SC "Klaipedos Nafta" is currently preparing for the launch of Liquefied Natural Gas (hereinafter, LNG) Terminal (hereinafter, the Terminal) and hereby announces the beginning of the Terminal capacities allocation procedure.
Interested parties are invited to provide requests for foundation and seasonal Terminal capacities allocation. We would like to note, that Terminal capacities shall be allocated at least once per Gas year1 .
During the first Terminal capacities allocation procedure there will be allocated:
Regulations).
Foundation LNG regasification capacities shall be allocated for the period of minimum one Gas year, meanwhile the Seasonal regasification/reloading capacities – for not less than two LNG cargoes per one Gas year.
Total volume of the Terminal capacities for allocation is 11.000.000 Nm3 per day (preliminary 18.965 m3 of LNG per day, when the relative expansion rate is 1:580).
First period of allocated Terminal capacities use shall commence on the 1st of January, 20152 . The end date of the Terminal capacities use shall not be set.
1 Gas year - a period, which begins on the below mentioned first day of allocated Terminal capacities use period and ends on the 1st of October, 2015, and every next year - the period from the 1st of October till the 1st of October next year. 2 If commencement of the Terminal operations would be brought forward or delayed, the SC "Klaipedos Nafta" shall announce about it no later than 5 months before planned Terminal launching as set in the Regulations for Use of the Liquefied Natural Gas Terminal (published on: http://www.sgd.lt/index.php?id=631&L=1) (hereinafter, the
Advantages:
3 http://www.portofklaipeda.lt/klaipedos-uostas
The LNG terminal is based on FSRU (Floating Storage and Regasification Unit) technology, which is provided by Höegh LNG. Jetty of 450 meters long, to which the FSRU will be permanently moored, is being built in the Curonian Lagoon in the southern part of port of Klaipeda.
Terminal coordinates are: 55 º 39'50 '' N; 21 ° 08'30 '' E (Greenwich). The LNG terminal will be connected to the transmission system operator – SC Amber Grid – gas grid via 18km long linking pipeline.
| Terminal's technical characteristics* | |
|---|---|
| Total capacity of LNG tanks | 170.000 m3 |
| Maximum LNG filling level | 98 %, at 70kPag |
| Minimum operational LNG Heel level | 3.500 m3 of LNG |
| Max LNG loading/reloading rate | 9.000 m3 /h of LNG |
* Terminal's Technical Characteristics are specified at reference conditions: temperature (combustion/measurement) – 25/20 °C, pressure – 101,325 kPa. .
Detailed Terminal's Technical Characteristics are provided in the annex No. 3 to the Regulations for Use of the Liquefied Natural Gas Terminal - "Operator's Technical Conditions" (published on www.sgd.lt).
The Terminal shall provide LNG regasification and LNG reloading Services. The LNG Regasification Service consists of the following related and mutually dependent services:
The LNG reloading Service consists of the following related and mutually dependent services:
The LNG Carriers sizes other than the specified above can be agreed with the Operator by a separate agreement.
The Terminal's activity is regulated and supervised by the National Commission for Energy Control and Prices (hereinafter, NCC).
After public market consultation has been performed, NCC pre-approved the Regulations by decree No. O3-103 as of 14 April, 2014 (the Register of the Legal Acts, 2014-04-15, No. 2014- 04458), and SC "Klaipedos Nafta" approved them by the Order of General Manager on the 18th of April, 2014.
The main legal acts regulating activity of the Terminal are:
LNG regasification services price caps and particular LNG reloading service price shell be set by NCC. In accordance with the aforementioned state-regulated pricing methodology in natural gas sector SC "Klaipedos Nafta" calculated preliminary prices of the Terminal services:
The form of the Terminal capacities allocation request is provided in annex No. 1 of the Invitation. Together with the request to allocate seasonal reloading capacities, the applicants, among the other things, shall provide technical information of the LNG carriers, arriving for LNG reloading, as it is requested in the annex No. 2 to the Invitation.
Applicants seeking to obtain Terminal Capacities shall meet the following requirements:
to hold a natural gas supply license if it is mandatory for performance of the activity for which respective Terminal Capacities are being obtained;
The applicant shall provide the Operator with the following documents along with the request:
Terminal capacity allocation request together with the aforementioned documents must be submitted to the SC "Klaipedos nafta" in writing till the 16:00 o'clock Lithuanian time on 30th of May, 2014, by registered post mail or courier to the following address: Buriu str. 19, P.O. box 81, LT-91003, Klaipeda, Lithuania (by registered mail or courier), by fax No.: +370 46 313142, or by e-mail: [email protected]. In any case applicant must provide the original copy of the bank guarantee to secure the validity of the proposal. Requests, which shall be received behind the time or sent to the wrong address, as well as requests not meeting the requirements of the invitation and the Regulations, in case of failure to remove inconsistencies (if they can be removed) shall be rejected.
| Dates / terms | Actions |
|---|---|
| 2014-04-30 | The beginning of Capacities allocation procedure. Invitation to submit |
| requests for capacities allocation. | |
| 2014-05-30 | The deadline for submission of the requests. |
| Up to 5 working days | The Operator considers submitted requests and provides its conclusion. |
| Up to 12 working days | Time period to adjust discrepancies of the requests |
| Up to 5 calendar days | The end of capacities allocation procedure. Informing the applicants of |
| the results. |
| Up to 35 calendar days Conclusion of LNG Terminal User's Contract. |
|---|
| ----------------------------------------------------------------------- |
Other provisions, liabilities and obligations not covered by these Terms, as well as additional requirements related to the activity of the Terminal or its use in order to deliver LNG to the Terminal and unload it, regasify and ( or) to reload to the smaller LNG Carriers, are governed by the Regulations.
For any questions please contact us by phone: +370 46 297008, +370 46 297093, or by e-mail: [email protected]
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.