing electricity generation,
increasing zero-emissions generation
from 75% in 2023 (including managed
capacity) to 86% of total in 2026,
including consolidated and managed
capacity.
• No use of carbon-removal

Results and main actions in 2023

KPI achievement in 2023: 168 gCO2eq/kWh

13% increase in Group consolidated renewables generation in 2023 on 2022. 7% reduction in 2023 compared with 2022 in the gap between sale of electricity to end users and own generation in the countries in which the Group has an integrated position.

GHG TARGET Scope 3 GHG emissions related to the sale of natural gas on end-user market
Primary business
Sale of gas to end users
activity
Type of activity in
value chain
• Downstream in value chain
Stakeholders
impacted or
involved
• Gas customers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
• 30% of Scope 3 GHG emissions (corresponding to 100% of Scope 3 GHG emissions – category 11)
Time frame Sho term (2026) Medium term (2030) Long term (2040)
20.0 MtCO2eq
GHG target
11.4 MtCO2eq 0 MtCO2eq
Zero emissions
% reduction on 2017
(SBTi baseline)
-21% -55% -100%
% reduction on
2023 (repo ing
year)
-(4) -32% -100%
Climate scenario n.a.(5) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Encourage customers (especially
residential customers) to switch
from gas to electricity by promoting
e cient electricity technologies
(e.g., heat pumps for home heating
or induction cooktops in kitchens),
increasing annual unit electricity
consumption of free-market B2C
power customers (in Italy and Iberia)
from 2.65 MWh in 2023 to about 2.9
MWh in 2026, thereby increasing the
electri cation rate of customers.
• Allocate 32% of investment in grids
in 2024-2026 to connections, pa ly
with a view to enabling the expansion
of distributed generation, thereby
promoting the electri cation of
end users' energy consumption.
The number of connections to
distributed generation is forecast
to double in the period, reaching 4
million in 2026.
• Reduce the volumes of gas sold to
customers to around 8.4 billion cubic
meters in 2026.
• No use of carbon-removal
technologies to achieve the target.
• Encourage customers (especially
residential customers) to switch
from gas to electricity by promoting
e cient electricity technologies
(e.g., heat pumps for home heating
or induction cooktops in kitchens),
increasing annual unit electricity
consumption of free-market B2C
power customers (in Italy and Iberia)
to about 3.5 MWh in 2030, thereby
increasing the electri cation rate of
customers.
• Continue to invest in distribution
grids, suppo ing the growth of
distributed generation, thereby
promoting the electri cation of end
users' energy consumption, reaching
6 million connections to distributed
generation in 2030.
• Optimize the customer gas po folio
(industrial customers in pa icular),
continuing to reduce the volume of
gas sold to about 5.3 billion cubic
meters in 2030.
• No use of carbon-removal
technologies to achieve the target.
• By 2040, achieve 100% of energy sales
covered by renewables.
• Exit retail gas sales business by 2040.
• No use of carbon-removal
technologies to achieve the target.

main actions in 2023

Gas sales in 2023 equal to 8.3 billion cubic meters, down 19% on 2022.

3.6 million new connections in 2023.

EMAKKE
ents) R
CERTIFIED
GHG TARGET Additional emissions Scopes 1-2-3
Primary business
activity
• Electricity distribution (Scopes 1 and 2)
• Management of vehicle eet, buildings and other assets (Scopes 1 and 2)
• Management of supply chain (Scope 3)
• Purchase of fuels (Scope 3)
Type of activity in
value chain
• Direct (electricity distribution and management of vehicle eet, buildings and other Group assets)
• Upstream in value chain (supply chain for products and services and fuel business)
Stakeholders
impacted or
involved
• Customers and power consumers
• Electricity generators (peers)
• Suppliers of goods and services
• Oil&gas suppliers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
• 0.5% of Scope 1 GHG emissions
• 100% of Scope 2 GHG emissions
• Target 2030(6): 15% of Scope 3 GHG emissions (corresponding to 17% of Scope 3 emissions - category 1 and 22%
of Scope 3 emissions - category 3)
• Target 2040(6): 18% of Scope 3 GHG emissions (corresponding to 35% of Scope 3 emissions - category 1 and 22%
of Scope 3 emissions - category 3)
Time frame Medium term (2030) Long term (2040)
GHG target 10.4 MtCO2eq <2.5 MtCO2eq
Net zero emissions
% reduction on 2017
(SBTi baseline)
-55% -90%
% reduction on
2023 (repo ing
year)
-12% -83%
Climate scenario 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Invest a total of €18.6 billion in grids over the 2024-2026
period, of which 50% to improve grid resilience, quality
and digitalization, thereby helping to reduce grid losses
and related greenhouse gas emissions. Replace existing
distribution grid infrastructure components with SF6-free
solutions.
• Implement a circular procurement approach; increase the
number of contracts that include the measurement of the
carbon footprint of the products and services purchased
by Enel, encouraging its reduction in a collaborative
decarbonization process with our suppliers. Strengthen
dialogue with raw material producers and other utilities
to de ne shared and e ective long-term decarbonization
strategies.
• Phase out coal- red generation by 2027, mitigating all GHG
emissions related to coal supply.
• No use of carbon-removal technologies to achieve the
target.
• Promote grid digitalization and replace existing distribution
grid infrastructure components with SF6-free solutions.
• Implement a circular procurement approach; increase the
number of contracts that include the measurement of the
carbon footprint of the products and services purchased
by Enel, encouraging its reduction in a collaborative
decarbonization process with our suppliers. Strengthen
dialogue with raw material producers and other utilities
to de ne shared and e ective long-term decarbonization
strategies.
• Eliminate emissions connected with gas extraction activities,
as the Group has fully exited gas- red generation and sale of
gas to end users.
• Neutralize the residual amount through carbon-removal
actions (purchase of ce i cates linked to nature-based or
technology-based projects in voluntary carbon markets,
in accordance with international standards) if complete
mitigation of emissions is not feasible due to exogenous
factors (technological, market or regulatory).

Results and main actions in 2023

  • €5.4 billion invested in the grid in 2023.
  • 43% reduction in coal burned in thermal generation plants.
  • 41% reduction in volume of gas burned in thermal generation plants compared with 2022 (due also to the sale of gas plants in Russia and Argentina), and 19% reduction in volume of gas sold to end users compared with 2022.
    • 8% reduction in electricity consumption in Group generation plants and buildings.
    • 24% reduction in emissions intensity (tCO2eq/€mn) in supply chain in 2023 compared with 2022, reaching 684 tCO2eq/€mn.

TOTAL COVERAGE OF SCOPES 1-2-3 EMISSIONS IN 2023

  • 95.5% of Scope 1 GHG emissions (2026, 2030 and 2040 targets)
  • 100% of Scope 2 GHG emissions (2030 and 2040 targets)
  • 87% (2017-2030 target) and 90% (2017-2040 target) of Scope 3 GHG emissions(6)
  • (1) Percentages based on total GHG emissions in 2023.
  • (2) Excludes marginal Scope 1 GHG emissions not directly related to the combustion of fossil fuels in electricity generation at thermal plants. These emissions also include the use of ancillary services in distribution operations. In pa icular, in 2023 there was an extraordinarily high use of these services in Brazil to deal with the meteorological emergency that occurred in São Paulo in November 2023, which caused the interruption of grid operations. In any event, 95.8% of Scope 1 and Scope 2 GHG emissions are covered by all of the above targets, greater than the 95% threshold required under the Science Based Targets initiative and the GHG Protocol.
  • (3) The target is in line with the path to 1.5 °C set by the SBTi for the electrical services industry (Sectoral Decarbonization Approach, or SDA), although it could not be o cially validated because the SBTi does not ce ify targets over a time frame of less than ve years from the presentation date.
  • (4) In 2023, gas sales decreased considerably compared with previous years. Fu hermore, a methodological change in the use of conversion factors has been implemented. These two factors produced a value below the target expected for 2026.
  • (5) The target could not be o cially validated because the SBTi does not ce ify targets over a time frame of less than ve years from the presentation date. In addition, the SBTi has not de ned a sectoral decarbonization approach for these types of emissions, so the ambition level cannot be veri ed.
  • (6) Two di erent percentage limits have been set for the target for Scope 3 GHG emissions by the supply chain, as allowed under the SBTi approach, which required coverage of at least 67% of Scope 3 emissions for the 2030 target, and at least 90% for the 2040 target.

Adaptation: resiliency and response to climate change and new options for the Group (Climate Adaptation Model)

The Group implements solutions to adapt to weather and climate events in order to effectively manage both chronic and acute situations for each business line and activity. These adaptation solutions may concern both short-term actions and long-term decisions, such as planning for investments in response to weather events. Adaptation efforts also include procedures, policies and best practices for resiliency, response and innovation.

For new investment, we can also take action right from the design and construction phases to reduce the impact of climate risks by design (e.g., by assessing risks and vulnerabilities during the design stage) and to take account of any chronic effects (e.g., including climate scenarios in long-term estimates for renewable resources).

Once the weather and climate events have been identified, actions to maximize our capacity for adaptation may be categorized as follows.

• Response management – Procedures to prepare the response to extreme events (e.g., acquiring short-term weather forecasts and training) and procedures to restore normal operations as quickly as possible (e.g., defining operating and organizational procedures to implement in response to critical events).

  • Resiliency measures Actions aimed at increasing asset resiliency, such as assessing the entity of potential acute and chronic risks in order to define both design requirements and actions to take with regard to existing assets.
  • New business options Conception of new businesses or products that are adapted to future changes in climate, so as to facilitate adaptation for both the Group and our communities and stakeholders.

In order to assess the impact of climate change for the purpose of making business and strategy decisions, and thereby aimed at implementing adaptation measures in line with the above, the Group is investing in the development of quantitative models that also make use of climate scenario data in order to assess the impact of climate change on specific assets or areas of production.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Assessment of the risks and opportunities connected with the Strategic Plan

The Group Strategic Plan is accompanied by a careful analysis of the risks and opportunities connected with those strategies.

Identifying those risks and opportunities within the Enel Group's strategic and industrial planning process is designed to improve the Group's risk/return profile.

Although the strategy underlying the Plan, as described above, envisages a phase of careful analysis and verification of the strategic risk factors and variables, it retains scenario assumptions regarding future events that will not necessarily occur or not occur to the extent assumed, as they depend on variables that cannot be controlled by management. Upside and downside developments may occur as time unfolds.

Before being able to approve the Strategic Plan, a quantitative analysis of the risks and opportunities associated with the Group's strategic positioning is presented annually to the Control and Risk Committee appointed by the Board of Directors. In particular, risk factors such as macroeconomic and energy variables (such as exchange rates, inflation, commodity prices and electricity demand), regulatory developments, weather and climate events and risks connected with the strategy are identified.

Based on the nature of the risk and opportunity drivers, the analytical approach that best represents their volatility is selected. In particular, we perform a deterministic analysis based on what-ifs of the possible evolution of the main market and business variables with respect to the main risk factors for the execution of the Business Plan and a probabilistic analysis to assess the variability of renewable resources.

Focusing on the scenario risk analysis for the Strategic Plan, exchange rates, electricity demand and the volatility of energy and commodity prices, together with possible reviews of regulatory frameworks and possible changes in commercial and sourcing strategies, represent almost all the volatility of the drivers. In particular, in addition to the US dollar the most impacting currencies are the Chilean peso, the Colombian peso and the Brazilian real. Italy and Spain represent nearly all of the Group's exposure to the impact of the volatility of energy prices and commodity price fluctuations on margins.

Examining the other risk factors, such as those connected with weather and climate events, we can see that geographical diversification significantly reduces the exposure to the risk associated with renewable resources – a highly positive factor considering the Group's positioning and the steady expansion of renewable generation. Furthermore, with regard to climate change, the risk associated with chronic effects is of little significance over the course of the three years of the Plan.

The Enel Group risk governance model

In performing its industrial and commercial activities, the Enel Group is exposed to risks that could impact its performance and financial position if not effectively monitored, managed and mitigated.

In this regard, in line with the architecture of Enel's internal

control and risk management system (ICRMS), the Group has also adopted a risk governance model based on a number of "pillars" described below, as well as a uniform taxonomy of risks (the "risk catalogue") that facilitates their management and organic representation.

The "pillars" of risk governance

Enel has adopted a reference framework for risk governance that is implemented in the real world through the establishment of specific management, monitoring, control and reporting controls for each of the risk categories identified.

The Group's risk governance model is in line with the best national and international risk management practices and is based on the following pillars:

  • Lines of defense. The Group's arrangements are structured along three lines of defense for risk management, monitoring and control activities, in compliance with the principle of segregating roles in the main areas in respect of significant risks.
  • Group Risk Committee. This body, set up at management level and chaired by the Chief Executive Officer, is responsible for strategic guidance and risk management supervision through:
    • analysis of the main exposures and the main risk issues faced by the Group;
    • adoption of specific risk policies applicable to Group companies, in order to identify roles and responsibilities in risk management, monitoring and control processes, in compliance with the principle of organizational separation between the units responsible for operations and those responsible for monitoring and controlling risks;
  • approval of specific operating limits, authorizing, where necessary and appropriate, exceptions to these limits for specific circumstances or needs;
  • definition of risk response strategies.
  • The Group Risk Committee generally meets four times a year and can also be convened, where deemed necessary, by the Chief Executive Officer and the head of the "Risk Control" unit, which forms part of the "Administration, Finance and Control" Function.
  • Integrated and widespread system of local risk committees. The presence of specific local risk committees, organized in accordance with the main global business lines and geographical areas of Group operations and chaired by their respective top managers, provides adequate oversight of the most characteristic risks at the local level. The coordination of these committees with the Group Risk Committee facilitates appropriate agreement with Group top management of the information

and mitigation strategies for the most significant exposures, as well as local implementation of the guidelines and strategies defined at Group level.

  • Risk Appetite Framework (RAF). The Risk Appetite Framework constitutes the reference framework for determining risk appetite and is an integrated and formalized system of elements that enable the definition and application of a single approach to the management, measurement and control of each risk. The RAF is summarized in the Risk Appetite Statement, a document that summarily describes the risk strategies identified and the indicators and/or limits applicable to each risk.
  • Risk policies. The allocation of responsibilities, coordination mechanisms and the main control activities are represented in specific policies and organizational documents defined in accordance with specific approval procedures involving the corporate structures directly involved.
  • Reporting. Specific and regular information flows on risk exposures and metrics, broken down at Group level and by individual global business line or geographical area, allow Enel's top management and corporate bodies to have an integrated view of the Group's main risk exposures, both current and prospective.

The Group's risk governance model is in line with the best national and international risk management practices and is

REPORTING

POLICY

based on the following pillars:

RISK APPETITE FRAMEWORK

LINES OF DEFENSE GROUP RISK COMMITTEE

LOCAL RISK

COMMITTEES

1. 2. 3. 4. 5. 6.

• Risk Landscape Enel Group©. Acting on the basis of its risk governance arrangements and on the international risk management standard ISO 31000:2018, the Group constantly monitors risks using a process supported by a data visualization tool (e-Risk Landscape©). This system collects and organizes information coming from the different geographical areas and business lines of the Group, categorizing them in accordance with the definition in the Group's risk catalogue. The monitoring and control process involves the assignment of metrics based on the risk events' probability of occurrence (likelihood) and the scale of potential economic-financial impact, providing the Group's top management with a dynamically updated view of the Group's risk profile and the associated management and mitigation actions. These dimensions, modulated through representative grids, provide an indication of the level of individual risks.

At December 31, 2023, the Enel Group monitored a set of about 300 risks, 11 of which were identified as Top Risks (with an above average likelihood and significant potential financial impacts), mainly identified as regulatory and legal/tax risks and/or uncertainties.

The Enel Group Risk Landscape© enables the selection and visualization of medium-to-high risks (i.e. excluding highly unlikely and/or low impact events). It is also possible to make a multidirectional selection:

• by category;

• by country/legal entity;

• by business line.

With regard to the Top Risks identified and examined for the Plan period, we find the greater concentration of strategic risks, in particular legislative-regulatory risks (5) in Italy (3) and Spain (2), deriving from exposures to rate revisions, the renewal of concessions and recognition in profitability parameters. As regards the section linked to compliance risks (6), we find a concentration mainly linked to tax risks in Brazil (4) and Italy (1) and legal risks in the United States (1).

The following graphic offers an example of the variability of the main risk clusters in terms of both probability and potential impact in the Top Risk categories. These ranges of variation are representative of the timeline with which the individual risk driver is examined (for example, for a possible evolution of the regulatory framework and ongoing mitigation actions) and the heterogeneity of the type of risks belonging to the same cluster.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

The Group risk catalogue

Enel has adopted a risk catalogue that represents a point of reference at the Group level and for all corporate units involved in risk management and monitoring processes. The adoption of a common language facilitates the mapping and comprehensive representation of risks within the Group, thus facilitating the identification of the main types of risk that impact Group processes and the roles of the organizational units involved in their management. The risk catalogue groups the types of risk into macro-categories, which include, as shown below, strategic, financial and operational risks, (non)-compliance risks, risks related to governance and culture as well as digital technology.

The following table shows the list of risks currently identified and classified within the aforementioned macro-categories.

CATEGORY RISK DEFINITION
Climate changes Risk of ineffective identification, assessment and management of risks related
to climate changes – caused by acute and chronic events (physical risks) and by
effects of regulatory, technology and market trends arising from the transition
to a lower-carbon economy (transition risks) – through strategic and operating
initiatives of adaptation and mitigation of climate risks.
Competitive landscape Risk of ineffective identification, assessment and monitoring of evolutionary
market trends that may impact Group competitive positioning, growth and
profitability.
Innovation Risk of ineffective development, delivery and diffusion of innovative solutions
caused by technology scouting inadequacy and wrong or incomplete analysis
over uncertainty, complexity, sustainability, feasibility degree, market expectations,
internal skills or financial commitment of innovative projects.
STRATEGIC Legislative and regulatory
development
Risk of adverse evolution of legislative or regulatory landscape, and/or
ineffective identification, assessment, management and monitoring of
legislative/regulatory evolutions, communication of new compliance duties,
execution of advocacy activities and internal gap analysis.
Lack of a systematic assessment process on regulatory exposures coming
from new strategic and business initiatives.
Macroeconomic and
geopolitical trends
Risk of ineffective identification, assessment and monitoring of global
economic, financial, political and social trends and monetary, fiscal and trade
policies evolutions.
Strategic planning and
capital allocation
Risk of ineffective strategic planning and capital allocation processes, caused
by unreliable scenario assumptions and inability to capture emerging trends
or to timely address relevant changes, that may adversely influence decision
making process.

CATEGORY RISK DEFINITION
Corporate culture and ethics Risk of (i) inadequate integration, within business processes and activities, of the
ethical principles defined by the Group, (ii) inability to put in place policies and
processes to ensure the respect of diversity and equal opportunity principles and
(iii) unsanctioned behaviors of employees and management, in breach with ethical
values of the Group.
Corporate governance Risk of ineffective corporate governance frameworks/rules and/or lack of
integrity and transparency within decision-making processes.
GOVERNANCE
AND CULTURE
Stakeholder engagement Risk to ineffectively engage key stakeholders on Enel's strategic positioning on
sustainability and financial goals due to a lack of understanding, anticipating
or orienting their expectations, which might cause an incomplete integration
of such expectations into Group's business strategy and sustainability
planning processes, with a potential negative impact on its reputation and
competitiveness.
Cyber security Risk of cyber-attacks and sensitive or massive corporate and customers data
stealing, ascribable to a lack of security of networks, operating systems and
databases.
Digitalization Risk of managing ineffective business processes and supporting higher
operating costs due to a lack of digitalization in terms of workflows coverage,
systems integration and adoption of new technologies.
DIGITAL
TECHNOLOGY
IT effectiveness Risk of ineffective support of IT systems to business processes and operating
activities.
Service continuity Risk of exposure of IT/OT systems to service interruptions and data losses.
Capital structure adequacy
and funding access
Risk that company and/or Group debt/equity ratio or the mix between long
and short-term debt may not be adequate to (i) support financial flexibility, (ii)
enable free access to a wide range of funding sources and (iii) achieve cost of
debt targets.
Commodity Risk of (i) adverse commodity market trends and/or prices volatility
movements (price risk) and/or (ii) lack of demand or availability of
commodities, natural resources and raw materials (volume risk).
FINANCIAL Credit and counterparty Risk of (i) counterparty's inability to meet payment or delivery contractual
obligations, (ii) credit deterioration or default of a counterparty, (iii) significant
exposure to a single counterparty (single name concentration) or (iv) to
counterparties operating in the same sector or belonging to the same
geographical area (sectorial/geographical concentration).
Foreign exchange rate Risk of adverse variations in exchange rates, negatively affecting: (i) costs and
revenue denominated in foreign currencies with respect to the time at which
price conditions were defined or the investment decision was made (economic
risk); (ii) revaluations or fair value adjustments of exchange rate-sensitive financial
assets and liabilities (transaction risk); (iii) the consolidation of subsidiaries having
different accounting currencies (translation risk).
Interest rate Risk of adverse fluctuations in interest rates impacting on net financial
expense as well as on fair value adjustments of sensitive financial assets and
liabilities.
Liquidity Risk of incurring into difficulties to meet short-term financial needs as a result
of inability or higher costs incurred in (i) raising short-term funds (funding
liquidity risk) or (ii) liquidating assets on financial markets (asset liquidity risk).

CATEGORY RISK DEFINITION
OPERATIONAL Asset protection Risk of financial or reputational losses due to unauthorized access, theft,
misappropriation or mismanagement of equipment, plants, strategic information
or other physical or intangible assets. Risk of financial or reputational losses due
to ineffective safeguarding activity (i.e. insurance and legal activities) of Group
financial assets.
Business
interruption
Risk of partial or total interruption of business operations arising from
technical failures, assets and plants malfunctions, human errors, sabotages,
raw materials unavailability or adverse weather events.
Customer
needs and satisfaction
Risk of failure of Group's products and services in achieving customers'
expectations and needs in terms of quality, accessibility, sustainability and
innovation.
Environment Risk that inappropriate working operations or machineries may adversely
impact on the environment quality and ecosystems involved.
Risk of a breach in complying with international, country or local
environmental laws and regulations.
Health and safety Risk that inappropriate working environments, structures, machineries and
business operations may negatively impact on health & safety conditions of
employees and other stakeholders involved.
Risk of a breach in complying with international, country or local laws and
regulations on health and safety.
Intellectual property Risk of Group's intellectual property infringements or frauds.
People and
organization
Risk of inadequacy of Group's organizational structures or lack of internal skills
caused by the absence or inadequacy of training programs, ineffectiveness of
incentive schemes, inadequate turnover planning process or inability to define
effective employees recruiting processes and retention policies.
Process efficiency Risk of incurring higher operating costs or delays as well as reduced revenue
streams due to an inadequate management of operating processes and
activities, a lack of data quality, incomplete or ineffective monitoring over internal
performances and internal reporting.
Procurement, logistics and
supply chain
Risk of ineffective procurement or contract management activities, due to
inadequate requirements definition or supplier qualification process, a frequent
recourse to direct awarding, scouting activities shortcomings, poor monitoring
over the fulfillment of contractual duties, non-application of penalties.
Service quality management Risk of third-party/internal service providers inability to meet the agreed
required levels of service.

CATEGORY RISK DEFINITION
COMPLIANCE Accounting compliance Risk of a breach of international and national accounting laws and regulations
or incorrect application and/or interpretation of international accounting
standards adopted by the Group (IFRS-EU) and national accounting standards
(local GAAP).
Antitrust compliance and
consumers' rights
Risk of a breach of antitrust and consumer rights laws and regulations.
Corruption Risk of willful misconduct or bribery carried out by persons inside or outside
the Group in order to obtain an unfair or illicit advantage.
Data protection Risk of a breach of applicable data protection and privacy laws.
External disclosure Risk of dissemination of reports, accounting documents, communications or
other notices with wrong, inaccurate or incomplete information.
Financial regulation
compliance
Risk of a breach of international or national financial laws and regulations.
Tax compliance Risk of a breach in complying with international or national fiscal laws and
regulations.
Compliance with other laws
and regulations
Risk of a breach of international, national or local laws and regulations not
already specified in the other risk categories (e.g., in electricity markets,
distribution, generation, procurement, permitting, stock exchanges).

Strategic risks

This section provides disclosure on the following strategic risks:

Legislative and regulatory developments

The Group operates in regulated markets and changes in the operating rules of the various systems, as well as the prescriptions and obligations characterizing them, impact the operations and performance of the Group.

Accordingly, Enel closely monitors legislative and regulatory developments, such as:

  • periodic revisions of regulation in the distribution segment;
  • the liberalization of electricity markets, with special attention being paid to the acceleration provided for in Italy and expected developments in South America;
  • developments in capacity payment mechanisms in the generation segment;
  • regulatory measures to shield users from impact of price developments.

In order to manage the risks associated with these developments, Enel has intensified its relationships with local governance and regulatory bodies, adopting a transparent, collaborative and proactive approach in addressing and eliminating sources of instability in the legislative and regulatory framework.

Macroeconomic and geopolitical trends

The considerable internationalization of the Group – which has a presence in many regions, including Europe, South America, North America and Africa – requires Enel to consider country risk, i.e. risks of a macroeconomic, financial, institutional or social nature and those specifically associated with the energy sector whose occurrence could have a significant adverse impact on both revenue flows and the value of corporate assets. Enel has adopted a quantitative Open Country Risk assessment model capable of monitoring the riskiness of the countries in which it operates. The Open Country Risk model seeks to go beyond the more conventional definition of country risk, which focuses on the ability of a government to repay the debt it has issued, to offer a broader view of the risk factors that can impact a country. The model is divided into four risk components: economic, institutional and political, social, and energy factors.

Open Country Risk is a quantitative model that extends the more conventional de nition of country risk used in the existing literature by providing a more complete analysis of the risks involved, incorporating economic, nancial, political, climate and energy factors.

More specifically, the Open Country Risk model has the ambition to measure the economic resilience of individual countries, defined as the balance of their position with respect to the rest of the world, the effectiveness of internal policies, the vulnerabilities of their banking and corporate system that might portend systemic crises and their attractiveness in terms of economic growth, and finally a quantification of extreme climate events as a cause of stress at the environmental and economic level (economic factors). This is accompanied by an assessment of the robustness of the country's institutions and political context (institutional and political factors), an in-depth analysis of social phenomena, measuring the level of well-being, inclusion and social progress (social factors), and the effectiveness of the energy system and its positioning within the energy transition process, as these are all essential factors for evaluating the sustainability of investments in the medium to long term (energy factors).

Specifically, the introduction of extreme climate events within the Open Country Risk model makes it possible to develop a uniform assessment on the evolution of certain climate hazards at the country level on a global scale.

Finally, with regard to the analysis of the energy transition process, the Open Country Risk model also includes risk and opportunity analyses designed for forecasting purposes, quantifying the actions and the paths taken by the individual countries. For example, the model incorporates various factors reflecting the weight of renewable sources in energy generation, the electrification process and the environmental sustainability of the national energy system, which together are crucial characteristics for evaluating the country's potential growth and attractiveness in the medium to long term.

Risks and strategic opportunities associated with climate change

The identification and management of risks connected with climate change and actions to seize opportunities

As discussed in previous sections, the energy transition and climate change will impact Group activities in a variety of ways.

In order to identify the main types of risk and opportunity and their impact on the business associated with them in a structured manner consistent with the most recent climate-change reporting standards, we have adopted a framework that explicitly represents the main relationships between scenario variables and types of risk and opportunity for Group operations, specifying the strategic and operational approaches to managing them, comprising mitigation and adaptation measures.

There are two main macro-categories of risks/opportunities: those linked to the evolution of the transition scenarios and those connected with developments in physical variables. The framework has been created with a view to ensuring overall consistency, making it possible to analyze and evaluate the impact of transition phenomena (e.g., energy context) and physical phenomena (e.g., climate change) within solid alternative scenarios, constructed using a quantitative and modeling approach combined with ongoing dialogue with both internal stakeholders and external authorities.

The energy transition presents risks and opportunities connected both with changes in the regulatory and legal context and trends in technology development and competition, electrification and customer behavior and the consequent market developments.

Physical risks are divided in turn between acute (i.e. extreme events) and chronic, with the former linked to extremely intense meteorological conditions and the latter to more gradual but structural changes in climate conditions.

Extreme events expose the Group to the risk of prolonged unavailability of assets and infrastructure, the cost of restoring service, customer disruptions and so on. Chronic changes in climate conditions expose the Group to other risks or opportunities: for example, structural changes in temperature could cause changes in electricity demand and have an impact on output, while alterations in rainfall or wind conditions could impact the Group's business by increasing or decreasing potential electricity generation. In general, adapting to the probable changes that will occur in the future also drives activities in the field of innovation and strategic positioning: new businesses and better products could be found to live sustainably in the changed context.

The Enel Group is contributing to realizing the transition and the opportunities that may arise. As discussed previously, our strategic choices, which are already strongly oriented towards the energy transition, with more than 90% of investments directed at improving a number of the Sustainable Development Goals, enable us to incorporate risk mitigation and opportunity maximization "by design", adopting a positioning that takes account of the medium- and long-term phenomena we have identified. The strategic choices are accompanied by the operating best practices adopted by the Group.

<-- PDF CHUNK SEPARATOR -->

Framework of main risks and opportunities

Scenario
phenomena
Time horizon Risk & opportunity
driver
Description Management approach
Transition Starting with short term
(1-3 years)
Policy & Regulation Risk/opportunity: policies on
CO2
prices and emissions,
energy transition policies
and financial instruments,
revision of market design and
permitting procedures, and
resilience regulation.
The Group is minimizing its exposure to risks
through progressive decarbonization and the
focus of the business on renewables, grids and
customers. The business model is designed to
maximize the benefits of our integrated position
in the core countries and leveraging partnership
and stewardship activities, which enables us to
exploit the opportunities connected with the
energy transition. The Group is also actively
contributing to the formation of public policies
through its advocacy efforts. These activities are
conducted within platforms for dialogue with
stakeholders that explore ambitious national
decarbonization scenarios in the various
countries in which Enel operates.
Transition Starting with medium
term (2027-2034)
Market Risk/opportunity: changes in
the prices of commodities,
raw materials and energy,
evolution of energy
mix, changes in retail
consumption, changes in
competitive environment.
The Group is maximizing opportunities by
adopting a strategy founded on the energy
transition, focusing on the electrification of
energy consumption and the development of
renewables and a geographical positioning
in countries in which we have an integrated
presence. Considering alternative transition
scenarios, the Group assesses the impact of
different commodity price trends, changes in the
share of renewables in the generation mix and
the electrification of final consumption.
Transition Starting with medium
term (2027-2034)
Product and
Services
Risk/opportunity: increase/
decrease in margins and
greater scope for investment
as a consequence of the
transition in terms of greater
penetration of electrical
mobility, distributed
generation and new
technologies for the direct
and indirect electrification of
final consumption.
The Group is maximizing opportunities thanks
to its strong positioning in new businesses
and "beyond commodity" services. In addition,
considering alternative transition scenarios, the
Group assesses the impact of different trends in
the electrification of consumption.
Starting with medium
term (2027-2034)
Technology The Group is maximizing opportunities thanks
to its strong strategic positioning in new
businesses and grids at the global level. With the
penetration of direct and indirect electrification
technologies, considering alternative scenarios,
the Group assesses the potential opportunities
for scaling existing and potential businesses and
for the development of new solutions linked to
digitalization and resilience of power grids.
Acute physical Starting with short term
(1-3 years)
Extreme events Risk: especially extreme
weather/climate events,
which can damage assets and
interrupt operations.
The Group adopts best practices to manage the
restoration of service as quickly as possible. We
also work to implement investments in resilience
(e.g., the Italian case). With regard to risk
assessment in insurance, the Group has a loss
prevention program for property risk that also
assesses the main exposures to natural events,
supported by preventive maintenance activities
and internal risk management policies.
Looking forward, the assessments will also
include the potential impacts of long-term trends
in the most significant climate variables.
Chronic
physical
Medium (2027-2034)
and long term (2035-
2050)
Market Risk/opportunity: increase
or decrease in electricity
demand under influence of
temperature, whose variations
can impact the business.
Increase or decrease in
renewables output, which
may be affected by structural
changes in resource
availability.
The Group΄s geographical and technological
diversification means that the impact of changes
(positive and negative) in a single variable is
mitigated at the global level. In order to ensure
that operations always take account of weather
and climate phenomena, the Group adopts a
range of practices such as, for example, weather
forecasting, real-time monitoring of generation
plants and long-term climate scenarios to
identify any chronic changes in renewable source
availability.

VULNERABILITY ASSESSMENT

investment)

High level (e.g., Open Country Risk, evolution of

energy system) Site speci c (e.g., high resolution climate data)

SCENARIO INTEGRATION

Analysis of vulnerabilities to quantify risk at the asset level (existing and new

Speci cation of adaptation priorities at the local level and main adaptation risks and actions at the country

Development of

ADAPTATION PLANS

long-term adaptation plans to increase resilience

PRIORITIZATION

level

The framework illustrated above also highlights the relationships that link the physical and transition scenarios with the potential impact on the Group's business.

These effects can be assessed from the perspective of three time horizons: the short term (1-3 years), in which sensitivity analyses based on the Strategic Plan presented to investors in 2023 can be performed; the medium term (until 2027-2034), in which it is possible to assess the effects of the energy transition; and the long term (2035- 2050), in which chronic structural changes in the climate should begin to emerge in addition to the most evident transition effects.

In order to facilitate the correct identification and management of the risks and opportunities associated with climate change, a Group policy was adopted in 2021 that describes the common guidelines for assessing these risks and opportunities. The "Climate change risks and opportunities" policy defines a harmonized approach for integrating issues relating to climate change and the energy transition into the Group's processes and activities, thus informing industrial and strategic choices to improve business resilience and long-term sustainable value creation, in line with the adaptation and mitigation strategy. The main steps considered in the policy are described below.

  • Prioritization of phenomena and scenario analysis. These activities include the identification of physical and transition phenomena relevant to the Group and the consequent preparation of the scenarios to be considered, which are developed through the analysis and processing of data from internal and external sources. For the phenomena so identified, functions can be developed to connect the scenarios (for example, data on changes in renewable sources) to the operation of the business (for example, changes in expected potential output).
  • Evaluation of impacts. This includes all the analyses and activities needed to quantify the effects at an operational, economic and financial level, consistent with the processes in which they are integrated (for example, design of new buildings, evaluation of operational performance, etc.).
  • Operational and strategic actions. The information obtained from the previous activities is integrated into processes, informing the decisions of the Group and the business activities. Some examples of activities and processes that benefit from this are capital allocation, such as in the evaluation of investments in existing assets or new projects, the development of resilience plans, risk management and financing activities, engineering and business development.

The main sources of risk and opportunity from the evolution of transition scenarios and physical variables, the best practices for the operational management of weather and climate phenomena, and the qualitative and quantitative impact assessments performed to date are discussed below. The above activities are performed on the foundation of an ongoing effort during the year to analyze, assess and manage the information produced. The process of disclosing information on the risks and opportunities connected with climate change will be gradual and incremental from year to year, in line with the recommendations of the most recent climate-change reporting standards.

Enel's resilience to the energy transition and climate change

The impacts of climate change, technological evolution, the evolution of policies and changes in macroeconomic fundamentals and geopolitical and market conditions make it every more important to develop resilient business strategies, i.e. strategies both capable of withstanding external shocks, and therefore of absorbing the causes of potential crises and thriving even when external conditions change, whether slowly or rapidly, and sufficiently flexible to identify new opportunities and transform them into actions. Jointly considering the factors associated with energy transition scenarios and the various climate change scenarios is therefore a prerequisite for long-term planning.

The set of transition and climatic scenarios plays a role in guiding strategic and industrial decisions, taking account, for example, of the future effects of temperature on electricity demand, the investments necessary to support the process of ever greater electrification and decarbonization, the evolution of the market environment and of consumer habits. Given that Enel's Strategic Plan concentrates more than 90% of investment on combatting climate change through the progressive expansion of generation from renewable sources and the development of infrastructure and services to guide energy systems and customers towards progressive electrification, aiming at the same time at significantly reducing the use of fossil fuels and increasing quality and efficiency, the Group's investments and activities delineate, by design, a long-term growth path that is in line with an energy transition consistent with the Paris Agreement.

The application of long-term climate scenarios enables the construction of adaptation plans for the Group's asset and business portfolio. Climate scenarios are developed starting with the identification of the most relevant physical phenomena for each business (such as heat waves, extreme rainfall, fire risk, etc.), to produce analyses that provide both high-level indicators (such as comparable

country risk indices) and high-resolution data, which make it possible to study physical impacts at the single-site level. The approach applies to both the existing portfolio and new investments. More details on new investments are

described in the dedicated section "Inclusion of climate change effects in the assessment of new projects". Asset vulnerability assessment makes it possible to identify priority actions to increase resilience.

SCENARIO
INTEGRATION
VULNERABILITY
ASSESSMENT
PRIORITIZATION ADAPTATION
PLANS
High level (e.g., Open
Country Risk, evolution of
energy system)
Analysis of vulnerabilities
to quantify risk at the asset
level (existing and new
Speci cation of adaptation
priorities at the local level
and main adaptation risks
Development of
long-term adaptation plans
to increase resilience

Site speci c (e.g., high resolution climate data) investment)

and actions at the country level

long-term adaptation plans

Transition phenomena: repercussions on our business, risks and opportunities

With regard to the risks and opportunities associated with transition variables, we use the different reference scenarios in combination with the elements that make up the risk identification process (e.g., competitive context, longterm vision of the industry, materiality analysis, technological evolution, etc.) to identify the drivers of potential risks and opportunities. Priority is given to the most material phenomena. The main risks and opportunities identified within this framework are described below.

POLICY & REGULATION

Limits on emissions
and carbon pricing
Laws and regulations that introduce more stringent emission limits by government action (non-mar
ket driven) and market-based mechanisms.

Opportunities: command & control regulations and market-based mechanisms strengthening
CO2
price signals to foster investment in carbon-free technologies.

Risks: lack of a coordinated approach among the various actors and policymakers involved and
limited effectiveness of the policy instruments, with an impact on the speed of the trend towards
electrification and decarbonization in the various sectors, compared with a decisive Group strat
egy focused on the energy transition.
Policies and Introduction of policies, regulatory frameworks and revision of market design features incentiviz
regulation for ing the energy transition, consequently guiding the energy system towards the use of renewable
accelerating the energy resources as the mainstream approach in the energy mixes of countries, greater electrifi
transition and cation of energy consumption, energy efficiency, flexibility of the electrical system and upgrading
energy security of infrastructure.
  • Opportunities: creation of a more favorable framework for investment in renewable energy, thanks also to the development of long-term markets (PPAs, CfDs) in electricity technologies and distribution grids in line with Group strategy.
  • Risks: slow administrative authorization processes, and ineffective market design and regulatory frameworks in core countries can reduce asset profitability and limit growth opportunities.
Resilience
and adaption
regulation
To improve standards or introduce ad hoc mechanisms to incentivize investments in resilience in
the context of the evolution of climate change.

Opportunities: benefits from investments that reduce the risk of impact on service quality, loss
es on corporate assets and service continuity for customers and communities.

Risks: in the case of especially severe extreme events with a greater-than-expected impact,
there is a risk that recovery could be slower than planned, with an associated reputational risk.
Financial measures
for the energy
transition
Development of policies and financial instruments that encourage the energy transition, which
should be capable of supporting an investment framework and a long-term, credible and stable
positioning of policymakers. Introduction of rules and/or public and private financial instruments
(e.g., funds, mechanisms, taxonomies, benchmarks) aimed at integrating sustainability into financial
markets and public finance instruments.

Opportunities: the creation of new markets and sustainable finance products consistent with
the investment framework, activating greater public resources for decarbonization and access
to financial resources in line with energy transition objectives and the related impact on costs
and on finance charges; introduction of subsidized support tools (funds and calls) for the tran
sition.

Risks: actions and instruments are not sufficient to drive an acceleration of energy transition,
uncertainty or slowdown in the introduction of new instruments and rules due to the deteriora
tion in the public finances.

MARKET

Commodity prices
dynamics
Changes in market dynamics, such as those related to the volatility of commodity prices, can influ
ence the behavior of operators, policymakers and customers.

Opportunities: acceleration of clean electrification as a solution to reduce energy costs and ex
posure to commodity volatility. Increased propensity of customers to switch from conventional
fossil fuel technologies to efficient electric technologies.

Risks: "disorderly" energy transition caused by the introduction of potentially distortive mea
sures.
Market dynamics Propensity of final customers to adopt more sustainable technologies, thanks to greater awareness
of the risks of climate change and greater regulatory pressure.

Opportunities: positive effects associated with the growth in electricity demand and the greater
room for renewables, thanks in part to greater demand for long-term contracts (PPAs).
TECHNOLOGY
Penetration of
new technologies
supporting the
Gradual penetration of new technologies such as electric vehicles, storage, demand response and
electrolyzers for the production of green hydrogen. Large-scale adoption of digital technologies to
transform operating models and "platform" business models.
transition
Opportunities: investments in developing technology solutions supporting the flexibility of the
electrical system. Additional boost to renewables for the production of green hydrogen.

Risks: slowdowns and interruptions in the supply chain for raw materials and semiconductors
could lead to delays in procurement and/or increase costs, potentially slowing the penetration
of renewables, storage and electric vehicles.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

PRODUCTS AND SERVICES

Electrification of residential energy consumption and industrial processes With the gradual electrification of end uses, the penetration of products with lower costs and a smaller impact in terms of local emissions and greater efficiency in the residential and industrial sectors will expand (for example, the use of heat pumps). • Opportunities: increase in electricity consumption against a background of declining energy consumption thanks to the greater efficiency of electricity. Greater opportunities to provide beyond-commodity services and the opportunity to reduce customers' energy costs and carbon footprint. Greater investments in grids to support the electrification of consumption. • Risks: additional competition in this market segment. Dependence on adequate development of electricity grids, which are essential to deliver increasing loads and service continuity. Electric mobility Use of more efficient and effective modes of transportation from the point of view of climate change, with a special focus on the development of electric mobility and charging infrastructure. • Opportunities: positive effects of the increase in electricity demand and greater margins connected with the penetration of electric transportation and associated beyond-commodity services. • Risks: additional competition in this market segment.

The Group has already taken strategic actions to mitigate potential risks and exploit the opportunities offered by the energy transition.

A strategy focused on decarbonization and the energy transition makes the Group resilient to the risks associated with the introduction of more ambitious policies for emissions reductions and maximizes opportunities for the development of renewable generation, infrastructure and enabling technologies, thanks in part to our geographical positioning in countries with an integrated presence.

To quantify the risks and opportunities engendered by the energy transition, the transition scenarios described in the section "Enel's energy transition scenarios" have been considered.

In the Enel Reference scenario, the progressive electrification of final energy consumption, especially in transport and the residential sector, leads to an increase in electricity consumption and therefore to a growth in electricity demand. This dynamic reduces the risk associated with the progressive increase in the share of renewables in the energy mix, which could trigger a reduction in the price of wholesale electricity. Furthermore, revisions of the market design in favor of long-term remuneration would have a positive impact on profitability.

The effects of the Slower Transition and Accelerated Transition on the variables that can most impact the business were then identified, in particular electricity demand influenced by developments in the electrification of consumption – and hence the penetration of electrical technologies – and the power generation mix.

With regard to the electrification of consumption, however, the Slower Transition scenario envisages lower penetration rates for the most efficient electrical technologies, in particular electric vehicles and heat pumps, producing a decrease in electricity demand compared with the Reference scenario, which is expected to have a limited impact on the commodity and beyond-commodity retail business. At the same time, the decline in electricity demand would leave less room for growth in renewables, with an impact on the generation business, partially offset by higher electricity prices than in a scenario with more renewables capacity.

The Accelerated Transition scenario assumes a more rapid reduction in the costs of green hydrogen production technologies compared with the Reference scenario. This translates into greater penetration for green hydrogen, with a consequent additive effect on national electricity demand and the installation of renewables capacity compared with the Reference scenario.

All of the scenarios, but especially the Reference and the Accelerated Transition scenarios, will entail a greater role for grids. In fact, we expect a significant increase in distributed generation and storage systems, the greater penetration of charging infrastructure and a growing rate of electrification of consumption. These developments will lead to the decentralization of power withdrawal/injection points, an increase in electricity demand and the average power required, and strong variability of energy flows, requiring dynamic and flexible management of the grid.

Upside (Accelerated Transition vs Reference)
Downside (Slower Transition vs Reference)
Quanti cation - range
Scenario
phenomena
Risk/
oppo unity
category
Description Time
horizon
Description of
impact
GBL
involved
Scope Quanti cation -
Impact type
Upside/
Downside
<€100
mil
€100-300
mil
>€300
mil
Transition Market Risk/oppo unity:
more/less scope
for investment in
new renewables
capacity and power
price changes
corresponding to
di erent degrees
of renewables
penetration
Medium
term(1)
Two alternative
transition scenarios
to the Reference
scenario are
considered, with
respect to which the
Group has evaluated
the impact of
di erent degrees
of renewables
penetration on the
reference power
price and additional
capacity
Global
Generation
Global Enel
X Retail
Enel
Group
EBITDA/year Upside
Downside Adoption of
measures to
increase Customer
Base in order
to compensate
for the negative
impact on margins
Transition Risk/oppo unity:
smaller/
Considering two
alternative transition
scenarios to the
Reference scenario,
the Group has
evaluated the
Global Enel
X Retail
Global Grids
Upside
Market larger margins
Medium
depending
term(1)
on degree of
electri cation of
consumption
e ects of a change
in average unit
consumption and
electricity demand
as a result of greater/
lesser electri cation
of energy
consumption
Enel
Group
EBITDA/year Downside Adoption of
measures to
increase Customer
Base in order
to compensate
for the negative
impact on margins
Transition Product and Risk/oppo unity:
larger/smaller
margins and
more/less scope
for investment
depending on
Medium Considering
two alternative
transition scenarios
to the Reference
scenario, the Group
has evaluated
Global Enel
X Retail
Enel Upside
Services the e ects of the
transition in terms
of penetration of
new technologies
and electric
transpo
term(1) the e ects of
di erent trends in
the electri cation
of transpo and
the electri cation
of domestic
consumption
Group EBITDA/year Downside

(1) 2030 benchmark.

The Group therefore expects that in this scenario incremental investments will be needed to ensure connections and adequate levels of quality and resilience, encouraging the adoption of innovative operating models. These investments must be accompanied by consistent policy and regulatory scenarios to ensure adequate financial returns within the Enel Grids Business Line.

Chronic and acute physical phenomena: possible impacts on our business, risks and opportunities

Taking the scenarios developed by the Intergovernmental Panel on Climate Change (IPCC) as our reference point, developments in the following physical variables and the associated operational and industrial impacts connected with potential risks and opportunities are assessed.

Chronic physical changes creating risks and opportunities

The climate scenarios developed with the International Centre for Theoretical Physics (ICTP) in Trieste show material changes beginning to emerge between 2030 and 2050. In practice, while significant meteorological variations have been recorded, it is still a challenge to establish in the short term whether certain phenomena are changing structurally, or whether the average benchmark values are already changing. Instead, it is established on the longer time horizon with probability intervals.

The main impacts of chronic physical changes are expected to be reflected in the following variables:

Variables impacted by chronic physical changes

  • Electricity demand: variation in the average temperature level with a potential increase or reduction in electricity demand.
  • Thermal generation: variation in the level and average temperatures of the oceans and rivers, with effects on thermal generation.
  • Hydroelectric generation: variation in the average level of rainfall and snowfall and temperatures with a potential increase or reduction in hydro generation.
  • Solar generation: variation in the average level of solar radiation, temperature and rainfall with a potential increase or reduction in solar generation.
  • Wind generation: variation in the average wind level with a potential increase or reduction in wind generation.

As part of the assessment of the effects of long-term climate change, we have identified chronic events relevant to each technology and began the analysis of the related impacts. The following matrix identifies the chronic climate phenomena to which each of the Group's assets and technologies was found to be most vulnerable, differentiating by the priority of the phenomenon.

In particular, the Group works to effectively estimate the relationships between the changes in the physical variables reported in the matrix and the change in producibility relating to individual plants for the different technologies.

Analysis of the impact of chronic climate change on renewable generation

To calculate the impact of the chronic effects of climate change on the production of our assets, a series of ad hoc functions have been created for each renewable technology (wind, solar and hydroelectric) and plant, which associate, with each change in climatic variables (e.g., temperature, radiation, wind speed, rainfall), probable changes in terms of electrical producibility of the plants in our portfolio.

To calibrate these "link" functions, we started from the historical data of the weather-climate variables(33) and from the internal references of the observed producible energy of our plants. In this way, link functions have been obtained which respond to the specific characteristics of each renewable plant and technology.

It was therefore possible to study the chronic climate impacts for possible future projections of climate variables (RCP 2.6, 4.5 and 8.5 scenarios).

Together with the chronic phenomena, which involve aver-

age structural changes, it is necessary to study the typical volatility of the weather and therefore more short-term. Both the information derived from the variation ranges of the chronic trends projected by the climatic scenarios and the historical volatilities of the meteorological data were taken as input for the strategic planning, through analysis of the variations in electricity production (TWh) over the last 10 years.

All fluctuations, both weather and climatic, can lead to adjustments, since the production of the plants feeds the sourcing for the sale of energy to customers. In essence, reductions in terms of energy for renewable production can lead to imbalances on the sourcing side which can lead to the purchase of the missing volumes on the market to feed the commercial strategy. Conversely, greater renewable production leads to a possible reduction in the purchase of volumes on the market (or possibly higher sales).

Chronic structural changes in the recent trends of physical variables will manifest themselves gradually over long time scales. In order to obtain an indicative projection of the potential impacts, and include a possible acceleration of the manifestation of chronic effects, we can perform a stress test of the Business Plan with regard to the factors potentially influenced by the physical scenario, taking account of historical weather variability and the climate changes that are expected to emerge in the long term. The current Business Plan was constructed using the information contained in the median scenarios for chronic phenomena, so as to consider the possible effects of trends in climate variables. The following chart reports the findings of this analysis.

Upside scenario Downside scenario
Risk/ Quanti cation - range
Scenario
phenomena
oppo unity
category
Description Time
horizon
Description of impact GBL
involved
Scope Quanti cation -
Impact type
Upside/
Downside
<€100
mil
€100-
300 mil
>€300
mil
Chronic
physical
Market Risk/
oppo unity:
increased or
decreased
electricity
demand
Medium/
long term
Electricity demand is also
in uenced by temperature,
uctuations in which can
impact the business. Although
structural changes should
not emerge in the sho
term, sensitivity analyses
of variations in electricity
demand are used, in line with
the climate scenarios analyzed
Global
Generation
Global Grids
Enel
EBITDA/year
Group
Upside
Downside
Risk/
oppo unity:
Renewable generation is
in uenced by the availability
of resources, uctuations in
which can impact the business.
Although structural changes
should not emerge in the
Global Upside
Chronic
physical
Market increase or
decrease in
renewable
generation
Medium/
long term
sho term, the sensitivity
of the Group's results was
assessed using sensitivity
analyses considering historical
meteorological volatility
and variations in generation
potential in the di erent climate
scenarios
Generation
Enel
EBITDA/year
Group
Downside

(33) Historical data from ISPRA (Istituto Superiore per la Protezione e la Ricerca Ambientale) e ERA5 data from ECMWF (European Centre for Medium-Range Weather Forecasts).

Acute physical changes creating risks and opportunities

With regard to acute physical phenomena (extreme events), the intensity and frequency of extreme physical phenomena can cause significant and unexpected physical damage to assets and generate negative externalities associated with the interruption of service.

Acute physical phenomena, in different cases such as windstorms, floods, heat waves, cold snaps, etc., are characterized by considerable intensity and a frequency of occurrence that, while not high in the short term, is clearly trending upwards in medium- and long-term climate scenarios.

Therefore, the Group is already managing the risk associated with extreme events in the short term. At the same time, the methodology is also being extended to longer time horizons (up to 2050) in accordance with the climate change scenarios that have been developed (RCP 8.5, 4.5 and 2.6).

In the case of the vulnerability of assets in the portfolio, a table of the main extreme events relevant to the different technologies was defined in collaboration with the Group's relevant global business lines, in order of priority, as was done for chronic phenomena.

In order to understand the impacts on our business, this matrix was considered for conducting possible ad hoc analyses in order of priority.

Acute event risk assessment methodology

In order to quantify the risk deriving from extreme events,

the Group uses a consolidated catastrophic risk analysis approach, which is adopted in the insurance sector and in the IPCC reports.(34) This methodology is used both in assessing risks to support industrial and strategic decision-making and to hedge the risk through its insurance business units and the captive insurance company Enel

Scenario phenomena

Chronic physical Market

Chronic physical Market

Risk/ oppo unity

category Description

Risk/ oppo unity: increased or decreased electricity demand

Risk/ oppo unity: increase or decrease in renewable generation

Time

Medium/ long term

Medium/ long term

horizon Description of impact

scenarios

Electricity demand is also in uenced by temperature, uctuations in which can impact the business. Although structural changes should not emerge in the sho term, sensitivity analyses of variations in electricity demand are used, in line with the climate scenarios analyzed

Renewable generation is in uenced by the availability of resources, uctuations in which can impact the business. Although structural changes should not emerge in the sho term, the sensitivity of the Group's results was assessed using sensitivity analyses considering historical meteorological volatility and variations in generation potential in the di erent climate GBL

Global Generation Global Grids

Global Generation Enel

involved Scope

Enel

Group EBITDA/year

Group EBITDA/year

Quanti cation - Impact type

Upside/ Downside

Upside

Downside

Upside

Downside

Quanti cation - range

€100- 300 mil >€300 mil

<€100 mil

Upside scenario Downside scenario

(34) L. Wilson, "Industrial Safety and Risk Management", University of Alberta Press, Alberta, 2003.

T. Bernold, "Industrial Risk Management", Elsevier Science Ltd, Amsterdam, 1990.

H. Kumamoto and E.J. Henley, "Probabilistic Risk Assessment and Management for Engineers and Scientists", IEEE Press, 1996.

Nasim Uddin, Alfredo H.S. Ang (eds.), "Quantitative risk assessment (QRA) for natural hazards", ASCE, Germany, 2012.

UNISDR, "Global Assessment Report on Disaster Risk Reduction: Revealing Risk, Redefining Development", United Nations International Strategy for Disaster Reduction. Geneva, 2011. IPCC, "Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation - A Special Report of Working Groups I-II of the Intergover-

nmental Panel on Climate Change (IPCC)", Cambridge University Press, Cambridge, 2012.

Insurance NV. The Group manages the various phases of assessing the risks connected with natural disasters: from assessment and quantification to the corresponding insurance coverage to minimize impacts.

In all of these types of natural disasters, three independent factors can be identified, as briefly described below.

• The event probability (hazard), i.e. the theoretical frequency of the event over a specific time frame, which can also be expressed as the recurrence interval or return period. A hazard that has a specific geographical distribution is analyzed in the areas where the Group assets involved are located.

For this purpose, the Group adopts the hazard map tool, which associates the estimated hazard for the different types of natural disasters with each geographical point. This information, organized in geo-referenced databases, is obtained from global reinsurance companies or developed on the basis of data from weather consulting firms or academic institutions.

• Vulnerability, which indicates in percentage terms how much value would be lost upon the occurrence of a given catastrophic event. In more specific terms, reference can be made to the damage to material assets, the impact on the continuity of electricity generation and/or distribution or the provision of electrical services to end users.

The Group, especially in the case of damage to its assets, conducts and promotes specific vulnerability analyses for each technology in its portfolio, for example solar, wind and hydroelectric generation plants, transmission and distribution grids, primary and secondary substations, etc.

• Exposure, i.e. the set of economic values present in the Group's portfolio that could be materially impacted in the presence of catastrophic natural events. Again, the dimensions of the analyses are specific for the different production technologies, distribution assets and services to end users.

The three factors described above (hazard, vulnerability and exposure) constitute the fundamental elements of any assessment of the risk associated with extreme events. In this sense, the Group, with respect to climate change scenarios, differentiates its risk analyses in accordance with the specificities of the various associated time horizons. The following table summarizes the scheme adopted for the assessment of the impacts deriving from acute physical phenomena.

Time horizon Hazard Vulnerability Exposure
Short term Hazard maps based on historical data
and meteorological models
Vulnerability, being linked to
the type of extreme event, to
the specifics of the type of
Group values in the short term
Medium and long term Hazard maps and specific studies for
the different RCP climate scenarios
of the IPCC
damage and to the technical
requirements of the technology
in question, is essentially
independent of time horizons
Group values in the long term

Managing the risk of extreme events in the short term

Over the short term (1-3 years) the Group, in addition to risk assessment and quantification, takes actions to reduce the impacts that the business may suffer following catastrophic extreme events. Two main types of action can be distinguished: obtaining effective insurance coverage and climate adaptation activities, preventing losses that could be caused by extreme events.

The general characteristics of these actions are illustrated below and, naturally, in the case of adaptation activities for damage prevention and mitigation, specific reference will be made to the Group's Generation and Enel Grids Global Business Lines.

Impact of acute physical events on the Group

The Enel Group has a well-diversified portfolio in terms of its generation technologies, geographical distribution and asset scale and, consequently, the portfolio's exposure to natural risks is also diversified. The Group implements various risk mitigation measures, which, as described below, include both insurance coverage and other management and operational arrangements to further lower the Company's risk profile.

The empirical evidence indicates negligible repercussions from these risks, as shown by the data for the last five years. Considering the most significant events, defined as events with a gross impact of more than €10 million, the cumulative gross impact amounts to about €130 million, which represents less than 0.06% of the value of the Group's insured assets as at 2023 (about €220 billion).

Acute Events Risk Index (AERI)

As reported in previous publications, the Group has developed a climate change index called Acute Events Risk Index (AERI)(35) to provide a high-level indication of changes in risk to renewable generation plants attributable to climate change for acute phenomena. In particular, the results show the share of installed capacity that, based on climate projections (RCP 2.6), will be located in areas characterized by a risk class that will vary depending on the expected increase in the hazard attributable to climate change in the 2030-2050 period compared with the historical period.

The AERI considers the Group's hydroelectric, solar and wind plants (Enel Green Power and Enel X) and in 2023 it was updated to include COD 2022 plants.(36) The index uses climate metrics and the approach followed for the preliminary screening, which will also be described later, in order to identify assets that will be exposed to more intense climate change effects. The objective of this evaluation is to define the priorities for the detailed analyses necessary for the identification of adaptation actions. This offers a summary representation of a screening performed for each plant and relevant physical phenomenon, against which priorities will be evaluated for more detailed analyses.

In particular, the relevant physical phenomena are considered for each plant, with respect to which the level of future climate change is calculated and a risk class (high, medium, low, very low) is assigned to each asset using an appropriate weighting system. At this point it is possible to aggregate the results and arrive at the Group AERI value broken down by each risk category.

As shown in the figure below, in the RCP 2.6 scenario, just over 1% of the total analyzed capacity of the Enel Group is located in areas classified as at high risk from climate change: for these plants, a detailed analysis is a priority in order to identify possible adaptation measures. By comparison, about 11% will be located in medium-risk areas. This means that the asset situation must be analyzed on a rolling basis to evaluate whether to proceed with more in-depth analyses using higher resolution data in order to determine the need for adaptation with respect to specific phenomena. Finally, the remaining installed capacity (88%) is associated with a low or very low risk: plants in these categories are not expected to be exposed to substantial climate change impacts in the RCP 2.6 scenario. For these, therefore, the criteria and actions already implemented remain adequate and any detailed studies will have a lower priority. The analyses will in any case be updated and refined on an ongoing basis to ensure monitoring of expected climate change effects on all plants.

BREAKDOWN OF GROUP CAPACITY (%) BY CLIMATE CHANGE RISK CATEGORY (RCP 2.6 SCENARIO)

(35) The AERI evaluates the percentage of capacity at risk in the long term (2030-2050) compared with the historical period. It is thereby assumed that the Group's plants are resilient to phenomena observed in the recent past.

(36) Plants in Peru are not included in the estimation of the index. In 2023, the index calculation methodology was also refined to take better account of the intrinsic uncertainty of climate data.

The Group is also working to extend the analysis to the distribution grids and thus also obtain qualitative and quantitative information for Enel Grids on the climate risks associated with that business line's assets.

Insurance in the Enel Group

Each year, the Group develops global insurance programs for its businesses in the various countries in which it operates. The two main programs, in terms of coverage and volumes, are the following:

  • the Property Program ("Property Damage and Business Interruption Insurance Program") for material damage to assets and the resulting business interruption. Accordingly, in addition to the costs of rebuilding assets (or parts thereof), the financial losses due to the stoppage of electricity generation and/or distribution are also covered, within the limits and conditions defined in the policies;
  • the Liability Program ("General & Environmental Liability Insurance Program"), which insures against losses caused to third parties, including the impact that extreme events may have on the Group's assets and business.

Based on effective risk assessment, it is possible to specify appropriate limits and insurance conditions within the policies, and this also applies in the case of extreme natural events linked to climate change. In fact, in the latter case, the impacts on the business can be significant but, as has happened in the past in various locations around the world, the Group has demonstrated a high degree of resilience, thanks to the ample insurance coverage limits, thanks in part to the Group's solid reinsurance capabilities through the captive company.

The presence of this effective insurance coverage does not make the actions that the Group takes in the preventive maintenance of its generation and distribution assets any less important. In fact, while on the one hand the effects of these activities are immediately reflected in the mitigation of the impacts of extreme events, on the other hand they are a necessary prerequisite for optimizing risk financing and minimizing the cost of the Group's global insurance coverage programs, including the risk associated with catastrophic natural events. This adaptive strategy takes the form of management strategies and actions that go beyond insurance alone and change with the surrounding conditions. For example, the Group has managed to sterilize much of the strong upward trend in premiums on the insurance markets through changes to its risk retention policies for assets, as well as through internal risk transfer policies that reward the business lines that are most virtuous in terms of risk mitigation. From this perspective, the method and the information extracted from the ex-post analysis of events play a crucial role in determining the processes and practices to be deployed in mitigating such events in the future.

Climate change adaptation in the Enel Group

The Group implements climate change adaptation solutions using an overall approach that, as described in the "Climate change strategy" section, assesses potential impacts in order to appropriately calibrate the necessary adaptation measures to enhance our ability to respond to adverse events (Response Management) and to enhance the resilience of the business (Resiliency Measures), thereby reducing the risk of future negative impacts of adverse events. Furthermore, the skills and tools developed to analyze the effects of climate change can be used to create value, for example through the conception of new business options that offer solutions to facilitate the adaptation of communities and all stakeholders.

The adaptation solutions can involve both policy actions and best practices implemented in the short term, and long-term decisions.

For new investments, in line with the general approach, it is also possible to take early action in the design and construction phase to reduce the impact of climate risks "by design", for example by taking account in the design stage of climate scenarios and asset vulnerability analyses for specific phenomena in order to implement resilient solutions.

The following table provides a high-level summary of the type of actions that Enel implements to effectively manage adverse events and to increase resilience to weather phenomena and their evolution under the impetus of climate change. In the following sections, certain activities are described in greater detail.

1 Enel Group Group Strategy & Risk Management EMARK
° Consolidated financial statements ) R
CERTIFIED
Business lines A. Resiliency Measures – Enhancing asset resilience B. Response Management – Adverse event
management
Enel Green Power and
Thermal Generation
Existing assets
1. Guidelines for hydraulic risk assessment and design
2. Lessons-learned feedback from O&M to E&C and BD
New construction
In addition to actions for existing assets:
1. Climate change risk assessments (CCRA) included in
environmental impact documentation (pilot)
Existing assets
1. Critical incident and event management
2. Site-specific emergency management plans and
procedures
3. Specific tools for forecasting imminent extreme
events and weather alerts
Enel Grids Existing assets and new construction
1. Guidelines for developing grid resilience enhancement
plans (e.g., the "Network Resilience Enhancement Plan" of
e-distribuzione)
2. Strategies and guidelines for Risk Prevention on distribution
grid
3. Resilience Plan for Italy and Network Strength in Colombia
Existing assets
1. Strategies and guidelines for Readiness, Response
and Recovery actions for the distribution grid
2. Global guidelines for emergency and critical event
management
3. Risk prevention and preparation measures for fires
involving electrical installations (lines, transformers,
etc.)
Enel X Global Retail Existing assets
1. Preliminary analysis of the impacts of medium/long-term
climate change
Existing assets
1. Enel X Critical Event Management

Enel has also completed a project involving the construction of a catalog of practical intervention actions intended to enhance the resilience of assets and their ability to respond to possible climate change effects.

The catalog includes targeted actions for each of the relevant events reported in the matrices of relevant phenomena (see previous sections), for each geographical area of interest of the Group, differentiated by the different asset technologies adopted in these areas.

The catalog of possible adaptation actions, which is maintained and updated on a cyclical basis in response to emerging needs and the refinement of the analyses conducted prior to their development, comprises more than 100 actions, including:

  • weather alerting (which includes the use of various tools to monitor and manage assets and natural resources);
  • automation (for example, implementation on medium-voltage grids to reduce the impact of faults on customers as measured in terms of SAIDI and SAIFI);
  • structural reinforcement across the entire asset base with a special focus on critical components;
  • continuous staff training;
  • maintenance of vegetation and care of the environment immediately surrounding assets.

The catalog is an important collection of possible adaptation options that can be used to generate estimates of cost and risk avoided for applications at specific sites. This information makes it possible to select the most appropriate action on the basis of a cost-benefit analysis that takes account of the expected risks in each specific situation.

How Enel ensures the resilience of generation

With regard to generation, over time the Group has implemented targeted measures at specific sites and established ad hoc management activities and processes. Measures implemented for specific sites in recent years include:

  • improving cooling water management systems for certain plants in order to counter the problems caused by the decline in water levels on rivers, such as the Po River in Italy;
  • installing fogging systems to improve the flow of inlet air and offset the reduction in power output caused by the increase in ambient temperature in CCGTs;
  • installing drainage pumps, raising embankments, periodic cleaning of canals and interventions to consolidate land adjacent to plants to prevent landslides in order to mitigate flood risks;
  • periodic site-specific reassessments for hydro plants of flood scenarios using numerical simulations. The scenarios developed are managed with mitigation actions and interventions for civil works, dams and water inlets.

The Group adopts a series of best practices to manage the impact of weather events on power generation, such as:

Group practices for managing weather events in generation operations

Main areas:

Maintenance O&M Operation

Dams and Hydraulic Infrastructure Safety

Critical Event Management

  • Weather forecasting both to monitor renewable resource availability and detect extreme events, with warning systems to ensure the protection of people and assets.
  • Hydrological simulations, land surveys (including with the use of drones), monitoring any vulnerabilities through digital GISs (Geographic Information Systems) and satellite measurements.
  • Advanced monitoring of over 100,000 parameters (with over 160 million historical measurements) for dams and hydroelectric works.
  • Real-time remote monitoring of generation plants.
  • Safe rooms in plants in areas exposed to tornadoes and hurricanes, such as the wind farms in Oklahoma in the United States.
  • Adoption of specific guidelines for performing hydrological and hydraulic studies from the earliest development stages, aimed at assessing the risks inside plants and in the areas outside plants, with application in the design phase of drainage and mitigation systems in compliance with the principle of hydraulic invariance.
  • Verification of potential climate trends for the main project parameters in order to take them into account in the sizing of systems for relevant projects (for example, assessments of the temperature of the coolant source in order to ensure greater flexibility in cooling in new CCGTs) and civil engineering works (for example, rainfall assessments for designs of drainage systems at solar plants).
  • Estimation of extreme wind speeds using updated databases containing the logs and historical trajectories of hurricanes and tropical storms, enabling the selection of the wind turbine technology best suited to the emerging conditions.

In addition, in order to ensure rapid response to adverse events, the Group has adopted specific emergency management procedures with protocols for real-time communication and management of all activities to restore operations rapidly and standard checklists for damage assessment and the safe return to service for all plants as rapidly as possible. One solution to minimize the impacts of climate phenomena is represented by the lessons-learned feedback process, which is implemented by the technical functions. It is governed by the existing operating model and influences future projects.

Analyzing future climate impacts to identify adaptation needs

In the Generation Business Line we mapped globally relevant phenomena (see earlier matrix) to perform analyses of acute and chronic climate risks in order to estimate the medium/long-term impact on the Group's generation plants.

In particular, the analysis of acute events was performed in two phases, involving:

  • preliminary screening of the hazard and exposure for all hydro, wind and solar plants with the aim of classifying the existing plant portfolio, considering specific vulnerabilities and identifying plants at greater risk in order to conduct a more detailed analysis;
  • detailed analysis of plants with a greater risk priority, enabling the future identification of possible

adaptation actions and measures to prevent damage from acute events and output losses.

The detailed analysis was conducted to take account of the possible increase in the frequency and intensity of extreme events and consequently identify assets exposed to the related phenomenon.

The detailed analysis of the pilot sites identified a small number of assets at high risk in the long term for the entire set of phenomena considered.

Heavy rainfall

• An analysis was performed for a significant number of plants, which highlighted a high correlation between the geo-morphology of the site and the impact of the phenomenon on the asset, confirming the need for a specific site analysis, especially for those assets most exposed to the phenomenon

involved (the most exposed technologies included photovoltaics while the greatest exposures at the geographical level were found in Latin America).

• More extensive studies made it possible to identify possible structural adaptation measures to lower the level of hydraulic risk to an acceptable threshold. Their implementation will require a cost-benefit analysis. Such structural adaptation interventions can, for example, involve the construction of hydraulic mitigation works (mainly embankments, riverbed reprofiling, adaptation of drainage channels, expansion and lamination tanks) or raising of the components at risk with earth moving works or increasing the length of the support structures in the case of photovoltaic panels.

Heat waves

  • The impact of heat waves on photovoltaic systems was studied in depth. This critical event is characterized by the persistence of high temperatures for multiple days with no rainfall.
  • Despite the increase in the frequency and intensity of this climate phenomenon, no significant impacts were registered on this asset, with just a reduction in the performance of the inverter due to derating in certain periods of the year in specific locations.

Windstorms

• With regard to windstorm risk, despite scenarios showing an increase in such events, the impact

analysis shows a high level of resilience by design, especially for the wind farms analyzed.

• The implementation of any adaptation measures will require specific site assessments based on a costbenefit analysis, considering the limited impact of the phenomenon on Enel Green Power plants.

Wildfires

• With regard to fire risk, the business line conducted a study to identify the areas at greatest risk. In order to prevent fires outright and/or reduce response times, a number of possible adaptation measures were identified for adoption in the design or operational phase of plants. These include additional removal of vegetation around the project area, the creation of firebreaks, additional coordination with local authorities on how to respond in the event of a fire.

The methodologies developed will be progressively refined with the aim of also applying them to the design and development of new Enel Green Power plants. The application of these assessments in the design stage will help further boost resilience, forecasting the risks and preserving the value of new projects.

These studies will make it possible to quantify the need for adaptation in terms of Risk Prevention (for example, the adoption of an adaptive design) and Event Management and management of residual risk.

Grid resilience lies at the heart of Enel's strategy

The Enel Grids Business Line, following the Group policies mentioned above ("Climate change risks and opportunities"), has issued a specific policy (Climate Change Risk Assessment) that provides general criteria, methodological tools and requirements for identifying, analyzing and assessing climate change risks in respect of the assets managed and the activities conducted, in order to monitor the risk and the actions to be implemented to mitigate its impacts.

In the Enel Grids Business Line the Enel Group has adopted an approach in recent years called "4R" to cope with extreme climate events. A specific policy (which seeks to implement an innovative strategy to ensure the resilience of the distribution grid) has been developed to define the measures to be taken both in preparation for an emergency within the network and for the prompt restoration of service once climate events have caused damage to assets and/or outages. The 4R strategy is divided into four phases:

  • 1. Risk prevention: this includes actions that make it possible to reduce the probability of losing network components because of an event and/or to minimize its effects, i.e. interventions aimed both at increasing the robustness of the infrastructure and maintenance interventions. The choice of technical solutions to enhance resilience is guided by a catalogue that identifies the most appropriate response for each climate event and geographical area.
  • 2. Readiness: this includes all measures aimed at increasing the speed with which a potentially critical event can be identified, ensuring coordination with Civil Protection authorities and local institutions and preparing the necessary resources once a grid disruption has occurred.
  • 3. Response: this represents the phase in which the operational capacity to cope with an emergency upon the occurrence of an extreme event is assessed. It is directly related to the ability to mobilize operational resources in the field and the capacity to remotely restore power supply through resilient backup systems.

4. Recovery: this is the last phase, in which the goal is to return the grid to ordinary operating conditions as soon as possible in cases where an extreme weather event has caused service interruptions despite the increased resilience measures taken previously.

Following this approach, the business line has prepared various policies for specific actions to address the various aspects and risks associated with climate change. In particular:

Guidelines for
Readiness Response
and Recovery
actions during
emergencies
This policy covers the last three phases of the 4R approach, indicating guidelines and measures to
improve preparation strategies, mitigate the impact of total blackouts and, finally, restore service to
as many customers as possible in the shortest time possible.
Guideline for
Network Resilience
Enhancement Plan
This policy seeks to identify the most impactful extraordinary climate events on the network, to
evaluate the specific KPIs of the AS-IS network and to improve them based on proposed interven
tions in order to be able to evaluate the order of priority. In this manner, actions are selected that,
when implemented, will minimize the impact on the grid of particularly critical extreme events in a
given area/region. The policy therefore covers the first two phases of the 4R approach, suggesting
measures regarding risk prevention and readiness.
In Italy, this policy has been translated into the Resilience Plan that e-distribuzione has prepared
each year since 2017, which represents an addendum to the Development Plan for ad hoc invest
ments over a 3-year time horizon to reduce the impact of extreme events in certain critical areas,
namely heat waves, icing and windstorms (with the associated risk of falling trees). In 2017-2021,
some €672 million were invested and about €262 million will be invested in the following three-year
period, as specified in the addendum to the 2022-2024 Plan. To address these risks, investments
include the targeted replacement of uninsulated lines with insulated conductors, the underground
ing of cables in some cases or solutions involving routes to restore power that are not vulnerable
to the above phenomena.
As in Italy, similar issues are being explored in other countries, both in Europe and South America,
in order to prepare an ad hoc investment planning process to enhance the resilience of grids to
extreme events, taking due account of the distinctive characteristics of each territory.
Measures for Risk
Prevention and
Preparation in
case of wildfires
affecting the
electrical
installations
This policy is dedicated to addressing the risk of wildfires, outlining an integrated approach to
emergency management measures applied in the case of forest fires, whether they are of exter
nal origin or, in rare cases, are caused by the grid itself and could potentially threaten Enel plant.
The document provides guidelines to be implemented in the various territories involved to identify
areas/plant at risk, define specific prevention measures (e.g., evaluation of specific maintenance
plans and any upgrades) and, in the event of a fire, manage the emergency optimally in order to limit
its impact and restore service as soon as possible.
Support actions These include the implementation of systems for weather forecasting, monitoring the status of
the grid and evaluating the impact of critical climate phenomena on the grid, the preparation of
operational plans and the organization of specific exercises. Particularly important in this regard are
advance agreements for the mobilization of extraordinary resources to respond to emergencies,
comprising both internal personnel and contractors. For example, in Italy, in addition to having in
stalled and placed in operation three experimental stations to observe and investigate ice forma
tion on MV lines, IoT sensor trials were launched to monitor on above-ground lines in areas that are
highly exposed to snow and wind (Project Newman).

Enel Grids is making a significant contribution to the drafting of the initial industry publications on the importance of resilience and adaptation to climate change and possible actions, including the report issued by Eurelectric-EPRI(37)

in December 2022 entitled "The Coming Storm: building electricity resilience to extreme weather".

With a view to ensuring continuous improvement, Enel Grids also performs scouting activities, directly contact-

(37) EPRI: Electric Power Research Institute.

ing startups and industry experts or using challenges proposed by the Enel Group's innovation function, in order to identify innovative technological solutions to support

climate impact and adaptation measures to increase the resilience of the grid.

Analyzing future climate impacts to identify adaptation measures

Beginning with the mapping of key phenomena at the global level, Enel Grids monitors trends in the most critical threats in the various countries in which the Group operates in order to estimate their future impact on the grid in the medium and long term. To

do this, it is first necessary to perform a preliminary assessment of the impacts on the grid (including associated failures) of the extreme weather events that have occurred in the past. The mapping that associates the most critical acute events to each core country is shown in the figure below. This enables the identification of priority analyses to identify any adaptation measures.

Starting from these assessments, detailed studies were then conducted for specific phenomena and geographical areas. Here are some examples.

Heavy rainfall/windstorms

  • An analysis was conducted to investigate the phenomenon of explosive cyclogenesis (the product of a combination of intense wind and rain) in Spain, with projections of events up to 2050, evaluating the possible future impacts on grid assets. The initial findings suggest that the trend is substantially in line with the historical observed record, with the exception of the coastal areas of Catalonia, where a possible intensification of events is expected.
  • Studies were also carried out in Colombia on the impact of rainfall in both the Bogotá and Cundinamarca areas, evaluating the possible scenarios up to 2050. The in-depth studies carried out show a substantial persistence over time of the negative effects associated with this phenomenon. On the basis of these initial results, the planned response measures mainly regard waterproofing secondary substations in urban areas, to avert flood risk, and strengthening aerial infrastructures to limit the consequences of the direct impact of rainfall.
  • An initial analysis was conducted in Chile on the impact of windstorms in the Santiago de Chile concession area. The findings of the scenario analysis through 2050 show the phenomenon

persisting. This is being kept under observation for future planning of work to reinforce the overhead network by replacing bare conductors with cable.

Heat waves

• Heat waves in Italy were investigated further on the basis of the initial results in 2020. This critical event is characterized by the persistence of high temperatures over a period of several days in correspondence with the absence of precipitation which, by hindering the dissipation of heat from underground cables, causes an anomalous increase in the risk of multiple failures on grids, especially in urban areas and in summer tourist locales. The analyses performed have highlighted how this climate phenomenon will intensify in the coming decades by 10-40% by 2050 (depending on the climate scenario), requiring adequate adaptation actions as already laid out in the expanding commitment envisaged both by the Resilience Plan indicated above and from participation in the tender of the NRRP (National

Recovery and Resilience Plan) for the funds (€0.3 billion) allocated for increasing the resilience of infrastructure.

Wildfires

• With regard to fire risk, the business line, consistent with the above policy, is preparing an update of the policy on fire risk prevention, applying an index that evaluates the fire risk of areas based on topological and environmental characteristics (FWI: Fire Weather Index) as a support tool, with projections of scenarios to 2050 on developments in the phenomenon. So far, each country has conducted a study to identify the areas at greatest risk of forest fires. Today, the study also draws on GIS (Geographic Information System) mapping for more precise identification of grids in different environments (protected natural areas, forests, habitats). This makes it possible to adopt even more effective construction or maintenance design measures to prevent fire risk.

Adaptation activities – Enel X Global Retail

In order to address extreme climate events, the Enel X Global Retail Business Line has continued to work on estimating the potential impacts of physical phenomena in order to develop actions to adapt to climate change, identifying the risks and opportunities for priority countries/ assets.

An impact analysis was carried out for owned assets, which represent a minority share of the total asset portfolio. At the same time, potential risks and possible resilience solutions are being assessed for business-to-business and business-to-government customers.

The work on adaptation focused on defining a methodology for assessing the vulnerability of Enel X Global Retail assets by extending the studies developed by Enel Green Power and Thermal Generation and Enel Grids for the assessment and management of acute meteorological events for solar (Distributed Energy PV), storage and public lighting.

For solar, a preliminary climate risk screening was carried out in the countries/assets identified as priorities for material acute events such as extreme winds, heavy rainfall/floods and fire risk. For this technology, the work performed, considering both the results obtained thanks to the preliminary screening and more detailed analyses, does not currently reveal any critical issues related to climate change. The analysis will be extended to sites where new construction is planned. For storage, the work carried out so far finds no critical issues associated with acute climatic events. Finally, the acute phenomena relevant to the public lighting segment are under study.

Introduction of nature-based solutions to Enel X Global Retail's resilience actions

Attention to the effects of climate change is implemented by Enel X Global Retail in both extraurban and urban spaces with an approach to the challenges of sustainable development inspired and supported by nature. Enel X Global Retail is thus committed to promoting an approach in which the services and products of its commercial offer are integrated with nature-based solutions (NBS), i.e. techniques and design approaches that use nature and processes inspired by it to provide integrated services that enhance the resilience of cities to climate change, mitigating the microclimate, air quality and generally improving the quality of life. To promote NBS, Enel X Global Retail has developed the Enel X "NBS Biodiversity Handbook" and the Enel X "Urban

Biodiversity Scoring Model", which make it possible to integrate NBS solutions in business solutions and assess their positive impact on the climate, natural resources and the human experience. The introduction of NBS solutions in the Enel X Global Retail product range was rolled out with an extensive set of recommended scientific indicators (published in the Enel X "NBS Handbook for Urban Context") to measure positive impacts and support customers in the adoption of these practices recognized internationally as effective tools for adaptation to acute climate phenomena. In practice, NBS can be integrated with Enel X Global Retail's technological solutions to provide ecocompatible services to support nature. These solutions also contribute to the adaptation and mitigation of climate change and to the improvement of the quality of life in urban centers.

Inclusion of climate change effects in the assessment of new projects

Many activities connected with the evaluation and implementation of new projects can benefit from general and site-specific climate analyses, which the Group is beginning to integrate with those already considered in the evaluation of new projects. For example:

  • preliminary studies: in this phase, climate data can serve as a preliminary screening tool, with the analysis of specific climate phenomena, such as those discussed previously in the analysis of physical scenarios, incorporated into indicators such as the Acute Event Risk Index, and synthetic indicators such as the Climate Risk Index, integrated into the Open Country Risk model. These data provide a preliminary measure of the most relevant phenomena in an area among those identified as being relevant for each technology;
  • estimation of expected output: the climate scenarios will be progressively integrated to enable the evalua-

Competitive environment

The analysis of the competitive environment is one of the material elements of the analysis of the context in which the Group operates and defines its business ambitions.

The risks associated with evolutionary developments in the market are also mitigated by the periodic monitoring of the comparative performance at an industrial and financial level of our competitors.

The assessment activity is carried out using a framework designed to (i) identify the most relevant competitors and peers; (ii) analyze their results, the main business drivers, strategic and industrial objectives; and (iii) understand tion of how climate change will modify the availability of renewable sources at the specific site. The section "Analysis of the impact of chronic climate change on renewable generation" describes the approach as applied to the entire generation portfolio;

  • environmental impact analysis: the Group has begun to integrate a Climate Change Risk Assessment into project documentation. This contains a representation of the main physical phenomena and their expected change in the area;
  • resilient design: as noted, the development of resilient assets by design is a key climate change adaptation activity. The Group is working to progressively consider analyses based on climate data, such as the increase in the frequency and intensity of acute events. The latter will integrate existing analyses based on historical data already in use, in order to increase the resilience of future assets, including all necessary adaptation actions over the useful life of a project.

their current and prospective positioning.

The process of identifying our peer group is periodically updated to ensure timely collection of information, KPIs and reporting elements useful for the Group's positioning and strategic planning activities.

In particular, a comparative assessment of the strategic and industrial plans of competitors is particularly relevant for assessing potential risks deriving from possible changes in the competitive context and, above all, providing economic and industrial benchmarks to help improve the Group's performance.

Financial risks

As part of its operations, Enel is exposed to a variety of financial risks that, if not appropriately mitigated, can directly impact our performance.

In line with the Group's risk catalogue, these risks include the following:

• Interest rate
• Commodity
• Currency
• Credit and counterparty
• Liquidity

The internal control and risk management system (ICRMS) provides for the specification of policies that establish the roles and responsibilities for risk management, monitoring and control processes, ensuring compliance with the principle of organizational separation of units responsible for operations and those in charge of monitoring and managing risk.

The financial risk governance system also defines a sys-

tem of operating limits at the Group and region/country levels for each risk, which are monitored periodically by risk management units. For the Group, the system of limits constitutes a decision-making tool to achieve its objectives.

For further information on the management of financial risks, please see note 49 of the consolidated financial statements.

Interest rate The Group is exposed to the risk that changes in the level of interest rates could produce unexpected
changes in net financial expense or financial assets and liabilities measured at fair value.
The exposure to interest rate risk derives mainly from the variability of the terms of financing, in the
case of new debt, and from the variability of the cash flows in respect of interest on floating-rate
debt.
The interest rate risk management policy seeks to contain financial expense and its volatility by opti
mizing the Group's portfolio of financial liabilities and using OTC derivatives.
Risk control through specific processes, risk indicators and operating limits enables us to limit pos
sible adverse financial impacts and, at the same time, to optimize the structure of debt with an ade
quate degree of flexibility.
Commodity Enel operates in energy markets and for this reason is exposed to the risk of incurring losses as a
result of an increase in the volatility of the prices of energy commodities, such as power, gas and
fuel, and other commodities, such as minerals and metals (price risk), or owing to a lack of demand or
energy commodity shortages (volume risk).
If not managed effectively, these risks can have a significant impact on results.
To mitigate this exposure, the Group has developed a strategy of stabilizing margins by contracting

for supplies of fuel and materials and the delivery of electricity to end users or wholesalers in advance.

Enel has also implemented a formal procedure that provides for the measurement of the residual commodity risk, the specification of a ceiling for maximum acceptable risk and the implementation of a hedging strategy using derivatives on regulated markets and over-the-counter (OTC) markets. The commodity risk control process limits the impact of unexpected changes in market prices on margins and, at the same time, ensures an adequate margin of flexibility that makes it possible to seize short-term opportunities.

In order to mitigate the risk of interruptions in the supply of fuel and raw materials, the Group has diversified fuel sources, using suppliers from different geographical areas.

In 2023, despite the continuing economic strains at the global level owing to the rise in inflation, the Russia-Ukraine and Israel-Palestinian conflicts and climate change, the prices of energy commodities and other raw materials gradually declined, although they remain above their pre-pandemic levels. During the year, the risks recorded by Enel were below the limits set for 2023, which were contained thanks to careful and timely management and mitigation measures, the geographical diversification of our business and supply channels in order to reduce dependence on Russian gas. Finally, the adoption of global and local strategies, such as flexibility in contractual clauses and proxy hedging techniques (in the event that hedging derivatives are not available on the market or are not sufficiently liquid), has made it possible to optimize results even in a highly dynamic market context.

Currency In view of their geographical diversification, access to international markets for the issuance of debt instruments and transactions in commodities, Group companies are exposed to the risk that changes in exchange rates between the presentation currency and other currencies could generate unexpected changes in the performance and financial aggregates in their respective financial statements.

Given the current structure of Enel, the exposure to currency risk is mainly linked to the US dollar and is attributable to:

  • cash flows in respect of the purchase or sale of fuel or electricity;
  • cash flows in respect of investments, dividends from foreign subsidiaries or the purchase or sale of equity investments;
  • cash flows connected with commercial relationships;
  • financial assets and liabilities.
  • The possible impacts of exchange rate risk are reflected in:
  • costs and revenue denominated in foreign currencies with respect to the time at which pricing conditions were defined or the investment decision was made (economic risk);
  • revaluations or adjustments to fair value of financial assets and liabilities sensitive to exchange rates (transaction risk);
  • the consolidation of subsidiaries with different currencies of account (translation risk).

The currency risk management policy is based on systematically hedging the exposures of the Group companies, with the exception of translation risk.

Appropriate operational processes ensure the definition and implementation of appropriate hedging strategies, which typically employ financial derivatives obtained on OTC markets.

Risk control through specific processes and indicators enables us to limit possible adverse financial impacts and, at the same time, to optimize the management of cash flows on the managed portfolios. During the year, currency risk was managed through compliance with the risk management policies, encountering no difficulties in accessing the derivatives market.

Credit and counterparty

The Group's commercial commodity and financial transactions expose it to credit risk, i.e. the possibility that a deterioration in the creditworthiness of counterparties or the failure to discharge contractual payment obligations could lead to the interruption of incoming cash flows and an increase in collection costs (settlement risk) as well as lower revenue flows due to the replacement of the original transactions with similar transactions negotiated on unfavorable market conditions (replacement risk). Other risks include the reputational and financial risks associated with significant exposures to a single counterparty or groups of related customers, or to counterparties operating in the same sector or in the same geographical area.

The exposure to credit risk is attributable to the following types of operations:

  • the sale and distribution of electricity and gas in free and regulated markets and the supply of goods and services (trade receivables);
  • trading activities that involve the physical exchange of assets or transactions in financial instruments with commodity underlyings (the commodity portfolio);
  • trading in derivatives, bank deposits and, more generally, financial instruments (the financial portfolio).

The policy for managing credit risk associated with commercial activities and transactions in commodities provides for a preliminary assessment of the creditworthiness of counterparties and the adoption of mitigation instruments, such as obtaining guarantees.

The control process based on specific risk indicators and, where possible, limits ensures that the economic and financial impacts associated with a possible deterioration in credit standing are contained within sustainable levels. At the same time, this approach preserves the necessary flexibility to optimize portfolio management.

In addition, the Group undertakes transactions to factor receivables without recourse, which results in the complete derecognition of the corresponding assets involved in the factoring.

Finally, with regard to financial and commodity transactions, risk mitigation is pursued through the diversification of the portfolio (giving preference to counterparties with a high credit rating) and the adoption of specific standardized contractual frameworks that contain risk mitigation clauses (e.g., netting arrangements) and possibly the exchange of cash collateral.

During the year, after a temporary deterioration in the collection status of certain customer segments, the situation was restored to the conditions registered the previous year. The Group's portfolio has so far demonstrated resilience to the macroeconomic context and current price scenario. This reflects the expansion of digital collection channels and a solid diversification of the customer base.

Liquidity Liquidity risk is the risk that the Group, while solvent, would not be able to discharge its obligations in a timely manner or would only be able to do so on unfavorable terms or in the presence of constraints on disinvestment from assets with consequent capital losses, owing to situations of tension or systemic crises (credit crunches, sovereign debt crises, etc.) or changes in the perception of Group riskiness by the market.

Enel's liquidity risk management policy is designed to maintain sufficient liquidity to meet expected commitments over a given time horizon without resorting to additional sources of financing, also retaining a prudential liquidity reserve, sufficient to meet any unexpected commitments. Furthermore, in order to meet its medium- and long-term commitments, Enel pursues a borrowing strategy that provides for a diversified structure of funding sources, which it uses to meet its financial needs, and a balanced maturity profile.

Among the factors that define the risk perceived by the market, the credit rating assigned to Enel by rating agencies plays a decisive role, since it influences its ability to access sources of financing and the related financial terms of that financing. A deterioration in the credit rating could therefore restrict access to the capital market and/or increase the cost of funding, with consequent negative effects on the financial position, financial performance and cash flows of the Group.

In 2023, Enel's risk profile changed compared with December 2022 for Standard & Poor's, whose rating went from "BBB+" with a stable outlook to "BBB" with a stable outlook, and for Moody's, whose rating went from "Baa1" with a stable outlook to "Baa1" with a negative outlook. Fitch maintained its rating at "BBB+" with a stable outlook.

In order to manage liquidity efficiently, treasury activities have largely been centralized at the holding company level, meeting liquidity requirements primarily by drawing on the cash generated by ordinary operations and managing any cash surpluses appropriately.

With regard to the increase in gas prices in 2022 following the Russia-Ukraine conflict and the associated sanctions imposed by the European Union on Russia, which had a major impact on the margins on commodity derivatives, in 2023, liquidity used for margin requirements decreased considerably despite the continuation of the war and the sanctions. At the end of the year, the liquidity risk index monitored for the Group was well within the limits set for 2023.

Digital technology risks

The risks discussed in this section are as follows:

• Cyber security

• Digitalization, IT effectiveness and service continuity

Cyber security The speed of technological developments that constantly generate new challenges, the ever-increasing frequency and intensity of cyber-attacks and the attraction of critical infrastructures and strategic industrial sectors as targets underscore the potential risk that, in extreme cases, the normal operations of companies could grind to a halt. Cyber-attacks have evolved dramatically in recent years: their number has grown exponentially, as has their complexity and impact. In the case of the Enel Group, this exposure reflects the many environments in which it operates (data, industry and people), a circumstance that accompanies the intrinsic complexity and interconnection of the digital resources that over the years have been increasingly integrated into the Group's daily operating processes. In this context, it is clear that cyber risk must be managed promptly and in an integrated manner. In short, technological transformation could not exist without paying great attention to cyber security.

To manage cyber risk, the Group has developed a Cyber Security operating model and a related framework of processes. Specifically, the operating model defines roles and responsibilities for the implementation of the framework processes, establishing an ad hoc unit headed by the CISO (Chief Information Security Officer) and integrated into the Group's business areas. In addition, the Group has designed and adopted a framework of holistic processes to manage cyber-security issues that is applied to all the sectors of IT (Information Technology), OT (Operational Technology) and IoT (Internet of Things). The framework sets out a governance model based on the commitment of top management, on global strategic management, on the involvement of all business areas as well as of the units involved in the implementation of our IT, OT and IoT systems, constituting a solid foundation for the full merger of technologies, processes and people. The framework is based on two essential pillars: a "risk-based approach" and "cyber security by design". The former establishes that risk assessment is the prerequisite for strategic decisions and the development and safe maintenance of all assets within the organization; the latter ensures the adoption of cyber security principles from the beginning and throughout the entire life cycle of solutions, services and infrastructures in all areas, i.e. IT, OT and IoT. In applying the framework, a cyber risk management approach has been defined, applicable to all IT, OT and IoT environments. It comprises all the phases necessary to perform risk analysis and define related mitigation plans, consistent with the established cyber-security objectives. To balance the advantages of using IT/OT/IoT systems against the risk that they may engender, well-informed risk-based decisions are essential.

Enel has also created its own Cyber Emergency Readiness Team (CERT) in order to proactively respond to any IT security incidents.

In order to measure the possible financial impact of cyber risks and manage them more effectively, Enel has developed a Cyber Value-at-Risk ("Cyber V@R Enel Group©") methodology, which is being evolved as a metric to calculate Value-at-Risk in various attack scenarios.

Digitalization, IT effectiveness and service continuity

The Group is carrying out a complete digital transformation of how it manages the entire energy value chain, developing new business models and digitizing its business processes, integrating systems and adopting new technologies. A consequence of this digital transformation is that the Group is increasingly exposed to risks related to the functioning of the IT systems, which are integrated across the Company with impacts on processes and operations, which could expose IT and OT systems to service interruptions or data losses.

These risks are managed using a series of internal measures developed by the Group to guide the digital transformation. It has set up an internal control system that introduces control points along the entire IT value chain, enabling us to prevent the emergence of risks engendered by such issues as the creation of services that do not meet business needs, the failure to adopt adequate security measures and service interruptions. The internal control system oversees both the activities performed in-house and those outsourced to external associates and service providers. Furthermore, Enel is promoting the dissemination of a digital culture and digital skills within the Group in order to successfully guide the digital transformation and minimize the associated risks.

Operational risks

The risks discussed in this section are as follows:

  • Health and safety
  • Environment
  • Procurement, logistics and supply chain
  • People and organization

Health and safety

Generating a strong and sustainable safety culture shared by all members of the organization is a strategic objective. For this reason, Enel is committed to developing increasingly sound and safe processes, conditions and working environments for its employees, for the companies that work with it, for its customers and for all the other communities with which it interacts every day, promoting dedicated training courses as well.

The main health and safety risks to which the employees of Enel and its contractors are exposed are attributable to performing operational activities at the Group's sites and assets. These risks may vary or even change depending on economic and social trends, as well as the introduction of digitalization into operational processes and activities. Another type of health and safety risk is connected with non-compliance with applicable laws and regulations. This can impact on health and safety and lead to administrative or judicial penalties, and thus produce financial and reputational impacts on the Enel Group.

For this reason, each Group business line had adopted its own Health and Safety Management System compliant with the international UNI ISO 45001 standard, which also considers the rigor employed in the selection and management of contractors and suppliers. The management system is based on the identification of threats, the qualitative and quantitative assessment of risks, including financial and reputational risks, the planning and implementation of prevention and protection measures, the verification of the effectiveness of such measures and any corrective actions. These systems make it possible to ensure regulatory compliance, to verify the effectiveness of processes and related remedial actions and, finally, to ensure the dissemination of a "risk-based" approach as well as a robust organizational and individual culture in health and safety issues. The key documentation of these systems is represented by the Group's Health and Safety Policy, developed in cooperation with the Board of Directors and signed by the CEO. It sets out the guiding principles, strategic objectives, approach and action lines and priorities for continuous improvement of workplace health and safety performance.

From an operational standpoint, health and safety risks are assessed specifically for each site or asset on the basis of

the activities performed by workers and external environmental conditions. This assessment enables us to identify prevention and protection measures for safety in the workplace and to plan their implementation, improvement and control in order to verify their effectiveness and efficiency. At Group level, an analysis of events in the last three years shows that, in terms of probability of occurrence, mechanical incidents (falls, collisions, crushing and cuts) are the most common, while the most severe in terms of potential associated impact are electrical incidents, which may involve fatalities, life changing accidents or high-potential incidents, the latter of which differ from fatal and life changing events only in their outcome for the worker but not their dynamics.

Enel uses an inspection process to conduct the continuous monitoring of behavior and compliance with procedures and work methods in the field to ensure the effective management of risks to the workplace health and safety of both internal staff and external contractors. The process is managed both by internal staff and certified third-party companies and is designed to identify risk situations (non-compliance) and the related plans containing remedial actions, including training courses, coaching and dissemination of the safety culture.

As regards contractors specifically, Enel's approach is to consider them as partners in embracing the key principles of health and safety for its workers, who are therefore considered on a par with internal employees in the application of these principles and in their attention to workplace health and safety issues. Therefore, safety is integrated into the procurement process, and contractor performance is monitored both in the preliminary phase, using the qualification system, and in the contract execution phase, through numerous control processes and tools such as the Contractor Assessment (analyses of contractors in the qualification phase or in cases where critical issues or low scores emerge in the evaluation of the indicators) or the Evaluation Groups (periodic interfunctional meetings conducted across all global business lines and geographical areas in order to evaluate the safety performance of suppliers and decide consequence management actions).

In addition to procedural and operational aspects, another important driver in the correct management of health and safety risks is linked to training, awareness and information activities. To encourage the growth of technical skills and a safety culture, supporting change processes and responding in a timely manner to the needs that emerge from the business, the Enel Group has developed a structured training management process, which is designed to transform knowledge into skills and therefore into behavior.

Enel also fosters the systematic dissemination of information and awareness among personnel through a variety of company channels, such as news on the intranet, information emails, newsletters and magazines. We periodically conduct surveys to collect feedback from our people on process improvement and undertake communication initiatives to raise awareness among all workers about the observance of safety procedures and to create moments of collective reflection on the dynamics and causes of serious or fatal accidents.

Finally, Enel is also constantly engaged in dialogue with international top players in the energy sector and beyond, through participation in inter-company working groups to ensure continuous improvement by sharing best practices in the health and safety field, examining both operational processes and innovative initiatives.

Environment

Over the past few years, society has acquired a growing awareness of the risks deriving from development models that generate impacts on the environment and ecosystems, with a particular emphasis on global warming and ever-increasing exploitation and degradation of water resources. These impacts have triggered increased concern for environmental quality and ecosystem health, with greater awareness of the associated risks.

An analysis of environmental risks connected with Enel's activities was conducted using an integrated and multifunctional approach, based on the results of the materiality analysis for impacts and dependencies. The assessment helped identify the main operational and financial risks associated with the environmental and social impacts of the various activities and technologies involved in our business, including the impact of the occupation of land and the transformation of ecosystems, the depletion of natural resources, including the impact of water scarcity, and the pollution of environmental matrices.

In addition to operational risks, the assessment also regarded reputational and transitional risks resulting from possible changes to the regulatory, technological or market framework and the associated opportunities.

Enel is committed to the prevention and minimization of environmental impacts and risks in all its operations and over the entire life cycle of projects. The adoption of ISO 14001-certified environmental management systems across the entire Group ensures the implementation of

structured policies and procedures to identify and manage environmental risks and opportunities. A structured control plan combined with improvement actions and objectives inspired by the best environmental practices mitigates the potential impacts on the environment and consequent reputational damage and litigation. Enel has also undertaken a multitude of actions to achieve challenging environmental improvement objectives, such as those regarding atmospheric emissions, waste production and water consumption, especially in areas with high water stress, and impacts on natural habitats and species. The impact on areas of high water stress is directly mitigated by Enel's development strategy, which is based on the growth of generation from renewable sources that are essentially not dependent on the availability of water for their operation, as well as the adoption of advanced solutions to reduce consumption in traditional thermal plants. As regards ecosystems, Enel adopts measures to protect and conserve biodiversity and natural habitats, following the mitigation hierarchy (avoid, minimize, restore and offset) and monitoring the effectiveness of the actions. Collaboration with local water basin management authorities fosters the adoption of shared strategies for the sustainable management of hydroelectric generation assets. Enel also actively participates in the international debate on nature and biodiversity issues with influential stakeholders and networks, such as Business for Nature, the Taskforce on Nature-related Financial Disclosure, the World Business Council for Sustainable Development and Science Based Targets for Nature.

Procurement, logistics and supply chain

The purchasing processes of Global Procurement and the associated governance documents form a structured system of rules and control points that make it possible to combine the achievement of economic business objectives with full compliance with the fundamental principles set out in the Code of Ethics, the Enel Global Compliance Program, the "Zero-Tolerance-of-Corruption" Plan and the Human Rights Policy, without renouncing the promo-

tion of initiatives for sustainable economic development. These principles have been incorporated into the organizational processes and controls that Enel has voluntarily decided to adopt in order to establish relationships of trust with all its stakeholders, as well as define stable and constructive relationships that are not based exclusively on ensuring financial competitiveness but also take account of best practices in essential areas for the Group, such as the avoidance of child labor, occupational health and safety and environmental responsibility. Thanks to the greater interaction and integration with the outside world and with the different parts of the corporate organization, the procurement process has assumed an increasingly central role in the creation of value.

Global Procurement contributes to create a resilient and sustainable supply chain, calling on all of us to think from a circular economy perspective and fostering innovation, sharing the Group's values and objectives with suppliers who thereby become enablers of the achievement of Enel's targets. More specifically, tenders can incorporate incentives or mandatory requirements to produce virtuous behavior on the part of our suppliers. These include: 1) incentives connected with the measurement and reduction of the carbon footprint of suppliers, which encourage them to undertake improvements; 2) incentives connected with social aspects, such as the training and employment of people belonging to local communities and actions aimed at respecting gender diversity; 3) mandatory requirements concerning human rights, which involves mapping the potential supply chain involved in the supply of strategic product categories.

From the point of view of the procurement process, the various units adopt the tender mechanism, thus ensuring maximum competition and equal access opportunities for all operators who are in possession of the technical, economic/financial and environmental requirements, security, human, legal and ethical rights. Procurement with direct assignment and without a competitive procedure can only take place in exceptional cases, duly motivated, in compliance with current legislation on the matter.

Furthermore, the single global supplier qualification system for the entire Enel Group, even before the procurement process begins, verifies that potential suppliers who intend to participate in procurement procedures are aligned with the Company's strategic vision and policies.

With regard to the risk governance system, Global Procurement is focused on the application of metrics that indicate the level of risk before and after the mitigation action, in order to implement precautionary measures to reduce uncertainty to a tolerable level or mitigate any impacts in all business, technological and geographical areas.

The effectiveness of supply chain risk management is monitored through specific indicators that assess a variety of factors – including the probability of insolvency, the concentration of contracts with individual suppliers or industrial groups, the supplier's dependence on Enel, a performance indicator for the correctness of conduct during the tender, quality, punctuality and sustainability in the execution of the contract, country risk, etc. – for which

thresholds have been specified to guide the definition of the procurement, negotiation and tender award strategy, enabling informed choices of risk and potential benefit.

In order to counter the consequences of the geopolitical situation in Ukraine, which has increased market volatility and further stressed the supply chain, already strained during the COVID-19 pandemic, during which Enel worked

People and organization

The profound social, economic, demographic and cultural transformations we are experiencing, from the energy transition to the processes of digitalization and technological innovation and the rapid diffusion of artificial intelligence systems, also have a profound effect on the world of work, renewing its paradigms and imposing major cultural and organizational changes, which require new professional qualifications and skills.

In order to deal with change, it is essential to act inclusively, placing the Person at the center in his or her social and work dimension, with adequate tools to cope with this epochal transformation.

Organizations are increasingly called upon to move towards new agile and flexible work and business models that are sustainable along the entire value chain. It is also essential to adopt policies to enhance the diversity and talents of each person, understanding that the contribution of the individual represents an essential element for the creation of widespread and shared value.

The centrality of the Person, constant listening, sharing, enhancement of the entrepreneurial capacities of individuals, involvement, are some of the keywords that guide our way of working and experiencing the Company.

Thanks to an ever more efficient and streamlined organization and operational simplification, the management of human capital and the centrality of the Person are playing a key role in the implementation of the Group's industrial strategy, acting as an enabling factor to which specific to differentiate supply sources to avoid interruptions in the supply chain, Global Procurement constantly monitors activities related to the supply/logistics chain, with the active participation of our suppliers, through a specific contractual monitoring obligation, to mitigate the risks associated with market shortages, logistical issues and business interruptions.

objectives are linked, including: the ongoing development of skills and competences; the promotion of reskilling and upskilling for our people (continuous, personalized, flexible, accessible and transversal) in order to enable each of us to effect change and be a protagonist with our distinctive contribution to achieving results while guaranteeing greater satisfaction for people, understood as motivation and well-being; the development of systems for evaluating the working environment and performance; the dissemination and rigorous assessment of the effects of diversity and inclusion policies in all countries in which the Group operates, as well as instilling an inclusive organizational culture based on the principles of non-discrimination and equal opportunity, key drivers for attracting and retaining talent.

The Group is involved in enhancing the resilience and flexibility of organizational models through organizational and procedural simplification and the digitalization of processes in order to enable the autonomy and accountability of individuals and teams by strengthening people empowerment processes and fostering an entrepreneurial approach that values people's talents, attitudes and aspirations. The hybrid working method and the promotion of internal mobility, as well as the use of innovative and flexible organizational models, are tools aimed precisely at supporting this evolution of organizational culture on the basis of trust and responsibility, proactiveness and entrepreneurship.

Compliance risks

The risks discussed in this section are as follows:

• Data protection

Risks connected with the protection of personal data

The Group, which is present in more than 43 countries, has the largest customer base in the public services sector (more than 70 million customers), and currently employs about 61,000 people. Consequently, the Group's business model requires the management of an increasingly large and growing volume of personal data in order to achieve the financial and business results envisaged in the 2024- 2026 Strategic Plan.

This exposes Enel to the risks connected with the protection of personal data. These risks may result in the loss of confidentiality, integrity or availability of the personal information of our customers, employees and others, with the risk of incurring fines determined on the basis of global turnover, the prohibition of the use of certain processes and consequent financial losses and reputational harm. In order to manage and mitigate this risk, Enel has adopted a model for the global governance of personal data, with the appointment of personnel responsible for privacy issues at all levels (including the appointment of Data Protection Officers at the global and country levels) and digital compliance tools to map applications and processes and manage risks with an impact on protecting personal data, in compliance with specific local regulations in this field.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

REPORT ON OPERATIONS

4. GROUP PERFORMANCE

Solid results in 2023, with ordinary EBITDA of €22 billion (+11.6%) and an ordinary net profit of €6.5 billion (+20.7%)

The increase is mainly attributable to the positive performance of the integrated businesses and distribution activities, net of changes in the consolidation scope and Stewardship transactions compared with the previous year.

Net financial debt/ordinary EBITDA at about 2.7x (compared with 3.1x at end-2022)

Positive cash flows generated by operations, the sale of a number of investments no longer considered strategic, the effects of the issue of perpetual hybrid subordinated non-convertible bonds and the recognition of investment grants more than offset for cash requirements of investment in the period and the payment of dividends.

A simple, predictable and attractive dividend policy

The total dividend proposed for the 2023 financial year is equal to €0.43 per share (of which €0.215 per share already paid as an interim dividend in January 2024), an increase of 7.5% compared with the total dividend of €0.40 per share paid for the 2022 financial year.

DEFINITION OF PERFORMANCE MEASURES

In order to present the performance of the Group and analyze its financial structure, separate reclassified schedules have been prepared that differ from the schedules envisaged under the IFRS-EU adopted by the Group and contained in the consolidated financial statements. These reclassified schedules contain different performance measures from those obtained directly from the consolidated financial statements, in line with the ESMA Guidelines on Alternative Performance Measures (ESMA/2015/1415) published on October 5, 2015. Management believes that these measures are useful in monitoring the performance of the Group and representative of the financial performance and position of our business, ensuring greater comparability over time.

With regard to those measures, on April 29, 2021, CON-SOB issued warning notice no. 5/2021, which gives force to the Guidelines issued on March 4, 2021, by the European Securities and Markets Authority (ESMA) on disclosure requirements under Regulation (EU) 2017/1129 (the Prospectus Regulation), which took effect on May 5, 2021 and replace the references to the CESR Recommendations and those contained in Communication no. DEM/6064293 of July 28, 2006 regarding the net financial position.

The Guidelines update the previous CESR Recommendations (ESMA/2013/319, in the revised version of March 20, 2013) with the exception of those concerning the special issuers referred to in Annex no. 29 of Delegated Regulation (EU) 2019/980, which were not converted into Guidelines and remain applicable.

The Guidelines are intended to promote the usefulness and transparency of alternative performance measures included in regulated information or prospectuses within the scope of application of Directive 2003/71/EC in order to improve their comparability, reliability and comprehensibility.

In line with the regulations cited above, the criteria used to construct these measures for the Enel Group are the following.

Gross operating profit (EBITDA): an operating performance indicator, calculated as the sum of "Operating profit", "Net impairment/(reversals of impairment) on trade receivables and other receivables" and "Depreciation, amortization and other impairment".

Ordinary gross operating profit (ordinary EBITDA): defined as "Gross operating profit" from core businesses connected with the Ownership, Partnership and Stewardship business models with which the Group operates plus the ordinary gross operating profit of discontinued operations where present. It does not include costs connected with corporate restructurings and "Extraordinary solidarity levies" imposed by local foreign governments on energy companies.

Ordinary operating profit: defined as "Operating profit" plus the ordinary operating profit of discontinued operations, excluding the effects of transactions not connected with core operations referred to with regard to ordinary gross operating profit. It also excludes significant impairment losses (including reversals of impairment losses) on assets and/or groups of assets following an assessment of the recoverability of their carrying amount under the provisions of "IAS 36 - Impairment of assets" or "IFRS 5 - Non-current assets held for sale and discontinued operations".

Group ordinary profit: it is determined by adjusting "Group profit" for the items discussed under "Ordinary operating profit", taking account of any tax effects and non-controlling interests.

Also excluded are a number of financial components not strictly attributable to the Group's core business operations and the extraordinary solidarity levy imposed on energy companies in Italy.

Net non-current assets: calculated as the difference between "Non-current assets" and "Non-current liabilities" with the exception of:

  • "Deferred tax assets";
  • "Other non-current financial assets included in net financial debt" included in "Other non-current financial assets";
  • "Long-term borrowings";
  • "Employee benefits";
  • "Provisions for risks and charges (non-current portion)";

  • "Deferred tax liabilities";
  • "Other non-current financial liabilities".

Net working capital: calculated as the difference between "Current assets" and "Current liabilities" with the exception of:

  • "Current financial assets included in net financial debt" included in "Other current financial assets";
  • "Cash and cash equivalents";
  • "Short-term borrowings" and the "Current portion of long-term borrowings";
  • "Provisions for risks and charges (current portion)";
  • "Other current financial liabilities included in net financial debt" included in "Other current financial liabilities".

Net assets held for sale: calculated as the algebraic sum of "Assets classified as held for sale" and "Liabilities included in disposal groups classified as held for sale".

Net capital employed: calculated as the sum of "Net non-current assets" and "Net working capital", "Provisions for risks and charges", "Employee benefits", "Deferred tax liabilities" and "Deferred tax assets", as well as "Net assets held for sale".

Net financial debt: a financial structure indicator, determined by:

  • "Long-term borrowings", "Short-term borrowings", "Current portion of long-term borrowings", "Other non-current financial liabilities" and "Other current financial liabilities included in net financial debt" included in "Other current financial liabilities";
  • net of "Cash and cash equivalents";
  • net of "Current financial assets included in net financial debt" included in "Other current financial assets", which include: (i) the current portion of long-term loan assets, (ii) securities, (iii) loan assets and (iv) other current financial assets;
  • net of "Non-current financial assets included in net financial debt" included in "Other non-current financial assets", which include (i) securities and (ii) financial assets.

More generally, the net financial debt of the Enel Group is reported in accordance with Guideline 39, issued on March 4, 2021 by ESMA, applicable as from May 5, 2021, and with the above warning notice no. 5/2021 issued by CONSOB on April 29, 2021.

A reconciliation of the Group's financial debt as determined with the criteria indicated above and the financial debt determined in accordance with the criteria of CONSOB Communication no. DEM/6064293 of July 28, 2006 is reported in note 47 to the consolidated financial statements.

Main changes in the consolidation scope

In the two periods under review, the consolidation scope changed. For more information, please see note 9 "Main acquisitions and disposals in the year" of the consolidated financial statements.

PERFORMANCE OF THE GROUP

207.33 TWh

NET ELECTRICITY GENERATION(1)

of which 126.98 TWh of renewable generation

1.9 million km

ELECTRICITY DISTRIBUTION AND TRANSMISSION GRID

45.2 million

END USERS WITH ACTIVE SMART METERS

digitalized end users equal to 64.3%

61.1 million

RETAIL CUSTOMERS

of which 24.3 million on the free market

68.2%

NET EFFICIENT INSTALLED RENEWABLES CAPACITY

for a total of 55.5 GW

24,281 no.

PUBLIC CHARGING POINTS(2)

+20.1% on 2022(3)

(1) If net generation operated through joint ventures were also included, total generation at December 31, 2023 would amount to 220.6 TWh; similarly, generation from renewable sources would be equal to 140.3 TWh at December 31, 2023 (123.7 TWh at December 31, 2022).

(2) If the figures also included charging points operated through joint ventures, the totals would amount to 25,337 at December 31, 2023 and 22,617 at December 31, 2022.

(3) The figure for 2022 reflects a more accurate calculation of the aggregate.

The following is a description of the Group's operating and environmental performance.

Operations

SDG 2023 2022 Change
Net electricity generation (TWh)(1) 207.33 227.77 (20.44)
of which:
7 - renewable (TWh)(1) 126.98 112.45 14.53
Total net efficient installed capacity (GW) 81.4 84.6 (3.2)
7 Net efficient installed renewables capacity (GW) 55.5 53.6 1.9
7 Net efficient installed renewables capacity (%) 68.2% 63.3% 4.9%
7 Additional efficient installed renewables capacity (GW) 4.03 4.96 (0.93)
9 Electricity transported on Enel's distribution grid (TWh) 489.2 507.5(2) (18.3)
9 End users with active smart meters (no.)(3) 45,172,959 45,824,963 (652,004)
9 Electricity distribution and transmission grid (km) 1,899,419 2,024,038 (124,619)
End users (no.) 70,291,727 72,655,170 (2,363,443)
Electricity sold by Enel (TWh) 300.9 321.1 (20.2)
Gas sold to end users (billions of m3) 8.3 10.2 (1.9)
Retail customers (no.) 61,118,024 66,784,895 (5,666,871)
- of which free market 24,320,725 27,864,392 (3,543,667)
11 Demand response capacity (MW) 9,588 8,476 1,112
11 Public charging points (no.)(4) 24,281 22,112(2) 2,169
11 Storage (MW) 1,730 760 970

(1) If net generation operated through joint ventures were also included, total generation at December 31, 2023 would amount to 220.6 TWh; similarly, generation from renewable sources would be equal to 140.3 TWh at December 31, 2023 (123.7 TWh at December 31, 2022).

(2) The figure for 2022 reflects a more accurate calculation of the aggregate.

(3) Of which 28.7 million second-generation smart meters in 2023 and 25.2 million in 2022.

(4) If the figures also included charging points operated through joint ventures, the totals would amount to 25,337 at December 31, 2023 and 22,617 at December 31, 2022.

Net electricity generated by Enel in 2023 decreased by 20.44 TWh compared with 2022, the result of lower thermal generation (-34.97 TWh) essentially due to a reduction in quantities generated by fuel oil and turbo-gas plants (-6.63 TWh) and combined-cycle plants (-17.73 TWh), taking into account the divestment of operations in Russia, Argentina (Enel Generación Costanera and Central Sud Dock) and Brazil (Central Geradora Termelétrica Fortaleza - CGTF), as well as the decrease in coal generation (-8.97 TWh), mainly in Italy.

The increase in generation from renewable sources (14.53 TWh) is essentially attributable to greater hydroelectric generation (9.26 TWh), which benefited from greater water availability in several countries, and to solar generation (3.30 TWh), mainly in Chile, the United States and Iberia.

NET ELECTRICITY GENERATION BY SOURCE (2023)

At the end of December 2023, the Group's net efficient installed capacity totaled 81.4 GW, a decrease of 3.2 GW from 2022.

As mentioned in relation to electricity generation, the reduction in net efficient generation capacity is also mainly attributable to the sale of thermal generation assets in Argentina. However, this decrease was mitigated by the increase in net efficient renewables capacity (+1.9 GW) as a result of renewable energy investments made by the Group during the year (+4.03 GW), which was partly offset by plant disposals in Romania, Greece, Australia, Chile and India.

NET EFFICIENT INSTALLED CAPACITY BY SOURCE (2023)

At the end of December 2023, the Group's net efficient installed renewables capacity reached 55.5 GW, an increase of 1.9 GW compared with 2022, and represents 68.2% of total net efficient installed capacity.

Electricity distribution and access, ecosystems and platforms

2023 2022 Change
Electricity transported on Enel's distribution grid TWh 489.2 507.5(1) (18.3) -3.6%
SAIDI average minutes 217.6 230.5(1) (12.9) -5.6%
SAIFI average no. 2.5 2.6 (0.1) -3.8%
End users with active smart meters (no.)(2) no. 45,172,959 45,824,963 (652,004) -1.4%
Digital end users % 64.3 63.1 1.2 1.9%
Electricity sold by Enel TWh 300.9 321.1 (20.2) -6.3%
- of which free market TWh 194.5 198.3 (3.8) -1.9%
Retail customers no. 61,118,024 66,784,895 (5,666,871) -8.5%
- of which free market no. 24,320,725 27,864,392 (3,543,667) -12.7%
Natural gas sales millions of m3 8,324 10,243 (1,919) -18.7%
Public charging points(3) no. 24,281 22,112 2,169 9.8%
Demand response capacity MW 9,588 8,476 1,112 13.1%
Storage MW 1,730 760 970 -

(1) The figure for 2022 reflects a more accurate calculation of the aggregate.

(2) Of which 28.7 million second-generation smart meters in 2023 and 25.2 million in 2022.

(3) It should be noted that the figures shown, if they also included the charging points of the companies managed in joint ventures, would amount to 25,337 at December 31, 2023, and 22,617 at December 31, 2022.

Electricity transported on Enel's distribution grid amounted to 489.2 TWh in 2023, a decrease of 18.5 TWh (-3.6%) compared with the previous year, mainly attributable to Brazil (-11.6 TWh), especially for the sale of Celg Distribução SA - Celg-D (Enel Goiás) at the end of 2022, as well as the decrease in quantities in Italy (-6.3 TWh), Chile (-3.1 TWh) and Romania (-3.0 TWh) due to the changes in the consolidation scope. These effects were slightly offset by increases in Spain (+4.7 TWh).

The number of Enel end users with active smart meters decreased by 652,004 in 2023 due to the deconsolidation of operations in Romania (a decrease of 1,285,969). These effects were partially offset by increases in Brazil (+412,667), Italy (+129,439) and Spain (+87,218).

34.8% Hydroelectric 33.5% in 2022

29.4% Hydroelectric 22.7% in 2022

21.9% Wind 19.0% in 2022

7.0% Solar 5.0% in 2022

2.9%

Geothermal and other 2.7% in 2022

14.7% Combined-cycle 16.5% in 2022

17.7% Combined-cycle 23.9% in 2022

12.0% Nuclear 11.6% in 2022

5.2% Coal 8.7% in 2022

Total 207.33TWh 227.77 TWh in 2022

2023

2023

Total 81.4 GW 84.6 GW in 2022

TOTAL RENEWABLE SOURCES:

TOTAL RENEWABLE SOURCES:

68.2% 63.3% in 2022

61.2% 49.4% in 2022 TOTAL TRADITIONAL SOURCES:

TOTAL TRADITIONAL SOURCES:

31.8% 36.7% in 2022

38.8% 50.6%in 2022 3.9%

Fuel oil and turbo-gas 6.4% in 2022

7.3%

5.7% Coal 7.8% in 2022

4.1% Nuclear 3.9% in 2022

Fuel oil and turbo-gas 8.5% in 2022

19.5% Wind 18.6% in 2022

12.8% Solar 10.1% in 2022

1.1%

Geothermal and other 1.1% in 2022 Electricity sold by Enel in 2023 came to 300.9 TWh, decreasing by 20.2 TWh (-6.3%) compared with the previous year.

The decrease in the volumes of electricity sold in 2023 was mainly concentrated on the regulated market in Brazil (-9.7 TWh), as a result of the sale of Enel Goiás, and in Italy (-6.8 TWh) with the ongoing transition of customers to the free market, due in part to the pending elimination of the enhanced-protection market set for June 2024.

With regard to the free market, volume decreases were seen mainly in Italy (-3.1 TWh) and Spain (-0.6 TWh), partially offset by increases in Brazil (+2.2 TWh) and Chile (+0.6 TWh).

In addition, natural gas sales in 2023 amounted to 8,324 million cubic meters, down 1,919 million cubic meters compared with the previous year, mainly in Spain (down 1,107 million cubic meters) and in Italy (down 577 million cubic meters).

Active public charging points for electric cars at December 31, 2023 numbered 24,281, an increase of 2,169 compared with 2022, mainly in Spain (+1,824) and in Italy (+846).

Demand response capacity in 2023 amounted to 9,588 MW, an increase of 1,112 MW compared with the previous year, mainly in Japan (+494 MW), North America (+273 MW) and Italy (+256 MW).

Finally, storage at December 31, 2023 amounted to 1,730 MW, an increase of 970 MW due mainly to the installation of new batteries at renewable energy plants (+931 MW), mainly in North America (+736 MW) and Italy (+159 MW).

Fighting climate change and ensuring environmental sustainability

35.4 million m3

TOTAL WATER CONSUMPTION

-21.7% on 2022

€17,982 million

ORDINARY EBITDA FROM LOW-CARBON PRODUCTS, SERVICES AND TECHNOLOGIES(1)

ZERO-EMISSIONS GENERATION

(% of total)

€12,837 million

CAPITAL EXPENDITURE ON LOW-CARBON PRODUCTS, SERVICES AND TECHNOLOGIES

(1) Ordinary EBITDA for low-carbon products, services and technologies represents the ordinary gross operating margin of the low-carbon products, services and technologies included in the following business lines: Enel Green Power, Enel Grids, Enel X and End-user Markets (excluding gas).

Main climate change indicators

2023 2022 Change
Direct greenhouse gas emissions - Scope 1 MtCO2eq 34.51 53.07 (18.56) -35.0%
Indirect greenhouse gas emissions - Scope 2 - location based(1) MtCO2eq 3.28 3.82 (0.54) -14.1%
Indirect greenhouse gas emissions - Scope 2 - market based(1) MtCO2eq 4.51 5.10 (0.59) -11.6%
Indirect greenhouse gas emissions - Scope 3(2) MtCO2eq 56.53 71.04 (14.51) -20.4%
- of which emissions connected with gas sales(2) MtCO2eq 16.79 20.63 (3.84) -18.6%
Intensity of Scope 1 GHG emissions related to power generation(3) gCO2eq/kWh 160 229 (69) -30.1%
Intensity of Scope 1 and Scope 3 GHG emissions related to Integrated Power(4) gCO2eq/kWh 168 210 (42) -20.0%
Specific emissions of SO2 g/kWheq 0.09 0.07 0.02 28.6%
Specific emissions of NOx g/kWheq 0.26 0.32 (0.06) -18.8%
Specific emissions of particulates g/kWheq 0.006 0.005 0.001 20.0%
Zero-emission generation as percentage of total % 73.2 61.0 12.2 20.0%
Total direct fuel consumption Mtoe 19.3 26.5 (7.2) -27.2%
Average efficiency of thermal plants(5) % 42.0 42.8 (0.8) -1.9%
Water withdrawals in water-stressed areas % 23.3 19.3 4.0 20.7%
Total specific withdrawals of fresh water l/kWh 0.20 0.23 (0.03) -13.0%
Reference price of CO2 €/ton 71 86 (15) -17.4%
Ordinary EBITDA from low-carbon products, services and technologies(6) millions of € 17,982 13,900 4,082 29.4%
Capital expenditure on low-carbon products, services and technologies millions of € 12,837 13,351 (514) -3.8%
Ratio of capex for low-carbon products, services and technologies to total % 94.6 92.1 2.5 2.7%

(1) The figure for 2022 has been adjusted to reflect an update in the methodology for calculating energy consumption in distribution assets and an update of the emission factors of national electricity systems.

(2) The figure for 2022 has been adjusted to reflect an update in the calculation methodology based on the calorific value of natural gas sold to end users and an update of the emission factors of national electricity systems.

(3) KPI corresponding to the target certified by the SBTi in 2022, calculated considering direct emissions (Scope 1) from electricity generation compared with total renewable, nuclear and thermoelectric generation, excluding pumped production. The figure for 2022 has been adjusted to reflect an update of the emission factors of national electricity systems.

(4) KPI corresponding to the target certified by the SBTi in 2022, calculated considering direct emissions (Scope 1) from electricity generation and indirect emissions from the purchase of electricity for sale to end users (Scope 3) as a ratio to the total of renewable, nuclear and thermoelectric production, excluding pumped production, and also electricity purchased.

(5) The calculation does not consider Italian O&G plants being decommissioned or of marginal impact. Average efficiency is calculated on the basis of the plant fleet and is weighted by generation.

(6) Ordinary EBITDA for low-carbon products, services and technologies represents the ordinary gross operating margin of the low-carbon products, services and technologies included in the following business lines: Enel Green Power, Enel Grids, Enel X and End-user Markets (excluding gas).

In 2023, total direct and indirect emissions (i.e. Scopes 1, 2 and 3) amounted to 94.3 MtCO2eq, an all-time low, reversing the rising trend seen in 2021 and 2022 following the global energy crisis. More specifically, total emissions decreased by 26.3% compared with 2022 (127.9 MtCO2eq). This was mainly due to an overall improvement in the main operational performance measures, which have helped to reduce direct and indirect emissions throughout the entire value chain, including a 38% reduction in thermal generation due to lower coal and CCGT generation in Italy and Iberia and the sale of thermal plants in Russia in 2022 and in Argentina in 2023, the 19% volume reduction in natural gas sold to end users, and the 24% reduction in the ratio of greenhouse gas emissions to supply chain spending compared with 2022. In addition, the digitalization and automation of electricity grids have also helped to reduce grid losses and enable the development of renewables, thereby playing a key role in the Group's decarbonization efforts, as well as in the decarbonization of the energy systems in which the Group operates.

Scope 1 GHG emissions amounted to 34.51 MtCO2eq in 2023, representing 36.6% of total GHG emissions, down 35% compared with the 53.07 MtCO2eq of 2022. Of the total, 94.9% of these emissions are linked to the process of burning fuels for electricity generation, which has benefited from the reduction in thermal generation and the increase in generation from renewable sources.

Electricity generated by Enel in 2023 from zero-emission sources amounted to 73.2% of total generation, increasing considerably from the 61.0% registered in 2022 due mainly to an increase in the contribution of hydroelectric and solar generation.

Our constant commitment to improving air quality in the areas where Enel operates is underscored by the attention paid to reducing emissions of the main air pollutants associated with thermal generation, namely sulfur dioxide (SO2 ), nitrogen oxides (NOx ), and particulates.

In 2023, there was a decrease in NOx emissions compared with 2022, in both absolute and specific terms, linked to the concomitant lower overall generation by gas and CCGT plants in Italy and Iberia and to the sale of plants in Argentina. SO2 and particulate emissions, on the other hand, have increased compared with last year as a consequence of the increased coal generation in Latin America (Colombia), which is normally inactive, due to specific generation needs resulting from intense drought associated with the effects of El Niño, which caused a significant alteration of the balance of rainfall. More specifically, specific emissions of SO2 were equal to 0.09 g/kWheq (+28.6% compared with the 2022 value of 0.07 g/kWheq), with NOx at 0.26 g/kWheq (-18.8% compared with the 2022 value of 0.32 g/kWheq) and particulates at 0.006 g/kWheq (+20.0% compared with the 2022 value of 0.005 g/kWheq).

Protection and development of natural capital

The protection of natural capital and combating climate change are strategic factors that are integrated into planning and in business management and development, so as to promote the sustainable economic development of the communities in which the Group operates, and are deciding factors in consolidating the Enel's leadership in energy markets.

As an energy company, our operations depend on natural resources but, at the same time, have an impact on those resources. This is why Enel integrates assessments of risks and opportunities into Group governance and into our decision-making processes in line with international frameworks by setting specific targets over time.

The decarbonization of our energy mix, along with our objectives to reduce our impact on nature, to reclaim habitats, and to share the benefits of ecosystem services with our communities, are cornerstones of Enel's sustainability strategy.

Responsible water resource management

2023 2022 Change
Total withdrawals millions of m3 55.0 76 (21.0) -27.6%
Water withdrawals in water-stressed areas % 23.3 19.3 4.0 20.7%
Total specific withdrawals of fresh water l/kWheq 0.20 0.23 (0.03) -13.0%
Total water consumption millions of m3 35.4 45.2 (9.8) -21.7%
Water consumption in water-stressed areas % 22.1 20.5 1.6 7.8%

The water needed in electricity generation is obtained from "non-scarce" sources (i.e. seawater used as-is in open-cycle cooling processes or undergoing desalination to obtain demineralized and industrial water) and, only where necessary, from scarce sources (surface, underground and civil-use fresh water). In 2023, there was a significant reduction in total water withdrawals (-27.6% from 76 million cubic meters in 2022 to 55 million cubic meters in 2023) due to lower thermal generation in Italy, Iberia and Latin America and nuclear generation in Spain, which corresponds to a 13% reduction in total specific withdrawals of fresh water

Enel's commitment to biodiversity

Enel has extensive experience managing and preserving biodiversity in and around our production sites in an ever-increasing number of countries. In 2019, Enel adopted Group guidelines that establish the principles and procedures for managing our impact on biodiversity and ecosystem services (BES) throughout the entire life cycle of our plants, from development and operations to decommissioning.

The identification of potential impacts on biodiversity and nature is essential in order to define the most effective strategies to avoid, minimize, remedy or compensate for the associated effects, through application of the Mitigation Hierarchy. In the same way, identifying all that depends (0.20 l/kWheq in 2023 compared with 0.23 l/kWheq in 2022). This decrease was also seen for withdrawals of fresh water in water-stressed areas,(38) from 12.4 x103 million liters in 2022 to 10.3 x103 million liters (-17%), although less severe than the reduction recorded in total withdrawals, with an increase in the relative percentage of water withdrawn from water-stressed areas out of the total (+20.7%, from 19.3% in 2022 to 23.3% in 2023).

About 11.6% of total electricity generated by the Enel Group used fresh water in water-stressed areas, deriving mainly from thermal and nuclear plants.

on biodiversity and natural capital enables us to identify the best strategies to reduce any consequent risks.

In 2023, we pursued 183 projects to safeguard species and natural habitats in and around operational plants, 57 of which were developed in partnership with government, non-governmental organizations, and universities, for a total investment of €10.8 million. These projects were carried out throughout the world.

Also in 2023, we carried out a further 60 projects related to plants under construction, mainly in Brazil, Chile, Colombia, Italy and Spain, aimed at protecting and monitoring the indigenous species affected, for a total investment of over €9 million.

(38) Mapped in line with GRI criteria in relation to the "(baseline) water stress" conditions specified in the World Resources Institute Aqueduct Water Risk Atlas.

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Group performance

GROSS OPERATING PROFIT

€19,918 million in 2022

ORDINARY OPERATING PROFIT(1)

of which 27.2% from Enel Green Power

OPERATING PROFIT

-3.2% on 2022

ORDINARY PROFIT ATTRIBUTABLE TO OWNERS OF THE PARENT

€5,391 million in 2022

€3,438 million

PROFIT ATTRIBUTABLE TO OWNERS OF THE PARENT

€1,682 million in 2022

ORDINARY GROSS OPERATING PROFIT(1)

of which 59.7% eligible and aligned with the European taxonomy

(1) The margins in the ordinary income statement are calculated in accordance with the indications given in the section "Definition of performance measures". The summary of results presents a reconciliation of reported figures with ordinary figures for the following aggregates: gross operating profit, operating profit, and profit for the year (attributable to owners of the Parent).

Millions of euro Ordinary income statement(1) Income statement
2023 2022 Change 2022 Change
Revenue 98,163 143,009 (44,846) -31.4% 95,565 140,517 (44,952) -32.0%
Costs 73,232 125,692 (52,460) -41.7% 72,344 122,964 (50,620) -41.2%
Net results from commodity contracts (2,962) 2,366 (5,328) - (2,966) 2,365 (5,331) -
Gross operating profit/(loss) 21,969 19,683 2,286 11.6% 20,255 19,918 337 1.7%
Depreciation, amortization and impairment 7,927 7,554 373 4.9% 9,423 8,725 698 8.0%
Operating profit/(loss) 14,042 12,129 1,913 15.8% 10,832 11,193 (361) -3.2%
Financial income 6,062 8,305 (2,243) -27.0% 6,049 8,287 (2,238) -27.0%
Financial expense 9,440 10,812 (1,372) -12.7% 9,424 10,743 (1,319) -12.3%
Net financial expense (3,378) (2,507) (871) -34.7% (3,375) (2,456) (919) -37.4%
Share of profit/(loss) of equity-accounted
investments(2)
226 27 199 - (41) (60) 19 31.7%
Pre-tax profit/(loss) 10,890 9,649 1,241 12.9% 7,416 8,677 (1,261) -14.5%
Income taxes 3,211 2,622 589 22.5% 2,778 3,523 (745) -21.1%
Profit/(Loss) from continuing operations(2) 7,679 7,027 652 9.3% 4,638 5,154 (516) -10.0%
Profit/(Loss) from discontinued operations(2) - - - - (371) (2,234) 1,863 83.4%
Profit for the year (owners of the Parent and
non-controlling interests)
7,679 7,027 652 9.3% 4,267 2,920 1,347 46.1%
Attributable to owners of the Parent 6,508 5,391 1,117 20.7% 3,438 1,682 1,756 -
Attributable to non-controlling interests 1,171 1,636 (465) -28.4% 829 1,238 (409) -33.0%

(1) The margins in the ordinary income statement are calculated in accordance with the indications given in the section "Definition of performance measures". The summary of results presents a reconciliation of reported figures with ordinary figures for the following aggregates: gross operating profit, operating profit, and profit for the year (attributable to owners of the Parent).

(2) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

Revenue

Millions of euro
2023 2022 Change
Sale of electricity 52,465 69,340 (16,875) -24.3%
Transport of electricity 11,123 11,096 27 0.2%
Fees from network operators 1,142 979 163 16.6%
Transfers from institutional market operators 1,570 1,667 (97) -5.8%
Sale of gas 7,983 8,970 (987) -11.0%
Transport of gas 68 80 (12) -15.0%
Sale of fuels 3,458 5,605 (2,147) -38.3%
Fees for connection to electricity and gas networks 877 826 51 6.2%
Revenue from construction contracts 995 1,672 (677) -40.5%
Sale of commodities with physical settlement and fair value gain/(loss) on
contracts settled in the period
10,383 32,987 (22,604) -68.5%
Sale of value-added services 1,653 1,384 269 19.4%
Other income 3,848 5,911 (2,063) -34.9%
Total 95,565 140,517 (44,952) -32.0%

In 2023, revenue decreased by €44,952 million (-32.0%) from the €140,517 million of 2022. Specifically, this reduction is related both to the lower quantities of electricity sold on the wholesale and retail markets and to the trends in average selling prices of commodities in the two years compared, which also significantly impacted the recognition of sales contracts with physical settlement.

The reduction in revenue also reflects the effects deriving from the deconsolidation of certain companies sold in the second half of 2022 (specifically Enel Transmisión Chile, Celg Distribuição SA - Celg-D (Enel Goiás) and Fortaleza CGT in Brazil) and in early 2023 (Enel Generación Costanera and Central Dock Sud in Argentina), effects of which were only partially offset by the greater revenue recorded in generation from renewable sources, especially in Italy and Spain, from hydroelectric plants and, in Latin America, from wind and solar plants.

It should also be noted that "other income" recognized in 2023 includes revenue totaling €557 million deriving from the partial sale, with loss of control, of assets in Australia (€103 million) and in Greece (€160 million), from the sale of certain renewable energy companies operating in Chile (€195 million), and from the end-of-concession gain of Enel CIEN for €99 million. In 2022, income included revenue deriving from the sale of transmission assets in Chile (€1,051 million) as well as ordinary income related to Stewardship transactions involving the sale of investments in Ufinet (€220 million), Gridspertise (for a total of €520 million), and a number of companies to Mooney Group SpA (€67 million).

Costs

Millions of euro
2023 2022 Change
Electricity purchases 24,668 46,955 (22,287) -47.5%
Consumption of fuel for electricity generation 6,385 9,286 (2,901) -31.2%
Fuel for trading and gas for sale to end users 15,324 40,742 (25,418) -62.4%
Materials 2,747 3,534 (787) -22.3%
Personnel expenses 5,030 4,571 459 10.0%
Services, leases and rentals 15,450 16,606 (1,156) -7.0%
Environmental certificates 2,603 2,510 93 3.7%
Other charges related to the electricity and gas system 568 172 396 -
Other charges for taxes and fees 1,529 1,107 422 38.1%
Capital losses and other costs on the disposal of equity investments 404 363 41 11.3%
Extraordinary solidarity levies 208 - 208 -
Other expenses 813 533 280 52.5%
Capitalized costs (3,385) (3,415) 30 0.9%
Total 72,344 122,964 (50,620) -41.2%

Costs decreased by €50,620 million, mainly due to the general reduction in the average prices of energy commodities, also connected to a reduction in volumes.

This reduction was also affected by a decrease in transport costs in Italy due to lower volumes and in Spain due to a change in rates, by lower ancillary costs in the gas business in Chile associated with lower sales, by lower costs for service concession arrangement in Brazil, a decrease in purchases of CO2 allowances and lower costs for material purchases as a result of the change in the consolidation scope. These effects were partially offset by higher costs for early-retirement incentives and by the effects of regulatory measures related to the clawback in Italy and Spain, as well as an increase of €515 million in costs in Spain related to an arbitration dispute with a Qatari gas supplier.

It should also be noted that, in 2023, charges deriving from the sale of Enel Generación Costanera SA, Central Dock Sud SA, and the El Chocón plant, in Argentina, were recognized for a total of €363 million, as well as from the adjustment of the price related to the sale of Celg Distribuição SA - Celg-D (Enel Goiás) (€23 million).

Ordinary gross operating profit/(loss)

The table below presents gross operating profit/(loss) by business line.

Millions of euro
2023 2022 Change
Thermal Generation and Trading 3,594 6,094 (2,500) -41.0%
Enel Green Power 5,568 3,779 1,789 47.3%
Enel Grids 7,851 8,276 (425) -5.1%
End-user Markets(1) 5,275 1,702 3,573 -
Holding and Services(1) (319) (168) (151) -89.9%
Total 21,969 19,683 2,286 11.6%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Ordinary gross operating profit amounted to €21,969 million in 2023, an increase of €2,286 million compared with 2022 (+11.6%), mainly due to the increase of €2,627 million in profit deriving from the operation of Integrated Businesses (the combination of the business of Thermal Generation and Trading, Enel Green Power and End-user Markets) and the performance of Enel Grids, where the changes in the consolidation scope as a result of the sale of certain distribution assets in Brazil and Chile were more than offset by the positive impact of rate adjustments in Latin America.

In addition, the Integrated Businesses margin includes the recognition, in 2023, of charges related to the definition of an arbitration award for the supply of gas in Spain (€515 million) and the benefit of €481 million recognized in 2022 following an agreement with Shell in Chile. Excluding these two factors, Integrated Businesses performance improved by €3,623 million.

The overall change in ordinary gross operating margin also reflects revenue from Stewardship transactions completed during the two years compared. More specifically, the positive effects of the 2023 divestments of Enel Green Power Australia (€103 million) and Enel Green Power Hellas (€422 million) were more than offset by the impact of proceeds from 2022 divestments relating to Ufinet (€220 million), the sale of the finance companies of Enel X to the Mooney Group (€67 million) and the partial disposal of Gridspertise (€520 million).

Integrated Businesses

Enel has chosen to pursue an integrated strategy in our core countries (i.e. Italy, Spain, the United States, Brazil, Chile and Colombia), where the Group has a widespread presence and a customer base to which to distribute the electricity generated.

This integrated strategy aims to maximize the margin on electricity sold, particularly by relying on gradual reductions in sourcing costs (i.e. the cost of generating and/or procuring the commodity), connected to the increase in renewable energy in our generation mix, in addition to the expansion of volumes linked to the electrification of consumption, with consequent benefits for the Group, for our customers, and for all stakeholders generally.

The ordinary gross operating margin relating to the Integrated Businesses encompassed by this strategy (the "Integrated Businesses margin") therefore stems from the integration of the electricity value chain and includes the results from electricity generation (i.e. Enel Green Power, Thermoelectric Generation and Trading) and the sale of electricity and services (End-user Markets).

In greater detail, the main businesses included in this Integrated Businesses margin are the following:

  • 1. Electricity free market, which consists of:
    • Integrated energy business: including electricity

business on the free market and generation from renewable and thermal sources;

  • Enel X: including all services provided to customers;
  • Mobility: encompassing the activities of innovation, development and commercialization of electric mobility solutions.
  • 2. Electricity regulated market, which refers to regulated generation activities (capacity market, essential plants, incentives received for renewable energy, etc.) and to the commercialization of energy on regulated markets.
  • 3. Gas, which includes the retail and wholesale commercialization of natural gas.
  • 4. Trading and services, which includes portfolio optimization and generation balancing services.

These are the businesses included in the Integrated Businesses margin, which, as mentioned, are as follows:

  • Thermal Generation and Trading;
  • Enel Green Power;
  • End-user Markets, which includes Retail, Enel X and Enel X Way.

The following table presents the Integrated Businesses margin by business line and by geographical area, excluding the impact of Stewardship transactions.

Millions of euro Thermal Generation and
Trading
Enel Green Power End-user Markets Total
2023 2022 Change 2023 2022 Change 2023 2022 Change 2023 2022 Change
Italy 2,718 2,735 (17) 555 (562) 1,117 4,039 531 3,508 7,312 2,704 4,608
Iberia 739 2,583 (1,844) 826 631 195 780 417 363 2,345 3,631 (1,286)
Rest of the World 113 762 (649) 4,213 3,697 516 460 445 15 4,786 4,904 (118)
Other 24 14 10 (26) 13 (39) (4) 309 (313) (6) 336 (342)
Integrated Businesses
margin including
Stewardship
3,594 6,094 (2,500) 5,568 3,779 1,789 5,275 1,702 3,573 14,437 11,575 2,862
Stewardship - - - 511 (9) 520 - 285 (285) 511 276 235
Total 3,594 6,094 (2,500) 5,057 3,788 1,269 5,275 1,417 3,858 13,926 11,299 2,627

The Integrated Businesses margin increased by €2,627 million due mainly to the improvement of margins on free market sales, especially in Italy and Spain as average sales prices rose compared with the previous year, which was characterized by significant price instability. This factor was only partially offset by changes in consolidation scope between the two periods and by the reduction in the generation margin. With regard to generation, the increase in

renewable energy (+14.5 TWh), mainly from hydroelectric sources in Italy, Chile, Colombia and Spain, together with the different sales price in trading activities, partially offset the effects of lower amounts of electricity generated from conventional sources and the recognition of regulatory measures related to the clawback in Italy in the amount of €357 million.

Gross operating profit/(loss)

Millions of euro 2023
Thermal Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding and
Services
Total
Ordinary gross operating profit/(loss) 3,594 5,568 7,851 5,275 (319) 21,969
Non-ordinary gain/(loss) of mergers and
acquisitions
(349)(1) 181(2) (23) - - (191)
Extraordinary solidarity levies - - - - (208) (208)
Energy transition and digitalization (178) (6) (43) (58) (81) (366)
Impairment losses - (60) - - - (60)
Ordinary profit/(loss) from discontinued
operations
- (505) (324) (59) (1) (889)
Gross operating profit/(loss) 3,067 5,178 7,461 5,158 (609) 20,255

(1) The balance includes €194 million for the capital loss on the sale of Central Dock Sud, €132 million to the loss on the sale of Enel Generación Costanera recognized on Enel Argentina, €21 million to the elimination of receivables collected by Enel SpA relating to Enel Generación Costanera, and €2 million to the impairment of the receivable recognized by Enel Américas, also from Enel Generación Costanera.

(2) The balance includes the loss on the sale of El Chocón generator sets in the amount of €14 million and the gain on the sale of Arcadia in the amount of €195 million.

Millions of euro 2022(1)
Thermal Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding and
Services
Total
Ordinary gross operating profit/(loss) 6,094 3,779 8,276 1,702 (168) 19,683
Non-ordinary gain/(loss) of mergers and
acquisitions
(137) - 839 - - 702
Energy transition and digitalization (212) (51) (23) (3) (8) (297)
Ordinary profit/(loss) from discontinued
operations
(42) (246) 38 105 8 (137)
COVID-19 costs (6) (5) (16) (2) (4) (33)
Gross operating profit/(loss) 5,697 3,477 9,114 1,802 (172) 19,918

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

The gross operating profit for 2023 amounted to €20,255 million, an increase of €337 million compared with the previous year. This change essentially reflects the effects mentioned in relation to ordinary gross operating profit, excluding the effects attributable to discontinued operations, as well as the non-recurring results largely deriving from the disposal of certain investments in the two years being compared. For 2023, the latter are attributable to the disposals of thermal generation operations in Argentina (a total charge of €363 million) and the sale of certain renewable plants in Chile (a gain of €195 million), while for 2022 they regarded the sale of the companies Enel Transmisión Chile in Chile and of the thermal generation company CGT Fortaleza and the distribution company Celg Distribuição SA - Celg-D (Enel Goiás) in Brazil. These divestments resulted in recognition of a gain of €1,051 million for Enel Transmisión Chile and charges for Enel Goiás (€208 million) and CGT Fortaleza (€135 million).

