Annual Report • Apr 30, 2014
Annual Report
Open in ViewerOpens in native device viewer
2013
| Consolidated income statement 4 | |
|---|---|
| Consolidated balance sheet5 | |
| Consolidated cash flow statement6 | |
| Statement of changes in equity7 | |
| Consolidated statement of fixed assets8 | |
| Notes to the Consolidated Financial Statements10 | |
| List of Participations 66 | |
| Group Management Report83 | |
| Auditor's Report131 |
| Balance sheet 134 | |
|---|---|
| Income statement 135 | |
| Notes to the 2013 Financial Statements136 | |
| Statement of Changes in non-current assets 141 | |
| List of Participations 143 | |
| Management and Supervisory Board 145 | |
| Group Management Report146 | |
| Auditor's Report196 | |
| T€ | Notes | 2013 | 2012 |
|---|---|---|---|
| Revenue | (1) | 12,475,654 | 12,983,233 |
| Changes in inventories | 40,090 | 50,388 | |
| Own work capitalised | 2,394 | 3,573 | |
| Other operating income | (2) | 232,242 | 221,065 |
| Construction materials, consumables and services used | (3) | -8,204,351 | -8,655,101 |
| Employee benefits expenses | (4) | -2,998,648 | -3,051,777 |
| Other operating expenses | (5) | -857,292 | -938,158 |
| Share of profit or loss of associates | (6) | 5,784 | -9,217 |
| Net income from investments | (7) | -959 | 4,348 |
| EBITDA | 694,914 | 608,354 | |
| Depreciation and amortisation expense | (8) | -433,337 | -401,168 |
| EBIT | 261,577 | 207,186 | |
| Interest and similar income | 66,716 | 73,145 | |
| Interest expense and similar charges | -98,256 | -123,871 | |
| Net interest income | (9) | -31,540 | -50,726 |
| Profit before tax | 230,037 | 156,460 | |
| Income tax expense | (10) | -73,778 | -46,422 |
| Net income | 156,259 | 110,038 | |
| Attributable to: non-controlling interests | 42,701 | 49,407 | |
| Attributable to: equity holders of the parent company | 113,558 | 60,631 | |
| Earnings per share (€) | (11) | 1.11 | 0.58 |
| T€ | Notes | 2013 | 2012 |
|---|---|---|---|
| Net income | 156,259 | 110,038 | |
| Differences arising from currency translation | -57,991 | 46,891 | |
| Recycling of differences arising from currency translation | 691 | -1,840 | |
| Change in hedging reserves including interest rate swaps | 9,864 | -48,095 | |
| Recycling of hedging reserves including interest rate swaps | 22,681 | 21,153 | |
| Change in fair value of financial instruments under IAS 39 | 256 | -1,724 | |
| Deferred taxes on neutral change in equity | (10) | -6,390 | 4,941 |
| Other income from associates | -3,740 | 2,319 | |
| Total of items which are later recognised ("recycled") in the income statement | -34,629 | 23,645 | |
| Change in actuarial gains or losses | 720 | -63,871 | |
| Deferred taxes on neutral change in equity | (10) | 374 | 18,487 |
| Other income from associates | 48 | 211 | |
| Total of items which are not later recognised ("recycled") in the income statement | 1,142 | -45,173 | |
| Other income | -33,487 | -21,528 | |
| Total comprehensive income | 122,772 | 88,510 | |
| Attributable to: non-controlling interests | 38,535 | 43,325 | |
| Attributable to: equity holders of the parent company | 84,237 | 45,185 |
| T€ | Notes | 31.12.2013 | 31.12.2012 |
|---|---|---|---|
| Intangible assets | (12) | 501,788 | 530,361 |
| Property, plant and equipment | (12) | 2,145,517 | 2,225,572 |
| Investment property | (13) | 36,894 | 41,667 |
| Investments in associates | (14) | 371,596 | 379,122 |
| Other financial assets | (14) | 253,376 | 250,292 |
| Receivables from concession arrangements | (17) | 780,628 | 782,567 |
| Trade receivables | (17) | 72,576 | 91,426 |
| Income tax receivables | (17) | 7,978 | 12,009 |
| Other financial assets | (17) | 28,649 | 35,824 |
| Deferred taxes | (15) | 217,288 | 197,619 |
| Non-current assets | 4,416,290 | 4,546,459 | |
| Inventories | (16) | 1,104,978 | 1,031,557 |
| Receivables from concession arrangements | (17) | 24,643 | 22,785 |
| Trade receivables | (17) | 2,697,645 | 2,535,469 |
| Non-financial assets | (17) | 56,020 | 52,749 |
| Income tax receivables | (17) | 35,066 | 53,623 |
| Other financial assets | (17) | 514,180 | 520,094 |
| Cash and cash equivalents | (18) | 1,711,968 | 1,374,955 |
| Current assets | 6,144,500 | 5,591,232 | |
| Assets | 10,560,790 | 10,137,691 | |
| Share capital | 114,000 | 114,000 | |
| Capital reserves | 2,311,384 | 2,311,384 | |
| Retained earnings and other reserves | 491,604 | 436,130 | |
| Non-controlling interests | 321,781 | 301,028 | |
| Group equity | (19) | 3,238,769 | 3,162,542 |
| Provisions | (20) | 994,744 | 1,025,833 |
| Financial liabilities1) | (21) | 1,353,870 | 1,265,982 |
| Trade payables | (21) | 48,534 | 61,006 |
| Non-financial liabilities | (21) | 1,397 | 1,328 |
| Other financial liabilities | (21) | 27,866 | 33,330 |
| Deferred taxes | (15) | 39,377 | 44,437 |
| Non-current liabilities | 2,465,788 | 2,431,916 | |
| Provisions | (20) | 695,824 | 665,208 |
| Financial liabilities2) | (21) | 368,830 | 384,002 |
| Trade payables | (21) | 2,936,051 | 2,724,119 |
| Non-financial liabilities | (21) | 391,600 | 368,432 |
| Income tax liabilities | (21) | 97,281 | 71,248 |
| Other financial liabilities | (21) | 366,647 | 330,224 |
| Current liabilities | 4,856,233 | 4,543,233 | |
| Equity and Liabilities | 10,560,790 | 10,137,691 |
1) Thereof T€ 538,608 concerning non-recourse liabilities from concession arrangements (2012: T€ 585,105)
2) Thereof T€ 46,497 concerning non-recourse liabilities from concession arrangements (2012: T€ 45,206)
| T€ | Notes | 2013 | 2012 |
|---|---|---|---|
| Net income | 156,259 | 110,038 | |
| Deferred taxes | -36,085 | -51,734 | |
| Non-cash effective results from consolidation | 2 | 9,094 | |
| Non-cash effective results from associates | 1,194 | 19,385 | |
| Depreciations/write ups | 449,630 | 418,445 | |
| Change in long-term provisions | -18,892 | 36,944 | |
| Gains/losses on disposal of non-current assets | -39,074 | -33,559 | |
| Cash flow from profits | 513,034 | 508,613 | |
| Change in inventories | -83,443 | -104,618 | |
| Change in trade receivables, construction contracts and consortia | -69,016 | 303,221 | |
| Change in receivables from subsidiaries and receivables from participation companies | -27,484 | -69,983 | |
| Change in other assets | 29,488 | 26,783 | |
| Change in trade payables, construction contracts and consortia | 224,124 | -252,280 | |
| Change in liabilities from subsidiaries and liabilities from participation companies | 45,047 | 6,315 | |
| Change in other liabilities | 28,431 | -70,120 | |
| Change in current provisions | 33,521 | -79,130 | |
| Cash flow from operating activities | 693,702 | 268,801 | |
| Purchase of financial assets | -22,875 | -41,171 | |
| Purchase of property, plant, equipment and intangible assets | -387,361 | -458,283 | |
| Gains/losses on disposal of non-current assets | 39,074 | 33,559 | |
| Disposals of non-current assets (carrying value) | 46,620 | 39,692 | |
| Change in other cash clearing receivables | 2,750 | 203 | |
| Change in scope of consolidation | -10,591 | -21,191 | |
| Cash flow from investing activities | -332,383 | -447,191 | |
| Change in bank borrowings | -46,823 | -244,099 | |
| Change in bonded loan | 0 | 140,000 | |
| Change in bonds | 105,000 | 25,000 | |
| Change in liabilities from finance leases | -20,598 | -3,641 | |
| Change in other cash clearing liabilities | 2,185 | 7,457 | |
| Change in non-controlling interests due to acquisition | 341 | 11,540 | |
| Acquisition of own shares | -8,863 | -42,880 | |
| Distribution and withdrawals from partnerships | -37,729 | -69,639 | |
| Cash flow from financing activities | -6,487 | -176,262 | |
| Net change in cash and cash equivalents | 354,832 | -354,652 | |
| Cash and cash equivalents at the beginning of the period | 1,350,669 | 1,688,612 | |
| Change in cash and cash equivalents due to currency translation | -17,819 | 29,370 | |
| Change in restricted cash and cash equivalents | -2,982 | -12,661 | |
| Cash and cash equivalents at the end of the period | (24) | 1,684,700 | 1,350,669 |
| T€ | Share capital |
Capital reserves |
Retained earnings |
Hedging reserves |
Foreign currency reserves |
Group equity |
Non controlling interests |
Total equity |
|---|---|---|---|---|---|---|---|---|
| Balance as at 1.1.2012 | 114,000 | 2,311,384 | 656,913 | -97,816 | -45,737 | 2,938,744 | 211,098 | 3,149,842 |
| Net income | 0 | 0 | 60,631 | 0 | 0 | 60,631 | 49,407 | 110,038 |
| Differences arising from | ||||||||
| currency translation | 0 | 0 | 0 | 0 | 44,304 | 44,304 | 747 | 45,051 |
| Change in hedging reserves | 0 | 0 | 0 | 3,173 | 0 | 3,173 | 76 | 3,249 |
| Changes in financial | ||||||||
| instruments IAS 39 | 0 | 0 | -1,533 | 0 | 0 | -1,533 | -191 | -1,724 |
| Changes in investments | ||||||||
| in associates | 0 | 0 | 211 | -2,418 | 4,679 | 2,472 | 58 | 2,530 |
| Change of actuarial gains | ||||||||
| and losses | 0 | 0 | -54,931 | 0 | 0 | -54,931 | -8,940 | -63,871 |
| Change of interest rate swap | 0 | 0 | 0 | -29,622 | 0 | -29,622 | -569 | -30,191 |
| Deferred taxes on neutral | ||||||||
| change in equity | 0 | 0 | 15,833 | 4,858 | 0 | 20,691 | 2,737 | 23,428 |
| Total comprehensive income | 0 | 0 | 20,211 | -24,009 | 48,983 | 45,185 | 43,325 | 88,510 |
| Transactions concerning | ||||||||
| non-controlling interests | 0 | 0 | -17,043 | 0 | 0 | -17,043 | 53,752 | 36,709 |
| Acquisition of own shares | 0 | 0 | -42,880 | 0 | 0 | -42,880 | 0 | -42,880 |
| Distribution of dividends1) | 0 | 0 | -62,492 | 0 | 0 | -62,492 | -7,147 | -69,639 |
| Balance as at 31.12.2012 = | ||||||||
| Balance as at 1.1.2013 | 114,000 | 2,311,384 | 554,709 | -121,825 | 3,246 | 2,861,514 | 301,028 | 3,162,542 |
| Net income | 0 | 0 | 113,558 | 0 | 0 | 113,558 | 42,701 | 156,259 |
| Differences arising from | ||||||||
| currency translation | 0 | 0 | 0 | 0 | -53,758 | -53,758 | -3,542 | -57,300 |
| Change in hedging reserves | 0 | 0 | 0 | -822 | 0 | -822 | -19 | -841 |
| Changes in financial | ||||||||
| instruments IAS 39 | 0 | 0 | 242 | 0 | 0 | 242 | 14 | 256 |
| Changes in investments | ||||||||
| in associates | 0 | 0 | 47 | -480 | -3,175 | -3,608 | -84 | -3,692 |
| Change of actuarial gains | ||||||||
| and losses | 0 | 0 | 2,306 | 0 | 0 | 2,306 | -1,586 | 720 |
| Change of interest rate swap | 0 | 0 | 0 | 32,675 | 0 | 32,675 | 711 | 33,386 |
| Deferred taxes on neutral | ||||||||
| change in equity | 0 | 0 | -122 | -6,234 | 0 | -6,356 | 340 | -6,016 |
| Total comprehensive income | 0 | 0 | 116,031 | 25,139 | -56,933 | 84,237 | 38,535 | 122,772 |
| Transactions concerning | ||||||||
| non-controlling interests | 0 | 0 | 620 | 0 | 0 | 620 | -573 | 47 |
| Acquisition of own shares | 0 | 0 | -8,863 | 0 | 0 | -8,863 | 0 | -8,863 |
| Distribution of dividends2) | 0 | 0 | -20,520 | 0 | 0 | -20,520 | -17,209 | -37,729 |
| Balance as at 31.12.2013 | 114,000 | 2,311,384 | 641,977 | -96,686 | -53,687 | 2,916,988 | 321,781 | 3,238,769 |
1) The total dividend payment of T€ 62,492 corresponds to a dividend per share of € 0.60 based on 104,153,000 shares.
2) The total dividend payment of T€ 20,520 corresponds to a dividend per share of € 0.20 based on 102,600,000 shares.
| Acquisition and production costs | ||||||
|---|---|---|---|---|---|---|
| T€ | Balance as at 31.12.2012 |
Change in scope of consolidation |
Currency translation |
Balance as at 1.1.2013 |
Additions | Transfers |
| I. Intangible Assets | ||||||
| 1. Concessions; industrial property rights | ||||||
| and similiar rights as well as licences derived thereof | 121,780 | -1,081 | -2,806 | 117,893 | 3,452 | 483 |
| 2. Goodwill | 648,060 | 1,835 | -8,656 | 641,239 | 0 | 0 |
| 3. Development costs | 27,113 | -760 | 0 | 26,353 | 1,242 | 0 |
| 4. Advances paid | 322 | 0 | 0 | 322 | 422 | -483 |
| Total | 797,275 | -6 | -11,462 | 785,807 | 5,116 | 0 |
| II. Tangible Assets | ||||||
| 1. Properties; land rights equivalent to real property; buildings including buildings on third-party property |
1,400,070 | -3,636 | -12,804 | 1,383,630 | 55,355 | 9,258 |
| 2. Technical equipment and machinery | 2,656,670 | 3,627 | -40,355 | 2,619,942 | 174,863 | 53,448 |
| 3. Other facilities, furniture and fixtures and | 971,957 | -892 | -10,807 | 960,258 | 125,418 | -1,438 |
| office equipment | ||||||
| 4. Advances paid and facilities under construction |
103,193 | -401 | -718 | 102,074 | 25,892 | -61,268 |
| Total | 5,131,890 | -1,302 | -64,684 | 5,065,904 | 381,528 | 0 |
| III. Investment Property | 206,854 | 0 | -124 | 206,730 | 717 | 0 |
| Acquisition and production costs | ||||||
|---|---|---|---|---|---|---|
| T€ | Balance as at 31.12.2011 |
Change in scope of consolidation |
Currency translation |
Balance as at 1.1.2012 |
Additions | Transfers |
| I. Intangible Assets | ||||||
| 1. Concessions; industrial property rights | ||||||
| and similiar rights as well as licences derived thereof | 129,985 | -677 | 379 | 129,687 | 5,008 | 0 |
| 2. Goodwill | 638,288 | 3,577 | 8,213 | 650,078 | 0 | 0 |
| 3. Development costs | 25,163 | 0 | 0 | 25,163 | 1,950 | 0 |
| 4. Advances paid | 157 | 0 | 0 | 157 | 165 | 0 |
| Total | 793,593 | 2,900 | 8,592 | 805,085 | 7,123 | 0 |
| II. Tangible Assets | ||||||
| 1. Properties; land rights equivalent to real property; | ||||||
| buildings including buildings on third-party property | 1,341,908 | 1,485 | 11,195 | 1,354,588 | 29,705 | 35,179 |
| 2. Technical equipment and machinery | 2,468,638 | 16,868 | 33,330 | 2,518,836 | 236,385 | 37,791 |
| 3. Other facilities, furniture and fixtures and | ||||||
| office equipment | 909,434 | 8,116 | 8,500 | 926,050 | 139,613 | -445 |
| 4. Advances paid and facilities under construction |
129,688 | 337 | 236 | 130,261 | 45,457 | -72,525 |
| Total | 4,849,668 | 26,806 | 53,261 | 4,929,735 | 451,160 | 0 |
| III. Investment Property | 214,331 | -2,945 | 0 | 211,386 | 0 | 0 |
| Accumulated depreciation | Carrying values | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Disposals | Balance as at 31.12.2013 |
Balance as at 31.12.2012 |
Change in scope of consolidation |
Currency translation |
Additions1) | Transfers | Disposals | Balance as at 31.12.2013 |
Values 31.12.2013 |
Values 31.12.2012 |
| 7,059 | 114,769 | 81,672 | -738 | -1,978 | 11,975 | 0 | 6,819 | 84,112 | 30,657 | 40,108 |
| 0 | 641,239 | 176,551 | 0 | 113 | 3,985 | 0 | 0 | 180,649 | 460,590 | 471,509 |
| 0 | 27,595 | 8,691 | -760 | 0 | 9,262 | 0 | 0 | 17,193 | 10,402 | 18,422 |
| 122 | 139 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 139 | 322 |
| 7,181 | 783,742 | 266,914 | -1,498 | -1,865 | 25,222 | 0 | 6,819 | 281,954 | 501,788 | 530,361 |
| 34,263 | 1,413,980 | 475,965 | -133 | -3,523 | 45,127 | -49 | 19,683 | 497,704 | 916,276 | 924,105 |
| 175,114 | 2,673,139 | 1,741,384 | 2,140 | -29,630 | 250,963 | 1,699 | 165,737 | 1,800,819 | 872,320 | 915,286 |
| 108,464 | 975,774 | 669,463 | -711 | -8,233 | 101,859 | -1,650 | 100,955 | 659,773 | 316,001 | 302,494 |
| 0 | 66,698 | 19,506 | 0 | 0 | 6,272 | 0 | 0 | 25,778 | 40,920 | 83,687 |
| 317,841 | 5,129,591 | 2,906,318 | 1,296 | -41,386 | 404,221 | 0 | 286,375 | 2,984,074 | 2,145,517 | 2,225,572 |
| 4,098 | 203,349 | 165,187 | 0 | 0 | 3,894 | 0 | 2,626 | 166,455 | 36,894 | 41,667 |
| Carrying values | |||
|---|---|---|---|
| Balance Balance Change as at as at in scope of Currency Disposals 31.12.2012 31.12.2011 consolidation translation Additions2) Transfers Disposals |
Balance as at Values 31.12.2012 31.12.2012 |
Values 31.12.2011 |
|
| 12,915 121,780 83,047 105 -5 10,787 0 |
12,262 81,672 40,108 |
46,938 | |
| 2,018 648,060 166,461 0 13 10,077 0 |
0 176,551 471,509 |
471,827 | |
| 0 27,113 7,575 0 0 1,116 0 |
0 8,691 18,422 |
17,588 | |
| 0 322 0 0 0 0 0 |
0 0 322 |
157 | |
| 14,933 797,275 257,083 105 8 21,980 0 |
12,262 266,914 530,361 |
536,510 | |
| 19,402 1,400,070 441,857 -1,342 2,433 42,555 6 |
9,544 475,965 924,105 |
900,051 | |
| 136,342 2,656,670 1,609,756 12,623 23,639 213,136 1,320 |
119,090 1,741,384 915,286 |
858,882 | |
| 93,261 971,957 638,012 6,836 5,430 105,662 -1,326 |
85,151 669,463 302,494 |
271,422 | |
| 0 103,193 5,805 0 0 13,701 0 |
0 19,506 83,687 |
123,883 | |
| 249,005 5,131,890 2,695,430 18,117 31,502 375,054 0 |
213,785 2,906,318 2,225,572 |
2,154,238 | |
| 4,532 206,854 161,053 0 0 4,134 0 |
0 165,187 41,667 |
53,278 |
STRABAG SE is one of Europe's leading construction groups. The company has its headquarters in Triglavstraße 9, 9500 Villach, Austria. From its core markets of Austria and Germany, STRABAG is present via its numerous subsidiaries in all countries of Eastern and South-East Europe including Russia, in selected markets in North and Western Europe and the Arabian Peninsula, as well as in the project business in Africa, Asia and the Americas. STRABAG's activities span the entire construction industry (Building Construction & Civil Engineering, Transportation Infrastructures, Tunnelling, construction-related services) and cover the entire value-added chain in the field of construction.
The consolidated financial statements of STRABAG SE, at the reporting date 31 December 2013, were drawn up under application of Section 245a Paragraph 2 of the Austrian Business Enterprise Code (UGB) in accordance with the International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board (IASB), including the interpretations of the International Financial Reporting Interpretations Committee (IFRIC).
Applied were exclusively those standards and interpretations adopted by the European Commission before the reporting deadline and published in the Official Journal of the European Union. Further reporting requirements of Section 245a Paragraph 1 of the Austrian Business Enterprise Code (UGB) were fulfilled as well.
In addition to a statement of comprehensive income, the financial statements include a cash flow statement in accordance with IAS 7, and a statement of changes in equity and a statement of recognised income and expense (IAS 1). The disclosures in the notes also contain a segment reporting section in accordance with IFRS 8.
In order to improve the clarity of the representation, various items in the balance sheet and the income statement have been combined. These items have been shown separately and are explained in the notes. The income statement has been drawn up in accordance with the nature of expense method.
The consolidated financial statements were drawn up in T€. The presentation in T€ may result in rounding differences.
The IASB has made the following amendments to the existing IFRS and passed several new IFRS and IFRIC, which have also been adopted by the European Commission. Application became mandatory on 1 January 2013.
| Application for financial years which begin on or after (according to IASB) |
Application for financial years which begin on or after (according to EU endorsement) |
|
|---|---|---|
| Amendments to IAS 1 Presentation of Financial Statements – Presentation of Items of | ||
| Other Comprehensive Income | 1.7.2012 | 1.7.2012 |
| IFRS 13 Fair Value Measurement | 1.1.2013 | 1.1.2013 |
| Amendments to IAS 12 Income Taxes: Deferred Tax – Recovery of Underlying Assets | 1.1.2012 | 1.1.2013 |
| IAS 19 Employee Benefits | 1.1.2013 | 1.1.2013 |
| Amendments to IFRS 7 Financial Instruments: Disclosures – Offsetting Financial Assets | ||
| and Financial Liabilities | 1.1.2013 | 1.1.2013 |
| IFRIC 20 Stripping Costs in the Production Phase of a Surface Mine | 1.1.2013 | 1.1.2013 |
| Annual Improvements to IFRS 2009–2011 | 1.1.2013 | 1.1.2013 |
IAS 1 now requires the components of other comprehensive income to be presented in such a way that it is clear whether the income and expenses will be recycled in the income statement at a later point or whether these are never recycled in the income statement. The requirements were implemented accordingly in the statement of comprehensive income.
IFRS 13 defines fair value, sets out a framework for measuring fair value and requires specific disclosures about fair value measurements. The regulations not only refer to financial instruments but also to the measurement of fair value according to other IAS/IFRS.
IAS 12 "Recovery of underlying assets": The changes offer a solution for the recognition of deferred taxes on investment property measured using the fair value model in IAS 40 as well as on revalued non-depreciable assets.
IAS 19: The amended version contains clarifications and changes. The new IAS 19 does away with the "corridor" method, i.e. the possibility of recognising actuarial gains or losses from defined benefit obligations divided over several periods. Measurement of the expected plan asset yields is performed by applying the same rate as is used to discount defined benefit obligations. As a result, the total revenue from plan assets is no longer recognised in the income statement. The new IAS 19 also contains extended disclosure requirements for defined benefit plans as well as changes to the accounting of termination benefits.
IFRS 7: To facilitate the comparison between entities preparing IFRS financial statements and entities which prepare their financial statements in accordance with US GAAP, IFRS 7 was amended to enhance the disclosure requirements when offsetting arrangements exist. The amendments also require extensive disclosure of information about such offsetting rights that are not set off under IFRS.
IFRIC 20: This interpretation addresses the removal of mine waste materials that are produced in the production phase of a surface mine. It defines when and how to account for benefits which may arise from such an activity, as well as how to measure these benefits.
Annual Improvements to IFRS 2009–2011: Amendments to individual standards in the course of annual improvement processes by the IASB.
The application of the new accounting standards had only minor impacts on the consolidated financial statements of STRABAG SE.
The IASB and the IFRIC approved further standards and interpretations. However, these were neither required to be applied in the 2013 financial year nor adopted by the European Commission. The amendments affect the following standards and interpretations:
| Application for financial years which begin on or after (according to IASB) |
Application for financial years which begin on or after (according to EU endorsement) |
Impact on the consolidated financial statements |
|
|---|---|---|---|
| IFRS 10 Consolidated Financial Statements | 1.1.2013 | 1.1.2014 | minor impact |
| IFRS 11 Joint Arrangements | 1.1.2013 | 1.1.2014 | see below |
| IFRS 12 Disclosure of Interests in Other Entities | 1.1.2013 | 1.1.2014 | see below |
| Amendments to IAS 27 Separate Financial Statements | 1.1.2013 | 1.1.2014 | none |
| Amendments to IAS 28 Investment in Associates and Joint Ventures | 1.1.2013 | 1.1.2014 | see below |
| Amendments to IAS 32 Financial Instruments Presentation – Offsetting Rules | 1.1.2014 | 1.1.2014 | minor impact |
| Transition guidance – Amendments to IFRS 10, IFRS 11 and IFRS 12 | 1.1.2013 | 1.1.2014 | minor impact |
| Investment entities – Amendments to IFRS 10, IFRS 12 and IAS 27 | 1.1.2014 | 1.1.2014 | none |
| Amendments to IAS 36 Impairment of Assets – Recoverable Amount Disclosures |
1.1.2014 | 1.1.2014 | minor impact |
| Amendments to IAS 39 Financial Instruments: Recognition and | 1.1.2014 | 1.1.2014 | minor impact |
| Measurement – Novation of Over-the-Counter Derivatives and Continuation of Existing Hedging Relationships |
|||
| IFRIC 21 Levies | 1.1.2014 | n. a.1) | minor impact |
| Amendments to IAS 19 | 1.7.2014 | 1.7.2014 | minor impact |
| Annual Improvements to IFRS 2010–2012 | 1.7.2014 | n. a.1) | is being analysed |
| Annual Improvements to IFRS 2011–2013 | 1.7.2014 | n. a.1) | is being analysed |
| IFRS 9 (2009, 2010, 2013) Financial Instruments | 1.1.2018 | n. a.1) | is being analysed |
Consequences for the consolidated financial statements are expected especially from the application of the following standards and interpretations:
IFRS 10 and IAS 27: IFRS 10 replaces the criteria for the consolidated financial statements contained in IAS 27 and addresses issues that had previously been governed by SIC-12 Consolidation – Special Purpose Entities. IFRS 10 changes the definition of control so that the same criteria are applied to all entities to determine control. The new definition provides for more comprehensive rules to define the scope of consolidation than under IAS 27. Like IAS 27, IFRS 10 addresses the basic consolidation requirements for the interest of non-controlling entities and requires the use of uniform accounting policies.
IFRS 11 and IAS 28 regulate the accounting of arrangements in which an entity exercises joint control over a joint venture or a joint operation. It supersedes the previous rules under IAS 31 and SIC-13. The new standard does away with the option of proportionate consolidation for jointly controlled entities.
According to a statement by the Institute of Public Auditors in Germany (IDW), the typical construction consortium meets the requirements to be classified as a joint venture. Based on the current status of our analysis this also applies to Austrian construction consortia. The impact on the consolidated financial statements is limited to changes in the presentation in the balance sheet and the income statement. Starting with the 2014 financial year, the share of profit or loss will no longer be recognised as revenue (other operating expense) but instead as income from associates; however, it will continue to be recognised as EBIT. In the balance sheet, this item is reclassified from trade receivables (payables) to other receivables (payables). The disclosure requirements for associates are thus extended to apply to construction consortia as well.
IFRS 12: This new standard encompasses all disclosure requirements for subsidiaries, associates and joint arrangements as well as for unconsolidated structured entities. It replaces the relevant requirements in IAS 27, IAS 28 and IAS 31.
IAS 32 contains changes to clarify under which requirements a netting of financial instruments is permitted on the balance sheet.
Amendments to IFRS 10, IFRS 11 and IFRS 12 – transition guidance primarily refers to the first-time application of IFRS 10 and additional information according to IFRS 12.
Amendments to IFRS 10, IFRS 12 and IAS 27 – investment entities, introduces the exception from the requirement of consolidation for subsidiaries according to IFRS 10 for investment entities.
IAS 36, consequential to the issue of IFRS 13, was modified to require disclosure of the recoverable amount of each cashgenerating unit (or group of units) for which material goodwill or material intangible assets with indefinite useful lives are allocated. IAS 36 also introduces new disclosure requirements for cases of impairment loss (reversal) of assets or cashgenerating units.
IAS 39, in its amended version, provides relief for novation of over-the-counter derivatives by allowing hedge accounting to continue in a situation where novation of a hedging instrument to a central counterparty meets certain criteria.
IFRIC 21 provides guidance for when to recognise provisions for levies under IAS 37 where the timing and amount of the payment is uncertain, as well as guidance for when to recognise corresponding liabilities, i.e. where the timing and amount are certain. IFRIC 21 does not include income taxes as defined by IAS 12. Application of the interpretation may result in a levy payment obligation being recognised at another time than before, specifically if the obligation to pay the levy arises only when a specified event occurs at a specified point in time.
The amendments to IAS 19 offer clarification of how to treat employee contributions to defined benefit plans. If the amount of the contributions is independent of the number of years of service, these contributions can continue to be recognised as a reduction in the service cost in the respective period; if the amount of the contributions depends on the number of years of service, these must be considered in the calculation of the gross benefit obligation. STRABAG has already been using the possibility of reducing the service cost in defined benefit plans in Switzerland.
IFRS 9 follows a new standard for the classification and measurement of financial assets, distinguishing only between two measurement categories (measurement at fair value and measurement at amortised cost) based on the entity's business model or on the characteristics of the contractual cash flows of the financial asset in question. Measurement with regard to impairment is to be performed using a unique method.
Early application of the new standards and interpretations is not planned.
Aside from those described in IFRS 11 and IAS 28, application of the new standards and interpretations will have only a minor impact on the consolidated financial statements.
The financial statements of the domestic and foreign companies included in the scope of consolidation are drawn up in accordance with uniform methods of accounting and valuation. The annual financial statements of the domestic and foreign group companies are adapted accordingly.
Entities whose financial and operating policies are controlled by the group constitute subsidiaries. Control usually exists when the group holds more than 50 % of the entity's voting rights. However, the determination of control must also consider potential voting rights that may be exercised or converted at any time. Furthermore, control may also exist even if the group holds less than 50 % of the voting rights as long as the magnitude of the group's voting rights in relation to the number and distribution of the voting rights of all other shareholders gives the group control of the entity's financial and operating policies (de facto control).
A subsidiary is included in the consolidated financial statements from the date on which the parent acquired control. Conversely, the entity is deconsolidated when control ends.
Capital consolidation is performed in accordance with IFRS 3 using the acquisition method. The cost of acquisition of the subsidiary is measured as the sum of the fair values of assets given, equity instruments issued and liabilities assumed. Contingent considerations are also measured at their fair value from the date of the business combination. Later deviations from this value are recognised in profit or loss. Transaction costs are also recognised immediately in profit or loss.
Non-controlling interests are recognised based on their proportional interest in the net assets of the acquired entity (partial goodwill method). The option of recognising non-controlling interests at fair value is not used.
In business combinations achieved in stages (step acquisitions), the existing equity interest of the entity is remeasured at fair value from the date of acquisition. The resulting profit or loss is recognised in the income statement.
The acquisition costs, contingent considerations, existing equity interests and non-controlling interests are to be compared with all identifiable assets and liabilities of the subsidiary, measured at fair value. Any remaining difference on the assets side is classified as goodwill. Differences arising from the capital consolidation on the liabilities side are recognised immediately in profit and loss following another review. Goodwill is subjected to an impairment test in accordance with IAS 36 at least once a year.
In the 2013 financial year, T€ 1,835 in goodwill arising from capital consolidation were recognised as assets. Impairments in the amount of T€ 3,985 were made.
