AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Litgrid AB

Regulatory Filings Feb 15, 2013

2262_iss_2013-02-15_a7fc7b08-4891-466a-b839-154ca46b8cca.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

Disclosure 304895

LITGRID AB - Notification on material event

LITGRID and ABB today signs an agreement for construction of LitPol Link HVDC converter station

Vilnius, Lithuania, 2013-02-15 08:33 CET (GLOBE NEWSWIRE) -- LITGRID, the Lithuanian electricity transmission system operator, and ABB, the global technology group, today signs an agreement for design and construction of a high-voltage direct current (HVDC) back-to-back converter station with a 400 kV switchyard in Alytus. The value of the contract is 288 million LTL. The preliminary value of the LitPol Link project being implemented by Lithuania and Poland is 1.281 billion LTL. The HVDC back-to-back converter station that is the key element in the LitPol Link interconnection will be built next to the Alytus transformer substation. Construction work will begin in spring 2014 and will be completed by December 2015. A high-voltage electricity transmission line will be built, and the Alytus substation's 330 kV switchyard will be remodelled. Operation of the power interconnector will begin in December 2015. Laura Šebekienė Head of Communication Department Tel. + 370 693 65377, E-mail: [email protected]

Talk to a Data Expert

Have a question? We'll get back to you promptly.