Ordinary operating profit/(loss)

Millions of euro
2023 2022 Change
Thermal Generation and Trading 2,812 5,253 (2,441) -46.5%
Enel Green Power 3,815 2,230 1,585 71.1%
Enel Grids 4,743 5,254 (511) -9.7%
End-user Markets(1) 3,241 (210) 3,451 -
Holding and Services(1) (569) (398) (171) -43.0%
Total 14,042 12,129 1,913 15.8%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Ordinary operating profit for 2023 increased by €1,913 million as a result of the factors commented above in relation to ordinary gross operating profit, taking into account the increase in depreciation and amortization recognized during the year in the area of distribution, particularly in Italy and Spain, and the increase in impairment losses recognized on trade receivables compared with the previous year in the same geographical areas.

Operating profit/(loss)

Millions of euro 2023
Thermal Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding and
Services
Total
Ordinary operating profit/(loss) 2,812 3,815 4,743 3,241 (569) 14,042
Non-ordinary gain/(loss) of mergers and
acquisitions
(349)(1) 147(2) (23) - - (225)
Extraordinary solidarity levies - - - - (208) (208)
Energy transition and digitalization (192) (6) (43) (58) (81) (380)
Impairment losses (91) (1,465) - (126) - (1,682)
Ordinary profit/(loss) from discontinued
operations
- (449) (251) (15) - (715)
Operating profit/(loss) 2,180 2,042 4,426 3,042 (858) 10,832

(1) The balance includes €194 million for the loss related to the sale of Central Dock Sud, €132 million to the loss on the sale of Enel Generación Costanera recognized on Enel Argentina, €21 million to the elimination of receivables collected by Enel SpA relating to Enel Generación Costanera, and €2 million to the impairment of the receivable recognized by Enel Américas, also from Enel Generación Costanera.

(2) The balance includes the loss on the sale of El Chocón generator sets in the amount of €14 million, the gain on the sale of Arcadia in the amount of €195 million, and impairment losses on geothermal plants in North American in the amount of €34 million.

Millions of euro
Ordinary operating profit/(loss)
2022(1)
Thermal Generation and
Trading
Enel Green
Power
Enel Grids End-user
Markets
Holding and
Services
Total
5,253 2,230 5,254 (210) (398) 12,129
Non-ordinary gain/(loss) of mergers and
acquisitions
(500) - 12 - - (488)
Energy transition and digitalization (287) (51) (23) (3) (8) (372)
Ordinary profit/(loss) from discontinued
operations
(28) (193) 120 134 9 42
COVID-19 costs (6) (5) (16) (2) (4) (33)
Other changes (47) (11) (15) (12) - (85)
Operating profit/(loss) 4,385 1,970 5,332 (93) (401) 11,193

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Operating profit decreased by €361 million compared with the previous year. This change reflects the factors commented above in relation to gross operating profit, the effects of which were more than offset by the increase in depreciation, amortization and impairment recognized in 2023.

During the year, net impairment losses amounted to €1,736 million, of which €1,234 million in respect of a number of wind and photovoltaic generation plants in the United States. Those plants underwent verification of the recoverability of their carrying amounts, mainly due to the continuation of adverse economic conditions connected with dispatching costs for electricity generated in certain markets, which gradually consolidated during the year, accompanied by a general deterioration of the macroeconomic environment and the initiation and implementation by management of specific restructuring plans in the country, which have had a significant impact on the recoverable values of those assets.

Other impairment losses were recognized in North America on the assets of Enel X (€57 million) and Enel X Way (€69 million).

Finally, in 2023, an impairment loss of €171 million was recognized on the Colombian Windpeshi wind project, subject to reclassification among net assets held for sale, in accordance with the provisions of IFRS 5.

Impairment losses totaling €1,361 million were recognized in 2022, in accordance with IFRS 5, on assets involved in disposals, mainly related to Celg Distribuição SA - Celg-D (Enel Goiás) (€827 million) and CGT Fortaleza (€73 million) in Brazil and Enel Generación Costanera (€174 million) and Central Dock Sud (€116 million) in Argentina.

Profit/(Loss) from discontinued operations

Discontinued operations posted a net loss of €371 million, which, in 2023, includes the profits and losses relating to the net discontinued operations of the companies that make up the geographical areas of Russia, Romania and Greece, classified as such based on the requirements of "IFRS 5 - Non-current assets held for sale and discontinued operations".

Millions of euro
2023 Russia Greece Romania 2022(1) Russia(1) Greece Romania
Total revenue 2,535 - 122 2,413 3,543 290 125 3,128
Costs 2,126 - 75 2,051 3,585 243 70 3,272
Impairment losses 215 - - 215 1,230 534 - 696
Total costs 2,341 - 75 2,266 4,815 777 70 3,968
Operating profit/(loss) 194 - 47 147 (1,272) (487) 55 (840)
Financial income/(expense) (62) - (49) (13) (43) (9) (35) 1
Share of profit/(loss) of equity-accounted
investments
58 58 - - 83 64 19 -
Pre-tax profit/(loss) from discontinued
operations
190 58 (2) 134 (1,232) (432) 39 (839)
Current taxes 67 - 8 59 (15) 8 2 (25)
Deferred tax assets and liabilities (38) - - (38) (37) - - (37)
Income taxes 29 - 8 21 (52) 8 2 (62)
Profit/(Loss) from Russia, Greece and
Romania
161 58 (10) 113 (1,180) (440) 37 (777)
Gain/(Loss) on the sale of discontinued
operations
(532) (124) 262 (670) (1,054) (1,054) - -
Profit/(Loss) from discontinued operations (371) (66) 252 (557) (2,234) (1,494) 37 (777)

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

It should be noted that, in addition to the financial performance of these companies (a net profit of €161 million), the figure includes the charges related to the sale of assets owned in Romania in the amount of €670 million and charges connected with the sale of Rusenergosbyt in Russia in the amount of €124 million. These effects were partly offset by the gain recognized at the end of 2023 on the sale of assets in Greece (€262 million).

In 2022, in addition to the financial performance of these companies (a net loss of €1,180 million), the figure reflected effects of the loss on the divestment in Russia in the amount of €1,054 million.

Group ordinary profit/(loss)

Group ordinary profit for 2023 amounted to €6,508 million, an increase of €1,117 million (+20.7%) compared with the €5,391 million of the previous year.

This increase in ordinary operating profit and the decrease in non-controlling interests in ordinary profit more than offset the increase in net financial expense due to the trend in interest rates. In absolute terms, taxes also increased as a result of the improvement of pre-tax profit, while the tax rate increased mainly as a result of the writedown of deferred tax assets in the United States, Mexico and Peru (€180 million).

Group profit/(loss)

Group profit in 2023 came to €3,438 million (€1,682 million in 2022), an increase of €1,756 million compared with 2022. The table below provides a reconciliation of Group profit with Group ordinary profit, indicating the non-recurring items and their respective impact on performance, net of the associated tax effects and non-controlling interests.

Millions of euro
2023 2022
Group ordinary profit 6,508 5,391
Impairment losses (1,216) -
Non-ordinary profit/(loss) on discontinued operations (959) (1,992)
Non-ordinary profit/(loss) on merger and acquisitions (278) (716)
Energy transition and digitalization (259) (189)
Write-down of certain assets related to the sale of the investment in
Slovenské elektrárne
(209) (18)
Extraordinary solidarity levies (149) (724)
Other transactions - (47)
COVID-19 costs - (23)
Group profit 3,438 1,682

Of note is the impact on Group profit of the "Caro bollette" and solidarity levies introduced in Italy, Spain and Romania, for a total of €149 million in 2023 and of €724 million in 2022.

VALUE GENERATED AND DISTRIBUTED FOR STAKEHOLDERS

Millions of euro
2023 2022 Change
Economic value generated directly 96,159 140,821 (44,662) -31.7%
Economic value distributed directly
Operating expenses 67,631 114,384 (46,753) -40.9%
Personnel expenses and benefits 4,126 3,646 480 13.2%
Payments to providers of capital (shareholders and lenders) 8,890 7,691 1,199 15.6%
Payments to government(1) 6,221 5,103 1,118 21.9%
86,868 130,824 (43,956) -33.6%
Economic value retained 9,291 9,997 (706) -7.1%

(1) The figure for 2022 has been adjusted on the basis of more accurate information. The amount mainly includes "total tax borne", which is the total amount paid by the Enel Group (including the Greek and Romanian companies in both years) for taxes recognized in profit or loss. For more information on total tax borne, please see the 2023 Sustainability Report and the Consolidated Non-Financial Statement.

The economic value generated and distributed directly by Enel provides a good indication of how the Group has created wealth for all stakeholders.

The decrease in value generated directly mainly reflects the reduction in revenue from the sale of energy commodities, in particular gas and electricity, due both to the smaller quantities transacted on the wholesale and retail markets and to the reduction in average prices.

The decline in operating expenses is mainly due to the reduction in costs for electricity and gas purchases due to the decrease in volumes and average prices, as well as the decrease in costs for transport and CO2 allowances.

Payments to providers of capital mainly increased in reflection of interest expense, primarily connected with the rise in interest rates. In addition, dividend payments increased compared with the previous year.

ANALYSIS OF THE GROUP'S FINANCIAL POSITION AND STRUCTURE

NET CAPITAL EMPLOYED

€102,743 million in 2022

SUSTAINABLE FINANCING

on total gross debt €74,949 million

€60,163 million

NET FINANCIAL DEBT(1)

-0.8% on 2022

€12,714 million

TOTAL CAPITAL EXPENDITURE

84.4% eligible and aligned with the European taxonomy

(1) In order to facilitate analysis of developments in Group net financial debt, thereby ensuring greater comparability over time, management has decided to exclude the fair value of the cash flow hedge and fair value hedge derivatives used to hedge the exchange rate risk on loans. Accordingly, in order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022.

(2) Does not include €849 million regarding units classified as held for sale (€156 million in 2022).

Net capital employed and funding

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Net non-current assets:
- property, plant and equipment and intangible assets 106,953 106,135 818 0.8%
- goodwill 13,042 13,742 (700) -5.1%
- equity-accounted investments 1,650 1,281 369 28.8%
- net other non-current assets/(liabilities)(1) (3,363) (4,778) 1,415 29.6%
Total net non-current assets 118,282 116,380 1,902 1.6%
Net working capital:
- trade receivables 17,773 16,605 1,168 7.0%
- inventories 4,290 4,853 (563) -11.6%
- net receivables due from institutional market operators (4,317) (1,083) (3,234) -
- net other current assets/(liabilities)(1) (9,907) (10,959) 1,052 9.6%
- trade payables (15,821) (17,641) 1,820 10.3%
Total net working capital (7,982) (8,225) 243 3.0%
Gross capital employed 110,300 108,155 2,145 2.0%
Provisions:
- employee benefits (2,320) (2,202) (118) -5.4%
- provisions for risks and charges and net deferred taxes(2) (6,311) (5,999) (312) -5.2%
Total provisions (8,631) (8,201) (430) -5.2%
Net assets held for sale 3,603 2,789 814 29.2%
Net capital employed 105,272 102,743 2,529 2.5%
Total equity(2) 45,109 42,080 3,029 7.2%
Net financial debt(1) 60,163 60,663 (500) -0.8%

(1) In order to facilitate analysis of developments in Group net financial debt, thereby ensuring greater comparability over time, management has decided to exclude the fair value of the cash flow hedge and fair value hedge derivatives used to hedge the exchange rate risk on loans. Accordingly, in order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022.

(2) Figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures" of the consolidated financial statements.

Property, plant and equipment and intangible assets increased due essentially to capital expenditure in the period (€11,919 million), the capitalization of financial expense (€300 million), the activation of new IFRS 16 rights of use (€684 million), and the effect of impairment losses related to the hyperinflation of assets held in Argentina (€914 million). These impacts were partially offset by the classification of certain assets as held for sale (€4,293 million), essentially referring to distribution and generation assets in Peru, as well as by depreciation, amortization and impairment losses recognized for the year (€7,825 million) and adverse exchange rate developments (€1,226 million), referring essentially to Latin America.

Goodwill decreased mainly as a result of the above-mentioned classifications of certain Peruvian companies as available for sale (€616 million) and the impairment recognized on the assets of Enel X and Enel X Way in the United States (€126 million). These effects are partially offset by favorable exchange rate developments (€42 million).

Equity-accounted investments increased mainly due to the consolidation at equity of joint ventures in Greece and Australia following the partial sale, with loss of control, of the related companies and the impairment loss on Slovak Power Holding. These impacts were partially offset by the effects deriving from the sale of Rusenergosbyt.

Net working capital increased, compared with December 31, 2022, by €243 million, mainly due to an increase in trade receivables and a decrease in trade payables. These impacts were partly offset by an increase in payables to institutional electricity market operators, mainly in Italy due to the gradual restoration, in 2023, of the charges related to the support of renewable energy and cogeneration, and in Spain for other components payable to market operators.

Net assets held for sale increased mainly as a result of the classification among the net assets held for the sale of generation and distribution companies in Peru, net of the divestments during the year. For a more detailed breakdown of the aggregate and related changes, please see note 36 of the consolidated financial statements.

Net capital employed at December 31, 2023 came to €105,272 million (€102,743 million at December 31, 2022) and was covered by €45,109 million in equity attributable to owners of the Parent and non-controlling interests and €60,163 million in net financial debt. With regard to net debt, the debt-to-equity ratio at December 31, 2023 was 1.33 (compared with 1.44 at December 31, 2022).

Net financial debt

The Enel Group's net financial debt and changes in the period are detailed in the table below.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Long-term debt:
- bank borrowings 14,500 15,261 (761) -5.0%
- bonds 43,579 50,079 (6,500) -13.0%
- other borrowings(1) 3,014 2,851 163 5.7%
Long-term debt 61,093 68,191 (7,098) -10.4%
Long-term financial assets and securities (3,837) (4,213) 376 8.9%
Net long-term debt 57,256 63,978 (6,722) -10.5%
Short-term debt
Bank borrowings:
- current portion of long-term bank borrowings 1,992 890 1,102 -
- other short-term bank borrowings 393 1,320 (927) -70.2%
Short-term bank borrowings 2,385 2,210 175 7.9%
Bonds (current portion) 6,763 1,612 5,151 -
Other borrowings (current portion) 331 333 (2) -0.6%
Commercial paper 2,499 13,838 (11,339) -81.9%
Cash collateral and other financing on derivatives 1,383 1,513 (130) -8.6%
Other short-term financial borrowings(2) 495 1,721 (1,226) -71.2%
Other short-term debt 11,471 19,017 (7,546) -39.7%
Long-term loan assets (short-term portion) (1,007) (2,838) 1,831 64.5%
Loan assets – cash collateral (2,899) (8,319) 5,420 65.2%
Other short-term financial assets (161) (2,266) 2,105 92.9%
Cash and cash equivalents (6,882) (11,119) 4,237 38.1%
Cash and cash equivalents and short-term financial assets (10,949) (24,542) 13,593 55.4%
Net short-term debt 2,907 (3,315) 6,222 -
NET FINANCIAL DEBT(3) 60,163 60,663 (500) -0.8%
Net financial debt of assets held for sale 888 892 (4) -0.4%

(1) Includes other non-current financial borrowings included under other non-current financial liabilities.

(2) Includes current borrowings included under other current financial liabilities.

(3) In order to facilitate analysis of developments in Group net financial debt, thereby ensuring greater comparability over time, management has decided to exclude the fair value of the cash flow hedge and fair value hedge derivatives used to hedge the exchange rate risk on loans. Accordingly, in order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022.

Net financial debt, in the amount of €60,163 million at December 31, 2023, decreased by €500 million from the €60,663 million of December 31, 2022. Cash flows generated by operating activities (€14,620 million) and from the sale of certain investments included within the Group's divestment plan (for a total of €2,083 million, mainly related to the sale of the Romanian companies, a shareholding in companies in Greece, and certain renewable generation companies in Chile and Argentina), the effects of the issuance of perpetual hybrid subordinated non-convertible bonds (€986 million), the recognition of NRRP contributions in Italy to support investment as well as the change in net financial liabilities associated with assets available for sale (€720 million) substantially offset the cash flows used in investing activities (€12,714 million) and the payment of dividends (€5,317 million, including coupons paid to holders of hybrid bonds in the amount of €182 million).

Gross financial debt at December 31, 2023 came to €74,949 million, a decrease of €14,469 million from the previous year.

Gross financial debt

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Gross long
term debt
Gross short
term debt
Gross debt Gross long
term debt
Gross short
term debt
Gross debt
Gross financial debt 70,179 4,770 74,949 71,026 18,392 89,418
of which:
- sustainable financing 45,147 2,663 47,810 42,561 13,977 56,538
Sustainable financing/Total gross debt (%) 64% 63%

More specifically, gross long-term financial debt (including the short-term portion), in the amount of €70,179 million, includes €45,147 million in sustainable financing and is structured as follows:

  • bonds in the amount of €50,342 million, of which €30,822 million in sustainable bonds, down €1,349 million compared with December 31, 2022. This change is mainly the result of redemptions, including a hybrid bond of Enel SpA in the amount of \$1,250 million (equal to €1,132 million at December 31, 2023), currency gains, and changes in the consolidation scope, only partially offset by new issues, including a multi-tranche sustainability-linked bond issued by Enel Finance International in the total amount of €1,500 million in February 2023;
  • bank borrowings in the amount of €16,492 million, €14,325 million of which related to sustainable financing. These borrowings increased by €341 million compared with the previous year due mainly to the use of new financing that was only partially offset by repayments made during the period. Of note among new bank borrowings:
    • a sustainability-linked line of credit granted by EKF to Enel Finance America used at December 31, 2023 for \$370 million (equal to €335 million at December 31, 2023);
  • financing linked to sustainability goals granted by the European Investment Bank to various companies of the Group for a total value of €874 million;
  • other borrowings in the amount of €3,345 million, an increase of €161 million from the previous year.

Gross short-term financial debt, which decreased by €13,622 million from December 31, 2022, totals €4,770 million and consists of commercial paper, all linked to sustainability objectives, in the amount of €2,499 million, cash collateral in the amount of €1,383 million, other shortterm financial payables in the amount of €495 million, and other short-term bank borrowings in the amount of €393 million.

Cash and cash equivalents and short- and long-term financial assets, totaling €14,786 million, decreased by €13,969 million compared with the end of 2022, mainly due to the €5,420 million decrease in financial receivables for cash collateral, the €4,237 million decrease in cash and cash equivalents, and the €2,105 million decrease in other short-term financial receivables, mainly attributable to the repayment of the receivable due at the end of 2022 from Equatorial for the sale of the Brazilian electricity distribution company Celg Distribuição SA - Celg-D (Enel Goiás).

Sustainability-linked finance at Enel

At Enel, sustainable finance is a key lever in creating economic and financial value, enabling us to raise public and private capital and channel those resources into sustainable investments, thereby sustaining achievement of our development goals. The new sustainability-linked bond issues, together with all the sustainable financing arranged in the last year, made it possible to reach a 64% ratio of sustainable sources of financing to the Group's total gross debt at the end of 2023, with a goal of reaching around 70% in 2026.

Sustainability-Linked Financing Framework

In 2020, Enel was the world's first company to include a mechanism in its funding agreements that links the cost of financing to achieving one or more of the sustainability targets specified in the Sustainability-Linked Financing Framework, a document that extends the sustainability-linked approach to all instruments of financial debt. The Sustainability-Linked Financing Framework is updated annually in line with the objectives defined in the Group's Strategic Plan.

The latest version published in January 2024 updated the Sustainability Performance Targets (SPT) of the five key performance indicators (KPIs) included in the framework, which contribute to achievement of SDG 7 ("Clean and Accessible Energy") and SDG 13 ("Climate Action") and the European Environmental Objective of Climate Change Mitigation:

  • 1. Intensity of Scope 1 GHG emissions related to power generation (gCO2eq/kWh);
  • 2. Intensity of Scope 1 and Scope 3 GHG emissions related to Integrated Power (gCO2eq/kWh);
  • 3. Absolute Scope 3 GHG emissions related to retail gas (MtCO2eq);
  • 4. Percentage of installed renewable capacity (%);
  • 5. Percentage of capital expenditure aligned with the EU taxonomy (%).
KPI Actual value Sustainability Performance Targets (SPTs)
2023 2023 2024 2025 2026 2030 2040
Intensity of Scope 1 GHG emissions related to
power generation (gCO2eq/kWh)
160 148 140 130 125 72 0
Intensity of Scope 1 and Scope 3 GHG emissions
related to Integrated Power (gCO2eq/kWh)
168 135 135 73 0
Absolute Scope 3 GHG emissions related to retail
gas (MtCO2eq)
16.8 20.9 20.0 11.4 0
Percentage of installed renewables capacity (%) 68.2 65 69 73 74 80 100
Percentage of capital expenditure aligned with
the EU taxonomy (%)
84.8 >80
(2023-2025)(39)
>80
(2024-2026)(40)

Developments in the KPIs shown in the table are periodically verified by an external auditor and are published by Enel in the Integrated Annual Report and the Sustainability Report.

Globally, greenhouse gas (GHG) emissions continued to increase in 2023, largely as a result of economic recovery and a further increase in fossil fuel consumption, with the energy crisis and the high prices of natural gas and liquefied natural gas sparking greater use of coal as a cheaper but more polluting fuel.

Nevertheless, the Group managed to reduce direct and indirect greenhouse gas emissions along the entire value chain by 26.3% overall compared with the previous year. Furthermore, the Group also reduced the intensity of Scope 1 GHG emissions related to power generation by over 30.6%, going from 229 gCO2eq/kWh in 2022 to 160 gCO2eq/kWh in 2023. This reduction reflected a 12.9% increase in consolidated renewables generation and a 37.5% reduction in consolidated thermal generation compared with 2022, a consequence of the Group's strategy to shift its generation mix towards renewables and to advance the decarbonization process.

However, the war in Ukraine and the resulting restrictions on gas imports from Russia into the EU, which caused a decrease in gas supplies accompanied by a surge in wholesale electricity and gas prices, with serious effects for households and businesses, prompted EU governments to implement a series of policy responses to mitigate the impact of rising costs and ensure the stability of the energy system.

(39) SPT with cumulative observation period of 2023-2025. (40) SPT with cumulative observation period of 2024-2026.

In particular, the Italian government responded with a national plan to contain natural gas consumption, including measures to maximize thermal generation using fuels other than gas. This was implemented with Decree Law 14/2022, which required the national transmission system operator (TSO) to develop a program to maximize electricity production from coal-fired power plants until the end of September 2023. Consequently, the TSO identified Enel's coal plants as essential and required them to maximize such output.

In Spain, the government authorization for the closure of the As Pontes coal plant, requested by Enel's Endesa subsidiary in December 2019 for June 2021, was postponed to the end of 2023 as the plant was identified as essential by the transmission system operator.

Due to the unprecedented crisis faced by the European energy system in 2022 and 2023, the Group's emissions reduction in 2023 was not sufficient to achieve the Scope 1 GHG emissions intensity target related to electricity generation set for 2023 as announced on the occasion of the Capital Markets Day held in November 2020 for the launch of the 2021-2023 Strategic Plan. As a result of the energy crisis, the intensity value was slightly higher than the target of 148 gCO2eq/kWh. In the absence of these factors, Enel would have been able to reach an emissions intensity level well below the target of 148 gCO2eq/kWh.

As a result, the Group's sustainability-linked instruments that set the Scope 1 emissions intensity target for electricity generation at 148 gCO2eq/kWh for 2023 will be subject to an increase in the relative step-up, and Enel will comply with its obligations in accordance with the terms and conditions of the legal documentation of these sustainability-linked transactions.

Despite these unprecedented circumstances, the Group's emissions intensity in 2023 remained aligned with the 1.5 ºC pathway: the sector's decarbonization approach envisaged by the SBTi initiative had established a maximum threshold of 246 gCO2eq/kWh for 2023, well above Enel's actual performance.

Ultimately, Enel's commitment to decarbonization remains confirmed for both the short, medium and long term, as envisaged in the new 2024-2026 Strategic Plan, which establishes a new short-term target for 2026 of 125 gCO2eq/ kWh. This new target, which is incorporated in the Sustainability-Linked Financing Framework as updated in January 2024 and linked to the first issue of sustainability-linked bonds in 2024, confirms Enel's commitment to the energy transition and contributes to the environmental and financial sustainability of the Group's development strategy. Furthermore, we are still committed to the 2030 target of an 80% reduction in the intensity of Scope 1 GHG emissions related to power generation compared with the 2017 baseline and the final 2040 target of a 100% reduction in these emissions without resort to any type of offsetting or carbon removal mechanisms.

In 2023, the Group, acting through its financial subsidiary Enel Finance International NV (EFI), issued a bond in February on the European market in the amount of €1,500 million, combining, in the eight-year tranche, a KPI linked to the EU taxonomy with a KPI linked to the United Nations SDGs. The second tranche of the 20-year bond, on the other hand, was linked to two KPIs associated with the Group's focus on complete decarbonization through the reduction of direct and indirect greenhouse gas emissions.

In November 2023, Enel SpA obtained a three-year sustainability-linked revolving credit facility worth €1,500 million and linked to SDG 13.

In March 2023, Enel Finance International renewed its €8,000 million commercial paper program, linking it to the KPI "Intensity of Scope 1 GHG emissions related to power generation (gCO2eq/kWh)" and the KPI "Percentage of capital expenditure aligned with the EU taxonomy (%)".

Enel's role in the Recovery Plan

Enel acts as a strategic partner in the Recovery Plan with the aim of driving sustainable, rapid and effective growth through the implementation of projects in line with the missions of the individual Recovery and Resilience Plans at the national level. In this regard, in 2023, the decrees relating to the projects Smart Grids and Resilience in Italy were signed, for a total of €3,500 million. In addition to Recovery, the Enel Group has submitted project proposals for other opportunities offered at European level, such as the Innovation Fund where the grant agreement for the Catania Gigafactory was signed, the Important Projects of Common European Interest (IPCEI) where projects for the development of green hydrogen were presented, and the Connecting Europe Facility (CEF) for the development of electric charging infrastructures.

International development finance

The Group is leading an innovation process aimed at accelerating the mobilization of capital to support sustainable growth through the use of sustainability-linked financial instruments.

More specifically, in 2023, the Group obtained incentivized loans for a total of €1,800 million, which include sustainability-linked mechanisms tied to SDG 13. The main operations include sustainability-linked financing for a total of \$800 million by Enel Finance America and EKF (Danish export credit agency), which is the EKF's first sustainability-linked financing agreement.

Cash flows

For more information, please see note 46 of the consolidated financial statements.

Capital expenditure

Millions of euro
2023 2022(1) Change
Thermal Generation and Trading 761 990 (229) -23.1%
Enel Green Power 5,345 6,386 (1,041) -16.3%
Enel Grids 5,280 5,547 (267) -4.8%
End-user Markets 1,138 1,205 (67) -5.6%
Holding and Services 190 219 (29) -13.2%
Total(2) 12,714 14,347 (1,633) -11.4%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

(2) The figure does not include €849 million regarding units classified as held for sale (€156 million in 2022).

Capital expenditure decreased by €1,633 million from the previous year.

In line with the Paris Agreement in terms of reducing CO2 emissions, the Group's investments focused mainly on renewable energy and grids.

In particular, with regard to renewable energy, the change mainly concerned the increases in Italy (€824 million) and Colombia (€15 million), which were more than offset by lower capital expenditure in the United States (€1,197 million), Chile (€236 million), Peru (€196 million), Canada (€181 million), and Spain (€51 million).

Capital expenditure on grids, aimed at ensuring reliability and quality of service through efficient, resilient and digital networks, increased in Italy (€370 million), Spain (€25 million), and Colombia (€18 million), while decreasing in Brazil (€335 million), Romania (€140 million), Peru (€111 million), Argentina (€60 million), and Chile (€26 million).

Capital expenditure in the End-user Markets Business Line fell by €67 million. More specifically, the decrease in Retail concerned Italy (€81 million), Spain (€18 million) and Romania, essentially in the digitization of operational customer management processes.

Within the End-user Markets, but related to mobility, capital expenditure mainly decreased in Brazil, by €30 million, only partially offset by increased capital expenditure in Italy. Within the End-user Markets Business Line for Enel X, capital expenditure increased mainly in Italy, in the e-City and Distributed Energy businesses, and in Brazil in the e-City business.

Capital expenditure in Thermal Generation and Trading decreased by €229 million, particularly in Latin America and Italy.

PERFORMANCE BY PRIMARY SEGMENT (BUSINESS LINE) AND SECONDARY SEGMENT (GEOGRAPHICAL AREA)

The representation of performance by business line presented here is based on the approach used by management in monitoring Group performance for the two periods under review, taking account of the operational model adopted as described above.

With regard to disclosures for operating segments, as management reports on performance by business line, the Group has therefore adopted the following reporting sectors:

  • primary segment: Business Line;
  • secondary segment: Geographical Area.

The business line is therefore the main discriminant in the analyses performed and decisions taken by the management of the Enel Group, and is fully consistent with the internal reporting prepared for these purposes since the results are measured and evaluated first and foremost for each business line and only thereafter are they broken down by geographical area.

In this regard, note that the organizational simplification process begun in 2023 led to a restructuring of the business lines and geographical areas, with a consequent need to redefine the segments subject to disclosure in order to present the results of the segments based on the approach used by management to monitor and present the Group's performance to investors.

In particular, in the presentation of figures by primary segment (Business Line):

  • the figures for Enel X, which in the year ended December 31, 2022 had been presented separately, are now reported under End-user Markets;
  • the figures for Enel X Way, which in the year ended December 31, 2022 had been presented under Holding, Services and Other, are now reported under End-user Markets.

In the presentation of figures by secondary segment (Geographical Area), the figures for Latin America, Europe, North America, Africa, Asia and Oceania have merged into the "Rest of the World" area.

The organization continues to be based on matrix of business lines (Thermal Generation and Trading, Enel Green Power, Enel Grids, End-user Markets, Enel X, Holding and Services) and geographical areas (Italy, Iberia, Rest of the World, Central/Holding).

The following chart outlines these organizational arrangements.

REGIONS/
COUNTRIES
THERMAL
GENERATION
TRADING ENEL GREEN
POWER
ENEL GRIDS END-USER MARKETS HOLDING
AND SERVICES
Italy
Iberia
Rest of the
World
Africa, Asia
and Oceania
Latin
America
Europe
Nort h
America

Following these changes, the figures for the previous year were adjusted for comparative purposes only.

Performance by primary segment (Business Line) in 2023 and 2022

Results for 2023(1)

Millions of euro Thermal
Generation
and Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding
and
Services
Total
reporting
segment
Eliminations
and
adjustments
Total
Revenue and other income from third
parties
20,152 8,459 17,206 49,748 - 95,565 - 95,565
Revenue and other income from
transactions with other segments
20,038 3,161 3,053 2,371 2,045 30,668 (30,668) -
Total revenue 40,190 11,620 20,259 52,119 2,045 126,233 (30,668) 95,565
Net results from commodity contracts (1,983) (65) - (923) 5 (2,966) - (2,966)
Gross operating profit/(loss) 3,067 5,178 7,461 5,158 (609) 20,255 - 20,255
Depreciation, amortization and
impairment losses
887 3,136 3,035 2,116 249 9,423 - 9,423
Operating profit/(loss) 2,180 2,042 4,426 3,042 (858) 10,832 - 10,832
Capital expenditure 761(2) 5,345(3) 5,280(4) 1,138(5) 190(6) 12,714 - 12,714

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) The figure does not include €14 million classified as available for sale or discontinued operations.

(3) The figure does not include €565 million classified as available for sale or discontinued operations.

(4) The figure does not include €233 million classified as available for sale or discontinued operations.

(5) The figure does not include €34 million classified as available for sale or discontinued operations.

(6) The figure does not include €3 million classified as available for sale or discontinued operations.

Results for 2022(1)

Millions of euro Thermal
Generation
and Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding
and
Services
Total
reporting
segment
Eliminations
and
adjustments
Total
Revenue and other income from third
parties
53,239 6,669 19,806 60,785 18 140,517 - 140,517
Revenue and other income from
transactions with other segments
23,096 2,498 3,226 3,565 2,032 34,417 (34,417) -
Total revenue 76,335 9,167 23,032 64,350 2,050 174,934 (34,417) 140,517
Net results from commodity contracts 551 183 - 1,595 (5) 2,324 41 2,365
Gross operating profit/(loss) 5,697 3,477 9,114 1,802 (180) 19,910 8 19,918
Depreciation, amortization and
impairment losses
1,312 1,507 3,782 1,895 229 8,725 - 8,725
Operating profit/(loss) 4,385 1,970 5,332 (93) (409) 11,185 8 11,193
Capital expenditure 990(2) 6,386(3) 5,547(4) 1,205(5) 219 14,347 - 14,347

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) The figure does not include €2 million classified as available for sale or discontinued operations.

(3) The figure does not include €42 million classified as available for sale or discontinued operations.

(4) The figure does not include €110 million classified as available for sale or discontinued operations.

(5) The figure does not include €2 million classified as available for sale or discontinued operations.

In addition to the above, the Group also monitors performance by geographical area, classifying results by region/ country. In the table below, ordinary gross operating profit is shown for the two periods under review with the goal of providing a view of performance not only by division/

business line, but also by geographical area.

It should be noted that ordinary gross operating profit excludes non-recurring items. For a reconciliation with gross operating profit, please see the section "Group Performance".

Ordinary gross operating profit(1)

Millions of euro Thermal Generation and Trading Enel Green Power Enel Grids
2023 2022 Change 2023 2022 Change 2023 2022 Change
Italy 2,718 2,735 (17) 555 (562) 1,117 3,589 3,707 (118)
Iberia 739 2,583 (1,844) 826 631 195 1,668 1,621 47
Rest of the World 113 762 (649) 4,213 3,697 516 2,598 2,384 214
Latin America 166 737 (571) 2,623 2,372 251 2,284 2,445 (161)
Argentina 5 76 (71) 19 21 (2) (54) 88 (142)
Brazil (16) 81 (97) 549 506 43 1,496 1,489 7
Chile 50 399 (349) 983 798 185 102 168 (66)
Colombia (23) 29 (52) 743 674 69 517 487 30
Peru 153 154 (1) 224 203 21 223 213 10
Panama (1) (2) 1 70 102 (32) - - -
Other countries (2) - (2) 35 68 (33) - - -
Europe 4 45 (41) 659 244 415 314 (61) 375
Romania 4 (8) 12 156 140 16 314 (61) 375
Russia - 53 (53) - 18 (18) - - -
Other countries - - - 503 86 417 - - -
North America (57) (20) (37) 789 988 (199) - - -
United States and
Canada
(60) (19) (41) 749 907 (158) - - -
Mexico 3 (1) 4 40 81 (41) - - -
Africa, Asia and
Oceania
- - - 142 93 49 - - -
South Africa - - - 31 73 (42) - - -
India - - - 6 17 (11) - - -
Other countries - - - 105 3 102 - - -
Other 24 14 10 (26) 13 (39) (4) 564 (568)
Total 3,594 6,094 (2,500) 5,568 3,779 1,789 7,851 8,276 (425)

(1) Ordinary gross operating profit does not include non-recurring items. For a reconciliation with gross operating profit, please see the section "Group Performance".

End-user Markets Holding and Services Total
2022 2023 Change 2023 2022 Change 2023 2022 Change
531 4,039 3,508 56 89 (33) 10,957 6,500 4,457
417 780 363 39 (5) 44 4,052 5,247 (1,195)
445 460 15 (132) (119) (13) 7,252 7,169 83
560 424 (136) (132) (117) (15) 5,365 5,997 (632)
35 5 (30) (5) (3) (2) (30) 217 (247)
237 220 (17) (37) (23) (14) 2,212 2,290 (78)
83 75 (8) (89) (91) 2 1,121 1,357 (236)
151 79 (72) - - - 1,316 1,341 (25)
54 45 (9) (1) - (1) 644 624 20
- - - - - - 69 100 (31)
- - - - - - 33 68 (35)
(81) 50 131 2 - 2 1,029 147 882
(110) 54 164 2 - 2 530 (39) 569
1 - (1) - - - - 72 (72)
28 (4) (32) - - - 499 114 385
(24) (11) 13 (2) (2) - 719 942 (223)
(28) (15) 13 (2) (2) - 672 858 (186)
4 4 - - - - 47 84 (37)
(10) (3) 7 - - - 139 83 56
- - - - - - 31 73 (42)
- - - - - - 6 17 (11)
(10) (3) 7 - - - 102 (7) 109
309 (4) (313) (282) (133) (149) (292) 767 (1,059)
1,702 5,275 3,573 (319) (168) (151) 21,969 19,683 2,286

THERMAL GENERATION AND TRADING

26 GW

NET EFFICIENT INSTALLED CAPACITY

-29.8% from coal-fired plants on 2022

80.3 TWh

NET ELECTRICITY GENERATION

-45.5% from coal-fired plants on 2022

ORDINARY GROSS OPERATING PROFIT

€6,094 million in 2022

Operations

Net electricity generation

Millions of kWh
2023 2022
Coal-fired plants 10,755 19,722 (8,967) -45.5%
Fuel-oil and turbo-gas plants 8,021 14,652 (6,631) -45.3%
Combined-cycle plants 36,705 54,436 (17,731) -32.6%
Nuclear plants 24,865 26,508 (1,643) -6.2%
Total net generation 80,346 115,318 (34,972) -30.3%
- of which Italy 20,503 30,149 (9,646) -32.0%
- of which Iberia 46,052 52,674 (6,622) -12.6%
- of which Rest of the World 13,791 32,495 (18,704) -57.6%
- of which Latin America 13,791 22,439 (8,648) -38.5%
- of which Europe - 10,056 (10,056) -

In 2023, thermal generation decreased by 34,972 million kWh compared with 2022, in a context of greater water availability and a reduction in electricity needs, particularly in Italy and Iberia.

The decrease in generation by fuel-oil and turbo-gas plants and by combined-cycle plants, of 6,631 million kWh and 17,731 million kWh respectively, is mainly attributable to the sale of the entire stake held in the share capital of the Russian company PJSC Enel Russia (10,056 million kWh), as well as the sale of the Argentine companies Enel Generación Costanera (3,989 million kWh) and Central Dock Sud (2,553 million kWh).

The decrease in generation by coal-fired plants, down 8,967 million kWh, is mainly attributable to Italy, which had resorted to this technology in 2022 and until the 1st Quarter of 2023 for application of the preventive measures put in place by the Italian government to reduce gas consumption.

Net efficient installed capacity

MW
2023 2022 Change
Coal-fired plants 4,627 6,590 (1,963) -29.8%
Fuel-oil and turbo-gas plants 5,942 7,204 (1,262) -17.5%
Combined-cycle plants 11,983 13,895 (1,912) -13.8%
Nuclear plants 3,328 3,328 - -
Total 25,880 31,017 (5,137) -16.6%
- of which Italy 11,145 11,569 (424) -3,7%
- of which Iberia 11,347 12,751 (1,404) -11.0%
- of which Rest of the World 3,388 6,697 (3,309) -49.4%
- of which Latin America 3,388 6,697 (3,309) -49.4%
- of which Europe - - - -

Net efficient generation capacity for thermal power plants at December 31, 2023 stood at 25,880 MW, a decrease of 5,137 MW compared with 2022, mainly following the sale of the Enel Generación Costanera and Central Dock Sud plants in Argentina, the decommissioning of a coal plant in Iberia (As Pontes), and the decommissioning of two units of a coal plant in Italy (Fusina).

Performance

Millions of euro
2023 2022 Change
Revenue 40,190 76,335 (36,145) -47.4%
Gross operating profit/(loss) 3,067 5,697 (2,630) -46.2%
Ordinary gross operating profit/(loss) 3,594 6,094 (2,500) -41.0%
Operating profit/(loss) 2,180 4,385 (2,205) -50.3%
Ordinary operating profit/(loss) 2,812 5,253 (2,441) -46.5%
Capital expenditure 761(1) 990(2) (229) -23.1%

(1) The figure does not include €14 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €2 million regarding units classified as held for sale or discontinued operations.

The following table provides a breakdown of revenue for Thermal Generation and Trading from conventional thermal and nuclear generation.

Revenue from thermal and nuclear generation(1)

Millions of euro
2023 2022
Revenue
Revenue from thermal generation 14,054 24,155
- of which coal-fired generation 2,885 6,500
Revenue from nuclear generation 1,463 1,570
Revenue from thermal generation as a percentage of total revenue 14.7% 17.2%
- of which revenue from coal-fired generation as a percentage of total
revenue
3.0% 4.6%
Revenue from nuclear generation as a percentage of total revenue 1.5% 1.1%

(1) The revenue analyzed refers to that for the segment and include transactions with third parties and the intersegment transactions of each segment with the others.

The following tables show a breakdown of performance by geographical area in 2023.

Revenue

Millions of euro
2023 2022 Change
Italy 26,178 55,389 (29,211) -52.7%
Iberia 11,348 17,488 (6,140) -35.1%
Rest of the World 2,809 4,090 (1,281) -31.3%
Latin America 2,548 3,858 (1,310) -34.0%
- of which Argentina 7 145 (138) -95.2%
- of which Brazil 656 959 (303) -31.6%
- of which Chile 1,335 2,268 (933) -41.1%
- of which Colombia 317 218 99 45.4%
- of which Peru 233 268 (35) -13.1%
- of which other countries - - - -
North America 261 218 43 19.7%
Europe - 14 (14) -
Other 82 106 (24) -22.6%
Eliminations and adjustments (227) (738) 511 69.2%
Total 40,190 76,335 (36,145) -47.4%

Revenue for 2023 amount to €40,190 million, a decrease of €36,145 million from 2022. This decrease is mainly attributable to the decline in thermal generation, due in part to the increase in renewable generation, above all from hydroelectric sources, and to the decreasing average prices applied, above all, on wholesale sales compared with the previous year.

Ordinary gross operating profit/(loss)

Millions of euro
2023 2022 Change
Italy 2,718 2,735 (17) -0.6%
Iberia 739 2,583 (1,844) -71.4%
Rest of the World 113 762 (649) -85.2%
Latin America 168 737 (569) -77.2%
- of which Argentina 5 76 (71) -93.4%
- of which Brazil (16) 81 (97) -
- of which Chile 50 399 (349) -87.5%
- of which Colombia (23) 29 (52) -
- of which Peru 153 154 (1) -0.6%
- of which other countries (1) (2) 1 50.0%
North America (57) (20) (37) -
Europe 4 45 (41) -91.1%
Other 24 14 10 71.4%
Total 3,594 6,094 (2,500) -41.0%

The decrease in the ordinary gross operating profit, in the amount of €2,500 million, is mainly attributable to the lower thermal generation, combined with the lower average prices applied in 2023 compared with 2022, as well as the recognition of a charge in the amount of €515 million following the arbitration award for the revision of the price of a long-term gas-supply contract at Endesa.

The reduction also reflects the change in the consolidation scope linked to the sales of CGT Fortaleza in Brazil in 2022 and of Enel Generación Costanera and Central Dock Sud in Argentina in 2023.

Gross operating profit came to €3,067 million, a decrease of €2,630 million from the €5,697 million posted in 2022.

In addition to the reduced generation at lower average prices and the recognition of the arbitration award of €515 million in Spain, as mentioned above, the change from the previous year also reflects the change in the consolidation scope, for the sales mentioned above in Argentina and Brazil (a decrease of €158 million).

Finally, it should be noted that, in the two financial years compared, non-recurring items essentially led to the recognition of greater overall charges of €172 million. More specifically, these effects refer to the charges related to the 2023 sales of the thermal generation companies in Argentina (€349 million) and the charges for the energy transition and digitalization (€178 million), mainly relating to the adjustment of the value of inventories of fuel and other materials used by coal-fired plants in Italy.

In 2022, the main non-recurring items included the charges related to the sale of CGT Fortaleza in Brazil (€137 million), the closure of the Bocamina II power plant in Chile (€56 million), and the provision recognized for Enel Produzione (€142 million) for the costs associated with the conversion of certain plants.

Ordinary operating profit/(loss)

Millions of euro
2023
2022
Change
Italy 2,562 2,591 (29) -1.1%
Iberia 217 2,068 (1,851) -89.5%
Rest of the World 10 582 (572) -98.3%
Latin America 76 571 (495) -86.7%
- of which Argentina 3 4 (1) -25.0%
- of which Brazil (16) 75 (91) -
- of which Chile 16 361 (345) -95.6%
- of which Colombia (40) 12 (52) -
- of which Peru 122 122 - -
- of which other countries (9) (3) (6) -
North America (70) (20) (50) -
Europe 4 31 (27) -87.1%
Other 23 12 11 91.7%
Total 2,812 5,253 (2,441) -46.5%

The decrease in the ordinary operating profit essentially reflects the factors described in relation to ordinary gross operating profit, taking account of the decrease in depreciation, amortization and impairment losses of €59 million compared with the previous year.

Operating profit for 2023 came to €2,180 million (€4,385 million in 2022), a decrease of €2,205 million taking into account the factors described above in relation to gross operating profit and the decrease in depreciation, amortization and impairment losses compared with previous year. More specifically, 2022 included impairment losses in Latin America and Spain totaling €474 million, while in 2023 they concerned certain projects in Spain in the amount of €91 million.

Capital expenditure

Millions of euro
2023 2022 Change
Italy 394 408 (14) -3.4%
Iberia 306 272 34 12.5%
Rest of the World 61 310 (249) -80.3%
Latin America 57 289 (232) -80.3%
North America 4 7 (3) -42.9%
Europe - 14 (14) -
Total 761(1) 990(2) (229) -23.1%

(1) The figure does not include €14 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €2 million regarding units classified as held for sale or discontinued operations.

The decrease of €229 million in capital expenditure is due to the change in the consolidation scope as a result of the sale of the aforementioned assets in Argentina.

ENEL GREEN POWER

NET EFFICIENT INSTALLED CAPACITY

68.2% of total Group capacity

€5,345 million(1)

CAPITAL EXPENDITURE

-16.3% on 2022

127.0 TWh

NET ELECTRICITY GENERATION

+29.2% from solar plants on 2022

€5,568 million

ORDINARY GROSS OPERATING PROFIT

€3,779 million in 2022

(1) The figure does not include €565 million regarding units classified as held for sale or discontinued operations.

Operations

Net electricity generation

Millions of kWh
2023 2022 Change
Hydroelectric 60,991 51,728 9,263 17.9%
Geothermal 6,001 6,117 (116) -1.9%
Wind 45,339 43,255 2,084 4.8%
Solar 14,613 11,306 3,307 29.2%
Other sources 42 43 (1) -2.3%
Total net generation 126,986 112,449 14,537 12.9%
- of which Italy 22,098 18,311 3,787 20.7%
- of which Iberia 14,212 12,041 2,171 18.0%
- of which Rest of the World 90,676 82,097 8,579 10.4%
- of which Latin America 60,960 53,154 7,806 14.7%
- of which Europe 2,151 2,458 (307) -12.5%
- of which North America 25,611 23,385 2,226 9.5%
- of which Africa, Asia and Oceania 1,954 3,100 (1,146) -37.0%

Net electricity generation in 2023 increased from 2022 due to greater hydroelectric, wind and solar generation.

Hydroelectric generation posted a sharp increase as a result of greater water availability in Italy (+3,686 million kWh), in Chile (+2,440 million kWh), in Colombia (+1,630 million kWh), in Argentina (+1,200 million kWh), and in Spain (+606 million kWh), partly offset by lower generation in Panama (-153 million kWh) and Guatemala (-99 million kWh). Solar generation increased mainly in Chile (+1,386 million kWh), the United States (+1,047 million kWh), and Spain (+882 million kWh).

The most significant changes in wind generation were seen in Brazil (+1,052 million kWh), in the United States (+1,074 million kWh), in Spain (+683 million kWh), and in Canada (+371 million kWh), partly offset by lower generation in South Africa (-529 million kWh) due to the deconsolidation of certain companies, in India (-208 million kWh), and in Peru (-136 million kWh).

Net efficient installed capacity

MW
2023 2022 Change
Hydroelectric 28,340 28,355 (15) -0.1%
Geothermal 931 931 - -
Wind 15,853 15,735 118 0.7%
Solar 10,407 8,534 1,873 21.9%
Other sources 6 6 - -
Total net efficient installed capacity 55,537 53,561 1,976 3.7%
- of which Italy 14,885 14,683 202 1.4%
- of which Iberia 9,899 9,293 606 6.5%
- of which Rest of the World 30,753 29,585 1,168 3.9%
- of which Latin America 19,684 17,827 1,857 10.4%
- of which Europe 4 1,020 (1,016) -
- of which North America 10,335 9,532 803 8.4%
- of which Africa, Asia and Oceania 729 1,206 (477) -39.6%

The increase of 1.98 GW in net efficient installed capacity was affected by the additional renewables capacity (+4.03 GW), mainly in Latin America (+2.3 GW), North America (+0.8 GW) and Spain (+0.6 GW), partially offset by the effects of plant sales, due to mergers and acquisitions in Romania, Greece, Australia, Chile and India.

Performance

Millions of euro
2023 2022 Change
Revenue 11,620 9,167 2,453 26.8%
Gross operating profit/(loss) 5,178 3,477 1,701 48.9%
Ordinary gross operating profit/(loss) 5,568 3,779 1,789 47.3%
Operating profit/(loss) 2,042 1,970 72 3.7%
Ordinary operating profit/(loss) 3,815 2,230 1,585 71.1%
Capital expenditure 5,345(1) 6,386(2) (1,041) -16.3%

(1) The figure does not include €565 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €42 million regarding units classified as held for sale or discontinued operations.

The following tables show a breakdown of performance by geographical area in 2023.

Revenue

2023
2022
Change
Italy
3,248
2,149
1,099
51.1%
Iberia
1,217
935
282
30.2%
Rest of the World
7,127
6,095
1,032
16.9%
Latin America
5,109
4,164
945
22.7%
- of which Argentina
28
35
(7)
-20.0%
- of which Brazil
846
739
107
14.5%
- of which Chile
2,570
2,076
494
23.8%
- of which Colombia
1,108
822
286
34.8%
- of which Peru
258
201
57
28.4%
- of which Panama
201
178
23
12.9%
- of which other countries
98
113
(15)
-13.3%
North America
1,612
1,702
(90)
-5.3%
- of which United States and Canada
1,379
1,424
(45)
-3.2%
- of which Mexico
233
282
(49)
-17.4%
- area eliminations
-
(4)
4
-
Europe
161
40
121
-
- of which Romania
-
28
(28)
-
- of which Russia
-
11
(11)
-
- of which Greece
160
-
160
-
- of which other countries
1
1
-
-
Africa, Asia and Oceania
255
196
59
30.1%
Rest of the World eliminations
(10)
(7)
(3)
-42.9%
Other
299
288
11
3.8%
Eliminations and adjustments
(271)
(300)
29
9.7%
Total
11,620
9,167
2,453
26.8%
Millions of euro

The increase in revenue is mainly attributable to the greater volumes of hydroelectric generation, above all in Italy and Colombia, in addition to the greater quantities of solar generation by plants that came into operation during the year, mainly in Latin America.

€195 million) and, in the context of transactions conducted under the Stewardship business model, the disposals of net assets in Australia (€103 million, of which €24 million in capital gain and €79 million for the remeasurement at fair value) and in Greece (solely for the remeasurement at fair value in the amount of €160 million).

In 2023, the Group also recognized gains totaling €458 million on the sale of certain plants in Chile (Arcadia project for

Ordinary gross operating profit/(loss)

Millions of euro
2023 2022 Change
Italy 555 (562) 1,117 -
Iberia 826 631 195 30.9%
Rest of the World 4,213 3,697 516 14.0%
Latin America 2,623 2,372 251 10.6%
- of which Argentina 19 21 (2) -9.5%
- of which Brazil 549 506 43 8.5%
- of which Chile 983 798 185 23.2%
- of which Colombia 743 674 69 10.2%
- of which Peru 224 203 21 10.3%
- of which Panama 70 102 (32) -31.4%
- of which other countries 35 68 (33) -48.5%
North America 789 988 (199) -20.1%
- of which United States and Canada 749 907 (158) -17.4%
- of which Mexico 40 81 (41) -50.6%
Europe 659 244 415 -
- of which Romania 156 140 16 11.4%
- of which Russia - 18 (18) -
- of which Greece 504 88 416 -
- of which other countries (1) (2) 1 50.0%
Africa, Asia and Oceania 142 93 49 52.7%
Other (26) 13 (39) -
Total 5,568 3,779 1,789 47.3%

The increase in ordinary gross operating profit in 2023, which also includes an increase in gross operating profit compared with 2022 (€259 million), the result of assets classified as discontinued operations in Greece and Romania, is essentially attributable to the increase in renewable energy, particularly hydroelectric generation in Italy, as well as the normalization of margins compared with 2022, a year that was characterized by significant price instability.

We should also note the recognition of a total gain of €525 million due to the partial sales with loss of control of the assets in Australia (€103 million) and the gain on the sale of discontinued operations relating to the assets in Greece (€422 million, including a capital gain of €262 million and the remeasurement at fair value of €160 million).

These increases were partly offset in Italy by the greater impact of the clawback (€357 million).

The gross operating profit of €5,178 million (€3,477 million at December 31, 2022) increased by €1,701 million and includes the factors described in relation to ordinary gross operating profit, with the exception of €262 million relating to the capital gain on the sale in Greece of assets classified as discontinued operations. In addition, 2023 included recognition of gains on the sale of certain plants in Chile (€195 million), a loss on the sale of the El Chocón generator sets in Argentina (€14 million), and the charges related to the disposal of certain assets in the United States in the amount of €60 million. In 2022, gross operating margin included charges related to the disposal of assets in Chile (€51 million).

Ordinary operating profit/(loss)

Millions of euro
2023 2022 Change
Italy 200 (874) 1,074 -
Iberia 519 373 146 39.1%
Rest of the World 3,171 2,744 427 15.6%
Latin America 2,145 1,942 203 10.5%
- of which Argentina 16 14 2 14.3%
- of which Brazil 394 378 16 4.2%
- of which Chile 783 625 158 25.3%
- of which Colombia 693 625 68 10.9%
- of which Peru 190 168 22 13.1%
- of which Panama 52 83 (31) -37.3%
- of which other countries 17 49 (32) -65.3%
North America 322 594 (272) -45.8%
- of which United States and Canada 308 541 (233) -43.1%
- of which Mexico 14 53 (39) -73.6%
Europe 601 190 411 -
- of which Romania 135 123 12 9.8%
- of which Russia (2) 14 (16) -
- of which Greece 469 55 414 -
- of which other countries (1) (2) 1 50.0%
Africa, Asia and Oceania 103 18 85 -
Other (75) (13) (62) -
Total 3,815 2,230 1,585 71.1%

Ordinary operating profit for 2023, up by €1,585 million from 2022, reflects the improvement in operating performance, partly offset by the increase in depreciation, amortization and impairment losses of €204 million, mainly relating to the entry into service of new plants during the year.

Operating profit for 2023 came to €2,042 million, up €72 million (€1,970 million in 2022). The improvement in operating performance was partially offset by the different levels of impairment losses in the two years compared. More specifically, in 2023, operating profit includes impairment losses on certain US assets (€1,268 million) recognized to take account of a deterioration in the outlook of certain reference markets that gradually emerged throughout

2023, accompanied by a deterioration in the general macroeconomic environment, as well as the launch and implementation by management of specific restructuring plans in the country. An impairment loss was also recognized for the Windpeshi project in Colombia (€171 million), as it was classified as held for sale.

Capital expenditure

Millions of euro
2023 2022 Change
1,645 821 824 -
782 833 (51) -6.1%
2,899 4,714 (1,815) -38.5%
1,866 2,106 (240) -11.4%
1,023 2,408 (1,385) -57.5%
- 51 (51) -
10 149 (139) -93.3%
19 18 1 5.6%
5,345(1) 6,386(2) (1,041) -16.3%

(1) The figure does not include €565 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €42 million regarding units classified as held for sale or discontinued operations.

Capital expenditure decreased by €1,041 million in 2023 compared with the same figure for the previous year. Specifically, this change is attributable to:

  • decreased capital expenditure in the Rest of the World, and specifically:
    • lower capital expenditure in solar and wind farms in the United States and Canada;
    • a €240 million decrease in capital expenditure in Latin America, mainly in solar plants in Chile and Peru

and in wind farms in Peru and Colombia, partly offset by greater capital expenditure in Brazil;

  • decreased capital expenditure in Africa, Asia and Oceania, mainly related to the lower capital expenditure in solar plants in India and wind and solar plants in Australia;
  • lower capital expenditure in wind farms in Iberia;
  • greater capital expenditure in Italy, mainly in battery energy storage systems.

End users with active smart meters (no.) 45,172,959 45,824,963 (652,004) -1.4%

(1) The figure for 2022 has been restated.

In 2023, electricity transported on the grid decreased (by 3.6%), mainly attributable to:

  • Europe (-19%) for the sale in October 2023 of all the investments held by the Enel Group in Romania;
  • Brazil and Chile for, respectively, the sale in December 2022 of Celg Distribuição SA - Celg-D (Enel Goiás) and of Enel Transmisión Chile SA;
  • Italy (-2.9%), due to a decrease in demand for electricity.

Average frequency of interruptions per customer

2023 2022 Change
SAIFI (average no.)
Italy 1.7 1.6 0.1 6.2%
Iberia 1.2 1.3 (0.1) -7.7%
Argentina 7.9 5.3 2.6 49.1%
Brazil 3.7 4.5 (0.8) -17.8%
Chile 1.2 1.6 (0.4) -25.0%
Colombia 4.6 3.9 0.7 17.9%
Peru 2.7 2.9 (0.2) -6.9%
Romania(1) 2.1 2.6 (0.5) -19.2%

(1) The figure for 2022 has been restated.

Average duration of interruptions by customer

2023 2022 Change
SAIDI (average minutes)
Italy(1) 45.6 41.8 3.8 9.1%
Iberia(1) 63.0 64.3 (1.3) -2.0%
Argentina 1,169.2 892.0 277.2 31.1%
Brazil 465.3 547.3 (82.0) -15.0%
Chile(1) 121.4 158.6 (37.2) -23.5%
Colombia 352.6 320.0 32.6 10.2%
Peru(1) 635.5 610.3 25.2 4.1%
Romania(1) 71.3 90.4 (19.1) -21.1%

(1) The figure for 2022 has been restated.

As shown in the tables above, service quality level improved above all in Chile and Brazil and significant worsened in Argentina due to adverse weather events in 2023.

Grid losses

2023 2022 Change
Grid losses (average %)
Italy 4.7 4.7 - -
Iberia 6.8 7.0 (0.2) -2.9%
Argentina 16.8 17.1 (0.3) 1.8%
Brazil 13.1 13.5 (0.4) -3.0%
Chile 5.3 5.1 0.2 3.9%
Colombia 7.5 7.5 - -
Peru 8.7 8.2 0.5 6.1%
Romania 8.3 8.5 (0.2) -2.4%

Performance

Millions of euro
2023 2022 Change
Revenue 20,259 23,032 (2,773) -12.0%
Gross operating profit/(loss) 7,461 9,114 (1,653) -18.1%
Ordinary gross operating profit/(loss) 7,851 8,276 (425) -5.1%
Operating profit/(loss) 4,426 5,332 (906) -17.0%
Ordinary operating profit/(loss) 4,743 5,254 (511) -9.7%
Capital expenditure 5,280(1) 5,547(2) (267) -4.8%

(1) The figure does not include €233 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €110 million regarding units classified as held for sale or discontinued operations.

The following tables show a breakdown of performance by geographical area in 2023.

Revenue

Millions of euro

2023 2022 Change
Italy 7,610 6,963 647 9.3%
Iberia 2,379 2,258 121 5.4%
Rest of the World 10,228 12,948 (2,720) -21.0%
Latin America 10,227 12,956 (2,729) -21.1%
- of which Argentina 560 1,000 (440) -44.0%
- of which Brazil 6,321 7,762 (1,441) -18.6%
- of which Chile 1,590 2,562 (972) -37.9%
- of which Colombia 823 753 70 9.3%
- of which Peru 933 879 54 6.1%
Europe 1 (8) 9 -
Other 402 1,273 (871) -68.4%
Eliminations and adjustments (360) (410) 50 12.2%
Total 20,259 23,032 (2,773) -12.0%

The decrease in revenue is mainly attributable to Brazil and Chile due to the changes in the consolidation scope relating, respectively, to the sales of Celg Distribuição SA - Celg-D (Enel Goiás) and Enel Transmisión Chile SA which took place in December 2022, and above all to the recognition in 2022 of the gain on the sale of Enel Transmisión Chile SA (€1,051 million). These negative effects were only partially offset by the increase in revenue due to rate adjustments, especially in Italy and Brazil, in addition to the increase in Spain in relation to the charges recognized in 2022 for rate adjustments for the years 2017 to 2019.

Ordinary gross operating profit/(loss)

Millions of euro
2023 2022 Change
Italy 3,589 3,707 (118) -3.2%
Iberia 1,668 1,621 47 2.9%
Rest of the World 2,598 2,384 214 9.0%
Latin America 2,284 2,445 (161) -6.6%
- of which Argentina (54) 88 (142) -
- of which Brazil 1,496 1,489 7 0.5%
- of which Chile 102 168 (66) -39.3%
- of which Colombia 517 487 30 6.2%
- of which Peru 223 213 10 4.7%
Europe 314 (61) 375 -
Other (4) 564 (568) -
Total 7,851 8,276 (425) -5.1%

Ordinary gross operating profit, which takes account of the increase in the result on assets classified as discontinued operations (€362 million), decreased by €425 million. This change is mainly attributable to the recognition in 2022 of the gain on the sale of 50% of the stake held by Enel Grids in Gridspertise (€520 million), to changes in the consolidation scope (a total of €250 million) mainly due to the sales of Enel Transmisión Chile and Celg Distribuição SA - Celg-D (Enel Goiás), to the increase in service quality indemnities (€118 million), and to the increased costs for plant maintenance following adverse weather events in Italy (€61 million). These effects were partially offset by the rate adjustments recognized in Brazil, Italy and Romania.

Gross operating profit came to €7,461 million, a decrease of €1,653 million from the €9,114 million posted in 2022. This change is essentially attributable to the net gains (€1,359 million) recognized in 2022 on the sales of Gridspertise, Enel Transmisión Chile and Celg Distribuição SA - Celg-D (Enel Goiás), as well as to the negative impacts of the related changes in the consolidation scope (€250 million), the increased costs for service quality indemnities (€118 million), and the higher maintenance costs in response to hazardous weather events in Italy (€61 million). These impacts were only partially offset by the rate adjustments recorded in Brazil and Italy.

Ordinary operating profit/(loss)

Millions of euro
2023 2022 Change
Italy 2,139 2,357 (218) -9.2%
Iberia 872 815 57 7.0%
Rest of the World 1,738 1,528 210 13.7%
Latin America 1,496 1,671 (175) -10.5%
- of which Argentina (109) 52 (161) -
- of which Brazil 980 975 5 0.5%
- of which Chile 51 109 (58) -53.2%
- of which Colombia 424 391 33 8.4%
- of which Peru 150 144 6 4.2%
Europe 242 (143) 385 -
Other (6) 554 (560) -
Total 4,743 5,254 (511) -9.7%

The decrease of €511 million in ordinary operating profit for 2023 essentially reflects the factors described in relation to ordinary gross operating profit, as well as the greater depreciation due to the new capital expenditure made in Italy on distribution grids.

Operating profit amounted to €4,426 million in 2023, a decrease of €906 million on 2022 (€5,332 million). This change is attributable to the effects noted above in relation to gross operating profit, as well as to the increased depreciation and amortization in Italy, which were partially offset by the recognition in 2022 of the impairment on the assets of Celg Distribuição SA - Celg-D (Enel Goiás) in the amount of €827 million.

Capital expenditure

Millions of euro
2023 2022 Change
Italy 3,084 2,714 370 13.6%
Iberia 885 860 25 2.9%
Rest of the World 1,287 1,949 (662) -34.0%
Latin America 1,287 1,809 (522) -28.9%
Europe - 140 (140) -
Other 24 24 - -
Total 5,280(1) 5,547(2) (267) -4.8%

(1) The figure does not include €233 million regarding units classified as held for sale or discontinued operations.

(2) The figure does not include €110 million regarding units classified as held for sale or discontinued operations.

Capital expenditure in the two years being compared decreased by €267 million, mainly attributable to Latin America, and in particular to Brazil due to the sale of Celg Distribuição SA - Celg-D (Enel Goiás) in December 2022. This reduction was partially offset in Italy by the increase in the activation of new customers and by the improvement in service quality.

- of which Iberia 77,689 79,003 (1,314) -1.7% - of which Rest of the World 135,926 144,910 (8,984) -6.2% - of which Latin America 129,177 135,094 (5,917) -4.4% - of which Europe 6,749 9,816 (3,067) -31.2%

The lower volumes of electricity sold in 2023 are mainly concentrated on the regulated market in Brazil (-9.7 TWh) due to the sale of Celg Distribuição SA - Celg-D (Enel Goiás) at the end of 2022 and in Italy (-6.8 TWh) for the transition of customers to the free market, due in part to the pending elimination of the enhanced protection market, set for June 2024 as per Resolution no. 600/2023. With regard to the performance of the free market, there was a decrease in volumes mainly in Italy (-3.1 TWh) and in Spain (-0.6 TWh), partially offset by the increase seen in

Brazil (+2.2 TWh) and Chile (+0.6 TWh).

Natural gas sales

2023
2022
Change
Business to consumer
3,502
3,910
(408)
-10.4%
Business to business
4,822
6,333
(1,511)
-23.9%
Total
8,324
10,243
(1,919)
-18.7%
- of which Italy
4,149
4,726
(577)
-12.2%
- of which Iberia
3,802
4,909
(1,107)
-22.6%
- of which Rest of the World
373
608
(235)
-38.7%
- of which Latin America
185
342
(157)
-45.9%
Millions of m3
- of which Europe
188
266
(78)
-29.3%

The decrease in the volume of gas sold in 2023 mainly came in Italy and Spain. Both business-to-business (B2B) and business-to-consumer (B2C) customer segments showed lower sales volumes compared with 2022.

Demand response, storage and lighting points

2023 2022 Change
Demand response capacity (MW) 9,588 8,476 1,112 13.1%
Lighting points (thousands) 3,259 3,023 236 7.8%
Storage (MW) 1,730 760 970 -
Public charging points (no.)(1) 24,281 22,112 2,169 9.8%

(1) It should be noted that the figures shown, if they also included the charging points of joint ventures, would amount to 25,337 at December 31, 2023, and 22,617 at December 31, 2022.

Demand response capacity increased mainly in Japan (+494 MW), North America (+273 MW), and Italy (+256 MW). Lighting points, which concern the implementation of intelligent and energy-saving public lighting, increased mainly in Italy, Spain, Brazil and Chile, while storage increased above all in North America, essentially due to the installation of new batteries at renewable energy plants.

Performance(1)

Millions of euro
2023 2022 Change
Revenue 52,119 64,350 (12,231) -19.0%
Gross operating profit/(loss) 5,158 1,802 3,356 -
Ordinary gross operating profit/(loss) 5,275 1,702 3,573 -
Operating profit/(loss) 3,042 (93) 3,135 -
Ordinary operating profit/(loss) 3,241 (210) 3,451 -
Capital expenditure 1,138(2) 1,205(3) (67) -5.6%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

(2) The figure does not include €34 million regarding units classified as held for sale or discontinued operations.

(3) The figure does not include €2 million regarding units classified as held for sale or discontinued operations.

The following tables show a breakdown of performance by geographical area in 2023.

Revenue(1)

Millions of euro
2023 2022 Change
Italy 28,717 33,351 (4,634) -13.9%
Iberia 20,747 28,114 (7,367) -26.2%
Rest of the World 2,644 2,522 122 4.8%
Latin America 2,157 2,071 86 4.2%
- of which Argentina 5 13 (8) -61.5%
- of which Brazil 545 543 2 0.4%
- of which Chile 197 192 5 2.6%
- of which Colombia 1,040 1,002 38 3.8%
- of which Peru 370 321 49 15.3%
- of which other countries - - - -
North America 331 312 19 6.1%
Europe 76 89 (13) -14.6%
Africa, Asia and Oceania 84 70 14 20.0%
Rest of the World eliminations (4) (20) 16 80.0%
Other 212 553 (341) -61.7%
Eliminations and adjustments (201) (190) (11) -5.8%
Total 52,119 64,350 (12,231) -19.0%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Revenue for 2023 decreased by 19.0% from the previous year, mainly due to a decline in revenue from electricity sales (down €8,786 million) and gas sales (down €3,188 million) as a result of both the lower quantities of electricity and gas sold and the decreasing average sales prices, mainly in Italy and Spain. The decrease in other revenue was due to the recognition, in 2022, of the gains on the sale of the 1.1% investment in Ufinet by Enel X International (€220 million) and on the sale of certain assets by Enel Srl to Mooney (€67 million). Revenue from the sale of electricity in Latin America increased, mainly in Colombia and Peru.

Ordinary gross operating profit/(loss)(1)

Millions of euro
2023 2022 Change
Italy 4,039 531 3,508 -
Iberia 780 417 363 87.1%
Rest of the World 460 445 15 3.4%
Latin America 424 560 (136) -24.3%
- of which Argentina 5 35 (30) -85.7%
- of which Brazil 220 237 (17) -7.2%
- of which Chile 75 83 (8) -9.6%
- of which Colombia 79 151 (72) -47.7%
- of which Peru 45 54 (9) -16.7%
- of which other countries - - - -
North America (11) (24) 13 54.2%
Europe 50 (81) 131 -
Africa, Asia and Oceania (3) (10) 7 70.0%
Other (4) 309 (313) -
Total 5,275 1,702 3,573 -

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Ordinary gross operating profit for 2023 increased mainly following the increase of €3,508 million in Italy and of €363 million in Spain, due to the improved performance on the free market due mainly to the reduction in procurement costs in a context of normalizing sales prices.

The increase in ordinary gross operating profit in Europe is entirely attributable to the performance of the Romanian assets classified as discontinued operations.

Performance also improved in the e-Home, e-City, and Demand Response businesses.

These positive effects were only partially offset by the decrease in profits in Latin America, in the amount of €136 million, particularly in Colombia in the Retail segment and for the e-Bus project, as well as for the aforementioned gains recognized in 2022 on the sale of the investment in Ufinet (€220 million) and of certain other investments to Mooney (€67 million).

Gross operating profit came to €5,158 million (€1,802 million in 2022). The increase of €3,356 million reflects the improved performance on the free market, mainly due to the reduction in procurement costs in a context of normalizing sales prices.

These effects do not take into account the results of discontinued operations and the charges related to the energy transition and digitalization relating to the adjustment of the fund Acuerdo Voluntario de Salida (AVS) in Spain.

Ordinary operating profit/(loss)(1)

Millions of euro
2023 2022 Change
Italy 2,987 (633) 3,620 -
Iberia 268 84 184 -
Rest of the World 74 76 (2) -2.6%
Latin America 132 279 (147) -52.7%
- of which Argentina (5) 19 (24) -
- of which Brazil 10 44 (34) -77.3%
- of which Chile 57 59 (2) -3.4%
- of which Colombia 44 115 (71) -61.7%
- of which Peru 26 42 (16) -38.1%
- of which other countries - - - -
North America (53) (77) 24 31.2%
Europe 4 (111) 115 -
Africa, Asia and Oceania (9) (15) 6 40.0%
Other (88) 263 (351) -
Total 3,241 (210) 3,451 -

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

The change in the ordinary operating profit reflects the factors noted above in relation to ordinary gross operating profit, in addition to the greater depreciation, amortization and impairment losses in the amount of €122 million, mainly attributable to the amortization and the greater write-downs of trade receivables in the amount of €89 million, mainly in Spain and Brazil.

Operating profit for 2023, in the amount of €3,042 million (a loss of €93 million in 2022), reflects the factors noted above in relation to gross operating profit, as well as the greater depreciation, amortization and impairment losses of €221 million. This change also includes the impairment losses recognized in the United States in 2023 by Enel X Way in the amount of €69 million and by Enel X in the amount of €57 million, due above all to the deterioration in the macroeconomic environment.

Capital expenditure(1)

Millions of euro
2023 2022 Change
Italy 566 582 (16) -2.7%
Iberia 311 324 (13) -4.0%
Rest of the World 164 190 (26) -13.7%
Latin America 84 80 4 5.0%
North America 69 76 (7) -9.2%
Europe 2 19 (17) -89.5%
Africa, Asia and Oceania 9 15 (6) -40.0%
Other 97 109 (12) -11.0%
Total 1,138(2) 1,205(3) (67) -5.6%

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

(2) The figure does not include €34 million regarding units classified as held for sale or discontinued operations.

(3) The figure does not include €2 million regarding units classified as held for sale or discontinued operations.

The decrease in capital expenditure in Italy and Spain is essentially attributable to a reduction in customer acquisition efforts, only partially offset by greater capital expenditure in Italy in the e-City business and in Latin America in the Distributed Energy business.

HOLDING AND SERVICES

Performance(1)

2023 2022 Change
Revenue 2,045 2,050 (5) -0.2%
Gross operating profit/(loss) (609) (180) (429) -
Ordinary gross operating profit/(loss) (319) (168) (151) -89.9%
Operating profit/(loss) (858) (409) (449) -
Ordinary operating profit/(loss) (569) (398) (171) -43.0%
Capital expenditure 190(2) 219 (29) -13.2%

(1) The figures for 2022 have been restated to include Enel X Way in the End-user Markets Business Line, as they were previously shown among Holding, Services and Other.

(2) The figure does not include €3 million regarding units classified as held for sale or discontinued operations.

The following tables show a breakdown of performance by geographical area in 2023.

Revenue(1)

Millions of euro
2023 2022 Change
Italy 734 729 5 0.7%
Iberia 501 488 13 2.7%
Rest of the World - - - -
Latin America - (1) 1 -
North America - 1 (1) -
Europe - - - -
Other 1,028 1,041 (13) -1.2%
Eliminations and adjustments (218) (208) (10) -4.8%
Total 2,045 2,050 (5) -0.2%

(1) The figures for 2022 have been restated to include Enel X Way in the End-user Markets Business Line, as they were previously shown among Holding, Services and Other.

Revenue for 2023 is essentially in line with 2022 and mainly refer to IT services, management fees, personal services, vehicle management, contract work, rental fees and other services provided to the other business lines.

Ordinary gross operating profit/(loss)(1)

Millions of euro
2023 2022 Change
Italy 56 89 (33) -37.1%
Iberia 39 (5) 44 -
Rest of the World (132) (119) (13) -10.9%
Latin America (132) (117) (15) -12.8%
- of which Argentina (5) (3) (2) -66.7%
- of which Brazil (37) (23) (14) -60.9%
- of which Chile (89) (91) 2 2.2%
- of which Peru (1) - (1) -
North America (2) (2) - -
Europe 2 - 2 -
Africa, Asia and Oceania - - - -
Other (282) (133) (149) -
Total (319) (168) (151) -89.9%

(1) The figures for 2022 have been restated to include Enel X Way in the End-user Markets Business Line, as they were previously shown among Holding, Services and Other.

The increase in the ordinary gross operating loss in 2023 is mainly attributable to the increased provisions for risks and charges set aside by Enel Insurance following requests related to adverse weather conditions.

The gross operating loss increased from 2022 as a result of the factors noted in relation to ordinary gross operating profit and the extraordinary solidarity levy and the charges for the energy transition and digitalization in Spain, of €208 million and €81 million respectively.

Ordinary operating profit/(loss)(1)

Millions of euro
2023 2022 Change
Italy (12) 20 (32) -
Iberia (5) (39) 34 87.2%
Rest of the World (143) (122) (21) -17.2%
Latin America (142) (120) (22) -18.3%
- of which Argentina (5) (3) (2) -66.7%
- of which Brazil (42) (26) (16) -61.5%
- of which Chile (93) (91) (2) -2.2%
- of which Peru (2) - (2) -
North America (2) (1) (1) -
Europe 1 (1) 2 -
Africa, Asia and Oceania - - - -
Other (409) (257) (152) -59.1%
Total (569) (398) (171) -43.0%

(1) The figures for 2022 have been restated to include Enel X Way in the End-user Markets Business Line, as they were previously shown among Holding, Services and Other.

The ordinary operating loss for 2023 is essentially in line with the increase in the ordinary gross operating loss, taking account of the €20 million increase in depreciation, amortization and impairment losses.

The operating loss for 2023 reflects the factors described in relation to the gross operating loss, as well as higher depreciation, amortization and impairment in the amount of €20 million.

Capital expenditure(1)

Millions of euro
2023 2022 Change
Italy 74 115 (41) -35.7%
Iberia 21 27 (6) -22.2%
Rest of the World 8 5 3 60.0%
Latin America 8 5 3 60.0%
North America - - - -
Europe - - - -
Other 87 72 15 20.8%
Total 190(2) 219 (29) -13.2%

(1) The figures for 2022 have been restated to include Enel X Way in the End-user Markets Business Line, as they were previously shown among Holding, Services and Other.

(2) The figure does not include €3 million regarding units classified as held for sale or discontinued operations.

The decrease in capital expenditure in 2023 in Italy is mainly attributable to reduced capital expenditure by Enel Italia SpA for the redevelopment of its headquarters in Rome.

ENEL SHARES

Enel and the financial markets

2023 2022
Gross operating profit per share (euro)(1) 1.99 1.96
Operating profit per share (euro)(1) 1.07 1.10
Group profit per share (euro)(1) 0.34 0.17
Group ordinary profit per share (euro)(1) 0.64 0.53
Dividend per share (euro) 0.430 0.40
Group equity per share (euro)(1) 3.12 2.82
Share price – 12-month high (euro) 6.73 7.20
Share price – 12-month low (euro) 5.17 4.00
Average share price in December (euro) 6.63 5.15
Market capitalization (millions of euro)(2) 67,369 52,325

(1) The number of shares considered to calculate the index is 10,166,679,946 and includes 9,262,330 treasury shares in 2023 and 7,153,795 treasury shares in 2022.

(2) Calculated on average share price in December.

at Dec. 31, 2023 at Dec. 31, 2022
Rating
Standard & Poor's Outlook STABLE NEGATIVE
Medium/long-term BBB BBB+
Short-term A-2 A-2
Moody's Outlook NEGATIVE NEGATIVE
Medium/long-term Baa1 Baa1
Short-term - -
Fitch Outlook STABLE STABLE
Medium/long-term BBB+ BBB+
Short-term F2 F2

The global macroeconomic environment in 2023 was characterized by a broad decline in the real economy. The restrictive monetary policy stances adopted by central banks to counter inflationary pressures, the deterioration in financial and credit conditions, and the decline in trade and investment at the global level caused a slowdown in global growth, with GDP estimated to have grown by around 3% on an annual basis (slightly down compared with 2022).

In this context, the main European stock indices – after a 2022 characterized by a general decline – closed 2023 on the rise: FTSE-MIB +28%, Ibex35 +22.8%, DAX +20.3% and CAC40 +16.5%.

The euro area utilities index (EURO STOXX Utilities) closed the year with a gain of +11.9%.

Finally, as regards the Enel stock, 2023 ended with a price of €6.73 per share, a sharp rise (+33.8%) on the previous year, outperforming both the Italian index and the European sectoral index.

On January 25, 2023 Enel paid an interim dividend of €0.20 per share from 2022 profits and on July 26, 2023 it paid the balance of the dividend for that year in the amount of €0.20. Total dividends distributed in 2023 amounted to €0.40 per share, more than 5% higher than the €0.38 per share distributed in 2022.

On January 24, 2024 an interim dividend of €0.215 per share was paid in respect of ordinary profit for 2023, while the balance of the dividend is scheduled for payment on July 24, 2024.

At December 31, 2023, institutional investors represented 58.6% of share capital (up from 56.7% at December 31, 2022), while the share of individual investors came to 17.8% (as against 19.7% at December 31, 2022). The interest of the Ministry for the Economy and Finance was unchanged at 23.6%.

Socially responsible investors (SRIs) expanded their interest to about 17.5% of share capital at December 31, 2023 (up from 14.9% at December 31, 2022) and represent 29.8% of institutional investors (26.2% at December 31, 2022). Investors who have signed the Principles for Responsible Investment represent 42.8% of share capital (42.1% at December 31, 2022).

For further information we invite you to visit the Investor Relations section of our corporate website (https://www. enel.com/investors/overview) and download the "Enel Investor" app, which contains both economic and financial information (annual reports, semi-annual and quarterly reports, presentations to the financial community, analyst estimates and stock market trading trends involving the shares issued by Enel and its main listed subsidiaries, ratings and outlooks assigned by rating agencies) and up-todate data and documentation of interest to shareholders and bondholders in general (price sensitive press releases, outstanding bonds, bond issue programs, composition of Enel's corporate bodies, bylaws and regulations of Shareholders' Meetings, information and documentation relating to Shareholders' Meetings, procedures and other documentation concerning corporate governance, the Code of Ethics and organizational and management arrangements).

We have also created contact centers for private investors (which can be reached by phone at +39-0683054000 or by e-mail at [email protected]) and for institutional investors (phone: +39-0683057975; e-mail: [email protected]).

PERFORMANCE OF ENEL SHARE PRICE AND THE EURO STOXX UTILITIES AND FTSE-MIB INDICES FROM JANUARY 1, 2023 TO DECEMBER 31, 2023

Source: Bloomberg.

INNOVATION

During 2023, the innovation area was given a new organizational structure that, in line with Group strategy, operates with a view to simplification and focus on the Group's priorities and promotion of an integrated, efficient and effective approach to innovation.

To address business challenges, we adopt an open innovation model, which enables us to connect all areas of the Company with startups, industrial partners, large companies, small and medium-sized enterprises (SMEs), research centers, universities and entrepreneurs – drawing in part on crowdsourcing platforms. The Group's innovation strategy exploits various tools that enable it to develop innovative and sustainable solutions, such as the online crowdsourcing platform openinnovability.com and a global network of Innovation Hubs and Labs, which forms the foundation of the collaboration model with startups and SMEs. While the latter offer innovative projects and new business models, Enel provides its expertise, facilities for the technical and financial validation of the proposed solutions in an industrial environment, and a global network of partners to support their development and possible scale-up. The Innovation Hubs, located in the most relevant innovation ecosystems for the Group, such as Europe and the United States, manage relationships with all the players involved in their respective areas and constitute the main source of scouting for startups and SMEs, responding to the innovation needs manifested by the business lines.

Collaboration with external players is thus a key element of the Group's innovation strategy. In fact, the Company has active partnership agreements which cover both the most strategic areas for the Group and those addressing major frontier issues (for example, the promotion of space applications in the energy sector, green hydrogen, and fourth generation nuclear). Through co-development with suppliers, the Group also seeks to implement innovative solutions quickly and effectively at the pre-commercial development level and leverages existing skills and the customization and transfer of solutions already adopted in other productive sectors.

In 2022, we voluntarily adopted the ISO 56002 standard

113

Proofs of Concept launched to test innovative solutions in 2023

solutions in scale-up phase in the business in 2023

for innovation management. The standard covers all aspects of innovation management, from the birth of an idea to its implementation on a global scale. During 2023, the UNI/PdR 155 practice "Management of sustainable innovation – Guidelines for the management of sustainable innovation processes in companies through open innovation" was developed in collaboration with UNI. The practice was published on the UNI website in December 2023. The document, of a pre-regulatory nature, is intended to offer practical support for any organization that wants to pursue the organizational and production changes necessary to implement an effective internal process of sustainable innovation management.

46

2023 saw the continuation of the activities of the innovation communities, multidisciplinary working groups created to innovatively address the most relevant new-technology issues for the business in order to create value for the Group (energy storage, blockchain, drones, metaverse, robotics, sensors, 3D printing, quantum computing, wearables, additive manufacturing, artificial intelligence, materials and hydrogen). The communities also continuously monitor technological improvements and share new business models, value-added services or use cases for types of technology that could be potentially implemented in different areas of the Enel Group.

During 2023, 113 Proofs of Concepts were launched to test new solutions, while 46 innovative solutions were identified by the business for large-scale implementation. Overall, €60 million (including personnel expenses) were invested in innovation.

Digitalization

In 2023, innovation activities in the field of cyber security benefited from the network of Innovation Hubs, as well as from their portfolio of startups and partnerships forged at the Group level.

These interconnections have enabled the sharing of best practices and operating models, as well as the construction and enhancement of info-sharing channels.

The main initiatives in this area are reported below:

  • analysis of solutions based on quantum key distribution(41) and quantum safe encryption algorithms(42) to improve understanding of how to go beyond current encryption models threatened by the future expansion of computational capacity offered by quantum computing;
  • services and solutions to support software development to analyze open source code and third-party software libraries from the point of view of vulnerabilities and user licenses;
  • analysis of browser isolation solutions (isolation of the browser from the network to prevent it from becoming an entry point for malicious actors) and browser security to understand the resilience of central protection techniques compared with distributed approaches;
  • further development of solutions that exploit emerging technologies such as artificial intelligence and machine learning to enhance capabilities in detecting IT threats and automating the process of analysis, correlation and response to incidents;
  • solutions for identifying vulnerabilities of assets and devices (IoT, web applications, etc.) with the help of innovative techniques;
  • review of industrial environments through the implementation of a vulnerability identification process with scripts without impacting the operating environments;
  • a study for the implementation of a multifactor authentication system for company systems, using a "passwordless" technique to replace the password with alternative secure solutions (for example, fingerprint authentication);
  • analysis and scouting of solutions for the anonymization and masking of data in non-production environments and definition of the associated policy;
  • analysis of solutions to prevent data loss to ensure compliance with protection requirements imposed by internal and external regulations;
  • study and analysis of solutions for the management of cryptographic keys and business secrets;
  • analysis of new anti-malware solutions to protect industrial environments;
  • creation of the Cyber Harbor, an innovation center that brings together cyber security experts, companies, investors and the academic world to foster the creation of innovative and competitive projects in the IT security field for Italy;
  • establishment of a communication channel with Italy's National Cybersecurity Authority (NCA) for the creation of the Hyper SOC, an infrastructure for the aggregation, correlation and analysis of events of interest to ensure the early identification of emerging threats and coordinate responses to deal with them effectively.

(41) Cryptographic technique for distributing symmetrical keys based on the principles of quantum physics.

(42) Encryption protocols based on algorithms and characteristics considered sufficiently secure against threats posed by the computational capacity of quantum computers.

The circular economy

For the Group, the circular economy is a strategic lever to support our decarbonization roadmap. It involves a steady expansion of energy production from renewable sources and the consequent abandonment of fossil fuels, offering a path towards a fair and inclusive transition. Achieving these objectives requires a profound transformation of the energy system and, at the same time, entails a different and growing need for raw materials and new approaches to managing assets, such as the distribution grid and generation plants.

The circular economy model adopted by the Group seeks to redesign the entire value chain of the goods used, not only to reduce consumption of raw materials but also to limit the associated environmental, social, economic and geopolitical impacts and risks: in other words, to make the business model more sustainable and competitive. The Group's vision encompasses all the different life phases of a product and is based on five pillars: circular inputs (inputs from renewables, recycling, reuse), extension of useful life (through modular design, facilitated repairability and maintenance predictive), product as a service (the Company provides the customer with a service and retains ownership of the product, maximizing its use factor and useful life), shared platforms (shared use of an asset among multiple users), new life cycles (recovery of the value of goods and materials, for example through reuse and recycling).

The Group's initiatives focus mainly on three of the five pillars, namely circular inputs, useful life extension and new life cycles.

With regard to circular inputs, during the tender phase suppliers of core components(43) are asked to specify the quantities of each material used in the production processes, indicating the share of recycled and recyclable material to support assessments in the selection phase. One example of the reduction in the use of input resources is the 3SUN Gigafactory project in Catania, which is intended to ensure greater independence for the photovoltaic supply chain, not only by bringing the production of cells and panels onto European soil, but also by using innovation to reduce the intensity of silicon use and building a diversified and sustainable supply chain. In 2023 3SUN worked on the development of the new production site and, from 2024, a new type of high-efficiency panel with HJT technology will optimize the quantity of silicon used, using layers of the material with a 15% smaller thickness.

With regard to extending useful life, in addition to using predictive repair and maintenance in the global management of power distribution and generation assets, the Group is also working on innovative solutions. For example, the Pioneer project in Italy involves Enel collaborating with ADR - Aeroporti di Roma on the development of a storage system that reuses end-of-life batteries from electric vehicles. During 2023, the detailed design of the plant was completed: with a storage capacity of 10 MWh, it involves the reuse of 786 second-life batteries.

With regard to the new life cycle pillar, initiatives are also under way in all the countries in which the Group operates to ensure the systematic reuse, both internally and through sale, of obsolete or unused generation equipment that still retains a useful residual life, or the recycling of materials recovered from maintenance activities on the distribution grid. Specifically, the Equipment New Life Program, which is active around the world for all generation technologies, seeks to give new life to components held in power plant inventories, to the equipment of decommissioned power plants and to plants undergoing repowering. In 2023, the project generated approximately €23 million in economic value, of which approximately €13.8 million in the form of costs avoided through the internal reuse of spare parts and equipment in all plants and €9.2 million from sales.

In order to identify areas requiring attention and related priorities concerning materials, and to consequently update the portfolio of projects and initiatives, an internal working group has been operating since 2020 with the participation of all the relevant areas of the Group. The working group's activities begin with a systematic analysis of raw material requirements for generation and distribution assets, solutions for customers and digital assets. Environmental, social, economic and geopolitical impacts and risks are then assessed, mainly with respect to the extraction and production phases of raw materials. Intervention priorities are then identified and a mitigation plan is developed, leveraging circular economy projects that reduce the consumption of raw materials, particularly critical materials.

(43) The core categories are those strategic for the business, including wind turbines, inverters, smart meters, photovoltaics, switches, panels, cables, transformers, charging stations, street lighting, smart home solutions and storage systems.

PEOPLE CENTRICITY

People management and development at Enel

The Enel Group workforce at December 31, 2023 numbered 61,055 (65,124 at December 31, 2022). The contraction of 4,069 in the Group workforce in 2023 reflects negative balance between new hires and terminations during the period (-201) plus the negative impact of the change in the consolidation scope (-3,868), which included:

  • the sale of Enel Generación Costanera SA in Argentina;
  • the sale of Central Dock Sud SA in Argentina;
  • the sale of Usme ZE SAS and Fontibón ZE SAS in Colombia;
  • the sale of Avikiran Solar India Private Limited in India;
  • the sale of Enel Green Power Australia in Australia;
  • the sale of all companies in Romania;
  • the sale of Enel Green Power Hellas and all companies in Greece.

The following tables analyze the number and variation in employees by gender, age group, job classification and geographical area. An analysis by business line is also provided for the number of employees only.

Year-end workforce

2023 2022 Change
Employees by gender: no. 61,055 65,124 (4,069) -6.2%
- of which men no. 47,202 49,899 (2,697) -5.4%
% 77.3 76.6 0.7 0.9%
- of which women no. 13,853 15,225 (1,372) -9.0%
% 22.7 23.4 -0.7 -3.0%
Employees by age group: no. 61,055 65,124 (4,069) -6.2%
- <30 no. 7,661 8,543 (882) -10.3%
% 12.5 13.1 -0.6 -4.6%
- 30-50 no. 35,111 36,795 (1,684) -4.6%
% 57.6 56.5 1.1 1.9%
- >50 no. 18,283 19,786 (1,503) -7.6%
% 29.9 30.4 -0.5 -1.6%
Employees by level: no. 61,055 65,124 (4,069) -6.2%
- senior manager % 2.1 2.1 - -
- middle manager % 20.3 19.4 0.9 4.6%
- office staff % 51.3 53.2 -1.9 -3.6%
- blue collar % 26.3 25.3 1.0 4.0%
Employees by geographical area: no. 61,055 65,124 (4,069) -6.2%
- Italy no. 31,470 31,664 (194) -0.6%
% 51.5 48.6 2.9 6.0%
- Iberia no. 9,504 9,643 (139) -1.4%
% 15.6 14.8 0.8 5.4%
- Rest of the World no. 20,081 17,361 110 0.6%
% 28.6 26.7 1.9 7.1%
- Latin America no. 17,471 17,361 110 0.6%
% 28.6 26.7 1.9 7.1%
- Europe no. 139 3,532 (3,393) -96.1%
% 0.2 5.4 -5.2 -96.3%
- North America no. 1,747 2,100 (353) -16.8%
% 2.9 3.2 -0.3 -9.4%
- Africa, Asia and Oceania no. 724 824 (100) -12.1%
% 1.2 1.3 -0.1 -7.7%

Workforce by business line

No.
at Dec. 31,
2023
at Dec. 31,
2022
Percentage of total
continuing operations
at Dec. 31, 2023
Percentage of total
continuing operations
at Dec. 31, 2022
Thermal Generation and Trading 5,725 6,447 9.3% 10.4%
Enel Green Power 8,891 9,397 14.6% 15.2%
Enel Grids 30,946 30,262 50.7% 49.0%
End-user Markets 8,926 8,293 14.6% 13.5%
Holding and Services 6,567 7,325 10.8% 11.9%
Total continuing operations 61,055 61,724 100.0% 100.0%
Total discontinued operations - 3,400
TOTAL 61,055 65,124

Change in workforce

Balance at December 31, 2022 65,124
Hirings 3,837
Terminations (4,038)
Change in the consolidation scope (3,868)
Balance at December 31, 2023 61,055

Breakdown of changes in workforce

2023 2022 Change
Hiring rate % 6.3 9.8 -3.5 -35.7%
New hires by gender: no. 3,837 6,412 (2,575) -40.2%
- of which men no. 3,153 4,356 (1,203) -27.6%
% 82.2 67.9 14.3 21.1%
- of which women no. 684 2,056 (1,372) -66.7%
% 17.8 32.1 -14.3 -44.5%
New hires by age group: no. 3,837 6,412 (2,575) -40.2%
- <30 no. 1,627 3,359 (1,732) -51.6%
% 42.4 52.4 -10.0 -19.1%
- 30-50 no. 2,054 2,905 (851) -29.3%
% 53.5 45.3 8.2 18.1%
- >50 no. 156 148 8 5.4%
% 4.1 2.3 1.8 78.3%
New hires by geographical area: no. 3,837 6,412 (2,575) -40.2%
- Italy no. 1,036 2,866 (1,830) -63.9%
% 27.0 44.7 -17.7 -39.6%
- Iberia no. 395 741 (346) -46.7%
% 10.3 11.6 -1.3 -11.2%
- Rest of the World no. 2,406 2,805 (399) -14.2%
% 62.7 43.7 19.0 43.5%
- Latin America no. 1,921 1,542 379 24.6%
% 50.1 24.0 26.1 -
- Europe no. 104 443 (339) -76.5%
% 2.7 6.9 -4.2 -60.9%
- North America no. 253 614 (361) -58.8%
% 6.6 9.6 -3.0 -31.3%
- Africa, Asia and Oceania no. 128 206 (78) -37.9%
% 3.3 3.2 0.1 3.1%

2023 2022 Change
Turnover rate % 6.6 6.8 -0.2 -2.9%
Terminations by gender: no. 4,038 4,414 (376) -8.5%
- of which men no. 3,093 3,391 (298) -8.8%
% 76.6 76.8 -0.2 -0.3%
- of which women no. 945 1,023 (78) -7.6%
% 23.4 23.2 0.2 0.9%
Terminations by age group: no. 4,038 4,414 (376) -8.5%
- <30 no. 497 655 (158) -24.1%
% 12.3 14.8 -2.5 -16.9%
- 30-50 no. 1,804 1,759 45 2.6%
% 44.7 39.9 4.8 12.0%
- >50 no. 1,737 2,000 (263) -13.2%
% 43.0 45.3 -2.3 -5.1%
Terminations by geographical area: no. 4,038 4,414 (376) -8.5%
- Italy no. 1,230 1,224 6 0.5%
% 30.5 27.7 2.8 10.1%
- Iberia no. 534 578 (44) -7.6%
% 13.2 13.1 0.1 0.8%
- Rest of the World no. 2,724 2,612 (338) -12.9%
% 56.3 59.2 -2.9 -4.9%
- Latin America no. 1,348 1,534 (186) -12.1%
% 33.4 34.8 -1.4 -4.0%
- Europe no. 174 454 (280) -61.7%
% 4.3 10.3 -6.0 -58.3%
- North America no. 606 428 178 41.6%
% 15.0 9.7 5.3 54.6%
- Africa, Asia and Oceania no. 146 196 (50) -25.5%
% 3.6 4.4 -0.8 -18.2%

Training and development

The rapid, ongoing evolution of our business and the support of our strategy in a rapidly changing global environment have resulted in a need for new technical and professional skills. For this reason, ongoing employee training and strategies of upskilling (training and empowerment programs to improve performance within a given role) and reskilling (learning new skills and capabilities that enable people to fill new positions) are of increasing importance. In 2023, in support of these strategies, we provided a total of about 3.1 million hours of training, an average of about 48 hours per employee, exceeding the target of an average of 45.5 hours per employee. Of these, 44.8% were dedicated to up/reskilling, an increase on the previous year (42% in 2022). Total training costs came to about €27 million in 2023.

This was made possible by the upgrading of digital tools and the E-Ducation platform, which gives broad access, including remotely, to training content concerning conduct, technical issues, safety and reskilling, working in cooperation with academic partners.

EP
1 Enel Group 3 Group Strategy & Risk Management

Average training hours per employee

2023 2022 Change
Average number of training hours hrs/person
48.1
47.4 0.7 1.5%
Average number of training hours by level:
- senior manager hrs/person
34.0
44.1 (10.1) -22.9%
- middle manager hrs/person
42.9
47.4 (4.5) -9.5%
- office staff hrs/person
40.3
43.0 (2.7) -6.3%
- blue collar hrs/person
69.3
57.1 12.2 21.4%
Average number of training hours by gender:
- men hrs/person
50.7
48.3 2.4 5.0%
- women hrs/person
39.7
44.3 (4.6) -10.4%

In 2023, with regard to the development and assessment of Enel's people, we continued with the Open Feedback Evaluation (OFE) program, a mechanism for the constant, 360° collection of feedback from all employees, thereby creating an ongoing dialogue within the organization. The process is conducted on a half-yearly cycle and assesses "Generosity", meaning a propensity for interacting with others; and "Action", i.e. the ability to achieve professional objectives, as assessed by superiors.

With a view to fostering and developing the individual, 2023 say an increase in the use of tools such as job shadowing, mentoring and coaching.

Listening and enhancing wellness

In 2023, listening activities were carried out through the first Global Inclusive Survey exploring people's general perception of inclusion in the working environment at all organizational levels. 48% of eligible people responded (over 61,000). The findings of the survey underscore the good level of perceived general inclusion of people: the average respondent assessment of this aspect was equal to 4.5 out of 6, and 87% of people had either a positive or very positive evaluation.

Since 2021, Enel has developed a global Well-being model using a co-creation approach based on eight pillars: emotional, physical, social, ethical, financial and cultural well-being, a sense of protection and work-life harmony. Following the analysis of the results of the Well-being & Motivation survey, which was launched in 2022 in order to gain an understanding of the evolution of organizational well-being and to refine initiatives designed to improve it, meetings were held to share the findings, using webinars coordinated by management in the various countries. At the global level, projects were developed in 2023 to enhance the well-being of people, teams and managers in the organization. The general well-being index measured by the survey in 2022 was 60% globally. This represents the During 2023, the annual process of managing Succession Plans for management positions saw an increase in the percentage of female successors (47.2%). Together with other confirmed selection criteria for the identification of successors, gender criteria take account of the commitments made by the Enel Group regarding diversity and inclusion, further enhancing these aspects.

Succession planning has also been extended to key non-management positions, involving new position holders (heads of organizational positions). This expansion enabled the identification of new successors, both ready and in the pipeline (with consideration of gender issues), for whom an ad hoc development and training program has been developed.

percentage of respondents who are quite or very satisfied with their general well-being (personal and working life). Last year was the first year of full operation of the Global Well-being Program, which is intended to increase the awareness of all people on their level of well-being by engaging them through self-assessment tests, webinars, newsletters and other dedicated activities. The program is associated with an incentive mechanism that rewards the virtuous behavior of those who participate in the program every six months. During 2023, over 26,000 employees (43% of Enel's people) actively participated, while over 4,000 rewards were distributed globally to people who used all the content of the program.

The pilot project "Well-being leaders, Happy teams" tested a new intervention method to support teams with lower perceived well-being, using the Well-being Index as the selection criterion. In addition, by listening to the managers of teams with a very high perceived well-being, the project identified distinctive characteristics and virtuous behaviors to be disseminated within the Company in order to reinforce well-being-oriented leadership.

To facilitate the diffusion of a culture of well-being and identify situations calling for improvement, the first

well-being ambassadors – promoters of enabling behaviors, listening and guidance figures for people who request help – have been selected and trained in the main Group countries.

Services and initiatives that help care for your personal and family mental and physical well-being are also avail-

The levers of inclusion at Enel

At Enel, attention to uniqueness and care for people are key elements for generating well-being and motivation and are levers for creativity, innovation and the achievement of valuable results for our people and the entire organization. The approach to diversity and inclusion is based on the principles of non-discrimination, equal opportunities, personal dignity, inclusion regardless of any form of diversity, and work-life balance. This approach is embodied in a comprehensive set of actions that promote an attention to and expression of individuality, a culture of inclusiveness without prejudice, and a coherent mix of talents, qualities and experience, all of which creates value for our people and for our business, which is transitioning towards a decarbonized economy, acknowledged globally as a flywheel for guiding various forms of diversity towards the world of work.

The approach has been ratified in our Charter for the Individual, a protocol of intent that Enel signed on March 29, 2022, underscoring the importance of personal well-being and integrity in an environment in which well-being, productivity, continuous learning and security can reinforce each other, contributing to the greatest fulfillment of the person and the achievement of results.

The principles expressed in the Charter for the Individual with regard to the participation, well-being, inclusion and security of each worker inspired the renewal in 2023 of the Global Framework Agreement (GFA) – originally signed in 2013 – with the Italian industry federations and the global federations IndustriALL and Public Services International.

Industrial relations are addressed at Group level in accordance with the model envisaged in the GFA, which is recognized as a reference best practice for European and non-European multinationals. The agreement is based on international principles for human rights and business and is inspired by the best and most advanced transnational industrial relations systems used in multinational groups and key institutions at the international level.

The milestones that have brought us to today began back in 2013 with publication of our Human Rights Policy (updatable at the local level. Free or subsidized psychological support services are available for more than 98% of Enel's people, while physical well-being services are available for over 90%. The CReW – Enel Cycle, Run & Walk Challenge project is also active globally: it promotes the physical well-being associated with sustainable mobility, involving over 3,500 Enel participants in 2023.

ed in 2021). This was followed in 2015 by Enel's adoption of the seven Women's Empowerment Principles (WEPs) promoted by the UN Global Compact and UN Women and the parallel publication of the Diversity and Inclusion Policy, which defines the principles of non-discrimination, equal opportunities, dignity, work-life balance, and inclusiveness regardless of any form of diversity. In 2019, our Workplace Harassment Policy(44) introduced the issues of individual respect, integrity and dignity in the workplace into the prevention of all types of harassment. These principles were shared in 2020 in the Statement Against Harassment in the workplace.(45) We also created a Digital Accessibility section on the Enel intranet. It is designed to ensure equal opportunities in access to digital systems and information.

In recent years, intensive awareness-raising efforts have enabled the dissemination and strengthening of a culture of inclusion at all levels and in all settings within the organization by way of communication campaigns and local and global events. The most important initiatives undertaken in 2023 include the expansion of local Employee Resources Groups, important networks and/or communities that fuel conversations within the Group on a variety of issues concerning inclusion and diversity and offer an opportunity to sharing views on female empowerment, parenting, caregiving, disability, intergenerational and intercultural relations and the LGBTQ+ community. The delivery of Beyond Bias training courses continued throughout the Group, enabling the identification of the main prejudices that may be encountered in the workplace. Adopting an ironic and surreal tone, the course suggests how to prevent these biases by offering interesting food for thought. The Workplace Harassment training course describes forms of harassment and discrimination related to age, disability, LGBTQ+ status and sexual orientation. To spread the principles of inclusive design, the training activity "Accessibility and Design for all Awareness" was also offered globally. It represents a design approach whose fundamental objective is the conception and creation of spaces, products and services that are themselves accessible to

(44) The Workplace Harassment Policy is an internal corporate publication.

(45) https://www.enel.com/content/dam/enel-com/documenti/investitori/sostenibilita/enel-statement-against-harassment.pdf.

<-- PDF CHUNK SEPARATOR -->

all. The course aims to raise awareness and train people in an increasingly inclusive culture, spreading awareness of the application Design for All principles.

Promoting a culture of inclusiveness at Enel also involves target setting and measurement. It is an approach that is encapsulated in a comprehensive plan of actions measured using a broad set of KPIs for which commitments approved by the corporate bodies have been made. These commitments include: balancing the percentage of women in hiring processes; increasing the representation of women in senior and middle management and in succession plans; increasing the number of female students involved in awareness initiatives in Science, Technology, Engineering and Math (STEM) fields; promoting projects for the inclusion of employees with disabilities at all stages of the employee journey; and fostering the dissemination of a bias-free culture sensitive to intercultural diversity.

More specifically, our strategy for gender equality is organized into various lines of action. We are working to increase the presence of women in hiring processes, with a positive trend being registered in 2023 as well (52%), confirming the Group's commitment to achieving this goal. In terms of women in management positions, we have seen both the number and the percentage of female managers continue to climb, increasing by 1.3 percentage points in 2023 (from 24.9% in 2022 to 26.2% in 2023). The percentage of women middle managers also increased (from 32.6% in 2022 to 33.1% in 2023). Actions to value the contribution of women throughout the organization, and not just in senior positions, have also continued, and the effects of these efforts will be better seen over the medium to long term, due in part to generational dynamics. Among the actions taken globally, the performance target for "the percentage of women in top management succession plans at the end of 2025" has been confirmed in the 2023 Long-Term Incentive Plan with a weighting of 10% of the total in order to strengthen and lend greater continuity to a policy to establish a suitable platform for management appointments into the coming years.

Over the years, we have also increased our commitment to promote the presence of women in STEM training and careers in collaboration with schools and government, so as to overcome gender stereotypes and promote the importance of STEM and its integration with the humanities. These STEM awareness and orientation initiatives involved more than 7,800 female secondary-school students in 2023 and more than 37,000 female students over the last seven years.(46)

On the issue of disabilities, Enel provides equipment, services, working methods and other initiatives to create an inclusive climate for work and relationships for all that provides full autonomy at work regardless of the disability. Worldwide, we have more than 2,000 employees with disabilities. The issue is particularly relevant in Italy (with more than 1,500 employees with disabilities, more than 73% of the Group total).

Since Enel's participation in the global Valuable 500 initiative in 2019, initiatives involving disability issues have been grouped within the Value for Disability project, aimed at seizing potential business and promoting inclusion among employees and customers with disabilities by designing specific global and local plans of action. The project has engendered widespread commitment to the issue and given rise to initiatives in all countries, with an impact on the inclusion of people with disabilities in relation to the different aspects of their experience in the organization and on cultural change.

Each country with at least one employee with a disability has a focal point for hearing and responding to specific needs and designing dedicated actions, as provided for in the Diversity and Inclusion Policy.

Many countries have also organized initiatives focused on intercultural and intergenerational issues and on the LGBTQ+ community.

Finally, to promote parenthood and caring for all people who find themselves in circumstances that have an impact on work, the Parental Program supporting the parenting experience has continued, as has the expansion of the MaCro@Work Caring Program for employees with chronic disorders and vulnerabilities in the various countries.

The table below shows Enel's commitment to diversity and inclusion, including the percentage of employees with disabilities, the number of women in senior and middle management, and the ratio of the average salaries of women to those of men.

(46) Beginning in 2022, the figure only includes initiatives targeting primary and secondary schools.

Diversity and inclusion

2023 2022 Change
Disabled personnel or personnel belonging to protected
categories
% 3.4 3.3 0.1 3.0%
Women in senior and middle management no. 4,447 4,463 (16) -0.4%
Percentage of women in senior and middle management % 32.5 31.8 0.7 2.2%
Percentage of women in management succession plans % 47.2 46.1 1.1 2.4%
Percentage of women in senior management succession plans % 50.4 49.6 0.8 1.6%
Base salary and remuneration ratios
Ratio of base salary women-to-men:
- senior manager % 84.5 83.9 0.6 0.7%
- middle manager % 93.9 92.8 1.1 1.2%
- office staff % 92.1 88.8 3.3 3.7%
- blue collar % 101.4 125.0 -23.6 -18.9%
Ratio of base remuneration women-to-men:
- senior manager % 81.4 80.7 0.7 0.9%
- middle manager % 92.8 91.9 0.9 1.0%
- office staff % 92.5 89.3 3.2 3.6%
- blue collar % 102.1 125.4 -23.3 -18.6%

Workplace health and safety

At Enel, people's health, safety and mental and physical integrity are considered the most precious assets, to be protected at every moment of life, at work, at home and in their free time. For this reason, we are committed to developing processes and creating increasingly healthier and safer workspaces, both for employees and for anyone who works with Enel, promoting dedicated training courses in this arena.

To make this commitment clear and evident to all Group employees as well as external stakeholders, Enel has developed and disseminated a Health and Safety Policy, which sets out the guiding principles, strategic objectives, approach and action guidelines for the continuous improvement of health and safety performance. The areas in which Enel is committed to achieving its targets are also specified: first and foremost, we find people, understood both as internal employees and contractors working with the Group, followed by processes and innovative technologies supporting accident prevention. Consistent with the values expressed and assumed in the Health and Safety Policy, a Stop Work Policy has also been issued. It seeks to make Enel employees and contractor companies responsible for managing potential risk situations regarding health, safety and the environment. In fact, all workers can stop any activity deemed risky for health, safety and environmental protection, following a "no blaming" approach.(47)

Enel also promotes, implements and continuously updates its Health and Safety Management Systems, in compliance with the internal policies referred to earlier as well as with the international ISO 45001 standard. Enel SpA's Management System provides guidance and a uniform approach for all Group companies: the business lines and the countries then have the task of implementing that system at the local level, based on the specific features of their regulatory and business environment, and verifying its correct implementation in the field.

(47) The principle under which no blame or liability is attributable to an employee or contractor who reports a risk situation.

El
· Enel Group Strategy & Risk Management Group Performance Outlook Consolidated financial statements

2023 2022 Change
Hours worked millions of
hours
385.898 427.847 (41.949) -9.8%
Enel millions of
hours
120.546 123.624 (3.078) -2.5%
Contractors millions of
hours
265.352 304.223 (38.871) -12.8%
Total Recordable Injuries (TRI)(1) no. 726 962 (236) -24.5%
Enel no. 176 153 23 15.0%
Contractors no. 550 809 (259) -32.0%
Total Recordable Injury Frequency Rate (TRI FR)(2) i 1.88 2.25 (0.37) -16.4%
Enel i 1.46 1.24 0.22 17.7%
Contractors i 2.07 2.66 (0.59) -22.2%
Fatal injuries (FAT) no. 11 6 5 83.3%
Enel no. 3 1 2 -
Contractors no. 8 5 3 60.0%
Fatal Injury Frequency Rate (FAT FR) i 0.029 0.014 0.015 -
Enel i 0.025 0.008 0.017 -
Contractors i 0.030 0.016 0.014 87.5%
Life Changing Accidents (LCA)(3) no. 1 2 (1) -50.0%
Enel no. - - - -
Contractors no. 1 2 (1) -50.0%
Life Changing Accidents (LCA) Frequency Rate i 0.003 0.005 (0.002) -40.0%
Enel i - - - -
Contractors i 0.004 0.007 (0.003) -42.9%
Lost Time Injury Frequency Rate with days lost (ACC>3 FR)(4) i 0.50 0.36 0.14 38.9%
Enel i 0.59 0.48 0.11 22.9%
Contractors i 0.46 0.31 0.15 48.4%
Lost Time Injury Frequency Rate with days lost (LTI FR)(5) i 0.61 0.50 0.11 22.0%
Enel i 0.72 0.56 0.16 28.6%
Contractors i 0.56 0.48 0.08 16.7%
High Potential Accidents Frequency Rate (HiPo FR)(6) i 0.070 0.072 (0.002) -2.8%
Enel i 0.050 0.057 (0.007) -12.3%
Contractors i 0.079 0.079 - -

(1) Total Recordable Injuries (TRI): this includes all incidents that have caused injuries, including lost time injuries, incidents requiring the administration of first aid, or incidents that did not result in lost time.

(2) Total Recordable Injury Frequency Rate (TRI FR): as for all the frequency rates for the various types of incidents, this is calculated as the ratio of number of events to total hours worked (in millions).

(3) Life Changing Accidents (LCAs): injuries whose health consequences caused permanent changes in the life of the individual (e.g., amputation of a limb, paralysis, extensive and visible scarring, etc.). Beginning with the 2021 reporting cycle, the metric Life Changing Accidents replaced High Consequence Injuries following efforts to standardize safety reporting within the organization. Therefore, the figures for 2020 and 2019 have been recalculated in line with this new approach.

(4) Lost Time Injury Frequency Rate with days lost (ACC>3 FR) is calculated considering accidents in which the worker lost at least three days of work.

(5) Lost Time Injury Frequency Rate (LTI FR) is calculated considering all injuries that have resulted in at least one day of absence from work.

(6) High Potential Accidents Frequency Rate (HiPo FR): all injuries the characteristics of which have a high potential for causing a life changing or fatal event.

Compared with 2022, the number of accident events with injuries, including first aid (TRI), decreased by 24.5% (726 in 2023 compared with 962 in 2022), mainly due to the reduction in accident events that did not involve days of absence from work. The reduction is mainly attributable to the employees of contractors (-32%), while there was a slight increase in events involving Enel personnel (+15%). The Total Recordable Injury Frequency Rate (TRI FR) followed the same trend, with a decrease of 16.4% (1.88 in 2023 compared with 2.25 in 2022), representing approximately 2 accident events

per million hours worked. With regards to hours worked, there was a significant reduction during 2023 compared with the previous year (approximately -10%), mainly linked to the sale of a number of operations, such as Enel Goiás in Brazil at the end of 2022. The Lost Time Injury Frequency Rate with days lost (LTI FR) showed an increase of 22% compared with the previous year (0.61 in 2023 compared with 0.50 in 2022) among both Enel personnel and contractors.

This increase is mainly due to an increase in minor injuries associated with only minimal impacts on worker safety. In

fact, the sum of the most serious injuries, i.e. those with the greatest actual or potential impact such as fatal injuries, life changing injuries (those which produce permanent changes in the life of the injured person) and high-potential incidents (which differ from the former only in the extent of the consequences for the worker but not in the dynamics of the event), was unchanged on 2022 (39 events) and 25% lower than the average for the three previous years. However, the distribution of injuries among the different categories did change, as fatalities increased (11 in 2023 compared with 6 in 2022), while life changing injuries (1 in 2023 and 2 in 2022) and high-potential incidents (27 in 2023 and 31 in 2022) declined.

Of the 11 fatal injuries in 2023, 9 were associated with electrical risk and 2 with mechanical risk. Three fatal injuries involved Enel personnel (2 employees of Enel Grids in Romania and 1 employee of Enel Grids in Argentina) and 8 contractor personnel (3 in Brazil, 2 in Italy and 1 in Spain who worked for Enel Grids, 1 in Brazil who worked for Enel Green Power Brazil and 1 in Brazil who worked for Enel Servizi).

As regards activities in 2023, Policy no. 106, which provides guidelines for the entire Group concerning the communication, analysis and classification of accidents, was updated in order to strengthen the near miss and safety observation reporting process,(48) increase the attention paid to HiPo events and more effectively trace the root causes of each event to ensure greater effectiveness in action plans and improved health and safety performance.

The inspection process for verifying conduct and compliance with procedures and working methods in the field has also been revised in order to enhance effectiveness. In particular, a data-driven approach has been implemented, based on IT tools and analytical dashboards. It can use evidence from the monitoring and control system to enable evaluation of the performance of organizational units and suppliers, the identification of areas at greatest risk of fatal and life changing accidents and subsequent management methods.

In 2023, there were 101 cases of Extra Checking on Site (ECoS) involving high-risk areas. This process consists in internal environment and safety assessments designed to verify the adequacy of the organization and processes in a specific area of Group operations, identify any adverse issues and develop corrective actions. These checks are conducted by specialist HSEQ personnel from outside the units being assessed, assisted by technicians specialized in the specific business.

Another area of great attention for the entire Enel Group is the protection of health, a fundamental value for the care and development of our people, not only at work but also in daily life. For this reason, the Enel Group has adopted a structured health management system based on prevention and protection measures and is committed to developing a corporate culture oriented towards the promotion of mental and physical health and organizational well-being and personal work-life balance: to this end Policy no. 179 "Health and Well-being" was updated at the end of July 2023.

The objective of safeguarding workplace safety and the mental and physical integrity of all the people of the Enel Group is the main driver of training, awareness and information activities. To foster the growth of technical skills and a safety culture, support change processes and respond in a timely manner to the needs that emerge from the business, the Group has a structured training management process, designed to transform knowledge into skills and then into behaviors. Overall, in 2023, 1,452 hours of training were provided to Enel staff on workplace health and safety issues.

The Enel Group's approach to contractors is to consider each to be a partner with which we share our essential workplace safety and environmental protection rules. As such, safety is integrated into the tender process, and supplier performance is assessed both as part of the qualification process and when executing the contract by way of numerous controls and other mechanisms, including: the Health, Safety and Environment (HSE) Terms, the Supplier Performance Management (SPM) process, the Contractor Assessment (CA) process and Evaluation Groups (EGs).(49) In particular, the supplier qualification system provides for a specific evaluation of H&S issues based on the level of H&S risk of the activities associated with the different product groups. As regards workplace and environmental safety checks of contractors, in 2023 we continued to perform CAs at their premises, their construction sites or remotely if an on-site visit was not possible. Specifically, 1,215 CAs were performed across all business lines and countries in which Enel is present.

Enel also recognizes technological innovation as a valid tool for improving health and safety processes. The cri-

(48) An unsafe behavior/situation adopted by Enel or contractor personnel or an unsafe/risky situation, to which Enel or contractor personnel could be exposed, which did not give rise to an accident, but which could have caused one.

(49) HSE Terms, a document that defines the obligations with which contractors and their subcontractors must comply concerning health, safety and environment; Supplier Performance Management, a process for controlling the safety performance of companies; Contractor Assessment, analyses of contractors during the qualification phase or in cases where critical issues or low scores emerge in the evaluation of safety indicators during the contracted activities; Evaluation Groups, periodic multidisciplinary meetings across all global business lines and geographical areas for the evaluation of the safety performance of suppliers and the definition of targeted actions and personalized support plans for individual companies.

teria with which the development priorities of innovative projects are defined are based on a "risk management" logic, seeking primarily to eliminate or reduce the probability of an event occurring depending on feasibility. An example is the Remote Trimming project, developed within Enel Grids, which consists in the use of a robot for pruning vegetation near electricity grids, allowing operators to interact with the device remotely, remaining outside the most dangerous areas and effectively eliminating the risks.

Responsible relations with communities

Listening to the communities in the territories in which Enel operates and promoting inclusive economic and social development to ensure an energy transition that is as fair as possible represent a fundamental pillar of Enel's strategy both in the daily management of business operations and in the planning of new infrastructures. Establishing solid and long-lasting relationships with local communities is essential to guaranteeing the implementation of a sustainable business, while boosting its competitiveness and inclusiveness.

Aware that the Group's activities can have a direct and indirect influence on the communities in which it operates, Enel has adopted a sustainable business approach along the entire value chain, integrating social as well as environmental sustainability criteria into the various processes from very earliest stages of development. This model is consistent with the main international standards in this area (such as the United Nations Guiding Principles on Business and Human Rights and the OECD Guidelines for Multinational Enterprises), which underpin Enel's commitment to human rights in business practices.

The Group's sustainable business approach is based on careful analysis of the contexts in which we operate. Thanks to proactive dialogue and community engagement initiatives, potential risks, impacts and opportunities are identified in order to implement prevention and mitigation interventions. This approach also includes the principle of "Sustainability by design" to take account of the needs of local communities from the early stages of asset design. The approach also envisages emergency management plans with sustainability actions to be implemented in response to sudden and unexpected events and serious damage, such as critical events impacting Group assets, projects or products as a result of natural disasters or social/community unrest.

This approach has prompted Enel to innovate both the way it manages the business and develops energy products and services. It also leverages the awareness that the activation of virtuous ecosystems, such as partnerships, represents an indispensable factor in facilitating and promoting the identification and implementation of innovative social solutions as part of the transition towards a decarbonized economy.

In 2023, Enel's contribution to the development and social and economic growth of the territories and communities with whom it operates translated into sustainability projects in the various countries in which it operates, involving over 3.9 million beneficiaries, in line with the United Nations Sustainable Development Goals (SDGs), of which over 70% regard projects and initiatives associated with the three SDGs to which the Group has made a commitment (SDG 4, SDG 7, SDG 8).

In line with the SDGs, Enel makes an effective contribution to the progress of local territories, creating value for both communities and our business through professional education and training projects and providing access to reliable and sustainable energy, both through rural and suburban electrification initiatives and by promoting social inclusion for the most vulnerable categories of the population (from a physical, social and economic point of view).

For further information on the activities performed, please see the Group's 2023 Sustainability Report.

Sustainable supply chain

2023 2022 Change
Active suppliers no. 14,001 20,434 (6,433) -31.5%
Suppliers (FTE) no. 150,820 172,854 (22,034) -12.7%
Qualified suppliers assessed for ESG issues % 100 99 1,0 1.0%
Qualified suppliers assessed for social issues (including human
rights and health and safety) for all goods categories
% 100 99 1,0 1.0%
Qualified suppliers assessed for environmental issues for all goods
categories
% 100 99 1,0 1.0%

Suppliers are the Group's partners along the path of sustainable growth, working to maximize the economic, productive, social and environmental benefits of the transition. Enel is committed every day to creating sustainable, innovative and circular processes that also make it possible to better quantify, and therefore mitigate, the total impacts that suppliers generate, aware of the need to minimize pressures on critical materials and components through technological innovation and continuous recycling and to support the resilience and retraining of its partners.

Purchasing processes are founded on mutual loyalty, transparency and collaboration in accordance with the highest standards of sustainability. For this reason, the selection of partners and the execution of contracts undergo analysis and monitoring throughout the entire procurement process. This is pursued on the basis of clear guidelines, namely codes of conduct, including the Human Rights Policy, the Code of Ethics, the "Zero-Tolerance-of-Corruption" Plan and global compliance programs.

Specifically:

  • Enel's global vendor qualification system conducts an analysis of compliance with technical, financial, legal, environmental, human (including health and safety), ethical rights and integrity requirements of the firms that intend to participate in tenders. At December 31, 2023, qualified suppliers totaled 19,692 (of which 100% assessed on the basis of ESG criteria) and of these 8,300 had an active contract during the reporting period;
  • the tendering and bargaining process adopts a structured process for defining "sustainability requirements and rewarding factors (K)" which can be used by the various purchasing and monitoring units throughout the period of execution of the contract. The process involves the use of two "libraries", which catalog all the sustainability requirements and Ks grouped into social, environmental and circularity certification macro-categories. At December 31, 2023, 66% of supply contracts provided for the submission of carbon footprint certifications from the contracted vendors.

Furthermore, specific contractual clauses have been defined, which are included in all works, service and supply contracts and updated periodically to ensure alignment with international best practices. The General Terms of Contract establish that Enel's suppliers, including subcontractors, sub-suppliers, third parties and in general the entire supply chain shall comply with current regulations on pay, contributions, insurance and taxation for all workers employed in any capacity in the execution of the contract. In addition, explicit reference is made to the principles referred to in the relevant ILO Conventions and provisions of law concerning child labor, female labor, equality of treatment, prohibition of discrimination, abuse and harassment; trade union freedom, association and representation; refusal of forced labor; safety and environmental protection and sanitation conditions. In the event of conflict between regulatory sources, the more restrictive shall prevail.

The clauses(50) also provide that suppliers, subcontractors, sub-suppliers, third parties and in general the entire supply chain shall undertake to prevent any and all forms of corruption.

The number of FTEs(51) working at Enel worksites at December 31, 2023 totaled 150,820;

• analysis and monitoring are conducted throughout the entire procurement process, making use of specific systems such as, during performance of the contract, the Supplier Performance Management (SPM), whose objective within our collaboration with vendors is not only to undertake any corrective actions in the contract execution phase, but also to encourage a process of improvement using actions that reward the adoption of best practices. The process is based on an objective and systematic collection of data and information relating to the execution of the service covered by the contract. These data are used to produce specific indicators, also called categories (e.g., Health, Safety and Environment, Human Rights & Correctness, and Quality and Punctuality).

Meetings with suppliers continued in 2023 with a focus on decarbonization issues, circularity and human rights, with a view to jointly developing practices and common approaches and spur vendors to achieve the sustainability standards demanded by the international community.

More specifically, meetings were organized with the main suppliers in strategic product categories to provide them with technical information on the new tender requirements regarding human rights and other contractual clauses. For more information on the activities carried out, please see the Group's 2023 Sustainability Report.

(50) Article 29.1.5 of the General Terms of Contract.

(51) FTE = Full Time Equivalent. This corresponds to the number of workers necessary to perform a certain number of hours worked, assuming they are working full time. One FTE therefore corresponds to one person/day.

WORLD ECONOMIC FORUM (WEF)

The International Business Council (IBC) of the World Economic Forum has produced a report entitled "Measuring Stakeholder Capitalism: Towards Common Metrics and Consistent Reporting of Sustainable Value Creation", with the aim of defining shared common metrics to measure, report and compare levels of sustainability, i.e. the effectiveness of its actions in pursuing the Sustainable Development Goals set by the United Nations (SDGs), in the business model adopted to create value for stakeholders. The metrics are based on existing standards and seek to increase convergence and comparability between the various parameters used today in sustainability reports. The following table gives the 21 main indicators specified in the WEF report.

INTEGRATED ANNUAL REPORT 2023

PILLAR THEME 21 CORE KPIs KPIs representing the 21
CORE KPIs of the WEF
2023 2022 Change Chapter/Section repo ing all
KPIs and disclosure on the 21
CORE KPIs of the WEF
Governing
purpose
Se ing purpose "Governance" chapter
Quality of
governing body
Governance body
composition
No. of women on Board 4 4 - "Corporate boards" section in
"Governance" chapter
Stakeholder
engagement
Material issues
impacting
stakeholders
"Basis of Presentation" chapter
PRINCIPLES Anti-corruption Employees with training in
anti-corruption policies and
procedures (%)
49.6 46.9 2.7 "Values and pillars of corporate
ethics" section in "Governance"
OF
GOVERNANCE
Ethical behavior Con rmed violations for con ict
of interest/corruption (no.)
7 10 (3) chapter
Protected
ethics advice
and repo ing
mechanisms
Repo s received for violations
of the Code of Ethics
207 168 39 "Values and pillars of corporate
ethics" section in "Governance"
chapter
Risk and
oppo unity
oversight
Integrating risk and
oppo unity into
business process
"Risk management" section
in "Group Strategy & Risk
Management" chapter
Climate change Greenhouse Gas
(GHG) emissions
Direct greenhouse gas emissions
- Scope 1 (million teq)
34.51 53.07 (18.56)
Indirect greenhouse gas
emissions - Scope 2 - Purchase
of electricity from the grid
(location based) (million teq)
3.28 3.82 0.54 "Fighting climate change
and ensuring environmental
Indirect greenhouse gas
emissions - Scope 2 - Purchase
of electricity from the grid
(market based) (million teq)
4.51 5.10 (0.59) sustainability" section in "Group
Pe ormance" chapter
Indirect greenhouse gas
emissions - Scope 3 (million teq)
56.53 71.04 (14.51)
PLANET TCFD
implementation
(ISSB from January
1, 2024)(1)
"Governance", "Group Strategy
& Risk Management", "Group
Pe ormance" and "Outlook"
chapters
Nature loss Land use and
ecological
sensitivity
Habitat restoration projects (in
hectares)
8,343 9,452 (1,109) "Fighting climate change
and ensuring environmental
sustainability" section in "Group
Pe ormance" chapter
Water
consumption
and withdrawal in
water-stressed
areas
Water withdrawals (millions of m3) 55.0 76.0 (21.0)
Water withdrawals in water
stressed areas (%)
23.3 19.3 4.0 "Fighting climate change
Freshwater
availability
Total water consumption (millions
of m3)
35.4 45.2 (9.8) and ensuring environmental
sustainability" section in "Group
Pe ormance" chapter
Water consumption in water
stressed areas (%)
22.1 20.5 1.6
INTEGRATED ANNUAL REPORT 2023
PILLAR THEME 21 CORE KPIs KPIs representing the 21
CORE KPIs of the WEF
2023 2022 Change Chapter/Section repo ing all
KPIs and disclosure on the 21
CORE KPIs of the WEF
Diversity and
inclusion
Women as propo ion of total
employees (%)
22.7 23.4 (0.7) "People centricity" section in
"Group Pe ormance" chapter
Pay equality Equal Remuneration Ratio (%) 81.4 80.7 (0.7) "People centricity" section in
"Group Pe ormance" chapter
Dignity and CEO Pay Ratio - up to May 10,
2023(2)
25x 62x (37)
equality Wage level CEO Pay Ratio - from May 12,
2023(2)
43x n.a. -
Risk for incidents
of child, forced or
compulsory labor
Assessment of protection of
child labor and compliance with
ban on forced labor in the supply
chain
"Values and pillars of corporate
ethics" section in "Governance"
chapter
PEOPLE Health and safety Fatal accidents - Enel (no.) 3 1 2
Frequency of fatal accidents -
Enel (i.)
0.025 0.008 0.017
Health and well
being
Life Changing Accidents - Enel
(no.)
- - - "People centricity" section in
"Group Pe ormance" chapter
Frequency of Life Changing
Accidents - Enel (i.)
- - -
Skills for the Training provided Average hours of training per
employee (hrs/person)
48.1 47.4 0.7 "People centricity" section in
future Employee training costs (millions
of euro)
27 30 (3) "Group Pe ormance" chapter
Absolute number
and rate of
employment
People hired (no.) 3,837 6,412 (2,575)
Hiring rate (%) 6.3 9.8 (3.5) "People centricity" section in
Terminations (no.) 4,038 4,414 (376) "Group Pe ormance" chapter
Turnover (%) 6.6 6.8 (0.2)
PROSPERITY Employment
and wealth
Economic
contribution
"Value generated and
distributed for stakeholders"
section in "Group Pe ormance"
chapter
generation Financial Total investment (millions of euro) 12,714 14,347 (1,633) "Analysis of the Group's
nancial position and
structure" section in "Group
Pe ormance" chapter
investment
contribution
Purchase of treasury shares,
payment of dividends and interim
dividends and coupons paid to
holders of hybrid bonds (millions
of euro)
5,337 5,038 299 Consolidated nancial
statements
Innovation in
be er products
and services
Total R&D
expenses
Investment in R&D (millions of
euro)
60 105 (45) "Innovation" section in "Group
Pe ormance" chapter
Community and
social vitality
Total tax paid Total tax paid (millions of euro)(3) 5,861 4,778 1,083 "Value generated and
distributed for stakeholders"
section in "Group Pe ormance"

velopment Goals set by the United Nations (SDGs), in the business model adopted to create value for stakeholders. The metrics are based on existing standards and seek to increase convergence and comparability between the various parameters used today in sustainability reports. The following table gives the 21 main indicators specified

Chapter/Section repo ing all KPIs and disclosure on the 21 CORE KPIs of the WEF

"Basis of Presentation" chapter

ethics" section in "Governance"

"Values and pillars of corporate ethics" section in "Governance"

"Risk management" section in "Group Strategy & Risk Management" chapter

"Fighting climate change and ensuring environmental sustainability" section in "Group Pe ormance" chapter

"Governance", "Group Strategy & Risk Management", "Group Pe ormance" and "Outlook"

"Fighting climate change and ensuring environmental sustainability" section in "Group Pe ormance" chapter

"Fighting climate change and ensuring environmental sustainability" section in "Group Pe ormance" chapter

"Governance" chapter

49.6 46.9 2.7 "Values and pillars of corporate

chapter

chapters

in the WEF report.

composition No. of women on Board 4 4 - "Corporate boards" section in

Con rmed violations for con ict chapter

3.28 3.82 0.54

4.51 5.10 (0.59)

INTEGRATED ANNUAL REPORT 2023

purpose Se ing purpose "Governance" chapter

of interest/corruption (no.) 7 10 (3)

of the Code of Ethics 207 168 39

  • Scope 1 (million teq) 34.51 53.07 (18.56)

emissions - Scope 3 (million teq) 56.53 71.04 (14.51)

hectares) 8,343 9,452 (1,109)

Water withdrawals (millions of m3) 55.0 76.0 (21.0)

stressed areas (%) 23.3 19.3 4.0

of m3) 35.4 45.2 (9.8)

stressed areas (%) 22.1 20.5 1.6

Employees with training in anti-corruption policies and

Repo s received for violations

Direct greenhouse gas emissions

Indirect greenhouse gas emissions - Scope 2 - Purchase of electricity from the grid (location based) (million teq)

Indirect greenhouse gas emissions - Scope 2 - Purchase of electricity from the grid (market based) (million teq)

Indirect greenhouse gas

Habitat restoration projects (in

Water withdrawals in water-

Total water consumption (millions

Water consumption in water-

procedures (%)

CORE KPIs of the WEF 2023 2022 Change

PILLAR THEME 21 CORE KPIs KPIs representing the 21

Governance body

Material issues impacting stakeholders

Anti-corruption

Integrating risk and oppo unity into business process

Greenhouse Gas (GHG) emissions

TCFD implementation (ISSB from January 1, 2024)(1)

Water consumption and withdrawal in water-stressed areas

Land use and ecological sensitivity

Protected ethics advice and repo ing mechanisms

Governing

Quality of governing body

Stakeholder engagement

Ethical behavior

Climate change

Nature loss

Freshwater availability

Risk and oppo unity oversight

PRINCIPLES OF

PLANET

GOVERNANCE

(1) Incorporated in the ISSB standards from January 1, 2024 as the sustainability repo ing standards IFRS S1 and IFRS S2 published at the end of June by the ISSB are pe ectly in line with those of the TCFD.

(2) Ratio between the total remuneration of the CEO/General Manager of Enel and the average gross annual remuneration of Group employees. In order to

ensure the gures for 2023 and 2022 are comparable, the 2022 gure has been adjusted by applying the 2023 exchange rate to 2022 remuneration. (3) The amount regards "total tax borne", which is the total amount paid by the Enel Group (including the Greek and Romanian companies in both years) for taxes recognized in pro t or loss. For more information on total tax borne, please see the 2023 Sustainability Repo and the Consolidated Non-Financial Statement.

chapter

EUROPEAN UNION TAXONOMY

Enel welcomes the development of the EU Taxonomy Regulation 2020/852, as it provides a standardized, science-based classification system to identify environmentally sustainable economic activities.

The EU Taxonomy Regulation acts as an important enabler to promote sustainable investments and accelerate the decarbonization of the European economy, while at the same time creating reliability and transparency for investors and supporting companies in planning the Net Zero transition.

Please note that EU taxonomy reporting is included in full in the "2023 Sustainability Report - Consolidated Non-Financial Statement" prepared as required by Article 8 of the European Taxonomy Regulation 2020/852, complying with the criteria established in the other delegated acts issued by the European Commission and available on the date of publication of the Sustainability Report.

More specifically, the EU taxonomy reporting has been implemented based on the following regulations:

  • Delegated Regulation (EU) 2021/2139 of June 4, 2021 (Climate Delegated Act);
  • Delegated Regulation (EU) 2021/2178 of July 6, 2021 (Disclosures Delegated Act);
  • Delegated Regulation (EU) 2022/1214 of March 9, 2022 (Complementary Climate Delegated Act);
  • Delegated Regulation (EU) 2023/2485 of June 27, 2023 amending the Climate Delegated Act;
  • Delegated Regulation (EU) 2023/2486 of June 27, 2023 (Environmental Delegated Act).

The European taxonomy implementation process at Enel

In a process overseen by the CEO and top management, involving the relevant functions at corporate and country level, as well as all business lines, a five-step process is in place to analyze the applicability of the EU Taxonomy Regulation throughout the entire value chain and in all countries where we operate.

For more on the phases of the implementation process for the European taxonomy, please see the "2023 Sustainability Report – Consolidated Non-Financial Statement".

Through this process, Enel has classified all economic activities along its value chain for their contribution to the climate change mitigation objective, which is the most relevant for the Group, according to the following three categories: eligible aligned, eligible non-aligned, and non-eligible.

ELIGIBLE ALIGNED Eligible aligned: refers to an economic activity that simultaneously satisfies the following
three conditions:

it is explicitly included in the EU Taxonomy Regulation for its substantial contribution to climate
change mitigation; and

it meets the specific criteria developed by the EU Taxonomy Regulation for that specific environ
mental objective; and

it meets all DNSH criteria and minimum social safeguards.
ELIGIBLE NON
ALIGNED
Eligible non-aligned: refers to an economic activity that:

is explicitly included in the EU Taxonomy Regulation for its substantial contribution to climate
change mitigation or adaptation; but

does not meet the specific criteria developed by the EU Taxonomy Regulation for those specific
environmental objectives; or

does not meet all the DNSH criteria and/or the minimum social safeguards.
NON-ELIGIBLE Non-eligible: refers to an economic activity that has not been identified by the EU Taxonomy Reg
ulation as a substantial contributor to climate change mitigation and for which no criteria have
therefore been developed. The logic of the European Commission is that these activities might:

not have a significant impact on climate change mitigation or could be integrated into the EU
Taxonomy Regulation at a later stage;

cause a very significant impact on climate change mitigation, so they cannot be eligible in any
case.

It is important to note that activities classified as eligible aligned from a climate change mitigation perspective also include adaptation solutions (mainly in the design and construction phase of assets) and are therefore also eligible aligned for this other objective.

EUROPEAN UNION

The European taxonomy implementation

3.

Assessment of the principle of Do No Signicant Harm (DNSH) to other environmental objectives

4.

Verication of minimum social safeguards

5. Calculation of nancial metrics

TAXONOMY

process at Enel

2. Analysis of substantial contribution

1.

Identication of eligible economic activities

However, the existence of the category "non-eligible" makes it impossible to achieve a business model that is fully aligned with the criteria of the EU Taxonomy Regulation, even though these might not cause any harm to the EU's environmental objectives.

Mapping of Enel's business activities for their contribution to climate change mitigation

(1) The operation of the nuclear generation pofolio is not included among the eligible activities considered by the Complementary Delegated Act in the generation of electricity from nuclear power plants.

(2) Includes both fuel-oil and gas (OCGT) as it is not possible to divide the two types of fuel. Fuel-oil was considered to be the prevalent fossil fuel and is therefore non-eligible under the EU taxonomy regulation.

In 2023 the Enel Group updated the eligibility analysis of Enel's productive economic activities by incorporating the published delegated acts, implementing the process described above based on the three categories: eligible aligned, eligible non-aligned, non-eligible.

For more information on the results of the eligibility analysis and the classification of economic activities in the above three categories, please see the "2023 Sustainability Report – Consolidated Non-Financial Statement".

Statement on the alignment of Enel's business to the EU Taxonomy Regulation

Process for calculating the financial metrics

The Enel Group calculates the financial metrics associated with each economic activity (classified into the categories eligible aligned, eligible non-aligned, non-eligible) using a specific process adopting the following criteria and considerations:

  • the three financial metrics required by the EU Taxonomy Regulation (turnover, capital expenditure – capex – and operating expenditure – opex) were calculated according to the eligibility analysis described in this "European Union taxonomy" section;
  • although not expressly required, Enel also performed an assessment in terms of the ordinary gross operating profit (EBITDA) believing that this metric represents the actual financial performance of integrated utilities such as Enel;
  • the financial information was gathered from the digital accounting system used by the Enel Group, or from the management systems in use by the Company's business lines. However, a number of derogations were adopted to provide a more detailed representation of the figures or to exclude specific activities from the overall calculation of eligible alignment (such as non-aligned hydroelectric power generation or infrastructure considered eligible but non-aligned among eligible and aligned distribution network systems). For example, the following derogations were used:
    • hydroelectric: eligible non-aligned hydroelectric power plants were excluded by considering their output multiplied by the average turnover per unit in the years 2022 and 2023. This approach was also extended to capex, opex and EBITDA;
    • infrastructure and networks: concerning capex, new connections between a substation or grid and a power plant with a greenhouse gas intensity above the threshold of 100 gCO2eq/kWh were excluded considering their capacity (in MW) multiplied by the average capex per unit (k€/MW) for the years 2022 and 2023. This approach was also extended to turnover based on the on the assets' lifespan;
  • aggregate financial data in the report refer to the "sector" level and include items related to third parties and inter sectorial exchanges;
  • financial metrics were represented by considering all electricity and gas sales as "non-eligible";
  • revenue classified as eligible aligned also include intercompany revenue related to the sale of renewable electricity produced by the Group's generation companies and sold to the Group's retail companies for marketing to end customers, according to the Group's integrated position;
  • capex: this also includes increases in assets from leases (recognized pursuant to IFRS 16, paragraph 53, point (h)), as requested by the Commission Delegated Regulation (EU) 2021/2178;
  • absolute turnover/capex/opex/ordinary EBITDA correspond to the turnover/capex/opex/ordinary EBIT-DA (measured in euros) of each specific activity. The share of individual KPIs corresponds to each individual economic activity in the total turnover/capex/ordinary EBITDA of the Group (except for ordinary opex, as the total of which refers only to the type of costs required by the taxonomy);
  • no ordinary capex and opex figures that may correspond to adaptation solutions – in accordance with Article 11 (1)(a) of EU Taxonomy Regulation – in business activities that already contribute to climate mitigation have been allocated to climate adaptation objective, thus avoiding any potential double counting with the figures provided on climate mitigation objective. Furthermore, no revenue was considered eligible for climate adaptation objective as Enel does not provide adaptation solutions in accordance with Article 11 (1)(b) of EU Taxonomy Regulation;
  • for those minor activities that are eligible for either the protection and restoration of biodiversity and ecosystem or the circular economy objective a rounded figure of "0" has been reported due to its insignificant weight out of overall financial figures.

Overall results

The high level of alignment of our economic activities with the EU Taxonomy Regulation in 2023, made possible mainly by their substantial contribution to the climate change mitigation objective while respecting the principle of Do

ORDINARY GROSS OPERATING PROFIT (EBITDA) UNDER THE EUROPEAN TAXONOMY

No Significant Harm (DNSH) to other environmental objective and observing the minimum social safeguards, is shown below.

In 2023, 59.7% of ordinary EBITDA relates to the business activities aligned to the EU taxonomy, compared to 56.7% in 2022.

The ordinary EBITDA percentage of eligible taxonomy-aligned business activities increases in 2023 compared to 2022 mainly due to an increase in the ordinary EBITDA of renewable energy production and distribution activities in absolute terms. At the same time, there is a decrease in the ordinary EBITDA of the eligible non-aligned activities mainly due to the thermoelectric power generation business from combined cycles, which produced lower energy volumes in 2023 compared to 2022.

TURNOVER (REVENUE) UNDER THE EUROPEAN TAXONOMY

In 2023, 33.8% of revenue are related to business activities aligned to the EU taxonomy, compared to 21.4% in 2022. Revenue decreased in absolute terms by €44.8 billion compared to 2022. The change is mainly attributable to the lower volumes of electricity produced, the lower quantities of energy sold in the wholesale and retail markets, as well as the decrease in average selling prices of commodities, thus impacting non-eligible and non-aligned activities. At the same time, revenue related to the production of energy from renewable sources increased in 2023, resulting in an increase in absolute terms of revenue in aligned activities from €30.6 billion in 2022 to €33.1 billion in 2023.

These phenomena contributed to the increase in the percentage weight of revenue from EU taxonomy-aligned activities by 12% year-on-year.

(1) Revenue refers to the ordinary income statement. (1) Revenue refers to the ordinary income statement.

CAPITAL EXPENDITURE (CAPEX) UNDER THE EUROPEAN TAXONOMY

In 2023, 84.8% of capital expenditure (capex) is related to business activities aligned to the EU taxonomy, compared to 81.9% in 2022. This increase is mainly due to higher investments in energy storage systems through BESS (Battery Energy Storage Systems) and a reduction in investments in non-eligible or non-aligned thermoelectric technologies.

The actual 2023 capex for eligible aligned assets is 4.0% higher than the capex planned for 2023 in the 2023-2025 Strategic Plan for the same assets. This change is mainly due to higher investments in absolute terms in eligible aligned renewable and distribution activities than planned (approximately €1.9 billion).

(1) Includes an increase of €0.7 billion from assets in lease transactions and €0.8 billion in respect of units classified as held for sale.

ORDINARY OPERATING EXPENSES (OPEX) UNDER THE EUROPEAN TAXONOMY

(1) Only includes types of cost specified by the taxonomy.

Detailed results

The following tables are represented according to what is required by EU Regulation 2020/852, therefore considering the activity of electricity sales as "non-eligible".

In 2023, 68.4% of ordinary operating expenses (opex) relate to business activities aligned to the EU taxonomy, compared to 66.9% in 2022.

The percentage of ordinary opex of eligible taxonomy-aligned business activities increases in 2023 compared to 2022 mainly due to higher maintenance costs incurred in photovoltaic renewable energy production and taxonomy-aligned distribution activities.