Immaterial subsidiaries are not consolidated; these are reported at cost or at fair value in accordance with IAS 39 if this value can be reliably determined.
Differences arising from the acquisition or disposal of investments in affiliated entities without acquisition or loss of control are recognised in full in equity outside profit or loss.
When control over a subsidiary is lost, any remaining investment is remeasured at fair value. The difference to the existing carrying amounts is recognised in profit or loss. Associate, joint arrangements or financial assets are initially recognised at this fair value. All previous amounts recognised to date in other income are accounted for as if the assets and liabilities of the affected entities had been sold directly.
Entities in which the group exercises significant influence constitute associates. This is generally the case with a holding of between 20 % and 50 % of the voting rights. Investments in associates are accounted for using the equity method: the acquired investment is initially measured at cost. Any differences that arise are treated according to the principles of consolidation. In subsequent years, the carrying amount of the investment increases or decreases in proportion to the share of profit or loss and/or the investee's other income. Distributions reduce the carrying amount of the investment. As soon as the group's share of losses equals or exceeds the interest in the associate, no further losses are recognised unless the group is liable for the associate's losses.
At the end of every accounting period, the group determines whether there are any indications for an impairment of the investment in the associate. If there are, then the difference between the carrying amount and the recoverable amount is recognised as an impairment expense in the income statement.
In the year under review, the initial equity measurement of newly acquired entities resulted in net goodwill in the amount of T€ 0 (2012: T€ 0), which is recognised as a component of investments in associates.
Associates which are not recognised using the equity method are recognised at cost or at fair value in accordance with IAS 39 if this value can be reliably determined.
Joint ventures are entities over which the group exercises joint control together with a third entity. Joint control exists when the determination of the financial and operating policies requires the unanimous consent of all parties to the joint control. STRABAG accounts for jointly controlled entities using the equity method.
Joint ventures which are not recognised using the equity method are recognised at cost or at fair value in accordance with IAS 39 if this value can be reliably determined.
Results from construction consortia are recognised proportionately to the group's share, with profits presented in the revenue and losses in the other operating income.
Investments which do not constitute subsidiaries, joint ventures or associates are recognised at cost or at fair value in accordance with IAS 39 if this value can be reliably determined.
As part of the consolidation of intercompany balances, any trade receivables, loans and other receivables existing within the group are set off against the corresponding liabilities and provisions of the subsidiaries included in the consolidated financial statements.
Expenses and revenues from intra-group transactions are eliminated. Results incurred from intra-group transactions that are recognised in the non-current and current assets have been eliminated if they are material.
Unrealised profits from transactions between group entities and associates are eliminated in proportion to the group's share in the associate.
Non-controlling interests in equity and profits of companies controlled by the parent company are shown separately in the consolidated financial statements.
The necessary tax deferrals are made for consolidation procedures.
The consolidated financial statements as at 31 December 2013 include STRABAG SE as well as all major domestic and foreign subsidiaries where STRABAG SE either directly or indirectly holds a majority of the voting rights. Major associated companies and joint ventures are reported in the balance sheet using the equity method (investments in associates).
Group companies which are of minor importance for the purpose of giving a true and fair view of the financial position, financial performance and cash flows of the group are not consolidated. The decision to include an entity in the scope of consolidation is based on quantitative and qualitative considerations.
Subsidiaries included in the 2013 consolidated financial statements are given in the list of subsidiaries.
The financial year for all consolidated and associated companies is identical with the calendar year.
The number of consolidated companies changed in the 2013 financial year as follows:
| Consolidation | Equity method | |
|---|---|---|
| Situation as at 31.12.2011 | 308 | 21 |
| First-time inclusions in year under report | 23 | 1 |
| First-time inclusions in year under report due to merger/accretion | 20 | 0 |
| Merger/accretion in year under report | -26 | 0 |
| Exclusions in year under report | -4 | -1 |
| Situation as at 31.12.2012 | 321 | 21 |
| First-time inclusions in year under report | 7 | 0 |
| First-time inclusions in year under report due to merger/accretion | 14 | 0 |
| Merger/accretion in year under report | -35 | 0 |
| Exclusions in year under report | -9 | 0 |
| Situation as at 31.12.2013 | 298 | 21 |
The following companies formed part of the scope of consolidation for the first time on the reporting date:
| Direct stake | Date of acquisition | |
|---|---|---|
| Company | % | or foundation |
| Consolidation | ||
| BLUMENFELD Liegenschaftsverwaltungs GmbH, Vienna | 100.00 | 16.12.2013 |
| Bostadsrättsföreningen Tyresö View 1, Tyresö | 100.00 | 1.1.20131) |
| Merk Timber GmbH, Aichach | 100.00 | 22.4.2013 |
| STRABAG RAIL POLSKA Sp.z o.o., Breslau | 100.00 | 1.1.20131) |
| STRABAG Vasútépítö Kft., Budapest | 100.00 | 1.1.20131) |
| TyresöView1 Holding AB, Stockholm | 100.00 | 1.1.20131) |
| VIOLA PARK Immobilienprojekt GmbH, Vienna | 75.00 | 16.12.2013 |
1) Due to its increased business volume, the company was included in the scope of consolidation of the group for the first time effective 1 January 2013. The foundation/ acquisition of the company occurred before 1 January 2013.
| Company | Direct stake % |
Date of acquisition or foundation |
|---|---|---|
| Merger/accretion1) | ||
| "Wiebau" Hoch-, Tief- und Strassenbau-Gesellschaft m.b.H., Gerasdorf near Vienna | 100.00 | 1.1.2013 |
| ARP Asphaltmischwerke Rheinhessen-Pfalz GmbH & Co. KG, Sprendlingen | 100.00 | 1.1.2013 |
| ARP Asphaltmischwerke Rheinhessen-Pfalz Verwaltungs-GmbH, Sprendlingen | 100.00 | 1.1.2013 |
| Böblingen Quartier 11 GmbH & Co. KG, Cologne | 100.00 | 1.1.2013 |
| Böblingen Quartier 11 Verwaltung GmbH, Cologne | 100.00 | 1.1.2013 |
| Donnersberger Höfe Kita GmbH, Düsseldorf | 100.00 | 1.1.2013 |
| Helmus Beteiligungsgesellschaft mit beschränkter Haftung, Vechta | 100.00 | 1.1.2013 |
| Hotelprojekt Messe-West Europa-Allee Frankfurt GmbH & Co. KG, Cologne | 100.00 | 1.1.2013 |
| Kiesverwertungsgesellschaft Senden mit beschränkter Haftung, Senden | 100.00 | 1.1.2013 |
| SB Beton GmbH, Bad Langensalza | 100.00 | 1.1.2013 |
| SF-BAU Projektentwicklung GmbH, Cologne | 100.00 | 1.1.2013 |
| T1 Objektgesellschaft mbH & Co. KG, Cologne | 100.00 | 1.1.2013 |
| Voss GmbH, Cuxhaven | 100.00 | 1.1.2013 |
| ZDE Vierte Vermögensverwaltung GmbH, Cologne | 100.00 | 1.1.2013 |
Per contract from 11 March 2013, STRABAG acquired 100 % of Merk Timber GmbH (former Metsä Wood Merk GmbH), Aichach, effective retroactively to 1 January 2013. The acquisition serves to expand the group's existing activities in the field of structural timber engineering. The closing took place on 22 April 2013.
Per contract from 14 March 2013, STRABAG AG, Cologne, through its subsidiary STRABAG B.V., acquired the transportation infrastructure activities of Netherlands-based Janssen de Jong Groep B.V. The acquisition aims at expanding the regional capacities in transportation infrastructures in the Netherlands, especially in the field of asphalt.
Effective 16 December 2013, STRABAG acquired 75 % of VIOLA PARK Immobilienprojekt GmbH, Vienna, with its 100 % subsidiary Blumenfeld Liegenschaftsverwaltungs GmbH, Vienna. The company owns a property in Vienna for which the development of a real estate project is planned.
The purchase price is preliminarily allocated to assets and liabilities as follows:
| T€ | Acquisitions |
|---|---|
| Acquired assets and liabilities | |
| Goodwill | 1,835 |
| Other non-current assets | 7,952 |
| Current assets | 18,326 |
| Increase in non-controlling interest | -1,087 |
| Non-current liabilities | -3,576 |
| Current liabilities | -10,132 |
| Purchase price | 13,318 |
| Acquired cash and cash equivalents | -702 |
| Net cash outflow from acquisitions | 12,616 |
As the acquisitions are relatively insignificant, when viewed both individually and as a whole, a single summarised presentation was chosen.
The consolidation of companies included for the first time took place at the date of acquisition or the nearest reporting date, provided that this had no significant difference to an inclusion at the date of acquisition.
In the 2013 financial year, negative goodwill in the amount of T€ 709 (2012: T€ 777) occurred. This amount is reported under other operating income.
1) The companies listed under "Merger/Accretion" were merged with/accrued on already consolidated companies and as such are at once represented as additions to and removals from the scope of consolidation.
Assuming a fictitious first-time consolidation on 1 January 2013 for all acquisitions in the 2013 financial year, the consolidated revenue would amount to T€ 12,481,652. The consolidated net income in the financial year would change only insignificantly.
All companies which were consolidated for the first time in 2013 contributed T€ 47,526 to revenue and T€ -1,721 to net income.
As at 31 December 2013, the following companies were no longer included in the scope of consolidation:
BPM Bau Prozess Management GmbH, Vienna Fell below significant level DRUMCO SA, Timisoara Fell below significant level EFKON Germany GmbH, Berlin Fell below significant level Fachmarktzentrum Arland Errichtungs- und Vermietungsgesellschaft mbH, Vienna Fell below significant level GRASTO d.o.o., Ljubljana Fell below significant level STRABAG - ZIPP Development s.r.o., Bratislava Fell below significant level TolLink Pakistan (Private) Limited, Islamabad Fell below significant level TPA EOOD, Sofia Fell below significant level Züblin International Malaysia Sdn. Bhd., Kuala Lumpur Fell below significant level
GfB Gesellschaft für Bauwerksabdichtungen mbH, Kobern-Gondorf "Wiebau" Hoch-, Tief- und Strassenbau-Gesellschaft m.b.H., Gerasdorf near Vienna A2 Strada sp.z o.o., Pruszkow ARP Asphaltmischwerke Rheinhessen-Pfalz GmbH & Co. KG, Sprendlingen ARP Asphaltmischwerke Rheinhessen-Pfalz Verwaltungs-GmbH, Sprendlingen Astrada AG, Subingen Baunova AG, Dällikon Böblingen Quartier 11 GmbH & Co. KG, Cologne Böblingen Quartier 11 Verwaltung GmbH, Cologne Brunner Erben AG, Zurich Brunner Erben Holding AG, Opfikon Donnersberger Höfe Kita GmbH, Düsseldorf Egolf AG Strassen- und Tiefbau, Weinfelden Helmus Beteiligungsgesellschaft mit beschränkter Haftung, Vechta Hotelprojekt Messe-West Europa-Allee Frankfurt GmbH & Co. KG, Cologne Kiesverwertungsgesellschaft Senden mit beschränkter Haftung, Senden Kopalnie Melafiru, Czarny Bor Leitner Gesellschaft m.b.H., Hausmening Merk Timber GmbH, Aichach Meyerhans AG Amriswil, Amriswil Meyerhans AG, Strassen- und Tiefbau Uzwil, Uzwil Northern Energy GlobalTech III. GmbH, Aurich Polski Asfalt SP.z o.o., Pruszkow POßÖGEL & PARTNER STRAßEN- UND TIEFBAU GMBH HERMSDORF/THÜR., St. Gangloff R I M E X GmbH Servicebetriebe, Aalen riw Industriewartung GmbH, Ulm SB Beton GmbH, Bad Langensalza SBR Verwaltungs-GmbH, Kehl SF-BAU Projektentwicklung GmbH, Cologne SLOVAKIA ASFALT s.r.o., Bratislava STRABAG Beteiligungsverwaltung GmbH, Cologne T1 Objektgesellschaft mbH & Co. KG, Cologne Voss GmbH, Cuxhaven ZDE Vierte Vermögensverwaltung GmbH, Cologne Züblin Bau, Vienna
The deconsolidation resulted in disposals of assets in the amount of T€ 32,370 and of liabilities – including non-controlling interests – in the amount of T€ 21,271.
The items contained in the financial statements of each group entity are measured on the basis of the currency corresponding to the currency of the primary economic environment in which the entity operates (functional currency).
The functional currency of STRABAG's subsidiaries is the respective local currency, with the exception of AKA Alföld Koncesszios Autopalya Zrt., Budapest, whose functional currency is the euro. The consolidated financial statements are prepared in euro, STRABAG's reporting currency.
Foreign currency transactions are translated into the functional currency at the foreign exchange rate on the day of the transaction. On the reporting date, monetary items are translated at the closing rate, while non-monetary items are translated at the rate on the day of the transaction. Exchange differences are recognised in profit or loss.
Assets and liabilities of group entities whose functional currency is not the euro are translated from the respective local currency into euro at the average exchange rate on the reporting date. As well as the corresponding profit for the period, the income statements of foreign group entities whose functional currency is not the euro are translated at the average exchange rate for the reporting period. The differences resulting from the use of both rates are reported outside profit or loss.
The most important currencies, including their average exchange rates on the reporting date, are listed under item 25. In the course of capital consolidation, currency translation differences of T€ -57,300 (2012: T€ 45,051) are recognised directly in equity in the financial year with no effect on the operating result. The currency translation differences between the closing rate for the balance sheet and the average rate for the income statement are allocated to equity. Forward exchange operations (hedging) excluding deferred taxes in the amount of T€ -841 (2012: T€ 3,249) were recognised directly in equity.
Restatements in accordance with IAS 29 (Financial Reporting in Hyperinflationary Economies) were not necessary.
| Austria | Nominal capital T€/TATS | Direct stake % | |
|---|---|---|---|
| "A-WAY Infrastrukturprojektentwicklungs- und -betriebs GmbH", Spittal an der Drau | 35 | 100.00 | |
| "DOMIZIL" Bauträger GmbH, Vienna | 727 | 100.00 | |
| "Filmforum am Bahnhof" Errichtungs- und Betriebsgesellschaft m.b.H., Vienna | TATS | 3,000 | 100.00 |
| "SBS Strabag Bau Holding Service GmbH", Spittal an der Drau | 35 | 100.00 | |
| "Wiener Heim" Wohnbaugesellschaft m.b.H., Vienna | 741 | 100.00 | |
| "Wohngarten Sensengasse" Bauträger GmbH, Vienna | 35 | 55.00 | |
| ABR Abfall Behandlung und Recycling GmbH, Schwadorf | 37 | 100.00 | |
| Asphalt & Beton GmbH, Spittal an der Drau | 36 | 100.00 | |
| AUSTRIA ASPHALT GmbH & Co OG, Spittal an der Drau | TATS | 500 | 100.00 |
| Bau Holding Beteiligungs AG, Spittal an der Drau | 48,000 | 100.00 | |
| Baukontor Gaaden Gesellschaft m.b.H., Gaaden | 36 | 100.00 | |
| Bitumen Handelsgesellschaft m.b.H. & Co KG, Loosdorf | TATS | 3,000 | 100.00 |
| BITUNOVA Baustofftechnik Gesellschaft m.b.H., Spittal an der Drau | TATS | 2,000 | 100.00 |
| BLUMENFELD Liegenschaftsverwaltungs GmbH, Vienna | TATS | 1,000 | 100.00 |
| BMTI-Baumaschinentechnik International GmbH, Trumau | 1,454 | 100.00 | |
| Böhm Stadtbaumeister & Gebäudetechnik GmbH, Vienna | 36 | 100.00 | |
| BrennerRast GmbH, Vienna | 35 | 100.00 | |
| BRVZ Bau- Rechen- u. Verwaltungszentrum Gesellschaft m.b.H., Spittal an der Drau | 37 | 100.00 | |
| Bug-AluTechnic GmbH, Vienna | 5,000 | 100.00 | |
| Campus Eggenberg Immobilienprojekt GmbH, Graz | 36 | 60.00 | |
| Center Communication Systems GmbH, Vienna | 727 | 100.00 |
| Austria | Nominal capital T€/TATS | Direct stake % | |
|---|---|---|---|
| Diabaswerk Saalfelden Gesellschaft m.b.H., Saalfelden | 363 | 100.00 | |
| Eckstein Holding GmbH, Spittal an der Drau | 73 | 100.00 | |
| EFKON AG, Raaba | 28,350 | 98.14 | |
| Erste Nordsee-Offshore-Holding GmbH, Pressbaum | 100 | 51.00 | |
| F. Lang u. K. Menhofer Baugesellschaft m.b.H. & Co. KG, Wiener Neustadt | 1,192 | 100.00 | |
| Goldeck Bergbahnen GmbH, Spittal an der Drau | 363 | 100.00 | |
| Ilbau Liegenschaftsverwaltung GmbH, Spittal an der Drau | 4,500 | 100.00 | |
| InfoSys Informationssysteme GmbH, Spittal an der Drau | 363 | 94.90 | |
| Innsbrucker Nordkettenbahnen Betriebs GmbH, Innsbruck | 35 | 51.00 | |
| KAB Straßensanierung GmbH & Co KG, Spittal an der Drau | 133 | 50.60 | |
| Kanzel Steinbruch Dennig Gesellschaft mit beschränkter Haftung, Gratkorn | TATS | 500 | 75.00 |
| M5 Beteiligungs GmbH, Vienna | 70 | 100.00 | |
| M5 Holding GmbH, Vienna | 35 | 100.00 | |
| Mineral Abbau GmbH, Spittal an der Drau | 36 | 100.00 | |
| Mischek Systembau GmbH, Vienna | 1,000 | 100.00 | |
| Mobil Baustoffe GmbH, Reichenfels | 50 | 100.00 | |
| OAT - Bohr- und Fugentechnik Gesellschaft m.b.H., Spittal an der Drau | TATS | 1,000 | 51.00 |
| Osttiroler Asphalt Hoch- und Tiefbauunternehmung GmbH, Lavant i. Osttirol | 36 | 80.00 | |
| Raststation A 3 GmbH, Vienna | 35 | 100.00 | |
| Raststation A 6 GmbH, Vienna | TATS | 500 | 100.00 |
| RBS Rohrbau-Schweißtechnik Gesellschaft m.b.H., Linz | 291 | 100.00 | |
| SF Bau vier GmbH, Vienna | 35 | 100.00 | |
| Storf Hoch- und Tiefbaugesellschaft m.b.H., Reutte | 727 | 100.00 | |
| STRABAG AG, Spittal an der Drau | 12,000 | 100.00 | |
| STRABAG Anlagentechnik GmbH, Thalgau | 1,000 | 100.00 | |
| STRABAG Bau GmbH, Vienna | 1,800 | 100.00 | |
| STRABAG Energy Technologies GmbH, Vienna | 50 | 100.00 | |
| STRABAG Holding GmbH, Vienna | 35 | 100.00 | |
| Strabag Liegenschaftsverwaltung GmbH, Linz | 4,500 | 100.00 | |
| STRABAG Property and Facility Services GmbH, Vienna | 35 | 100.00 | |
| STRABAG SE, Villach | 114,000 | 100.00 | |
| TPA Gesellschaft für Qualitätssicherung und Innovation GmbH, Vienna | 37 | 100.00 | |
| VIOLA PARK Immobilienprojekt GmbH, Vienna | 45 | 75.00 | |
| Züblin Holding GesmbH, Vienna | 55 | 100.00 | |
| Züblin Spezialtiefbau Ges.m.b.H., Vienna | 1,500 | 100.00 | |
| Zweite Nordsee-Offshore-Holding GmbH, Pressbaum | 100 | 51.00 | |
| Germany | Nominal capital T€/TDEM | Direct stake % | |
| Alpines Hartschotterwerk GmbH, Leinfelden-Echterdingen | 25 | 100.00 | |
| Atlas Tower GmbH & Co. KG, Cologne | 106 | 100.00 | |
| Baugesellschaft Nowotnik GmbH, Nörvenich | 26 | 100.00 | |
| Baumann & Burmeister GmbH, Halle/Saale | 51 | 100.00 | |
| Bauunternehmung Ohneis Gesellschaft mit beschränkter Haftung, Straubing | TDEM | 100 | 100.00 |
| BBS Baustoffbetriebe Sachsen GmbH, Hartmannsdorf | TDEM | 30,000 | 100.00 |
| becker bau GmbH, Bornhöved | 25 | 100.00 | |
| BHG Bitumenhandelsgesellschaft mbH, Hamburg | 26 | 100.00 | |
| BITUNOVA GmbH, Düsseldorf | 256 | 100.00 | |
| Blees-Kölling-Bau GmbH, Cologne | TDEM | 2,500 | 100.00 |
| BMTI - Baumaschinentechnik International GmbH & Co. KG, Cologne | 307 | 100.00 | |
| BRVZ Bau- Rechen- und Verwaltungszentrum GmbH & Co. KG, Cologne | 30 | 100.00 | |
| CLS Construction Legal Services GmbH, Cologne | 25 | 100.00 | |
| Deutsche Asphalt GmbH, Cologne | 28 | 100.00 | |
| DYWIDAG Bau GmbH, Munich | 32 | 100.00 | |
| DYWIDAG International GmbH, Munich | 5,000 | 100.00 | |
| DYWIDAG-Holding GmbH, Cologne | 500 | 100.00 | |
| E S B Kirchhoff GmbH, Leinfelden-Echterdingen | 1,500 | 100.00 | |
| Eberhard Pöhner Unternehmen für Hoch- und Tiefbau GmbH, Bayreuth | 30 | 100.00 | |
| Eberhardt Bau-Gesellschaft mbH, Berlin | TDEM | 300 | 100.00 |
| ECS European Construction Services GmbH, Mörfelden-Walldorf | 225 | 100.00 | |
| Ed. Züblin AG, Stuttgart | 20,452 | 57.26 |
| Germany | Nominal capital T€/TDEM | Direct stake % | |
|---|---|---|---|
| Eduard Hachmann Gesellschaft mit beschränkter Haftung, Lunden | 520 | 100.00 | |
| Eichholz Eivel GmbH, Berlin | 25 | 100.00 | |
| ETG Erzgebirge Transportbeton GmbH, Freiberg | 290 | 60.00 | |
| F. Kirchhoff GmbH, Leinfelden-Echterdingen | 23,319 | 100.00 | |
| F. Kirchhoff Straßenbau GmbH, Leinfelden-Echterdingen | 25 | 100.00 | |
| F. KIRCHHOFF SYSTEMBAU GmbH, Münsingen | 2,000 | 100.00 | |
| Fahrleitungsbau GmbH, Essen | 1,550 | 100.00 | |
| Forum Mittelrhein Koblenz Generalübernehmergesellschaft mbH & Co.KG, Oststeinbek | 25 | 51.00 | |
| Forum Mittelrhein Koblenz Kultur GmbH & Co. KG, Hamburg | 25 | 51.00 | |
| Gaul GmbH, Sprendlingen | 25 | 100.00 | |
| Gebr. von der Wettern Gesellschaft mit beschränkter Haftung, Cologne | TDEM | 5,000 | 100.00 |
| Griproad Spezialbeläge und Baugesellschaft mbH, Cologne | TDEM | 400 | 100.00 |
| HEILIT Umwelttechnik GmbH, Düsseldorf | 2,000 | 100.00 | |
| Heilit+Woerner Bau GmbH, Munich | 18,000 | 100.00 | |
| Heimfeld Terrassen GmbH, Cologne | 25 | 100.00 | |
| Helmus Straßen-Bau GmbH, Vechta | 25 | 100.00 | |
| Hermann Kirchner Bauunternehmung GmbH, Bad Hersfeld | 15,000 | 100.00 | |
| Hermann Kirchner Hoch- und Ingenieurbau GmbH, Bad Hersfeld | 2,500 | 100.00 | |
| Ilbau GmbH Deutschland, Berlin | 4,700 | 100.00 | |
| Ilbau Liegenschaftsverwaltung GmbH, Hoppegarten | TDEM | 15,000 | 100.00 |
| Josef Riepl Unternehmen für Ingenieur- und Hochbau GmbH, Regensburg | 900 | 100.00 | |
| JUKA Justizzentrum Kurfürstenanlage GmbH, Cologne | 26 | 100.00 | |
| Kirchner & Völker Bauunternehmung GmbH, Erfurt | 520 | 100.00 | |
| Leonhard Moll Hoch- und Tiefbau GmbH, Munich | 51 | 100.00 | |
| LIMET Beteiligungs GmbH & Co. Objekt Köln KG, Cologne | 10 | 94.00 | |
| LIMET Beteiligungs GmbH, Cologne | TDEM | 50 | 100.00 |
| Ludwig Voss GmbH, Cuxhaven | 25 | 100.00 | |
| MAV Mineralstoff - Aufbereitung und - Verwertung GmbH, Krefeld | 600 | 50.00 | |
| MAV Mineralstoff - Aufbereitung und Verwertung Lünen GmbH, Lünen | 250 | 100.00 | |
| MERK Timber GmbH, Aichach | 1,534 | 100.00 | |
| Mineral Baustoff GmbH, Cologne | 25 | 100.00 | |
| MOBIL Baustoffe GmbH, Munich | 100 | 100.00 | |
| NE Sander Eisenbau GmbH, Sande | 155 | 100.00 | |
| NE Sander Immobilien GmbH, Sande | 155 | 100.00 | |
| Northern Energy GAIA I. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy GAIA II. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy GAIA III. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy GAIA IV. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy GAIA V. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy GlobalTech II. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy OWP Albatros GmbH, Aurich | 100 | 100.00 | |
| Northern Energy OWP West GmbH, Aurich | 100 | 100.00 | |
| Northern Energy SeaStorm I. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy SeaStorm II. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy SeaWind I. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy SeaWind II. GmbH, Aurich | 25 | 100.00 | |
| Northern Energy SeaWind III GmbH, Aurich | 25 | 100.00 | |
| Northern Energy SeaWind IV. GmbH, Aurich | 25 | 100.00 | |
| Offshore Wind Logistik GmbH, Stuttgart | 51 | 100.00 | |
| PEKA Entwicklungsgesellschaft Kurfürstenanlage GmbH, Cologne | 25 | 100.00 | |
| Preusse Baubetriebe Gesellschaft mit beschränkter Haftung, Hamburg | 1,050 | 100.00 | |
| Projekt Elbpark GmbH & Co. KG, Cologne | 11 | 100.00 | |
| Pyhrn Concession Holding GmbH, Cologne | 38 | 100.00 | |
| REPASS-SANIERUNGSTECHNIK GMBH Korrosionsschutz und | |||
| Betoninstandsetzung, Munderkingen | TDEM | 51 | 100.00 |
| Rimex Gebäudemanagement GmbH, Ulm | 51 | 100.00 | |
| ROBA Transportbeton GmbH, Cologne | 520 | 100.00 | |
| Robert Kieserling Industriefußboden Gesellschaft mit beschränkter Haftung, Hamburg | 1,050 | 100.00 | |
| SAT Straßensanierung GmbH, Cologne | 30 | 100.00 | |
| SF-Ausbau GmbH, Freiberg | 600 | 100.00 | |
| Germany | Nominal capital T€/TDEM | Direct stake % | |
|---|---|---|---|
| Staßfurter Baubetriebe GmbH, Staßfurt | 1,050 | 100.00 | |
| Steffes-Mies GmbH, Sprendlingen | 25 | 100.00 | |
| Stephan Holzbau GmbH, Stuttgart | 25 | 100.00 | |
| STRABAG AG, Cologne | 104,780 | 93.63 | |
| STRABAG Anlagentechnik GmbH, Cologne | 9,220 | 100.00 | |
| STRABAG Asset GmbH, Cologne | 2,663 | 100.00 | |
| STRABAG Beton GmbH & Co. KG, Berlin | TDEM | 2,000 | 100.00 |
| STRABAG Facility Management GmbH, Nürnberg | 30 | 100.00 | |
| STRABAG Infrastrukturprojekt GmbH, Bad Hersfeld | 1,280 | 100.00 | |
| STRABAG International GmbH, Cologne | 2,557 | 100.00 | |
| STRABAG Offshore Wind GmbH, Stuttgart | 26 | 100.00 | |
| STRABAG Pipeline- und Rohrleitungsbau GmbH, Regensburg | 50 | 100.00 | |
| STRABAG Projektentwicklung GmbH, Cologne | TDEM | 20,000 | 100.00 |
| STRABAG Property and Facility Services GmbH, Münster | 5,000 | 100.00 | |
| STRABAG Rail Fahrleitungen GmbH, Berlin | 600 | 100.00 | |
| STRABAG Rail GmbH, Lauda-Königshofen | 25 | 100.00 | |
| STRABAG Real Estate GmbH, Cologne | 30,000 | 100.00 | |
| STRABAG Sportstättenbau GmbH, Dortmund | TDEM | 200 | 100.00 |
| STRABAG Umweltanlagen GmbH, Dresden | 2,000 | 100.00 | |
| STRABAG Unterstützungskasse GmbH, Cologne | 26 | 100.00 | |
| STRABAG Wasserbau GmbH, Hamburg | 6,833 | 100.00 | |
| Stratebau GmbH, Regensburg | TDEM | 8,000 | 100.00 |
| T S S Technische Sicherheits-Systeme Gesellschaft mit beschränkter Haftung, Cologne | TDEM | 270 | 100.00 |
| Torkret GmbH, Stuttgart | 1,023 | 100.00 | |
| TPA GmbH, Cologne | 511 | 100.00 | |
| Windkraft FiT GmbH, Hamburg | 25 | 100.00 | |
| Wolfer & Goebel Bau GmbH, Stuttgart | 25 | 100.00 | |
| Xaver Bachner GmbH, Straubing | TDEM | 500 | 100.00 |
| Z-Bau GmbH, Magdeburg | 100 | 100.00 | |
| ZDE Sechste Vermögensverwaltung GmbH, Cologne | 25 | 100.00 | |
| Züblin Chimney and Refractory GmbH, Cologne | 511 | 100.00 | |
| Züblin Gebäudetechnik GmbH, Erlangen | 25 | 100.00 | |
| Züblin International GmbH, Stuttgart | 2,500 | 100.00 | |
| Züblin Projektentwicklung GmbH, Stuttgart | TDEM | 5,000 | 100.00 |
| Züblin Spezialtiefbau GmbH, Stuttgart | TDEM | 6,000 | 100.00 |
| Züblin Stahlbau GmbH, Hosena | 1,534 | 100.00 | |
| Züblin Umwelttechnik GmbH, Stuttgart | 2,000 | 100.00 | |
| Züblin Wasserbau GmbH, Berlin | TDEM | 500 | 100.00 |
| Albania | Nominal capital TALL | Direct stake % | |
| Trema Engineering 2 sh p.k., Tirana | 545,568 | 51.00 | |
| Azerbaijan | Nominal capital TUSD | Direct stake % | |
| "Strabag Azerbaijan" L.L.C., Baku | 260 | 100.00 | |
| Belgium | Nominal capital T€ | Direct stake % | |
| N.V. STRABAG Belgium S.A., Antwerp | 18,059 | 100.00 | |
| N.V. STRABAG Benelux S.A., Antwerp | 6,863 | 100.00 | |
| Bulgaria | Nominal capital TLEW | Direct stake % | |
| STRABAG EAD, Sofia | 13,313 | 100.00 | |
| Chile | Nominal capital TCLP | Direct stake % | |
| Strabag SpA, Santiago | 500,000 | 100.00 | |
| Züblin International GmbH Chile SpA, Santiago de Chile | 7,909,484 | 100.00 | |
| China | Nominal capital TCNY | Direct stake % | |
| Shanghai Changjiang-Züblin Construction&Engineering Co.Ltd., Shanghai | 29,312 | 75.00 |
| Denmark | Nominal capital TDKK | Direct stake % |
|---|---|---|
| KMG - KLIPLEV MOTORWAY GROUP A/S, Copenhagen | 500 | 100.00 |
| Züblin A/S, Trige | 1,000 | 100.00 |
| Finland | Nominal capital T€ | Direct stake % |
| STRABAG Oy, Helsinki | 3 | 100.00 |
| India | Nominal capital TINR | Direct stake % |
| EFKON INDIA Pvt. Ltd., Mumbai | 50,000 | 100.00 |
| I-PAY CLEARING SERVICES Pvt. Ltd., Mumbai | 20,000 | 74.00 |
| Italy | Nominal capital T€ | Direct stake % |
| STRABAG S.p.A., Bologna | 10,000 | 100.00 |
| Canada | Nominal capital TCAD | Direct stake % |
| Strabag Inc., Toronto | 3,000 | 100.00 |
| Züblin Inc., Saint John/NewBrunswick | 100 | 100.00 |
| Croatia | Nominal capital THRK | Direct stake % |
| BRVZ d.o.o., Zagreb | 20 | 100.00 |
| CESTAR d.o.o., Slavonski Brod | 1,100 | 74.90 |
| MINERAL IGM d.o.o., Zapuzane | 10,701 | 100.00 |
| Pomgrad Inzenjering d.o.o., Split | 25,534 | 100.00 |
| PZC SPLIT d.d., Split | 18,810 | 95.37 |
| Strabag d.o.o., Zagreb | 48,230 | 100.00 |
| STRABAG-HIDROINZENJERING d.o.o, Split | 144 | 100.00 |
| TPA odrzavanje kvaliteta i inovacija d.o.o., Zagreb | 20 | 100.00 |
| Montenegro | Nominal capital T€ | Direct stake % |
| "Crnagoraput" AD, Podgorica, Podgorica | 9,779 | 95.32 |
| The Netherlands | Nominal capital T€ | Direct stake % |
| STRABAG B.V., Vlaardingen | 450 | 100.00 |
| Züblin Nederland BV, Vlaardingen | 500 | 100.00 |
| Oman | Nominal capital TOMR | Direct stake % |
| STRABAG OMAN L.L.C., Muscat | 1,000 | 100.00 |
| Poland | Nominal capital TPLN | Direct stake % |
| BHG Sp.z o.o., Pruszkow | 500 | 100.00 |
| BITUNOVA Sp.z o.o., Warsaw | 2,700 | 100.00 |
| BMTI Sp.z o.o., Pruszkow | 2,000 | 100.00 |
| BRVZ Sp.z o.o., Pruszkow | 500 | 100.00 |
| HEILIT+WOERNER Sp. z o.o., Breslau | 16,140 | 100.00 |
| Mineral Polska Sp. z.o.o., Czarny Bor | 19,056 | 100.00 |
| PBOiUT Slask Sp. z o.o., Katowice | 295 | 60.98 |
| SAT Sp.z o.o., Olawa | 4,171 | 100.00 |
| STRABAG RAIL POLSKA Sp.z o.o., Breslau | 100 | 100.00 |
| STRABAG Sp.z o.o., Pruszkow | 73,328 | 100.00 |
| TPA Sp.z o.o., Pruszkow | 600 | 100.00 |
| Züblin Sp. z o.o., Poznan | 7,765 | 100.00 |
| Portugal | Nominal capital T€ | Direct stake % |
| Zucotec - Sociedade de Construcoes Lda., Lisbon | 200 | 100.00 |
| Qatar | Nominal capital TRIY | Direct stake % |
| Strabag Qatar W.L.L., Qatar | 200 | 100.00 |
| Romania | Nominal capital TRON | Direct stake % |
|---|---|---|
| ANTREPRIZA DE REPARATII SI LUCRARI A R L CLUJ S.A., Cluj-Napoca | 64,974 | 98.59 |
| Bitunova Romania SRL, Bucharest | 16 | 100.00 |
| BRVZ SERVICII & ADMINISTRARE SRL, Bucharest | 278 | 100.00 |
| Carb SA, Brasov | 10,909 | 99.47 |
| Strabag srl, Bucharest | 43,519 | 100.00 |
| TPA Societate pentru asigurarea calitatii si inovatii SRL, Bucharest | 0 | 100.00 |
| Züblin Romania S.R.L., Bucharest | 4,580 | 100.00 |
| Russia | Nominal capital TRUB | Direct stake % |
| SAO BRVZ Ltd, Moscow | 313 | 100.00 |
| ZAO "Strabag", Moscow | 14,926 | 100.00 |
| Saudi Arabia | Nominal capital TSAR | Direct stake % |
| Dywidag Saudi Arabia Co. Ltd., Jubail | 10,000 | 100.00 |
| Sweden | Nominal capital TSEK | Direct stake % |
| BRF Tyresö View 1, Tyresö1) | 0 | 100.00 |
| BRVZ Sweden AB, Kumla | 100 | 100.00 |
| Nimab Entreprenad AB, Sjöbo | 501 | 100.00 |
| STRABAG AB, Stockholm | 50 | 100.00 |
| STRABAG Projektutveckling AB, Stockholm1) | 1,000 | 100.00 |
| STRABAG Sverige AB, Stockholm | 15,975 | 100.00 |
| TyresöView1 Holding AB, Stockholm | 50 | 100.00 |
| Züblin Scandinavia AB, Stockholm | 100 | 100.00 |
| Switzerland | Nominal capital TCHF | Direct stake % |
| BMTI GmbH, Erstfeld | 20 | 100.00 |
| BRVZ Bau-, Rechen- und Verwaltungszentrum AG, Erstfeld | 100 | 100.00 |
| STRABAG AG, Zurich | 8,000 | 100.00 |
| Serbia | Nominal capital TRSD/T€ | Direct stake % |
| "PUTEVI" A.D. CACAK, Cacak | 122,638 | 85.02 |
| Preduzece za puteve "Zajecar" a.D.Zajecar, Zajecar | 265,015 | 100.00 |
| STRABAG d.o.o. Beograd, Novi Beograd | 770,237 | 100.00 |
| TPA za obezbedenje kvaliteta i inovacije d.o.o. Beograd, Novi Beograd | 32,550 | 100.00 |
| Vojvodinaput-Pancevo a.d. Pancevo, Pancevo | T€ 4,196 |
82.07 |
| Slovakia | Nominal capital T€ | Direct stake % |
| BITUNOVA spol. s r.o., Zvolen | 1,195 | 100.00 |
| BRVZ s.r.o., Bratislava | 33 | 100.00 |
| Errichtungsgesellschaft Strabag Slovensko s.r.o., Bratislava-Ruzinov | 7 | 100.00 |
| KSR - Kamenolomy SR, s.r.o., Zvolen | 25 | 100.00 |
| OAT spol. s.r.o., Bratislava | 199 | 100.00 |
| STRABAG s.r.o., Bratislava | 66 | 100.00 |
| TPA Spolocnost pre zabezpecenie kvality a inovacie s.r.o., Bratislava | 7 | 100.00 |
| Viedenska brana s.r.o., Bratislava | 25 | 100.00 |
| ZIPP BRATISLAVA spol. sr.o., Bratislava | 133 | 100.00 |
| Slovenia | Nominal capital T€ | Direct stake % |
| BRVZ center za racunovodstvo in upravljanje d.o.o., Ljubljana | 9 | 100.00 |
| DRP, d.o.o., Ljubljana | 9 | 100.00 |
| STRABAG gradbene storitve d.o.o., Ljubljana | 500 | 100.00 |
| South Africa | Nominal capital T€ | Direct stake % |
| EFKON SOUTH AFRICA (PTY) LTD, Pretoria | 166 | 100.00 |
1) The presentation of interests is done using the economic approach; the interests as defined by civil law may deviate from this presentation.