Economic activities

Energy)

Installation,

Energy)

Storage)

A.1 ATTIVITÀ ECOSOSTENIBILI (ALLINEATE ALLA TASSONOMIA)

Infrastructure for personal mobility (6.13) Installation, maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces a ached to buildings) (7.4) (e-Mobility)

Manufacture of renewable energy technologies

EBITDA of environmentally sustainable activities (taxonomy-aligned)

(A.1)

Professional services related to energy pe ormance of buildings

(Enel X - Distributed

Installation, maintenance and repair of energy e ciency equipment (Enel X - Condomini)

maintenance and repair of energy e ciency equipment (7.3) Installation,

maintenance and repair of renewable energy technologies (7.6) (Enel X - Distributed

Installation, maintenance and repair of renewable energy technologies (Enel X - Ba ery Energy

Taxonomy code

CCM 7.3

CCM 7.3

CCM

CCM

Absolute ordinary gross

operating pro t

millions of euro %

(EBITDA) 2023

Propo ion of ordinary

gross operating pro t

(EBITDA) 2023

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

(CE)

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

ecosystems

Y; N;

CCM 9.3 14 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

a-e 99 0.5 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2 E

d, e; 7.6 a 1 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

7.6 f -2 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

6.13; 7.4 -132 -0.6 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y -0.5 E

CCM 3.1 0 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

13,098 59.7 59.7 0.0(1) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 56.7

Of which enabling % 36.5 36.5 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 37.6 E

Of which transitional % 0.0 0.0 0.0 T

(BIO)

Climate change

mitigation

(CCM)

Climate change

adaptation

(CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum safeguards

Propo ion of

taxonomy- aligned (A.1)

or - eligible (A.2) ordinary

gross operating pro t

(EBITDA) 2022

Enabling activity

Transitional activity

2023 Substantial contribution criteria DNSH criteria ("Do No Signi cant Harm") Category Economic activities Taxonomy code Absolute ordinary gross operating pro t (EBITDA) 2023 Propo ion of ordinary gross operating pro t (EBITDA) 2023 Climate change mitigation (CCM) Climate change adaptation (CCA) Water and marine resources (WTR) Circular economy (CE) Pollution (PPC) Biodiversity and ecosystems (BIO) Climate change mitigation (CCM) Climate change adaptation (CCA) Water and marine resources (WTR) Circular economy (CE) Pollution (PPC) Biodiversity and ecosystems (BIO) Minimum safeguards Propo ion of taxonomy- aligned (A.1) or - eligible (A.2) ordinary gross operating pro t (EBITDA) 2022 Enabling activity Transitional activitymillions of euro % Y; N; N/EL Y; N; N/EL Y; N; N/EL Y; N; N/EL Y; N; N/EL Y; N; N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T A. Taxonomy-eligible activities Electricity generation from wind power CCM 4.3 1,755 8.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 10.6 Electricity generation using solar photovoltaic technology CCM 4.1 786 3.6 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.0 Electricity generation from hydropower CCM 4.5 2,233 10.2 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 6.0 Electricity generation from geothermal energy CCM 4.6 292 1.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y -0.7 Storage of electricity CCM 4.10 82 0.4 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E Transmission and distribution of electricity CCM 4.9 7,632 34.7 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 36.3 E Installation, maintenance and repair of energy e ciency equipment (Enel X - Sma Lighting) CCM 7.3 d 110 0.5 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E Urban and suburban transpo , road passenger transpo (Enel X - e-Bus) CCM 6.3 a 26 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2 Installation, maintenance and repair of energy e ciency equipment (Enel X - Energy E ciency) CCM 7.3 a-e 7 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E Installation, maintenance and repair of energy e ciency equipment (7.3) Installation, maintenance and repair of instruments and devices for measuring, regulation and controlling energy pe ormance of buildings (7.5) Installation, maintenance andrepair of renewable energy technologies (7.6) (Enel X - Home/Vivi Meglio Unifamiliare) CCM 7.3 a-e; 7.5 a; 7.6 a 195 0.9 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 1.0 E

EBITDA (ordinary) Ordinary gross operating profit (EBITDA) under the European taxonomy

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute ordinary gross
operating pro t
(EBITDA) 2023
Propo ion of ordinary
gross operating pro t
(EBITDA) 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
Biodiversity and
ecosystems
(BIO)
Climate change
mitigation
(CCM)
Climate change
adaptation
(CCA)
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
Minimum safeguards or - eligible (A.2) ordinary
taxonomy- aligned (A.1)
gross operating pro t
(EBITDA) 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Professional services
related to energy
pe ormance of
buildings
CCM 9.3 14 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
(Enel X - Distributed
Energy)
Installation, maintenance
and repair of energy
e ciency equipment
(Enel X - Condomini)
CCM 7.3
a-e
99 0.5 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2 E
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation,
maintenance and repair
of renewable energy
technologies (7.6)
CCM 7.3
d, e; 7.6 a
1 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
(Enel X - Distributed
Energy)
Installation, maintenance
and repair of renewable
energy technologies
CCM
7.6 f
-2 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
(Enel X - Ba ery Energy
Storage)
Infrastructure for
personal mobility (6.13)
Installation, maintenance
and repair of charging
stations for electric
vehicles in buildings (and
parking spaces a ached
to buildings) (7.4)
CCM
6.13; 7.4
-132 -0.6 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y -0.5 E
(e-Mobility)
Manufacture of
renewable energy
technologies
CCM 3.1 0 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
EBITDA of
environmentally
sustainable activities
(taxonomy-aligned)
(A.1)
13,098 59.7 59.7 0.0(1) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 56.7
Of which enabling % 36.5 36.5 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 37.6 E
Of which transitional % 0.0 0.0 0.0 T

Ordinary gross operating profit (EBITDA) under the European taxonomy EBITDA (ordinary)

Taxonomy code

CCM

CCM

CCM

CCM

CCM

CCM

CCM

CCM

CCM 7.3 a-e; 7.5 a; 7.6 a

Absolute ordinary gross

operating pro t

millions of euro %

(EBITDA) 2023

Propo ion of ordinary

gross operating pro t

(EBITDA) 2023

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

Economic activities

activities

technology

A. Taxonomy-eligible

Electricity generation from wind power

Electricity generation using solar photovoltaic

Electricity generation from hydropower

Electricity generation from geothermal energy

Transmission and distribution of electricity

Installation, maintenance and repair of energy e ciency equipment (Enel X - Sma Lighting)

Urban and suburban transpo , road passenger transpo (Enel X - e-Bus)

Installation, maintenance and repair of energy e ciency equipment (Enel X - Energy E ciency)

maintenance and repair of energy e ciency equipment (7.3) Installation, maintenance and repair of instruments and devices for measuring, regulation and controlling energy pe ormance of buildings (7.5) Installation,

maintenance andrepair of renewable energy technologies (7.6) (Enel X - Home/Vivi Meglio Unifamiliare)

Installation,

A.1 ENVIRONMENTALLY SUSTAINABLE ACTIVITIES (TAXONOMY-ALIGNED)

Storage of electricity CCM

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

(CE)

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

ecosystems

Y; N;

4.3 1,755 8.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 10.6

4.1 786 3.6 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.0

4.5 2,233 10.2 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 6.0

4.6 292 1.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y -0.7

4.10 82 0.4 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

4.9 7,632 34.7 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 36.3 E

7.3 d 110 0.5 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E

7.3 a-e 7 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

195 0.9 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 1.0 E

6.3 a 26 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2

(BIO)

Climate change

mitigation

(CCM)

Climate change

adaptation

(CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum safeguards

Propo ion of

taxonomy- aligned (A.1)

or - eligible (A.2) ordinary

gross operating pro t

(EBITDA) 2022

Enabling activity

Transitional activity

2023 Substantial contribution criteria DNSH criteria Category
Taxonomy code Absolute ordinary gross
operating pro t
(EBITDA) 2023
Propo ion of ordinary
gross operating pro t
(EBITDA) 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
Biodiversity and
ecosystems
(BIO)
Climate change
mitigation
(CCM)
Climate change
adaptation
(CCA)
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
Minimum safeguards or - eligible (A.2) ordinary
taxonomy- aligned (A.1)
gross operating pro t
(EBITDA) 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
% EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
CCM 4.5 5 0.0 EL N/EL N/EL N/EL N/EL N/EL 0.0
CCM 4.9 224 1.0 EL N/EL N/EL N/EL N/EL N/EL 2.9
CCM
4.29
450 2.0 EL N/EL N/EL N/EL N/EL N/EL 12.7
CE 5.2 0 0.0 N/EL N/EL N/EL EL(2) N/EL N/EL 0.0
BIO 1.1 0 0.0 N/EL N/EL N/EL N/EL N/EL EL(2) 0.0
679 3.0 3.0 0.0 0.0 0.0 0.0 0.0 15.6
62.7 0.0 0.0 0.0 0.0 0.0 72.3
13,777 62.7 ("Do No Signi cant Harm")

eligible activities

Electricity generation
from coal
n.a. 869 4.0
Electricity generation
from nuclear
n.a. 511 2.3
Electricity generation
from Oil&Gas (OCGT)(3)
n.a. 405 1.8
Enel X (only non
elegible activities)
n.a. -60 -0.3
Trading activities
(Energy sales -
wholesale)
n.a. 1,525 6.9
Market (Gas sales - end
customer)
n.a. 739 3.4
Market (Power sales -
end customer)
n.a. 4,125 18.8

A.2 TAXONOMY-ELIGIBLE BUT NOT ENVIRONMENTALLY

SUSTAINABLE ACTIVITIES (TAXONOMY-NON-ALIGNED ACTIVITIES)

Transitional activity

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute ordinary gross
operating pro t
(EBITDA) 2023
Propo ion of ordinary
gross operating pro t
(EBITDA) 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
Biodiversity and
ecosystems
(BIO)
Climate change
mitigation
(CCM)
Climate change
adaptation
(CCA)
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
Minimum safeguards or - eligible (A.2) ordinary
taxonomy- aligned (A.1)
gross operating pro t
(EBITDA) 2022
Propo ion of
Enabling activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Services, Holding &
Others
n.a. -318 -1.4
Elisions and
adjustments
n.a. 396 1.8
EBITDA of taxonomy
non-eligible activities
8,192 37.3
Total (A + B) 21,969 100.0
PROPORTION OF EBITDA/TOTAL EBITDA
Taxonomy-aligned
per objective
Taxonomy-eligible
per objective
CCM 59.7 62.7
CCA 0.0 0.0
WTR 0.0 0.0
CE 0.0 0.0
PPC 0.0 0.0
BIO 0.0 0.0

European Union taxonomy 219

(1) No EBITDA gures were considered eligible for climate adaptation objective as Enel does not provide adaptation solutions in accordance with A icle 11 (b) of EU taxonomy regulation.

(2) The analysis of the alignment of this activity was not pe ormed for the purpose of the 2023 Sustainability Repo and will be disclosed next year in coherence with the timeline established in the Environmental Delegated Act.

(3) Electricity generation from fuel-oil and OCGT: it refers to thermal power plants that use fuel-oil and/or gas (OCGT), for which a breakdown by technology is not available.

Economic activities

Energy)

Energy)

Storage)

A.1 ENVIRONMENTALLY SUSTAINABLE ACTIVITIES (TAXONOMY-ALIGNED)

Infrastructure for personal mobility (6.13) Installation, maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces a ached to buildings) (7.4) (e-Mobility)

Manufacture of renewable energy technologies

Turnover of environmentally sustainable activities (taxonomy-aligned)

(A.1)

Professional services related to energy pe ormance of buildings

(Enel X - Distributed

Installation, maintenance and repair of energy e ciency equipment (Enel X - Condomini)

Installation, maintenance and repair of energy e ciency equipment (7.3) Installation, maintenance and repair of renewable energy technologies (7.6) (Enel X - Distributed

Installation, maintenance and repair of renewable energy technologies (Enel X - Ba ery Energy

Taxonomy code

CCM

CCM

CCM 7.3 d, e; 7.6 a

CCM

CCM

CCM

Absolute turnover

millions of euro %

"revenue" 2023

Propo ion of turnover

"revenue" 2023

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

(CE)

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

Y; N;

9.3 66 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

7.3 a-e 245 0.2 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

7.6 f 27 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

6.13; 7.4 246 0.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

3.1 0.0 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

33,073 33.8 33.8 0.0(2) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 21.4

Of which enabling % 22.0 22.0 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 14.8 E

Of which transitional % 0.0 0.0 0.0 T

131 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

ecosystems (BIO)

Climate change

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of

taxonomy-aligned (A.1)

or -eligible (A.2) turnover

"revenue" 2022

Enabling activity

Transitional activity

Turnover (Revenue) under the European taxonomy(1) Turnover "Revenue"(1)

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute turnover
"revenue" 2023
Propo ion of turnover
"revenue" 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
or -eligible (A.2) turnover
taxonomy-aligned (A.1)
"revenue" 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
A. Taxonomy-eligible
activities
Electricity generation
from wind power
CCM
4.3
3,063 3.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 2.4
Electricity generation
using solar photovoltaic
technology
CCM
4.1
1,084 1.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.7
Electricity generation
from hydropower
CCM
4.5
6,774 6.9 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.0
Electricity generation
from geothermal
energy
CCM
4.6
555 0.6 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.4
Storage of electricity CCM
4.10
72 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Transmission and
distribution of
electricity
CCM
4.9
19,915 20.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 13.9 E
Installation,
maintenance and
repair of energy
e ciency equipment
CCM
7.3 d
313 0.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2 E
(Enel X - Sma Lighting)
Urban and suburban
transpo , road
passenger transpo
(Enel X - e-Bus)
CCM
6.3 a
87 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1
Installation,
maintenance and
repair of energy
e ciency equipment
(Enel X - Energy
E ciency)
CCM
7.3 a-e
53 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation,
maintenance and
repair of instruments
and devices for
measuring, regulation
and controlling energy
pe ormance of
buildings (7.5)
Installation,
maintenance and repair
of renewable energy
technologies (7.6)
(Enel X - Home/Vivi
Meglio Unifamiliare)
CCM
7.3 a-e;
7.5 a;
7.6 a
442 0.5 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.3 E
2023 Substantial contribution criteria DNSH criteria ("Do No Signi cant Harm") Category
Economic
activities
Taxonomy code Absolute turnover
"revenue" 2023
Propo ion of turnover
"revenue" 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
or -eligible (A.2) turnover
taxonomy-aligned (A.1)
"revenue" 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Professional services
related to energy
pe ormance of
buildings
(Enel X - Distributed
CCM
9.3
66 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
Energy)
Installation, maintenance
and repair of energy
e ciency equipment
CCM
7.3 a-e
245 0.2 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
(Enel X - Condomini)
Installation, maintenance
and repair of energy
e ciency equipment (7.3)
Installation, maintenance
and repair of renewable
energy technologies (7.6)
CCM
7.3 d, e;
7.6 a
131 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
(Enel X - Distributed
Energy)
Installation, maintenance
and repair of renewable
energy technologies
(Enel X - Ba ery Energy
CCM
7.6 f
27 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Storage)
Infrastructure for
personal mobility (6.13)
Installation, maintenance
and repair of charging
stations for electric
vehicles in buildings (and
parking spaces a ached
to buildings) (7.4)
CCM
6.13; 7.4
246 0.3 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
(e-Mobility)
Manufacture of
renewable energy
technologies
CCM
3.1
0.0 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Turnover of
environmentally
sustainable activities
(taxonomy-aligned)
(A.1)
33,073 33.8 33.8 0.0(2) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 21.4
Of which enabling % 22.0 22.0 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 14.8 E
Of which transitional % 0.0 0.0 0.0 T
EMARKET
SDIR
CERTIFIED
2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute turnover
"revenue" 2023
Propo ion of turnover
"revenue" 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
or -eligible (A.2) turnover
taxonomy-aligned (A.1)
"revenue" 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
% EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
Electricity generation
from hydropower
CCM
4.5
50 0.1 EL N/EL N/EL N/EL N/EL N/EL 0.0
Transmission and
distribution of electricity
(Peru and new
connections to plants
with threshold >
100 gCO2eq/kWh)
CCM
4.9
934 1.0 EL N/EL N/EL N/EL N/EL N/EL 1.3
Electricity generation
from fossil gaseous
fuels (CCGT)
CCM
4.29
2,984 3.0 EL N/EL N/EL N/EL N/EL N/EL 6.6
Sale of spare pa s CE
5.2
0.0 0.0 N/EL N/EL N/EL EL(3) N/EL N/EL 0.0
Conservation, including
restoration, of habitats,
ecosystems and species
BIO
1.1
0.0 0.0 N/EL N/EL N/EL N/EL N/EL EL(3) 0.0
Turnover of taxonomy
eligible but not
environmentally
sustainable activities
(taxonomy-non
aligned activities) (A.2)
3,968 4.1 4.1 0.0 0.0 0.0 0.0 0.0 7.9
A. Turnover of
taxonomy-eligible
activities (A.1 + A.2)
37,041 37.9 37.9 0.0 0.0 0.0 0.0 0.0 29.3
B. Taxonomy-non
eligible activities
Electricity generation
from coal
n.a. 2,884 2.9
Electricity generation
from nuclear
n.a. 1,455 1.5
Electricity generation
from Oil&Gas (OCGT)(4)
n.a. 3,483 3.4
Enel X (only non
elegible activities)
n.a. 559 0.5
Trading activities
(Energy sales -
wholesale)
n.a. 29,407 30.0
Market (Gas sales - end
customer)
n.a. 8,794 9.0
Market (Power sales -
end customer)
n.a. 40,930 41.7

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute turnover
"revenue" 2023
Propo ion of turnover
"revenue" 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
or -eligible (A.2) turnover
taxonomy-aligned (A.1)
"revenue" 2022
Propo ion of
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Services, Holding &
Others
n.a. 2,058 2.1
Elisions and
adjustments
n.a. -28,448 -29.0
Turnover of taxonomy
non-eligible activities
61,122 62.1
Total (A + B) 98,163 100.0
PROPORTION OF TURNOVER/TOTAL TURNOVER
Taxonomy-aligned
per objective
Taxonomy-eligible
per objective
CCM 33.8 37.9
CCA 0.0 0.0
WTR 0.0 0.0
CE 0.0 0.0
PPC 0.0 0.0
BIO 0.0 0.0

(1) Revenue refers to the ordinary income statement.

(2) No revenues gures were considered eligible for climate adaptation objective as Enel does not provide adaptation solutions in accordance with A icle 11 (b) of EU taxonomy regulation.

(3) The analysis of the alignment of this activity was not pe ormed for the purpose of the 2023 Sustainability Repo and will be disclosed next year in coherence with the timeline established in the Environmental Delegated Act.

(4) Electricity generation from fuel-oil and OCGT: it refers to thermal power plants that use fuel-oil and/or gas (OCGT), for which a breakdown by technology is not available.

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

EL; N/EL

(CE)

Pollution

Y; N; N/EL

EL; N/EL

(PPC)

Biodiversity and

Y; N;

EL; N/EL

4.5 50 0.1 EL N/EL N/EL N/EL N/EL N/EL 0.0

4.9 934 1.0 EL N/EL N/EL N/EL N/EL N/EL 1.3

4.29 2,984 3.0 EL N/EL N/EL N/EL N/EL N/EL 6.6

5.2 0.0 0.0 N/EL N/EL N/EL EL(3) N/EL N/EL 0.0

1.1 0.0 0.0 N/EL N/EL N/EL N/EL N/EL EL(3) 0.0

3,968 4.1 4.1 0.0 0.0 0.0 0.0 0.0 7.9

37,041 37.9 37.9 0.0 0.0 0.0 0.0 0.0 29.3

ecosystems (BIO)

Climate change

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

Economic activities

Electricity generation from hydropower

Electricity generation from fossil gaseous fuels (CCGT)

A.2 TAXONOMY-ELIGIBLE BUT NOT ENVIRONMENTALLY

SUSTAINABLE ACTIVITIES (TAXONOMY-NON-ALIGNED ACTIVITIES)

Conservation, including restoration, of habitats, ecosystems and species

Turnover of taxonomyeligible but not environmentally sustainable activities (taxonomy-nonaligned activities) (A.2)

A. Turnover of taxonomy-eligible activities (A.1 + A.2)

B. Taxonomy-noneligible activities

Electricity generation

Electricity generation

Electricity generation

Enel X (only non-

B. TAXONOMY-NON-ELIGIBLE ACTIVITIES

Trading activities (Energy sales wholesale)

Market (Gas sales - end

Market (Power sales -

from coal n.a. 2,884 2.9

from nuclear n.a. 1,455 1.5

from Oil&Gas (OCGT)(4) n.a. 3,483 3.4

elegible activities) n.a. 559 0.5

customer) n.a. 8,794 9.0

end customer) n.a. 40,930 41.7

n.a. 29,407 30.0

Sale of spare pa s CE

Transmission and distribution of electricity (Peru and new connections to plants with threshold > 100 gCO2eq/kWh)

Taxonomy code

CCM

CCM

CCM

BIO

Absolute turnover

millions of euro %

"revenue" 2023

Propo ion of turnover

"revenue" 2023

% EL; N/EL

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

EL; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

EL; N/EL

resources (WTR)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of

taxonomy-aligned (A.1)

or -eligible (A.2) turnover

"revenue" 2022

Enabling activity

Transitional activity

Capital expenditure (capex) under the European taxonomy Capex

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute Capex "Capital
expenditure" 2023
"Capital expenditure"
Propo ion of Capex
2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
Propo ion of taxonomy
(A.2) Capex "Capital
expenditure" 2022
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
A. Taxonomy-eligible
activities
Electricity generation
from wind power
CCM
4.3 /
CCA
4.3
1,125 7.9 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 14.7
Electricity generation
using solar photovoltaic
technology
CCM
4.1 /
CCA
4.1
2,400 16.8 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 18.9
Electricity generation
from hydropower
CCM
4.5 /
CCA
4.5
463 3.2 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 2.9
Electricity generation
from geothermal energy
CCM
4.6 /
CCA 4.6
136 1.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.8
Storage of electricity CCM
4.10 /
CCA
4.10
1,322 9.3 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.5 E
Transmission and
distribution of
electricity
CCM
4.9 /
CCA 4.9
5,376 37.7 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 34.7 E
Installation, maintenance
and repair of energy
e ciency equipment
(Enel X - Sma Lighting)
CCM
7.3 d /
CCA
7.3 d
130 0.9 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E
Urban and suburban
transpo , road
passenger transpo
CCM
6.3 a
/ CCA
6.3 a
8 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0
(Enel X - e-Bus)
Installation,
maintenance and
repair of energy
e ciency equipment
(Enel X - Energy
CCM
7.3 a-e /
CCA
7.3 a-e
13 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
E ciency)
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation,
maintenance and
repair of instruments
and devices for
measuring, regulation
and controlling energy
pe ormance of
buildings (7.5)
Installation,
maintenance and repair
of renewable energy
technologies (7.6)
(Enel X - Home/Vivi
Meglio Unifamiliare)
CCM
7.3 a-e;
7.5 a;
7.6 a /
CCA
7.3 a-e;
7.5 a;
7.6 a
71 0.5 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E
Substantial contribution criteria ("Do No Signi cant Harm") DNSH criteria Category
Economic
activities
Taxonomy code Absolute Capex "Capital
expenditure" 2023
"Capital expenditure"
Propo ion of Capex
2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
Propo ion of taxonomy
(A.2) Capex "Capital
expenditure" 2022
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Professional services
related to energy
pe ormance of
buildings
(Enel X - Distributed
CCM
9.3
4 0.0 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Energy)
Installation, maintenance
and repair of energy
e ciency equipment
CCM
7.3 a-e /
CCA
17 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.2 E
(Enel X - Condomini)
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation, maintenance
and repair of renewable
energy technologies (7.6)
(Enel X - Distributed
7.3 a-e
CCM
7.3 d,
e; 7.6 a
/ CCA
7.3 d, e;
7.6 a
59 0.4 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
Energy)
Installation, maintenance
and repair of renewable
energy technologies
(Enel X - Ba ery Energy
Storage)
CCM
7.6 f /
CCA
7.6 f
44 0.3 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.4 E
Infrastructure for
personal mobility (6.13)
Installation, maintenance
and repair of charging
stations for electric
vehicles in buildings (and
parking spaces a ached
to buildings) (7.4)
(e-Mobility)
CCM
6.13; 7.4
/ CCA
6.13;
7.4
106 0.7 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.7 E
Manufacture of
renewable energy
technologies
CCM
3.1 /
CCA
3.1
337 2.4 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 1.1 E
Additions to right-of
use assets (IFRS 16 par.
53 point h)
n.a. 486 3.4 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 2.8
Capex of
environmentally
sustainable activities
(taxonomy-aligned)
(A.1)
12,097 84.8 84.8 0.0(1) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 81.9
Of which enabling % 52.4 52.4 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 41.8 E
Of which transitional % 0.0 0.0 0.0 T

Capital expenditure (capex) under the European taxonomy Capex

Absolute Capex "Capital

millions of euro %

expenditure" 2023

Propo ion of Capex

"Capital expenditure"

2023

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

Taxonomy code

CCM 4.3 / CCA 4.3

CCM 4.1 / CCA 4.1

CCM 4.5 / CCA 4.5

CCM 4.6 / CCA 4.6

CCM 4.10 / CCA 4.10

CCM 4.9 / CCA 4.9

CCM 7.3 d / CCA 7.3 d

CCM 6.3 a / CCA 6.3 a

CCM 7.3 a-e / CCA 7.3 a-e

CCM 7.3 a-e; 7.5 a; 7.6 a / CCA 7.3 a-e; 7.5 a; 7.6 a

Economic activities

activities

technology

A. Taxonomy-eligible

Electricity generation from wind power

Electricity generation using solar photovoltaic

Electricity generation from hydropower

Electricity generation from geothermal energy

Storage of electricity

Installation, maintenance and repair of energy e ciency equipment (Enel X - Sma Lighting)

Urban and suburban transpo , road passenger transpo (Enel X - e-Bus)

Installation, maintenance and repair of energy e ciency equipment (Enel X - Energy E ciency)

A.1 ENVIRONMENTALLY SUSTAINABLE ACTIVITIES (TAXONOMY-ALIGNED)

Installation,

maintenance and repair of energy e ciency equipment (7.3) Installation, maintenance and repair of instruments and devices for measuring, regulation and controlling energy pe ormance of buildings (7.5) Installation,

maintenance and repair of renewable energy technologies (7.6) (Enel X - Home/Vivi Meglio Unifamiliare)

Transmission and distribution of electricity

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

(CE)

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

Y; N;

1,125 7.9 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 14.7

2,400 16.8 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 18.9

463 3.2 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 2.9

136 1.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.8

1,322 9.3 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.5 E

5,376 37.7 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 34.7 E

130 0.9 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E

13 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

71 0.5 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.5 E

8 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0

ecosystems (BIO)

Climate change

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of taxonomy

-aligned (A.1) or -eligible

(A.2) Capex "Capital

expenditure" 2022

Enabling activity

Transitional activity

Economic activities

Market (Gas sales - end

Market (Power sales -

Services, Holding &

Additions to right-ofuse assets (IFRS 16 par.

Capex of taxonomy-

Elisions and

B. TAXONOMY-NON-ELIGIBLE ACTIVITIES

53 point h)

customer) n.a. 106 0.7

end customer) n.a. 512 3.6

Others n.a. 193 1.4

adjustments n.a. 152 1.1

non-eligible activities 1,735 12.3

Total (A + B) 14,247 100.0

provided on climate mitigation objective.

is not available.

ence with the timeline established in the Environmental Delegated Act.

Taxonomy code

Absolute Capex "Capital

millions of euro %

n.a. 179 1.3

expenditure" 2023

Propo ion of Capex

"Capital expenditure"

2023

Climate change

Y; N; N/EL

mitigation (CCM)

PROPORTION OF CAPEX/TOTAL CAPEX

Taxonomy-aligned per objective

CCM 84.8 87.7 CCA 0.0 87.7 WTR 0.0 0.0 CE 0.0 0.0 PPC 0.0 0.0 BIO 0.0 0.0

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

2023 Substantial contribution criteria DNSH criteria

Circular economy

Y; N; N/EL

(CE)

Taxonomy-eligible per objective

(1) No Capex gures that may correspond to adaptation solutions – in accordance with A icle 11 (1) (b) of EU taxonomy regulation – in business activities that already contribute to climate mitigation have been allocated to climate adaptation objective, thus avoiding any potential double counting with the gures

(2) The analysis of the alignment of this activity was not pe ormed for the purpose of the 2023 Sustainability Repo and will be disclosed next year in coher-

(3) Electricity generation from fuel-oil and OCGT: it refers to thermal power plants that use fuel-oil and/or gas (OCGT), for which a breakdown by technology

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

Y; N;

ecosystems (BIO)

Climate change

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of taxonomy

-aligned (A.1) or -eligible

(A.2) Capex "Capital

expenditure" 2022

Enabling activity

Transitional activity

2023 Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute Capex "Capital
expenditure" 2023
"Capital expenditure"
Propo ion of Capex
2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
Propo ion of taxonomy
(A.2) Capex "Capital
expenditure" 2022
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
% EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
Electricity generation
from hydropower
CCM
4.5 /
CCA 4.5
4 0.0 EL EL N/EL N/EL N/EL N/EL 0.0
Transmission and
distribution of electricity
(Peru and new
connections to plants
with threshold >
100 gCO2eq/kWh)
CCM
4.9 /
CCA 4.9
123 0.9 EL EL N/EL N/EL N/EL N/EL 2.6
Electricity generation
from fossil gaseous
fuels (CCGT)
CCM
4.29 /
CCA
4.29
269 1.9 EL EL N/EL N/EL N/EL N/EL 2.6
Additions to right-of
use assets (IFRS 16 par.
53 point h)
n.a. 19 0.1 EL EL N/EL N/EL N/EL N/EL 1.1
Sale of spare pa s CE
5.2
0 0.0 N/EL N/EL N/EL EL(2) N/EL N/EL 0.0
Conservation, including
restoration, of habitats,
ecosystems and species
BIO
1.1
0 0.0 N/EL N/EL N/EL N/EL N/EL EL(2) 0.0
Capex of taxonomy
-eligible but not
environmentally
sustainable activities
(taxonomy-non
aligned activities) (A.2)
415 2.9 2.9 0.0 0.0 0.0 0.0 0.0 6.3
A. Capex of taxonomy
eligible activities
(A.1 + A.2)
12,512 87.7 87.7 0.0 0.0 0.0 0.0 0.0 88.2
Electricity generation
from coal
n.a. 52 0.4
Electricity generation
from nuclear
n.a. 171 1.2
Electricity generation
from Oil&Gas (OCGT)(3)
n.a. 209 1.5
Enel X (only non
elegible activities)
n.a. 103 0.7
Trading activities
(Energy sales -
wholesale)
n.a. 58 0.4
EMARKET
ents) R
CERTIFIED
Substantial contribution criteria DNSH criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute Capex "Capital
expenditure" 2023
"Capital expenditure"
Propo ion of Capex
2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
Propo ion of taxonomy
(A.2) Capex "Capital
expenditure" 2022
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Market (Gas sales - end
customer)
n.a. 106 0.7
Market (Power sales -
end customer)
n.a. 512 3.6
Services, Holding &
Others
n.a. 193 1.4
Elisions and
adjustments
n.a. 152 1.1
Additions to right-of
use assets (IFRS 16 par.
53 point h)
n.a. 179 1.3
Capex of taxonomy
non-eligible activities
1,735 12.3
Total (A + B) 14,247 100.0
PROPORTION OF CAPEX/TOTAL CAPEX
Taxonomy-aligned
per objective
Taxonomy-eligible
per objective
CCM 84.8 87.7
CCA 0.0 87.7
WTR 0.0 0.0
CE 0.0 0.0
PPC 0.0 0.0
BIO 0.0 0.0
  • (1) No Capex gures that may correspond to adaptation solutions in accordance with A icle 11 (1) (b) of EU taxonomy regulation in business activities that already contribute to climate mitigation have been allocated to climate adaptation objective, thus avoiding any potential double counting with the gures provided on climate mitigation objective.
  • (2) The analysis of the alignment of this activity was not pe ormed for the purpose of the 2023 Sustainability Repo and will be disclosed next year in coherence with the timeline established in the Environmental Delegated Act.
  • (3) Electricity generation from fuel-oil and OCGT: it refers to thermal power plants that use fuel-oil and/or gas (OCGT), for which a breakdown by technology is not available.

Economic activities

Installation, maintenance and repair of energy e ciency equipment (Enel X - Condomini)

Installation,

Energy)

Storage)

A.1 ENVIRONMENTALLY SUSTAINABLE ACTIVITIES (TAXONOMY-ALIGNED)

Installation,

Infrastructure for personal mobility (6.13)

Manufacture of renewable energy technologies

Opex of environmentally sustainable activities (taxonomy-aligned)

(A.1)

maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces a ached to buildings) (7.4) (e-Mobility)

Installation, maintenance and repair of renewable energy technologies (Enel X - Ba ery Energy

maintenance and repair of energy e ciency equipment (7.3) Installation,

maintenance and repair of renewable energy technologies (7.6) (Enel X - Distributed

Taxonomy code

CCM 7.3 a-e / CCA 7.3 a-e

CCM 7.3 d, e; 7.6 a / CCA 7.3 d, e; 7.6 a

CCM 7.6 f / CCA 7.6 f

CCM 6.13; 7.4 / CCA 6.13; 7.4

CCM 3.1 / CCA 3.1

Absolute ordinary

millions of euro %

Opex 2023

Propo ion of ordinary

Opex 2023

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

resources (WTR)

2023 Substantial contribution criteria DNSH Criteria

Circular economy

Y; N; N/EL

(CE)

Pollution

Y; N; N/EL

(PPC)

Biodiversity and

Y; N;

ecosystems (BIO)

Climate change

0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

2 0.2 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.3 E

0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E

864 68.4 68.4 0.0(1) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 66.9

Of which enabling % 44.6 44.6 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 42.5 E

Of which transitional % 0.0 0.0 0.0 T

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of taxonomy

-aligned (A.1) or -eligible

(A.2) ordinary Opex 2022

Enabling activity

Transitional activity

Ordinary operating expenses (opex) under the European taxonomy Opex (ordinary)

2023 Substantial contribution criteria ("Do No Signi cant Harm") DNSH Criteria Category
Economic
activities
Taxonomy code Absolute ordinary
Opex 2023
Propo ion of ordinary
Opex 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
(A.2) ordinary Opex 2022
Propo ion of taxonomy
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
A. Taxonomy-eligible
activities
Electricity generation
from wind power
CCM 4.3
/ CCA
4.3
86 6.8 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 7.2
Electricity generation
using solar photovoltaic
technology
CCM 4.1
/ CCA
4.1
57 4.5 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 3.9
Electricity generation
from hydropower
CCM 4.5
/ CCA
4.5
153 12.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 12.9
Electricity generation
from geothermal energy
CCM 4.6
/ CCA
4.6
5 0.4 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.4
Storage of electricity CCM
4.10 /
CCA
4.10
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Transmission and
distribution of
electricity
CCM 4.9
/ CCA
4.9
559 44.2 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 41.8 E
Installation, maintenance
and repair of energy
e ciency equipment
(Enel X - Sma Lighting)
CCM 7.3
d / CCA
7.3 d
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
Urban and suburban
transpo , road
passenger transpo
(Enel X - e-Bus)
CCM 6.3
a / CCA
6.3 a
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0
Installation,
maintenance and
repair of energy
e ciency equipment
(Enel X - Energy
CCM
7.3 a-e /
CCA 7.3
a-e
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
E ciency)
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation,
maintenance and
repair of instruments
and devices for
measuring, regulation
and controlling energy
pe ormance of
buildings (7.5)
Installation, maintenance
and repair of renewable
energy technologies (7.6)
(Enel X - Home/Vivi
Meglio Unifamiliare)
CCM 7.3
a-e; 7.5
a; 7.6 a /
CCA 7.3
a-e; 7.5
a; 7.6 a
1 0.1 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
Professional services
related to energy
pe ormance of
buildings
(Enel X - Distributed
Energy)
CCM 9.3 1 0.1 Y N/EL N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E

A.1 ENVIRONMENTALLY SUSTAINABLE ACTIVITIES (TAXONOMY-ALIGNED)

EMARKET
ents) R
CERTIFIED
2023 Substantial contribution criteria DNSH Criteria ("Do No Signi cant Harm") Category
Economic
activities
Taxonomy code Absolute ordinary
Opex 2023
Propo ion of ordinary
Opex 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
(A.2) ordinary Opex 2022
Propo ion of taxonomy
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Installation,
maintenance and
repair of energy
e ciency equipment
CCM
7.3 a-e /
CCA 7.3
a-e
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.1 E
(Enel X - Condomini)
Installation,
maintenance and repair
of energy e ciency
equipment (7.3)
Installation,
maintenance and repair
of renewable energy
technologies (7.6)
CCM 7.3
d, e; 7.6
a / CCA
7.3 d, e;
7.6 a
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
(Enel X - Distributed
Energy)
Installation,
maintenance and
repair of renewable
energy technologies
(Enel X - Ba ery Energy
Storage)
CCM 7.6
f / CCA
7.6 f
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Infrastructure for
personal mobility (6.13)
Installation,
maintenance and repair
of charging stations
for electric vehicles in
buildings (and parking
spaces a ached to
buildings) (7.4)
(e-Mobility)
CCM
6.13; 7.4
/ CCA
6.13; 7.4
2 0.2 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.3 E
Manufacture of CCM 3.1
renewable energy
technologies
/ CCA
3.1
0 0.0 Y Y N/EL N/EL N/EL N/EL Y Y Y Y Y Y Y 0.0 E
Opex of
environmentally
sustainable activities
(taxonomy-aligned)
(A.1)
864 68.4 68.4 0.0(1) 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 66.9
Of which enabling % 44.6 44.6 0.0 0.0 0.0 0.0 0.0 Y Y Y Y Y Y Y 42.5 E
Of which transitional % 0.0 0.0 0.0 T

2023 Substantial contribution criteria DNSH Criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute ordinary
Opex 2023
Propo ion of ordinary
Opex 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
(A.2) ordinary Opex 2022
Propo ion of taxonomy
Enabling activity Transitional activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
% EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
EL;
N/EL
Electricity generation
from hydropower
CCM 4.5
/ CCA
4.5
1 0.1 EL EL N/EL N/EL N/EL N/EL 0.0
Transmission and
distribution of
electricity (Peru and
new connections to
plants with threshold
>100 gCO2eq/kWh)
CCM 4.9
/ CCA
4.9
10 0.8 EL EL N/EL N/EL N/EL N/EL 3.9
Electricity generation
from fossil gaseous
fuels (CCGT)
CCM
4.29 /
CCA
4.29
86 6.8 EL EL N/EL N/EL N/EL N/EL 8.9
Sale of spare pa s CE 5.2 0 0.0 N/AM N/AM N/EL EL(2) N/EL N/EL 0.0
Conservation, including
restoration, of habitats,
ecosystems and
species
BIO 1.1 0 0.0 N/AM N/AM N/EL N/EL N/EL EL(2) 0.0
Opex of taxonomy
eligible but not
environmentally
sustainable activities
(taxonomy-non
aligned activities) (A.2)
97 7.7 7.7 0.0 0.0 0.0 0.0 0.0 12.8
A.Opex of taxonomy
eligible activities
(A.1 + A.2)
961 76.1 76.1 0.0 0.0 0.0 0.0 0.0 79.7
B. TAXONOMY-NON-ELIGIBLE ACTIVITIES

A.2 TAXONOMY-ELIGIBLE BUT NOT ENVIRONMENTALLY SUSTAINABLE

ACTIVITIES (TAXONOMY-NON-ALIGNED ACTIVITIES)

eligible activities

Electricity generation

Electricity generation

Electricity generation

Enel X (only non-

Trading activities (Energy sales wholesale)

Market (Gas sales -

from coal n.a. 48 3.8

from nuclear n.a. 80 6.3

from Oil&Gas (OCGT)(3) n.a. 101 8.0

elegible activities) n.a. 4 0.3

end customer) n.a. 3 0.2

n.a. 4 0.3

Transitional activity

2023 Substantial contribution criteria DNSH Criteria
("Do No Signi cant Harm")
Category
Economic
activities
Taxonomy code Absolute ordinary
Opex 2023
Propo ion of ordinary
Opex 2023
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
mitigation (CCM)
Climate change
adaptation (CCA)
Climate change
Water and marine
resources (WTR)
Circular economy
(CE)
Pollution
(PPC)
ecosystems (BIO)
Biodiversity and
safeguards
Minimum
-aligned (A.1) or -eligible
(A.2) ordinary Opex 2022
Propo ion of taxonomy
Enabling activity
millions
of euro
% Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y; N;
N/EL
Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T
Market (Power sales -
end customer)
n.a. 14 1.1
Services, Holding &
Others
n.a. 50 4.0
Elisions and
adjustments
n.a. -1 -0.1
Opex of taxonomy
non-eligible activities
303 23.9
Total (A + B) 1,264 100.0
PROPORTION OF OPEX/TOTAL OPEX
Taxonomy-aligned
per objective
Taxonomy-eligible
per objective
CCM 68.4 76.1
CCA 0.0 76.0
WTR 0.0 0.0
CE 0.0 0.0
PPC 0.0 0.0
BIO 0.0 0.0
  • (1) No Opex gures that may correspond to adaptation solutions in accordance with A icle 11 (1) (a) of EU taxonomy regulation in business activities that already contribute to climate mitigation have been allocated to climate adaptation objective, thus avoiding any potential double counting with the gures provided on climate mitigation objective.
  • (2) The analysis of the alignment of this activity was not pe ormed for the purpose of the 2023 Sustainability Repo and will be disclosed next year in coherence with the timeline established in the Environmental Delegated Act.
  • (3) Electricity generation from fuel-oil and OCGT: it refers to thermal power plants that use fuel-oil and/or gas (OCGT), for which a breakdown by technology is not available.

2023 Substantial contribution criteria DNSH Criteria

Circular economy

Y; N; N/EL

EL; N/EL

Sale of spare pa s CE 5.2 0 0.0 N/AM N/AM N/EL EL(2) N/EL N/EL 0.0

(CE)

Pollution

Y; N; N/EL

EL; N/EL

(PPC)

Biodiversity and

Y; N;

EL; N/EL

1 0.1 EL EL N/EL N/EL N/EL N/EL 0.0

10 0.8 EL EL N/EL N/EL N/EL N/EL 3.9

86 6.8 EL EL N/EL N/EL N/EL N/EL 8.9

97 7.7 7.7 0.0 0.0 0.0 0.0 0.0 12.8

961 76.1 76.1 0.0 0.0 0.0 0.0 0.0 79.7

BIO 1.1 0 0.0 N/AM N/AM N/EL N/EL N/EL EL(2) 0.0

ecosystems (BIO)

Climate change

mitigation (CCM)

Climate change

adaptation (CCA)

Water and marine

resources (WTR)

Circular economy

(CE)

Pollution

N/EL Y/N Y/N Y/N Y/N Y/N Y/N Y/N % E T

(PPC)

Economic activities

Electricity generation from hydropower

Electricity generation from fossil gaseous fuels (CCGT)

Conservation, including restoration, of habitats, ecosystems and species

Opex of taxonomyeligible but not environmentally sustainable activities (taxonomy-nonaligned activities) (A.2)

A.Opex of taxonomyeligible activities (A.1 + A.2)

B. Taxonomy-noneligible activities

Electricity generation

Electricity generation

Electricity generation

Enel X (only non-

B. TAXONOMY-NON-ELIGIBLE ACTIVITIES

A.2 TAXONOMY-ELIGIBLE BUT NOT ENVIRONMENTALLY SUSTAINABLE

ACTIVITIES (TAXONOMY-NON-ALIGNED ACTIVITIES)

Trading activities (Energy sales wholesale)

Market (Gas sales -

from coal n.a. 48 3.8

from nuclear n.a. 80 6.3

from Oil&Gas (OCGT)(3) n.a. 101 8.0

elegible activities) n.a. 4 0.3

end customer) n.a. 3 0.2

n.a. 4 0.3

Transmission and distribution of electricity (Peru and new connections to plants with threshold >100 gCO2eq/kWh)

Taxonomy code

CCM 4.5 / CCA 4.5

CCM 4.9 / CCA 4.9

CCM 4.29 / CCA 4.29

Absolute ordinary

millions of euro %

Opex 2023

Propo ion of ordinary

Opex 2023

% EL; N/EL

Climate change

Y; N; N/EL

mitigation (CCM)

Climate change

Y; N; N/EL

EL; N/EL

adaptation (CCA)

Water and marine

Y; N; N/EL

EL; N/EL

resources (WTR)

("Do No Signi cant Harm") Category

Biodiversity and

ecosystems (BIO)

Minimum

safeguards

Propo ion of taxonomy

-aligned (A.1) or -eligible

(A.2) ordinary Opex 2022

Enabling activity

Transitional activity

Additional information on electricity generation from nuclear and gas activities

The following figures are reported in accordance with the Commission Delegated Regulation (EU) 2022/1214 of March 9, 2022, amending Delegated Regulation (EU) 2021/2139 as regards economic activities in certain energy sectors and Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those economic activities.

Template 1 - Nuclear energy and fossil gas related activities

Nuclear energy related activities 1 The undertaking carries out, funds or has exposures to research, develop-ment, demonstration and deployment of innovative electricity generation facili-ties that produce energy from nuclear processes with minimal waste from the fuel cycle. No 2 The undertaking carries out, funds or has exposures to construction and safe operation of new nuclear installations to produce electricity or process heat, including for the purposes of district heating or industrial processes such as hydrogen production, as well as their safety upgrades, using best available technologies. No 3 The undertaking carries out, funds or has exposures to safe operation of exist-ing nuclear installations that produce electricity or process heat, including for the purposes of district heating or industrial processes such as hydrogen pro-duction from nuclear energy, as well as their safety upgrades. Yes Fossil gas related activities 4 The undertaking carries out, funds or has exposures to construction or opera-tion of electricity generation facilities that produce electricity using fossil gase-ous fuels. Yes 5 The undertaking carries out, funds or has exposures to construction, refur-bishment, and operation of combined heat/cool and power generation facilities using fossil gaseous fuels. No 6 The undertaking carries out, funds or has exposures to construction, refur-bishment and operation of heat generation facilities that produce heat/cool us-ing fossil gaseous fuels. No

As shown in the table above, the only applicable activities for Enel concern the safe operation of existing nuclear plants and the operation of power generation plants using gaseous fossil fuels. The former activity is 100% non-eligible, while the latter is 100% eligible non-aligned. Accordingly, the following tables refer to templates 4 and 5 included in the annexes to the Complementary Delegated Act. The remaining templates in the Delegated Act are not applicable to Enel's business model. Furthermore, the information only refers to the climate change mitigation objective, as it is the prevailing objective for the Group.

Template 4 - Taxonomy-eligible but not taxonomy-aligned economic activities

Turnover (Revenue) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of taxonomy-eligible but not taxonomy-aligned economic
activity referred to in Section 4.29 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
2,984 3.0
Amount and proportion of other taxonomy-eligible but not taxonomy-aligned economic
activities not referred to in rows 1 to 6 above in the denominator of the applicable KPI
984 1.0
Total amount and proportion of taxonomy-eligible but not taxonomy-aligned
economic activities in the denominator of the applicable KPI
3,968 4.0

Capex (Capital expenditure) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of taxonomy-eligible but not taxonomy-aligned economic
activity referred to in Section 4.29 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
269 1.9
Amount and proportion of other taxonomy-eligible but not taxonomy-aligned economic
activities not referred to in rows 1 to 6 above in the denominator of the applicable KPI
146 1.0
Total amount and proportion of taxonomy-eligible but not taxonomy-aligned
economic activities in the denominator of the applicable KPI
415 2.9

Operating expenses (Opex) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of taxonomy-eligible but not taxonomy-aligned economic
activity referred to in Section 4.29 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
86 6.8
Amount and proportion of other taxonomy-eligible but not taxonomy-aligned economic
activities not referred to in rows 1 to 6 above in the denominator of the applicable KPI
11 0.9
Total amount and proportion of taxonomy-eligible but not taxonomy-aligned
economic activities in the denominator of the applicable KPI
97 7.7

Ordinary gross operating profit (EBITDA) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of taxonomy-eligible but not taxonomy-aligned economic
activity referred to in Section 4.29 of Annexes I and II to Delegated Regulation
2021/2139 in the denominator of the applicable KPI
450 2.0
Amount and proportion of other taxonomy-eligible but not taxonomy-aligned economic
activities not referred to in rows 1 to 6 above in the denominator of the applicable KPI
229 1.0
Total amount and proportion of taxonomy-eligible but not taxonomy-aligned
economic activities in the denominator of the applicable KPI
679 3.0

Template 5 - Taxonomy non-eligible economic activities

Turnover (Revenue) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of economic activity referred to in row 3 of Template 1 that
is taxonomy-non-eligible in accordance with Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the denominator of the applicable KPI
1,455 1.5
Amount and proportion of other taxonomy-non-eligible economic activities not referred
to in rows 1 to 6 above in the denominator of the applicable KPI
59,667 60.8
Total amount and proportion of taxonomy-non-eligible economic activities in the
denominator of the applicable KPI
61,122 62.3

Capex (Capital expenditure) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of economic activity referred to in row 3 of Template 1 that
is taxonomy-non-eligible in accordance with Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the denominator of the applicable KPI
171 1.2
Amount and proportion of other taxonomy-non-eligible economic activities not referred
to in rows 1 to 6 above in the denominator of the applicable KPI
1,564 11.0
Total amount and proportion of taxonomy-non-eligible economic activities in the
denominator of the applicable KPI
1,735 12.2

Operating expenses (Opex) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of economic activity referred to in row 3 of Template 1 that
is taxonomy-non-eligible in accordance with Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the denominator of the applicable KPI
80 6.3
Amount and proportion of other taxonomy-non-eligible economic activities not referred
to in rows 1 to 6 above in the denominator of the applicable KPI
223 17.6
Total amount and proportion of taxonomy-non-eligible economic activities in the
denominator of the applicable KPI
303 23.9

Ordinary gross operating profit (EBITDA) under the European taxonomy

Climate change mitigation
Economic activities Amount in millions of euro %
Amount and proportion of economic activity referred to in row 3 of Template 1 that
is taxonomy-non-eligible in accordance with Section 4.28 of Annexes I and II to
Delegated Regulation 2021/2139 in the denominator of the applicable KPI
511 2.3
Amount and proportion of other taxonomy-non-eligible economic activities not referred
to in rows 1 to 6 above in the denominator of the applicable KPI
7,681 35.0
Total amount and proportion of taxonomy-non-eligible economic activities in the
denominator of the applicable KPI
8,192 37.3

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

SIGNIFICANT EVENTS IN 2023

Enel places new perpetual hybrid bonds for €1.75 billion to refinance some of its outstanding hybrid bonds

On January 9, 2023, Enel SpA launched the issue of non-convertible, subordinated, perpetual hybrid bonds for institutional investors on the European market, denominated in euros, with an aggregate principal amount of €1.75 billion.

Enel launches a €1.5 billion sustainabilitylinked bond

On February 14, 2023, Enel Finance International NV launched a dual-tranche sustainability-linked bond for institutional investors for a total of €1.5 billion. The new issue envisages for the first time the use by Enel of multiple Key Performance Indicators (KPIs) per tranche. One tranche of the bond combines a KPI linked to the EU taxonomy with a KPI linked to the United Nations Sustainable Development Goals (SDGs). The other tranche of the bond is linked to two KPIs related to the Group's full decarbonization path through direct and indirect reductions of greenhouse gas emissions.

Disposal of thermal generation activities in Argentina

On February 17, 2023, the Enel Group, acting through its subsidiary Enel Argentina, reached an agreement for the sale to the energy company Central Puerto SA of the Group's stake in the thermal generation company Enel Generación Costanera for €42 million.

In addition, on March 29, 2023, YPF and Pan American Sur SA exercised their respective pre-emption rights for:

  • the purchase by YPF of the shares held by Enel Américas in Inversora Dock Sud SA and indirectly of the shares it holds in Central Dock Sud SA; and
  • the purchase by Pan American Sur SA of the shares held by Enel Argentina in Central Dock Sud SA.

The sale closed on April 14, 2023 for a total of about €48 million.

For more information on the associated financial effects, please see note 9 "Main acquisitions and disposals during the year".

Enel Perú signs an agreement to sell its distribution, supply and advanced energy services' assets to CSGI

On April 7, 2023, Enel Perú SAC, controlled by Enel SpA through Enel Américas SA, reached an agreement with the Chinese company China Southern Power Grid International (HK) Co. Ltd (CSGI) to sell the entire equity stakes held by Enel Perú in the power distribution and supply company Enel Distribución Perú SAA and in Enel X Perú SAC, the latter providing advanced energy services.

The agreement establishes that CSGI will acquire Enel Perú's interests in Enel Distribución Perú SAA (equal to around 83.15% of the share capital) and Enel X Perú SAC (equal to 100% of the share capital), for a total of around \$2.9 billion, equivalent to an enterprise value of about \$4 billion (on a 100% basis).

Enel finalizes joint venture deal with INPEX Corporation by selling 50% of Enel Green Power Australia

On September 29, 2023, Enel SpA, acting through its wholly-owned subsidiary Enel Green Power SpA closed the sale to INPEX Corporation (INPEX) of 50% of two entities that own all of the Group's renewables operations in Australia, namely Enel Green Power Australia (Pty) Ltd and Enel Green Power Australia Trust. The sale was closed following the fulfillment of all conditions set out in the sale agreement signed on July 13, 2023.

In line with the above agreement, INPEX paid a total of about €142 million.

Upon the transaction's closing, Enel Green Power SpA and INPEX will jointly control Enel Green Power Australia, overseeing the company's current renewable generation portfolio and continuing to develop its project pipeline, seeking to increase its installed capacity.

For more information on the associated financial effects, please see note 9 "Main acquisitions and disposals during the year".

Enel launches a sustainability-linked share buyback program serving its 2023 Long-Term Incentive Plan

On October 5, 2023, the Board of Directors of Enel SpA, implementing the authorization granted by the Shareholders' Meeting of May 10, 2023 and in compliance with the relevant terms previously disclosed to the market, approved the launch of a share buyback program for a total of 4.2 million shares, equal to approximately 0.041% of Enel's share capital.

The program, which will run from October 16, 2023 until no later than January 18, 2024, is designed to serve the 2023 Long-Term Incentive Plan for the management of Enel and/or of its subsidiaries pursuant to Article 2359 of the Italian Civil Code, which was also approved by the Shareholders' Meeting on May 10, 2023.

Since the beginning of the program, Enel has purchased 3,377,224 treasury shares (equal to about 0.0332% of share capital), for a total €21,007,908.138. Considering the treasury shares already owned, as at December 29, 2023, Enel held a total 9,262,330 treasury shares, equal to about 0.0911% of the share capital.

Enel signs agreement to sell a geothermal and solar portfolio in the United States to Ormat

On October 23, 2023, Enel SpA, acting through its fully-owned subsidiary Enel Green Power North America Inc. (EGPNA), signed an agreement with Ormat Technologies Inc., for the sale of a renewable asset portfolio in the United States.

The sale was finalized on January 4, 2024 at a price of \$271 million, equivalent to €250 million, subject to customary transactional adjustments.

The assets sold include EGPNA's entire geothermal portfolio as well as a number of small solar plants, with a total capacity of about 150 MW of operating plants.

Enel closes the sale of a photovoltaic generation portfolio in Chile to Sonnedix

On October 25, 2023, Enel SpA and its listed subsidiary Enel Chile SA closed the sale of their entire equity interests in the share capital of Arcadia Generación Solar SA, a Chilean company which owns a portfolio of four operating PV plants with a total installed capacity of about 416 MW, to Sonnedix, an international renewable energy producer. The transaction was closed following the fulfillment of all conditions set forth in the stock purchase agreement signed on July 12, 2023, including receipt of clearance from the Chilean antitrust authority Fiscalía Nacional Económica (FNE).

Pursuant to the above agreement, the purchaser paid a total of €535 million, corresponding to the 100% enterprise value agreed by the parties. The transaction resulted in the recognition of a capital gain of €195 million.

For more information on the associated financial effects, please see note 9 "Main acquisitions and disposals during the year".

Enel finalized the sale of its Romanian operations to PPC

On October 25, 2023, Enel SpA finalized the sale to the Greek company Public Power Corporation SA (PPC) of all the interests held by the Enel Group in Romania, following the fulfillment of all the conditions set forth in the related sale agreement, signed on March 9, 2023.

In line with the agreement, PPC paid a total of about €1,241 million. An earn-out mechanism is also envisaged, involving a potential further post-closing payment based on the future value of the retail business.

The transaction had a negative impact on profit or loss for the year of €847 million, of which €655 million reflecting the release of a currency translation reserve, €15 million in respect of transaction costs connected with the sale and the recognition of €177 million in impairment losses on the assets prior to the sale (net of taxes).

For more information on the associated financial effects, please see note 9 "Main acquisitions and disposals during the year" and note 7 "Discontinued operations".

Enel reaches agreement to sell Group's Peruvian generation assets

On November 22, 2023, Enel SpA announced that its subsidiaries Enel Américas SA and Enel Perú SAC, the latter controlled by Enel through the Chilean listed company Enel Américas, have signed an agreement with Niagara Energy SAC, a Peruvian company controlled by the global investment fund Actis, for the sale of all the equity stakes held by the Enel Group in power generation companies Enel Generación Perú SAA and Compañía Energética Veracruz SAC.

Specifically, the agreement establishes that Niagara Energy will acquire the stakes held by Enel Perú and Enel Américas in Enel Generación Perú's share capital (equal to approximately 66.50% and 20.46%, respectively) as well as those held by Enel Perú in Compañía Energética Veracruz

(equal to 100%) for a total of about \$1.4 billion (about €1.3 billion), equivalent to an overall enterprise value of around \$2.1 billion (about €1.9 billion, on a 100% basis).

This consideration is subject to adjustments customary for these kinds of transactions in consideration of the time between signing and closing.

The closing of the sale, which is expected by the 2nd Quarter of 2024, is subject to certain conditions customary for these kinds of transactions, including receipt of clearance from the competent antitrust authorities in Peru.

Enel finalizes the sale of 50% of Enel Green Power Hellas to Macquarie Asset Management

On December 29, 2023, Enel SpA announced that, acting through its wholly-owned subsidiary Enel Green Power SpA (EGP), it had finalized the sale of 50% of Enel Green Power Hellas (EGPH), EGP's fully-owned renewable subsidiary in Greece, to Macquarie Asset Management, acting through the Macquarie Green Investment Group Renewable Energy Fund 2, following the fulfillment of all the conditions customary for these kinds of transactions, including receipt of clearance from the competent antitrust authorities, set out in the sale agreement signed on July 26, 2023. In line with that agreement, the total price received by EGP was €351 million.

Following the transaction's closing, EGP and Macquarie Asset Management entered into a shareholder agreement which envisages joint control of EGPH in order to co-manage the company's current renewable generation portfolio as well as continuing to develop its project pipeline, further increasing its installed capacity.

The transaction generated a positive impact on Enel Group profit of €422 million (including the fair value remeasurement of the remaining equity investment).

For more information on the associated financial effects, please see note 9 "Main acquisitions and disposals during the year" and note 7 "Discontinued operations".

The European regulatory framework

Developments in the "Fit for 55" and REPowerEU packages

The European Commission's "Fit for 55" package, presented in July 2021, proposed raising the EU's 2030 targets in support of a more ambitious climate goal of reducing greenhouse gas emissions by 55% by 2030 and achieving climate neutrality by 2050. In 2023 the European institutions continued discussions over the various dossiers in the "Fit for 55" package" and its adaptation to the changes introduced by REPowerEU.

Renewable energy and energy efficiency

In October 2023 the revision of the Renewable Energy Directive was published in the Official Journal of the European Union. Member States have 18 months to transpose it into national law. The Directive raises the share of renewable energy in the European Union's overall energy consumption to 42.5% by 2030, with an additional 2.5% indicative top-up to allow the target of 45% to be achieved. All Member States will have to contribute to achieving more ambitious sector-specific targets in transport, industry and buildings. Moreover, the Directive provides for an acceleration in permit procedures for renewable energy projects. Member States shall design renewables acceleration areas where renewable energy projects will undergo simplified and fast permit-granting processes. Renewable energy deployment will also be presumed to be of "overriding public interest", which will limit the grounds of legal objections to new installations.

EU institutions have also reached an agreement to raise to 11.7% the EU energy efficiency target by 2030, from the initial 9% of the "Fit for 55" package, including an increase in the Member State's annual energy saving obligation, which should gradually increase from 2024 to 2030. Moreover, in 2023 European institutions reached an agreement on the European Energy Performance of Buildings Directive (EPBD). The new provisions include significant innovations in reducing the use of fossil fuels in buildings, developing charging infrastructure for electric mobility, increasing the rate of renovation and efficiency of the building stock, as well as integrating solar systems into buildings.

Mobility

In October 2023, the new Alternative Fuels Infrastructure Regulation (AFIR) was published in the Official Journal of the European Union, establishing – for the first time in the EU – mandatory targets for the development of charging infrastructure for light and heavy vehicles and for the infrastructure to supply electricity to vessels moored in ports in the different Member States. Again in 2023, the ReFuelEU Aviation and FuelEU Maritime Regulations, targeted at reducing greenhouse gas emissions for aviation and maritime transport, setting increasingly stringent emission limits for ships and planes, and envisaging measures to promote renewable fuels, including hydrogen and renewable or low-carbon electricity, were published in the Official Journal of the European Union. At the end of 2023, the European Parliament and Council reached an agreement on a proposal for the revision of the Trans-European Transport Network (TEN-T) Regulation, which seeks to close regional, economic and social gaps through the development of interconnected air transport, roadway, railway and maritime network infrastructures, directly connected with the Connecting Europe Facility (CEF), which defines projects of common interest (PCIs) eligible for CEF funding.

The revision of CO2 standards for new cars and light commercial vehicles, published in the Official Journal of the European Union in the 1st Half of 2023, increase emission reduction targets for 2030 and requires that all new light vehicles sold from 2035 be zero-emission vehicles. In this respect, a further revision is expected, which should allow internal combustion vehicles powered only by synthetic fuels to be placed on the market even after 2035.

Hydrogen and decarbonized gas market package and definition of renewable hydrogen

As required by the Renewables Directive of 2018, in the 1st Half of 2023 two delegated acts aimed at defining the criteria by which hydrogen produced from electricity can be considered renewable were published in the Official Journal of the European Union and are directly applicable in all EU countries, ensuring clarity on the rules for the production of renewable hydrogen. The main criteria concern the principles of additionality for renewable plants that power the electrolyzers and the spatial and temporal correlation between electrolyzers and renewable plants, as well as the

Digital technology

During the 2nd Half of 2023 the European Commission finalized several new proposals for the digital sector impacting the energy industry.

In December 2023, EU legislators provisionally approved the Artificial Intelligence Act, the first-ever legal framework on AI worldwide, aimed at ensuring that EU law, fundamental rights and sustainability principles are protected from high-risk AI systems; however, the package has yet to be formally adopted. Complementing the AI Act, a political agreement was reached on the revised Product Liability Directive, ensuring that people can sue for compensation for damage caused by a defective product, including digital products.

With regard to data policies, in June 2023 the Commission adopted the Implementing Regulation laying down interoperability requirements and non-discriminatory

method to use to calculate the reduction of greenhouse gas emissions deriving from its use.

In December 2023 the EU institutions reached a provisional political agreement on the package for the decarbonization of the gas market, the proposal for which dates back to December 2021. The new regulation and directive included in the package establish a framework facilitating the penetration of renewable and low-carbon gases into the system, including hydrogen, and rules governing the market and organization of the sector, including infrastructure aspects. The provisional agreement needs to be endorsed and formally adopted by the Parliament and the Council in 2024 before publication in the Official Journal of the European Union.

and transparent procedures for access to metering and consumption data for end users and eligible parties. Furthermore, in December 2023, the European regulation establishing harmonized rules on fair access to data and its use was published in the Official Journal of the European Union, giving Member States until September 12, 2025 to implement the regulation.

Finally, with regard to cyber security, in October 2023 the Commission published a draft implementing regulation establishing the European Common Criteria-based cyber security certification scheme for information and communication technologies. That draft is linked to the Cyber Resilience Act, the proposal for a European regulation on cyber security requirements for products with digital elements, such as smart meters, on which EU legislators reached a political agreement in December 2023.

Batteries

Published in the Official Journal of the European Union in July 2023, the new European regulation on batteries, the proposal for which dates back to 2020, pursues three objectives: to strengthen the functioning of the internal market, ensuring a level playing field through a common set of rules; to promote a circular economy; and to reduce environmental and social impacts at all stages of the battery life cycle.

State aid

New State aid regulations

As from June 30, 2023, the revised General Block Exemption Regulation (GBER) came into force, which will facilitate, simplify and accelerate support for the EU's green and digital transition, while preserving a level playing field in the single market. The GBER defines specific categories of State aid that, under certain conditions, are compatible with the Treaty on the Functioning of the European Union (TFEU) and exempts these categories from the obligation of prior notification to the Commission and its approval. Major changes were made to the sections relating to climate, environmental protection and energy, including an update of the notification thresholds, in response to the energy crisis. The revised GBER expands the scope for Member States to finance different types of green projects, such as those to reduce CO2 emissions, sustainable mobility and charging infrastructure; the introduction of new green conditions that large energy-intensive businesses must meet to receive aid in the form of reduced tax rates or exemptions from payment of system charges; energy efficiency and storage, including batteries; sustainable hydrogen and renewable energy communities. Finally, the definition of energy infrastructure has been extended to hydrogen and CO2 as long as it is accessible to third parties. The scope has also been extended geographically to the entire territory and no longer just to areas receiving assistance.

The State aid COVID Temporary Framework (TF COVID) concerning solvency and investments for economic development for sustainable growth expired on December 31, 2023. That date marked the end of the phasing out period which started during 2022. We have worked within the Temporary Framework to disburse aid for national measures intended to boost employment even in disadvantaged areas.

The Temporary Crisis Framework (TCF) was most recently revised on March 9, 2023. The new framework was renamed Temporary Crisis and Transition Framework (TCTF) in order to underline the nature of the revision, aimed at fostering support measures in sectors which are key for the transition to a zero-emission economy, in line with the Green Deal Industrial Plan. The TCTF will also allow the disbursement of aid until December 31, 2025. In addition to direct aid to meet the additional costs associated with the rise in the price of gas and electricity, the system also provides for schemes for accelerating the rollout of renewable energy and energy storage. More specifically, the investment support can cover up to 100% of total costs if it is granted through a tender procedure. This also includes aid for decarbonization through electrification and the use of renewable and electrolytic hydrogen. The main new aspect regards investment support for the mass manufacture of batteries, solar panels, wind turbines, heat-pumps, electrolyzers and carbon capture usage and storage as well as for production of key components. Their amount varies according to the region in which the investment is to be made, ranging from 15% of costs and a maximum of €150 million per company in the richest regions, to 35% of costs and a maximum of €350 million per company in disadvantaged regions. The most relevant aspect of this type of aid is the so-called "matching aid": an EU Member State could – under certain conditions – match the support offered to a company in a non-EU state.

On November 20, the Commission prolonged by six months, until June 30, 2024, a limited number of sections of the TCTF. In particular, it put off the phasing out of the provisions enabling Member States to grant limited amounts of aid (section 2.1) with an increase in aid ceilings to compensate for high energy prices (section 2.4) to cover the winter heating period. The other provisions of the TCTF, among which liquidity support in the form of State guarantees or in the form of subsidized loans and measures aimed at supporting the reduction of electricity consumption, were not affected and expired on December 31, 2023. Sections aimed at accelerating the green transition and reducing dependence on fuels remain in force until December 31, 2025.

Moreover, the European Commission extended until December 31, 2025 the possibility of granting State aid for rescuing and restructuring non-financial undertakings in difficulty according to the related guidelines of 2014. The rest of the guidelines remain applicable without further changes and their extension is necessary to avoid a legal vacuum after December 31, 2023.

On June 2, 2023, the European Commission published a communication in the Official Journal of the European Union which establishes the rules for any changes to regional aid maps. EU countries can propose updates to their maps for the 2022-2027 period.

Cases of State aid

In 2023, we continued to monitor the funds authorized by the European Commission for the countries of importance to the Group in relation to TF COVID, TCF and TCTF.

On February 7, 2023, the Commission approved a €1.36 billion Greek scheme to partially compensate energy-intensive companies for higher electricity prices resulting from the indirect costs of emissions under the ETS.

On February 17, 2023, the Commission approved a €460 million Spanish measure supporting the ArcelorMittal España project aimed at a partial decarbonization of its steel production in Gijón, where it operates two blast furnaces producing liquid hot metal from a mixture of iron ore, coke and limestone. The aid will support the construction of a plant for the production of direct reduced iron based on renewable hydrogen.

On March 6, 2023, the Commission approved the amendments to an existing Italian guarantee scheme, including an up to €3 billion budget increase for the reinsurance of natural gas and electricity trade credit risk in the context of the Ukraine crisis. The original scheme, approved on September 30, 2022, seeks to limit the risks that insurers currently face in offering customers trade credit insurance. Managed by SACE, the Italian export credit agency, the scheme ensures that trade credit insurance will continue to be available to businesses, enabling them to avoid having to pay their energy bills in advance or within few weeks, thus reducing their immediate liquidity needs.

On March 27, 2023, the Commission approved the reintroduction of a €396 million Spanish scheme to reduce electricity consumption levies imposed on energy-intensive enterprises.

On April 3, 2023, the Commission approved a €450 million Italian scheme to support investments in the integrated production of renewable hydrogen and renewable electricity in brownfield sites.

On April 24, 2023, the Commission approved a €450 million Spanish scheme to support gas-intensive manufacturing companies in the context of Russia's war against Ukraine.

On April 25, 2023, the Commission approved a prolonged and amended State aid measure issued by Spain and Portugal to reduce wholesale electricity prices on the Iberian market (MIBEL), lowering the input costs of fossil fuel power plants.

On May 11, 2023, the Commission approved a €837 million Spanish scheme to support the production of batteries for electric and related vehicles, for the benefit of battery manufacturers, their key components and related raw materials.

On May 17, 2023, the Commission approved the amendments to an existing Greek scheme, including an up to €600 million budget increase to support non-domestic electricity users in the context of the Ukraine crisis.

On June 19, 2023, the Commission approved, within the

TCTF, two Italian schemes totaling €535 million to finance contribution relief for newly hired young people and women until December 31, 2023.

On July 7, 2023, the Commission approved a €350 million Spanish scheme, entirely funded under the NRRP and operational until June 2026, to support the construction and operation of electricity storage plants.

On August 8, 2023, the Commission approved, within the TCTF, an Italian scheme totaling €100 million to support companies active in Sardinia.

On August 9, 2023, the Commission approved a €150 million Italian scheme denominated "Sicilian Energy Bonus" to support companies active in Sicily.

On October 9, 2023, the Commission approved a €100 million Italian scheme in the form of direct subsidies to support the production of electrolyzers within the TCTF.

On October 31, 2023, the Commission approved a €61.5 million Italian scheme exempting private employers from the payment of social security contributions for the hiring of disadvantaged workers.

On November 10, 2023, the Commission approved a €1.7 billion Italian scheme supporting agrivoltaic installations, funded under the NRRP and operational until December 31, 2024. The scheme provides investment grants for the construction and operation of new photovoltaic plants in Italy, with a total capacity of 1.04 GW and an annual electricity generation of at least 1,300 GWh, to become operational by June 30, 2026. On November 20, 2023, the Commission approved amendments to a Spanish scheme, already approved in 2022, to compensate energy-intensive companies with the partial reimbursement of indirect emissions costs under the EU ETS. The amendments essentially consist in a budget increase of €5.61 billion leading to an overall budget of €8.51 billion to partially compensate those firms for an increase in electricity bills due to the impact of the price of carbon on electricity costs.

On November 22, 2023, the Commission approved a €5.7 billion Italian scheme to support renewable energy communities, in particular generation and self-consumption from renewable power generation installations, as well as the expansion of existing ones. The part of the scheme financed by the National Recovery and Resilience Plan will run until December 31, 2025, while the remaining part of the scheme will run until December 31, 2027.

On November 28, 2023, the Commission approved, within the TCTF, a €1.1 billion Spanish scheme to support investments in the production of equipment needed to facilitate the transition to a zero-emission economy, targeting manufacturers of batteries, solar panels, wind turbines, heat pumps and electrolyzers, as well as key components mainly designed and used as direct inputs for the production of such equipment or related critical raw materials necessary for their production.

On December 19, 2023, the Commission authorized the amendment of a 2017 Italian support scheme (SA. 38635) for

electricity-intensive firms in the form of reductions in certain levies on electricity consumption with the aim of mitigating the risk that, due to these levies, these businesses will relocate their activities to locations outside the European Union with less ambitious climate policies.

On December 21, 2023, the Commission approved, under EU State aid rules, a €17.7 billion Italian scheme to support the construction and operation of a centralized electricity storage system with a joint capacity of more than 9 GW/71 GWh. The scheme will run until December 31, 2033.

We continued to provide support in 2023 to the assessment of the State aid aspects of priority projects for the Group under the NRRP.

More specifically, on July 20, 2023 the European Commission has approved an €89.5 million Italian measure consisting in a direct grant through the Recovery and Resilience Facility to support 3SUN's investment for the expansion of its solar panels factory. Discussions in the 1st Half of 2023 with the DG Competition in Brussels before, during and after the State aid notification were fundamental in obtaining approval.

The evaluation of IPCEI (Important Projects of Common European Interest) hydrogen projects and the related conditions for granting already approved State aid continues.

Regulatory framework by business line

Thermal Generation and Trading

Italy

Generation and the wholesale market

Rules governing plants essential to the electrical supply system

Within the rules governing ancillary services, certain plants are classified as essential due to their territorial location, their technical characteristics and their relevance for Terna SpA in resolving specific critical issues with the grid. In return for meeting availability and market supply requirements, these plants receive specific remuneration determined by the Regulatory Authority for Energy, Networks and the Environment (hereinafter "ARERA" or the "Authority"). The obligations and specific remuneration granted are determined each year on the basis of a procedure for identifying, for each plant, the specific regulatory regime among those provided for in the rules governing essential plants, namely:

  • alternative contracts pursuant to Article 65-bis of Annex A to ARERA Resolution no. 111/2006, which provides for the payment of a fixed premium based on the power identified as essential for the management of the electricity system against the obligation to offer that power on the ASM (Ancillary Services Market) within maximum/ minimum price limits for increasing/decreasing quantities and in the hours defined ex-ante by ARERA. The decision to opt for this contract is left to the operator in the phase preceding the publication of the list of essential systems and entails exclusion from the other regimes indicated below for the contracted capacity;
  • ordinary regime pursuant to Article 64 of the aforementioned Resolution, which establishes requirements to

supply the DAM (Day-Ahead Market) and the IM (Intraday Market) solely for quantities of power requested by Terna, against payment of the higher specific variable costs of the units involved. Outside the hours and quantities specified by Terna, supply on the DAM and IM is free of constraints. Finally, all supply on the ASM is subject to an obligation to offer quantities at the specific variable cost calculated for the production unit;

• the cost reimbursement regime pursuant to Article 65 of the aforementioned Resolution, which, in return for meeting supply obligations for the entire power of the plant and at all hours of the year, provides for payment of fixed costs, including a return on invested capital and variable costs, net of revenue generated. Participation in this regime is subject to an ARERA decision upon application of the operator. The reimbursement is settled by ARERA in the form of payments on account and payment of a final balance, based on requests submitted by the operator.

With Resolution no. 532/2022/R/eel ARERA set the invested capital remuneration rate for essential plants eligible for reimbursement of costs for 2023 at 11.9%. For 2024, with Resolution no. 481/2023/R/eel, WACC was set at 9.7%.

Essential plant designations for Enel plants in 2023 and 2024

For 2023 with Resolution no. 742/2022/R/eel the Sulcis, Portoferraio and Assemini plants were declared eligible for the cost reimbursement scheme. With Resolution no. 624/2023/R/eel, these same plants were declared eligible for the cost reimbursement scheme also for 2024, with the exception of the Portoferraio plant which was not considered essential by Terna for the year.

The Porto Empedocle plant is eligible for long-term cost reimbursement until 2025, while plants located on the smaller islands are automatically eligible for cost reimbursement for all years in which they are declared essential, including 2023.

For 2023 and 2024 the remainder of essential capacity was contracted under alternative contracts to the essential plant regime (pursuant to Article 65-bis of Annex A of Resolution no. 111/2006).

Maximization of thermal generation by plants powered by non-gas alternative fuels

In order to tackle the gas supply problems for the 2022/2023 thermal year, Decree Law 14/2022 (the socalled "Ukraine Decree") allowed the Ministry of Ecological Transition (MiTE, now Ministry of the Environment and Energy Security - MASE) to require Terna to maximize thermal generation by plants with a capacity of over 300 MW powered by non-gas alternative fuels, as well as generation by bioliquid plants and – with Law of April 21, 2023 – biomass. The decree law also contains measures for the competent institutions to cooperate on issuing environmental waivers that may be necessary for the operation of plants whose output is to be maximized and ask ARERA to establish the supply rules for those plants and the reimbursement of costs incurred following the activation of the measure.

With its Guidelines of September 1, 2022, the MiTE (now MASE) asked Terna to draw up and implement a gas-alternative production maximization plan for the September 19, 2022 - March 31, 2023 period to enable a savings of 1.8 billion cubic meters of gas, minimizing recourse to environmental waivers.

Terna has identified the plants that will take part and, on September 19, launched the production maximization plan. Enel's Sulcis, Fusina, Torrevaldaliga Nord, and Brindisi plants are included.

With its Resolution no. 430/2022/R/eel, ARERA established that:

  • for plants that are already deemed essential plants eligible for the cost reimbursement scheme (Sulcis plant), the existing supply and production cost reimbursement rules will continue to apply;
  • for other plants, the operator is required to present bids relating to the maximization plan announced by Terna at the minimum technical price on the energy markets and at the recognized variable cost (RVC) for each unit of generation in the ASM. Terna pays to the operator any positive difference between the energy market price and the RVC; while Terna pays to operators whose bids are accepted for sale on the ASM the day-ahead market zonal prices, if higher than the RCV. If revenue is not sufficient to cover even the fixed costs incurred during the maximization period, the operator can request that ARERA reimburse these costs, exclud-

ing the remuneration and amortization of the capital invested in the plant prior to the start of the maximization procedure.

With its Guidelines of April 1, 2023, the MASE asked Terna to continue the maximization plan until September 30, 2023. Terna confirmed the inclusion of Enel plants and defined a production maximization plan for the May 15 - September 30, 2023 period.

With its Resolution no. 258/2023/R/eel ARERA approved Enel Produzione's petition to review the criteria for determining the variable cost recognized that is applicable to the plants of Brindisi Sud, Fusina and Torrevaldaliga Nord. The updated parameters after the issue of the resolution will be used in the determination of income items for the entire period covered by the maximization plan, that is from September 19, 2022 until completion of the plan, on September 30, 2023.

Capacity remuneration mechanism

On June 28, 2019, the Minister for Economic Development issued a decree approving the definitive rules governing the capacity remuneration mechanism (the capacity market). On November 6 and November 28, 2019 two auctions were held with delivery in 2022 and 2023 respectively: Enel was awarded capacity for both years. A number of operators and a sectoral trade association contested the decree and the results of the two auctions before the Lombardy Regional Administrative Court.

Two operators also challenged the European Commission decision approving the Italian mechanism before the EU Court. In two decisions dated 7 September 2022, the European General Court dismissed the actions and the two applicant companies decided to not appeal the decisions before the Court of Justice of the European Union, thereby concluding the disputes.

The disputes are, however, still pending before the Lombardy Regional Administrative Court, which had suspended its proceedings in April 2021 pending the rulings of the EU Court, having identified an issue for which a preliminary ruling was called for with respect to these proceedings.

With the Decree of the MiTE of October 28, 2021, the new capacity market regulation was approved. It will apply to auctions with delivery from 2024. In execution of the decree, Terna launched the auction procedures for 2024, which took place on February 21, 2022. Enel was awarded annual contracts for approximately 10.4 GW of existing capacity with delivery in 2024, and contracts for approximately 1.5 GW of new capacity with a duration of 15 years from 2024 to 2038. Pursuant to the decree, the results of the 2024 auction will be used as the basis for assessing whether to hold an auction for the 2025 delivery year. In December 2021, two operators filed two appeals with the Lombardy Regional Administrative Court against the MiTE Ministerial Decree of 28 October 2021, Terna's 2021

Capacity Market Regulations and the ARERA resolutions which define the framework for the execution of the capacity auction for 2024. In May 2022, the same companies also challenged the detailed report of the results of the main auction for 2024, published by Terna.

In March 2022, ARERA issued Resolution no. 83/2022/R/ eel with urgent measures to change the methods of calculating the strike price of the capacity market, introducing a mechanism for indexing on a daily basis the components relating to the cost of gas and the issue charges included in the calculation of the strike price, in order to cope with the increased volatility of the natural gas spot market since 2022. The new methodology replaced the previous formulas, which provided for an indexation of the strike price on a monthly basis, and was confirmed by AR-ERA with Resolution no. 583/2023/R/eel for 2024. With a notice of September 18, 2023, Terna published the new version of the technical provisions for the functioning of the capacity market valid for 2023 and 2024, which establish a new method for verifying the energy availability requirements for the storage facilities participating in the capacity market on the basis of which these systems are remunerated.

On December 20, 2023 Terna announced the start of the consultation on the updating of the capacity market regulations containing the new rules for the award of contracts through new auctions from 2025.

Renewable energy communities

At the end of November 2021, Legislative Decree 199/2021 implementing Directive 2018/2001 on the promotion of the use of energy from renewable sources was published in the Gazzetta Ufficiale. The decree also contains provisions on self-consumption arrangements and renewable energy communities, which are already governed in Italy by the experimental regulations introduced with Law 8/2020 (ratifying Decree Law 162/2019, the "Milleproroghe" omnibus extension act) and subsequent implementation measures (ARERA Resolution no. 318/2020/R/eel and Ministerial Decree of September 16, 2020 of the Ministry for Economic Development).

In December 2022, in implementation of Legislative Decree 199/2021, ARERA approved the Consolidated Distributed Self-Consumption Code (TIAD) which sets out the new regulatory framework for energy communities and self-consumption arrangements. In November 2023, the European Commission approved the draft decree proposed by the MASE, which defines new incentive mechanisms for these communities and arrangements. Following approval by the European Commission, on January 23, 2024 the MASE published the new decree, with full implementation commencing on January 24, 2024. The Decree of September 16, 2020 will be repealed starting from the sixtieth day following the date of adoption of the operational rules, which will be determined by the ESO (Energy Services Operator).

Iberia

Royal Decree Law 6/2022 of March 29 adopting urgent measures as part of the Plan for the National Response to the economic and social consequences of the war in Ukraine, Royal Decree Law 11/2022 of June 25 adopting and extending certain measures to respond to the economic and social consequences of the war in Ukraine, address situations of social and economic vulnerability and the economic and social recovery of the island of La Palma

On March 30, 2022, Royal Decree Law 6/2022 of March 29 was published in Spain's Official Journal, approving certain measures as part of the Plan for the National Response to the consequences of the war in Ukraine. The legislation contains various measures for the energy sector, some of which were extended until December 31, 2022 with Royal Decree Law 11/2022 of June 25 and until December 31, 2023 with Royal Decree Law 18/2022 of October 18 and Royal Decree Law 20/2022 of December 27. Some of the most significant measures were the following:

  • extension until December 31, 2022 of the payment obligation that Royal Decree Law 17/2021 of September 14 established for non-emitting generation plants in proportion to the presumed higher revenue that those plants would have earned following the incorporation into wholesale electricity prices of the value of the price of natural gas. Power hedged with fixed-price forward contracts before March 31, 2022 will be exempt from the application of the mechanism. Hedging instruments with a duration equal to or greater than one year and a fixed price after March 31, 2022 will be excluded if the fixed price is equal to or less than €67/MWh. In the case of bilateral contracts between generators and retailers in the same business group, the hedge price will be the price that sellers pass on to final consumers and, in this case, the exempt fixed price will be determined by increasing the value by €67/MWh in the average marketing margin of the sector;
  • the reduction in the remuneration of generation from intramarginal plants was subsequently not extended, meaning the mechanism expired on December 31, 2023. Exceptionally, within two months of the entry into force of the royal decree law, a ministerial order will update the remuneration parameters for renewable sources, cogeneration and waste plants, taking account of forward prices for the 2nd Half of 2021 for market prices and carbon dioxide (CO2 ). Furthermore, starting from 2023 inclusive, the adjustment mecha-

nism for deviations from the market price is eliminated, in order to encourage the forward sale of energy by these plants. However, Royal Decree Law 10/2022 of May 13 restored the adjustment mechanism for deviations from the market price, incorporating forward benchmarks in relation to the expected price;

  • specific, simplified procedures have been established to promote the streamlining of the authorization process for new renewable plants or plants under construction, for wind projects up to 75 MW and photovoltaic plants up to 150 MW, with connection lines of less than 15 kW;
  • as regards the access auctions, for two years from the publication of the royal decree law, in the nodes where the capacity tenders were held, 10% of the available reserved capacity will be released for renewable plants (linked to transmission or distribution) for self-consumption;
  • exceptionally, for the 2023-2025 period, electricity distributors must specifically include in their investment plans specified actions to increase the capacity of their networks to allow the evacuation of electricity from renewable sources and self-consumption, which must represent a minimum of 10% of the investment eligible for the remuneration paid by the system each year, and must be primarily intended for areas where there is a lack of access capacity for renewable energy;
  • strategic natural gas reserves will be increased from 20 days of consumption to 27.5 days, with greater flexibility.

Royal Decree Law 10/2022 of May 13 establishing a temporary generation cost adjustment mechanism to reduce wholesale electricity prices

On May 14, 2022, Royal Decree Law 10/2022 of May 13 was published in Spain's Official Journal. It establishes a temporary mechanism for adjusting generation costs to reduce the wholesale price of electricity. The measure establishes a mechanism for adjusting the generation costs of marginal fossil fuel technologies, with the aim of obtaining an equivalent reduction in the clearing price of the wholesale market until May 31, 2023.

Under this mechanism, the adjustment is based on the difference between a benchmark price for the gas consumed by thermal generation plants (€40/MWh for six months, subsequently increasing by €5/MWh per month, up to €70/MWh) and the spot price of gas on the Spanish organized gas market (MIBGAS). This mechanism will be applicable to combined-cycle, coal and cogeneration plants not covered by any regulated remuneration framework. The amount of the adjustment will be distributed among the portion of Iberian demand that directly benefits, either because it buys energy at a price directly related to the wholesale market value or because it has signed or renewed a contract that already takes account of the beneficial effect of the wholesale pricing mechanism. With regard to the latter aspect, the storage supply units, whether batteries or pumping systems, as well as supply units for auxiliary generation services, are exempt from payment of the cost of the mechanism.

The entry into force of the mechanism was subject to the authorization of the European Commission, which was granted on June 8, 2022, following which the Ministry for the Ecological Transition and the Demographic Challenge (MITECO) approved order TED/517/2022 of June 8, which established June 14, 2022 as the start date for application of the mechanism (for the June 15 market day). In addition, this Royal Decree Law includes the following:

  • a mandate has been established to introduce a reference to forward market prices, incorporating a price component based on a basket of products (annual, quarterly and monthly) and a daily and intraday market price component, so that the new voluntary price for small consumers (PVPC) energy costing formula can begin to be applied in early 2023. Therefore, the MITE-CO began hearings on the drafting of a royal decree to modify the PVPC energy costing formula to incorporate a forward basket of products in addition to the daily and intraday market price component. Moreover, the cost of funding the Bono Social by the operators of the reference market is incorporated in the PVPC. The draft royal decree also modifies the scope of application of the PVPC, which would apply to residential customer and micro-enterprises with a contractual capacity of no more than 10 kW. Finally, changes were made to the rules for non-peninsular territories;
  • the regime for the installation of renewable, cogeneration and waste facilities has been modified to reintroduce the adjustment mechanism for deviations from the market price and to incorporate a basket of prices in the price forecast, which will include both the daily market and forward benchmarks (annual, quarterly and monthly), with different weights.

Royal Decree Law 17/2022 of September 20 adopting urgent measures in the field of energy, in application of the remuneration system for cogeneration plants and temporarily reducing the Value Added Tax (VAT) rate applicable to intra-EU delivery, import and acquisition of certain fuels

On September 21, 2022, Royal Decree Law 17/2022 of September 20 was published, containing several urgent measures in the energy field, some of which were subsequently extended by Royal Decree Law 20/2022 of December 27. The measures adopted were as follows:

• option for cogeneration plants to temporarily waive the regulated remuneration scheme in favor of the adjustment mechanism for production costs provided under Royal Decree Law 10/2022 of May 13;

  • greater flexibility in determining network transmission capacity, and streamlining and simplifying procedures for renewable energy projects;
  • reduction in the VAT rate from 21% to 5% on supplies of natural gas, pellets, briquettes, and firewood until December 31, 2023;
  • application of the entire surplus for 2021 to cover temporary imbalances and transitory deviations between revenue and costs in the 2022 financial year.

Royal Decree Law 18/2022 of October 18 which approves measures to reinforce the protection of energy consumers and to contribute to reducing natural gas consumption in application of "Plan +Security for your energy (+SE)", as well as measures on the remuneration of public sector workers and to protect seasonal agricultural workers affected by drought

The Royal Decree Law 18/2022 was published on October 19, 2022, and implements some of the measures contained in the "Plan +Security for your energy (+SE)". The most significant features are as follows:

  • extension of the mechanism to reduce excess electricity market remuneration caused by high natural gas prices in the international markets, introduced by Royal Decree Law 17/2021 of September 14, until December 31, 2023;
  • until the ordinance regulating auctions for the supply of fuel in non-peninsular territories is approved, a new dynamic dispatch pricing system, based on monthly calculations, will apply in these territories in order to make dispatching more efficient and reduce excess costs.

Law 38/2022 of December 27 on the establishment of temporary energy levies and taxes on credit institutions and financial credit establishments by creating the temporary solidarity tax on large fortunes, and amending certain tax rules

On August 30, 2022, socialist parliamentary groups and the parties constituting the government presented a draft law imposing temporary levies on the energy and banking sectors.

The law was published in Spain's Official Journal on December 28, 2022, after being approved by the Spanish Parliament.

The main features of the energy levy under this law are as follows:

• in 2023 and 2024, a temporary levy of 1.2% will be imposed on the net turnover derived from activity carried out in Spain in the previous calendar year, with the payment obligation arising as of the first day of the calendar year;

  • the net turnover amount does not include revenue relating to the tax on hydrocarbons, the Canary Islands special tax on petroleum-derived fuels and the additional charges on fuels and petroleum products in Ceuta and Melilla, which have been paid or incurred as an input tax. It will also exclude turnover relating to regulated activities, meaning the supply at regulated prices (PVPC for electricity, the last resort rate (TUR) for gas, bottled LPG and piped LPG), the regulated revenue of electricity and natural gas transmission and distribution networks and, in the case of generation with regulated remuneration and additional remuneration in non-mainland areas, all plant revenue, including any received from the market and from dispatch services;
  • the levy will apply to persons or entities considered main operators in the energy sectors, with an annual net turnover in 2019 of more than €1,000 million, or whose net turnover in 2017, 2018 and 2019 from their qualifying activities exceeded 50% of total net turnover for that year. It also establishes that main operators will include any individuals or entities who carry out in Spain activities relating to the production of crude oil or natural gas, coal mining or oil refining, and who generate, in the year preceding that in which the levy payment obligation arises, at least 75% of their turnover from economic activities relating to mining, oil refining or the manufacture of coke products;
  • the net turnover for companies that are part of a tax group that is taxed on a consolidated basis is calculated based on the entire group;
  • the tax is legally classified as non-tax levies of a public nature which are not deductible for corporate income tax purposes, nor can they be passed on to customers/ third parties.

Royal Decree Law 20/2022 of December 27 on measures to respond to the economic and social consequences of the war in Ukraine and to support the reconstruction of the island of La Palma and other situations of vulnerability

On December 28, 2022, Royal Decree Law 20/2022 of December 27 was published, with the following most significant aspects:

  • the scope of application of the exceptions introduced by Royal Decree Law 10/2022 of May 13 includes waste-to-energy plants authorized prior to 2013 with a power capacity of between 50 MW and 100 MW, which allows them to temporarily waive inclusion in the specific regulated remuneration scheme as is currently allowed for cogeneration plants;
  • in order to prevent speculative maneuvers in the renewable energy sector and to avoid overwhelming the administrative process, some procedures for which applications have been submitted will be suspended for a

period of 18 months with regard to nodes reserved for capacity tenders;

  • progress has been made in simplifying and speeding up the procedures for processing authorizations for renewable energy plants;
  • in the area of self-consumption, the distance for a photovoltaic system used for self-consumption to be considered in close proximity to the grid has been increased from 1,000 to 2,000 meters, and they may be located, in addition to on rooftops, on industrial land or on structures whose primary purpose is not the generation of electricity;
  • with regard to electricity transmission, by March 31, 2023 the government will start to modify the development plans for the transmission grid to include priority measures to promote the energy transition and that make it possible to develop the industrial value chain. On an exceptional basis, these measures may be partially funded by the Recovery, Transformation and Resiliency Plan and are not subject to the investment limits for transmission companies;
  • aid will be available to gas-intensive companies to offset the increase in natural gas prices;
  • finally, a number of measures enacted to make natural gas supply contracts more flexible were extended until December 31, 2023.

Royal Decree Law 3/2023 of March 28, extending the generation cost adjustment mechanism to reduce wholesale electricity prices established by Royal Decree Law 10/2022 of May 13

On March 29, 2023 Royal Decree Law 3/2023 of March 28 was published in Spain's Official Journal which, among other things, extends for seven months until December 31, 2023, the so-called "Iberian derogation" mechanism established by Royal Decree Law 10/2022 of May 13. The royal decree law modifies and completes, until the end of 2023, the evolution of the benchmark price for natural gas for the purpose of activating the mechanism, ranging between €45/MWh in January 2023to €65/MWh in December 2023.

The mechanism was not extended and expired on December 31, 2023.

Royal Decree Law 5/2023 of June 28, adopting and extending certain measures to respond to the economic and social consequences of the war in Ukraine and to support the reconstruction of the island of La Palma and other situations of vulnerability

On June 29, 2023, Royal Decree Law 5/2023 of June 28 was published in Spain's Official Journal. Among other things, it includes a new package of measures to respond to the economic and social impact of the war in Ukraine on Spain, also with the extension of measures already adopted in the past. Its main features concerning energy are as follows:

  • the deadline for renewable projects with access permits from January 1, 2018 in the process of obtaining administrative authorization for construction has been extended by six months. In any case, the five-year term from the start of work for commissioning has been retained;
  • the price references for electricity and fuels to be used for calculating the remuneration for the operation of renewable energy, cogeneration and waste plants have been modified to use values more in line with current market levels. Order TED/741/2023 of June 30 updates remuneration parameters for 2023-2025, incorporating among other things the provisions of Royal Decree Law 5/2023 of June 28;
  • in line with European legislation, energy communities formed of members of the public are introduced as a new figure in the sector. Among other rights, such communities may own distribution networks and act as consumer representatives to engage in collective self-consumption activities;
  • all charging stations with a capacity exceeding 3 MW are declared to be public utility, with corresponding authorization from the Ministry for the Ecological Transition and the Demographic Challenge. Accordingly, plants with an output of less than 3 MW are exempt from the requirement to obtain administrative authorization.

Royal Decree Law 8/2023 of December 27, adopting certain measures to respond to the economic and social consequences of the war in Ukraine and the Middle East and to alleviate the impact of drought

On December 28, 2023, Royal Decree Law 8/2023 of December 27 was published in Spain's Official Journal. It extends the energy protection measures implemented in response to the war in Ukraine, promotes renewable energy and contains measures to reduce the impact of drought. The key aspects concerning energy are as follows:

  • VAT: VAT on electricity increases from 5% to 10% throughout 2024 (provided that the average daily market price of the previous month is above €45/MWh). For natural gas, VAT rises from 5% to 10% until March 31, 2024;
  • value of production tax (7%): 3.5% will be applied in the 1st Quarter of 2024, 5.25% in the 2nd Quarter of 2024 and 7% thereafter. The electricity system will be compensated for the decline in receipts within the limit of the amount necessary to achieve balance between revenue and expenditure in respect of those charges;
  • excise tax on electricity: this will rise from 0.5% to 2.5% in the 1st Quarter of 2020 and to 3.8% by the 2nd Quarter of 2020, before increasing to 5% thereafter;

  • energy tax (1.2%): this has been extended until 2024, without prejudice to the establishment in the 2024 State Budget of an incentive for strategic investments essential for the ecological transition (energy storage, new renewable fuels such as biogas, biomethane or green hydrogen);
  • renewables, self-consumption and storage: the deadline for developing new renewables projects is voluntarily extended to eight years. It is possible to incorporate qualitative criteria into renewables auctions that recognize the social and environmental added value of European industry;
  • self-consumption: to ensure the clearance of surpluses by self-consumption plants, a reserve of 10% of the capacity of all nodes of the electricity transmission network has been reserved for access tenders;
  • network capacity: to avoid the hoarding of network access permits for large-scale consumption, two measures have been introduced:
    • guarantees for large-scale consumption projects that connect to ≥36 kV grids equal to €40/kW and €20/kW for storage in demand mode, in addition to the €40/kW required in generation mode. The guarantees also apply to permits already granted, which have six months to present the guarantees to the competent body and another six months to send the accreditation receipt to the grid operator;
    • automatic forfeiture of access and connection permits, with connection point in a ≥36 kV grid, if within 5 years of obtaining those permits an access contract is not signed for a contractual capacity in the P1 period equal to at least 50% of the access capacity granted in the permit;
  • demand tenders: the Ministry for the Ecological Transition and the Demographic Challenge may organize demand tenders on transmission grid nodes where the total volume of new applications for demand access capacity is so great that it is impossible to satisfy them all;
  • hydroelectric storage: storage is included among the uses of water, ranking third in the established order of preference after the supply of civil use populations and agricultural use and ahead of electricity generation and other industrial uses. Pumping concessions are adapted to be considered hydraulic energy storage facilities and their repowering is encouraged.

Renewable energy auctions

Based on the provisions of Order TED/1161/2020 of December 4, which sets out the rules for the first auction held under the economic regime for renewable energy and sets the indicative timetable for 2020-2025, the Resolution of July 18, 2022, published on July 28, 2022, announced the third auction under the economic regime for renewable energy. A total of 380 MW was allocated for the auction, which was held on October 25, 2022. Similarly, the Resolution of August 2, 2022, published on August 5, 2022, announced a fourth auction, with 3,300 MW allocated for award, which was held on November 22, 2022. Furthermore, in 2022 various ministerial orders where approved, updating the remuneration of some of the compensation parameters of the structures, and work has begun on updating the parameters for the 6-month regulatory period beginning in 2023.

Tenders for access capacity at certain nodes of the transmission grid

On June 10, 2022, the Ministry for the Ecological Transition and the Demographic Challenge began preparation of a proposal for an Order for a tender for the access capacity at certain nodes of the transmission network, in compliance with the provisions of Royal Decree 1183/2020 of December 29 concerning access and connection to the electricity transmission and distribution grids, for a total capacity of 5,844 MW.

In addition, on August 9, 2022, the Resolution of the Secretary of State for Energy of August 3, 2022 was published, containing the decision to hold another tender for access capacity at certain nodes of the transmission grid.

Fuel Order for non-peninsular territories

On December 30, 2022, Order TED/1315/2022 was published, implementing Decision 1337/2021 of November 16, 2021 of the Spanish Supreme Court, concerning the need to regulate auctions for the supply of fuel in the non-peninsular territories and other technical issues.

The Order sets out the procedure for conducting fuel auctions, which will be held every two years and will be for the product used in the plant (or the raw material in the case of gas from the Balearic Islands). The auctions will be reverse auctions based on starting prices obtained by increasing the benchmark prices by 10% (3% in the case of natural gas), which will be those applied until the auctions are held or the auctions do not take place or are canceled. As from January 27, 2022, the benchmark price for natural gas will be the price on the Iberian Gas Market (MIB-GAS), while for other fuels it is determined on the basis of a number of international indices, to which a premium is added, where appropriate. The Order also grants the logistics costs of delivering the product to the plant, which can be revised every three years.

In addition, the Order also provides for the use of natural gas in the Canary Islands and in Melilla, as well as LPG in the Canary Islands, together with other less polluting fuels. Following the publication of Order TED/1315/2022, on February 3, 2023 the resolution of January 24, 2023 of the Directorate General for Energy Policy and Mining was published. It establishes product prices and special taxes applicable to coal, fuel oil and diesel for the 2nd Half of 2021, to be applied in the settlement of this period for gener-

ation units located in non-continental territories. Consequently, the fuel prices were determined by applying the references referred to in the third transitional provision of Royal Decree 738/2015 of July 31, as the aforementioned Directorate General is aware of the fact that Decision 1337/2021 of November 16 of the Spanish Supreme Court was declared contrary to the law and is not applicable to the determination of fuel prices.

Proposal for a resolution of the tender procedure for new investment and extension of the useful lives of existing units in nonpeninsular territories

In implementation of Royal Decree 738/2015 of July 31, the Ministry for the Ecological Transition and the Demographic Challenge in January began hearings on the proposed resolution of the Secretariat of State for Energy calling the competitive procedure for the granting of favorable compatibility resolutions for the purposes of payment of the additional remuneration regime. The purpose of the procedure is to grant compatibility resolutions, among other things, for actions that enable coverage of additional electricity demand emerging from the coverage analyses conducted by the System Operator. On November 6, 2023 a new version of this proposed resolution was again opened to the public. It updates the power requirements with the latest information provided by the System Operator and introduces other elements, such as new criteria and scales for evaluating the applications submitted.

Regulatory amendments in non-peninsular territories

Royal Decree 446/2023 of June 13 amending the calculation method for determining the voluntary price for small consumers (PVPC), modified certain regulatory aspects of generation in non-peninsular territories, including:

  • elimination of the adjustment factor for fuel bills effective as of January 1, 2023;
  • introduction of a correlation factor in the calculation of carbon dioxide (CO2 ) emissions allowances effective as of July 1, 2023 to consider actual emissions of plants;
  • in view of the financial impact of the extraordinary measures taken to ensure security of supply, it grants compensation for the financial cost of the lag between the completion of settlement of regulated electricity sector activities for the year in which the measures are approved and the date of approval of the final settlement for that year, based on the one-year Euribor rate plus 50 basis points.

Approval of final generation costs for generation units in non-peninsular territories

In July 2023, the resolutions approving the definitive generation costs in non-peninsular territories for 2018 and 2019 were published, while in September the work of drafting an equivalent proposed resolution for 2020 was begun.

Rest of the World

Latin America

Chile

Rate revision – Introduction of temporary electricity price stabilization mechanisms

On November 2, 2019, Law 21.185 of the Ministry of Energy was published, introducing a temporary electricity price stabilization mechanism for customers subject to rate regulation. Consequently, the prices to be applied to regulated customers in the 2nd Half of 2019 were lowered to those applied in the 1st Half of 2019 (Decree 20T/2018) and were defined as "stabilized prices for regulated customers" (PEC).

Between January 1, 2021 and the expiry of this mechanism, the prices to be applied will be those set every six months on the basis of Article 158 of the Electricity Law and may not exceed the level of the PECs noted above adjusted for consumer price inflation.

Any differences between the amount invoiced by applying the stabilization mechanism and the theoretical amount that could be invoiced considering the price that would have been applied in accordance with the contractual terms and conditions agreed with the various electricity distribution companies will be accounted for as receivables for invoices to be issued to generation companies up to a maximum of \$1,350 million until 2023. These differences will be recognized in US dollars and will not accrue interest until the end of 2025. Any imbalances in favor of the generation companies must be recovered no later than December 31, 2027. It should be noted that the fund limit was reached in January 2022.

On August 2, 2022, the Ministry of Energy published Law 21.472, which establishes a rate stabilization fund and a new mechanism for the temporary stabilization of electricity prices for customers subject to rate regulation. This law establishes a Transitional Customer Protection Mechanism (TCPM) which will stabilize energy prices, complementing that provided for by Law no. 21.185, for customers subject to regulation of prices supplied by concession holders of the public distribution service governed by the General Law of Electricity Services. The purpose of the TCPM will be to pay the differences that occur between the invoicing of distribution companies to end customers for the energy and power component, and the amount that corresponds to the payment of the supply of electricity to generation companies. The resources appropriated for the operation of the TCPM cannot exceed \$1,800

million and their availability will be extended until the balances originating from the application of the law are extinguished. Starting from 2023, the National Energy Com-

Enel Green Power

Italy

The Ministerial Decree of July 4, 2019 provided for competitive procedures based on Dutch auctions and registers, depending on the installed capacity and by technology groups, including photovoltaic systems. In particular, expected procedures are:

• Dutch auctions for plants with a capacity of more than 1 MW;

• registers for plants with a capacity of less than 1 MW.

Unlike previous decrees, the Ministerial Decree of July 4, 2019 provides for a new method for supporting renewable sources through two-way contracts for differences under which the successful tenderer returns any positive differences between the zonal price and the auction price. The successful tenderer for renewables capacity will benefit from the incentive mechanism for the entire useful life of the plant (20, 25 or 30 years, according to the technology).

On November 30, 2021, Legislative Decree 199 of November 8, 2021 transposing Directive (EU) 2018/2001 on the promotion of the use of energy from renewable sources (the RED II Decree) was published in the Gazzetta Ufficiale. The decree provides that capacity not assigned in the auction procedures referred to in the Ministerial Decree of July 4, 2019 shall be put up for auction in subsequent procedures in 2022, until the publication of the new auction schedule for the next five years. Pending the new planning, an additional three auctions were called in 2023.

In addition, the measure confirmed the same Dutch auction mechanisms for plants with a capacity greater than 1 MW, providing for an exception for plants with a capacity greater than 10 MW, which will be able to use the mechanism even though they have not completed the authorization process.

Plants with a capacity of less than 1 MW, on the other hand, will have direct access to incentives, with the exception of innovative technology plants, which will be able to access the subsidies through specific tenders.

The incentive mechanisms are being updated by the Ministry of the Environment and Energy Security (MASE) with a specific implementing decree.

The clawback mechanism

Decree Law 4 of January 27, 2022 (the Third Support Decree), ratified with Law 25 of March 28, 2022, introduced, for the period February 2022 - December 2022 a twoway refund mechanism for plants powered by renewable mission must project the total payment of the residual final account every six months for a date that cannot be later than December 31, 2032.

sources receiving incentives through the energy account and for all plants powered by renewable sources that are not receiving incentives and that entered service by January 2010. Producers must return the difference between the market price, or the contracted price for forward sales, and a reference price identified in the same decree for each market zone (an average of €60/MWh). Decree Law 115 of August 9, 2022 (the Second Aid Decree), ratified with Law 142 of September 21, 2022, introduced a number of amendments to the Third Support Decree by extending the period of application of the clawback mechanism until June 2023, specifying that, for vertically integrated groups, only contracts signed by group companies (including non-generators) with other natural or legal persons outside the group are eligible. The implementation procedures for this mechanism were specified by ARERA with Resolution no. 266/2022/R/eel (for the period February 1, 2022 - December 31, 2022) and with Resolution no. 143/2023/R/eel (for the period January 1, 2023 - June 30, 2023).

Finally, the 2023 Budget Act (Law 197 of December 29, 2022), transposing Regulation (EU) 1854/2022, extended the reimbursement scheme to plants not covered by Decree Law 4 of January 27, 2022, establishing a cap of €180/ MWh.

ARERA Resolution no. 266/2022/R/eel, together with other technical standards with which the Energy Services Operator (ESO) required the generators concerned to repay the amounts due, was the subject of an appeal before the Lombardy Administrative Regional Court (TAR). The TAR granted the appeals filed by several operators, voiding the resolution and the consequential measures. ARERA lodged a precautionary appeal of the voidance ruling before the Council of State, which met on March 21, 2023. On March 22, 2023, with precautionary orders no. 1124/2023, 1126/2023 and 1127/2023, the Council of State granted the precautionary petition filed by ARERA, setting a hearing for discussion on December 2023, which was subsequently postponed to another date to be determined.

At the same time, another operator appealed ARERA Resolution no. 266/2022/R/eel as well as the second resolution no.143/2023/R/eel. As part of this judgment, the Lombardy TAR referred the assessment of the compliance of the mechanism envisaged in the Third Support Decree with respect the EU regulatory framework to the Court of Justice of the European Union, suspending the proceeding until the Court's decision.

Iberia

Renewable energy

As in the rest of Europe, Spain in the 1st Half of 2023 was also involved in the consultation by the European Commission on the Electricity Market Design, which should lead to the adoption of a proposal by Brussels by next March.

One of the most important issues facing Spain in 2023 with regard to the development of new renewable generation capacity is compliance with the milestones that Royal Decree 23/2020 establishes to maintain access and connection permits to the grid. The deadline for certifying the Environmental Impact Statement and the prior administrative authorization expired in the 1st Half of 2023. Nationwide, more than 50 GW of power from wind and solar projects successfully achieved these two milestones.

In the case of Enel Green Power-Endesa, most of the power in the pipeline also achieved these requirements (more than 4 GW).

As in 2022, the achievement of these goals monopolizes a considerable portion of the activity of the central administration, of the Autonomous Communities and, obviously, of the promoters of renewable generation.

At the end of 2022, the Spanish government published a resolution for the grant of aid, under competitive tendering, for the repowering of wind farms, as well as aid for the development of recycling facilities for decommissioned wind turbine components. Enel Green Power-Endesa has submitted applications for a grant of aid both for the repowering of wind farms and, together with its partners, for the recycling of wind turbine blades. In November 2023 the definitive allocation of aid for the repowering of wind projects with the funds of the Recovery, Transformation and Resilience Plan was published. Enel Green Power was awarded €17.6 million contributing to the repowering of six projects for a total of 100.3 MW.

At the end of 2022, the Spanish government also published a call for tenders for hybrid storage projects. In case of award, applicants receive a grant to finance investment in and development of the projects. Enel Green Power-Endesa submitted various projects and obtained grants in the amount of €9.2 million in December 2023.

On December 28, 2023, the Royal Decree Law 8/2023 was published. It includes various measures related to renewable generation. It does not extend the reduction in generation remuneration governed by Royal Decree Law 17/2021, due to an excess price of €67/MWh. The measure expired therefore on December 31, 2023. The period of application of the "Iberian derogation", governed by Royal Decree Law 10/2022, was also not extended and therefore expired on December 31, 2023.

For generation projects with access and connection permits after December 31, 2017 and before this Royal Decree Law, the deadline for accreditation of the administrative construction permit has been moved from January 25, 2024 to July 25, 2024. Additionally, for those projects, an extension of the terms may be requested to obtain the definitive exploitation permit within a period of three months, up to a maximum of eight years (until July 25, 2028) indicating the half-year of commissioning. This enables the better organization of projects to be carried out between 2024 and 2028.

Furthermore, the royal decree provides for measures to progressively restore the energy taxation in force before the start of the energy crisis resulting from the war in Ukraine.

Rest of the World

North America

United States

Forced labor in the solar supply chain

In June 2021, US customs authorities responded to reports by issuing a "Withhold Release Order" (WRO) on silicon-based products manufactured by the company Hoshine Silicon Industry Co. Ltd (Hoshine) and its subsidiaries, since they have been accused of exploiting their workforce. The WRO restricts the import into the United States of polysilicon products made by Hoshine Silicon Industry Co. Ltd.

The effect on the US solar industry was the halting of shipments of photovoltaic modules by US customs, resulting in a delay in the delivery of solar equipment to end users, including Enel.

All photovoltaic equipment manufacturers had to produce clear documentation of their supply chain to meet US customs requirements. The documentation had to prove the specific origin of metallurgical grade silicon in imported photovoltaic products and demonstrate the absence of any Hoshine product in any part of the mining or manufacturing process.

Enel's Code of Ethics and corporate procedures do not permit the exploitation of workers by any Group supplier or subcontractor. Nevertheless, Enel is strengthening its controls, reviewing its supply chain and monitoring the implementation of the WRO by customs officials.

In a separate but connected development, in December 2021, President Biden signed the Uyghur Forced Labor Prevention Act (UFLPA). UFLPA requires US customs authorities to apply a presumption that goods "mined, produced, or manufactured in whole or in part" in the Xinjiang Uyghur Autonomous Region are made with forced labor and, therefore, are prohibited from being imported into the United States.

Goods covered by this presumption shall not be allowed to enter unless the importer proves that:

  • it has fully complied with government guidelines and regulations;
  • it has responded fully and substantially to all US customs inquiries; and
  • it is determined "with clear and convincing evidence" that the goods were not produced using forced labor.

Polysilicon is one of the three industries on which application of the WRO is focused, and this focus extends to photovoltaic equipment that could contain raw materials mined in the Xinjiang Uyghur Autonomous Region. Implementation of the law will be guided by an administrative regulation process under way since February 2022, which is expected to be completed by June 2022.

A key element of the UFLPA came into force on June 21, 2022: rebuttable presumption. From now on, any import of goods mined, produced or manufactured in whole or in part in the Xinjiang Uygur Autonomous Region (XUAR), or from entities identified in a new UFLPA entity list, will be assumed to have been made with forced labor and will be barred from entering the United States. To prevent US customs from blocking the delivery of goods, importers will need to demonstrate whether the goods to be imported (or their components) were extracted, produced or manufactured in the XUAR and/or whether the goods to be imported were purchased from a supplier identified in the UFLPA entity list.

UFLPA compliance by importers should ensure compliance with the current Withhold Release Order (WRO), which blocks the import of any solar equipment containing metallurgical grade silicon manufactured by Hoshine.

The private nature of the blockade imposed by US customs makes it difficult to monitor the application of the UFLPA.

Importers with solar module products using Chinese-sourced polysilicon continue to be detained due to difficulties in providing complete traceability documentation. In December 2023, US customs apparently released detained products that used Chinese polysilicon not sourced from Xinjiang.

Separately, ROTH Capitol reported that Astroenergy also obtained US customs clearance for products made from Chinese polysilicon (Ordos and Asia Silicon) that "appear" to be made from Chinese quartz and MGS.

US duties on imported solar equipment

In February 2022, the Biden administration announced its decision to extend the duties applicable to imported solar panels. The decision extends the collection of duties for another four years, while adopting a very marginal annual tariff reduction: the duty on imported solar panels will decline by 0.25% each year. It is important to note that the Biden administration's decision also confirms the tariff exemption for bifacial solar modules, which are the main type of solar panels used by Enel for its utility-scale projects in the United States. The Biden administration is currently carrying out an intermediate review of the duty. A final report is due to be sent to the President during 2024, after which the President could make changes to the duty or leave the corrective measures as they are.

Also in February 2022, California-based PV manufacturer Auxin Solar filed a petition for a circumvention enquiry with the US Department of Commerce (DOC), asking the DOC to launch an investigation into whether crystalline silicon PV cells and modules (CSPV) from Vietnam, Malaysia, Thailand and Cambodia were "circumventing" anti-dumping and countervailing duties. The DOC then launched an investigation and in August 2023 the DOC officially ended the "Auxin" circumvention investigation, concluding that the AD/CVD applicable to Chinese solar cells and modules will be extended to cells and modules from Cambodia, Malaysia, Thailand and Vietnam.

President Biden issued an emergency declaration on June 6, 2022, giving the DOC the authority to waive the collection of AD/CVD duties and, above all, deposits for duties on CSPV cells and modules exported from Vietnam, Malaysia, Thailand and Cambodia for 24 months, starting from the date of the announcement. The DOC is making use of this new authority and has issued regulations to implement the 24-month emergency declaration, protecting affected imports from Auxin-related duties until June 2024.

The US Department of Commerce (DOC) also clarified that imports of solar cells and modules form Cambodia, Malaysia, Thailand and Vietnam will not be subject to suspension of settlement or cash deposit requirements if accompanied by a certification that they are not circumventing AD/ CVD orders.

US duties on imported Chinese products

In 2018, the United States Trade Representative (USTR) conducted a Section 301 investigation and found that China's acts, policies and practices related to technology transfer, intellectual property and innovation were unreasonable and discriminatory.

As a result, it published five lists (List 1, 2, 3, 4A and 4B), each of which identifies different Chinese products subject to different duties. To Enel, the list of greatest interest is that including Chinese components used for wind and solar projects and batteries.

In September 2022, the USTR announced that it was seeking public comments regarding the effectiveness of the Section 301 duties in order to understand the effects of these on the economy and on US consumers in order to

identify any other actions that could be taken.

The clean energy industry has called on the Biden administration to leave tariffs for batteries (7.5%) and battery cells (25%) unchanged; or to lower the tariff for battery cells to 7.5%, eliminating the problem of tariff inversion.

Federal loans and incentives for clean energy in the United States

In November 2021, President Biden signed the \$1 trillion Infrastructure Investment and Jobs Act (IIJA), also known as the bipartisan infrastructure law, unlocking funds for new spending on roads, bridges, aqueducts, broadband. The new law also contains provisions to boost the expansion of the country's electricity grid and support existing and new clean energy technologies. It also contains provisions to support existing nuclear power plants and hydroelectric plants, clean up orphaned wells and abandoned mining lands and facilitate access to critical minerals needed for clean energy production. Of potential interest to Enel, the following programs were announced:

  • clean hydrogen: the Department of Energy (DOE) has received \$7 billion to develop between 6 and 10 "Clean Hydrogen Hubs" in the United States. Each hub will consist of a network of clean hydrogen producers, potential consumers and connecting infrastructure located in close proximity. The DOE received applications, which had to be completed and sent by April 2023, and selected seven regional programs in October 2023. Negotiations to finalize proposals are under way;
  • the National Electric Vehicle Infrastructure Formula Program (NEVI) has made \$5 billion in funding available over five years and distributed across all 50 states. The plan aims to promote the development of battery-powered cars, ensuring that motorists always have somewhere to charge their vehicles. The funding covers the cost of EV charging stations and the related infrastructure (including solar power and storage systems), as well as operation and maintenance costs for five years;
  • electric vehicle charging infrastructure: the US Department of Energy (DOE) and the US Department of Transportation (DOT), acting through the Federal Highway Administration, have presented a plan to create a network of public electric vehicle chargers along interstate highways worth \$5 billion. The money will be distributed over five years across all 50 states. The plan aims to promote the development of battery-powered cars, ensuring that motorists always have somewhere to charge their vehicles. Separately, the DOT, acting through the Federal Transit Administration, has announced a plan to distribute \$5.3 billion in grants to state and local transit agencies for the "Low or No Emission Vehicle Program". The "Low or No Emission Vehicle Program" supports transport agencies in purchasing or leasing low or no emission buses and other transport vehicles that use technologies such as electric batteries;
  • strengthening the power grid and expanding transmission: this program of \$2.5 billion in government subsidies over five years was introduced to strategically distribute publicly available EV charging infrastructure and other infrastructure to be located along alternative fuel corridors. At least 50% of this funding must be used for projects that expand access to EV recharging and alternative fuel infrastructures in rural areas, low- and moderate-income sections and communities with little private parking;
  • electric school buses: \$5 billion over five years has been allocated to replace existing diesel-powered school buses with clean, zero-emission buses. Half of the funding will be spent on electric zero-emission buses, while the other half will be used on zero-emission buses powered with alternative fuels. Grants can cover up to 100% of the costs of replacing existing schools and installing charging and refueling stations. The IIJA will replace over 1,000 transport vehicles, including buses, with clean electric vehicles, thanks to an additional appropriation for the US DOT of \$5.75 billion over the next five years, 5% of which will be dedicated to training the transportation labor force on maintaining and managing the fleets.

Inflation Reduction Act of 2022

On August 16, 2022, President Biden signed the Inflation Reduction Act (IRA), which sets aside about \$415 billion over the next 10 years in the form of grants, tax credits and investments to support new clean energy technologies projects, renewable energy generation, the electrification of transport systems and climate-smart agriculture. It is expected that the measures will reduce carbon emissions by almost 40% in the United States by 2030 and will raise US GDP by 0.2% in 2031. The funding will be distributed as follows:

  • energy (to extend, and in some cases increase, tax credits; \$263 billion);
  • climate (to accelerate the reduction in emissions and support low-income communities; \$48 billion);
  • generation (to encourage the domestic production of solar panels, wind turbines and batteries; \$48 billion);
  • environment (to create environmental quality incentives; \$27 billion);
  • transportation (through offering tax credits to consumers; \$24 billion);
  • water (through a drought-relief program; \$5 billion).

The US Department of Treasury is currently working on the guidance needed for a new set of tax credits. The various tax credits will be phased down starting the latter of:

  • December 31, 2032; or
  • the year in which the US's greenhouse gas emissions from electricity generation will be 25% below 2022 emission levels.

Depending on that status of the infrastructure to be built, tax credits may be available beyond 2032. The following are the IRA provisions that are of greatest interest to Enel.

Extension and expansion of federal tax credits for clean energy: the IRA extends the production tax credit (PTC) (\$26.5/MWh for projects that begin construction after December 31, 2021) and introduces a new technology-neutral clean electricity tax credit commencing in 2025. It also extends the investment tax credit (ITC) (30% for projects that begin construction after December 31, 2021) and launches a new technology-neutral clean electricity ITC beginning in 2025. Solar power developers may now request PTC instead of ITC. However, to be eligible for the full credit, projects must meet the prevailing wage and apprenticeship requirements for the entire period of construction (and perhaps also for some of the maintenance activities); project owners that fail to comply will have to pay a penalty or see their tax credit reduced to 20% (\$5/ MWh PTC or 6% ITC). The IRA also adds stand-alone energy storage projects, in line with the conditions for solar power, and microgrid controllers, specifically for systems of between 4 kW and 20 MW, to the technology eligible for ITC.

The IRA creates a bonus tax credit if domestic content requirements or energy community requirements are met. Another new bonus tax credit is available for solar and wind facilities (and connected storage systems) located in low-income communities.

A new 10-year clean hydrogen PTC of \$3 per kilogram is available for hydrogen produced after December 31, 2022. For a project to be eligible, construction must begin before January 1, 2033.

Extension and expansion of federal tax credits and loans for electric vehicles: in order to encourage the electrification of the transportation sector, the IRA extends various tax credits for new and previously owned electric vehicles and commercial electric vehicles, including buses, and expands the tax credit to cover the purchase of EV charging equipment.

The IRA allocates \$1 billion for replacing heavy-duty Class 6 and 7 commercial vehicles with zero-emission vehicles (for example, school buses, public transportation bus, garbage trucks) and \$3 billion for the US Postal Service to purchase new electric delivery vehicles and charging stations.

New advanced manufacturing production tax credits: the IRA creates a new PTC for the production of components for wind, solar and battery projects, such as solar PV cells, PV wafers, PV modules, wind turbines, nacelles, inverters, battery cells and modules, and many others. Tax credit amounts vary by component, production cost and certain capacity factors. To be eligible, the component must be produced by the taxpayer in the United States Credits are available on an annual basis for components sold beginning in 2023 until 2032 (gradually reduced starting from 2030).

New direct payment of applicable tax credits and the transferability of some tax credits: the IRA creates the option for some sector operators to choose between direct pay or transferability of the tax credit, which means that we will see changes in the ways projects are developed and an expansion in the number of industries that develop projects. Enel is particularly interested in the direct pay option for new advanced PTC and for new clean hydrogen PTC.

US Department of the Treasury solicits public input and finalizes IRA tax credit guidelines

The US Department of the Treasury spent much of 2023 issuing preliminary guidance and soliciting public input before issuing final guidance. Although preliminary guidelines have been published for most of the tax credits of particular interest to Enel to encourage investment, Enel is still awaiting the publication of final guidelines. The Department of the Treasury does not expect to finalize all tax credit guidance related to the Inflation Reduction Act before 2024.

Development of renewable energy on federal/public lands

The Biden administration set the goal of authorizing 25 GW of renewable energy on public lands by 2025. In order to reach this goal, the administration has ordered federal agencies to accelerate reviews of clean energy projects for production on public lands by establishing five new renewable energy coordination offices and has cut rents and fees for solar and wind projects on public lands by more than 50%.

Climate information

The US Securities and Exchange Commission is finalizing the rules on what climate-related information registrants need to disclose in their filings and annual reports. Such information will include data on greenhouse gas emissions, certain climate-related financial metrics, and material climate risk. The rules had been scheduled to be issued by the end of 2022, but the release date has been postponed several times.

Individual state policy actions

Texas Governor Abbott signs pro-fossil/anti-renewables legislation: the legislation promotes state-sponsored low-interest loans for "dispatchable" generation, which is seen largely as a boon to the natural gas industry. The law also creates a new ancillary service that can only be satisfied by "dispatchable" generation, the conditions of which will make it difficult for energy storage to participate. A

new funding mechanism for dispatchable assets, capped at \$1 billion per year (net), will require assets to demonstrate their availability to the market during times of grid stress. Interconnection charges will be awarded to the new generation that exceeds an average interconnection charge, determined by the Public Utilities Commission of Texas (PUCT). The basic interconnection cost thresholds adopted by the PUCT are acceptable according to the renewables industry. The allowance for renewable energy systems interconnecting to lines of 138 kV or less is \$12 million; for systems interconnecting to lines greater than 138 kV, the allowance is \$22,5 million.

New resources interconnecting after 2027 will have to demonstrate that they are able to meet an average level of production per season, based on their activity class, both by having on-site resources and through power purchase agreements. Batteries can meet this requirement. Many of these elements, including cost allocation, will be implemented by PUCT or the Electric Reliability Council of Texas (ERCOT).

California appropriates significant funds for clean energy initiatives: at the end of 2022, California had an almost \$100 billion budget surplus and so allocated significant funding for various programs, including clean energy. Among these, it allocated a \$550 million lump sum to support distributed backup electricity assets (DEBA) for zero or low-emission resources to support the grid when necessary, and a onetime \$200 million appropriation for demand-side grid support (DSGS) to reduce the load on the grid during periods of extreme stress.

In 2023, California will have a budget deficit of \$31.5 billion, but no reduction of funds has been approved in the year. Since the budget deficit is expected to be even higher in 2024, proposals to reduce funds to DEBA and to DSGS have been submitted.

Illinois adopts renewable energy siting reform: in January 2023, the Illinois legislation shifted renewable energy location decisions away from local communities and adopted pro-renewable energy siting standards that apply throughout the state, which all communities must adopt when approving new projects. The legislation requires counties with an existing zoning ordinance that conflicts with provisions of the new law to amend their zoning ordinance to comply with state law by May 30, 2023. The new law specifies setback requirements, restrictions on the height of the blade tips, acoustic limitations and other restrictions. Most importantly, the law requires the county to make a decision on a project within 30 days of the conclusion of the public hearing, to avoid years of project delay and millions of dollars in additional costs locally.

Maryland approves major energy storage law: in April 2023, for the first time in state history, the Maryland General Assembly established a goal of 3,000 MW of energy storage and created the Maryland Energy Storage Program. The new law requires the Public Service Commission to establish a competitive procurement program by July 1, 2024. The program will include energy storage credits and market-based incentives. The law is expected to lead to \$100 million in energy cost savings for Marylanders and help reduce energy sector emissions by 90%.

Michigan adopts renewable energy siting reform and clean energy legislation: in 2023 the Michigan legislature approved two important bills, signed by the governor. The first bill established state siting standards for renewable energy and battery energy storage that cannot be made more burdensome by local governments. Disputes between state law and local authorities will be resolved by the Public Service Commission. The second bill establishes a renewable energy standard for Michigan of 50% by 2030, 60% by 2035 and 100% of clean energy by 2040. This bill increases the cap for distributed generation and creates a mandate for 2,500 MW of battery energy storage.

Increase utility ownership of generation: because the Inflation Reduction Act allows utilities to claim tax credits at the time of production, rather than depreciate them over the life of a project, a number of utilities have proposed legislation to codify a preference for development of new renewable energy and energy storage projects by utilities. Nevada has passed legislation that will allow NVEnergy to build most new renewable energy and energy storage projects. Puget Sound Energy in the state of Washington has pushed for legislation requiring 50% of all new generation to be assigned to the utility. The bill failed to be approved this year. In its plans for electric resources, the Public Service Company of Colorado (PSCo) had decided that more than 60% of next generation projects would be owned by PSCo. The Colorado Public Service Commission reduced the utility's ownership of such projects to just over 50%.

Canada

On March 28, 2023, the Canadian government unveiled a budget that reinforces its ongoing commitment to accelerate the transition to a low-carbon economy. The budget contains a series of measures supporting the development of renewable energy plants, clean hydrogen plants and electric vehicle charging equipment and has replenished existing funds to support investments. The budget was passed on June 11, 2023.

Main developments:

  • Clean Hydrogen Investment Tax Credit (Hydrogen Credit): 15-40%;
  • Clean Technology Investment Tax Credit (Cleantech ITC): 15%;
  • Clean Electricity Investment Tax Credit (Electricity Credit): 30%;

  • Clean Technology Manufacturing Investment Tax Credit (Manufacturing Credit): 30%;
  • Carbon Capture, Utilization and Storage Investment Tax Credit (CCUS Credit): 15-40%.

Most investment tax credits have job requirements that must be met in order to obtain the full amount of the respective credit. These job requirements fall into two categories:

  • prevailing wage requirement: requires workers to be paid at a level comparable to the relevant wage, with benefits and pension contributions;
  • apprenticeship requirement: requires at least 10% of total working hours to be undertaken by registered apprentices.

In November 2023, the Deputy Prime Minister and Minister of Finance presented a motion to introduce a bill entitled "An act to implement certain provisions of the fall economic statement" tabled in Parliament on November 21, 2023 and certain provisions of the budget tabled in Parliament on March 28, 2023. With the presentation of the Ways and Means motion and the legislation to implement the fall economic statement (FES), Clean Technology Investment Tax Credit (Cleantech ITC) labor requirements are now in effect. The Cleantech ITC is one of several amendments to the Income Tax Act (ITA) contained in the FES implementation act. The bill is currently at the reading and examination stage.

Developments in provincial policies

In May 2023, Alberta citizens re-elected the United Conservative Party to form a governing majority. As Prime Minister Danielle Smith appoints ministers for relevant portfolios, restructures senior department officials and reprioritizes her government, the energy industry can expect a continuation of existing policies from the past four years. This includes the continuation of the regulation on technological innovation and the reduction of emissions, the carbon price for primary industry that allows the development of renewable energies, as well as the finalization of the phasing out of coal-fired power generation.

On August 2, 2023, Alberta's Minister of Energy has issued an order to the Alberta Utilities Commission (AUC or Commission) to block the processing of new permits for the construction of new utility-scale renewable energy generation facilities until the Commission, the Alberta Electric System Operator (AESO) and the Minister of Energy were able to determine whether the continued development of renewable resources in Alberta was increasing pressure on electricity rates and compromising the reliability.

Meetings and requests for information took place over the remainder of 2023. The AESO is also reviewing its current market structure for possible changes. The Premier of Alberta, a conservative, oil-producing province, told the Prime Minister of Canada that Alberta will not seek to meet the country's clean energy or greenhouse gas emissions reduction goals. Work on these issues will continue until 2024.

Africa, Asia and Oceania

India

On December 5, 2022, the Deviation Settlement Mechanism and Related Matters Regulation (2022 DSM Regulation) published by the Central Electricity Regulatory Commission (CERC) and replacing the 2014 DSM Regulation entered into force.

The new regulation has a negative impact on Independent Power Producers (IPPs) with wind and solar plants. Basically, over-injection (i.e. injection into the grid in excess of the declared generation) will be compensated:

  • for PV/hybrid (wind + solar) plants, at the contractual rate for up to a 10% deviation and at 90% of the contractual rate for an over-injection of between 10% and 15%;
  • for wind plants, at the contractual rate for up to a 15% deviation and at 90% of the contractual rate from 15% to 20%.

No payment will be made for an over-injection of above 20%. Compared with the previous version, the regulation increases the remuneration percentage, and increases the threshold over which no payment is made from 10% to 20%.

Terms also change for under-injections (generation below scheduled levels), with a reduction of the deviation band from the planned amounts, with higher penalties compared with 2014, breaking down as follows:

  • for PV/hybrid (wind + solar) plants, with under-injections of up to 15%, the IPP will pay the buyer the contract rate with no further penalty. For under-injections from 10% to 15%, the shortfall will be paid at 110% of the contract rate, while those above 15% will be paid at 150%;
  • for wind plants, for under-injections up to 15%, the IPP will pay the buyer the contract rate with no further penalty. For under-injections from 15% to 20%, the shortfall will be paid at 110% of the contract rate, while those above 20% will be paid at 150%.

The new DSM Regulation has an impact on revenue due to (i) no payment of over-injections over a 15% deviation for PV/hybrid plants and over 20% for wind plants, (ii) the increase of deviation penalties in case of under-injections.

Morocco

The reform of Law 13.09, the key renewable energy law, approved in January 2023, permits entering into Power Purchase Agreements (PPAs) with customers connected to the medium-voltage grid, effectively opening a new market for Enel Green Power in the country. Until now it was possible to enter into PPAs only with end users connected to the high-voltage and very-high-voltage grids. The secondary legislation that will make Law 13.09 enforceable has yet to be enacted but is expected to pass in 2024.

Enel Grids

Italy

Rates for the fifth regulatory period (2016-2023) are governed by the ARERA Resolution no. 654/2015/R/eel. This period lasts eight years and is divided into two sub-periods of four years each (NPR1 for 2016-2019 and NPR2 for 2020- 2023).

With regard to the NPR2 period, ARERA published Resolution no. 568/2019/R/eel, with which it updated rates for transmission, distribution and metering services in force in the 2020-2023 period, publishing the new integrated texts. The method for determining the WACC for the 2022-2027 period was updated with Resolution no. 614/2021/R/com, establishing a value of 5.2% for electricity distribution and metering. The regulation provides for an update of the value for 2025-2027, as well as the possibility of a further annual updating (in 2023 and 2024), should certain financial indicators lead to a change in the WACC of at least 50 bps. With Resolution no. 654/2022/R/com, ARERA confirmed the value of WACC at 5.2% in 2023, as the conditions to proceed with the update have not been met, while the value of WACC for 2024 was updated to 6% with Resolution no. 556/2023/R/com.

As for distribution and metering rates, the Authority approved the definitive reference rates for 2022, calculated by taking into account the updated balance sheet data for 2021 (Resolution no. 154/2023/R/eel) and the provisional reference rates for 2023 on the basis of the preliminary balance sheet data for 2022 (Resolution no. 206/2023/R/eel). The definitive reference rates for 2023 are expected to be published in 2024.

With Resolution no. 271/2021/R/com, the Authority initiated a procedure to introduce, from 2024, new methods for recognizing the costs of infrastructure services (ROSSbase - Adjustment for Expenditure and Service Objectives). As part of the ROSS-base mechanism, in 2023 the Authority published Resolution no. 163/2023/R/com, with which it approved the "Integrated Text of the criteria and general principles of the ROSS regulation" (TIROSS 2024-2031) for infrastructure services in the electricity and gas sectors, as well as Resolution no. 497/2023/R/com, with which it specified the application criteria, modifying the TIROSS. Finally, with Resolution no. 616/2023/R/eel it approved distribution and metering rates for the 2024-2027 period, publishing the new integrated texts (TIT - provisions for delivery of transmission and distribution services; TIME - provisions for delivery metering services; and TIC - economic terms for delivery of metering services).

During 2023, the Authority, implementing the government's provisions, progressively reintroduced the general system charges to be applied to customers (in the 1st Quarter, they were applied only to users with available power over 16.5 kW; in the subsequent quarters they were applied to all electricity users). The Authority also took action during 2023 with regard to social allowances, providing for, among other things, an update of the requirements for access to the benefits and specific strengthening measures to contain the effects of the increase in energy bills.

With Resolutions no. 232/2022/R/eel and no. 712/2022/R/ eel, ARERA updated in 2022 the rate regulation for reactive energy providing for the entry into force by April 1, 2023 of charges for reactive energy injected and an update of the charges for reactive energy withdrawn for distributors as well.

At the end of 2023, ARERA again updated the regulation, providing for a single fee for excessive withdrawals and injections of reactive energy paid by MV and LV customers from 2024. It also modified the share of revenue retained by distribution companies, which will be updated annually. ARERA has also introduced a mechanism that incentivizes distribution companies to install compensation systems for reactive energy injections to the National Electricity Transmission Grid.

As regards service quality, with Resolution no. 646/2015/R/ eel and no. 566/2019/R/eel as amended, the Authority established output-based regulation for electricity distribution and metering services for the 2016-2023 period (TIQE 2016-2023), introducing tools to bridge gaps in quality of service still existing between the various areas of the country and examine certain mechanisms concerning the effects of climate change.

As from January 1, 2024, with Resolutions no. 617/2023/R/ eel and no. 614/2023/R/eel, the Authority updated the output-based incentive regulation of technical and commercial service quality and network resilience.

In particular, with Resolution no. 617/2023/R/eel and the related annexes TIQD and TIQC, ARERA adopted improvements that radically modified the twenty-year-old regulatory system, specifically in terms of continuity of distribution services and introducing an incentive mechanism for development measures.

With Resolution no. 614/2023/R/eel, ARERA defined the regulation of resilience for the 2019-2024 period, governing the termination of the regulations in place since 2018, modifying the incentive mechanism for resilience interventions in the 2024 plan.

With regard to relations between distributors and traders, on January 1, 2021 the new version of the Electricity Transport Grid Code came into force with Resolution no. 261/2020/R/eel, which, due to the reduction in the time required to terminate transport contracts due to the default of sellers, reduced the credit exposure of distributors. Consequently, the value of guarantees that all sellers must give to distributors to cover the transport service provided was reduced (passing from a level of coverage ranging from 3 to 5 months of the trader's turnover to a new range between 2 and 4 months).

With Resolution no. 119/2022/R/eel, ARERA introduced a single mechanism for distribution companies for the reimbursement of system general charges and network charges not collected by defaulting sellers in order to unify and streamline the pre-existing mechanisms.

More specifically, the resolution confirms the application of two deductibles for the recognition of credits relating to network charges. On the one hand, this is to serve as an incentive for an efficient management of the credit by the distributor and, on the other, to remove what has already been compensated by the rate system. The resolution provides for requests for reimbursement to be made on an annual basis and liquidated in the same year.

Energy efficiency – White certificates

The decree of the Ministry for the Ecological Transition of May 21, 2021 amended the ministerial decree of January 11, 2017 as already amended by the decree of the Ministry for Economic Development of May 10, 2018. The measure set the national quantitative targets for electricity and gas distribution companies for the years 2021-2024. The decree also updated the methods for distribution companies to meet the obligation and for reimbursing the related costs.

Iberia

2023 electricity rates

On December 22, 2022, the National Commission for Markets and Competition (CNMC) Resolution of December 15, 2022 was published in Spain's Official Journal, establishing the access charges for electricity transmission and distribution networks to be applied starting from January 1, 2023, providing for an average reduction of 1.0% compared with January 1, 2022.

On December 29, 2022, Order TED/1312/2022 of December 23, 2022 was published in Spain's Official Journal. It establishes electricity system charges applicable from January 1, 2023 and sets the various regulated costs of the electricity system for 2023. The new rates for 2023 represent an average reduction of about 40.0% compared with the charges approved on January 1, 2022.

Natural gas rates for 2023

On December 28, 2022, the Resolution of December 22, 2022 of the Directorate General for Energy Policy and Mines was published. It establishes the rate of last resort

(TUR) for natural gas to be applied as of January 1, 2023, and, taking account of the provisions of Royal Decree Law 17/2021 of September 14, provides for approximate increases of 7.7%, 9.0% and 9.5% (excluding taxes) respectively for TUR 1, TUR 2, and TUR 3. Meanwhile, the TURs applicable to homeowners' associations, introduced by Royal Decree Law 18/2022 of October 18, were reduced by around 2.0% (excluding taxes).

On March 30, 2023, the Resolution of March 28, 2023 of the Directorate General for Energy Policy and Mines was published. It establishes the rate of last resort (TUR) for natural gas to be applied as of April 1, 2023, with a reduction of about 27.1%, 31% and 32.7%, respectively (excluding taxes), for TUR 1, TUR 2, and TUR 3. Meanwhile, the TURs applicable to homeowners' associations, introduced by Royal Decree Law 18/2022 of October 18, were reduced by around 45.7% to 56.3% (excluding taxes).

On June 29, 2023 the Resolution of June 27, 2023 of the Directorate General for Energy Policy and Mines was published. It establishes the rate of last resort (TUR) for natural gas to be applied as of July 1, 2023, with a reduction of about 2.4%, 2.9% and 3.1%, respectively (excluding taxes), for TUR 1, TUR 2, and TUR 3. Meanwhile, the TURs applicable to homeowners' associations, introduced by Royal Decree Law 18/2022 of October 18, were reduced by around 3.6% to 5.4% (excluding taxes).

On September 29, 2023, the Resolution of September 28, 2023 of the Directorate General for Energy Policy and Mines was published. It establishes the rate of last resort (TUR) for natural gas to be applied as of October 1, 2023, with a reduction of about 3.4%, 0.3% and 1.1%, respectively (excluding taxes), for TUR 1, TUR 2, and TUR 3. Apart from these, the TURs applicable to homeowners' associations, introduced by Royal Decree Law 18/2022 of October 18, increased by about 10.7% to 20.7% (excluding taxes).

Natural gas rates for 2024

On December 29, 2023, the Resolution of December 28, 2023 of the Directorate General for Energy Policy and Mines was published. It establishes the rate of last resort (TUR) for natural gas to be applied as of January 1, 2024, with an increase of about 6.5%, 7.9% and 8.5%, respectively (excluding taxes), for TUR 1, TUR 2, and TUR 3. Meanwhile, the TURs applicable to homeowners' associations, introduced by Royal Decree Law 18/2022 of October 18, were increased by about 4.8% to 6.8% (excluding taxes). Royal Decree Law 8/2023 established that VAT on gas will increase from 5% to 10% from January 1, 2024 to March 31, 2024.

Remuneration for distribution activities

On August 3, 2022, Order TED/749/2022 of July 27 was published. It approved the incentive or penalty for achieving a reduction in losses within the electricity distribution network for 2016, modifying the base remuneration for

2016 for several distribution companies, and approving the remuneration of electricity distribution companies for 2017, 2018 and 2019. This ministerial order sets the value of the remuneration for the years 2017 to 2019, taking into account the previous reports of the CNMC.

Furthermore, on December 16, 2022, CNMC began preparing its proposed resolution setting the remuneration for 2020.

Closed electricity distribution grids

On April 26, 2023, Royal Decree 314/2023 of April 25 was published. It regulates the conditions and requirements for closed electricity distribution grids and their owners, as well as the administrative authorization procedure and the circumstances for revocation of that authorization. The industrial owners of the closed grid will have to build it or buy it from a distribution company, and will be responsible for managing it, investing in its maintenance and billing rates, charges and other costs to the consumers connected to it, while the traders selling electricity to the members of the closed grid will only bill for the power consumed.

Rest of the World

Latin America

Chile

The Chilean electricity sector is governed by the General Electricity Service Act 20.018, contained in Decree 1 of 1982 issued by the Ministry of Mines, subsequently updated by the Ministry of Economy with Decree 4 of 2006 as amended ("Ley Eléctrica") and its corresponding implementing regulation, contained in Decree 327 of 1998.

Distribution rates for 2020-2024

The process of determining rates for the 2020-2024 period is still under way. For the moment, rates continue to be applied in accordance with the methodology in force for the 2016-2020 period.

Argentina

Rate revisions

With Resolution no. 240/2023, the regulator ENRE approved the new rates to be applied as from April 1, 2023. In particular, it:

  • incorporates the increase in the FNEE envisaged by SE Resolution no. 719/22 (\$512/MWh from April 1, 2023) and the first increase in the VAD (Distribution Value Added) or CPD (Own Cost of Distribution) granted to Edesur of 107.83%;
  • publishes the new CPD or VAD, which will take effect as from June 1, 2023 with an additional 74% increase to apply in a future rate chart;

• establishes the new CEN and CESMC values to be applied starting from April 1, 2023, corresponding to semester 54 (March 2023 - August 2023).

The average distributor rate is set at about 13,706 \$/kWh (+23%).

Service quality of electricity distribution

Following the events occurring from February 10, 2023, which caused the interruption of low- and medium-voltage supply to a large number of customers, ENRE called for a Comprehensive Technical Audit to determine the capacity and reliability of the public electricity distribution service and monitor service quality.

The teams conducted a process audit to verify the consistency of technological availability, materials, supplies and human resources to execute the substantive management processes consisting of primary assistance, claims, operation, corrective and preventive maintenance, investment planning, loss management, internal cost controls and management processes.

Investment program for the distribution grid

On August 7, 2023 a memorandum was signed between the Ministry of Energy and Edesur, with the simultaneous presence, notification and signature of ENRE, aimed at ensuring that the State will provide the necessary funds for the construction work plan prepared by Edesur, with the aim of improving the quality of the service, in addition to adopting a time framework suitable for the execution of the works, considering the impact on the public service deriving from the increase in electricity demand and taking into account the urgent need to implement the cited work plan to reduce service interruptions caused by the high demand for electricity and overloading of grids during periods of record high temperatures last summer. Furthermore, seeking to ease the financial burden on users, on October 10, 2023 the Ministry of Energy issued Resolution no. 828, which allows Edesur and Edenor to transform the penalties to be paid to the State into a "Program of works, jobs and/or actions to meet the challenges of next summer", provided they are in compliance with their obligations towards CAMMESA. In compliance with the legislation, on October 26, 2023, with Ger Gen note no. 127/2023, the Program was presented to the Ministry of Energy.

Memorandum of understanding for "special obligation settlement regime"

On December 29, 2022, addressing the "special obligation settlement regime" and the "special receivables regime" established with Article 87 of Law 27.591, extended with the PEN 88/2022 decree, a memorandum of understanding was signed between the Ministry of Energy and ENRE, on the one hand, and Edesur, on the other, with CAMMESA, also referred to in the same instrument as a notified entity.

This agreement provided for: (a) the recognition by Edesur of the liability in respect of CAMMESA and the MEM (wholesale electricity market); (b) the recognition of a receivable due to Edesur from the Ministry of Energy, applicable to the partial compensation of the recognized liability; and (c) the determination of a payment plan for the liability referred to in point (a) after the compensation referred to in point (b), the amount of which is within the limits of that attributed by ENRE in the recomposition of the VAD. Furthermore, Edesur has undertaken to apply an amount equivalent to a part of the recognized receivable, to settle the liabilities of defaulting users benefitting from demand support policies, as well as to submit reporting on the investment plan associated with the mechanism envisaged under SE Resolution no. 371/2021 to encourage the investment to increase energy efficiency and improve the quality of electricity distribution. On April 25, 2023, the Ministry of Energy issued a note addressed to CAMMESA, instructing it to adopt the necessary measures to apply the agreement signed on December 29, 2022 within the framework of the "special obligation settlement regime" concerning the implementation of a payment plan for Edesur's residual liability in respect of that company, in accordance with the scope of the aforementioned agreement. The foregoing was based on the calculation report submitted by CAMMESA to the Ministry of Energy on April 18, 2023 and the agreement issued by Edesur on April 20, 2023.

Regarding the "Acta Acuerdo Régimen Especial de Obligaciones" (Article 87 of Law 27.591 of the National General Budget for 2021), on May 18, 2023, within the scope of the memorandum of understanding of December 29, 2022, the payment plan with CAMMESA was implemented. The payment plan provides for 96 increasing monthly installments and an interest rate equivalent to 50% of that in force in the MEM. The first installment was paid on September 25, 2023. Payment is subject to the attribution by ENRE of the recomposition of the VAD or the CPD during the transitional rate adjustment process.

With regard to the repayment of this financing, the agreements signed with the Ministry of Energy establish that ENRE must include the necessary resources in the framework of the Comprehensive Rate Review (RTI) process in a timely manner. For its part, the Ministry of Energy shall establish term and conditions no earlier than 180 days from the entry into force of the rate tables resulting from the aforementioned RTI, expressly addressing that financing, considering an interest rate equivalent to the average rate paid by CAMMESA on its financial resources.

To guarantee the faithful fulfillment of each of the obligations assumed by Edesur with this contract and the repayment of the financing, the company assigns and transfers to CAMMESA receivables of any sort that it may claim within the MEM. This transfer as security will remain in force until the total extinguishment of the financing.

Brazil

Rate revision for Enel Distribuição Ceará

The latest complete rate revisions approved for each Brazilian distribution company belonging to the Enel Group are summarized below:

Average increase
Company Date of rate
adjustment
High
voltage
Low voltage
Enel Distribuição Rio
de Janeiro
March 2023 -4.91% +6.18%
Enel Distribuição
Ceará
April 2023 -3.77% +5.51%
Enel Distribuição São
Paulo
July 2023 -6.10% -0.97%

In view of the disparity between the energy costs recognized in rates and the real costs outside the control of the distributor, in January 2015, the regulator ANEEL started the implementation of the Tariff Flags system which applies an additional monthly component to the rate charged to consumers, provided that the marginal system cost is greater than the standard regulatory cost.

Rate revision for Enel Distribuição Rio de Janeiro

On October 31, 2023, ANEEL approved the extraordinary tariff review (ETR) of Enel Distribuição Rio de Janeiro due to the pandemic and the law prohibiting electricity cuts. The effects of the ETR, pursuant to ANEEL Order no. 4.089/2023, are considered an interest component in the company's upcoming rate review on March 15, 2024.

Colombia

The Energy and Gas Regulatory Commission (CREG) defines the method of remuneration of the distribution grid. The distribution rates are determined every five years and are updated monthly on the basis of the Producer Price Index (IPP).

Rate revisions

With Resolution no. 122 of 2020, CREG set the distribution rates for Codensa for the 2018-2023 period.

In March 2023, CREG published Resolution no. 101 015 of 2023, to extend the period of application of the transitional measures to defer the payment of sales companies to generation, transmission and distribution companies. The provision allows the deferral of payment for up to 18 months and applies until April 30, 2024.

Peru

The main laws governing the Peruvian electricity market are the Electricity Concessions Act (Decree Law 25844) and its regulations and the Efficient Electricity Generation Act (Law 28832).

The Electricity Concessions Act divides the Peruvian electricity sector into three large segments: generation, transmission and distribution, with no company permitted to participate in more than one segment. The Peruvian electricity system consists of the National Interconnected Electricity System (SEIN), as well as some isolated electricity systems.

End-user Markets

Italy

Elimination of price protection

The current regulatory framework governing the process of eliminating regulated prices in the electricity sector (Law 124/2017 – the Competition Act – as most recently amended by Decree Law 152/2021 implementing the NRRP, ratified with Law 233/2021) provides for a staggered postponement of the removal of price protection: to January 1, 2021 for small businesses, to January 1, 2023 for micro-enterprises and to January 2024 for domestic customer auctions.

The ministerial decrees implementing the Competition Act and ARERA Resolutions no. 491/2020/R/eel and no. 208/2022/R/eel have implemented the elimination of price protection for small businesses and micro-businesses (and non-residential customers with a committed capacity of less than 15 kW), making provision for the activation of specific last resort services ("graduated safeguard services") provided by operators awarded the concession in a tender for customers who do not have chosen a free-market supplier.

The graduated safeguard service for small businesses lasts three years, will expire on June 30, 2024 and will be reassigned with new auctions.

For micro-enterprises, the service will be provided until March 31, 2027. At the end of the first service period, supplies still served under graduated protection will switch to the most economically advantageous free-market offer of the same operator.

For non-residential micro-enterprise customers with a committed capacity of less than 15 kW, ARERA, due to the postponement to April 1, 2023 for technical reasons of the start date of the last resort service dedicated to them, established that the financial terms and conditions of the enhanced protection service will continue to apply until March 31, 2023 for customers already served.

With regard to residential customers, Legislative Decree 210/2021 has identified two categories for which the elimination of price protections will involve different In Peru, the process for determining distribution rates takes place every four years and is referred to as the "Distribution Value Added Fixing" (VAD). The last approved rate cycle is valid for the 2022-2026 period, with new VAD in force as from November 1, 2022.

timeframes and methods: "vulnerable" customers (such as customers over 75 years of age, recipients of a social allowance due to economic or physical hardship, individuals with disabilities pursuant to Law 104/1992, users located in emergency homes following natural disasters) and "non-vulnerable" customers.

Decree 169 of May 18, 2023 of the MASE regulated the assignment through competitive procedures carried out on a territorial basis for the graduated safeguard service for non-vulnerable residential customers, setting the market share awardable to each operator at 30%. The same decree established that, upon expiry of the service assignment period scheduled for 31 March 2027, supplies will switch to the most economically advantageous free-market offer with the same operator.

ARERA Resolution no. 580/2023/R/eel, implementing the Decree Law 181/2023 (the "Energy Decree"), scheduled the tenders for January 10, 2024. With the earlier Resolution no. 362/2023/R/eel as amended, ARERA regulated the methods for the award and delivery of graduated safeguard services in which customers identified as non-vulnerable will be supplied with residential supplies. Pursuant to Resolution no. 600/2023/R/eel, due to the postponement of the auctions provided for in the Energy Decree, the service will be provided starting from July 1, 2024 by the sellers awarded the tender. The final award is expected by February 6, 2024. Until July 1, 2024, non-vulnerable residential customers will continue to be served by the operator of the enhanced protection service.

As regards vulnerable domestic customers, the Energy Decree refers to a provision of the Authority the definition of the methods for the exit of customers from the greater protection through the assignment of a "vulnerability service" by tender. Pending this provision, vulnerable customers will continue to be served by the current operator of the enhanced protection service.

As regards the gas sector, the elimination of price protections starting from January 2024 is governed by ARE-RA Resolution no. 100/2023/R/gas, which establishes that non-vulnerable residential customers and condominiums who have not selected a free-market offer shall move to the free market with their seller in accordance with rules defined by ARERA. Customers identified as vulnerable pursuant to Decree Law 115/2022 (the Second Aid Decree) will continue to be served under the economic and contractual conditions specified by ARERA for the vulnerability protection service.

With regard to the elimination of price safeguards for small firms in the electricity sector, in March 2021, Enel Energia and Servizio Elettrico Nazionale (together with Enel Italia) appealed the decree of the Ministry for Economic Development implementing the Competition Act before the Lazio Regional Administrative Court, contesting the imposition of the antitrust cap at 35% and the lack of provisions for the reimbursement of the residual costs of Servizio Elettrico Nazionale following the loss of customers. With regard to the latter point, in March 2021, Servizio Elettrico Nazionale and Enel Italia had also challenged Resolution no. 491/2020/R/eel with an appeal before the Lombardy Regional Administrative Court. At the moment, no hearing has yet been set for these appeals.

In July 2022, Enel Energia and Servizio Elettrico Nazionale, basing their challenges on the same grounds, appealed Resolution no. 208/2022/R/eel, relating to micro-enterprises and non-residential customers with a committed capacity of less than 15 kW, before the Lombardy Regional Administrative Court; in November 2022, they also appealed before the Lazio Regional Administrative Court the decree of the Ministry of the Ecological Transition setting out how graduated safeguard services for micro-enterprises are to be implemented.

With Resolutions no. 136/2023/R/eel and no. 151/2023/R/ eel, ARERA established, for 2023, the procedures for accessing the customer exit compensation mechanism pursuant to Article 20 of the Integrated Provisions Governing Last-Resort Services (TIV). With an appeal filed on May 29, 2023, Servizio Elettrico Nazionale and Enel Italia challenged these provisions before the Lombardy Regional Administrative Court through an appeal with additional evidence to the main proceedings already brought against Resolution no. 208/2022/R/eel.

With regard to the elimination of price safeguards for non-vulnerable residential customers, in July 2023, Enel Energia and Servizio Elettrico Nazionale (together with Enel Italia) appealed the Ministry of the Environment and Energy Security (MASE) Decree 169 of May 18, 2023 before the Lazio Regional Administrative Court, contesting the imposition of the antitrust cap at 30% and the lack of provisions for the reimbursement of the residual costs of Servizio Elettrico Nazionale following the loss of customers. Likewise, in October 2023, the two companies (together with Enel Italia) appealed ARERA Resolution no. 362/2023/R/eel of August 3, 2023, concerning the regulation of the graduated safeguard services for non-vulnerable domestic customers, before the Lombardy Regional Administrative Court, raising the objections already formulated against the MASE ministerial decree.

In addition, with an appeal filed in January 2024, Servizio Elettrico Nazionale (together with Enel Italia) challenged ARERA Resolutions no. 549/2023/R/eel, no. 580/2023/R/ eel and no. 600/2023/R/eel completing the regulation referred to in Resolution no. 362/2023/R/eel, again contesting the failure to reimburse the residual costs following the loss of customers.

As part of the bill ratifying Decree Law 181/2023 (the "Energy Decree"), which was approved on January 31, 2024, a provision allowing operators of the enhanced protection service to recover otherwise non-recoverable costs directly attributable to the service incurred since April 1, 2023 has been introduced. ARERA shall issue a resolution to be adopted within 90 days from the date of entry into force of the law ratifying the decree to govern the time limits and methods for submitting the report necessary to certify the aforementioned costs.

Electricity

With Resolution no. 146/2022/R/eel, ARERA updated, with effect from April 1, 2022, the rate component covering the marketing costs of the operators of the enhanced protection service (RCV). The resolution also updates the levels of the fee for covering electricity marketing costs (PCV), which represents the reference price for sellers on the free market. With Resolution no. 136/2023/R/eel, ARERA updated, with effect from April 1, 2023, the RCV component and the related PCV compensation solely for residential customers enrolled in the enhanced protection service. With Resolution no. 600/2023/R/eel, ARERA provided for the update of the RCV by March 2024 to take account of adjustments to the WACC of infrastructure services. The RCV and PCV for vulnerable customers who will be served by the enhanced safeguard operator will be determined by the end of June 2024.

The TIV envisages specific equalization mechanisms for operators of the enhanced protection service, such as a mechanism that makes it possible to regulate any imbalances in the costs incurred by the operator for the supply of electricity.

To cover the deficit generated by the extraordinary increase in energy provisioning costs in 2022, ARERA Resolution no. 463/2022/R/eel also provided that, by the end of 2022, the Energy and Environmental Services Fund would disburse an advance on 2022 equalization balances to RCV operators. Resolutions no. 558/2022/R/eel, no. 743/2022/R/eel and no. 135/2023/R/eel contain the nec-

essary implementing measures concerning the calculation and settlement of that advance and its subsequent restitution in 2023.

With regard to settlement mechanisms for end users in arrears in the electricity sector, in Article 18 of the TIV for 2023 the Authority governs the compensation mechanism for the amounts not collected by operators of the enhanced protection service in respect of fraudulent withdrawals of power.

With Resolution no. 32/2021/R/eel, the Authority established a mechanism to reimburse arrears relating to the general system charges paid by the sales companies on the free and safeguard markets to distribution companies but not collected from end users (for the safeguard market, this only applies to customers that can be disconnected).

For customers who cannot be disconnected on the safeguard market, the mechanism for reimbursing non-recoverable charges is governed by Article 50 of the TIV for 2023.

Gas

With Resolution no.147/2022/R/gas the levels of the QVD component were updated with effect from April 1, 2022. The levels were subsequently updated, with effect from April 1, 2023, with Resolution no. 137/2023/R/gas. They have been determined so as to take account of the effects associated with the duration – less than a year – of the period remaining at the end of the termination of the protection service, which is expected to start from January 2024. This component, to be applied as from January 2024 to vulnerable customers, will be subsequently updated (for at least the first year of application) with similar but simplified criteria compared with the current system by the end of March of each year for the following 12 months, pending the acquisition of detailed data on the cost of sales associated with vulnerable customers.

With regard to reimbursement mechanisms for end users in arrears in the gas sector, in Articles 31-quinquies and 37.1 letter b) of the TIVG (Integrated Retail Gas Sales Code), ARERA regulates specific mechanisms for the reimbursement of arrears for providers of the last resort service and the default service on distribution grids.

Iberia

Energy efficiency

Law 18/2014 of October 15 containing urgent measures for growth, competitiveness and efficiency created the National Energy Efficiency Fund to achieve energy efficiency objectives.

On March 30, 2023, Order TED/296/2023 of March 27 was published, establishing the contribution to the National Energy Efficiency Fund for 2023, amounting to €49 million for Endesa.

Endesa is expected to provide a contribution to the National Energy Efficiency Fund in the amount of €99 million in 2024, of which it must contribute at least €35 million (35.0% of the amount). It can satisfy the rest of its obligation by submitting energy efficiency certificates (EEC).

Consumer protection measures: Bono Social

Following the publication of Royal Decree Law 8/2023 of December 27, in Spain's Official Journal, adopting measures for the economic and social consequences of the wars in Ukraine and the Middle East, and to alleviate the impact of drought, several measures to protect vulnerable consumers already extended by Royal Decree Law 20/2022 of December 27 were further extended until June 30, 2024, including:

  • the increase in the discounts of the electricity social bonus from 25% to 65% for vulnerable consumers, and from 40% to 80% for severely vulnerable consumers;
  • a discount of 40% for the same period, for working households covered by the voluntary price for small consumers (PVPC) with income between 1.5 and 2 times the Public Index of Multiple Purpose Income (IP-REM), increased by 0.3 for each additional adult member and 0.5 for each additional minor member.

On January 21, 2023, the Order TED/81/2023 of January 27 was published, approving the distribution of the amounts to be financed for the Bono Social allowance for 2023. The order establishes the different unit values that must be paid by those obliged to finance these costs.

Consumer protection measures: guarantee of electricity services

Royal Decree Law 8/2023 of December 28, further extends the prohibition of suspending electricity, water and gas supplies to vulnerable consumers, severely vulnerable consumers and customers at risk of social exclusion until June 30, 2024. The Minimum Viable Supply regime will then come into force, whereby a vulnerable customer cannot be excluded for non-payment during the four-month payment period and an additional six-month grace period.

Consumer protection measures: tax measures

Royal Decree Law 8/2023 of December 28, has changed tax rates: it increases VAT from 5% to 10% for all of 2024 for consumers whose contracted power supply is less than or equal to 10 kW (if the average daily market price of the previous month is less than €45/MWh, the "normal" VAT of 21% is applied) or who are beneficiaries of the Bono Social as severely vulnerable consumers.

Likewise, the special tax on electricity will rise from the previous 0.5% to 2.5% in the 1st Quarter of 2024, and 3.8% in the 2nd Quarter of 2024. As for the tax on the value of electricity production, which is 7% but has been suspended, a rate of 3.5% will apply in the 1st Quarter of 2024, 5.25% in the 2nd Quarter of 2024 and 7% thereafter. The electricity system will be compensated for the decline in receipts within the limit of the amount necessary to achieve balance between revenue and expenditure in respect of those charges.

Moreover, the VAT rate applicable to deliveries, imports and intra-community purchases of natural gas rises from 5% to 10% until March 31, 2024.

Consumer protection measures: reduction of volatility of voluntary price for small consumers (PVPC)

On June 14, 2023 Royal Decree 446/2023 of June 31 was published. It modifies, with effect as from January 1, 2024, Royal Decree 216/2014 of March 28, regarding the calculation method for determining the voluntary price for small consumers (PVPC), the salient aspects which are as follows:

  • PVPC will apply to residential consumers and micro-enterprises with a contracted power supply equal to or less than 10 kW;
  • the cost of energy will be partially indexed to the forward markets, incorporating a basket of forward products on the OMIP, which will be phased in gradually at a weight of 25% in 2024, 40% in 2025 and 55% from 2026. The remaining portion will be determined by the spot price. The forward market portion will be divided between the monthly (10%), quarterly (36%) and annual (54%) products;
  • the reference supplier will be reimbursed, as a component of the PVPC, the cost of financing the Bono Social scheme established annually in the corresponding order, together with an additional payment for the recovery of amounts incurred under Royal Decree Law 6/2022 of March 29.

This royal decree also modifies certain regulatory aspects of generation in non-peninsular territories.

Consumer protection measures: electricityintensive customers

Royal Decree 444/2023 of June 13, published on June 14, 2023, amends the Charter of Electricity-Intensive Consumers approved in 2020. The amendment expands the catalogue of eligible activities and reduces certain requirements, thereby expanding the number of beneficiaries. It also updates the maximum amount of aid to offset the cost associated with the specific remuneration regime for renewable energy and the cost of non-mainland electricity systems included in charges, from 85% for all activities to: 85% for sectors at significant risk; 75% for sectors at risk (and up to 85% if they can demonstrate that 50% of consumption comes from fossil fuel sources and have entered into forward contracts for 10% of consumption or 5% of consumption with self-consumption from renewable sources); or a higher percentage for especially vulnerable plants (i.e., when the cost of electricity exceeds certain gross value added thresholds). However, in no case may charges borne by beneficiaries be less than or equal to €0.5/MWh.

Rest of the World

Latin America

Free market

In all countries, distribution companies can supply electricity to their customers on a regulated basis, but may also do so under free-market conditions if customers exceed particular limits. The limits of the free market by country are as follows:

Country kW
Argentina >30 kW
Brazil >1,000 kW or >500 kW(1)
Colombia >100 kW or 55 MWh-month
Costa Rica Not applicable(2)
Guatemala >100 kW
Panama >100 kW
Peru >200 kW(3)
Chile >500 kW

(1) The >500 kW limit applies if the electricity consumed is generated using renewable resources, which are subsidized by the government.

(2) In Costa Rica the only electricity purchaser is ICE, accordingly, the concept of free-market customer does not exist.

(3) DS 018-2016-EM established that:

•the demand of customers who can choose between the regulated market and the free market (those with a capacity between 200 and 2,500 kW) is measured for each supply point;

• customers whose capacity per supply point is greater than 2,500 kW are free-market customers.

REPORT ON OPERATIONS

5. OUTLOOK

Enel is the world's largest privately owned electricity distribution company

Enel will accelerate its investment in the development, digitalization and resilience of the distribution grid, an indispensable enabler of the energy transition.

Enel is the world's largest private renewable energy operator

Enel will continue to invest in the development of new renewables capacity, adopting a business model aligned with the climate objectives of the Paris Agreement.

Enel manages the largest customer base among private companies

The electrification of energy consumption will enable Enel to create value for itself and for its customers, who are the focus of the Group's strategy.

A simple and attractive dividend policy

Enel΄s dividend policy is based on a fixed minimum dividend throughout the plan period, while retaining the possibility of increasing the dividend if cash neutrality is achieved.

OUTLOOK

In November 2023, the Group presented its new Strategic Plan for 2024-2026, based on three pillars:

  • profitability, flexibility and resilience through selective capital allocation, aimed at optimizing the Enel Group's risk/return profile;
  • effectiveness and efficiency as drivers of the Group's operations, based on process simplification, a leaner organization focused on core geographies, and streamlined costs;
  • financial and environmental sustainability to pursue value creation in addressing the challenges of climate change.

For the three-year period 2024-2026, the Group mapped out a total gross investment plan of €35.8 billion:

  • around €18.6 billion in Grids, focusing on improving quality, resilience and digitalization, and encouraging new connections;
  • around €12.1 billion in Renewables, particularly on onshore wind, solar and battery storage, also leveraging on practices as repowering plants;
  • around €3 billion in Customer experience, with an active management of the customer base through multi-play bundled offers, including goods and services in an integrated portfolio available through a single touchpoint for the customer.

As a result of the strategic actions described above, the Enel Group's ordinary EBITDA is expected to increase to between €23.6 billion and €24.3 billion in 2026, while Group net ordinary income is expected to increase to between €7.1 billion and €7.3 billion.

Dividend policy provides for a minimum fixed dividend per share (DPS) of €0.43 for the 2024-2026 period, with a potential increase up to a 70% payout on net ordinary income if cash neutrality is achieved.

The following are planned for 2024:

  • investment in distribution grids focusing on geographical areas that have fair and transparent regulatory frameworks in place, in particular in Italy;
  • selective investment in renewables, aimed at maximizing the return on capital employed and minimizing risks;
  • active management of the customer base through bundled multi-play offers.

In view of the foregoing, the financial targets on which the Group's 2024-2026 Plan is based are reported below.

Financial targets

Profit growth 2023 2024 2026
Ordinary EBITDA (€ billions) 22.0 22.1-22.8 23.6-24.3
Ordinary profit (€ billions) 6.5 6.6-6.8 7.1-7.3
Value creation
0.43(1) 0.43(1)
Dividend per share (€/share) 0.43 Increase in DPS up to a payout of 70%
ordinary profit if cash neutrality is achieved(2)

(1) Minimum DPS

(2) Cash neutrality is achieved if funds from operations (FFO) fully cover Group net investment plus dividends in excess of the fixed minimum dividend.

OUTLOOK OTHER INFORMATION

Non-EU subsidiaries

At the date of approval by the Board of Directors of the financial statements of Enel SpA for 2023 – March 21, 2024 – the Enel Group meets the "conditions for the listing of shares of companies with control over companies established and regulated under the law of non-EU countries" (hereinafter "non-EU subsidiaries") established by CON-SOB with Article 15 of the Markets Regulation (approved with Resolution no. 20249 of December 28, 2017).

Specifically, we report that:

  • in application of the materiality criteria for the purposes of consolidation referred to in Article 15, paragraph 2, of the CONSOB Markets Regulation, 49 non-EU subsidiaries of the Enel Group have been identified to which the rules in question apply on the basis of the consolidated accounts of the Enel Group at December 31, 2022;
  • they are: 1) 25 Mile Creek Windfarm LLC (a United States company belonging to Enel North America Inc.); 2) 25RoseFarms Holdings LLC (a United States company belonging to Enel North America Inc.); 3) Alta Farms Azure Ranchland Holdings LLC (a United States company belonging to Enel North America Inc.); 4) Alta Farms Wind Project II LLC (a United States company belonging to Enel North America Inc.); 5) Ampla Energia e Serviços SA (a Brazilian company belonging to Enel Américas SA); 6) Aurora Wind Project LLC (a United States company belonging to Enel North America Inc.); 7) Azure Blue Jay Holdings LLC (a United States company belonging to Enel North America Inc.); 8) Azure Sky Wind Project LLC (a United States company belonging to Enel North America Inc.); 9) Blue Jay Solar I LLC (a United States company belonging to Enel North America Inc.); 10) Cimarron Bend Wind Holdings I LLC (a United States company belonging to Enel North America Inc.); 11) Companhia Energética do Ceará - Coelce (a Brazilian company belonging to Enel Américas SA); 12) Eletropaulo Metropolitana Eletricidade de São Paulo SA (a Brazilian company belonging to Enel Américas SA); 13) Empresa Distribuidora Sur SA - Edesur (an Argentine company belonging to Enel Américas SA); 14) Empresa Eléctrica Pehuenche SA (a Chilean company belonging to Enel Chile SA); 15) Enel Américas SA (a Chilean subsidiary of Enel SpA); 16) Enel Argentina SA (an Argentine company belonging to Enel Américas SA); 17) Enel Brasil SA (a Brazilian company belonging to Enel Américas SA); 18) Enel Chile SA (a Chilean subsidiary of Enel SpA);

19) Enel Colombia SA ESP (formerly Emgesa SA ESP, a Colombian company belonging to Enel Américas SA); 20) Enel Distribución Chile SA (a Chilean company belonging to Enel Chile SA); 21) Enel Distribución Perú SAA (a Peruvian company belonging to Enel Américas SA); 22) Enel Finance America LLC (a United States company belonging to Enel North America Inc.); 23) Enel Fortuna SA (a Panamanian company belonging to Enel Américas SA); 24) Enel Generación Chile SA (a Chilean company belonging to Enel Chile SA); 25) Enel Generación Perú SAA (a Peruvian company belonging to Enel Américas SA); 26) Enel Green Power Canada Inc. (a Canadian company belonging to Enel North America Inc.); 27) Enel Green Power Chile SA (a Chilean company belonging to Enel Chile SA); 28) Enel Green Power Diamond Vista Wind Project LLC (a United States company belonging to Enel North America Inc.); 29) Enel Green Power México S de RL de Cv (a Mexican company belonging to Enel Green Power SpA); 30) Enel Green Power North America Inc. (a United States company belonging to Enel North America Inc.); 31) Enel Green Power Perú SAC (a Peruvian company merged into Enel Generación Perú SAA on August 1, 2023); 32) Enel Green Power Rattlesnake Creek Wind Project LLC (a United States company belonging to Enel North America Inc.); 33) Enel Green Power Roseland Solar LLC (a United States company belonging to Enel North America Inc.); 34) Enel Green Power South Africa (Pty) Ltd (a South African company belonging to Enel Green Power SpA); 35) Enel Kansas LLC (a United States company belonging to Enel North America Inc.); 36) Enel North America Inc. (a US subsidiary of Enel SpA); 37) Enel Perú SAC (a Peruvian company belonging to Enel Américas SA); 38) Enel Rinnovabile SA de Cv (a Mexican company belonging to Enel Green Power SpA); 39) Enel Trading North America LLC (a United States company belonging to Enel North America Inc.); 40) Enel X North America Inc. (a United States company belonging to Enel North America Inc.); 41) Geotérmica del Norte SA (a Chilean company belonging to Enel Chile SA); 42) High Lonesome Wind Power LLC (a United States company belonging to Enel North America Inc.); 43) Red Dirt Wind Project LLC (a United States company belonging to Enel North America Inc.); 44) Renovables de Guatemala SA (a Guatemala company belonging to Enel Américas SA); 45) Rock Creek Wind Project LLC (a United States company belonging to Enel

North America Inc.); 46) Seven Cowboy Wind Project LLC (a United States company belonging to Enel North America Inc.); 47) Thunder Ranch Wind Project LLC (a United States company belonging to Enel North America Inc.); 48) Tradewind Energy Inc. (a United States company belonging to Enel North America Inc.); 49) White Cloud Wind Project LLC (a United States company belonging to Enel North America Inc.);

• the balance sheet and income statement of the above companies included in the reporting package used for the purpose of preparing the 2023 consolidated financial statements of the Enel Group will be made available to the public by Enel SpA (pursuant to Article 15, paragraph 1A) of the Markets Regulation) at least 15 days prior to the day scheduled for the Ordinary Shareholders' Meeting called to approve the 2023 financial statements of Enel SpA together with the summary statements showing the essential data of the latest annual financial statements of subsidiaries and associated companies (pursuant to the applicable provisions of Article 77, paragraph 2-bis, of the CONSOB Issuers Regulation approved with Resolution no. 11971 of May 14, 1999);

  • the articles of association and composition and powers of the control bodies from all the above subsidiaries have been obtained by Enel SpA and are available in updated form to CONSOB where the latter should request such information for supervisory purposes (pursuant to Article 15, paragraph 1B) of the Markets Regulation);
  • Enel SpA has verified that the above subsidiaries:
    • provide the auditor of the Parent, Enel SpA, with information necessary to perform annual and interim audits of Enel SpA (pursuant to Article 15, paragraph 1 (letter C-i) of the Markets Regulation);
    • use an administrative and accounting system appropriate for regular reporting to the management and auditor of the Parent, Enel SpA, of income statement, balance sheet and financial data necessary for preparation of the consolidated financial statements (pursuant to Article 15, paragraph 1 (letter C-ii) of the Markets Regulation).

Disclosures on financial instruments

The disclosures on financial instruments required by Article 2428, paragraph 2, no. 6-bis of the Italian Civil Code are reported in the following notes to the consolidated financial statements: 48 "Financial instruments by category", 49 "Risk management", 51 "Derivatives and hedge accounting" and 52 "Assets and liabilities measured at fair value".

Atypical or unusual operations

Pursuant to the CONSOB Notice of July 28, 2006, the Group did not carry out any atypical or unusual operations in 2023.

Such operations include transactions whose significance, size, nature of the counterparties, subject matter, method for calculating the transfer price or timing could give rise to doubts concerning the propriety and/or completeness of disclosure, conflicts of interest, preservation of company assets or protection of non-controlling shareholders.

Subsequent events

Significant events following the close of the year are discussed in note 60 "Events after the reporting period" of the consolidated financial statements.

Transactions with related parties

For more information on transactions with related parties, please see note 54 "Related parties" of the consolidated financial statements.

Reconciliation of equity and profit of Enel SpA and the corresponding consolidated figures

Pursuant to CONSOB Notice no. DEM/6064293 of July 28, 2006, the following table provides a reconciliation of Group profit for the year and equity with the corresponding figures for the Parent.

Millions of euro Income
statement
Equity Income
statement
Equity
at Dec. 31, 2023 at Dec. 31, 2022
Separate financial statements - Enel SpA 3,032 37,883 7,157 38,342
Carrying amount of and impairment losses on consolidated
equity investments
608 (104,457) 1,828 (104,604)
Equity and profit (calculated using the same accounting
policies) of the consolidated companies and groups and those
accounted for using the equity method, net of non-controlling
interests(1)
6,299 90,392 4,616 88,500
Translation reserve - (5,289) - (5,912)
Goodwill (126) 13,042 - 13,742
Intercompany dividends (5,968) - (9,807) -
Elimination of unrealized intercompany profits, net of tax effects
and other minor adjustments
(407) 184 (2,112) (1,413)
OWNERS OF THE PARENT(1) 3,438 31,755 1,682 28,655
NON-CONTROLLING INTERESTS 829 13,354 1,238 13,425
CONSOLIDATED FINANCIAL STATEMENTS(1) 4,267 45,109 2,920 42,080

(1) Figures at December 31, 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

CONSOLIDATED FINANCIAL STATEMENTS

  1. CONSOLIDATED FINANCIAL STATEMENTS

Improvement of cash flows from operating activities

Management actions made it possible to significantly improve the generation of cash flows from operating activities, equal to about €14.6 billion, an increase of about €6.0 billion compared with 2022 (about +69.0%).

Revenues at €95,565 million (€140,517 million in 2022, -32%)

The change is mainly attributable to lower average sales prices in an environment characterized by the progressive normalization of the energy sector compared with 2022, as well as to changes in the consolidation scope.

Climate change

All Group evaluation processes take account of the long-term impacts of climate change.

CONSOLIDATED FINANCIAL STATEMENTS

Consolidated Income Statement

Millions of euro Notes
2023 2022
of which with of which with
Revenue related parties related parties
Revenue from sales and services 11.a 92,882 7,260 135,653 12,939
Other income 11.b 2,683 18 4,864 389
[Subtotal] 95,565 140,517
Costs
Electricity, gas and fuel 12.a 46,270 11,578 96,896 27,880
Services and other materials 12.b 18,304 3,351 20,228 3,800
Personnel expenses 12.c 5,030 4,570
Net impairment/(reversals) on trade receivables and other
receivables
12.d 1,334 1,278
Depreciation, amortization and other impairment losses 12.e 8,089 7,447
Other operating costs 12.f 6,125 620 4,685 581
Capitalized costs 12.g (3,385) (3,415)
[Subtotal] 81,767 131,689
Net results from commodity contracts 13 (2,966) (7) 2,365 50
Operating profit 10,832 11,193
Financial income from derivatives 14 1,558 3,118
Other financial income 15 2,916 239 3,430 154
Financial expense from derivatives 14 2,167 3,414
Other financial expense 15 5,966 89 5,880 34
Net income from hyperinflation 15 284 290
Share of profit/(loss) of equity-accounted investments(1) 16 (41) (60)
Pre-tax profit(1) 7,416 8,677
Income taxes 17 2,778 3,523
Profit/(Loss) from continuing operations(1) 4,638 5,154
Attributable to owners of the Parent(1) 3,813 3,573
Attributable to non-controlling interests 825 1,581
Profit/(Loss) from discontinued operations(1) 7 (371) (2,234)
Attributable to owners of the Parent(1) (375) (1,891)
Attributable to non-controlling interests 4 (343)
Profit/(Loss) for the year (owners of the Parent and non
controlling interests)
4,267 2,920
Attributable to owners of the Parent 3,438 1,682
Attributable to non-controlling interests 829 1,238
Earnings per share 18
Basic earnings per share 18
Basic earnings per share 0.32 0.15
Basic earnings/(loss) per share from continuing operations(1) 0.36 0.34
Basic earnings/(loss) per share from discontinued operations(1) (0.04) (0.19)
Diluted earnings per share 18
Diluted earnings per share 0.32 0.15
Diluted earnings/(loss) per share from continuing operations(1) 0.36 0.34
Diluted earnings/(loss) per share from discontinued operations(1) (0.04) (0.19)

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

Statement of Consolidated Comprehensive Income

Millions of euro
Notes
2023 2022
Profit for the year 4,267 2,920
Other comprehensive income/(expense) that may be
subsequently reclassified to profit or loss (net of taxes)
Effective portion of change in the fair value of cash flow hedges 2,714 (1,677)
Change in the fair value of hedging costs 49 (70)
Share of the other comprehensive expense of equity-accounted
investments
98 233
Change in the fair value of financial assets at FVOCI 11 (44)
Change in translation reserve(1) (523) 959
Cumulative other comprehensive income that may be subsequently
reclassified to profit or loss in respect of non-current assets and
disposal groups classified as held for sale/discontinued operations(1)
16 (78)
Other comprehensive income/(expense) that may not be
subsequently reclassified to profit or loss (net of taxes)
Remeasurement of net liabilities/(assets) for defined benefit plans (150) 303
Change in the fair value of equity investments in other companies 3 13
Cumulative other comprehensive income that may not be
subsequently reclassified to profit or loss in respect of non-current
assets and disposal groups classified as held for sale/discontinued
operations
(1) 21
Total other comprehensive income/(expense) for the year
37
2,217 (340)
Comprehensive income/(expense) for the year 6,484 2,580
Attributable to:
- owners of the Parent 5,172 1,658
- non-controlling interests 1,312 922

(1) The figure for 2022 has been adjusted to reflect the classification of the "Change in translation reserve" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

Statement of Consolidated Financial Position

Millions of euro Notes
ASSETS at Dec. 31, 2023 at Dec. 31, 2022
of which with
related parties
of which with
related parties
Non-current assets
Property, plant and equipment 19 89,801 88,521
Investment property 22 97 94
Intangible assets 23 17,055 17,520
Goodwill 24 13,042 13,742
Deferred tax assets(1) 25 9,218 11,175
Equity-accounted investments 26 1,650 1,281
Non-current financial derivative assets 27 2,383 4 3,970 -
Non-current contract assets 28 444 508
Other non-current financial assets 29 8,750 1,930 8,359 1,885
Other non-current assets 31 2,249 6 2,486 -
[Total] 144,689 147,656
Current assets
Inventories 33 4,290 4,853
Trade receivables 34 17,773 1,266 16,605 1,563
Current contract assets 28 212 106
Tax assets 705 561
Current financial derivative assets 27 6,407 14,830 5
Other current financial assets 30 4,329 174 13,753 104
Other current assets 32 4,099 92 4,314 153
Cash and cash equivalents 35 6,801 11,041
[Total] 44,616 66,063
Assets classified as held for sale(1) 36 5,919 6,155
TOTAL ASSETS(1) 195,224 219,874

(1) Figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Millions of euro
Notes
LIABILITIES AND EQUITY
at Dec. 31, 2023
at Dec. 31, 2022
of which with
related parties
of which with
related parties
Equity attributable to owners of the Parent
Share capital 10,167 10,167
Treasury share reserve (59) (47)
Other reserves 6,551 2,740
Retained earnings(1) 15,096 15,795
[Total] 31,755 28,655
Non-controlling interests 13,354 13,425
Total equity(1)
37
45,109 42,080
Non-current liabilities
Long-term borrowings
38
61,085 659 68,191 774
Employee benefits
39
2,320 2,202
Provisions for risks and charges (non-current portion)
40
6,018 6,055
Deferred tax liabilities(1)
25
8,217 9,794
Non-current financial derivative liabilities
27
3,373 8 5,895 9
Non-current contract liabilities
28
5,743 18 5,747 17
Other non-current financial liabilities
41
8 -
Other non-current liabilities
42
4,236 4,246
[Total] 91,000 102,130
Current liabilities
Short-term borrowings
38
4,769 3 18,392 14
Current portion of long-term borrowings
38
9,086 111 2,835 110
Provisions for risks and charges (current portion)
40
1,294 1,325
Trade payables
44
15,821 2,829 17,641 2,810
Income tax liabilities 1,573 1,623
Current financial derivative liabilities
27
6,461 15 16,141
Current contract liabilities
28
2,126 53 1,775 43
Other current financial liabilities
45
909 853 1
Other current liabilities
43
14,760 40 11,713 47
[Total] 56,799 72,298
Liabilities included in disposal groups classified as held for sale(1)
36
2,316 3,366
Total liabilities(1) 150,115 177,794
TOTAL LIABILITIES AND EQUITY(1) 195,224 219,874

(1) Figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Statement of Changes in Consolidated Equity (note 37)

Millions of euro Share capital and reserves attributable to owners of the Parent
Share
capital
Share
premium
reserve
Treasury
share
reserve
Reserve
for equity
instruments
- perpetual
hybrid bonds
Legal
reserve
Other
reserves
Translation
reserve
Hedging
reserve
Hedging
costs
reserve
At December 31, 2021 10,167 7,496 (36) 5,567 2,034 2,313 (8,125) (2,268) (39)
Application of new accounting
policies
- - - - - - - - -
At December 31, 2021 restated 10,167 7,496 (36) 5,567 2,034 2,313 (8,125) (2,268) (39)
Distribution of dividends - - - - - - - - -
Coupons paid to holders of hybrid
bonds
- - - - - - - - -
Reclassifications - - - - - - - - -
Purchase of treasury shares - - (14) - - 14 - - -
Payments of own shares - - 3 - - (3) - - -
Reserve for share-based payments
(LTI bonus)
- - - - - 8 - - -
Equity instruments - hybrid
perpetual bonds
- - - - - - - - -
Monetary restatement (IAS 29) - - - - - - - - -
Change in the consolidation scope - - - - - - 1,365 18 5
Transactions in non-controlling
interests
- - - - - - (31) (10) 5
Comprehensive income for the
period
- - - - - - 879 (1,293) (52)
of which:
- other comprehensive expense - - - - - - 879 (1,293) (52)
- profit/(loss) for the year - - - - - - - - -
At December 31, 2022 restated 10,167 7,496 (47) 5,567 2,034 2,332 (5,912) (3,553) (81)
Distribution of dividends - - - - - - - - -
Coupons paid to holders of hybrid
bonds
- - - - - - - - -
Reclassifications - - - - - - - - -
Purchase of treasury shares - - (21) - - 21 - - -
Payments of own shares - - 9 - - (9) - - -
Reserve for share-based payments
(LTI bonus)
- - - - - (3) - - -
Equity instruments - hybrid
perpetual bonds
- - - 986 - - - - -
Monetary restatement (IAS 29) - - - - - - - - -
Change in the consolidation scope - - - - - - 1,038 49 -
Transactions in non-controlling
interests
- - - - - - - - -
Comprehensive income for the
period
- - - - - - (415) 2,111 43
of which:
- other comprehensive expense - - - - - - (415) 2,111 43
- profit/(loss) for the year - - - - - - - - -
At December 31, 2023 10,167 7,496 (59) 6,553 2,034 2,341 (5,289) (1,393) (38)

Millions of euro Share capital and reserves attributable to owners of the Parent

Reserve from
Reserve from
Reserve from
disposal of
acquisitions
Equity
equity
equity interests
of non
attributable to
Non
accounted
Actuarial
without loss of
controlling
Retained
owners of the
controlling
investments
reserve
control
interests
earnings
Parent
interests
(721)
(1,325)
(2,378)
(843)
17,801
29,653
12,689
-
-
-
-
(2)
(2)
-
(721)
(1,325)
(2,378)
(843)
17,799
29,651
12,689
42,340
-
-
-
-
(3,963)
(3,963)
(937)
(4,900)
-
-
-
-
(123)
(123)
-
(123)
-
-
-
-
-
-
-
-
-
-
-
(14)
(14)
-
(14)
-
-
-
-
3
3
-
-
-
-
-
-
8
-
-
-
-
-
-
-
-
-
-
-
-
411
410
316
726
21
14
4
(30)
-
1,397
56
1,453
-
(1)
(16)
(319)
-
(372)
379
224
249
-
-
1,682
1,658
922
2,580
224
249
-
-
-
(24)
(316)
(340)
-
-
-
-
1,682
1,682
1,238
2,920
(476)
(1,063)
(2,390)
(1,192)
15,795
28,655
13,425
42,080
-
-
-
-
(4,215)
(4,215)
(1,177)
(5,392)
-
-
-
-
(182)
(182)
-
(182)
-
-
-
-
(14)
-
-
-
-
-
-
(26)
(26)
-
(26)
-
-
-
-
9
9
-
-
-
-
-
-
(3)
-
(3)
-
-
-
-
-
986
-
986
-
-
-
-
291
291
202
493
4
(2)
-
-
-
1,089
(397)
692
-
-
-
(21)
-
(21)
(11)
(32)
97
(120)
-
-
3,438
5,172
1,312
6,484
97
(120)
-
-
-
1,734
483
2,217
-
-
-
-
3,438
3,438
829
4,267
45,109
Reserve from
measurement
of financial
instruments at
Total equity FVOCI
42,342 10
(2) -
10
-
-
-
-
-
(1)
-
-
(31)
(31)
14
-
-
-
-
-
-
18
13,354 31,755 15,096 (1,213) (2,390) (1,185) (375) -
10

Consolidated Statement of Cash Flows

Millions of euro Notes
2023 2022
of which with
related parties
of which with
related parties
Profit for the year 4,267 2,920
Adjustments for:
Net impairment losses on trade receivables and other financial assets 12.d 1,355 1,288
Depreciation, amortization and other impairment losses 12.e 8,457 8,809
Financial (income)/expense 14-15 3,437 2,499
Net (gains)/losses from equity-accounted investments 16 (17) (23)
Income taxes 2,807 3,470
Changes in net working capital: (604) (3,961)
- inventories 33 435 (2,166)
- trade receivables 34 (2,487) 297 (2,783) (242)
- trade payables 44 (1,165) 19 1,333 (1,272)
- other contract assets 28 (107) 15
- other contract liabilities 28 172 10 254 31
- other assets/liabilities 2,548 (52) (614) (783)
Accruals to provisions 1,403 803
Utilization of provisions (1,647) (1,521)
Interest income and other financial income collected(1) 14-15 2,049 239 2,715 154
Interest expense and other financial expense paid(1) 14-15 (5,657) (89) (5,134) (34)
Net (income)/expense from measurement of commodities 1,359 (927)
Income taxes paid 17 (2,958) (1,934)
Net capital gains 369 (355)
Cash flows from operating activities (A)(1) 14,620 8,649
of which: discontinued operations 132 (391)
Investments in property, plant and equipment 19-22 (11,383) (11,281)
Investments in intangible assets 23 (1,385) (1,961)
Capital grants received 413 -
Investments in non-current contract assets (795) (1,261)
Investments in entities (or business units) less cash and cash equivalents
acquired 8 (17) (1,275)
Disposals of entities (or business units) less cash and cash equivalents sold 8 2,083 2,032
(Increase)/Decrease in other investing activities 474 120
Cash flows used in investing activities (B) (10,610) (13,626)
of which: discontinued operations (442) (351)
New long-term borrowings 48.3 6,093 22,399
Repayments of borrowings 48.3 (6,006) (125) (9,359) (97)
Other changes in net financial debt (4,072) (620)
Collections/(Payments) associated with derivatives connected with
borrowings(1)
- -
Payments for acquisition of equity investments without change of control
and other transactions in non-controlling interests
(25) 12
Issues/(Redemptions) of hybrid bonds 986 -
Purchase of treasury shares (20) (14)
Dividends and interim dividends paid (5,135) (4,901)
Coupons paid to holders of hybrid bonds (182) (123)
Cash flows from/(used in) financing activities (C)(1) (8,361) 7,394
of which: discontinued operations (16) 656
Impact of exchange rate fluctuations on cash and cash equivalents (D) (49) 136
Increase/(Decrease) in cash and cash equivalents (A+B+C+D) (4,400) 2,553
Cash and cash equivalents at the beginning of the year(2) 11,543 8,990
Cash and cash equivalents at the end of the year(3) 7,143 11,543

(1) In order to improve presentation, for comparative purposes only, realized financial income and expense connected solely with borrowings have been reclassified from "Collections/(Payments) associated with derivatives connected with borrowings" in the section on cash flows from financing activities to the items "Interest income and other financial income collected" and "Interest expense and other financial expense paid"included in cash flows from operating activities.

(2) Of which cash and cash equivalents equal to €11,041 million at January 1, 2023 (€8,315 million at January 1, 2022), short-term securities equal to €78 million at January 1, 2023 (€88 million at January 1, 2022), cash and cash equivalents pertaining to "Assets classified as held for sale" in the amount of €98 million at January 1, 2023 (€44 million at January 1, 2022) and cash and cash equivalents pertaining to "Discontinued operations" equal to €326 million at January 1, 2023 (€543 million at January 1, 2022).

(3) Of which cash and cash equivalents equal to €6,801 million at December 31, 2023 (€11,041 million at December 31, 2022), short-term securities equal to €81 million at December 31, 2023 (€78 million at December 31, 2022), cash and cash equivalents pertaining to "Assets classified as held for sale" in the amount of €261 million at December 31, 2023 (€98 million at December 31, 2022) and cash and cash equivalents pertaining to "Discontinued operations" equal to €326 million at December 31, 2022.

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

Basis of presentation

1. Form and content of the consolidated financial statements

Enel SpA has its registered office in Viale Regina Margherita 137, Rome, Italy, and since 1999 has been listed on the Milan stock exchange.

There were no changes in the company name in 2023.

Enel is an energy multinational and is one of the world's leading integrated operators in the electricity and gas industries, with a special focus on Europe and Latin America. The consolidated financial statements of the Group as at and for the year ended December 31, 2023 comprise the financial statements of Enel SpA, its subsidiaries and Group holdings in associates and joint ventures, as well as the Group's share of the assets, liabilities, costs and revenue of joint operations ("the Group").

A list of the subsidiaries, associates, joint operations and joint ventures included in the consolidation scope is attached.

These consolidated financial statements were approved and authorized for publication by the Board of Directors on March 21, 2024.

These consolidated financial statements have been audited by KPMG SpA.

Basis of presentation

The consolidated financial statements as at and for the year ended December 31, 2023 have been prepared in accordance with international accounting standards (International Accounting Standards - IAS and International Financial Reporting Standards - IFRS) issued by the International Accounting Standards Board (IASB), the interpretations of the IFRS Interpretations Committee (IFRSIC) and the Standing Interpretations Committee (SIC), recognized in the European Union pursuant to Regulation (EC) no. 1606/2002 and in effect as of the close of the year. All of these standards and interpretations are hereinafter referred to as the "IFRS-EU". The consolidated financial statements have also been prepared in conformity with measures issued in implementation of Article 9, paragraph 3, of Legislative Decree 38 of February 28, 2005.

The consolidated financial statements consist of the consolidated income statement, the statement of consolidated comprehensive income, the statement of consolidated financial position, the statement of changes in consolidated equity and the consolidated statement of cash flows and the related notes.

The assets and liabilities recognized in the statement of financial position are classified on a "current/non-current basis", with separate reporting of assets held for sale and liabilities included in disposal groups held for sale. Current assets, which include cash and cash equivalents, are assets that are intended to be realized, sold or consumed during the normal operating cycle of the Group; current liabilities are liabilities that are expected to be settled during the normal operating cycle of the Group.

The income statement classifies costs on the basis of their nature, with separate reporting of profit/(loss) from continuing operations and profit/(loss) from discontinued operations attributable to owners of the Parent and to non-controlling interests.

The consolidated cash flow statement is prepared using the indirect method, with separate reporting of any cash flows by operating, investing and financing activities associated with discontinued operations.

In particular, although the Group does not diverge from the provisions of IAS 7 in the classification of items:

  • cash flows from operating activities report cash flows from core operations, interest on loans granted and obtained and dividends received from associates or joint ventures;
  • investing activities comprise investments in property, plant and equipment and intangible assets and disposals of such assets and contract assets related to service concession arrangements. They include, also, the effects of business combinations in which the Group acquires or loses control of companies, as well as other minor investments;

  • cash flows from financing activities include cash flows generated by liability management transactions and leases, dividends and interim dividends paid to owners of the Parent and non-controlling interests and the effects of transactions in non-controlling interests that do not change the status of control of the companies involved;
  • a separate item is used to report the impact of exchange rates on cash and cash equivalents and their impact on profit or loss is eliminated in full in order to neutralize the effect on cash flows from operating activities.

For more information on cash flows as reported in the statement of cash flows, please see note 46 "Cash flows". The consolidated financial statements have been prepared on a going concern basis using the cost method, with the exception of items measured at fair value in accordance

2. Accounting policies

2.1 Use of estimates and management judgment

Preparing the consolidated financial statements under IF-RS-EU requires management to take decisions and make estimates and assumptions that may impact the carrying amount of revenue, costs, assets and liabilities and the related disclosures concerning the items involved as well as contingent assets and liabilities. The estimates and management's judgments are based on previous experience and other factors considered reasonable in the circumstances. They are formulated when the carrying amount of assets and liabilities is not easily determined from other sources. The actual results may therefore differ from these estimates. The estimates and assumptions are periodically revised and the effects of any changes are reflected through profit or loss if they only involve that period. If the revision involves both the current and future periods, the change is recognized in the period in which the revision is made and in the related future periods.

In order to enhance understanding of the consolidated financial statements, the following sections examine the main items affected by the use of estimates and the cases that reflect management judgments to a significant degree, underscoring the main assumptions used by management in measuring these items in compliance with the IFRS-EU. The critical element of such valuations is the use of assumptions and professional judgments concerning issues that are by their very nature uncertain.

Changes in the conditions underlying the assumptions and judgments could have a substantial impact on future results.

The information included in the consolidated financial statements is selected on the basis of a materiality analysis carried out in accordance with the requirements of with IFRS, as explained in the measurement bases applied to each individual item, and of non-current assets and disposal groups classified as held for sale, which are measured at the lower of their carrying amount and fair value less costs to sell.

The consolidated financial statements are presented in euro, the functional currency of the Parent Enel SpA. All figures are shown in millions of euro unless stated otherwise. The consolidated income statement, the statement of financial position and the consolidated statement of cash flows report transactions with related parties, the definition of which is given in note 2.2 "Material accounting policies". The consolidated financial statements provide comparative information in respect of the previous year.

Practice Statement 2 "Making Materiality Judgments", issued by the International Accounting Standards Board (IASB).

With regard to the effects of climate change issues, the Group believes that climate change represents an implicit element in the application of the methodologies and models used to perform estimates in the valuation and/or measurement of certain accounting items. Furthermore, the Group has also taken account of the impact of climate change in the significant judgments made by management. In this regard, the main items included in the consolidated financial statements at December 31, 2023 affected by management's use of estimates and judgments refer to the impairment of non-financial assets and obligations connected with the energy transition, including those for decommissioning and site restoration of certain generation plants. For further details on these items, please see note 19 "Property, plant and equipment", note 24 "Goodwill", and note 40 "Provisions for risks and charges".

Use of estimates

Revenue from contracts with customers

Revenue from supply of electricity and gas to end users is recognized at the time the electricity or gas is delivered and includes, in addition to amounts invoiced on the basis of electricity consumption measured through periodic (and pertaining to the year) meter readings or on the volumes notified by distributors and transporters, an estimate of the electricity and gas delivered during the period but not yet invoiced that is equal to the difference between the amount of electricity and gas delivered to the distribution network and that invoiced in the period, taking account of any network losses. Revenue between the date of the last meter reading and the year-end is based on estimates of the daily consumption of individual customers, primarily determined on their historical information, adjusted to reflect the climate factors or other matters that may affect the estimated consumption.

For more details on such revenue, please see note 11.a "Revenue from sales and services".

Impairment of non-financial assets

When the carrying amount of property, plant and equipment, investment property measured at cost, intangible assets, right-of-use assets, goodwill and investments in associates/joint ventures exceeds its recoverable amount, which is the higher of the fair value less costs to sell and the value in use, the assets are impaired.

Verification of the recoverable amount of such assets is performed in accordance with the provisions of IAS 36, as described in greater detail in note 24 "Goodwill".

In order to determine the recoverable amount, the Group generally adopts the value in use criterion, intended as the present value of the estimated future cash flows generated by the asset, discounted using a pre-tax discount rate that reflects the current market assessment of the time value of money and of the specific risks of the asset.

Future cash flows used to determine value in use are based on the most recent Business Plan, approved by the management, containing forecasts for volumes, revenue, operating costs and investments. These projections cover the next three years. For subsequent years, account is taken of:

  • assumptions concerning the long-term evolution of the main variables considered in the calculation of cash flows, as well as the average residual useful life of the assets or the duration of the concessions, based on the specific characteristics of the businesses;
  • a long-term growth rate equal to the long-term growth of electricity demand and/or inflation (depending on the country and business) that does not in any case exceed the average long-term growth rate of the market involved.

The recoverable amount is sensitive to the estimates and assumptions used in the calculation of cash flows and the discount rates applied. Nevertheless, possible changes in the underlying assumptions of such amounts could generate different recoverable amounts. The analysis of each group of non-financial assets is unique and requires management to use estimates and assumptions considered prudent and reasonable in the specific circumstances.

In line with its business model and in the context of the energy transition process, the Group has also carefully assessed whether climate change issues have affected the reasonable and supportable assumption used to estimate expected cash flows. In this regard, where necessary, the Group has also taken account of the long-term impact of climate change, in particular by considering in the estimation of the terminal value a long-term growth rate in line with the change in electricity demand determined using energy models for each country.

Information on the main assumptions used to estimate the recoverable amount of assets with reference to the impacts relating to climate change, as well as information on changes in these assumptions, is provided in note 24 "Goodwill".

Expected credit losses on financial assets

At the end of each reporting period, the Group recognizes a loss allowance for expected credit losses on trade receivables and other financial assets measured at amortized cost, debt instruments measured at fair value through other comprehensive income, contract assets and all other assets in scope.

Loss allowances for financial assets are based on assumptions about risk of default and on the measurement of expected credit losses. Management uses judgment in making these assumptions and selecting the inputs for the impairment calculation, based on the Group's past experience, current market conditions as well as forward-looking estimates at the end of each reporting period.

The expected credit loss (ECL) – determined considering probability of default (PD), loss given default (LGD), and exposure at default (EAD) – is the difference between all contractual cash flows that are due in accordance with the contract and all cash flows that are expected to be received (including all shortfalls) discounted at the original effective interest rate (EIR).

For additional details on the general simplified approach used to determine expected credit losses, please see note 48 "Financial instruments by category".

Based on the specific reference market and the regulatory context of the sector, as well as expectations of recovery after 90 days, for trade receivables, contract assets and lease receivables, the Group mainly applies a default definition of 180 days past due to determine expected credit losses, as this is considered an effective indication of a significant increase in credit risk. Accordingly, financial assets that are more than 90 days past due are generally not considered to be in default, except for some specific regulated markets.

For trade receivables and contract assets the Group mainly applies a collective approach based on grouping them into specific clusters, taking into account the specific regulatory and business context. Only if the trade receivables are deemed to be individually significant by management and there is specific information about any significant increase in credit risk, does the Group apply an analytical approach.

Based on specific management evaluations, the forward-looking adjustment can be applied considering

qualitative and quantitative information in order to reflect possible future events and macroeconomic scenarios, which may affect the risk of the portfolio or the financial instrument.

For additional details on the key assumptions and inputs used, please see note 48 "Financial instruments by category".

Depreciable amount of certain elements of Italian hydroelectric plants subsequent to enactment of Law 134/2012

Italian regulations governing large-scale hydroelectric concessions were significantly modified by the "Simplifications Decree" (Decree Law 135 of 2018, ratified with Law 12 of February 11, 2019). The regulations introduce a number of innovations which, if applied to existing concessions, would require a review of the useful lives of certain investments in hydroelectric plants in order to reflect the possibility that, at the end of the concession, some assets could be transferred free of charge to the new concession holder. However, in estimating the useful lives of these plants, management, with the support of a legal opinion, considered the foreseeable outcome of the appeals promptly lodged by the Group – and others – and the related constitutionality issues, which have also been raised by industrial associations. Consequently, we believe that the legislation raises serious constitutionality issues that will be effectively recognized in the appropriate fora. Accordingly, management deemed it appropriate not to reflect the changes introduced by the regulations and therefore has continued to measure the useful lives of the plants as has been done in previous years under the previous regulatory system, considering this to be the most realistic estimate.

Law 134 of August 7, 2012 containing "urgent measures for growth" (published in the Gazzetta Ufficiale of August 11, 2012), introduced a sweeping overhaul of the rules governing hydroelectric concessions. Among its various provisions, the law establishes that five years before the expiration of a major hydroelectric water diversion concession and in cases of lapse, relinquishment or revocation, where there is no prevailing public interest for a different use of the water, incompatible with its use for hydroelectric generation, the competent public entity shall organize a public call for tenders for the award for consideration of the concession for a period ranging from 20 to a maximum of 30 years.

In order to ensure operational continuity, the law also governs the methods of transferring ownership of the business unit necessary to operate the concession, including all legal relationships relating to the concession, from the outgoing concession holder to the new concession holder, in exchange for payment of a price to be determined in negotiations between the departing concession holder and the grantor agency, taking due account of the following elements:

  • for intake and governing works, penstocks and outflow channels, which under the consolidated law governing waters and electrical plants are to be relinquished free of charge (Article 25 of Royal Decree 1775 of December 11, 1933), the revalued cost less government capital grants, also revalued, received by the concession holder for the construction of such works, depreciated for ordinary wear and tear;
  • for other property, plant and equipment, the market value, meaning replacement value, reduced by estimated depreciation for ordinary wear and tear.

While acknowledging that the new regulations introduce important changes as to the transfer of ownership of the business unit with regard to the operation of the hydroelectric concession, the practical application of these principles faces difficulties, given the uncertainties that do not permit the formulation of a reliable estimate of the value that can be recovered at the end of existing concessions (residual value).

Accordingly, management has decided it could not produce a reasonable and reliable estimate of residual value. The fact that the legislation requires the new concession holder to make a payment to the departing concession holder prompted management to review the depreciation schedules for assets classified as to be relinquished free of charge prior to Law 134/2012 (until the year ended on December 31, 2011, given that the assets were to be relinquished free of charge, the depreciation period was equal to the closest date between the term of the concession and the end of the useful life of the individual asset), calculating depreciation no longer over the term of the concession but, if longer, over the useful life of the individual assets. If additional information becomes available to enable the calculation of residual value, the carrying amounts of the assets involved will be adjusted prospectively.

Determining the fair value of financial instruments

The fair value of financial instruments is determined on the basis of prices directly observable in the market, where available, or, for unlisted financial instruments, using specific valuation techniques (mainly based on present value) that maximize the use of observable market inputs. In rare circumstances where this is not possible, the inputs are estimated by management taking due account of the characteristics of the instruments being measured.

For more information on financial instruments measured at fair value, please see note 52 "Assets and liabilities measured at fair value".

In accordance with IFRS 13, the Group includes a measurement of credit risk, both of the counterparty (Credit Valuation Adjustment or CVA) and its own (Debit Valuation Adjustment or DVA), in order to adjust the fair value

of financial instruments for the corresponding amount of counterparty risk, using the method discussed in note 52 "Assets and liabilities measured at fair value".

Changes in the assumptions made in estimating the input data could have an impact on the fair value recognized for those instruments.

Pensions and other post-employment benefits

Some of the Group's employees participate in pension plans offering benefits based on their wage history and years of service. Certain employees are also eligible for other post-employment benefit schemes.

The expenses and liabilities of such plans are calculated on the basis of estimates carried out by consulting actuaries, who use a combination of statistical and actuarial elements in their calculations, including statistical data on past years and forecasts of future costs. Other components of the estimation that are considered include mortality and retirement rates as well as assumptions concerning future developments in discount rates, the rate of wage increases, the inflation rate and trends in healthcare cost.

These estimates can differ significantly from actual developments owing to changes in economic and market conditions, increases or decreases in retirement rates and the lifespan of participants, as well as changes in the effective cost of healthcare.

Such differences can have a substantial impact on the quantification of pension costs and other related expenses. For more details on the main actuarial assumptions adopted, please see note 39 "Employee benefits".

Provisions for risks and charges

For more details on provisions for risks and charges, please see note 40 "Provisions for risks and charges".

Note 57 "Contingent assets and liabilities" also provides information regarding the most significant contingent assets and liabilities for the Group at year end.

Litigation

The Group is involved in various civil, administrative and tax disputes connected with the normal pursuit of its activities that could give rise to significant liabilities. It is not always objectively possible to predict the outcome of these disputes. The assessment of the risks associated with this litigation is based on complex factors whose very nature requires recourse to management judgments, even when taking account of the contribution of external advisors assisting the Group, about whether to classify them as contingent liabilities or liabilities.

Provisions have been recognized to cover all significant liabilities for cases in which legal counsel feels an adverse outcome is likely and a reasonable estimate of the amount of the expense can be made.

Obligations associated with generation plants, including decommissioning and site restoration

Generation activities may entail obligations for the operator with regard to future interventions that will have to be performed following the end of the operating life of the plant. Such interventions may involve the decommissioning of plants and site restoration, or other obligations linked to the type of generation technology involved. The nature of such obligations may also have a major impact on the accounting treatment used for them.

In the case of nuclear power plants, where the costs regard both decommissioning and the storage of waste fuel and other radioactive materials, the estimation of the future cost is a critical process, given that the costs will be incurred over a very long span of time, estimated at up to 100 years.

The obligation, based on financial and engineering assumptions, is calculated by discounting the expected future cash flows that the Group considers it will have to pay to meet the obligations it has assumed.

The discount rate used to determine the present value of the liability is the pre-tax risk-free rate and is based on the economic parameters of the country in which the plant is located. That liability is quantified by management on the basis of the technology existing at the measurement date and is reviewed each year, taking account of developments in storage, decommissioning and site restoration technology, as well as the ongoing evolution of the legislative framework governing health and environmental protection.

Subsequently, the value of the obligation is adjusted to reflect the passage of time and any changes in estimates. For more information, please see note 40 "Provisions for risks and charges".

Onerous contracts

In order to identify an onerous contract, the Group estimates the non-discretionary costs necessary to fulfil the obligations assumed (including any penalties) under the contract and the economic benefits that are presumed to be obtained from the contract.

Leases

When the interest rate implicit in the lease cannot be readily determined, the Group uses the incremental borrowing rate (IBR) at the lease commencement date to calculate the present value of the lease payments. This is the interest rate that the lessee would have to pay to borrow over a similar term, and with a similar security, the funds necessary to obtain an asset of a similar value to the rightofuse asset in a similar economic environment. When no observable inputs are available, the Group estimates the IBR making assumptions to reflect the terms and conditions of the lease and certain lessee-specific estimates.

One of the most significant judgments for the Group is determining this IBR necessary to calculate the present value of the lease payments required to be paid to the lessor. The Group approach to determine an IBR is based on the assessment of the following three key components:

  • the risk-free rate, that consider the currency flows of the lease payments, the economic environment where the lease contract has been negotiated and also the lease term;
  • the credit spread adjustment, in order to calculate an IBR that is specific for the lessee considering any underlying Parent or other guarantee;
  • the lease related adjustments, in order to reflect into the IBR calculation the fact that the discount rate is directly linked to the type of the underlying asset, rather than being a general incremental borrowing rate. In particular, the risk of default is mitigated for the lessors as they have the right to reclaim the underlying asset itself.

For more information on lease liabilities, please see note 48 "Financial instruments by category".

Income tax

Recovery of deferred tax assets

At December 31, 2023, the consolidated financial statements report deferred tax assets in respect of tax losses or tax credits usable in subsequent years and income components whose deductibility is deferred in an amount whose future recovery is considered by management to be highly probable.

The recoverability of such assets is subject to the achievement of future profits sufficient to absorb such tax losses and to use the benefits of the other deferred tax assets.

Significant management judgment is required to assess the probability of recovering deferred tax assets, considering all negative and positive evidence, and to determine the amount that can be recognized, based upon the likely timing and the level of future taxable profits together with future tax planning strategies and the tax rates applicable at the date of reversal. However, where the Group should become aware that it is unable to recover all or part of recognized tax assets in future years, the consequent adjustment would be taken to profit or loss in the year in which this circumstance arises.

The recoverability of deferred tax assets is reviewed at the end of each period. Deferred tax assets not recognized are reassessed at each reporting date in order to verify the conditions for their recognition.

For more details on deferred tax assets recognized or not recognized, please see note 25 "Deferred tax assets and liabilities".

Management judgment

Identification of operating segments

In accordance with the requirements of IFRS 8, the Group's operating segments are represented by the business lines, identified as components:

  • that engage in business activities from which they may earn revenue and incur expenses (including revenue and expenses relating to transactions with other components of the same entity);
  • whose operating results are regularly reviewed by management to make decisions about resources to be allocated to the segment and assess their performance; and
  • for which discrete financial information is available.

Identification of cash generating units (CGUs)

For impairment testing, if the recoverable amount cannot be determined for an individual asset, the Group identifies the smallest group of assets that generate largely independent cash inflows. The smallest group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or group of assets is a CGU. Identifying such CGUs involves management judgments regarding the specific nature of the assets and the business involved (geographical segment, business segment, regulatory framework, etc.). The assets of each CGU are also identified on the basis of the manner in which management manages and monitors those assets, as well as the evidence that the cash inflows of the group of assets are largely independent of those associated with other assets (or groups of assets).

The assets of each CGU are also identified on the basis of the manner in which management manages and monitors those assets. In particular, the number and scope of the CGUs are updated systematically to reflect the impact of new business combinations and reorganizations carried out by the Group.

The CGUs identified by management to which the goodwill recognized in these consolidated financial statements has been allocated are reported in note 24 "Goodwill".

Determining the useful life of non-financial assets

In determining the useful life of property, plant and equipment and intangible assets with a finite useful life, the Group considers not only the future economic benefits – contained in the assets – obtained through their use, but also many other factors, such as physical wear and tear, the technical, commercial or other obsolescence of the product or service produced with the asset, legal or similar limits (e.g., safety, environmental or other restrictions) on the use of the asset, if the useful life of the asset depends on the useful life of other assets.

Furthermore, in estimating the useful lives of the assets

concerned, the Group has taken account of its commitment under the Paris Agreement. For more information, please see note 19 "Property, plant and equipment".

Determination of the existence of control

Under the provisions of IFRS 10, control is achieved when the Group is exposed, or has rights, to variable returns from its involvement with the investee and has the ability to affect those returns through its power over the investee. Power is defined as the current ability to direct the relevant activities of the investee based on existing substantive rights.

The existence of control does not depend solely on ownership of a majority investment, but rather it arises from substantive rights that each investor holds over the investee. Consequently, management must use its judgment in assessing whether specific situations determine substantive rights that give the Group the power to direct the relevant activities of the investee in order to affect its returns.

For the purpose of assessing control, management analyzes all facts and circumstances including any agreements with other investors, rights arising from other contractual arrangements and potential voting rights (call options, warrants, put options granted to non-controlling shareholders, etc.). These other facts and circumstances could be especially significant in such assessment when the Group holds less than a majority of voting rights, or similar rights, in the investee.

Following such analysis of the existence of control, in application of IFRS 10 the Group consolidated certain companies on a line-by-line basis even though it did not hold more than half of the voting rights, determining that the requirements for de facto control existed.

Furthermore, even if it holds more than half of the voting rights in an entity, the Group considers all the relevant facts and circumstances in assessing whether it controls the investee.

The Group reassesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the elements considered in verifying the existence of control.

Determination of the existence of joint control and of the type of joint arrangement

Under the provisions of IFRS 11, a joint arrangement is an agreement where two or more parties have joint control. Joint control exists only when the decisions over the relevant activities require the unanimous consent of the parties that share joint control.

A joint arrangement can be configured as a joint venture or a joint operation. Joint ventures are joint arrangements whereby the parties that have joint control have rights to the net assets of the arrangement. Conversely, joint operations are joint arrangements whereby the parties that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement.

In order to determine the existence of the joint control and the type of joint arrangement, management must apply judgment and assess its rights and obligations arising from the arrangement. For this purpose, the management considers the structure and legal form of the arrangement, the terms agreed by the parties in the contractual arrangement and, when relevant, other facts and circumstances.

Following that analysis, the Group has considered its interest in Asociación Nuclear Ascó-Vandellós II as a joint operation.

The Group re-assesses whether or not it has joint control if facts and circumstances indicate that changes have occurred in one or more of the elements considered in verifying the existence of joint control and the type of the joint arrangement.

For more information on the Group's investments in joint ventures, please see note 26 "Equity-accounted investments".

Determination of the existence of significant influence over an associate

Associates are those in which the Group exercises significant influence, i.e. the power to participate in the financial and operating policy decisions of the investee but not exercise control or joint control over those policies. In general, it is presumed that the Group has a significant influence when it has an ownership interest of 20% or more.

In order to determine the existence of significant influence, management must apply judgment and consider all facts and circumstances.

The Group re-assesses whether or not it has significant influence if facts and circumstances indicate that there are changes to one or more of the elements considered in verifying the existence of significant influence.

For more information on the Group's equity investments in associates, please see note 26 "Equity-accounted investments".

Determination of non-current assets (or disposal groups) held for sale and discontinued operations

An asset is classified as "held for sale" when its sale is highly probable.

To determine whether a sale is highly probable, the Group considers whether:

  • management is committed to a plan to sell the asset (or disposal group), and an active program to locate a buyer and complete the plan has been initiated;
  • the sale should be expected to qualify for recognition as a completed sale within one year from the date of

classification, except where the delay is caused by events or circumstances beyond the Group's control and there is sufficient evidence that the Group remains committed to its plan to sell the asset;

• the actions required to complete the plan should indicate that it is unlikely that significant changes to the plan will be made or that the plan will be withdrawn.

In addition, an asset (or group of assets) shall be presented as a discontinued operation when it is classified as held for sale and:

  • represents a separate major business line or geographical area of operations;
  • is part of a single coordinated plan to dispose of a separate major business line or geographical area of operations; or
  • is a subsidiary acquired exclusively with a view to resale.

Application of "IFRIC 12 - Service Concession Arrangements" to concessions

The Group, as operator, applies IFRIC 12 to "public-to-private" service concession arrangements, under which a public entity (the grantor) conveys to an operator the right to manage the infrastructure used to provide services.

More specifically, management assesses whether "public-to-private" service concession arrangements are within the scope of IFRIC 12 on the basis of whether:

  • the grantor controls or regulates what services the operator must provide with the infrastructure, to whom it must provide them, and at what price; and
  • the grantor controls through ownership, beneficial entitlement or otherwise – any significant residual interest in the infrastructure at the end of the term of the arrangement.

On the basis of that analysis, the provisions of IFRIC 12 are applicable to the service concession arrangements of a number of companies that operate primarily in Brazil. Further details about service concession arrangements in the scope of IFRIC 12 are provided in note 20 "Infrastructure within the scope of 'IFRIC 12 - Service Concession Arrangements'".

Revenue from contracts with customers

The Group carefully analyzes the contractual terms and conditions on a jurisdictional level in order to determine when a contract exists and the terms of that contract's enforceability so as to apply IFRS 15 only to such contracts. When a contract includes multiple promised goods or services, in order to assess if they should be accounted for separately or as a group, the Group considers both the individual characteristics of goods/services (i.e. whether they are distinct or are a series of distinct goods or services that are substantially the same and that have the same pattern of transfer to the customer), and the nature of the promise within the context of the contract. To this end, it is necessary to evaluate all the facts and circumstances relating to the specific contract under the relevant legal and regulatory framework. To evaluate when a performance obligation is satisfied, the Group evaluates when the control of the goods or services is transferred to the customer, assessed primarily from the perspective of the customer.

For each performance obligation, and in relation to the type of transaction:

  • revenue is recognized over time on the basis of the progress towards complete satisfaction of the performance obligation, as in the case of the provision of services. The measurement of progress towards complete satisfaction of a performance obligation is carried out consistently for performance obligations and similar circumstances using an "output" or "input" method. In particular, the cost incurred method (costto-cost method) is considered appropriate for measuring progress except when a specific analysis of the contract counsels the use of an alternative method. If it should prove impossible to reasonably assess progress towards satisfaction of the performance obligation, the Group recognizes revenue only to the extent of the incurred costs that are considered recoverable;
  • if, on the other hand, the performance obligation is satisfied at a given moment, as in the case of the supply of goods, revenue is recognized at the point in time in which the customer obtains the control of the goods, considering all relevant indicators.

The Group considers all relevant facts and circumstances in determining whether a contract includes variable consideration (i.e. consideration that may vary or depends upon the occurrence or non-occurrence of a future event). In estimating variable consideration, the Group uses the method that better predicts the consideration to which it will be entitled, applying it consistently throughout the contract and for similar contracts, also considering all available information, and updating such estimates until the uncertainly is resolved. The Group includes the estimated variable consideration in the transaction price only to the extent that it is highly probable that a significant reversal in the cumulative revenue recognized will not occur when the uncertainty is resolved.

The Group considers that it is an agent in some contracts in which it is not primarily responsible for fulfilling the contract and therefore it does not control goods or services before they are being transferred to customers. For example, the Group acts as an agent in some contracts for electricity/gas network connection services and other related activities depending on local legal and regulatory framework.

For contracts that have more than one performance obligation (e.g., "bundled" sale contracts), the Group generally allocates the transaction price to each performance obligation in proportion to its stand-alone selling price. The Group determines stand-alone selling prices considering all information and using observable prices when they are available in the market or, if not, using an estimation method that maximizes the use of observable inputs and applying it consistently to similar arrangements.

If the Group evaluates that a contract includes an option for additional goods or services (e.g., customer loyalty programs or renewal options) that represents a material right, it allocates the transaction price to this option since the option gives rise to an additional performance obligation.

The Group assesses recoverability of the incremental costs of obtaining a contract either on a contract-by-contract basis, or for a group of contracts if those costs are associated with the group of contracts.

The Group supports the recoverability of such costs on the basis of its experience with other similar transactions and evaluating various factors, including potential renewals, amendments and follow-on contracts with the same customer.

The Group amortizes such costs over the average customer term. In order to determine this expected period of benefit from the contract, the Group considers its past experience (e.g., "churn rate"), the predictive evidence from similar contracts and available information about the market.

Power Purchase Agreements

Power Purchase Agreements (PPAs), which provide for the physical delivery of energy and which do not comply with the requirements of IFRS 10 for the existence of control or joint control over a company or an asset, and IFRS 16 for the recognition of a lease, but which comply with the definition of a derivative under IFRS 9, are accounted for on the basis of the own use exemption when the relevant conditions are met.

For more information on Virtual PPAs complying with the definition of derivative pursuant to IFRS 9, please see note 51 "Derivatives and hedge accounting".

Classification and measurement of financial assets

At initial recognition, in order to classify financial assets as financial assets at amortized cost, at fair value through other comprehensive income and at fair value through profit or loss, management assesses both the contractual cash flow characteristics of the instrument and the business model for managing financial assets in order to generate cash flows.

In order to evaluate the contractual cash flow characteristics of the instrument, management performs the SPPI test at an instrument level, in order to determine if it gives rise to cash flows that are solely payments of principal and interest (SPPI) on the principal amount outstanding, performing specific assessment on the contractual clauses of the financial instruments, as well as quantitative analysis, if required.

The business model determines whether cash flows will result from collecting contractual cash flows, selling the financial assets, or both.

For more details, please see note 48 "Financial instruments by category".

Hedge accounting

Hedge accounting is applied to derivatives in order to reflect into the financial statements the effect of the Group's risk management strategies.

Accordingly, at the inception of the transaction the Group documents the hedge relationship between hedging instruments and hedged items, as well as its risk management objectives and strategy. The Group also assesses, both at hedge inception and on an ongoing basis, whether hedging instruments are highly effective in offsetting changes in the fair values or cash flows of hedged items.

On the basis of management's judgment, the effectiveness assessment based on the existence of an economic relationship between the hedging instruments and the hedged items, the dominance of credit risk in the changes in fair value and the hedge ratio, as well as the measurement of the ineffectiveness, is evaluated through a qualitative assessment or a quantitative computation, depending on the specific facts and circumstances and on the characteristics of the hedged items and the hedging instruments.

For cash flow hedges of forecast transactions designated as hedged items, management assesses and documents that they are highly probable and present an exposure to changes in cash flows that affect profit or loss.

For additional details on the key assumptions about effectiveness assessment and ineffectiveness measurement, please see note 51.1 "Derivatives designated as hedging instruments".

Leases

The complexity of the assessment of the lease contracts, and also their long-term expiring date, requires considerable professional judgments for application of IFRS 16. In particular, this regards:

  • the application of the definition of a lease to the cases typical of the sectors in which the Group operates;
  • the identification of the non-lease component into the lease arrangements;
  • the evaluation of any renewable and termination options included in the lease in order to determine the term of leases, also considering the probability of their exercise and any significant leasehold improvements on

the underlying asset;

  • the identification of any variable lease payments that depend on an index or a rate to determine whether the changes of the latter impact the future lease payments and also the amount of the right-of-use asset;
  • the estimate of the discount rate to calculate the present value of the lease payments; further details on assumptions about this rate are provided in the paragraph "Use of estimates".

For more information on leases, please see note 21 "Leases".

Uncertainty over income tax treatments

The Group determines whether to consider each uncertain income tax treatment separately or together with one or more other uncertain tax treatments as well as whether to reflect the effect of uncertainty by using the most likely amount or the expected value method, based on which approach better predicts the resolution of the uncertainty for each uncertain tax treatments, taking account of local tax regulations.

The Group makes significant use of professional judgment in identifying uncertainties about income tax treatments and reviews the judgments and estimates made in the event of a change in facts and circumstances that could change its assessment of the acceptability of a specific tax treatment or the estimate of the effects of uncertainty, or both.

For more information on income taxes, please see note 17 "Income taxes".

2.2 Material accounting policies

Related parties

Pursuant to IAS 24, related parties are mainly those that share the same controlling entity with Enel SpA, the companies that directly or indirectly are controlled by Enel SpA, the associates or joint ventures (including their subsidiaries) of Enel SpA, or the associates or joint ventures (including their subsidiaries) of any Group company. Related parties also include entities that operate post-employment benefit plans for employees of Enel SpA or its associates (specifically, the FOPEN and FONDENEL pension funds), as well as the members of the boards of statutory auditors, and their immediate family, and the key management personnel, and their immediate family, of Enel SpA and its subsidiaries. Key management personnel comprise management personnel who have the power and direct or indirect responsibility for the planning, management and control of the activities of the Company. They include directors (whether executive or not).

Subsidiaries

Pursuant to IFRS 10, subsidiaries are all entities over which the Group has control. For more information on the definition of control, please see section "Determination of the existence of control" in note 2.1 "Use of estimates and management judgment".

The financial statements of subsidiaries used to prepare the consolidated financial statements were prepared at December 31, 2023 in accordance with the accounting policies adopted by the Group.

If a subsidiary uses different accounting policies from those adopted in preparing the consolidated financial statements for similar transactions and facts in similar circumstances, appropriate adjustments are made to ensure conformity with Group accounting policies.

The figures of the subsidiaries are consolidated on a full line-by-line basis as from the date control is acquired until such control ceases.

Profit or loss for the year and the other comprehensive income are attributed to owners of the Parent and non-controlling interests, even if this results in a loss for non-controlling interests.

All intercompany assets and liabilities, equity item, revenue, expenses and cash flows relating to transactions between entities of the Group are eliminated in full.

Changes in ownership interest in subsidiaries that do not result in loss of control are accounted for as equity transactions, with the carrying amounts of the controlling and non-controlling interests adjusted to reflect changes in their interests in the subsidiary. Any difference between the amount to which non-controlling interests are adjusted and the fair value of the consideration paid or received is recognized in consolidated equity.

When the Group ceases to have control over a subsidiary, any interest retained in the entity is remeasured to its fair value, recognized through profit or loss, at the date when control is lost, recognizing any gain or loss from the loss of control through profit or loss. In addition, any amounts previously recognized in other comprehensive income in respect of the former subsidiary are accounted for as if the Group had directly disposed of the related assets or liabilities.

Investments in associates and joint ventures

In the consolidated financial statements, investments in associated companies and joint arrangements are measured in accordance with the requirements established by "IAS 28 - Investments in Associates and Joint Ventures" and "IFRS 11 - Joint Arrangements".

In this respect, an associate is an entity over which the Group has significant influence, while a joint venture is a joint arrangement over which the Group exercises joint control and has rights to the net assets of the arrangement. The Group's investments in associates and joint ventures are accounted for using the equity method, under which these investments are initially recognized at cost and any goodwill arising from the difference between the cost of the investment and the Group's share of the net fair value of the investee's identifiable assets and liabilities at the acquisition date is included in the carrying amount of the investment.

After the acquisition date, their carrying amount is adjusted to recognize changes in the Group's share of profit or loss of the associate or joint venture in Group profit or loss. Adjustments to the carrying amount may also be necessary following changes in the Group's share in the associate or joint venture as a result of changes in the other comprehensive income of the investee. The Group's share of these changes is recognized in the Group's other comprehensive income.

Distributions received from joint ventures and associates reduce the carrying amount of the investments.

Gains and losses resulting from transactions between the Group and the associates or joint ventures are eliminated to the extent of the interest in the associate or joint venture.

The financial statements of the associates or joint ventures are prepared for the same reporting period as the Group. After application of the equity method, the Group determines whether it is necessary to recognize an impairment loss on its investment in an associate or joint venture. If there is objective evidence of a loss of value, the entire carrying amount of the investment undergoes impairment testing pursuant to IAS 36 as a single asset. For more information on impairment, please see the section "Impairment of non-financial assets" in note 2.1 "Use of estimates and management judgment".

If the investment ceases to be an associate or a joint venture, the Group recognizes any retained investment at its fair value, through profit or loss. Any amounts previously recognized in other comprehensive income in respect of the former associate or joint venture are accounted for as if the Group had directly disposed of the related assets or liabilities.

If the ownership interest in an associate or a joint venture is reduced, but the Group continues to exercise a significant influence or joint control, the Group continues to apply the equity method and the share of the gain or loss that had previously been recognized in other comprehensive income relating to that reduction is accounted for as if the Group had directly disposed of the related assets or liabilities.

Joint operations are joint arrangements whereby the Group, which holds joint control, has rights to the assets and obligations for the liabilities relating to the arrangement. For each joint operation, the Group recognized assets, liabilities, costs and revenue on the basis of the provisions of the arrangement rather than the interest held. Where there is an increase in the interest in a joint arrangement that meets the definition of a business:

  • if the Group acquires control, and had rights over the assets and obligations for the liabilities of the joint arrangement immediately before the acquisition date, then the transaction represents a business combination achieved in stages, with the remeasurement of the interest it held previously in the joint operation at its fair value at each acquisition date;
  • if the Group obtains joint control (i.e. it already had an interest in a joint operation without holding joint control), the interest previously held in the joint operation shall not be remeasured.

For more information on the Group's investments in associates and joint ventures, please see note 26 "Equity-accounted investments".

Translation of foreign currency items

Pursuant to "IAS 21 - The Effects of Changes in Foreign Exchange Rates", transactions in currencies other than the functional currency are initially recognized at the spot exchange rate prevailing on the date of the transaction.

Monetary assets and liabilities denominated in a foreign currency other than the functional currency are subsequently translated using the spot exchange rate prevailing at the reporting date.

Non-monetary assets and liabilities denominated in foreign currency that are recognized at historical cost are translated using the exchange rate at the date of the initial recognition of the transaction. Non-monetary assets and liabilities in foreign currency measured at fair value are translated using the exchange rate at the date the fair value was determined.

Any exchange differences are recognized through profit or loss.

In determining the spot exchange rate to use on initial recognition of the related asset, expense or income (or part of it) on the derecognition of a non-monetary asset or non-monetary liability relating to advance consideration in foreign currency paid or received, the date of the transaction is the date on which the Group initially recognizes the non-monetary asset or non-monetary liability associated with the advance consideration.

Translation of financial statements denominated in a foreign currency

For the purposes of the consolidated financial statements, all revenue, expenses, assets and liabilities are stated in euro, which is the presentation currency of the Parent. Pursuant to IAS 21, in order to prepare the consolidated financial statements, the financial statements of consolidated companies with functional currencies other than

the presentation currency used in the consolidated financial statements are translated into euros by applying the closing exchange rate to the assets and liabilities, including goodwill and consolidation adjustments, and the average exchange rate for the period to the income statement items on the condition it approximates the exchange rates prevailing at the date of the respective transactions.

Any resulting exchange gains or losses are recognized as a separate component of equity in a special reserve. The gains and losses are recognized proportionately in the income statement on the disposal (partial or total) of the subsidiary.

When the functional currency of a consolidated company is the currency of a hyperinflationary economy, the Group restates the financial statements in accordance with "IAS 29 - Financial Reporting in Hyperinflationary Economies" before applying the specific conversion method set out below.

In order to consider the impact of hyperinflation on the local currency exchange rate, the financial position and performance (i.e. assets, liabilities, equity items, revenue and expenses) of a company of the Group whose functional currency is the currency of a hyperinflationary economy are translated into the Group's presentation currency (the euro) using the exchange rate prevailing at the reporting date, except for comparative amounts presented in the previous year's financial statements which are not adjusted for subsequent changes in the price level or subsequent changes in exchange rates.

Goodwill

Goodwill represents the future economic benefits arising from other assets acquired in a business combination that are not individually identified and separately recognized and is recognized in the consolidated financial statements as at the date of acquisition of control of the business. To this end, the Group recognizes business combinations using:

• the "purchase method", for all business combinations initiated before January 1, 2010 and completed within that financial year on the basis of IFRS 3 (2004), where the purchase cost is equal to the fair value at the date of the exchange of the assets acquired and the liabilities incurred or assumed, plus costs directly attributable to the acquisition. This cost was allocated by recognizing the assets, liabilities and identifiable contingent liabilities of the acquired company at their fair values. Any positive difference between the cost of the acquisition and the fair value of the net assets acquired attributable to owners of the Parent was recognized as goodwill. The carrying amount of non-controlling interests was determined in proportion to the interest held by non-controlling shareholders in the net assets. In the case of business combinations achieved in stages, at the date of acquisition any adjustment to the fair value of the net assets acquired previously was recognized in equity; the amount of goodwill was determined for each transaction separately based on the fair values of the acquiree's net assets at the date of each exchange transaction;

• the "acquisition method", for all business combinations carried out as from January 1, 2010 that are recognized on the basis of IFRS 3 (2008), which is referred to as IFRS 3 (Revised) hereafter, where the purchase cost (the consideration transferred) is equal to the fair value at the purchase date of the assets acquired and the liabilities incurred or assumed, as well as any equity instruments issued by the purchaser. The purchase cost includes the fair value of any asset or liability resulting from a contingent consideration arrangement. The consideration transferred is allocated by recognizing the assets, liabilities and identifiable contingent liabilities of the acquired company at their fair values as at the acquisition date. In this regard, goodwill is defined as the excess of the consideration transferred, measured at fair value as at the acquisition date, the amount of any non-controlling interest in the acquiree plus the fair value of any equity interest in the acquiree previously held by the Group (in a business combination achieved in stages) over the net amount of the identifiable assets acquired and the liabilities incurred or assumed measured at fair value. The carrying amount of non-controlling interests is determined either in proportion to the interest held by non-controlling shareholders in the net identifiable assets of the acquiree or at their fair value as at the acquisition date.

IFRS 3 (Revised) requires, among other things, the following:

  • costs directly attributable to the acquisition are recognized through profit or loss;
  • in the case of business combinations achieved in stages, at the date of acquisition of control the previously held equity interest in the acquiree is remeasured to fair value and any positive or negative difference is recognized in profit or loss;
  • any contingent consideration is recognized at fair value at the acquisition date. Subsequent changes to the fair value of the contingent consideration classified as an asset or a liability, or as a financial instrument within the scope of IFRS 9, are recognized in profit or loss. If the contingent consideration is not within the scope of IFRS 9, it is measured in accordance with the appropriate IFRS-IAS. Contingent consideration that is classified as equity is not re-measured, and its subsequent settlement is accounted for within equity;
  • if the fair values of the assets, liabilities and contingent liabilities can only be calculated on a provisional basis, the business combination is recognized using such provisional values. Any adjustments resulting from the

completion of the measurement process are recognized within 12 months of the date of acquisition, restating comparative figures.

Goodwill arising on the acquisition of subsidiaries is recognized separately. After initial recognition, goodwill is not amortized, but is tested for impairment at least annually. For the purpose of impairment testing, goodwill is allocated, from the acquisition date, to each CGU or group of CGUs that is expected to benefit from the synergies of the combination.

For more information, please see the section "Impairment of non-financial assets" in note 2.1 "Use of estimates and management judgment".

Goodwill relating to equity investments in associates and joint venture is included in their carrying amount.

Fair value measurement

For all fair value measurements and disclosures of fair value, that are either required or permitted by IFRS, the Group applies IFRS 13.

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability, in an orderly transaction, between market participants, at the measurement date (i.e. an exit price).

The fair value measurement assumes that the transaction to sell an asset or transfer a liability takes place in the principal market, i.e. the market with the greatest volume and level of activity for the asset or liability. In the absence of a principal market, it is assumed that the transaction takes place in the most advantageous market to which the Group has access, i.e. the market that maximizes the amount that would be received to sell the asset or minimizes the amount that would be paid to transfer the liability.

The fair value of an asset or a liability is measured using the assumptions that market participants would use when pricing the asset or liability, assuming that market participants act in their economic best interest. Market participants are independent, knowledgeable sellers and buyers who are able to enter into a transaction for the asset or the liability and who are motivated but not forced or otherwise compelled to do so.

When measuring fair value, the Group considers the characteristics of the asset or liability, in particular:

  • for a non-financial asset, a fair value measurement takes into account a market participant's ability to generate economic benefits by using the asset in its highest and best use or by selling it to another market participant that would use the asset in its highest and best use;
  • for liabilities and own equity instruments, the fair value reflects the effect of non-performance risk, i.e. the risk that an entity will not fulfill an obligation, including among others the credit risk of the Group itself.

In measuring the fair value of assets and liabilities, the Group uses valuation techniques that are appropriate in the circumstances and for which sufficient data are available, maximizing the use of relevant observable inputs and minimizing the use of unobservable inputs.

Property, plant and equipment

Pursuant to IAS 16, property, plant and equipment is stated at cost, net of accumulated depreciation and accumulated impairment losses, if any. Such cost includes expenses directly attributable to bringing the asset to the location and condition necessary for its intended use.

The cost is also increased by the present value of the estimate of the costs of decommissioning and restoring the site on which the asset is located where there is a legal or constructive obligation to do so. The corresponding liability is recognized under provisions for risks and charges. For more information on changes in the estimate of these costs, the passage of time and the discount rate, please see note 2.1 "Use of estimates and management judgement".

Property, plant and equipment transferred from customers to connect them to the electricity distribution network and/or to provide them with other related services is initially recognized at its fair value at the date on which control is obtained.

Borrowing costs that are directly attributable to the acquisition, construction or production of a qualifying asset, i.e. an asset that takes a substantial period of time to get ready for its intended use or sale, are capitalized as part of the cost of the assets themselves. Borrowing costs associated with the purchase/construction of assets that do not meet such requirement are expensed in the period in which they are incurred.

Certain assets that were revalued at the IFRS transition date or in previous periods are recognized at their fair value, which is considered to be their deemed cost at the revaluation date.

Where individual items of major components of property, plant and equipment have different useful lives, the components are recognized and depreciated separately.

Subsequent costs are recognized as an increase in the carrying amount of the asset when it is probable that future economic benefits associated with the cost incurred to replace a part of the asset will flow to the Group and the cost of the item can be measured reliably. All other costs are recognized in profit or loss as incurred.

The cost of replacing part or all of an asset is recognized as an increase in the carrying amount of the asset and is depreciated over its useful life; the carrying amount of the replaced unit is derecognized through profit or loss.

Property, plant and equipment, net of its residual value, is depreciated on a straight-line basis over its estimated useful life, which is reviewed annually. Any changes in de-

preciation criteria shall be applied prospectively. Depreciation begins when the asset is available for use. For more information on estimating useful life, please see note 2.1 "Use of estimates and management judgment".

Civil buildings 10-60 years
Buildings and civil works incorporated in plants 10-100 years
Hydroelectric power plants:
- penstock 10-65 years
- mechanical and electrical machinery 10-65 years
- other fixed hydraulic works 10-100 years
Thermal power plants:
- boilers and auxiliary components 20-40 years
- gas turbine components 10-40 years
- mechanical and electrical machinery 5-40 years
- other fixed hydraulic works 60 years
Nuclear power plants 50 years
Geothermal power plants:
- cooling towers 20 years
- turbines and generators 10-50 years
- turbine parts in contact with fluid 10 years
- mechanical and electrical machinery 20-40 years
Wind power plants:
- towers 20-30 years
- turbines and generators 20-30 years
- mechanical and electrical machinery 15-30 years
Solar power plants:
- mechanical and electrical machinery 15-30 years
Public and artistic lighting:
- public lighting installations 10-20 years
- artistic lighting installations 20 years
Transport lines 10-60 years
Transformer stations 20-55 years
Distribution plants:
- high-voltage lines 10-60 years
- primary transformer stations 10-50 years
- low- and medium-voltage lines 10-50 years
Meters:
- electromechanical meters 5-40 years
- electricity balance measurement equipment 10 years
- electronic meters 15 years
Charging stations 7-15 years

The useful life of leasehold improvements is determined on the basis of the term of the lease or, if shorter, on the duration of the benefits produced by the improvements themselves.

Land is not depreciated as it has an indefinite useful life. Assets recognized under property, plant and equipment are derecognized either upon their disposal (i.e. at the date the recipient obtains control) or when no future economic benefit is expected from their use or disposal. Any gain or loss, recognized through profit or loss, is calculated as the difference between the net disposal proceeds, determined in accordance with the transaction price requirements of IFRS 15, and the carrying amount of the derecognized assets.

Assets to be relinquished free of charge

The Group's plants include assets to be relinquished free of charge at the end of the concessions. These mainly regard major water diversion works and the public lands used for the operation of the thermal power plants.

Within the Italian regulatory framework in force until 2011, if the concessions are not renewed, at those dates all intake and governing works, penstocks, outflow channels and other assets on public lands were to be relinquished free of charge to the State in good operating condition. Accordingly, depreciation on assets to be relinquished was calculated over the shorter of the term of the concession and the useful life of the assets.

In the wake of the legislative changes introduced with Law 134 of August 7, 2012, the assets previously classified as assets "to be relinquished free of charge" connected with the hydroelectric water diversion concessions are now considered in the same manner as other categories of "property, plant and equipment" and are therefore depreciated over the useful life of the asset (where this exceeds the term of the concession), as discussed in the section above on the "Depreciable amount of certain elements of Italian hydroelectric plants subsequent to enactment of Law 134/2012", which you are invited to consult for more details.

In accordance with Spanish laws 29/1985 and 46/1999, hydroelectric power stations in Spanish territory operate under administrative concessions at the end of which the plants will be returned to the government in good operating condition. The terms of the concessions extend up to 2078. A number of generation companies that operate in Latin America hold administrative concessions with similar conditions to those applied under the Spanish concession system. These concessions will expire in Argentina in 2087, in Brazil in 2047, in Costa Rica in 2031, in Panama and in Guatemala in 2062.

Service concession arrangements

When acting as operator under "public-to-private" service concession arrangements, the Group constructs/upgrades infrastructure used to provide a public service and/ or operates and maintains that infrastructure for the years of the concession, in accordance with the terms specified in the contract.

In these circumstances, the Group does not account for the infrastructure operated under a service concession

arrangement within the scope of IFRIC 12 as property, plant and equipment, recognizing and measuring revenue in accordance with IFRS 15 for the services it performs. In particular, when the Group provides construction or upgrade services, depending on the characteristics of the service concession arrangement, it recognizes:

  • a financial asset, if the Group has an unconditional contractual right to receive cash or another financial asset from the grantor (or from a third party at the direction of the grantor), that is the grantor has little discretion to avoid payment; and/or
  • an intangible asset, if the Group receives the right (a license) to charge users of the public service provided and thus does not have an unconditional right to receive cash because the amounts are contingent on the extent that the public uses the service.

If the Group (as operator) has a contractual right to receive an intangible asset, borrowing costs are capitalized using the criteria specified in note 19 "Property, plant and equipment".

However, for construction/upgrade services, both types of consideration are classified as a contract asset during the construction/upgrade period.

For more details about such consideration, please see note 11.a "Revenue from sales and services".

Conversely, where the service concession arrangement provides for the infrastructure used for to operate the concessions themselves do not comply with the requirements established by IFRIC 12 and, in particular, are owned and available to the operator or have an indefinite expiry, the carrying amount of the assets attributable to these concessions is recognized under "Property, plant and equipment" and accounted for in accordance with IAS 16. Information on the main characteristics of the Group's service concession arrangements can be found in note 20 "Infrastructure within the scope of 'IFRIC 12 - Service Concession Arrangements'".

Leases

At inception of a contract, the Group assesses whether a contract is, or contains, a lease applying the definition of a lease under IFRS 16, that is met if the contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration.

When the Group acts as a lessee, it recognizes a right-ofuse asset and a lease liability at the commencement date of the lease (i.e. the date the underlying asset is available for use).

The right-of-use asset is initially measured at cost, which includes the initial amount of lease liability adjusted for any lease payments made at or before the commencement date less any lease incentives received, plus any initial direct costs incurred and an estimate of costs to retire and remove the underlying asset and to restore the underlying asset or the site on which it is located.

Right-of-use assets are subsequently depreciated on a straight-line basis over the shorter of the lease term and the estimated useful lives of the right-of-use assets.

Average residual life
(years)
Buildings 8
Ground rights of energy plants 32
Vehicles and other means of transport 4

If the lease transfers ownership of the underlying asset to the Group at the end of the lease term or if the cost of the right-of-use asset reflects the fact that the Group will exercise a purchase option, depreciation is calculated using the estimated useful life of the underlying asset.

In addition, the right-of-use assets are subject to impairment testing and adjusted for any remeasurement of lease liabilities.

The lease liability is initially measured at the present value of lease payments to be made over the lease term, discounted using the lessee's incremental borrowing rate at the lease commencement date when the interest rate implicit in the lease is not readily determinable.

Variable lease payments that do not depend on an index or a rate are recognized as expenses in the period in which the event or condition that triggers the payment occurs.

After the commencement date, the lease liability is measured at amortized cost using the effective interest method and is remeasured upon the occurrence of certain events.

The Group applies the short-term lease recognition exemption to its lease contracts that have a lease term of 12 months or less from the commencement date. It also applies the low-value assets recognition exemption to lease contracts for which the underlying asset is of low-value whose amount is estimated not material. For example, the Group has leases of certain office equipment (i.e. personal computers, printing and photocopying machines) that are considered of low value. Lease payments on short-term leases and leases of low-value assets are recognized as expense on a straight-line basis over the lease term.

Intangible assets

Pursuant to IAS 38, intangible assets are identifiable assets without physical substance controlled by the Group, when it is probable that the use of such assets will generate future economic benefits and the related cost can be reliably determined.

They are measured at purchase or internal development cost for internally generated assets and are recognized only when the Group can demonstrate the technical feasibility of completing the asset, its intention and ability to complete development and to use or sell the asset and the availability of resources to complete the asset.

The cost includes any directly attributable expenses necessary to make the assets ready for their intended use.

Intangible assets with a finite useful life are recognized net of accumulated amortization and any impairment losses. Amortization is calculated on a straight-line basis over the asset's estimated useful life, which is reassessed at least annually; any changes in amortization policies are reflected on a prospective basis. For more information on estimating useful life, please see note 2.1 "Use of estimates and management judgment" and note 23 "Intangible assets". Amortization commences when the asset is ready for use. Consequently, intangible assets not yet available for use are not amortized, but are tested for impairment at least

annually. The Group's intangible assets have a finite useful life, with the exception of a number of concessions and goodwill.

Intangible assets with indefinite useful lives are not amortized, but are tested for impairment annually.

The assessment of indefinite useful life is reviewed annually to determine whether the indefinite useful life continues to be supportable. If not, the change in useful life from indefinite to finite is accounted for as a change in accounting estimate.

Development expenditure:
- internally generated 5 years
- acquired 3-26 years
Industrial patents and intellectual property rights:
- internally generated 3-10 years
- acquired 3-10 years
Concessions, licenses, trademarks and similar rights:
- internally generated 20 years
- acquired 10-18 years
Other:
- internally generated 2-28 years
- acquired 3-15 years

The Group presents costs to obtain a contract with a customer capitalized in accordance with IFRS 15 as intangible assets, only if:

  • the costs are incremental, that is they are directly attributable to an identified contract and the Group would not have incurred them if the contract had not been obtained;
  • the Group expects to recover them, through reimbursements (direct recoverability) or the margin (indirect recoverability).

In particular, the Group generally capitalizes trade fees and commissions paid to agents for such contracts if the capitalization criteria are met.

Capitalized customer contract costs are amortized on a systematic basis, consistent with the pattern of the transfer of the goods or services to which they relate, and undergo impairment testing to identify any impairment losses to the extent that the carrying amount of the asset recognized exceeds the recoverable amount.

The Group amortizes the capitalized customer contract costs on a straight-line basis over the expected period of benefit from the contract (i.e. the average term of the customer relationship); any changes in amortization policies are reflected on a prospective basis.

Impairment of non-financial assets

Pursuant to "IAS 36 - Impairment of assets", at each reporting date, property, plant and equipment, investment property recognized at cost, intangible assets, right-ofuse assets, goodwill and equity investments in associates/ joint ventures are reviewed to determine whether there is evidence of impairment (using internal and external sources of information).

CGUs to which goodwill is allocated, intangible assets with an indefinite useful life and intangible assets not yet available for use are tested for recoverability annually or more frequently if there is evidence suggesting that the assets can be impaired.

If such evidence exists, the recoverable amount of any involved asset is estimated on the basis of the use of the asset and its future disposal, in accordance with the Group's most recent Business Plan. For the estimate of the recoverable amount, please see note 2.1 "Use of estimates and management judgment".

The recoverable amount is determined for an individual asset, unless the asset do not generate cash inflows that are largely independent of those from other assets or groups of assets and therefore it is determined for the CGU to which the asset belongs.

If the carrying amount of an asset or of a CGU to which it is allocated is greater than its recoverable amount, an impairment loss is recognized in profit or loss and presented under "Depreciation, amortization and other impairment losses".

Impairment losses of CGUs are firstly charged against the carrying amount of any goodwill attributed to it and then against the other assets, in proportion to their carrying amount.

If the reasons for a previously recognized impairment loss no longer apply, the carrying amount of the asset is restored through profit or loss, under "Depreciation, amortization and other impairment losses", in an amount that shall not exceed the carrying amount that the asset would have had if the impairment loss had not been recognized. The original amount of goodwill is not restored even if in subsequent years the reasons for the impairment no longer apply.

Inventories

Pursuant to IAS 2, inventories are measured at the lower of cost and net realizable value except for inventories involved in trading activities, which are measured at fair value with recognition through profit or loss. Cost is determined on the basis of average weighted cost, which in-

cludes related ancillary charges. Net estimated realizable value is the estimated normal selling price net of estimated costs to sell or, where applicable, replacement cost.

For the portion of inventories held to discharge sales that have already been made, the net realizable value is determined on the basis of the amount established in the contract of sale.

Inventories include environmental certificates (for example, green certificates, energy efficiency certificates and European CO2 emissions allowances and guarantees of origin and renewable energy certificates) not used for compliance in the reporting period. These inventories are allocated to different portfolios, distinguishing between those held for trading or non-trading purposes. For more details on inventories, please see note 58 "Environmental programs".

Materials and other consumables (including energy commodities) held for use in production are not written down if it is expected that the final product in which they will be incorporated will be sold at a price sufficient to enable recovery of the cost incurred.

Financial instruments

Financial instruments are recognized and measured in accordance with "IAS 32 - Financial Instruments: Presentation" and "IFRS 9 - Financial Instruments".

A financial asset or liability is recognized in the consolidated financial statements when, and only when, the Group becomes party to the contractual provision of the instrument (i.e. the trade date).

Trade receivables arising from contracts with customers, in the scope of IFRS 15, are initially measured at their transaction price (as defined in IFRS 15) if such receivables do not contain a significant financing component or when the Group applies the practical expedient allowed by IFRS 15.

Conversely, the Group initially measures financial assets other than the above-mentioned trade receivables at their fair value plus, in the case of a financial asset not measured at fair value through profit or loss, transaction costs. Financial assets are classified, at initial recognition, as financial assets at amortized cost, at fair value through other comprehensive income and at fair value through profit or loss, on the basis of both:

  • the Group's business model for managing financial assets, that is the way in which the Group manages its financial assets in order to generate cash flows (i.e. collecting contractual cash flows, selling the financial assets, or both); and
  • the contractual cash flow characteristics of the instrument, to determine whether the instrument gives rise to cash flows that are solely payments of principal and interest based on the SPPI test.

For purposes of subsequent measurement, financial assets are classified in four categories:

  • financial assets measured at amortized cost (debt instruments);
  • financial assets at fair value through OCI with reclassification of cumulative gains and losses (debt instruments);
  • financial assets designated at fair value through OCI with no reclassification of cumulative gains and losses upon derecognition (equity instruments); and
  • financial assets at fair value through profit or loss.

Financial assets measured at amortized cost

This category mainly includes trade receivables, other financial assets and loan assets.

Financial assets at amortized cost are held within a business model whose objective is to hold financial assets in order to collect contractual cash flows and whose contractual terms give rise, on specified dates, to cash flows that are solely payments of principal and interest on the principal amount outstanding.

Such assets are initially recognized at fair value, adjusted for any transaction costs, and subsequently measured at amortized cost using the effective interest method and are subject to impairment.

Gains and losses are recognized in profit or loss when the asset is derecognized, modified or impaired.

Financial assets at fair value through other comprehensive income (FVOCI) – Debt instruments

Financial assets at fair value through other comprehensive income are assets held within a business model whose objective is achieved by both collecting contractual cash flows and selling financial assets and whose contractual cash flows give rise, on specified dates, to cash flows that are solely payments of principal and interest on the principal amount outstanding.

Changes in fair value for these financial assets are recognized in other comprehensive income as well as loss allowances that do not reduce the carrying amount of the financial assets.

When a financial asset is derecognized (e.g., at the time of sale), the cumulative gains and losses previously recognized in equity (except impairment and foreign exchange gains and losses to be recognized in profit or loss) are reversed to profit or loss.

Financial assets at fair value through other comprehensive income (FVOCI) – Equity instruments

This category includes mainly equity investments in other entities irrevocably designated as such upon initial recognition.

Gains and losses on these financial assets are never reclassified to profit or loss. The Group may transfer the cumulative gain or loss within equity.

Equity instruments designated at fair value through OCI are not subject to impairment testing.

Dividends on such investments are recognized in profit or loss unless they clearly represent a recovery of a part of the cost of the investment.

Financial assets at fair value through profit or loss

This category mainly includes:

  • financial assets with cash flows that are not solely payments of principal and interest, irrespective of the business model;
  • financial assets held for trading because acquired or held principally for the purpose of selling or repurchasing in the short term (i.e. securities, financial investments in funds, etc.);
  • derivatives, including separated embedded derivatives, held for trading or not designated as effective hedging instruments;
  • financial assets that qualify as contingent consideration.

Such financial assets are initially recognized at fair value with subsequent gains and losses from changes in their fair value recognized through profit or loss.

This category also includes equity investments which the Group had not irrevocably elected to classify at fair value through OCI. Dividends on such investments are also recognized as other income in the income statement when the right of payment has been established.

Impairment of financial assets

At each reporting date, the Group recognizes a loss allowance for expected credit losses on trade receivables and other financial assets measured at amortized cost, debt instruments measured at fair value through other comprehensive income (FVOCI), contract assets and all other assets within the scope of IFRS 9.

The impairment model adopted by the Group in compliance with IFRS 9 is based on the determination of expected credit losses (ECL) using a forward-looking approach.

For trade receivables, contract assets and lease receivables, including those with a significant financial component, the Group adopts the simplified approach, determining expected credit losses over a period corresponding to the entire life of the asset, generally equal to 12 months.

For all financial assets other than trade receivables, contract assets and lease receivables, the Group applies the general approach under IFRS 9, based on the assessment of a significant increase in credit risk since initial recognition.

The Group recognizes in profit or loss, as an impairment gain or loss, the amount of expected credit losses (or reversal) that is required to adjust the loss allowance at the reporting date.

The Group applies the low credit risk exemption, avoiding the recognition of loss allowances at an amount equal to lifetime expected credit losses due to a significant increase in credit risk of debt securities at fair value through OCI, whose counterparty has a strong financial capacity to meet its contractual cash flow obligations (e.g., investment grade). For more information on the impairment of financial assets, please see note 48 "Financial instruments by category".

Cash and cash equivalents

This category includes deposits that are available on demand or at very short term, as well as highly liquid shortterm financial investments that are readily convertible into a known amount of cash and which are subject to insignificant risk of changes in value.

In addition, for the purpose of the consolidated statement of cash flows, cash and cash equivalents do not include bank overdrafts at period-end.

Financial liabilities at amortized cost

This category mainly includes borrowings, trade payables, lease liabilities and debt instruments.

Financial liabilities, other than derivatives, are recognized when the Group becomes a party to the contractual clauses of the instrument and are initially measured at fair value adjusted for directly attributable transaction costs. Financial liabilities are subsequently measured at amortized cost using the effective interest rate method. The effective interest rate is the rate that exactly discounts the estimated future cash payments or receipts over the expected life of the financial instrument or a shorter period, where appropriate, to the carrying amount of the financial asset or liability.

Financial liabilities at fair value through profit or loss

Financial liabilities at fair value through profit or loss mainly include:

  • financial liabilities held for trading incurred for the purpose of repurchasing in the near term;
  • derivative financial instruments entered into by the Group that are not designated as hedging instruments in hedge relationships as defined by IFRS 9;
  • financial liabilities that qualify as contingent consideration.

Derecognition of financial assets and liabilities

Financial assets are derecognized whenever one of the following conditions is met:

  • the contractual right to receive the cash flows associated with the asset expires;
  • the Group has transferred substantially all the risks and rewards associated with the asset, transferring its rights to receive the cash flows of the asset or assuming a contractual obligation to pay such cash flows to one or more beneficiaries under a contract that meets the requirements provided by IFRS 9 (the "pass through test");
  • the Group has not transferred or retained substantially all the risks and rewards associated with the asset but has transferred control over the asset.

On derecognition of a financial asset, the Group recognizes the difference between the carrying amount (measured at the date of derecognition) and the consideration received through profit or loss.

Financial liabilities are derecognized when they are extinguished, i.e. when the contractual obligation has been discharged, cancelled or expired.

When an existing financial liability is replaced by another from the same lender on substantially different terms, or the terms of an existing liability are substantially modified, such an exchange or modification is treated as the derecognition of the original liability and the recognition of a new liability. The difference in the respective carrying amounts is recognized in profit or loss.

Derivative financial instruments

Derivative instruments are classified as financial assets or liabilities depending on the positive or negative fair value and they are classified as "held for trading" within "Other business models" and measured at fair value through profit or loss, except for those designated as effective hedging instruments.

All derivatives held for trading are classified as current assets or liabilities.

Derivatives not held for trading purposes, but measured at fair value through profit or loss since they do not qualify for hedge accounting, and derivatives designated as effective hedging instruments are classified as current or not current on the basis of their maturity date and the Group intention to hold the financial instrument till maturity or not.

For more details on derivatives and hedge accounting, please see note 51 "Derivatives and hedge accounting".

Embedded derivatives

An embedded derivative is a derivative included in a "combined" contract (the so-called "hybrid instrument") that contains another non-derivative contract (the so-called "host contract") and gives rise to some or all of the combined contract's cash flows. Embedded derivatives are separated from the host contract and accounted for as derivatives when:

  • the host contract is not a financial instrument measured at fair value through profit or loss;
  • the economic risks and characteristics of the embedded derivative are not closely related to those of the host contract;

• a separate contract with the same terms as the embedded derivative would meet the definition of a derivative. Embedded derivatives that are separated from the host contract are recognized in the consolidated financial statements at fair value with changes recognized in profit or loss (except when the embedded derivative is part of a designated hedge relationship).

Contracts that do not represent financial instruments to be measured at fair value are analyzed in order to identify any embedded derivatives, which are to be separated and measured at fair value. This analysis is performed when the Group becomes party to the contract or when the contract is renegotiated in a manner that significantly changes the original associated cash flows.

The main Group contracts that may contain embedded derivatives are contracts to buy or sell energy commodities.

Contracts to buy or sell non-financial items

In general, contracts to buy or sell non-financial items that are entered into and continue to be held for receipt or delivery in accordance with the Group's normal expected purchase, sale or usage requirements are out of the scope of IFRS 9 and then recognized as executory contracts, in accordance with the "own use exemption".

A contract to buy or sell non-financial items is classified as "normal purchase or sale" if it is entered into:

  • for the purpose of the physical settlement;
  • in accordance with the entity's expected purchase, sale or usage requirements.

Moreover, contracts to buy or sell non-financial items with physical settlement (for example, fixed-price forward contracts on energy commodities) that do not qualify for the own use exemption are recognized as derivatives measured at fair value from the trade date only if:

  • they can be settled net in cash; and
  • they are not entered into in accordance with the Group's expected purchase, sale or usage requirements.

Trading contracts are valued at fair value through profit or loss; the results of the measurement of changes in the fair value of contracts still outstanding at the reporting date are recognized on a net basis under the item "Net results from commodity contracts", while at the settlement date:

  • the results of the measurement of changes in the fair value of closed contracts for the sale of energy commodities as well as the related revenue, together with the impact on profit or loss of the derecognition of the derivative, are recognized under "Revenue from sales and services";
  • the results of the measurement of changes in the fair value of closed contracts for the purchase of energy commodities as well as the related cost, together with the impact on profit or loss of the derecognition of the derivative, are recognized under "Electricity, gas and fuel" and "Services and other materials".

Contracts to buy or sell non-financial items falling within the scope of application of IFRS 9 can also be subsequently designated as hedging instruments if they satisfy the requirements for hedge accounting.

The Group analyzes all contracts to buy or sell non-financial assets on an ongoing basis, with a specific focus on forward purchases and sales of electricity and energy commodities, in order to determine if they shall be classified and treated in accordance with IFRS 9 or if they have been entered into for "own use".

Offsetting of financial assets and liabilities

The Group offsets financial assets and liabilities when it:

  • currently has a legally enforceable right to set off the recognized amounts; and
  • intends either to settle on a net basis, or to realize the asset and settle the liability simultaneously.

Hyperinflation

Pursuant to IAS 29, in a hyperinflationary economy, the Group adjusts non-monetary items, equity and items deriving from index-linked contracts up to the limit of recoverable amount, using a price index that reflects changes in general purchasing power.

The effects of initial application are recognized in equity net of tax effects. Conversely, during the hyperinflationary period (until it ceases), the gain or loss resulting from adjustments is recognized in profit or loss and disclosed separately in financial income and expense.

These provisions are applied to the Group's transactions in Argentina, whose economy has been declared hyperinflationary since July 1, 2018.

Non-current assets (or disposal groups) classified as held for sale and discontinued operations

Pursuant to IFRS 5, non-current assets (or disposal groups) are classified as held for sale if their carrying amount will be recovered principally through a sale transaction, rather than through continuing use.

This classification criterion is applicable only when non-current assets (or disposal groups) are available in their present condition for immediate sale and the sale is highly probable.

For more details on the requirements for determining whether a sale is highly probable, please see note 2.1 "Use of estimates and management judgment".

If the Group is committed to a sale program involving loss of control of a subsidiary and the requirements provided for under IFRS 5 are met, all the assets and liabilities of that subsidiary are classified as held for sale when the classification criteria are met, regardless of whether the Group will retain a non-controlling interest in its former subsidiary after the sale.

The Group applies these classification criteria as envisaged in IFRS 5 to an investment, or a portion of an investment, in an associate or a joint venture. Any retained portion of an investment in an associate or a joint venture that has not been classified as held for sale is accounted for using the equity method until disposal of the portion that is classified as held for sale takes place.

Non-current assets (or disposal groups) and liabilities of disposal groups classified as held for sale are presented separately from other assets and liabilities in the consolidated statement of financial position.

The amounts presented for non-current assets or for the assets and liabilities of disposal groups classified as held for sale are not reclassified or re-presented for prior periods presented.

Immediately before the initial classification of non-current assets (or disposal groups) as held for sale, the carrying amounts of such assets (or disposal groups) are measured in accordance with the accounting standard applicable to those assets or liabilities. Non-current assets (or disposal groups) classified as held for sale are measured at the lower of their carrying amount and fair value less costs to sell. Impairment losses for any initial or subsequent writedown of the assets (or disposal groups) to fair value less costs to sell and gains for their reversals are recognized in profit or loss from continuing operations.

Non-current assets are not depreciated (or amortized) while they are classified as held for sale or while they are part of a disposal group classified as held for sale.

If a component of the Group is a discontinued operation, the Group presents, in a separate line item of the income statement, a single amount comprising the total of:

  • the post-tax profit or loss of discontinued operations; and
  • the post-tax gain or loss recognized on the measurement at fair value less costs to sell or on the disposal of the assets or disposal groups constituting the discontinued operation.

The corresponding amount is restated in the income statement for prior periods presented in the financial statements, so that the disclosures relate to all operations that are discontinued by the end of the current reporting period. If the Group ceases to classify a component as held for sale, the results of the component previously presented in discontinued operations are reclassified and included in profit or loss from continuing operations for all periods presented.

Environmental certificates

In the absence of specific IAS/IFRS rules, the accounting treatment adopted by the Group complies with the general rules included in the body of applicable IAS/IFRS accounting standards and with international best practice.

In particular, the Group accounting treatment of environmental certificates reflects the business model of the entities involved and, therefore, the different features of the business conducted by these entities, distinguishing between those that generate electricity from renewable sources, obligated parties, traders and other entities that operate in the energy services sector even though they are not obligated parties.

Further details on the application of this accounting model are provided in note 58 "Environmental programs".

<-- PDF CHUNK SEPARATOR -->

Employee benefits

Post-employment and other long-term benefits

Pursuant to IAS 19, the Group determines separately for each plan liabilities related to employee benefits paid upon or after ceasing employment or other long-term benefits accrued during the employment period. The Group uses actuarial assumptions to estimate the amount of the future benefits that employees have accrued at the reporting date (using the projected unit credit method) and an appropriate discount rate to determine the present value of those plans.

The liability, net of any plan assets, is recognized on an accrual basis over the vesting period of the related rights. These appraisals are performed by independent actuaries.

If the plan assets exceed the present value of the related defined benefit obligation, the surplus (up to the limit of any cap) is recognized as an asset.

As regards the liabilities/(assets) of defined benefit plans, the Group recognizes the cumulative actuarial gains and losses from the actuarial measurement of the liabilities, the return on the plan assets (net of the associated interest income) and the effect of the asset ceiling (net of the associated interest) in other comprehensive income when they occur. For other long-term benefits, the related actuarial gains and losses are recognized through profit or loss.

In addition, the Group is involved in defined contribution plans under which it pays fixed contributions to a separate entity (a fund) and has no legal or constructive obligation to pay further contributions if the fund does not hold sufficient assets to pay all employee benefits relating to employee service in the current and prior periods. Such plans are usually aimed to supplement pension benefits due to employees post-employment. The related costs are recognized through profit or loss on the basis of the amount of contributions paid in the period.

Termination benefits

Pursuant to IAS 19, liabilities for benefits due to employees for the early termination of employee service arise out of the Group's decision to terminate an employee's employment before the normal retirement date or an employee's decision to accept an offer of benefits in exchange for the termination of employment.

Termination benefits are recognized at the earlier of the following dates:

  • when the entity can no longer withdraw its offer of benefits; and
  • when the entity recognizes a cost for a restructuring that is within the scope of IAS 37 and involves the payment of termination benefits.

The liabilities are measured on the basis of the nature of the employee benefits.

Share-based payments

The Group undertakes share-based payment transactions settled with equity instruments as part of the remuneration policy adopted for the Chief Executive Officer/ General Manager and for key management personnel.

The most recent long-term incentive plans provide for the grant to recipients of an incentive represented by an equity component (settled with equity instruments) and a monetary component (paid in cash), which will accrue if specific conditions are met.

Pursuant to IFRS 2, the Group classifies the monetary component as a cash-settled transaction if it is based on the price (or value) of the equity instruments of the company that issued the plan or, in other cases, as another long-term employee benefit.

In order to settle the equity component through the bonus award of Enel shares, a program for the purchase of treasury shares to support these plans was approved. For more details on share-based incentive plans, please see note 53 "Share-based payments".

In particular for the equity component, the Group recognizes the services rendered by employees as personnel expenses over the period in which the conditions for remaining in service and for achieving certain results must be satisfied (vesting period) and indirectly estimates their value, and the corresponding increase in a specific equity item, on the basis of the fair value of the equity instruments (i.e. the issuer shares) at the grant date.

The overall expense recognized is adjusted at each reporting date until the vesting date to reflect the best estimate available to the Group of the number of equity instruments for which the service and performance conditions other than market conditions or non-vesting conditions will be satisfied at the end of the vesting period.

Conversely, if the incentive based on equity instruments is paid in cash, the Group recognizes the services rendered by employees as personnel expenses over the vesting period and a corresponding liability measured at the fair value of the liability incurred. Subsequently, and until its extinction, the liability is remeasured at fair value at each reporting date, considering the best possible estimate of the incentive that will vest, with changes in fair value recognized under personnel expenses.

Provisions for risks and charges

Pursuant to IAS 37, provisions are recognized where there is a legal or constructive obligation as a result of a past event at the end of the reporting period, the settlement of which is expected to result in an outflow of resources whose amount can be reliably estimated. Where the

impact of the time value of money is material, the accruals are determined by discounting expected future cash flows using a pre-tax discount rate that reflects the current market assessment of the time value of money and, if applicable, the risks specific to the liability.

If the provision is discounted, the periodic adjustment of the present value for the time factor is recognized as a financial expense.

When the Group expects some or all charges to be reimbursed, the reimbursement is recognized as a separate asset, but only when the reimbursement is virtually certain. Where the liability relates to decommissioning and/or site restoration in respect of property, plant and equipment, the initial recognition of the provision is made against the related asset and the expense is then recognized in profit or loss through the depreciation of the asset involved.

Where the liability regards the treatment and storage of nuclear waste and other radioactive materials, the provision is recognized against the related operating costs.

A liability for restructuring refers to a program planned and controlled by management that materially changes the scope of a business undertaken by the Group or the manner in which the business is conducted. Such a liability is recognized when a constructive obligation is established, i.e. when the Group has approved a detailed formal restructuring plan and has started to implement the plan or has announced its main features to those affected by it.

Provisions do not include liabilities in respect of uncertain income tax treatments that are recognized as tax liabilities. The Group could provide a warranty in connection with the sale of a product (whether a good or service) from contracts with customers in the scope of IFRS 15, in accordance with the contract, the law or its customary business practices. In this case, the Group assesses whether the warranty provides the customer with assurance that the related product will function as the parties intended because it complies with agreed-upon specifications or whether the warranty provides the customer with a service in addition to the assurance that the product complies with agreed-upon specifications.

After the assessment, if the Group establishes that an assurance warranty is provided, it recognizes a separate warranty liability and corresponding expense when transferring the product to the customer, as additional costs of providing goods or services, without attributing any of the transaction price (and therefore revenue) to the warranty. The liability is measured and presented as a provision.

Otherwise, if the Group determines that a service warranty is provided, it accounts for the promised warranty as a performance obligation in accordance with IFRS 15, recognizing the contract liability as revenue over the period the warranty service is provided and the costs associated as they are incurred.

Finally, if the warranty includes both an assurance element and a service element and the Group cannot reasonably account for them separately, then it accounts for both of the warranties together as a single performance obligation.

Changes in estimates of accruals to the provisions addressed here are recognized through profit or loss in the period in which the changes occur, with the exception of those in the costs of decommissioning, retiring and/or restoration resulting from changes in the timetable and costs necessary to extinguish the obligation or from a change in the discount rate. These changes increase or decrease the carrying amount of the related assets and are taken to profit or loss through depreciation. Where they increase the carrying amount of the assets, it is also determined whether the new carrying amount of the assets is fully recoverable. If this is not the case, a loss equal to the unrecoverable amount is recognized through profit or loss.

Decreases in estimates are recognized up to the carrying amount of the assets. Any excess is recognized immediately in profit or loss.

For more information on the estimation criteria adopted in determining provisions for retiring and/or restoration of property, plant and equipment, especially those associated with decommissioning nuclear power plants and storage of waste fuel and other radioactive materials, please see note 2.1 "Use of estimates and management judgment".

Revenue from contracts with customers

The Group recognizes revenue from contracts with customers at an amount that reflects the consideration at which the Group expects to be entitled in exchange for those goods or services, using the five-step model envisaged by IFRS 15:

  • identify the contract with the customer;
  • identify the performance obligations in the contract, that is, all goods or services promised in the contract;
  • determine the transaction price at inception of the contract considering any variable considerations, noncash consideration received from a customer or payable to the customer, significant financing components;
  • allocate the transaction price, at contract inception, to each separate performance obligation;
  • recognize revenue, when (or as) each performance obligation is satisfied by transferring the promised good or service to the customer.

The Group does not disclose the information about the remaining performance obligations in existing contracts if the performance obligation is part of a contract that has an original expected duration of one year or less and if the Group recognizes revenue in the amount to which it has a right to invoice the customer.

More information on the application of this revenue recognition model is provided in note 2.1 "Use of estimates

and management judgment" and in note 11.a "Revenue from sales and services".

Other revenue

The Group recognizes revenue other than that deriving from contracts with customers mainly referring to:

  • revenue from the sale of energy commodities based on contracts with physical settlement, which do not qualify for the own use exemption and therefore is recognized at FVTPL in accordance with IFRS 9;
  • changes in the fair value of settled contracts to sell energy commodities with physical settlement, which do not qualify for the own use exemption and therefore are recognized at FVTPL in accordance with IFRS 9;
  • operating lease revenue accounted for on an accrual basis in accordance with the substance of the relevant lease agreement.

Other operating income

Other operating income primarily includes gains on disposal of assets that are not an output of the Group's ordinary activities and government grants.

Pursuant to IAS 20, government grants, including non-monetary grants at fair value, are recognized where there is reasonable assurance that they will be received and that the Group will comply with all conditions attaching to them as set by the government, government agencies and similar bodies whether local, national or international.

When loans are provided by governments at a below-market rate of interest, the benefit is regarded as a government grant. The loan is initially recognized and measured at fair value and the government grant is measured as the difference between the initial carrying amount of the loan and the funds received. The loan is subsequently measured in accordance with the requirements for financial liabilities.

Government grants are recognized in profit or loss on a systematic basis over the periods in which the Group recognizes as expenses the costs that the grants are intended to compensate.

A government grant received to compensate for costs or losses already incurred, or for the purpose of providing immediate financial support to the Group without related future costs, is recognized as income in the year in which it becomes enforceable.

When government grants are received to purchase, build or otherwise acquire non-current assets (for example, an item of property, plant and equipment or an intangible asset), they are deducted from the carrying amount of the asset and are recognized in profit or loss over the depreciable/amortizable life of the asset as a reduction in the depreciation/amortization charge. If there is insufficient information to enable adequate attribution to the fixed assets to which they refer, capital grants are recognized as deferred income under other liabilities, and credited to profit or loss on a systematic basis over the useful life of the asset. If a government grant is made in a period subsequent to that in which the depreciation of the assets began, the portion of the grant corresponding to the depreciation recognized in previous periods is recognized directly in profit or loss.

Where the Group receives government grants in the form of a transfer of a non-monetary asset for the use of the Group, it accounts for both the grant and the asset at the fair value of the non-monetary asset received at the date of the transfer.

Net results from commodity contracts

The net results from commodity contracts include:

  • the net income or expense from commodity derivatives, including derivatives designated as cash flow hedges and derivatives measured at fair value through profit or loss, whether settled or outstanding at the reporting date; and
  • the net gain/(loss) from the measurement through profit or loss of energy commodity contracts with physical settlement still outstanding at the reporting date.

Dividends

Pursuant to "IFRS 9 - Financial Instruments", dividends are recognized when the unconditional right to receive payment is established.

Dividends and interim dividends payable to the Parent's shareholders and non-controlling interests are recognized as changes in equity in the period in which they are approved by the Shareholders' Meeting and the Board of Directors, respectively.

Income taxes

IAS 12 specifies the requirements for the recognition of current and deferred tax assets and liabilities. The uncertainty in the determination of tax liabilities is defined in accordance with the provisions of "IFRIC 23 - Uncertainty over Income Tax Treatments".

Current income taxes

Current income taxes for the year, which are recognized under "Income tax liabilities" net of payments on account, or under "Tax assets" where there is a credit balance, are determined using an estimate of taxable income and in conformity with the applicable regulations.

Such liabilities and assets are determined using the tax rates and tax laws that are enacted or substantively enacted by the end of the reporting period in the countries where taxable income has been generated.

Current income taxes are recognized in profit or loss with the exception of current income taxes related to items recognized outside profit or loss that are recognized in equity.

Deferred tax

Deferred tax liabilities and assets are calculated on the temporary differences between the carrying amounts of liabilities and assets in the financial statements and their corresponding amounts recognized for tax purposes on the basis of tax rates in effect on the date the temporary difference will reverse, which is determined on the basis of tax rates that are enacted or substantively enacted as at the end of the reporting period.

Deferred tax liabilities are recognized for all taxable temporary differences, except when such liability arises: (i) from the initial recognition of goodwill; or (ii) from the initial recognition of an asset or a liability in a transaction which is not a business combination and, at the time of the transaction, affects neither accounting profit nor taxable profit (tax loss); and does not give rise to equal taxable and deductible temporary differences; or (iii) in respect of taxable temporary differences associated with investments in subsidiaries, associates and joint ventures, when the Group can control the timing of the reversal of the temporary differences and it is probable that the temporary differences will not reverse in the foreseeable future.

Deferred tax assets are recognized for all deductible temporary differences, the carry forward of tax losses and any unused tax credits. For more information concerning the recoverability of such assets, please see the appropriate section of the discussion of estimates.

Deferred taxes and liabilities are recognized in profit or loss, with the exception of those in respect of items recognized outside profit or loss that are recognized in equity.

Deferred tax assets and deferred tax liabilities are offset only if there is a legally enforceable right to offset current tax assets with current tax liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities which intend either to settle current tax liabilities and assets on a net basis, or to realize the assets and settle the liabilities simultaneously, in each future period in which significant amounts of deferred tax liabilities or assets are expected to be settled or recovered.

Uncertainty over income tax treatments

In defining "uncertainty", it shall be considered whether a particular tax treatment will be accepted by the relevant taxation authority. If it is deemed probable that the tax treatment will be accepted (where the term "probable" is defined as "more likely than not"), then the Group recognizes and measures its current/deferred tax asset or liabilities applying the requirements in IAS 12.

Conversely, when the Group feels that it is not likely that the taxation authority will accept the tax treatment for income tax purposes, the Group reflects the uncertainty in the manner that best predicts the resolution of the uncertain tax treatment.

For more information on uncertainty over tax treatments, please see note 2.1 "Use of estimates and management judgment".

Since uncertain income tax positions meet the definition of income taxes, the Group presents uncertain tax liabilities/assets as current tax liabilities/assets or deferred tax liabilities/assets.

3. New and amended standards and interpretations

The Group has applied the following standards, interpretations and amendments that took effect as from January 1, 2023.

  • "Amendments to IAS 1 and IFRS Practice Statement 2 – Disclosure of Accounting Policies", issued in February 2021. The amendments are intended to provide support in deciding which policies to disclose. In this regard:
    • the amendments to "IAS 1 Presentation of Financial Statements" require disclosures of "material" accounting policies rather than "significant" policies;
    • the amendments to "IFRS Practice Statement 2 Making Materiality Judgements" are intended to provide guidance on how to apply the concept of materiality to accounting policy disclosures.

In the absence of an IFRS definition of "significant" in the context of disclosures on accounting policies, the term has been replaced with "material". The definition of material was modified in October 2018, and aligned with the IFRS and the Conceptual Framework and, therefore, is widely understood by primary users of financial statements. In accordance with IAS 1, information on accounting policies is material if, either individually or in combination with other information, it could reasonably be expected to influence decisions that the primary users of the financial statements make on the basis of such financial statements. When assessing the materiality of the disclosures on accounting policies, it is appropriate to consider both the magnitude of the transactions, other events or conditions, and their nature. However, although a transaction, other event or condition to which the disclosures on accounting policies refer may be material, this does not imply that the corresponding information is material for the purposes of the financial statements. In this context, the amendments to the IFRS Practice Statement 2 seek to provide guidance on how to determine whether disclosure of an accounting policy is material for financial statement purposes. These amendments aim to: (i) clarify that materiality judgments about disclosures of accounting policies should follow the same guidance in materiality judgments about other information, therefore considering both qualitative and quantitative factors; (ii) underscore the importance of providing information on accounting policies that is specific to the Group; and (iii) provide examples of situations where generic or standardized information, although summarizing or duplicating the requirements of the IFRS, can be considered disclosure of material accounting policies.

The disclosures on accounting policies have been revised in line with the requirements established by the amendments and have been updated in note 2.2 "Material accounting policies".

  • "Amendments to IAS 8 Definition of Accounting Estimates", issued in February 2021. The amendments clarify how companies should distinguish changes in accounting policies from changes in accounting estimates. The definition of changes in accounting estimates has been replaced with a definition of accounting estimates as "monetary amounts in financial statements that are subject to measurement uncertainty". In order to clarify the interaction between an accounting policy and an accounting estimate, IAS 8 has been amended to state that an accounting standard may require certain financial statement items to be measured at monetary amounts that cannot be directly observed, and therefore must be estimated (since they involve uncertainty in the measurement). In such circumstances, accounting estimates are developed to achieve the objective set out by the accounting policy, including the use of judgments and assumptions based on the latest available, reliable information. The amendments explain how measurement techniques and inputs must be used to develop accounting estimates and establish that measurement techniques include estimation techniques. In order to provide greater guidance, the amendments clarify that the effects on an accounting estimate of a change in an input or a change in a measurement technique are changes in accounting estimates unless they result from the correction of prior period errors. Changes in accounting estimates resulting from new information are not corrections of errors. The application of the amendments did not have a material impact on these consolidated financial statements.
  • "Amendments to IAS 12 Income Taxes: Deferred Tax related to Assets and Liabilities arising from a Single Transaction", issued in May 2021. The amendments clarify that the exemption from initial recognition provided for by the standard no longer applies to transactions that give rise to taxable and deductible temporary differences of the same amount.

In general, the initial recognition exemption provided for by IAS 12 prohibits the recognition of deferred assets and liabilities in respect of the initial recognition of assets or liabilities in a transaction that does not constitute a business combination and affects neither accounting profit nor taxable profit. As illustrated, the amendments have narrowed the scope of the exception.

For transactions (e.g., leases and decommissioning liabilities) subject to the amendments, the related deferred assets and liabilities shall be recognized from the beginning of the first comparative period presented, with any cumulative effect recognized as an adjustment

to retained earnings (or other components of equity) as at that date. In this regard, the application of the amendments did not produce a material impact on retained earnings in the opening equity of the Enel Group at January 1, 2022.

"Amendments to IAS 12 – International Tax Reform – Pillar II Model Rules", issued in May 2023. The changes were introduced in response to the Pillar II rules issued by the OECD, the aim of which is to ensure that large multinational enterprises pay a minimum level of income tax, generated in a specific period, in each jurisdiction in which they operate. In general, these rules require the application of a top-up tax that brings the total amount of taxes paid in each jurisdiction in which they operate to a minimum of 15%.

The changes introduced:

  • a mandatory temporary exception to the accounting for and disclosure of deferred tax assets and liabilities arising from the implementation of the Pillar II rules; and
  • disclosure requirements to help users of the financial statements better understand an entity's exposure to income taxes arising from the rule.

In particular, for periods in which Pillar II legislation is enacted but not yet in effect, the entity shall disclose qualitative information (such as information regarding how the entity is affected by Pillar II rules and the main jurisdictions in which exposures might exist) and quantitative information (such as indicating the portion of profits that could be subject to Pillar II income taxes and the average effective tax rate applicable to such profits; or indicating how the entity's average effective tax rate would have changed if Pillar II legislation had been in effect).

The Group has adopted the mandatory temporary exception to the recognition of deferred taxation, which applies retrospectively. However, since as at December 31, 2022 no new rule for the application of the top-up tax had yet been issued in any jurisdiction in which the Group operates and no related deferred tax had been recognized as of that date, retrospective application has had no impact on the Group's consolidated financial statements.

For more information on the disclosure requirements, please see note 4 "Minimum tax".

"IFRS 17 – Insurance Contracts", issued in May 2017. The new standard was issued by the IASB to replace IFRS 4, defining the principles for the recognition, measurement, presentation and disclosure of insurance contracts, including reinsurance contracts issued and held and investment contracts with discretionary participation features. The standard applies to insurance contracts compliant with the definition of IFRS 17, regardless of the issuer, but includes various exceptions and exemption options that allow certain types of contracts that meet the definition of insurance contract to be accounted for by applying another standard. Based on the analysis performed, the new standard has had no impact on the Group's consolidated financial statements.

4. Minimum tax

The Pillar II - Global Anti-Base Erosion Model Rules (GloBE Rules), which are intended to ensure that large multinational enterprises pay a minimum level of income tax in each jurisdiction in which they operate, have been enacted or substantially enacted in certain jurisdictions in which the Enel Group operates. In general, the rules envisage the application of a "top-up" tax to the excess profit in a jurisdiction to bring the effective tax rate on that income up to a minimum of 15%.

For this purpose, the Group has conducted an assessment of its potential exposure to the top-up tax in such jurisdictions, which found that there are a limited number of circumstances in which the effective tax rate is below 15%.

On the basis of this assessment, the potential top-up tax that the Enel Group will have to pay as the difference between the effective tax rates calculated per jurisdiction based on the GloBE Rules and the minimum rate of 15% will not have a significant impact.

In application of the provisions of the amendment of "IAS 12 - International Tax Reform – Pillar II Model Rules", the Group has applied the mandatory temporary exemption to requirements regarding deferred taxes deriving from the application of Pillar II. The Group will recognize the taxes emerging from the application of the rules as current taxes when they are incurred (see note 25 "Deferred tax assets and liabilities").

5. Argentina – Hyperinflationary economy: impact of the application of IAS 29

As from July 1, 2018, the Argentine economy has been considered hyperinflationary based on the criteria established by "IAS 29 – Financial Reporting in Hyperinflationary Economies". This designation is determined following an assessment of a series of qualitative and quantitative circumstances, including the presence of a cumulative inflation rate of more than 100% over the previous three years.

For the purposes of preparing the consolidated financial statements at December 31, 2023, and in accordance with IAS 29, certain items of the statements of financial position of the investees in Argentina have been remeasured by applying the general consumer price index to historical data in order to reflect changes in the purchasing power of the Argentine peso at the reporting date for those companies.

Bearing in mind that the Enel Group acquired control of the Argentine companies on June 25, 2009, the remeasurement of the non-monetary financial statement figures was conducted by applying the inflation indices starting from that date. In addition to being already reflected in the opening statement of financial position, the accounting effects of that remeasurement also include changes during the period. More specifically, the effect of the remeasurement of non-monetary items, the equity items and the income statement items recognized in 2023 was recognized in a specific line of the income statement under financial income and expense. The associated tax effect was recognized in taxes for the year.

In order to also take account of the impact of hyperinflation on the exchange rate of the local currency, the income statement balances expressed in the hyperinflationary currency have been translated into the Group's presentation currency (euro) applying, in accordance with IAS 21, the closing exchange rate rather than the average rate for the year in order to adjust these amounts to present values.

The cumulative changes in the general price indices from December 31, 2018 until December 31, 2023 are shown in the following table:

Periods Cumulative change
in general consumer
price index
From July 1, 2009 to December 31, 2018 346.30%
From January 1, 2019 to December 31, 2019 54.46%
From January 1, 2020 to December 31, 2020 35.41%
From January 1, 2021 to December 31, 2021 49.73%
From January 1, 2022 to December 31, 2022 97.08%
From January 1, 2023 to December 31, 2023 222.01%

In 2023, the application of IAS 29 generated net financial income (gross of tax) of €284 million.

The following tables report the effects of IAS 29 on the balance at December 31, 2023 and the impact of hyperinflation on the main income statement items for 2023, differentiating between that concerning the revaluation on the basis of the general consumer price index and that due to the application of the closing exchange rate rather than the average exchange rate for the period, in accordance with the provisions of IAS 21 for hyperinflationary economies.

Millions of euro
Cumulative
hyperinflation effect
at Dec. 31, 2022
Hyperinflation effect
for the period
Exchange differences Change in the
consolidation scope
for disposal of entities
Cumulative
hyperinflation effect
at Dec. 31, 2023
Total assets 1,989 917 (1,567) (45) 1,294
Total liabilities 555 314 (424) (7) 438
Equity 1,434 603(1) (1,143) (38) 856

(1) The figure includes profit for year equal to €110 million.

Millions of euro
IAS 29 effect IAS 21 effect Total effect at Dec. 31, 2023
Revenue 278 (588) (310)
Costs 352(1) (641)(2) (289)
Operating profit (74) 53 (21)
Net financial income/(expense) (39) 16 (23)
Net income/(expense) from hyperinflation 284 - 284
Pre-tax profit/(loss) 171 69 240
Income taxes 61 126 187
Profit/(Loss) for the year (owners of the Parent and non-controlling
interests)
110 (57) 53
Attributable to owners of the Parent 68 (83) (15)
Attributable to non-controlling interests 42 26 68

(1) Includes impact on depreciation, amortization and impairment losses of €55 million.

(2) Includes impact on depreciation, amortization and impairment losses of €(27) million.

6. Climate change disclosures

The move towards "net zero" is under way worldwide and the processes of decarbonization and electrification of the global economy are crucial to avoiding the serious consequences of an increase in temperatures of over 1.5 °C.

With this outlook, the Group has set its strategic guidelines as follows:

  • allocate capital to support a decarbonized electricity supply;
  • enable the electrification of customers' energy demand;
  • leverage the creation of value along the value chain;
  • bring forward achievement of the sustainable "net-zero" goals to 2040.

Considering the risks related to climate change and the commitments established under the Paris Agreement, the Group has decided to achieve the carbon neutrality objectives in advance and reflect its impact on assets, liabilities, and profit or loss, highlighting its significant and foreseeable impacts as required under the Conceptual Framework of the international accounting standards.

In this regard, in accordance with the provisions of the document published by the IFRS Foundation in July 2023, the Group provides explicit information in the notes to these consolidated financial statements regarding how climate change is reflected in our accounts.

For a more effective and comprehensive communication concerning climate change disclosures prepared as part of the notes to these consolidated financial statements, we have mapped this disclosure as shown below, providing references to the various sections where issues associated with climate change are addressed:

Topic Note Content
Estimates and judgments concerning
climate change
Note 2.1 "Use of estimates and
management judgment"

Reference to management's use of estimates and judgments
with regard to climate change (taking account of their
materiality within financial reporting).

Focus on estimating expected cash flows from specific
assets/CGUs (section: "Impairment of non-financial assets").

Focus of the effects of the Group's commitments under the
Paris Agreement and their impact on the estimation of the
useful life of the assets involved (section "Determining the
useful life of non-financial assets").
Sustainable investment Note 19 "Property, plant and equipment"
Focus on infrastructure associated with the development of
the grid and investment in expanding the e-Mobility, e-City
and e-Home businesses.
Measurement of non-financial assets Note 12.e "Depreciation, amortization
and other impairment losses"
Note 19 "Property, plant and equipment"
Note 24 "Goodwill"

Focus on the effects related to the commitments of the
Group in line with the Paris Agreement with regard to the
measurement of non-financial assets, with particular regard
to the residual useful life of certain assets and impairment
testing.
Provisions Note 40 "Provisions for risks and
charges"

Focus on provisions for the impact of climate change on
distribution grids and generation plants, including those
for decommissioning and restoration of sites, and possible
provisions for restructuring plans linked to the energy
transition.
Sustainability-linked finance at Enel Note 48.3 "Borrowings"
Note 60 "Events after the reporting
period"

Focus on:

issues of sustainability-linked bonds connected with the
achievement of sustainability objectives in line with the
SDGs issued by the United Nations

green bonds used to finance specific sustainable Group
projects and initiatives

sustainable loans connected with the achievement of the
Sustainable Development Goals (SDGs).
Share-based payments Note 53 "Share-based payments"
Description of long-term incentive plans anchored to
achievement of specific climate-related targets.
Environmental programs Note 58 "Environmental programs"
Description of costs relating to environmental compliance
required by national and international regulations.

Description of costs generated by not having sufficient
environmental certificates to meet environmental
compliance regulations.

7. Discontinued operations

Within the "Europe" area, the Enel Group has decided to divest certain major business lines, particularly in Russia, Romania and Greece.

Due to the fact that all discontinued assets represent a significant part of a geographical area in which the Group operates, the results relating to these assets have been classified in accordance with the provisions of IFRS 5 in a separate line of the consolidated income statement denominated "Profit/(Loss) from discontinued operations".

In accordance with the provisions of IFRS 5, which governs the presentation in the financial statements of profit or loss and the disclosures to be provided in the explanatory note on non-current assets held for sale and discontinued operations, the income statement below reports the results of discontinued operations for 2023 and 2022.

The items are shown net of intercompany transactions which have been completely eliminated.