| Czech Republic | Nominal capital TCZK | Direct stake % |
|---|---|---|
| BHG CZ s.r.o., Ceské Budejovice | 200 | 100.00 |
| Bitunova spol. s r.o., Jihlava | 2,000 | 100.00 |
| BMTI CR s.r.o., Brno | 100 | 100.00 |
| BOHEMIA ASFALT, s.r.o., Sobeslav | 10,000 | 100.00 |
| BRVZ s.r.o., Prague | 1,000 | 100.00 |
| Dalnicni stavby Praha, a.s., Prague | 136,000 | 100.00 |
| FRISCHBETON s.r.o., Prague | 20,600 | 100.00 |
| JHP spol. s.r.o., Prague | 20,000 | 100.00 |
| KAMENOLOMY CR s.r.o., Ostrava - Svinov | 106,200 | 100.00 |
| MiTTaG spol. s.r.o., Prague | 100,100 | 100.00 |
| Na belidle s.r.o., Prague | 100 | 100.00 |
| OAT s.r.o., Prague | 4,000 | 100.00 |
| SAT s.r.o., Prague | 1,000 | 100.00 |
| Strabag a.s., Prague | 1,119,600 | 100.00 |
| STRABAG Property and Facility Services a.s., Prague | 46,800 | 100.00 |
| TPA CR, s.r.o., Ceske Budejovice | 1,000 | 100.00 |
| Viamont DSP a.s., Usti nad Labem | 180,000 | 100.00 |
| Züblin stavebni spol s.r.o., Prague | 100,000 | 100.00 |
| Ukraine | Nominal capital TUAH | Direct stake % |
| Chustskij Karier, Zakarpatska | 3,279 | 95.96 |
| Möbius Construction Ukraine Ltd, Odessa | 31 | 100.00 |
| Hungary | Nominal capital THUF | Direct stake % |
|---|---|---|
| AKA Zrt., Budapest | 24,000,000 | 100.00 |
| ASIA Center Kft., Budapest | 1,830,080 | 100.00 |
| BHG Bitumen Kft., Budapest | 3,000 | 100.00 |
| Bitunova Kft., Budapest | 50,000 | 100.00 |
| BMTI Kft., Budapest | 5,000 | 100.00 |
| BRVZ Kft., Budapest | 1,545,000 | 100.00 |
| Frissbeton Kft., Budapest | 100,000 | 100.00 |
| KÖKA Kft., Budapest | 761,680 | 100.00 |
| OAT Kft., Budapest | 25,000 | 100.00 |
| STRABAG Általános Építö Kft., Budapest | 3,600,000 | 100.00 |
| STRABAG Property and Facility Services Zrt., Budapest | 20,000 | 51.00 |
| STRABAG Vasútépítö Kft., Budapest | 3,000 | 100.00 |
| Strabag Zrt., Budapest | 2,100,000 | 100.00 |
| STRABAG-MML Kft., Budapest | 500,000 | 100.00 |
| Szentesi Vasútépítö Kft, Budapest | 189,120 | 100.00 |
| TPA HU Kft., Budapest | 113,000 | 100.00 |
| Treuhandbeteiligung H1) | 10,000 | 100.00 |
| Züblin Kft., Budapest | 3,000 | 100.00 |
| United Arab Emirates | Nominal capital TAED | Direct stake % |
Zezelivskij karier TOW, Zezelev 13,130 99.36
STRABAG ABU DHABI LLC, Abu Dhabi 150 100.00 Züblin Ground and Civil Engineering LLC, Dubai 1,000 100.00
Acquired intangible assets are recognised at their initial costs less depreciation and impairment if applicable.
Development costs for an internally generated intangible asset are capitalised if the group can demonstrate the technical feasibility of completing the intangible asset so that it will be available for internal use or sale and if it can demonstrate the intent to complete the intangible asset and use or sell it. The group must also demonstrate that the intangible asset will generate probable future economic benefits, that it has adequate resources to complete the asset and that it is able to reliably measure the expenditure attributable to the asset during its development. The construction costs for these assets comprise all construction costs directly attributable to the construction process as well as production-related overheads. Borrowing costs are capitalised for qualified assets. Research costs which do not fulfil these criteria are recognised as an expense in the period in which they are incurred. Costs that have already been recognised as an expense are not capitalised in a subsequent period.
The subsequent measurement of intangible assets with definite useful lives is performed at cost less accumulated depreciation and impairment losses. Within the group, there are no intangible assets with indefinite useful lives.
The following useful lives were assumed for intangible assets using the straight-line method:
| Intangible assets | Useful life in years |
|---|---|
| Property rights/Utilisation rights | 3–50 |
| Software | 2–5 |
| Patents, licences | 3–10 |
Goodwill from a business combination is initially measured at cost. This is calculated as the excess of the consideration transferred over the identifiable assets acquired and liabilities assumed. Subsequent to initial recognition, goodwill is measured at cost less accumulated impairment losses. Goodwill is not amortised, rather, it is subjected to an annual impairment test in accordance with IAS 36. For the purpose of the impairment test, goodwill is assigned to one or more of the group's cash-generating units that should benefit from the synergy effects of the combination. The recoverability of goodwill is determined by comparing the carrying amount of the respective cash-generating unit or units with the recoverable amount. The possibility of a write-back once the reasons for the impairment no longer apply is not foreseen for goodwill.
Property, plant and equipment is initially recognised at cost. STRABAG performs subsequent measurements using the cost model – cost less accumulated depreciation and impairment losses. If the reasons for a previously recognised impairment loss no longer apply, these assets are written back in profit or loss. The amount may not exceed the carrying amount that would have resulted if no impairment loss had been recognised in the previous periods.
Subsequent cost is capitalised if it is probable that future economic benefits will flow to the group and if the costs can be reliably determined. Repair and maintenance costs which do not constitute significant maintenance expenditures are recognised as expenses in the period in which they are incurred.
Depreciable property, plant and equipment is depreciated using the straight-line method over the expected useful life. If there is an indication that an asset may be impaired and if the present values of the future cash inflow surpluses are below the carrying amounts, the amount is revalued to the lower fair value in accordance with IAS 36.
The following useful lives were assumed for property, plant and equipment:
| Property, plant and equipment | Useful life in years |
|---|---|
| Buildings | 10–50 |
| Investments in third-party buildings | 5–40 |
| Machinery | 3–21 |
| Office equipment/furniture and fixtures | 3–23 |
| Vehicles | 4–12 |
Investment property is property held to earn rentals or for the purpose of capital appreciation. Investment property is initially measured at cost. STRABAG uses the cost model for subsequent measurements, i.e. the measurement is performed at cost less accumulated depreciation and impairment losses. If the present values of the future cash inflow surpluses are below the carrying amounts, the amount is revalued to the lower fair value in accordance with IAS 36. The fair value of this investment property is disclosed separately. The fair value is determined using recognised methods such as derivation from the current market price of comparable properties or the discounted cash flow method.
The useful life of investment property varies between ten and 35 years. Investment property is depreciated using the straightline method.
Leased assets are capitalised where STRABAG is the lessee and where STRABAG bears all the substantial risks and rewards associated with the asset in accordance with the criteria of IAS 17. The lease is capitalised at the lower of the fair value of the asset and the present value of the minimum lease payments. The asset is depreciated over the shorter of the lease term or the economic life of the asset. The depreciation method used is the same as for comparable acquired or internally generated assets.
Payment obligations resulting from future lease payments are recognised as a liability. In this case, the present value of the minimum lease payment is to be used. In subsequent years, lease payments are apportioned between an interest component and a repayment component so that the lease liability has a constant rate of return. The interest component is recognised in profit or loss.
Both expenses as well as income from operating leases are recognised in the income statement using the straight-line method over the term of the respective lease.
Government subsidies and investment grants are offset against the cost of the assets and amortised in proportion to their useful lives. A government grant is recognised when there is reasonable assurance that the grant will be received and the group complies with the necessary conditions for receiving the grant.
Borrowing costs that are directly attributable to the acquisition or production of a qualifying asset are recognised as part of the cost of that asset. Qualifying assets are assets that necessarily take a substantial period of time to get ready for their intended use or sale. Other borrowing costs are recognised as an expense in the period in which they are incurred.
Assets that are subject to depreciation or amortisation are tested for impairment whenever events or changes in circumstances indicate that its carrying amount may no longer be recoverable. Assets that have an indefinite useful life, such as goodwill or intangible assets not yet available for use, are tested for impairment annually as such assets are not subject to depreciation or amortisation.
To identify the need for impairment, the recoverable amount is determined. The recoverable amount is the higher of fair value of the asset less costs to sell and value in use. If it is not possible to determine the recoverable amount for an individual asset, then the recoverable amount is determined for the smallest identifiable group of assets (cash-generating unit) to which the asset in question can be assigned.
Considering that, as a rule, market prices are not available for individual units, the present value of net cash inflows is used to determine the fair value less costs to sell. The forecast of the cash flows is based on STRABAG's latest planning, with a planning horizon of at least four years. In justified individual cases, the detailed planning period is extended if this allows for a better presentation of the future cash flows. The last detailed planning year forms the basis for calculating the perpetuity if applicable legislation and legal requirements do not limit the usability of the cash-generating unit to a shorter period of time.
For the purpose of determining the fair value less costs to sell, the cash-generating unit is measured from the viewpoint of an independent market participant. In calculating the value in use of an asset, on the other hand, the cash flows are considered on the basis of the previous use. For the net cash inflows beyond the detailed planning period, individual growth rates derived from market information are determined on the basis of long-term business expectations in both methods of calculation.
Net cash inflows are discounted at the cost of capital, which is calculated as the weighted average cost of equity and debt. Consideration is given to the different yield and risk profiles of STRABAG's various areas of expertise by determining the individual costs of capital using comparison companies. The cost of equity corresponds to the required rate of return for investors, while the cost of debt is based on the long-term financing conditions available to comparison companies. Both components are derived from capital market information.
The following table shows the two parameters growth rate and cost of capital for the impairment tests:
| % | 2013 | 2012 |
|---|---|---|
| Growth rate | 0.0–2.0 | 0.0–2.0 |
| Cost of capital (after taxes) | 7.2–8.3 | 6.8–10.7 |
| Cost of capital (before taxes) | 9.4–11.3 | 7.9–11.6 |
The management board has calculated the budgeted gross margin based on past developments and on expectations for future market development.
If the recoverable amount of an asset is lower than the carrying amount, the impairment is recognised immediately in profit or loss. In the case of impairment losses related to cash-generating units which contain goodwill, existing goodwill is initially reduced. If the impairment exceeds the carrying amount of the goodwill, the difference is generally apportioned proportionally over the remaining non-current assets of the cash-generating unit.
With the exception of goodwill, non-monetary assets for which an impairment loss was charged in the past are reviewed at every balance sheet date to determine whether the impairment loss should be reversed.
Financial assets are recognised in the consolidated balance sheet if STRABAG has a contractual right to receive cash or other financial assets from another party. Regular way purchases and sales of financial assets are recognised using settlement date accounting.
A financial asset is initially recognised at fair value including transaction costs. Transaction costs incurred on the acquisition of financial assets measured at fair value through profit or loss are recognised in the income statement immediately. Receivables bearing no interest or interest below the market rate are initially recognised at the present value of the expected future cash flows.
For purposes of subsequent measurement, financial assets are classified in one of the following categories in accordance with IAS 39, with each category having its own measurement requirements. The classification is determined at initial recognition:
• Financial assets at fair value through profit or loss
At STRABAG, financial assets measured at fair value through profit or loss comprise financial assets held for trading. A financial asset is classified in this category if it was acquired for the purpose of selling in the short term. Derivatives also belong to this category if they are not designated as hedging instruments. Assets in this category are classified as current assets if recovery is expected within twelve months. All other assets are classified as non-current. Changes in the value of financial assets measured at fair value through profit or loss are recognised in profit or loss.
• Loans and receivables
Loans and receivables are non-derivative financial assets with fixed or determinable payments that are not traded in an active market. They are considered current assets if they do not mature more than twelve months after the balance sheet date. If they do, they are classified as non-current assets. Loans and receivables are measured at amortised cost calculated using the effective interest method.
• Available-for-sale financial assets
Available-for-sale financial assets are non-derivative financial assets which were either classified in this category or which were not classified in any of the other categories presented here. Fair value changes on available-for-sale financial assets are recognised in other income. If assets in this category are sold or if they are subject to impairment, then the cumulative changes in fair value that were previously recognised in equity are recognised in profit or loss in the income statement.
At the end of each reporting period, and whenever there are indications of impairment, the carrying amounts of financial assets that are not measured at fair value through profit or loss are tested for their recoverability (impairment test). An impairment loss results from the comparison of carrying amount and fair value. If there is an objective indication of impairment, an impairment loss is recognised in profit or loss in other operating expense or in net income from investments. Impairment losses are reversed if objective facts arise which speak for a reversal. An increase can only be made to the amount of the amortised cost that would have resulted if the impairment loss had not been recognised.
Within the group, impairment losses are recognised if the debtor has considerable financial difficulties; if there is a high probability that insolvency proceedings will be commenced against him; if the issuer's technological, economic, legal and market environment changes substantially; or if the fair value of a financial instrument continually falls below the amortised cost.
Financial assets are derecognised when the contractual rights to receive payment from the financial assets no longer exist or if the financial assets are transferred along with all substantial risks and rewards.
Service concession arrangements which provide an absolute contractual right to receive payment are shown separately. All receivables from concession arrangements are accounted for under the special balance sheet item receivables from concession arrangements. The receivables are carried at the present value of the payment to be made. The annual accumulation amount is recognised in other operating income, where it is balanced with the interest expense from related non-recourse financing.
The hedging transactions embedded in the concession arrangements are carried at fair value and shown in the item receivables from concession arrangements.
Trade receivables and other receivables are evaluated at their nominal value less impairment for realisable individual risks. Graduated impairment is formed according to risk groups in order to take general loan risks on customer receivables into consideration. Specific cases of default result in the derecognition of the receivables in question.
Derivative financial instruments are initially recognised at cost at the date the contract is entered into. In subsequent periods, derivative financial instruments are carried at fair value. Unrealised gains or losses on the measurement are recognised in the income statement if the conditions for hedge accounting under IAS 39 are met. Derivative financial instruments are stated under other financial assets or other financial liabilities.
Derivative financial instruments are measured on the basis of interbank conditions and, if necessary, on the loan margin applicable or stock exchange price for STRABAG, under application of the bid and ask prices on the balance sheet date. Where stock exchange prices are not used, the fair value is calculated by means of actuarial valuation methods.
The group designates its derivative financial instruments either as
In accounting for fair value hedges, both the derivative hedging instrument and the hedged item attributable to hedged risk are accounted for at fair value through profit or loss.
If, however, a derivative financial instrument is used as a hedging instrument in a cash flow hedge, the unrealised gains or losses from the hedging instrument are initially accounted for under other income. They are reclassified to profit or loss when the hedged item affects profit or loss. Any changes resulting from the ineffectiveness of these financial instruments are recognised immediately in profit or loss in the income statement.
Derivative financial instruments are employed exclusively to mitigate risks arising from movements in currency exchange rates and interest rates. The utilisation of financial derivatives is subject to internal guidelines and controls.
On concluding a transaction, the group documents the hedging relationship between the hedging instrument and the hedged item, the aim of its risk management as well as the underlying strategy for hedging transactions. An assessment is made at the beginning of a hedging relationship, with documentation provided continually thereafter, of whether the derivatives used in the hedge are effective or not in compensating the changes in fair value or cash flow of the hedged item.
The critical term match method is used to determine the prospective hedge effectiveness. The retrospective effectiveness is determined using the dollar offset method.
The income tax payables and receivables contain mainly rights and obligations with regard to domestic and foreign income taxes. These comprise the current year as well as possible rights and obligations from previous years. The receivables/ payables are calculated on the basis of the tax regulations in the respective countries.
Deferred taxes are measured using the balance sheet liability method for all differences between the valuation of the balance sheet items in the IFRS financial statements and the existing tax value at the individual companies. Furthermore, any realisable tax advantage from existing losses carried forward will be included in the calculation. Exceptions to this comprehensive tax deferral are balances from non-tax-deductible goodwill.
Deferred tax assets may only be recognised if the associated tax advantage is likely to be realisable. The calculation of the tax deferral is based on the usual income tax rate in the respective country at the point of the predicted reversal.
Recognition is made of deferred tax liabilities arising from temporary differences in relation to investments in subsidiaries and associates, unless the timing of the reversal of the temporary differences in the group can be determined and the temporary differences are unlikely to reverse in response to this influence in the foreseeable future.
Inventory costs include cost of purchase and production and are required to be stated at the lower of cost and net realisable value.
Production costs include all direct costs as well as appropriate parts of overhead arising in the production. Distribution costs, as well as costs for general administration, are not included in the production costs. Borrowing costs related to production are recognised for inventories which are to be classified as qualifying assets.
The results from construction contracts are realised using the percentage of completion method under IAS 11. Determination of the stage of completion is made on the basis of the actual output volume attained by the balance sheet date.
If the results from a contract can be reliably determined and the contract is likely to be profitable, then the contract revenue is recognised in proportion to the stage of completion over the duration of the contract. If the total contract cost is likely to exceed the total contract revenue, then the expected loss is recognised immediately in full as an expense. Presentation is made as an impairment loss on receivables relating to construction contracts or as a provision if the impending loss that is expected exceeds the receivables from construction contracts from the specific project.
If, due to uncertainties in the construction schedule, the future results cannot be reliably determined, the construction contract is recognised at contract cost.
If the costs incurred plus recognised profits exceed the payments received for it, then this is shown on the assets side under receivables from construction contracts. Vice versa, this is reported on the liabilities side under liabilities from construction contracts.
The results, in the case of construction contracts which are carried out in consortia, are realised according to the percentage of completion method in accordance with the degree of completion as at the balance sheet date. Impending losses arising from further construction work are accounted for by means of appropriate depreciation. Receivables from or liabilities to consortia include the proportional contract result as well as capital contributions, in- and out-flows of cash and charges resulting from services.
Cash and cash equivalents include all liquid assets which at the date of acquisition or investment have a remaining term of less than three months. Cash and cash equivalents are measured at amortised cost.
The following defined benefit plans for which provisions must be recognised exist within the group.
The company's obligation relating to defined benefit plans consists in fulfilling the promised benefits to current and former employees. Defined contribution plans in the form of financing through third-party support funds do not exist.
The group is legally required to provide a one-off severance payment to employees of Austrian subsidiaries in the case of termination or from the date of retirement if their employment began before 1 January 2003. The level of this payment depends on the number of years at the company and amount due at the date of severance and comes to between two and twelve monthly salaries. A provision is made for this obligation.
For employees of Austrian subsidiaries whose employment began after 1 January 2003, the defined benefit obligations are funded by the regular payment of contributions into the employee benefit fund.
The provisions for severance payments are determined using actuarial principles in accordance with the projected unit credit method. Here the future claim over the length of employment of the employees is collected while taking any future pay rises into consideration. The present value of the already earned partial-claims on the reporting date is recognised as the provision.
Additionally, the severance payment rights in other countries in the case of termination or retirement amount from one to three monthly salaries. Due to the relatively insignificant amounts involved, provisions for severance payments arising from these obligations are determined using financial mathematical methods.
The provisions for pensions are formed for obligations from the right to future pension payments and current payments to present and past employees and their dependents. The group's pension promises in Germany and Austria exist on the basis of individual contracts or internal labour-management agreements. The obligations are based on a number of different pension arrangements. The number of different employee benefit plans is the result of the group's enterprise acquisitions over the past few years in Germany. New agreements are not concluded within the group.
As a rule, the pension promises foresee the granting of monthly old age, invalidity and survivors' benefits. With some promises, the pension arrangement foresees benefits to be paid in the form of a capital payment.
The benefit plans exist in various designs. The range of plan structures includes specified benefit systems (e.g. specified amount per year of employment), dynamic systems (e.g. % per year of employment) and benefit promises (e.g. specified promise). Plans also exist with or without survivors' benefits.
In Switzerland, the legal regulations governing pension plans require payments to be made into pension foundations. One half of the contributions are made by the employer, the other half by the employee. At retirement, the employees can choose to receive either a one-off severance payment or regular monthly pension payments.
As restructuring contributions are required if the pension foundation has insufficient funds for coverage, the promises are categorised as defined benefit plan in accordance with IAS 19.
Within the STRABAG Group, the obligations of the pension funds are reinsured.
The group's obligations relating to defined benefit plans are determined separately for each plan using actuarial principles in accordance with the projected unit credit method. The projected unit credit method is used to determine the discounted pension entitlements acquired up to the end of the accounting period. The existing plan assets including their fair value are subtracted from the defined benefit obligations. This yields the defined benefit liability (asset) to be recognised.
Determination of the net defined benefit liability at the end of the reporting year is based on an actuarial report from a certified actuarial analyst.
The rate used to discount severance and pension provisions is determined on the basis of market yields at the end of the respective reporting period on high-quality fixed-interest industrial bonds with a comparable term.
The assumptions relating to discounting, pay rises and fluctuation that are used to calculate the severance and pension provisions vary in proportion to the economic situation of each specific country. Life expectancy is calculated according to the respective country's mortality tables.
Actuarial gains and losses are recognised in equity outside profit or loss. The service cost is stated in employee benefits expense, while the interest component of the allocation to the provision is reported in the financial result.
If the present value of a defined benefit obligation changes in response to plan amendments, the resulting effects are recognised in profit or loss as past service cost in the year of the amendment. Any income resulting from a settlement is also recognised directly in the income statement.
The company is exposed to various risks in relation to the defined contribution severance and pension plans. Besides the general actuarial risks such as the longevity risk and the interest rate risk, the group is also exposed to currency risk as well as to capital market risk or investment risk.
More information concerning the risks is available in the sensitivity analysis on page 49.
The other provisions take into consideration all realisable risks and uncertain obligations. They are recognised at the respective amount which, according to commercial judgement, is necessary at the balance sheet date to cover future payment obligations of the group. Hereby the respective amount which arises as the most probable on careful examination of the facts is recognised.
Long-term provisions are, in as far as they are not immaterial, entered into the accounts at their discounted discharge amount as at the balance sheet date. The discharge amount also includes the cost increases to be considered on the reporting date. Provisions which arise from the obligation to recultivate gravel sites are allocated according to the rate of utilisation.
Non-financial liabilities reported under other liabilities are carried at the repayment amount. The overpaid amounts from construction contracts are qualified as non-financial liabilities.
Financial liabilities comprise original liabilities and the negative fair values of derivative financial instruments.
Original liabilities are recognised in the consolidated balance sheet if STRABAG has a contractual obligation to transfer cash or other financial assets to another party. Original liabilities are initially recognised at fair value. Any premiums, discounts or other differences between the cash inflow and the repayment amount are distributed over the financing term using the effective interest rate method and stated on an accruals basis in interest expense.
Financial liabilities are derecognised if the contractual obligations are discharged, cancelled or have expired. Costs related to the issue of corporate bonds are offset over the term using the effective interest rate method.
Contingent liabilities are present or possible future obligations which are not reflected in the balance sheet as liabilities because an outflow of resources is not probable. They are – as long as IFRS 3 does not require recognition on acquisition – not reflected in the balance sheet. The amount of the contingent liabilities reported corresponds to the amount of existing guarantees outstanding as at the balance sheet date.
Revenue comprises the fair value of the considerations received or receivable for the sale of goods and services in the ordinary course of business.
Revenues from the construction contracts are realised according to the percentage of completion method. The output volume actually attained at the balance sheet date serves as a benchmark for the degree of completion.
Revenues from the sale of proprietary projects, from trade to and services for consortia, from property and facility services, from other services and from the sale of construction materials are realised with the transfer of power to dispose and the related opportunities and risks and/or with the rendering of the services.
Supplementary claims in relation with construction contracts involve services which, based on the existing contractual agreements, cannot be invoiced until their invoicing potential or recognition is agreed with the client. While the costs are recognised in profit or loss immediately when they arise, revenue from supplementary claims is recognised generally after receipt of written recognition from the client or, in the event that payment is received before the written recognition, with the payment itself.
Revenue that is to be seen as purely transitory due to consortial structures, as well as its corresponding expense, is not recognised.
Other income, such as rental income or expenses passed through, is stated on the basis of the amount accrued in accordance with the respective agreements.
Dividends and the share of profits from investments are recognised if a legal right to payment exists.
Interest income is recognised as it accrues using the effective interest rate method.
Estimates and assumptions which refer to the amount and recognition of the assets and liabilities accounted, the income and expenditure as well as the statement of contingent liabilities are necessary for the preparation of the consolidated financial statement according to IFRS.
The estimates and assumptions that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year are discussed below.
The group conducts an annual test to determine whether its goodwill is impaired in accordance with the accounting policies described on page 28. The recoverable amount of cash-generating units was determined on the basis of calculations of the value in use. These calculations are based on assumptions about the expected business development and the recover-able margin. Estimates about the expected business development are based on the facts and circumstances prevailing at the time of preparation of the financial statements as well as on realistic assumptions about the global and industry-specific environment. In response to changes in these underlying conditions which deviate from the assumptions and are beyond the management board's control, actual values may deviate from the estimated values.
All other things remaining equal, an annual 5 % decrease of the free cash flow used to calculate the value in use would result in an impairment loss of T€ 11, while an isolated increase of the cost of capital by one percentage point would not lead to an impairment. These two effects together would trigger an impairment loss of T€ 5,317.