2023 2022 Change
2,535 3,543 (1,008)
2,341 4,815 (2,474)
194 (1,272) 1,466
(62) (43) (19)
58 83 (25)
190 (1,232) 1,422
29 (52) 81
161 (1,180) 1,341
(532) (1,054) 522
(371) (2,234) 1,863

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

The breakdown by country is as follows.

Millions of euro
2023 Russia Greece Romania 2022(1) Russia(1) Greece Romania
Total revenue 2,535 - 122 2,413 3,543 290 125 3,128
Costs 2,126 - 75 2,051 3,585 243 70 3,272
Impairment 215 - - 215 1,230 534 - 696
Total costs 2,341 - 75 2,266 4,815 777 70 3,968
Operating profit/(loss) 194 - 47 147 (1,272) (487) 55 (840)
Financial income/(expense) (62) - (49) (13) (43) (9) (35) 1
Share of profit/(loss) of equity-accounted
investments
58 58 - - 83 64 19 -
Pre-tax profit/(loss) from discontinued
operations
190 58 (2) 134 (1,232) (432) 39 (839)
Current income taxes 67 - 8 59 (15) 8 2 (25)
Deferred income taxes (38) - - (38) (37) - - (37)
Income taxes 29 - 8 21 (52) 8 2 (62)
Profit/(Loss) Russia, Greece and Romania 161 58 (10) 113 (1,180) (440) 37 (777)
Capital gains/(losses) from disposal of
discontinued operations
(532) (124) 262 (670) (1,054) (1,054) - -
Profit/(Loss) from discontinued operations (371) (66) 252 (557) (2,234) (1,494) 37 (777)

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

In accordance with the provisions of IFRS 5, the facts and circumstances that led to the reclassification are described below.

Russia

On October 12, 2022, Enel SpA closed the sale of the entire stake held in PJSC Enel Russia. Upon completion of the sale, Enel sold all power generation assets in Russia, which include approximately 5.6 GW of conventional capacity and approximately 300 MW of wind capacity at various stages of development, ensuring continuity for its employees and customers.

Furthermore, on December 20, 2023, Enel SpA sold the entire stake it held in Rusenergosbyt LLC for €83 million. The operation had a negative impact of €124 million, of which €82 million related to the release of the translation reserve.

Romania

Following the agreements of December 14, 2022, February 4, 2023 and March 9, 2023, on October 25, 2023 Enel SpA finalized the sale to the Greek company Public Power Corporation SA (PPC) of all the equity stakes held by Enel Group in Romania.

In accordance with the terms of the agreement, PPC paid a total of €1,241 million. An earn-out mechanism is also foreseen concerning a potential further post-closing payment, based on the future value of the retail business.

The overall transaction had a negative impact on the Group's net profit of about €847 million, of which €655 million reflecting the release of a currency translation reserve, €15 million in respect of transaction costs connected with the sale and the recognition of €177 million net of taxation in impairment losses on the assets prior to the sale.

For more information, please see note 9 "Main acquisitions and disposals during the year".

Greece

Following the agreement of July 26, 2023, on December 29, 2023, Enel Green Power (EGP) finalized the sale of 50% of Enel Green Power Hellas (EGPH), EGP's fully-owned renewable subsidiary in Greece, to Macquarie Asset Management, acting through the Macquarie Green Investment Group Renewable Energy Fund 2, following the fulfillment of all the conditions customary for this type of transaction, including receipt of clearance from competent antitrust authorities.

In line with the above agreement, the total price received by EGP was €351 million.

Following the transaction's closing, EGP and Macquarie Asset Management entered into a shareholder agreement which envisages the joint control of EGPH in order to co-manage the company's current renewable generation portfolio alongside continuing to develop its project pipeline, further increasing its installed capacity.

The transaction generated a positive impact on Group profit of €422 million (including the remeasurement at fair value of the residual interest).

For more information, please see note 9 "Main acquisitions and disposals during the year".

For more details on the financial position by business line and geographical area of assets classified as discontinued operations, please see the section "Performance by primary segment (Business Line) and secondary segment (Geographical Area)".

The details of cash flows relating to discontinued operations are provided below, as already separately shown in the cash flow statement.

Millions of euro
2023 2022 Change
Cash flows from operating activities - discontinued operations 132 (391) 523
Cash flows used in investing activities - discontinued operations (442) (351) (91)
Cash flows from/(used in) financing activities - discontinued operations (16) 656 (672)
Cash flows - discontinued operations (326) (86) (240)

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

8. Restatement of comparative disclosures

The 2022 statement of consolidated financial position has been adjusted to take account of the effects of the amendment to IAS 12 in effect for annual reporting periods beginning on or after January 1, 2023, which clarifies that the exemption from initial recognition provided for by the standard no longer applies to transactions that give rise to taxable and deductible temporary differences of the same amount, such as leases and decommissioning.

Impact on the consolidated financial position

Millions of di euro
ASSETS at Dec. 31, 2022 IAS 12 at Dec. 31, 2022
restated
Non-current assets
Property, plant and equipment 88,521 - 88,521
Investment property 94 - 94
Intangible assets 17,520 - 17,520
Goodwill 13,742 - 13,742
Deferred tax assets 10,925 250 11,175
Equity-accounted investments 1,281 - 1,281
Non-current financial derivative assets 3,970 - 3,970
Non-current contract assets 508 - 508
Other non-current financial assets 8,359 - 8,359
Other non-current assets 2,486 - 2,486
[Total] 147,406 250 147,656
Current assets
Inventories 4,853 - 4,853
Trade receivables 16,605 - 16,605
Current contract assets 106 - 106
Tax assets 561 - 561
Current financial derivative assets 14,830 - 14,830
Other current financial assets 13,753 - 13,753
Other current assets 4,314 - 4,314
Cash and cash equivalents 11,041 - 11,041
[Total] 66,063 - 66,063
Assets classified as held for sale 6,149 6 6,155
TOTAL ASSETS 219,618 256 219,874

Millions of euro
LIABILITIES AND EQUITY at Dec. 31, 2022 IAS 12 at Dec. 31, 2022
restated
Equity attributable to owners of the Parent
Share capital 10,167 - 10,167
Treasury share reserve (47) - (47)
Other reserves 2,740 - 2,740
Retained earnings 15,797 (2) 15,795
[Total] 28,657 (2) 28,655
Non-controlling interests 13,425 - 13,425
Total equity 42,082 (2) 42,080
Non-current liabilities
Long-term borrowings 68,191 - 68,191
Employee benefits 2,202 - 2,202
Provisions for risks and charges (non-current portion) 6,055 - 6,055
Deferred tax liabilities 9,542 252 9,794
Non-current financial derivative liabilities 5,895 - 5,895
Non-current contract liabilities 5,747 - 5,747
Other non-current financial liabilities - - -
Other non-current liabilities 4,246 - 4,246
[Total] 101,878 252 102,130
Current liabilities
Short-term borrowings 18,392 - 18,392
Current portion of long-term borrowings 2,835 - 2,835
Provisions for risks and charges (current portion) 1,325 - 1,325
Trade payables 17,641 - 17,641
Income tax liabilities 1,623 - 1,623
Current financial derivative liabilities 16,141 - 16,141
Current contract liabilities 1,775 - 1,775
Other current financial liabilities 853 - 853
Other current liabilities 11,713 - 11,713
[Total] 72,298 - 72,298
Liabilities included in disposal groups classified as held for sale 3,360 6 3,366
Total liabilities 177,536 258 177,794
TOTAL LIABILITIES AND EQUITY 219,618 256 219,874

The 2022 consolidated income statement and statement of consolidated comprehensive income have been adjusted to take account of the presentation in discontinued operations, as required by the "IFRS 5 – Non-current Assets Held for Sale and Discontinued Operations", of the investment held in Rusenergosbyt LLC, which was sold in the 4th Quarter of 2023.

For more details, please see note 7 "Discontinued operations".

Impact on the consolidated income statement

Millions of euro
2022 IFRS 5 2022 restated
Revenue 140,517 - 140,517
Costs 131,689 - 131,689
Net results from commodity contracts 2,365 - 2,365
Operating profit 11,193 - 11,193
Financial income from derivatives 3,118 - 3,118
Other financial income 3,430 - 3,430
Financial expense from derivatives 3,414 - 3,414
Other financial expense 5,880 - 5,880
Net income from hyperinflation 290 - 290
Share of profit/(loss) of equity-accounted investments 4 (64) (60)
Pre-tax profit 8,741 (64) 8,677
Income taxes 3,523 - 3,523
Profit/(Loss) from continuing operations 5,218 (64) 5,154
Attributable to owners of the Parent 3,637 (64) 3,573
Attributable to non-controlling interests 1,581 - 1,581
Profit/(Loss) from discontinued operations (2,298) 64 (2,234)
Attributable to owners of the Parent (1,955) 64 (1,891)
Attributable to non-controlling interests (343) - (343)
Profit/(Loss) for the year (owners of the Parent and non-controlling
interests)
2,920 - 2,920

Impact on the statement of consolidated comprehensive income

Millions of euro
2022 IFRS 5 2022 restated
Profit for the year 2,920 - 2,920
Other comprehensive income/(expense) that may be subsequently
reclassified to profit or loss (net of taxes)
Effective portion of change in the fair value of cash flow hedges (1,677) - (1,677)
Change in the fair value of hedging costs (70) - (70)
Share of the other comprehensive income of equity-accounted
investments
233 - 233
Change in the fair value of financial assets at FVOCI (44) - (44)
Change in translation reserve 944 15 959
Cumulative other comprehensive income that may be subsequently
reclassified to profit or loss in respect of non-current assets and disposal
groups classified as held for sale/discontinued operations
(63) (15) (78)
Other comprehensive income/(expense) that may not be subsequently
reclassified to profit or loss (net of taxes)
Remeasurement of net liabilities/(assets) for defined benefit plans 303 - 303
Change in the fair value of equity investments in other companies 13 - 13
Cumulative other comprehensive income that may not be subsequently
reclassified to profit or loss in respect of non-current assets and disposal
groups classified as held for sale/discontinued operations
21 - 21
Total other comprehensive expense for the year (340) - (340)
Comprehensive income/(expense) for the year 2,580 - 2,580
Attributable to:
- owners of the Parent 1,658 - 1,658
- non-controlling interests 922 - 922

The figures presented in the comments and the tables of the notes to these consolidated financial statements at December 31, 2023 are uniform and comparable with each other.

Changes in the consolidation scope

9. Main acquisitions and disposals during the year

In the two periods under review, the consolidation scope changed as a result of a number of transactions.

2022

  • On January 3, 2022, Enel Produzione SpA acquired 100% of ERG Hydro Srl (subsequently renamed Enel Hydro Appennino Centrale Srl and merged into Enel Produzione SpA on December 1, 2022), owner of generation plants with an installed capacity of about 527 MW and an annual output of approximately 1.5 TWh, for a consideration of about €1,267 million; in December 2022, the identification of the fair value of the acquired assets and liabilities was completed, with the recognition of goodwill of approximately €349 million.
  • On June 30, 2022, Enel Green Power SpA sold to Al Rayyan Holding LLC (controlled by the Qatar Investment Authority) 50% of its stake in EGP Matimba NewCo 1 Srl, indirect owner of six companies in South Africa with an installed capacity of about 740 MW, for about €108 million, which has been paid in full.
  • On July 25, 2022, Enel X Srl sold to Mooney SpA, for about €140 million, settled in the form of financial receivables, its entire stake in Enel X Financial Services, CityPoste Payment, PayTipper and Junia Insurance and their subsidiaries.
  • On August 24, 2022, Enel Brasil SA, a subsidiary of Enel Américas, closed the sale of its entire stake in CGTF - Central Geradora Termelétrica Fortaleza SA to ENEVA SA for a consideration of about €89 million. The transaction had a negative impact on profit or loss of about €210 million.
  • On October 12, 2022, Enel finalized the sale of its entire stake in PJSC Enel Russia, equal to 56.43% of the latter's share capital, to PJSC Lukoil and the Closed Combined Mutual Investment Fund "Gazprombank-Frezia", for a

total of about €137 million. The transaction had a negative impact on reported Group net income of around €1.5 billion, mainly reflecting the release of a currency translation of about €1 billion and an impairment adjustment of €497 million.

  • On December 9, 2022, Enel Chile SA finalized the sale of its entire 99.09% stake in the share capital of listed Chilean power transmission company Enel Transmisión Chile SA to Sociedad Transmisora Metropolitana SpA, controlled by Inversiones Grupo Saesa Ltda, for about €1.3 billion. The transaction generated a capital gain of about €1.1 billion.
  • On December 22, 2022, Enel closed the sale of a 50% quota in its wholly-owned subsidiary Gridspertise Srl to the international private equity fund CVC Capital Partners Fund VIII for a total of approximately €300 million. The transaction involved the recognition of a capital gain of €261 million and the remeasurement to fair value of the residual holding in the amount of €259 million.
  • On December 29, 2022, Enel Brasil SA, a subsidiary of Enel Américas SA, finalized the sale of its entire stake in the Brazilian power distribution company Celg Distribuição SA - Celg-D (Enel Goiás), equal to about 99.9% of the latter's share capital, to Equatorial Participações e Investimentos SA, a subsidiary of Equatorial Energia SA, for a total of about €1.5 billion (of which about €269 million for the equity portion and about €1.2 billion as repayment of intercompany loans). The transaction had a negative impact on profit or loss of about €1 billion, mainly reflecting the release of a currency translation reserve associated with the net assets sold.

2023

  • On February 17, 2023, the Enel Group, through its subsidiary Enel Argentina, closed the deal for the sale to energy company Central Puerto SA of the Group's stake in the thermal generation company Enel Generación Costanera for €42 million, which have been collected in full. The transaction resulted in the recognition of a capital loss of €132 million.
  • On April 14, 2023, the Enel Group completed the sale

to YPF and Pan American Sur SA of the shares held in Inversora Dock Sud SA and Central Dock Sud SA, for a total of €48 million. The transaction had a negative impact on profit or loss of about €194 million.

• On September 29, 2023, the Enel Group, acting through its subsidiary Enel Green Power SpA, finalized the sale of 50% of the two companies that own all of the Group's renewables operations in Australia, specifically Enel

Green Power Australia (Pty) Ltd and Enel Green Power Australia Trust, to INPEX Corporation, for a total of €142 million. The operation resulted in the recognition of a gain of €103 million.

  • On October 25, 2023, Enel SpA and its listed subsidiary Enel Chile SA closed the sale of their entire equity interests in the share capital of Arcadia Generación Solar SA, a Chilean company which owns a portfolio of four operating PV plants for a total installed capacity of approximately 416 MW, to Sonnedix, an international renewable energy producer, for a total of €535 million. The transaction resulted in the recognition of a capital gain of €195 million.
  • On October 25, 2023, the Enel Group finalized the sale

Other changes

In addition to the above changes in the consolidation scope, the following transactions, although they do not represent transactions involving the acquisition or loss of control, gave rise to a change in the interest held by the Group in the investees.

• On November 24, 2023, the Enel Group, acting through the subsidiary Endesa Generación SAU, finalized the sale of the entire investment in Tecnatom SA for a total

Sale of Enel Generación Costanera

On February 17, 2023, the Enel Group sold its stake in the thermal generation company Enel Generación Costanera for €42 million, collected in full.

to the Greek company Public Power Corporation SA of all the equity stakes held by the Enel Group in Romania, for a total of €1,241 million. The transaction had a negative impact on profit or loss of the year of €847 million, of which €655 million reflecting the release of a currency translation reserve.

• On December 29, 2023, Enel SpA, acting through its fully-owned subsidiary Enel Green Power SpA, finalized the sale of 50% of Enel Green Power Hellas, Enel Green Power's fully-owned renewable subsidiary in Greece, to Macquarie Asset Management, for a total of €351 million. The overall transaction had a positive impact on the profit or loss of the Group in 2023 of €422 million.

of €26 million. The transaction had no impact on profit or loss.

• On December 20, 2023, Enel SpA sold its entire stake in Rusenergosbyt LLC for a total of €83 million. The transaction had a negative impact of €124 million on Group profit, of which €82 million reflecting the release of a currency translation reserve.

Millions of euro
Sale price 42
Total net assets sold (39)
Release of OCI reserve (135)
Gain/(Loss) on sale (132)

Sale of Inversora Dock Sud SA and Central Dock Sud SA

On April 14, 2023, the Enel Group completed the sale of shares held in the thermal generation companies Inversora Dock Sud SA and Central Dock Sud SA for €48 million, collected in full.

Millions of euro
Sale price 48
Total net assets sold (48)
Release of OCI reserve (194)
Gain/(Loss) on sale (194)

Sale of 50% of Enel Green Power Australia

On September 29, 2023, the Enel Group, acting through its subsidiary Enel Green Power SpA, finalized the sale of 50% of the two companies that own all of the Group's renewables operations in Australia, specifically Enel Green Power Australia (Pty) Ltd and Enel Green Power Australia Trust, to INPEX Corporation, for a total of €142 million, collected in full.

Millions of euro
Sale price 142
Total net assets sold (63)
Release of OCI reserve (55)
Gain/(Loss) on sale 24
Fair value remeasurement of residual interest (50%) 79
Income from sale 103

Sale of Arcadia Generación Solar

On October 25, 2023, Enel SpA and its subsidiary Enel Chile SA finalized the sale of their entire stakes in Arcadia Generación Solar SA to Sonnedix, for a total consideration of €535 million, which have been collected in full.

Millions of euro
Sale price 535
Total net assets sold (314)
Release of OCI reserve 21
Transaction costs (1)
Goodwill (46)
Gain/(Loss) on sale 195

The transaction had a tax effect of €68 million.

Sale of Romanian operations

On October 25, 2023, the Enel Group finalized the sale to the Greek company Public Power Corporation SA of all the equity stakes held in Romania, for a total consideration of €1,241 million, collected in full.

Millions of euro
Sale price 1,241
Total net assets sold (1,241)
Release of OCI reserve (655)
Transaction costs (15)
Gain/(Loss) on sale (670)
Adjustment of pre-sale plant value (215)
Tax on value adjustment 38
Financial impact (847)

Sale of 50% of Enel Green Power Hellas

On December 29, 2023, Enel SpA, acting through its fully-owned subsidiary Enel Green Power SpA, finalized the sale of 50% of Enel Green Power Hellas, Enel Green Power's fully-owned renewable subsidiary in Greece, to Macquarie Asset Management, for a total consideration of €351 million, collected in full.

Millions of euro
Sale price 351
Total net assets sold (86)
Transaction costs (3)
Gain/(Loss) on sale 262
Fair value remeasurement of residual interest (50%) 160
Income from sale 422

10. Performance and financial position by primary segment (Business Line) and secondary segment (Geographical Area)

The representation of performance and financial position presented here is based on the approach used by management in monitoring Group performance for the two periods under review. In particular, management monitors and reports on performance by business line. Accordingly, the Group has adopted the following reporting sectors:

  • primary segment: Business Line;
  • secondary segment: Geographical Area.

The business line is therefore the main discriminant in the analyses performed and decisions taken by the management of the Enel Group, and is fully consistent with the internal reporting prepared for these purposes since the results are measured and evaluated first and foremost for each business line and only thereafter are they broken down by geographical area.

In this regard, note that the organizational simplification process begun in 2023 led to a restructuring of the business lines and geographical areas, with a consequent need to redefine the segments subject to disclosure in order to present the results of the segments based on the approach used by management to monitor and present the Group's performance to investors.

In particular, in the presentation of figures by primary segment (Business Line):

  • the figures for Enel X, which in the year ended December 31, 2022 had been presented separately, are now reported under End-user Markets;
  • the figures for Enel X Way, which in the year ended December 31, 2022 had been presented under Holding, Services and Other, are now reported under End-user Markets.

In the presentation of figures by secondary segment (Geographical Area), the figures for Latin America, Europe, North America, and Africa, Asia and Oceania have merged into the "Rest of the World" area.

Following these changes, the figures for the previous year have been adjusted for comparative purposes only.

Performance by primary segment (Business Line)

Results for 2023(1)

Millions of euro Thermal
Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding
and
Services
Total
reporting
segment
Eliminations
and
adjustments
Total
Revenue and other income from
third parties
20,152 8,459 17,206 49,748 - 95,565 - 95,565
Revenue and other income from
transactions with other segments
20,038 3,161 3,053 2,371 2,045 30,668 (30,668) -
Total revenue 40,190 11,620 20,259 52,119 2,045 126,233 (30,668) 95,565
Total costs 35,140 6,377 12,798 46,038 2,659 103,012 (30,668) 72,344
Net results from commodity
contracts
(1,983) (65) - (923) 5 (2,966) - (2,966)
Depreciation and amortization 775 1,603 2,957 785 233 6,353 - 6,353
Impairment losses 161 1,552 168 1,439 18 3,338 - 3,338
Impairment gains (49) (19) (90) (108) (2) (268) - (268)
Operating profit/(loss) 2,180 2,042 4,426 3,042 (858) 10,832 - 10,832
Capital expenditure 761(2) 5,345(3) 5,280(4) 1,138(5) 190(6) 12,714 - 12,714

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) Does not include €14 million regarding units classified as held for sale or discontinued operations.

(3) Does not include €565 million regarding units classified as held for sale or discontinued operations.

(4) Does not include €233 million regarding units classified as held for sale or discontinued operations.

(5) Does not include €34 million regarding units classified as held for sale or discontinued operations.

(6) Does not include €3 million regarding units classified as held for sale or discontinued operations.

Results for 2022(1)

Thermal
Generation and
Enel Green Enel End-user Holding
and
Total
reporting
Eliminations
and
Millions of euro Trading Power Grids Markets Services segment adjustments Total
Revenue and other income from
third parties
53,239 6,669 19,806 60,785 18 140,517 - 140,517
Revenue and other income from
transactions with other segments
23,096 2,498 3,226 3,565 2,032 34,417 (34,417) -
Total revenue 76,335 9,167 23,032 64,350 2,050 174,934 (34,417) 140,517
Total costs 71,189 5,873 13,918 64,143 2,225 157,348 (34,384) 122,964
Net results from commodity
contracts
551 183 - 1,595 (5) 2,324 41 2,365
Depreciation and amortization 802 1,456 2,852 747 229 6,086 - 6,086
Impairment losses 562 53 1,047 1,296 - 2,958 - 2,958
Impairment gains (52) (2) (117) (148) - (319) - (319)
Operating profit/(loss) 4,385 1,970 5,332 (93) (409) 11,185 8 11,193
Capital expenditure 990(2) 6,386(3) 5,547(4) 1,205(5) 219 14,347 - 14,347

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) Does not include €2 million regarding units classified as held for sale or discontinued operations.

(3) Does not include €42 million regarding units classified as held for sale or discontinued operations.

(4) Does not include €110 million regarding units classified as held for sale or discontinued operations.

(5) Does not include €2 million regarding units classified as held for sale or discontinued operations.

Performance by secondary segment (Geographical Area)

Results for 2023(1)

Rest
of the
Latin North Africa,
Asia and
Eliminations
Rest of the
Other,
eliminations
and
Millions of euro Italy Iberia World America Europe America Oceania World adjustments Total
Revenue and other income from
third parties
49,145 25,418 20,927 18,569 234 2,129 335 (340) 75 95,565
Revenue and other income
from transactions with other
segments
182 10 354 7 5 13 3 326 (546) -
Total revenue 49,327 25,428 21,281 18,576 239 2,142 338 (14) (471) 95,565
Total costs 38,792 18,578 15,091 13,563 80 1,262 200 (14) (117) 72,344
Net results from commodity
contracts
233 (3,171) (38) 181 - (220) 1 - 10 (2,966)
Depreciation and amortization 2,325 1,911 1,931 1,389 2 491 49 - 186 6,353
Impairment losses 824 558 1,879 452 2 1,425 - - 77 3,338
Impairment gains (22) (197) (48) (43) (1) - (4) - (1) (268)
Operating profit/(loss) 7,641 1,407 2,390 3,396 156 (1,256) 94 - (606) 10,832
Capital expenditure 5,763(2) 2,305 4,419(3) 3,302(4) 2(5) 1,096(6) 19(7) - 227 12,714

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) Does not include €337 million regarding units classified as held for sale or discontinued operations.

(3) Does not include €512 million regarding units classified as held for sale or discontinued operations.

(4) Does not include €180 million regarding units classified as held for sale or discontinued operations.

(5) Does not include €210 million regarding units classified as held for sale or discontinued operations. (6) Does not include €1 million regarding units classified as held for sale or discontinued operations.

(7) Does not include €121 million regarding units classified as held for sale or discontinued operations.

Results for 2022(1)

Rest
of the
Latin North Africa,
Asia and
Eliminations
Rest of the
Other,
eliminations
and
Millions of euro Italy Iberia World America Europe America Oceania World adjustments Total
Revenue and other income from
third parties
83,337 32,725 23,476 21,329 82 2,208 266 (409) 979 140,517
Revenue and other income
from transactions with other
segments
171 108 398 5 5 6 - 382 (677) -
Total revenue 83,508 32,833 23,874 21,334 87 2,214 266 (27) 302 140,517
Total costs 81,880 25,388 16,149 14,811 66 1,126 174 (28) (453) 122,964
Net results from commodity
contracts
4,679 (2,215) (95) 56 6 (148) (9) - (4) 2,365
Depreciation and amortization 2,209 1,784 1,900 1,393 2 430 75 - 193 6,086
Impairment losses 886 478 1,577 1,553 1 18 5 - 17 2,958
Impairment gains (39) (271) (7) (7) - - - - (2) (319)
Operating profit/(loss) 3,251 3,239 4,160 3,640 24 492 3 1 543 11,193
Capital expenditure 4,640 2,316 7,168(2) 4,289(3) 224(4) 2,491 164(5) - 223(6) 14,347

(1) Segment revenue includes both revenue from third parties and revenue from transactions with other segments.

(2) Does not include €138 million regarding units classified as held for sale or discontinued operations.

(3) Does not include €94 million regarding units classified as held for sale or discontinued operations.

(4) Does not include €4 million regarding units classified as held for sale or discontinued operations.

(5) Does not include €40 million regarding units classified as held for sale or discontinued operations.

(6) Does not include €18 million regarding units classified as held for sale or discontinued operations.

Financial position by primary segment (Business Line)

At December 31, 2023

Thermal
Generation and
Enel Green Enel End-user Holding
and
Total
reporting
Eliminations
and
Millions of euro Trading Power Grids Markets Services segment adjustments Total
Property, plant and equipment 8,340 42,757 40,490 1,142 793 93,522 (13) 93,509
Intangible assets 271 5,555 20,188 4,926 443 31,383 - 31,383
Non-current and current contract
assets
20 17 484 169 2 692 (1) 691
Trade receivables 7,287 3,471 7,771 8,373 792 27,694 (9,711) 17,983
Other 5,736 290 2,738 2,489 3,134 14,387 (6,268) 8,119
Operating assets 21,654(1) 52,090(2) 71,671(3) 17,099(4) 5,164(5) 167,678 (15,993) 151,685
Trade payables 6,741 3,797 4,174 9,418 1,014 25,144 (8,986) 16,158
Non-current and current contract
liabilities
112 271 7,515 59 7 7,964 (95) 7,869
Sundry provisions 3,468 979 3,348 742 1,208 9,745 (63) 9,682
Other 3,833 1,606 9,817 4,327 4,740 24,323 (6,164) 18,159
Operating liabilities 14,154(6) 6,653(7) 24,854(8) 14,546(9) 6,969(10) 67,176 (15,308) 51,868

(1) Of which €640 million regarding units classified as held for sale or discontinued operations.

(2) Of which €2,254 million regarding units classified as held for sale or discontinued operations.

(3) Of which €2,469 million regarding units classified as held for sale or discontinued operations.

(4) Of which €84 million regarding units classified as held for sale or discontinued operations. (5) Of which €9 million regarding units classified as held for sale or discontinued operations.

(6) Of which €142 million regarding units classified as held for sale or discontinued operations.

(7) Of which €265 million regarding units classified as held for sale or discontinued operations.

(8) Of which €207 million regarding units classified as held for sale or discontinued operations.

(9) Of which €19 million regarding units classified as held for sale or discontinued operations.

(10) Of which €3 million regarding units classified as held for sale or discontinued operations.

At December 31, 2022

Millions of euro Thermal
Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding
and
Services
Total
reporting
segment
Eliminations
and
adjustments
Total
Property, plant and equipment 8,530 41,519 40,377 760 642 91,828 (3) 91,825
Intangible assets 397 5,723 20,035 4,975 467 31,597 - 31,597
Non-current and current contract
assets
- 50 500 109 6 665 (1) 664
Trade receivables 7,667 3,730 5,706 9,003 1,197 27,303 (9,567) 17,736
Other 7,928 540 2,551 3,262 2,463 16,744 (7,891) 8,853
Operating assets 24,522(1) 51,562(2) 69,169(3) 18,109(4) 4,775(5) 168,137 (17,462) 150,675
Trade payables 8,034 4,173 4,297 9,396 1,205 27,105 (9,042) 18,063
Non-current and current contract
liabilities
95 323 7,527 91 9 8,045 (81) 7,964
Sundry provisions 3,979 921 3,263 488 1,088 9,739 (68) 9,671
Other 3,475 1,802 6,691 7,055 4,434 23,457 (7,903) 15,554
Operating liabilities 15,583(6) 7,219(7) 21,778(8) 17,030(9) 6,736(10) 68,346 (17,094) 51,252

(1) Of which €188 million regarding units classified as held for sale or discontinued operations.

(2) Of which €2,146 million regarding units classified as held for sale or discontinued operations.

(3) Of which €1,994 million regarding units classified as held for sale or discontinued operations.

(4) Of which €1,241 million regarding units classified as held for sale or discontinued operations.

(5) Of which €32 million regarding units classified as held for sale or discontinued operations.

(6) Of which €92 million regarding units classified as held for sale or discontinued operations.

(7) Of which €308 million regarding units classified as held for sale or discontinued operations.

(8) Of which €866 million regarding units classified as held for sale or discontinued operations. (9) Of which €801 million regarding units classified as held for sale or discontinued operations.

(10) Of which €15 million regarding units classified as held for sale or discontinued operations.

Financial position by secondary segment (Geographical Area)

At December 31, 2023

Millions of euro Italy Iberia Rest
of the
World
Latin
America
Europe North
America
Africa,
Asia and
Oceania
Eliminations
Rest of the
World
Other,
eliminations
and
adjustments
Total
Property, plant and equipment 34,361 23,527 35,524 22,273 3 12,790 458 - 97 93,509
Intangible assets 3,122 16,178 11,397 10,771 26 482 118 - 686 31,383
Non-current and current
contract assets
90 80 520 473 2 40 5 - 1 691
Trade receivables 8,819 4,011 5,302 4,978 29 244 78 (27) (149) 17,983
Other 4,281 2,375 1,706 1,393 13 271 31 (2) (243) 8,119
Operating assets 50,673(1) 46,171 54,449(2) 39,888(3) 73 13,827(4) 690(5) (29) 392 151,685
Trade payables 9,001 2,888 5,011 4,075 30 849 79 (22) (742) 16,158
Non-current and current
contract liabilities
4,318 3,537 47 47 - - - - (33) 7,869
Sundry provisions 3,078 3,177 2,686 2,529 1 134 21 1 741 9,682
Other 6,913 3,556 6,219 4,205 37 1,932 48 (3) 1,471 18,159
Operating liabilities 23,310(6) 13,158 13,963(7) 10,856(8) 68 2,915(9) 148(10) (24) 1,437 51,868

(1) Of which €631 million regarding units classified as held for sale or discontinued operations.

(2) Of which €4,801 million regarding units classified as held for sale or discontinued operations.

(3) Of which €4,541 million regarding units classified as held for sale or discontinued operations. (4) Of which €242 million regarding units classified as held for sale or discontinued operations.

(5) Of which €18 million regarding units classified as held for sale or discontinued operations.

(6) Of which €155 million regarding units classified as held for sale or discontinued operations.

(7) Of which €481 million regarding units classified as held for sale or discontinued operations.

(8) Of which €477 million regarding units classified as held for sale or discontinued operations.

(9) Of which €3 million regarding units classified as held for sale or discontinued operations.

(10) Of which €1 million regarding units classified as held for sale or discontinued operations.

At December 31, 2022

Millions of euro Italy Iberia Rest
of the
World
Latin
America
Europe North
America
Africa,
Asia and
Oceania
Eliminations
Rest of the
World
Other,
eliminations
and
adjustments
Total
Property, plant and equipment 30,327 23,167 38,220 21,099 2,397 13,722 1,002 - 111 91,825
Intangible assets 3,200 16,173 11,596 10,534 331 602 129 - 628 31,597
Non-current and current
contract assets
73 9 576 493 48 19 16 - 6 664
Trade receivables 7,086 4,369 6,470 5,037 1,127 268 66 (28) (189) 17,736
Other 4,947 2,929 2,105 1,498 294 250 63 - (1,128) 8,853
Operating assets 45,633(1) 46,647 58,967(2) 38,661(3) 4,197(4) 14,861 1,276(5) (28) (572) 150,675
Trade payables 9,595 3,220 6,652 4,813 483 1,261 119 (24) (1,404) 18,063
Non-current and current
contract liabilities
4,188 3,351 479 35 443 - 1 - (54) 7,964
Sundry provisions 3,008 3,458 2,576 2,378 69 97 32 - 629 9,671
Other 4,323 3,144 7,076 4,480 637 1,893 66 - 1,011 15,554
Operating liabilities 21,114(6) 13,173 16,783(7) 11,706(8) 1,632(9) 3,251 218(10) (24) 182 51,252

(1) Of which €253 million regarding units classified as held for sale or discontinued operations.

(2) Of which €4,968 million regarding units classified as held for sale or discontinued operations.

(3) Of which €307 million regarding units classified as held for sale or discontinued operations.

(4) Of which €4,108 million regarding units classified as held for sale or discontinued operations.

(5) Of which €553 million regarding units classified as held for sale or discontinued operations.

(6) Of which €64 million regarding units classified as held for sale or discontinued operations.

(7) Of which €1,737 million regarding units classified as held for sale or discontinued operations. (8) Of which €99 million regarding units classified as held for sale or discontinued operations.

(9) Of which €1,584 million regarding units classified as held for sale or discontinued operations.

(10) Of which €54 million regarding units classified as held for sale or discontinued operations.

The following table reconciles segment assets and liabilities and the consolidated figures.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Total assets 195,224 219,874
Equity-accounted investments 1,650 1,281
Non-current financial derivative assets 2,383 3,970
Other non-current financial assets 8,750 8,359
Non-current tax assets included in "Other non-current assets" 1,487 1,674
Other current financial assets 4,329 13,753
Current financial derivative assets 6,407 14,830
Cash and cash equivalents 6,801 11,041
Deferred tax assets(1) 9,218 11,175
Tax assets 2,016 2,159
Financial and tax assets of "Assets classified as held for sale"(1) 498 957
Segment assets 151,685 150,675
Total liabilities 150,115 177,794
Long-term borrowings 61,085 68,191
Non-current financial derivative liabilities 3,373 5,895
Other non-current financial liabilities 8 -
Short-term borrowings 4,769 18,392
Current portion of long-term borrowings 9,086 2,835
Other current financial liabilities 909 853
Current financial derivative liabilities 6,461 16,141
Deferred tax liabilities(1) 8,217 9,794
Income tax liabilities 1,573 1,623
Other tax liabilities 1,034 1,048
Financial and tax liabilities of "Liabilities included in disposal groups
classified as held for sale"(1)
1,732 1,770
Segment liabilities 51,868 51,252

(1) Figures at December 31, 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Information on the consolidated income statement

Revenue

11.a Revenue from sales and services – €92,882 million

Millions of euro
2023 2022 Change
Sale of electricity 52,465 69,340 (16,875) -24.3%
Transport of electricity 11,123 11,096 27 0.2%
Fees from network operators 1,142 979 163 16.6%
Transfers from institutional market operators 1,570 1,667 (97) -5.8%
Sale of gas 7,983 8,970 (987) -11.0%
Transport of gas 68 80 (12) -15.0%
Sale of fuel 3,458 5,605 (2,147) -38.3%
Fees for connection to electricity and gas networks 877 826 51 6.2%
Construction contracts 995 1,672 (677) -40.5%
Sale of environmental certificates 283 111 172 -
Sale of value-added services 1,653 1,384 269 19.4%
Other sales and services 866 918 (52) -5.7%
Total IFRS 15 revenue 82,483 102,648 (20,165) -19.6%
Sale of commodities under contracts with physical settlement 8,875 37,247 (28,372) -76.2%
Gain/(Loss) on the measurement of commodity sales contracts with
physical settlement closed during the period
1,508 (4,260) 5,768 -
Other revenue 16 18 (2) -11.1%
Total revenue from sales and services 92,882 135,653 (42,771) -31.5%

Revenue from the "sale of electricity" amounted to €52,465 million, a decrease of €16,875 million compared with the previous year (-24.3%). The decrease mainly reflected lower sales volumes against a background of decreasing electricity sales prices, mainly in Italy (€9,873 million) and Spain (€6,916 million), reflecting the stabilization of markets.

"Transfers from institutional market operators" increased by €163 million compared with the previous year, mainly reflecting an increase in transfers in Italy (€334 million), primarily relating to the remuneration of the capacity market and the plan to maximize thermal generation from plants powered by alternative fuels to gas required by the Ministry of the Environment and Energy Security (MASE), which included a number of Enel Produzione SpA plants. The item was offset by a decrease in transfers in Argentina (€139 million) and Peru (€28 million).

Revenue from the "sale of gas" in 2023 amounted to €7,983 million (€8,970 million in 2022), a decrease of €987 million compared with the previous year. The decrease is mainly attributable to a decrease in prices and the number of customers in Spain (€1,101 million), offset by the adjustment of offers to market prices (through indexation or restructuring of contract conditions), partly offset by greater sales in Italy (€272 million).

Revenue from the "sale of fuel" decreased by €2,147 million due to decreasing gas sales prices in trading operations. This was partially offset by higher sales in Spain.

Revenue from "construction contracts" came to €995 million, a decrease of €677 million, attributable to the decline in development work on the distribution grid operated on concession basis in Brazil and mainly to the change in the Group consolidation scope following the disposal of Celg Distribuição SA - Celg-D (Enel Goiás) in December 2022.

Revenue from "sale of environmental certificates" came to €283 million, up €172 million. The increase is mainly attributable to higher sales of CO2 allowances by Endesa Generación (€166 million).

"Sale of value-added services" came to €1,653 million, an increase of €269 million, mainly attributable to greater revenue from the sale of energy efficiency products and services connected with the maintenance, consulting,

repair and installation of energy efficient products in the e-Home and Vivi Meglio segments of Enel X in Italy (€123 million), and greater revenue from the sale of value-added services in North America (€55 million) and Colombia (€21 million).

The decrease in revenue from the "sale of commodities under contracts with physical settlement", measured at fair value through profit or loss within the scope of IFRS 9 (€28,372 million), mainly regards the sale of gas and reflects a decrease in prices as well as in volumes handled.

The following table shows the net results on contracts for the sale or purchase of commodities with physical settlement measured at fair value through profit or loss within the scope of IFRS 9.

Millions of euro
2023 2022 Change
Fair value gain/(loss) on contracts for energy commodities with physical
settlement (within the scope of IFRS 9) closed in the period
Sales contracts
Sale of electricity 1,550 5,436 (3,886) -71.5%
Fair value gain/(loss) on closed contracts 281 (795) 1,076 -
Total electricity 1,831 4,641 (2,810) -60.5%
Sale of gas 7,271 30,924 (23,653) -76.5%
Fair value gain/(loss) on closed contracts 1,114 (3,600) 4,714 -
Total gas 8,385 27,324 (18,939) -69.3%
Sale of emissions allowances 4 875 (871) -99.5%
Fair value gain/(loss) on closed contracts 109 131 (22) -16.8%
Total emissions allowances 113 1,006 (893) -88.8%
Sale of guarantees of origin 50 12 38 -
Fair value gain/(loss) on closed contracts 4 4 - -
Total guarantees of origin 54 16 38 -
Total revenue 10,383 32,987 (22,604) -68.5%
Purchase contracts
Purchase of electricity 2,884 6,161 (3,277) -53.2%
Fair value gain/(loss) on closed contracts 570 (200) 770 -
Total electricity 3,454 5,961 (2,507) -42.1%
Purchase of gas 8,063 33,092 (25,029) -75.6%
Fair value gain/(loss) on closed contracts 1,370 (1,940) 3,310 -
Total gas 9,433 31,152 (21,719) -69.7%
Purchase of emissions allowances 624 843 (219) -26.0%
Fair value gain/(loss) on closed contracts (31) 132 (163) -
Total emissions allowances 593 975 (382) -39.2%
Purchase of guarantees of origin 101 25 76 -
Fair value gain/(loss) on closed contracts 32 3 29 -
Total guarantees of origin 133 28 105 -
Total costs 13,613 38,116 (24,503) -64.3%
Net revenue/(costs) on contracts for energy commodities with physical (3,230) (5,129) 1,899 37.0%
settlement (within the scope of IFRS 9) closed in the period
Gain/(Loss) from measurement of outstanding contracts for energy
commodities with physical settlement (within the scope of IFRS 9)
Sales contracts
Electricity 226 (134) 360 -
Gas 136 4,841 (4,705) -97.2%
Emissions allowances 23 490 (467) -95.3%
Guarantees of origin 4 (15) 19 -
Total 389 5,182 (4,793) -92.5%
Purchase contracts
Electricity 254 (124) 378 -
Gas 586 3,879 (3,293) -84.9%
Emissions allowances 19 627 (608) -97.0%
Guarantees of origin 67 (72) 139 -
Total 926 4,310 (3,384) -78.5%
Gain/(Loss) from measurement of outstanding contracts for energy
commodities with physical settlement (within the scope of IFRS 9)
(537) 872 (1,409) -
Total net revenue/(costs) on contracts with physical settlement (within the
scope of IFRS 9)
(3,767) (4,257) 490 11.5%

Revenue from contracts with customers (IFRS 15) breaks down into "point in time" and "over time" revenue as indicated in the following table.

Millions of euro 2023
Italy Iberia Rest of the World Other, eliminations and
adjustments
Total
Over time Point in
time
Over time Point in
time
Over time Point in
time
Over time Point in
time
Over time Point in
time
Total IFRS 15 revenue 36,982 1,169 23,063 1,973 17,887 1,342 13 54 77,945 4,538
2022
Italy Iberia Rest of the World Other, eliminations and
adjustments
Total
Over time Point in
time
Over time Point in
time
Over time Point in
time
Over time Point in
time
Over time Point in
time
Total IFRS 15 revenue 47,650 2,068 30,984 1,425 19,061 1,307 10 143 97,705 4,943

The table below gives a breakdown of revenue from sales and services by geographical segment.

Millions of euro
2023 2022
Italy 39,724 57,859
Europe
Iberia 21,799 30,535
France 1,919 3,086
Switzerland 1,936 6,791
Germany 1,028 1,676
Austria 75 189
Slovenia 10 146
Romania 4 3
Greece 6 15
Belgium 13 834
Czech Republic 180 321
Hungary 13 7
Netherlands 145 38
United Kingdom 4,523 11,841
Other European countries 2,299 1,551
Americas
United States 864 779
Canada 62 53
Mexico 315 313
Brazil 7,621 9,064
Chile 4,369 4,434
Peru 1,565 1,449
Colombia 3,248 2,725
Argentina 613 966
Panama 200 177
Costa Rica 17 17
Guatemala 81 83
Other
Africa 96 132
Asia 119 521
Oceania 38 48
Total 92,882 135,653

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Performance obligations

The following table provides information about the Group's performance obligations arising from contracts with customers with reference to the main revenue streams only, with a summary of the specific judgments made and the related revenue recognition policies.

For information on the use of estimates with revenue from contracts with customers, please see note 2.1 "Use of estimates and management judgment".

Type of product/
service
Nature and timing of satisfaction of performance obligation Accounting policies
Sale of electricity
produced by the
Group
In order to determine the nature of the promise contained in
these contracts with customers for the sale of electricity, the
Group carefully analyzes the facts and circumstances applicable
to each contract.
For the sale of electricity on power exchanges, the facts
and circumstances (including the intrinsic characteristics of
the commodity, contractual terms, information regarding
infrastructure and other delivery mechanisms) generally indicate
that the performance obligation is a service in which the
customer simultaneously receives and consumes the benefits
of the commodity as it is delivered. Thus, the Group identifies
a performance obligation satisfied over time as part of a series
of distinct goods/services (i.e. each unit of commodity) that are
substantially the same and have the same pattern of transfer to
the customer.
The Group applies an output method to recognize
revenue from the sale of electricity on power exchanges,
recognized over time, so as to recognize revenue in the
amount to which it has a right to invoice the customer
if that amount corresponds directly with the value to
the customer of the performance completed to date,
i.e. at the price defined in the market (without variable
consideration).
Network
connection
services
The network connection fees received from customers for
connecting them to the electricity/gas distribution networks
require a specific Group assessment to take into consideration
all terms and conditions of the connection arrangements.
This assessment is intended to determine whether the contract
includes other distinct goods or services, such as for example
the right to obtain ongoing access to the infrastructure in order
to receive the commodity or, when the connection fee is a "non
refundable up-front fee" paid at or near contract inception, a
material right that gives rise to a performance obligation.
In particular, in some countries in which the Group operates, it
has determined that the nature of the consideration received
represents a "non-refundable up-front fee" whose payment
provides a material right to the customer. In order to determine
if the period over which this material right should be recognized
extends beyond the initial contractual period, the Group takes
into consideration the applicable local legal and regulatory
framework applicable to the contract and affecting the parties. In
such cases, if there is an implied assignment of the material right
and an obligation from the initial customer to the new customer,
the Group recognizes the connection fee over a period beyond
the relationship with the initial customer, considering the
concession terms as the period during which the initial customer
and any future customer can benefit from the ongoing access
without paying an additional connection fee. As a consequence,
the fee is recognized over the period for which the payment
creates an obligation for the Group to make the lower prices
available to future customers (i.e. the period during which the
customer is expected to benefit from the ongoing access
service without having to pay an "up-front fee" upon renewal).
Revenue from monetary and in-kind fees for connection
to the electricity and gas distribution network is
recognized on the basis of the satisfaction of the
performance obligations included in the contract. The
identification of distinct goods or services requires
a careful analysis of the terms and conditions of the
connection arrangements, which could vary from country
to country based on the local context, regulations and
law. In order to finalize this assessment, the Group
considers not only the characteristics of the goods/
services themselves (i.e. the good or service is capable
of being distinct) but also the implied promises for which
the customer has a valid expectation as it views those
promises as part of the negotiated exchange, that is
goods/services that the customer expects to receive
and has paid for (i.e. the promise to transfer the good or
service to the customer is separately identifiable from
other promises in the contract).
Furthermore, the Group acts as an agent in some
contracts for electricity/gas network connection services
and other related activities, depending on local legal
and regulatory framework. In such cases, it recognizes
revenue on a net basis, corresponding to any fee or
commission to which it expects to be entitled.
Sale/transport of
electricity/gas to
end users
An electricity/gas supply agreement signed with an end user
includes a single performance obligation (sale and transport
of the commodity) because the Group has determined that
the contract does not provide distinct goods/services and the
promise is satisfied by transferring control over the commodity
to the customer when it is delivered at the point of delivery.
In order to determine the nature of the promise included in
such contracts, the Group carefully analyzes the facts and
circumstances applicable to each contract and commodity.
However, the Group considers that the performance obligation
provided for in a repetitive service contract, such as a
supply contract for the provision of electricity/gas to end
users, is typically satisfied over time (because the customer
simultaneously receives and consumes the benefits of the
commodity as it is delivered) as part of a series of distinct goods/
services (i.e. each unit of commodity) that are substantially the
same and have the same pattern of transfer to the customer.
The Group applies an output method to recognize
revenue from the sale and transport of electricity/gas
to end users, so as to recognize revenue in the amount
to which it has a right to invoice the customer if that
amount corresponds directly with the value to the
customer of the performance completed to date, i.e. the
quantities provided during the period, even if these have
not yet been invoiced; this revenue is determined using
estimates as well as periodic meter readings. Where
applicable, this revenue is based on the rates and related
restrictions established by law or by the Regulatory
Authority for Energy, Networks and the Environment
(ARERA) and analogous foreign authorities during the
applicable period.

Construction
contracts
The construction contracts typically include a performance
obligation satisfied over time. For these contracts, the Group
generally considers it appropriate to use an input method for
measuring progress, except when a specific contract analysis
suggests the use of an alternative method that better depicts
the Group's performance obligation fulfilled at the reporting date.
For construction contracts that include a performance
obligation satisfied over time, the Group recognizes
revenue over time by measuring progress toward the
complete satisfaction of that performance obligation.
The cost-to-cost method is generally considered
the best method to depict the Group's performance
obligation fulfilled at the reporting date.
The amount due from customers under a construction
contract is presented as a contract asset; the amount
due to customers under a construction contract is
presented as a contract liability.
Service concession
arrangements
(within the scope
of IFRIC 12)
The Group, as concession holder, provides services for the
construction/upgrade of the infrastructure used for the
provision of public services and/or services for the operation
and maintenance of the infrastructure itself for the period of the
concession.
For performance obligations related to infrastructure
construction and improvement, please refer to the section
"Construction contracts".
As far as revenue from operating services are concerned, please
refer to the sections "Sale of electricity produced by the Group"
and "Sale/transport of electricity/gas to end users".
When the Group provides construction/upgrade
services, it recognizes intangible assets and/or financial
assets, depending on the characteristics of the service
concession arrangement.
The amounts received or receivable relating to both
components are initially recognized as revenue from
contracts with customers. For more details on revenue
recognition, please refer to the section "Construction
contracts".
Furthermore, the component recognized in profit or
loss deriving from the remeasurement at fair value of
the financial assets in respect of service concession
agreements for the distribution business in Brazil is
also classified as revenue, in order to adequately reflect
the business model in line with the related concession
agreement.
Revenues from management and maintenance activities
are recognized as revenue from the sale of electricity on
the market or to end users (please refer to sections "Sale
of electricity produced by the Group" and "Sale/transport
of electricity/gas to end users", respectively).

11.b Other income – €2,683 million

Millions of euro
2023 2022 Change
Grants for environmental certificates(1) 346 220 126 57.3%
Other operating grants 9 28 (19) -67.9%
Capital grants (electricity and gas business) 28 28 - -
Sundry reimbursements 314 314 - -
Gains on the disposal of subsidiaries, associates, joint ventures, joint
operations and non-current assets held for sale
584 1,876 (1,292) -68.9%
Gains on the disposal of property, plant and equipment, and intangible
assets
44 64 (20) -31.3%
Service continuity bonuses 13 31 (18) -58.1%
Other income 1,345 2,303 (958) -41.6%
Total 2,683 4,864 (2,181) -44.8%

(1) For more on "Grants for environmental certificates", please see note 58 "Environmental programs".

Gains on the disposal of entities amounted to €584 million in 2023, mainly reflecting the recognition by Enel CIEN (in Brazil) of €99 million for the end-of-concession indemnity received for the takeover of the concession by another entity, the overall income of €103 million from the partial sale with loss of control of assets held in Australia, the gain on the sale of Arcadia Generación Solar (€195 million) and the remeasurement at fair value of the residual interest in Enel Green Power Hellas (€160 million).

In 2022, the item mainly included the recognition of gains on the disposal by Enel X International of 1.1% of the investment in Ufinet (€220 million), the sale by Enel X Srl of financial companies to Mooney (€67 million), the sale of 50% of the investment held by Enel Grids in Gridspertise (€520 million) and the sale of Enel Chile's interest in Enel Transmisión Chile.

"Other income" decreased by €958 million, mainly due to the decrease of income of Enel Generación Chile (€456 million), mainly in respect of the contractual agreement with Shell, the modification of which generated an increase in 2022; the decrease in the income connected with the electricity business recognized in Argentina (€219 million) following the agreements concluded in 2022 be-

tween Edesur and the local authorities, as well as the decrease in Enel Green Power North America in income from tax partnerships (€127 million).

The following tables show a breakdown of total revenue by business line based on the approach used by management to monitor the Group's performance during the two years being compared.

Millions of euro 2023
Thermal
Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets
Holding
and
Services
Total
reporting
segment
Eliminations
and
adjustments
Total
Total IFRS 15 revenue 26,354 9,982 19,719 51,630 2,004 109,689 (27,206) 82,483
Sale of commodities under
contracts with physical settlement
12,374 - - 6 - 12,380 (3,505) 8,875
Gain/(Loss) on the measurement
of commodity sales contracts with
physical settlement closed during
the period
1,504 - - 4 - 1,508 - 1,508
Other revenue 6 3 18 1 16 44 (28) 16
Total revenue from sales and
services
40,238 9,985 19,737 51,641 2,020 123,621 (30,739) 92,882
Other income (48) 1,635 522 478 25 2,612 71 2,683
TOTAL REVENUE 40,190 11,620 20,259 52,119 2,045 126,233 (30,668) 95,565
Millions of euro 2022
Thermal
Generation and
Trading
Enel Green
Power
Enel
Grids
End-user
Markets(1)
Holding
and
Services(1)
Total
reporting
segment
Eliminations
and
adjustments
Total
Total IFRS 15 revenue 37,154 7,863 20,854 63,476 1,993 131,340 (28,692) 102,648
Sale of commodities under
contracts with physical settlement
42,667 - - 26 - 42,693 (5,446) 37,247
Gain/(Loss) on the measurement
of commodity sales contracts with
physical settlement closed during
the period
(4,240) - - (20) - (4,260) - (4,260)
Other revenue - 6 13 1 22 42 (24) 18
Total revenue from sales and
services
75,581 7,869 20,867 63,483 2,015 169,815 (34,162) 135,653
Other income 754 1,298 2,165 867 35 5,119 (255) 4,864
TOTAL REVENUE 76,335 9,167 23,032 64,350 2,050 174,934 (34,417) 140,517

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

Costs

12.a Electricity, gas and fuel – €46,270 million

Millions of euro
2023 2022 Change
Electricity 24,098 47,155 (23,057) -48.9%
- of which purchases under contracts with physical settlement (IFRS 9) 2,884 6,161 (3,277) -53.2%
Gas 16,583 47,930 (31,347) -65.4%
- of which purchases under contracts with physical settlement (IFRS 9) 8,063 33,092 (25,029) -75.6%
Fair value gain/(loss) on contracts for purchase of electricity and gas with
physical settlement closed during the period
1,940 (2,140) 4,080 -
Nuclear fuel 99 111 (12) -10.8%
Other fuels 3,550 3,840 (290) -7.6%
Total 46,270 96,896 (50,626) -52.2%

"Electricity" purchases decreased due to a decrease in volumes purchased and a decline in average prices compared with the previous year, mainly attributable to Italy (€17,942 million) and Spain (€4,833 million).

The decrease in costs for "gas" purchases mainly reflects the decrease in average prices for gas purchases, which also had a significant impact on the measurement of contracts with physical settlement, as well as the decrease in volumes handled, mainly in Italy and Spain.

The item also includes charges of €515 million recognized

related to the settlement of an arbitration dispute with a Qatari gas supplier in Spain.

Results of the fair value measurement of purchases of gas under contracts with physical settlement closed increased by €4,080 million compared with the previous year, of which €3,311 million attributable to gas and €769 million to electricity.

The decrease in "other fuels" is mainly attributable to the decrease in volumes purchased.

12.b Services and other materials – €18,304 million

Millions of euro
2023 2022 Change
Wheeling 7,781 8,247 (466) -5.7%
Maintenance and repairs 1,134 1,067 67 6.3%
Telephone and postal costs 168 181 (13) -7.2%
Communication services 120 117 3 2.6%
IT services 840 872 (32) -3.7%
Leases and rentals 534 503 31 6.2%
Other services 4,980 5,707 (727) -12.7%
Environmental certificates not used for compliance 1,002 963 39 4.0%
- of which purchases under contracts with physical settlement (IFRS 9) 725 868 (143) -16.5%
Fair value gain/(loss) on contracts for purchase of environmental certificates
with physical settlement closed during the period
1 135 (134) -99.3%
Change in inventories of environmental certificates (593) (97) (496) -
Other materials 2,337 2,533 (196) -7.7%
Total 18,304 20,228 (1,924) -9.5%

Costs for services and other materials amounted to €18,304 million in 2023, a decrease of €1,924 million compared with 2022. This change essentially reflected:

• a decrease of €466 million in costs for "wheeling",

mainly due to lower volumes in Italy and lower prices in Spain;

• a decrease of €727 million in "other services" essentially reflecting the decrease in costs for services connected

with the electricity and gas business (€371 million) and those related to concessions in Brazil (€353 million);

• a decrease in costs of environmental certificates, including the change in inventories, essentially related to lower purchases of CO2 allowances;

• a decrease in "other materials" mainly attributable to procurement costs due to changes in the consolidation scope.

12.c Personnel expenses – €5,030 million
------------------------------------------ --
Millions of euro
2023 2022 Change
Wages and salaries 3,498 3,442 56 1.6%
Social security contributions 903 924 (21) -2.3%
Italian post-employment benefits 114 107 7 6.5%
Post-employment and other long-term benefits 67 73 (6) -8.2%
Early retirement incentives 42 (20) 62 -
Early retirement incentives connected with restructuring agreements 214 (151) 365 -
Other costs 192 195 (3) -1.5%
Total 5,030 4,570 460 10.1%

Personnel expenses in 2023 amounted to €5,030 million, an increase of €460 million.

The Group's workforce decreased by 4,069 employees, mainly reflecting the negative balance between new hires and terminations (201 employees) adding to negative changes in the consolidation scope (-3,868 employees), essentially attributable to:

• the sale of Enel Generación Costanera SA in Argentina;

  • the sale of Central Dock Sud SA in Argentina;
  • the sale of Usme ZE SAS and Fontibón ZE SAS in Colombia;
  • the sale of Avikiran Solar India Private Limited in India;
  • the sale of Enel Green Power Australia in Australia;
  • the sale of all Romanian companies;
  • the sale of Enel Green Power Hellas and all companies in Greece.

The increase in "wages and salaries" substantially reflects the cost incurred as a result of new hiring at companies in Italy, Spain, Chile and Colombia.

The €6 million decrease in "post-employment and other long-term benefits" is mainly attributable to Latin America and Spain.

The increase in "early retirement incentives" and "early retirement incentives connected with restructuring agreements" is mainly attributable to an increase in costs in Spain, following the €177 million adjustment of the provision for the Acuerdo Voluntario de Salida (AVS) plan, and in Italy of the provision for restructuring and digitalization in respect of the framework agreement in application of Article 4, paragraphs 1-7-ter, of Law 92/2012 signed in 2021, which required a negative adjustment in 2022 and a positive adjustment in 2023, according to the developments of the period and changes underlying the actuarial assumptions.

The table below shows the average number of employees by category, along with a comparison with the previous year, and the headcount as of December 31, 2023.

No. Average(1) Headcount(1)
2023 2022 at Dec. 31, 2023
Senior managers 1,374 1,389 1,310
Middle managers 12,589 12,528 12,389
Office staff 33,906 35,676 31,308
Blue collar 16,527 16,883 16,048
Total 64,396 66,476 61,055

(1) For companies consolidated on a proportionate basis, the headcount corresponds to Enel's percentage share of the total.

12.d Net impairment/(reversals) on trade receivables and other receivables – €1,334 million

Millions of euro
2023 2022 Change
Impairment losses on trade receivables 1,384 1,375 9 0.7%
Impairment losses on other financial assets 162 169 (7) -4.1%
Total impairment losses on trade receivables and other financial assets 1,546 1,544 2 0.1%
Impairment gains on trade receivables (210) (265) 55 20.8%
Impairment gains on other financial assets (2) (1) (1) -
Total impairment gains on trade receivables and other financial assets (212) (266) 54 20.3%
NET IMPAIRMENT/(REVERSALS) ON TRADE RECEIVABLES AND OTHER
FINANCIAL ASSETS
1,334 1,278 56 4.4%

The item, equal to €1,334 million, includes impairment losses and reversals on trade receivables and other finan-

cial assets. The net impairment losses on trade receivables are essentially in line with the previous year.

12.e Depreciation, amortization and other impairment losses – €8,089 million

Millions of euro
2023 2022 Change
Property, plant and equipment 4,674 4,472 202 4.5%
Investment property 2 2 - -
Intangible assets 1,677 1,612 65 4.0%
Other impairment losses 1,792 1,414 378 26.7%
Other reversals of impairment losses (56) (53) (3) -5.7%
Total 8,089 7,447 642 8.6%

The change in "depreciation, amortization and other impairment losses" essentially reflected:

  • higher depreciation and amortization due to new capital expenditure, mainly in the sector of renewable energy and distribution;
  • the impairment losses on a number of renewables generation companies (€1,268 million) in North America, mainly attributable to the deterioration in the outlook for certain markets, which was consolidated over the course of 2023, accompanied by a general deterioration in macroeconomic conditions as well as redefined strategic and restructuring plans in the area;
  • impairment losses recognized in 2023 on the assets of Enel X and Enel X Way (totaling €126 million) in North America;
  • the impairment loss of €171 million on the Windpeshi wind project in Colombia as it was classified as held for sale;
  • the value adjustments in 2022 of the net assets of Celg Distribuição SA - Celg-D (Enel Goiás) (€827 million), CGT Fortaleza (€73 million) in Brazil, and net assets of Enel Generación Costanera SA (€174 million) and Central Dock Sud SA (€116 million) in Argentina.

12.f Other operating costs – €6,125 million

Millions of euro
2023 2022 Change
System charges – Environmental certificates(1) 2,603 2,510 93 3.7%
Other costs connected with electrical and gas system 568 172 396 -
Other taxes and duties 1,529 1,107 422 38.1%
Capital losses and other costs on the disposal of equity investments 404 363 41 11.3%
Extraordinary solidarity levies 208 - 208 -
Other 813 533 280 52.5%
Total 6,125 4,685 1,440 30.7%

(1) For more on "System charges – Environmental certificates", please see note 58 "Environmental programs".

Other operating costs increased by €1,440 million compared with the previous year due to the following.

"Other costs connected with electrical and gas system" increased by €396 million, mainly due to:

  • the increased impact of the Bono Social in Spain (€246 million), mainly attributable to the recognition in 2022 of an indemnity of €152 million following Supreme Court ruling no. 202/2022;
  • an increase in indemnities and penalties connected with service quality in Italy provided for under the Regulatory Authority for Energy, Networks and Environment (ARERA) Resolution no. 566/2019/R/eel charged to distributors (€118 million).

"Other taxes and duties" increased by €422 million, mainly due to the clawback mechanism in Italy (€357 million) introduced with Decree Law 25 of March 28, 2022 and in Spain (€118 million) as a result of Royal Decree 17/2021. The change was partly offset by a decrease in charges for the occupation of public land in Spain (€76 million) as a result of a reduction in fees.

"Capital losses and other costs on the disposal of equity investments" in 2023 mainly include the capital losses on the disposal of Enel Generación Costanera (€132 million) and Central Dock Sud (€194 million) in Argentina and the price adjustment in respect of the disposal of Celg Distribuição SA - Celg-D (Enel Goiás) (€23 million). In 2022 the item mainly referred to capital losses recognized for the disposal of Enel Goiás (€208 million) and CGT Fortaleza (€135 million) in Brazil.

"Extraordinary solidarity levies" regard the extraordinary solidarity levy recognized, in 2023, in Spain (€208 million) following the approval of Law 38 of December 27, 2022.

The increase in "other" operating costs is mainly attributable to an increase in provisions for risks and charges recognized by Enel Insurance in response to claims connected with adverse weather events.

12.g Capitalized costs – €(3,385) million

Millions of euro
2023 2022 Change
Personnel (1,120) (1,184) 64 5.4%
Materials (1,338) (1,258) (80) -6.4%
Other (927) (973) 46 4.7%
Total (3,385) (3,415) 30 0.9%

Capitalized costs are in line with the previous year.

13. Net results from commodity contracts – €(2,966) million

Millions of euro
2023 2022 Change
Commodity derivatives
- income from settled derivatives 7,315 23,124 (15,809) -68.4%
- expense from settled derivatives 9,865 18,929 (9,064) -47.9%
Net income/(expense) from settled commodity derivatives (2,550) 4,195 (6,745) -
- income from outstanding derivatives (3,283) (2,479) (804) -32.4%
- expense from outstanding derivatives (3,404) 223 (3,627) -
Net income/(expense) from outstanding commodity derivatives 121 (2,702) 2,823 -
Outstanding contracts for energy commodities with physical settlement
- results from outstanding contracts to sell energy commodities with
physical settlement
389 5,182 (4,793) -92.5%
- results from outstanding contracts to purchase energy commodities with
physical settlement
(926) (4,310) 3,384 78.5%
Net results from outstanding contracts for energy commodities with
physical settlement
(537) 872 (1,409) -
NET RESULTS FROM COMMODITY CONTRACTS (2,966) 2,365 (5,331) -

Net results from commodity contracts showed net expense of €2,966 million in 2023 (net income of €2,365 million in 2022), and break down as follows:

• net expense from commodity derivatives totaling €2,429 million (net income of €1,493 million in 2022), including derivatives designated as cash flow hedges and derivatives measured at fair value through profit or loss. More specifically, net expense from derivatives settled in the period amounted to €2,550 million (net income of €4,195 million in 2022) and net income from the fair value measurement of outstanding derivatives came to €121 million (net expense of €2,702 million in 2022);

• net expense from the fair value measurement through profit or loss of energy commodity contracts with physical settlement still outstanding at the reporting date amounting to €537 million (net income of €872 million in 2022).

For more information on derivatives, please see note 51 "Derivatives and hedge accounting".

14. Net financial income/(expense) from derivatives – €(609) million

Millions of euro
2023 2022 Change
Income:
- income from derivatives designated as hedging derivatives 756 1,442 (686) -47.6%
- income from derivatives at fair value through profit or loss 802 1,676 (874) -52.1%
Total income 1,558 3,118 (1,560) -50.0%
Expense:
- expense from derivatives designated as hedging derivatives (1,254) (1,744) 490 28.1%
- expense from derivatives at fair value through profit or loss (913) (1,670) 757 45.3%
Total expense (2,167) (3,414) 1,247 36.5%
NET FINANCIAL INCOME/(EXPENSE) FROM DERIVATIVES (609) (296) (313) -

In 2023 net expense from derivatives on interest and exchange rates amounted to €609 million (net expense of €296 million in 2022) and breaks down as follows:

• net expense from derivatives designated as hedging derivatives in the amount of €498 million (net expense of €302 million in 2022) mainly in regard of cash flow hedges;

• net expense from derivatives at fair value through profit or loss in the amount of €111 million (net income of €6 million in 2022).

The net balances recognized in 2023 and 2022 on both hedging derivatives and those at fair value through profit or loss mainly referred to the hedging of exchange rate risk. For more information on derivatives, please see note 51 "Derivatives and hedge accounting".

15. Net other financial income/(expense) – €(2,766) million

Other financial income

Millions of euro
2023 2022 Change
Interest income from financial assets (current and non-current):
- interest income at effective rate on non-current financial assets 289 158 131 82.9%
- interest income at effective rate on current financial investments 335 201 134 66.7%
Total interest income at the effective interest rate 624 359 265 73.8%
Financial income on non-current financial assets designated at fair value
through profit or loss
- - - -
Exchange gains 1,807 2,289 (482) -21.1%
Income on equity investments 3 1 2 -
Income from hyperinflation 1,575 1,739 (164) -9.4%
Other income 482 781 (299) -38.3%
TOTAL OTHER FINANCIAL INCOME 4,491 5,169 (678) -13.1%

Other financial income amounted to €4,491 million, a decrease of €678 million on 2022. The change mainly reflects the following factors:

  • a decrease in income from exchange gains (€482 million), mainly relating to Enel Finance International (€370 million) and Enel Global Trading (€82 million);
  • a decrease in income from hyperinflation (€164 million), recognized by the Argentine companies as a result of the application of IAS 29 on financial reporting in hyperinflationary economies; for more information,

please see note 5 of these consolidated financial statements at December 31, 2023;

  • a decrease in other income mainly deriving from the value adjustment of hedged liabilities in fair value hedge relationships (€159 million), and the change in the consolidation scope relating to the disposal of Celg Distribuição SA - Celg-D (Enel Goiás) (€45 million);
  • an increase in interest income at the effective rate (€265 million).

Other financial expense

Millions of euro
2023 2022 Change
Interest expense on financial debt (current and non-current):
- interest on bank borrowings 987 509 478 93.9%
- interest expense on bonds 2,079 1,884 195 10.4%
- interest expense on other borrowings 451 235 216 91.9%
Total interest expense 3,517 2,628 889 33.8%
Financial expense on debt management transactions 7 - 7 -
Exchange losses 1,058 2,179 (1,121) -51.4%
Adjustment to post-employment and other employee benefits 165 145 20 13.8%
Adjustment to other provisions 255 201 54 26.9%
Expense from equity investments - - - -
Expense from hyperinflation 1,291 1,449 (158) -10.9%
Other expenses 964 727 237 32.6%
TOTAL OTHER FINANCIAL EXPENSE 7,257 7,329 (72) -1.0%

Other financial expense amounted to €7,257 million, an overall decrease of €72 million compared with 2022 essentially reflecting the following factors:

  • a decrease in expense from hyperinflation of €158 million, recognized by the Argentine companies as a result of the application of IAS 29 on financial reporting in hyperinflationary economies; for more information, please see note 5 of these consolidated financial statements at December 31, 2023;
  • a decrease in expense on exchange losses of €1,121 million, mainly relating to Enel Finance International (€733 million) and Enel Global Trading (€217 million);
  • an increase in interest expense of €889 million, mainly attributable to the increase in interest rates;
  • an increase in other expenses mainly attributable to impairment losses on liabilities covered by fair value hedges (€126 million) and financial expense on the assignment of receivables (€102 million).

16. Share of profit/(loss) of equity-accounted investments – €(41) million

Millions of euro
2023 2022 Change
Share of profit of associates(1) 68 81 (13) -16.0%
Share of loss of associates (109) (141) 32 22.7%
Total(1) (41) (60) 19 31.7%

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

The share of the net loss of equity-accounted investments in 2023 came to €41 million, an increase of €19 million on 2022.

The change was essentially due to an increase in the share of profit/(loss) pertaining to the Group of Slovak Power Holding (€65 million) and Gridspertise (€9 million), partly offset by the decrease in the share of profit/(loss) of Mooney (€18 million), PowerCrop (€22 million), Enel Green Power Australia (€7 million) and Compañía Eólica Tierras Altas (€7 million).

17. Income taxes – €2,778 million

Millions of euro
2023 2022 Change
Current taxes 2,877 3,025 (148) -4.9%
Adjustments for income taxes relating to prior years (75) (233) 158 67.8%
Total current taxes 2,802 2,792 10 0.4%
Deferred tax expense(1) (197) 318 (515) -
Deferred tax income(1) 173 413 (240) -58.1%
TOTAL 2,778 3,523 (745) -21.1%

(1) Figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Income taxes for 2023 came to €2,778 million and decreased by €745 million compared with 2022.

The tax rate for 2023 came to 37%, compared with 41% in 2022.

The decrease mainly reflects the following factors:

  • the impact of higher impairment and losses resulting from mergers and acquisitions in 2022 that were not tax deductible, essentially regarding Celg Distribuição SA - Celg-D (Enel Goiás) and CGT Fortaleza in Brazil;
  • higher taxes recognized in 2022 in Italy in respect of the extraordinary energy cost tax, established by Law

51/2022 (about €121 million), and the solidarity tax from Law 197/2022 (about €599 million);

  • the tax effect of hyperinflation in Argentina mainly attributable, in 2023, to the recognition for tax purposes of the increase in the value of assets adjusted for hyperinflation;
  • an increase in tax credit to eliminate dual taxation of dividends at Enel Iberia in 2023.

These factors were partially offset by:

• the non-deductibility of the extraordinary solidarity levy in Spain;

  • the reversal of the portion of deferred tax assets no longer considered recoverable in the United States, Mexico and Peru;
  • the tax effect (€190 million) of the sale of interests in Ufinet, Gridspertise and the finance companies of the Enel X segment to Mooney in 2022.

For more information on changes in deferred tax assets and liabilities, please see note 25.

The following table provides a reconciliation of the theoretical tax rate and the effective tax rate.

Millions of euro
2023 2022
Pre-tax profit(1) 7,416 8,677
Theoretical taxes 1,780 24% 2,082 24%
Delta of tax effect on impairment adjustments and M&A transactions 195 420
Preferential tax treatment of Ufinet, Gridspertise and Mooney capital gain - (190)
Preferential tax treatment of disposals in Australia and Greece (63) -
Deferred tax assets recognized on the carve-out of Enel X Way - (60)
Patent Box in Italy - (65)
Sundry tax effects of hyperinflation accounting in Argentina (58) 30
Tax effect of non-deductible provisions for risks in Spain - 30
Write-off of deferred tax assets for Enel Green Power Perú and Enel
Generación Perú merger
25 -
Write-off of deferred tax assets for the United States and Mexico 155 -
IRAP 352 260
Extraordinary energy cost tax - 121
Solidarity tax - 599
Non-deductibility of extraordinary solidarity levy in Spain 52 -
Other differences, effect of different tax rates abroad compared with the
theoretical rate in Italy, and other minor items
340 296
Total 2,778 3,523

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

18. Basic and diluted earnings per share

Both of these indicators are calculated on the basis of the average number of ordinary shares for the year, equal to 10,166,679,946, adjusted by the average number of treasury shares held.

The number of treasury shares, with a par value of €1 each, held at December 31, 2023 was equal to 9,262,330 (7,153,795 at December 31, 2022).

Millions of euro
2023 2022
Profit for the year attributable to owners of the Parent (basic) 3,438 1,682
of which from:
- continuing operations(1) 3,813 3,573
- discontinued operations(1) (375) (1,891)
Effect of preference rights on dividends (e.g., preference shares) - -
Dividends on equity instruments (e.g., hybrid bonds) (182) (123)
Other - -
Profit for the year attributable to ordinary owners of the Parent (basic) 3,256 1,559
of which from:
- continuing operations(1) 3,631 3,450
- discontinued operations(1) (375) (1,891)
Number of shares (units)
Number of ordinary shares issued at 1 January 10,166,679,946 10,166,679,946
Effect of treasury shares held (7,696,284) (6,287,027)
Effect of share options exercised 422,896 145,119
Other - -
Weighted average number of ordinary shares outstanding (total) for basic
earnings per share
10,159,406,558 10,160,538,038
Profit for the year attributable to ordinary owners of the Parent (basic) 3,256 1,559
Effect of dilution:
- interest on convertible bonds - -
- other - -
Profit for the year attributable to ordinary owners of the Parent (diluted) 3,256 1,559
of which:
- continuing operations 3,631 3,450
- discontinued operations (375) (1,891)
Number of shares (units)
Weighted average number of ordinary shares outstanding (total) for basic
earnings per share
10,159,406,558 10,160,538,038
Effect of conversion of convertible notes - -
Other - -
Weighted average number of ordinary shares outstanding (total) for
diluted earnings per share
10,159,406,558 10,160,538,038
Basic earnings per share
Basic earnings per share 0.32 0.15
Basic earnings per share from continuing operations 0.36 0.34
Basic earnings per share from discontinued operations (0.04) (0.19)
Diluted earnings per share
Diluted earnings per share 0.32 0.15
Diluted earnings per share from continuing operations 0.36 0.34
Diluted earnings per share from discontinued operations (0.04) (0.19)

(1) The figure for 2022 has been adjusted to reflect the classification of the "Share of profit/(loss) of equity-accounted investments" referring to Rusenergosbyt LLC, a Russian company sold in December 2023, to "discontinued operations".

Information on the statement of consolidated financial position

19. Property, plant and equipment – €89,801 million

The breakdown of and changes in property, plant and equipment for 2023 is given below.

Millions of euro Land Buildings Plant and
machinery
Industrial and
commercial
equipment
Other
assets
Leased
assets
Leasehold
improvements
Assets under
construction
and advances
Total
Cost net of accumulated
impairment losses
629 11,606 165,370 572 1,439 4,021 547 13,964 198,148
Accumulated depreciation - 5,719 100,685 409 1,147 1,259 408 - 109,627
Balance at Dec. 31, 2022 629 5,887 64,685 163 292 2,762 139 13,964 88,521
Capital expenditure 4 47 2,182 27 86 1 4 8,213 10,564
Assets entering service 31 1,189 6,085 6 56 4 29 (7,365) 35
Exchange differences 11 (22) (933) (1) (26) (23) - (464) (1,458)
Change in the
consolidation scope
2 8 33 - - (6) - 3 40
Disposals (2) (2) (106) (1) (31) (63) (1) 20 (186)
Depreciation - (219) (3,857) (23) (81) (337) (34) - (4,551)
Impairment losses (1) (230) (1,149) - - - - (186) (1,566)
Impairment gains - 1 30 - - - - 8 39
Leases - - - - - 684 - - 684
Other changes (1) (92) 879 (1) 6 3 (1) 460 1,253
Reclassifications from/to
assets held for sale
(43) (270) (2,590) (1) (5) (161) - (504) (3,574)
Total changes 1 410 574 6 5 102 (3) 185 1,280
Cost net of accumulated
impairment losses
630 12,084 167,123 592 1,456 4,318 572 14,149 200,924
Accumulated depreciation - 5,787 101,864 423 1,159 1,454 436 - 111,123
Balance at Dec. 31, 2023 630 6,297 65,259 169 297 2,864 136 14,149 89,801

Plant and machinery included assets to be relinquished free of charge with a carrying amount of €9,538 million (€8,409 million at December 31, 2022), largely regarding power plants in Iberia and Latin America amounting to €4,068 million (€3,456 million at December 31, 2022) and the electricity distribution grid in Latin America totaling €4,470 million (€4,228 million at December 31, 2022).

For more information on "leased assets", please see note 21 below.

Capital expenditure came to €11,919 million, of which 10,564 million in "property, plant and equipment", and €1,355 million in "intangible assets" (for more details see note 23). The types of capital expenditure made during 2023 are summarized below by class of asset.

Millions of euro
2023 2022 Change
Power plants:
- thermal 550 659 (109) -16.5%
- hydroelectric 458 435 23 5.3%
- geothermal 136 121 15 12.4%
- nuclear 163 134 29 21.6%
- alternative energy sources 3,444 5,147 (1,703) -33.1%
Total power plants 4,751 6,496 (1,745) -26.9%
Electricity distribution grids(1) 4,485 4,373 112 2.6%
Enel X (e-City, e-Industries, e-Home) 449 373 76 20.4%
Enel X Way (e-Mobility) 106 113 (7) -6.2%
Retail customers 617 721 (104) -14.4%
Other 1,511 1,097 414 37.7%
TOTAL 11,919 13,173 (1,254) -9.5%

(1) The figure for 2023 does not include €795 million in respect of infrastructure investments within the scope of IFRIC 12 (€1,174 million in 2022).

The Enel Group, in line with the Paris Agreement on CO2 emissions reductions and guided by energy efficiency and energy transition objectives, has invested above all in generation plants that exploit alternative energy sources. Capital expenditure on thermal generation plants decreased mainly in Latin America and Italy.

Capital expenditure on the distribution grid were substantial; in particular, higher investments in Italy, mainly for corrective maintenance and grid reliability, were partly offset by lower investments in Brazil, Romania, Peru, Argentina and Chile.

The decrease in capital expenditure in the Retail business in Italy, Spain and Romania is essentially attributable to a decrease in digitalization activities of operational processes in customer management.

The growth of capital expenditure of Enel X mainly regards the e-City and the Distributed Energy businesses in Italy and the e-City business in Brazil.

Impairment losses in 2023 amounted to €1,566 million, of which €1,234 million are attributable to the value adjustment of photovoltaic and wind plants in the United States, operating in a progressively deteriorating macroeconomic context and in local markets characterized by the persistence of disadvantageous conditions for the dispatching of power, as well as the initiation and implementation by management of specific restructuring plans in the country, which have had a significant impact on the recoverable values of those assets. The above circumstances constituted evidence of low margins, which, following IAS 36 impairment testing, indicate that their carrying amount cannot be completely recovered.

Impairment losses in 2023 also include value adjustments of thermal generation assets in the non-peninsular territories in Spain (€91 million), in line with the decarbonization process pursued by the Group, and the value adjustment of Windpeshi wind project in Colombia (€171 million) as a result of the implementation of a disposal program for the related assets, which prompted their classification as assets held for sale.

Impairment gains of €39 million mainly regards generation assets in Colombia of Sociedad Portuaria Central Cartagena SA, which had been written down in 2022 to reflect their realizable value.

"Reclassifications from/to assets held for sale" refer mainly to electricity distribution and supply assets held by Enel Distribución Perú SAA in Peru, generation assets held by Enel Generación Perú, Compañía Energética Veracruz, and Enel Generación Piura, a portfolio of renewables assets consisting of about 150 MW of geothermal and solar plants in North America, whose sale was finalized in January 2024, photovoltaic plants of Arcadia Generación Solar SA in Chile, sold during 2023, and the Windpeshi wind facility under development.

"Other changes" include the adjustment of plant decommissioning and site restoration costs, which decreased by €38 million, mainly in Spain, new leases of €684 million, impairment losses on the property, plant and equipment of the Argentine companies operating in a hyperinflationary economy in the amount of €872 million and the effect of capitalizing interest on loans specifically dedicated to capital expenditure on property, plant and equipment of €303 million (€251 million in 2022), breaking down as follows.

Millions of euro
2023 Rate % 2022 Rate % Change
EGP North America 70 0.2% 83 0.5% (13) -15.7%
EGP México 16 9.8% 14 7.0% 2 14.3%
EGP South Africa - - - 6.3% - -
Enel Américas Group 55 6.4% 41 3.2% 14 34.1%
Enel Chile Group 90 6.0% 91 6.1% (1) -1.1%
Endesa Group 12 3.2% 5 1.4% 7 -
Enel Italia Group 58 2.1% 8 3.2% 50 -
Nuove Energie 2 3.3% 2 1.6% - -
Total 303 251 52 20.7%

At December 31, 2023, contractual commitments to purchase property, plant and equipment came to €4,690 million.

20. Infrastructure within the scope of "IFRIC 12 – Service Concession Arrangements"

Service concession arrangements, which are recognized in accordance with IFRIC 12, regard certain infrastructure serving concessions for electricity distribution in Brazil

and Costa Rica and public lighting in Brazil. The following table summarizes the salient details of those concessions.

Millions of euro

Concession Concession
period
Renewal Amount
recognized
among
intangible
contract
assets at Dec.
Amount
recognized
among
financial
contract
assets at Dec.
Amount
recognized
among
financial
assets at
Dec. 31,
Amount
recognized
among
intangible
assets at
Dec. 31,
Grantor Activity Country period remaining option 31, 2023 31, 2023 2023 2023
Enel
Distribuição
Rio de Janeiro
Brazilian
government
Electricity
distribution
Brazil 1996-2026 3 years Yes 134 - 1,353 439
Enel
Distribuição
Ceará
Brazilian
government
Electricity
distribution
Brazil 1998-2028 5 years Yes 134 - 1,138 466
Enel Green
Power Mourão
Brazilian
government
Electricity
generation
Brazil 2016-2046 23 years No - - 6 -
Enel Green
Power
Paranapanema
Brazilian
government
Electricity
generation
Brazil 2016-2046 23 years No - - 27 -
Enel Green
Power Volta
Grande
Brazilian
government
Electricity
generation
Brazil 2017-2047 24 years No - - 291 -
Enel
Distribuição
São Paulo
Brazilian
government
Electricity
distribution
Brazil 1998-2028 5 years Yes 157 - 1,549 722
Luz de Angra
Energia
Brazilian
government
Public
lighting
Brazil 2021-2036 13 years Yes(1) - 3 - -
Luz de
Jaboatão
Energia
Brazilian
government
Public
lighting
Brazil 2023-2045 21 years Yes(1) - 5 - -
Luz de Caruaru
Energia
Brazilian
government
Public
lighting
Brazil 2023-2043 19 years Yes(1) - 4 - -
Luz de
Cataguases
Brazilian
government
Public
lighting
Brazil 2023-2048 24 years Yes(1) - 1 - -
PH Chucas Costa Rican
Electricity
Institute
Hydroelectric
plant
Costa
Rica
2012-2031 8 years No - - 40 38
Total 425 13 4,404 1,665

(1) Limited to 35 years.

The assets classified under financial assets are measured at fair value at the end of the concessions. For more information, please see note 52 "Assets and liabilities measured at fair value".

21. Leases

The table below shows changes in right-of-use assets in 2023.

Millions of euro Leased land Leased buildings Leased plants Other leased assets Total
Total at Dec. 31, 2022 1,312 513 424 513 2,762
Increases 318 270 (3) 99 684
Exchange differences (26) 2 - 1 (23)
Depreciation (47) (118) (29) (143) (337)
Other changes (69) (35) (114) (4) (222)
Total at Dec. 31, 2023 1,488 632 278 466 2,864

Lease liabilities and changes during the year are shown in the table below.

Millions of euro
Total at Dec. 31, 2022 2,672
Increases 677
Payments (406)
Other changes (38)
Total at Dec. 31, 2023 2,905
of which medium to long term 2,638
of which short term 267

Note that in 2023 no changes or renegotiations were made to leases.

Millions of euro
2023
Depreciation of right-of-use assets 346
Interest expense on lease liabilities 128
Expense relating to short-term leases (included in costs for services and other materials) 46
Expense relating to leases of low-value assets (included in costs for services and other materials) -
Variable lease payments (included in costs for services and other materials) 29
Total 549

22. Investment property – €97 million

Millions of euro
Cost net of accumulated impairment losses
Accumulated depreciation
Balance at Dec. 31, 2022
Exchange differences -
Depreciation (2)
Impairment losses (1)
Other changes 6
Total changes 3
Cost net of accumulated impairment losses 114
Accumulated depreciation 17
Balance at Dec. 31, 2023 97

Investment property at December 31, 2023 amounted to €97 million, an increase of €3 million on 2022.

The Group's investment property consists of properties in Italy, Spain, Brazil and Chile, which are free of restrictions on their sale or the remittance of income and proceeds of disposal. In addition, the Group has no contractual obligations to purchase, construct or develop investment property or for repairs, maintenance or enhancements.

The change in 2023 was mainly due to impairment losses recognized on a number of assets in Spain, a number of disposals in Italy and depreciation charges for the period.

For more information on the valuation of investment property, please see notes 52 "Assets and liabilities measured at fair value", and 52.2 "Assets not measured at fair value in the statement of financial position".

23. Intangible assets – €17,055 million

A breakdown of and changes in intangible assets for 2023 are shown below.

Millions of euro Development
expenditure
Industrial
patents &
intellectual
property
rights
Concessions,
licenses,
trademarks
and similar
rights
Service
concession
arrangements
Other Leasehold
improvements
Assets under
development
and advances
Contract
costs
Total
Cost net of accumulated
impairment losses
101 3,697 12,646 5,261 5,279 - 1,747 2,831 31,562
Accumulated
amortization
22 3,034 1,851 3,761 3,847 - - 1,527 14,042
Balance at Dec. 31, 2022 79 663 10,795 1,500 1,432 - 1,747 1,304 17,520
Capital expenditure 3 30 45 - 122 - 640 515 1,355
Assets entering service 2 300 8 - 209 - (564) 10 (35)
Exchange differences 1 (4) 220 72 (4) - (49) (4) 232
Change in the
consolidation scope
- - 1 - - - (1) - -
Disposals - (2) - (18) - - 3 - (17)
Amortization (5) (313) (199) (402) (342) - - (425) (1,686)
Impairment losses (3) - 1 - (1) - (57) - (60)
Impairment gains - - - - 2 - - - 2
Other changes (47) 50 (10) 513 - - (46) 3 463
Reclassifications from/to
assets held for sale
(4) (49) (590) - (44) - (32) - (719)
Total changes (53) 12 (524) 165 (58) - (106) 99 (465)
Cost net of accumulated
impairment losses
55 3,988 12,401 5,822 5,513 - 1,641 3,352 32,772
Accumulated
amortization
29 3,313 2,130 4,157 4,139 - - 1,949 15,717
Balance at Dec. 31, 2023 26 675 10,271 1,665 1,374 - 1,641 1,403 17,055

The following table reports service concession arrangements that do not fall within the scope of IFRIC 12 and had a balance as at December 31, 2023.

Millions of euro
Grantor Activity Country Concession
period
Concession
period remaining
Renewal
option
at Dec. 31,
2023
at Dec. 31,
2022
Initial fair
value
Endesa Distribución
Eléctrica
- Electricity
distribution
Spain Indefinite Indefinite - 5,677 5,678 5,673
Enel Colombia
(formerly Codensa)
Republic of
Colombia
Electricity
distribution
Colombia Indefinite Indefinite - 1,266 1,047 1,839
Enel Distribución Chile
(formerly Chilectra)
Republic of
Chile
Electricity
distribution
Chile Indefinite Indefinite - 1,254 1,331 1,667

Assets with an indefinite useful life amounted to €8,197 million (€8,056 million at December 31, 2022) essentially accounted for by concessions for distribution activities in Spain (€5,677 million), Colombia (€1,266 million) and Chile (€1,254 million), for which there was no statutory or currently predictable expiration date. On the basis of the forecasts developed, cash flows for each CGU, with which the various concessions are associated, were sufficient to recover the carrying amount. The change during the year was essentially attributable to changes in exchange rates in Latin America. The assets in respect of concession arrangements that do not fall within the scope of IFRIC 12 of Enel Distribución Perú were reclassified as held for sale in the amount of €581 million (€584 million at December 31, 2022).

For more information on service concession arrangements, please see note 20.

Impairment losses amounted to €60 million in 2023, and mainly regarded renewable projects no longer considered strategic in Spain, the United States and Italy.

"Reclassifications from/to assets held for sale" refer mainly to assets held by Enel Distribución Perú SAA, Enel Generación Perú, Compañía Energética Veracruz and other renewable assets in North America (the latter sold at the beginning of 2024).

"Other changes" mainly include the reclassification under financial assets of investments falling within the scope of IFRIC 12 in Brazil and the value adjustment of intangible assets of Argentine companies as a result of the application of the accounting standard for financial reporting in hyperinflationary economies.

24. Goodwill – €13,042 million

Millions of euro at Dec. 31, 2022 Change in the
consolidation
scope
Exchange
differences
Impairment
losses
Reclassifications
from/to assets
held for sale
Other
changes
at Dec. 31, 2023
Net carrying
amount
Net carrying
amount
Iberian Peninsula 8,785 - - - - - 8,785
Chile 1,148 - (1) - (46) - 1,101
Argentina 21 - (1) - - - 20
Peru 571 - (1) - (570) - -
Colombia 518 - 8 - - - 526
Brazil 1,313 - 44 - - - 1,357
Central America 26 - - - - - 26
Enel Green Power North
America
70 - (2) - - - 68
Enel X North America 142 - (4) (57) - - 81
Enel X Way North America 70 - (1) (69) - -
Enel X Asia Pacific 84 - - - - - 84
Enel X Rest of Europe(1) 43 - - - - - 43
Market Italy(2) 581 - - - - - 581
Enel Green Power Italy 21 - - - - - 21
Enel Produzione Italy 349 - - - - - 349
Total 13,742 - 42 (126) (616) - 13,042

(1) Includes Viva Labs.

(2) Includes Enel Energia.

The following table presents the allocation of goodwill in the matrix of business lines and geographical areas. Note that the changes in the presentation of operating segments, described in note 10 above, did not produce changes in the allocation of goodwill for the purposes of impairment testing.

Goodwill matrix at Dec. 31, 2023

Thermal
Generation and
Enel Green End-user Holding and
Millions of euro Trading Power Enel Grids Markets Services Total
Enel Green Power Italy - 21 - - - 21
Market Italy(1) - - - 581 - 581
Enel Produzione Italy - 349 - - - 349
Iberian Peninsula - 1,190 5,788 1,807 - 8,785
Argentina - 1 19 - - 20
Brazil - 502 855 - - 1,357
Chile - 949 152 - - 1,101
Colombia - 303 223 - - 526
Peru - - - - - -
Central America - 26 - - - 26
Enel Green Power North America - 68 - - - 68
Enel X North America - - - 81 - 81
Enel X Way North America - - - - - -
Enel X Asia Pacific - - - 84 - 84
Enel X Rest of Europe(2) - - - 43 - 43
Total - 3,409 7,037 2,596 - 13,042

(1) Includes Enel Energia.

(2) Includes Viva Labs.

Goodwill matrix at Dec. 31, 2022

Millions of euro Thermal
Generation and
Trading
Enel Green
Power
Enel Grids End-user
Markets(1)
Holding and
Services(1)
Total
Enel Green Power Italy - 21 - - - 21
Market Italy(2) - - - 581 - 581
Enel Produzione Italy - 349 - - - 349
Iberian Peninsula - 1,190 5,788 1,807 - 8,785
Argentina - 2 19 - - 21
Brazil - 478 835 - - 1,313
Chile - 996 152 - - 1,148
Colombia - 295 223 - - 518
Peru 44 207 320 - - 571
Central America - 26 - - - 26
Enel Green Power North America - 70 - - - 70
Enel X North America - - - 142 - 142
Enel X Way North America - - - 70 - 70
Enel X Asia Pacific - - - 84 - 84
Enel X Rest of Europe(3) - - - 43 - 43
Total 44 3,634 7,337 2,727 - 13,742

(1) The figures for 2022 for the End-user Market Business Line have been adjusted to take account of the values for Enel X and Enel X Way. The latter had previously been reported under Holding, Services and Other.

(2) Includes Enel Energia.

(3) Includes Viva Labs.

The decrease of €700 million in goodwill was mainly attributable to Peru for the reclassification as assets held for sale of generation and distribution assets (€570 million), and Chile for the reclassification to assets held for sale of Arcadia Generación Solar (€46 million).

New impairment losses were also recognized in 2023 in respect of the CGUs in North America of Enel X and Enel X Way (€57 and €69 million, respectively) following impairment testing conducted in response to changes in macroeconomic conditions.

The decrease is partly offset by exchange gains recognized in Brazil.

The recoverable amount of the goodwill recognized was estimated by calculating the value in use of the CGUs using discounted cash flow models, which involve estimating expected future cash flows and applying an appropriate discount rate, selected on the basis of market inputs such as risk-free rates, betas and market-risk premiums.

Cash flows were determined on the basis of the best information available at the time of the estimate, taking account of the specific risks of each CGU, and drawn:

  • for the explicit period, from the Business Plan approved by the Board of Directors of the Parent on November 22, 2023, containing forecasts for volumes, revenue, operating costs, capital expenditure, industrial and commercial organization and developments in the main macroeconomic variables (inflation, nominal interest rates and exchange rates) and commodity prices. The explicit period of cash flows considered in impairment testing was three years;
  • for subsequent years, from assumptions concerning long-term developments in the main variables that determine cash flows, the average residual useful life of assets or the duration of the concessions.

More specifically, the terminal value is calculated based on the specific characteristics of the businesses related to the various CGUs subject to impairment testing:

  • perpetuity, for the businesses of large-hydro (LH) power generation and of distribution, in which the licenses and public concessions are of a long-term nature and renewal can be forecast with reasonable certainty; as well as for the Enel X and Enel X Way businesses, as they feature the development of specific know-how that is sustainable over the long term;
  • annuity, for CGUs that are predominantly characterized by retail business, for which the residual life is, therefore, essentially correlated with the average duration of the customer relationships; as well as for businesses

of conventional thermal power generation (Generation and Trading). This method is also used for the renewable energy (Enel Green Power) businesses to take account of: (i) the value resulting from the remaining useful lives of the plants; and (ii) the residual value, in the event of plant decommissioning, associated with licensing rights, the competitiveness of the production facilities (in terms of natural resources), and network interconnectivity.

The nominal growth rate (g-rate) is equal to the long-term rate of growth in electricity and/or inflation (depending on the country and business involved).

Regarding the assumptions for commodity price developments, the scenarios adopted are consistent with current emissions reductions targets.

Note also that the Group has used sensitivity analysis to take account of the impacts of climate change in the long term. More specifically:

  • we consider a perpetual long-term growth rate for cash flows after the explicit period that is in line with the change in electricity demand over the 2026-2050 period, based on the specific features of the businesses concerned, adopting certain assumptions concerning the increase in temperature due to climate change and trends connected with the energy transition;
  • we consider changes in the hydroelectric, wind and photovoltaic generation levels of our Portfolio assets, associated with each projection of underlying climate and weather variables (for example, temperature, irradiance, wind speed and precipitation);
  • we assume that the Group will incur the costs provisioned for decommissioning fossil fuel generation plants in line with the goal of zero direct (Scope 1) and indirect emissions from retail activities (Scope 3).

In order to verify the robustness of the value in use of the CGUs, sensitivity analyses were conducted for the main value drivers, in particular WACC and the long-term growth rate.

Even in these circumstances, results were consistent with the evidence described previously, finding that for all the CGUs analyzed, with the exception of those written down (Enel X North America and Enel X Way North America), the value in use exceeded the carrying amount, ensuring the full recoverability of the carrying amounts of those assets in the consolidated financial statements of the Enel Group at December 31, 2023.

OUR ZERO-EMISSIONS AMBITION

Enel is commi ed to achieving zero emissions by 2040 and to developing a business model that is in line with the objectives of the Paris Agreement (COP 21) to limit the average increase in global temperatures

of total generation in 2023.

to 1.5 ºC. For this reason, the Group has developed a decarbonatization roadmap that covers both direct and indirect emissions throughout the value chain. The roadmap includes four targets ce i ed by the Science Based Targets initiative (SBTi) in December 2022 to be in line with the Net Zero Standard.

GHG TARGET Intensity of Scope 1 GHG emissions related to power generation
Primary business
activity
Electricity generation
Type of activity in
value chain
Direct
Stakeholders
impacted or
involved
• Customers and power consumers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
95% of Scope 1 GHG emissions(2)
Time frame Sho term (2026)
Medium term (2030)
Long term (2040)
GHG target 125 gCO2eq/kWh 72 gCO2eq/kWh 0 gCO2eq/kWh
Zero emissions
% reduction on 2017
(SBTi baseline)
-66% -80% -100%
% reduction on
2023 (repo ing
year)
-22% -55% -100%
Climate scenario 1.5 °C(3) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Gradual phase out of coal- red capacity
in 2024-2026, with planned closure of
the Federico II and Torrevaldaliga Nord
plants in Italy (with a total capacity of
about 3.6 GW).
• Invest €12.1 billion to accelerate the
development of renewable energy by
installing 13.4 GW of new renewables
capacity (about 11.3 GW of which at
the consolidated level) in 2024-2026,
reaching 73 GW of renewables capacity
(including BESS) by 2026.
• Continue the process of decarbonizing
electricity generation, with the
propo ion of renewables plants in the
Enel asset po folio reaching 78% in
2026, with zero-emissions generation
amounting to 86% of the total, including
consolidated and managed generation.
• No use of carbon-removal technologies
to achieve the target.
• Continue the process of decarbonizing
electricity generation, with Group
investments raising the propo ion of
renewables plants in the asset po folio
to about 85% in 2030, with zero
emissions generation amounting to 90%
of the total, including consolidated and
managed generation.
• Exit from coal- red generation, which is
expected to take place by 2027 globally.
• No use of carbon-removal technologies
to achieve the target.
• Exit from the thermal electricity
generation business, achieving a 100%
renewable energy mix.
• No use of carbon-removal technologies
to achieve the target.
Results and
main actions in
2023
KPI achievement in 2023: 160 gCO2eq/kWh
• About €5.9 billion invested in renewables in 2023.
• New consolidated renewables capacity installed equal to 4 GW in 2023, bringing total consolidated capacity to 55.5 GW in
2023.
• Increase in consolidated renewables generation equal to 13% on 2022, representing 61% of total consolidated generation in
2023.
• Reduction of thermal capacity by about 5.1 GW on 2022, including the closure of two coal- red plants (for a total of about 2
GW) and the sale of gas plants in Argentina (for a total of about 3 GW) and Colombia (for a total of about 0.2 GW).
• Reduction of thermal generation by 38% on 2022 (speci cally, with a 45% reduction in coal- red generation), representing 27%

Primary business

Type of activity in

Stakeholders impacted or involved

Sources of covered GHG (GHG Protocol)(1)

Time frame

% reduction on 2017

Primary drivers and

Results and main actions in 2023

% reduction on 2023 (repo ing year)

activity Sale of gas to end users

value chain • Downstream in value chain

actions • Encourage customers (especially residential customers) to switch from gas to electricity by promoting e cient electricity technologies (e.g., heat pumps for home heating or induction cooktops in kitchens), increasing annual unit electricity consumption of free-market B2C power customers (in Italy and Iberia) from 2.65 MWh in 2023 to about 2.9 MWh in 2026, thereby increasing the electri cation rate of customers. Allocate 32% of investment in grids in 2024-2026 to connections, pa ly with a view to enabling the expansion of distributed generation, thereby promoting the electri cation of end users' energy consumption. The number of connections to distributed generation is forecast to double in the period, reaching 4

million in 2026.

meters in 2026.

No use of carbon-removal technologies to achieve the target.

Reduce the volumes of gas sold to customers to around 8.4 billion cubic

3.6 million new connections in 2023.

6.2 million gas customers in 2023, down 6% on 2022.

Gas sales in 2023 equal to 8.3 billion cubic meters, down 19% on 2022.

Gas customers

Society and environment

GHG target 20.0 MtCO2eq 11.4 MtCO2eq

GHG TARGET Scope 3 GHG emissions related to the sale of natural gas on end-user market

(SBTi baseline) -21% -55% -100%

Climate scenario n.a.(5) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)

customers.

generation in 2030.

meters in 2030.

No use of carbon-removal technologies to achieve the target.

30% of Scope 3 GHG emissions (corresponding to 100% of Scope 3 GHG emissions – category 11)

Sho term (2026) Medium term (2030) Long term (2040)

-(4) -32% -100%

Encourage customers (especially residential customers) to switch from gas to electricity by promoting e cient electricity technologies (e.g., heat pumps for home heating or induction cooktops in kitchens), increasing annual unit electricity consumption of free-market B2C power customers (in Italy and Iberia) to about 3.5 MWh in 2030, thereby increasing the electri cation rate of

Continue to invest in distribution grids, suppo ing the growth of distributed generation, thereby promoting the electri cation of end users' energy consumption, reaching 6 million connections to distributed

Optimize the customer gas po folio (industrial customers in pa icular), continuing to reduce the volume of gas sold to about 5.3 billion cubic

KPI achievement in 2023: 16.8 MtCO2eq

0 MtCO2eq Zero emissions

By 2040, achieve 100% of energy sales

Exit retail gas sales business by 2040.

covered by renewables.

No use of carbon-removal technologies to achieve the target.

GHG TARGET Intensity of Scope 1 and Scope 3 GHG emissions related to Integrated Power
Primary business
activity
Sale of electricity
Type of activity in
value chain
• Direct (electricity generation)
• Upstream in value chain (purchase of electricity from other generators for sale to end users)
Stakeholders
impacted or
involved
• Customers and power consumers
• Electricity generators (peers)
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
• 95% of Scope 1 GHG emissions
• 42% of Scope 3 GHG emissions (corresponding to 78% of Scope 3 GHG emissions – category 3)
Time frame Sho term (2026) Medium term (2030) Long term (2040)
GHG target 135 gCO2eq/kWh 73 gCO2eq/kWh 0 gCO2eq/kWh
Zero emissions
% reduction on 2017
(SBTi baseline)
-59% -78% -100%
% reduction on
2023 (repo ing
year)
-20% -57% -100%
Climate scenario 1.5 °C(3) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Increase the percentage of renewable
energy sold to customers, while
increasing the Group's renewables
production and optimizing customer
po folio, continuing supply and
demand balancing strategy.
• In Europe, increase the share of
xed-price energy sales to end users
covered by zero-emissions sources
from about 65% in 2023 to more than
• Continue the strategy of balancing
supply and demand and increase the
share of electricity sold at a xed price
covered by carbon-free generation.
• Continue the process of
decarbonizing electricity generation,
increasing zero-emissions generation
to about 90% of the total in 2030.
• No use of carbon-removal
• By 2040, achieve 100% of electricity
sales covered by renewables.
• No use of carbon-removal
technologies to achieve the target.
80% in 2026.
• In Latin America, maintain 100%
zero-emissions sales to end users
(including through PPAs).
technologies to achieve the target.
• In No h America, maintain 100% zero
emissions sales to end users.
• Continue the process of
decarbonizing electricity generation,
increasing zero-emissions generation
from 75% in 2023 (including managed
capacity) to 86% of total in 2026,
including consolidated and managed
capacity.
• No use of carbon-removal
technologies to achieve the target.

KPI achievement in 2023: 168 gCO2eq/kWh

13% increase in Group consolidated renewables generation in 2023 on 2022.

Results and main actions in 2023

7% reduction in 2023 compared with 2022 in the gap between sale of electricity to end users and own generation in the countries in which the Group has an integrated position.

GHG TARGET Scope 3 GHG emissions related to the sale of natural gas on end-user market
Primary business
activity
Sale of gas to end users
Type of activity in
value chain
• Downstream in value chain
Stakeholders
impacted or
involved
• Gas customers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
• 30% of Scope 3 GHG emissions (corresponding to 100% of Scope 3 GHG emissions – category 11)
Time frame Sho term (2026) Medium term (2030) Long term (2040)
GHG target 20.0 MtCO2eq 11.4 MtCO2eq 0 MtCO2eq
Zero emissions
% reduction on 2017
(SBTi baseline)
-21% -55% -100%
% reduction on
2023 (repo ing
year)
-(4) -32% -100%
Climate scenario n.a.(5) 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Encourage customers (especially
residential customers) to switch
from gas to electricity by promoting
e cient electricity technologies
(e.g., heat pumps for home heating
or induction cooktops in kitchens),
increasing annual unit electricity
consumption of free-market B2C
power customers (in Italy and Iberia)
from 2.65 MWh in 2023 to about 2.9
MWh in 2026, thereby increasing the
electri cation rate of customers.
• Allocate 32% of investment in grids
in 2024-2026 to connections, pa ly
with a view to enabling the expansion
of distributed generation, thereby
promoting the electri cation of
end users' energy consumption.
The number of connections to
distributed generation is forecast
to double in the period, reaching 4
million in 2026.
• Reduce the volumes of gas sold to
customers to around 8.4 billion cubic
meters in 2026.
• No use of carbon-removal
technologies to achieve the target.
• Encourage customers (especially
residential customers) to switch
from gas to electricity by promoting
e cient electricity technologies
(e.g., heat pumps for home heating
or induction cooktops in kitchens),
increasing annual unit electricity
consumption of free-market B2C
power customers (in Italy and Iberia)
to about 3.5 MWh in 2030, thereby
increasing the electri cation rate of
customers.
• Continue to invest in distribution
grids, suppo ing the growth of
distributed generation, thereby
promoting the electri cation of end
users' energy consumption, reaching
6 million connections to distributed
generation in 2030.
• Optimize the customer gas po folio
(industrial customers in pa icular),
continuing to reduce the volume of
gas sold to about 5.3 billion cubic
meters in 2030.
• No use of carbon-removal
technologies to achieve the target.
• By 2040, achieve 100% of energy sales
covered by renewables.
• Exit retail gas sales business by 2040.
• No use of carbon-removal
technologies to achieve the target.

- main actions in 2023

  • Gas sales in 2023 equal to 8.3 billion cubic meters, down 19% on 2022.
  • 3.6 million new connections in 2023.

GHG TARGET Additional emissions Scopes 1-2-3
Primary business
activity
• Electricity distribution (Scopes 1 and 2)
• Management of vehicle eet, buildings and other assets (Scopes 1 and 2)
• Management of supply chain (Scope 3)
• Purchase of fuels (Scope 3)
Type of activity in
value chain
• Direct (electricity distribution and management of vehicle eet, buildings and other Group assets)
• Upstream in value chain (supply chain for products and services and fuel business)
Stakeholders
impacted or
involved
• Customers and power consumers
• Electricity generators (peers)
• Suppliers of goods and services
• Oil&gas suppliers
• Society and environment
Sources
of covered GHG
(GHG Protocol)(1)
• 0.5% of Scope 1 GHG emissions
• 100% of Scope 2 GHG emissions
of Scope 3 emissions - category 3)
of Scope 3 emissions - category 3)
• Target 2030(6): 15% of Scope 3 GHG emissions (corresponding to 17% of Scope 3 emissions - category 1 and 22%
• Target 2040(6): 18% of Scope 3 GHG emissions (corresponding to 35% of Scope 3 emissions - category 1 and 22%
Time frame Medium term (2030) Long term (2040)
GHG target 10.4 MtCO2eq <2.5 MtCO2eq
Net zero emissions
% reduction on 2017
(SBTi baseline)
-55% -90%
% reduction on
2023 (repo ing
year)
-12% -83%
Climate scenario 1.5 °C (SBTi ce i ed) 1.5 °C (SBTi ce i ed)
Primary drivers and
actions
• Invest a total of €18.6 billion in grids over the 2024-2026
period, of which 50% to improve grid resilience, quality
and digitalization, thereby helping to reduce grid losses
and related greenhouse gas emissions. Replace existing
distribution grid infrastructure components with SF6-free
solutions.
• Implement a circular procurement approach; increase the
number of contracts that include the measurement of the
carbon footprint of the products and services purchased
by Enel, encouraging its reduction in a collaborative
decarbonization process with our suppliers. Strengthen
dialogue with raw material producers and other utilities
to de ne shared and e ective long-term decarbonization
strategies.
• Phase out coal- red generation by 2027, mitigating all GHG
emissions related to coal supply.
• No use of carbon-removal technologies to achieve the
target.
• Promote grid digitalization and replace existing distribution
grid infrastructure components with SF6-free solutions.
• Implement a circular procurement approach; increase the
number of contracts that include the measurement of the
carbon footprint of the products and services purchased
by Enel, encouraging its reduction in a collaborative
decarbonization process with our suppliers. Strengthen
dialogue with raw material producers and other utilities
to de ne shared and e ective long-term decarbonization
strategies.
• Eliminate emissions connected with gas extraction activities,
as the Group has fully exited gas- red generation and sale of
gas to end users.
• Neutralize the residual amount through carbon-removal
actions (purchase of ce i cates linked to nature-based or
technology-based projects in voluntary carbon markets,
in accordance with international standards) if complete
mitigation of emissions is not feasible due to exogenous
factors (technological, market or regulatory).

Results and main actions in

  • €5.4 billion invested in the grid in 2023.
  • 43% reduction in coal burned in thermal generation plants.
  • 2023 • 41% reduction in volume of gas burned in thermal generation plants compared with 2022 (due also to the sale of gas plants
    • in Russia and Argentina), and 19% reduction in volume of gas sold to end users compared with 2022.
    • 8% reduction in electricity consumption in Group generation plants and buildings.
    • 24% reduction in emissions intensity (tCO2eq/€mn) in supply chain in 2023 compared with 2022, reaching 684 tCO2eq/€mn.

TOTAL COVERAGE OF SCOPES 1-2-3 EMISSIONS IN 2023

  • 95.5% of Scope 1 GHG emissions (2026, 2030 and 2040 targets)
  • 100% of Scope 2 GHG emissions (2030 and 2040 targets)
  • 87% (2017-2030 target) and 90% (2017-2040 target) of Scope 3 GHG emissions(6)
  • (1) Percentages based on total GHG emissions in 2023.
  • (2) Excludes marginal Scope 1 GHG emissions not directly related to the combustion of fossil fuels in electricity generation at thermal plants. These emissions also include the use of ancillary services in distribution operations. In pa icular, in 2023 there was an extraordinarily high use of these services in Brazil to deal with the meteorological emergency that occurred in São Paulo in November 2023, which caused the interruption of grid operations. In any event, 95.8% of Scope 1 and Scope 2 GHG emissions are covered by all of the above targets, greater than the 95% threshold required under the Science Based Targets initiative and the GHG Protocol.
  • (3) The target is in line with the path to 1.5 °C set by the SBTi for the electrical services industry (Sectoral Decarbonization Approach, or SDA), although it could not be o cially validated because the SBTi does not ce ify targets over a time frame of less than ve years from the presentation date.
  • (4) In 2023, gas sales decreased considerably compared with previous years. Fu hermore, a methodological change in the use of conversion factors has been implemented. These two factors produced a value below the target expected for 2026.
  • (5) The target could not be o cially validated because the SBTi does not ce ify targets over a time frame of less than ve years from the presentation date. In addition, the SBTi has not de ned a sectoral decarbonization approach for these types of emissions, so the ambition level cannot be veri ed.
  • (6) Two di erent percentage limits have been set for the target for Scope 3 GHG emissions by the supply chain, as allowed under the SBTi approach, which required coverage of at least 67% of Scope 3 emissions for the 2030 target, and at least 90% for the 2040 target.

The table below reports the composition of the main goodwill values for the companies to which the CGU belongs, along with the discount rates applied and the time

horizon over which the expected cash flows have been discounted.

Millions of euro Amount of
goodwill
Growth
rate(1)
Pre-tax
WACC
discount
rate(2)
Explicit
period of
cash flows
Terminal
value(3)
Amount of
goodwill
Growth
rate(1)
Pre-tax
WACC
discount
rate(2)
Explicit
period of
cash flows
Terminal
value(3)
at Dec. 31, 2023 at Dec. 31, 2022
Iberian Peninsula 8,785 2.19% 8.23% 3 years Perpetuity/22
years EGP/12
years G&T/15
years MKT
8,785 2.47% 6.10% 3 years Perpetuity/25
years EGP/13
years G&T
Chile 1,101 2.07% 9.57% 3 years Perpetuity/28
years EGP/5
years G&T
1,148 2.00% 8.45% 3 years Perpetuity/26
years EGP/5
years G&T
Argentina 20 17.57% 41.90% 3 years Perpetuity 21 45.70% 71.78% 3 years Perpetuity
Peru n.a. n.a. n.a. n.a. n.a. 571 2.25% 8.75% 3 years Perpetuity/25
years EGP/8
years G&T
Colombia 526 3.50% 14.25% 3 years Perpetuity/25
years EGP/14
years G&T
518 3.20% 11.79% 3 years Perpetuity/26
years EGP/15
years G&T
Brazil 1,357 3.86% 12.31% 3 years Perpetuity/24
years EGP
1,313 3.58% 11.22% 3 years Perpetuity/25
years EGP
Central America 26 2.10% 10.92% 3 years 17 years 26 2.02% 9.66% 3 years 18 years
Enel Green Power
North America
68 2.10% 8.27% 3 years 24 years 70 2.02% 6.48% 3 years 25 years
Enel X North America 81 2.10% 11.75% 3 years Perpetuity 142 2.02% 9.71% 3 years Perpetuity
Enel X Way North
America
n.a. n.a. n.a. n.a. n.a. 70 2.02% 11.53% 3 years Perpetuity
Enel X Asia Pacific 84 2.10% 13.27% 3 years Perpetuity 84 2.02% 10.39% 3 years Perpetuity
Enel X Rest of Europe 43 2.10% 11.45% 3 years Perpetuity 43 1.62% 8.82% 3 years Perpetuity
Enel Green Power Italy 21 2.10% 8.66% 3 years Perpetuity/26
years
21 1.62% 6.39% 3 years Perpetuity/24
years
Market Italy 581 1.93% 11.31% 3 years 15 years 581 2.38% 10.69% 3 years 15 years
Enel Produzione Italy 349 2.06% 9.07% 3 years Perpetuity/14
years
349 1.64% 7.70% 3 years Perpetuity/15
years
Romania n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a.
CGUs with no
recognized goodwill
but that underwent
impairment testing
given the presence
of the indicators
provided for in IAS 36
Iberia - NPT (Non
Peninsular Territories)
n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a.
Australia n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a.
Mexico n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a. n.a.

(1) Perpetual growth rate for cash flows after the explicit forecast period.

(2) Pre-tax WACC calculated using the iterative method: the discount rate that ensures that the value in use calculated with pre-tax cash flows is equal to that calculated with post-tax cash flows discounted with the post-tax WACC.

(3) The terminal value has been estimated on the basis of a perpetuity or an annuity with a rising yield for the years indicated in the column (G&T = Generation & Trading, EGP = Enel Green Power, MKT = End-user Markets).

25. Deferred tax assets and liabilities – €9,218 million and €8,217 million

The following tables detail changes in deferred tax assets and liabilities by type of timing difference and calculated based on the tax rates established by applicable regula-

tions, as well as the amount of deferred tax assets offsettable, where permitted, with deferred tax liabilities.

Millions of euro Increase/
(Decrease)
taken to
profit or loss
Increase/
(Decrease)
taken to
equity
Change in the
consolidation
scope
Exchange
differences
Other
changes
Reclassifications
of assets
held for sale
at
Dec. 31, 2022
at
Dec. 31, 2023
Deferred tax assets:
- differences in the
carrying amount of
intangible assets,
property, plant and
equipment
2,313 (79) - - - 65 (30) 2,269
- accruals to provisions
for risks and charges
and impairment
losses with deferred
deductibility
1,956 (68) - - 6 33 (2) 1,925
- tax loss carried forward 786 (39) - - (12) 11 - 746
- measurement of
financial instruments
2,914 1 (1,521) - (2) (70) - 1,322
- employee benefits 798 (25) 66 - 22 3 (1) 863
- other items(1) 2,408 32 11 1 (148) (98) (113) 2,093
Total 11,175 (178) (1,444) 1 (134) (56) (146) 9,218
Deferred tax liabilities:
- differences on non
current and financial
assets
5,719 17 - 1 (490) 306 (515) 5,038
- measurement of
financial instruments
1,506 (3) (473) - (3) (69) (1) 957
- other items(1) 2,569 (200) (5) - (27) (68) (47) 2,222
Total 9,794 (186) (478) 1 (520) 169 (563) 8,217
Non-offsettable
deferred tax assets
5,221
Non-offsettable
deferred tax liabilities
3,347
Excess net deferred
tax liabilities after any
offsetting
873

(1) The figures at December 31, 2022 for deferred tax assets and liabilities have been adjusted in the amount of €250 million and €252 million respectively to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Deferred tax assets recognized at December 31, 2023, as the recovery of such assets is considered reasonably certain, totaled €9,218 million (€11,175 million at December 31, 2022).

Deferred tax assets decreased by €1,957 million during the year, essentially due to:

  • a decrease in deferred tax assets connected with developments in the fair value of cash flow hedge derivatives;
  • the impact of exchange rate differences in Latin America, in particular in Argentina;
  • the reversal of the portion of deferred tax assets no longer considered recoverable in the United States and Mexico;
  • the reclassification to assets held for sale of generation and distribution assets in Peru.

Note that deferred tax assets have not been assessed on tax losses carried forward for the year (€1,480 million) in

the amount of €453 million, as their recoverability is not considered probable based on current estimates of future taxable income.

Deferred tax liabilities amounted to €8,217 million at December 31, 2023 (€9,794 million at December 31, 2022). They essentially include the determination of the tax effects of the adjustments to assets acquired as part of the final allocation of the cost of acquisitions made in the various years and the deferred taxation in respect of the differences between depreciation charged for tax purposes, including accelerated depreciation, and depreciation based on the estimated useful lives of assets.

Deferred tax liabilities decreased by a total of €1,577 million, due in particular to:

  • the decrease in deferred tax liabilities connected with developments in the fair value of cash flow hedge derivatives;
  • the impact of exchange rate differences in Latin America, in particular in Argentina;
  • the reversal of deferred tax liabilities connected with impairment losses on renewable generation plants in the United States;
  • the reclassification of deferred tax liabilities relating to companies held for sale in Peru.

26. Equity-accounted investments – €1,650 million

The following table shows changes in the main investments in joint ventures and associated companies accounted for using the equity method.

Impact
on profit
Change in the
consolidation
Reclassification
to discontinued
Reclassifications
from/to assets
Other
Millions of euro % held or loss scope Dividends operations held for sale Impairment changes % held
at
Dec. 31, 2022
at
Dec. 31, 2023
Joint ventures
Gridspertise Srl 299 50.0% 9 - - - - - (2) 306 50.0%
Mooney Group
SpA
219 50.0% (35) - - - - - 1 185 50.0%
Slovak Power
Holding
90 50.0% - - - - - - 99 189 50.0%
Enel Green
Power Australia
- (7) 142 - - - - 13 148 50.0%
Enel Green
Power Hellas
- (1) 246 - - - - - 245 50.0%
Matimba project
companies
108 50.0% (1) (15) - - - - (17) 75 50.0%
Kino project
companies
16 20.0% (13) - - - - - (2) 1 20.0%
Ewiva Srl 20 50.0% (3) - - - - - 22 39 50.0%
Drift Sand Wind
Project
45 50.0% 1 - - - - - (1) 45 50.0%
Front Marítim del
Besòs
31 61.4% (2) - - - - - 1 30 61.4%
Elecgas SA 30 50.0% 6 - (13) - - - (2) 21 50.0%
Tejo Energia
- Produção e
Distribuição de
Energia Eléctrica
5 43.8% - - - - - - - 5 43.8%
Suministradora
Eléctrica de
Cádiz
9 33.5% 3 - (3) - - - (1) 8 33.5%
Energie
Electrique de
Tahaddart
11 32.0% 3 - (2) - - - (4) 8 32.0%
Rusenergosbyt 91 49.5% 58 - - (115) - - (34) -
PowerCrop 14 50.0% (6) - - - - - - 8 50.0%
Total joint
ventures
988 12 373 (18) (115) - - 73 1,313
Millions of euro % held Impact
on profit
or loss
Change in the
consolidation
scope
Dividends Reclassification
to discontinued
operations
Reclassifications
from/to assets
held for sale
Impairment Other
changes
% held
at
Dec. 31, 2022
at
Dec. 31, 2023
Associates
CESI 58 42.7% (2) - - - - - - 56 42.7%
GNL Chile SA 14 33.3% 7 - - - - - (1) 20 33.3%
Energías
Especiales del
Bierzo
12 50.0% 1 - (2) - - - (1) 10 50.0%
Gorona del
Viento El Hierro
SA
13 23.2% (6) - - - - - - 7 23.2%
Compañía Eólica
Tierras Altas
7 37.5% 1 - (1) - - - - 7 37.5%
Sociedad Eólica
El Puntal
4 50.0% 1 - (2) - - - 2 5 50.0%
Renovables
Brovales 400 kV
- - - - - - - 5 5 64.2%
Cogenio Iberia 5 20.0% - - - - - - 1 6 20.0%
Cogenio Srl 9 20.0% - - - - - - (1) 8 20.0%
Avikiran Solar
India
- (1) 29 - - - - (1) 27 51.0%
Avikiran Surya
India
27 51.1% (1) - - - - - (2) 24 51.0%
EGPNA
Renewable
Energy Partners
77 10.0% 2 - - - - - (15) 64 10.0%
Rocky Caney
Holding
22 10.0% 2 - - - - - (4) 20 10.0%
Other minor 45 (57) 8 (2) - (1) - 85 78
Total associates 293 (53) 37 (7) - (1) - 68 337
TOTAL 1,281 (41) 410 (25) (115) (1) - 141 1,650

The increase in equity accounted investments in 2023 mainly reflected:

  • changes in the consolidation scope, mainly regarding:
    • the recognition of the interest in the joint ventures of Enel Green Power Australia (€142 million), following the sale, to INPEX Corporation, of a 50% stake in those companies, previously wholly owned and classified as held for sale;
    • the recognition of the interest in the joint venture Enel Green Power Hellas (€246 million), following the sale, to Macquarie Asset Management, of a 50% stake in the company, previously controlled by the Enel Group;
    • the recognition of the interest in the associate Avikiran Solar India Private Limited (€ 29 million) following the sale to Norfund of 49% of the company, with loss of control;
    • the recognition of the negative price adjustment of the investment in the joint venture holding the companies of the Matimba project (€15 million);

• the recognition of the Group's share in changes in the OCI reserves (€98 million) mainly in respect of Slovak Power Holding and attributable to developments in the fair value of cash flow hedge derivatives of the company.

These positive effects were mainly offset by the reclassification under discontinued operations of the entire investment in Rusenergosbyt (€115 million), which was then sold in 2023, as well as dividends distributed in the year in the amount of €25 million, mainly by Spanish companies, and adverse exchange rate developments.

The following tables provide a summary of financial information for the main joint ventures and associates of the Group not classified as held for sale in accordance with IFRS 5.

at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022
170 94 132 192 302 286
894 880 487 449 1,381 1,329
12,468 12,376 1,470 1,444 13,938 13,820
428 - 73 - 501 -
Enel Green Power Hellas
687
- 109 - 796 -
1,583 1,759 320 348 1,903 2,107
40 40 39 - 79 40
179 191 13 25 192 216
148 - 6 - 154 -
200 207 63 30 263 237
Non-current assets Current assets Total assets
Millions of euro Total revenue Pre-tax profit/(loss) Profit/(Loss) from continuing
operations
2023 2022 2023 2022 2023 2022
Joint ventures
Gridspertise Srl 418 334 23 12 17 8
Mooney Group SpA 435 224 (70) (33) (70) (33)
Slovak Power Holding 5,129 5,184 856 (320) 598 (223)
Enel Green Power
Australia
37 - (28) - (28) -
Enel Green Power Hellas 127 - 25 - 17 -
Matimba project
companies
148 114 (8) (39) (2) (24)
Ewiva Srl - - (6) (4) (6) (4)
Associates
CESI 164 155 (5) (4) (5) (1)
Avikiran Solar India 15 - (6) - (6) -
Avikiran Surya India 18 9 (3) 1 (3) 1
i (1 EMAKKE
tements R
CERTIFIED
Equity
at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022
95
(402)
(332)
Total liabilities Current liabilities Non-current liabilities
207 207 198 158 9 49
1,661 1,783 575 649 1,086 1,134
4,702
2,250
11,570 9,236 6,620 1,393 4,950 7,843
-
165
336 - 21 - 315
-
(42)
838 - 166 - 672
191 1,856 1,712 93 113 1,763 1,599
-
79
- - - - -
99 114 93 90 73 24 20
-
53
101 - 14 - 87
103 126 160 9 48 117 112

Millions of euro Total revenue Pre-tax profit/(loss)

Profit/(Loss) from continuing operations

2023 2022 2023 2022 2023 2022

Gridspertise Srl 418 334 23 12 17 8 Mooney Group SpA 435 224 (70) (33) (70) (33) Slovak Power Holding 5,129 5,184 856 (320) 598 (223)

Australia 37 - (28) - (28) - Enel Green Power Hellas 127 - 25 - 17 -

companies 148 114 (8) (39) (2) (24) Ewiva Srl - - (6) (4) (6) (4)

CESI 164 155 (5) (4) (5) (1) Avikiran Solar India 15 - (6) - (6) - Avikiran Surya India 18 9 (3) 1 (3) 1

Joint ventures

Enel Green Power

Matimba project

Associates

27. Derivatives

Millions of euro Non-current Current
at
Dec. 31, 2023
at
Dec. 31, 2022
at
Dec. 31, 2023
at
Dec. 31, 2022
Derivative financial assets 2,383 3,970 6,407 14,830
Derivative financial liabilities 3,373 5,895 6,461 16,141

For more information on derivatives qualifying has hedging instruments and measured at FVTPL, please see note 51 "Derivatives and hedge accounting".

28. Current/Non-current contract assets/(liabilities)

Millions of euro Non-current
Current
at
Dec. 31, 2023
at
Dec. 31, 2022
at
Dec. 31, 2023
at
Dec. 31, 2022
Contract assets 444 508 212 106
Contract liabilities 5,743 5,747 2,126 1,775

Non-current assets deriving from contracts with customers (contract assets) refer mainly to assets with long-term utility under construction in respect of public-to-private service concession arrangements recognized in accordance with IFRIC 12 (€425 million). These cases arise when the concession holder has not yet obtained full right to recognize the asset from the grantor, in that there remains a contractual obligation to ensure that the asset is completed and can be remunerated through rates. The figure at December 31, 2023 includes investments for the year in the amount of €795 million.

Current contract assets mainly concern construction contracts in progress (€167 million) to be invoiced, payments on which are subject to the fulfillment of a performance obligation.

The value at December 31, 2023 of non-current contract liabilities is mainly attributable to distribution operations in Italy (€3,014 million) and Spain (€2,729 million) as a result of the accounting treatment of revenue from connections of new customers, which are deferred over the average duration of the associated contracts.

Current contract liabilities include the contractual liabilities related to revenue from connections to the electricity grid expiring within 12 months in the amount of €1,628 million mainly recognized in Italy and Spain, as well as liabilities for construction contracts in progress (€453 million).

As required under IFRS 15, the following table reports the reversal to profit or loss of contract liabilities by time band.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Within 1 year 2,126 1,775
Within 2 years 568 516
Within 3 years 567 517
Within 4 years 565 516
Within 5 years 564 515
More than 5 years 3,479 3,683
Total 7,869 7,522

29. Other non-current financial assets – €8,750 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Equity investments in other companies measured at fair value 346 366 (20) -5.5%
Other non-current financial assets included in net financial debt
(see note 29.1)
3,837 4,213 (376) -8.9%
Service concession arrangements 4,391 3,732 659 17.7%
Financial assets in respect of joint development agreements (JDA) 133 - 133 -
Non-current financial prepayments 43 48 (5) -10.4%
Total 8,750 8,359 391 4.7%

"Other non-current financial assets" increased by €391 million reflecting:

  • the increase in financial assets in respect of service concession arrangements, mainly in Brazil;
  • the recognition of financial assets in respect of joint development agreements (JDA) in relation to amounts paid by a number of the Group's Italian renewables companies to developers for the development of renewable generation projects; in 2022 those assets were recognized under other non-current assets in the amount of €100 million.

These positive effects were partly offset mainly by the decrease in other non-current financial assets included in net financial debt, as specified in note 29.1, and the decrease in equity investments in other companies following the disposal of the investment in Athonet Srl and the reduction in the value of the investments in Termoeléctrica José de San Martín SA and Termoeléctrica Manuel Belgrano SA.

The following is a breakdown of equity investments in other companies measured at fair value.

Millions of euro
at Dec. 31, 2023 % held at Dec. 31, 2022 % held Change
Empresa Propietaria de la Red SA 8 11.1% 7 11.1% 1
European Energy Exchange AG 22 2.4% 22 2.4% -
Athonet Srl - - 7 16.0% (7)
Korea Line Corporation 1 0.3% 1 0.3% -
Hubject GmbH 11 12.5% 11 12.5% -
Termoeléctrica José de San Martín SA 3 5.6% 11 24.7% (8)
Termoeléctrica Manuel Belgrano SA 2 6.2% 9 8.6% (7)
Zacapa Topco Sàrl 287 19.5% 288 19.5% (1)
Other 12 10 2
Total 346 366 (20)

29.1 Other non-current financial assets included in net financial debt – €3,837 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Securities 505 447 58 13.0%
Other financial assets 3,332 3,766 (434) -11.5%
Total 3,837 4,213 (376) -8.9%

"Securities" at FVOCI are represented by financial instruments in which the Dutch insurance companies invest a portion of their liquidity.

The decrease in "other financial assets" is mainly attributable to a decrease in financial assets for security deposits (€634 million), mainly in the Endesa Group, partly offset in particular by the increase in financial assets relating to the deficit of the Spanish electricity system (€85 million) and medium- and long-term financial assets (€79 million), mainly in Enel Finance International and Enel Américas.

30. Other current financial assets – €4,329 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Current financial assets included in net financial debt (see note 30.1) 4,148 13,501 (9,353) -69.3%
Other 181 252 (71) -28.2%
Total 4,329 13,753 (9,424) -68.5%

"Other current financial assets" decreased by €9,424 million, mainly reflecting the decrease in current financial assets included in net financial debt, as detailed in note 30.1, and the decrease in accrued financial income.

30.1 Other current financial assets included in net financial debt – €4,148 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Current portion of long-term financial assets 1,007 2,838 (1,831) -64.5%
Securities at FVOCI 81 78 3 3.8%
Cash collateral and other financial assets in respect of derivatives
transactions
2,899 8,319 (5,420) -65.2%
Other 161 2,266 (2,105) -92.9%
Total 4,148 13,501 (9,353) -69.3%

The change in the item is mainly attributable to:

  • €5,420 million in respect of a decrease in cash collateral paid to counterparties for derivatives transactions;
  • a decrease in "other", mainly reflecting the decrease in financial assets of:
    • Enel Brasil (€1,212 million), mainly in respect of the recognition in 2022 of the receivables connected to the sale of Celg Distribuição SA - Celg-D (Enel Goiás);
  • Enel X Italia (€581 million), mainly reflecting the collection of financial assets in respect of the assignment of tax credits for building renovations under the "eco-sisma bonus" program in 2022;
  • the decrease in the current portion of long-term financial assets (€1,831 million), mainly due to a decrease in financial assets relating to the deficit of the Spanish electricity system.

31. Other non-current assets – €2,249 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Amounts due from institutional market operators 331 282 49 17.4%
Net assets of personnel programs 42 8 34 -
Tax assets > 12 months 1,487 1,674 (187) -11.2%
Operating security deposits >12 months 306 301 5 1.7%
Other 83 221 (138) -62.4%
Total 2,249 2,486 (237) -9.5%

Amounts due from institutional market operators increased by €49 million on 2022, mainly in Spain in respect of distribution activities.

Tax assets decreased by €187 million, mainly in Brazil in connection with the PIS/COFINS tax dispute (€338 million), partly offset by an increase in tax assets in Italy and Chile.

32. Other current assets – €4,099 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Amounts due from institutional market operators 1,161 1,033 128 12.4%
Advances to suppliers 311 332 (21) -6.3%
Amounts due from employees 28 30 (2) -6.7%
Non-monetary grants to be received for environmental certificates 24 16 8 50.0%
Amounts due from others 1,068 1,040 28 2.7%
Sundry tax assets 1,311 1,598 (287) -18.0%
Current accrued income and prepayments 196 265 (69) -26.0%
Total 4,099 4,314 (215) -5.0%

Amounts due from institutional market operators mainly include amounts due in respect of the Italian system in the amount of €700 million (€617 million at December 31, 2022) and the Spanish system in the amount of €422 million (€388 million at December 31, 2022).

The increase was essentially attributable to the increase in amounts receivable in Italy in respect of the Energy and Environmental Services Fund, mainly held by e-distribuzione (€390 million) and Servizio Elettrico Nazionale (€252 million), primarily connected with equalization mechanisms.

The decrease of €287 million in sundry tax assets is mainly attributable to a decrease in credits for indirect taxes and duties recognized by the Parent Company Enel SpA (€274 million) in Italy (€18 million) and Latin America (€108 million), partially offset by an increase in such items in Spain (€146 million) and North America (€58 million).

33. Inventories – €4,290 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Raw and ancillary materials, and consumables:
- fuels 1,598 2,396 (798) -33.3%
- materials, equipment and other inventories 2,000 2,137 (137) -6.4%
Total 3,598 4,533 (935) -20.6%
Environmental certificates:
- CO2
emissions allowances
514 152 362 -
- guarantees of origin 39 18 21 -
- energy efficiency certificates - 6 (6) -
- other environmental certificates 6 - 6
Total 559 176 383 -
Buildings held for sale 45 47 (2) -4.3%
Payments on account 88 97 (9) -9.3%
TOTAL 4,290 4,853 (563) -11.6%

Raw and ancillary materials, and consumables consist of materials and equipment used to operate, maintain, and construct power plants and distribution networks, as well as fuel inventories to cover the Group's requirements for generation and trading activities.

The overall decrease in inventories in 2023 (€563 million) is mainly attributable to a decrease in inventories of fuel and materials, devices and other inventories recorded in Italy (€537 million, of which €166 million in respect of writedowns of coal and other materials), Spain (€363 million) and Latin America (€35 million), notably gas inventories to meet the needs of the Group, partially offset by the increase in CO2 emissions allowances in Italy.

34. Trade receivables – €17,773 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Customers:
- electricity sales and transport 11,133 10,216 917 9.0%
- distribution and sale of gas 2,811 3,026 (215) -7.1%
- other assets 3,646 3,118 528 16.9%
Total trade receivables due from customers 17,590 16,360 1,230 7.5%
Trade receivables due from associates and joint ventures 183 245 (62) -25.3%
TOTAL 17,773 16,605 1,168 7.0%

Trade receivables due from customers are recognized net of loss allowances, which totaled €3,775 million at the end of the year, compared with a balance of €3,783 million at the end of the previous year.

Specifically, the increase in 2023, totaling €1,168 million, is attributable to an increase in receivables for electricity sale and transport recognized in the year.

The change was mainly recognized in Italy (€1,810 million), partially offset by the decrease recognized in Spain (€230 million) and Latin America (€231 million).

For more information on trade receivables, please see note 48 "Financial instruments by category".

35. Cash and cash equivalents – €6,801 million

Cash and cash equivalents, detailed in the following table, decreased by €4,240 million, mainly in Italy and North America, partially offset by an increase in Spain.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Bank and postal deposits 4,664 8,968 (4,304) -48.0%
Cash and cash equivalents on hand 23 35 (12) -34.3%
Other investments of liquidity 2,114 2,038 76 3.7%
Total 6,801 11,041 (4,240) -38.4%

36. Assets and liabilities included in disposal groups classified as held for sale – €5,919 million and €2,316 million

Changes in assets held for sale in 2023 break down as follows.

Millions of euro Reclassification
from/to current
and non
current assets
Disposals and
change in the
consolidation
scope
Impairment Exchange differences Investments Other
changes
at
Dec. 31, 2022
at
Dec. 31, 2023
Property, plant and equipment 3,304 3,574 (3,440) (263) (59) 820 (228) 3,708
Intangible assets 334 719 (328) 16 (14) 29 (41) 715
Goodwill - 616 (46) (1) 3 - - 572
Deferred tax assets(1) 217 146 (88) - (56) - (23) 196
Equity-accounted investments 27 116 (142) - - - - 1
Other non-current assets(2) 50 37 (222) - - - 170 35
Non-current financial assets
and securities(2)
75 - (29) - (45) - (1) -
Non-current financial assets 138 - (85) - (3) - (50) -
Current financial assets and
securities
43 1 (20) - (32) - 9 1
Other current financial assets 9 2 (11) - - - - -
Cash and cash equivalents 425 259 (320) - (40) - (63) 261
Inventories, trade receivables
and other current assets
1,533 351 (1,479) - 29 - (4) 430
Total(1) 6,155 5,821 (6,210) (248) (217) 849 (231) 5,919

(1) The figures at December 31, 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

(2) At December 31, 2022, "Other non-current assets" included the "Non-current financial assets and securities" reported separately in the table above.

Developments in liabilities break down as follows.

Millions of euro Reclassification
from/to current
and non-current
liabilities
Disposals and
change in the
consolidation
scope
Exchange
differences
Other
changes
at
Dec. 31, 2022
at
Dec. 31, 2023
Long-term borrowings 775 663 (908) (49) 249 730
Provisions for risks and charges, non-current portion 33 33 (34) - 4 36
Deferred tax liabilities(1) 246 563 (192) (70) (42) 505
Post-employment and other employee benefits 23 4 (22) (3) 3 5
Non-current financial liabilities 69 - (80) (2) 23 10
Non-current contract liabilities 442 - (453) - 11 -
Other non-current liabilities 179 19 (149) (8) 13 54
Short-term borrowings 642 217 (189) (10) (384) 276
Long-term borrowings, current portion 18 100 (9) (5) 41 145
Provisions for risks and charges, current portion 33 10 (64) (2) 32 9
Other current financial liabilities 12 8 (17) - 6 9
Trade payables and other current liabilities 894 385 (705) 11 (48) 537
Total(1) 3,366 2,002 (2,822) (138) (92) 2,316

(1) The figures at December 31, 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

The item essentially includes assets measured at the lower of cost, understood as their net carrying amount, and the estimated realizable value, which, due to management decisions, meet the requirements of "IFRS 5 - Non-current Assets Held for Sale and Discontinued Operations" for their classification in this item.

The balances of assets held for sale and associated liabilities at December 31, 2023 came to, respectively, €5,919 million and €2,316 million and mainly refer to:

  • 3SUN in Italy: on the basis of the negotiations finalized to the disposal of a 50% stake in the social capital of 3SUN Srl, its net assets have been reclassified as "Non-current assets held for sale and discontinued operations", in line with IFRS 5;
  • North America: assets relating to a renewable portfolio in the United States including about 150 MW of operational geothermal and solar plants;
  • Peru: the electricity distribution and supply assets held by Enel Distribución Perú SAA, the advanced energy services assets of Enel X Perú SAC and the generation assets held by Enel Generación Perú, Compañía Energética Veracruz and Enel Generación Piura as, on the basis of the negotiations in place, the requirements set by IFRS 5 have been met;
  • Colombia: the Windpeshi wind farm under construction, which based on negotiations under way satisfies the requirements of IFRS 5.

Assets previously classified as held for sale disposed of in 2023 include:

  • in the 1st Half of 2023, Enel Generación Costanera, Inversora Dock Sud and Central Dock Sud generation companies were sold in Argentina; Enel Green Power India relinquished control of the net assets held through Avikiran Solar India Private Limited while maintaining a residual interest in the company of 51% of the paid-up share capital;
  • in the 3rd Quarter of 2023, the subsidiary Enel Green Power SpA sold 50% of the two companies holding all of the Group renewable assets in Australia, specifically Enel Green Power Australia (Pty) Ltd and Enel Green Power Australia Trust, to INPEX Corporation;
  • during the 4th Quarter of 2023, the Enel Group completed through the subsidiary Endesa Generación SAU the sale of the entire stake held in Tecnatom SA.

For more information on the financial effects of the above transactions, please see note 9 "Main acquisitions and disposals during the year".

Several assets previously classified as discontinued operations were disposed of in 2023. In particular, in the 4th Quarter the Group completed the sale of all the stakes held in Romania. Finally, the sale of a 50% stake in Enel Green Power Hellas was finalized.

For more information on the financial effects of the above transactions, please see note 7 "Discontinued operations" and note 9 "Main acquisitions and disposals during the year".

37. Equity – €45,109 million

37.1 Equity attributable to owners of the Parent – €31,755 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Share capital 10,167 10,167 -
Treasury share reserve (59) (47) (12)
Other reserves 6,551 2,740 3,811
Share premium reserve 7,496 7,496 -
Reserve for equity instruments - perpetual hybrid bonds 6,553 5,567 986
Legal reserve 2,034 2,034 -
Other reserves 2,341 2,332 9
Translation reserve (5,289) (5,912) 623
Hedging reserve (1,393) (3,553) 2,160
Hedging costs reserve (38) (81) 43
Reserve from measurement of financial instruments at FVOCI 10 (22) 32
Reserve from equity-accounted investments (375) (476) 101
Actuarial reserve (1,185) (1,063) (122)
Reserve from disposal of equity interests without loss of control (2,390) (2,390) -
Reserve from acquisitions of non-controlling interests (1,213) (1,192) (21)
Retained earnings(1) 15,096 15,795 (699)
Equity attributable to owners of the Parent(1) 31,755 28,655 3,100

(1) The figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

Share capital – €10,167 million

At December 31, 2023 the fully subscribed and paid-up share capital of Enel SpA totaled €10,166,679,946, represented by the same number of ordinary shares with a par value of €1.00 each. Enel SpA's share capital was unchanged compared with the amount reported at December 31, 2022.

At December 31, 2023, based on the shareholders register and the notices submitted to CONSOB and received by the Parent pursuant to Article 120 of Legislative Decree 58 of February 24, 1998, as well as other available information, shareholders with interests of greater than 3% in the Parent's share capital were the Ministry for the Economy and Finance (with a 23.585% stake) and BlackRock Inc. (with a 5.023% stake held for asset management purposes).

Treasury share reserve – €(59) million

At December 31, 2023, treasury shares are represented by 9,262,330 ordinary shares of Enel SpA with a par value of €1.00 each (7,153,795 at December 31, 2022), purchased through an authorized intermediary for a total of €59 million.

Other reserves – €6,551 million

Share premium reserve – €7,496 million

Pursuant to Article 2431 of the Italian Civil Code, the share premium reserve contains, in the case of the issue of shares at a price above par, the difference between the issue price of the shares and their par value, including those resulting from conversion from bonds. The reserve, which is a capital reserve, may not be distributed until the legal reserve has reached the threshold established under Article 2430 of the Italian Civil Code.

Reserve for equity instruments - perpetual hybrid bonds – €6,553 million

This reserve reports the nominal value, net of transaction costs, of the non-convertible subordinated perpetual hybrid bonds denominated in euros for international investors.

The change of €986 million in the reserve reflects the issue of new bonds in the amount of €1,738 million, net of transaction costs, partly offset by the repurchase and subsequent cancellation of previous bonds in the amount of €752 million, including transaction costs.

In 2023, coupons of €182 million were paid to holders of perpetual hybrid bonds.

Legal reserve – €2,034 million

The legal reserve is formed as allocation of part of the net income that, pursuant to Article 2430 of the Italian Civil Code, cannot be distributed as dividends.

Other reserves – €2,341 million

These include €2,215 million related to the remaining portion of the value adjustments carried out when Enel was transformed from a public entity to a joint-stock company. Pursuant to Article 47 of the Uniform Income Tax Code, this amount does not constitute taxable income when distributed.

Translation reserve – €(5,289) million

The increase of €623 million in the period was mainly due to the change in the consolidation scope connected with stakes held in Romania, Inversora Dock Sud and Central Dock Sud and Enel Generación Costanera, as well as the net depreciation of the functional currencies used by foreign subsidiaries, mainly in Chile and the United States, against the euro (presentation currency of the Parent).

Hedging reserve – €(1,393) million

This includes the net expense recognized in equity from the measurement of hedging derivatives. The change in the period is mainly attributable to developments in commodity prices.

Hedging costs reserve – €(38) million

In application of IFRS 9, this reserve includes the fair value gains and losses on currency basis points and forward points. The change in 2023 is mainly attributable to developments in commodity prices.

Reserve from measurement of financial instruments at FVOCI – €10 million

This includes net unrealized fair value losses on financial assets.

Reserve from equity-accounted investments – €(375) million

The reserve reports the share of comprehensive income to be recognized directly in equity of equity-accounted investees. The change in 2023 is mainly attributable to the change in the hedging reserve of Slovak Power Holding.

Actuarial reserve – €(1,185) million

This reserve includes actuarial gains and losses in respect of employee benefit liabilities, net of tax effects.

Reserve from disposal of equity interests without loss of control – €(2,390) million

This item mainly reports:

  • the gain posted on the public offering of Enel Green Power shares, net of expenses associated with the disposal and the related taxation;
  • the sale of non-controlling interests recognized as a result of the Enersis (now Enel Américas and Enel Chile) capital increase;

  • the capital loss, net of expenses associated with the disposal and the related taxation, from the public offering of 21.92% of Endesa;
  • the disposal to third parties of the non-controlling interest in Enel Green Power North America Renewable Energy Partners;
  • the effects of the merger into Enel Américas of Endesa Américas and Chilectra Américas;
  • the effects of the disposal of a 49% stake held by Enel Green Power Canada in Pincher Creek LP and Riverview LP.

Reserve from acquisitions of non-controlling interests – €(1,213) million

This reserve mainly includes the surplus of acquisition prices with respect to the carrying amount of the equity acquired following the acquisition from third parties of further interests in companies already controlled in Latin America.

The change for the year (-€21 million) mainly reflects the effects of the merger of Enel Green Power Perú, Energética Monzón and Empresa de Generación Eléctrica Los Pinos (merged entities) into Enel Generación Perú (acquiring entity), changing the interest held by the Group in those companies.

Retained earnings – €15,096 million

This reserve reports earnings from previous years that have not been distributed or allocated to other reserves. The table below shows the changes in gains and losses recognized directly in other comprehensive income, including non-controlling interests, with specific reporting of the related tax effects.

Millions of euro
at Dec. 31, 2022 Changes at Dec. 31, 2023
Total Of
which
owners
of the
Parent
Of which
non
controlling
interests
Gains/
(Losses)
recognized
in equity
during the
year
Released
to profit
or loss
Taxes Total Of
which
owners
of the
Parent
Of which
non
controlling
interests
Total Of
which
owners
of the
Parent
Of which
non
controlling
interests
Translation
reserve
(10,900) (5,424) (5,476) (504) - - (504) (415) (89) (11,404) (5,839) (5,565)
Hedging reserve (4,656) (3,573) (1,083) 1,146 2,512 (947) 2,711 2,111 600 (1,945) (1,462) (483)
Hedging costs
reserve
(111) (91) (20) 75 (16) (10) 49 43 6 (62) (48) (14)
Reserve from
measurement
of financial
instruments at
FVOCI
(33) (32) (1) 12 - (1) 11 15 (4) (22) (17) (5)
Share of OCI
of equity
accounted
associates
(586) (601) 15 92 - 6 98 97 1 (488) (504) 16
Reserve from
measurement
of equity
investments
in other
companies
(19) (19) - 3 - - 3 3 - (16) (16) -
Actuarial reserve (1,474) (1,016) (458) (217) - 66 (151) (120) (31) (1,625) (1,136) (489)
Total gains/
(losses)
recognized in
equity
(17,779) (10,756) (7,023) 607 2,496 (886) 2,217 1,734 483 (15,562) (9,022) (6,540)

37.2 Dividends

Amount distributed
(millions of euro)
Dividend per share (euro)
Dividends distributed in 2022
Dividends for 2021 3,861 0.38
Interim dividends for 2022(1) - -
Special dividends - -
Total dividends distributed in 2022 3,861 0.38
Dividends distributed in 2023
Dividends for 2022 4,064 0.40
Interim dividends for 2023(2) - -
Special dividends - -
Total dividends distributed in 2023 4,064 0.40

(1) Approved by the Board of Directors on November 3, 2022 and paid as from January 25, 2023 (interim dividend of €0.20 per share for a total of €2,033

million). (2) Approved by the Board of Directors on November 7, 2023 and paid as from January 24, 2024 (interim dividend of €0.215 per share for a total of €2,186 million).

Dividends distributed are shown net of amounts due to treasury shares at the respective "record dates". These shares were waived for collection and allocated to "retained earnings".

The dividend for 2023, is equal to €0.43 per share, for a total of €4,372 million (of which €0.215 per share for a total of €2,186 million already paid as an interim dividend). It will be proposed to the Shareholders' Meeting of May 23, 2024 at single call.

These consolidated financial statements do not take account of the effects of the distribution to shareholders of the dividend for 2023, except for the liability in respect of shareholders for the interim dividend for 2023, which was approved by the Board of Directors on November 7, 2023 for a potential maximum of €2,186 million, and paid as from January 24, 2024 net of the portion pertaining to the 10,085,106 treasury shares held as at the record date of January 23, 2024.

In 2023 the Group also paid €182 million in coupons to holders of perpetual hybrid bonds.

Capital management

The Group's objectives for managing capital comprise safeguarding the business as a going concern, creating value for stakeholders and supporting the development of the Group. In particular, the Group seeks to maintain an adequate capitalization that enables it to achieve a satisfactory return for shareholders and ensure access to external sources of financing, in part by maintaining an adequate rating.

In this context, the Group manages its capital structure and adjusts that structure when changes in economic conditions so require. There were no substantive changes in objectives, policies or processes in 2023.

To this end, the Group constantly monitors developments in the level of its debt in relation to equity. The situation at December 31, 2023 and 2022 is summarized in the following table.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Non-current financial debt 61,093 68,191 (7,098)
Net current financial position 2,907 (3,315) 6,222
Non-current financial assets and long-term securities (3,837) (4,213) 376
Net financial debt(1) 60,163 60,663 (500)
Equity attributable to owners of the Parent 31,755 28,655 3,100
Non-controlling interests 13,354 13,425 (71)
Equity(2) 45,109 42,080 3,029
Debt/equity ratio 1.33 1.44 (0.11)

(1) In order to facilitate analysis of developments in Group net financial debt, thereby ensuring greater comparability over time, management has decided to exclude the fair value of the cash flow hedge and fair value hedge derivatives used to hedge the exchange rate risk on loans. Accordingly, in order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022.

(2) The figures for 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

The decrease in the debt/equity ratio, which measures financial leverage, is essentially attributable to the increase in equity as a result of profit for the year, the increase in reserves from the measurement of cash flow hedge derivatives and the change in the scope of the reserve for the translation of financial statements in foreign currency, only

37.3 Non-controlling interests – €13,354 million

The following table presents the composition of non-controlling interests by geographical area.

partly offset by dividend distributions. The reduction in net financial debt further contributed to the decline.

See note 47 for a breakdown of the individual items in the table.

Millions of euro Non-controlling interests Profit for the year attributable to non
controlling interests
at Dec. 31, 2023
at Dec. 31, 2022
at Dec. 31, 2023 at Dec. 31, 2022
Italy - 1 - -
Iberia 5,470 5,321 192 713
Latin America 7,665 7,422 666 857
Europe - 328 3 (342)
North America 151 218 (39) 10
Africa, Asia and Oceania 68 135 7 -
Total 13,354 13,425 829 1,238

The change in non-controlling interests mainly reflects the effect of the dividends distributed and the disposal of equity stakes in Romania. These effects were offset by the results for the period, the impact of hyperinflation and the value adjustment of cash flow hedge instruments.

sidiaries with significant non-controlling interests are reported below.

The figures at December 31, 2022 have been adjusted to take account of the effects of the Amendment to IAS 12, which took effect for annual reporting periods beginning on or after January 1, 2023. For more information, please see note 8 "Restatement of comparative disclosures".

The financial disclosure requirements of IFRS 12 for sub-

Millions of euro Non-current assets Current assets Total assets
at Dec. 31, 2023
at Dec. 31, 2022
at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2022
Subsidiaries
Enel Américas 27,578 29,635 8,459 5,430 36,037 35,065
Enel Chile 10,810 11,094 1,722 1,541 12,532 12,635
Endesa 43,701 45,125 4,033 11,166 47,734 56,291
Millions of euro Non-current
liabilities
Current liabilities
Total liabilities
Equity Parent Equity attributable
to owners of the
Non-controlling
interests
at Dec.
31, 2023
at Dec.
31, 2022
at Dec.
31, 2023
at Dec.
31, 2022
at Dec.
31, 2023
at Dec.
31, 2022
at Dec.
31, 2023
at Dec.
31, 2022
at Dec.
31, 2023
at Dec.
31, 2022
at Dec.
31, 2023
at Dec.
31, 2022
Subsidiaries
Enel Américas 10,466 11,569 7,314 6,208 17,780 17,777 18,257 17,288 12,936 12,136 5,321 5,152
Enel Chile 3,706 4,222 2,730 2,460 6,436 6,682 6,096 5,953 3,753 3,683 2,343 2,270
Endesa 16,018 18,523 10,045 17,372 26,063 35,895 21,671 20,396 16,202 15,081 5,469 5,315

Millions of euro Total revenue
Pre-tax profit
Profit from
continuing
operations
Profit attributable to
owners of the Parent
Profit attributable
to non-controlling
interests
2023 2022 2023 2022 2023 2022 2023 2022 2023 2022
Subsidiaries
Enel Américas 13,400 14,696 1,639 1,015 877 221 504 (90) 373 311
Enel Chile 4,678 6,450 996 1,971 748 1,458 456 913 292 545
Endesa 25,423 32,714 839 3,055 595 2,244 402 1,534 193 710

38. Borrowings

Millions of euro Non-current Current
at
Dec. 31, 2023
at
Dec. 31, 2022
at
Dec. 31, 2023
at
Dec. 31, 2022
Long-term borrowings 61,085 68,191 9,086 2,835
Short-term borrowings - - 4,769 18,392
Total 61,085 68,191 13,855 21,227

For more information on the nature of borrowings, please see note 48.2 "Financial liabilities by category".

39. Employee benefits – €2,320 million

The Group provides its employees with a variety of benefits, including deferred compensation benefits, additional months' pay for having reached age limits or eligibility for old-age pension, loyalty bonuses for achievement of seniority milestones, supplemental retirement and healthcare plans, residential electricity discounts and similar benefits. More specifically:

• for Italy, the item "pension benefits" regards estimated accruals made to cover benefits due under the supplemental retirement schemes of retired executives and the benefits due to personnel under law or contract at the time the employment relationship is terminated. For the foreign companies, the item refers to post-employment benefits, of which the most material regard the pension benefit schemes of Endesa in Spain, which break down into three types that differ on the basis of employee seniority and company. In general, under the framework agreement of October 25, 2000, employees participate in a specific defined contribution pension plan and, in cases of disability or death of employees in service, a defined benefit plan which is covered by appropriate insurance policies. In addition, the group has two other limited-enrollment plans (i) for current and retired Endesa employees covered by the electricity industry collective bargaining agreement prior to the changes introduced with the framework agreement noted earlier and (ii) for employees of the Catalan companies merged in the past (Fecsa/Enher/HidroEmpordà). Both are defined benefit plans and benefits are fully insured, with the exception of the former plan for benefits in the event of the death of a retired employee. Finally, the Brazilian companies have also established defined benefit plans;

  • the item "electricity discount" comprises benefits regarding electricity supply associated in particular with foreign companies;
  • the item "health insurance" refers to benefits for current or retired employees covering medical expenses;
  • the item "other benefits" mainly regards the loyalty bonus, which is adopted in various countries and for Italy is represented by the estimated liability for the benefit entitling employees covered by the electricity workers national collective bargaining agreement to a bonus for achievement of seniority milestones (25th and 35th year of service). It also includes other incentive plans, which provide for the award to certain Company managers of a monetary bonus subject to specified conditions.

The following table reports changes in the defined benefit obligation for post-employment and other long-term employee benefits at December 31, 2023, and December 31, 2022, respectively, as well as a reconciliation of that obligation with the actuarial liability.

Millions of euro 2023 2022
Pension
benefits
Electricity
discount
Health
insurance
Other
benefits
Total Pension
benefits
Electricity
discount
Health
insurance
Other
benefits
Total
CHANGES IN ACTUARIAL
OBLIGATION
Change in actuarial
obligation previous year
Actuarial obligation at the
start of the year
3,765 224 162 118 4,269 4,240 410 206 190 5,046
Current service cost 9 1 3 (1) 12 13 1 5 13 32
Interest expense 336 8 9 4 357 320 7 8 5 340
Actuarial (gains)/losses arising
from changes in demographic
assumptions
- - - 2 2 - - - - -
Actuarial (gains)/losses arising
from changes in financial
assumptions
224 8 6 3 241 (533) (93) (38) (18) (682)
Experience adjustments (43) (12) 6 1 (48) 119 (80) 8 1 48
Past service cost - - - - - (3) - - - (3)
(Gains)/Losses arising from
settlements
- - - - - (163) - - - (163)
Exchange differences 145 1 4 (4) 146 335 - 6 (1) 340
Employer contributions - - - - - - - - - -
Employee contributions - - - - - - - - - -
Benefits paid (393) (14) (14) (17) (438) (470) (15) (13) (44) (542)
Other changes - - - - - - - - (6) (6)
Reclassification to assets 41 - - - 41 8 - - - 8
Liabilities included in disposal
groups classified as held for
sale
1 - - (4) (3) (101) (6) (20) (22) (149)
Actuarial obligation at year
end (A)
4,085 216 176 102 4,579 3,765 224 162 118 4,269
CHANGES IN PLAN ASSETS
Fair value of plan assets at
the start of the year
2,124 - - - 2,124 2,348 - - - 2,348
Interest income 200 - - - 200 193 - - - 193
Expected return on plan
assets excluding amounts
included in interest income
(52) - - - (52) (184) - - - (184)
Exchange differences 89 - - - 89 213 - - - 213
Employer contributions 331 14 14 11 370 286 15 13 22 336
Employee contributions - - - - - - - - - -
Benefits paid (393) (14) (14) (11) (432) (470) (15) (13) (22) (520)
Other payments - - - - - (163) - - - (163)
Changes in the consolidation
scope
- - - - - (99) - - - (99)
Fair value of plan assets at
year-end (B)
2,299 - - - 2,299 2,124 - - - 2,124
EFFECT OF ASSET CEILING
Asset ceiling at the start of
the year
57 - - - 57 26 - - - 26
Interest income 6 - - - 6 2 - - - 2
Changes in asset ceiling (26) - - - (26) 27 - - - 27
Exchange differences 3 - - - 3 2 - - - 2
Changes in the consolidation
scope
- - - - - - - - - -
Asset ceiling at year-end (C) 40 - - - 40 57 - - - 57
Net liability in statement of
financial position (A-B+C)
1,826 216 176 102 2,320 1,698 224 162 118 2,202

The liability recognized came to €2,320 million, an increase of €118 million on 2022 mainly reflecting impairment losses recognized in reflection of a change in the financial assumptions following the general adverse developments in rates (discount and inflation rates). In addition to normal annual changes, in 2023, the actuarial liabilities of Enel Generación Perú SAA and Enel Distribución Perú SAA in Peru were reclassified as held for sale. Furthermore, the actuarial measurement of a plan of Asociación Nuclear Ascó-Vandellós II AIE, in Spain, showed a surplus with respect to the obligation assumed by the company, and was thus reclassified in a specific asset item of the balance sheet.

Millions of euro
2023 2022
(Gains)/Losses taken to profit or loss
Service cost and past service cost 17 22
Net interest expense 163 149
(Gains)/Losses arising from settlements - -
Actuarial (gains)/losses on other long-term benefits (5) 7
Other changes 5 (20)
Total 180 158
Millions of euro
2023 2022
Change in (gains)/losses in OCI
Expected return on plan assets excluding amounts included in interest
income
52 184
Actuarial (gains)/losses on defined benefit plans 190 (614)
Changes in asset ceiling excluding amounts included in interest income (26) 27
Other changes 1 -
Total 217 (403)

The change in the cost recognized in profit or loss was equal to €22 million. The impact on the income statement is, therefore, greater but essentially in line with 2022.

The liability recognized in the statement of financial position at the end of the year is reported net of the fair value of plan assets, amounting to €2,299 million at December 31, 2023. The item "actuarial (gains)/losses on defined benefit plans" shows an increase on 2022, following the decrease in interest rates, compared to the strong increase in 2022. Those assets, which are entirely in Spain and Brazil, break down as follows.

% 2023 2022
Investments quoted in active markets
Equity instruments 4 10
Fixed-income securities 73 66
Investment property 3 3
Other 20 21
Unquoted investments
Assets held by insurance undertakings - -
Other - -
Total 100 100

The main actuarial assumptions used to calculate the liabilities in respect of employee benefits and the plan assets, which are consistent with those used the previous year, are set out in the following table.

Italy Iberia Latin
America
Other
countries
Italy Iberia Latin
America
Other
countries
2023 2022
Discount rate 3.30%-3.40% 3.14%-3.47% 5.31%-10.09% 7.20% 3.60%-3.70% 3.57%-3.77% 5.40%-10.40% 3.75%-7.65%
Inflation rate 2.30% 2.57% 3.00%-7.58% 2.30% 2.78% 3.00%-8.00% 2.40%-3.50%
Rate of wage increases 2.30%-4.30% 2.57% 4.55%-10.00% 10.00% 2.30%-4.30% 2.78% 3.80%-8.49% 3.00%-10.00%
Rate of increase in
healthcare costs
3.30% 4.77% 7.63%-10.00% 3.30% 4.98% 7.12%-10.00% -
Expected rate of return on
plan assets
- 3.22%-3.31% 9.99%-10.09% - 3.76%-3.77% 10.40% 7.40%

The following table reports the outcome of a sensitivity analysis that demonstrates the effects on the defined benefit obligation of changes reasonably possible at the end of the year in the actuarial assumptions used in estimating the obligation.

Pension
benefits
Electricity
discount
Health
insurance
Other
benefits
Pension
benefits
Electricity
discount
Health
insurance
Other
benefits
at Dec. 31, 2023 at Dec. 31, 2022
Decrease of 0.5% in
discount rate
147 8 5 (6) 185 2 6 (17)
Increase of 0.5% in
discount rate
(188) (14) (9) (12) (118) (22) (9) (23)
Increase of 0.5% in inflation
rate
(49) (4) (9) (12) 16 (11) (8) (21)
Decrease of 0.5% in
inflation rate
(30) (4) 5 (6) 37 (10) 6 (16)
Increase of 0.5% in
remuneration
(28) (4) (19) 18 29 (10) (2) (17)
Increase of 0.5% in
pensions currently being
paid
(28) (4) (19) 11 28 (10) (2) (20)
Increase of 1% in
healthcare costs
- - (164) - - - (147) -
Increase of 1 year in life
expectancy of active and
retired employees
16 2 (15) 12 55 (9) 5 (17)

The sensitivity analysis used an approach that extrapolates the effect on the defined benefit obligation of reasonable changes in an individual actuarial assumption, leaving the other assumptions unchanged.

The contributions expected to be paid into defined benefit plans in the subsequent year amount to €243 million.

The following table reports expected benefit payments in the coming years for defined benefit plans.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Within 1 year 447 427
In 1-2 years 407 397
In 2-5 years 1,120 1,124
More than 5 years 1,739 1,826

40. Provisions for risks and charges – €7,312 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Non-current Current Total Non-current Current Total
Provision for litigation, risks and other
charges:
- nuclear decommissioning 571 - 571 581 - 581
- site retirement, removal and restoration 2,517 160 2,677 2,686 247 2,933
- litigation 663 39 702 652 51 703
- environmental certificates - 250 250 - 292 292
- taxes and duties 295 19 314 313 26 339
- other 1,053 425 1,478 803 316 1,119
Total 5,099 893 5,992 5,035 932 5,967
Provision for early retirement incentives and
other restructuring plans
154 128 282 231 192 423
Provision for restructuring programs
connected with the energy transition
765 273 1,038 789 201 990
TOTAL 6,018 1,294 7,312 6,055 1,325 7,380
Millions of euro Accrual Reversal Utilization Discounting Provisions
for site
retirement
and
restoration
Change in the
consolidation
scope
Exchange
differences
Other
changes
Reclassifications
of liabilities
included in
disposal groups
held for sale
at Dec.
31, 2022
at Dec.
31, 2023
Provision for
litigation, risks and
other charges:
- nuclear
decommissioning
581 - - - 17 (27) - - - - 571
- site retirement
removal and
restoration
2,933 47 (47) (161) - (15) - (10) (37) (33) 2,677
- litigation 703 188 (105) (118) 36 - - 6 - (8) 702
- environmental
certificates
292 241 - (313) - - - - 30 - 250
- taxes and duties 339 18 (19) (40) 6 - - 2 9 (1) 314
- other 1,119 519 (24) (151) 1 5 - (8) 18 (1) 1,478
Total 5,967 1,013 (195) (783) 60 (37) - (10) 20 (43) 5,992
Provision for
early retirement
incentives and other
restructuring plans
423 28 (11) (174) 18 - - - (2) - 282
Provision for
restructuring
programs connected
with the energy
transition
990 209 (6) (184) 35 - - - (6) - 1,038
TOTAL 7,380 1,250 (212) (1,141) 113 (37) - (10) 12 (43) 7,312

Nuclear decommissioning provision

At December 31, 2023 the provision reflected solely the costs that would be incurred at the time of decommissioning of nuclear plants by Enresa, a Spanish public entity responsible for such activities in accordance with Royal Decree 1349/2003 and Law 24/2005. In general, the costs are quantified on the basis of a standard contract between Enresa and the electricity companies approved by the Ministry for the Economy, which regulates the retirement and closing of nuclear power plants. The time horizon envisaged, three years, corresponds to the period from the termination of power generation to the transfer of plant management to Enresa (so-called post-operational costs) and takes account, among the various assumptions used to estimate the amount, of the quantity of unused nuclear fuel expected at the date of closure of each of the Spanish nuclear plants on the basis of the provisions of the concession agreement.

Site retirement, removal and restoration provision

This provision represents the present value of the estimated cost for the retirement and removal of non-nuclear plants where there is a legal or constructive obligation to do so. The provision mainly regarded the Endesa Group and Enel Produzione. The change in the provision in 2023 was mainly linked to the uses and releases of provisions set aside in previous years to deal with the decarbonization process, mainly in Italy, Spain and Chile.

The following table summarizes the temporal breakdown of payments connected with the site retirement, removal and restoration provision.

Millions of euro
Payments by time bracket
(nominal value)
Discounted amount
Within 1 year 276 258
In 1-5 years 1,147 1,045
More than 5 years 2,636 1,374
Total 4,059 2,677

Litigation provision

The litigation provision covers contingent liabilities in respect of pending litigation and other disputes. It includes an estimate of the potential liability relating to disputes that arose during the year, as well as revised estimates of the potential costs associated with disputes initiated in prior years, based on the indications of internal and external consultants. The balance for litigation mainly regards the companies in Latin America (€396 million), Spain (€158 million) and Italy (€116 million).

The amount is virtually unchanged compared with 2022, as the decrease associated with higher uses and releases in Brazil was offset by new accruals.

Provision for environmental certificates

The provision for environmental certificates covers costs in respect of shortfalls in the environmental certificates need for compliance with national or supranational environmental protection requirements and mainly regards Iberia (Endesa Energía and Endesa Generación SA).

Provision for taxes and duties

The provision for taxes and duties covers the estimated liability deriving from tax disputes concerning direct and indirect taxes.

The balance of the provision also includes the provision for current and potential disputes concerning local property tax (whether the Imposta Comunale sugli Immobili - ICI or the Imposta Municipale Unica - IMU) in Italy. In Italy, the Group has taken due account of developments in land registry regulations (which with effect from January 1, 2016 excluded machinery, devices, equipment and other plant specific to a production process from the calculation of the imputed rent for buildings classified in land registry group D, which includes generation plants) in estimating the liability for such taxes, both for the purposes of quantifying the probable risk associated with pending litigation and generating a reasonable valuation of probable future charges on positions that have not yet been assessed by the Revenue Agency and municipalities.

Other provisions

Other provisions cover various risks and charges, mainly in connection with regulatory disputes and disputes with local authorities regarding various duties and fees or other charges.

The increase of €342 million in other provisions is mainly attributable to Enel Reinsurance for accruals of provisions for insurance claims (€217 million) and provisions for regulatory measures, atmospheric events and faults.

Provision for early retirement incentives and other restructuring plans

The provision for early retirement incentives and other restructuring plans includes the estimated charges related to binding agreements for the voluntary termination of employment contracts in response to organizational needs. The reduction of €141 million for the year mainly reflects uses of provisions for incentives established in previous period in Spain and Italy to cover the early termination of employment for certain employees.

Provision for restructuring programs connected with the energy transition

Enel, in its role as a leader of the energy transition, has placed decarbonization and growth of renewables around the world at the center of its strategy.

In this context, Enel has begun restructuring the activities associated with the energy transition process, which involves thermal generation plants in all the geographical areas in which the Group operates. The consequent revision of processes and operating models will require changes in the roles and skills of employees, which the Group intends to implement with highly sustainable plans based on redeployment programs, with major upskilling and reskilling plans and voluntary individual early retirement

agreements. The energy transition is also based on the progressive and expansive development of digital tools, as digitization is essential to responding to multiple external forces and making informed and well-considered decisions at every level within the Group.

A provision was therefore established in 2020 for restructuring programs, which at December 31, 2023 amounted to €1,038 million, which is mainly attributable to Spain and Italy, and represents the estimated costs that the Group will incur following the acceleration of the energy transition, for all direct and indirect activities related to the review of processes and operating models and the roles and skills of employees. New accruals in 2023 mainly regard Spain following the adjustment of €177 million to the provision for the Acuerdo Voluntario de Salida (AVS) plan.

41. Other non-current financial liabilities – €8 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Other non-current financial liabilities 8 - 8 -
Total 8 - 8 -

The change in "other non-current financial liabilities" came to €8 million and regards the recognition of non-current financial liabilities in respect of the Spanish electrical system deficit, which were included in net financial debt.

42. Other non-current liabilities – €4,236 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Accrued operating expenses and deferred income 464 347 117 33.7%
Liabilities with equalization funds/market and energy services operators 307 205 102 49.8%
Liabilities for tax partnerships > 12 months 1,262 1,322 (60) -4.5%
Sundry non-current payments on account 348 - 348 -
Other items 1,855 2,372 (517) -21.8%
Total 4,236 4,246 (10) -0.2%

The change in "other items" reflected the decrease in "other liabilities" mainly relating to the outcome of the PIS/ COFINS dispute in Brazil (already discussed under "Other non-current assets") in the amount of €401 million. The item "sundry non-current payments on account" reports the collection by e-distribuzione of €348 million in respect of the 10% advance payment of the grant for 24 projects awarded NRRP subsidies.

43. Other current liabilities – €14,760 million

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Change
Amounts due to customers 1,882 2,094 (212) -10.1%
Amounts due to institutional market operators 5,479 2,115 3,364 -
Amounts due to employees 503 519 (16) -3.1%
Other tax liabilities 1,034 1,046 (12) -1.1%
Amounts due to social security institutions 235 215 20 9.3%
Current accrued expenses and deferred income 314 441 (127) -28.8%
Liabilities for closed energy commodity derivatives 437 285 152 53.3%
Dividends 2,470 2,228 242 10.9%
Liabilities for tax partnerships < 12 months 271 241 30 12.4%
Sundry current payments on account 144 201 (57) -28.4%
Other liabilities 1,991 2,328 (337) -14.5%
Total 14,760 11,713 3,047 26.0%

The change in "other current liabilities" mainly reflects:

  • the decrease in "amounts due to customers", which mainly reports the change in security deposits from customers in Italy in line with the decrease in the number of customers served by market companies, offset by the increase in trade receivables following the restoration of distribution system costs. In Italy, the item also includes the decrease in various sundry amounts due to customers, mainly for the amounts relating to VAT recovery on uncollected receivables, amounts available to customers and refunds to be made, on behalf of the distribution companies, to customers moved from the regulated market to the free market for exceeding rate limits in previous years. The decrease was offset by the increase, in the distribution segment, in amounts collected and in processing and in liabilities for indemnities;
  • the increase in "amounts due to institutional market

operators", mainly attributable to Italy, and in particular e-distribuzione SpA, for the progressive restoration, in 2023, of charges relating to the support of renewable energy and cogeneration, and of other charges (Asos and Arim components) determined in ARERA Resolutions nos. 735/2022, 134/2023, 297/2023 and 419/2023, and Spain, in particular Edistribución Redes Digitales, for an increase in amounts due to the local regulator Comisión Nacional de los Mercados y la Competencia (CNMC);

  • the increase in liabilities for "dividends" to be distributed to shareholders, essentially those of the Parent Company Enel SpA and the Spanish subsidiary Endesa SA;
  • the increase in liabilities in respect of derivatives to be settled on energy commodities in Italy;
  • the decrease in "other liabilities", mainly attributable to a decline in liabilities in Spain and Brazil.

More specifically, trade payables falling due in less than 12 months amounted to €15,487 million (€17,605 million at December 31, 2022) while those falling due in more than 12 months amounted to €334 million (€36 million at December 31, 2022).

The item amounted to €15,821 million (€17,641 million at

44. Trade payables – €15,821 million

December 31, 2022) and includes payables in respect of electricity supplies, fuel, materials, equipment associated with tenders, and other services.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Accrued financial expense and deferred financial income 734 710 24 3.4%
Other current financial liabilities included in net financial debt 1 - 1 -
Other liabilities 174 143 31 21.7%
Total 909 853 56 6.6%

The increase in other current financial liabilities is mainly attributable to the increase in accrued financial expense. The item also includes current financial liabilities in respect of the deficit of the Spanish electrical system in the amount of €1 million included in net financial debt.

Information on the consolidated statement of cash flows

46. Cash flows

Millions of euro
2023 2022 Change
Cash and cash equivalents at the beginning of the year(1) 11,543 8,990 2,553
Cash flows from operating activities(2) 14,620 8,649 5,971
of which discontinued operations 132 (391)
Cash flows from/(used in) investing activities (10,610) (13,626) 3,016
of which discontinued operations (442) (351)
Cash flows from financing activities(2) (8,361) 7,394 (15,755)
of which discontinued operations (16) 656
Impact of exchange rate fluctuations on cash and cash equivalents (49) 136 (185)
Cash and cash equivalents at the end of the year(3) 7,143 11,543 (4,400)

(1) Of which cash and cash equivalents equal to €11,041 million at January 1, 2023 (€8,315 million at January 1, 2022), short-term securities equal to €78 million at January 1, 2023 (€88 million at January 1, 2022), cash and cash equivalents pertaining to "Assets classified as held for sale" in the amount of €98 million at January 1, 2023 (€44 million at January 1, 2022) and cash and cash equivalents pertaining to "Discontinued operations" equal to €326 million at January 1, 2023 (€543 million at January 1, 2022).

(2) In order to improve presentation, for comparative purposes only, realized financial income and expense connected solely with borrowings have been reclassified from "Collections/(Payments) associated with derivatives connected with borrowings" in the section on cash flows from financing activities to the items "Interest income and other financial income collected" and "Interest expense and other financial expense paid"included in cash flows from operating activities.

(3) Of which cash and cash equivalents equal to €6,801 million at December 31, 2023 (€11,041 million at December 31, 2022), short-term securities equal to €81 million at December 31, 2023 (€78 million at December 31, 2022), cash and cash equivalents pertaining to "Assets classified as held for sale" in the amount of €261 million at December 31, 2023 (€98 million at December 31, 2022) and cash and cash equivalents pertaining to "Discontinued operations" equal to €326 million at December 31, 2022.

Cash flows from operating activities in 2023 was a positive €14,620 million, an increase of €5,971 million on 2022, mainly attributable to lower cash requirements connected with changes in net working capital.

Cash flows used in investing activities in 2023 came to €10,610 million, from €13,626 million in 2022.

More specifically, investments in property, plant and equipment, intangibles, property investment and contract assets came to €13,563 million (including €849 million classified as available for sale), a decrease on 2022.

Investments in companies or business units, net of cash and cash equivalents acquired, amount to €17 million (in 2022 they came to €1,275 million and mainly referred to the acquisition by Enel Produzione SpA of 100% of ERG Hydro Srl (now Enel Hydro Appennino Centrale Srl), for a consideration of €1,196 million net of cash and cash equivalents acquired of €69 million.

Disposals of businesses or business units, net of cash and cash equivalents sold, amount to €2,083 million and mainly refer to:

  • the sale by Enel Argentina of the entire stake held in Enel Generación Costanera for €28 million, net of cash and cash equivalents sold of €14 million;
  • the sale by Enel Green Power India Private Limited of the entire stake held in Khidrat Renewable Energy Private Limited for €4 million;
  • the sale to YPF and Pan American Sur SA of the stakes held in Inversora Dock Sud SA and Central Dock Sud SA, for a total amount of about €29 million, net of cash and cash equivalents sold of €19 million;
  • the sale of 80% of the stake held in the Colombian bus company Colombia ZE SAS for about €6 million;
  • the sale of 50% of the two companies holding all the Group assets dedicated to renewables in Australia, more specifically Enel Green Power Australia (Pty) Ltd and Enel Green Power Australia Trust, to INPEX Corporation, for a total amount of €121 million, net of cash and cash equivalents sold of €21 million;
  • the sale of the stakes held in Romania for a total amount of €1,013 million, net of cash and cash equivalents sold of €228 million;
  • the sale of the interest held in Transmisora de Energía Renovable, in Guatemala, for a total of €22 million, net of cash and cash equivalents sold of €11 million;
  • the sale to Sonnedix of the interest held by Enel Chile in Arcadia Generación Solar SA, for a total of €533 million, net of cash and cash equivalents sold of €2 million;
  • the sale of 50% of Enel Green Power Hellas, Enel Green Power wholly-owned subsidiary dedicated to renewables in Greece, to Macquarie Asset Management, for a total of €322 million, net of cash and cash equivalents sold of €29 million.

Cash flows from/(used in) other investing activities in 2023 came to €474 million and mainly reflects:

  • the sale of the entire stake held in Tecnatom SA for a total of €26 million. The transaction had no impact on profit or loss;
  • the sale of the stake held in Rusenergosbyt LLC for €83 million;
  • minor disposals mainly in Italy, Iberia, North America and Latin America.

Cash flows from financing activities came to a negative €8,361 million, compared with a positive €7,394 million in 2022, mainly reflecting:

  • the change in net financial debt (as the balance between repayments, new borrowings and other changes) of €3,985 million;
  • distribution of dividends in the amount of €5,135 mil-

lion, plus €182 million paid to holders of perpetual hybrid bonds;

  • the issue of hybrid bonds in the amount of €986 million;
  • capital increases in subsidiaries with no change in control in the amount of €25 million, particularly in Australia.

In 2023, cash flow used in investing activities of €10,610 million and financing activities of €8,361 million fully absorbed the cash flows from operating activities in the amount of €14,620 million. The difference is reflected in a decrease in cash and cash equivalents, which at December 31, 2023 came to €7,143 million, from €11,543 million at the end of 2022. The change was also affected by effects associated with negative developments in the exchange rates of local currencies against the euro, in the amount of €49 million.

47. Net financial position and long-term financial assets and securities – €60,163 million

The following table shows the net financial position and long-term financial assets and securities on the basis of the items on the statement of consolidated financial position.

Millions of euro
Notes at Dec. 31, 2023 at Dec. 31, 2022 Change
Long-term borrowings 38 61,085 68,191 (7,106) -10.4%
Other non-current financial borrowings(1) 41 8 - 8 -
Short-term borrowings 38 4,769 18,392 (13,623) -74.1%
Other current financial borrowings(2) 1 - 1 -
Current portion of long-term borrowings 38 9,086 2,835 6,251 -
Other non-current financial assets included in net financial debt 29.1 (3,837) (4,213) 376 8.9%
Other current financial assets included in net financial debt 30.1 (4,148) (13,501) 9,353 69.3%
Cash and cash equivalents 35 (6,801) (11,041) 4,240 38.4%
Total(3) 60,163 60,663 (500) -0.8%

(1) The item "Other non-current financial borrowings" is represented by "Other non-current financial liabilities" in the statement of financial position.

(2) The item "Other current financial borrowings" is included under "Other current financial liabilities" in the statement of financial position.

(3) In order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022 in accordance with the new representation of net financial debt by the Enel Group.

The financial position is reported in compliance with Guideline 39, issued on March 4, 2021 by ESMA and applicable as from May 5, 2021, and with warning notice no. 5/2021 issued by CONSOB on April 29, 2021, which replaced the references to the CESR Recommendations and the references in Communication no. DEM/6064293 of July 28, 2006 regarding the net financial position.

The net financial debt of the Enel Group at December 31, 2023 and December 31, 2022 is reconciled with net financial debt as provided for in the presentation methods of the Enel Group.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Liquidity
Cash and cash equivalents on hand 23 35 (12) -34.3%
Bank and post office deposits 4,664 8,968 (4,304) -48.0%
Liquid assets 4,687 9,003 (4,316) -47.9%
Cash equivalents 2,114 2,038 76 3.7%
Securities 81 78 3 3.8%
Short-term loan assets 3,060 10,585 (7,525) -71.1%
Current portion of long-term loan assets 1,007 2,838 (1,831) -64.5%
Other current financial assets 4,148 13,501 (9,353) -69.3%
Liquidity 10,949 24,542 (13,593) -55.4%
Current financial debt
Bank debt (393) (1,320) 927 70.2%
Commercial paper (2,499) (13,838) 11,339 81.9%
Other short-term borrowings(1) (1,878) (3,234) 1,356 41.9%
Current financial debt (including debt instruments) (4,770) (18,392) 13,622 74.1%
Current portion of long-term bank borrowings (1,992) (890) (1,102) -
Bonds issued (current portion) (6,763) (1,612) (5,151) -
Other borrowings (current portion) (331) (333) 2 0.6%
Non-current financial debt (current portion) (9,086) (2,835) (6,251) -
Current financial debt (13,856) (21,227) 7,371 34.7%
Net current financial debt (2,907) 3,315 (6,222) -
Non-current financial debt
Bank borrowings (14,500) (15,261) 761 5.0%
Other borrowings(2) (3,014) (2,851) (163) -5.7%
Non-current financial debt (excluding current portion and debt
instruments)
(17,514) (18,112) 598 3.3%
Bonds (43,579) (50,079) 6,500 13.0%
Trade payables and other non-interest-bearing non-current liabilities with
a significant financing component
- - - -
Non-current financial position (61,093) (68,191) 7,098 10.4%
Financial assets in respect of "Assets classified as held for sale" 262 543 (281) -51.7%
Financial liabilities in respect of "Liabilities included in disposal groups
classified as held for sale"
(1,150) (1,435) 285 19.9%
Net financial position as per CONSOB instructions (64,888) (65,768) 880 1.3%
Long-term financial receivables and securities 3,837 4,213 (376) -8.9%
( - ) Financial assets in respect of "Assets classified as held for sale" (262) (543) 281 51.7%
( - ) Financial liabilities in respect of "Liabilities included in disposal groups
classified as held for sale"
1,150 1,435 (285) -19.9%
NET FINANCIAL DEBT(3) (60,163) (60,663) 500 0.8%

(1) Includes current financial borrowings included in "Other current financial liabilities" in the statement of financial position.

(2) Includes other non-current financial borrowings presented under "Other non-current financial liabilities" in the statement of financial position.

(3) In order to improve the comparability of the figures, it was necessary to recalculate net financial debt at December 31, 2022 in accordance with the new representation of net financial debt by the Enel Group.

The net position as per CONSOB instructions does not include derivatives designated as hedges for hedge accounting purposes or entered into for trading purposes as they are used for hedging.

At December 31, 2023 those financial assets and liabilities are reported separately in the statement of financial position under the following items: "Non-current financial derivative assets" in the amount of €2,383 million (€3,970 million at December 31, 2022), "Current financial derivative assets" in the amount of €6,407 million (€14,830 million at December 31, 2022), "Non-current financial derivative liabilities" in the amount of €3,373 million (€5,895 million at December 31, 2022), and "Current financial derivative liabilities" in the amount of €6,461 million (€16,141 million at December 31, 2022).

Financial instruments

48. Financial instruments by category

This note provides disclosures necessary for users to assess the significance of financial instruments for the Group's financial position and performance.

48.1 Financial assets by category

The following table reports the carrying amount for each category of financial asset provided for under IFRS 9, broken down into current and non-current financial assets, showing hedging derivatives and derivatives measured at fair value through profit or loss separately.

Millions of euro Non-current Current
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
at
Dec. 31, 2023
at
Dec. 31, 2022
Financial assets measured at amortized cost 48.1.1 5,709 5,732 28,495 40,176
Financial assets at FVOCI 48.1.2 882 901 81 279
Financial assets at FVTPL
Derivative financial assets at FVTPL 48.1.3 206 473 4,443 12,075
Other financial assets at FVTPL 48.1.3 4,341 3,442 219 1,048
Total financial assets at FVTPL 4,547 3,915 4,662 13,123
Derivative financial assets designated as hedging instruments
Fair value hedge derivatives 48.1.4 113 37 - -
Cash flow hedge derivatives 48.1.4 2,064 3,460 1,964 2,755
Total derivative financial assets designated as hedging instruments 2,177 3,497 1,964 2,755
TOTAL 13,315 14,045 35,202 56,333

For more information on the recognition and classification of current and non-current derivative assets, please see note 51 "Derivatives and hedge accounting".

For more information on fair value measurement, please see note 52 "Assets and liabilities measured at fair value".

48.1.1 Financial assets measured at amortized cost

The following table reports financial assets measured at amortized cost by nature, broken down into current and non-current financial assets.

Millions of euro Non-current Current Notes at Dec. 31, 2023 at Dec. 31, 2022 Notes at Dec. 31, 2023 at Dec. 31, 2022 Cash and cash equivalents - - 35 6,772 10,169 Trade receivables 34 1,726 1,388 34 16,047 15,217 Current portion of long-term loan assets - - 30.1 1,007 2,838 Cash collateral - - 30.1 2,899 8,319 Other financial assets 29.1 3,332 3,767 30.1 30 2,090 Financial assets from service concession arrangements at amortized cost 29 310 295 29 14 12 Other financial assets at amortized cost 341 282 1,726 1,531 Total 5,709 5,732 28,495 40,176

Impairment of financial assets measured at amortized cost Financial assets measured at amortized cost amounted to €34,202 million at December 31, 2023 (€45,788 million at December 31, 2022) and are recognized net of allowances for expected credit losses totaling €4,098 million at December 31, 2023 (€4,087 million at the end of the previous year).

The Group mainly has the following types of financial assets measured at amortized cost subject to impairment testing:

  • cash and cash equivalents;
  • trade receivables and contract assets;
  • loan assets;
  • other financial assets.

While cash and cash equivalents are also subject to the impairment requirements of IFRS 9, the identified impairment loss was immaterial.

The expected credit loss (ECL) – determined using probability of default (PD), loss given default (LGD) and exposure at default (EAD) – is the difference between all contractual cash flows that are due in accordance with the contract and all cash flows that are expected to be received (i.e. all shortfalls) discounted at the original effective interest rate (EIR).

For calculating ECL, the Group applies two different approaches:

• the general approach, for financial assets other than trade receivables, contract assets and lease receivables. This approach, based on an assessment of any significant increase in credit risk since initial recognition, is performed comparing the PD at origination with PD at the reporting date, at each reporting date.

Then, based on the results of the assessment, a loss allowance is recognized based on 12-month ECL or lifetime ECL (i.e. staging):

– 12-month ECL, for financial assets for which there has not been a significant increase in credit risk since initial recognition;

  • lifetime ECL, for financial assets for which there has been a significant increase in credit risk or which are credit impaired (i.e. defaulted based on past due information);
  • the simplified approach, for trade receivables, contract assets and lease receivables with or without a significant financing component, based on lifetime ECL without tracking changes in credit risk.

A forward-looking adjustment can be applied considering qualitative and quantitative information in order to reflect future events and macroeconomic developments that could impact the risk associated with the portfolio or financial instrument.

Depending on the nature of the financial assets and the credit risk information available, the assessment of the increase in credit risk can be performed on:

  • an individual basis, if the receivables are individually significant and for all receivables which have been individually identified for impairment based on reasonable and supportable information;
  • a collective basis, if no reasonable and supportable information is available without undue cost or effort to measure expected credit losses on an individual instrument basis.

When there is no reasonable expectation of recovering a financial asset in its entirety or a portion thereof, the gross carrying amount of the financial asset shall be reduced.

A write-off represents a derecognition event (e.g., the right to cash flows is legally or contractually extinguished, transferred or expired).

The following table reports expected credit losses on financial assets measured at amortized cost on the basis of the general simplified approach.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Gross amount Expected
credit loss
allowance
Total Gross amount Expected
credit loss
allowance
Total
Cash and cash equivalents 6,772 - 6,772 10,169 - 10,169
Trade receivables 21,548 3,775 17,773 20,388 3,783 16,605
Loan assets 7,579 311 7,268 17,262 248 17,014
Other financial assets at amortized cost 2,403 12 2,391 2,176 56 2,120
Total 38,302 4,098 34,204 49,995 4,087 45,908

To measure expected losses, the Group assesses trade receivables and contract assets with the simplified approach, both on an individual basis (e.g., government entities, authorities, financial counterparties, wholesale sellers, traders and large companies, etc.) and a collective basis (e.g., retail customers).

In the case of individual assessments, PD is generally obtained from external providers.

Otherwise, in the case of collective assessments, trade receivables are grouped on the basis of their shared credit risk characteristics and information on past due positions, considering a specific definition of default.

Based on each business and local regulatory framework, as well as differences between customer portfolios, including their default and recovery rates (comprising expectations for recovery beyond 90 days):

• the Group mainly defines a defaulted position as one that is 180 days past due. Accordingly, beyond this time limit, trade receivables are presumed to be credit impaired); and

• specific clusters are defined on the basis of specific markets, business and risk characteristics.

Contract assets substantially have the same risk characteristics as trade receivables for the same types of contracts.

In order to measure the ECL for trade receivables on a collective basis, as well as for contract assets, the Group uses the following assumptions regarding the ECL parameters:

  • PD, assumed equal to the average default rate, is calculated by cluster and considering historical data from at least 24 months;
  • LGD is a function of the recovery rates for each cluster, discounted using the effective interest rate; and
  • EAD is estimated as equal to the carrying amount at the reporting date net of cash deposits, including invoices issued but not past due and invoices to be issued.

The following table reports changes in the allowance for expected credit losses on loan assets in accordance with the general approach.

Millions of euro ECL 12-month allowance ECL lifetime allowance
Opening balance at Jan. 1, 2022 65 169
Accruals 22 5
Uses - -
Reversals to profit or loss - (11)
Other changes (58) 56
Closing balance at Dec. 31, 2022 29 219
Opening balance at Jan. 1, 2023 29 219
Accruals - 36
Uses - 11
Reversals to profit or loss (32) (6)
Other changes 45 9
Closing balance at Dec. 31, 2023 42 269

The following table reports changes in the allowance for expected credit losses on trade receivables in accordance with the simplified approach.

Millions of euro
Opening balance at Jan. 1, 2022 3,663
Accruals 1,375
Uses (766)
Reversals to profit or loss (265)
Other changes (224)
Closing balance at Dec. 31, 2022 3,783
Opening balance at Jan. 1, 2023 3,783
Accruals 1,384
Uses (1,136)
Reversals to profit or loss (210)
Other changes (46)
Closing balance at Dec. 31, 2023 3,775

The following table reports changes in the allowance for expected credit losses on other financial assets at amortized cost in accordance with the simplified approach.

Millions of euro ECL lifetime allowance
Opening balance at Jan. 1, 2022 154
Accruals 180
Uses -
Reversals to profit or loss (1)
Other changes (277)
Closing balance at Dec. 31, 2022 56
Opening balance at Jan. 1, 2023 56
Accruals 149
Uses -
Reversals to profit or loss (1)
Other changes (192)
Closing balance at Dec. 31, 2023 12

Note 49 "Risk management" provides additional information on the exposure to credit risk and expected losses.

48.1.2 Financial assets at fair value through other comprehensive income

The following table shows financial assets at fair value through other comprehensive income by nature, broken down into current and non-current financial assets.

Millions of euro Non-current Current
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Investments in other companies at FVOCI 29 338 360 - -
Securities 29.1 505 447 30.1 81 78
Receivables and other financial assets at FVOCI 39 94 - 201
Total 882 901 81 279

Changes in financial assets at FVOCI

Investments in other companies

Millions of euro Non-current Current
Opening balance at Jan. 1, 2023 360 -
Purchases - -
Sales (7) -
Changes in fair value through OCI (15) -
Other changes - -
Closing balance at Dec. 31, 2023 338 -

Securities and other receivables at FVOCI

Millions of euro Non-current Current
Opening balance at Jan. 1, 2023 447 78
Purchases 160 -
Sales (14) (15)
Changes in fair value through OCI 17 -
Reclassifications (105) 105
Other changes - (87)
Closing balance at Dec. 31, 2023 505 81

48.1.3 Financial assets at fair value through profit or loss

The following table shows financial assets at fair value

through profit or loss by nature, broken down into current and non-current financial assets.

Millions of euro Non-current Current
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Derivatives at FVTPL 51 206 473 51 4,443 12,075
Investments in liquid assets - - 35 29 872
Securities - - 30.1 - -
Equity investments in other companies at FVTPL 29 8 6 - -
Financial assets from service concession arrangements at FVTPL 29 4,080 3,436 - -
Financial assets from joint development agreements (JDA) at FVTPL 123 - - -
Other financial assets at FVTPL 130 - 30,
30.1
190 176
Total 4,547 3,915 4,662 13,123

48.1.4 Derivative financial assets designated as hedging instruments

For more information on derivative financial assets, please see note 51 "Derivatives and hedge accounting".

48.2 Financial liabilities by category

The following table shows the carrying amount for each category of financial liability provided for under IFRS 9, broken down into current and non-current financial liabilities, showing hedging derivatives and derivatives measured at fair value through profit or loss separately.

Millions of euro Non-current Current
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
at
Dec. 31, 2023
at
Dec. 31, 2022
Financial liabilities measured at amortized cost 48.2.1 61,734 68,432 39,784 45,697
Financial liabilities at fair value through profit or loss
Derivative financial liabilities at FVTPL 48.4 204 588 4,485 11,642
Total financial liabilities at fair value through profit or loss 204 588 4,485 11,642
Derivative financial liabilities designated as hedging instruments
Fair value hedge derivatives 48.4 105 191 17 -
Cash flow hedge derivatives 48.4 3,064 5,116 1,959 4,499
Total derivative financial liabilities designated as hedging
instruments
3,169 5,307 1,976 4,499
TOTAL 65,107 74,327 46,245 61,838

For more information on fair value measurement, please see note 52 "Assets and liabilities measured at fair value".

48.2.1 Financial liabilities measured at amortized cost

The following table shows financial liabilities at amortized

cost by nature, broken down into current and non-current financial liabilities.

Millions of euro Non-current
Current
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Notes at
Dec. 31, 2023
at
Dec. 31, 2022
Long-term borrowings
48.3
61,085 68,191 48.3 9,086 2,835
Short-term borrowings - - 48.3 4,769 18,392
Trade payables
44
334 36 44 15,487 17,605
Other financial liabilities 315 205 10,442 6,865
Total 61,734 68,432 39,784 45,697

48.3 Borrowings

48.3.1 Long-term borrowings (including the portion falling due within 12 months) – €70,171 million

The following table reports the nominal value, carrying

amount and fair value of long-term borrowing, including the portion falling due within 12 months.

Long-term borrowings by category and type of interest rate

Millions of euro Nominal
value
Carrying
amount
Current
portion
Portion
due in
more
than 12
months
Fair
value
Nominal
value
Carrying
amount
Current
portion
Portion
due in
more
than 12
months
Fair
value
Changes
in
carrying
amount
at Dec. 31, 2023 at Dec. 31, 2022
Bonds:
- listed, fixed rate 29,539 29,163 4,686 24,477 27,885 30,355 29,892 978 28,914 27,468 (729)
- listed, floating rate 2,643 2,622 623 1,999 2,641 2,569 2,547 537 2,010 2,473 75
- unlisted, fixed rate 18,336 18,129 1,357 16,772 17,842 18,959 18,727 - 18,727 17,249 (598)
- unlisted, floating rate 428 428 97 331 456 525 525 97 428 600 (97)
Total bonds 50,946 50,342 6,763 43,579 48,824 52,408 51,691 1,612 50,079 47,790 (1,349)
Bank borrowings:
- fixed rate 3,874 3,822 853 2,969 3,746 3,367 3,273 211 3,062 3,021 549
- floating rate 12,664 12,629 1,139 11,490 12,892 12,884 12,848 677 12,171 12,570 (219)
- use of revolving credit
lines
41 41 - 41 41 30 30 2 28 26 11
Total bank borrowings 16,579 16,492 1,992 14,500 16,679 16,281 16,151 890 15,261 15,617 341
Leases:
- fixed rate 2,852 2,852 256 2,596 2,852 2,630 2,630 251 2,379 2,630 222
- floating rate 53 53 12 41 53 42 42 10 32 42 11
Total leases 2,905 2,905 268 2,637 2,905 2,672 2,672 261 2,411 2,672 233
Other non-bank
borrowings(1):
- fixed rate 426 426 63 363 426 504 504 70 434 504 (78)
- floating rate 6 6 - 6 6 8 8 2 6 12 (2)
Total other non-bank
borrowings
432 432 63 369 432 512 512 72 440 516 (80)
Total fixed-rate
borrowings
55,027 54,392 7,215 47,177 52,751 55,815 55,026 1,510 53,516 50,872 (634)
Total floating-rate
borrowings
15,835 15,779 1,871 13,908 16,089 16,058 16,000 1,325 14,675 15,723 (221)
TOTAL 70,862 70,171 9,086 61,085 68,840 71,873 71,026 2,835 68,191 66,595 (855)

(1) Does not include other non-current financial borrowings reported under "Other non-current financial liabilities" in the statement of financial position that are included in long-term financial debt.

The table below reports long-term financial debt by currency and interest rate.

Long-term borrowing (including the portion falling due within 12 months) by currency and interest rate

Millions of euro Carrying
amount
Nominal
value
Carrying
amount
Nominal
value
Current
average
nominal
interest rate
Current
effective
interest rate
Current
average
nominal
interest rate
Current
effective
interest rate
at Dec. 31, 2023 at Dec. 31, 2022 at Dec. 31, 2023 at Dec. 31, 2022
Euro 35,865 36,166 34,993 35,383 2.5% 2.8% 1.9% 2.1%
US dollar 24,601 24,847 26,930 27,209 4.9% 5.2% 4.8% 5.1%
Pound sterling 4,612 4,720 4,470 4,610 4.6% 4.8% 4.6% 4.8%
Colombian peso 1,884 1,888 1,310 1,310 13.5% 13.5% 10.3% 10.3%
Brazilian real 2,229 2,255 1,899 1,926 10.5% 10.6% 10.0% 10.2%
Swiss franc 382 382 359 360 1.8% 1.8% 1.8% 1.8%
Chilean peso/UF 510 514 526 531 5.1% 5.2% 5.1% 5.2%
Peruvian sol - - 429 429 5.3% 5.3%
Other currencies 88 90 110 115
Total non-euro currencies 34,306 34,696 36,033 36,490
TOTAL 70,171 70,862 71,026 71,873

Long-term financial debt denominated in currencies other than the euro decreased by €1,727 million, largely attributable to the changes in debt denominated in US dollars.

Change in the nominal value of long-term borrowing (including the portion falling due within 12 months)

Millions of euro Nominal value Repayments Change in the
consolidation
scope
New borrowings Exchange
differences
Nominal value
at Dec. 31, 2022 at Dec. 31, 2023
Bonds 52,408 (2,798) (293) 1,900 (271) 50,946
Borrowings 19,465 (3,208) (482) 4,193 (52) 19,916
- of which leases 2,672 (406) (36) 677 (2) 2,905
Total financial debt 71,873 (6,006) (775) 6,093 (323) 70,862

The nominal value of long-term debt amounted to €70,862 million at December 31, 2023, a decrease of €1,011 million compared with December 31, 2022. The decrease reflected repayments in the amount of €6,006 million, changes in consolidation scope for €775 million and positive exchange differences of €323 million, only partially offset by new borrowings of €6,093 million.

Repayments in 2023 involved bonds in the amount of €2,798 million and loans in the amount of €3,208 million.

Specifically, repayments of bonds in 2023 included:

• \$1,250 million (€1,132 million at December 31, 2023), in respect of the hybrid bond issued by Enel SpA involved in a partial tender offer in the first months of 2023 and entirely repaid in September 2023;

  • €100 million in respect of a floating-rate bond issued by Enel Finance International, maturing in February 2023;
  • 290,130 million Colombian pesos (equivalent to €68 million at December 31, 2023) in respect of a floating-rate bond issued by Enel Colombia, maturing in February 2023;
  • 280,000 million Colombian pesos (equivalent to €65 million at December 31, 2023) in respect of a fixed-rate bond issued by Enel Colombia, maturing in March 2023;
  • €50 million in respect of a floating-rate bond issued by Enel Finance International, maturing in March 2023;
  • €585 million in respect of a fixed-rate bond issued by Enel Finance International, maturing in April 2023;
  • R\$305 million (equivalent to €57 million at December 31, 2023), in respect of a floating-rate bond issued by Enel Distribuição São Paulo, maturing in April 2023;
  • €300 million in respect of a fixed-rate bond issued by Enel Finance International maturing in September 2023;
  • R\$698 million (equivalent to €130 million at December 31, 2023), in respect of a floating-rate amortizing bond issued by Enel Distribuição São Paulo maturing in September 2023.

The main repayments of loans made during the year included:

  • €200 million in respect of floating-rate revolving credit lines of Enel SpA;
  • €367 in respect of sustainable loans of Group's Italian companies;
  • €1,493 million in respect of Endesa loans, of which €452 million in sustainable loans;
  • the equivalent of €322 million relating to South American companies.

New borrowings in 2023 involved €1,900 million in bonds and €4,193 million in loans.

The table below shows the main characteristics of financial transactions carried out in 2023 and translated into euros at the exchange rate prevailing at December 29, 2023.

Issuer/Borrower Issue/Grant
date
Amount in
millions of euro
Currency Interest rate Interest rate
type
Maturity
Bonds
Enel Finance
International
20.02.2023 750 EUR 4.00% Fixed rate 20.02.2031
Enel Finance
International
20.02.2023 750 EUR 4.50% Fixed rate 20.02.2043
Enel Distribuição
Ceará
11.01.2023 177 BRL CDI + 1.48% Floating rate 11.01.2026
Enel Distribuição
Ceará
11.05.2023 93 BRL CDI + 1.65% Floating rate 15.05.2024
Enel Distribuição
Ceará
26.06.2023 121 BRL CDI + 1.65% Floating rate 28.06.2024
Total bonds 1,891
Bank borrowings
Enel SpA 24.07.2023 200 EUR Euribor 3M + 0.35% Floating rate 03.05.2024
e-distribuzione 20.10.2023 500 EUR Euribor 6M + 0.55% Floating rate 20.10.2038
Enel X Way Italia 07.08.2023 70 EUR Euribor 6M + 0.56% Floating rate 09.08.2038
Enel Italia 15.06.2023 60 EUR Euribor 6M + 0.56% Floating rate 15.06.2038
Enel Finance
America
04.04.2023 335 USD SOFR 6M CPM + 1.22% Floating rate 15.05.2034
Endesa 30.04.2023 50 EUR 0.26% Fixed rate 31.07.2028
Endesa 03.05.2023 425 EUR 4.18% Fixed rate 03.05.2028
Endesa 04.05.2023 75 EUR 3.98% Fixed rate 04.05.2028
Endesa 05.05.2023 125 EUR 4.63% Fixed rate 05.05.2028
Endesa 03.07.2023 300 EUR Euribor 6M + 0.80% Floating rate 28.06.2035
Endesa 21.12.2023 400 EUR Euribor 6M + 0.72% Floating rate 21.12.2028
Enel Chile 13.04.2023 68 USD SOFR 1M + 1.33% Floating rate 26.06.2024
Enel Chile 21.07.2023 72 USD 5.46% Fixed rate 21.07.2038
Enel Chile 20.12.2023 74 USD 5.62% Fixed rate 21.12.2038
Enel Distribuição
São Paulo
20.04.2023 50 USD 4.38% Fixed rate 20.04.2038
Enel Colombia 12.04.2023 160 COP IBR O/N 3M + 3.7% Floating rate 12.04.2028
Enel Colombia 30.11.2023 283 COP IBR O/N 3M + 3.1% Floating rate 15.10.2031
Enel Colombia 21.12.2023 70 COP IBR 3M + 3.85% Floating rate 21.12.2027
Total bank
borrowings
3,317

The following table reports the impact on gross long-term debt of hedges to mitigate currency risk.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Impact
Debt structure after
Initial debt structure
of hedge
hedging
Initial debt structure
Impact
of hedge
Debt structure after
hedging
Carrying
amount
Nominal
value
% Carrying
amount
Nominal
value
%
Euro 35,865 36,166 51.0% 21,862 58,028 81.9% 34,993 35,383 49.2% 23,473 58,856 81.9%
US dollar 24,601 24,847 35.1% (17,850) 6,997 9.9% 26,930 27,209 37.9% (19,759) 7,450 10.4%
Pound sterling 4,612 4,720 6.7% (4,720) - - 4,470 4,610 6.4% (4,610) - -
Colombian peso 1,884 1,888 2.7% - 1,888 2.7% 1,310 1,310 1.8% - 1,310 1.8%
Brazilian real 2,229 2,255 3.2% 1,047 3,302 4.7% 1,899 1,926 2.7% 1,205 3,131 4.4%
Swiss franc 382 382 0.5% (382) - - 359 360 0.5% (360) - -
Chilean peso/UF 510 514 0.7% - 514 0.7% 526 531 0.7% - 531 0.7%
Peruvian sol - - - - - - 429 429 0.6% - 429 0.6%
Other currencies 88 90 0.1% 43 133 0.2% 110 115 0.2% 51 166 0.2%
Total non-euro
currencies
34,306 34,696 49.0% (21,862) 12,834 18.1% 36,033 36,490 50.8% (23,473) 13,017 18.1%
TOTAL 70,171 70,862 100.0% - 70,862 100.0% 71,026 71,873 100.0% - 71,873 100.0%

The amount of floating-rate debt that is not hedged against interest rate risk is the main risk factor that could adversely impact profit or loss (raising borrowing costs), in the event of an increase in market interest rates.

Millions of euro 2023 2022
Nominal
amount
pre-hedge
% Nominal
amount
post-hedge
% Nominal
amount
pre-hedge
% Nominal
amount
post-hedge
%
Floating rate 20,604 27.2% 17,241 22.8% 34,450 38.2% 31,353 34.7%
Fixed rate 55,027 72.8% 58,389 77.2% 55,815 61.8% 58,912 65.3%
Total 75,631 75,630 90,265 90,265

At December 31,2023, 27.2% of the nominal value of longand medium-term financial debt was floating rate (38.2% at December 31, 2022). Taking account of hedges of interest rates considered effective pursuant to the IFRS-EU, 22.8% of the nominal value of long- and medium-term financial debt was exposed to interest rate risk at December 31, 2023 (34.7% at December 31, 2022). These figures are in line with the limits established in the risk management policy.

Long-term debt – Main covenants

The Group's main long-term financial liabilities are governed by covenants that are commonly adopted in international business practice. They include in particular bond issues carried out within the framework of the Global/Euro Medium-Term Notes program, issues of subordinated unconvertible hybrid bonds (so-called "hybrid bonds") and loans granted by banks and other financial institutions (including the European Investment Bank and Cassa Depositi e Prestiti SpA).

The main covenants regarding bond issues carried out within the framework of the Global/Euro Medium-Term Notes programs of Enel and Enel Finance International NV (including the green bonds of Enel Finance International NV guaranteed by Enel SpA, which are used to finance the Group's so-called eligible green projects) and those regarding bonds issued by Enel Finance International NV on the US market guaranteed by Enel SpA can be summarized as follows:

  • negative pledge clauses under which the issuer and the guarantor may not establish or maintain mortgages, liens or other encumbrances on all or part of their assets or revenue to secure certain financial liabilities, unless the same encumbrances are extended equally or pro rata to the bonds in question;
  • pari passu clauses, under which the bonds and the associated security constitute a direct, unconditional and unsecured obligation of the issuer and the guarantor and are issued without preferential rights among them and have at least the same seniority as other present and future unsubordinated and unsecured bonds of the issuer and the guarantor;

• cross-default clauses, under which the occurrence of a default event in respect of a specified financial liability (above a threshold level) of the issuer, the guarantor or, in some cases, "significant" subsidiaries, constitutes a default in respect of the liabilities in question, which become immediately repayable.

Since 2019, Enel Finance International NV has issued a number of "sustainable" bonds on the European market (as part of the Euro Medium-Term Notes - EMTN bond issue program) and on the American market, both guaranteed by Enel SpA, linked to the achievement of a number of the Sustainable Development Goals (SDGs) of the United Nations that contain the same covenants as other bonds of the same type.

In 2022, Enel Finance America LLC issued a "sustainable" bond of the same type, guaranteed by Enel SpA, on the US market.

The main covenants covering Enel's hybrid bonds, including the perpetual hybrid bond issues, which will only be repaid in the event of the dissolution or liquidation of the Company, can be summarized as follows:

  • subordination clauses, under which each hybrid bond is subordinate to all other bonds issued by the company and has the same seniority with all other hybrid financial instruments issued, being senior only to equity instruments;
  • prohibition on mergers with other companies, the sale or leasing of all or a substantial part of the company's assets to another company, unless the latter succeeds in all obligations of the issuer.

The main covenants envisaged in the loan contracts of Enel SpA and Enel Finance International NV and the other Group companies, including the sustainability-linked loan facility agreements obtained by Enel SpA, can be summarized as follows:(52)

• negative pledge clauses, under which the borrower and, in some cases, the guarantor are subject to limitations on the establishment of mortgages, liens or other encumbrances on all or part of their respective assets, with the exception of expressly permitted encumbrances;

  • disposals clauses, under which the borrower and, in some cases, the guarantor may not dispose of their assets or operations, with the exception of expressly permitted disposals;
  • pari passu clauses, under which the payment undertakings of the borrower have the same seniority as its other unsecured and unsubordinated payment obligations;
  • change of control clauses, under which the borrower and, in some cases, the guarantor could be required to renegotiate the terms and conditions of the financing or make compulsory early repayment of the loans granted;
  • rating clauses, which provide for the borrower or the guarantor to maintain their rating above a certain specified level;
  • cross-default clauses, under which the occurrence of a default event in respect of a specified financial liability (above a threshold level) of the issuer or, in some cases, the guarantor constitutes a default in respect of the liabilities in question, which become immediately repayable.

In some cases, the covenants are also binding for the significant companies or subsidiaries of the obligated parties. All the borrowings considered specify "events of default" typical of international business practice, such as, for example, insolvency, bankruptcy proceedings or the entity ceases trading.

In addition, the guarantees issued by Enel in the interest of e-distribuzione SpA for certain loans to e-distribuzione SpA from Cassa Depositi e Prestiti SpA require that at the end of each six-month measurement period Enel's net consolidated financial debt shall not exceed 4.5 times annual consolidated EBITDA.

Finally, the debt of Endesa SA, Enel Américas SA, Enel Chile SA and the other Spanish and Latin American subsidiaries (notably Enel Generación Chile SA) contains covenants and events of default typical of international business practice.

(52) The sustainability-linked loan entered into on September 30, 2022, granted by EKF Denmark's Export Credit Agency and Citi to Enel Finance America LLC as borrower and Enel SpA (as guarantor), provide for a number of additional covenants, such as:

a "reputational damage" clause, under which the lending bank can request the cancellation of its financial commitment undertaken by it and the early payment of the sums disbursed if it has suffered ascertained harm to its own reputation or that of other persons as a result of substantial breach of certain regulations;

the commitment, also of the guarantor, to ensure compliance with certain environmental and social regulations and standards.

48.3.2 Short-term borrowings – €4,769 million

At December 31, 2023, short-term borrowings totaled

€4,769 million, a decrease of €13,623 million compared with December 31, 2022, and break down as follows.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Short-term bank borrowings 393 1,320 (927)
Commercial paper 2,499 13,838 (11,339)
Cash collateral and other financing on derivatives 1,383 1,513 (130)
Other short-term borrowings(1) 494 1,721 (1,227)
Short-term borrowings 4,769 18,392 (13,623)

(1) Does not include current financial liabilities included in "Other current financial liabilities" in net short-term financial debt.

Commercial paper liabilities totaling €2,499 million concerned issues by Enel Finance International and Enel Finance America.

The main commercial paper programs include:

  • €8,000 million of Enel Finance International;
  • €5,000 million of Endesa;
  • \$5,000 million (equivalent to €4,526 million at December 31, 2023) of Enel Finance America.

At December 31, 2023, the whole amount of commercial paper issues, equal to €2,499 million, was linked to sustainability objectives.

Sustainability-linked finance at Enel

The new sustainability-linked bond issues, together with all the sustainable financing arranged in the last year, made it possible to reach a 64% ratio of sustainable sources of financing to the Group's total gross debt at the end of 2023, with a goal of reaching around 70% in 2026.

Shown below are the KPIs and targets included in the latest update of Enel's Sustainability-Linked Financing Framework, published in January 2024.

KPI Actual value Sustainability Performance Targets (SPTs)
2023 2023 2024 2025 2026 2030 2040
Intensity of Scope 1 GHG emissions related to
power generation (gCO2eq/kWh)
160 148 140 130 125 72 0
Intensity of Scope 1 and Scope 3 GHG
emissions related to Integrated Power
(gCO2eq/kWh)
168 135 135 73 0
Absolute Scope 3 GHG emissions related to
retail gas (MtCO2eq)
16.8 20.9 20.0 11.4 0
Percentage of installed renewables capacity (%) 68.2 65 69 73 74 80 100
Percentage of capital expenditure aligned with
the EU taxonomy (%)
84.8 >80
(2023-2025)(53)
>80
(2024-2026)(54)

Developments in the indicators shown in the table are periodically verified by an external auditor.

The war in Ukraine and the resulting restrictions on gas imports from Russia into the EU, which caused a decrease in gas supplies accompanied by a surge in wholesale electricity and gas prices, with serious effects for households and businesses, prompted EU governments to implement a series of policy responses to mitigate the impact of rising costs and ensure the stability of the energy system.

Despite these policy measures, the Group managed to reduce direct and indirect greenhouse gas emissions along the entire value chain by 26.3% overall compared with the previous year. Furthermore, the Group also reduced the intensity of Scope 1 GHG emissions related to power generation by over 30.6%, going from 229 gCO2eq/kWh in 2022 to 160 gCO2eq/kWh in 2023. This reduction reflected a 12.9% increase in consolidated renewables generation and a 37.5% reduction in consolidated thermal generation compared with 2022, a consequence of the Group's strategy to shift its generation mix towards renewables and to advance the decarbonization process.

(53) SPT with cumulative observation period of 2023-2025. (54) SPT with cumulative observation period of 2024-2026.

However, due to the unprecedented crisis faced by the European energy system in 2022 and 2023, the Group's emissions reduction in 2023 was not sufficient to achieve the Scope 1 GHG emissions intensity target related to electricity generation set for 2023 as announced on the occasion of the Capital Markets Day held in November 2020 for the launch of the 2021-2023 Strategic Plan. As a result of the energy crisis, the intensity value was slightly higher than the target of 148 gCO2eq/kWh. In the absence of these factors, Enel would have been able to reach an emissions intensity level well below the target of 148 gCO2eq/kWh.

As a result, the Group's sustainability-linked instruments that set the Scope 1 emissions intensity target for electricity generation at 148 gCO2eq/kWh for 2023 will be subject to an increase in the relative step-up.

48.4 Derivative financial liabilities

For more information on derivative financial liabilities, please see note 51 "Derivatives and hedge accounting".

48.5 Net gain/(loss)

The following table shows net gains and losses by category of financial instruments, excluding derivatives.

Millions of euro 2023 2022
Net gain/(loss) Of which
impairment
(loss)/gain
Net gain/(loss) Of which
impairment
(loss)/gain
Financial assets measured at amortized cost (1,112) (1,320) (1,242) (1,305)
Financial assets at FVOCI
Equity investments at FVOCI - - - -
Other financial assets at FVOCI 15 - (4) -
Total financial assets at FVOCI 15 - (4) -
Financial assets at FVTPL
Financial assets at FVTPL 6 - 9 -
Financial assets designated upon initial recognition (fair value option) - - - -
Total financial assets at FVTPL 6 - 9 -
Financial liabilities measured at amortized cost (2,759) - (2,357) -
Financial liabilities at FVTPL
Financial liabilities held for trading - - - -
Financial liabilities designated upon initial recognition (fair value option) - - - -
Total financial liabilities at FVTPL - - - -

For more details on net gains and losses on derivatives, please see note 14 "Net financial income/(expense) from derivatives".

49. Risk management

Financial risk management governance and objectives

As part of its operations, the Enel Group is exposed to a variety of financial risks, notably interest rate risk, commodity risk, currency risk, credit and counterparty risk and liquidity risk.

As noted in the section "Risk management" in the Report on Operations, the Group's governance arrangements for financial risks include risk committees and the establishment of dedicated policies, measurement metrics and operational limits. Enel's primary objective is to mitigate financial risks appropriately so that they do not give rise to unexpected changes in results.

The following sections detail the above financial risks. There were no changes in the sources of exposure to such risks compared with the previous year.

Interest rate risk

Interest rate risk derives primarily from the use of financial instruments and manifests itself as unexpected changes in charges on financial liabilities, if indexed to floating rates and/or exposed to the uncertainty of financial terms and conditions in negotiating new debt instruments, or as an unexpected change in the value of financial instruments measured at fair value (such as fixed-rate debt).

The main financial liabilities held by the Group include bonds, bank borrowings, borrowings from other lenders, commercial paper, derivatives, cash deposits received to secure commercial or derivative contracts (guarantees, cash collateral).

The Enel Group mainly manages interest rate risk through the definition of an optimal financial structure, with the dual goal of stabilizing borrowing costs and containing the cost of funds.

This goal is pursued through the diversification of the portfolio of financial liabilities by contract type, maturity and interest rate, and modifying the risk profile of specific exposures using OTC derivatives, mainly interest rate swaps and interest rate options. The term of such derivatives does not exceed the maturity of the underlying financial liability, so that any change in the fair value and/or expected cash flows of such contracts is offset by a corresponding change in the fair value and/or cash flows of the hedged position.

Proxy hedging techniques can be used in a number of residual circumstances, when the hedging instruments for the risk factors are not available on the market or are not sufficiently liquid.

Using interest rate swaps, the Enel Group agrees with the counterparty to periodically exchange floating-rate interest flows with fixed-rate flows, both calculated on the same notional principal amount.

The following table reports the notional amount of interest rate derivatives at December 31, 2023 and December 31, 2022, broken down by type of contract.

Millions of euro Notional amount
at Dec. 31, 2023 at Dec. 31, 2022
Floating-to-fixed interest rate swaps 5,996 5,836
Fixed-to-floating interest rate swaps 1,386 1,401
Floating-to-floating interest rate swaps 644 618
Total 8,026 7,855

For more details on interest rate derivatives, please see note 51 "Derivatives and hedge accounting".

Interest rate risk sensitivity analysis

Enel analyzes the sensitivity of its exposure by estimating the effects of a change in interest rates on the portfolio of financial instruments.

More specifically, sensitivity analysis measures the potential impact on profit or loss and on equity of market scenarios that would cause a change in the fair value of derivatives or in the financial expense associated with unhedged gross debt.

These market scenarios are obtained by simulating parallel increases and decreases in the yield curve as at the reporting date.

There were no changes introduced in the methods and assumptions used in the sensitivity analysis compared with the previous year.

With all other variables held constant, the Group's pre-tax profit would be affected by a change in the level of interest rates as follows:

3 Group Strategy & Risk Management 2 Governance 1 Enel Group 4 Group Performance 5 Outlook 6Consolidated financial statements

Millions of euro 2023
Pre-tax impact on profit
or loss
Pre-tax impact on
equity
Basis points Increase Decrease Increase Decrease
Change in financial expense on gross long-term floating-rate debt after
hedging
25 31 (31) - -
Change in the fair value of derivatives classified as non-hedging
instruments
25 32 (32) - -
Change in the value of derivatives designated as hedging instruments
Cash flow hedges 25 - - 26 (26)
Fair value hedges 25 - - (6) 6

At December 31, 2023, 22.3% (22.3% at December 31, 2022) of the nominal value of gross long-term financial debt was floating rate. Taking account of effective cash flow hedges of interest rate risk (in accordance with the provisions of the IFRS-EU), 82.4% of the nominal value of gross long-term financial debt was hedged at December 31, 2023 (82.0% at December 31, 2022).

Currency risk

Currency risk mainly manifests itself as unexpected changes in the financial statement items associated with transactions denominated in a currency other than the presentation currency. The Group's consolidated financial statements are also exposed to translation risk as a result of the conversion of the financial statements of foreign subsidiaries, which are denominated in local currencies, into euros as the Group's presentation currency.

The Group's exposure to currency risk is connected with the purchase or sale of fuels and power, investments (cash flows for capitalized costs), dividends and the purchase or sale of equity investments, commercial transactions and financial assets and liabilities.

The Group policies for managing currency risk provide for the mitigation of the effects on profit or loss of changes in the level of exchange rates, with the exception of the translation effects connected with consolidation.

In order to minimize the exposure to currency risk, Enel implements diversified revenue and cost sources geographically, and uses indexing mechanisms in commercial contracts. Enel also uses various types of derivatives, typically on the OTC market.

struments include cross currency interest rate swaps, currency forwards and currency swaps. The term of such contracts does not exceed the maturity of the underlying instrument, so that any change in the fair value and/or expected cash flows of such instruments offsets the corresponding change in the fair value and/or cash flows of the hedged position.

Cross currency interest rate swaps are used to transform a long-term financial liability denominated in currency other than the presentation currency into an equivalent liability in the presentation currency.

Currency forwards are contracts in which the counterparties agree to exchange principal amounts denominated in different currencies at a specified future date and exchange rate (the strike). Such contracts may call for the actual exchange of the two principal amounts (deliverable forwards) or payment of the difference generated by differences between the strike exchange rate and the prevailing exchange rate at maturity (non-deliverable forwards). In the latter case, the strike rate and/or the spot rate can be determined as averages of the rates observed in a given period.

Currency swaps are contracts in which the counterparties enter into two transactions of the opposite sign at different future dates (normally one spot, the other forward) that provide for the exchange of principal denominated in different currencies.

The following table reports the notional amount of transactions outstanding at December 31, 2023 and December 31, 2022, broken down by type of hedged item.

Millions of euro Notional amount
at Dec. 31, 2023 at Dec. 31, 2022
Cross currency interest rate swaps (CCIRSs) hedging debt denominated in
currencies other than the euro
25,890 28,444
Currency forwards hedging currency risk on commodities 6,496 8,392
Currency forwards/CCIRSs hedging future cash flows in currencies other
than the euro
3,134 5,333
Other currency forwards 602 1,497
Total 36,122 43,666

The derivatives in the Group's portfolio of financial in-

More specifically, these include:

  • CCIRSs with a notional amount of €25,890 million to hedge the currency risk on debt denominated in currencies other than the euro (€28,444 million at December 31, 2022);
  • currency forwards and cross currency swaps with a total notional amount of €9,630 million used to hedge the currency risk associated with purchases of natural gas and fuel and expected cash flows in currencies other than the euro (€13,725 million at December 31, 2022).

"Other currency forwards" include OTC derivatives transactions carried out to mitigate currency risk on expected cash flows in currencies other than the presentation currency. This includes transactions connected with the purchase of investment goods in the renewables sector (including battery energy storage systems), as well as infrastructure and grids sectors (as new generation digital meters) and operating costs for the supply of cloud services and on revenue from the sale of renewable energy.

At December 31, 2023, 49% (51% at December 31, 2022) of Group long-term debt was denominated in currencies other than the euro.

Taking account of hedges of currency risk, the percentage of debt not hedged against that risk amounted to 18% at December 31, 2023 (18% at December 31, 2022).

Currency risk sensitivity analysis

The Group analyzes the sensitivity of its exposure by estimating the effects of a change in exchange rates on the portfolio of financial instruments.

More specifically, sensitivity analysis measures the potential impact on profit or loss and equity of market scenarios that would cause a change in the fair value of derivatives or in the financial expense associated with unhedged gross medium/long-term debt.

These scenarios are obtained by simulating the appreciation/depreciation of the euro against all of the currencies compared with the value observed as at the reporting date.

There were no changes in the methods or assumptions used in the sensitivity analysis compared with the previous year.

With all other variables held constant, the pre-tax profit would be affected by changes in exchange rates as follows.

Millions of euro 2023
Pre-tax impact on
profit or loss
Pre-tax impact
on equity
Exchange rate EUR appr. EUR depr. EUR appr. EUR depr.
Change in the fair value of derivatives classified as non
hedging instruments
10% 494 (603) - -
Change in the fair value of derivatives designated as
hedging instruments
Cash flow hedges 10% - - (2,883) 3,522
Fair value hedges 10% (44) 53 - -

Commodity price risk

The risk of fluctuations in the price of energy commodities such as electricity, gas, oil, CO2, and raw materials such as minerals and metals is generated by the volatility of prices and structural correlations between them, which create uncertainty in the margin on purchases and sales of electricity and fuels and materials at variable prices (e.g., indexed bilateral contracts, transactions on the spot market, etc.).

The exposures on indexed contracts are quantified by breaking down the contracts that generate exposure into the underlying risk factors.

To contain the effects of fluctuations and stabilize margins, in accordance with the policies and operating limits determined by the Group's governance and leaving an appropriate margin of flexibility to seize any short-term opportunities that may present themselves, Enel develops and plans strategies that impact the various phases of the industrial process linked to the production and sale of electricity and gas (such as forward procurement and long-term commercial agreements), as well as risk mitigation plans and techniques using derivative contracts (hedging).

As regards electricity sold by the Group, Enel mainly uses fixed-price contracts in the form of bilateral physical contracts (Power Purchase Agreements, or PPAs) and financial contracts (e.g., contracts for differences, Virtual Power Purchase Agreements or VPPAs, etc.) in which differences are paid to the counterparty if the market electricity price exceeds the strike price and to Enel in the opposite case.

The table below shows the main characteristics of PPA and VPPA contracts at December 31, 2023.

at Dec. 31, 2023
Country Type of contract Sell/Buy Price terms Volume of power
contracted (GWh)
Duration (years) Accounting
treatment
Italy PPA Buy fixed price 17.3 1 FVTPL
Italy PPA Buy fixed price 35.8 1 FVTPL
Italy PPA Buy floating price 1,501.5 1 FVTPL
Italy PPA Buy floating price 28.7 2 FVTPL
Italy PPA Buy fixed price 395.9 10 Own use
exemption
Italy VPPA Sell fixed price 1,801.2 4 CFH
Italy VPPA Sell fixed price 800.0 4 CFH
Iberia VPPA Buy fixed price 30.0 9 FVTPL
Iberia VPPA Buy fixed price 22,650.0 15 CFH
Iberia
Germany
VPPA
VPPA
Sell
Buy
fixed price
floating price
14,010.0
44.7
18
2
CFH
FVTPL
United States VPPA Sell fixed price 49.9 8-20 CFH
United States VPPA Sell fixed price 15.5 8-15 FVTPL
United States VPPA Sell fixed price 2.3 12-20 Own use
exemption
United States VPPA Sell floating price 3.4 12 CFH
United States PPA Sell fixed price 6.0 12 CFH
United States PPA Sell fixed price 6.0 12 FVTPL
United States PPA Sell fixed price 194.4 10-30 Own use
exemption
United States PPA Sell floating price 12.2 12-30 Own use
exemption
South Africa PPA Sell floating price 1.2 20 FVTPL
Brazil PPA Sell fixed price 115,542.6 1-20 Own use
exemption
Brazil PPA Buy fixed price 37,474.9 1-16 Own use
exemption
Chile PPA Sell fixed price 249,377.4 1-15 Own use
exemption
Chile PPA Sell floating price 258.0 1-3 Own use
exemption
Chile VPPA Sell fixed price 27,828.2 4 -10 Own use
exemption
Chile VPPA Buy fixed price 50,101.9 5-15 Own use
exemption
Chile PPA Buy fixed price 98,412.7 1-20 Own use
exemption
Colombia VPPA Sell fixed price 91,509.4 1-16 Own use
exemption
Colombia VPPA Sell floating price 4,546.3 1-10 Own use
exemption
Colombia VPPA Buy fixed price 56,763.5 1-19 Own use
exemption
Guatemala VPPA Sell fixed price 3,336.0 1-15 Own use
exemption
Guatemala VPPA Sell floating price 20.0 1-2 Own use
exemption
Panama VPPA Sell fixed price 23,858.0 3-15 Own use
exemption
Panama VPPA Sell floating price 4,253.0 5-25 Own use
exemption
Panama VPPA Buy fixed price 263.0 7-10 Own use
exemption
Panama VPPA Buy floating price 1,455.0 1-2 Own use
exemption
Peru PPA Buy fixed price 547.1 1-8 Own use
exemption
Peru PPA Sell fixed price 75,938.8 1-12 Own use
exemption
Peru PPA Sell floating price 115.0 2-5 Own use
exemption

The residual exposure in respect of the sale of energy on the spot market not hedged with such contracts is aggregated by uniform risk factors that can be managed with hedging transactions on the market. Proxy hedging techniques can be used for the industrial portfolios when the hedging instruments for the specific risk factors generating the exposure are not available on the market or are not sufficiently liquid. In addition, Enel uses portfolio hedging techniques to assess opportunities for netting intercompany exposures.

The Group mainly uses plain vanilla derivatives for hedging (more specifically, forwards, swaps, options on commodities, futures, contracts for differences).

Some of these products can be indexed to a variety of underlyings (coal, gas, oil, CO2, different geographical areas, etc.) and the approaches can be assessed and adapted to specific needs.

Enel also engages in proprietary trading in order to maintain a presence in the Group's reference energy commodity markets. These operations consist in taking on exposures in energy commodities (oil products, gas, coal, CO2 certificates and electricity) using financial derivatives and physical contracts traded on regulated and over-thecounter markets, optimizing profits through transactions carried out on the basis of expected market developments while always complying with the limits set on the basis of portfolio risk analysis.

The following table reports the notional amount of outstanding transactions at December 31, 2023 and December 31, 2022, broken down by type of instrument.

Millions of euro Notional amount
at Dec. 31, 2023 at Dec. 31, 2022
Forward and futures contracts 44,307 114,128
Swaps 7,694 11,271
Options 1,407 504
Total 53,408 125,903

For more details, please see note 51 "Derivatives and hedge accounting".

Commodity price risk sensitivity analysis

The following table presents the results of the analysis of sensitivity to a reasonably possible change in the commodity prices underlying the valuation model used in the scenario at the same date, with all other variables held constant.

The impact on pre-tax profit of shifts of +15% and -15% in

the price curve for the main commodities that make up the fuel scenario and the basket of formulas used in the contracts is mainly attributable to the change in the price of electricity, gas and petroleum products and, to a lesser extent, of CO2. The impact on equity of the same shifts in the price curve is primarily due to changes in the price of electricity, petroleum products and, to a lesser extent, CO2. The Group's exposure to changes in the prices of other commodities is not material.

Millions of euro 2023
Pre-tax impact on profit or loss Pre-tax impact on equity
Commodity price Increase Decrease Increase Decrease
Change in the fair value of trading derivatives on
commodities
15% (39) 40 - -
Change in the fair value of derivatives on commodities
designated as hedging instruments
15% (19) 25 (442) 437

Credit and counterparty risk

The Group's commercial, commodity and financial transactions expose it to credit risk, i.e. the possibility that a deterioration in the creditworthiness of a counterparty or the failure to discharge contractual payment obligations could lead to the interruption of incoming cash flows and an increase in collection costs (settlement risk), as well as lower revenue flows due to the replacement of the original transactions with similar transactions negotiated on unfavorable market conditions (replacement risk). Other risks include the reputational and financial risks associated with significant exposures to a single counterparty or groups of related customers, or to counterparties operating in the same sector or in the same geographical area.

Accordingly, the exposure to credit and counterparty risk is attributable to the following types of transactions:

  • the sale and distribution of electricity and gas in free and regulated markets and the supply of goods and services (trade receivables in respect of non-Group debtors);
  • trading activities that involve the physical exchange of assets or transactions in financial instruments (the commodity portfolio);
  • trading in derivatives, bank deposits and, more generally, financial instruments (the financial portfolio).

In order to minimize credit and counterparty risk, credit exposures are managed at the region/country/global business line level by different units, thereby ensuring the necessary segregation of risk management and control activities. Monitoring the consolidated exposure is carried out by Enel SpA.

In addition, at the Group level the policy provides for the use of uniform criteria – in the region/countries/global business lines and at the consolidated level – in measuring commercial credit exposures in order to promptly identify any deterioration in the quality of outstanding receivables and any mitigation actions to be taken.

The policy for managing credit and counterparty risk associated with commercial activities provides for a preliminary assessment of the creditworthiness of counterparties and the adoption of mitigation instruments, such as obtaining collateral or unsecured guarantees.

In addition, the Group undertakes transactions to factor receivables without recourse, which results in the complete derecognition of the corresponding assets involved in the factoring, as the risks and rewards associated with them have been transferred.

Finally, with regard to financial and commodity transactions, risk mitigation is pursued with a uniform system for assessing counterparties at the Group level, including implementation at the level of region/countries/global business lines, as well as with the adoption of specific standardized contractual frameworks that contain risk mitigation clauses (e.g., netting arrangements) and possibly the exchange of cash collateral.

Despite the deterioration in the collection status of some customer segments, which was taken into account in the assessment of the impairment of trade receivables, to date the Group portfolio has displayed resilience to the current macroeconomic context and price scenario. This reflects the strengthening of digital collection channels and a sound diversification of the customer base.

Loan assets

Millions of euro
at Dec. 31, 2023
Staging Basis for recognition
of expected credit loss
allowance
Average loss rate
(PD*LGD)
Gross carrying
amount
Expected credit
loss allowance
Carrying
amount
Performing 12-month ECL 4.0% 6,664 264 6,400
Underperforming Lifetime ECL 2.8% 321 9 312
Non-performing Lifetime ECL 6.4% 594 38 556
Total 7,579 311 7,268

Contract assets, trade receivables and other financial assets: individual measurement

Millions of euro
at Dec. 31, 2023
Average loss rate
(PD*LGD)
Gross carrying
amount
Expected credit loss
allowance
Carrying
amount
Contract assets - 83 - 83
Trade receivables
Trade receivables not past due 0.5% 6,225 32 6,193
Trade receivables past due:
- 1-30 days 2.0% 350 7 343
- 31-60 days 1.9% 103 2 101
- 61-90 days 5.3% 38 2 36
- 91-120 days 12.2% 41 5 36
- 121-150 days 13.2% 53 7 46
- 151-180 days 8.2% 49 4 45
- more than 180 days (credit impaired) 83.9% 1,474 1,236 238
Total trade receivables 8,333 1,295 7,038
Other financial assets
Other financial assets not past due 0.4% 1,690 7 1,683
Other financial assets past due:
- 1-30 days - 25 - 25
- 31-60 days - - - -
- 61-90 days - - - -
- 91-120 days - - - -
- 121-150 days - 2 - 2
- 151-180 days - - - -
- more than 180 days (credit impaired) 2.7% 75 2 73
Total other financial assets 1,792 9 1,783
TOTAL 10,208 1,304 8,904

Millions of euro

at Dec. 31, 2022
Average loss rate
(PD*LGD)
Gross carrying
amount
Expected credit loss
allowance
Carrying
amount
Contract assets - 79 - 79
Trade receivables
Trade receivables not past due 0.7% 5,560 41 5,519
Trade receivables past due:
- 1-30 days 1.0% 477 5 472
- 31-60 days 1.3% 75 1 74
- 61-90 days 2.8% 36 1 35
- 91-120 days 7.1% 28 2 26
- 121-150 days 12.5% 24 3 21
- 151-180 days 5.9% 51 3 48
- more than 180 days (credit impaired) 80.8% 1,629 1,317 312
Total trade receivables 7,880 1,373 6,507
Other financial assets
Other financial assets not past due 2.2% 1,401 31 1,370
Other financial assets past due:
- 1-30 days - 35 - 35
- 31-60 days - 219 - 219
- 61-90 days - - - -
- 91-120 days - - - -
- 121-150 days - - - -
- 151-180 days - 2 - 2
- more than 180 days (credit impaired) 16.3% 147 24 123
Total other financial assets 1,804 55 1,749
TOTAL 9,763 1,428 8,335

Contract assets, trade receivables and other financial assets: collective measurement

Millions of euro
at Dec. 31, 2023
Average loss rate
(PD*LGD)
Gross carrying
amount
Expected credit loss
allowance
Carrying
amount
Contract assets 1.3% 150 2 148
Trade receivables
Trade receivables not past due 2.9% 8,322 239 8,083
Trade receivables past due:
- 1-30 days 2.6% 802 21 781
- 31-60 days 44.3% 70 31 39
- 61-90 days 19.5% 210 41 169
- 91-120 days 25.8% 132 34 98
- 121-150 days 50.8% 132 67 65
- 151-180 days 52.9% 119 63 56
- more than 180 days (credit impaired) 57.9% 3,428 1,984 1,444
Total trade receivables 13,215 2,480 10,735
Other financial assets
Other financial assets not past due - 604 - 604
Other financial assets past due:
- 1-30 days 66.7% 3 2 1
- 31-60 days - - - -
- 61-90 days - - - -
- 91-120 days - - - -
- 121-150 days - - - -
- 151-180 days - 2 - 2
- more than 180 days (credit impaired) 50.0% 2 1 1
Total other financial assets 611 3 608
TOTAL 13,976 2,485 11,491

Millions of euro

at Dec. 31, 2022
Average loss rate
(PD*LGD)
Gross carrying
amount
Expected credit loss
allowance
Carrying
amount
Contract assets 4.3% 46 2 44
Trade receivables
Trade receivables not past due 2.4% 7,698 187 7,511
Trade receivables past due:
- 1-30 days 2.6% 535 14 521
- 31-60 days 42.3% 123 52 71
- 61-90 days 24.0% 275 66 209
- 91-120 days 29.0% 186 54 132
- 121-150 days 35.6% 146 52 94
- 151-180 days 45.0% 129 58 71
- more than 180 days (credit impaired) 56.4% 3,416 1,927 1,489
Total trade receivables 12,508 2,410 10,098
Other financial assets
Other financial assets not past due - 251 - 251
Other financial assets past due:
- 1-30 days 50.0% 2 1 1
- 31-60 days - - - -
- 61-90 days - - - -
- 91-120 days - - - -
- 121-150 days - - - -
- 151-180 days - - - -
- more than 180 days (credit impaired) - - - -
Total other financial assets 253 1 252
TOTAL 12,807 2,413 10,394

Liquidity risk

Liquidity risk manifests itself as uncertainty about the Group's ability to discharge its obligations associated with financial liabilities that are settled by delivering cash or another financial asset.

Enel manages liquidity risk by implementing measures to ensure an appropriate level of liquid financial resources, minimizing the associated opportunity cost and maintaining a balanced debt structure in terms of its maturity profile and funding sources.

In the short term, liquidity risk is mitigated by maintaining an appropriate level of unconditionally available resources, including liquidity on hand and short-term deposits, available committed credit lines and a portfolio of highly liquid assets.

In the long term, liquidity risk is mitigated by maintaining a balanced maturity profile for our debt, access to a range of sources of funding on different markets, in different currencies and with diverse counterparties.

The mitigation of liquidity risk enables the Group to maintain a credit rating that ensures access to the capital market and limits the cost of funds, with a positive impact on its financial position and performance.

The Group holds the following undrawn lines of credit and commercial paper programs.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Expiring within
one year
Expiring
beyond one
year
Expiring within
one year
Expiring
beyond one
year
Committed credit lines 823 19,040 355 19,122
Uncommitted credit lines 734 - 980 -
Commercial paper 15,027 - 3,847 -
Total 16,584 19,040 5,182 19,122

Maturity analysis

The table below summarizes the maturity profile of the re-

payment plans of the Group's gross long- and short-term financial debt at December 31, 2023.

Millions of euro Maturing in
Less than 3 From 3 months
months to 1 year 2025 2026 2027 2028 Beyond
Gross long-term financial debt
Bonds:
- listed, fixed rate - 4,686 3,425 3,838 3,764 946 12,504
- listed, floating rate 186 437 342 435 221 117 884
- unlisted, fixed rate - 1,357 1,351 1,126 2,448 2,023 9,824
- unlisted, floating rate - 97 97 97 97 - 40
Total bonds 186 6,577 5,215 5,496 6,530 3,086 23,252
Bank borrowings:
- fixed rate 63 790 231 413 730 1,006 589
- floating rate 126 1,013 1,479 2,489 1,140 1,410 4,972
- use of revolving credit lines - - 23 - 18 - -
Total bank borrowings 189 1,803 1,733 2,902 1,888 2,416 5,561
Leases:
- fixed rate 76 180 267 243 200 166 1,720
- floating rate 3 9 14 9 3 3 12
Total leases 79 189 281 252 203 169 1,732
Other non-bank borrowings:(1)
- fixed rate 24 39 70 69 44 8 172
- floating rate - - 14 - - - -
Total other non-bank borrowings 24 39 84 69 44 8 172
Total gross long-term financial debt 478 8,608 7,313 8,719 8,665 5,679 30,717
Gross short-term financial debt
Short-term bank borrowings 101 292 - - - - -
Commercial paper 2,499 - - - - - -
Cash collateral and other financing on derivatives 1,383 - - - - - -
Other short-term financial debt(2) 489 6 - - - - -
Total gross short-term financial debt 4,472 298 - - - - -
TOTAL GROSS FINANCIAL DEBT 4,950 8,906 7,313 8,719 8,665 5,679 30,717

(1) Includes other non-current financial borrowings presented under "Other non-current financial liabilities" in the statement of financial position. (2) Includes other current financial borrowings included in "Other current financial liabilities" in the statement of financial position.

<-- PDF CHUNK SEPARATOR -->

Commitments to purchase commodities

In conducting its business, the Enel Group has entered into contracts to purchase specified quantities of commodities at a certain future date for its own use, which qualify for the own use exemption provided for under IFRS 9.

The following table reports the undiscounted cash flows associated with outstanding commitments at December 31, 2023.

Millions of euro
at Dec. 31, 2023 2023-2026 2027-2031 2032-2036 Beyond
Commitments to purchase commodities:
- electricity 63,422 13,820 18,167 12,420 19,015
- fuels 47,666 11,998 23,399 8,802 3,467
Total 111,088 25,818 41,566 21,222 22,482

50. Offsetting financial assets and financial liabilities

At December 31, 2023 the Group did not hold offset positions in assets and liabilities, as it is not the Enel Group's policy to settle financial assets and liabilities on a net basis.

51. Derivatives and hedge accounting

The following tables show the notional amount and the fair value of derivative financial assets and derivative financial liabilities eligible for hedge accounting or measured at FVTPL, classified on the basis of the type of hedge relationship and the hedged risk, broken down into current and non-current instruments.

The notional amount of a derivative contract is the amount on the basis of which cash flows are exchanged. This amount can be expressed as a value or a quantity (for example tons, converted into euros by multiplying the notional amount by the agreed price). Amounts denominated in currencies other than the euro are translated at the official closing exchange rates provided by the World Markets Refinitiv (WMR) Company.

Millions of euro Non-current Current
Notional Fair value Notional Fair value
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
DERIVATIVE ASSETS
Fair value hedge derivatives:
- on interest rates 556 154 101 22 - - - -
- on exchange rates 90 99 12 15 - - - -
Total 646 253 113 37 - - - -
Cash flow hedge derivatives:
- on interest rates 4,090 4,949 174 336 54 9 1 -
- on exchange rates 11,060 16,955 1,007 1,854 4,393 4,053 145 389
- on commodities 4,094 4,321 883 1,270 5,560 7,416 1,818 2,366
Total 19,244 26,225 2,064 3,460 10,007 11,478 1,964 2,755
Trading derivatives:
- on interest rates - - - - - - - -
- on exchange rates 84 19 1 1 1,734 3,640 24 74
- on commodities 858 1,774 205 472 17,511 49,253 4,419 12,001
Total 942 1,793 206 473 19,245 52,893 4,443 12,075
TOTAL DERIVATIVE ASSETS 20,832 28,271 2,383 3,970 29,252 64,371 6,407 14,830

Millions of euro Non-current Current
Notional Fair value Notional Fair value
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
DERIVATIVE LIABILITIES
Fair value hedge derivatives:
- on interest rates 675 1,603 27 92 554 - 17 -
- on exchange rates 929 813 78 99 - 185 - -
Total 1,604 2,416 105 191 554 185 17 -
Cash flow hedge derivatives:
- on interest rates 1,897 890 91 59 100 150 - 1
- on exchange rates 11,173 11,956 1,830 1,640 4,785 3,798 332 176
- on commodities 3,075 6,403 1,143 3,417 4,696 9,556 1,627 4,322
Total 16,145 19,249 3,064 5,116 9,581 13,504 1,959 4,499
Trading derivatives:
- on interest rates - - - - 100 100 29 23
- on exchange rates 67 52 1 1 1,807 2,096 28 34
- on commodities 921 1,281 203 587 16,693 45,899 4,428 11,585
Total 988 1,333 204 588 18,600 48,095 4,485 11,642
TOTAL DERIVATIVE LIABILITIES 18,737 22,998 3,373 5,895 28,735 61,784 6,461 16,141

51.1 Derivatives designated as hedging instruments

Derivatives are initially recognized at fair value, on the trade date of the contract, and are subsequently re-measured at their fair value. The method of recognizing the resulting gain or loss depends on whether the derivative is designated as a hedging instrument, and if so, the nature of the item being hedged.

Hedge accounting is applied to derivatives entered into in order to reduce risks such as interest rate risk, currency risk, commodity price risk (including Virtual PPAs) when all the criteria provided by IFRS 9 are met.

At the inception of the transaction, the Group documents the relationship between hedging instruments and hedged items, as well as its risk management objectives and strategy. The Group also documents its assessment, both at hedge inception and on an ongoing basis, of whether hedging instruments are highly effective in offsetting changes in fair values or cash flows of hedged items. For cash flow hedges of forecast transactions designated as hedged items, the Group assesses and documents that they are highly probable and present an exposure to changes in cash flows that affect profit or loss.

Depending on the nature of the risk exposure, the Group designates derivatives as either:

  • fair value hedges;
  • cash flow hedges.

For more details about the nature and the extent of risks arising from financial instruments to which the Group is exposed, please see note 49 "Risk management".

To be effective a hedge relationship shall meet all of the following criteria:

  • existence of an economic relationship between hedging instrument and hedged item;
  • the effect of credit risk does not dominate the value changes resulting from the economic relationship;
  • the hedge ratio defined at initial designation shall be equal to the one used for risk management purposes (i.e. same quantity of the hedged item that the entity actually hedges and the quantity of the hedging instrument that the entity actually uses to hedge the quantity of the hedged item).

Based on the IFRS 9 requirements, the existence of an economic relationship is evaluated by the Group through a qualitative assessment or a quantitative computation, depending on the following circumstances:

  • if the underlying risk of the hedging instrument and the hedged item is the same, the existence of an economic relationship will be provided through a qualitative analysis;
  • on the other hand, if the underlying risk of the hedging instrument and the hedged item is not the same, the existence of the economic relationship will be demonstrated through a quantitative method in addition to a qualitative analysis of the nature of the economic relationship (i.e. linear regression).

In order to demonstrate that the behavior of the hedging instrument is in line with that of the hedged item, different scenarios will be analyzed.

For hedging of commodity price risk, the existence of an economic relationship is deduced from a ranking matrix that defines, for each possible risk component, a set of all standard derivatives available in the market whose ranking

is based on their effectiveness in hedging the considered risk.

In order to evaluate the credit risk effects, the Group considers the existence of risk mitigating measures (collateral, mutual break-up clauses, netting agreements, etc.).

The Group has established a hedge ratio of 1:1 for all the hedge relationships (including commodity price risk hedging) as the underlying risk of the hedging derivative is identical to the hedged risk, in order to minimize hedging ineffectiveness.

The hedge ineffectiveness will be evaluated through a qualitative assessment or a quantitative computation, depending on the following circumstances:

  • if the critical terms of the hedged item and hedging instrument match and there are no other sources of ineffectiveness including the credit risk adjustment on the hedging derivative, the hedge relationship will be considered fully effective on the basis of a qualitative assessment;
  • if the critical terms of the hedged item and hedging instrument do not match or there is at least one source of ineffectiveness, the hedge ineffectiveness will be quantified applying the dollar offset cumulative method with hypothetical derivative. This method compares changes in the fair value of the hedging instrument and the hypothetical derivative between the reporting date and the inception date.

The main causes of hedge ineffectiveness can be the following:

  • basis differences (i.e. the fair value or cash flows of the hedged item depend on a variable that is different from the variable that causes the fair value or cash flows of the hedging instrument to change);
  • timing differences (i.e. the hedged item and hedging instrument occur or are settled at different dates);
  • quantity or notional amount differences (i.e. the hedged item and hedging instrument are based on different quantities or notional amounts);
  • other risks (i.e. changes in the fair value or cash flows of a derivative hedging instrument or hedged item relate to risks other than the specific risk being hedged);
  • credit risk (i.e. the counterparty credit risk differently impacts the changes in the fair value of the hedging instruments and hedged items).

Fair value hedges

Fair value hedges are mainly used to protect the Group against exposures to changes in the fair value of liabilities or firm commitment attributable to a particular risk that could affect profit or loss.

Changes in the fair value of derivatives that qualify and are designated as hedging instruments are recognized in the income statement, together with changes in the fair value of the hedged item that are attributable to the hedged risk.

If the hedge no longer meets the criteria for hedge accounting, the adjustment to the carrying amount of a hedged item for which the effective interest rate method is used is amortized to profit or loss over the period to maturity.

Cash flow hedges

Cash flow hedges are applied in order to hedge the Group exposure to changes in future cash flows that are attributable to a particular risk associated with a recognized asset or liability or a highly probable transaction that could affect profit or loss.

The effective portion of changes in the fair value of derivatives that are designated and qualify as cash flow hedges is recognized in other comprehensive income. The gain or loss relating to the ineffective portion is recognized immediately in the income statement.

Amounts accumulated in equity are reclassified to profit or loss in the periods when the hedged item affects profit or loss (for example, when the hedged forecast sale takes place).

If the hedged item results in the recognition of a non-financial asset (i.e. property, plant and equipment or inventories, etc.) or a non-financial liability, or a hedged forecast transaction for a non-financial asset or a non-financial liability becomes a firm commitment for which fair value hedge accounting is applied, the amount accumulated in equity (i.e. hedging reserve) shall be removed and included in the initial amount (cost or other carrying amount) of the asset or the liability hedged (i.e. "basis adjustment").

When a hedging instrument expires or is sold, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is recognized when the forecast transaction is ultimately recognized in the income statement. When a forecast transaction is no longer expected to occur, the cumulative gain or loss that was reported in equity is immediately transferred to the income statement. For hedge relationships using forwards as a hedging instrument, where only the change in the value of the spot element is designated as the hedging instrument, accounting for the forward element (profit or loss vs OCI) is defined case by case. This approach is actually applied by the Group for hedging of currency risk on renewables assets.

Conversely, for hedge relationships using cross currency interest rate swaps as hedging instruments, the Group separates foreign currency basis spread, in designating the hedging derivative, and present them in other comprehensive income (OCI) as hedging costs.

With specific regard to cash flow hedges of commodity risk, in order to improve their consistency with the risk management strategy, the Enel Group applies a dynamic

hedge accounting approach based on specific liquidity requirements (the so-called liquidity-based approach). This approach requires the designation of hedges through the use of the most liquid derivatives available on the market and replacing them with others that are more effective in covering the risk in question.

Consistent with the risk management strategy, the liquidity-based approach allows the roll-over of a derivative by replacing it with a new derivative, not only in the event of expiry but also during the hedge relationship, if and only if the new derivative meets both of the following requirements:

  • it represents a best proxy of the old derivative in terms of ranking;
  • it meets specific liquidity requirements.

Satisfaction of these requirements is verified quarterly. At the roll-over date, the hedge relationship is not discontinued. Accordingly, starting from that date, changes in the effective fair value of the new derivative will be recognized in equity (the hedging reserve), while changes in the fair value of the old derivative are recognized through profit or loss.

Reform of benchmarks for the determination of interest rates – IBOR reform

Overview

Interbank Offered Rates ("IBORs") are benchmark rates at which banks can borrow funds on the interbank market on an unsecured basis for a given period ranging from overnight to 12 months, in a specific currency.

In recent years there have been a number of cases of manipulation of these rates by the banks contributing to their calculation. For this reason, regulators around the world have begun a sweeping reform of interest rate benchmarks that includes the replacement of some benchmarks with alternative risk-free rates (the IBOR reform).

The Group's main exposure is based on Euribor.

Euribor is still considered compliant with the European Benchmarks Regulation (BMR) and this permits market participants to continue to use it for both existing and new contracts.

In line with the most recent guidance issued by the major regulatory bodies, the 1-month, 3-month and 6-month USD LIBOR benchmarks have become unrepresentative after June 30, 2023 and the alternative reference rate is the Secured Overnight Financing Rate (SOFR).

As a result of the IBOR reform, a number of temporary exceptions to the rules on hedge relationships have been allowed in implementation of the amendments to IFRS 9 issued in September 2019 (Phase 1) and August 2020 (Phase 2) to address, respectively:

• pre-replacement issues that impact financial reporting in the period preceding the replacement of an existing interest rate benchmark with an alternative risk-free rate (Phase 1); and

• post-replacement issues that could impact financial reporting when an existing interest rate benchmark is reformed or replaced and there is no longer any initial uncertainty, but hedge contracts and relationships still need to be updated to reflect the new benchmark rates (Phase 2).

Impact of the IBOR reform on the Group

In a context of uncertainty regarding the IBOR transition in the various countries, the Group has determined the overall number and nominal value of the contracts impacted by the reform. In addition, a number of contractual amendments have previously been implemented in contracts indexed to GBP LIBOR in 2021 and others have been implemented in 2023, considering that, as already mentioned, USD LIBOR benchmarks have become unrepresentative as from June 30, 2023.

Debt and derivatives

The Group's floating rate debt is mainly benchmarked against Euribor and is almost entirely hedged using financial derivatives.

At the reporting date, the Group is planning to take no action with regard to Euribor since, as stated above, this benchmark has been comprehensively reformed to comply with the European Benchmarks Regulation. Despite the continuity with Euribor, replacement clauses may be required and could therefore be implemented by the Group in the new contracts in accordance with the evolution of accepted market practice.

During 2023, the Group obtained new dollar loans indexed to SOFR and focused on the implementation of how to change all exposures from USD LIBOR to USD SOFR.

The Group's derivative instruments are managed through contracts that are mainly based on framework agreements defined by the International Swaps and Derivatives Association (ISDA).

The ISDA has revised its standardized contracts in light of the IBOR reform and amended the choices for floating rates within the 2006 ISDA definitions to include replacement clauses that would apply upon the permanent discontinuation of specific key benchmarks. These changes took effect on January 25, 2021. Transactions represented in the 2006 ISDA definitions carried out on January 25, 2021 or later include adjusted floating-rate options (e.g., the choice of floating rate with replacement clause), while transactions completed before that date (previous derivative contracts) continue to be based on the 2006 ISDA definitions.

For this reason, the ISDA published an IBOR Fallback Protocol to facilitate multilateral amendments to include the amended definitions.

As regards Euribor, the Group is assessing whether to: (i) adopt that protocol in the light of its exposure and developments in the IBOR reform or (ii) adjust in advance any contracts impacted bilaterally by the reform.

Hedge relationships

At the reporting date, hedged items and hedging instruments are primarily indexed to Euribor, SOFR and SONIA. The Group has assessed the impact of uncertainty engendered by the IBOR reform on hedge relationships at December 31, 2023 with reference to both hedging instruments and hedged items. Both the hedged items and the hedging instruments have changed their parameterization from interbank market-based benchmarks (IBORs) to alternative risk-free rates (RFRs) as a result of the contractual amendments that have taken effect.

In particular, in order to manage the uncertainty associated with both hedging instruments and hedged items indexed to USD LIBOR, until June 30, 2023 the Group has continued to apply the temporary exceptions provided for in the amendments to IFRS 9 issued in September 2019 (Phase 1). It was therefore felt that the benchmark indices for determining the interest rates on which the cash flows of the hedged items or the hedging instruments are based would not change as a consequence of the IBOR reform. The exception was applied for the following hedge relationship requirements:

  • determining if a forecast transaction is highly probable;
  • establishing whether the future hedged cash flows will arise in a discontinued cash flow hedge relationship;
  • assessing the economic relationship between the hedged item and the hedging instrument.

The hedge relationships impacted may have become ineffective due to different replacements of existing benchmarks with alternative risk-free benchmarks. In order to avoid that risk, the Group has sought to implement the replacements at the same time.

In addition, the Group changed the reference to USD LI-BOR in its interest rate hedging instruments used in cash flow hedge relationships with the new, economically equivalent, SOFR benchmark in 2023. Consequently, the Group no longer applies the amendments to IFRS 9 issued in September 2019 (Phase 1) to these hedge relationships and, consequently, is applying the amendments to IFRS 9 issued in August 2020 (Phase 2), modifying the formal designation of the hedge relationship as required by the IBOR reform and without considering this event as a termination of the hedge relationship.

Furthermore, for cash flow hedge relationships, in modifying the description of the hedged item in the hedge relationship, the amounts accumulated in the cash flow hedge reserve were considered on the basis of the alternative benchmark index in relation to which the future hedged cash flows are determined.

51.1.1 Hedge relationships by type of risk hedged

Interest rate risk

The following table shows the notional amount and the average interest rate of instruments hedging the interest rate risk on transactions outstanding at December 31, 2023 and December 31, 2022, broken down by maturity.

Maturity
Millions of euro 2024 2025 2026 2027 2028 Beyond Total
At Dec. 31, 2023
Interest rate swaps
Total notional amount 708 564 879 1,975 19 3,781 7,926
Notional amount related to IRSs in euro 608 564 636 1,532 19 3,141 6,500
Average IRS rate in euro 4.56 1.92 2.12 3.38 0.86 2.37
Notional amount related to IRSs in US dollars 46 - - 444 - 210 700
Average IRS rate in US dollars 0.70 3.28 5.05

The following table shows the notional amount and the fair value of the hedging instruments on the interest rate risk of transactions outstanding as at December 31, 2023 and December 31, 2022, broken down by type of hedged item.

Millions of euro Fair value Notional
amount
Fair value
Assets Liabilities Assets Liabilities
Hedging instrument Hedged item at Dec. 31, 2023 at Dec. 31, 2022
Fair value hedges
Interest rate swaps Floating-rate
borrowings/bonds
98 - 544 20 (2) 518
Interest rate swaps Fixed-rate borrowings/
bonds
3 (44) 1,241 2 (90) 1,239
Cash flow hedges
Interest rate swaps Floating-rate bonds 12 (49) 1,040 29 (44) 1,190
Interest rate swaps Floating-rate loan
assets
- (7) 145 - (9) 162
Interest rate swaps Floating-rate
borrowings
163 (35) 4,956 307 (7) 4,646
Total 276 (135) 7,926 358 (152) 7,755

The following table shows the notional amount and the fair value of hedging derivatives on interest rate risk as at December 31, 2023 and December 31, 2022, broken down by type of hedge.

Millions of euro Notional amount Fair value assets Notional amount Fair value liabilities
Derivatives at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
Fair value hedges
Interest rate swaps 556 154 101 22 1,229 1,603 (44) (92)
Total 556 154 101 22 1,229 1,603 (44) (92)
Cash flow hedges
Interest rate swaps 4,144 4,958 175 336 1,997 1,040 (91) (60)
Total 4,144 4,958 175 336 1,997 1,040 (91) (60)
TOTAL INTEREST RATE DERIVATIVES 4,700 5,112 276 358 3,226 2,643 (135) (152)

The notional amount of derivatives classified as hedging instruments at December 31, 2023 came to €7,926 million, with a corresponding positive fair value of €141 million.

Compared with December 31, 2022, the notional amount increased by €171 million, mainly reflecting:

  • the expiry of interest rate swaps amounting to €159 million;
  • early closure of interest rate swaps for an amount of €150 million, following early redemption of the underlying;

• new interest rate swaps amounting to €800 million;

• the reduction in the notional amount of amortizing interest rate swaps in the amount of €320 million.

The deterioration in the fair value of €65 million mainly reflects developments in the yield curve.

Fair value hedge derivatives

The following table reports net gains and losses recognized through profit or loss in respect of fair value hedge derivatives and the hedged item that are attributable to interest rate risk both in 2023 and the previous year.

Millions of euro 2023 2022
Net gain/(loss) Net gain/(loss)
Interest rate hedging instruments 125 (84)
Hedged item (132) 75
Ineffective portion (7) (9)

The following table shows the impact of fair value hedges of interest rate risk in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Notional
amount
Fair value used
Carrying
ineffectiveness
amount
Notional
amount
Carrying
amount
Interest rate swaps 1,785 57 57 1,757 (70) (70)

The following table shows the impact of the hedged item of fair value hedges in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Carrying
amount
Cumulative
adjustment of
fair value of
hedged item
Fair value used
to measure
ineffectiveness
in the year
Carrying
amount
Cumulative
adjustment
of fair value
of hedged
item
Fair value used
to measure
ineffectiveness
in the year
Fixed-rate borrowings 1,186 (43) 44 1,138 (89) (79)
Fixed-rate bonds 14 2 (2) 14 2 (2)
Floating-rate bonds 671 41 (107) 576 (16) (18)
Total 1,871 - (65) 1,728 (103) (99)

Cash flow hedge derivatives

The following table shows the cash flows expected in

coming years from cash flow hedge derivatives on interest rate risk.

Millions of euro Fair value
Distribution of expected cash flows
at Dec. 31, 2023 2024 2025 2026 2027 2028 Beyond
Cash flow hedge derivatives on interest rates
Positive fair value 175 86 29 19 14 12 28
Negative fair value (91) (8) (21) (20) (17) (13) (22)

The following table shows the impact of cash flow hedges of interest rate risk in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Notional
amount
Carrying
amount
Notional
amount
Carrying
amount
Interest rate swaps 6,141 84 84 5,998 276 276

The following table shows the impact of the hedged item of cash flow hedges in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Fair value
through
P&L of CFH
derivatives
designated
after initial
recognition
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Fair value
through
P&L of CFH
derivatives
designated
after initial
recognition
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Floating-rate
bonds
37 - (37) - - 15 - (15) - -
Floating-rate loan
assets
7 - (7) - - 9 - (9) - -
Floating-rate
borrowings
(149) (20) 149 - (1) (327) (28) 326 - 2
Total (105) (20) 105 - (1) (303) (28) 302 - 2

Currency risk

The following table reports the maturity profile of the notional amount and associated average contractual exchange rate for the instruments hedging currency risk on transactions outstanding at December 31, 2023 and December 31, 2022.

Millions of euro Maturity
2024 2025 2026 2027 2028 Beyond Total
At Dec. 31, 2023
Cross currency interest rate swaps (CCIRSs)
Total notional amount of CCIRSs 4,562 2,577 1,222 2,337 2,037 13,386 26,121
Notional amount for CCIRSs EUR/USD 2,213 2,036 1,132 1,560 2,037 9,102 18,080
Average exchange rate EUR/USD 1.13 1.07 1.07 1.10 1.18 1.15
Notional amount for CCIRSs EUR/GBP 981 - - 577 - 3,856 5,414
Average exchange rate EUR/GBP 0.88 0.90 0.82
Notional amount for CCIRSs EUR/CHF 242 - - 140 - - 382
Average exchange rate EUR/CHF 1.07 1.21
Notional amount for CCIRSs USD/BRL 279 231 91 - - 387 988
Average exchange rate USD/BRL 5.50 5.22 5.30 4.13
Notional amount for CCIRSs EUR/BRL 445 231 - 60 - - 736
Average exchange rate EUR/BRL 6.25 6.05 3.92
Currency forwards
Total notional amount of forwards 4,616 1,186 507 - - - 6,309
Notional amount - currency forwards EUR/USD 3,144 1,042 507 - - - 4,693
Average currency forward rate - EUR/USD 1.10 1.11 1.13
Notional amount - currency forwards USD/CLP 938 141 - - - - 1,079
Average currency forward rate - USD/CLP 873.05 885.2239
Notional amount - currency forwards EUR/CNH 175 - - - - - 175
Average currency forward rate - EUR/CNH 7.81
Notional amount - currency forwards USD/BRL 130 - - - - - 130
Average currency forward rate - USD/BRL 4.95
Notional amount - currency forwards USD/COP 122 2 - - - - 124
Average currency forward rate - USD/COP 4,498.97 4,597.37
EN
1 Enel Group 3 Group Strategy & Risk Management
EMAKKE
ents R
CERTIFIED
Millions of euro Maturity
2023 2024 2025 2026 2027 Beyond Total
At Dec. 31, 2022
Cross currency interest rate swaps (CCIRSs)
Total notional amount of CCIRSs 1,908 4,831 2,648 1,265 2,380 15,701 28,733
Notional amount for CCIRSs EUR/USD 1,171 2,290 2,107 1,171 1,615 11,529 19,883
Average exchange rate EUR/USD 1.33 1.13 1.07 1.18 1.10 1.15
Notional amount for CCIRSs EUR/GBP - 958 - - 564 3,721 5,243
Average exchange rate EUR/GBP 0.88 0.90 0.81
Notional amount CCIRSs EUR/CHF - 228 - - 132 - 360
Average exchange rate EUR/CHF 1.06 1.21
Notional amount for CCIRSs USD/BRL 140 288 239 94 - - 761
Average exchange rate USD/BRL 5.22 5.50 5.22 5.29
Notional amount for CCIRSs EUR/BRL 597 438 181 - 70 - 1,286
Average exchange rate EUR/BRL 6.09 6.25 6.16 3.92
Currency forwards
Total notional amount of forwards 6,127 2,374 625 - - - 9,126
Notional amount - currency forwards EUR/USD 4,713 2,345 625 - - - 7,683
Average currency forward rate - EUR/USD 1.09 1.10 1.11
Notional amount - currency forwards USD/BRL 333 - - - - - 333
Average currency forward rate - USD/BRL 5.61
Notional amount - currency forwards EUR/CNH 311 - - - - - 311
Average currency forward rate - EUR/CNH 7.41
Notional amount - currency forwards USD/CLP 199 20 - - - - 219
Average currency forward rate - USD/CLP 906.90 921.05
Notional amount - currency forwards USD/COP 156 2 - - - - 158
Average currency forward rate - USD/COP 4,720.74 4,444.96

The following table shows the notional amount and the fair value of the hedging instruments on the currency risk of transactions outstanding as at December 31, 2023 and December 31, 2022 broken down by type of hedged item.

Millions or euro Fair value Notional
amount
Fair value Notional
amount
Hedging instrument Hedged item Assets Liabilities Assets Liabilities
at Dec. 31, 2023 at Dec. 31, 2022
Fair value hedges
Cross currency interest rate swaps
(CCIRSs)
Fixed-rate borrowings/bonds in
foreign currencies
12 (78) 1,019 15 (99) 1,097
Cross currency interest rate swaps
(CCIRSs)
Floating-rate borrowings in
foreign currencies
- - - - - -
Cash flow hedges
Cross currency interest rate swaps
(CCIRSs)
Floating-rate borrowings/
financial assets in foreign
currencies
67 (36) 754 95 (76) 1,061
Cross currency interest rate swaps
(CCIRSs)
Fixed-rate borrowings/financial
assets in foreign currencies
5 (220) 2,104 4 (233) 2,445
Cross currency interest rate swaps
(CCIRSs)
Floating-rate bonds in foreign
currencies
56 - 250 60 - 414
Cross currency interest rate swaps
(CCIRSs)
Fixed-rate bonds in foreign
currencies
965 (1,724) 21,763 1,864 (1,293) 23,381
Cross currency interest rate swaps
(CCIRSs)
Future cash flows denominated
in foreign currencies
- (43) 231 - (50) 335
Currency forwards Future cash flows denominated
in foreign currencies
2 (1) 117 9 (6) 326
Currency forwards Future commodity purchases
denominated in foreign
currencies
54 (126) 5,666 192 (135) 7,508
Currency forwards Purchases of investment goods
and other in foreign currencies
3 (12) 526 19 (23) 1,292
Total 1,164 (2,240) 32,430 2,258 (1,915) 37,859

Cash flow hedges and fair value hedges include:

  • CCIRSs with a notional amount of €24,886 million used to hedge the currency risk on fixed-rate debt denominated in currencies other than the euro with a negative fair value of €1,040 million;
  • CCIRSs with a notional amount of €1,235 million used to hedge the currency risk on floating-rate debt denominated in currencies other than the euro, with a positive fair value of €44 million;
  • currency forwards with a notional amount of €5,783 million used to hedge the currency risk associated with purchases of natural gas, purchases of fuel and expected cash flows in currencies other than the euro, with a total negative fair value of €71 million;
  • currency forwards with a notional amount of €526 million and a negative fair value of €9 million, in respect of OTC transactions to mitigate the currency risk on expected cash flows in currencies other than the presentation currency connected with the purchase of investment goods in the renewables (including Battery Energy Storage Systems - BESS) and infrastructure and networks sectors (new generation digital meters), on operating costs for the supply of cloud services and on revenue from the sale of renewable energy.

The following table reports the notional amount and fair value of foreign exchange derivatives at December 31, 2023 and December 31, 2022, broken down by type of hedge.

Millions of euro Notional amount Fair value assets Notional amount Fair value liabilities
Derivatives at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
Fair value hedges
CCIRSs 90 99 12 15 929 998 (78) (99)
Total 90 99 12 15 929 998 (78) (99)
Cash flow hedges
Currency forwards 1,979 4,313 59 220 4,330 4,813 (140) (164)
CCIRSs 13,474 16,695 1,093 2,023 11,628 10,941 (2,022) (1,652)
Total 15,453 21,008 1,152 2,243 15,958 15,754 (2,162) (1,816)
TOTAL EXCHANGE RATE
DERIVATIVES
15,543 21,107 1,164 2,258 16,887 16,752 (2,240) (1,915)

The notional amount of CCIRSs at December 31, 2023 amounted to €26,121 million, a decrease of €2,612 million from €28,733 million at December 31, 2022. In particular:

  • CCIRSs with a total amount of €737 million expired;
  • a partial unwinding operation of CCIRSs was carried out following the early repurchase of part of the hybrid bond denominated in US dollars. That transaction, together with the natural expiry of the residual portion of that liability and the associated CCIRSs, caused a decrease in the notional amount compared with December 31, 2022 of €1,171 million;
  • new derivatives amounted to €109 million. The notional amount decreased by €813 million, reflecting developments in the exchange rate of the euro against the main other currencies and the effect of amortization.

The notional amount of currency forwards at December 31, 2023 amounted to €6,309 million (€9,126 million at December 31, 2022), a decrease of €2,817 million. The exposure to currency risk, especially that associated with the US dollar, is mainly due to purchases of natural gas, purchases of fuel and cash flows in respect of investments.

After the turbulence experienced in raw material prices during 2022, which led to a considerable increase in the notional amounts hedged, the notional value of currency hedges on energy commodities returned to normal operating levels in 2023. The deterioration of net fair value of €137 million reflected normal developments in exchange rates.

Fair value hedge derivatives

The following table reports net gains and losses recognized through profit or loss, reflecting changes in the fair value of fair value hedge derivatives and the hedged item that are attributable to currency risk for 2023 and the previous year.

Millions of euro 2023 2022
Net gain/(loss) Net gain/(loss)
Interest rate hedging instruments 20 (119)
Hedged item (12) 129
Ineffective portion 8 10

The following table shows the impact of fair value hedges of currency risk in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness
in the year
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness
in the year
Cross currency interest rate swaps (CCIRSs) 1,019 (66) (68) 1,097 (84) (87)

The following table shows the impact of the hedged item of fair value hedges in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Carrying
amount
Cumulative
adjustment of
fair value of
hedged item
Fair value used
to measure
ineffectiveness
in the year
Carrying
amount
Cumulative
adjustment of
fair value of
hedged item
Fair value used
to measure
ineffectiveness
in the year
Fixed-rate bonds in foreign currencies 500 (77) 48 458 (106) 90
Fixed-rate borrowings in foreign
currencies
434 (7) 24 520 (8) (2)
Total 934 (84) 72 978 (114) 88

Cash flow hedge derivatives

The following table shows the cash flows expected in coming years from cash flow hedge derivatives on currency risk.

Millions of euro Fair value Distribution of expected cash flows
at Dec. 31, 2023 2024 2025 2026 2027 2028 Beyond
Cash flow hedge derivatives on exchange rates
Positive fair value 1,152 358 216 258 211 273 885
Negative fair value (2,162) (960) (594) (13) (34) (18) (644)

The following table shows the impact of cash flow hedges of currency risk in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness
in the year
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness
in the year
Cross currency interest rate swaps (CCIRSs) 25,102 (930) (919) 27,636 371 433
Currency forwards 6,309 (80) (73) 9,126 56 56
Total 31,411 (1,010) (992) 36,762 427 489

The following table shows the impact of the hedged item of cash flow hedges in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Other
effects(1)
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Other
effects(1)
Floating-rate
borrowings in
foreign currencies
(31) 31 - - - (30) 30 - (11) -
Fixed-rate
borrowings in
foreign currencies
219 (219) 4 - - 225 (225) (4) - -
Floating-rate bonds
in foreign currencies
(56) 56 - - - (60) 60 - - -
Fixed-rate bonds in
foreign currencies
861 (861) (15) - 118 (628) 509 (56) - 118
Future cash flows
denominated in
foreign currencies
(hedged with
CCIRSs)
43 (43) - - - 50 (50) - - -
Future cash flows
denominated in
foreign currencies
(hedged with
forwards)
(1) 1 - - - (3) 3 - - -
Future commodity
purchases
denominated in
foreign currencies
72 (72) (1) - - (60) 59 (1) (1) -
Purchases of
investment goods
and other in foreign
currencies
3 (3) (6) - - 7 (7) 1 2 -
Total 1,110 (1,110) (18) - 118 (499) 379 (60) (10) 118

(1) Impact connected with the change in spot exchange rates between the date the CCIRSs to hedge bonds in foreign currencies were obtained and the actual disbursement of the loan for the CCIRSs obtained in 2022.

Commodity price risk

Millions of euro Maturity
2024 2025 2026 2027 2028 Beyond Total
At Dec. 31, 2023
Commodity swaps
Notional amount on power 128 106 100 284 91 286 995
Average commodity swap price on power (€/MWh) 87.0 44.0 37.0 59.6 32.0 34.0
Notional amount on coal/shipping - - - - - - -
Average commodity swap price on coal/shipping (\$/ton) - - - - - -
Notional amount on gas 1,551 1,747 296 - - 125 3,719
Average commodity swap price on gas (€/MWh) 41.8 40.4 27.0 - - 7.0
Notional amount on oil 1,016 106 10 - - - 1,132
Average commodity swap price on oil (\$/barrel) 86.0 78.0 69.0 - - -
Commodity forwards/futures
Notional amount on power 2,506 388 297 258 151 606 4,206
Average commodity forward/future price on power (€/MWh) 114.9 18.0 18.0 16.0 18.0 16.0
Notional amount on coal/shipping 38 - - - - - 38
Average commodity forward/future price on coal/shipping (\$/ton) 175.0 - - - - -
Notional amount on gas 4,432 377 626 - - - 5,435
Average commodity forward/future price on gas (€/MWh) 71.4 48.9 32.0 - - -
Notional amount on CO2 662 336 21 - - - 1,019
Average commodity forward/future price on CO2
(€/ton)
91.9 93.0 84.0 - - -
Notional amount on oil 354 - - - - - 354
Average commodity forward/future price on oil (\$/barrel) 74.6 - - - - -
Commodity options
Notional amount on power 24 39 44 39 39 342 527
Average commodity option price on power (€/MWh) 27.5 30.0 30.5 34.0 34.0 34.0
Notional amount on gas - - - - - - -
Average commodity option price on gas (€/MWh) - - - - - -
Notional amount on oil - - - - - - -
Average commodity option price on oil (\$/barrel) - - - - - -
Millions of euro
2023 2024 2025 2026 2027 Beyond Total
At Dec. 31, 2022
Commodity swaps
Notional amount on power 653 164 143 139 132 333 1,564
Average commodity swap price on power (€/MWh) 162.5 77.9 48.9 47.2 45.8 29.0
Notional amount on coal/shipping 1,037 - - - - - 1,037
Average commodity swap price on coal/shipping (\$/ton) 293.7 - - - - -
Notional amount on gas 1,183 1,184 1,205 23 20 65 3,680
Average commodity swap price on gas (€/MWh) 60.1 47.9 52.0 21.0 8.3 7.2
Notional amount on oil 1,076 227 48 - - - 1,351
Average commodity swap price on oil (\$/barrel) 105.0 93.0 82.0 - - -
Commodity forwards/futures
Notional amount on power 2,906 509 388 294 249 720 5,066
Average commodity forward/future price on power (€/MWh) 148.1 35.2 17.4 17.8 15.8 15.6
Notional amount on coal/shipping - - - - - - -
Average commodity forward/future price on coal/shipping (\$/ton) - - - - - -
Notional amount on gas 7,171 4,099 229 - - - 11,499
Average commodity forward/future price on gas (€/MWh) 72.9 92.1 56.6 - - -
Notional amount on CO2 1,635 226 50 - - - 1,911
Average commodity forward/future price on CO2
(€/ton)
81.3 94.9 94.0 - - -
Notional amount on oil 1,263 58 - - - - 1,321
Average commodity forward/future price on oil (\$/barrel) 81.7 73.9 - - - -
Commodity options
Notional amount on power 16 16 16 16 16 117 197
Average commodity option price on power (€/MWh) 35.0 35.0 35.0 35.0 35.0 33.0
Notional amount on oil 70 - - - - - 70
Average commodity option price on oil (€/barrel) 133 - - - - - -

The following table reports the notional amount and fair value of instruments hedging commodity price risk on transactions outstanding at December 31, 2023 and December 31, 2022, broken down by type of commodity.

Millions of euro Notional amount Fair value assets Notional amount Fair value liabilities
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
Derivatives
Cash flow hedges
Derivatives on power:
- swaps 684 1,213 357 982 311 352 (233) (498)
- forwards/futures 1,636 1,535 162 89 2,570 3,510 (763) (898)
- options 527 218 93 36 - - (62) (12)
Total derivatives on power 2,847 2,966 612 1,107 2,881 3,862 (1,058) (1,408)
Derivatives on coal/shipping:
- swaps - 9 - 2 - 1,028 - (373)
- forwards/futures - - - - 38 - (17) -
- options - - - - - - - -
Total derivatives on coal/shipping - 9 - 2 38 1,028 (17) (373)
Derivatives on gas and oil:
- swaps 2,785 2,302 623 666 2,066 2,729 (468) (765)
- forwards/futures 3,382 4,734 1,375 1,714 2,407 8,085 (1,198) (5,182)
- options - 22 - 4 - 48 - (4)
Total derivatives on gas and oil 6,167 7,058 1,998 2,384 4,473 10,862 (1,666) (5,951)
Derivatives on CO2:
- swaps - - - - - - - -
- forwards/futures 640 1,704 91 143 379 207 (29) (7)
- options - - - - - - - -
Total derivatives on CO2 640 1,704 91 143 379 207 (29) (7)
TOTAL COMMODITY DERIVATIVES 9,654 11,737 2,701 3,636 7,771 15,959 (2,770) (7,739)

The table reports the notional amount and fair value of derivatives hedging commodity price risk at December 31, 2023 and December 31, 2022, broken down by type of hedge.

The positive fair value of cash flow hedge derivatives on commodities regards derivatives on gas and oil commodities in the amount of €1,998 million, derivatives on CO2 in the amount of € 91 million and derivatives on power for €612 million.

The first category primarily regards hedges of fluctuations in the price of natural gas, for both purchases and sales, carried out for oil commodities and gas products.

The CO2 category mainly includes hedging transactions undertaken for Enel Group compliance purposes.

The power category mainly includes medium/long-term hedging transactions, especially in Spain and North America.

Cash flow hedge derivatives on commodities included in liabilities regard derivatives on gas and oil commodities in the amount of €1,666 million, derivatives on power in the amount of €1,058 million and, to a lesser extent, derivatives on coal and CO2 in the amount of respectively €17 million and €29 million.

Cash flow hedge derivatives

The following table shows the cash flows expected in

coming years from cash flow hedge derivatives on commodity price risk.

Millions of euro Fair value Distribution of expected cash flows
at Dec. 31, 2023 2024 2025 2026 2027 2028 Beyond
Cash flow hedge derivatives on commodities
Positive fair value 2,701 1,861 428 153 85 55 246
Negative fair value (2,770) (1,727) (430) (217) (216) (72) (235)

The following table shows the impact of cash flow hedges of commodity price risk in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness in
the year
Notional
amount
Carrying
amount
Fair value used
to measure
ineffectiveness in
the year
Power swaps 995 124 126 1,564 485 469
Coal/shipping swaps - - - 1,037 (371) (371)
Gas and oil swaps 4,850 155 155 5,031 (99) (98)
Power forwards/futures 4,206 (602) (638) 5,045 (809) (938)
Coal/shipping forwards/futures 38 (17) (17) - - -
Gas and oil forwards/futures 5,789 178 92 12,820 (3,469) (3,673)
CO2
forwards/futures
1,019 62 62 1,911 136 138
Power options 528 31 31 218 24 24
Gas and oil options - - - 70 - -
Total 17,425 (69) (189) 27,696 (4,103) (4,449)

The following table shows the impact of the hedged item of cash flow hedges in the statement of financial position at December 31, 2023 and December 31, 2022.

Millions of euro at Dec. 31, 2023 at Dec. 31, 2022
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Fair value of
the hedged
item used
to measure
ineffectiveness
in the year
Hedging
reserve
Hedging
costs
reserve
Ineffective
portion of
carrying
amount
of CFH
derivatives
Future transactions in power 491 (491) 12 (59) 602 (602) 15 (32)
Future transactions in coal/shipping 17 (17) - - 371 (371) - -
Future transactions in gas and oil (422) 422 - (118) 3,360 (3,360) - (232)
Future transactions in CO2 (62) 62 - - (133) 133 - -
Total 24 (24) 12 (177) 4,200 (4,200) 15 (264)

With regard to cash flow hedge derivatives on commodity prices, 2023 was marked by a progressive reduction in the extreme price volatility seen in past years.

The greatest impact in terms of changes in the cash flow hedge reserve is mainly attributable to future transactions in gas and power, which experience a reduction in the magnitude of the amount to defer to future years because those commodities were the most affected by the high price volatility.

Moreover, the change is also attributable to the usual re-

lease of the impact on profit or loss of amounts accrued in 2023, which were the most affected by major price swings of the past years.

The ineffectiveness recognized in 2023 on future transactions in gas is mainly related to proxy hedging operations in Spain, while ineffectiveness on future transactions in power is mainly related to proxy hedging operations in North America.

51.2 Derivatives at fair value through profit or loss

The following table shows the notional amount and the fair value of derivatives at FVTPL as at December 31, 2023 and December 31, 2022.

Millions of euro Notional amount Fair value assets Notional amount Fair value liabilities
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
at Dec. 31,
2023
at Dec. 31,
2022
Derivatives at FVTPL
on interest rates:
- interest rate swaps - - - - 100 100 (29) (23)
- interest rate options - - - - - - - -
on exchange rates:
- currency forwards 1,818 3,659 25 75 1,874 2,102 (29) (34)
- CCIRSs - - - - - 46 - (1)
on commodities
Derivatives on power:
- swaps 243 595 24 106 68 245 (16) (180)
- forwards/futures 5,294 6,903 905 872 5,039 5,620 (906) (908)
- options 46 7 4 15 80 140 (171) (172)
Total derivatives on power 5,583 7,505 933 993 5,187 6,005 (1,093) (1,260)
Derivatives on coal:
- swaps - - - - - - - -
- forwards/futures 156 115 23 21 112 1,291 (43) (9)
- options - - - - - - - -
Total derivatives on coal 156 115 23 21 112 1,291 (43) (9)
Derivatives on gas and oil:
- swaps 969 1,964 295 806 529 834 (167) (550)
- forwards/futures 10,687 40,669 2,970 10,456 10,856 38,651 (2,963) (10,280)
- options 448 34 344 8 278 33 (232) (22)
Total derivatives on gas and oil 12,104 42,667 3,609 11,270 11,663 39,518 (3,362) (10,852)
Derivatives on CO2
:
- swaps - - - - - - - -
- forwards/futures 498 725 41 115 426 361 (42) (35)
- options 12 2 14 2 11 - (14) -
Total derivatives on CO2 510 727 55 117 437 361 (56) (35)
Derivatives on other:
- swaps - - - - 39 - (6) -
- forwards/futures 16 13 4 72 171 5 (71) (16)
- options - - - - 5 - - -
Total derivatives on other 16 13 4 72 215 5 (77) (16)
TOTAL 20,187 54,686 4,649 12,548 19,588 49,428 (4,689) (12,230)

At December 31, 2023 the notional amount of trading derivatives on interest rates came to €100 million. The negative fair value of €29 million deteriorated by €6 million on the previous year mainly due to developments in the yield curve.

At December 31, 2023 the notional amount of derivatives on exchange rates was €3,692 million. After the strains experienced in raw material prices during 2022, which led to a considerable increase in the notional amounts hedged, the notional value of currency hedges on energy commodities returned to normal operating levels in 2023. This produced an overall decrease in the value of the hedges of €2,069 million. The deterioration of net fair value of €45 million reflected normal developments in exchange rates.

At December 31, 2023, the notional amount of derivatives on commodities came to €35,983 million. In absolute terms, the notional amounts decreased compared with 2022 in line with the gradual decline observed in the prices of energy commodities. The fair value of trading derivatives on commodities classified as assets mainly reflects the market valuation of hedges of gas and oil amounting to €3,609 million, derivatives on power amounting to €933 million, derivatives on CO2 amounting to €55 million and, to a lesser extent, derivatives on coal and other commodities totaling €23 million and €4 million, respectively. The fair value of trading derivatives on commodities classified as liabilities mainly regards hedges of gas and oil amounting to €3,362 million, derivatives on power amounting to €1,093 million, and derivatives on CO2, coal and other commodities in the amount of €56 million, €43 million and €77 million, respectively.

These amounts include transactions managed within the trading portfolios and transactions that, although established for hedging purposes, did not meet the requirements for hedge accounting.

In addition to weather derivative hedges, the "other" category includes hedges carried out on guarantees of origin and green certificates, i.e. incentive mechanisms for the production of electricity from renewable sources. In addition to the commodity price risk, the Group companies have to manage the risk of fluctuations in the price of these certificates which were recently affected by greater market volatility compared with the past, due to the increasing market attention to environmental sustainability issues.

Fair value measurement

52. Assets and liabilities measured at fair value

The Group determines fair value in accordance with IFRS 13 whenever such measurement is required by the IFRS as a recognition or measurement criterion.

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability, in an orderly transaction, between market participants, at the measurement date (i.e. an exit price).

The best proxy of fair value is market price, i.e. the current publicly available price actually used on a liquid and active market.

The fair value of assets and liabilities is classified in accordance with the three-level hierarchy described below, depending on the inputs and valuation techniques used in determining their fair value:

  • Level 1, where the fair value is determined on the basis of quoted prices (unadjusted) in active markets for identical assets or liabilities that the entity can access at the measurement date;
  • Level 2, where the fair value is determined on the basis of inputs other than quoted prices included within

Level 1 that are observable for the asset or liability, either directly (such as prices) or indirectly (derived from prices);

• Level 3, where the fair value is determined on the basis of unobservable inputs.

This note also provides detailed disclosures concerning the valuation techniques and inputs used to perform these measurements.

To that end:

  • recurring fair value measurements of assets or liabilities are those required or permitted by the IFRS in the statement of financial position at the close of each period;
  • non-recurring fair value measurements are those required or permitted by the IFRS in the statement of financial position in particular circumstances.

For general information or specific disclosures on the accounting treatment of these circumstances, please see note 2 "Accounting policies".

52.1 Assets measured at fair value in the statement of financial position

The following table shows, for each class of assets measured at fair value on a recurring or non-recurring basis in the statement of financial position, the fair value measurement at the end of the reporting period and the level in the fair value hierarchy into which the fair value measurements of those assets are classified.

Millions of euro Non-current assets Current assets
Notes Fair value Level 1 Level 2 Level 3 Fair value Level 1 Level 2 Level 3
at Dec. 31, 2023 at Dec. 31, 2023
Equity investments in other
companies at FVOCI
29 338 15 28 295 - - - -
Securities at FVOCI 29.1, 30.1 505 505 - - 81 81 - -
Loan assets and other financial
assets at FVOCI
39 - - 39 - - - -
Equity investments in other
companies at FVTPL
29 8 - - 8 - - - -
Financial assets from service
concession arrangements at
FVTPL
29 4,080 - 4,080 - - - - -
Financial assets from JDA at FVTPL 123 41 - 82 - - - -
Loan assets and other financial
assets at FVTPL
169 - - 169 190 131 - 59
Other cash investments at FVTPL - - - - 29 29 - -
Fair value hedge derivatives:
- on interest rates 51 101 - 101 - - - - -
- on exchange rates 51 12 - 12 - - - - -
Cash flow hedge derivatives:
- on interest rates 51 174 - 174 - 1 - 1 -
- on exchange rates 51 1,007 - 1,007 - 145 - 145 -
- on commodities 51 883 173 375 335 1,818 1,311 413 94
Trading derivatives:
- on interest rates 51 - - - - - - - -
- on exchange rates 51 1 - 1 - 24 - 24 -
- on commodities 51 205 27 178 - 4,419 3,038 1,381 -
Non-monetary grants in respect
of environmental certificates
- - - - 18 1 11 6
Inventories measured at fair value 51 48 48 - - 3 - 3 -
Contingent consideration 5 - - 5 2 - 2 -

The fair value of "equity investments in other companies at FVOCI" is determined for listed companies on the basis of the quoted price at the close of the year, while that for unlisted companies is based on a reliable valuation of the relevant assets and liabilities.

"Financial assets from service concession arrangements at FVTPL" concern electricity distribution operations in Brazil, mainly by Enel Distribuição Rio de Janeiro, Enel Distribuição Ceará and Enel Distribuição São Paulo, and are accounted for in accordance with IFRIC 12.

Fair value was estimated as the net replacement cost based on the most recent rate information available and on the general price index for the Brazilian market.

Level 3 of the non-current portion of "loan assets and other financial assets at FVTPL" reports the receivable in respect of the sale of Slovak Power Holding, which amounted to €39 million at December 31, 2023. Its fair value was determined using the contractual price formula.

The current portion of "loans assets and other financial assets at FVTPL" includes mainly under Level 1 financial deposits held by Latin American companies.

In addition, "loan assets and other financial assets at FVT-PL" include the non-current portion (€130 million) and the current portion (€59 million) of "super-eco-sisma bonus" receivables purchased after the enactment of the Revival Decree and assigned to banks, the measurement of which falls within Level 3.