Revenue from construction contracts is recognised using the percentage of completion method. The group estimates the actual output concluded by the balance sheet date as a percentage of the total volume of the order as well as the remaining contract cost to be incurred. If the contract cost exceeds the total contract revenue, then the expected loss is recognised as an expense. Technically complex and demanding projects, in particular, involve the risk that the estimate of the total cost deviates considerably from the actual cost incurred.
In 2011 and 2012, the group acquired a majority interest in companies developing offshore wind farms in the North Sea. The investments involve 13 fields for which approval to build offshore wind farms is being acquired. In none of these fields has the installation of wind turbines begun yet. The wind farm projects are recognised at amortised cost under inventories with a carrying amount of T€ 181,156. Should the underlying political conditions in Germany hinder or impede realisation in the future, the value could decline considerably.
STRABAG has to calculate the actual income tax expected for each taxable entity and must assess the temporary differences arising from the different treatment of certain balance sheet items in the IFRS consolidated financial statements and the statutory financial statements required for tax purposes. The existence of temporary differences usually results in the recognition of deferred tax assets and liabilities in the consolidated financial statements.
The management must make assessments in the calculation of current and deferred taxes. Deferred tax assets are recognised to the extent that their use is probable. The use of deferred tax assets depends on the possibility of realising sufficient taxable income under the respective tax type and jurisdiction under consideration of any possible legal restrictions regarding the maximum loss carryforward period. A number of different factors is used to assess the probability of the future usability of deferred tax assets, such as the past financial performance, operational planning, loss carryforward periods and tax planning strategies. If the actual results deviate from these estimates, or if these estimates must be adjusted in future periods, this could have a negative impact on the financial position, financial performance and cash flows. In the event of a changed assessment of the recoverability of deferred tax assets, the deferred tax assets which have been recognised are written down in profit or loss or, depending on their original formation, outside profit or loss; impaired deferred tax assets are similarly recognised either in profit or loss or outside profit or loss.
The fair value of financial instruments that are not traded in an active market is determined by using suitable valuation techniques selected from among a number of different methods. The assumptions used are mainly based on market conditions existing at the balance sheet date. The group uses present value techniques to determine the fair value of a number of available-for-sale financial assets that are not traded in an active market.
The present value of the pension obligations depends on a number of different factors based on actuarial assumptions. One of the assumptions used to determine the net expenses or income for pensions is the discount rate. Any change to these assumptions will influence the carrying amount of the pension obligation.
The group determines the appropriate discount rate at the end of every year. The discount rate is the interest rate used to determine the present value of future cash flows required to settle the obligation. For the purpose of determining the discount rate, the group employs the interest rate of highest-grade industrial bonds in the same currency in which the benefits are paid and which have terms to maturity equivalent to those of the pension obligations.
Additional substantial assumptions relating to pension obligations are based in part on market conditions. Further information and sensitivity analysis can be found in item 20.
Other construction-related provisions, in particular, involve the risk that in individual cases the actual costs for warranty obligations or remaining performance obligations will turn out higher than expected. This risk is reduced, however, through the case-by-case examinations among the large number of projects. The same is true for provisions relating to legal disputes.
The revenue of T€ 12,475,654 (2012: T€ 12,983,233) is attributed in particular to revenue from construction contracts, revenue from own projects, trade to and services for consortia, as well as other services and proportionally acquired profits resulting from consortia. Revenue from construction contracts including the realised part of profits according to the level of completion of the respective contract (percentage of completion method) amounts to T€ 10,612,669 (2012: T€ 10,788,986), the revenues from property and facility management services amount to T€ 907,502 (2012: T€ 916,135).
Revenues according to business fields and regions are represented individually in the segment reporting.
Revenue provides only an incomplete picture of the output volume achieved in the financial year. Additionally, therefore, the total output volume of the group is represented, which includes the proportional output of consortia and participation companies:
| T€ | 2013 | 2012 |
|---|---|---|
| Germany | 5,788,809 | 5,779,335 |
| Austria | 1,981,500 | 1,888,139 |
| Poland | 787,300 | 1,138,806 |
| Czech Republic | 644,661 | 646,332 |
| Hungary | 495,942 | 392,652 |
| Russia and neighbouring countries | 561,298 | 527,394 |
| Slovakia | 340,420 | 399,602 |
| Romania | 321,834 | 372,042 |
| other CEE countries | 251,874 | 310,046 |
| Rest of CEE | 1,475,426 | 1,609,084 |
| Scandinavia | 510,070 | 578,525 |
| Benelux | 399,659 | 456,235 |
| Switzerland | 386,220 | 424,680 |
| other European countries | 249,779 | 239,838 |
| Rest of Europe | 1,545,728 | 1,699,278 |
| Middle East | 323,132 | 304,936 |
| The Americas | 262,584 | 348,184 |
| Africa | 164,867 | 124,539 |
| Asia | 103,123 | 111,311 |
| Rest of World | 853,706 | 888,970 |
| Total output volume | 13,573,072 | 14,042,596 |
Other operating income includes revenue from letting and leasing in the amount of T€ 28,814 (2012: T€ 22,189), insurance compensation and indemnification in the amount of T€ 35,328 (2012: T€ 37,547), and exchange rate gains in the amount of T€ 11,345 (2012: T€ 8,851) as well as gains from the disposal of fixed assets without financial assets in the amount of T€ 46,293 (2012: T€ 38,151).
Interest income from concession arrangements which is included in other operating income is represented as follows (see also notes on item 17):
| T€ | 2013 | 2012 |
|---|---|---|
| Interest income | 68,670 | 70,925 |
| Interest expense | -34,118 | -36,389 |
| Net interest income | 34,552 | 34,536 |
| T€ | 2013 | 2012 |
|---|---|---|
| Construction materials, consumables | 3,117,915 | 3,551,929 |
| Services used | 5,086,436 | 5,103,172 |
| Construction materials, consumables and services used | 8,204,351 | 8,655,101 |
Services used are mainly attributed to services of subcontractors and professional craftsmen as well as planning services, machine rentals and third-party repairs.
| T€ | 2013 | 2012 |
|---|---|---|
| Wages | 1,000,364 | 1,036,143 |
| Salaries | 1,487,895 | 1,495,331 |
| Social security and related costs | 458,776 | 462,521 |
| Expenses for severance payments and contributions to employee provident fund | 20,672 | 22,623 |
| Expenses for pensions and similar obligations | 7,618 | 10,054 |
| Other social expenditure | 23,323 | 25,105 |
| Employee benefits expense | 2,998,648 | 3,051,777 |
The expenses for severance payments and contributions to the employee provident fund and expenses for pensions and similar obligations include the expenses for service costs and indemnity claims resulting from old-age-part-time claims in the business year. The proportion of interest included in the expenses for severance payments as well as for pensions and similar obligations are recognised in the item net interest income.
Expenses from defined contribution plans amounted to T€ 8,955 (2012: T€ 9,179).
The average number of employees with the proportional inclusion of all participation companies is as follows:
| Average number of employees | 2013 | 2012 |
|---|---|---|
| White-collar-workers | 28,091 | 28,295 |
| Blue-collar-workers | 45,009 | 45,715 |
| Total | 73,100 | 74,010 |
Other operating expenses of T€ 857,292 (2012: T€ 938,158) mainly include general administrative costs, travel and advertising costs, insurance premiums, proportional transfer of losses from consortia, impairment of receivables, the balance of allocations to and utilisation of provisions, legal and advisory costs, rental and lease costs and losses on the disposal of assets (excluding financial assets). Other taxes amounting to T€ 44,163 (2012: T€ 40,976) are included.
Other operating expenses include losses from exchange rate differences in the amount of T€ 18,588 (2012: T€ 26,265).
Indemnity payments in the amount of T€ 43,000 were included in other operating expenses in the previous year, due to the arbitration proceedings with Cemex. The arbitration court ruled that the cancellation of the contract on the purchase of Cemex activities in Hungary and Austria was against the law. STRABAG's appeal against this ruling has been dismissed.
Spending on research and development arose in various special technical proposals, in connection with concrete competitive projects and in the introduction of building processes and products into the market, and was therefore recognised in full in the income statement.
| T€ | 2013 | 2012 |
|---|---|---|
| Income from investments in associates | 10,050 | 12,863 |
| Expenses arising from investments in associates | -4,266 | -22,080 |
| Share of profit or loss of associates | 5,784 | -9,217 |
| T€ | 2013 | 2012 |
|---|---|---|
| Investment income | 45,072 | 30,387 |
| Expenses arising from investments | -30,687 | -7,224 |
| Gains on the disposal and write-up of investments | 1,102 | 532 |
| Impairment of investments | -16,305 | -17,845 |
| Losses on the disposal of investments | -141 | -1,502 |
| Net income from investments | -959 | 4,348 |
Depreciations and impairments are represented in the consolidated statement of fixed assets. In the year under report impairments on intangible assets and on property, plant and equipment to the amount of T€ 24,939 (2012: T€ 18,405) were made. Impairment on goodwill amounts to T€ 3,985 (2012: T€ 10,077). The goodwill impairments involve mainly the activities of a company in the field of communication systems in Austria in the segment International + Special Divisions.
| T€ | 2013 | 2012 |
|---|---|---|
| Interests and similar income | 66,716 | 73,145 |
| Interests and similar charges | -98,256 | -123,871 |
| Net interest income | -31,540 | -50,726 |
Included in interests and similar charges are interest components from the allocation of severance payment and pension provisions amounting to T€ 21,424 (2012: T€ 25,695), security impairment losses of T€ 946 (2012: T€ 1,009) as well as currency losses of T€ 6,952 (2012: T€ 24,876).
Included in interests and similar income are gains from exchange rates amounting to T€ 19,990 (2012: T€ 13,124) and interest components from the plan assets for pension provisions in the amount of T€ 3,645 (2012: T€ 4,454).
Income tax includes taxes paid in the individual companies or owed on income, as well as deferred taxes and the payments of additional tax payments resulting from tax audits:
| T€ | 2013 | 2012 |
|---|---|---|
| Current taxes | 109,863 | 98,156 |
| Deferred taxes | -36,085 | -51,734 |
| Income tax expense | 73,778 | 46,422 |
The following tax components are recognised directly in equity in the statement of comprehensive income:
| T€ | 2013 | 2012 |
|---|---|---|
| Change in hedging reserves | -6,366 | 5,345 |
| Actuarial gains/losses | 374 | 18,487 |
| Fair value of financial instruments under IAS 39 | -24 | -404 |
| Total | -6,016 | 23,428 |
The reasons for the difference between the Austrian corporate income tax rate of 25 % valid in 2013 and the actual consolidated tax rate are as follows:
| T€ | 2013 | 2012 |
|---|---|---|
| Profit before tax | 230,038 | 156,460 |
| Theoretical tax expenditure 25 % | 57,509 | 39,115 |
| Differences to foreign tax rates | -2,685 | -6,754 |
| Change in tax rates | 306 | -688 |
| Non-tax-deductible expenses | 7,004 | 8,910 |
| Tax-free earnings | -4,977 | -8,719 |
| Tax effects of results from associates | 12 | 1,509 |
| Depreciation of goodwill/capital consolidation | -1,964 | 7,190 |
| Additional tax payments/tax refund | 6,911 | -1,696 |
| Change of valuation adjustment on deferred tax assets | 9,719 | 8,022 |
| Others | 1,943 | -467 |
| Recognised income tax | 73,778 | 46,422 |
The basic earnings per share are calculated by dividing the consolidated profit or loss by the weighted average number of ordinary shares.
As there are no stock options at the STRABAG Group, the diluted earnings per share equal the basic earnings per share.
| 2013 | 2012 | |
|---|---|---|
| Number of shares outstanding as at 1.1. | 114,000,000 | 114,000,000 |
| Number of shares bought back | -11,400,000 | -10,912,340 |
| Number of shares outstanding as at 31.12. | 102,600,000 | 103,087,660 |
| Profit or loss attributable to equity holders of the parent (consolidated profit/loss) T€ | 113,558 | 60,631 |
| Weighted number of shares outstanding during the year | 102,716,850 | 104,083,238 |
| Earnings per share € | 1.11 | 0.58 |
The composition of and changes in intangible assets, goodwill, and property, plant and equipment is shown in the consolidated statement of fixed assets.
No borrowing costs were capitalised for property, plant and equipment, or for intangible assets in the year under report, as significant qualifying assets were not produced or acquired after 1 January 2009.
The goodwill at the balance sheet date is composed as follows:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| STRABAG Cologne1) | 178,803 | 178,803 |
| Czech Republic S+O | 66,329 | 72,331 |
| STRABAG Poland | 63,259 | 64,507 |
| Germany N+W | 45,487 | 46,421 |
| Sweden N+W | 18,438 | 19,034 |
| Züblin | 14,938 | 14,938 |
| Special divisions Austria | 13,020 | 16,515 |
| STRABAG Switzerland | 14,973 | 15,227 |
| Construction materials | 13,407 | 13,995 |
| Gebr. von der Wettern Group | 9,700 | 10,090 |
| Other | 22,236 | 19,648 |
| Goodwill | 460,590 | 471,509 |
The comparison of the book values with the recoverable amounts of the cash-generating units determined by the annual impairment test showed a need for goodwill impairment of T€ 3,985 (2012: T€ 10,077).
At the balance sheet date, development costs in the amount of T€ 10,402 (2012: T€ 18,422) were capitalised as intangible assets. In the 2013 financial year, development costs in the amount of T€ 5,424 (2012: T€ 6,000) were incurred, of which T€ 1,242 (2012: T€ 1,950) were capitalised.
Due to existing finance leasing contracts, the following book values are included in property, plant and equipment assets as at the balance sheet date:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Property leasing | 24,986 | 27,451 |
| Machinery leasing | 1,446 | 18,604 |
| Total | 26,432 | 46,055 |
1) Is composed of goodwill from CGU STRABAG Cologne North + West in the amount of T€ 117,698 and CGU STRABAG Cologne South + East in the amount of T€ 61,105.
Offset against these are liabilities arising from the present value of leasing obligations amounting to T€ 22,503 (2012: T€ 43,101).
The terms of the finance leases for property are between four and 20 years, while those for machinery are between two and eight years.
The following payment obligations will arise from financial leases in subsequent financial years:
| Present values | Minimum Payments | |||
|---|---|---|---|---|
| T€ | 31.12.2013 | 31.12.2012 | 31.12.2013 | 31.12.2012 |
| Term up to one year | 2,021 | 8,577 | 3,122 | 11,091 |
| Term between one and five years | 12,467 | 25,690 | 15,212 | 29,631 |
| Term over five years | 8,015 | 8,834 | 9,194 | 10,679 |
| Total | 22,503 | 43,101 | 27,528 | 51,401 |
The reconciliation of minimum lease payments with payables relating to finance leases recognised as at 31 December is as follows.
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Minimum lease payments 31.12. | 27,528 | 51,401 |
| Interest | -4,968 | -8,361 |
| Currency translation | -57 | 61 |
| Finance leases 31.12. | 22,503 | 43,101 |
In addition to the finance leases, there are also operating leases for the utilisation of technical equipment and machinery. The expenses from these contracts are recognised in the income statement. The payments made for the financial year 2013 amount to T€ 95,314 (2012: T€ 96,832).
Payment obligations arising from operating lease agreements in subsequent business years are represented as follows:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Term up to one year | 75,538 | 75,379 |
| Term between one and five years | 136,992 | 148,368 |
| Term over five years | 43,629 | 51,572 |
| Total | 256,159 | 275,319 |
As at the balance sheet date there were T€ 56,656 (2012: T€ 109,960) in contractual commitments for acquisition of property, plant and equipment which were not considered in the financial statement.
Restrictions exist for non-current assets in the amount of T€ 2,576 (2012: T€ 21,470).
The development of investment property is shown in the consolidated statement of fixed assets. The fair value of investment property amounts to T€ 39,528 as at 31 December 2013. The fair value was determined using internal reports based on a discounted cash flow analysis or by employing the fair value of development land at market prices.
The rental income from investment property in the 2013 financial year amounted to T€ 6,259 (2012: T€ 7,440) and direct operating expenses totalled T€ 8,660 (2012: T€ 7,532). In the financial year, as in the year before, no direct expenses were incurred from unlet investment property. Additionally, gains from asset disposals in the amount of T€ 668 (2012: T€ 2,195) were achieved. No impairment was made in the financial year 2013 (2012: T€ 0).
The internal reports are to be classified as Level 3 methods of measurements and build on data that are also based on values that cannot be observed in the market.
Detailed information on the group's investments (shares of more than 20 %) can be found in the list of participations.
The development of the financial assets in the financial year was as follows:
| T€ | Balance as at 1.1.2013 |
Currency translation |
Change in scope of consoli dation |
Additions | Transfers | Disposal | Impairment/ Write-up |
Balance as at 31.12.2013 |
|---|---|---|---|---|---|---|---|---|
| Investments in associates | 379,122 | -183 | 0 | 5,669 | -2,464 | -10,548 | 0 | 371,596 |
| Investments in subsidiaries | 101,493 | -96 | 7,855 | 12,488 | 3,264 | -6,065 | -9,906 | 109,033 |
| Loans to subsidiaries | 173 | 0 | 0 | 0 | -9 | -1 | 0 | 163 |
| Participation companies | 100,612 | -418 | -216 | 4,602 | -791 | -6,281 | -6,386 | 91,122 |
| Loans to participation | ||||||||
| companies | 10,907 | 1 | 0 | 5,742 | 0 | -107 | 0 | 16,543 |
| Securities | 35,317 | -24 | 0 | 86 | 0 | -39 | -1 | 35,339 |
| Other loans | 1,790 | 0 | 0 | 39 | 0 | -653 | 0 | 1,176 |
| Other financial assets | 250,292 | -537 | 7,639 | 22,957 | 2,464 | -13,146 | -16,293 | 253,376 |
The following table provides an overview of the financial information (100 %) for associates and for companies which were reported applying the equity method of accounting in accordance with IAS 31.38 (Joint Ventures):
| T€ | 2013 | 2012 |
|---|---|---|
| Total assets as at 31.12. | 3,766,513 | 3,485,399 |
| Total liabilities as at 31.12. | 3,160,960 | 2,877,334 |
| Revenue | 1,066,090 | 983,736 |
| Profit for the period | 22,811 | -62,230 |
Tax accruals and deferrals recognised in the balance sheet on temporary differences between the amounts stated in the IFRS financial statements and the respective tax amounts as well as losses carried forward developed as follows:
| T€ | Balance as at 1.1.2013 |
Currency translation |
Change in scope of consolidation |
Other Changes | Balance as at 31.12.2013 |
|---|---|---|---|---|---|
| Property, plant and equipment and | |||||
| intangible assets | 10,200 | -179 | 0 | -1,251 | 8,770 |
| Financial assets | 978 | -14 | 0 | 660 | 1,624 |
| Inventories | 6,701 | -9 | -2,669 | 4,925 | 8,948 |
| Trade and other receivables | 10,808 | -996 | 0 | 3,969 | 13,781 |
| Provisions | 189,911 | -1,033 | -151 | -16,165 | 172,562 |
| Liabilities | 4,120 | -265 | 0 | 8,913 | 12,768 |
| Tax loss carryforward | 213,883 | -20 | 0 | -1,480 | 212,383 |
| Deferred tax assets | 436,601 | -2,516 | -2,820 | -429 | 430,836 |
| Netting out of deferred tax assets and liabilities | |||||
| of the same tax authorities | -238,982 | 0 | 0 | 25,434 | -213,548 |
| Deferred tax assets netted out | 197,619 | -2,516 | -2,820 | 25,005 | 217,288 |
| T€ | Balance as at 1.1.2013 |
Currency translation |
Change in scope of consolidation |
Other Changes | Balance as at 31.12.2013 |
|---|---|---|---|---|---|
| Property, plant and equipment and | |||||
| intangible assets | -60,054 | 57 | 0 | 13,739 | -46,258 |
| Financial assets | -9,765 | 0 | 0 | 4,318 | -5,447 |
| Inventories | -62,023 | 0 | 0 | 11,717 | -50,306 |
| Trade and other receivables | -151,577 | 179 | 0 | 13,262 | -138,136 |
| Provisions | 0 | 0 | 0 | -3,176 | -3,176 |
| Liabilities | 0 | 0 | 0 | -9,602 | -9,602 |
| Deferred tax liabilities | -283,419 | 236 | 0 | 30,258 | -252,925 |
| Netting out of deferred tax assets and liabilities | |||||
| of the same tax authorities | 238,982 | 0 | 0 | -25,434 | 213,548 |
| Deferred tax liabilities netted out | -44,437 | 236 | 0 | 4,824 | -39,377 |
Deferred taxes on losses carried forward were capitalised as these can probably be offset with future taxable profits.
The Austrian Corporate Income Tax Act (Körperschaftsteuergesetz) requires a tax-effective impairment of investments to be claimed over a period of seven years. The deferred tax assets on loss carryforwards contain open one-seventh impairments in the amount of T€ 14,306 (2012: T€ 53,377).
No deferred tax assets were made for differences in book value on the assets side and tax losses carried forward of T€ 842,842 (2012: T€ 869,925), as their effectiveness as final tax relief is not sufficiently assured.
Of the non-capitalised loss carryforwards, T€ 779,746 (2012: T€ 800,766) have unrestricted use.
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Construction materials, auxiliary supplies and fuel | 321,384 | 332,597 |
| Offshore wind projects | 181,156 | 174,912 |
| Finished buildings and goods | 163,471 | 232,236 |
| Unfinished buildings and goods | 335,331 | 176,838 |
| Development land | 71,475 | 59,288 |
| Payments made | 32,161 | 55,686 |
| Inventories | 1,104,978 | 1,031,557 |
In the financial year, impairment in the amount of T€ 9,746 (2012: T€ 10,732) was recognised on inventories excluding construction materials, auxiliary supplies and fuel. T€ 43,733 (2012: T€ 53,234) of the inventories excluding construction materials, auxiliary supplies and fuel were reported with the net realisable value.
For qualifying assets, interest on borrowings was recognised in the amount of T€ 2,436 (2012: T€ 4,886).
STRABAG has a 100 % interest in the Hungarian M5 Motorway Concession Company, AKA Alföld Koncesszios Autopalya Zrt., Budapest (AKA).
In the concession agreement with the Hungarian state, AKA committed to develop, plan, finance and to build and operate the M5 motorway. The motorway itself is the property of the state; all vehicles and equipment necessary for motorway operation are to be transferred to the state free of charge following the end of the concession period.
In exchange, AKA will regularly receive an availability fee, independent of transit volume, from the Hungarian state for making the motorway available to the public. AKA bears the operator's risk of motorway closure and non-compliance of contractually agreed roadway criteria.
The route totals 156.5 km and was built in three phases. The concession period runs until 2031. A one-time extension for up to 17.5 years is possible.
All services provided under this concession arrangement are accounted for under the separate balance sheet item receivables from concession arrangements. The receivables are carried at the present value of the payment to be made by the state. The annual accumulation amount is recognised in other operating income.
A part of the availability fee consists of interest adjustment payments of the Hungarian state. As a result, the state bears the interest risk from the financing of AKA. These interest adjustment payments represent an embedded hedging transaction which is measured separately in accordance with IAS 39.11. Presentation is made as a cash flow hedge; as a result, changes in the fair value of the interest rate swap are recognised directly in equity.
The negative market value of the interest rate swap in the amount of T€ -38,493 (2012: T€ -61,199) is also recognised as long-term receivables from concession arrangements.
Recognisable receivables from concession arrangements are offset by non-recourse financing in the amount of T€ 585,105 (2012: T€ 630,311), classified either as a current or non-current liability depending on the term. The resulting interest expense is recognised in other operating income.
Receivables and other assets are comprised as follows:
| 31.12.2013 Thereof |
Thereof | 31.12.2012 Thereof |
Thereof | |||
|---|---|---|---|---|---|---|
| T€ | Total | current | non-current | Total | current | non-current |
| Receivables from concession arrangements | 805,271 | 24,643 | 780,628 | 805,352 | 22,785 | 782,567 |
| Receivables from construction contracts | 5,087,917 | 5,087,917 | 0 | 4,758,302 | 4,758,302 | 0 |
| Advances received | -4,128,730 | -4,128,730 | 0 | -3,823,135 | -3,823,135 | 0 |
| Net receivable from construction contracts | 959,187 | 959,187 | 0 | 935,167 | 935,167 | 0 |
| Other trade receivables | 1,535,957 | 1,463,381 | 72,576 | 1,383,932 | 1,292,506 | 91,426 |
| Advances paid to subcontractors | 40,690 | 40,690 | 0 | 53,652 | 53,652 | 0 |
| Receivables from consortia | 234,387 | 234,387 | 0 | 254,144 | 254,144 | 0 |
| Trade receivables | 2,770,221 | 2,697,645 | 72,576 | 2,626,895 | 2,535,469 | 91,426 |
| Non-financial assets | 56,020 | 56,020 | 0 | 52,749 | 52,749 | 0 |
| Income tax receivables | 43,044 | 35,066 | 7,978 | 65,632 | 53,623 | 12,009 |
| Receivables from subsidiaries | 204,504 | 204,504 | 0 | 145,042 | 145,036 | 6 |
| Receivables from participation companies | 113,415 | 109,337 | 4,078 | 162,197 | 158,789 | 3,408 |
| Other financial assets | 224,910 | 200,339 | 24,571 | 248,679 | 216,269 | 32,410 |
| Other financial assets total | 542,829 | 514,180 | 28,649 | 555,918 | 520,094 | 35,824 |
The receivables from construction contracts as at the balance sheet date are represented as follows:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| All contracts in progress at balance sheet date | ||
| Costs incurred at balance sheet date | 8,577,054 | 9,294,609 |
| Profits arising at balance sheet date | 410,019 | 389,511 |
| Accumulated losses | -413,720 | -378,307 |
| Less receivables recognised under liabilities | -3,485,436 | -4,547,511 |
| Receivables from construction contracts | 5,087,917 | 4,758,302 |
Receivables from construction contracts amounting to T€ 3,485,436 (2012: T€ 4,547,511) are recognised in liabilities, as advances received exceed the receivables.
As usual in the industry, the customer has the contractual right to retain part of the total amount of the invoice. As a rule these retentions are, however, redeemed by collateral (bank or group guarantees).
In the reporting period, impairment on other trade receivables developed as follows:
| T€ | 2013 | 2012 |
|---|---|---|
| Other trade receivables before impairment as at 1.1. | 1,673,294 | 1,512,040 |
| Impairment | ||
| As at 1.1. | 128,108 | 136,138 |
| Currency translation | -2,226 | 2,115 |
| Changes in scope of consolidation | -445 | 330 |
| Allocation/utilisation1) | 11,900 | -10,475 |
| As at 31.12. | 137,337 | 128,108 |
| Book value of other trade receivables as at 31.12. | 1,535,957 | 1,383,932 |
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Securities | 7,820 | 12,472 |
| Cash on hand | 3,254 | 5,917 |
| Bank deposits | 1,700,894 | 1,356,566 |
| Cash and cash equivalents | 1,711,968 | 1,374,955 |
The cash and cash equivalents include assets abroad in the amount of T€ 16,785 (2012: T€ 8,757), subject to the restriction that they may only be transferred to another country following official completion of the construction order.
Moreover, in construction projects executed through consortia there are cash and cash equivalents whose use can only be determined jointly with other partner companies. Of the cash and cash equivalents, T€ 10,510 (2012: T€ 15,529) are pledged as collateral (see also item 24).
The fully paid in share capital amounts to € 114,000,000 and is divided into 113,999,997 no-par bearer shares and three registered shares.
As at 31 December 2013, STRABAG SE had acquired 11,400,000 bearer shares equalling 10 % of the share capital. The corresponding value of the share capital amounts to € 11,400,000. The acquisition took place between July 2011 and May 2013. The average purchase price per share was € 20.79.
The management board has been authorised, with the approval of the supervisory board, to increase the share capital of the company by up to € 57,000,000 by 19 June 2014, in several tranches if necessary, by issuing up to 57,000,000 registered no-par shares for cash or contributions in kind (approved capital). In the case of capital increase through contributions in kind, the partial or full exclusion of the shareholders' subscription rights is possible.
The exercise, issue price and conditions of issue shall be determined with the approval of the supervisory board. The supervisory board was authorised to determine the necessary changes to the Articles of Association required upon the issuance of shares from the approved capital.
The management board has also been authorised until 15 June 2017, in accordance with Section 65 Paragraph 1b of the Austrian Stock Corporation Act, to sell or assign its own shares, with approval by the supervisory board, in a manner other than on the stock market or through a public tender, to the exclusion of the shareholders' buyback rights (subscription rights), and to determine the conditions of sale. The authorisation can be exercised in full, or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Section 228 Paragraph 3 of the Austrian Business Enterprise Code) or third parties acting on behalf of the company.
The management board has been authorised, with approval from the supervisory board, until 15 June 2017, to issue financial instruments within the meaning of Section 174 of the Austrian Stock Corporation Act (AktG), in particular convertible bonds, income bonds and profit participation rights with a total nominal value of up to € 1,000,000,000.00 which may also confer subscription and/or exchange rights for the acquisition of up to 50,000,000 shares of the company and/or may be designed in such a way that they can be issued as equity. This can be done also in several tranches and in different combinations and indirectly by way of a guarantee for the issue of financial instruments through an associate or related entity of the company with conversion rights on shares of the company. For the servicing, the management board may use the conditional capital or own shares. The issue amount and issue conditions, as well as the possible exclusion of the shareholders' subscription rights for the issued financial instruments, are to be determined by the management board with the approval of the supervisory board.
Also approved was a conditional increase of the share capital of the company pursuant to Section 159 Paragraph 2 No. 1 of the Austrian Stock Corporation Act (AktG) by up to € 50,000,000.00 through the issue of up to 50,000,000 new bearer shares with no face value (no-par shares) for issue to creditors of financial instruments within the meaning of the authorisation granted to the management board, provided the creditors of financial instruments exercise their subscription and/or exchange rights for shares of the company. The issue amount and the exchange ratio are to be determined based on recognised financial mathematical methods and the price of the shares of the company in a recognised pricing procedure. The newly issued shares of the conditional capital increase carry a dividend entitlement corresponding to that of the shares traded on the stock market at the time of the issue. The management board is authorised, with the approval of the supervisory board, to establish the further details of the implementation of the conditional capital increase. The supervisory board is authorised to pass resolution on any amendments to the Articles of Association resulting from the issue of shares within the scope of the conditional capital.
Details as to the development of the equity of STRABAG SE are represented in the statement of changes in equity.
Long-term economic success, within the context of responsibility to our shareholders, customers, employees, suppliers, subcontractors and the company itself, is the primary entrepreneurial objective of the STRABAG Group. Working to pursue these goals, recognising opportunities and risks before and as they arise, and responsibly taking these into consideration safeguards the continuity of the group and protects the interests of the shareholders.
To guarantee the continuity of the company, the management and responsible employees assure that there is a balanced relationship between opportunities and risks during the selection of projects and assess the individual risks against the background of the overall company risk.
The group equity ratio target was defined at between 20 % and 25 % during the IPO of STRABAG SE in October 2007. The equity capital ratio is calculated from the book value of the equity as at 31 December divided by the balance sheet total as at 31 December. The equity contains all parts of the equity according to the balance sheet: share capital, capital reserves, retained earnings and non-controlling interests.
The group equity ratio as at 31 December 2013 amounted to 30.7 % (2012: 31.2 %). With this equity base, the STRABAG Group will be able to participate increasingly in tenders for public-private partnership (PPP) projects. This means that the necessary funds for a participation in equity capital are available and that the related change in the balance sheet total will be manageable.