The current portion of "other cash investments at FVTPL" at Level 1 mainly refers to investment in money-market funds to manage the liquidity of Enel Insurance.

The fair value of derivative contracts is determined using the official prices for instruments traded on regulated markets. The fair value of instruments not listed on a regulated market is determined using valuation methods appropriate for each type of financial instrument and market

data as of the end of the reporting period (such as interest rates, exchange rates, volatility), discounting expected future cash flows on the basis of the market yield curve and translating amounts in currencies other than the euro using exchange rates provided by the World Markets Refinitiv (WMR) Company.

Derivatives on interest rates and exchange rates are all measured using Level 2 inputs.

The fair value of derivatives on commodities is almost always measured using Level 1 or Level 2 inputs, as the determination is based on market inputs as these contracts are entered into with exchange counterparties, leading sector operators or financial institutions.

Certain long-term financial contracts in Spain (Virtual Power Purchase Agreements, or VPPAs), for which internal measurement models were also used in part in order to measure these instruments over longer time horizons, given the illiquidity of the underlying variables fall within Level 3.

In accordance with the IFRS, the Group assesses credit risk, both of the counterparty (Credit Valuation Adjustment or CVA) and its own (Debit Valuation Adjustment or DVA), in order to adjust the fair value of financial instruments for the corresponding amount of counterparty risk where necessary. More specifically, the Group measures CVA/ DVA using a Potential Future Exposure valuation technique for the net exposure of the position and subsequently allocating the adjustment to the individual financial instruments that make up the overall portfolio. All of the inputs used in this technique are observable on the market.

52.2 Assets not measured at fair value in the statement of financial position

For each class of assets not measured at fair value on a recurring basis but whose fair value must be reported, the following table reports the fair value at the end of the year and the level in the fair value hierarchy into which the fair value measurements of those assets are classified.

Millions of euro Non-current assets Current assets
Notes Fair value Level 1 Level 2 Level 3 Fair value Level 1 Level 2 Level 3
at Dec. 31, 2023 at Dec. 31, 2023
Investment property 22 98 7 - 91 - - - -
Inventories 33 - - - - 45 - - 45

The table reports the fair value of investment property and inventories of real estate not used in the business in the amount of €98 million and €45 million respectively. The amounts were calculated with the assistance of appraisals conducted by independent experts, who used different methods depending on the specific assets involved.

52.3 Liabilities measured at fair value in the statement of financial position

The following table reports for each class of liabilities measured at fair value on a recurring or non-recurring basis in the statement of financial position the fair value measurement at the end of the reporting period and the level in the fair value hierarchy into which the fair value measurements are classified.

Millions of euro Non-current liabilities Current liabilities
Notes Fair value Level 1 Level 2 Level 3 Fair value Level 1 Level 2 Level 3
at Dec. 31, 2023 at Dec. 31, 2023
Fair value hedge derivatives:
- on interest rates 51 27 - 27 - 17 - 17 -
- on exchange rates 51 78 - 78 - - - - -
Cash flow hedge derivatives:
- on interest rates 51 91 - 91 - - - - -
- on exchange rates 51 1,830 - 1,830 - 332 - 332 -
- on commodities 51 1,143 43 922 178 1,627 1,030 555 42
Trading derivatives:
- on interest rates 51 - - - - 29 - 29 -
- on exchange rates 51 1 - 1 - 28 - 28 -
- on commodities 51 203 102 100 1 4,428 3,154 1,268 6
Contingent consideration 41 - - 41 26 - 26 -

Contingent consideration mainly regards a number of equity investments held by the Group in North America, whose fair value was determined on the basis of the contractual terms and conditions.

52.4 Liabilities not measured at fair value in the statement of financial position

For each class of liabilities not measured at fair value in the statement of financial position but whose fair value must be reported, the following table reports the fair value at the end of the period and the level in the fair value hierarchy into which the fair value measurements of those liabilities are classified.

Millions of euro
Fair value Level 1 Level 2 Level 3
at Dec. 31, 2023
Bonds:
- fixed rate 45,727 43,287 2,440 -
- floating rate 3,097 66 3,031 -
Bank borrowings:
- fixed rate 3,746 - 3,746 -
- floating rate 12,933 - 12,933 -
Non-bank borrowings:
- fixed rate 3,278 - 3,278 -
- floating rate 59 - 59 -
Total 68,840 43,353 25,487 -

For listed debt instruments, the fair value is given by official prices. For unlisted instruments the fair value is determined using appropriate valuation techniques for each category of financial instrument and market data at the close of the year, including the credit spreads of Enel.

Other information

53. Share-based payments

Starting in 2019, the Shareholders' Meeting of Enel SpA ("Enel" or the "Company") has each year approved the adoption of long-term share-based incentive plans for the management of Enel and/or its subsidiaries pursuant to Article 2359 of the Italian Civil Code. Each of the incentive plans approved (the 2019 Long-Term Incentive Plan, the 2020 Long-Term Incentive Plan, the 2021 Long-Term Incentive Plan, the 2022 Long-Term Incentive Plan, the 2023 Long-Term Incentive Plan, referred to hereinafter, respectively, the "2019 LTI Plan", "2020 LTI Plan", the "2021 LTI Plan", the "2022 LTI Plan", the "2023 LTI Plan" and, jointly, the "Plans") provides for the grant of ordinary Company shares ("Shares") to the respective beneficiaries subject to the achievement of specific performance targets.

Plan beneficiaries are the Chief Executive Officer/General Manager of Enel and Enel Group managers in the positions most directly responsible for company performance or considered to be of strategic interest. The Plans provide for the award to the beneficiaries of an incentive consisting of a monetary component and an equity component. This incentive – determined, at the time of the award, as a base value calculated in relation to the fixed remuneration of the individual beneficiary – may vary depending on the degree of achievement of each of the three-year performance targets by the Plans, ranging from zero up to a maximum of 280% or 180% of the base value in the case, respectively, of the Chief Executive Officer/General Manager or the other beneficiaries.

The Plans establish that, of the total incentive effectively vested, the bonus will be fully paid in Shares: (a) for the LTI 2019, 2020, 2021, 2022 and 2023 Plans (i) up to 100% of the base value for the Chief Executive Officer/General Manager (up to 130% for the 2022 LTI Plan), and (ii) up to 50% of the base value for the other beneficiaries (up to 65% for the 2022 LTI Plan); (b) for the LTI 2023 Plan (i) up to 150% of the base value for the Chief Executive Officer/ General Manager, (ii) up to 100% of the base value for officers reporting directly to the Chief Executive Officer/Gen-

eral Manager, including key management personnel, and (iii) up to 65% of the base value for the other beneficiaries, other than those indicated under (i) and (ii) above.

The actual award of the bonus under the Plans is subject to the achievement of specific performance targets during the three-year performance period. If these targets are achieved, 30% of both the stock and cash components of the incentive will be paid in the first year following the end of the performance period and the remaining 70% will be paid in the second year following the end of the performance period. The payment of a substantial portion of long-term variable remuneration (70% of the total) is therefore deferred to the second year following the end of the performance period of the individual Plans.

The following table provides information on the 2019 LTI Plan, the 2020 LTI Plan, the 2021 LTI Plan, the 2022 LTI Plan, and the 2023 LTI Plan.

For more information on the characteristics of the Plans, please see the information documents prepared pursuant to Article 84-bis of the CONSOB Regulation issued with Resolution no. 11971 of May 14, 1999 (the Issuers Regulation), which are available to the public in the section of Enel's website (www.enel.com) dedicated to the Shareholders' Meetings held respectively on May 16, 2019, May 14, 2020, May 20, 2021, May 19, 2022 and May 10, 2023.

Grant date Performance period Verification of
achievement of targets
Payout
2019 LTI Plan 12.11.2019(55) 2019-2021 2022(56) 2022-2023(57)
2020 LTI Plan 17.09.2020(58) 2020-2022 2023(59) 2023-2024(60)
2021 LTI Plan 16.09.2021(61) 2021-2023 2024(62) 2024-2025
2022 LTI Plan 21.09.2022(63) 2022-2024 2025(64) 2025-2026
2023 LTI Plan 05.10.2023(65) 2023-2025 2026(66) 2026-2027

In implementation of the authorizations granted by the Shareholders' Meetings held on the dates indicated above and in compliance with the associated terms and conditions, the Board of Directors approved – at its meetings of September 19, 2019, July 29, 2020, June 17, 2021, June 16, 2022 and October 5, 2023 – the launch of share buyback programs to serve the 2019 LTI Plan, the 2020 LTI Plan, the 2021 LTI Plan, the 2022 LTI Plan, and the 2023 LTI Plan respectively. The number of Shares whose purchase was authorized by the Board of Directors for each Plan, the actual number of Shares purchased, the associated weighted average price and total value are shown below.

(55) The date on which the Board of Directors approved the procedures and timing for granting the 2019 LTI Plan to the beneficiaries (taking account of the proposal issued by the Nomination and Compensation Committee at its meeting of November 11, 2019).

(56) On the occasion of the approval of the consolidated financial statements of the Enel Group at December 31, 2021, the Board of Directors verified the level of achievement of the performance targets of the 2019 LTI Plan.

(57) On September 5, 2022 the Company awarded part of the equity component of the bonus vested by the beneficiaries of the 2019 LTI Plan, in accordance with the Plan rules. The remainder of the equity component of the bonus vested by the beneficiaries of the 2019 LTI Plan was awarded on September 5, 2023. (58) The date on which the Board of Directors approved the procedures and timing for granting the 2020 LTI Plan to the beneficiaries (taking account of the

proposal issued by the Nomination and Compensation Committee at its meeting of September 16, 2020). (59) On the occasion of the approval of the consolidated financial statements of the Enel Group at December 31, 2022, the Board of Directors verified the level

of achievement of the performance targets of the 2020 LTI Plan. (60) On September 5, 2023 the Company awarded part of the equity component of the bonus vested by the beneficiaries of the 2020 LTI Plan, in accordance

with the Plan rules. (61) The date on which the Board of Directors approved the procedures and timing for granting the 2021 LTI Plan to the beneficiaries (taking account of the proposal issued by the Nomination and Compensation Committee at its meeting of June 9, 2021).

(62) On the occasion of the approval of the consolidated financial statements of the Enel Group at December 31, 2023, the Board of Directors will verify the level of achievement of the performance targets of the 2021 LTI Plan.

(63) The date on which the Board of Directors approved the procedures and timing for granting the 2022 LTI Plan to the beneficiaries (taking account of the proposal issued by the Nomination and Compensation Committee at its meeting of June 8, 2022).

(64) On the occasion of the approval of the consolidated financial statements of the Enel Group at December 31, 2024, the Board of Directors will verify the level of achievement of the performance targets of the 2022 LTI Plan.

(65) The date on which the Board of Directors approved the procedures and timing for granting the 2023 LTI Plan to the beneficiaries (taking account of the proposal issued by the Nomination and Compensation Committee at its meeting of October 4, 2023).

(66) On the occasion of the approval of the consolidated financial statements of the Enel Group at December 31, 2025, the Board of Directors will verify the level of achievement of the performance targets of the 2023 LTI Plan.

Purchases authorized by the
Board of Directors
Actual purchases
Number of Shares Number of
Shares
Weighted average price
(euros per Share)
Total value (euros)
2019 LTI Plan No more than 2,500,000 for a
maximum amount of €10,500,000
million
1,549,152(67) 6.7779 10,499,999
2020 LTI Plan 1,720,000 1,720,000(68) 7.4366 12,790,870
2021 LTI Plan 1,620,000 1,620,000(69) 7.8737 12,755,459
2022 LTI Plan 2,700,000 2,700,000(70) 5.1951 14,026,715
2023 LTI Plan 4,200,000 3,377,224(71) 6.2205(72) 21,007,908(73)

As a result of the purchases made to support the 2019 LTI Plan, the 2020 LTI Plan, the 2021 LTI Plan, the 2022 LTI Plan, and the 2023 LTI Plan, and taking into account the award on September 5, 2022 of 435,357 Shares to the beneficiaries of the 2019 LTI Plan and on September 5, 2023 of 1,268,689 Shares to the beneficiaries of the 2019 LTI Plan and 2020 LTI Plan, at December 31, 2023 Enel holds a total of 9,262,330 treasury shares, equal to about 0.09% of share capital. The share buyback program to serve the 2023 LTI Plan was completed with the purchases made on January 18, 2024. Taking account of the total number of Shares purchased to serve the 2023 LTI Plan, at the publication date of this document Enel holds a total of 10,085,106 treasury shares, equal to about 0.1% of share capital.

The following information concerns the equity instruments granted in 2019, 2020, 2021, 2022 and 2023.

2023 2022
Number of
Shares granted
at the grant
date
Fair value per
Share at the
grant date
Number of Shares
potentially available
for award
Number of
Shares awarded
Number of
Shares potentially
available for award
Number of Shares
awarded
2019 LTI Plan 1,538,547 6.983 0 956,562(74) 1,021,328 435,357(75)
2020 LTI Plan 1,638,775 7.380 728,265 312,127(76) 1,631,951 -
2021 LTI Plan 1,577,773 7.0010 1,375,671 - 1,577,773 -
2022 LTI Plan 2,398,143 4.8495 2,023,677 - 2,395,323 -
2023 LTI Plan 4,040,820 5.5540 4,040,820 - -

(69) Shares purchased in the period between June 18 and July 21, 2021, equal to about 0.016% of share capital.

  • (72) Weighted average price of the Shares purchased to serve the 2023 LTI Plan at December 31, 2023.
  • (73) Total value of the Shares purchased to serve the 2023 LTI Plan at December 31, 2023.

(67) Shares purchased in the period between September 23 and December 2, 2019, equal to about 0.015% of share capital.

(68) Shares purchased in the period between September 3 and October 28, 2020, equal to about 0.017% of share capital.

(70) Shares purchased in the period between June 17 and July 20, 2022, equal to about 0.026% of share capital.

(71) Number of Shares purchased to serve the 2023 LTI Plan at December 31, 2023. The share buyback programs to serve the 2023 LTI Plan, launched on October 16, 2023, was completed with the purchases made on January 18, 2024. The program involved the purchase of a total of 4,200,000 Shares, equal to about 0.04% of share capital, at the weighted average price of €6.3145 per share and with a total value of €26,520,849.002.

(74) The table shows the number of Shares awarded on September 5, 2023, to the beneficiaries of the 2019 LTI Plan, which make up the remaining portion of the equity component of the bonus vested by the beneficiaries following the achievement of the performance objectives of the Plan.

(75) The table shows the number of Shares awarded on September 5, 2022, to the beneficiaries of the 2019 LTI Plan, which make up part of the equity component of the bonus vested by the beneficiaries following the achievement of the performance objectives of the Plan. The remaining portion of the equity component of the bonus, in accordance with the terms and procedures of the rules of the 2019 LTI Plan, was paid on September 5, 2023.

(76) The table shows the number of Shares awarded on September 5, 2023, to the beneficiaries of the 2020 LTI Plan, which make up part of the equity component of the bonus vested by the beneficiaries following the achievement of the performance objectives of the Plan. Disbursement of the remaining portion of the equity component of the bonus is deferred to 2024, in accordance with the terms and procedures of the rules of the 2020 LTI Plan.

The fair value of those equity instruments is measured on the basis of the market price of Enel Shares at the grant date.(77)

The cost of the equity component is determined on the basis of the fair value of the equity instruments granted and is recognized over the duration of the vesting period through an equity reserve.

The total costs recognized by the Group through profit or loss amounted to €6 million in 2023 (€11 million in 2022). There have been no terminations or amendments involving the 2019 LTI Plan, the 2020 LTI Plan, the 2021 LTI Plan, the 2022 LTI Plan, or the 2023 LTI Plan.

54. Related parties

As an operator in the field of generation, distribution, transport and sale of electricity and the sale of natural gas, Enel carries out transactions with a number of companies directly or indirectly controlled by the Italian State, the Group's controlling shareholder.

The table below summarizes the main types of transactions carried out with such counterparties.

Related party Relationship Nature of main transactions
Single Buyer Fully controlled (indirectly) by the Ministry
for the Economy and Finance
Purchase of electricity for the enhanced protection market
Cassa Depositi e Prestiti Group Directly controlled by the Ministry for the
Economy and Finance
Sale of electricity on the Ancillary Services Market (Terna)
Sale of electricity transport services (Eni Group)
Purchase of transport, dispatching and metering services (Terna)
Purchase of postal services (Poste Italiane)
Purchase of fuels for generation plants and natural gas storage and
distribution services (Eni Group)
ESO - Energy Services Operator Fully controlled (directly) by the Ministry
for the Economy and Finance
Sale of subsidized electricity
Payment of A3 component for renewable resource incentives
EMO - Energy Markets Operator Fully controlled (indirectly) by the
Ministry for the Economy and Finance
Sale of electricity on the Power Exchange (EMO)
Purchase of electricity on the Power Exchange for pumping and
plant planning (EMO)
Leonardo Group Directly controlled by the Ministry for the
Economy and Finance
Purchase of IT services and supply of goods

In addition, the Group conducts essentially commercial transactions with associated companies or companies in which it holds non-controlling interests.

Finally, Enel also maintains relationships with the pension funds FOPEN and FONDENEL, as well as Fondazione Enel and Enel Cuore, an Enel non-profit company devoted to providing social and healthcare assistance.

All transactions with related parties were carried out on

normal market terms and conditions, which in some cases are determined by the Regulatory Authority for Energy, Networks and the Environment.

The following tables summarize transactions with related parties, associated companies and joint ventures outstanding at December 31, 2023 and December 31, 2022 and carried out during the period.

(77) For the 2019 LTI Plan, the grant date is November 12, 2019, i.e. the date of the meeting of the Board of Directors that approved the procedures and timing of the grant under the 2019 LTI Plan to the beneficiaries.

For the 2020 LTI Plan, the grant date is September 17, 2020, i.e. the date of the meeting of the Board of Directors that approved the procedures and timing of the grant under the 2020 LTI Plan to the beneficiaries.

For the 2021 LTI Plan, the grant date is September 16, 2021, i.e. the date of the meeting of the Board of Directors that approved the procedures and timing of the grant under the 2021 LTI Plan to the beneficiaries.

For the 2022 LTI Plan, the grant date is September 21, 2022, i.e. the date of the meeting of the Board of Directors that approved the procedures and timing of the grant under the 2022 LTI Plan to the beneficiaries.

For the 2023 LTI Plan, the grant date is October 5, 2023, i.e. the date of the meeting of the Board of Directors that approved the procedures and timing of the grant under the 2023 LTI Plan to the beneficiaries.

Associates and joint

ventures

Overall total at Dec. 31,

2023

Total in financial

statements % of total

Single Buyer EMO ESO Cassa Depositi e
Prestiti Group(1)
Other
Income statement
Revenue from sales and services - 3,172 14 3,626 224
Other income - - - 10 3
Other financial income - - - 2 -
Electricity, gas and fuel purchases 2,035 7,098 11 2,304 2
Costs for services and other materials - 63 2 2,751 72
Other operating costs 11 201 355 51 2
Net results from commodity contracts - - - - -
Other financial expense 1 - - 29 -

(1) Includes balances mainly referring to: Terna, Cassa Depositi e Prestiti SpA, Eni, Snam, Poste Italiane, Ansaldo Energia and Italgas.

Millions of euro Single Buyer EMO ESO Cassa Depositi e Prestiti Group(1) Other Total at Dec. 31, 2023 Statement of financial position Other non-current financial assets - - - - 1 1 1,929 1,930 8,750 22.1% Non-current financial derivative assets - - - - - - 4 4 2,383 0.2% Other non-current assets - - - 6 - 6 - 6 2,249 0.3% Trade receivables - 84 7 940 59 1,090 176 1,266 17,773 7.1% Other current financial assets - - - 5 1 6 168 174 4,329 4.0% Other current assets - - 17 23 3 43 49 92 4,099 2.2% Long-term borrowings - - - 357 - 357 302 659 61,085 1.1% Non-current contract liabilities - - - 11 7 18 - 18 5,743 0.3% Non-current financial derivative liabilities - - - - - - 8 8 3,373 0.2% Short-term borrowings - - - - - - 3 3 4,769 0.1% Current portion of long-term borrowings - - - 89 - 89 22 111 9,086 1.2% Trade payables 497 201 378 1,616 8 2,700 129 2,829 15,821 17.9% Current financial derivative liabilities - - - - - - 15 15 6,461 0.2% Current contract liabilities - - - 31 22 53 - 53 2,126 2.5% Other current liabilities - - - 3 34 37 3 40 14,760 0.3% Other information Guarantees issued - - - 10 60 70 - 70 Guarantees received - - - 136 36 172 - 172

(1) Includes balances mainly referring to: Terna, Cassa Depositi e Prestiti SpA, Eni, Snam, Poste Italiane, Ansaldo Energia and Italgas.

Commitments - - - 23 - 23 - 23

EMARKE
ements R
CERTIFIED
Total in financial
statements
Overall total 2023 Associates and joint
ventures
Total 2023
92,882 7,260 224 7,036
2,683 18 5 13
2,916 239 237 2
46,270 11,578 128 11,450
18,304 3,351 463 2,888
6,125 620 - 620
(2,966) (7) (7) -
5,966 89 59 30

Millions of euro

Millions of euro

% of total Total in financial
statements
Overall total at Dec. 31,
2023
Associates and joint
ventures
Total at Dec. 31, 2023
22.1% 8,750 1,930 1,929 1
0.2% 2,383 4 4 -
0.3% 2,249 6 - 6
7.1% 17,773 1,266 176 1,090
4.0% 4,329 174 168 6
2.2% 4,099 92 49 43
1.1% 61,085 659 302 357
0.3% 5,743 18 - 18
0.2% 3,373 8 8 -
0.1% 4,769 3 3 -
1.2% 9,086 111 22 89
17.9% 15,821 2,829 129 2,700
0.2% 6,461 15 15 -
2.5% 2,126 53 - 53
0.3% 14,760 40 3 37
70 - 70
172 - 172
23 - 23

Millions of euro

Single Buyer EMO ESO Cassa Depositi e
Prestiti Group(1)
Other
Income statement
Revenue from sales and services - 7,949 87 4,497 196
Other income - - - 389 -
Other financial income - - - - -
Electricity, gas and fuel purchases 6,379 16,817 2 4,266 3
Costs for services and other materials - 220 2 3,258 73
Other operating costs 10 147 - 420 3
Net results from commodity contracts - - - 50 -
Other financial expense 1 - 2 10 -

(1) Includes balances mainly referring to: Terna, Cassa Depositi e Prestiti SpA, Eni, Snam, Poste Italiane, Ansaldo Energia and Italgas.

Millions of euro

Cassa Depositi e
Single Buyer EMO ESO Prestiti Group(1) Other
Statement of financial position
Other non-current financial assets - - - - -
Trade receivables - 220 6 1,040 38
Current financial derivative assets - - - - -
Other current financial assets - - - 5 -
Other current assets - - 30 58 2
Long-term borrowings - - - 447 -
Non-current contract liabilities - - - 9 8
Non-current financial derivative liabilities - - - - -
Short-term borrowings - - - - -
Current portion of long-term borrowings - - - 89 -
Trade payables 1,211 305 6 1,097 (1)
Other current financial liabilities - - - - -
Current contract liabilities - - - 23 20
Other current liabilities - - - 3 23
Other information
Guarantees issued - 20 - 11 58
Guarantees received - - - 134 36
Commitments - - - 149 -

(1) Includes balances mainly referring to: Terna, Cassa Depositi e Prestiti SpA, Eni, Snam, Poste Italiane, Ansaldo Energia and Italgas.

Millions of euro

Total in financial Associates and joint
statements Overall total 2022 ventures Total 2022
135,653 12,939 210 12,729
4,864 389 - 389
3,430 154 154 -
96,896 27,880 413 27,467
20,228 3,800 247 3,553
4,685 581 1 580
2,365 50 - 50
5,880 34 21 13
% of total Total in financial
statements
Overall total at Dec. 31,
2022
Associates and joint
ventures
Total at Dec. 31, 2022
22.6% 8,359 1,885 1,885 -
9.4% 16,605 1,563 259 1,304
- 14,830 5 5 -
0.8% 13,753 104 99 5
3.5% 4,314 153 63 90
1.1% 68,191 774 327 447
0.3% 5,747 17 - 17
0.2% 5,895 9 9 -
0.1% 18,392 14 14 -
3.9% 2,835 110 21 89
15.9% 17,641 2,810 192 2,618
0.1% 853 1 1 -
2.4% 1,775 43 - 43
0.4% 11,713 47 21 26
89 - 89
170 - 170
149 - 149

With regard to disclosures on the remuneration of directors, members of the Board of Statutory Auditors, the General Manager and key management personnel, provided for under IAS 24, please see the following tables.

Millions of euro
2023 2022 Change
Remuneration of members of the Board of Directors and Board of
Statutory Auditors and the General Manager
Short-term employee benefits 5 5 - -
Termination benefits 5 - 5 -
Share-based payments 1 1 - -
Total 11 6 5 83.3%
Millions of euro 2023 2022 Change
Remuneration of key management personnel
Short-term employee benefits 8 13 (5) -38.5%
Termination benefits 4 - 4 -
Share-based payments 1 2 (1) -50.0%
Total 13 15 (2) -13.3%

In November 2010, the Board of Directors of Enel SpA approved a procedure governing the approval and execution of transactions with related parties carried out by Enel SpA directly or through subsidiaries (Enel Procedure for Transactions with Related Parties). The procedure (available at https://www.enel.com/investors/bylaws-rules-and-policies/transactions-with-related-parties/) sets out rules designed to ensure the transparency and procedural and substantive propriety of transactions with related parties. It was adopted in implementation of the provisions of Article 2391-bis of the Italian Civil Code and the implementing regulations issued by CONSOB with Resolution no. 17221 of March 12, 2010, as amended ("CONSOB Regulation").

No related-party transactions requiring disclosure in the financial statements pursuant to the CONSOB Regulation were carried out in 2023.

55. Government grants – Disclosure pursuant to Article 1, paragraphs 125-129, of Law 124/2017

Pursuant to Article 1, paragraphs 125-129, of Law 124/2017 as amended, the following provides information on grants received from Italian public agencies and bodies, as well as donations by Enel SpA and the fully consolidated subsidiaries to companies, individuals and public and private entities. The disclosure comprises: (i) grants received from Italian public entities/State entities; and (ii) donations made by Enel SpA and Group subsidiaries to public or private parties resident or established in Italy.

The following disclosure includes payments in excess of €10,000 made by the same grantor/donor during 2023, even if made in multiple financial transactions. They are recognized on a cash basis.

Pursuant to the provisions of Article 3-quater of Decree Law 135 of December 14, 2018, ratified with Law 12 of February 11, 2019, for grants received, please refer to the information contained in the National Register of State Aid referred to in Article 52 of Law 234 of December 24, 2012.

Grants received in millions of euro
Financial institution/
Grantor
Beneficiary Amount Notes
Regione Sicilia Enel X Mobility Srl (Enel
X Way Italia Srl as from
July 1, 2023)
(1.03) Instalment of grant for the Sicilia Smart Charging project, financed
under the PNIRE Regione Sicilia
MIUR Enel X Srl (0.38) Instalment of grant for the SE4I project application, financed under
the PON MIUR R&SSI PNR 2015-2020
MIMIT Enel Produzione SpA (0.04) Balance of grant for the Hydrostore project financed under the
2015 Bando Industria
MASE e-distribuzione SpA (347.79) 10% advance payment of the SmartGrid and Resilience projects of
the NRRP
MASE e-distribuzione SpA (15.68) Progress payment for PON IC 2014/2020 FESR, ASSE IV, AZIONE
4,3,1, of the projects: Agrigento, Pachino, Priolo, Campagna,
Ciminna, Valguarnera, Santa Croce Camerina, Mussomeli, Scordia,
Ragusa 3
European Commission e-distribuzione SpA (0.10) Progress payment for R&D project Life Lanario (LIFE funding
program)
European Commission e-distribuzione SpA (0.02) Progress payment for R&D project Flexplan (H2020 funding
program)
MASE e-distribuzione SpA (10.69) Progress payment for R&D project Puglia Active Network (NER 300
funding program)
(375.73) Total

Grants made in millions of euro
Grantor Beneficiary Amount Notes
Enel SpA Fondazione Centro
Studi Enel
0.10 Donation
Enel SpA Enel Cuore Onlus 0.59 Donation in support of projects identified in 2023
Enel SpA Luiss Guido Carli 0.07 Donation for the development and transmission of scientific,
technological and humanistic knowledge
Enel SpA Human Foundation 0.05 Donation to generate and develop innovative solutions to social
problems
Enel SpA FGS Onlus 0.03 Donation to promote equal opportunities
Enel X Srl Enel Cuore Onlus 0.04 2023 contribution
Enel Green Power Italia Lega Navale Italiana
Sezione Belluno
0.04 Donation for the "Vela per Tutti" project
Enel Green Power Italia Lega Navale Italiana
Sezione Belluno
0.02 Donation for the "Vela per Tutti" project
Enel Produzione SpA Fondazione Vajont 9
Ottobre 1963 Onlus
0.05 Donation Vajont Foundation
Enel Produzione SpA Fondazione Centro
Studi Enel
0.41 1st Instalment 2023 grant
Enel Produzione SpA Enel Cuore Onlus 0.15 1st Instalment 2023 grant
Enel Produzione SpA Enel Cuore Onlus 0.70 Balance 2022 grant
Enel Produzione SpA Comune di
Civitavecchia
0.08 Sustainability Plan City of Civitavecchia
Enel Produzione SpA Capitaneria di Porto
Empedocle
0.03 Design, construction and installation of removable metal structure
to shade area of Port Authority of Porto Empedocle for parking of
associated military vehicles
Enel Energia SpA Fondazione Centro
Studi Enel
0.90 50% advance on 2023 contribution
Enel Energia SpA Enel Cuore Onlus 0.33 20% advance on 2023 contribution
Enel Energia SpA Fondazione Centro
Studi Enel
0.89 Balance 2022 contribution
Enel Italia SpA Enel Cuore Onlus 0.07 Balance 2022 extraordinary contribution
Enel Italia SpA Capone Valentina 0.01 Modal donation "Alleva la Speranza" project
Enel Italia SpA Fondazione Nazionale
Accademia Santa
Cecilia
0.60 Donation to support the Foundation cultural activities
Enel Italia SpA Teatro alla Scala di
Milano
0.60 Donation to the Teatro alla Scala to support the cultural activities of
the Foundation
Enel Italia SpA Fondazione MAXXI 0.60 Donation to support the Foundation cultural activities
Enel Italia SpA Fondazione Centro
Studi Enel
0.05 2022 contribution to support research and higher education
projects
Enel Italia SpA Croce Rossa Italiana 0.26 Donation of medical-health equipment/materials purchased for
COVID vaccination centers in Enel locations
Enel Global Trading SpA Fondazione Centro
Studi Enel
1.02 Contribution aimed at supporting and developing research and
higher education projects
e-distribuzione SpA Enel Cuore Onlus 1.89 80% balance of 2022 grant
e-distribuzione SpA Enel Cuore Onlus 0.33 20% balance of 2023 grant
e-distribuzione SpA Fondazione Centro
Studi Enel
1.28 50% balance of 2022 grant
e-distribuzione SpA Fondazione Centro
Studi Enel
0.88 50% balance of 2023 grant
e-distribuzione SpA Dipartimento della
Protezione Civile
Presidenza del
Consiglio dei Ministri
0.67 Free transfer of company assets to be transported and delivered
to the Ukrainian authorities as part of the initiative to support
the energy sector in Ukraine promoted by Energy Community in
collaboration with the European Union Civil Protection Mechanism
(UCPM)
12.74 Total

56. Contractual commitments and guarantees

The commitments entered into by the Enel Group and the guarantees given to third parties are shown below.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022 Change
Guarantees given:
- sureties and other guarantees granted to third parties 3,407 4,296 (889)
Commitments to suppliers for:
- electricity purchases 63,422 64,878 (1,456)
- fuel purchases 47,666 96,996 (49,330)
- various supplies 3,017 2,449 568
- tenders 6,982 6,165 817
- other 6,483 6,889 (406)
Total 127,570 177,377 (49,807)
TOTAL 130,977 181,673 (50,696)

Compared with December 31, 2022, the decrease of €1,456 million in commitments for "electricity purchases" is essentially attributable to companies in Latin America, in particular in Chile, and developments in electricity prices.

The decrease of €49,330 million in commitments for "fuel purchases" mainly regards the decrease in gas prices, especially in Italy and Spain, compared to 2022.

For more details on the expiry of commitments and guarantees, please see the section "Commitments to purchase commodities" in note 49.

57. Contingent assets and liabilities

The following reports the main contingent assets and liabilities at December 31, 2023, which are not recognized in the consolidated financial statements as they do not meet the requirements provided for in IAS 37.

Hydroelectric concessions – Italy

Italian regulations governing large-scale hydroelectric concessions were most recently modified by the "Simplifications Decree" (Decree Law 135 of 2018 ratified with Law 12 of February 11, 2019), which introduced a series of innovations regarding the granting of such concessions upon their expiry and the valorization of the assets and works connected to them to be transferred to the new concession holder. This legislation also introduced a number of changes in the matter of concession fees, establishing a fixed and variable component of fees, as well as an obligation to provide free power to public bodies (220 kWh of power for each kW of average nominal capacity of the facilities covered by the concession). In implementation of this national law and under specific enabling authority, as of today various regions (Lombardy, Piedmont, Emilia-Romagna, Friuli-Venezia Giulia, the Province of Trento, Veneto, Calabria, Basilicata, Abruzzo and Umbria) have enacted regional laws implementing state legislation, and requested payment of the dual-component fee and the monetization of free electricity supplies.

Enel Produzione SpA and Enel Green Power SpA challenged before the Superior Public Water Resources Court implementing acts issued under the individual regional laws and the subsequent payment notices of fees and the monetization of free electricity supplies, asking that they be declared void and raising the question of constitutional illegitimacy of both the national law and the regional laws.

The companies initiated the proceedings by complaining that the regional implementing acts – as well as the regional legislation which they implement – were constitutionally illegitimate, first for violation of national legislation and various primary principles protected both by the Italian Constitution and European law concerning legitimate expectations, property rights, reasonableness, private initiative, and concessions, where:

  • they provide for retroactive application to valid large diversion concessions of the dual-component fee and the obligation to supply free power or its financial equivalent;
  • they order the monetization of the obligation to supply free energy, which is not envisaged in the national law.

Furthermore, the introduction by the regions of these new obligations to pay the new dual-component fee (divided

into a fixed component and a variable component) and to supply a certain annual quantity of electricity free of charge in the form of payment of the associated monetary value, which is also to be paid by the holders of valid concessions that have not yet expired, creates an unexpected and unreasonable financial imbalance in the concession relationships. This circumstance is in evident contrast with the principles of reasonableness, proportionality and legitimate expectation of concession fees, compliance with which is required by constitutional case law if, in the context of longterm relationships, pejorative modifications are introduced. Both the national law and the regional implementing legislation violate Community principles and constitutional principles such as property rights, the principle of legal certainty, and the freedom of enterprise. In particular, the rules do not expressly provide for the transfer of the business unit from the outgoing to the successor concession holder, and also establish inadequate criteria for the valorization of the works to be transferred, which threatens to create what is essentially a mechanism for expropriation, in violation of constitutional principles.

The pending cases against the regions of Lombardy and Piedmont have been adjourned to the collegial hearings of April 24, 2024 and June 12, 2024, while the remaining proceedings are still pending in the preliminary investigation phase.

Antitrust proceeding 12461 - EE - Contract renewals – Italy

On December 13, 2022, the Competition Authority notified Enel Energia SpA ("the Company" or "EE") and six other companies (Hera, A2A, Acea, Eni Plenitude, Engie, Edison) that it had initiated a proceeding for unfair commercial practices (violation of certain provisions of the Consumer Code and Article 3 of Legislative Decree 115/2022, the second "Aid Decree").

In particular, the Competition Authority, among other thing, argued that EE had sent its customers, in the period from May to October 2022, notices of price changes that were allegedly generic and omissive to the extent that they did not specify the expiry date of the financial conditions subject to renewal and represented an unwarranted exercise of ius variandi in modification of the financial conditions of the supply relationship, in violation of the aforementioned Article 3 of the second Aid Decree.

With the measure initiating the procedure, the Competition Authority simultaneously prohibited on a precautionary basis the sending of new price change notices and ordered the correction of those already sent.

All the operators subject to the order, including EE, challenged the provision, which was based on the assumption that any price change had been prohibited to suppliers in the period indicated by the second Aid Decree (August 10 - April 30, then extended until June 30, 2023 by Legislative Decree 198/2022, the "Milleproroghe Decree").

Following the pronouncement of the Council of State of December 22, 2022 and the Milleproroghe Decree of December 29, 2022, which excluded the applicability of Article 3 of the Decree to contract renewals (of expiring offers) in compliance with the contractual terms of notice and without prejudice to the right of withdrawal of the counterparty, thus distinguishing them from those covered by the ius variandi, the Competition Authority, with a new precautionary measure on December 29, 2022, ordered the partial upholding of the original precautionary measure and confirmed the prohibition on changes or renewals of the financial conditions of expiring contracts for which the expiry date was not specifically identified or in any case predeterminable in the associated notice sent to the customer. EE filed an appeal for additional reasons against this measure. With a ruling published on May 19, 2023, the Lazio Regional Administrative Court accepted the arguments of EE and voided the two precautionary measures of the Competition Authority on December 12, 2022 and December 29, 2022, disagreeing with the logical process established by the Competition Authority as a basis for the provisions, which were deemed to lack grounds for success. In particular, according to the Court, the legislator intended to suspend only the changes to the rules portion of the agreement and not also the updating of expired or expiring prices, as this would fix the previous pricing conditions indefinitely. Both AGCM and EE appealed the Court ruling before the Council of State and the proceeding is pending.

In the meantime, on November 15, 2023, the Competition Authority, acting in the proceeding for unfair commercial practices, issued a ruling finding a violation of Articles 24 and 25 of the Consumer Code, levying a fine of €10 million on EE, which was paid by EE on December 15, 2023. On January 15, 2024, EE appealed to void the fine before the Lazio Regional Administrative Court.

In an order issued following the hearing held on March 20, 2024, the Lazio Regional Administrative Court granted a petition presented jointly by the parties to address the grounds for appeal at the hearing on the merits scheduled for July 17, 2024.

Criminal proceeding against e-distribuzione concerning an accident – Italy

On July 1, 2021, e-distribuzione SpA was notified of a proceeding against a number of its employees and managers and e-distribuzione SpA itself pursuant to Legislative Decree 231/2001, initiated by the Public Prosecutor's Office of Taranto, following the accident that occurred on the night between June 27 and 28, 2021 in which an employee of a contractor was injured and subsequently died.

During the investigative phase, an unrepeatable technical assessment was ordered and the report of the Technical Consultant of the Public Prosecutor, dated December 15, 2021, was filed and incorporated in the Public Prosecutor's case.

A notice of dismissal of charges was subsequently sent to some of the defendants and the subcontractor with whom the deceased worker was employed. A notice of conclusion of the preliminary investigation pursuant to Article 415-bis of the Code of Criminal Procedure was sent to the remaining defendants and the company and, on April 17, 2023, a notice was served to set the preliminary hearing before the Preliminary Hearing Judge of the Court of Taranto for May 23, 2023. Following adjournments, the preliminary hearing was scheduled to continue on February 20, 2024, when the parties were heard, including the request for a plea deal from one of the defendants. The Court then rescheduled the hearing to May 21, 2024 for the decision to send the case to trial.

In agreement with the insurance company, a process was defined to reach a settlement with the heirs of the deceased to extinguish the claims formulated by the injured parties without admission of liability.

Arbitration proceedings Enel Produzione SpA – Italy

In the 4th Quarter of 2023 a coal supplier initiated an arbitration proceeding against Enel Produzione requesting the fulfillment by the latter of certain coal supply contracts stipulated between the parties during 2021, performance of which was suspended by Enel Produzione in March 2022 due to the sanctions imposed with EU Regulations no. 269/2014 and no. 833/2014. A claim of about \$11 million was filed for supplies already executed and about \$62 million for expected supplier, plus interest. The arbitration proceedings are pending and are currently expected to be completed in 2025.

Green Network litigation – Italy

With a summons dated May 8, 2019, Green Network SpA (GN) sued Enel Energia SpA (EE) before the Court of Rome to ascertain alleged anti-competitive conduct (including illegal win-back practices) that EE carried out in an attempt to recover customers who would have moved to the competing trader and, as a result, order EE to pay damages quantified at €116,049,056, plus interest and monetary revaluation, in addition to the publication of the sentence. EE formally appeared in court, contesting the validity of the opposing party's claim in fact and law and requesting the complete denial of the claims, as well as an order for the plaintiff to pay damages for frivolous litigation. After conducting the preliminary investigation phase, during which a court-ordered phonic assessment was performed, the Court rejected the plaintiff's further preliminary investigation requests and adjourned the case for summing up to a hearing scheduled for June 27, 2024.

Penalty proceeding for Enel Energia – Italy

On February 29, 2024, the Personal Data Protection Authority (DPA) announced that it was levying a fine of €79,107,101 on Enel Energia SpA, in addition to a number of prescriptive measures.

The action originates with a proceeding undertaken by the DPA in July 2023, during which the company was accused of failing to adopt an adequate system for monitoring and controlling the operation of its agencies, which, in the period from 2015 to 2022, also made use of operators who were not officially appointed, for the sole purpose of maximizing their profits even to the detriment of the company itself.

In the meantime, the company, acting for its own protection, had already taken all the contractually established measures against the agencies involved in the circumstances addressed by the penalty measure and had also filed criminal complaints against the operators who had acted abusively.

The company, considering the objections raised by the DPA to be unfounded, intends to challenge the provision before the Civil Court of Rome, filing a request for suspension of both the payment of the fine and the prescriptive measures.

BEG litigation – Italy, France, Luxembourg

Following an arbitration proceeding initiated by BEG SpA (BEG) in Italy, Enelpower SpA (now Enelpower Srl) obtained a ruling in its favor in 2002, which was upheld by the Court of Cassation in 2010, which entirely rejected the petition for damages with regard to alleged breach by Enelpower of an agreement concerning the assessment of the possible construction of a hydroelectric power station in Albania. Subsequently, BEG, acting through its subsidiary Albania BEG Ambient, filed suit against Enelpower and Enel SpA (Enel) in Albania concerning the matter, obtaining a ruling from the District Court of Tirana on March 24, 2009, upheld by the Albanian Court of Cassation, ordering Enelpower and Enel to pay tortious damages of about €25 million for 2004 as well as an unspecified amount of tortious damages for subsequent years. Following the ruling, Albania BEG Ambient demanded payment of more than €430 million.

In November 2016, Enel and Enelpower filed a petition with the Albanian Court of Cassation, asking for the ruling issued by the District Court of Tirana on March 24, 2009 to be voided. The proceeding is still pending.

With a ruling of the Court of Appeal of Rome of March 7, 2022, the further proceedings undertaken by Enel and Enelpower before the Court of Rome were concluded, having sought recognition of BEG's liability for having circumvented the arbitration award rendered in Italy in favor of Enelpower through the aforementioned initiatives undertaken by the subsidiary ABA. With the ruling, the Court of Appeal of Rome upheld the ruling of first instance rendered by the Court of Rome on June 16, 2015, which had denied the petition in the proceeding.

On May 20, 2021, the European Court of Human Rights (ECHR) issued a ruling with which it decided the appeal

brought by BEG against the Italian State for violation of Article 6.1 of the European Convention on Human Rights. With this decision, the Court denied BEG's request to reopen the above arbitration proceedings, and also rejected BEG's claim for pecuniary damages amounting to about €1.2 billion due to the absence of a causal link with the disputed conduct, granting it €15,000 in non-pecuniary damages.

Nonetheless, on December 29, 2021, BEG, with an action that the company and its legal counsel deemed unfounded and specious, also decided to sue the Italian State before the Court of Milan, to demand, as a consequence of the ECHR ruling, damages for tortious liability in an amount of about €1.8 billion. In this case, BEG also involved Enel and Enelpower by way of a claim of joint and several liability. With an order of June 14, 2022, the Court of Milan, in accepting the objection of territorial incompetence raised by the State Attorney, declared its incompetence to hear the dispute in favor of the Court of Rome, the court exclusively competent to hear the causes in which the Italian State is involved, ordering BEG to pay the costs of the proceedings in favor of the defendants. BEG did not resume the judgment before the Court of Rome within the legal term of October 14, 2022 and therefore the proceeding was extinguished.

A short time later, on November 3, 2022, BEG resubmitted the same claims for damages of the terminated proceeding, serving a new writ of summons before the Court of Milan against the same defendants, with the exception of the Italian State, which BEG declared not to wishing to agree to this judgement. Enel and Enelpower are preparing their defenses to proceed with the appearance in court in order to contest the claim, which is considered entirely specious and unfounded, like the previous similar initiative. Following the hearing for admission of evidence, the Court issued an order on October 26, 2023 denying the preliminary requests of the plaintiff and, considering the case ready for decision, scheduled final arguments for October 17, 2024.

Proceedings undertaken by Albania BEG Ambient Shpk (ABA) to obtain enforcement of the ruling of the District Court of Tirana of March 24, 2009

Italy

With an appeal notified on September 11, 2023, Albania BEG Ambient ShpK (ABA) initiated a proceeding before the Court of Appeal of Rome against Enel SpA and Enelpower Srl, in order to obtain, pursuant to Article 67 of Law 218/1995, enforcement of the ruling of the Court of Tirana of March 24, 2009. The two companies are preparing their defense to contest the claim for execution in Italy as well. Following the initial hearing, the Court of Appeal adjourned the proceeding until September 18, 2025 for oral arguments.

France

In 2012, ABA filed suit against Enel and Enelpower with the Tribunal de Grande Instance in Paris in order to render the ruling of the Albanian court enforceable in France.

On January 29, 2018, the Tribunal de Grande Instance rejected ABA claim. Among other issues, the Tribunal de Grande Instance ruled that: (i) the Albanian ruling conflicted with an existing decision (the arbitration ruling of 2002) and that (ii) the fact that BEG sought to obtain in Albania what it was not able to obtain in the Italian arbitration proceeding, resubmitting the same claim through ABA, represented fraud.

Subsequently, with a ruling of May 4, 2021, the Paris Court of Appeal denied the appeal by ABA, in full, upholding the ruling at first instance and, in particular, fully upholding the non-compatibility of the Albanian ruling with the arbitration award of 2002, ordering it to reimburse Enel and Enelpower €200,000.00 each for legal costs.

With a ruling of May 17, 2023 the French Cour de Cassation rejected ABA's appeal, thereby definitively denying the ABA's petition for execution.

Following the favorable ruling of the Court of Appeal, Enel initiated a separate proceeding to obtain release of the precautionary attachments granted to ABA of any receivables of Enel in respect of Enel France. With an order of June 16, 2022, the Court of Paris ordered the release of the precautionary attachments while also ordering ABA to pay Enel a total of about €146,000 in damages and legal costs. ABA challenged the aforementioned release order and the appeal was granted by the Paris Court of Appeal with a decision of May 17, 2023. On June 16, 2023 Enel filed a petition and on December 15, 2023 formally appealed that ruling before the French Cour de Cassation.

The Netherlands

In 2014, ABA filed suit with the Court of Amsterdam to render the ruling of the Albanian court enforceable in the Netherlands.

Following an initial ruling of June 29, 2016, in favor of ABA, in a ruling of July 17, 2018, the Amsterdam Court of Appeal upheld the appeal advanced by Enel and Enelpower, ruling that the Albanian judgment cannot be recognized and enforced in the Netherlands, as it was arbitrary and manifestly unreasonable and therefore contrary to Dutch public order. Subsequently, the proceeding before the Court of Appeal continued with regard to the subordinate question raised by ABA with which it asked the Dutch court to rule on the merits of the dispute in Albania and in particular the alleged tortious liability of Enel and Enelpower in the failure to build the power plant in Albania. On December 3, 2019, the Amsterdam Court of Appeal issued a definitive ruling in which it rejected any claim made by ABA, thereby confirming the denial of recognition and enforcement of the Albanian ruling in the Netherlands. Moreover, having re-analyzed the merits of the case under Albanian law,

the Court found no tortious liability on the part of Enel and Enelpower and ordered ABA to reimburse the companies for the losses incurred in illegitimate conservative seizures, to be quantified as part of a specific procedure, and the costs of the trial and appeal proceedings.

On July 16, 2021 the Supreme Court completely rejected ABA's appeals, ordering it to reimburse court costs.

Luxembourg

In Luxembourg, again at the initiative of ABA, J.P. Morgan Bank Luxembourg SA was also served with an order for a number of precautionary seizures of any receivables of both Enel Group companies in respect of the bank.

In parallel ABA filed a claim to obtain enforcement of the ruling of the Court of Tirana in Luxembourg. Owing to a number of procedural delays, the proceeding is still in the initial stages and no ruling has been issued. In particular, after several legal representatives appointed by ABA withdrew from the cause, in September 2023 the court suspended the proceeding.

United States and Ireland

In 2014, ABA had initiated two proceedings requesting execution of the Albanian sentence before the courts of the State of New York and Ireland, which both ruled in favor of Enel and Enelpower, respectively, on February 23 and February 26, 2018. Accordingly, there are no lawsuits pending in Ireland or New York State.

Environmental incentives - Endesa Generación SA – Spain

Following the Decision of November 27, 2017 (the "Decision") of the European Commission on the issue of environmental incentives for thermal power plants, on March 2, 2018 the Commission's Directorate-General for Competition has initiated a formal enquiry pursuant to Article 108, paragraph 2, of the Treaty on the Functioning of the European Union, in order to establish whether the environmental incentive for coal power plants provided for in Spain's Order ITC/3860/2007 represents State aid compatible with the internal market. On April 13, 2018, acting as an interested third party, Endesa Generación submitted comments contesting this interpretation. Subsequently, on September 8, 2021, the appeal of the decision lodged by Gas Natural (now Naturgy) with the General Court of the European Union was denied. The ruling was appealed by Naturgy and EDP España before the Court of Justice of the European Union (CJEU). Endesa Generación filed a request to participate in the proceeding and, with an order of June 1, 2022, the CJEU allowed that participation. Subsequently, following the filing of the ruling of the Advocate General, on December 14, 2023, the CJEU voided both the decision and ruling of the General Court.

Bono Social – Spain

In relation to the various financing schemes for the Bono Social adopted by the Spanish government, with ruling no. 212/2022 of February 21, 2022 the Tribunal Supremo ruled on the appeals filed by Endesa SA, Endesa Energía SAU and Energía XXI Comercializadora de Referencia SLU (Endesa) and other companies in the energy sector against the third scheme for financing the Bono Social, and for co-financing with government authorities of the supply to vulnerable consumers, envisaged under Article 45, paragraph 4 of Spain's Electricity Industry Law 24/2013, Royal Decree Law 7/2016 of December 23 and Royal Decree 897/2017 of October 6.

With the ruling, the Tribunal Supremo, partially allowing the appeals, found that (i) the aforesaid regime was inapplicable; (ii) Articles 12 to 17 of Royal Decree 897/2017 are inapplicable and void, and (iii) the appellants were entitled to be compensated for the amounts paid to finance the Bono Social and provide co-financing with government authorities, and to reimbursement of all costs incurred to fulfill the obligations set out in this mechanism, deducting any amounts transferred to customers, where applicable. In the absence of voluntary compliance by the authorities, on November 10, 2022 the companies filed a petition for enforcement of the ruling, requesting immediate payment of the uncontested part, equal to about €152 million, for financing costs associated with customers in the regulated market, as well as payment of other amounts as quantified in the technical studies prepared by the companies. With an order of May 26, 2023 the Tribunal Supremo (i) ordered the government to pay Endesa €152,272,229.83, plus interest, (ii) required the Ministry for the Ecological Transition and the Demographic Challenge (MITECO) to quantify as soon as possible the additional amounts to be paid to Endesa in respect of (a) costs to finance the Bono Social for the free market, deducting any amounts transferred to customers, and (b) investments made to implement the Bono Social, and to pay Endesa those amounts, plus interest, within two months. On July 28, 2023, the Secretary of State for Energy (MITECO) announced a resolution that grants Endesa (i) an indemnity of €171.6 million (including interest) for financing costs associated with customers in the regulated market and (ii) an additional indemnity of €6.6 million (including interest) for costs incurred to implement the Bono Social. However, the resolution does not provide for any indemnity for the financing costs of the Bono Social for the free market. Therefore, on September 18, 2023 Endesa filed arguments supported by technical studies with the Tribunal Supremo to demonstrate Endesa's entitlement to be indemnified for the free market segment as well.

"Endesa I and II" industrial relations dispute – Spain

After being signed by the social partners and entering force on January 23, 2020, the 5th Endesa Collective Bargaining Agreement was published in the Spanish Official Journal (Boletín Oficial del Estado) on June 17, 2020, taking full effect.

On December 30, 2020, the Audiencia Nacional notified Endesa a new petition for a "collective dispute" initiated by three trade unions with minority representation filed on December 1, 2020, concerning the cancellation of some "derogatory provisions" of the 5th Endesa Collective Bargaining Agreement. The plaintiffs claim that the contested "derogatory provisions" would imply the illegitimate abolition of social benefits and economic rights of workers. Endesa considers these provisions to be fully legitimate, in line with the arguments made during proceeding concerning the reduction of social benefits for retired personnel. With a ruling of November 15, 2021, the petitions of the plaintiff unions were rejected, with verification of the legitimacy of the 5th Endesa Collective Bargaining Agreement. The ruling was appealed by the trade unions before the Tribunal Supremo and the proceeding is currently under way.

Moreover, with reference to the 4th Endesa Collective Bargaining Agreement, on July 7, 2021 the Tribunal Supremo issued a definitive ruling denying the appeals lodged by the aforementioned unions against the termination of the agreement by Endesa, affirming that social benefits (including those relating to electricity prices) originate exclusively in the collective bargaining agreements, both for employees currently in service and those who have retired, as well as for their family members, with the consequence that the termination of such agreements produces the general contractual regulation of the conditions established therein for employees currently in service and, for those who have retired and their family members, the definitive extinction of all their rights, until new regulations (which came with the 5th Endesa Collective Bargaining Agreement). That decision is also definitive for the individual proceeding brought concerning the same issue.

GNL Endesa Generación SA arbitration proceeding I – Spain

In the course of an arbitration proceeding to review the price of a long-term supply contract for liquefied natural gas (LNG) initiated by Endesa Generación SA, the defendant, an LNG production company, filed a counterclaim demanding payment of about \$1.283 billion at September 30, 2023. The proceeding was concluded with an award on November 15, 2023, with the partial grant of the counterclaim. Both parties filed petitions for clarification and correction of the award; a decision is pending. Meanwhile, the defendant issued an invoice in the amount of \$587 million.

GNL Endesa Generación SA arbitration proceeding II – Spain

In March 2023, a liquefied natural gas (LNG) producer initiated an arbitration proceeding within the context of a proceeding for the revision of the price of a long-term supply contract for LNG against Endesa Generación SA, demanding payment of about \$585 million at December 31, 2023. The amount of the claim could be revised depending on market developments in months up to the completion of arbitration proceeding, which is scheduled for the 2nd Half of 2024. The company believes that this counterclaim is unfounded.

Tractebel litigation – Brazil

In 1998 the Brazilian company CIEN (now Enel CIEN) signed an agreement with Tractebel (now Engie Brasil Energia SA) for the delivery of electricity from Argentina through its Argentina-Brazil interconnection line. As a result of Argentine regulatory changes introduced as a consequence of the economic crisis in 2002, Enel CIEN was unable to make the electricity available to Tractebel.

In October 2009, Tractebel sued Enel CIEN for alleged breach of contract. Enel CIEN submitted its defense citing force majeure as a result of the Argentine crisis as the main argument. Out of court, Tractebel indicated that it plans to acquire 30% of the interconnection line involved in the dispute. With a ruling of February 16, 2023, the court of first instance denied the grounds of the claim submitted by Tractebel against Enel CIEN. The ruling was appealed by Tractebel on March 20, 2023, but on February 29, 2024 the Court of Appeal upheld the decision at first instance in favor of Enel CIEN. The amount involved in the dispute is estimated at about R\$715 million (about €133 million), plus damages to be quantified.

For similar reasons, the company Furnas, in May 2010, had also presented a sue against Enel CIEN for the failure to deliver electricity, requesting payment of about R\$571.6 million (about €91 million), plus damages to be quantified, with a claim to acquire 70% of the interconnection line. The trial concluded in favor of Enel CIEN with a sentence issued by the Tribunal de Justiça, which became final on October 18, 2019, which rejected all of Furnas' claims.

Cibran litigation – Brazil

Companhia Brasileira de Antibióticos (Cibran) has filed six suits against the Enel Group company Ampla Energia e Serviços SA (today Enel Distribuição Rio de Janeiro) to obtain damages for alleged losses incurred as a result of the interruption of electricity service by the Brazilian distribution company between 1987 and 2002, in addition to non-pecuniary damages. The Court ordered a unified technical appraisal for those cases, the findings of which were partly unfavorable to Enel Distribuição Rio de Janeiro. The latter challenged the findings, asking for a new study,

which led to the denial of part of Cibran's petitions. Cibran subsequently challenged the findings of the new study, but without success.

The first suit, regarding the years from 1995 to 1999, was denied in full with a ruling that became definitive on August 24, 2020.

With regard to the second case, filed in 2006 and regarding the years from 1987 to 1994, on June 1, 2015, the courts issued a ruling ordering Enel Distribuição Rio de Janeiro to pay R\$96 million (about €23 million) plus interest in pecuniary damages and R\$80,000 (about €19,000) in non-pecuniary damages. On November 6, 2019, the Tribunal de Justiça of Rio de Janeiro issued a ruling granting Enel Distribuição Rio de Janeiro's petition, and denying all of Cibran's claims. Subsequently, all the appeals submitted by Cibran between 2019 and 2022 were denied in full and, accordingly, the decision of November 6, 2019 in favor of Enel Distribuição Rio de Janeiro became final on March 24, 2023.

The remaining four suits for the years 2001 and 2002, which had been suspended pending the decision concerning the petition filed in 2006, are waiting to be taken up again. The value of all the disputes is estimated at about R\$729 million (about €131 million).

Coperva litigation – Brazil

As part of the project to expand the grid in rural areas of Brazil, in 1982 Coelce Companhia Energética do Ceará SA (today Enel Distribuição Ceará), then owned by the Brazilian government and now an Enel Group company, had entered into contracts for the use of the grids of a number of cooperatives established specifically to pursue the expansion project. The contracts provided for the payment of a monthly fee by Enel Distribuição Ceará, which was also required to maintain the networks.

Those contracts, between cooperatives established in special circumstances, did not specifically identify the grids governed by the agreements, which prompted a number of the cooperatives to sue Enel Distribuição Ceará asking for, among other things, a revision of the fees agreed.

These proceedings include: (a) the suit filed by Cooperativa de Eletrificação Rural do Vale do Acarau Ltda (Coperva) with a value of about R\$475 million (about €89 million): Enel Distribuição Ceará was granted rulings in its favor from the trial court and the Court of Appeal, but Coperva filed an appeal (embargo de declaração) based on procedural issues, which was also denied by the Court of Appeal in a ruling of January 11, 2016. On February 3, 2016, Coperva lodged an extraordinary appeal before the Tribunal Superior de Justiça (TSJ) against the ruling on the merits, which was granted on November 5, 2018 for the ruling issued in the previous appeal (embargo de declaração). On December 3, 2018, Enel Distribuição Ceará filed an appeal (agravo interno) against this ruling of the TSJ and the proceeding is currently pending; and (b) the suit filed by Cooperativa de Energia, Telefonia e Desenvolvimento Rural do Sertão Central Ltda (COERCE) with a value of about R\$285 million (about €53 million): in the suit COERCE requested a revision of the fee agreed for the use of its grids to be calculated on the basis of 2% of their value. The judgment is pending before the court of first instance, pending the performance of an engineering appraisal.

ANEEL litigation – Brazil

In 2014, Eletropaulo (today Enel Distribuição São Paulo) initiated an action before the Brazilian federal courts seeking to void the administrative measure of the Agência Nacional de Energia Elétrica (ANEEL, the national electricity agency), which in 2012 retroactively introduced a negative coefficient to be applied in determining rates for the following regulatory period (2011-2015). With this provision, ANEEL ordered the restitution of the value of some components of the network previously included in rates because they were considered non-existent and denied Enel Distribuição São Paulo's request to include additional components in rates. The administrative measure of ANEEL was challenged and on September 9, 2014, it was suspended on a precautionary basis. The first-instance proceeding has concluded and we are awaiting the decision. The value of the suit is about R\$1,3 billion (about €245 million).

Endicon – Brazil

On October 17, 2021 Endicon (former Enel service provider in Brazil) filed a lawsuit against Enel Distribuição Rio de Janeiro and Enel Distribuição Ceará in which it seeks total damages of approximately R\$500 million (about €93 million) for pecuniary and non-pecuniary damages incurred in connection with certain events allegedly attributable to Group companies, which occurred during the execution of the contracts and from the abusive exercise of contractual rights by the latter, which is alleged to have produced a loss on the management of the contracts. Following the revocation on May 10, 2022 of the precautionary measure that had been previously notified to the companies, on December 2, 2021, Enel Distribuição Rio de Janeiro and Enel Distribuição Ceará presented their defenses in the proceedings on the merits, and the evidentiary stage of the first-instance proceeding is continuing.

Socrel – Brazil

Enel Distribuição São Paulo has been sued by Serviços de Eletricidade and Telecomunicações Ltda (Socrel) for damages for losses caused by an alleged unlawful termination of contract by the Group company that involved a series of contracts between the parties, which would have caused Socrel's liquidity crisis. Following an expert report issued

during the proceedings, Socrel's request was quantified at R\$321 million (about €61 million). With the ruling of March 27, 2023, the Tribunal de Justiça do Estado de São Paulo denied the entire substance of the Socrel claim. Socrel challenged the ruling, which was overturned with a ruling of November 7, 2023 and remanded for trial at first instance to hear oral evidence not allowed in the first proceeding.

Extraordinary 2022 rate revision (Ceará) – Brazil

On April 19, 2022, the Agência Nacional de Energia Elétrica (ANEEL) issued resolution no. 3.026/2022 with which it authorized an average 24.85% rate increase for 2022 for the electricity distribution services performed by Enel Distribuição Ceará. Both private individuals and public institutions have challenged this resolution before the Federal Regional Court of the district of Ceará, for a total of six proceedings requesting, on precautionary basis, the cancellation of the effects of the resolution and, on a permanent basis, the voidance of the resolution itself, arguing that the rate increase is illegitimate. In all proceedings, Enel Distribuição Ceará has contested the petitioners' claims, arguing the legitimacy of the rate adjustment. On June 21, 2022, the Federal Regional Court rejected the precautionary request and joindered the six proceedings in a single proceeding in consideration of fact that the relief sought and the cause of action are the same. On September 23, 2022, Enel Distribuição Ceará also submitted that, as a result of certain subsequent legislative measures, the rate had been reduced following an extraordinary rate review and a reduction in taxes. The ruling remains pending. The estimated value of the proceeding has not been determined. Moreover, on July 31, 2023, an additional action was filed by one of the public petitioners with the Federal Regional Court for reasons connected with the previous actions, arguing that the rate increase was excessive in relation to the poor quality of service provided and alleged contractual breaches, as well as asking for collective non-pecuniary damages of about R\$55 million (about €10.6 million).

CTEEP – Brazil

On March 16, 2021 Enel Distribuição São Paulo (formerly Eletropaulo Metropolitana Eletricidade de São Paulo SA - Eletropaulo) filed a debt collection action before the Tribunal de Justiça do Estado de São Paulo in the amount of about R\$1.5 billion against the transmission system operator ISA CTEEP - Companhia de Transmissão de Energia Elétrica (CTEEP) as the original debtor for a liability arising prior to the privatization of Eletropaulo, against Centrais Elétricas Brasileiras SA (Eletrobras), which had initially been paid by Eletropaulo to the latter as part of a settlement agreement. With a decision of September 26, 2023, the competent Court of Appeal upheld the ruling at first instance, which had denied Enel Distribuição São Paulo's claim, also quantifying the defense's legal costs due for losing the cast at 13% of the present value of the claim, for an amount equal, at December 2023, to about R\$365 million (about € 68 million). With a ruling of January 12, 2024 the Court of Appeal denied the appeal of that decision by Enel Distribuição São Paulo. On February 23, 2024 the company also appealed the latter ruling before the higher courts.

Black-out November 2023 São Paulo – Brazil

Following the severe weather events that on November 3, 2023 hit the concession area of Enel Distribuição São Paulo (ED SP), on December 31, 2023, 341 individual actions and 6 collective actions were filed by representatives of municipalities, unions, political parties, the public prosecutor and the public defender's office requesting the grant of precautionary measures, the provision of assistance by ED SP, the provision of information/documentation, the maintenance of distribution service levels and the payment of individual and collective pecuniary and non-pecuniary damages to be determined in court. At December 31, 2023, the overall value of the individual actions was about R\$6.2 million (about €1.2 million) while the value of the collective actions was undetermined.

Black-out November 2023 Rio de Janeiro – Brazil

Following the severe weather events that on November 18, 2023 hit the concession area of Enel Distribuição Rio de Janeiro (ED RJ), on December 31, 2023, 3,308 individual actions and 16 collective actions were filed by representatives of municipalities, the public prosecutor and the public defender's office requesting the grant of precautionary measures, the provision of assistance by ED RJ, the provision of information/documentation, the maintenance of assistance measures and the payment of individual and collective pecuniary and non-pecuniary damages to be determined in court. At December 31, 2023 the overall value of the individual actions was about R\$61.3 million (about €11.4 million) while the value of the collective actions was undetermined.

GasAtacama Chile – Chile

In January 2020, the appeal proceeding was completed for the administrative fine levied in August 2016 by the Superintendencia de Electricidad y Combustibles (SEC) against GasAtacama Chile (now Enel Generación Chile) concerning the information provided to the CDEC- SING (Centro de Despacho Económico de Carga) in relation to the variables of the Technical Minimum and the Minimum Operation Time at the Atacama power station. Upon completion of the proceeding, the amount of the fine was reduced from approximately \$6 million to about \$432,000 and the amount was paid by the company.

In relation to the issue mentioned above, a number of operators of the Sistema Interconectado del Norte Grande (SING), including Aes Gener SA, Eléctrica Angamos SA and Engie Energía Chile SA, sued GasAtacama Chile in 2017 seeking damages for a total amount of about €189 million. On October 17, 2023, the Civil Court of Santiago issued a ruling partially upholding the plaintiffs' petitions in an amount to be quantified at a subsequent stage of the proceeding. On October 31, 2023 the ruling was challenged by all the defendants and the appeal proceeding is pending. The company and its external legal counsel feel that the likelihood of the plaintiffs' claim being upheld on appeal is remote.

Compañía Minera Arbiodo – Chile

In 2016, Compañía Minera Arbiodo and Ingenieros Asesores Limitada filed a suit against the Ministerio de Bienes Nacionales, the Ministerio de Energía, the Ministerio de Minería (together, the "Ministry"), the Servicio Nacional de Geología y Minería (Sernageomin), Enel Green Power Chile (EGP Chile) and Parque Eólico Taltal SA seeking damages for alleged losses incurred as a result of presumed violations of mining rights to the soil underneath the land on which the Taltal wind farm, which was built under a ministerial concession granted in 2012, is located.

With decision of December 6, 2023, the Civil Court of Santiago ordered Parque Eólico Taltal and EGP Chile, jointly and severally with Sernageomin, to pay an amount of about 346 billion Chilean pesos (equal to about €367 million) in favor of the plaintiffs.

The decision was challenged by the Group companies on December 22, 2023 and the appeal proceeding is pending. The companies and their external legal counsel feel that the likelihood of the plaintiffs' claim being upheld on appeal is remote.

El Quimbo – Colombia

A number of legal actions ("acciones de grupo" and "acciones populares") brought by residents and fishermen in the affected area are pending with regard to the El Quimbo project for the construction by Emgesa (now Enel Colombia) of a 400 MW hydroelectric plant in the region of Huila (Colombia). More specifically, the first collective action, currently in the preliminary stage, was brought by around 1,140 residents of the municipality of Garzón, who claim that the construction of the plant would reduce their business revenue by 30%. A second action was brought, between August 2011 and December 2012, by residents and businesses/associations of five municipalities of Huila claiming damages related to the closing of a bridge (Paso El Colegio). With regard to acciones populares, or class action lawsuits, in 2008 a suit was filed by a number of residents of the area demanding, among other things, that the environmental permit be suspended. As part of this action, on September 11, 2020, the Huila Court issued a partially unfavorable ruling against Emgesa, sentencing it to fulfill the obligations already provided for in the environmental license. Both the Autoridad Nacional de Licencias Ambientales (ANLA) and Emgesa challenged this decision before the Council of State. On September 20, 2022, AN-LA's appeal was denied because it had been filed late. The proceeding continues in relation to Emgesa's appeal.

Another acción popular was brought by a number of fish farming companies over the alleged impact that filling the Quimbo basin would have on fishing in the Betania basin downstream from Quimbo. After a number of precautionary rulings, on February 22, 2016, the Huila Court issued a ruling allowing generation to continue for six months. The court ordered Emgesa to prepare a technical design that would ensure compliance with oxygen level requirements and to provide collateral of about 20,000,000,000 Colombian pesos (about €5.5 million). The Huila Court subsequently extended the six-month time limit, and therefore, in the absence of contrary court rulings the Quimbo plant is continuing to generate electricity as the oxygenation system installed by Emgesa has so far demonstrated that it can maintain the oxygen levels required by the court. On March 22, 2018, ANLA and CAM jointly presented the final report on the monitoring of water quality downstream of the dam of the El Quimbo hydroelectric plant. Both authorities confirmed the compliance of Emgesa with the oxygen level requirements. On January 12, 2021, it was learned that the ruling of first instance of the Court of Huila had been issued. The ruling, while acknowledging that the oxygenation system implemented by Emgesa had mitigated the risks associated with the protection of fauna in the Bethany basin, imposed a series of obligations on the environmental authorities involved, as well as on Emgesa itself. In particular, the latter is required to implement a decontamination project to ensure that the water in the basin does not generate risks for the flora and fauna of the river, which will be subject to verification by ANLA, and to make permanent the operation of the oxygenation system, adapting it to comply with the parameters established by ANLA. On March 4, 2021, Emgesa challenged the appeal ruling before the Council of State. On December 31, 2021, the Council of State ruled that Emgesa's appeal was admissible. The proceeding is continuing at the appeal level.

Nivel de Tensión Uno proceedings – Colombia

This dispute involves an "acción de grupo" brought by Centro Médico de la Sabana hospital and other parties against Codensa (now Enel Colombia) seeking restitution of allegedly excess rates. The action is based upon the alleged failure of Codensa to apply a subsidized rate that they claim the users should have paid as Tensión Uno category users (voltage of less than 1 kV) and owners of infrastructure, as established in Resolution no. 82/2002, as amended by Resolution no. 97/2008. The preliminary stage

has been completed and a ruling is pending. The estimated value of the proceeding is about 337 billion Colombian pesos (about €96 million).

Group actions for flooding in Bosa and Kennedy neighborhoods of Bogotá – Colombia

Emgesa SA (now Enel Colombia SA) was sued with an "acción de grupo" brought by the residents of the Bosa and Kennedy neighborhoods of Bogotá (Colombia) seeking damages for flooding that occurred in 2010 and 2011 after the Bogotá overflowed its banks. The proceeding is at the preliminary stage. The estimated value of the proceeding is about 2.2 billion Colombian pesos (about €518 million).

Kino arbitration – Mexico

On September 16, 2020, Kino Contractor SA de Cv (Kino Contractor), Kino Facilities Manager SA de Cv (Kino Facilities) and Enel SpA (Enel) were notified of a request for arbitration filed by Parque Solar Don José SA de Cv, Villanueva Solar SA de Cv and Parque Solar Villanueva Tres SA de Cv (together, "Project Companies") in which the Project Companies alleged the violation (i) by Kino Contractor of certain provisions of the EPC Contract and (ii) by Kino Facilities of certain provisions of the Asset Management Agreement, both contracts concerning solar projects owned by the three companies filing for arbitration. Enel – which is the guarantor of the obligations assumed by Kino Contractor and Kino Facilities under the above contracts – has also been called into the arbitration proceeding, but no specific claims have been filed against it for the moment.

The Project Companies, in which Enel Green Power SpA is a non-controlling shareholder, are controlled by CDPQ Infraestructura Participación SA de Cv (which is controlled by Caisse de Dépôt et Placement du Québec) and CKD Infraestructura México SA de Cv.

On August 4, 2023, the arbitration ruling was notified. The arbitration board declared that it did not have jurisdiction against Enel SpA and, in partially granting the claim of the Project Companies, ordered Kino Contractor and Kino Facilities (now Enel Services Mexico SA de Cv - Enel Services) to pay penalties totaling about \$77 million, plus interest at an annual rate of 6%. Subsequently, Kino Contractor and Enel Services filed a petition requesting correction of the arbitration award, which was partially granted and, on December 13, 2023, they filed a petition to void the award before the Mexican courts. The proceeding is pending.

In December 2023, the Project Companies filed a suit before the Supreme Court of the State of New York against Enel, in its capacity as guarantor of the obligations assumed by Kino Contractor, to request payment due by the latter under the provisions of the arbitration award. The substance and legal grounds of the suit are being contested in full and the proceeding is pending.

Allianz – North America

On May 18, 2022, High Lonesome Wind Project LLC was sued in New York Superior Court by Allianz Risk Transfer Ltd for about \$203 million concerning an alleged liability accrued by the company, as of February 2021, in connection with a Proxy Revenue Swap. The claim is being contested in its entirety. The proceedings are currently pending before the Southern District Court in New York.

Osage Wind – North America

As part of a lawsuit filed by the United States (in its capacity as trustee of the Osage Nation) and the Osage Mineral Council against Enel Green Power North America, Enel Kansas LLC and Osage Wind LLC, on December 20, 2023 a ruling of the Oklahoma District Court ordered the removal of the wind farm and the continuation of the proceeding for damages, which were quantified by the plaintiffs in the amount of at least \$25 million. The proceeding is continuing at first instance and the plaintiffs' claims have been contested. The ruling, which is not final, will be appealed at the appropriate time.

Gastalsa – Peru

In February 2022, Enel Generación Piura SA (EGPIURA) learned of a precautionary measure issued by the Civil Court of Talara of the Superior Court of Justice of Sullana (Juzgado Civil de Talara de la Corte Superior de Justicia de Sullana) in favor of Empresa de Gas de Talara SA (Gastalsa) which orders the Dirección General de Hidrocarburos del Ministerio de Energía y Minas, the Organismo Superior de la Inversión en Energía y Minería (OSINERGMIN) and the Ministry of Energy to (i) restore the natural gas concession of the Parinas district in favor of Gastalsa; and (ii) proceed with the upgrade and transfer of the pipeline owned by EGPIURA (which supplies natural gas to the Malacas thermal power station) to Gastalsa. That precautionary measure was a consequence of the ruling issued by the Court of Talara partially granting a claim filed by Gastalsa requesting to revoke the measure that canceled the concession granted to Gastalsa and the consequent transfer of the gas pipeline owned by EGPIURA to Gastalsa itself.

On August 2, 2022, the Sala Civil de la Corte Superior de Justicia de Sullana ruled against Gastalsa in the second-level appeal, referring the case to the court of first instance for a new decision. As a result of that decision, on September 9, 2022, the precautionary measure issued earlier was revoked.

In the meantime, in July 2022, the Constitutional Court had granted the petition of the system operator, an interested third party, acknowledging that the original petition of Gastalsa had been filed after the time limit. On January 24, 2023 the Constitutional Court also denied the appeal of that measure, which has thus become final, and ordered the Court of Appeal to issue a new decision concerning the forfeiture of the petition.

With a ruling of June 27, 2023, the Court of Appeal denied the claim of forfeit advanced by an affected third party, while with a decision of July 25, 2023 the court of first instance revoked the suspension of the proceeding that had been ordered and took up the case for a decision. With a measure of September 15, 2023, the court found the claim that the provision was null raised by EGPIURA and the other party was unfounded and scheduled oral arguments for September 25, 2023. EGPIURA and the other party in the proceeding appealed that ruling with the Court of Appeal, which, with decision of January 20, 2024, revoked the appealed measure and remanded the suit for trial at first instance. A decision is pending.

In the meantime, on August 9, 2023 EGPIURA also filed an appeal with the Superior Court of Justice of Lima against the decision of June 27, 2023 of the Court of Appeal, arguing that it conflicted with the ruling of the Constitutional Court of January 24, 2023.

The hearing to argue the case is scheduled for August 7, 2024.

Gabčíkovo litigation – Slovakia

Slovenské elektrárne (SE) is involved in a number of cases before the national courts concerning the 720 MW Gabčíkovo hydroelectric plant, which is administered by Vodohospodárska Výsatavba Štátny Podnik (VV) and whose operation and maintenance, as part of the privatization of SE in 2006, had been entrusted to SE for a period of 30 years under an operating agreement (the VEG Operating Agreement).

Immediately after the closing of the privatization, the Public Procurement Office (PPO) filed suit with the Court of Bratislava seeking to void the VEG Operating Agreement on the basis of alleged violations of the regulations governing public tenders, qualifying the contract as a service contract and as such governed by those regulations. In November 2011 the trial court ruled in favor of SE, whereupon the PPO appealed the decision.

In parallel with the PPO action, VV also filed a number of suits, asking in particular for the voidance of the VEG Operating Agreement. On December 12, 2014, VV withdrew unilaterally from the VEG Operating Agreement, notifying its termination on March 9, 2015, for breach of contract. On March 9, 2015, the decision of the appeals court overturned the ruling of the trial court and voided the contract as part of the action pursued by the PPO. SE lodged an extraordinary appeal against that decision before the Supreme Court. At a hearing of June 29, 2016, the Supreme Court denied the appeal and SE then appealed the ruling to the Constitutional Court, which denied the appeal with a ruling on January 18, 2017, which then became final.

In addition, SE lodged a request for arbitration with the Vienna International Arbitral Centre (VIAC) under the VEG Indemnity Agreement. Under that accord, which had been signed as part of the privatization between the National Property Fund (now MH Manazment - MHM) of the Slovak Republic and SE, the latter was entitled to an indemnity in the event of the early termination of the VEG Operating Agreement for reasons not attributable to SE. On June 30, 2017, the arbitration court issued its ruling denying the request of SE.

In parallel with this arbitration proceeding, both VV and MHM filed two suits in the Slovakian courts to void the VEG Indemnity Agreement owing to the alleged connection of the latter with the VEG Operating Agreement. These proceedings were rejected for procedural reasons on September 27, 2017. Both VV and MHM appealed that decision, and both the appeals were denied upholding the trial court decision in favor of SE. VV filed a further appeal (dovolanie) against that decision on March 9, 2020, with the Supreme Court, to which SE replied with a brief submitted on June 8, 2020. SE also filed an appeal before the Slovak Constitutional Court, which was denied on July 29, 2021. On March 24, 2021, the Supreme Court overturned the decision of the Bratislava Court of Appeal, referring the judgment to the latter court, and the proceeding is currently pending.

At the local level, VV has also filed other suits against SE for alleged unjustified enrichment (estimated at about €360 million plus interest) for the period from 2006 to 2015. SE filed counterclaims for all of the proceedings under way. Developments in those proceedings can be summarized as follows:

  • i. for 2006-2008, at the hearing of June 26, 2019, the Court of Bratislava rejected VV's main claim and, consequently, SE's counterclaim. The ruling in first instance was appealed by both parties before the Court of Appeal of Bratislava. The proceedings relating to 2006 were completed with the decision of December 6, 2022, notified to SE on February 18, 2023, which upheld the ruling in first instance. In April 2023, both SE and VV filed extraordinary appeals before the Supreme Court against the Court of Appeal ruling and the proceeding is pending. As regards the proceedings relating to 2007, the Court of Appeal, in a ruling dated January 31, 2023, notified to SE on April 12, 2023, voided the decision of first instance, referring the case back to the Court of Bratislava for a new judgment. The first hearing was held on January 8, 2024 and the proceeding was adjourned to a hearing scheduled for September 11, 2024. The proceedings relating to 2008 are still pending;
  • ii. the proceedings relating to the years 2011 and 2015 are all pending before the court of first instance and briefs have been exchanged between the parties. For both proceedings, hearings before the court of first instance were postponed several times owing to the pandemic and are now postponed to dates to be determined;
  • iii. the proceedings relating to the years 2009, 2010 and 2013 were completed in the court of first instance with ruling issued by the Court of Bratislava on, respectively, November 24, 15 and 22, 2022, rejecting both VV's

claim and SE's counterclaim. Between December 2022 and January 2023 both SE and VV filed appeals against the rulings relating to the years 2009, 2010 and 2013, and the proceeding is now pending. The proceedings relating to 2014 were completed at first instance with a ruling of the Court of Bratislava of October 10, 2023, which has not yet been published, rejecting the primary claim of VV and, consequently, the counterclaim of SE;

iv. as regards the proceeding relating to the year 2012, on February 2, 2023 SE was notified of the appeal ruling upholding the ruling of first instance denying of both VV's claim and SE's counterclaim. Both VV and SE, on March 17, 2023 and March 31, 2023, respectively, have filed an extraordinary appeal with the Supreme Court against the appellate ruling and the proceeding is pending.

Finally, in another proceeding VV asked for SE to return the fee for the transfer from SE to VV of the technology assets of the Gabčíkovo plant as part of the privatization, with a value of about €43 million plus interest. After issuing a preliminary decision on the case in which it noted the lack of standing of VV, on December 18, 2020, the Court issued a decision in favor of SE, rejecting VV's claims. On January 4, 2021, VV filed an appeal against that decision, and the proceeding is pending.

Tax litigation in Brazil

Withholding Tax – Ampla

In 1998, Ampla Energia e Serviços SA (Ampla) financed the acquisition of Coelce with the issue of bonds in the amount of \$350 million ("Fixed Rate Notes" - FRN) subscribed by its Panamanian subsidiary, which had been established to raise funds abroad. Under the special rules then in force, subject to maintaining the bond until 2008, the interest paid by Ampla to its subsidiary was not subject to withholding tax in Brazil.

However, the financial crisis of 1998 forced the Panamanian company to refinance itself with its Brazilian parent, which for that purpose obtained loans from local banks. The tax authorities considered this financing to be the equivalent of the early extinguishment of the bond, with the consequent loss of entitlement to the exemption from withholding tax.

In December 2005, Ampla carried out a spin-off that involved the transfer of the residual FRN debt and the associated rights and obligations to Ampla Investimentos e Serviços SA.

On November 6, 2012, the Câmara Superior de Recursos Fiscais (the highest level of administrative courts) issued a ruling against Ampla, for which the company promptly asked that body for clarifications. On October 15, 2013, Ampla was notified of the denial of the request for clarification (embargo de declaração), thereby upholding the previous adverse decision. The company provided security for the debt and on June 27, 2014 continued litigation before the ordinary courts (Tribunal de Justiça).

In December 2017, the court appointed an expert to examine the issue in greater detail in support of the future ruling. In September 2018, the expert submitted a report, requesting additional documentation.

In December 2018, the company, now Enel Distribuição Rio de Janeiro, provided the additional documentation and, in view of the conclusions presented by the expert, requested a further expert opinion. The case has been referred to the expert for clarifications regarding the position expressed by the company.

In July 2021, the supplementary report was filed by the expert in which the existence of the loan agreements was acknowledged and the bond loan was terminated, both for the principal amount and for interest, mainly through a capital increase. The company, called to pronounce on the report filed, requests the full cancellation of the tax debt. The amount involved in the dispute at December 31, 2023 was about €270 million.

PIS/COFINS/ICMS – Enel Distribuição São Paulo

In March 2017, the Supremo Tribunal Federal of Brazil (STF) ruled on the calculation of the PIS and COFINS taxes, confirming the argument that the ICMS (Imposto sobre Circulação de Mercadorias e Serviços, tax on the circulation of goods and services) tax was not included in the calculation basis of the PIS and COFINS.

In May 2021, the STF established that the ruling would have effect from the judgment of March 2017, except for taxpayers who had filed an appeal before that date.

The Group's Brazilian companies affected by the STF ruling had already initiated legal action in their respective federal regional courts. Subsequently, the latter notified them of the final decision, recognizing the right to deduct the ICMS applied to their operations from the calculation basis of the PIS and COFINS. Since the excess payment of the PIS and COFINS taxes had been transferred to final customers, at the same time as the recognition of these recoverable taxes, a liability in respect of those customers was recognized in the same amount, net of any costs incurred or to be incurred in the legal proceedings. These liabilities represent an obligation to reimburse the recovered taxes to final customers.

In this regard, Enel Distribuição São Paulo initiated two proceedings that led to rulings in its favor. These regarded the periods from December 2003 to December 2014 and from January 2015 onwards. With regard to the second proceeding, the Federal Union filed an action of rescission against the company, disputing the fact that part of the period in question (prior to March 2017) would be adversely impacted by the STF ruling of May 2021.

In May 2022, the company challenged this action and will defend its actions through the various levels of the court system. During 2023, following an adverse ruling at the ap-

peal level, the company filed a new appeal seeking clarification of the ruling.

The estimated amount involved in the proceeding at December 31, 2023 was about €235 million.

IRPJ/CSLL – Eletropaulo

On October 5, 2021, Eletropaulo received an assessment notice from the Brazilian tax authorities contesting the deductibility for income tax purposes (Imposto sobre a Renda das Pessoas Jurídicas - IRPJ and Contribuição Social sobre o Lucro Líquido - CSLL) of the amortization of the increased values generated by extraordinary corporate transactions carried out before the acquisition of the company by the Enel Group. The contested period runs from 2017 to 2019.

Considering its position sound, the company presented its defense at the first level of administrative adjudication. The amount involved in the dispute at December 31, 2023 was about €158 million.

PIS – Eletropaulo

In July 2000, Eletropaulo filed suit seeking a tax credit for PIS (Programa Integração Social) paid in application of regulations (Decree Laws 2.445/1988 and 2.449/1988) that were subsequently declared unconstitutional by the Supremo Tribunal Federal (STF). In May 2012, the Superior Tribunal de Justiça (STJ) issued a final ruling in favor of the company that recognized the right to the credit.

In 2002, before the issue of that favorable final ruling, the company had offset its credit against other federal taxes. This behavior was contested by the federal tax authorities but the company, claiming it had acted correctly, challenged in court the assessments issued by the federal tax authorities. Following defeat at the initial level of adjudication, the company appealed.

The amount involved in the dispute at December 31, 2023 was about €134 million.

ICMS – Ampla, Coelce and Eletropaulo

The States of Rio de Janeiro, Ceará and São Paulo issued a number of tax assessments against Ampla Energia e Serviços SA (for the years 1996-1999 and 2007-2017), Companhia Energética do Ceará (2003, 2004, 2006- 2012, 2015, 2016 and 2018) and Eletropaulo (2008-2021), challenging the deduction of ICMS (Imposto sobre Circulação de Mercadorias e Serviços, tax on the circulation of goods and services) in relation to the purchase of certain non-current assets. The companies challenged the assessments, arguing that they correctly deducted the tax and asserting that the assets, the purchase of which generated the ICMS, are intended for use in their electricity distribution activities.

The companies are continuing to defend their actions at the various levels of adjudication.

The amount involved in the disputes totaled approximately €106 million at December 31, 2023.

Withholding Tax – Endesa Brasil

On November 4, 2014, the Brazilian tax authorities issued an assessment against Endesa Brasil SA (now Enel Brasil SA) alleging the failure to apply withholding tax to dividends, reclassified as payment of income to non-resident recipients.

More specifically, in 2009, Endesa Brasil, as a result of the first-time application of the IFRS, had derecognized goodwill, recognizing the effects in equity, on the basis of the correct application of the accounting standards it had adopted. The Brazilian tax authorities, however, asserted – during an audit – that the accounting treatment was incorrect and that the effects of the derecognition should have been recognized through profit or loss. As a result, the corresponding amount (about €202 million) was reclassified as a payment of income to non-residents and, therefore, subject to withholding tax of 15%.

It should be noted that the accounting treatment adopted by the company was agreed with the external auditor and also confirmed by a specific legal opinion issued by a local firm.

Following unfavorable rulings from the administrative courts, the company is continuing to defend its actions in court and the appropriateness of the accounting treatment.

The overall amount involved in the dispute at December 31, 2022 was about €77 million.

ICMS – Coelce

The State of Ceará has filed various tax assessments against Companhia Energética do Ceará SA over the years (for tax periods 2015-2018), as well as against all other energy distributors in Brazil, demanding the ICMS (Imposto sobre Circulação de Mercadorias e Serviços, tax on the circulation of goods and services) on the subsidies paid by the Federal government against the regulatory discounts granted to certain consumers.

The company has appealed the individual assessments and is defending its actions in the various levels of jurisdiction.

The overall amount involved in the dispute at December 31, 2023 was about €69 million.

PIS/COFINS – Eletropaulo

Starting from June 2017, the Federal Tax Authority served a number of tax assessment notices against Eletropaulo (for the 2013-2018 tax periods) contesting the offsetting of tax credits relating to social security contributions (PIS and COFINS), requesting the payment of those contributions. The tax authorities argue that the company has claimed PIS and COFINS credits for the purchase of goods and

services that cannot be considered fiscally relevant since they are not essential for the distribution of electricity. Furthermore, it disputes the claim of a tax credit associated with "non-technical" losses on the electricity purchased. The company has promptly defended the accuracy of its

calculations in the various levels of jurisdiction and argued the validity of the offsets claimed.

The estimated amount involved in the proceeding at December 31, 2023 was about €55 million.

ICMS (pro-rata) – Coelce

The State of Ceará has filed various tax assessments against Companhia Energética do Ceará SA over the years (for tax periods from 2005 to 2014), contesting the determination of the deductible portion of the ICMS (Imposto sobre Circulação de Mercadorias e Serviços, tax on the circulation of goods and services) and in particular the method of calculation of the pro-rata deduction with reference to the revenue deriving from the application of a special rate envisaged by the Brazilian government for the sale of electricity to low-income households (Baixa Renda).

The company has appealed the individual assessments, arguing that the tax deduction was calculated correctly. The company is defending its actions in the various levels of jurisdiction.

The overall amount involved in the dispute at December 31, 2023 was about €52 million.

PIS – Eletropaulo

In December 1995, the Brazilian government increased the rate of the federal PIS (Programa Integração Social) tax from 0.50% to 0.65% with the issue of a provisional measure (Executive Provisional Order).

Subsequently, the provisional measure was re-issued five times before its definitive ratification into law in 1998. Under Brazilian legislation, an increase in the tax rate (or the establishment of a new tax) can only be ordered by law and take effect 90 days after its publication.

Eletropaulo therefore filed suit arguing that an increase in the tax rate would only have been effective 90 days after the last Provisional Order, claiming that the effects of the first four provisional measures should be considered void (since they were never ratified into law). This dispute ended in April 2008 with recognition of the validity of the increase in the PIS rate starting from the first provisional measure.

In May 2008, the Brazilian tax authorities filed a suit against Eletropaulo to request payment of taxes corresponding to the rate increase from March 1996 to December 1998. Eletropaulo has fought the request at the various levels of adjudication, arguing that the time limit for the issue of the notice of assessment had lapsed. In particular, since more than five years have passed since the taxable event (December 1995, the date of the first provisional measure) without issuing any formal instrument, the right of the tax authorities to request the payment of additional taxes and the authority to undertake legal action to obtain payment have been challenged.

In 2017, following the unfavorable decisions issued in previous rulings, Eletropaulo filed an appeal in defense of its rights and its actions with the Superior Tribunal de Justiça (STJ) and the Supremo Tribunal Federal (STF). The proceedings are still pending while the amounts subject to dispute have been covered by a bank guarantee.

With regard to the request of the Office of the Attorney General of the Brazilian National Treasury Department to replace the bank guarantee with a deposit in court, the court of second instance granted the petition. The company therefore replaced the bank guarantee with a cash deposit and filed a clarification motion against the related decision, which is currently awaiting a decision.

The overall amount involved in the dispute at December 31, 2023 was about €48 million.

FINSOCIAL – Eletropaulo

Following a final ruling issued by the Federal Regional Court on September 11, 2011, Eletropaulo was recognized the right to compensation for certain FINSOCIAL credits (social contributions) relating to sums paid from September 1989 to March 1992.

Despite the expiration of the relative statute of limitations, the Federal Tax Authority contested the determination of some credits and rejected the corresponding offsetting, issuing tax assessments that the company promptly challenged in the administrative courts, defending the legitimacy of its calculations and actions.

After an unfavorable ruling at first instance, the company filed an appeal before the administrative court of second instance.

The overall amount involved in the dispute at December 31, 2023 was about €48 million.

Tax litigation in Spain

Income tax – Enel Iberia, Endesa and subsidiaries

In 2018, the Spanish tax authorities completed a general audit involving the companies of the Group participating in the Spanish tax consolidation mechanism. This audit, which began in 2016, involved corporate income tax, value added tax and withholding taxes (mainly for the years 2011 to 2014). With reference to the main claims, the companies involved have challenged the related assessments at the first administrative level (Tribunal Económico-Administrativo Central - TEAC), defending the correctness of their actions.

On April 4, 2022, the TEAC rejected the appeal and the companies are continuing to defend their actions in court (Audiencia Nacional).

With regard to the disputes concerning corporate income tax, the issues for which an unfavorable outcome is considered possible amounted to about €134 million at December 31, 2023:

  • i. Enel Iberia is defending the appropriateness of the criterion adopted for determining the deductibility of capital losses deriving from stock sales (around €88 million) and certain financial expense (around €15 million);
  • ii. Endesa and its subsidiaries are mainly defending the appropriateness of the criteria adopted for the deductibility of certain financial expense (about €25 million) and costs for decommissioning nuclear power plants (about €6 million).

In 2021, the Spanish tax authorities completed a new general audit for the years 2015 to 2018. The companies involved have challenged the related assessments at the first administrative level (TEAC), defending the correctness of their actions.

With reference to the main claims concerning corporate tax and regarding the deductibility of certain financial expense, the dispute that could produce an adverse ruling amounts to about €226 million at December 31, 2023 (Enel Iberia €213 million; Endesa SA €13 million).

58. Environmental programs

Some Group companies are affected by national or supranational environmental regulatory standards designed to develop the use of environmental protection mechanisms in accordance with the environmental policies of the European Union and global international agreements.

Income tax – Enel Green Power España SL

On June 7, 2017, the Spanish tax authorities issued a notice of assessment to Enel Green Power España SL, contesting the treatment of the merger of Enel Unión Fenosa Renovables SA (EUFER) into Enel Green Power España SL in 2011 as a tax neutral transaction, asserting that the transaction had no valid economic reason.

On July 6, 2017, the company appealed the assessment at the first administrative level (Tribunal Económico-Administrativo Central - TEAC), defending the appropriateness of the tax treatment applied to the merger. The company has provided the supporting documentation demonstrating the synergies achieved as a result of the merger in order to prove the existence of a valid economic reason for the transaction. On December 10, 2019, the TEAC denied the appeal and the company is continuing to defend its actions in court (Audiencia Nacional).

The overall amount involved in the dispute at December 31, 2023 was about €98 million.

58.1 Terms and nature of environmental programs

The main environmental programs affecting Group companies are summarized in the following table in accordance with ESMA Public Statement of October 25, 2023 – Priority 1: Climate-related matters.

Program Terms of the mechanism Nature
EU ETS(78) The scheme, which applies in all EU countries, sets an annual cap on emissions that
is being progressively reduced to bring down the total emissions in Europe.
The fourth trading period (2021-2030) has been tightened up as part of the EU's
contribution to the Paris Climate Agreement.
At the annual cap correspond a specific number of allowances (for each authorized
industrial plant) that are granted, through participation in auctions or for free, by the
competent local authority, freely transferable and traded between operators.
The obliged companies shall surrender several allowances equivalent to their
polluting emissions for each reporting period.
Mandatory by law "cap and trade" scheme.
Within the Group, CO2
allowances are
applicable to the thermal power generation
companies operating in Italy and Spain.
In those countries in which the Group is
engaged in thermal power generation
activity, European regulations have required
that EU Allowances (EUAs) are assigned via
auction, and they are not granted for free.
Energy
efficiency
certificates
The scheme has the objective to reduce the energy consumption by end-users
through various measures developed in application of European Union Directives
and by national laws.
These marketable certificates are issued, over a period of several years, by the
competent local authorities to companies that carry out directly or indirectly
initiatives/projects to improve energy efficiency.
At the end of the period, obliged companies are required to present certificates
corresponding to their obligatory energy savings.
Mandatory by law.
The Group currently holds energy efficiency
certificates in Italy and Spain where the
obliged companies are, respectively,
electricity distribution and sale companies.
Guarantees of
origin (GoOs)
This European scheme has the objective to encourage use of energy produced from
renewable sources.
These certificates are issued by the competent local authorities to renewable
generation plants that meet specific standards. They are marketable and traded, also
separately from the electricity to which they refer, during their term of validity until
they are cancelled by the issuer at the request of the user of the certificates.
This mechanism currently affects the Group
Italian and Spanish sale companies that have
an obligation to surrender a certain volume
of GoOs depending on the level of sales to
customers.
Renewable
Energy
Certificates
(RECs)
These certificates are granted in countries outside Europe to renewable energy
generation companies to prove that consumed electricity has been generated in a
renewable way.
The functioning of this scheme is analogous to European GoOs.
This mechanism is voluntary and currently
affects some Group companies in North and
Latin America.

(78) European Emissions Trading System.

58.2 Accounting policies

For the purposes of accounting for charges arising from such regulatory requirements, the Group uses the "net liability approach".

Under this accounting policy:

  • any environmental certificates received free of charge and those self-produced as a result of Group's operations that will be used for compliance purposes are recognized at nominal value (nil);
  • charges incurred for obtaining (in the market or in some other transaction for consideration) any missing certificates to fulfil compliance requirements for the reporting period are recognized through profit or loss under other operating costs, as they represent "system charges" consequent to compliance with a regulatory requirement;
  • if the number of environmental certificates available at the reporting date is not sufficient to fulfill the related obligation (a certificate "deficit"), a provision is accrued under "provisions for risks and charges". Conversely, any "surplus" of certificates purchased at the reporting date is recognized in "inventories" in accordance with the general principles referred to in note 2.2 "Material accounting policies".

Some types of environmental certificates accrue in proportion to:

  • electricity generated by plants that use renewable resources (for example, guarantees of origin and renewable energy certificates);
  • energy savings certified by the competent authority (energy efficiency certificates).

In these cases, the right to obtain such certificates can be

treated as a non-monetary government operating grant and, as such, the Group recognizes that right at fair value under "other non-current/current non-financial assets". When the certificates are credited to the ownership account, they are reclassified from other assets to inventories.

The corresponding income is recognized under other operating profit.

For Group companies involved in trading activities, environmental certificates represent goods exchanged as part of their normal business activity and, as such, the purchased certificates are recognized under "services and other materials".

Revenue from the sale of such certificates is recognized under "revenue", with a corresponding decrease in inventories.

Contracts for the purchase or sale of environmental certificates settled at a future date (for example, forward contracts, etc.) that comply with the definition of derivative are recognized and measured in accordance with the "own use exemption", at fair value through profit or loss, or with hedge accounting rules based on specific circumstances. For further details, please see note 51 "Derivatives and hedge accounting".

58.3 Financial impact

Charges for environmental certificates

The following table reports system charges recognized by obligated Group companies in respect of the certificates necessary to meet compliance obligations for the year based on national and supranational regulations.

Millions of euro
2023 2022 Change
Charges for environmental certificates
System charges – Emissions allowances 2,038 2,216 (178) -8.0%
System charges – Energy efficiency certificates 244 182 62 34.1%
System charges – Guarantees of origin 321 112 209 -
Total 2,603 2,510 93 3.7%

The increase in costs for environmental certificates compared with the previous year is mainly attributable to the increase in charges recognized for guarantees of origin by Enel Energia and the Endesa Group, which reflects the increase in the quantity of green energy sold to customers and the prices of those certificates.

This effect was partially offset by a decrease in charges for emissions allowances, essentially in Italy, mainly connected with a decline in the quantity of electricity produced from fossil sources.

The following table reports the quantities of environmental certificates used by Group companies to meet compliance obligations under national and supranational regulations.

2023 2022 2023 2022 2023 2022
Emissions allowances
(thousands of metric tons)
Guarantees of origin
(GWh)
Energy efficiency certificates
(TOE)
Opening balance at January 1 34,494 28,350 20,565 11,417 416,174 257,940
Self-produced certificates - - 24,845 29,540 - -
Purchases of certificates 34,699 32,925 28,362 20,316 925,187 678,808
Sales of certificates (2,500) - (1,464) - - -
Certificates delivered for compliance(1) (35,456) (26,781) (53,075) (40,708) (863,526) (520,574)
Closing balance at December 31 31,237 34,494 19,233 20,565 477,835 416,174

(1) Certificates delivered in 2023 and 2022 regard compliance for previous years, in line with the time limits envisaged in the applicable regulations.

Provisions for environmental certificates

Provisions for risks and charges for environmental certificates include charges in respect of the certificate shortfall for fulfillment of compliance obligations for the year under national and supranational regulations.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Provisions for risk and charges for environmental certificates – current portion
Emissions allowances 33 209
Energy efficiency certificates 3 -
Guarantees of origin 214 83
Total 250 292

The reduction in provisions for risks and charges (€42 million) is attributable to the decline in the provision for emissions allowances recognized by the Endesa Group, partially offset by an increase in the provision for guarantees of origin recognized by Enel Energia.

Changes in provisions for risks and charges for environmental certificates in 2023 are detailed below.

Millions of euro Provisions Uses Other changes
at Dec. 31, 2022 at Dec. 31, 2023
Provisions for risk and charges for environmental
certificates – current portion
Emissions allowances 209 33 (209) - 33
Energy efficiency certificates - 2 - 1 3
Guarantees of origin 83 206 (104) 29 214
Total 292 241 (313) 30 250

Income from government grants for environmental certificates

The table reports non-monetary government grants for environmental certificates accrued during the year and certified by the competent authorities. They mainly regard guarantees of origin accrued in proportion to electricity generated by renewable resource plants.

Monetary government grants for energy efficiency certificates are paid by the Electricity Sector Equalization Fund to e-distribuzione for energy efficiency certificates purchased in the year.

2023 2022 Change
111 48 63 -
4 1 3 -
115 49 66 -
231 171 60 35.1%
346 220 126 57.3%

The increase of €126 million in grants for environmental certificates compared with the previous year mainly reflects:

  • an increase in non-monetary grants for guarantees of origin registered in Spain (€44 million) and Italy (€19 million), due to an increase in prices and the quantity of energy generated from renewable resources;
  • an increase in monetary grants for energy efficiency certificates (€60 million) recognized by e-distribuzione, due to an increase in the volume of certificates purchased in 2023 compared with the previous year.

Non-monetary grants to be received for environmental certificates

The following table reports environmental certificates accrued at the end of the year but not yet accredited by the competent authorities to the Group companies that produced them. They are recognized under other current non-financial assets and mainly regard guarantees of origin.

Millions of euro
at Dec. 31, 2023 at Dec. 31, 2022
Non-monetary grants to be received for environmental certificates
Guarantees of origin 23 15
Other certificates 1 1
Total 24 16

The increase of €8 million is attributable to an increase in non-monetary grants to be received for guarantees of origin recorded in Italy and Spain.

Other items

With regard to the impacts of environmental certificates on the other items of the income statement and statement of financial position, please see:

  • note 11.a "Revenue from sales and services" for revenue from the sale of environmental certificates;
  • note 12.b "Services and other materials" for purchases of environmental certificates not used to meet the year's compliance obligation;
  • note 33 "Inventories" for inventories of certificates not used to meet the year's compliance obligation.

59. Future accounting standards

The following provides a list of accounting standards, amendments and interpretations that will take effect for the Group after December 31, 2023.

  • "Amendments to IAS 1 Classification of Liabilities as Current or Non-current", issued in January 2020. The amendments regard the provisions of IAS 1 concerning the presentation of liabilities. More specifically, the changes clarify:
    • the criteria to adopt in classifying a liability as current or non-current, specifying the meaning of right to defer settlement and that that right must exist at the end of the reporting period;
    • that the classification is unaffected by the intentions or expectations of management about the exercise of the right to defer settlement of a liability;
    • that the right to defer exists if and only if the entity satisfies the terms of the liability at the end of the reporting period, even if the creditor does not verify compliance with those terms until later; and
    • that settlement regards the transfer to the counterparty of cash, equity instruments, other assets or services.

The amendments take effect for annual periods beginning on or after January 1, 2024.(79)

"Amendments to IAS 1 – Non-current Liabilities with Covenants", issued in October 2022. IAS 1 requires classification of liabilities as non-current only where an entity has a right to defer settlement in the 12 months following the reporting date. Nevertheless, the right to do so is often subject to compliance with covenants. The amendments of the standard improve disclosure when the right to defer settlement of a liability for at least 12 months is subject to compliance with covenants and specify that the classification of the liability as current or non-current at the reporting date is not affected by covenants that must be complied with subsequent to the reporting date.

The amendments take effect for annual periods beginning on or after January 1, 2024.

"Amendments to IFRS 10 and IAS 28 – Sale or Contribution of Assets between an Investor and its Associate or Joint Venture", issued in September 2014. The amendments clarify the accounting treatment for sales or contribution of assets between an investor and its associates or joint ventures. They confirm that the accounting treatment depends on whether the assets sold or contributed to an associate or joint venture constitute a "business" (as defined in IFRS 3). The IASB has deferred the effective date of these amendments indefinitely.

"Amendments to IFRS 16 – Lease Liability in a Sale and Leaseback", issued in September 2022. The amendments require the seller-lessee to measure the rightof-use asset arising from a sale and leaseback transaction in proportion to the previous carrying amount of the asset involved in the arrangement and in line with the retained right-of-use. Consequently, the seller-lessee will be allowed to recognize only the amount of any capital gain or loss relating to the rights transferred to the buyer-lessor.

The amendments do not prescribe specific measurement requirements for liabilities deriving from a leaseback. However, they include examples that illustrate the initial and subsequent measurement of the liability by including variable payments that do not depend on an index or a rate. This representation is a departure from the general accounting model required by IFRS 16, in which variable payments that do not depend on an index or a rate are recognized through profit or loss in the period in which the event or condition that determines these payments occurs. In this regard, the seller-lessee will have to develop and apply an accounting policy to determine the lease payments such that any amount of retained right-of-use gain or loss is not recognized.

The amendments take effect for annual periods beginning January 1, 2024. In conformity with "IAS 8 - Accounting Policies, Changes in Accounting Estimates and Errors", retrospective application is permitted for sale and leaseback transactions entered into after the date of initial application of IFRS 16.

"Amendments to IAS 21 – The Effects of Changes in Foreign Exchange Rates: Lack of Exchangeability", issued in August 2023. The amendments require the application of a consistent approach in determining whether a currency is exchangeable for another and, when it is not, in determining the exchange rate to be used and the disclosure to be provided.

The amendments will take effect, subject to endorsement, for annual periods beginning January 1, 2025 (earlier application is permitted).

"Amendments to IAS 7 and IFRS 7 – Supplier Finance Arrangements", issued in May 2023.

The amendments clarify the characteristics of supplier finance arrangements and require additional disclosures concerning these agreements in order to assist users of the financial statements in understanding their related impacts on an entity's liabilities, cash flows and exposure to liquidity risk.

The IASB granted a transitional exemption by requiring neither comparative information in the first year of ap-

(79) In 2020 an amendment was issued to postpone the date of entry into force from January 1, 2023 to January 1, 2024.

plication nor disclosure of specific opening balances. Furthermore, the information requested is applicable only for the first year of application. Accordingly, considering that the amendments will take effect, subject to endorsement, for annual reporting periods begin-

60. Events after the reporting period

Finalized the agreement to sell a geothermal and solar portfolio in the United States to Ormat

On January 4, 2024, Enel SpA, acting through its wholly-owned subsidiary Enel Green Power North America Inc. (EGPNA), closed an agreement with Ormat Technologies Inc. on the sale of a renewable asset portfolio in the United States for a total of \$271 million, equivalent to €250 million, subject to customary transactional adjustments. The assets sold include EGPNA's entire geothermal portfolio as well as a number of small solar plants, with a total capacity of about 150 MW of operating plants.

The overall transaction, which was closed following the fulfillment of a number of conditions, had a positive effect on the Enel Group´s consolidated net debt of about €250 million, and a negative impact of around €30 million on Group profit, which had already been recognized in 2023 as impairment losses in compliance with IFRS 5.

Enel issues a dual-tranche €1.75 billion sustainabilitylinked bond in the Eurobond market

On January 16, 2024, Enel Finance International NV, a finance company controlled by Enel SpA, issued a dual-tranche sustainability-linked bond for institutional investors in the Eurobond market in the total amount of €1.75 billion.

The new issue envisages the use of two sustainability Key Performance Indicators for each tranche, illustrated in the Sustainability-Linked Financing Framework, last updated in January 2024.

The issue is structured in the following two tranches:

  • €750 million at a fixed rate of 3.375%, with settlement date set on January 23, 2024, maturing July 23, 2028;
  • €1,000 million at a fixed rate of 3.875%, with settlement date set on January 23, 2024, maturing January 23, 2035.

Enel issues a new €900 million perpetual hybrid bond with coupon at 4.75%

On February 20, 2024, Enel SpA issued a non-convertible, subordinated perpetual hybrid bond for institutional investors on the European market, denominated in euros, with an aggregate principal amount of €900 million.

The transaction refinanced the €900 million equity-accounted perpetual hybrid bond with first call date in February 2025 and a 3.5% coupon.

The bond has no fixed maturity, and is due and payable

ning on or after January 1, 2024, the new disclosures must be provided no earlier than the annual financial report at December 31, 2024.

The Group is assessing the potential impact of the future application of the new provisions.

only in the event of the winding up or liquidation of the Company. An annual fixed coupon of 4.75% will be paid until (but excluding) the first reset date of May 27, 2029, which is the last day for the first optional redemption.

Partnership with Sosteneo to develop battery and opencycle plant projects in Italy

On March 1, 2024, Enel SpA, acting through its subsidiary Enel Italia SpA, signed an agreement with Sosteneo Fund 1 HoldCo Sàrl, for the acquisition by the latter of 49% of the share capital of Enel Libra Flexsys Srl, a company wholly-owned by Enel Italia and established for the implementation and operation of a portfolio of Battery Energy Storage Systems (BESS) and open-cycle gas turbines (OCGT). The agreement provides for payment by Sosteneo HoldCo of approximately €1.1 billion. The price is also subject to an

adjustment mechanism customary for this type of transaction. The enterprise value on a 100% basis of Enel Libra Flexsys recognized in the agreement is equal to around €2.5 billion once the investment cycle foreseen by the project is completed.

The transaction is expected to generate upon closing a positive impact of about €1.1 billion on the Enel Group's consolidated net debt, while it is set to bear no impact on the Group's performance, as Enel will continue to maintain control and fully consolidate Enel Libra Flexsys upon the closing of the transaction.

Agreement with A2A on electricity distribution operations in a number of municipalities in Lombardy

On March 9, 2024, the Enel subsidiary e-distribuzione SpA signed an agreement with A2A SpA for the sale to the latter of 90% of the capital of a newly incorporated vehicle to which electricity distribution operations in a number of municipalities of the provinces of Milan and Brescia will be transferred.

The agreement provides for A2A to pay about €1.2 billion, based on an enterprise value (for 100% of the company) of around €1.35 billion. The price, which will be paid at closing, is subject to an adjustment mechanism customary for these kinds of transactions.

Upon completion of the transaction, e-distribuzione will retain a 10% stake in NewCo's capital to support the startup phase of the company, and which will be subject to a put and call option mechanism that can be triggered starting from the first year from completion of the transaction.

Furthermore, specific agreements between the parties provide for e-distribuzione to guarantee supporting activities to ensure continuity of service.

The transaction is expected to generate a positive effect on the Enel Group's consolidated net debt in 2024 of about €1.2 billion and a positive impact on Group reported profit for 2024 of about €1 billion. If, before the closing of the transaction, a precise specification of further activities that e-distribuzione may carry out for NewCo is reached and such activities are reflected in specific agreements, thereby forming an industrial Stewardship relationship, the aforementioned performance effects could also be recognized on the Group's ordinary results.

The closing of the transaction, which is expected to occur by December 31, 2024, is subject to a number of conditions, including receipt of antitrust clearance, the successful completion of the golden power procedure by the Presidency of Italy's Council of Ministers and receipt of authorization to transfer the electricity distribution service concessions to NewCo.

61. Fees of the Audit Firm pursuant to Article 149-duodecies of the CONSOB Issuers Regulation

Fees pertaining to 2023 paid by Enel SpA and its subsidiaries at December 31, 2023 to the Audit Firm and entities belonging to its network for services are summarized in the following table, pursuant to the provisions of Article 149-duodecies of the CONSOB Issuers Regulation.

Millions of euro
Type of service Entity providing the service
Enel SpA
of which:
Auditing - KPMG SpA 0.9
- entities of the KPMG network -
of which:
Certification services - KPMG SpA 1.8
- entities of the KPMG network -
of which:
Other services - KPMG SpA -
- entities of the KPMG network -
Total 2.7
Enel SpA subsidiaries
of which:
Auditing - KPMG SpA 4.6
- entities of the KPMG network 9.5
of which:
Certification services - KPMG SpA 1.3
- entities of the KPMG network 1.2
of which:
Other services - KPMG SpA -
- entities of the KPMG network -
Total 16.6
TOTAL 19.3

Declaration of the Chief Executive Officer and the officer in charge of financial reporting of the Enel Group at December 31, 2023, pursuant to the provisions of Article 154-bis, paragraph 5, of Legislative Decree 58 of February 24, 1998 and Article 81-ter of CONSOB Regulation no. 11971 of May 14, 1999

  • 1. The undersigned Flavio Cattaneo and Stefano De Angelis, in their respective capacities as Chief Executive Officer and officer in charge of financial reporting of Enel SpA, hereby certify, taking account of the provisions of Article 154-bis, paragraphs 3 and 4, of Legislative Decree 58 of February 24, 1998:
    • a. the appropriateness with respect to the characteristics of the Enel Group and
    • b. the effective adoption of the administrative and accounting procedures for the preparation of the consolidated financial statements of the Enel Group in the period between January 1, 2023 and December 31, 2023.
  • 2. In this regard, we report that:
    • a. the appropriateness of the administrative and accounting procedures used in the preparation of the consolidated financial statements of the Enel Group has been verified in an assessment of the internal control system for financial reporting. The assessment was carried out on the basis of the guidelines set out in the "Internal Controls - Integrated Framework" issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO);
    • b. the assessment of the internal control system for financial reporting did not identify any material issues.
  • 3. In addition, we certify that the consolidated financial statements of the Enel Group at December 31, 2023:
    • a. have been prepared in compliance with the International Financial Reporting Standards endorsed by the European Union pursuant to Regulation (EC) no. 1606/2002 of the European Parliament and of the Council of July 19, 2002;
    • b. correspond to the information in the books and other accounting records;
    • c. provide a true and fair representation of the financial position, financial performance and cash flows of the issuer and the companies included in the consolidation scope.
  • 4. Finally, we certify that the Report on Operations, accompanied by the consolidated financial statements of the Enel Group at December 31, 2023, contains a reliable analysis of operations and performance, as well as the situation of the issuer and the companies included in the consolidation scope, together with a description of the main risks and uncertainties to which they are exposed.

Rome, March 21, 2024

Flavio Cattaneo Stefano De Angelis Chief Executive Officer of Enel SpA Officer in charge of financial

reporting of Enel SpA

REPORTS

Report of the Board of Statutory Auditors

REPORT OF THE BOARD OF STATUTORY AUDITORS TO THE SHAREHOLDERS' MEETING OF ENEL SpA CALLED TO APPROVE THE FINANCIAL STATEMENTS FOR 2023 (pursuant to Article 153 of Legislative Decree 58/1998)

Shareholders,

The current Board of Statutory Auditors of Enel SpA (hereinafter also "Enel" or the "Company") was appointed by the Shareholders' Meeting of May 19, 2022.

During the year ended December 31, 2023 we performed the oversight activities envisaged by law. In particular, pursuant to the provisions of Article 149, paragraph 1, of Legislative Decree 58 of February 24, 1998 (hereinafter the "Consolidated Law on Financial Intermediation") and Article 19, paragraph 1 of Legislative Decree 39 of January 27, 2010 (hereinafter "Decree 39/2010"), we monitored:

  • compliance with the law and the corporate bylaws as well as compliance with the principles of sound administration in the performance of the Company's business;
  • the Company's financial reporting process and the adequacy of the administrative and accounting system, as well as the reliability of the latter in representing operational events;
  • the statutory audit of the annual statutory and consolidated accounts and the independence of the audit firm;
  • the adequacy and effectiveness of the internal control and risk management system;
  • the adequacy of the organizational structure of the Company, within the scope of our responsibilities;
  • the implementation of the corporate governance rules as provided for by the 2020 edition of the Italian Corporate Governance Code (hereinafter, the "Corporate Governance Code"), which the Company has adopted;
  • the appropriateness of the instructions given by the Company to its subsidiaries to enable Enel to meet statutory public disclosure requirements.

In performing our checks and assessments of the above issues, we did not find any issues that would merit reporting here.

In compliance with the instructions issued by CONSOB with Communication no. DEM/1025564 of April 6, 2001, as amended, we report the following:

• we monitored compliance with the law and the bylaws and we have no issues to report;

-

  • on a quarterly basis, we received adequate information from the Chief Executive Officer, as well as through our participation in the meetings of the Board of Directors
    • of Enel, on activities performed, general developments in operations and the outlook, and on transactions with the most significant impact on performance or the financial position carried out by the Company and its subsidiaries. The actions approved and implemented appeared to be in compliance with the law and the bylaws and were not manifestly imprudent, risky, in potential conflict of interest or in contrast with the resolutions of the Shareholders' Meeting or otherwise prejudicial to the integrity of the Company's assets. For a discussion of the features of the most significant transactions, please see the report on operations accompanying the separate financial statements of the Company and the consolidated financial statements of the Enel Group for 2023 (in the section "Significant events in 2023");
  • we did not find any atypical or unusual transactions conducted with third parties, Group companies or other related parties;
  • in the section "Related parties" of the notes to the separate financial statements for 2023 of the Company, the directors describe the main transactions with relatedparties – the latter being identified on the basis of international accounting standards and the instructions of CONSOB – carried out by the Company, to which readers may refer for details on the transactions and their financial impact. They also detail the procedures adopted to ensure that related-party transactions are carried out in accordance with the principles of transparency and procedural and substantive fairness. On the basis of our oversight activities, we found that the transactions were carried out in compliance with the approval and execution processes set out in the related procedure – adopted in compliance with the provisions of Article 2391-bis of the Italian Civil Code and the implementing regulations issued by CONSOB – described in the report on corporate governance and ownership structure for 2023. All transactions with related parties reported in the notes to the separate financial statements for 2023 of the Company were executed as part of ordinary operations in the interest of the Company and settled on market terms and conditions;
  • the Company declares that it has prepared its separate financial statements for 2023 on the basis of international accounting standards (IAS/IFRS) – and the interpretations issued by the IFRIC and the SIC – endorsed by the European Union pursuant to Regulation (EC) no. 1606/2002 and in force at the close of 2023 (hereinafter also the "IFRS-EU"), as well as the provisions of Legislative Decree 38 of February 28, 2005 and its related implementing measures, as it did the previous year.

The Company's separate financial statements for 2023 have been prepared on a going-concern basis. The notes to the separate financial statements give detailed information on the accounting standards and measurement criteria adopted, accompanied by an indication of the standards applied for the first time in 2023, which as indicated in the notes did not have a significant impact in the year under review;

  • the separate financial statements for 2023 of the Company underwent the statutory audit by the audit firm, KPMG SpA, which issued an unqualified opinion, including with regard to the consistency of the report on operations and certain information in the report on corporate governance and ownership structure of the Company with the financial statements, as well as compliance with the provisions of law, pursuant to Article 14 of Decree 39/2010 and Article 10 of Regulation (EU) no. 537/2014. The report of KPMG SpA also includes the declaration provided pursuant to Article 14, paragraph 2(e) of Decree 39/2010 stating that the audit firm did not identify any significant errors in the contents of the report on operations;
  • the Company declares that it has also prepared the consolidated financial statements of the Enel Group for 2023 on the basis of international accounting standards (IFRS-EU) and the provisions of Legislative Decree 38 of February 28, 2005 and its related implementing measures. The 2023 consolidated financial statements of the Enel Group are also prepared on a going-concern basis. The notes to the consolidated financial statements provide a detailed discussion of the accounting standards and measurement criteria adopted, accompanied by an indication of standards applied for the first time in 2023, which did not have a significant impact in the year under review. Note also that, starting from 2021, in compliance with the provisions of Delegated Regulation (EU) 2019/815 of December 17, 2018 as amended (the "ESEF Regulation"), the Company has (i) drawn up its entire Annual Financial Report (including the separate financial statements and the consolidated financial statements, the respective reports on operations and the associated certifications pursuant to Article 154-bis, paragraph 5, of the Consolidated Law on Financial Intermediation) in the single electronic reporting format XHTML (Extensible Hypertext Markup Language), and (ii) marked up (with specific tags) the schedules of the consolidated financial statements and the related explanatory notes using the iXBRL markup language (Inline eXtensible Business Reporting Language), in accordance with the ESEF taxonomy issued annually by ESMA, in order to facilitate the accessibility, analysis and comparability of the annual financial reports;

  • the consolidated financial statements for 2023 of the Enel Group underwent statutory audit by the audit firm KPMG SpA, which issued an unqualified opinion, including with regard to the consistency of the consistency of the report on operations and certain information in the report on corporate governance and ownership structure with the consolidated financial statements, as well as compliance with the provisions of law, pursuant to Article 14 of Decree 39/2010 and Article 10 of Regulation (EU) no. 537/2014. The report of KPMG SpA also includes:

    • a discussion of key aspects of the audit report on the consolidated financial statements; and
    • the declaration provided pursuant to Article 14, paragraph 2(e) of Decree 39/2010 and Article 4 of CONSOB Regulation no. 20267 (implementing Legislative Decree 254 of December 30, 2016) concerning, respectively, a statement that the audit firm did not identify any significant errors in the contents of the report on operations and that it verified that the Board of Directors had approved the consolidated non-financial statement.

Under the terms of its engagement, KPMG SpA also issued unqualified opinions on the financial statements for 2023 of the most significant Italian companies of the Enel Group. Moreover, during periodic meetings with the representatives of the audit firm, KPMG SpA, the latter did not raise any issues concerning the reporting packages of the main foreign companies of the Enel Group, selected by the auditors on the basis of the work plan established for the auditing of the consolidated financial statements of the Enel Group, that would have a sufficiently material impact to be reported in the opinion on those financial statements;

• taking due account of the recommendations of the European Securities and Markets Authority issued on January 21, 2013, and most recently supplemented with the Public Statement of October 25, 2023, to ensure appropriate transparency concerning the methods used by listed companies in testing goodwill for impairment, in line with the recommendations contained in the joint Bank of Italy – CONSOB – ISVAP document no. 4 of March 3, 2010, and in the light of indications of CONSOB in its Communication no. 7780 of January 28, 2016, the compliance of the impairment testing procedure with the provisions of IAS 36 was expressly approved by the Board of Directors of the Company, having obtained a favorable opinion in this regard from the Control and Risk Committee in February 2024, i.e. prior to the date of approval of the financial statements for 2023;

  • we examined the Board of Directors' proposal for the allocation of net profit for 2023 and the distribution of available reserves and have no comments in this regard;
  • we note that the Board of Directors of the Company certified, following appropriate checks by the Control and Risk Committee and the Board of Statutory Auditors in March 2024, that as at the date on which the 2023 financial statements were approved, the Enel Group continued to meet the conditions established by CONSOB (set out in Article 15 of the Market Rules, approved with Resolution no. 20249 of December 28, 2017) concerning the accounting transparency and adequacy of the organizational structures and internal control systems that subsidiaries established and regulated under the law of non-EU countries must comply with so that Enel shares can continue to be listed on regulated markets in Italy;
  • we monitored, pursuant to the aforementioned Article 15 of the Market Rules, the capacity of the administrative-accounting systems of the subsidiaries referred to in the previous bullet point to regularly send management and the audit firm KPMG SpA the performance and financial data necessary for the preparation of the consolidated financial statements of the Enel Group, finding no adverse issues;
  • we monitored, within the scope of our responsibilities, the adequacy of the organizational structure of the Company (and the Enel Group as a whole), obtaining information from the competent department heads and in meetings with the boards of auditors or equivalent bodies of a number of the main Enel Group companies in Italy and abroad, for the purpose of the reciprocal exchange of material information. Taking account of the changes in its organizational arrangements, implemented most recently in 2023 and the early months of 2024, the Enel Group, consistent with the vision of the newly appointed top management, has adopted a matrix-based organizational structure, structured into:

    • (i) four global Divisions, which are charged with developing, building, operating and maintaining assets, conducting trading activities and developing and managing the portfolio of products and services in the various geographical areas in which the Group operates. The four global Divisions are divided into: Enel Green Power and Thermal Generation, Global Energy and Commodity Management & Chief Pricing Officer, Enel Grids and Innovability and Enel X Global Retail;
    • (ii) two Countries (Italy and Iberia) and a Region (Rest of the World), which, in each geographical area in which the Group operates, is charged with:
  • achieving economic-financial results, optimizing the balance between customers and generation and ensuring long-term value maximization, as well as the adoption of the highest safety and environmental standards;

  • managing relationships with institutions, regulators, media and other stakeholders;
  • performing staff and service activities in support of the business lines present at country level, maximizing efficiency and quality;
  • managing the integration between the business lines present in their geographical area;
  • managing stewardship relationships, coordinating with all the competent structures involved;
  • (iii) a global service function (Global Services), which is charged with the (i) integrated management of all Group activities connected with the development and governance of digital solutions, purchasing and strategy, customer processes and management models, as well as insourcing processes and (ii) managing the real estate portfolio, maximizing its value, and the related general services;
  • (iv) six Holding Company Staff Functions, which are charged with the strategic direction, coordination and control activities of the entire Group, broken down as follows: Administration, Finance and Control, Personnel and Organization, External Relations, Legal, Corporate, Regulatory and Antitrust Affairs, Audit and Security;
  • (v) a CEO Office and Strategy, which is charged with providing support to the CEO in defining and directing the Group's strategic decisions and defining the medium-long term strategic positioning for the entire Group, developing strategic scenarios that also consider the effects of climate change.

We found no issues concerning the adequacy of the organizational system described above in supporting the strategic development of the Company and the Enel Group or the consistency of that system with control requirements;

  • we met with the boards of auditors or equivalent bodies of a number of the Group's main companies in Italy and abroad. No material issues emerged from the exchange of information that would require mention here;
  • we monitored the independence of the audit firm, having received today from KPMG specific written confirmation that they met that requirement (pursuant to the

provisions of Article 6, paragraph 2(a), of Regulation (EU) 537/2014) and paragraph 17 of international standard on auditing (ISA Italia) 260 and having discussed the substance of that declaration with the audit partner. In this regard, we also monitored – as provided for under Article 19, paragraph 1(e), of Decree 39/2010 – the nature and the scale of non-audit services provided to the Company and other Enel Group companies by KPMG SpA and the entities belonging to its network. The fees due to KPMG SpA and the entities belonging to its network are reported in the notes to the separate financial statements of the Company. Following our examinations, the Board of Statutory Auditors found no critical issues concerning the independence of KPMG SpA.

We held periodic meetings with the representatives of the audit firm, pursuant to Article 150, paragraph 3, of the Consolidated Law on Financial Intermediation, and no material issues emerged that would require mention in this report.

With specific regard to the provisions of Article 11 of Regulation (EU) 537/2014, KPMG SpA today provided the Board of Statutory Auditors with the "additional report" for 2023 on the results of the statutory audit carried out, which indicates no significant difficulties encountered during the audit or any significant shortcomings in the internal control system for financial reporting or the Enel accounting system that would raise issues requiring mention in the opinion on the separate and consolidated financial statements. The Board of Statutory Auditors will transmit that report to the Board of Directors promptly, accompanied by any comments it may have, in accordance with Article 19, paragraph 1(a), of Decree 39/2010.

As at the date of this report, the audit firm also reported that it did not prepare any management letter for 2023;

• we monitored the financial reporting process, the appropriateness of the administrative and accounting system and its reliability in representing operational events, as well as compliance with the principles of sound administration in the performance of the Company's business and we have no comments in that regard. We conducted our checks by obtaining information from the head of the Administration, Finance and Control department (taking due account of the head's role as the officer responsible for the preparation of the Company's financial reports), examining Company documentation and analyzing the findings of the examinations performed by KPMG SpA. The Chief Executive Officer and the officer responsible for the preparation of the financial reports of Enel issued a statement (regarding the Company's 2023 separate financial statements) certifying (i) the appropriateness with

respect to the characteristics of the Company and the effective adoption of the administrative and accounting procedures used in the preparation of the financial statements; (ii) the compliance of the content of the financial reports with international accounting standards endorsed by the European Union pursuant to Regulation (EC) no. 1606/2002; (iii) the correspondence of the financial statements with the information in the books and other accounting records and their ability to provide a true and fair representation of the performance and financial position of the Company; and (iv) that the report on operations accompanying the financial statements contains a reliable analysis of operations and performance, as well as the situation of the issuer, together with a description of the main risks and uncertainties to which it is exposed. The statement also affirmed that the appropriateness of the administrative and accounting procedures used in the preparation of the separate financial statements of the Company had been verified in an assessment of the internal control system for financial reporting (supported by the findings of the independent testing performed by a qualified external advisor) and that the assessment of the internal control system did not identify any material issues. An analogous statement was prepared for the consolidated financial statements for 2023 of the Enel Group;

  • we monitored the adequacy and effectiveness of the internal control system, primarily through systematic participation of the head of the Audit department of the Company in the meetings of the Board of Statutory Auditors and holding about half of the meetings jointly with the Control and Risk Committee, as well as through periodic meetings with the body charged with overseeing the operation of and compliance with the organizational and management model adopted by the Company pursuant to Legislative Decree 231/2001. In the light of our examination and in the absence of significant issues, there are no reasons to doubt the adequacy and effectiveness of the internal control and risk management system. In February 2024, the Board of Directors of the Company expressed an analogous assessment of the situation and also noted, in November 2023, that the main risks associated with the strategic targets set out in the 2024-2026 Business Plan were compatible with the management of the Company in a manner consistent with those targets;
  • in 2023 no petitions were received by the Board of Auditors nor did we receive any complaints concerning circumstances deemed censurable pursuant to Article 2408 of the Italian Civil Code;

• we monitored the effective implementation of the Corporate Governance Code, verifying the compliance of Enel's corporate governance arrangements with the recommendations of the Code. Detailed information on the Company's corporate governance system can be found in the report on corporate governance and ownership structure for 2023.

In June 2023, the Board of Statutory Auditors verified that the Board of Directors – following its election by the Shareholders' Meeting of May 10, 2023 - in evaluating the independence of non-executive directors, correctly applied the assessment criteria specified in the Corporate Governance Code and the principle of the priority of substance over form that must inform the application of the Code's recommendations in general, adopting a transparent procedure, the details of which are discussed in the report on corporate governance and ownership structure for 2023.

With regard to the so-called "self-assessment" of the independence of its members, the Board of Statutory Auditors, in March 2023 ascertained that all standing statutory auditors met the relevant requirements set out in the Consolidated Law on Financial Intermediation and in the Corporate Governance Code.

  • in the final part of 2023 and during the first two months of 2024, the Board of Statutory Auditors, with the support of an independent advisory firm, conducted a board review assessing the size, composition and functioning of the Board of Statutory Auditors, as has been done since 2018, similar to the review conducted for the Board of Directors since 2004. This is a best practice that the Board of Statutory Auditors intended to adopt even in the absence of a specific recommendation of the Corporate Governance Code, a "peer-to-peer review" approach, i.e. the assessment not only of the functioning of the body as a whole, but also of the style and content of the contribution provided by each of the auditors. The approach adopted in performing the board review for 2023 and the findings of that review are described in detail in the report on corporate governance and ownership structure for 2023.
  • during 2023, the Board of Statutory Auditors also participated in an induction program, characterized by specific studies to update directors and statutory auditors on the corporate governance of the Company and the Enel Group, the structure and operation of the electrical system in general and the activities of the four global Divisions (Enel Green Power and Thermal Generation, Enel Grids, Global Energy and Commodity Management & Chief Pricing Officer, Enel X Global Retail) and the "People and Organization" Holding Company Function;

-

-

  • we monitored the application of the provisions of Legislative Decree 254 of December 30, 2016 (hereinafter "Decree 254) concerning the disclosure of non-financial and diversity information by certain large undertakings and groups. In performing that activity, we monitored the adequacy of the organizational, administrative, reporting and control system established by the Company in order to enable the accurate representation in the consolidated non-financial statements for 2023 of the activity of the Enel Group, its results and its impacts in the non-financial areas referred to in Article 3, paragraph 1, of Decree 254, and have no comments in this regard. The audit firm, KPMG SpA, has issued, pursuant to Article 3, paragraph 10, of Decree 254 and Article 5 of CONSOB Regulation no. 20267 of January 18, 2018, its certification of the conformity of the information provided in the consolidated non-financial statement with the requirements of applicable law;
  • since the listing of its shares, the Company has adopted specific rules (most recently amended in September 2018) for the internal management and processing of confidential information, which also set out the procedures for the disclosure of documentation and information concerning the Company and the Group, with specific regard to inside information. Those rules (which can be consulted on the corporate website) contain appropriate provisions directed at subsidiaries to enable Enel to comply with statutory public disclosure requirements, pursuant to Article 114, paragraph 2, of the Consolidated Law on Financial Intermediation;
  • in 2002 the Company also adopted (and has subsequently updated, most recently in February 2021) a Code of Ethics (also available on the corporate website) that expresses the commitments and ethical responsibilities involved in the conduct of business, regulating and harmonizing corporate conduct in accordance with standards of maximum transparency and fairness with respect to all stakeholders;
  • with regard to the provisions of Legislative Decree 231 of June 8, 2001 which introduced into Italian law a system of administrative liability for companies for certain types of offences committed by its directors, managers or employees on behalf of or to the benefit of the company – since July 2002 Enel has adopted a compliance program consisting of a "general part" and various "special parts" concerning the difference offences specified by Legislative Decree 231/2001 that the program is intended to prevent. For a description of the manner in which the model has been adapted to the characteristics of the various Italian companies of the Group, as well as a description of the purposes of the "Enel Global Compliance Program" for the Group's foreign companies, please see the report on corporate governance and

ownership structure for 2023. The structure that monitors the operation and compliance with the program and is responsible for updating it is a collegial body. This body, whose current members were appointed in July 2023, is still composed of three external members who jointly have specific professional expertise on corporate organization matters and corporate criminal law. The Board of Statutory Auditors received adequate information on the main activities carried out in 2023 by that body, including in meetings with its members. Our examination of those activities found no facts or situations that would require mention in this report;

  • in 2023, the Board of Statutory Auditors issued the following opinions:
    • a favorable opinion (at the meeting of February 8, 2023) on the 2023 Audit Plan, in accordance with the provisions of Recommendation 33, letter c) of the Corporate Governance Code;
    • a favorable opinion (at the meeting of June 12, 2023) on the appointment of the new officer in charge of financial reporting of Enel, in accordance with the provisions of Article 154-bis, paragraph 1, of the Consolidated Law on Financial Intermediation and Article 20.5 of the Company's articles of association;
    • a favorable opinion (at the meeting of July 5, 2023), pursuant to Article 2389, paragraph 3, of the Italian Civil Code, on the remuneration to be paid to the members of the various committees established within the Board of Directors, following the election of the latter by the Shareholders' Meeting of May 10, 2023, taking account of the provisions in this regard of Enel's remuneration policy for 2023, approved with a binding vote by the Shareholders' Meeting itself;
    • a favorable opinion (at the meeting of July 5, 2023) on the attendance fee to be paid to the Magistrate of the State Audit Court delegated to control Enel's financial management for participation in the meetings of the corporate bodies;
    • a favorable opinion (at the meeting of September 20, 2023), pursuant to Article 2389, paragraph 3, of the Italian Civil Code, on the decisions concerning the remuneration and other terms and conditions of employment of top management appointed following the election of the Board of Directors by the Shareholders' Meeting of May 10, 2023, taking account of the provisions in this regard of Enel's remuneration policy for 2023, approved with a binding vote by the Shareholders' Meeting itself;
  • a report on the fixed and variable compensation accrued by those who served as Chairman of the Board of Directors, the Chief Executive Officer/General Manager and other directors in 2023 for their respective positions and any compensation

instruments awarded to them is contained in the second section of the Report on Remuneration Policy for 2024 and Remuneration Paid in 2023 referred to in Article 123-ter of the Consolidated Law on Financial Intermediation (for the sake of brevity, "Remuneration Report" hereinafter), approved by the Board of Directors, acting on a proposal of the Nomination and Compensation Committee on April 11, 2024, which will be published in compliance with the time limits established by law. The design of these remuneration instruments is in line with best practices as it complies with the principle of establishing a link with appropriate financial and non-financial performance targets and pursuing the creation of shareholder value over the medium and long term. The proposals to the Board of Directors concerning such forms of compensation and the determination of the associated parameters were prepared by the Nomination and Compensation Committee, which is made up entirely of independent directors, drawing on the findings of benchmark analyses, including at the international level, conducted by an independent consulting firm (the "advisor"). In addition, the second section of the Remuneration Report contains, in compliance with the applicable CONSOB regulations, specific disclosures on the remuneration received in 2023 by the members of the oversight body and by key management personnel (in aggregate form for the latter).

The Board of Statutory Auditors also supervised the process of preparing the remuneration policy for 2024 – described in full in the first section of the Remuneration Report, without finding any critical issues. In particular, oversight activity examined the consistency of the various measures envisaged by that policy with (i) the provisions of Directive (EU) 2017/828 as transposed into Italian law, with (ii) the recommendations of the Italian Corporate Governance Code, as well as with (iii) the results of the benchmark analysis carried out, including at the international level, by an independent consulting firm that the Nomination and Compensation Committee elected to engage.

In addition, during the preparation of the remuneration policy for 2024, the Board of Statutory Auditors - taking account of the recommendations in this regard by the Corporate Governance Code – asked the independent consulting firm to conduct an additional benchmark analysis to ascertain the adequacy of the remuneration paid to the members of the oversight body. This analysis was performed by the advisor with reference to two benchmarks:

• as a benchmark external to Enel, the remuneration of the boards of statutory auditors reported in the documentation published on the occasion of 2023

shareholders' meetings by issuers belonging to a peer group composed of companies belonging the FTSE MIB index (1) with a similarly complex business and similar market size and ownership structure to Enel.

• as a benchmark internal to Enel, the remuneration paid to the members of the Board of Directors of Enel (excluding the Chairman and the Chief Executive Officer) in proportion to the number of meetings held.

As regards the external benchmark, the advisor first noted that, on the basis of the data as at December 31, 2022, Enel lies at the extreme upper bound of the size class compared with the peer group, as it significantly exceeds the ninth decile in terms of capitalization and turnover and is between the third quartile and ninth decile in terms of number of employees. At the same time, the analysis found that, compared with the peer group, the remuneration of the members of the Enel Board of Statutory Auditors was instead at the benchmark median for the Chairman and slightly above the median for the other standing Auditors.

As regards the internal benchmark, the advisor conducted a comparison between the average remuneration per meeting paid to the members of the Board of Statutory Auditors and that paid to the members of the Board of Directors of the Company (excluding the Chairman and the Chief Executive Officer), taking into account all meetings in which they respectively participate. This analysis found a significant disparity between the remuneration of the members of the two bodies. The average remuneration per meeting of the directors is more than three times greater than that of the Chairman of the Board of Statutory Auditors and nearly four times that of the other standing members of the Board of Statutory Auditors.

The Board of Statutory Auditors' oversight activity in 2023 was carried out in 24 meetings and with participation in the 15 meetings of the Board of Directors and participation in the annual Shareholders' Meeting, and, through the chairman or one or more of its members, in the 14 meetings of the Control and Risk Committee (held jointly with the Board of Statutory Auditors), in the 14 meetings of the Nomination and Compensation Committee, in the 6 meetings of the Related Parties Committee and in the 7 meetings of the Corporate Governance and Sustainability Committee. The delegated magistrate of the

(1) The peer group consists of the following 18 companies: A2A, Assicurazioni Generali, Banco BPM, BPER Banca, Eni, Hera, Italgas Leonardo, Mediobanca, Nexi, Pirelli, Poste Italiane, Prysmian, Saipem, Snam, Telecom Italia, Terna and Unicredit.

State Audit Court participated in the meetings of the Board of Statutory Auditors and those of the Board of Directors.

During the course of this activity and on the basis of information obtained from KPMG SpA, no omissions, censurable facts, irregularities or other significant developments were found that would require reporting to the regulatory authorities or mention in this report.

Based on the oversight activity performed and the information exchanged with the independent auditors KPMG SpA, we recommend that you approve the Company's financial statements for the year ended December 31, 2023 in conformity with the proposals of the Board of Directors.

Rome, April 19, 2024 The Board of Auditors

____________________ Barbara Tadolini – Chairman

____________________ Luigi Borré – Auditor

____________________ Maura Campra – Auditor

Report of the Audit Firm

KPMG S.p.A. Revisione e organizzazione contabile Via Curtatone, 3 00185 ROMA RM Telefono +39 06 80961.1 Email [email protected] PEC [email protected]

(This independent auditors' report has been translated into English solely for the convenience of international readers. Accordingly, only the original Italian version is authoritative.)

Independent auditors' report pursuant to article 14 of Legislative decree no. 39 of 27 January 2010 and article 10 of Regulation (EU) no. 537 of 16 April 2014

To the shareholders of Enel S.p.A.

Report on the audit of the consolidated financial statements

Opinion

We have audited the consolidated financial statements of the Enel Group (the "group"), which comprise the statement of financial position as at 31 December 2023, the income statement and the statements of comprehensive income, changes in equity and cash flows for the year then ended and notes thereto, which include material information on the accounting policies.

In our opinion, the consolidated financial statements give a true and fair view of the financial position of the Enel Group as at 31 December 2023 and of its financial performance and cash flows for the year then ended in accordance with the International Financial Reporting Standards endorsed by the European Union and the Italian regulations implementing article 9 of Legislative decree no. 38/05.

Basis for opinion

We conducted our audit in accordance with the International Standards on Auditing (ISA Italia). Our responsibilities under those standards are further described in the "Auditors' responsibilities for the audit of the consolidated financial statements" section of our report. We are independent of Enel S.p.A. (the "parent") in accordance with the ethics and independence rules and standards applicable in Italy to audits of financial statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Key audit matters

Key audit matters are those matters that, in our professional judgement, were of most significance in the audit of the consolidated financial statements of the current year. These matters were addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on these matters.

KPMG S.p.A. è una società per azioni di diritto italiano e fa parte del network KPMG di entità indipendenti affiliate a KPMG International Limited, società di diritto inglese.

Ancona Bari Bergamo Bologna Bolzano Brescia Catania Como Firenze Genova Lecce Milano Napoli Novara Padova Palermo Parma Perugia Pescara Roma Torino Treviso Trieste Varese Verona

Società per azioni Capitale sociale Euro 10.415.500,00 i.v. Registro Imprese Milano Monza Brianza Lodi e Codice Fiscale N. 00709600159 R.E.A. Milano N. 512867 Partita IVA 00709600159 VAT number IT00709600159 Sede legale: Via Vittor Pisani, 25 20124 Milano MI ITALIA

Recognition of revenue from the supply of electricity and gas not yet invoiced

Notes to the consolidated financial statements: notes 2.1 "Use of estimates and management judgement – Revenue from contracts with customers", 2.2 "Material accounting policies – Revenue from contracts with customers", 11.a "Revenue from sales and services" and 34 "Trade receivables"

Key audit matter Audit procedures addressing the key audit matter
Revenue from the supply of electricity and gas to end
users is recognised at the time the electricity or gas is
delivered and includes, in addition to amounts invoiced
on the basis of periodic meter readings or on the
volumes notified by distributors and transporters, an
estimate of the electricity and gas delivered during the
year but not yet invoiced that is calculated also taking
account of any network losses. Revenue accrued
between the date of the last meter reading and the
year-end is based on estimates of the consumption of
individual customers, primarily determined on their
historical information, adjusted to reflect the climate
Our audit procedures included:

understanding the process for the recognition of
revenue from the supply of electricity and gas not
yet invoiced;

assessing the design, implementation and
operating effectiveness of controls, including IT
controls, deemed material for the purposes of our
audit, including by involving our IT specialists;

performing substantive procedures on the
electricity and gas volumes considered in the
estimation;
factors or other matters that may affect the estimated
consumption.

checking the accuracy of the selling prices used in
These estimates are very complex given the nature of
underlying assumptions.
the estimation;

comparing the estimates recognised in the
Therefore, we believe that the recognition of revenue
from the supply of electricity and gas not yet invoiced is
consolidated financial statements with the
subsequent actual figures;
a key audit matter.
assessing the appropriateness of the disclosures
provided in the notes about the revenue from the
supply of electricity and gas not yet invoiced.

Responsibilities of the parent's directors and board of statutory auditors ("Collegio Sindacale") for the consolidated financial statements

The directors are responsible for the preparation of consolidated financial statements that give a true and fair view in accordance with the International Financial Reporting Standards endorsed by the European Union and the Italian regulations implementing article 9 of Legislative decree no. 38/05 and, within the terms established by the Italian law, for such internal control as they determine is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

The directors are responsible for assessing the group's ability to continue as a going concern and for the appropriate use of the going concern basis in the preparation of the consolidated financial statements and for the adequacy of the related disclosures. The use of this basis of accounting is appropriate unless the directors believe that the conditions for liquidating the parent or ceasing operations exist, or have no realistic alternative but to do so.

The Collegio Sindacale is responsible for overseeing, within the terms established by the Italian law, the group's financial reporting process.

Auditors' responsibilities for the audit of the consolidated financial statements

Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditors' report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a

guarantee that an audit conducted in accordance with ISA Italia will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these consolidated financial statements.