If the group is awarded the tender for large-scale projects, or if a strategically suitable acquisition is made, the equity ratio could briefly fall below the set minimum. In this case, the company reserves the right to adjust the dividend payments to the shareholders or to issue new shares.
| Total | 1,691,041 | -12,663 | 26 | 683,163 | 32,493 | 638,506 | 1,690,568 |
|---|---|---|---|---|---|---|---|
| Current provisions | 665,208 | -8,396 | -143 | 575,297 | 24,142 | 512,000 | 695,824 |
| Other provisions | 219,487 | -2,395 | -756 | 230,996 | 13,810 | 189,102 | 244,420 |
| Personnel-related provisions1) | 150,131 | -1,439 | 192 | 151,651 | 1,058 | 126,712 | 172,765 |
| Construction-related provisions | 295,590 | -4,562 | 421 | 192,650 | 9,274 | 196,186 | 278,639 |
| Non-current provisions | 1,025,833 | -4,267 | 169 | 107,866 | 8,351 | 126,506 | 994,744 |
| Other provisions | 50,463 | -94 | 264 | 4,235 | 6,099 | 14,862 | 33,907 |
| Personnel-related provisions | 88,123 | -140 | 82 | 6,805 | 249 | 27,316 | 67,305 |
| Construction-related provisions | 377,416 | -3,571 | -219 | 96,826 | 2,003 | 75,556 | 392,893 |
| Provisions for pensions | 429,923 | -462 | -24 | 0 | 0 | 7,194 | 422,243 |
| T€ Provisions for severance payments |
Balance as at 1.1.2013 79,908 |
Currency translation 0 |
scope of consoli dation 66 |
Additions 0 |
Disposals 0 |
Impairment 1,578 |
Balance as at 31.12.2013 78,396 |
The actuarial assumptions as at 31 December 2013 (in brackets as at 31 December 2012) used to calculate provisions for severance payments and pensions are represented as follows:
| Severance payments | Pension obligation Austria |
Pension obligation Germany |
Pension obligation Switzerland |
|
|---|---|---|---|---|
| Biometric tables | AVÖ 2008 | AVÖ 2008 | Dr. Klaus Heubeck | BVG 2010 |
| Discounting rate (%) | 3.50 | 3.50 | 3.50 | 2.35 |
| (2012: 3.75) | (2012: 3.75) | (2012: 3.75) | (2012: 1.90) | |
| Salary increase (%) | 2.00 | 0.00 | 2.25 | 2.00 |
| (2012: 2.00) | (2012: 0.00) | (2012: 2.25) | (2012: 2.00) | |
| Future pension increase (%) | dependent on contractual | dependent on contractual | dependent on contractual | 0.25 |
| adaptation | adaptation | adaptation | (2012: 0.25) | |
| Retirement age for men | 62 | 65 | 67 | 65 |
| (2012: 62) | (2012: 65) | (2012: 67) | (2012: 65) | |
| Retirement age for women | 62 | 60 | 67 | 64 |
| (2012: 62) | (2012: 60) | (2012: 67) | (2012: 64) |
All other parameters remaining equal, a change in the discount rate by +/- 0.5 percentage points, a change in the salary increase by +/- 0.25 percentage points as well as a change in the pension increase by +/- 0.25 percentage points would have the following impact on the amount of the provisions for severance payments and pension obligations:
| Change in discounting rate | Change in salary increase | Change in future pension increase | ||||
|---|---|---|---|---|---|---|
| Change T€2) | -0.5 %-points | +0.5 %-points | -0.25 %-points | +0.25 %-points | -0.25 %-points | +0.25 %-points |
| Severance payments | -3,572 | 3,304 | 1,712 | -1,772 | n.a. | n.a. |
| Pension obligations | -24,662 | 22,229 | 61 | -62 | 8,433 | -8,974 |
1) In the other personnel-related provisions plan assets in the amount of T€ 7,970 (2012: T€ 13,763) are deducted.
2) Sign: - increase of obligation, + decrease of obligation
Provisions for severance payments show the following development:
| T€ | 2013 | 2012 |
|---|---|---|
| Present value of the defined benefit obligation as at 1.1. | 79,908 | 70,438 |
| Changes in scope of consolidation | 66 | 539 |
| Current service costs | 2,586 | 3,087 |
| Interest costs | 2,442 | 2,885 |
| Severance payments | -6,058 | -6,015 |
| Actuarial gains/losses arising from experience adjustments | -2,232 | 1,190 |
| Actuarial gains/losses arising from changes in the discount rate | 1,684 | 7,784 |
| Present value of the defined benefit obligation as at 31.12. | 78,396 | 79,908 |
The development of the provisions for pensions is shown below:
| T€ | 2013 | 2012 |
|---|---|---|
| Present value of the defined benefit obligation as at 1.1. | 634,304 | 586,294 |
| Changes in scope of consolidation/currency translation | -3,429 | 8,154 |
| Current services costs | 19,185 | 17,157 |
| Interest costs | 18,982 | 22,810 |
| Pension payments | -41,146 | -62,579 |
| Actuarial gains/losses arising from experience adjustments | -2,930 | 1,336 |
| Actuarial gains/losses arising from changes in the discount rate | 4,688 | 61,132 |
| Present value of the defined benefit obligation as at 31.12. | 629,654 | 634,304 |
The plan assets for pension provisions developed as follows in the year under report:
| T€ | 2013 | 2012 |
|---|---|---|
| Fair value of the plan assets as at 1.1. | 204,381 | 202,085 |
| Changes to the scope of consolidation/currency translation | -2,943 | 6,605 |
| Income from plan assets | 3,645 | 4,454 |
| Contributions | 14,562 | 14,673 |
| Pension payments | -14,164 | -31,007 |
| Acturial gains/losses | 1,930 | 7,571 |
| Fair value of the plan assets as at 31.12. | 207,411 | 204,381 |
The plan assets consist of the following risk groups:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Shares1) | 21,454 | 21,722 |
| Bonds1) | 84,010 | 93,669 |
| Cash | 37,400 | 29,258 |
| Investment funds | 5,096 | 3,731 |
| Real estate | 6,813 | 6,923 |
| Liability insurance | 51,675 | 47,172 |
| Other assets | 963 | 1,906 |
| Total | 207,411 | 204,381 |
The plan assets involve almost exclusively the assets of the pension foundation of STRABAG AG, Switzerland. Any investments in this regard are subject to the applicable laws and regulations governing the supervision of foundations. Capital investments are to be chosen by trained experts in such a way as to guarantee the investment goal of revenue-generating and risk-minimising asset management while taking into consideration security, risk distribution, returns and the liquidity to fulfil the pension purposes. The assets are to be invested to 80 % in nominal investments such as cash and receivables in a fixed monetary amount and to 20 % in real investments such as stocks and real estate.
The contributions in the following year amounts to T€ 6,680.
1) All stocks and bonds are traded in an active market.
Pension payments in Switzerland are provided by pension foundations with funds dedicated to this purpose, while payments in Austria and in Germany are covered by readily available cash and cash equivalents as well as securities.
The actual return on plan assets amounted to T€ 6,057 (2012: T€ 7,748) in the financial year.
The following amounts for pension and severance provisions were recognised in the income statement:
| T€ | 2013 | 2012 |
|---|---|---|
| Current service cost | 21,771 | 20,244 |
| Interest cost | 21,424 | 25,695 |
| Return on plan assets | 3,645 | 4,454 |
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Present value of the defined benefit obligation (severance provisions) = net defined | ||
| benefit liability | 78,396 | 79,908 |
| Present value of the defined benefit obligation (pension provision) | 629,654 | 634,304 |
| Fair value of plan assets (pension provision) | -207,411 | -204,381 |
| Net defined benefit liability (pension provision) | 422,243 | 429,923 |
| Net defined benefit liability | 500,639 | 509,831 |
The actuarial adjustments to pension and severance provisions are represented as follows:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Adjustments of severance provisions | -548 | 8,974 |
| Adjustments of pension provisions | -172 | 54,897 |
| Adjustments | -720 | 63,871 |
The maturity profile of the benefit payments from the net defined benefit liability as at 31 December 2013 is as follows:
| T€ | <1 year | 1 – 5 years | 6 – 20 years | >20 years |
|---|---|---|---|---|
| Provisions for severance payments | 3,947 | 18,878 | 63,533 | 12,853 |
| Provisions for pensions | 28,611 | 143,357 | 327,679 | 204,748 |
The construction-related provisions include other warranty obligations, costs of the contract execution and subsequent costs of invoiced contracts, as well as impending losses from projects pending which are not accounted for elsewhere. The personnel-related provisions essentially include anniversary bonus obligations, contributions to occupational accident funds as well as costs of the old-age-part-time scheme and expenses for personnel downsizing measures. Other provisions include provisions for damages and litigations and restructuring.
| T€ | Total | 31.12.2013 Thereof current |
Thereof non-current |
Total | 31.12.2012 Thereof current |
Thereof non-current |
|---|---|---|---|---|---|---|
| Bonds | 582,500 | 7,500 | 575,000 | 477,500 | 95,000 | 382,500 |
| Bank borrowings | 1,117,697 | 359,309 | 758,388 | 1,129,383 | 280,425 | 848,958 |
| Liabilities from finance leases | 22,503 | 2,021 | 20,482 | 43,101 | 8,577 | 34,524 |
| Other liabilities | 0 | 0 | 0 | 0 | 0 | 0 |
| Financial liabilities | 1,722,700 | 368,830 | 1,353,870 | 1,649,984 | 384,002 | 1,265,982 |
| Receivables from construction contracts1) | -3,485,436 | -3,485,436 | 0 | -4,547,511 | -4,547,511 | 0 |
| Advances received | 4,030,764 | 4,030,764 | 0 | 5,077,581 | 5,077,581 | 0 |
| Net liabilities from construction contracts | 545,328 | 545,328 | 0 | 530,070 | 530,070 | 0 |
| Other trade payables | 2,085,763 | 2,037,229 | 48,534 | 1,981,392 | 1,920,386 | 61,006 |
| Payables to consortia | 353,494 | 353,494 | 0 | 273,663 | 273,663 | 0 |
| Trade payables | 2,984,585 | 2,936,051 | 48,534 | 2,785,125 | 2,724,119 | 61,006 |
| Non-financial liabilities | 392,997 | 391,600 | 1,397 | 369,760 | 368,432 | 1,328 |
| Income tax liabilities | 97,281 | 97,281 | 0 | 71,248 | 71,248 | 0 |
| Payables to subsidiaries | 122,214 | 122,214 | 0 | 68,639 | 68,639 | 0 |
| Payables to participation companies | 29,705 | 21,347 | 8,358 | 20,072 | 15,409 | 4,663 |
| Other financial liabilities | 242,594 | 223,086 | 19,508 | 274,843 | 246,176 | 28,667 |
| Other financial liabilities total | 394,513 | 366,647 | 27,866 | 363,554 | 330,224 | 33,330 |
In order to secure liabilities to banks, real securities amounting to T€ 309,353 (2012: T€ 205,526) have been booked.
The company has accepted the following guarantees:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Guarantees without financial guarantees | 903 | 903 |
In the construction industry, it is customary and necessary to provide various types of guarantees to secure the contractual obligations. These guarantees are usually issued by banks or credit insurers and most commonly comprise bid, contract performance, prepayment and warranty guarantees. In the event these guarantees are called upon, the relevant banks have a contractual right of recourse against the group. The risk that such guarantees are utilised and that a right of recourse arises materialises only if the primary contractual obligations are not properly performed.
Obligations and possible risks from such guarantees are recognised in the balance sheet as provisions or liabilities.
Not included in the balance sheet or the contingent liability as at 31 December 2013 are performance bonds in the amount of € 2.2 billion (2012: € 2.1 billion) of which an outflow of resources is unlikely.
As is customary in the industry, STRABAG SE shares liability with the other partners of consortia and joint ventures in which companies of the STRABAG Group hold a share interest.
The representation of the cash flow statement was made according to the indirect method and separated into the cash flows classified by operating, investing and financing activities. The cash and cash equivalents include exclusively cash on hand, bank deposits and short-term securities. Any effects of changes in consolidation were eliminated and represented in the cash flow from investing activities.
The cash and cash equivalents are composed as follows:
| T€ | 31.12.2013 | 31.12.2012 |
|---|---|---|
| Securities | 7,820 | 12,472 |
| Cash on hand | 3,254 | 5,917 |
| Bank deposits | 1,700,894 | 1,356,566 |
| Restricted cash abroad | -16,758 | -8,757 |
| Pledge of cash and cash equivalents | -10,510 | -15,529 |
| Cash and cash equivalents | 1,684,700 | 1,350,669 |
The cash flow from operating activities in the reporting year contains the following items:
| T€ | 2013 | 2012 |
|---|---|---|
| Interest paid | 64,890 | 71,667 |
| Interest received | 44,707 | 58,314 |
| Taxes paid | 66,933 | 141,699 |
| Dividends received | 25,870 | 31,857 |
A financial instrument is a contract that results in a financial asset at one enterprise and a financial liability or equity instrument at another. Financial assets include especially cash and cash equivalents, trade receivables and other receivables and derivatives. Financial liabilities are obligations to pay cash or other financial assets on a regular basis. These include especially financial liabilities such as bank borrowings, bonds, liabilities arising from financial leases and trade payables. Initial recognition is carried out in principle using settlement date accounting.
The financial assets are derecognised when the claims to payment from the investment extinguish or have been transferred and the group has largely transferred all risks and opportunities which are related with the property.
The financial instruments as at the balance sheet date were as follows:
| Measurement category |
31.12.2013 | 31.12.2012 | |||
|---|---|---|---|---|---|
| T€ | according to IAS 39 |
Carrying value |
Fair value | Carrying value |
Fair value |
| Assets | |||||
| Investments in subsidiaries | AfS1) | 109,033 | 101,493 | ||
| Participation companies | AfS1) | 91,122 | 100,612 | ||
| Loans to subsidiaries | L&R | 163 | 173 | ||
| Loans to participation companies | L&R | 16,543 | 10,907 | ||
| Other loans | L&R | 1,176 | 1,790 | ||
| Trade receivables | L&R | 2,770,222 | 2,626,895 | ||
| Receivables from concession arrangements | L&R | 843,765 | 866,550 | ||
| Other financial assets | L&R | 540,964 | 554,351 | ||
| Cash and cash equivalents | L&R | 1,704,148 | 1,362,483 | ||
| Valuation at historical costs | 6,077,136 | 5,625,254 | |||
| Securities | AfS | 35,339 | 35,339 | 35,317 | 35,317 |
| Cash and cash equivalents | AfS | 7,820 | 7,820 | 12,472 | 12,472 |
| Derivatives held for hedging purposes | -36,628 | -36,628 | -59,632 | -59,632 | |
| Valuation at fair value | 6,531 | 6,531 | -11,843 | -11,843 | |
| Liabilities | |||||
| Financial liabilities | FLaC | -1,722,700 | -1,756,085 | -1,649,984 | -1,671,524 |
| Trade payables | FLaC | -2,439,257 | -2,255,055 | ||
| Other financial liabilities | FLaC | -389,049 | -355,913 | ||
| Valuation at historical costs | -4,551,006 | -1,756,085 | -4,260,952 | -1,671,524 | |
| Derivatives held for hedging purposes | -5,464 | -5,464 | -7,641 | -7,641 | |
| Valuation at fair value | -5,464 | -5,464 | -7,641 | -7,641 | |
| Total | 1,527,197 | -1,755,018 | 1,344,818 | -1,691,008 | |
| Measurement categories | |||||
| Loans and receivables (L&R) | 5,876,981 | 5,423,149 | |||
| Available for sale (AfS) | 243,314 | 43,159 | 249,894 | 47,789 | |
| Financial liabilities measured at amortised costs (FLaC) | -4,551,006 | -1,756,085 | -4,260,952 | -1,671,524 | |
| Derivatives held for hedging purposes | -42,092 | -42,092 | -67,273 | -67,273 | |
| Total | 1,527,197 | -1,755,018 | 1,344,818 | -1,691,008 |
No special disclosure of the fair value of financial instruments is represented if the carrying amount is a reasonable approximation of fair value.
Cash and cash equivalents, trade receivables and other receivables have for the most part short remaining terms. Accordingly, their carrying values on the balance sheet date approximate their fair value. The fair value of non-current financial assets corresponds to the present value of the related payments under consideration of the prevailing market parameters as far as market values were not available.
Trade payables and other financial liabilities typically have short terms; their book values approximate the fair value. The fair value of bonds, bank borrowing and liabilities arising from financial leases are measured at the present value of the payments associated with them and under consideration of the relevant applicable market parameters as far as market values were not available. The fair value of the financial liabilities would qualify as a Level 1 measurement at T€ 603,276 and as a Level 2 measurement at T€ 1,152,809.
T€ 10,510 (2012: T€ 15,529) of cash and cash equivalents, T€ 2,744 (2012: T€ 2,684) of securities and T€ 11,206 (2012: T€ 11,708) of other financial instruments were pledged as collateral for liabilities.
The non-recourse liabilities related to receivables from concession arrangements are hedged using the income from receivables from concession arrangements.
The financial instruments recognised at fair value, classified by method of measurement (Level 1 to Level 3), are as follows.
Level 1: In measurement at market prices, the assets and liabilities are measured at the quoted prices in an active market for identical assets and liabilities.
Level 2: The measurement based on observable market inputs takes into account not only market prices but also directly or indirectly observable data.
Level 3: Other methods of measurement also consider data that are not observable on the markets.
The fair values as at 31 December 2013 for financial instruments were measured as follows:
| T€ | Level 1 | Level 2 | Total |
|---|---|---|---|
| Assets | |||
| Securities | 35,339 | 0 | 35,339 |
| Cash and cash equivalents | 7,820 | 0 | 7,820 |
| Derivatives held for hedging purposes | 0 | -36,628 | -36,628 |
| Total | 43,159 | -36,628 | 6,531 |
| Liabilities | |||
| Derivatives held for hedging purposes | 0 | -5,464 | -5,464 |
| Total | 0 | -5,464 | -5,464 |
The fair value as at 31 December 2012 for financial instruments were measured as follows:
| T€ | Level 1 | Level 2 | Total |
|---|---|---|---|
| Assets | |||
| Securities | 35,317 | 0 | 35,317 |
| Cash and cash equivalents | 12,472 | 0 | 12,472 |
| Derivatives held for hedging purposes | 0 | -59,632 | -59,632 |
| Total | 47,789 | -59,632 | -11,843 |
| Liabilities | |||
| Derivatives held for hedging purposes | 0 | -7,641 | -7,641 |
| Total | 0 | -7,641 | -7,641 |
During the financial year 2013, there were no transfers between the levels.
The fair value is determined on the basis of quoted prices in an active market. An active market exists if the prices are regularly established and readily available to the market participant. The quoted market price for the financial instruments presented in Level 1 corresponds to the bid price as at 31 December 2013.
These financial instruments are not traded in an active market. They involve exclusively derivatives concluded for hedging purposes in the group. The fair value is determined using methods of measurement on the basis of observable market data. Specifically, measurement is made using interest yield and currency curves in proportion to the term of the derivative.
At the end of the reporting period, the STRABAG Group had no financial instruments classified in Level 3.
T€ 31.12.2013 31.12.2012 Bank Assets Liabilities Total Assets Liabilities Total Bayerische Landesbank 2 -314 -312 108 -109 -1 Commerzbank AG 1,359 -1,231 128 455 -1,277 -822 Credit Agricole Corp. & Investment 154 -68 86 257 -232 25 Deutsche Bank AG 0 0 0 8 -142 -134 Erste Group Bank AG 0 0 0 18 0 18 ING Bank N.V. 5 0 5 0 0 0 Landesbank Baden-Württemberg 0 -2,165 -2,165 0 -3,176 -3,176 Raiffeisen Bank International 0 -2 -2 226 -258 -32 SEB AG 62 -1,658 -1,596 214 -2,420 -2,206 Republic of Hungary -38,493 0 -38,493 -61,199 0 -61,199 UniCredit Bank Austria AG 283 -26 257 281 -27 254 Total -36,628 -5,464 -42,092 -59,632 -7,641 -67,273
As at 31 December 2013, the following derivatives existed which are not offsettable but which can be set off in case of insolvency.
The net income effects of the financial instruments according to valuation categories are as follows:
| 2013 | 2012 | |||||||
|---|---|---|---|---|---|---|---|---|
| T€ | L&R | AfS | FLaC | Derivate | L&R | AfS | FLaC | Derivate |
| Interest | 41,887 | 0 | -68,933 | 0 | 51,581 | 0 | -72,293 | 0 |
| Interest from receivables from | ||||||||
| concession arrangements | 68,670 | 0 | -25,653 | -8,465 | 70,925 | 0 | -27,359 | -9,030 |
| Result from securities | 0 | 4,390 | 0 | 0 | 0 | 786 | 0 | 0 |
| Impairment losses | -45,776 | -15,541 | 116 | 0 | -42,099 | -17,600 | 0 | -692 |
| Disposal losses/profits | 0 | 617 | 0 | 0 | 0 | 1,857 | 0 | 0 |
| Gains from derecognition | ||||||||
| of liabilities and payments of | ||||||||
| written off receivables | 0 | 0 | 6,239 | 0 | 18 | 0 | 7,239 | 0 |
| Net income recognised | ||||||||
| in profit or loss | 64,781 | -10,534 | -88,231 | -8,465 | 80,425 | -14,957 | -92,413 | -9,722 |
| Value changes recognised | ||||||||
| directly in equity1) | 0 | 256 | 0 | 32,545 | 0 | -1,724 | 0 | -26,942 |
| Net income | 64,781 | -10,278 | -88,231 | 24,080 | 80,425 | -16,681 | -92,413 | -36,664 |
Dividends and income from investments shown in net income from investments are part of operating income and therefore not part of net income of financial instruments. Impairment losses, reversal of impairment losses, disposal gains and disposal losses of loans & receivables (L&R) and of financial liabilities amortised at cost (FLaC) are carried in other income or other expenses.
Impairment losses, reversal of impairment losses, disposal gains and disposal losses of the financial instruments are carried in net income from investments if they are investments in subsidiaries or participation companies, otherwise in net interest income.
Derivative instruments are used exclusively to hedge existing risks resulting from changes in currency and interest rates. The use of derivative financial instruments in the group is subject to the appropriate approval and control procedures. The connection to a mainstay business is a must, trading is not permissible.
The STRABAG Group is subject to credit, market and liquidity risks related to its assets, liabilities and planned transactions. The goal of financial risk management is to minimise these risks through ongoing financially oriented activities.
The basics of the financial policy are set by the management board and monitored by the supervisory board. The implementation of the financial policy and responsibility for the risk management are the domain of the group treasury. Certain transactions require prior approval by the management board, which is regularly informed as to the scope and amount of the current risk exposure.
The financial instruments bear variable interest rates on the assets side, on the liabilities side there are both variable and fixed interest obligations. The risk of financial instruments bearing variable interest rates consists of increasing interest charges and sinking interest revenue resulting from an unfavourable change in market interest rates. Fixed interest obligations mainly result from the bonds issued by STRABAG SE amounting to a total of T€ 575,000.
As at 31 December 2013, following hedging transactions existed:
| 31.12.2013 | 31.12.2012 | |||
|---|---|---|---|---|
| T€ | Nominal value | Market value | Nominal value | Market value |
| Interest rate swaps | 707,334 | -43,443 | 778,680 | -68,327 |
The amount of bank deposits and bank borrowings according to currency – giving the average interest rate at balance sheet date – is represented as follows:
| Carrying value | |||
|---|---|---|---|
| 31.12.2013 | Weighted average | ||
| Currency | T€ | interest rate 2013 % | |
| EUR | 1,001,293 | 0.37 | |
| PLN | 194,295 | 2.68 | |
| CZK | 127,798 | 0.54 | |
| HUF | 96,064 | 2.85 | |
| Others | 281,444 | 1.46 | |
| Total | 1,700,894 | 0.99 |
| Carrying value | |||
|---|---|---|---|
| 31.12.2013 | Weighted average | ||
| Currency | T€ | interest rate 2013 % | |
| EUR | 1,090,913 | 2.09 | |
| Others | 26,784 | 4.16 | |
| Total | 1,117,697 | 2.14 |
Had the interest rate level at 31 December 2013 been higher by 100 basispoints, then the profit before tax would have been higher by T€ 8,968 (2012: T€ 5,787) and the equity at 31 December 2013 would have been higher by T€ 44,525 (2012: T€ 47,341). Had the interest rate level been lower by 100 basispoints, this would have meant a correspondingly lower equity and profit before tax. The calculation is made based on the level of interest-bearing financial assets and liabilities as at 31 December. Tax effects from interest rate changes were not considered.
Due to the decentralised structure of the group, characterised by local companies in the respective countries, mainly closed currency positions appear in the balance sheet. Loan financing and investments were predominantly made by the group companies in the respective country's local currency. Receivables and liabilities from business activities mainly offset each other in the same currency.
The remaining currency risk mainly results when the currency of the order deviates from the functional currency of the subsidiary affected.
The internal financing of companies within the group using different functional currencies resulted in an earnings-relevant currency risk.
This applies in particular to orders in Eastern Europe and Scandinavia which are concluded in euro. The planned proceeds are received in the currency of the order while a substantial part of the associated costs is made in the local currency.
In order to limit the remaining currency risk and secure the calculation, derivative financial instruments were transacted. As at 31 December 2013, the following hedging transactions existed for the underlying transactions mentioned1) below:
| T€ Currency |
Expected cash flows 2014 |
Expected cash flows 2015 |
Total | Positive market value of the hedging transaction |
Negative market value of the hedging transaction |
|---|---|---|---|---|---|
| AED | 26,702 | 21,080 | 47,782 | 1,215 | 0 |
| HUF | 35,348 | 0 | 35,348 | 0 | -24 |
| PLN | 34,089 | 0 | 34,089 | 67 | 0 |
| Others | 58,478 | 0 | 58,478 | 583 | -490 |
| Total | 154,617 | 21,080 | 175,697 | 1,865 | -514 |
As at 31 December 2012, the following hedging transactions existed for the underlying transactions mentioned1) below:
| T€ Currency |
Expected cash flows 2013 |
Expected cash flows 2014 |
Total | Positive market value of the hedging transaction |
Negative market value of the hedging transaction |
|---|---|---|---|---|---|
| PLN | 119,562 | 2,300 | 121,862 | 1,566 | -422 |
| CZK | 52,234 | 0 | 52,234 | 116 | -60 |
| Others | 89,998 | 0 | 89,998 | 488 | -634 |
| Total | 261,794 | 2,300 | 264,094 | 2,170 | -1,116 |
Of the derivative financial instruments classified as cash flow hedges as at 31 December 2012, T€ -1,273 were shifted from equity and recognised in the consolidated income statement in the 2013 financial year (2012: T€ 1,907). The resulting deferred tax income amounted to T€ 242 (2012: tax expense of T€ -362).
| Currency | Exchange rate | 31.12.2013: 1 € = Average rate 2013: 1 € = | Exchange rate 31.12.2012: 1 € = |
Average rate 2012: 1 € = |
|
|---|---|---|---|---|---|
| HUF | 297.0400 | 297.9333 | 292.3000 | 288.2142 | |
| CZK | 27.4270 | 26.0270 | 25.1510 | 25.1395 | |
| PLN | 4.1543 | 4.2134 | 4.0740 | 4.1677 | |
| HRK | 7.6265 | 7.5785 | 7.5575 | 7.5261 | |
| CHF | 1.2276 | 1.2291 | 1.2072 | 1.2044 |
Essentially, the Polish zloty, the Czech crown, the Hungarian forint and the Swedish crown are affected by revaluation (devaluation). The following table shows the hypothetical changes in profit before tax and equity if the euro in the year 2013 had been revalued or devalued by 10 % in relation to another currency:
| T€ Currency |
Revaluation euro of 10 % | Devaluation euro of 10 % | ||
|---|---|---|---|---|
| Change in profit before tax |
Change in equity |
Change in profit before tax |
Change in equity |
|
| PLN | 8,403 | 8,403 | -8,403 | -8,403 |
| HUF | -5,757 | -5,757 | 5,757 | 5,757 |
| CHF | -7,285 | -7,285 | 7,285 | 7,285 |
| CZK | 7,811 | 7,811 | -7,811 | -7,811 |
| Others | -6,482 | -4,374 | 6,482 | 4,374 |
The following table shows the hypothetical changes in profit before tax and equity if the euro in the year 2012 had been revalued or devalued by 10 % in relation to another currency:
| T€ Currency |
Revaluation euro of 10 % | Devaluation euro of 10 % | ||
|---|---|---|---|---|
| Change in profit before tax |
Change in equity |
Change in profit before tax |
Change in equity |
|
| PLN | 11,430 | 11,200 | -11,430 | -11,200 |
| HUF | -315 | -315 | 315 | 315 |
| CHF | -6,867 | -6,867 | 6,867 | 6,867 |
| CZK | 9,065 | 9,065 | -9,065 | -9,065 |
| Others | -4,700 | -4,700 | 4,700 | 4,700 |
The calculation is based on original and derivative foreign currency holdings in non-functional currency as at 31 December as well as underlying transactions for the next twelve months. The effect on tax resulting from changes in currency exchanges rates was not taken into consideration.
The maximum risk of default of the financial assets, without cash and cash equivalents, as at the balance sheet date is T€ 4,371,697 (2012: T€ 4,238,457) and corresponds to the book values presented in the balance sheet. Thereof T€ 2,770,221 (2012: T€ 2,626,895) involve trade receivables. Receivables from construction contracts and receivables from consortia involve ongoing construction projects and are therefore not yet payable for the most part. Of the remaining trade receivables in the amount of T€ 1,535,957 (2012: T€ 1,383,933), only insignificant amounts are overdue and not impaired.
The risk for receivables from clients can be rated as low due to the wide dispersion, a constant creditworthiness check and the presence of the public sector as an important client.
The risk of default for other primary financial instruments shown on the assets side can also be regarded as low, as the contract partners are mainly financial institutions with the highest level of creditworthiness and/or the risk of default has been significantly reduced as a result of assumed liabilities of third parties.
Furthermore, there is a derived credit risk arising from the financial guarantee contracts of T€ 59,199 (2012: T€ 56,019).
Financial assets are impaired item by item if the book value of the financial assets is higher than the present value of the future cash flows. This can be triggered by financial difficulties, insolvency of the client, breach of contract or significant default of payment. The impairment is composed of many individual items of which none, seen alone, is significant. In addition to the estimation of the creditworthiness risk, the relevant country risk is also taken into consideration. Graduated valuation adjustments are formed according to risk groups to take into consideration general credit risks.
Liquidity for the STRABAG SE Group means not only solvency in the strict sense but also the availability of the necessary financial margin for mainstay business through sufficient aval lines.
To guarantee financial flexibility, liquidity reserves are kept in the form of cash and credit lines for cash and aval loans. The STRABAG SE Group keeps bilateral credit lines with banks and a syndicated aval credit line in the amount of € 2.0 billion. The overall line for cash and aval loan amounts to € 6.7 billion. The syndicated surety credit line contains covenants which were fulfilled at the balance sheet date.
The medium- and long-term liquidity needs have so far been covered by the issue of corporate bonds as well. In 2010 a bond of € 100 million with a term to maturity of five years and in the years 2011, respectively 2012, bonds of € 175 million, respectively € 100 million, each with a term to maturity of seven years were issued. In May 2013, STRABAG issued a further bond in the amount of € 200 million with a term to maturity of seven years. The annual coupon interest of the bond amounts to 3.00 %. The corporate bond from the year 2008 in the amount of € 75 million was paid in June 2013. Depending on the market situation and the appropriate need, further bond issuances are planned.
The following payment obligations arise from the financial liabilities (interest payments based on interest rate as at 31 December and redemption) for the subsequent years:
Payment obligations as at 31 December 2013
| Carrying values | Cash flows | Cash flows | Cash flows | |
|---|---|---|---|---|
| T€ | 31.12.2013 | 2014 | 2015–2018 | after 2018 |
| Bonds | 582,500 | 30,702 | 353,500 | 316,250 |
| Bank borrowings | 1,117,697 | 389,132 | 409,656 | 452,873 |
| Liabilities from finance leases | 22,503 | 3,122 | 15,212 | 9,194 |
| Financial liabilities | 1,722,700 | 422,956 | 778,368 | 778,317 |
Payment obligations as at 31 December 2012
| Carrying values | Cash flows | Cash flows | Cash flows | |
|---|---|---|---|---|
| T€ | 31.12.2012 | 2013 | 2014–2017 | after 2017 |
| Bonds | 477,500 | 117,658 | 166,346 | 291,813 |
| Bank borrowings | 1,129,383 | 311,539 | 454,725 | 530,862 |
| Liabilities from finance leases | 43,101 | 11,091 | 29,631 | 10,679 |
| Financial liabilities | 1,649,984 | 440,288 | 650,702 | 833,354 |
The trade payables and the other liabilities (see item 21) essentially lead to cash outflows in line with the maturity at the amount of the book values.
The rules of IFRS 8 Operating Segments, apply to the segment reporting. IFRS 8 prescribes defining the segments and reporting the earnings on the basis of the internal reporting (Management Approach). Segment assets are not disclosed as these do not form part of the regular internal reporting.
The internal reporting in the STRABAG SE Group is based on management board areas, which also represent the segments. The settlement between the single segments is made at arm's length prices.
The segment North + West bundles the construction activities in Germany, Poland, Benelux and Scandinavia as well the ground engineering, hydraulic engineering and construction activities in the offshore wind sector.
The segment South + East comprises the railway structures activities as well as the construction activities in Austria, Switzerland, Hungary, Czech Republic, Slovakia, Adriatic, Rest of Europe and Russia and neighbouring countries and environmental technology business, and selected real estate development activities, primarily in Austria.
The segment International + Special Divisions includes the international construction activities, tunnelling, services, real estate development and infrastructure development as well as the construction materials business.
In addition, there are the central divisions and central staff divisions, which handle services in the areas of accounting, group financing, technical development, machine management, quality management, logistics, legal affairs, contract management etc. These services are included in the segment Other.
| T€ | North + West | South + East | International + Special Divisions |
Other | Reconciliation to IFRS Financial Statements |
Group |
|---|---|---|---|---|---|---|
| Output volume | 6,021,112 | 4,593,358 | 2,822,408 | 136,194 | 13,573,072 | |
| Revenue | 5,524,427 | 4,466,028 | 2,458,683 | 26,516 | 0 | 12,475,654 |
| Inter-segment revenue | 137,515 | 22,918 | 324,461 | 797,435 | ||
| EBIT | 72,536 | 138,234 | 69,575 | 64 | -18,832 | 261,577 |
| thereof share of profit or loss | ||||||
| of associates | 7,447 | 0 | -1,663 | 0 | 0 | 5,784 |
| Interest and similar income | 0 | 0 | 0 | 66,716 | 0 | 66,716 |
| Interest expense and similar | ||||||
| charges | 0 | 0 | 0 | -98,256 | 0 | -98,256 |
| Profit before tax | 72,536 | 138,234 | 69,575 | -31,476 | -18,832 | 230,037 |
| Investments in property, plant and equipment, and in intangible |
||||||
| assets | 0 | 0 | 717 | 386,644 | 0 | 387,361 |
| Depreciation and amortisation thereof extraordinary depreciation |
200 | 421 | 7,066 | 425,650 | 0 | 433,337 |
| and amortisation | 200 | 290 | 3,495 | 24,939 | 0 | 28,924 |
| T€ | North + West | South + East | International + Special Divisions |
Other | Reconciliation to IFRS Financial Statements |
Group |
|---|---|---|---|---|---|---|
| Output volume | 6,237,167 | 4,755,738 | 2,924,860 | 124,831 | 14,042,596 | |
| Revenue | 5,509,526 | 4,792,430 | 2,661,292 | 19,985 | 0 | 12,983,233 |
| Inter-segment revenue | 187,139 | 48,720 | 356,262 | 814,324 | ||
| EBIT | -51,317 | 148,885 | 126,933 | -1,975 | -15,340 | 207,186 |
| thereof share of profit or loss | ||||||
| of associates | 6,540 | 0 | -15,757 | 0 | 0 | -9,217 |
| Interest and similar income | 0 | 0 | 0 | 73,145 | 0 | 73,145 |
| Interest expense and similar | ||||||
| charges | 0 | 0 | 0 | -123,871 | 0 | -123,871 |
| Profit before tax | -51,317 | 148,885 | 126,933 | -52,701 | -15,340 | 156,460 |
| Investments in property, plant and equipment, and in intangible |
||||||
| assets | 0 | 0 | 0 | 458,283 | 0 | 458,283 |
| Depreciation and amortisation thereof extraordinary depreciation |
5,803 | 4,416 | 3,993 | 386,956 | 0 | 401,168 |
| and amortisation | 5,803 | 4,275 | 0 | 18,404 | 0 | 28,482 |
Income and expense in the internal reporting are essentially shown in accordance with IFRS. An exception is income taxes, including those applicable to deferred tax, which are not considered in the internal reporting.
The basis for the internal reporting is formed by all subsidiaries. In the IFRS financial statements, earnings from companies which were not fully consolidated or reported using the equity method are recognised in conformity with dividends, transfer of earnings and/or depreciation and amortisation. For this reason, the internal reporting does not conform with EBIT in regards to profit before tax in the consolidated financial statements in terms of the investment result.
Other minor differences result from entries in other consolidations.
| T€ | 2013 | 2012 |
|---|---|---|
| Net income from investments | -10,826 | -8,700 |
| Other consolidations | -8,006 | -6,640 |
| Total | -18,832 | -15,340 |
| T€ | 2013 | 2012 |
|---|---|---|
| Germany | 5,713,680 | 5,686,722 |
| Austria | 2,151,455 | 2,278,299 |
| Rest of Europe | 4,135,817 | 4,463,875 |
| Rest of World | 474,702 | 554,337 |
| Revenue | 12,475,654 | 12,983,233 |
Presentation of revenue by region is done according to the company's registered place of business.
The core shareholders of STRABAG SE are the Haselsteiner Group, as well as the Raiffeisen-Holding NÖ-Wien Group, the UNIQA Group and Rasperia Trading Limited, owned by Russian businessman Oleg Deripaska.
As at 31 December 2013, core shareholder Rasperia Trading Limited held an 18.8 % interest in STRABAG SE as well as one registered share. As at 15 January 2014, a call option was exercised for the acquisition of a further 0.6 % of the shares. The option allowing Rasperia to buy back the remaining 5.6 % of the former interest from the other core shareholders expires in July 2014. A syndicate agreement remains in effect between the core shareholders.
Arm's-length finance and insurance transactions exist with the Raiffeisen Holding NÖ-Wien Group and the UNIQA Group.
The Haselsteiner Group holds investments in various areas such as banks, real estate and infrastructure. The portfolio also includes investments in healthcare and the cultural area.
The business relations between STRABAG SE and the companies of the Haselsteiner Group during the financial year are presented below.
| T€ | 2013 | 2012 |
|---|---|---|
| Work and services performed | 9,116 | 28,818 |
| Work and services received | 7,838 | 10,334 |
| Receivables as at 31.12. | 16,372 | 22,167 |
| Liabilities as at 31.12. | 539 | 953 |
The Basic Element Group, a group with numerous industrial holdings, among other things in the area of construction, construction materials and infrastructure, is owned by Russian businessman Oleg Deripaska. A cooperating agreement lays out the principles for joint operating cooperation in Russia and the CIS states between the STRABAG SE Group and the Basic Element Group.
Russian construction company Glavstroy Corporation, a member of the Basic Element Group, commissioned STRABAG to build the Olympic village in Sochi, Russia. The order includes the construction of residences and hotels ahead of the 2014 Winter Olympics and has a value of about € 268 million. The contract was signed in 2010. The construction works began in 2011 and were completed in 2014. By 31 December 2013, services amounting to € 256 million had been provided and STRABAG received advanced payments of € 244 million in return.
To consolidate and expand the business in Russia, STRABAG made in 2010 an advance payment secured by a bank guarantee, of € 70 million for a 26 % stake in the leading Russian road construction company Transstroy, part of the diversified industrial holding Basic Element. STRABAG has the right to refrain from the purchase and to demand reimbursement of the deposit of € 70 million, if the parties fail to agree on a final purchase price following a due diligence process. Until then, STRABAG will receive payments made on arm's length based on the amount of the prepayment.
IDAG Immobilienbeteiligung u. -Development GmbH is entirely held by private foundations whose beneficiaries are the Haselsteiner Group and the Raiffeisen-Holding NÖ-Wien Group. It is the business purpose of IDAG Immobilienbeteiligung u. -Development GmbH to develop property and to participate in property projects.
STRABAG's office buildings in Vienna and Graz are held in the real estate portfolio of subsidiaries of IDAG Immobilienbeteiligung u. -Development GmbH. The buildings are let to and in part sublet by STRABAG SE at the usual market conditions. Rental costs arising from both buildings in the 2013 financial year amounted to T€ 7,685 (2012: T€ 7,586). Other services in the amount of T€ 519 (2012: T€ 762) were obtained from the IDAG Group.
Furthermore, revenues of about T€ 4,707 (2012: about T€ 1,380) were made with IDAG Immobilienbeteiligung u. -Development GmbH in the 2013 financial year. At the balance sheet date of 31 December 2013, the STRABAG SE Group had receivables from rental deposits amounting to around T€ 22,059 (2012: T€ 20,919) from IDAG Immobilienbeteiligung u. -Development GmbH.
In September 2003, Raiffeisen evolution project development GmbH, a joint project development company, was founded together with R.B.T. Beteiligungsgesellschaft m.b.H, "URUBU" Holding GmbH (both Raiffeisen group) and UNIQA Beteiligungs-Holding GmbH.
Raiffeisen evolution project development GmbH bundles project developments in building construction activities of the shareholders (excluding Germany and Benelux). STRABAG SE is employed in the construction work on the basis of arm'slength contracts. In 2013 revenues of T€ 56,563 (2012: T€ 122,161) were made.
The shareholders of the Raiffeisen evolution project development GmbH have basically agreed to proportionally accept any obligations arising from the project developments.
Lafarge Cement CE Holding bundles the cement activities of Lafarge, a market leader in construction materials manufacturing, and STRABAG in the countries of Central Europe. The joint activities aim at maintaining a commensurate cement supply in the group's core countries. In 2013, STRABAG procured cement services worth about T€ 20,067 (2012: T€ 16,883) from Lafarge. As at the balance sheet date, there were liabilities to Lafarge Cement CE Holding GmbH in the amount of T€ 107 (2012: T€ 267).
| T€ | 2013 | 2012 |
|---|---|---|
| Work and services performed | 79,420 | 81,494 |
| Work and services received | 33,138 | 33,683 |
| Receivables as at 31.12. | 28,879 | 12,707 |
| Liabilities as at 31.12. | 646 | 41 |
The business transactions with the management board members and employees of the first management level (management in key positions) and with their family members and companies which are controlled by the management in key positions or decisively influenced by them were of minor significance in the year under report and the previous year.
The total remuneration including any severance and pension payments, as well as other long-term payments for employees of the first management level amounted to T€ 14,418 (2012: T€ 17,939) in the year under report. Of this amount, T€ 14,066 (2012: T€ 17,630) is attributable to the current remuneration and T€ 352 (2012: T€ 309) to severance and pension payments.
Dr. Hans Peter H a s e l s t e i n e r (CEO until 14 June 2013) Dr. Thomas B i r t e l (CEO since 15 June 2013) Mag. Christan H a r d e r Dipl.-Ing. Dr. Peter K r a m m e r Mag. Hannes T r u n t s c h n i g Dipl.-Ing. Siegfried W a n k e r
Dr. Alfred G u s e n b a u e r (Chairman) Mag. Erwin H a m e s e d e r (Vice Chairman) Mag. Hannes B o g n e r (since 14 June 2013) Andrei E l i n s o n Mag. Kerstin G e l b m a n n Dr. Gottfried W a n i t s c h e k (until 14 June 2013) Ing. Siegfried W o l f
Dipl.-Ing. Andreas B a t k e (works council) Miroslav C e r v e n y (works council) Magdolna P. G y u l a i n é (works council) Wolfgang K r e i s (works council) Gerhard S p r i n g e r (works council)
The total salaries of the management board members in the financial year amount to T€ 4,199 (2012: T€ 2,590). The severance payments for management board members amount to T€ 8 (2012: T€ 17).
The remunerations for the supervisory board members in the amount of T€ 135 (2012: T€ 135) are included in the expenses. Neither the management board members nor the supervisory board members of STRABAG SE received advances or loans.
The expenses for the auditor, KPMG Austria AG, incurred in the financial year amount to T€ 1,240 (2012: T€ 1,196) of which T€ 1,121 (2012: T€ 1,084) were for the audit of the consolidated financial statements (including the audit of separate financial statements of group companies) and T€ 119 (2012: T€ 111) for other services.
In Austrian companies organised as corporations limited by shares, the consolidated financial statements prepared by the management board are approved by the supervisory board. The STRABAG SE supervisory board meeting for the approval of the consolidated financial statements for the year ended 31 December 2013 will take place on 28 April 2014.
The political developments in Ukraine since February 2014 are having no significant influence on the situation of the STRABAG Group from today's perspective. The company generates less than 1 % of its annual output volume in Ukraine. In Russia, the group expects to generate less than 3 % of its output volume in 2014. As construction is an export non-intensive industry in which most of the services are provided locally, and the STRABAG Group provides its services almost exclusively for private clients, the company does not expect the political developments to have any immediate impact on its business in Russia.
Villach, 11 April 2014
Management Board
Dr. Thomas Birtel CEO Responsibility Central Divisions and Central Staff Divisions (except BRVZ) as well as Divisions 3L RANC1) and 3M RANC
Mag. Christian Harder CFO Responsibility Central Division BRVZ
Mag. Hannes Truntschnig Responsibility Segment International + Special Divisions
Dipl.-Ing. Dr. Peter Krammer Responsibility Segment North + West
Dipl.-Ing. Siegfried Wanker Responsibility Segment South + East (except Divisions 3L RANC and 3M RANC)
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| "A-WAY Infrastrukturprojektentwicklungs- und -betriebs GmbH" | Spittal an der Drau | VK | 100.00 |
| "Crnagoraput" AD, Podgorica | Podgorica | VK | 95.32 |
| "DOMIZIL" Bauträger GmbH | Vienna | VK | 100.00 |
| "Filmforum am Bahnhof" Errichtungs- und Betriebsgesellschaft m.b.H. | Vienna | VK | 100.00 |
| "Granite Mining Industries" Sp.z o.o. | Braslau | NK | 100.00 |
| "Kabelwerk" Bauträger GmbH | Vienna | NK | 25.00 |
| "LSH"-Fischer Baugesellschaft m.b.H. | Linz | NK | 100.00 |
| "Mineral 2000" EOOD | Sofia | NK | 100.00 |
| "Northern Capital Express" Limited Liability Company | Moscow | NK | 25.00 |
| "PUTEVI" A.D. CACAK | Cacak | VK | 85.02 |
| "SBS Strabag Bau Holding Service GmbH" | Spittal an der Drau | VK | 100.00 |
| "Strabag Azerbaijan" L.L.C. | Baku | VK | 100.00 |
| "Strabag" d.o.o. Podgorica | Podgorica | NK | 100.00 |
| "Wiener Heim" Wohnbaugesellschaft m.b.H. | Vienna | VK | 100.00 |
| "Wohngarten Sensengasse" Bauträger GmbH | Vienna | VK | 55.00 |
| "Zentrum Puntigam" Errichtungs- und Betriebsgesellschaft m.b .H. | Vienna | NK | 50.00 |
| "Zipp Ukraine" | Cholmok | NK | 100.00 |
| 2.Züblin Vorrats GmbH | Stuttgart | NK | 100.00 |
| A.S.T. Bauschuttverwertung GmbH & Co KG | Klagenfurt | NK | 66.67 |
| A.S.T. Bauschuttverwertung GmbH | Klagenfurt | NK | 66.67 |
| AB Frischbeton Gesellschaft m.b.H. | Vienna | NK | 100.00 |
| ABO Asphalt-Bau Oeynhausen GmbH | Oeynhausen | NK | 22.50 |
| ABR Abfall Behandlung und Recycling GmbH | Schwadorf | VK | 100.00 |
| ADI Asphaltmischwerke Donau-Iller GmbH & Co. KG i.L. | Inzigkofen | NK | 63.21 |
| ADI Asphaltmischwerke Donau-Iller Verwaltungsgesellschaft mit beschränkter Haftung i.L.Inzigkofen | NK | 63.20 | |
| AFRITOL (PROPRIETARY) LIMITED | Pretoria | NK | 100.00 |
| AGS Asphaltgesellschaft Stuttgart GmbH & Co.Kommanditgesellschaft | Stuttgart | NK | 40.00 |
| AGS Asphaltgesellschaft Stuttgart Verwaltungs-GmbH | Stuttgart | NK | 40.00 |
| AKA Zrt. | Budapest | VK | 100.00 |
| AKA-FinCo Zrt. | Budapest | NK | 100.00 |
| AKA-HoldCo Zrt. | Budapest | NK | 100.00 |
| Akilore Grundstücksverwaltungsges. mbH & Co. Vermietungs KG | Wiesbaden | NK | 94.00 |
| AL SRAIYA - STRABAG Road & Infrastructure WLL | Doha | NK | 49.00 |
| A-Lanes A15 Holding B.V. | Nieuwegein | EK | 24.00 |
| A-Lanes Management Services B.V. | Utrecht | NK | 25.00 |
| Al-Hani General Construction Inc. | Tripolis | NK | 60.00 |
| Alpines Hartschotterwerk GmbH | Leinfelden-Echterdingen | VK | 100.00 |
| AMA Asphalt-Mischwerke GmbH | Königsbrunn | NK | 45.00 |
| AMB Asphalt-Mischanlagen Betriebsgesellschaft m.b.H.& Co.KG | Zistersdorf | NK | 40.00 |
| AMB Asphalt-Mischanlagen Betriebsgesellschaft m.b.H. | Zistersdorf-Maustrenk | NK | 40.00 |
| AMB Asphaltmischwerke Bodensee GmbH & Co KG | Singen (Hohentwiel) | EK | 24.80 |
| AMG Asphaltmischwerk Gunskirchen Gesellschaft m.b.H. | Linz | NK | 33.33 |
| AMG-Asphaltmischwerk Gunskirchen Gesellschaft m.b.H. & Co.KG | Linz | NK | 33.33 |
| AMH Asphaltmischwerk Hauneck GmbH & Co. KG | Hauneck | EK | 50.00 |
| AMH Asphaltmischwerk Hauneck Verwaltungs GmbH | Hauneck | NK | 50.00 |
| AMH Asphaltmischwerk Hellweg GmbH | Erwitte | EK | 30.50 |
| AML - Asphaltmischwerk Limberg Gesellschaft m.b.H. | Limberg | NK | 50.00 |
| AMS-Asphaltmischwerk Süd Gesellschaft m.b.H. | Linz | NK | 35.00 |
| AMSS Asphaltmischwerke Sächsische Schweiz GmbH & Co. KG | Dresden | NK | 24.00 |
| AMSS Asphaltmischwerke Sächsische Schweiz Verwaltungs GmbH | Dresden | NK | 24.00 |
| AMWE-Asphaltmischwerke GmbH & Co. KG in Schwerin | Consrade | NK | 49.00 |
| AMWE-Asphaltmischwerke GmbH | Schwerin | NK | 49.00 |
| Anton Beirer Hartsteinwerke GmbH & Co KG | Pinswang | NK | 50.00 |
| ANTREPRIZA DE REPARATII SI LUCRARI A R L CLUJ S.A. | Cluj-Napoca | VK | 98.59 |
| Arena Development | Hasselt | NK | 50.00 |
EK … Companies included at-equity
| Company | Residence | Consoli dation1) |
Direct stake % |
|---|---|---|---|
| ASAMER Baustoff Holding Wien GmbH & Co.KG | Vienna | NK | 30.00 |
| ASAMER Baustoff Holding Wien GmbH | Vienna | NK | 30.00 |
| ASB Bau GmbH & Co KG | Inzigkofen | NK | 50.00 |
| ASB Transportbeton GmbH & CO.KG | Osterweddingen | NK | 50.00 |
| Asesorías de Ingenería y Construcciones Ltda. | Santiago | NK | 100.00 |
| ASF Frästechnik GmbH & Co KG | Kematen | NK | 40.00 |
| ASF Frästechnik GmbH | Kematen | NK | 40.00 |
| Asfalt Slaski Wprinz Sp.z o.o. | Warschau | NK | 100.00 |
| Genk | NK | 25.00 | |
| ASG INVEST N.V. | |||
| ASIA Center Kft. | Budapest | VK | 100.00 |
| Asphalt & Beton GmbH | Spittal an der Drau | VK | 100.00 |
| Asphalt Straßenbau Verwaltungs-GmbH | Inzigkofen | NK | 50.00 |
| Asphaltmischwerk Bendorf GmbH & Co. KG | Bendorf | NK | 49.00 |
| Asphaltmischwerk Bendorf Verwaltung GmbH | Bendorf | NK | 49.00 |
| Asphaltmischwerk Betriebsgesellschaft m.b.H. & Co KG | Rauchenwarth | NK | 20.00 |
| Asphaltmischwerk Betriebsgesellschaft m.b.H. | Rauchenwarth | NK | 20.00 |
| Asphaltmischwerk Bodensee Verwaltungs GmbH | Singen (Hohentwiel) | NK | 24.80 |
| Asphaltmischwerk Greinsfurth GmbH & Co OG | Amstetten | NK | 33.33 |
| Asphaltmischwerk Greinsfurth GmbH | Amstetten | NK | 33.33 |
| Asphaltmischwerk Rieder Vomperbach GmbH& Co KG | Innsbruck | NK | 60.00 |
| Asphaltmischwerk Rieder Vomperbach GmbH | Innsbruck | NK | 60.00 |
| Asphaltmischwerk Zeltweg Gesellschaft m.b.H. | Steyr | NK | 100.00 |
| Asphalt-Mischwerke-Hohenzollern GmbH & Co. KG | Inzigkofen | EK | 36.50 |
| Asphalt-Mischwerke-Hohenzollern VerwaltungsgesmbH | Inzigkofen | NK | 36.50 |
| ASTRA-BAU Gesellschaft m.b.H. Nfg. OG | Bergheim | NK | 50.00 |
| AStrada Development SRL | Bucharest | NK | 70.00 |
| Atlas Tower GmbH & Co. KG | Cologne | VK | 100.00 |
| AUSTRIA ASPHALT GmbH & Co OG | Spittal an der Drau | VK | 100.00 |
| AUSTRIA ASPHALT GmbH | Spittal an der Drau | NK | 100.00 |
| AUT Grundstücksverwaltungsgesellschaft mbH | Stuttgart | NK | 40.00 |
| Autocesta Zagreb-Macelj d.o.o. | Krapina | EK | 51.00 |
| A-WAY ITE Zrt. | Újhartyán | NK | 50.00 |
| AWB Asphaltmischwerk Büttelborn GmbH & Co. KG | Büttelborn | NK | 50.00 |
| AWB Asphaltmischwerk Büttelborn Verwaltungs-Gesellschaft mit beschränkter Haftung | Büttelborn | NK | 50.00 |
| AWK Asphaltmischwerk Könnern GmbH | Könnern | NK | 26.25 |
| AWM Asphaltwerk Mötschendorf Gesellschaft m.b.H. | Graz | NK | 50.00 |
| AWM Asphaltwerk Mötschendorf GmbH & Co.KG | Graz | NK | 50.00 |
| AWR Asphalt-Werke Rhön GmbH | Röthlein | NK | 24.90 |
| B + R Baustoff-Handel und -Recycling Köln GmbH | Cologne | NK | 100.00 |
| BA GebäudevermietungsgmbH | Vienna | NK | 29.00 |
| BASALT-KÖZÉPKÖ Köbányák Kft | Uzsa | NK | 25.14 |
| Bau Holding Beteiligungs AG | Spittal an der Drau | VK | 100.00 |
| Bauer Deponieerschließungs- und Verwertungsgesellschaft m.b.H. in Liqu. | Vienna | NK | 100.00 |
| Baugesellschaft "Negrelli" Ges.m.b.H. | Vienna | NK | 100.00 |
| Baugesellschaft Nowotnik GmbH | Nörvenich | VK | 100.00 |
| Baukontor Gaaden Gesellschaft m.b.H. | Gaaden | VK | 100.00 |
| Baumann & Burmeister GmbH | Halle/Saale | VK | 100.00 |
| Bauträgergesellschaft Olande mbH | Hamburg | NK | 51.00 |
| Bauunternehmung Ohneis Gesellschaft mit beschränkter Haftung | Straubing | VK | 100.00 |
| Bayerische Asphaltmischwerke Gesellschaft mit beschränkter Haftung | Hofolding | NK | 48.29 |
| Bayerische Asphaltmischwerke GmbH & Co.KG für Straßenbaustoffe | Hofolding | EK | 48.33 |
| BAYSTAG GmbH | Wildpoldsried | NK | 100.00 |
| Baytürk Grup Insaat Ithalat, Ihracat ve Ticaret Limited Sirketi | Ankara | NK | 100.00 |
| BBO Bauschuttaufbereitung Verwaltungsgesellschaft mbH | Steißlingen | NK | 33.33 |
| BBO Bodensee/Hegau Bauschuttaufbereitung GmbH & Co. KG | Steißlingen | NK | 22.22 |
EK … Companies included at-equity
| Company | Residence | Consoli dation1) |
Direct stake % |
|
|---|---|---|---|---|
| BBO Bodenseekreis Bauschuttaufbereitung GmbH & Co. KG | Steißlingen | NK | 25.00 | |
| BBS Baustoffbetriebe Sachsen GmbH | Hartmannsdorf | VK | 100.00 | |
| becker bau GmbH | Bornhöved | VK | 100.00 | |
| Beijing Züblin Equipment Production Co., Ltd. | Beijing | NK | 100.00 | |
| Betobeja Empreendimentos Imobiliarios, Lda | Beja | NK | 100.00 | |
| Beton AG Bürglen | Bürglen TG | NK | 65.60 | |
| Beton Pisek spol. s.r.o. | Pisek | NK | 50.00 | |
| Betun Cadi SA | Trun | NK | 35.00 | |
| BHG Bitumen Adria d.o.o. | Zagreb | NK | 100.00 | |
| BHG Bitumen d.o.o. Beograd | Belgrad | NK | 100.00 | |
| BHG Bitumen Kft. | Budapest | VK | 100.00 | |
| BHG Bitumenhandelsgesellschaft mbH | Hamburg | VK | 100.00 | |
| BHG COMERCIALIZARE BITUM S.R.L. | Bucharest | NK | 100.00 | |
| BHG CZ s.r.o. | Ceské Budejovice | VK | 100.00 | |
| BHG SK s.r.o. | Bratislava | NK | 100.00 | |
| BHG Sp.z o.o. | Pruszkow | VK | 100.00 | |
| BHV GmbH Brennstoffe - Handel - Veredelung | Lünen | NK | 100.00 | |
| Bitumen Handelsgesellschaft m.b.H. & Co KG | Loosdorf | VK | 100.00 | |
| Bitumen Handelsgesellschaft m.b.H. | Vienna | NK | 100.00 | |
| Bitumenka-Asfalt d.o.o. i.L. | Sarajevo | NK | 51.00 | |
| BITUNOVA Baustofftechnik Gesellschaft m.b.H. | Spittal an der Drau | VK | 100.00 | |
| BITUNOVA GmbH | Düsseldorf | VK | 100.00 | |
| Bitunova Kft. | Budapest | VK | 100.00 | |
| Bitunova Romania SRL | Bucharest | VK | 100.00 | |
| BITUNOVA Sp.z o.o. | Warszawa | VK | 100.00 | |
| BITUNOVA spol. s r.o. | Jihlava | VK | 100.00 | |
| BITUNOVA spol. s r.o. | Zvolen | VK | 100.00 | |
| BITUNOVA UKRAINA TOW | Brovary | NK | 60.00 | |
| Blees-Kölling-Bau GmbH | Cologne | VK | 100.00 | |
| BLUMENFELD Liegenschaftsverwaltungs GmbH | Vienna | VK | 100.00 | |
| BMTI - Baumaschinentechnik International GmbH & Co. KG | Cologne | VK | 100.00 | |
| BMTI - Tehnica Utilajelor Pentru Constructii SRL | Bucharest | NK | 100.00 | |
| BMTI Benelux bvba | Antwerp | NK | 100.00 | |
| BMTI CR s.r.o. | Brünn | VK | 100.00 | |
| BMTI d.o.o. Beograd | Novi Beograd | NK | 100.00 | |
| BMTI d.o.o. | Zagreb | NK | 100.00 | |
| BMTI GmbH | Erstfeld | VK | 100.00 | |
| BMTI Kft. | Budapest | VK | 100.00 | |
| BMTI SK, s.r.o. | Bratislava | NK | 100.00 | |
| BMTI Sp.z o.o. | Pruszkow | VK | 100.00 | |
| BMTI Verwaltung GmbH | Cologne | NK | 100.00 | |
| BMTI-Baumaschinentechnik International GmbH | Trumau | VK | 100.00 | |
| Bodensee - Moränekies Gesellschaft mit beschränkter Haftung & Co. | ||||
| Kommanditgesellschaft Tettnang | Tettnang | EK | 33.33 | |
| BOHEMIA ASFALT, s.r.o. | Sobeslav | VK | 100.00 | |
| Böhm Stadtbaumeister & Gebäudetechnik GmbH | Vienna | VK | 100.00 | |
| BPM Bau Prozess Management GmbH | Vienna | NK | 100.00 | |
| BRANDNER Wasserbau GmbH | Kollmitzberg | NK | 100.00 | |
EK … Companies included at-equity
NK … Not consolidated companies
2) The presentation of interests is done using the economic approach; the interests as defined by civil law may deviate from this presentation.