As part of an audit in accordance with ISA Italia, we exercise professional judgement and maintain professional scepticism throughout the audit. We also:

  • identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control;
  • obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the group's internal control;
  • evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by the directors;
  • conclude on the appropriateness of the directors' use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the group's ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditors' report to the related disclosures in the consolidated financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditors' report. However, future events or conditions may cause the group to cease to continue as a going concern;
  • evaluate the overall presentation, structure and content of the consolidated financial statements, including the disclosures, and whether the consolidated financial statements represent the underlying transactions and events in a manner that achieves fair presentation;
  • obtain sufficient appropriate audit evidence regarding the financial information of the entities or business activities within the group to express an opinion on the consolidated financial statements. We are responsible for the direction, supervision and performance of the group audit. We remain solely responsible for our audit opinion.

We communicate with those charged with governance, identified at the appropriate level required by ISA Italia, regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.

We also provide those charged with governance with a statement that we have complied with the ethics and independence rules and standards applicable in Italy and communicate with them all relationships and other matters that may reasonably be thought to bear on our independence, and where applicable, the measures taken to eliminate those threats or the safeguards applied.

From the matters communicated with those charged with governance, we determine those matters that were of most significance in the audit of the consolidated financial statements of the current year and are, therefore, the key audit matters. We describe these matters in this report.

Other information required by article 10 of Regulation (EU) no. 537/14

On 16 May 2019, the parent's shareholders appointed us to perform the statutory audit of its separate and consolidated financial statements as at and for the years ending from 31 December 2020 to 31 December 2028.

We declare that we did not provide the prohibited non-audit services referred to in article 5.1 of Regulation (EU) no. 537/14 and that we remained independent of the parent in conducting the statutory audit.

We confirm that the opinion on the consolidated financial statements expressed herein is consistent with the additional report to the Collegio Sindacale, in its capacity as audit committee, prepared in accordance with article 11 of the Regulation mentioned above.

Report on other legal and regulatory requirements

Opinion on the compliance with the provisions of Commission Delegated Regulation (EU) 2019/815

The parent's directors are responsible for the application of the provisions of Commission Delegated Regulation (EU) 2019/815 with regard to regulatory technical standards on the specification of a single electronic reporting format (ESEF) to the consolidated financial statements at 31 December 2023 to be included in the annual financial report.

We have performed the procedures required by Standard on Auditing (SA Italia) 700B in order to express an opinion on the compliance of the consolidated financial statements with Commission Delegated Regulation (EU) 2019/815.

In our opinion, the consolidated financial statements at 31 December 2023 have been prepared in XHTML format and have been marked up, in all material respects, in compliance with the provisions of Commission Delegated Regulation (EU) 2019/815.

Due to certain technical limitations, some information included in the notes to the consolidated financial statements when extracted from the XHTML format to an XBRL instance may not be reproduced in an identical manner with respect to the corresponding information presented in the consolidated financial statements in XHTML format.

Opinion pursuant to article 14.2.e) of Legislative decree no. 39/10 and article 123-bis.4 of Legislative decree no. 58/98

The parent's directors are responsible for the preparation of the group's reports on operation and on corporate governance and ownership structure at 31 December 2023 and for the consistency of such reports with the related consolidated financial statements and their compliance with the applicable law.

We have performed the procedures required by Standard on Auditing (SA Italia) 720B in order to express an opinion on the consistency of the report on operations and the specific information presented in the report on corporate governance and ownership structure indicated by article 123-bis.4 of Legislative decree no. 58/98 with the group's consolidated financial statements at 31 December 2023 and their compliance with the applicable law and to state whether we have identified material misstatements.

In our opinion, the report on operations and the specific information presented in the report on corporate governance and ownership structure referred to above are consistent with the group's consolidated financial statements at 31 December 2023 and have been prepared in compliance with the applicable law.

With reference to the above statement required by article 14.2.e) of Legislative decree no. 39/10, based on our knowledge and understanding of the entity and its environment obtained through our audit, we have nothing to report.

Statement pursuant to article 4 of the Consob regulation implementing Legislative decree no. 254/16

The directors of Enel S.p.A. are responsible for the preparation of a consolidated non-financial statement pursuant to Legislative decree no. 254/16. We have checked that the directors had approved such consolidated non-financial statement. In accordance with article 3.10 of Legislative decree no. 254/16, we attested the compliance of the consolidated non-financial statement separately.

Rome, 19 April 2024

KPMG S.p.A.

(signed on the original)

Davide Utili Director of Audit

ATTACHMENTS

Subsidiaries, associates and other significant equity investments of the Enel Group at December 31, 2023

In compliance with Articles 38 and 39 of Legislative Decree 127/1991 and CONSOB Notice no. DEM/6064293 of July 28, 2006, a list of subsidiaries and associates of Enel SpA at December 31, 2023, pursuant to Article 2359 of the Italian Civil Code, and of other significant equity investments is provided below. Enel has full title to all investments. The following information is included for each company: name, registered office, share capital, currency in which share capital is denominated, business segment, method of consolidation, Group companies that have a stake in the company and their respective ownership share, and the Group's ownership share.

The following provides a key to the icons representing the business segments.

Business segment Description of business segments
Group holding company
Country holding company
Enel Green Power
Thermal Generation
Trading
Enel Grids
End-user Markets
Enel X
e-Mobility
Services
Finance

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Parent
Enel SpA Rome IT 10,166,679,946 EUR Holding Enel SpA 100.00% 100.00%
Subsidiaries
25 Mile Creek Windfarm LLC Andover US 1 USD Line-by-line 25RoseFarms
Holdings LLC
100.00% 100.00%
25 Mile PPA LLC Andover US 1 USD Line-by-line EGP North America
PPA LLC
100.00% 100.00%
25RoseFarms Holdings LLC Andover US 1 USD Line-by-line Enel Green Power
25RoseFarms
Holdings LLC
100.00% 100.00%
3SUN Srl Catania IT 1,000,000 EUR Held for sale Enel Green Power
Italia Srl
Enel Green Power
96.74%
3.26%
100.00%
SpA
3SUN USA LLC Andover US 1 USD Line-by-line Enel North America
Inc.
100.00% 100.00%
400 Manley Solar LLC Boston US - USD Line-by-line Enel X Project MP
Holdings LLC
100.00% 100.00%
4814 Investments LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Ables Springs Solar LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Ables Springs Storage LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Abu Renewables India Private
Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Ace High Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Aced Renewables Hidden
Valley (RF) (Pty) Ltd
Johannesburg ZA 1,000 ZAR Equity Enel Green Power
RSA 2 (RF) (Pty) Ltd
55.00% 27.50%
Acefat AIE Barcelona ES 793,340 EUR - Edistribución Redes
Digitales SLU
14.29% 10.02%
Adams Solar PV Project Two
(RF) (Pty) Ltd
Johannesburg ZA 10,000,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
60.00% 60.00%
Adria Link Srl Gorizia IT 300,297 EUR Equity Enel Produzione SpA 50.00% 50.00%
Aferkat Wind Farm Casablanca MA 389,600 MAD Line-by-line Enel Green Power
Morocco Sàrl
99.97% 99.97%
Agassiz Beach LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Agatos Green Power Trino Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Solar Energy Srl
100.00% 100.00%
Aguillón 20 SA Zaragoza ES 2,682,000 EUR Line-by-line Enel Green Power
España SLU
51.00% 35.76%
Aidon Oy Jyväskylä FI 5,112,572 EUR Equity Gridspertise Srl 100.00% 50.00%
Enel Brasil SA 100.00%
Alba Energia Ltda Rio de Janeiro BR 16,045,169 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Albany Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Almyros Ape Single Member
PC
Maroussi GR 20,001 EUR Equity Enel Green Power
Hellas Supply Single
Member SA
100.00% 50.00%
Alpe Adria Energia Srl Udine IT 900,000 EUR Equity Enel Produzione SpA 50.00% 50.00%
Alta Farms Azure Ranchland
Holdings LLC
Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Alta Farms Wind Project
II LLC
Andover US 1 USD Line-by-line 25RoseFarms
Holdings LLC
100.00% 100.00%
Alvorada Energia SA Niterói BR 22,317,416 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Ampla Energia e Serviços SA Rio de Janeiro BR 4,438,230,387 BRL Line-by-line Enel Brasil SA 99.83% 82.13%
Annandale Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Apiacás Energia SA Rio de Janeiro BR 14,216,846 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Aquilla Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Aragonesa de Actividades
Energéticas SAU
Teruel ES 60,100 EUR Line-by-line Endesa SA 100.00% 70.12%
Aranort Desarrollos SLU Madrid ES 3,010 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Aravalli Surya (Project 1)
Private Limited
Gurugram IN 31,630,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Arcadia Power Inc. Washington DC US - USD - Enel X North America
Inc.
0.14% 0.14%
Arena Green Power 1 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Arena Green Power 2 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Arena Green Power 3 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Arena Green Power 4 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Arena Green Power 5 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Arena Power Solar 11 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 12 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 13 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 20 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 33 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 34 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Arena Power Solar 35 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
EN
4 Enel Group 3 Group Strategy & Risk Management 4 Group Performance of Outlook Consolidated financial statements

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Arrow Head Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Arrow Hills Solar Project Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Asociación Nuclear Ascó
Vandellós II AIE
Vandellós ES 19,232,400 EUR Proportional Endesa Generación
SAU
85.41% 59.89%
Baylio Solar SLU 19.72%
Ateca Renovables SL Madrid ES 3,000 EUR Equity Dehesa de los
Guadalupes Solar
SLU
14.93% 35.06%
Seguidores Solares
Planta 2 SLU
15.35%
Atlántico Photovoltaic SAS
ESP
Barranquilla CO 50,587,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Atwater Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Aurora Distributed Solar LLC Wilmington US - USD Line-by-line Aurora Solar Holdings
LLC
74.13% 74.13%
Aurora Land Holdings LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Aurora Solar Holdings LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Aurora Wind Holdings LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Aurora Wind Project LLC Andover US 1 USD Line-by-line Aurora Wind
Holdings LLC
100.00% 100.00%
Autumn Hills LLC Wilmington US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Autumn Waltz Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Avikiran Energy India Private
Limited
Gurugram IN 100,000,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Avikiran Solar India Private
Limited
New Delhi IN 4,918,810,370 INR Equity Enel Green Power
India Private Limited
51.00% 51.00%
Avikiran Surya India Private
Limited
Gurugram IN 875,350 INR Equity Enel Green Power
India Private Limited
51.00% 51.00%
Avikiran Vayu India Private
Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Azure Blue Jay Holdings LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Azure Blue Jay Solar Holdings
LLC
Andover US 1 USD Line-by-line Enel Green Power
Azure Blue Jay Solar
Holdings LLC
100.00% 100.00%
Azure Sky Solar Project LLC Andover US 1 USD Line-by-line Azure Blue Jay Solar
Holdings LLC
100.00% 100.00%
Azure Sky Wind Holdings LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Azure Sky Wind Project LLC Andover US 1 USD Line-by-line AzureRanchII Wind
Holdings LLC
100.00% 100.00%
Azure Sky Wind Storage LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
AzureRanchII Wind Holdings
LLC
Andover US 1 USD Line-by-line Enel Green Power
AzureRanchII Wind
Holdings LLC
100.00% 100.00%
Baikal Enterprise SLU Palma de Mallorca ES 3,006 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Baleares Energy SLU Palma de Mallorca ES 4,509 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Barnwell County Solar
Project LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Baylio Solar SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Beacon Harbor Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Beaver Falls Water Power
Company
Wilmington US - USD Line-by-line Beaver Valley
Holdings LLC
67.50% 67.50%
Beaver Valley Holdings LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Bejaad Solar Plant Casablanca MA 10,000 MAD Line-by-line Enel Green Power
Morocco Sàrl
99.90% 99.90%
Belltail Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Belomechetskaya WPS Moscow RU 3,010,000 RUB Line-by-line Enel Green Power
Rus Limited Liability
Company
100.00% 100.00%
Betwa Renewable Energy
Private Limited
Gurgaon IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Bijou Hills Wind LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Bioenergy Casei Gerola Srl Rome IT 100,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Bison Meadows Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Bison Meadows Wind Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Blair Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Blanche BESS (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Blanche Holding
(Pty) Ltd
100.00% 50.00%
Blanche BESS Trust Sydney AU 100 AUD Equity Enel Green Power
Blanche Holding Trust 100.00%
50.00%
Blue Jay Solar I LLC Andover US 1 USD Line-by-line Azure Blue Jay Solar
Holdings LLC
100.00% 100.00%
Blue Jay Solar II LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Blue Star Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Bogotá ZE SAS Bogotá CO 1,189,706,920 COP Equity Colombia ZE SAS 100.00% 9.44%
Boitumelo Solar Power Plant
(RF) (Pty) Ltd
Gauteng ZA 100 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
4 Enel Group · Group Strategy & Risk Management

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Alberta Wind Inc. 0.10%
Bold Elk Wind Limited
Partnership
Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Enel Brasil SA 100.00%
Bondia Energia Ltda Niterói BR 2,950,888 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Boone Stephens Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Bosa del Ebro SL Zaragoza ES 3,010 EUR Line-by-line Enel Green Power
España SLU
51.00% 35.76%
Bottom Grass Solar Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Boujdour Wind Farm Casablanca MA 300,000 MAD Equity Nareva Enel Green
Power Morocco SA
90.00% 45.00%
Bouldercombe Solar Farm
Trust
Sydney AU 10 AUD Equity Enel Green Power
Bouldercombe Trust
100.00% 50.00%
Bouldercombe Solar (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Bouldercombe
Holding (Pty) Ltd
100.00% 50.00%
Box Canyon Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
BP Hydro Finance
Partnership
Salt Lake City US - USD Line-by-line Enel Green Power
North America Inc.
24.08% 100.00%
Enel Kansas LLC 75.92%
Brandonville Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Bravo Dome Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Baylio Solar SLU 16.98%
Brazatortas 220 Renovables
SL
Madrid ES 3,000 EUR Equity Furatena Solar 1 SLU 16.98% 23.81%
Brazoria West Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Brazos Flat Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Brick Road Solar Holdings
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Bronco Hills Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Brush County Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Buck Canyon Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Buckshutem Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Buckshutem Solar II LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Buffalo Dunes Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Buffalo Dunes Wind Project
LLC
Topeka US - USD Line-by-line EGPNA Development
Holdings LLC
75.00% 75.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Alberta Wind Inc. 0.10%
Buffalo Jump LP Alberta CA 10 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Buffalo Spirit Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Bungala One Finco (Pty) Ltd Sydney AU 1,000 AUD Equity Bungala One
Property Trust
100.00% 25.50%
Bungala One Operation
Holding Trust
Sydney AU 100 AUD Equity Enel Green Power
Bungala (Pty) Ltd
50.00% 25.00%
Bungala One Operations
Holding (Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Bungala (Pty) Ltd
51.00% 25.50%
Bungala One Operations
(Pty) Ltd
Sydney AU 1,000 AUD Equity Bungala One
Operations Holding
(Pty) Ltd
100.00% 25.50%
Bungala One Operations
Trust
Sydney AU - AUD Equity Bungala One
Operations Holding
(Pty) Ltd
100.00% 25.50%
Bungala One Property
Holding (Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Bungala (Pty) Ltd
51.00% 25.50%
Bungala One Property
Holding Trust
Sydney AU 100 AUD Equity Enel Green Power
Bungala (Pty) Ltd
50.00% 25.00%
Bungala One Property
(Pty) Ltd
Sydney AU 1,000 AUD Equity Bungala One
Property Holding
(Pty) Ltd
100.00% 25.50%
Bungala One Property Trust Sydney AU - AUD Equity Bungala One
Property Holding
(Pty) Ltd
100.00% 25.50%
Bungala Two Finco (Pty) Ltd Sydney AU - AUD Equity Bungala Two Property
Trust
100.00% 25.50%
Bungala Two Operations
Holding (Pty) Ltd
Sydney AU - AUD Equity Enel Green Power
Bungala (Pty) Ltd
51.00% 25.50%
Bungala Two Operations
Holding Trust
Sydney AU - AUD Equity Enel Green Power
Bungala (Pty) Ltd
50.00% 25.00%
Bungala Two Operations
(Pty) Ltd
Sydney AU - AUD Equity Bungala Two
Operations Holding
(Pty) Ltd
100.00% 25.50%
Bungala Two Operations
Trust
Sydney AU - AUD Equity Bungala Two
Operations Holding
(Pty) Ltd
100.00% 25.50%
Bungala Two Property
Holding (Pty) Ltd
Sydney AU - AUD Equity Enel Green Power
Bungala (Pty) Ltd
51.00% 25.50%
Bungala Two Property
Holding Trust
Sydney AU - AUD Equity Enel Green Power
Bungala (Pty) Ltd
50.00% 25.00%
Bungala Two Property (Pty)
Ltd
Sydney AU - AUD Equity Bungala Two Property
Holding (Pty) Ltd
100.00% 25.50%
Bungala Two Property Trust Sydney AU 1 AUD Equity Bungala Two Property
Holding (Pty) Ltd
100.00% 25.50%
Enel Alberta Solar Inc. 0.10%
Burgundy Spruce Solar LP Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Business Venture
Investments 1468 (Pty) Ltd
Johannesburg ZA 100 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%
Butterfly Meadows Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
C&C Castelvetere Srl Rome IT 100,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
4 Enel Group " Group Strategy & Risk Management

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
C&C Uno Energy Srl Rome IT 118,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Cactus Mesa Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Campos Promotores
Renovables SL
Elche ES 3,000 EUR Equity Enel Green Power
España SLU
25.30% 17.74%
Canastota Wind Power LLC Andover US - USD Line-by-line Fenner Wind
Holdings LLC
100.00% 100.00%
Caney River Wind Project
LLC
Overland Park US - USD Equity Rocky Caney Wind
LLC
100.00% 10.00%
Canyon Top Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Alberta Wind Inc. 0.10%
Castle Rock Ridge Limited
Partnership
Alberta CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Catalana d'Iniciatives SA in
liquidation
Barcelona ES 30,862,800 EUR - Endesa SA 0.94% 0.66%
Cattle Drive Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cdec - Sic Ltda Santiago de Chile CL 709,783,206 CLP - Enel Green Power
Chile SA
6.00% 3.90%
Cedar Run Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Brasil SA 100.00%
Central Geradora
Fotovoltaica Bom Nome Ltda
Salvador BR 4,979,739 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Central Geradora Enel Brasil SA 0.00%
Fotovoltaica São Francisco
Ltda
Niterói BR 268,128,917 BRL Line-by-line Enel X Brasil SA 100.00% 82.27%
Central Hidráulica Güejar
Sierra SL
Granada ES 364,213 EUR Equity Enel Green Power
España SLU
33.30% 23.35%
Central Térmica de Anllares
AIE
Madrid ES 595,000 EUR Equity Endesa Generación
SAU
33.33% 23.37%
Central Vuelta de Obligado
SA
Buenos Aires AR 500,000 ARS - Enel Generación El
Chocón SA
33.20% 17.95%
Centrales Nucleares Almaraz
Trillo AIE
Madrid ES - EUR Equity Endesa Generación
SAU
24.18% 16.95%
Centrum Pre Vedu A Vyskum
Sro
Kalná Nad
Hronom
SK 6,639 EUR Equity Slovenské elektrárne
AS
100.00% 33.00%
CES 2 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 3 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 4 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 5 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 6 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 7 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%
CES 8 Private Company Athens GR 501 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.20% 0.10%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
CESI - Centro Elettrotecnico
Sperimentale Italiano
Giacinto Motta SpA
Milan IT 8,550,000 EUR Equity Enel SpA 42.70% 42.70%
Champagne Storage LLC Wilmington US 1 USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Enel Alberta Solar Inc. 0.10%
Checkerboard Plains Solar
Project Limited Partnership
Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Cheyenne Ridge II Wind
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cheyenne Ridge Wind
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Chi Black River LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chi Minnesota Wind LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chi Operations Inc. Andover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chi Power Inc. Naples US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chi Power Marketing Inc. Wilmington US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chi West LLC San Francisco US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Chinango SAC San Miguel PE 295,249,298 SOL Held for sale Enel Generación
Perú SAA
80.00% 57.23%
Chisago Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Chisholm View II Holding LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Chisholm View Wind Project
II LLC
Wilmington US - USD Line-by-line Chisholm View II
Holding LLC
62.79% 62.79%
Chisholm View Wind Project
LLC
New York US - USD Equity EGPNA REP Wind
Holdings LLC
100.00% 10.00%
Cimarron Bend Wind
Project I LLC
49.00%
Cimarron Bend Wind
Project II LLC
49.00%
Cimarron Bend Assets LLC Wilmington US - USD Line-by-line Cimarron Bend Wind
Project III LLC
1.00% 100.00%
Enel Kansas LLC 1.00%
Cimarron Bend III HoldCo
LLC
Andover US 1 USD Line-by-line Enel Green Power
Cimarron Bend Wind
Holdings III LLC
100.00% 100.00%
Cimarron Bend Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cimarron Bend Wind
Holdings I LLC
Wilmington US - USD Line-by-line Cimarron Bend Wind
Holdings II LLC
100.00% 100.00%
Cimarron Bend Wind
Holdings II LLC
Dover US 100 USD Line-by-line Cimarron Bend Wind
Holdings LLC
100.00% 100.00%
Cimarron Bend Wind
Holdings III LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Cimarron Bend Wind
Holdings LLC
Wilmington US - USD Line-by-line EGPNA Preferred
Wind Holdings LLC
100.00% 100.00%
Cimarron Bend Wind Project
I LLC
Wilmington US - USD Line-by-line Cimarron Bend Wind
Holdings I LLC
100.00% 100.00%
Cimarron Bend Wind Project
II LLC
Wilmington US - USD Line-by-line Cimarron Bend Wind
Holdings I LLC
100.00% 100.00%
Cimarron Bend Wind Project
III LLC
Wilmington US - USD Line-by-line Cimarron Bend Wind
Holdings III LLC
100.00% 100.00%
Cinch Top Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cipher Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
CityPoste Payment Digital Srl Mosciano
Sant'Angelo
IT 10,000 EUR Equity Mooney SpA 100.00% 50.00%
Clear Fork Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Clear Sky Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Clinton Farms Battery Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Clinton Farms Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Clinton Farms Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Cloudwalker Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cogein Sannio Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Cogeneración el Salto SL in
liquidation
Zaragoza ES 36,061 EUR Equity Enel Green Power
España SLU
20.00% 14.02%
Cogenio Iberia SL Madrid ES 2,874,622 EUR Equity Endesa X Servicios
SLU
20.00% 14.02%
Cogenio Srl Rome IT 2,310,000 EUR Equity Enel X Italia Srl 20.00% 20.00%
Cohuna Solar Farm (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Cohuna Holdings
(Pty) Ltd
100.00% 50.00%
Cohuna Solar Farm Trust Sydney AU 1 AUD Equity Enel Green Power
Cohuna Trust
100.00% 50.00%
Colombia ZE SAS Bogotá CO 11,872,499,000 COP Equity Enel Colombia SA
ESP
20.00% 9.44%
Comanche Crest Ranch LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Comercializadora Eléctrica
de Cádiz SA
Cádiz ES 600,000 EUR Equity Endesa SA 33.50% 23.49%
Compagnia Porto di
Civitavecchia SpA in
liquidation
Rome IT 15,130,800 EUR Equity Enel Produzione SpA 24.34% 24.34%
Companhia Energética do
Ceará - Coelce
Fortaleza BR 1,282,346,886 BRL Line-by-line Enel Brasil SA 74.05% 60.92%
Compañía de Trasmisión del
Mercosur SA - CTM
Buenos Aires AR 2,025,191,313 ARS Held for sale Enel Brasil SA
Enel CIEN SA
74.15%
25.85%
82.27%

Enel SpA 0.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Compañía Energética
Veracruz SAC
San Miguel PE 37,721,314 SOL Held for sale Enel Perú SAC 100.00% 82.27%
Compañía Eólica Tierras Compañía Eólica
Tierras Altas SA
5.00%
Altas SA Soria ES 13,222,000 EUR Equity Enel Green Power
España SLU
35.63% 26.29%
Compass Rose Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Concert Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Concho Solar I LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Concord Vine Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Consolidated Hydro
Southeast LLC
Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Consolidated Pumped
Storage Inc.
Wilmington US 550,000 USD Line-by-line Enel Green Power
North America Inc.
81.83% 81.83%
Conza Green Energy Srl Rome IT 73,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Copper Landing Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Corporación Empresarial de
Extremadura SA
Badajoz ES 44,538,000 EUR - Endesa SA 1.01% 0.71%
Corporación Eólica de
Zaragoza SL
La Puebla de
Alfindén
ES 271,652 EUR Equity Enel Green Power
España SLU
25.00% 17.53%
Country Roads Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Cow Creek Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Colombia ZE SAS 0.00%
Crédito Fácil Codensa SA
Compañía de Financiamiento
in liquidation
Bogotá CO 32,000,000,000 COP Equity Enel Colombia SA
ESP
48.99% 23.12%
Enel X Colombia
SAS ESP
0.00%
Crockett Solar I LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Dairy Meadows Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Daisy Patch Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Danax Energy (Pty) Ltd Sandton ZA 100 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%
Enel Alberta Storage
Inc.
0.10%
Dappled Colt Storage Project
Limited Partnership
Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Dauphin Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Daybreak Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Decimalfigure - Unipessoal
Ltda
Pego PT 2,000 EUR Equity Tejo Energia
- Produção e
Distribuição de
Energia Eléctrica SA
100.00% 30.68%
Enel Group 2 Governance 3 Group Strategy & Risk Management 2 Outlook 2 Consolidated financial statements

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Dehesa de los Guadalupes
Solar SLU
Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Dehesa PV Farm 03 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Dehesa PV Farm 04 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Derivex SA Bogotá CO 938,734,000 COP - Enel Colombia SA
ESP
5.20% 2.46%
Enel Green Power
México S de RL de Cv
100.00%
Desarrollo de Fuerzas
Renovables S de RL de Cv
Mexico City MX 53,104,350 MXN Line-by-line Enel Services México
SA de Cv
0.00% 100.00%
Desert Willow Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
DI.T.N.E. - Distretto
Tecnologico Nazionale
sull'Energia - Società
Consortile a Responsabilità
Limitata
Rome IT 451,878 EUR - Enel Produzione SpA 1.79% 1.79%
Diamond Vista Holdings LLC Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Diamond Vista Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Dispatch Renewable Energy
Societe Anonyme
Heraklion, Crete GR 740,000 EUR Equity Enel Green Power
Hellas SA
0.00% 0.00%
Distretto Tecnologico Sicilia
Micro e Nano Sistemi Scarl
Catania IT 628,978 EUR - 3SUN Srl 5.56% 5.56%
Endesa SA 55.00%
Distribuidora de Energía
Eléctrica del Bages SA
Barcelona ES 108,240 EUR Line-by-line Hidroeléctrica de
Catalunya SLU
45.00% 70.12%
Distribuidora Eléctrica del
Puerto de la Cruz SAU
Santa Cruz de
Tenerife
ES 12,621,210 EUR Line-by-line Endesa SA 100.00% 70.12%
Distrilec Inversora SA Buenos Aires AR 497,612,021 ARS Line-by-line Enel Américas SA 51.50% 42.37%
Dodge Center Distributed
Solar LLC
Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Enel Green Power
México S de RL de Cv
1.00%
Dolores Wind SA de Cv Mexico City MX 4,151,197,627 MXN Line-by-line Enel Rinnovabile SA
de Cv
99.00% 100.00%
Dominica Energía Limpia
SA de Cv
Mexico City MX 2,070,600,646 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Dorset Ridge Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Dover Solar I LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Dragonfly Fields Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Drift Sand Wind Holdings
LLC
Wilmington US - USD Equity Enel Kansas LLC 50.00% 50.00%
Drift Sand Wind Project LLC Wilmington US - USD Equity Drift Sand Wind
Holdings LLC
100.00% 50.00%
Dwarka Vayu 1 Private
Limited
Gurgaon IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
E.S.CO. Comuni Srl Bergamo IT 1,000,000 EUR Line-by-line Enel X Italia Srl 60.00% 60.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Earthly Reflections Solar
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Eastern Rise Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Eastwood Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Ebenezer Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Ecosolar2 Private Company Grevena GR 1,000 EUR - Enel Green Power
Hellas SA
0.10% 0.10%
Edgartown Depot Solar 1 LLC Boston US - USD Line-by-line Enel X MA Holdings
LLC
100.00% 100.00%
Edistribución Redes Digitales
SLU
Madrid ES 1,204,540,060 EUR Line-by-line Endesa SA 100.00% 70.12%
e-distribuzione SpA Rome IT 2,600,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
EF Divesture LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Efficientya Srl Bergamo IT 100,000 EUR Equity Enel X Italia Srl 50.00% 50.00%
EGP Australia (Pty) Ltd Sydney AU 10,000 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
EGP BESS 1 (RF) (Pty) Ltd Gauteng ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
EGP Bioenergy Srl Rome IT 1,000,000 EUR Line-by-line Enel Green Power
Puglia Srl
100.00% 100.00%
EGP fotovoltaica La Loma
SAS in liquidation
Bogotá CO 8,000,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
EGP Geronimo Holding
Company Inc.
Wilmington US 1,000 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGP GulfStar Solar PPA LLC Andover US 1 USD Line-by-line EGP North America
PPA LLC
100.00% 100.00%
EGP HoldCo 1 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 10 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 11 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 12 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 13 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 14 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 15 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 16 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 17 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
EGP HoldCo 18 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 2 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 3 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 4 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 5 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 6 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 7 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 8 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP HoldCo 9 LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP Magdalena Solar SA
de Cv
Mexico City MX 1,258,077,873 MXN Line-by-line Enel Green Power
México S de RL de Cv
Enel Rinnovabile SA
99.50%
0.50%
100.00%
de Cv
EGP Matimba NewCo 1 Srl Rome IT 10,000 EUR Equity Enel Green Power
SpA
50.00% 50.00%
EGP Matimba NewCo 2 Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
EGP Nevada Power LLC Wilmington US - USD Held for sale Enel Green Power
North America Inc.
100.00% 100.00%
EGP North America PPA LLC Andover US 1 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGP Sabaudia Srl Rome IT 1,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
EGP Salt Wells Solar LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGP San Leandro Microgrid
I LLC
Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGP Solar Services LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGP Solar V SAU San Salvador de
Jujuy
AR 500,000 ARS Line-by-line Enel Green Power
Argentina
100.00% 82.27%
EGP Solar VI SAU San Salvador de
Jujuy
AR 500,000 ARS Line-by-line Enel Green Power
Argentina
100.00% 82.27%
EGP Stillwater Solar LLC Wilmington US - USD Held for sale Enel Stillwater LLC 100.00% 100.00%
EGP Stillwater Solar PV II LLC Wilmington US 1 USD Held for sale Stillwater Woods Hill
Holdings LLC
100.00% 100.00%
EGP Terracina 01 Srl Rome IT 1,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
EGP Terracina 02 Srl Rome IT 1,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
EGP Timber Hills Project LLC Los Angeles US - USD Line-by-line Padoma Wind Power
LLC
100.00% 100.00%
EGPE Solar 2 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
EGPNA 2020 HoldCo 1 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 10 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 11 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 12 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 13 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 14 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 15 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 16 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 17 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 18 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 19 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 2 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 20 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 21 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 22 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 23 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 24 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 25 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 26 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 27 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 28 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 29 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EMA
Enel Group Strategy & Risk Management
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
EGPNA 2020 HoldCo 3 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 30 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 4 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 5 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 6 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 7 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 8 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2020 HoldCo 9 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 1 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 10 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 11 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 12 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 13 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 14 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 15 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 16 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 17 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 18 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 19 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 2 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 20 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 3 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 4 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 5 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
EGPNA 2023 HoldCo 6 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 7 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 8 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA 2023 HoldCo 9 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA Development
Holdings LLC
Wilmington US - USD Line-by-line Enel Green Power
North America
Development LLC
100.00% 100.00%
EGPNA Hydro Holdings LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Preferred Wind
Holdings II LLC
Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Preferred Wind
Holdings LLC
Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Project HoldCo 1 LLC Dover US 100 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
EGPNA Project HoldCo 2 LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Project HoldCo 5 LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Project HoldCo 6 LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Project HoldCo 7 LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA Renewable Energy
Partners LLC
Wilmington US - USD Equity EGPNA REP Holdings
LLC
10.00% 10.00%
EGPNA REP Holdings LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA REP Solar Holdings
LLC
Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
EGPNA REP Wind Holdings
LLC
Wilmington US - USD Equity EGPNA Renewable
Energy Partners LLC
100.00% 10.00%
EGPNA Wind Holdings 1 LLC Wilmington US - USD Equity EGPNA REP Wind
Holdings LLC
100.00% 10.00%
EGPNA-SP Seven Cowboy
Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Elcogas SA in liquidation Puertollano ES 809,690 EUR Equity Endesa Generación
SAU
40.99% 33.06%
Elecgas SA Pego PT 50,000 EUR Equity Enel SpA
Endesa Generación
Portugal SA
4.32%
50.00%
35.06%
Electra Capital (RF) (Pty) Ltd Johannesburg ZA 10,000,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
60.00% 60.00%
Eléctrica de Jafre SA Barcelona ES 165,876 EUR Line-by-line Endesa SA
Hidroeléctrica de
Catalunya SLU
52.54%
47.46%
70.12%
Eléctrica de Lijar SL Cádiz ES 1,081,822 EUR Equity Endesa SA 50.00% 35.06%
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Eléctrica del Ebro SAU Barcelona ES 500,000 EUR Line-by-line Endesa SA 100.00% 70.12%
Electricidad de Puerto
Real SA
Puerto Real ES 4,960,246 EUR Equity Endesa SA 50.00% 35.06%
Electro Metalúrgica del
Ebro SL
Madrid ES 2,906,862 EUR - Enel Green Power
España SLU
0.18% 0.12%
Electrotest Instalaciones,
Montajes y Mantenimientos
SL
Puerto Real ES 10,000 EUR - Epresa Energía SA 50.00% 17.53%
Eletropaulo Metropolitana
Eletricidade de São Paulo SA
São Paulo BR 3,079,524,934 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Alberta Solar Inc. 0.10%
Emerald Crescent Solar
Limited Partnership
Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Emeroo BESS (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Emeroo Holding
(Pty) Ltd
100.00% 50.00%
Emintegral Cycle SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Empresa Carbonífera del Sur
- ENCASUR SAU
Madrid ES 18,030,000 EUR Line-by-line Endesa Generación
SAU
100.00% 70.12%
Empresa de Alumbrado
Eléctrico de Ceuta
Distribución SAU
Ceuta ES 9,335,000 EUR Line-by-line Empresa de
Alumbrado Eléctrico
de Ceuta SA
100.00% 67.61%
Empresa de Alumbrado
Eléctrico de Ceuta Energía
SLU
Ceuta ES 10,000 EUR Line-by-line Endesa Energía SAU 100.00% 70.12%
Empresa de Alumbrado
Eléctrico de Ceuta SA
Ceuta ES 16,562,250 EUR Line-by-line Endesa SA 96.42% 67.61%
Distrilec Inversora SA 56.36%
Empresa Distribuidora Sur
SA - Edesur
Buenos Aires AR 898,585,028 ARS Line-by-line Enel Argentina SA 43.10% 59.33%
Empresa Eléctrica
Pehuenche SA
Santiago de Chile CL 175,774,920,733 CLP Line-by-line Enel Generación
Chile SA
92.65% 56.27%
Empresa Propietaria de la
Red SA
Panama City PA 58,500,000 USD - Enel SpA 11.11% 11.11%
EN. Solar 4 Single Member
Private Company
Maroussi GR 1,000 EUR Equity Enel Green Power
Hellas Supply Single
Member SA
100.00% 50.00%
Endesa Capital SAU Madrid ES 60,200 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Energía Renovable
SLU
Madrid ES 100,000 EUR Line-by-line Endesa Energía SAU 100.00% 70.12%
Endesa Energía SAU Madrid ES 14,445,576 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Financiación Filiales
SAU
Madrid ES 4,621,003,006 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Generación II SAU Seville ES 63,107 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Generación Nuclear
SAU
Seville ES 60,000 EUR Line-by-line Endesa Generación
SAU
100.00% 70.12%
Endesa Energía SAU 0.20% 70.12%
Endesa Generación Portugal
SA
Lisbon PT 50,000 EUR Line-by-line Endesa Generación
SAU
99.20%
Enel Green Power
España SLU
0.60%
Endesa Generación SAU Seville ES 1,940,379,735 EUR Line-by-line Endesa SA 100.00% 70.12%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Endesa Ingeniería SLU Seville ES 965,305 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Medios y Sistemas
SLU
Madrid ES 89,999,790 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Mobility SLU Madrid ES 10,000,000 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa Operaciones y
Servicios Comerciales SLU
Madrid ES 10,138,580 EUR Line-by-line Endesa Energía SAU 100.00% 70.12%
Endesa X Servicios SLU Madrid ES 32,396 EUR Line-by-line Endesa SA 100.00% 70.12%
Endesa X Way SL Madrid ES 600,000 EUR Line-by-line Endesa Mobility SLU
Enel X Way Srl
49.00%
51.00%
85.36%
Endesa SA 0.02%
Endesa SA Madrid ES 1,270,502,540 EUR Line-by-line Enel Iberia SRLU 70.10% 70.12%
Enel Alberta Solar Inc. Calgary CA 1 CAD Line-by-line Enel Green Power
Canada Inc.
100.00% 100.00%
Enel Alberta Storage Inc. Calgary CA 1 CAD Line-by-line Enel Green Power
Canada Inc.
100.00% 100.00%
Enel Alberta Wind Inc. Alberta CA 16,251,021 CAD Line-by-line Enel Green Power
Canada Inc.
100.00% 100.00%
Enel Américas SA Santiago de Chile CL 15,799,226,825 USD Line-by-line Enel SpA 82.27% 82.27%
Enel Américas SA 99.92%
Enel Argentina SA Buenos Aires AR 2,297,711,908 ARS Line-by-line Enel Generación
Chile SA
0.08% 82.25%
Enel Bella Energy Storage
LLC
Wilmington US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Enel Brasil SA Niterói BR 43,393,413,243 BRL Line-by-line Enel Américas SA 99.61% 82.27%
Enel Brasil SA 0.39%
Enel Chile SA Santiago de Chile CL 3,882,103,470,184 CLP Line-by-line Enel SpA 64.93% 64.93%
Enel CIEN SA Rio de Janeiro BR 285,044,682 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Chile SA 0.00%
Enel Colina SA Santiago de Chile CL 82,222,000 CLP Line-by-line Enel Distribución
Chile SA
100.00% 64.34%
Enel Colombia SA ESP Bogotá CO 655,222,312,800 COP Line-by-line Enel Américas SA 57.34% 47.18%
Enel Costa Rica CAM SA San José CR 27,500,000 USD Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Enel Cove Fort II LLC Wilmington US - USD Held for sale Enel Green Power
North America Inc.
100.00% 100.00%
Enel Cove Fort LLC Beaver US - USD Held for sale Enel Geothermal LLC 100.00% 100.00%
Enel Distribución Chile SA Santiago de Chile CL 177,568,664,063 CLP Line-by-line Enel Chile SA 99.09% 64.34%
Enel Distribución Perú SAA San Miguel PE 3,033,046,862 SOL Held for sale Enel Perú SAC 83.15% 68.41%
Enel Energia SpA Rome IT 10,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Green Power
México S de RL de Cv
100.00%
Enel Energia SA de Cv Mexico City MX 25,000,100 MXN Line-by-line Enel Rinnovabile SA
de Cv
0.00% 100.00%
Enel Energy Australia (Pty) Ltd Sydney AU 200,100 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Energy North America
Illinois LLC
Andover US 1 USD Line-by-line Enel Energy North
America LLC
100.00% 100.00%
Enel Energy North America
Ohio LLC
Andover US 1 USD Line-by-line Enel Energy North
America LLC
100.00% 100.00%
Enel Energy North America
Pennsylvania LLC
Andover US 1 USD Line-by-line Enel Energy North
America LLC
100.00% 100.00%
Enel Energy North America
Texas LLC
Andover US 1 USD Line-by-line Enel Energy North
America LLC
100.00% 100.00%
Enel Energy North America
LLC
Andover US 1 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enel Energy South Africa Wilmington ZA 100 ZAR Line-by-line Enel X International
Srl
100.00% 100.00%
Enel Energy Storage
Holdings LLC (formerly EGP
Energy Storage Holdings
LLC)
Andover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Enel Erre SpA Rome IT 3,000,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Finance America LLC Wilmington US 200,000,000 USD Line-by-line Enel North America
Inc.
100.00% 100.00%
Enel Finance International NV Amsterdam NL 1,478,810,371 EUR Line-by-line Enel Holding Finance
Srl
75.00% 100.00%
Enel SpA 25.00%
Enel Fortuna SA Panama City PA 100,000,000 USD Line-by-line Enel Panamá CAM Srl 50.06% 23.62%
Enel Future Project 2020
#1 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#10 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#11 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#12 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#13 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#14 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#15 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#16 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#17 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#18 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#19 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#2 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#20 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Future Project 2020
#3 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#4 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#5 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#6 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#7 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#8 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Future Project 2020
#9 LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Generación Chile SA Santiago de Chile CL 552,777,320,871 CLP Line-by-line Enel Chile SA 93.55% 60.74%
Enel Generación El Chocón Enel Argentina SA 8.67%
SA Buenos Aires AR 18,321,776,559 ARS Line-by-line Hidroinvest SA 59.00% 54.07%
Enel Américas SA 20.46%
Enel Generación Perú SAA San Miguel PE 3,134,886,677 SOL Held for sale Enel Perú SAC 66.49% 71.54%
Enel Generación Piura SA San Miguel PE 249,202,667 SOL Held for sale Enel Perú SAC 96.50% 79.39%
Enel Green Power 100.00%
Enel Generación SA de Cv Mexico City MX 7,100,100 MXN Line-by-line México S de RL de Cv
Enel Rinnovabile SA
de Cv
0.00% 100.00%
Enel Geothermal LLC Wilmington US - USD Held for sale Enel Green Power
North America Inc.
100.00% 100.00%
Enel Global Services Srl Rome IT 10,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Global Trading SpA Rome IT 90,885,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Green Power
25RoseFarms Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Argentina Buenos Aires AR 463,577,761 ARS Line-by-line Enel Américas SA 100.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
01 SA
Rio de Janeiro BR 334,518,402 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
02 SA
Rio de Janeiro BR 284,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
03 SA
Rio de Janeiro BR 284,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.97%
Enel Green Power Aroeira
04 SA
Rio de Janeiro BR 430,299,146 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.03% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 100.00%
Enel Green Power Aroeira
05 SA
Rio de Janeiro BR 284,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
06 SA
Rio de Janeiro BR 284,511,002 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
07 SA
Rio de Janeiro BR 284,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Aroeira
08 SA
Rio de Janeiro BR 284,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Australia
(Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
SpA
50.00% 50.00%
Enel Green Power Australia
Trust
Sydney AU 100 AUD Equity Enel Green Power
SpA
50.00% 50.00%
Enel Green Power Azure Blue
Jay Solar Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Azure
Ranchland Holdings LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power
AzureRanchII Wind Holdings
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Blanche
Holding (Pty) Ltd
Sydney AU 100 AUD Equity EGP Australia (Pty) Ltd 100.00% 50.00%
Enel Green Power Blanche
Holding Trust
Sydney AU 100 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Brasil SA 100.00%
Enel Green Power Boa Vista
01 Ltda
Salvador BR 3,554,607 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Boa Vista
Eólica SA
Rio de Janeiro BR 42,890,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power
Bouldercombe Holding
(Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Green Power
Bouldercombe Trust
Sydney AU 10 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Green Power Bungala
(Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Green Power Bungala
Trust
Sydney AU - AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Green Power Cabeça
de Boi SA
Niterói BR 270,114,539 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 99.61%
Enel Green Power Cachoeira
Dourada SA
Cachoeira
Dourada
BR 64,339,836 BRL Line-by-line Enel Green Power
Cachoeira Dourada
SA
0.15% 82.07%
Enel Green Power Canada
Inc.
Montreal CA 85,681,857 CAD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Enel Brasil SA 99.90%
Enel Green Power Cerrado
Solar SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Chile SA 99.99%
Enel Green Power Chile SA Santiago de Chile CL 842,121,531 USD Line-by-line Enel SpA 0.01% 64.93%
Enel Green Power Cimarron
Bend Wind Holdings III LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Cohuna
Holdings (Pty) Ltd
Sydney AU 3,419,700 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Green Power Cohuna
Trust
Sydney AU - AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Green Power Cove Fort
Solar LLC
Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Brasil SA 98.63%
Enel Green Power Cristal
Eólica SA
Rio de Janeiro BR 87,784,899 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.37% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Cumaru
01 SA
Niterói BR 204,653,591 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Cumaru
02 SA
Niterói BR 107,601,273 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Cumaru
03 SA
Rio de Janeiro BR 225,021,296 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Cumaru
04 SA
Rio de Janeiro BR 230,869,708 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.94%
Enel Green Power Cumaru
05 SA
Rio de Janeiro BR 180,208,001 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Cumaru
Participações SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Cumaru
Solar 01 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Cumaru
Solar 02 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.16%
Enel Green Power
Damascena Eólica SA
Rio de Janeiro BR 83,709,003 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.84% 82.27%
Enel Green Power Delfina A
Eólica SA
Rio de Janeiro BR 284,062,483 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Delfina B
Eólica SA
Rio de Janeiro BR 93,068,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Delfina C
Eólica SA
Rio de Janeiro BR 31,105,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Delfina D
Eólica SA
Rio de Janeiro BR 105,864,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Delfina E
Eólica SA
Niterói BR 105,936,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Green Power
Desenvolvimento Ltda
Rio de Janeiro BR 61,617,590 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power
Development Srl
Rome IT 20,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Diamond
Vista Wind Project LLC
Wilmington US 1 USD Line-by-line Diamond Vista
Holdings LLC
100.00% 100.00%
Enel Green Power Dois
Riachos Eólica SA
Rio de Janeiro BR 83,347,009 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Egypt SAE Cairo EG 250,000 EGP Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power El Salvador Enel Américas SA 0.04%
SA de Cv El Salvador SV 22,860 USD Line-by-line Enel Green Power
SpA
99.96% 99.99%
Enel Green Power Elkwater Enel Alberta Wind
Inc.
1.00%
Wind Limited Partnership Alberta
CA
1,000
CAD
Line-by-line
Enel Green Power
99.00%
Canada Inc.
100.00%
Enel Green Power Enel Alberta Wind Inc. 0.10%
Elmsthorpe Wind LP Calgary CA 1,000 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Enel Green Power Emeroo
Holding (Pty) Ltd
Sydney AU 100 AUD Equity EGP Australia (Pty) Ltd 100.00% 50.00%
Enel Brasil SA 98.35%
Enel Green Power Emiliana
Eólica SA
Rio de Janeiro BR 97,191,530 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.65% 82.27%
Enel Green Power España
Solar 1 SLU
Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enel Green Power España
SLU
Madrid ES 11,153 EUR Line-by-line Endesa Generación
SAU
100.00% 70.12%
Enel Brasil SA 98.89%
Enel Green Power Esperança
Eólica SA
Rio de Janeiro BR 99,418,174 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.11% 82.27%
Enel Green Power Estonian
Solar Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Fazenda
SA
Niterói BR 264,141,174 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Fence Post
Solar Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Flat Rocks
One Holding (Pty) Ltd
Sydney AU 100 AUD Equity EGP Australia (Pty) Ltd 100.00% 50.00%
Enel Green Power Flat Rocks
One Holding Trust
Sydney AU 100 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Brasil SA 100.00%
Enel Green Power Fontes dos
Ventos 2 SA
Rio de Janeiro BR 183,315,219 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Fontes dos
Ventos 3 SA
Rio de Janeiro BR 221,001,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Fontes II
Participações SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
0.10% 82.27%

Ltda

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 99.90%
Enel Green Power Fontes
Solar SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Ganado
Solar Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Germany
GmbH
Berlin DE 25,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Girgarre
Holdings (Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Enel Green Power Girgarre
Trust
Sydney AU 10 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Green Power Global
Investment BV
Amsterdam NL 10,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Alberta Wind Inc. 1.00%
Enel Green Power Hadros
Wind Limited Partnership
- CA 1,000 CAD Line-by-line Enel Green Power
Canada Inc.
99.00% 100.00%
Enel Green Power Hellas SA Maroussi GR 40,187,850 EUR Equity Hellas Res Holdings
Single Member
Societe Anonyme
100.00% 50.00%
Enel Green Power Hellas
Supply Single Member SA
Maroussi GR 13,357,770 EUR Equity Hella Res Societe
Anonyme
100.00% 50.00%
Enel Green Power Hellas
Wind Parks South Evia Single
Member SA
Maroussi GR 140,669,641 EUR Equity Enel Green Power
Hellas SA
100.00% 50.00%
Enel Green Power HF101
GmbH & Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power Hilltopper
Wind LLC (formerly Hilltopper
Wind Power LLC)
Dover US 1 USD Line-by-line Hilltopper Wind
Holdings LLC
100.00% 100.00%
Enel Green Power Holding
Crocodile Creek (Pty) Ltd
Sydney AU 100 AUD Equity EGP Australia (Pty) Ltd 100.00% 50.00%
Enel Green Power Horizonte Alba Energia Ltda 0.01%
MP Solar SA Rio de Janeiro BR 431,566,053 BRL Line-by-line Enel Brasil SA 99.99% 82.27%
Enel Green Power India
Private Limited
New Delhi IN 200,000,000 INR Line-by-line Enel Green Power
Development Srl
100.00% 100.00%
Enel Green Power Italia Srl Rome IT 272,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Enel Green Power Ituverava Rio de Janeiro BR 219,806,646 BRL Line-by-line Bondia Energia Ltda 0.08% 82.27%
Norte Solar SA Enel Brasil SA 99.92%
Rio de Janeiro BR 227,810,333 BRL Line-by-line Bondia Energia Ltda 0.00% 82.27%
Enel Green Power Ituverava
Solar SA
Enel Brasil SA 100.00%
Enel Green Power Ituverava
Sul Solar SA
Rio de Janeiro BR 408,949,643 BRL Line-by-line Bondia Energia Ltda 0.00%
Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 98.33%
Enel Green Power Joana
Eólica SA
Rio de Janeiro BR 90,259,530 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.67% 82.27%
Enel Green Power 99.00%
Enel Green Power Kenya
Limited
Nairobi KE 100,000 KES Line-by-line SpA
Enel Green Power
South Africa (Pty) Ltd
1.00% 100.00%
Enel Green Power Korea LLC Seoul KR 7,880,000,000 KRW Line-by-line Enel Green Power
SpA
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 99.90%
Enel Green Power Lagoa do
Sol 01 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Lagoa do
Sol 02 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Lagoa do
Sol 03 SA
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power
Desenvolvimento
Ltda
0.10%
Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 04 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10%
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 05 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Enel Brasil SA 99.90%
Enel Green Power Lagoa do
Sol 06 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 07 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 08 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 09 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 10 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Enel Brasil SA 99.90%
Enel Green Power Lagoa do
Sol 11 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 12 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa do
Sol 13 SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power Lagoa II
Participações SA
Enel Green Power
Desenvolvimento
Ltda
0.10%
Enel Green Power Lagoa III
Participações SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Brasil SA 99.90%
Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Lagoa Rio de Janeiro BR BRL Line-by-line Enel Brasil SA 99.90%
Participações SA (formerly
Enel Green Power Projetos
45 SA)
1,000 Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Lily Solar
Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 99.20%
Enel Green Power Maniçoba
Eólica SA
Rio de Janeiro BR 90,722,530 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.80% 82.27%
Enel Green Power Matimba
Srl in liquidation
Rome IT 10,000 EUR Equity Enel Green Power
SpA
50.00% 50.00%
Enel Green Power Metehara
Solar Private Limited
Company
- ET 5,600,000 ETB Line-by-line Enel Green Power
Solar Metehara SpA
80.00% 80.00%
Enel Green Power
SpA
66.67%
Enel Green Power México S
de RL de Cv
Mexico City MX 10,595,218,475 MXN Line-by-line Enel Rinnovabile SA
de Cv
33.33% 100.00%
Enel Green Power MM GmbH
& Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power Modelo I
Eólica SA
Rio de Janeiro BR 70,842,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Modelo II
Eólica SA
Rio de Janeiro BR 63,742,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Morocco MA 839,000,000 MAD Line-by-line Enel Green Power
Development Srl
0.00% 100.00%
Sàrl Casablanca Enel Green Power
SpA
100.00%
Enel Green Power Morro do
Chapéu I Eólica SA
Rio de Janeiro BR 248,138,287 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Morro do
Chapéu II Eólica SA
Rio de Janeiro BR 206,050,114 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Morro do Enel Brasil SA 99.90%
Chapéu Solar 01 SA (formerly
Enel Green Power São
Gonçalo III Participações SA)
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Morro
Norte 02 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Morro
Norte 03 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Morro
Norte 04 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Mourão SA Rio de Janeiro BR 25,600,100 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Namibia
(Pty) Ltd
Windhoek NA 10,000 NAD Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power North
America Development LLC
Wilmington US - USD Line-by-line Enel North America
Inc.
100.00% 100.00%
Enel Green Power North
America Inc.
Andover US - USD Line-by-line Enel North America
Inc.
100.00% 100.00%
Teresina BR Line-by-line Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 01 SA
1,000 BRL Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 02 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%

<-- PDF CHUNK SEPARATOR -->

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 03 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 04 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 05 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 06 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 07 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 08 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Nova Enel Brasil SA 99.90%
Olinda 09 SA Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Nova
Olinda 10 SA
Enel Brasil SA 99.90% 82.27%
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10%
Enel Green Power Nova Enel Brasil SA 99.90%
Olinda 11 SA (formerly Enel
Green Power Aroeira 09 SA)
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Nova
Olinda 12 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Nova
Olinda 13 SA (formerly Enel
Brasil Central SA)
Rio de Janeiro BR 10,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
01 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
02 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
03 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
04 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
05 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
06 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa
07 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
08 SA
Enel Green Power O&M
Solar LLC
Enel Brasil SA 99.90%
Enel Green Power Novo Lapa Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power
Paranapanema SA
Niterói BR 162,567,500 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power
Partecipazioni Speciali Srl
Rome IT 10,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Brasil SA 97.92%
Enel Green Power Pau Ferro
Eólica SA
Rio de Janeiro BR 74,124,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
2.08% 82.27%
Enel Brasil SA
98.25%
Enel Green Power
Desenvolvimento
1.75%
Ltda
Enel Green Power Pedra do
Gerônimo Eólica SA
Rio de Janeiro BR 119,319,528 BRL Line-by-line 82.27%
Enel Green Power PO11
GmbH & Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power PO133
GmbH & Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power PO25
GmbH & Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Brasil SA 98.50%
Enel Green Power Primavera
Eólica SA
Rio de Janeiro BR 95,674,900 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.50% 82.27%
Enel Green Power Puglia Srl Rome IT 1,000,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Enel Green Power Quorn
Holding (Pty) Ltd
Sydney AU 100 AUD Equity EGP Australia (Pty) Ltd 100.00% 50.00%
Enel Green Power Quorn
Holding Trust
Sydney AU 100 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Green Power RA SAE in
liquidation
Cairo EG 15,000,000 EGP Line-by-line Enel Green Power
Egypt SAE
100.00% 100.00%
Enel Green Power
Rattlesnake Creek Wind
Project LLC (formerly
Rattlesnake Creek Wind
Project LLC)
Delaware US 1 USD Line-by-line Rattlesnake Creek
Holdings LLC
100.00% 100.00%
Enel Green Power
Roadrunner Solar Project
Holdings II LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power
Roadrunner Solar Project
Holdings LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power
Roadrunner Solar Project
II LLC
Dover US 100 USD Line-by-line Enel Roadrunner
Solar Project
Holdings II LLC
100.00% 100.00%
Enel Green Power Rockhaven
Ranchland Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power Roseland
Solar LLC
Andover US 1 USD Line-by-line 25RoseFarms
Holdings LLC
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Green Power RSA
(Pty) Ltd
Johannesburg ZA 1,000 ZAR Equity EGP Matimba NewCo
1 Srl
100.00% 50.00%
Enel Green Power RSA 2 (RF)
(Pty) Ltd
Johannesburg ZA 120 ZAR Equity Enel Green Power
RSA (Pty) Ltd
100.00% 50.00%
Enel Green Power Rus Moscow RU 60,500,000 RUB Line-by-line Enel Green Power
Partecipazioni
Speciali Srl
1.00% 100.00%
Limited Liability Company Enel Green Power
SpA
99.00%
Enel Green Power SpA Rome IT 272,000,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Green Power Salto
Apiacás SA (formerly Enel
Green Power Damascena
Eólica SA)
Rio de Janeiro BR 274,420,832 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Sannio Srl Rome IT 750,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Enel Green Power São
Abraão Eólica SA
Rio de Janeiro BR 91,300,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 99.90%
Enel Green Power São Cirilo
02 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power São Cirilo
03 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 01 SA (formerly Enel
Green Power Projetos 10)
Teresina BR 81,960,397 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 02 SA (formerly Enel
Green Power Projetos 11)
Teresina BR 82,268,019 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 07 SA (formerly Enel
Green Power Projetos 42 SA)
Teresina BR 114,522,005 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 08 SA (formerly Enel
Green Power Projetos 43 SA)
Teresina BR 109,281,818 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power São
Gonçalo 10 SA (formerly Enel
Green Power Projetos 15)
Teresina BR 82,871,484 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São
Gonçalo 11 SA (formerly Enel
Green Power Projetos 44 SA)
Teresina BR 114,475,155 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 12 SA (formerly Enel
Green Power Projetos 22 SA)
Teresina BR 108,022,915 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 14
Teresina BR 147,279,288 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power São
Gonçalo 15
Teresina BR 120,057,469 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 17 SA
Teresina BR 122,007,043 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power São Enel Brasil SA 100.00%
Gonçalo 18 SA (formerly
Enel Green Power Ventos de
Santa Ângela 13 SA)
Teresina BR 120,981,744 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 100.00%
Enel Green Power São
Gonçalo 19 SA
Teresina BR 122,467,789 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 21 SA (formerly Enel
Green Power Projetos 16)
Teresina BR 99,994,198 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 22 SA Teresina BR 99,787,960 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 3 SA (formerly Enel
Green Power Projetos 12)
Teresina BR 91,324,686 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 4 SA (formerly Enel
Green Power Projetos 13)
Teresina BR 90,925,258 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São Alba Energia Ltda 0.00%
Gonçalo 5 SA (formerly Enel
Green Power Projetos 15)
Teresina BR 98,230,525 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power São
Gonçalo 6 SA (formerly Enel
Green Power Projetos 19 SA)
Teresina BR 183,602,691 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 98.26%
Enel Green Power São Judas
Eólica SA
Niterói BR 82,674,900 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
1.74% 82.27%
Enel Green Power São Micael Alba Energia Ltda 0.10%
01 SA (formerly Enel Green
Power São Gonçalo 9 SA)
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power São Micael Alba Energia Ltda 0.10%
02 SA (formerly Enel Green
Power São Gonçalo 13)
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Green Power São Micael
03 SA (formerly Enel Green
Power São Gonçalo 16 SA)
Alba Energia Ltda 0.10%
Teresina BR 1,000 BRL Line-by-line Enel Brasil SA 99.90% 82.27%
Enel Brasil SA 99.90%
Enel Green Power São Micael
04 SA (formerly Enel Green
Power São Gonçalo 20 SA)
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power São Micael
05 SA
Teresina BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Services
LLC
Wilmington US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Enel Green Power Shu SAE in
liquidation
Cairo EG 15,000,000 EGP Line-by-line Enel Green Power
Egypt SAE
100.00% 100.00%
Enel Green Power Singapore
Pte Ltd
Singapore SG 8,000,000 SGD Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Solar
Energy Srl
Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Enel Green Power Solar
Metehara SpA
Rome IT 50,000 EUR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Solar
Ngonye SpA (formerly Enel
Green Power Africa Srl)
Rome IT 50,000 EUR Held for sale EGP Matimba NewCo
2 Srl
100.00% 100.00%
Enel Green Power South
Africa (Pty) Ltd
Johannesburg ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power South
Africa 3 (Pty) Ltd
Gauteng ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Stampede
Solar Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Group 2 Governance 3 Group Strategy & Risk Management 2 Outlook 2 Consolidated financial statements

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Alberta Wind Inc. 0.10%
Enel Green Power Swift
Wind LP
Calgary CA 1,000 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Enel Brasil SA 97.87%
Enel Green Power Tacaicó
Eólica SA
Rio de Janeiro BR 50,034,360 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
2.13% 82.27%
Enel Green Power Tefnut SAE
in liquidation
Cairo EG 15,000,000 EGP Line-by-line Enel Green Power
Egypt SAE
100.00% 100.00%
Enel Green Power Turkey
Enerjí Yatirimlari Anoním
Şírketí
Istanbul TR 37,141,108 TRY Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power UB33
GmbH & Co. KG
Berlin DE 75,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power UB43
GmbH & Co. KG
Berlin DE 50,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 1 SA
Teresina BR 182,273,006 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00% 82.27%
de Santa Ângela 10 SA
(formerly Enel Green Power
Projetos 21)
Teresina BR 122,100,849 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00%
Enel Green Power Ventos Enel Brasil SA 100.00% 82.27%
de Santa Ângela 11 SA
(formerly Enel Green Power
Projetos 23)
Teresina BR 132,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00%
Enel Brasil SA 100.00% 82.27%
Enel Green Power Ventos
de Santa Ângela 14 SA
(formerly Enel Green Power
Projetos 24)
Teresina BR 198,554,956 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00%
Enel Green Power Ventos Enel Brasil SA 100.00% 82.27%
de Santa Ângela 15 SA
(formerly Enel Green Power
Projetos 25)
Teresina BR 125,100,849 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00%
Enel Green Power Ventos de Enel Brasil SA 100.00%
Santa Ângela 17 SA (formerly
Enel Green Power Projetos
26)
Teresina BR 152,022,288 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela 19 SA
(formerly Enel Green Power
Projetos 27)
Teresina BR 95,587,248 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 2 SA
Teresina BR 299,922,006 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela 20 SA
(formerly Enel Green Power
Projetos 28)
Teresina BR 92,895,409 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela 21 SA
(formerly Enel Green Power
Projetos 29)
Teresina BR 85,179,410 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 3 SA (formerly
Enel Green Power Projetos 4)
Teresina BR 99,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 4 SA (formerly
Enel Green Power Projetos 6)
Teresina BR 100,732,205 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 5 SA (formerly
Enel Green Power Projetos 7)
Teresina BR 84,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 6 SA (formerly
Enel Green Power Projetos 8)
Teresina BR 83,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Ângela 7 SA (formerly
Enel Green Power Projetos 9)
Teresina BR 81,245,806 BRL Line-by-line Ventos de Santa
Esperança Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos de Enel Brasil SA 100.00%
Santa Ângela 8 SA (formerly
Enel Green Power Projetos
18)
Teresina BR 91,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos de Enel Brasil SA 100.00%
Santa Ângela 9 SA (formerly
Enel Green Power Projetos
20)
Teresina BR 118,786,606 BRL Line-by-line Ventos de Santa
Ângela Energias
Renováveis SA
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela ACL 12
(formerly Enel Green Power
Projetos 36)
Teresina BR 94,727,364 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela ACL 13 SA
(formerly Enel Green Power
Projetos 17 SA)
Teresina BR 77,496,725 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela ACL 16 SA
(formerly Enel Green Power
Projetos 38 SA)
Teresina BR 89,917,563 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
82.27%
0.00%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Ângela ACL 18 SA
(formerly Enel Green Power
Projetos 47 SA)
Teresina BR 86,496,703 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Esperança 08 SA
(formerly Enel Green Power
Projetos 34 SA)
Rio de Janeiro BR 173,154,501 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 99.90%
de Santa Esperança 1 SA
(formerly Enel Green Power
Fonte dos Ventos 1 SA)
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Ventos de Enel Brasil SA 100.00%
Santa Esperança 13 (formerly
Enel Green Power Projetos
33 SA)
Rio de Janeiro BR 221,832,010 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
Santa Esperança 15 SA
Rio de Janeiro BR 152,494,014 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Esperança 16 SA
(formerly Enel Green Power
Projetos 35 SA)
Rio de Janeiro BR 252,240,013 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Esperança 17 SA
(formerly Enel Green Power
Projetos 31 SA)
Rio de Janeiro BR 252,240,013 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 98.67%
de Santa Esperança 21 SA
(formerly Enel Green Power
Projetos 37 SA)
Rio de Janeiro BR 225,898,777 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 81.18%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Esperança 22 SA
(formerly Enel Green Power
Projetos 39 SA)
Rio de Janeiro BR 124,625,154 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 100.00%
Enel Green Power Ventos
de Santa Esperança 25 SA
(formerly Enel Green Power
Projetos 40 SA)
Rio de Janeiro BR 171,324,008 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power Ventos Enel Brasil SA 100.00%
de Santa Esperança 26 SA
(formerly Enel Green Power
Projetos 41 SA)
Rio de Janeiro BR 344,251,126 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Ventos de
Santa Esperança 3 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Ventos Enel Brasil SA 99.90%
de Santa Esperança 7 SA
(formerly Enel Green Power
Lagedo Alto SA)
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Ventos Enel Brasil SA 99.90%
de Santa Esperança
Participações SA (formerly
Enel Green Power Cumaru
06 SA)
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Ventos de
Santo Orestes 1 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Brasil SA 99.90%
Enel Green Power Ventos de
Santo Orestes 2 SA
Rio de Janeiro BR 1,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.10% 82.27%
Enel Green Power Ventos de
São Roque 01 SA
Enel Brasil SA 100.00% 82.27%
Teresina BR 383,436,551 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00%
BR 369,758,651 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power Ventos de
São Roque 02 SA
Teresina Enel Green Power
Desenvolvimento
Ltda
0.00%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 03 SA
Teresina BR 262,576,701 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 04 SA
Teresina BR 379,980,531 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 05 SA
Teresina BR 362,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 99.96%
Enel Green Power Ventos de
São Roque 06 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.04% 82.27%
Enel Brasil SA 100.00% 82.27%
Enel Green Power Ventos de
São Roque 07 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 08 SA
Teresina BR 337,473,758 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 11 SA
Teresina BR 318,740,451 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 13 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 16 SA
Teresina BR 353,284,551 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 17 SA
Teresina BR 298,952,101 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 18 SA
Teresina BR 332,473,759 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 19 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 22 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 26 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Ventos de
São Roque 29 SA
Teresina BR 262,501,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Green Power
Verwaltungs GmbH
Berlin DE 25,000 EUR Line-by-line Enel Green Power
Germany GmbH
100.00% 100.00%
Enel Green Power Vietnam
LLC (Công ty TNHH Enel
Green Power Việt Nam)
Ho Chi Minh City VN 2,431,933 USD Line-by-line Enel Green Power
SpA
100.00% 100.00%
Enel Green Power Villoresi Srl Rome IT 1,200,000 EUR Line-by-line Enel Green Power
Italia Srl
51.00% 51.00%
Enel Green Power Volta
Grande SA (formerly Enel
Green Power Projetos 1 SA)
Niterói BR 565,756,528 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Green Power 1.00%
Enel Green Power Zambia
Limited
Lusaka ZM 15,000 ZMW Line-by-line Development Srl
Enel Green Power
South Africa (Pty) Ltd
99.00% 100.00%
Enel Green Power Zeus II -
Delfina 8 SA
Rio de Janeiro BR 77,939,980 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Brasil SA 100.00%
Enel Green Power Zeus Sul
1 Ltda
Rio de Janeiro BR 6,986,993 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Grids Srl Rome IT 10,100,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Américas SA 0.00%
Enel Guatemala SA Guatemala City GT 67,208,000 GTQ Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Enel Holding Finance Srl Rome IT 10,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Iberia SRLU Madrid ES 336,142,500 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Innovation Hubs Srl Rome IT 1,100,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Insurance NV Amsterdam NL 60,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Investment Holding BV Amsterdam NL 1,000,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel Italia SpA Rome IT 100,000,000 EUR Line-by-line Enel SpA 100.00% 100.00%
4 Enel Group 3 Group Strategy & Risk Management EN

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Kansas Development
Holdings LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Kansas LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Enel Land HoldCo LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Logistics Srl Rome IT 1,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Enel Minnesota Holdings LLC Minneapolis US - USD Line-by-line EGP Geronimo
Holding Company
Inc.
100.00% 100.00%
Enel Mobility Chile SpA Santiago de Chile CL 504,094,780 CLP Line-by-line Enel Chile SA 100.00% 64.93%
Enel Nevkan Inc. Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Enel North America Inc. Andover US 50 USD Line-by-line Enel SpA 100.00% 100.00%
Enel Operations Canada Ltd Alberta CA 1,000 CAD Line-by-line Enel Green Power
Canada Inc.
100.00% 100.00%
Enel Américas SA 0.03%
Enel Panamá CAM Srl Panama City PA 3,001 USD Line-by-line Enel Colombia SA
ESP
99.97% 47.19%
Enel Perú SAC San Miguel PE 5,361,789,105 SOL Line-by-line Enel Américas SA 100.00% 82.27%
Enel Produzione SpA Rome IT 1,800,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Enel QPSF (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Australia Trust
100.00% 50.00%
Enel Renovable Srl Panama City PA 40,320 USD Line-by-line Enel Colombia SA
ESP
Enel Panamá CAM Srl
0.79%
99.21%
47.19%
Enel Rinnovabile SA de Cv Mexico City MX 12,645,490,022 MXN Line-by-line Enel Green Power
Global Investment BV
Enel Green Power
100.00%
0.00%
100.00%
México S de RL de Cv
Enel Roadrunner Solar
Project Holdings II LLC
Andover US - USD Line-by-line Enel Green Power
Roadrunner Solar
Project Holdings
II LLC
100.00% 100.00%
Enel Roadrunner Solar
Project Holdings LLC
Dover US 100 USD Line-by-line Enel Green Power
Roadrunner Solar
Project Holdings LLC
100.00% 100.00%
Enel Salt Wells LLC Fallon US - USD Held for sale Enel Geothermal LLC 100.00% 100.00%
Enel Green Power
México S de RL de Cv
46.27% 100.00%
Enel Services México SA Mexico City MX 6,339,849 MXN Line-by-line Enel Green Power
SpA
53.73%
de Cv Enel Guatemala SA 0.00%
Enel Rinnovabile SA
de Cv
0.00%
Enel Sole Srl Rome IT 4,600,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Enel Brasil SA 100.00%
Enel Soluções Energéticas
Ltda
Rio de Janeiro BR 42,863,000 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Enel Stillwater LLC Wilmington US - USD Held for sale Enel Geothermal LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Surprise Valley LLC Wilmington US - USD Held for sale Enel Kansas LLC 100.00% 100.00%
Enel Texkan Inc. Wilmington US 100 USD Line-by-line Chi Power Inc. 100.00% 100.00%
Enel Trading Argentina Srl Buenos Aires AR 14,012,000 ARS Line-by-line Enel Américas SA
Enel Argentina SA
55.00%
45.00%
82.26%
Enel Trading Brasil SA Rio de Janeiro BR 54,280,312 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Trading North America
LLC
Wilmington US 10,000,000 USD Line-by-line Enel North America
Inc.
100.00% 100.00%
Enel Uruguay SA Montevideo UY 20,000 UYU Line-by-line Enel Brasil SA 100.00% 82.27%
Enel Vayu (Project 2) Private
Limited
Gurugram IN 45,000,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Enel Wind Project (Amberi)
Private Limited
New Delhi IN 5,000,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Enel X Advisory Services
Germany GmbH
Frankfurt DE 50,000 EUR Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Enel X Advisory Services
Japan GK
Tokyo JP 100,000,000 JPY Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Enel X Advisory Services
North America Inc.
Boston US - USD Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Enel X Advisory Services Srl Rome IT - EUR Line-by-line Enel X Srl 100.00% 100.00%
Enel X Advisory Services UK
Limited
London GB 30,000 GBP Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Enel X Advisory Services
USA LLC
Boston US - USD Line-by-line Enel X Advisory
Services North
America Inc.
100.00% 100.00%
Enel X Arecibo LLC Boston US - USD Line-by-line Enel X Project MP
Holdings LLC
100.00% 100.00%
Enel X Argentina SAU Buenos Aires AR 127,800,000 ARS Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Asputeck Ave. Project
LLC
Boston US - USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Australia Holding
(Pty) Ltd
Melbourne AU 45,424,578 AUD Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Australia (Pty) Ltd Melbourne AU 24,209,880 AUD Line-by-line Energy Response
Holdings (Pty) Ltd
100.00% 100.00%
Enel X Battery Storage
Limited Partnership
Oakville CA 10,000 CAD Line-by-line Enel X Canada
Holding Inc.
0.01% 100.00%
Enel X Canada Ltd 99.99%
Enel X Beech Road Project
LLC
Dover US 100 USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Brasil Gerenciamento
de Energia Ltda
Sorocaba BR 5,538,403 BRL Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Enel X Brasil SA São Paulo BR 766,725,892 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enel X Canada Holding Inc. Oakville CA 1,000 CAD Line-by-line Enel X Canada Ltd 100.00% 100.00%
Enel X Canada Ltd Mississauga CA 1,000 CAD Line-by-line Enel North America
Inc.
100.00% 100.00%
Enel X Chile SpA Santiago de Chile CL 2,837,737,149 CLP Line-by-line Enel Chile SA 100.00% 64.93%
Enel X College Ave. Project
LLC
Boston US - USD Line-by-line Enel X MA Holdings
LLC
100.00% 100.00%
Enel X Colombia SAS ESP Bogotá CO 230,368,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel X Cosgray Road Project
LLC
Dover US 100 USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Demand Response SA São Paulo BR 2,000,000 BRL Line-by-line Enel X Brasil SA 100.00% 82.27%
Enel X Demand Response
LLC
Boston US 100 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enel X Federal LLC Boston US 5,000 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enel X Finance Partner LLC Boston US 100 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enel X Germany GmbH Berlin DE 25,000 EUR Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Hayden Rowe St.
Project LLC
Boston US 100 USD Line-by-line Enel X MA Holdings
LLC
100.00% 100.00%
Enel X International Srl Rome IT 100,000 EUR Line-by-line Enel X Srl 100.00% 100.00%
Enel X Ireland Limited Dublin IE 10,841 EUR Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Italia Srl Rome IT 200,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Enel X Japan KK Tokyo JP 1,030,000,000 JPY Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X KOMIPO Solar Limited Seoul KR 11,054,000,000 KRW Line-by-line Enel X Korea Limited 80.00% 80.00%
Enel X Korea Limited Seoul KR 11,800,000,000 KRW Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Las Piedras LLC Boston US - USD Line-by-line Enel X Pr Holdings
LLC
100.00% 100.00%
Enel X MA Holdings LLC Boston US 100 USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X MA PV Portfolio 1 LLC Boston US - USD Line-by-line Enel X MA Holdings
LLC
100.00% 100.00%
Enel X MA PV Portfolio 2 LLC Boston US - USD Line-by-line Enel X Project MP
Holdings LLC
100.00% 100.00%
Enel X MA PV Portfolio 3 LLC Boston US - USD Line-by-line Enel X Project MP
Holdings LLC
100.00% 100.00%
MX 264,303,595 Enel Green Power
México S de RL de Cv
0.00%
Enel X México S de RL de Cv Mexico City MXN Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Mobilidade Urbana SA São Paulo BR 163,642,000 BRL Line-by-line Enel X Brasil SA 100.00% 82.27%
Enel X Morrissey Blvd. Project
LLC
Boston US 100 USD Line-by-line Enel X MA Holdings
LLC
100.00% 100.00%
Enel X New Zealand Limited Wellington NZ 313,606 AUD Line-by-line Energy Response
Holdings (Pty) Ltd
100.00% 100.00%
Enel X Newton Court Project
LLC
Boston US 10,000 USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X North America Inc. Boston US 1,000 USD Line-by-line Enel North America
Inc.
100.00% 100.00%
Enel X Perú SAC San Miguel PE 1,020,815 SOL Held for sale Enel Perú SAC 100.00% 82.27%
Enel X Polska Sp. Zo.o. Warsaw PL 12,275,150 PLN Line-by-line Enel X Ireland Limited 100.00% 100.00%
Enel X Pr Holdings LLC Boston US - USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Project MP Holdings
LLC
Boston US - USD Line-by-line Enel X Project MP
Sponsor LLC
100.00% 100.00%
Enel X Project MP Sponsor
LLC
Boston US - USD Line-by-line Enel X North America
Inc.
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel X Rus LLC Moscow RU 8,000,000 RUB Line-by-line Enel X International
Srl
99.00% 99.00%
Enel X Srl Rome IT 1,050,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel X Services India Private Mumbai INR Enel X International
Srl
100.00%
Limited IN 1,497,290 Line-by-line Enel X North America
Inc.
0.00% 100.00%
Enel X Storage LLC Boston US 100 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enel X Taiwan Co. Ltd Taipei TW 271,100,000 TWD Line-by-line Enel X Ireland Limited 100.00% 100.00%
Enel X UK Limited London GB 32,626 GBP Line-by-line Enel X International
Srl
100.00% 100.00%
Enel X Warner Road Project
LLC
Dover US 100 USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Way (Shanghai) Co. Ltd Shanghai CN 10,500,000 CNY Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way Brasil SA Rio de Janeiro BR 20,045,337 BRL Line-by-line Enel Brasil SA 20.00% 96.45%
Enel X Way Srl 80.00%
Enel X Way Canada Holding
Ltd
Vancouver CA - CAD Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way Chile SpA Santiago de Chile CL 14,229,030,071 CLP Line-by-line Enel Chile SA
Enel X Way Srl
49.00%
51.00%
82.81%
COP Enel Colombia SA
ESP
40.00% 78.87%
Enel X Way Colombia SAS Bogotá CO 15,036,000,000 Line-by-line Enel X Way Srl 60.00%
Enel X Way France SAS Paris FR 6,101,000 EUR Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way Germany GmbH Berlin DE 25,000 EUR Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way Italia Srl Rome IT 5,000,000 EUR Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way México SA de Cv Mexico City MX 6,479,171 MXN Line-by-line Enel Green Power
México S de RL de Cv
0.00% 100.00%
Enel X Way Srl 100.00%
Enel X Way North America
Inc.
San Carlos US - USD Line-by-line Enel X Way Srl 100.00% 100.00%
Enel Perú SAC 20.00%
Enel X Way Perú SAC Lima PE 1,561,900 SOL Line-by-line Enel X Way Srl 80.00% 96.45%
Enel X Way Srl Rome IT 6,026,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Enel X Way UK Limited London GB 1 GBP Line-by-line Enel X Way Srl 100.00% 100.00%
Enel X Way USA LLC San Carlos US - USD Line-by-line Enel X Way North
America Inc.
100.00% 100.00%
Enel X Wood St. Project LLC Boston US - USD Line-by-line Enel X Finance
Partner LLC
100.00% 100.00%
Enel X Woodland Solar
Project LLC
Boston US - USD Line-by-line Enel X Project MP
Holdings LLC
100.00% 100.00%
Enelpower Contractor and
Development Saudi Arabia
Ltd
Riyadh SA 5,000,000 SAR Line-by-line Enelpower Srl 51.00% 51.00%
Enelpower do Brasil Ltda Rio de Janeiro BR 5,689,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Enelpower Srl Milan IT 2,000,000 EUR Line-by-line Enel SpA 100.00% 100.00%
Energética Monzón SAC San Miguel PE 118,321,846 SOL Held for sale Enel Generación
Perú SAA
100.00% 71.54%
Enel Perú SAC 0.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Energía Base Natural SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energía Ceuta XXI
Comercializadora de
Referencia SAU
Ceuta ES 65,000 EUR Line-by-line Endesa Energía SAU 100.00% 70.12%
Energía Eólica Ábrego SLU Madrid ES 3,576 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energía Eólica Galerna SLU Madrid ES 3,413 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energía Eólica Gregal SLU Madrid ES 3,250 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energía Global de México
(Enermex) SA de Cv
Mexico City MX 50,000 MXN Line-by-line Enel Green Power
SpA
99.00% 99.00%
Energía Limpia de Amistad
SA de Cv
Mexico City MX 33,452,769 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Energía Limpia de Palo Alto
SA de Cv
Mexico City MX 673,583,489 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Energía Limpia de Puerto MXN Line-by-line Enel Green Power
México S de RL de Cv
0.01% 100.00%
Libertad S de RL de Cv Mexico City MX 2,953,980 Enel Rinnovabile SA
de Cv
99.99%
Energía Marina SpA Santiago de Chile CL 2,404,240,000 CLP Equity Enel Green Power
Chile SA
25.00% 16.23%
Energía Neta Sa Caseta
Llucmajor SLU
Palma de Mallorca ES 9,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energía XXI Comercializadora
de Referencia SLU
Madrid ES 2,000,000 EUR Line-by-line Endesa Energía SAU 100.00% 70.12%
Energía y Naturaleza SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energías Alternativas del
Sur SL
Las Palmas de
Gran Canaria
ES 546,919 EUR Line-by-line Enel Green Power
España SLU
54.95% 38.53%
Energía de Aragón I SLU Zaragoza ES 3,200,000 EUR Line-by-line Endesa SA 100.00% 70.12%
Energía de Graus SL Zaragoza ES 1,298,160 EUR Line-by-line Enel Green Power
España SLU
66.67% 46.74%
Energías Especiales de
Careón SA
Santiago de
Compostela
ES 270,450 EUR Line-by-line Enel Green Power
España SLU
97.00% 68.01%
Energías Especiales del Alto
Ulla SAU
Madrid ES 9,210,840 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Energías Especiales del
Bierzo SA
Torre del Bierzo ES 1,635,000 EUR Equity Enel Green Power
España SLU
50.00% 35.06%
Enviatos Promoción
I SLU
6.25% 13.15%
Energías Limpias de
Carmona SL
Seville ES 7,000 EUR Equity Enviatos Promoción
II SLU
6.25%
Enviatos Promoción
III SLU
6.25%
Energías Renovables La Mata Enel Green Power
México S de RL de Cv
99.50% 100.00%
SA de Cv Mexico City MX 3,011,133,575 MXN Line-by-line Enel Rinnovabile SA
de Cv
0.50%
Energie Electrique de
Tahaddart SA
Tangiers MA 306,160,000 MAD Equity Endesa Generación
SAU
32.00% 22.44%
Energotel AS Bratislava SK 2,191,200 EUR - Slovenské elektrárne
AS
20.00% 6.60%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Energy Podium Private
Company
Katerini Pieria GR 4,001 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.02% 0.01%
Energy Response Holdings
(Pty) Ltd
Melbourne AU 52,128,517 AUD Line-by-line Enel X Australia
Holding (Pty) Ltd
100.00% 100.00%
EnergyQ1BESS Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
EnerNOC GmbH Munich DE 25,000 EUR Line-by-line Enel X North America
Inc.
100.00% 100.00%
EnerNOC Ireland Limited Dublin IE 10,589 EUR Line-by-line Enel X Ireland Limited 100.00% 100.00%
EnerNOC UK II Limited London GB 21,000 GBP Line-by-line Enel X UK Limited 100.00% 100.00%
Enigma Green Power 1 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Entech Utility Service Bureau
Inc.
Lutherville US 1,500 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Enviatos Promoción I SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enviatos Promoción II SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enviatos Promoción III SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enviatos Promoción XX SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Eojin Wind Power Co. Ltd Seoul KR 301,000,000 KRW Line-by-line Enel Green Power
SpA
100.00% 100.00%
Eólica Valle del Ebro SA Zaragoza ES 3,561,343 EUR Line-by-line Enel Green Power
España SLU
50.50% 35.41%
Enel Green Power
México S de RL de Cv
56.98%
Eólica Zopiloapan SA de Cv Mexico City MX 1,877,201,544 MXN Line-by-line Enel Green Power
Partecipazioni
Speciali Srl
43.02% 100.00%
Eólicas de Agaete SL Las Palmas de
Gran Canaria
ES 240,400 EUR Line-by-line Enel Green Power
España SLU
80.00% 56.09%
Eólicas de Fuencaliente SA Las Palmas de
Gran Canaria
ES 216,360 EUR Line-by-line Enel Green Power
España SLU
55.00% 38.56%
Eólicas de Fuerteventura AIE Puerto del
Rosario
ES 4,558,427 EUR Equity Enel Green Power
España SLU
40.00% 28.05%
Eólicas de la Patagonia SA Buenos Aires AR 480,930 ARS Equity Enel Green Power
España SLU
50.00% 35.06%
Eólicas de Lanzarote SL Las Palmas de
Gran Canaria
ES 1,758,226 EUR Equity Enel Green Power
España SLU
40.00% 28.05%
Eólicas de Tenerife AIE Santa Cruz de
Tenerife
ES 420,708 EUR Equity Enel Green Power
España SLU
50.00% 35.06%
Eólicos de Tirajana SL Las Palmas de
Gran Canaria
ES 3,000 EUR Line-by-line Enel Green Power
España SLU
60.00% 42.07%
Epresa Energía SA Puerto Real ES 2,500,000 EUR Equity Endesa SA 50.00% 35.06%
Ermis 2 Energeiaki Private
Company
Grevena GR 1,002 EUR Equity Enel Green Power
Hellas SA
0.10% 0.05%
E-Solar 2 Srl Rome IT 2,500 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
E-Solar Srl Rome IT 2,500 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Essaouira Wind Farm Casablanca MA 300,000 MAD Equity Nareva Enel Green
Power Morocco SA
70.00% 35.00%
Estonian Solar PPA LLC Andover US 1 USD Line-by-line EGP North America
PPA LLC
100.00% 100.00%
European Energy Exchange
AG
Leipzig DE 40,050,000 EUR - Enel Global Trading
SpA
2.38% 2.38%
EV Gravitational Energy
Storage LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enviatos Promoción
I SLU
3.13%
Evacuación Carmona 400-
220 kV Renovables SL
Seville ES 10,003 EUR Equity Enviatos Promoción
II SLU
3.13% 6.58%
Enviatos Promoción
III SLU
3.13%
Evolution Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Ewiva Srl Milan IT 1,000,000 EUR Equity Enel X Way Srl 50.00% 50.00%
Expedition Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Explorer Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Explorer Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Explotaciones Eólicas de
Escucha SA
Zaragoza ES 3,505,000 EUR Line-by-line Enel Green Power
España SLU
70.00% 49.08%
Explotaciones Eólicas el
Puerto SA
Zaragoza ES 3,230,000 EUR Line-by-line Enel Green Power
España SLU
73.60% 51.61%
Explotaciones Eólicas Santo
Domingo de Luna SA
Zaragoza ES 100,000 EUR Line-by-line Enel Green Power
España SLU
51.00% 35.76%
Explotaciones Eólicas Saso
Plano SA
Zaragoza ES 5,488,500 EUR Line-by-line Enel Green Power
España SLU
65.00% 45.58%
Explotaciones Eólicas Sierra
Costanera SA
Zaragoza ES 8,046,800 EUR Line-by-line Enel Green Power
España SLU
90.00% 63.10%
Explotaciones Eólicas Sierra
la Virgen SA
Zaragoza ES 4,200,000 EUR Line-by-line Enel Green Power
España SLU
90.00% 63.10%
Falls Park Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Farrier Station Energy
Storage Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Fayette Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Fazenda Aroeira
Empreendimento de Energia
Ltda
Rio de Janeiro BR 2,362,046 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Fence Post Solar Holdings
LLC
Andover US 1 USD Line-by-line Enel Green Power
Fence Post Solar
Holdings LLC
100.00% 100.00%
Fence Post Solar Project LLC Andover US - USD Line-by-line Fence Post Solar
Holdings LLC
100.00% 100.00%
Fenner Wind Holdings LLC Dover US 100 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Field Day Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Finocchiara Solar Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Finsec Lab Ltd Tel Aviv IL 100 ILS Held for sale Enel X Srl 30.00% 30.00%
Flagpay Srl Milan IT 10,000 EUR Equity Mooney SpA 100.00% 50.00%
Flat Rock Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Cohuna Solar Farm
Trust
33.33%
Flat Rocks Girgarre Cohuna
Finco (Pty) Ltd
Sydney AU 120 AUD Equity Flat Rocks One Wind
Farm Trust
33.33% 50.00%
Girgarre Solar Farm
Trust
33.33%
Flat Rocks One Wind Farm
(Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Flat Rocks One
Holding (Pty) Ltd
100.00% 50.00%
Flat Rocks One Wind Farm
Trust
Sydney AU 100 AUD Equity Enel Green Power
Flat Rocks One
Holding Trust
100.00% 50.00%
Flat Top Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Flint Rock Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Florence Hills LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Flowing Spring Farms LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Fontibón ZE SAS Bogotá CO 434,359,750 COP Equity Bogotá ZE SAS 100.00% 9.44%
Fótons de Santo Anchieta
Energias Renováveis SA
Rio de Janeiro BR 577,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Fotovoltaica Yunclillos SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Fourmile Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Fox Run Energy Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Franklintown Farm LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Freedom Energy Storage LLC Andover US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Front Marítim del Besòs SL Barcelona ES 9,000 EUR Equity Endesa Generación
SAU
61.37% 43.03%
Frontiersman Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
FRV Corchitos I SLU Madrid ES 75,800 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRV Corchitos II Solar SLU Madrid ES 22,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRV Gibalbín - Jerez SLU Madrid ES 23,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
FRV Tarifa SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRV Villalobillos SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRV Zamora Solar 1 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRV Zamora Solar 3 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
FRWF Stage 1 (Pty) Ltd Sydney AU 100 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Fundamental Recognized
Systems SLU
Andorra ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Furatena Solar 1 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Ganado Solar Holdings LLC Andover US 1 USD Line-by-line Enel Green Power
Ganado Solar
Holdings LLC
100.00% 100.00%
Ganado Solar LLC Andover US - USD Line-by-line Ganado Solar
Holdings LLC
100.00% 100.00%
Ganado Storage LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Garob Wind Farm (RF)
(Pty) Ltd
Johannesburg ZA 100 ZAR Equity Enel Green Power
RSA 2 (RF) (Pty) Ltd
55.00% 27.50%
Gas y Electricidad
Generación SAU
Palma de Mallorca ES 213,775,700 EUR Line-by-line Endesa Generación
SAU
100.00% 70.12%
Gauley Hydro LLC Wilmington US - USD Equity GRPP Holdings LLC 100.00% 50.00%
Gauley River Management
LLC
Willison US 1 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Generadora de Occidente SA Guatemala City GT 16,262,000 GTQ Line-by-line Enel Colombia SA
ESP
99.00% 47.18%
Enel Guatemala SA 1.00%
Generadora Montecristo SA Guatemala City GT 3,820,000 GTQ Line-by-line Enel Colombia SA
ESP
Enel Guatemala SA
100.00%
0.00%
47.18%
Generadora Solar Austral SA Panama City PA 10,000 USD Line-by-line Enel Panamá CAM Srl 100.00% 47.19%
Generadora Solar de
Occidente SA
Panama City PA 10,000 USD Line-by-line Enel Panamá CAM Srl 100.00% 47.19%
Generadora Solar El Puerto
SA
Panama City PA 10,000 USD Line-by-line Enel Panamá CAM Srl 100.00% 47.19%
Geotérmica del Norte SA Santiago de Chile CL 326,577,419,702 CLP Line-by-line Enel Green Power
Chile SA
84.59% 54.92%
Gibson Bay Wind Farm (RF)
(Pty) Ltd
Johannesburg ZA 1,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
60.00% 60.00%
Girgarre Solar Farm (Pty) Ltd Sydney AU - AUD Equity Enel Green Power
Girgarre Holdings
(Pty) Ltd
100.00% 50.00%
Girgarre Solar Farm Trust Sydney AU 10 AUD Equity Enel Green Power
Girgarre Trust
100.00% 50.00%
Glass Top Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Global Commodities
Holdings Limited
London GB 4,042,375 GBP - Enel Global Trading
SpA
4.68% 4.68%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Globyte SA San José CR 910,000 CRC - Enel Costa Rica
CAM SA
10.00% 4.72%
Gloucester Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
GNL Chile SA Santiago de Chile CL 3,026,160 USD Equity Enel Generación
Chile SA
33.33% 20.25%
Golden Terrace Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Goodwell Wind Project LLC Wilmington US - USD Equity Origin Goodwell
Holdings LLC
100.00% 10.00%
Goose Foot Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Gooseneck Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Gorona del Viento El Hierro
SA
Santa Cruz de
Tenerife
ES 30,936,736 EUR Equity Unión Eléctrica de
Canarias Generación
SAU
23.21% 16.28%
Grand Prairie Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Gridspertise Iberia SL Madrid ES 3,000 EUR Equity Gridspertise Srl 100.00% 50.00%
Gridspertise India Private
Limited
Gurugram IN 19,759,130 INR Equity Gridspertise Srl 100.00% 50.00%
Gridspertise Latam SA São Paulo BR 2,010,000 BRL Equity Enel Brasil SA 0.00% 50.00%
Gridspertise Srl 100.00%
Gridspertise Srl Rome IT 7,500,000 EUR Equity Enel Grids Srl 50.00% 50.00%
Gridspertise LLC Dover US 160,000 USD Equity Gridspertise Srl 100.00% 50.00%
Grineo Gestión Circular SL Ponferrada ES 3,000 EUR Equity Endesa Generación
SAU
35.00% 24.54%
GRPP Holdings LLC Andover US 2 USD Equity EGPNA REP Holdings
LLC
50.00% 50.00%
Guadarranque Solar 4 SLU Seville ES 3,006 EUR Line-by-line Endesa Generación
II SAU
100.00% 70.12%
Guayepo Solar SAS Bogotá CO 1,000,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Guir Wind Farm Casablanca MA 10,000 MAD Line-by-line Enel Green Power
Morocco Sàrl
99.90% 99.90%
GulfStar Power LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Gusty Hill Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Hadley Ridge LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Hamilton County Solar
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Hamlet Mill Storage Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Hansborough Valley Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Harmony Plains Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Hastings Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Heartland Farms Wind
Project LLC
Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Hellas Res Holdings Single
Member Societe Anonyme
Maroussi GR 478,746,698 EUR Equity Hella Res Societe
Anonyme
100.00% 50.00%
Hella Res Societe Anonyme Maroussi GR 491,738,436 EUR Equity Enel Green Power
SpA
50.00% 50.00%
Hidroeléctrica de Catalunya
SLU
Barcelona ES 126,210 EUR Line-by-line Endesa SA 100.00% 70.12%
Hidroeléctrica de Ourol SL A Coruña ES 1,608,200 EUR Equity Enel Green Power
España SLU
30.00% 21.03%
Hidroelectricidad del Pacífico
S de RL de Cv
Colima MX 100,000,000,000 MXN Line-by-line Enel Green Power
México S de RL de Cv
99.99% 99.99%
Hidroflamicell SL Barcelona ES 78,120 EUR Line-by-line Hidroeléctrica de
Catalunya SLU
75.00% 52.59%
Hidroinvest SA Buenos Aires AR 55,312,093 ARS Line-by-line Enel Américas SA
Enel Argentina SA
41.94%
54.76%
79.55%
HIF H2 SpA Santiago de Chile CL 6,303,000 USD Equity Enel Green Power
Chile SA
50.00% 32.46%
High Chaparral Solar Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
High Lonesome Storage LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
High Lonesome Wind
Holdings LLC
Wilmington US 100 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
High Lonesome Wind Power
LLC
Boston US 100 USD Line-by-line High Lonesome Wind
Holdings LLC
100.00% 100.00%
High Noon Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
High Street Corporation
(Pty) Ltd
Melbourne AU 2 AUD Equity Enel Green Power
Australia (Pty) Ltd
100.00% 50.00%
Hilltopper Wind Holdings LLC Wilmington US 1,000 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Hispano Generación de
Energía Solar SL
Jerez de los
Caballeros
ES 3,500 EUR Line-by-line Enel Green Power
España SLU
51.00% 35.76%
Honey Stone Solar Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Honeybee Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Hope Creek LLC Crestview US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Hope Ridge Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Horse Run Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Horse Wrangler Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Hubject GmbH Berlin DE 65,943 EUR - Enel X Way Srl 12.50% 12.50%
Ice Tudela SL Pozuelo de
Alarcón
ES 3,000 EUR - Enel Green Power
España SLU
5.12% 3.59%
Idalia Park Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Idrosicilia SpA Milan IT 22,520,000 EUR Equity Enel SpA 1.00% 1.00%
IIK Energía de Dzemul SA Enel Green Power
México S de RL de Cv
0.00%
de Cv Mexico City MX 6,204,259 MXN Line-by-line Enel Rinnovabile SA
de Cv
100.00% 100.00%
Ilary Energia Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Impofu Cluster Investment
SPV (RF) (Pty) Ltd
Gauteng ZA 2,000,000 ZAR Equity Enel Green Power
RSA (Pty) Ltd
100.00% 50.00%
Enel Green Power
Italia Srl
96.74%
Infinitesun Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
SpA
3.26% 100.00%
Infraestructura de
Evacuación Peñaflor 220
kV SL
Madrid ES 3,500 EUR Equity Enel Green Power
España SLU
41.14% 28.85%
Infraestructuras Puerto Santa Madrid 3,000 EUR Line-by-line Puerto Santa María
Energía I SLU
50.00% 70.12%
María 220 SL ES Puerto Santa María
Energía II SLU
50.00%
Infraestructuras San Serván
220 SL
Madrid ES 12,000 EUR Equity Enel Green Power
España SLU
30.80% 21.60%
Madrid ES 90,000 Equity Aranort Desarrollos
SLU
6.41%
Infraestructuras San Serván
Set 400 SL
EUR Baylio Solar SLU 6.41% 13.48%
Furatena Solar 1 SLU 6.41%
Ingwe Solar Power Plant (RF)
(Pty) Ltd
Gauteng ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Inkolan Información y
Coordinación de Obras AIE
Bilbao ES 84,142 EUR - Edistribución Redes
Digitales SLU
14.29% 10.02%
Madrid EUR Equity Aranort Desarrollos
SLU
7.94%
Instalaciones San Serván II
400 SL
ES 11,026 Baylio Solar SLU 7.94% 16.69%
Furatena Solar 1 SLU 7.94%
International Multimedia
University Srl in bankruptcy
- IT 24,000 EUR - Enel Italia SpA 13.04% 13.04%
Ipsomata DPGU Private
Company
Heraklion, Crete GR 5,000 EUR - Enel Green Power
Hellas SA
0.02% 0.02%
Iris Bloom Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Iron Belt Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Iron Bull Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Isamu Ikeda Energia SA Niterói BR 16,474,476 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Italgest Energy (Pty) Ltd Johannesburg ZA 1,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Jack River LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Jackrabbit Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Jade Energia Ltda Rio de Janeiro BR 4,107,097 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Jaguito Solar 10 MW SA Panama City PA 10,000 USD Line-by-line Enel Panamá CAM Srl 100.00% 47.19%
Jessica Mills LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Julia Hills LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Junia Insurance Srl Mosciano
Sant'Angelo
IT 10,000 EUR Equity Mooney Group SpA 100.00% 50.00%
Juniper Canyon Energy
Storage Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Keeneys Creek Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Ken Renewables India Private
Limited
Gurugram IN 12,100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
King Branch Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Kingston Energy Storage LLC Wilmington US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Kino Contractor SA de Cv Mexico City MX 1,000,100 MXN Line-by-line Enel Green Power
México S de RL de Cv
Enel Rinnovabile SA
de Cv
100.00%
0.00%
100.00%
Knickerbocker Energy
Storage Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Kokkinari DPGU Private
Company
Heraklion, Crete GR 15,000 EUR - Enel Green Power
Hellas SA
0.01% 0.01%
Korea Line Corporation Seoul KR 122,132,520,000 KRW - Enel Global Trading
SpA
0.25% 0.25%
Enel Green Power
Hellas SA
0.07%
Koukos Energy Private
Company
Athens GR 4,003 EUR - Enel Green Power
Hellas Supply Single
Member SA
0.02% 0.01%
Kromschroeder SA L'Hospitalet de
Llobregat
ES 627,126 EUR Equity Endesa Medios y
Sistemas SLU
29.26% 20.52%
Kutlwano Solar Power Plant
(RF) (Pty) Ltd
Gauteng ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Lake Emily Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Lake Pulaski Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Land Run Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Land Run Wind Project LLC Dover US 100 USD Line-by-line Sundance Wind
Project LLC
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Lantana Springs Hydrogen
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Lantern Trail Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Lariat Energy Storage Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Lasso Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Latamsolar Energías
Renovables SAS
Bogotá CO 8,000,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Latamsolar Fotovoltaica
Fundación SAS
Bogotá CO 8,000,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Latamsolar Fotovoltaica
Sahagun SAS
Bogotá CO 8,000,000 COP Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Lathrop Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Lava Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Lawrence Creek Solar LLC Minneapolis US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Layerx Security Ltd Tel Aviv IL 20,112 ILS - Finsec Lab Ltd 3.00% 0.90%
Lebanon Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Enel Alberta Storage
Inc.
0.10%
Legacy Blossom Storage
Project Limited Partnership
Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Lemonade Solar Project LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Lerato Solar Power Plant (RF)
(Pty) Ltd
Gauteng ZA 1,000 ZAR Line-by-line Enel Green Power
SpA
100.00% 100.00%
Liberty Energy Storage LLC Andover US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Libyan Italian Joint Company
- Azienda Libico-Italiana
(A.L.I.)
Tripoli LY 1,350,000 EUR - Enelpower Srl 0.33% 0.33%
Libra Flexsys Srl Rome IT 10,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Light Cirrus Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Lily Solar Holdings LLC Andover US 1 USD Line-by-line Enel Green Power Lily
Solar Holdings LLC
100.00% 100.00%
Lily Solar LLC Andover US - USD Line-by-line Lily Solar Holdings
LLC
100.00% 100.00%
Lindahl Wind Holdings LLC Wilmington US - USD Line-by-line EGPNA Preferred
Wind Holdings LLC
100.00% 100.00%
Lindahl Wind Project LLC Wilmington US - USD Line-by-line Lindahl Wind
Holdings LLC
100.00% 100.00%
Little Elk Wind Holdings LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Consolidation Group %
Company name Headquarters Country Share capital Currency Segment method Held by % holding holding
Little Elk Wind Project LLC Wilmington US - USD Line-by-line Little Elk Wind
Holdings LLC
100.00% 100.00%
Little Salt Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Litus Energy Storage LLC Andover US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Lone Pine Wind Inc. Alberta CA - CAD - Enel Green Power
Canada Inc.
10.00% 10.00%
Lone Pine Wind Project LP Alberta CA - CAD Equity Enel Green Power
Canada Inc.
10.00% 10.00%
Lucas Sostenible SL Madrid ES 1,099,775 EUR Equity Enel Green Power
España SLU
35.29% 24.74%
Luminary Highlands Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Luz de Angra Energia SA Rio de Janeiro BR 14,304,790 BRL Line-by-line Enel X Brasil SA 51.00% 41.96%
Luz de Caruaru Energia SA Rio de Janeiro BR 21,027,600 BRL Line-by-line Enel X Brasil SA 51.00% 41.96%
Luz de Cataguases SA Cataguases BR 4,800,000 BRL Line-by-line Enel X Brasil SA 60.00% 49.36%
Luz de Caxias do Sul SA Rio de Janeiro BR 31,017,000 BRL Line-by-line Enel X Brasil SA 80.00% 65.82%
Luz de Itanhaém SA Itanhaém BR 22,700,000 BRL Line-by-line Enel X Brasil SA 60.00% 49.36%
Luz de Jaboatão Energia SA Rio de Janeiro BR 21,114,200 BRL Line-by-line Enel X Brasil SA 51.00% 41.96%
Luz de Macapá Energia SA Rio de Janeiro BR 24,338,000 BRL Line-by-line Enel X Brasil SA 51.00% 41.96%
Luz de Ponta Grossa SA Rio de Janeiro BR 17,889,000 BRL Line-by-line Enel X Brasil SA 80.00% 65.82%
Maicor Wind Srl Rome IT 20,850,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Mansar Renewable Energy
Private Limited
Gurgaon IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Maple Canada Solutions
Holdings Ltd
- CA - CAD Equity Enel X Canada Ltd 20.00% 20.00%
Maple Energy Solutions LP - CA - CAD Equity Enel X Canada
Holding Inc.
20.00% 20.00%
Maple Run Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
María Renovables SL Zaragoza ES 3,000 EUR Equity Enel Green Power
España SLU
45.36% 31.80%
Marshoy Energy Advisory
Services Private Limited
Mumbai IN 313,709,000 INR Line-by-line Enel X Advisory
Services Srl
100.00% 100.00%
Marte Srl Rome IT 6,100,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Marudhar Wind Energy
Private Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Más Energía S de RL de Cv Mexico City MX 61,873,926 MXN Line-by-line Enel Green Power
México S de RL de Cv
66.67% 100.00%
Enel Rinnovabile SA
de Cv
33.33%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Mason Jar Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Mason Mountain Wind
Project LLC
Wilmington US - USD Line-by-line Padoma Wind Power
LLC
100.00% 100.00%
Matrigenix (Pty) Ltd Johannesburg ZA 1,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%
Maty Energia Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
MC Solar I LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
McBride Wind Project LLC Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Merit Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Metro Wind LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Mexicana de
Hidroelectricidad Mexhidro S
de RL de Cv
Mexico City MX 181,728,901 MXN Line-by-line Enel Green Power
México S de RL de Cv
99.99% 99.99%
Mibgas SA Madrid ES 3,000,000 EUR - Endesa SA 1.35% 0.95%
Midelt Wind Farm SA Casablanca MA 145,000,000 MAD Equity Nareva Enel Green
Power Morocco SA
70.00% 35.00%
Millstone Junction Solar
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Energía Base Natural
SLU
4.79%
Energía Eólica
Ábrego SLU
7.98%
Minglanilla Renovables 400
kV AIE
Valencia ES - EUR Proportional Energía Eólica
Galerna SLU
9.31% 25.36%
Energía Eólica Gregal
SLU
9.31%
Energía y Naturaleza
SLU
4.79%
Minicentrales Acequia Cinco
Villas AIE
Ejea de los
Caballeros
ES 3,346,993 EUR - Enel Green Power
España SLU
5.39% 3.78%
Minicentrales del Canal de las
Bárdenas AIE
Ejea de los
Caballeros
ES 1,202,000 EUR - Enel Green Power
España SLU
15.00% 10.52%
Minicentrales del Canal
Imperial-Gallur SL
Zaragoza ES 1,820,000 EUR Equity Enel Green Power
España SLU
36.50% 25.59%
Mira Energy (Pty) Ltd Johannesburg ZA 100 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%
Miranda Plataforma Logística
SA
Miranda de Ebro ES 1,800,000 EUR - Nuclenor SA 0.22% 0.08%
MO Land Holdings 1358 LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Monte Reina Renovables SL Madrid ES 4,000 EUR Equity FRV Zamora Solar
1 SLU
20.58% 14.43%
Montrose Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Moonbeam Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Mooney Group SpA Milan IT 10,050,000 EUR Equity Enel X Srl 50.00% 50.00%
Mooney SpA Milan IT 87,833,331 EUR Equity Mooney Group SpA 100.00% 50.00%
Mooney Servizi SpA Milan IT 8,549,999 EUR Equity Mooney Group SpA 100.00% 50.00%
Morgan Branch Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Morning Light Energy
Storage Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Mount Pleasant Energy
Storage 1 LLC
Boston US - USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Mountrail Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
MPG Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Mucho Viento Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Mule Bit Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Muskegon County Solar
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Muskegon Green Wind
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Mustang Run Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
MyCicero Srl Senigallia IT 1,142,857 EUR Equity Mooney Servizi SpA 30.00% 39.50%
Pluservice Srl 70.00%
Nabb Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Napolean Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Nareva Enel Green Power
Morocco SA
Casablanca MA 98,750,000 MAD Equity Enel Green Power
Morocco Sàrl
50.00% 50.00%
Neugemacht GmbH Frankfurt DE 25,000 EUR Equity Gridspertise Srl 51.00% 25.50%
Nevkan Renewables LLC Wilmington US - USD Line-by-line Enel Nevkan Inc. 100.00% 100.00%
New York Distributed
Storage Projects LLC
Boston US - USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Ngonye Power Company
Limited
Lusaka ZM 10 ZMW Held for sale Enel Green Power
Solar Ngonye SpA
(formerly Enel Green
Power Africa Srl)
80.00% 80.00%
Nojoli Wind Farm (RF) (Pty)
Ltd
Johannesburg ZA 10,000,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
60.00% 60.00%
North English Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
North Rock Wind LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Northland Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Northstar Wind Project LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Northwest Hydro LLC Wilmington US - USD Line-by-line Chi West LLC 100.00% 100.00%
Notch Butte Hydro Company
Inc.
Wilmington US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Novolitio Recuperación de
Baterías SL
Ponferrada ES 180,000 EUR Equity Endesa Generación
SAU
45.00% 31.55%
Nuclenor SA Valle de Tobalina ES 5,406,000 EUR Equity Endesa Generación
SAU
50.00% 35.06%
Nuove Energie Srl Porto Empedocle IT 5,204,029 EUR Line-by-line Enel Global Trading
SpA
100.00% 100.00%
Nxuba Wind Farm (RF)
(Pty) Ltd
Johannesburg ZA 1,000 ZAR Equity Enel Green Power
RSA 2 (RF) (Pty) Ltd
51.00% 25.50%
NYC Storage (353 Chester)
SPE LLC
Wilmington US 1 USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Ochrana A Bezpecnost
Se Sro
Kalná Nad
Hronom
SK 33,194 EUR Equity Slovenské elektrárne
AS
100.00% 33.00%
Olathe Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Old Sport Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Olivum PV Farm 01 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
OMIP - Operador do
Mercado Ibérico (Portugal)
SGPS SA
Lisbon PT 2,610,000 EUR - Endesa Generación
Portugal SA
5.00% 3.51%
Open Range Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Operador del Mercado
Ibérico de Energía - Polo
Español SA
Madrid ES 1,999,998 EUR - Endesa SA 5.00% 3.51%
Operadora Distrital de
Transporte SAS
Bogotá CO 12,500,000,000 COP Equity Enel Colombia SA
ESP
20.00% 9.44%
Orchid Acres Solar Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Origin Goodwell Holdings
LLC
Wilmington US - USD Equity EGPNA Wind
Holdings 1 LLC
100.00% 10.00%
Origin Wind Energy LLC Wilmington US - USD Equity Origin Goodwell
Holdings LLC
100.00% 10.00%
Osage Wind Holdings LLC Wilmington US 100 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Osage Wind LLC Wilmington US - USD Line-by-line Osage Wind Holdings
LLC
100.00% 100.00%
Ossining Energy Storage
1 LLC
Boston US - USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Oxagesa AIE in liquidation Alcañiz ES 6,010 EUR Equity Enel Green Power
España SLU
33.33% 23.37%
Oyster Bay Wind Farm (RF)
(Pty) Ltd
Johannesburg ZA 1,000 ZAR Equity Enel Green Power
RSA 2 (RF) (Pty) Ltd
55.00% 27.50%
Padoma Wind Power LLC Elida US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Painted Rose Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Palo Alto Farms Wind Project
LLC
Dallas US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pampinus PV Farm 01 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Paradise Creek Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Paravento SL Paradela ES 3,006 EUR Line-by-line Enel Green Power
España SLU
90.00% 63.10%
Parc Eòlic La Tossa-La Mola
d'en Pascual SL
Madrid ES 1,183,100 EUR Equity Enel Green Power
España SLU
30.00% 21.03%
Parc Eòlic Los Aligars SL Madrid ES 1,313,100 EUR Equity Enel Green Power
España SLU
30.00% 21.03%
Parco Eolico Monti Sicani Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Parque Amistad II SA de Cv Mexico City MX 2,589,177,005 MXN Line-by-line Enel Green Power
México S de RL de Cv
0.50% 100.00%
Enel Rinnovabile SA
de Cv
99.50%
Parque Amistad III SA de Cv Mexico City MX 1,706,287,200 MXN Line-by-line Enel Green Power
México S de RL de Cv
0.50% 100.00%
Enel Rinnovabile SA
de Cv
99.50%
Mexico City MX 2,728,499,160 MXN Line-by-line Enel Green Power
México S de RL de Cv
0.50% 100.00%
Parque Amistad IV SA de Cv Enel Rinnovabile SA
de Cv
99.50%
Parque Eólico A Capelada
SLU
Santiago de
Compostela
ES 5,857,704 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Parque Eólico Belmonte SA Madrid ES 120,400 EUR Line-by-line Enel Green Power
España SLU
50.17% 35.17%
MX Line-by-line Enel Green Power
México S de RL de Cv
0.00%
Parque Eólico BR-1 SA de Cv Mexico City 50,000 MXN Enel Rinnovabile SA
de Cv
100.00% 25.50%
Parque Eólico Carretera de
Arigana SA
Las Palmas de
Gran Canaria
ES 1,007,000 EUR Line-by-line Enel Green Power
España SLU
80.00% 56.09%
Parque Eólico de Barbanza
SA
Santiago de
Compostela
ES 3,606,073 EUR Line-by-line Enel Green Power
España SLU
75.00% 52.59%
Parque Eólico de San Andrés
SA
Santiago de
Compostela
ES 552,920 EUR Line-by-line Enel Green Power
España SLU
82.00% 57.50%
Parque Eólico de Santa Las Palmas de Enel Green Power
España SLU
65.67%
Lucía SA Gran Canaria ES 901,500 EUR Line-by-line Parque Eólico de
Santa Lucía SA
1.00% 46.51%
Parque Eólico Finca de
Mogán SA
Santa Cruz de
Tenerife
ES 3,810,340 EUR Line-by-line Enel Green Power
España SLU
90.00% 63.10%
Parque Eólico Montes de las
Navas SA
Madrid ES 6,540,000 EUR Line-by-line Enel Green Power
España SLU
75.50% 52.94%
Parque Eólico Muniesa SLU Madrid ES 3,006 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enel Brasil SA 100.00%
Parque Eólico Palmas dos
Ventos Ltda
Salvador BR 4,096,626 BRL Line-by-line Enel Green Power
Desenvolvimento
Ltda
0.00% 82.27%
Parque Eólico Pampa SA Buenos Aires AR 477,139,364 ARS Line-by-line Enel Green Power
SpA
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Parque Eólico Punta de
Teno SA
Santa Cruz de
Tenerife
ES 528,880 EUR Line-by-line Enel Green Power
España SLU
52.00% 36.46%
Parque Eólico Sierra del
Madero SA
Madrid ES 7,193,970 EUR Line-by-line Enel Green Power
España SLU
58.00% 40.67%
Parque Salitrillos SA de Cv Mexico City MX 100 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Parque Solar Cauchari IV SA San Salvador de
Jujuy
AR 500,000 ARS Line-by-line Enel Green Power
Argentina
100.00% 82.27%
Parque Solar Don José SA
de Cv
Mexico City MX 100 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Parque Solar Villanueva Tres
SA de Cv
Mexico City MX 306,024,631 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Enel Green Power
Chile SA
60.91%
Parque Talinay Oriente SA Santiago de Chile CL 66,092,165,173 CLP Line-by-line Enel Green Power
SpA
39.09% 78.64%
Pastis - Centro Nazionale per
la ricerca e lo sviluppo dei
materiali SCPA in liquidation
Brindisi IT 2,065,000 EUR - Enel Italia SpA 1.14% 1.14%
Paynesville Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
PayTipper Network Srl Cascina IT 40,000 EUR Equity Mooney SpA 100.00% 50.00%
PDP Technologies Ltd Kfar Saba IL 1,129,252 ILS - Enel Grids Srl 4.75% 4.75%
Enel Alberta Wind Inc. 0.10%
Pearl Star Wind Limited
Partnership
Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Pebble Stream Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pegop - Energia Eléctrica SA Pego PT 50,000 EUR Equity Endesa Generación
Portugal SA
0.02% 35.06%
Endesa Generación
SAU
49.98%
PH Chucás SA San José CR 100,000 CRC Line-by-line Enel Costa Rica
CAM SA
65.00% 30.67%
PH Don Pedro SA San José CR 100,001 CRC Line-by-line Enel Costa Rica
CAM SA
33.44% 18.92%
Globyte SA 66.54%
PH Río Volcán SA San José CR 100,001 CRC Line-by-line Enel Costa Rica
CAM SA
34.32% 19.29%
Globyte SA 65.66%
Piebald Hill Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pike Den Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pilesgrove Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Pincher Creek LP Alberta CA - CAD Line-by-line Enel Green Power
Canada Inc.
50.50% 51.01%
Pincher Creek
Management Inc.
1.00%
Pincher Creek Management
Inc.
Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
51.00% 51.00%
Pine Island Distributed
Solar LLC
Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
EN
4 Enel Group 2 Governance 3 Group Strategy & Risk Management

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Playa Flat Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pluservice Srl Senigallia IT 450,000 EUR Equity Mooney Servizi SpA 70.00% 35.00%
Point Bar Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Point Rider Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Polka Dot Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Pomerado Energy Storage
LLC
Wilmington US 1 USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
PowerCrop Macchiareddu Srl Russi IT 100,000 EUR Equity PowerCrop SpA
(formerly PowerCrop
Srl)
100.00% 50.00%
PowerCrop Russi Srl Russi IT 100,000 EUR Equity PowerCrop SpA
(formerly PowerCrop
Srl)
100.00% 50.00%
PowerCrop SpA (formerly
PowerCrop Srl)
Russi IT 4,000,000 EUR Equity Enel Green Power
Italia Srl
50.00% 50.00%
Prairie Rose Transmission
LLC
Minneapolis US - USD Equity Prairie Rose Wind
LLC
100.00% 10.00%
Prairie Rose Wind LLC Albany US - USD Equity EGPNA REP Wind
Holdings LLC
100.00% 10.00%
Primavera Energia SA Niterói BR 36,965,445 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Productive Solar Systems
SLU
Andorra ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Productora de Energías SA Barcelona ES 60,101 EUR Equity Enel Green Power
España SLU
30.00% 21.03%
Productora Eléctrica
Urgellenca SA
La Seu d'Urgell ES 8,400,000 EUR - Endesa SA 8.43% 5.91%
Progreso Solar 20 MW SA Panama City PA 10,000 USD Line-by-line Enel Panamá CAM Srl 100.00% 47.19%
Promociones Energéticas del
Bierzo SLU
Madrid ES 12,020 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Enel Green Power
España SLU
24.75%
Promotores Mudéjar 400
kV SL
Zaragoza ES 3,000 EUR Equity Renovables La
Pedrera SLU
6.75% 26.08%
Renovables Mediavilla
SLU
5.69%
Proveedora de Electricidad
de Occidente S de RL de Cv
Mexico City MX 89,708,835 MXN Line-by-line Enel Green Power
México S de RL de Cv
99.99% 99.99%
Proyectos Universitarios de
Energías Renovables SL
Alicante ES 27,000 EUR Equity Enel Green Power
España SLU
33.33% 23.37%
Proyectos y Soluciones
Renovables SAC
San Miguel PE 1,000 SOL Line-by-line Enel Green Power
Partecipazioni
Speciali Srl
99.90% 99.98%
Enel Perú SAC 0.10%
PSG Energy Private Limited - IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
PT Enel Green Power Optima
Way Ratai
Jakarta ID 10,002,740 USD Line-by-line Enel Green Power
SpA
90.00% 90.00%
Puerto Santa María Energía
I SLU
Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Puerto Santa María Energía
II SLU
Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Pulida Energy (RF) (Pty) Ltd Johannesburg ZA 10,000,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
52.70% 52.70%
Pumpkin Vine Wind Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Quatiara Energia SA Niterói BR 13,766,119 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Queens Energy Storage LLC Andover US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Quorn Park Solar Farm
(Pty) Ltd
Sydney AU 100 AUD Equity Enel Green Power
Quorn Holding
(Pty) Ltd
100.00% 50.00%
Quorn Park Solar Farm Trust Sydney AU 100 AUD Equity Enel Green Power
Quorn Holding Trust
100.00% 50.00%
Raleigh Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Ranchland Solar Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Ranchland Wind Holdings
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Ranchland Wind Project
II LLC
Andover US 1 USD Line-by-line AzureRanchII Wind
Holdings LLC
100.00% 100.00%
Ranchland Wind Project LLC Andover US - USD Line-by-line Rockhaven
Ranchland Holdings
LLC
100.00% 100.00%
Ranchland Wind Storage LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rattlesnake Creek Holdings
LLC
Delaware US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rausch Creek Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
RC Wind Srl Milan IT 10,000 EUR - Enel Green Power
Italia Srl
0.50% 0.50%
RE Arroyo LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Reaktortest Sro Trnava SK 66,389 EUR - Slovenské elektrárne
AS
49.00% 16.17%
Rebuilding Agente
Rehabilitador SL
Madrid ES 250,000 EUR Equity Endesa X Servicios
SLU
50.00% 35.06%
Red Cap Impofu (Pty) Ltd Sandton ZA 20,000,000 ZAR Equity Impofu Cluster
Investment SPV (RF)
(Pty) Ltd
100.00% 50.00%
Red Cap Impofu East (Pty)
Ltd
Gauteng ZA 35,059,068 ZAR Equity Impofu Cluster
Investment SPV (RF)
(Pty) Ltd
100.00% 50.00%
Red Cap Impofu West
(Pty) Ltd
Gauteng ZA 10,000 ZAR Equity Impofu Cluster
Investment SPV (RF)
(Pty) Ltd
100.00% 50.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Red Cardinal Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Red Centroamericana de
Telecomunicaciones SA
Panama City PA 2,700,000 USD - Enel SpA 11.11% 11.11%
Red Dirt Wind Holdings I LLC Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Red Dirt Wind Holdings LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Red Dirt Wind Project LLC Dover US 1 USD Line-by-line Red Dirt Wind
Holdings LLC
100.00% 100.00%
Red Fox Wind Project LLC Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Red Stag Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Red Top Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Red Yucca Energy Storage
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Alberta Solar Inc. 0.10%
Regal Rising Solar Project
Limited Partnership
Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Ren Wave Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Renovables Andorra SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Baylio Solar SLU 6.24%
Dehesa de los
Guadalupes Solar
SLU
6.24% 44.98%
Renovables Brovales 400 Emintegral Cycle SLU 16.99%
kV SL Seville ES 5,000 EUR Equity Enel Green Power
España SLU
22.20%
Furatena Solar 1 SLU 6.24%
Seguidores Solares
Planta 2 SLU
6.24%
Renovables Brovales Segura Emintegral Cycle SLU 33.02%
de León 400 kV SL Seville ES 5,000 EUR Equity Enel Green Power
España SLU
31.03% 44.91%
Renovables de Guatemala SA Guatemala City GT 1,924,465,600 GTQ Line-by-line Enel Colombia SA
ESP
100.00% 47.18%
Enel Guatemala SA 0.00%
Renovables La Pedrera SLU Zaragoza ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Renovables Manzanares Madrid ES 5,000 EUR Equity Enel Green Power
España SLU
27.86% 30.84%
400 kV SL Stonewood
Desarrollos SLU
16.12%
Renovables Mediavilla SLU Zaragoza ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Renovables Teruel SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Reservoir Falls Energy
Storage Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rhinestone Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Ribina Renovables 400 SL Pozuelo de
Alarcón
ES 3,000 EUR Equity Enel Green Power
España SLU
40.21% 28.19%
River Mill Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
River Point Wind Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Riverbend Farms Wind
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Enel Green Power
Canada Inc.
50.50%
Riverview LP Alberta CA - CAD Line-by-line Riverview
Management Inc.
1.00% 51.01%
Riverview Management Inc. Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
51.00% 51.00%
Riverview Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Roadrunner Solar Project
LLC
Andover US 100 USD Line-by-line Enel Roadrunner
Solar Project
Holdings LLC
100.00% 100.00%
Roadrunner Storage LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rock Creek Wind Holdings
I LLC
Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Rock Creek Wind Holdings
II LLC
Dover US 100 USD Line-by-line Rock Creek Wind
Holdings LLC
100.00% 100.00%
Rock Creek Wind Holdings
LLC
Wilmington US - USD Line-by-line EGPNA Preferred
Wind Holdings II LLC
100.00% 100.00%
Rock Creek Wind Project LLC Clayton US 1 USD Line-by-line Rock Creek Wind
Holdings LLC
100.00% 100.00%
Rock Prairie Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rockhaven Ranchland
Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Rockhaven Wind Project LLC Andover US 1 USD Line-by-line Rockhaven
Ranchland Holdings
LLC
100.00% 100.00%
Rocky Caney Holdings LLC Oklahoma City US 1 USD Equity Enel Kansas LLC 10.00% 10.00%
Rocky Caney Wind LLC Albany US - USD Equity Rocky Caney
Holdings LLC
100.00% 10.00%
Rocky Ridge Wind Project
LLC
Oklahoma City US - USD Equity Rocky Caney Wind
LLC
100.00% 10.00%
Rodnikovskaya WPS Moscow RU 6,010,000 RUB Line-by-line Enel Green Power
Rus Limited Liability
Company
100.00% 100.00%
Roha Renewables India
Private Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Rolling Farms Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Rosy Range Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Ruthton Ridge LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
4 Enel Group 2 Governance 3 Group Strategy & Risk Management

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
S4ma Developments
Spółka z Ograniczoną
Odpowiedzialnośą
Wrocław PL 5,000 PLN Line-by-line Enel Green Power
SpA
100.00% 100.00%
Sacme SA Buenos Aires AR 12,000 ARS Equity Empresa
Distribuidora Sur SA
- Edesur
50.00% 29.66%
Saddle House Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Salt Springs Wind Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Salto de San Rafael SL Seville ES 462,186 EUR Equity Enel Green Power
España SLU
50.00% 35.06%
San Francisco de Borja SA Zaragoza ES 60,000 EUR Line-by-line Enel Green Power
España SLU
66.67% 46.74%
San Juan Mesa Wind Project
II LLC
Wilmington US - USD Line-by-line Padoma Wind Power
LLC
100.00% 100.00%
Sanosari Energy Private
Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Santo Rostro Cogeneración
SA in liquidation
Seville ES 207,340 EUR Equity Enel Green Power
España SLU
45.00% 31.55%
Sardhy Green Hydrogen Srl Sarroch IT 10,000 EUR Equity Enel Green Power
Italia Srl
50.00% 50.00%
Saugus River Energy Storage
LLC
Dover US 100 USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Savanna Power Solar 10 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 12 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 13 SLU Seville ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 4 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 5 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 6 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Savanna Power Solar 9 SLU Madrid ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Se Služby Inžinierskych
Stavieb Sro
Kalná Nad
Hronom
SK 200,000 EUR Equity Slovenské elektrárne
AS
100.00% 33.00%
Seaway Landing Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Seccionadora Almodóvar
Renovables SL
Málaga ES 5,000 EUR Equity Enel Green Power
España SLU
37.50% 26.29%
Seguidores Solares Planta
2 SLU
Madrid ES 3,010 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Servizio Elettrico Nazionale
SpA
Rome IT 10,000,000 EUR Line-by-line Enel Italia SpA 100.00% 100.00%
Set Carmona 400 kV
Renovables SL
Seville ES 10,000 EUR Equity Enel Green Power
España SLU
16.00% 11.22%
Setyl Srl Bergamo IT 100,000 EUR Equity Enel X Italia Srl 27.50% 27.50%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Seven Cowboy PPA LLC Andover US 1 USD Line-by-line EGP North America
PPA LLC
100.00% 100.00%
Seven Cowboy Wind Project
Holdings LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Seven Cowboy Wind Project
II LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Seven Cowboy Wind Project
LLC
Andover US 1 USD Line-by-line Seven Cowboy Wind
Project Holdings LLC
100.00% 100.00%
Seven Cowboys Solar Project
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Shark Power 10 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 4 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 5 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 6 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 7 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 8 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power 9 SLU Madrid ES 3,000 EUR Line-by-line Shark Power SLU 100.00% 70.12%
Shark Power SLU Madrid ES 143,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Shepherd Pass Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Shiawassee Wind Project
LLC
Wilmington US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Shield Energy Storage
Project LLC
Wilmington US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
Shikhar Surya (One) Private
Limited
Gurugram IN 340,100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Sicilhy Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
SIET - Società Informazioni
Esperienze Termoidrauliche
SpA
Piacenza IT 697,820 EUR Equity Enel Innovation
Hubs Srl
41.55% 41.55%
Silt Solar I LLC Andover US 1 USD Line-by-line Brick Road Solar
Holdings LLC
100.00% 100.00%
Silver Dollar Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Silverware Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Sinergia EWR4 Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Sinergia GP6 Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Sinergia GP7 Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Sistema Eléctrico de
Conexión Valcaire SL
Madrid ES 175,200 EUR Equity Enel Green Power
España SLU
28.13% 19.72%
Sistemas Energéticos Mañón
Ortigueira SA
Santiago de
Compostela
ES 2,007,750 EUR Line-by-line Enel Green Power
España SLU
96.00% 67.31%
Skyview Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Skyview Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
SL Energy SAC Lima PE 1,000 SOL Held for sale Enel Generación
Perú SAA
Enel Perú SAC
99.90%
0.10%
71.55%
Brick Road Solar
Sleep Hollow Solar I LLC Andover US 1 USD Line-by-line Holdings LLC 100.00% 100.00%
Slovak Power Holding BV Amsterdam NL 25,010,000 EUR Equity Enel Produzione SpA 50.00% 50.00%
Slovenské elektrárne -
Energetické Služby Sro
Bratislava SK 4,505,000 EUR Equity Slovenské elektrárne
AS
100.00% 33.00%
Slovenské elektrárne AS Bratislava SK 1,269,295,725 EUR Equity Slovak Power Holding
BV
66.00% 33.00%
Slovenské elektrárne Česká
Republika Sro
Moravská Ostrava CZ 295,819 CZK Equity Slovenské elektrárne
AS
100.00% 33.00%
Smoky Hill Holdings II LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Smoky Hills Wind Farm LLC Topeka US - USD Line-by-line EGPNA Project
HoldCo 1 LLC
100.00% 100.00%
Smoky Hills Wind Project
II LLC
Lenexa US - USD Line-by-line EGPNA Project
HoldCo 1 LLC
100.00% 100.00%
Snowy Knoll Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Snyder Wind Farm LLC Hermleigh US - USD Line-by-line Texkan Wind LLC 100.00% 100.00%
Socibe Energia SA Niterói BR 12,969,032 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Sociedad Agrícola de
Cameros Ltda
Santiago de Chile CL 5,738,046,495 CLP Line-by-line Enel Chile SA 57.50% 37.33%
Sociedad Eólica de Andalucía
SA
Seville ES 4,507,591 EUR Line-by-line Enel Green Power
España SLU
64.75% 45.40%
Sociedad Eólica el Puntal SL Seville ES 1,643,000 EUR Equity Enel Green Power
España SLU
50.00% 35.06%
Sociedad Eólica Los Lances
SA
Seville ES 2,404,048 EUR Line-by-line Enel Green Power
España SLU
60.00% 42.07%
Società Elettrica Trigno Srl Rome IT 100,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Soetwater Wind Farm (RF)
(Pty) Ltd
Johannesburg ZA 1,000 ZAR Equity Enel Green Power
RSA 2 (RF) (Pty) Ltd
55.00% 27.50%
Solana Renovables SL Madrid ES 6,246 EUR Equity Enel Green Power
España SLU
39.90% 27.97%
Soliloquoy Ridge LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Sona Enerjí Üretím Anoním
Şírketí
Istanbul TR 50,000 TRY Line-by-line Enel Green Power
Turkey Enerjí
Yatirimlari Anoním
Şírketí
100.00% 100.00%
Sonak Solar Project LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Sone Renewable Energy
Private Limited
Gurgaon IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Sotavento Galicia SA Santiago de
Compostela
ES 601,000 EUR Equity Enel Green Power
España SLU
36.00% 25.24%
South Italy Green Hydrogen
Srl
Rome IT 10,000 EUR Equity Enel Green Power
Italia Srl
50.00% 50.00%
South Rock Wind Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
South Sky Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Southern Star Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Southwest Transmission LLC Cedar Bluff US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Southwestern Rays Solar
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Spartan Hills LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Spinazzola SPV Srl Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Spring Wheat Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Square Dance Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Sreeja Infrastructure Private
Limited
Hyderabad IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Stable Brook Storage Project Enel Alberta Storage
Inc.
0.10%
Limited Partnership Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Stampede Solar Holdings
LLC
Andover US 1 USD Line-by-line Enel Green Power
Stampede Solar
Holdings LLC
100.00% 100.00%
Stampede Solar Project LLC Andover US - USD Line-by-line Fence Post Solar
Holdings LLC
100.00% 100.00%
Star Catcher Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Star Energy Single Member
PC
Maroussi GR 63,010 EUR Equity Enel Green Power
Hellas SA
100.00% 50.00%
Enel Alberta Solar Inc. 0.10%
Station Tales Solar Limited
Partnership
Calgary CA 100 CAD Line-by-line Enel Green Power
Canada Inc.
99.90% 100.00%
Sterling and Wilson Enel X
e-Mobility Private Limited
Mumbai IN 90,000,000 INR Equity Enel X Way Srl 50.00% 50.00%
Stillman Valley Solar LLC Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Stillwater Woods Hill
Holdings LLC
Wilmington US 1 USD Held for sale Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Enel Green Power
México S de RL de Cv
55.21%
Stipa Nayaá SA de Cv Mexico City MX 1,811,016,347 MXN Line-by-line Enel Green Power
Partecipazioni
Speciali Srl
44.79% 99.99%
Stockyard Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Stone Belt Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Stonewood Desarrollos SLU Madrid ES 4,053,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Storey Plains Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Stormy Hills Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Strinestown Solar I LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Green Power
México S de RL de Cv
0.10% 100.00%
Suave Energía S de RL de Cv Mexico City MX 1,000 MXN Line-by-line Enel Rinnovabile SA
de Cv
99.90%
Sublunary Trading (RF)
(Pty) Ltd
Bryanston ZA 13,750,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
57.00% 57.00%
Sugar Pine Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Suggestion Power
Unipessoal Ltda
Paço de Arcos PT 50,000 EUR Line-by-line Endesa Generación
Portugal SA
100.00% 70.12%
Suministradora Eléctrica de
Cádiz SA
Cádiz ES 12,020,240 EUR Equity Endesa SA 33.50% 23.49%
Suministro de Luz y Fuerza
SL
Barcelona ES 2,800,000 EUR Line-by-line Hidroeléctrica de
Catalunya SLU
60.00% 42.07%
Summit Energy Storage Inc. Wilmington US 1,000 USD Line-by-line Enel Green Power
North America Inc.
75.00% 75.00%
Sun River LLC Bend US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Sun Rock Solar Limited Enel Alberta Solar Inc. 0.10% 100.00%
Partnership Calgary CA - CAD Line-by-line Enel Green Power
Canada Inc.
99.90%
Sun Up Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Sun4 Koryta Spółka
z Ograniczoną
Odpowiedzialnością
Wrocław PL 5,750 PLN Line-by-line S4ma Developments
Spółka z Ograniczoną
Odpowiedzialnośą
80.00% 80.00%
Sun4 Torzym Spółka
z Ograniczoną
Odpowiedzialnością
Wrocław PL 5,750 PLN Line-by-line S4ma Developments
Spółka z Ograniczoną
Odpowiedzialnośą
80.00% 80.00%
Sundance Wind Project LLC Dover US 100 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Sunflower Prairie Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Swather Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Sweet Apple Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
TAE Technologies Inc. Pauling US 53,207,936 USD - Enel Produzione SpA 1.02% 1.02%
Tasseling Jewel Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Tauste Energía Distribuida SL Zaragoza ES 60,508 EUR Line-by-line Enel Green Power
España SLU
51.00% 35.76%
Teal Canoe Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Tecnoguat SA Guatemala City GT 30,948,000 GTQ Line-by-line Enel Colombia SA
ESP
75.00% 35.38%
Tejo Energia - Produção
e Distribuição de Energia
Eléctrica SA
Lisbon PT 5,025,000 EUR Equity Endesa Generación
SAU
43.75% 30.68%
Tenedora de Energía
Renovable Sol y Viento SAPI
de Cv
Mexico City MX 2,892,643,576 MXN Equity Enel Green Power
SpA
32.90% 32.90%
Tera Renewables India Private
Limited
Gurugram IN 100,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Termica Colleferro SpA Bologna IT 6,100,000 EUR Equity Cogenio Srl 60.00% 12.00%
Termoeléctrica José de San
Martín SA
Buenos Aires AR 7,078,298 ARS - Enel Generación El
Chocón SA
5.60% 3.03%
Termoeléctrica Manuel
Belgrano SA
Buenos Aires AR 7,078,307 ARS - Enel Generación El
Chocón SA
6.23% 3.37%
Termotec Energía AIE in
liquidation
La Pobla de
Vallbona
ES 481,000 EUR Equity Enel Green Power
España SLU
45.00% 31.55%
Madrid EUR Equity Baylio Solar SLU 11.66% 20.73%
Terrer Renovables SL ES 5,000 Dehesa de los
Guadalupes Solar
SLU
8.83%
Seguidores Solares
Planta 2 SLU
9.08%
Texas Sage Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Texkan Wind LLC Andover US - USD Line-by-line Enel Texkan Inc. 100.00% 100.00%
Thar Surya 1 Private Limited Gurgaon IN 1,127,840 INR Equity Avikiran Surya India
Private Limited
100.00% 51.00%
Thunder Ranch Wind
Holdings I LLC
Dover US 100 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Thunder Ranch Wind
Holdings LLC
Wilmington US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Thunder Ranch Wind Project
LLC
Dover US 1 USD Line-by-line Thunder Ranch Wind
Holdings LLC
100.00% 100.00%
Thunderegg Storage Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Thunderegg Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Tico Solar 1 SLU Zaragoza ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Tico Solar 2 SLU Zaragoza ES 3,000 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Tieton Storage Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Enel Group Strategy & Risk Management

Consolidation Group %
Company name Headquarters Country Share capital Currency Segment method Held by % holding holding
Tobivox (RF) (Pty) Ltd Johannesburg ZA 10,000,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
60.00% 60.00%
Toledo PV AIE Madrid ES 26,888 EUR Equity Enel Green Power
España SLU
33.33% 23.37%
Toro Renovables 400 kV SL Madrid ES 3,000 EUR Equity FRV Zamora Solar
1 SLU
8.28% 5.81%
Torrepalma Energy 1 SLU Madrid ES 3,100 EUR Line-by-line Enel Green Power
España SLU
100.00% 70.12%
Tradewind Energy Inc. Wilmington US 1,000 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Trading Post Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Trail Ride Canyon Wind
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Transformadora Almodóvar
Renovables SL
Seville ES 5,000 EUR Equity Enel Green Power
España SLU
60.53% 42.44%
Enel Argentina SA 0.00%
Transportadora de Energía
SA - TESA
Buenos Aires AR 2,584,473,416 ARS Held for sale Enel Brasil SA 60.15% 82.27%
Enel CIEN SA 39.85%
Transportes y Distribuciones
Eléctricas SA in liquidation
Olot ES 72,121 EUR Line-by-line Edistribución Redes
Digitales SLU
73.33% 51.42%
Furatena Solar 1 SLU 17.73%
Trévago Renovables SL Madrid ES 3,000 EUR Equity Seguidores Solares
Planta 2 SLU
17.77% 24.89%
Tsar Nicholas LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Tulip Grove Solar Project LLC Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Tumbleweed Flat Solar
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Tunga Renewable Energy
Private Limited
Gurugram IN 96,300,000 INR Line-by-line Avikiran Energy India
Private Limited
100.00% 100.00%
TWE Franklin Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
TWE ROT DA LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Twin Lake Hills LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Twin Saranac Holdings LLC Wilmington US - USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Tyme Srl Bergamo IT 100,000 EUR Equity Enel X Italia Srl 50.00% 50.00%
Unión Eléctrica de Canarias
Generación SAU
Las Palmas de
Gran Canaria
ES 190,171,521 EUR Line-by-line Endesa Generación
SAU
100.00% 70.12%
Upington Solar (Pty) Ltd Johannesburg ZA 1,000 ZAR Line-by-line Enel Green Power
South Africa (Pty) Ltd
100.00% 100.00%
Usina Eólica Pedra Pintada
A Ltda
Rio de Janeiro BR 286,427,454 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Eólica Pedra Pintada
B Ltda
Rio de Janeiro BR 135,748,697 BRL Line-by-line Enel Brasil SA 100.00% 82.27%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Usina Eólica Pedra Pintada
C Ltda
Rio de Janeiro BR 135,805,024 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Eólica Pedra Pintada
D Ltda
Rio de Janeiro BR 135,653,327 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Eólica Pedra Pintada
E Ltda
Rio de Janeiro BR 653 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Eólica Pedra Pintada
F Ltda
Rio de Janeiro BR 653,327 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Eólica Pedra Pintada
G Ltda
Rio de Janeiro BR 653,327 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
11 Ltda
Rio de Janeiro BR 249,033,267 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
12 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
13 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
14 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
15 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
16 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
17 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
21 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
22 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
23 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Usina Fotovoltaica Arinos E
24 Ltda
Rio de Janeiro BR 221,724,006 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
USME ZE SAS Bogotá CO 739,653,977 COP Equity Bogotá ZE SAS 100.00% 9.44%
Ustav Jaderného Výzkumu
Rez AS
Řež CZ 524,139,000 CZK - Slovenské elektrárne
AS
27.77% 9.17%
Vayu (Project 1) Private
Limited
Gurugram IN 30,000,000 INR Line-by-line Enel Green Power
India Private Limited
100.00% 100.00%
Vektör Enerjí Üretím Anoním
Şírketí
Istanbul TR 3,500,000 TRY Line-by-line Enel SpA 100.00% 100.00%
Velvet Wheat Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Ventos de Santa Ângela
Energias Renováveis SA
Rio de Janeiro BR 7,315,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Ventos de Santa Esperança
Energias Renováveis SA
Rio de Janeiro BR 4,727,414 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Ventos de Santo Orestes
Energias Renováveis SA
Rio de Janeiro BR 1,754,031 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Ventos de São Cirilo Energias
Renováveis SA
Rio de Janeiro BR 2,572,010 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
4 Enel Group 3 Group Strategy & Risk Management

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Ventos de São Mário
Energias Renováveis SA
Rio de Janeiro BR 2,492,000 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Ventos de São Roque
Energias Renováveis SA
Rio de Janeiro BR 10,188,722 BRL Line-by-line Enel Brasil SA 100.00% 82.27%
Vientos del Altiplano SA
de Cv
Mexico City MX 1,455,854,094 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Villanueva Solar SA de Cv Mexico City MX 205,316,027 MXN Equity Tenedora de Energía
Renovable Sol y
Viento SAPI de Cv
60.80% 20.00%
Viruleiros SL Santiago de
Compostela
ES 160,000 EUR Line-by-line Enel Green Power
España SLU
67.00% 46.98%
Viva Labs AS Oslo NO 1,250,000 NOK Line-by-line Enel X International
Srl
100.00% 100.00%
Wagon Train Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Walking Horse Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wapella Bluffs Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Waseca Solar LLC Waseca US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Waypost Solar Project LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Weber Energy Storage
Project LLC
Wilmington US - USD Line-by-line Enel Energy Storage
Holdings LLC
(formerly EGP Energy
Storage Holdings
LLC)
100.00% 100.00%
West Faribault Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
West Waconia Solar LLC Wilmington US - USD Line-by-line Aurora Distributed
Solar LLC
100.00% 74.13%
Western New York Wind
Corporation
Albany US 300 USD Line-by-line Enel Green Power
North America Inc.
100.00% 100.00%
Western Trails Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wharton-El Campo Solar
Project LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
White Cloud Wind Holdings
LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
White Cloud Wind Project
LLC
Andover US 1 USD Line-by-line White Cloud Wind
Holdings LLC
100.00% 100.00%
White Peaks Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Whitetail Trails Solar Project
LLC
Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Whitney Hill Wind Power
Holdings LLC
Andover US 99 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Whitney Hill Wind Power LLC Andover US - USD Line-by-line Whitney Hill Wind
Power Holdings LLC
100.00% 100.00%
Whittle's Ferry Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%

Company name Headquarters Country Share capital Currency Segment Consolidation
method
Held by % holding Group %
holding
Wild Ox Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wild Run LP Alberta CA 10 CAD Line-by-line Enel Alberta Wind Inc.
Enel Green Power
Canada Inc.
0.10%
99.90%
100.00%
Wild Six Solar Project LLC Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wildcat Flats Wind Project
LLC
Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Wilderness Range Solar
Project LLC
Andover US - USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wildflower Flats Battery
Project LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wildflower Flats Solar Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Wind Belt Transco LLC Andover US 1 USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%
Wind Parks Anatolis - Prinias
Single Member SA
Maroussi GR 15,803,388 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Katharas Single
Member SA
Maroussi GR 19,932,048 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Kerasias Single
Member SA
Maroussi GR 26,107,790 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Milias Single
Member SA
Maroussi GR 19,909,374 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Mitikas Single
Member SA
Maroussi GR 22,268,039 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Platanos Single
Member SA
Maroussi GR 13,342,867 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Wind Parks Spilias Single
Member SA
Maroussi GR 28,267,490 EUR Equity Enel Green Power
Hellas Wind Parks
South Evia Single
Member SA
100.00% 50.00%
Windbreaker Storage Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Winter's Spawn LLC Minneapolis US - USD Line-by-line Chi Minnesota Wind
LLC
100.00% 100.00%
Wkn Basilicata Development
PE1 Srl
Rome IT 10,000 EUR Line-by-line Enel Green Power
Italia Srl
100.00% 100.00%
Woods Hill Solar LLC Wilmington US - USD Held for sale Stillwater Woods Hill
Holdings LLC
100.00% 100.00%
X-bus Italia Srl Milan IT 15,000 EUR Equity Enel X Italia Srl 20.00% 20.00%
Yacylec SA Buenos Aires AR 20,000,000 ARS Held for sale Enel Américas SA 33.33% 27.42%
Yedesa Cogeneración SA in
liquidation
Almería ES 234,395 EUR Equity Enel Green Power
España SLU
40.00% 28.05%

Consolidation Group %
Company name Headquarters Country Share capital Currency Segment method Held by % holding holding
Yellow Rose Wind Project
LLC
Andover US 1 USD Line-by-line Enel Kansas LLC 100.00% 100.00%
Yorktown Energy Storage
1 LLC
Boston US - USD Line-by-line Enel X North America
Inc.
100.00% 100.00%
Zacapa Topco Sàrl Luxembourg LU 29,970,000 EUR - Enel X International
Srl
19.50% 19.50%
Zoo Solar Project LLC Andover US - USD Line-by-line Tradewind Energy Inc. 100.00% 100.00%

Concept design and realization Gpt Group

Copy editing postScriptum di Paola Urbani

Publication not for sale

Edited by Enel Communications

Disclaimer This Report issued in Italian has been translated into English solely for the convenience of international readers

Enel Società per azioni Registered Office 00198 Rome - Italy Viale Regina Margherita, 137 Stock Capital Euro 10,166,679,946 fully paid-in Companies Register of Rome and Tax I.D. 00811720580 R.E.A. of Rome 756032 VAT Code 15844561009

© Enel SpA 00198 Rome, Viale Regina Margherita, 137

enel.com

Talk to a Data Expert

Have a question? We'll get back to you promptly.