Breitenthaler Freizeit Beteiligungsgesellschaft mbH Breitenthal NK 50.00 Breitenthaler Freizeit GmbH & Co. KG Breitenthal NK 50.00 BrennerRast GmbH Vienna VK 100.00 BrennerWasser GmbH Vienna NK 100.00 BRF Tyresö View 1 Tyresö VK2) 100.00 Brnenska Obalovna, s.r.o. Brünn NK 50.00 BRVZ Bau- Rechen- u. Verwaltungszentrum Gesellschaft m.b.H. Spittal an der Drau VK 100.00
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| BRVZ Bau- Rechen- und Verwaltungszentrum GmbH & Co. KG | Cologne | VK | 100.00 |
| BRVZ Bau-, Rechen- und Verwaltungszentrum AG | Erstfeld | VK | 100.00 |
| BRVZ Benelux bvba | Antwerp | NK | 100.00 |
| BRVZ center za racunovodstvo in upravljanje d.o.o. | Ljubljana | VK | 100.00 |
| BRVZ d.o.o. Beograd | Novi Beograd | NK | 100.00 |
| BRVZ d.o.o. | Zagreb | VK | 100.00 |
| BRVZ EOOD | Sofia | NK | 100.00 |
| BRVZ Kft. | Budapest | VK | 100.00 |
| BRVZ s.r.o. | Bratislava | VK | 100.00 |
| BRVZ s.r.o. | Prague | VK | 100.00 |
| BRVZ SERVICII & ADMINISTRARE SRL | Bucharest | VK | 100.00 |
| BRVZ Sp.z o.o. | Pruszkow | VK | 100.00 |
| BRVZ SRL | Bologna | NK | 100.00 |
| BRVZ Sweden AB | Kumla | VK | 100.00 |
| BRVZ Verwaltung GmbH | Cologne | NK | 100.00 |
| BRVZ-Contabilidade, Organizacao,Representacao e Administracao de Empresas,S.U.,LdaLisbon | NK | 100.00 | |
| BRW Baustoff-Recycling GmbH & Co KG | Wesseling | NK | 25.00 |
| BSB Betonexpress Verwaltungsges.mbH | Berlin | NK | 100.00 |
| BS-Baugeräte-Service GmbH & Co.KG i.I. | Augsburg | NK | 25.00 |
| BS-Baugeräte-Service Verwaltungsgesellschaft mbH i.I. | Augsburg | NK | 25.00 |
| BSS Tunnel- & Montanbau GmbH i.L. | Bern | NK | 100.00 |
| Bug-AluTechnic GmbH | Vienna | VK | 100.00 |
| BULGARIA ASFALT EOOD | Sofia | NK | 100.00 |
| Büro Campus Deutz Torhaus GmbH | Cologne | NK | 100.00 |
| Büro-Center Ruppmannstraße GmbH | Stuttgart | NK | 50.00 |
| BUSINESS BOULEVARD Errichtungs- und Betriebs GmbH | Vienna | NK | 100.00 |
| BVHS Betrieb und Verwaltung von Hotel- und Sportanlagen GmbH | Berlin | NK | 100.00 |
| C.S.K.K. 2009. Kft. | Budapest | NK | 30.00 |
| Campus Eggenberg Immobilienprojekt GmbH | Graz | VK | 60.00 |
| Carb SA | Brasov | VK | 99.47 |
| Center Communication Systems GmbH | Mägenwil | NK | 100.00 |
| Center Communication Systems GmbH | Vienna | VK | 100.00 |
| Center Communication Systems SPRL | Diegem | NK | 100.00 |
| Center Systems Deutschland GmbH | Berlin | NK | 100.00 |
| CESTAR d.o.o. | Slavonski Brod | VK | 74.90 |
| Chustskij Karier | Zakarpatska | VK | 95.96 |
| CLS Construction Legal Services GmbH | Cologne | VK | 100.00 |
| CLS Construction Legal Services GmbH | Vienna | NK | 100.00 |
| CLS CONSTRUCTION SERVICES s. r. o. | Bratislava | NK | 100.00 |
| CLS CONSTRUCTION SERVICES s.r.o. | Prague | NK | 100.00 |
| CLS Kft. | Budapest | NK | 100.00 |
| CLS Legal Sp.z o.o. | Pruszkow | NK | 100.00 |
| Clubdorf Sachrang Betriebs GmbH | Cologne | NK | 100.00 |
| Coldmix B.V. | Son en Breugel | NK | 100.00 |
| Constrovia Construcao Civil e Obras Publicas Lda. | Lisbon | NK | 95.00 |
| Cosima Grundstücksverwaltungsgesellschaft mbH & Co. Objekt Beta KG | Pullach i. Isartal | NK | 94.00 |
| Cottbuser Frischbeton GmbH | Cottbus | NK | 100.00 |
| Crna Glava Seona d.o.o. | Nasice | NK | 51.00 |
| CROATIA ASFALT d.o.o. | Zagreb | NK | 100.00 |
| CSE Centrum-Stadtentwicklung GmbH i.L. | Cologne | NK | 50.00 |
| Dalnicni stavby Praha, a.s. | Prague | VK | 100.00 |
| DAM Deutzer Asphaltmischwerke GmbH & Co. KG | Cologne | NK | 40.44 |
| DAM Deutzer Asphaltmischwerke Verwaltungs-GmbH | Cologne | NK | 40.44 |
| DARWO TRADING NO 14 (PTY) LIMITED | Pretoria | NK | 50.00 |
EK … Companies included at-equity
| Company | Residence | Consoli dation1) |
Direct stake % |
|---|---|---|---|
| DBR Döbelner Baustoff und Recycling GmbH i.L. | Taucha | NK | 50.00 |
| Demirtürk Uluslararasi Insaat, Ithalat, Ihracat ve Ticaret Sirketi | Ankara | NK | 100.00 |
| Deutsche Asphalt GmbH | Cologne | VK | 100.00 |
| Diabaswerk Nesselgrund GmbH & Co KG | Floh-Seligenthal | NK | 20.00 |
| Diabaswerk Nesselgrund Verwaltungs-GmbH | Floh-Seligenthal | NK | 20.00 |
| Diabaswerk Saalfelden Gesellschaft m.b.H. | Saalfelden | VK | 100.00 |
| DIMMOPLAN Verwaltungs GmbH | Stuttgart | NK | 100.00 |
| DIRECTROUTE (FERMOY) CONSTRUCTION LIMITED | Dublin | NK | 25.00 |
| DIRECTROUTE (LIMERICK) CONSTRUCTION LIMITED | Fermoy | NK | 40.00 |
| DIRECTROUTE (LIMERICK) HOLDINGS LIMITED | Fermoy | EK | 20.00 |
| Dreßler Bauträger GmbH & Co. "Erlenbach"-Objekt KG | Aschaffenburg | NK | 50.00 |
| DRP, d.o.o. | Ljubljana | VK | 100.00 |
| DRUMCO SA | Timisoara | NK | 70.00 |
| DYWIDAG & Partner LLC | Oman | NK | 65.00 |
| Dywidag (Malaysia) Sdn. Bhd. | Kuala Lumpur | NK | 100.00 |
| DYWIDAG Bau GmbH | Munich | VK | 100.00 |
| Dywidag Construction Corporation | Vancouver | NK | 100.00 |
| Dywidag Insaat Limited Sirketi | Ankara | NK | 100.00 |
| DYWIDAG International GmbH | Munich | VK | 100.00 |
| Dywidag LNG Korea Chusikhoesa | Seoul | NK | 100.00 |
| DYWIDAG Romania S.R.L | Bucharest | NK | 100.00 |
| Dywidag Saudi Arabia Co. Ltd. | Jubail | VK | 100.00 |
| DYWIDAG Schlüsselfertig und Ingenieurbau GmbH | Munich | NK | 100.00 |
| DYWIDAG Verwaltungsgesellschaft mbH | Munich | NK | 50.00 |
| DYWIDAG-Holding GmbH | Cologne | VK | 100.00 |
| DYWIDAG-Service-GmbH Gebäude- und Anlagenmanagement | Bad Hersfeld | NK | 100.00 |
| E S B Kirchhoff GmbH | Leinfelden-Echterdingen | VK | 100.00 |
| E.S.T.M. KFT | Budapest | NK | 100.00 |
| Eberhard Pöhner Unternehmen für Hoch- und Tiefbau GmbH | Bayreuth | VK | 100.00 |
| Eberhardt Bau-Gesellschaft mbH | Berlin | VK | 100.00 |
| Eckstein Holding GmbH | Spittal an der Drau | VK | 100.00 |
| ECS European Construction Services GmbH | Mörfelden-Walldorf | VK | 100.00 |
| Ed. Züblin AG | Stuttgart | VK | 57.26 |
| EDEN Jizni roh s.r.o. | Prague | NK | 100.00 |
| Edificio Bauvorbereitungs- und Bauträgergesellschaft mb.H. | Vienna | NK | 100.00 |
| Eduard Hachmann Gesellschaft mit beschränkter Haftung | Lunden | VK | 100.00 |
| EFKON AG | Raaba | VK | 98.14 |
| EFKON ASIA SDN. BHD. | Kuala Lumpur | NK | 100.00 |
| EFKON AUSTRALIA PTY LTD | Victoria Point | NK | 100.00 |
| EFKON Bulgaria OOD | Sofia | NK | 80.00 |
| EFKON COLOMBIA LTDA | Bogota | NK | 100.00 |
| EFKON Germany GmbH | Berlin | NK | 100.00 |
| EFKON INDIA Pvt. Ltd. | Mumbai | VK | 100.00 |
| EFKON Road Pricing Limited | London | NK | 100.00 |
| EFKON ROMANIA S.R.L. | Bucharest | NK | 76.00 |
| EFKON SOUTH AFRICA (PTY) LTD | Pretoria | VK | 100.00 |
| EFKON SOUTHERN AFRICA (PROPRIETARY) LIMITED | Pretoria | NK | 30.00 |
| EFKON USA, INC. | Dallas | NK | 100.00 |
| Eichholz Eivel GmbH | Berlin | VK | 100.00 |
| Eisen Blasy Reutte GmbH | Reutte | NK | 50.00 |
| Emprese Constructora, Züblin Peru S.A.C. | Lima | NK | 99.97 |
| Entwicklung Quartier am Mailänder Platz Beteiligungsgesellschaft mbH | Hamburg | NK | 50.00 |
| Entwicklung Quartier am Mailänder Platz Management GmbH | Hamburg | NK | 50.00 |
| Entwicklung Quartier am Mailänder Platz Nr. 1 GmbH & Co. KG | Hamburg | NK | 48.08 |
| Entwicklung Quartier am Mailänder Platz Nr. 2 GmbH & Co. KG | Hamburg | NK | 48.08 |
EK … Companies included at-equity
| Company | Residence | Consoli dation1) |
Direct stake % |
|---|---|---|---|
| Entwicklung Quartier am Mailänder Platz Nr. 3 GmbH & Co. KG | Hamburg | NK | 48.08 |
| Eraproject Immobilien-, Projektentwicklung und Beteiligungsverwaltung GmbH | Berlin | NK | 100.00 |
| Erlaaer Straße Liegenschaftsverwertungs-GmbH | Vienna | NK | 100.00 |
| ERMATEC Maschinen Technische Anlagen Gesellschaft m.b.H. | Vienna | NK | 100.00 |
| Errichtungsgesellschaft Strabag Slovensko s.r.o. | Bratislava-Ruzinov | VK | 100.00 |
| Erste Nordsee-Offshore-Holding GmbH | Pressbaum | VK | 51.00 |
| Eslarngasse 16 GmbH | Vienna | NK | 75.00 |
| ETG Erzgebirge Transportbeton GmbH | Freiberg | VK | 60.00 |
| EURO SERVICES Catering & Cleaning GmbH | Mörfelden-Walldorf | NK | 100.00 |
| EUROASFALT d.o.o. | Zagreb | NK | 100.00 |
| EUROTEC ANGOLA, LDA | Luanda | NK | 100.00 |
| EVN S.r.l. | Rom | NK | 100.00 |
| Exploitatie Maatschappij A-Lanes A15 B.V. | Nieuwegein | NK | 33.33 |
| F. Kirchhoff GmbH | Leinfelden-Echterdingen | VK | 100.00 |
| F. Kirchhoff Silnice s.r.o. likvidaci | Prague | NK | 100.00 |
| F. Kirchhoff Straßenbau GmbH | Leinfelden-Echterdingen | VK | 100.00 |
| F. KIRCHHOFF SYSTEMBAU GmbH | Münsingen | VK | 100.00 |
| F. Lang u. K. Menhofer Baugesellschaft m.b.H. & Co. KG | Wiener Neustadt | VK | 100.00 |
| Fachmarktzentrum Arland Errichtungs- und Vermietungsgesellschaft mbH | Vienna | NK | 100.00 |
| Fachmarktzentrum Kielce Projekt GmbH | Berlin | NK | 100.00 |
| Facility Management Holding RF GmbH | Vienna | NK | 100.00 |
| Fahrleitungsbau GmbH | Essen | VK | 100.00 |
| Fastighets AB Botvid | Stockholm | NK | 51.00 |
| FDZ Grundstücksverwaltung GmbH & Co. Objekt Stuttgart-Möhringen KG | Mainz | NK | 94.00 |
| FLOGOPIT d.o.o. Beograd | Novi Beograd | NK | 100.00 |
| Forum Mittelrhein Beteiligungsgesellschaft mbH | Hamburg | NK | 51.00 |
| Forum Mittelrhein Koblenz Generalübernehmergesellschaft mbH & Co.KG | Oststeinbek | VK | 51.00 |
| Forum Mittelrhein Koblenz Kultur GmbH & Co. KG | Hamburg | VK | 51.00 |
| Freo Projektentwicklung Berlin GmbH | Berlin | NK | 50.10 |
| FRISCHBETON s.r.o. | Prague | VK | 100.00 |
| Frischbeton Wachau GmbH & CO.KG | Wachau | NK | 45.00 |
| Frissbeton Kft. | Budapest | VK | 100.00 |
| FUSSENEGGER Hochbau und Holzindustrie GmbH | Dornbirn | NK | 100.00 |
| G15 Projekt GmbH | Baar | NK | 100.00 |
| Gama Strabag Construction Limited | Dublin | NK | 40.00 |
| Gartensiedlung Lackenjöchel Liegenschaftsverwertungs GmbH | Vienna | NK | 100.00 |
| Gaul GmbH | Sprendlingen | VK | 100.00 |
| GBS Gesellschaft für Bau und Sanierung mbH | Leuna | NK | 100.00 |
| Gebr. von der Wettern Gesellschaft mit beschränkter Haftung | Cologne | VK | 100.00 |
| GFR remex Baustoffaufbereitung GmbH & Co. KG, Krefeld | Krefeld | NK | 100.00 |
| GFR remex Baustoffaufbereitung Verwaltungs-GmbH Krefeld | Krefeld | NK | 100.00 |
| GN-Anläggningar AB | Stockholm | NK | 100.00 |
| Goldeck Bergbahnen GmbH | Spittal an der Drau | VK | 100.00 |
| Grandemar SA | Cluj-Napoca | NK | 41.27 |
| GRASTO d.o.o. | Ljubljana | NK | 99.85 |
| Griproad Spezialbeläge und Baugesellschaft mbH | Cologne | VK | 100.00 |
| Grundstücksgesellschaft Kaiserplatz Aachen Adalbertstraße GmbH & Co. KG | Hamburg | NK | 50.00 |
| GTE-Gebäude-Technik-Energie-Betriebs- und Verwaltungsgesellschaft m.b.H. & Co. KG. Vienna | NK | 62.00 | |
| GTE-Gebäude-Technik-Energie-Betriebs- und Verwaltungsgesellschaft m.b.H. | Vienna | NK | 61.00 |
| GUS Gußasphaltwerk GmbH & Co KG | Stuttgart | NK | 50.00 |
| GUS Gußasphaltwerk Verwaltungs GmbH | Stuttgart | NK | 50.00 |
| GVD Versicherungsvermittlungen - Dienstleistungen GmbH | Cologne | NK | 100.00 |
| H S Hartsteinwerke GmbH | Pinswang | NK | 50.00 |
| Harald Zweig Bautenschutz G.m.b.H. | Essen | NK | 100.00 |
| Heidelberger Beton Donau-Iller GmbH & Co. KG | Elchingen | NK | 30.00 |
EK … Companies included at-equity
| Company | Residence | dation1) | stake % |
|---|---|---|---|
| Heidelberger Beton Donau-Iller Verwaltungs-GmbH | Unterelchingen | NK | 30.20 |
| HEILIT + WOERNER BAU GmbH | Vienna | NK | 100.00 |
| HEILIT Umwelttechnik GmbH | Düsseldorf | VK | 100.00 |
| HEILIT Umwelttechnik S.R.L. | Orhei | NK | 100.00 |
| Heilit+Woerner Bau GmbH | Munich | VK | 100.00 |
| HEILIT+WOERNER Sp. z o.o. | Breslau | VK | 100.00 |
| Heimfeld Terrassen GmbH | Cologne | VK | 100.00 |
| Helmus Straßen-Bau GmbH | Vechta | VK | 100.00 |
| HEOS Berufsschulen Hamburg GmbH & Co. KG | Hamburg | NK | 50.00 |
| Heptan Grundstücksverwaltungsgesellschaft mbH & Co Vermietungs-KG | Mainz | NK | 94.00 |
| Hermann Kirchner Bauunternehmung GmbH | Bad Hersfeld | VK | 100.00 |
| Hermann Kirchner Hoch- und Ingenieurbau GmbH | Bad Hersfeld | VK | 100.00 |
| Hillerstraße - Jungstraße GmbH | Vienna | NK | 75.00 |
| HK-Rohstoff & Umwelttechnik GmbH & Co. KG | Hildesheim | NK | 50.00 |
| HOTEL SCHLOSS SEEFELS BESITZ- UND MANAGEMENT GMBH | Techelsberg a. W. | NK | 30.00 |
| HOTEL VIA Kft. | Budapest | NK | 43.00 |
| Hrusecka Obalovna, s.r.o. | Hrusky | NK | 80.00 |
| I.C.S. "STRABAG" S.R.L. | Chisinau | NK | 100.00 |
| IBV - Immobilien Besitz- und Verwaltungsgesellschaft mbH Werder | Cologne | NK | 99.00 |
| IGM Vukovina d.o.o. | Vukovina b.b. | NK | 100.00 |
| Ilbau GmbH Deutschland | Berlin | VK | 100.00 |
| Ilbau Liegenschaftsverwaltung GmbH | Hoppegarten | VK | 100.00 |
| Ilbau Liegenschaftsverwaltung GmbH | Spittal an der Drau | VK | 100.00 |
| Immorent Oktatási Kft. | Budapest | NK | 20.00 |
| Industrial Engineering and Contracting Co. S.A.R.L. (INDECO) i.L. | Beirut | NK | 50.00 |
| Industrielles Bauen Betreuungsgesellschaft mbH | Stuttgart | NK | 100.00 |
| Industrija Gradevnog materijala ostra d.o.o. | Zagreb | NK | 100.00 |
| InfoSys Informationssysteme GmbH | Spittal an der Drau | VK | 94.90 |
| Innsbrucker Nordkettenbahnen Betriebs GmbH | Innsbruck | VK | 51.00 |
| Intelligent Traffic Systems Asia | Selangor | NK | 100.00 |
| Intolligent Toll Road Management Pvt. Ltd. | Mumbai | NK | 50.00 |
| I-PAY CLEARING SERVICES Pvt. Ltd. | Mumbai | VK | 74.00 |
| ITC Engineering GmbH & Co. KG | Stuttgart | NK | 50.00 |
| JCO s.r.o. | Ceske Budejovice | NK | 50.00 |
| Jernhusen Stockholm 122 AB | Stockholm | NK | 50.00 |
| JHP spol. s.r.o. | Prague | VK | 100.00 |
| JOSEF MOEBIUS CONSTRUCOES E ENGENHARIA CIVIL LTDA. | Sao Paulo | NK | 100.00 |
| Josef Riepl Unternehmen für Ingenieur- und Hochbau GmbH | Regensburg | VK | 100.00 |
| JUKA Justizzentrum Kurfürstenanlage GmbH | Cologne | VK | 100.00 |
| Jumbo Betonpumpen Service GmbH & Co.KG | Limbach-Oberfrohna | NK | 50.00 |
| Jumbo Betonpumpen Verwaltungs GmbH | Limbach-Oberfrohna | NK | 50.00 |
| JV HEILIT Umwelttechnik-BioPlanta S.R.L. | Orhei | NK | 98.00 |
| KAB Kärntner Abfallbewirtschaftung GmbH | Klagenfurt | NK | 36.25 |
| KAB Straßensanierung GmbH & Co KG | Spittal an der Drau | VK | 50.60 |
| KAB Straßensanierung GmbH | Spittal an der Drau | NK | 50.60 |
| Kamen-Ingrad gradnja i rudarstvo d.o.o. u likvidaciji | Zagreb | NK | 51.00 |
| KAMENOLOM MALI CARDAK d.o.o. | Zagreb | NK | 100.00 |
| KAMENOLOMY CR s.r.o. | Ostrava - Svinov | VK | 100.00 |
| Kanzel Steinbruch Dennig Gesellschaft mit beschränkter Haftung | Gratkorn | VK | 75.00 |
| Karlovarske silnice, a.s. | Ceske Budejovice | NK | 100.00 |
| KASERNEN Projektentwicklungs- und Beteiligungs GmbH | Vienna | NK | 24.90 |
| Kelet Aszfalt Kft. | Eger | NK | 100.00 |
| KIAG AG | Kreuzlingen | NK | 100.00 |
| Kies- und Betonwerk AG Sedrun | Sedrun | NK | 35.00 |
| Kiesabbau Gämmerler-Hütwohl GmbH & Co. Aug Kommanditgesellschaft | Königsdorf | NK | 50.00 |
1) VK … Consolidated companies EK … Companies included at-equity
NK … Not consolidated companies
Direct
Consoli-
| Company | Residence | Consoli dation1) |
Direct stake % |
|---|---|---|---|
| Kiesabbau Gämmerler-Hütwohl GmbH & Co. Grube Grafing KG | Königsdorf | NK | 50.00 |
| Kiesabbau Gämmerler-Hütwohl GmbH&Co. Grube Leitzinger Au KG | Königsdorf | NK | 50.00 |
| Kiesabbau Gämmerler-Hütwohl Verwaltungs- GmbH | Königsdorf | NK | 50.00 |
| Kiesgesellschaft Karsee Beteiligungs-GmbH | Immenstaad am Bodensee | NK | 50.00 |
| Kiesgesellschaft Karsee GmbH & Co. KG | Immenstaad am Bodensee | NK | 50.00 |
| Kieswerk Diersheim GmbH | Rheinau/Baden | NK | 60.00 |
| Kieswerk Ohr GmbH | Cologne | NK | 100.00 |
| Kieswerk Rheinbach Gesellschaft mit beschränkter Haftung | Cologne | NK | 50.00 |
| Kieswerk Rheinbach GmbH & Co Kommanditgesellschaft | Rheinbach | EK | 50.00 |
| Kieswerke Schray GmbH & Co. KG | Steißlingen | EK | 50.00 |
| Kieswerke Schray Verwaltungs GmbH | Steißlingen | NK | 50.00 |
| Kirchhoff + Schleith Beteiligungs-GmbH | Steißlingen | NK | 50.00 |
| Kirchhoff + Schleith Straßenbau GmbH & Co. KG | Steißlingen | NK | 50.00 |
| Kirchner & Völker Bauunternehmung GmbH | Erfurt | VK | 100.00 |
| Kirchner Baugesellschaft m.b.H. | Spittal an der Drau | NK | 100.00 |
| Kirchner PPP Service GmbH | Bad Hersfeld | NK | 100.00 |
| Kirchner Romania s.r.l. | Bucharest | NK | 100.00 |
| Klinik für Psychosomatik und psychiatrische Rehabilitation GmbH | Spittal an der Drau | NK | 30.00 |
| KMG - KLIPLEV MOTORWAY GROUP A/S | Copenhagen | VK | 100.00 |
| KÖKA Kft. | Budapest | VK | 100.00 |
| Königswall Invest B.V. | AK Den Haag | NK | 100.00 |
| KRAL ASFALT Sp.z o.o. | Konstantynow Lodzki | NK | 50.00 |
| KSH Kalkstein Heiterwang GmbH & Co KG | Pinswang | NK | 30.00 |
| KSH Kalkstein Heiterwang GmbH | Pinswang | NK | 30.00 |
| KSR - Kamenolomy SR, s.r.o. | Zvolen | VK | 100.00 |
| Lafarge Cement CE Holding GmbH | Vienna | EK | 30.00 |
| LAS Lauterhofener Asphalt und Straßenbau Gesellschaft mbH i.L. | Lauterhofen | NK | 100.00 |
| Latasfalts SIA | Milzkalne | NK | 100.00 |
| Leonhard Moll Hoch- und Tiefbau GmbH | Munich | VK | 100.00 |
| Leonhard Moll Tiefbau GmbH | Munich | NK | 100.00 |
| Liberecka Obalovna s.r.o. | Liberec | NK | 50.00 |
| Lieferasphalt Gesellschaft m.b.H. & Co OG, Viecht | Viecht | NK | 66.50 |
| Lieferasphalt Gesellschaft m.b.H. & Co. OG | Maria Gail | NK | 60.00 |
| Lieferasphalt Gesellschaft m.b.H.& Co.OG, Zirl | Vienna | NK | 50.00 |
| Lieferasphalt Gesellschaft m.b.H. | Vienna | NK | 50.00 |
| Lieferbeton Simmern GmbH & Co. KG | Simmern/Hunsrück | NK | 50.00 |
| Lieferbeton Simmern Verwaltungs-GmbH | Simmern/Hunsrück | NK | 50.00 |
| LIMET Beteiligungs GmbH & Co. Objekt Köln KG | Cologne | VK | 94.00 |
| LIMET Beteiligungs GmbH | Cologne | VK | 100.00 |
| Linnetorp AB | Sjöbo | NK | 100.00 |
| Linzer Schlackenaufbereitungs- und vertriebsgesellschaft m.b.H. | Linz | NK | 33.33 |
| LISAG Linzer Splitt- und Asphaltwerk GmbH. & CO KG | Linz | NK | 50.00 |
| LISAG Linzer Splitt- und Asphaltwerk GmbH. | Linz | NK | 50.00 |
| LPRD (LESZCZYNSKIE PRZEDSIEBIORSTWO ROBOT DROGOWO)-MOSTOWYCH Sp.z | |||
| o.o. | Leszno | NK | 98.70 |
| Ludwig Voss GmbH | Cuxhaven | VK | 100.00 |
| M5 Beteiligungs GmbH | Vienna | VK | 100.00 |
| M5 Holding GmbH | Vienna | VK | 100.00 |
| Magyar Bau Holding Zrt. | Budapest | NK | 100.00 |
| MAK Mecsek Autopalya Koncesszios Zrt. | Budapest | EK | 30.00 |
| MASZ M6 Kft. | Budapest | NK | 100.00 |
| MAV Mineralstoff - Aufbereitung und - Verwertung GmbH | Krefeld | VK | 50.00 |
| MAV Mineralstoff - Aufbereitung und Verwertung Lünen GmbH | Lünen | VK | 100.00 |
| Mazowieckie Asfalty Sp.z o.o. | Pruszkow | NK | 100.00 |
| Mecsek Autopalya-üzemeltetö Zrt. | Budapest | NK | 25.00 |
EK … Companies included at-equity
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| MERK Timber GmbH | Aichach | VK | 100.00 |
| Messe City Köln Beteiligungsgesellschaft mbH | Hamburg | NK | 50.00 |
| Messe City Köln GmbH & Co. KG | Hamburg | NK | 50.00 |
| MesseCity Köln Generalübernehmer GmbH & Co. KG | Oststeinbek | NK | 50.00 |
| MIEJSKIE PRZEDSIEBIORSTWO ROBOT DROGOWYCH Sp.z o.o. | Bialystok | NK | 100.00 |
| MIGU-Asphalt-Baugesellschaft m.b.H. | Lustenau | NK | 50.00 |
| Mikrobiologische Abfallbehandlungs GmbH | Schwadorf | NK | 51.00 |
| Milet Ditzingen Beteiligungsgesellschaft mbH | Heidelberg | NK | 49.00 |
| Milet Ditzingen Objektgesellschaft mbH & Co. KG | Heidelberg | NK | 48.71 |
| Mineral Abbau GmbH | Spittal an der Drau | VK | 100.00 |
| Mineral Baustoff GmbH | Cologne | VK | 100.00 |
| MINERAL IGM d.o.o. | Zapuzane | VK | 100.00 |
| Mineral Kop doo Beograd | Belgrad | NK | 100.00 |
| Mineral Polska Sp. z.o.o. | Czarny Bor | VK | 100.00 |
| MINERAL ROM S.R.L. | Brasov | NK | 100.00 |
| Mischek Bauträger Service GmbH | Vienna | NK | 100.00 |
| Mischek Leasing eins Gesellschaft m.b.H. | Vienna | NK | 100.00 |
| Mischek Systembau GmbH | Vienna | VK | 100.00 |
| Mister Recrutamento Lda. | Lisbon | NK | 100.00 |
| MiTTaG spol. s.r.o. | Prague | VK | 100.00 |
| MLT Maschinen Logistik Technik GmbH & Co. KG | Nesse-Apfelstädt | NK | 50.00 |
| MLT Verwaltungs GmbH | Nesse-Apfelstädt | NK | 50.00 |
| Mobil Baustoffe AG | Steinhausen | NK | 100.00 |
| MOBIL Baustoffe GmbH | Munich | VK | 100.00 |
| MOBIL Baustoffe GmbH | Reichenfels | VK | 100.00 |
| Mobil Concrete Qatar W.L.L. | Doha | NK | 98.00 |
| MOBIL-CONCRETE OOD | Sofia | NK | 50.00 |
| Möbius Construction Ukraine Ltd | Odessa | VK | 100.00 |
| Möbius Wasserbau GmbH | Hamburg | NK | 100.00 |
| MOEBIUS-Bau Polska EMO Baczewscy Spolka Jawna | Szczecin | NK | 50.00 |
| Moser & C. SRL | Bruneck | NK | 50.00 |
| MSO Mischanlagen GmbH Ilz & Co KG | Ilz | NK | 52.81 |
| MSO Mischanlagen GmbH Pinkafeld & Co KG | Pinkafeld | NK | 52.67 |
| MSO Mischanlagen GmbH | Ilz | NK | 33.33 |
| MUST Razvoj projekata d.o.o. | Zagreb | NK | 100.00 |
| N.V. STRABAG Belgium S.A. | Antwerp | VK | 100.00 |
| N.V. STRABAG Benelux S.A. | Antwerp | VK | 100.00 |
| Na belidle s.r.o. | Prague | VK | 100.00 |
| Natursteinwerke im Nordschwarzwald NSN GmbH & Co. KG | Mühlacker | EK | 25.00 |
| Natursteinwerke im Nordschwarzwald NSN Verwaltungsgesellschaft mit beschränkter | |||
| Haftung | Mühlacker | NK | 25.00 |
| NE Sander Eisenbau GmbH | Sande | VK | 100.00 |
| NE Sander Immobilien GmbH | Sande | VK | 100.00 |
| NEUE REFORMBAU Gesellschaft m.b.H. | Vienna | NK | 100.00 |
| Nimab Anläggning AB | Sjöbo | NK | 100.00 |
| Nimab Entreprenad AB | Sjöbo | VK | 100.00 |
| Nimab Fastigheter AB | Sjöbo | NK | 100.00 |
| Nimab Support AB | Sjöbo | NK | 100.00 |
| NIOG Projektentwicklungs-GmbH & Co. KG | Hamburg | NK | 50.00 |
| NIOG Verwaltung GmbH | Hamburg | NK | 50.00 |
| Norsk Standardselskap 154 AS | Oslo | NK | 100.00 |
| Northern Energy GAIA I. GmbH | Aurich | VK | 100.00 |
| Northern Energy GAIA II. GmbH | Aurich | VK | 100.00 |
| Northern Energy GAIA III. GmbH | Aurich | VK | 100.00 |
| Northern Energy GAIA IV. GmbH | Aurich | VK | 100.00 |
EK … Companies included at-equity
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| Northern Energy GAIA V. GmbH | Aurich | VK | 100.00 |
| Northern Energy GlobalTech II. GmbH | Aurich | VK | 100.00 |
| Northern Energy OWP Albatros GmbH | Aurich | VK | 100.00 |
| Northern Energy OWP West GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaStorm I. GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaStorm II. GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaWind I. GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaWind II. GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaWind III GmbH | Aurich | VK | 100.00 |
| Northern Energy SeaWind IV. GmbH | Aurich | VK | 100.00 |
| NR Bau- u. Immobilienverwertung GmbH | Berlin | NK | 100.00 |
| NUOVO MERCATO GIANICOLENSE SRL | Bologna | NK | 40.00 |
| Nyugat Aszfalt Kft. | Györ | NK | 100.00 |
| OAT - Bohr- und Fugentechnik Gesellschaft m.b.H. | Spittal an der Drau | VK | 51.00 |
| OAT Kft. | Budapest | VK | 100.00 |
| OAT s.r.o. | Prague | VK | 100.00 |
| OAT spol. s.r.o. | Bratislava | VK | 100.00 |
| OBIT GmbH | Berlin | NK | 100.00 |
| ODEN Anläggning Fastighets AB | Stockholm | NK | 100.00 |
| ODEN Entreprenad Fastighets AB | Stockholm | NK | 100.00 |
| ODEN Maskin Fastighets AB | Stockholm | NK | 100.00 |
| Oder Havel Mischwerke GmbH & Co. KG | Berlin | EK | 33.33 |
| ODRA-ASFALT Sp. z o.o. | Szeczecin | NK | 33.33 |
| Offshore Services Cuxhaven GmbH | Cologne | NK | 100.00 |
| Offshore Wind Logistik GmbH | Stuttgart | VK | 100.00 |
| OFIM HOLDINGS LIMITED | Cardiff | NK | 46.25 |
| Onezhskaya Mining Company LLC | Petrozavodsk | NK | 59.00 |
| Ontwikkelingscombinatie Maasmechelen N.V. | Antwerp | NK | 50.00 |
| OOO "Dywidag" | Moscow | NK | 100.00 |
| OOO "EFKON" | Moscow | NK | 100.00 |
| OOO "Möbius" | St. Petersburg | NK | 75.00 |
| OOO "SAT" | Moscow | NK | 100.00 |
| OOO "Strabag Straßenbau" | Moscow | NK | 100.00 |
| OOO "Strabag Sued" | Moscow | NK | 100.00 |
| OOO "STRATON" | Sotschi | NK | 50.00 |
| OOO "TPA Gesellschaft für Qualitätssicherung und Innovation" | Moscow | NK | 100.00 |
| OOO BMTI | Moscow | NK | 100.00 |
| OOO CLS Construction Legal Services | Moscow | NK | 100.00 |
| OOO STRABAG PFS | Moscow | NK | 100.00 |
| OOO Züblin Russia | Ufa | NK | 100.00 |
| OOO Züblin | Moscow | NK | 100.00 |
| Osttiroler Asphalt Hoch- und Tiefbauunternehmung GmbH | Lavant i. Osttirol | VK | 80.00 |
| PAM Pongauer Asphaltmischanlagen GmbH & Co KG | St. Johann im Pongau | NK | 50.00 |
| PAM Pongauer Asphaltmischanlagen GmbH | St. Johann im Pongau | NK | 50.00 |
| PANSUEVIA GmbH & Co. KG | Jettingen-Scheppach | EK | 50.00 |
| PANSUEVIA Service GmbH & Co. KG | Jettingen-Scheppach | EK | 50.00 |
| PARK SERVICE HÜFNER GmbH + Co. KG | Stuttgart | NK | 48.44 |
| Passivhaus Kammelweg Bauträger GmbH | Vienna | NK | 100.00 |
| PBOiUT Slask Sp. z o.o. | Katowice | VK | 60.98 |
| PEKA Entwicklungsgesellschaft Kurfürstenanlage GmbH | Cologne | VK | 100.00 |
| PH Bau Erfurt GmbH | Erfurt | NK | 100.00 |
| Philman Holdings Co. | Philippinen | NK | 20.00 |
| PNM, d.o.o. | Ljubljana | NK | 100.00 |
| POLSKI ASFALT Sp.z o.o. | Kraków | NK | 100.00 |
| Poltec Sp.z o.o. | Braslau | NK | 100.00 |
EK … Companies included at-equity
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| Pomgrad Inzenjering d.o.o. | Split | VK | 100.00 |
| PPP Conrad-von-Ense-Schule GmbH | Bad Hersfeld | NK | 100.00 |
| PPP Management GmbH | Cologne | NK | 100.00 |
| PPP Schulen Kreis Düren GmbH | Bad Hersfeld | NK | 100.00 |
| PPP Schulen Monheim am Rhein GmbH | Bad Hersfeld | NK | 100.00 |
| PPP SchulManagement Witten GmbH & Co. KG | Cologne | NK | 100.00 |
| PPP SeeCampus Niederlausitz GmbH | Bad Hersfeld | NK | 100.00 |
| Preduzece za puteve "Zajecar" a.D.Zajecar | Zajecar | VK | 100.00 |
| Preusse Baubetriebe Gesellschaft mit beschränkter Haftung | Hamburg | VK | 100.00 |
| PRID-CIECHANOW Sp.z o.o. | Ciechanow | NK | 100.00 |
| PRO Liegenschaftsverwaltungs- und Verwertungsgesellschaft m.b.H. | Vienna | NK | 100.00 |
| Projekt Elbpark GmbH & Co. KG | Cologne | VK | 100.00 |
| Projekt Elbpark Verwaltungs GmbH | Cologne | NK | 100.00 |
| Projektgesellschaft Willinkspark GmbH | Cologne | NK | 100.00 |
| Prottelith Produktionsgesellschaft mbH | Liebenfels | NK | 52.00 |
| PRZEDSIEBIORSTWO ROBOT DROGOWYCH Sp.z o.o. W LIKWIDACJI | Choszczno | NK | 100.00 |
| PWG-Bau Pfersee Wohn- und Gewerbebauträger GmbH & Co.KG | Munich | NK | 50.00 |
| PWG-Bau Pfersee Wohn-und Gewerbebauträger Verwaltungs GmbH | Munich | NK | 50.00 |
| Pyhrn Concession Holding GmbH | Cologne | VK | 100.00 |
| PZC SPLIT d.d. | Split | VK | 95.37 |
| QMP Generalübernehmer GmbH & Co. KG | Oststeinbek | NK | 50.00 |
| RAE Recycling Asphaltwerk Eisfeld GmbH & Co KG | Eisfeld | NK | 37.50 |
| RAE Recycling Asphaltwerk Eisfeld Verwaltungs-GmbH | Eisfeld | NK | 37.50 |
| Raiffeisen evolution project development GmbH | Vienna | EK | 20.00 |
| RAM Regensburger Asphalt-Mischwerke GmbH & Co KG | Barbing | NK | 44.33 |
| Rapp GmbH & Co. KG | Steinheim am Albuch | NK | 20.00 |
| Rapp Verwaltungs-GmbH | Steinheim am Albuch | NK | 20.00 |
| Raststation A 3 GmbH | Vienna | VK | 100.00 |
| Raststation A 6 GmbH | Vienna | VK | 100.00 |
| Rathaus-Carrée Saarbrücken Grundstücksentwicklungs Gesellschaft mbH i.L. | Cologne | NK | 24.97 |
| Rathaus-Carrée Saarbrücken Grundstücksentwicklungsgesellschaft mbH & Co.KG | Cologne | NK | 25.00 |
| RBS Rohrbau-Schweißtechnik Gesellschaft m.b.H. | Linz | VK | 100.00 |
| RE Wohnungseigentumserrichtungs GmbH | Vienna | NK | 75.00 |
| Regensburger Asphalt-Mischwerke GmbH | Barbing | NK | 44.33 |
| REMEX Coesfeld Gesellschaft für Baustoffaufbereitung mbH | Dülmen-Buldern | NK | 50.00 |
| REPASS-SANIERUNGSTECHNIK GMBH Korrosionsschutz und Betoninstandsetzung | Munderkingen | VK | 100.00 |
| Reutlinger Asphaltmischwerk Verwaltungs GmbH | Reutlingen | NK | 50.00 |
| Rezidencie Machnac, s.r.o. | Bratislava | NK | 50.00 |
| RFM Asphaltmischwerk GmbH & Co KG | Traiskirchen | NK | 33.33 |
| RFM Asphaltmischwerk GmbH. | Wienersdorf-Oeynhausen | NK | 33.33 |
| RGL Rekultivierungsgesellschaft Langentrog mbH | Langenargen | NK | 80.00 |
| Rheinbacher Asphaltmischwerk Gesellschaft mit beschränkter Haftung | Rheinbach | NK | 50.00 |
| Rheinbacher Asphaltmischwerk GmbH & Co. Kommanditgesellschaft für Straßenbaustoffe | |||
| i.L. | Rheinbach | NK | 50.00 |
| Rhein-Regio Neuenburg Projektentwicklung GmbH | Neuenburg am Rhein | NK | 90.00 |
| Rieder Asphaltgesellschaft m.b.H. & Co. KG. | Ried im Zillertal | NK | 50.00 |
| Rieder Asphaltgesellschaft m.b.H. | Ried im Zillertal | NK | 50.00 |
| Rimex Gebäudemanagement GmbH | Ulm | VK | 100.00 |
| RKH Rheinkies Hitdorf GmbH & Co. KG i.L. | Bergheim | NK | 33.33 |
| RKH Rheinkies Hitdorf Verwaltungs GmbH i.L. | Bergheim | NK | 33.33 |
| ROBA Kieswerk Merseburg GmbH i.L. | Merseburg | NK | 100.00 |
| ROBA Transportbeton GmbH | Cologne | VK | 100.00 |
| ROBA-Neuland Beton GmbH & Co. KG | Hamburg | NK | 50.00 |
| Robert Kieserling Industriefußboden Gesellschaft mit beschränkter Haftung | Hamburg | VK | 100.00 |
| Rohstoff & Umwelttechnik Verwaltungs GmbH | Hildesheim | NK | 50.00 |
EK … Companies included at-equity
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| Romania Asfalt s.r.l. | Bucharest | NK | 100.00 |
| RST Rail Systems and Technologies GmbH | Barleben | NK | 82.00 |
| RVB Gesellschaft für Recycling, Verwertung und Beseitigung von Abfällen mbH | Kelheim | NK | 100.00 |
| S.U.S. Abflussdienst Gesellschaft m.b.H. | Vienna | NK | 100.00 |
| Salzburger Lieferasphalt GmbH & Co OG | Sulzau | NK | 20.00 |
| SAM Sindelfinger Asphalt-Mischwerke GmbH & Co KG | Sindelfingen | NK | 20.00 |
| SAO BRVZ Ltd | Moscow | VK | 100.00 |
| SAT REABILITARE RECICLARE S.R.L. | Cluj-Napoca | NK | 100.00 |
| SAT s.r.o. | Prague | VK | 100.00 |
| SAT SANIRANJE cesta d.o.o. | Zagreb | NK | 100.00 |
| SAT SLOVENSKO s.r.o. | Bratislava | NK | 100.00 |
| SAT Sp.z o.o. | Olawa | VK | 100.00 |
| SAT Straßensanierung GmbH | Cologne | VK | 100.00 |
| SAT Ukraine | Brovary | NK | 100.00 |
| SAT Útjavító Kft. | Budapest | NK | 100.00 |
| SAV Südniedersächsische Aufbereitung und Verwertung Verwaltungs GmbH | Hildesheim | NK | 50.00 |
| Schlackenkontor Bremen GmbH | Bremen | NK | 25.00 |
| Schotter- und Kies-Union GmbH & Co. KG | Leipzig | NK | 57.90 |
| Schotter- und Kies-Union Verwaltungsgesellschaft mbH | Hirschfeld | NK | 100.00 |
| SCHOTTERWERK EDLING GESELLSCHAFT M.B.H. | Klagenfurt | NK | 74.00 |
| SEF Netz-Service GmbH | Munich | NK | 100.00 |
| SF Bau vier GmbH | Vienna | VK | 100.00 |
| SF-Ausbau GmbH | Freiberg | VK | 100.00 |
| SF-BAU-Grundstücksgesellschaft "ABC-Bogen" mbH | Cologne | NK | 100.00 |
| Shanghai Changjiang-Züblin Construction&Engineering Co.Ltd. | Shanghai | VK | 75.00 |
| Sindelfinger Asphalt-Mischwerke GmbH | Sindelfingen | NK | 20.00 |
| SMB Construction International GmbH | Sengenthal | NK | 50.00 |
| SOOO "STRABAG Engineering Center" | Minsk | NK | 60.00 |
| SOWI - Investor - Bauträger GmbH | Innsbruck | NK | 33.33 |
| SPK - Errichtungs- und Betriebsges.m.b.H. | Spittal an der Drau | NK | 100.00 |
| Spolecne obalovny, s r.o. | Prague | NK | 50.00 |
| SPPD Sp. z o.o. | Pruszkow | NK | 100.00 |
| SRE Erste Vermögensverwaltung GmbH | Cologne | NK | 100.00 |
| SRE Zweite Vermögensverwaltung GmbH | Cologne | NK | 100.00 |
| SRK Kliniken Beteiligungs GmbH | Vienna | NK | 25.00 |
| STA Asphaltmischwerk Strahlungen GmbH | Strahlungen | NK | 24.90 |
| stahl + verbundbau gesellschaft für industrielles bauen m.b.H. | Dreieich | NK | 30.00 |
| Staßfurter Baubetriebe GmbH | Staßfurt | VK | 100.00 |
| Steffes-Mies GmbH | Sprendlingen | VK | 100.00 |
| Steinbruch Mauterndorf Gesellschaft m.b.H. | St. Michael/Lungau | NK | 50.00 |
| Steinbruch Spittergrund GmbH | Erfurt | EK | 50.00 |
| Stephan Beratungs-GmbH | Linz am Rhein | NK | 30.00 |
| Stephan Holzbau GmbH | Stuttgart | VK | 100.00 |
| STHOI Co., Ltd. | Bangkok | NK | 49.00 |
| Storf Hoch- und Tiefbaugesellschaft m.b.H. | Reutte | VK | 100.00 |
| STR Irodaház Kft. | Budapest | NK | 100.00 |
| STR Lakasepitö Kft. | Budapest | NK | 100.00 |
| STRABAG - ZIPP Development s.r.o. | Bratislava | NK | 100.00 |
| STRABAG (B) Sdn Bhd | Bandar Seri Begawan | NK | 100.00 |
| Strabag a.s. | Prague | VK | 100.00 |
| STRABAG A/S | Trige | NK | 100.00 |
| STRABAG AB | Stockholm | VK | 100.00 |
| STRABAG ABU DHABI LLC | Abu Dhabi | VK | 100.00 |
| STRABAG AG | Cologne | VK | 93.63 |
| STRABAG AG | Spittal an der Drau | VK | 100.00 |
EK … Companies included at-equity
Company Residence
Direct stake %
Consolidation1)
| STRABAG AG | Zürich | VK | 100.00 |
|---|---|---|---|
| STRABAG Algerie EURL | Alger | NK | 100.00 |
| STRABAG Általános Építö Kft. | Budapest | VK | 100.00 |
| STRABAG Anlagentechnik GmbH | Cologne | VK | 100.00 |
| STRABAG Anlagentechnik GmbH | Thalgau | VK | 100.00 |
| STRABAG Asset GmbH | Cologne | VK | 100.00 |
| STRABAG AUSTRALIA PTY LTD | BRISBANE | NK | 100.00 |
| STRABAG B.V. | Vlaardingen | VK | 100.00 |
| STRABAG Bau GmbH | Vienna | VK | 100.00 |
| STRABAG Baustoffaufbereitung und Recycling GmbH | Düsseldorf | NK | 51.00 |
| STRABAG Beteiligungen International AG | Spittal/Drau | NK | 100.00 |
| STRABAG Beton GmbH & Co. KG | Berlin | VK | 100.00 |
| STRABAG Construction Co., Ltd. | Bangkok | NK | 49.00 |
| STRABAG Construction Nigeria | Ikeja | NK | 100.00 |
| STRABAG d.o.o. Beograd | Novi Beograd | VK | 100.00 |
| STRABAG d.o.o. Sarajevo | Sarajevo | NK | 100.00 |
| Strabag d.o.o. | Zagreb | VK | 100.00 |
| STRABAG Dredging GmbH | Hamburg | NK | 100.00 |
| STRABAG DROGI WOJEWODZKIE Sp. z o.o. | Pruszków | NK | 100.00 |
| STRABAG Dubai LLC | Dubai | NK | 100.00 |
| STRABAG EAD | Sofia | VK | 100.00 |
| STRABAG Energy Technologies GmbH | Vienna | VK | 100.00 |
| STRABAG Facility Management GmbH | Nürnberg | VK | 100.00 |
| STRABAG FACILITY MANAGEMENT S.R.L. | Bucharest | NK | 100.00 |
| STRABAG Gorzów Wielkopolski Sp.z o.o. | Gorzów Wielkopolski | NK | 49.00 |
| STRABAG gradbene storitve d.o.o. | Ljubljana | VK | 100.00 |
| STRABAG Holding GmbH | Vienna | VK | 100.00 |
| STRABAG HYDROTECH SP z o.o. | Szczecin | NK | 100.00 |
| Strabag Inc. | Toronto | VK | 100.00 |
| STRABAG India Private Limited | Maharashtra | NK | 100.00 |
| STRABAG Industries (Thailand) Co.,Ltd. | Bangkok | NK | 100.00 |
| STRABAG Infrastruktur Development | Moscow | NK | 100.00 |
| STRABAG Infrastrukturprojekt GmbH | Bad Hersfeld | VK | 100.00 |
| STRABAG Installations pour l'Environnement SARL | Champagne au mont d'or | NK | 100.00 |
| Strabag International Benin SARL | Benin | NK | 100.00 |
| Strabag International Corporation | Buena Vista | NK | 100.00 |
| STRABAG International GmbH | Cologne | VK | 100.00 |
| STRABAG Invest GmbH | Vienna | NK | 51.00 |
| Strabag Kiew TOW | Kiew | NK | 100.00 |
| STRABAG Krankenhaus Errichtungs- und BetriebsgmbH | Vienna | NK | 100.00 |
| Strabag Liegenschaftsverwaltung GmbH | Linz | VK | 100.00 |
| STRABAG Offshore Wind GmbH | Stuttgart | VK | 100.00 |
| Strabag Oktatási PPP Kft. | Budapest | NK | 30.00 |
| STRABAG OMAN L.L.C. | Muscat | VK | 100.00 |
| STRABAG OW EVS GmbH | Hamburg | NK | 51.00 |
| STRABAG Oy | Helsinki | VK | 100.00 |
| STRABAG Pipeline- und Rohrleitungsbau GmbH | Regensburg | VK | 100.00 |
| STRABAG Projektentwicklung GmbH | Cologne | VK | 100.00 |
| STRABAG Projektutveckling AB | Stockholm | VK2) | 100.00 |
| STRABAG Property and Facility Services a.s. | Prague | VK | 100.00 |
| STRABAG Property and Facility Services d.o.o. | Zagreb | NK | 100.00 |
| STRABAG Property and Facility Services GmbH | Münster | VK | 100.00 |
| STRABAG Property and Facility Services GmbH | Vienna | VK | 100.00 |
| STRABAG Property and Facility Services s.r.o. | Bratislava | NK | 55.00 |
1) VK … Consolidated companies
EK … Companies included at-equity
NK … Not consolidated companies
2) The presentation of interests is done using the economic approach; the interests as defined by civil law may deviate from this presentation.
Strabag Property and Facility Services Sp.z.o.o. Pruszkow NK 100.00
| Company | Residence | Consoli dation1) |
Direct stake % |
|---|---|---|---|
| STRABAG Property and Facility Services Zrt. | Budapest | VK | 51.00 |
| Strabag Qatar W.L.L. | Qatar | VK | 100.00 |
| STRABAG Rail AB | Kumla | NK | 100.00 |
| STRABAG Rail Fahrleitungen GmbH | Berlin | VK | 100.00 |
| STRABAG Rail GmbH | Lauda-Königshofen | VK | 100.00 |
| STRABAG RAIL POLSKA Sp.z o.o. | Breslau | VK | 100.00 |
| STRABAG Ray Ltd. Sti. | Ankara | NK | 100.00 |
| STRABAG Real Estate GmbH | Cologne | VK | 100.00 |
| STRABAG Residential Property Services GmbH | Berlin | NK | 99.51 |
| Strabag RS d.o.o. | Banja Luka | NK | 100.00 |
| STRABAG S.A.S. | Bogota D.C. | NK | 100.00 |
| STRABAG S.p.A. | Bologna | VK | 100.00 |
| STRABAG s.r.o. | Bratislava | VK | 100.00 |
| Strabag Saudi Arabia | Khobar | NK | 50.00 |
| STRABAG Sh.p.k. | Tirana | NK | 100.00 |
| STRABAG SIA | Milzkalne | NK | 82.08 |
| STRABAG Sp.z o.o. | Pruszkow | VK | 100.00 |
| Strabag SpA | Santiago | VK | 100.00 |
| STRABAG Sportstättenbau GmbH | Dortmund | VK | 100.00 |
| Strabag srl | Bucharest | VK | 100.00 |
| STRABAG Sverige AB | Stockholm | VK | 100.00 |
| STRABAG Umweltanlagen GmbH | Dresden | VK | 100.00 |
| STRABAG Unterstützungskasse GmbH | Cologne | VK | 100.00 |
| STRABAG Vasútépítö Kft. | Budapest | VK | 100.00 |
| STRABAG Wasserbau GmbH | Hamburg | VK | 100.00 |
| STRABAG Wasserbau Scandinavia AB | Täby | NK | 100.00 |
| Strabag Zrt. | Budapest | VK | 100.00 |
| STRABAG-HIDROINZENJERING d.o.o | Split | VK | 100.00 |
| Strabag-Mert Kkt. | Budapest | NK | 50.00 |
| STRABAG-MML Kft. | Budapest | VK | 100.00 |
| STRABAG-PROJEKT 2 Sp.z o.o. | Pruszkow | NK | 100.00 |
| STRABAG-PROJEKT Sp.z o.o. | Pruszkow | NK | 100.00 |
| STRABIL STRABAG Bildung im Lauenburgischen GmbH | Cologne | NK | 100.00 |
| Straktor Bau Aktien Gesellschaft | Kifisia | NK | 50.00 |
| Stratebau GmbH | Regensburg | VK | 100.00 |
| STRAVIA Kft. | Budapest | NK | 25.00 |
| STRIBA Protonentherapiezentrum Essen GmbH | Cologne | NK | 50.00 |
| Südprojekt A-Modell GmbH & Co. KG | Bad Hersfeld | NK | 100.00 |
| Südprojekt A-Modell Verwaltung GmbH | Bad Hersfeld | NK | 100.00 |
| Syrena Immobilien Holding Aktiengesellschaft | Spittal an der Drau | NK | 50.00 |
| Szentesi Vasútépítö Kft | Budapest | VK | 100.00 |
| SZYBKI TRAMWAY Sp. z o.o. | Pruszkow | NK | 100.00 |
| T S S Technische Sicherheits-Systeme Gesellschaft mit beschränkter Haftung | Cologne | VK | 100.00 |
| TBG Ceske Budejovice spol. s.r.o. | Budweis | NK | 50.00 |
| TBG Frissbeton Kft. | Pecs | NK | 50.00 |
| TBG Transportbeton Saalfeld GmbH & Co.KG | Saalfeld/Saale | NK | 28.33 |
| TBG Transportbeton Saalfeld Verwaltungs-GmbH | Saalfeld/Saale | NK | 28.33 |
| TBG-STRABAG d.o.o. | Zagreb | NK | 50.00 |
| TDE Mitteldeutsche Bergbau Service GmbH | Espenhain | NK | 35.00 |
| TETRA Telekommunikation - Service GmbH | Vienna | NK | 100.00 |
| TH 116 GmbH & Co. KG | Cologne | NK | 100.00 |
| THE INTOLLIGENT LIMITED | Dublin | NK | 100.00 |
| Thüringer Straßenwartungs- und Instandhaltungsgesellschaft mbH & Co. KG | Apfelstädt | EK | 50.00 |
| Tierra Chuquicamata SpA | Santiago | NK | 50.00 |
| TOLLINK (PROPRIERTARY) LIMITED | Pretoria | NK | 100.00 |
1) VK … Consolidated companies EK … Companies included at-equity
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| TolLink Pakistan (Private) Limited | Islamabad | NK | 60.00 |
| TOO STRABAG Kasachstan | Astana | NK | 100.00 |
| Torkret GmbH | Stuttgart | VK | 100.00 |
| TOW BRVZ | Kiew | NK | 100.00 |
| TPA CR, s.r.o. | Ceske Budejovice | VK | 100.00 |
| TPA EOOD | Sofia | NK | 100.00 |
| TPA Gesellschaft für Qualitätssicherung und Innovation GmbH | Erstfeld | NK | 100.00 |
| TPA Gesellschaft für Qualitätssicherung und Innovation GmbH | Vienna | VK | 100.00 |
| TPA GmbH | Cologne | VK | 100.00 |
| TPA HU Kft. | Budapest | VK | 100.00 |
| TPA odrzavanje kvaliteta i inovacija d.o.o. | Zagreb | VK | 100.00 |
| TPA Societate pentru asigurarea calitatii si inovatii SRL | Bucharest | VK | 100.00 |
| TPA Sp.z o.o. | Pruszkow | VK | 100.00 |
| TPA Spolocnost pre zabezpecenie kvality a inovacie s.r.o. | Bratislava | VK | 100.00 |
| TPA za obezbedenje kvaliteta i inovacije d.o.o. Beograd | Novi Beograd | VK | 100.00 |
| Transportbetonwerk Hirschlanden GmbH & Co KG | Ditzingen | NK | 30.00 |
| Transportbetonwerk Hirschlanden Verwaltungs GmbH | Ditzingen | NK | 30.00 |
| Trema Engineering 2 sh p.k. | Tirana | VK | 51.00 |
| Treuhandbeteiligung B | NK | 100.00 | |
| Treuhandbeteiligung H | VK2) | 100.00 | |
| Treuhandbeteiligung M | NK | 100.00 | |
| Treuhandbeteiligung Mo | NK | 100.00 | |
| Triplus Beton GmbH & Co KG | Zell am See | NK | 50.00 |
| Triplus Beton GmbH | Zell am See | NK | 50.00 |
| TSI VERWALTUNGS GMBH | Apfelstädt | NK | 50.00 |
| TyresöHandel AB | Stockholm | NK | 100.00 |
| TyresöHandel Holding AB | Stockholm | NK | 100.00 |
| TyresöView1 AB | Stockholm | NK | 100.00 |
| TyresöView1 Holding AB | Stockholm | VK | 100.00 |
| UAB "Strabag Baltija" | Klaipeda | NK | 100.00 |
| UAB "STRABAG Wasserbau" | Klaipeda | NK | 100.00 |
| ULTRA Transportbeton GmbH & Co KG | Neu-Ulm | NK | 29.00 |
| ULTRA Transportbeton VerwaltungsGmbH | Neu-Ulm | NK | 29.00 |
| UND-FRISCHBETON s.r.o. | Kosice | NK | 75.00 |
| Universitätszentrum Althanstraße Erweiterungsgesellschaft m.b.H. | Vienna | NK | 100.00 |
| Unterstützungseinrichtung für die Angestellten der ehemaligen Bau-Aktiengesellschaft | |||
| "Negrelli" Gesellschaft m.b.H. | Vienna | NK | 50.00 |
| Valarea SAS | Lyon | NK | 100.00 |
| VAM-Valentiner Asphaltmischwerk Gesellschaft m.b.H. & Co.KG | Linz | NK | 75.00 |
| VAM-Valentiner Asphaltmischwerk Gesellschaft m.b.H. | Linz | NK | 75.00 |
| VARNA EFKON OOD | Varna | NK | 52.00 |
| VCO - Vychodoceska obalovna, s r.o | Hradec Kralove | NK | 33.33 |
| Verbundplan Birecik Isletme Ltd. | Birecik | NK | 25.00 |
| Vereinigte Asphaltmischwerke Gesellschaft m.b.H. & Co KG | Spittal an der Drau | NK | 50.00 |
| Vereinigte Asphaltmischwerke Gesellschaft m.b.H. | Spittal an der Drau | NK | 50.00 |
| Verwaltung Forum Mittelrhein Koblenz Generalübernehmergesellschaft mbH | Oststeinbek | NK | 51.00 |
| Verwaltung Grundstücksgesellschaft Kaiserplatz Aachen Adalbertstraße GmbH | Hamburg | NK | 50.00 |
| Verwaltung MesseCity Köln Generalübernehmer GmbH | Oststeinbek | NK | 50.00 |
| Verwaltung QMP Generalübernehmer GmbH | Osteinbek | NK | 50.00 |
| Verwaltungsgesellschaft ROBA-Neuland Beton m.b.H. | Hamburg | NK | 50.00 |
| Viamont DSP a.s. | Usti nad Labem | VK | 100.00 |
| VIANOVA - Bitumenemulsionen GmbH | Fürnitz | NK | 24.90 |
| VIANOVA SLOVENIJA d.o.o. | Logatec | NK | 50.00 |
| Viedenska brana s.r.o. | Bratislava | VK | 100.00 |
| VIOLA PARK Immobilienprojekt GmbH | Vienna | VK | 75.00 |
EK … Companies included at-equity
NK … Not consolidated companies
2) The presentation of interests is done using the economic approach; the interests as defined by civil law may deviate from this presentation.
| Company | Residence | Consoli dation1) |
Direct stake % |
|
|---|---|---|---|---|
| VKG-Valentiner Kieswerk Gesellschaft m.b.H. | Linz | NK | 50.00 | |
| Vojvodinaput-Pancevo a.d. Pancevo | Pancevo | VK | 82.07 | |
| Walter Group International Philippines, Inc. | Philippinen | NK | 26.00 | |
| Vojvodinaput-Pancevo a.d. Pancevo | Pancevo | VK | 82.07 |
|---|---|---|---|
| Walter Group International Philippines, Inc. | Philippinen | NK | 26.00 |
| WBA - Walter Birgel Asphaltbau Gesellschaft mit beschränkter Haftung i.L. | Leipzig | NK | 85.00 |
| WIBAU Holding GmbH | Linz | NK | 37.83 |
| Windkraft FiT GmbH | Hamburg | VK | 100.00 |
| WMB Drogbud Sp.z o.o. | Lubojenka | NK | 51.00 |
| WMW Weinviertler Mischwerk Gesellschaft m.b.H. & Co KG | Zistersdorf | NK | 33.33 |
| WMW Weinviertler Mischwerk Gesellschaft m.b.H. | Zistersdorf | NK | 33.33 |
| Wohnbau Tafelgelände Beteiligungs-GmbH | Munich | NK | 25.00 |
| Wohnbau Tafelgelände GmbH & Co. KG | Munich | NK | 25.00 |
| Wohnbauträgergesellschaft Objekt "Freising - Westlich der Jagdstraße" mbH | Cologne | NK | 100.00 |
| Wohnen am Krautgarten Bauträger GmbH | Vienna | NK | 100.00 |
| Wolfer & Goebel Bau GmbH | Stuttgart | VK | 100.00 |
| Wollhaus HN GmbH & Co. KG | Cologne | NK | 100.00 |
| WTG Walhalla Transportbeton GmbH | Regensburg | NK | 22.20 |
| Xaver Bachner GmbH | Straubing | VK | 100.00 |
| Z.I.P.O.S. d.o.o. | Antunovac | NK | 50.00 |
| Zaklad Surowcow Drogowych "Walmor" Sp.z o.o. | Warschau | NK | 48.08 |
| ZAO "Strabag" | Moscow | VK | 100.00 |
| Z-Bau GmbH | Magdeburg | VK | 100.00 |
| ZDE Projekt Oberaltenallee GmbH | Hamburg | NK | 100.00 |
| ZDE Sechste Vermögensverwaltung GmbH | Cologne | VK | 100.00 |
| ZDE Siebte Vermögensverwaltung GmbH | Cologne | NK | 100.00 |
| Z-Design EOOD | Sofia | NK | 100.00 |
| Zentrum Rennweg S-Bahn Immobilienentwicklung GmbH | Vienna | NK | 100.00 |
| Zezelivskij karier TOW | Zezelev | VK | 99.36 |
| ZG1 s.r.o. | Bratislava | NK | 100.00 |
| ZIPP BRATISLAVA spol. sr.o. | Bratislava | VK | 100.00 |
| ZIPP Brno s.r.o. | Brünn | NK | 50.00 |
| ZIPP REAL, a.s. | Brünn | NK | 50.00 |
| ZS Real Estate AG | Opfikon | NK | 99.80 |
| Züblin A/S | Trige | VK | 100.00 |
| Züblin AS | Oslo | NK | 100.00 |
| Züblin Australia Pty Ltd | Perth | NK | 100.00 |
| Züblin Bulgaria EOOD | Sofia | NK | 100.00 |
| Züblin Chimney and Refractory GmbH | Cologne | VK | 100.00 |
| Züblin Construction L.L.C. | Abu Dhabi | NK | 100.00 |
| Züblin Engineering Consulting (Shanghai) Co., Ltd. | Shanghai | NK | 100.00 |
| Züblin Gebäudetechnik GmbH | Erlangen | VK | 100.00 |
| Züblin Ground and Civil Engineering LLC | Dubai | VK | 100.00 |
| Züblin Holding GesmbH | Vienna | VK | 100.00 |
| Züblin Holding Thailand Co. Ltd. | Bangkok | NK | 79.35 |
| Züblin Hrvatska d.o.o. | Zagreb | NK | 100.00 |
| Züblin Inc. | Saint John/NewBrunswick | VK | 100.00 |
| Züblin International GmbH Chile SpA | Santiago de Chile | VK | 100.00 |
| Züblin International GmbH | Stuttgart | VK | 100.00 |
| Züblin International Malaysia Sdn. Bhd. | Kuala Lumpur | NK | 100.00 |
| Züblin International Qatar LLC | Doha | EK | 49.00 |
| Züblin Ireland Limited | Dublin | NK | 100.00 |
| Züblin Kft. | Budapest | VK | 100.00 |
| Züblin Nederland BV | Vlaardingen | VK | 100.00 |
| Züblin Projektentwicklung GmbH | Stuttgart | VK | 100.00 |
| Züblin Romania S.R.L. | Bucharest | VK | 100.00 |
| Züblin Scandinavia AB | Stockholm | VK | 100.00 |
1) VK … Consolidated companies
EK … Companies included at-equity
NK … Not consolidated companies
Direct
| Consoli | Direct | ||
|---|---|---|---|
| Company | Residence | dation1) | stake % |
| Züblin Services GmbH | Stuttgart | NK | 100.00 |
| Züblin Sp. z o.o. | Poznan | VK | 100.00 |
| Züblin Spezialtiefbau Ges.m.b.H. | Vienna | VK | 100.00 |
| Züblin Spezialtiefbau GmbH | Stuttgart | VK | 100.00 |
| Züblin Stahlbau GmbH | Hosena | VK | 100.00 |
| Züblin stavebni spol s.r.o. | Prague | VK | 100.00 |
| Züblin Thailand Co. Ltd. | Bangkok | NK | 100.00 |
| Züblin Umwelttechnik GmbH | Stuttgart | VK | 100.00 |
| Züblin Wasserbau GmbH | Berlin | VK | 100.00 |
| Zucotec - Sociedade de Construcoes Lda. | Lisbon | VK | 100.00 |
| Zweite Nordsee-Offshore-Holding GmbH | Pressbaum | VK | 51.00 |
EK … Companies included at-equity
Important events
STRABAG postpones its planned investments in the field of gravity-based foundations technology for offshore wind until further notice. The company had planned to spend several hundred million euros over the next few years on the construction of a factory and on special ships to transport self-developed concrete gravity foundations for offshore wind plants. STRABAG's 51 % stake in 14 project companies to develop offshore wind farms remains unaffected by the decision.
The cooperation of STRABAG with the global mining company Rio Tinto is divided into two phases: From 2012 until 2014, STRABAG will carry out field trials at selected construction sites using new excavation systems and technologies and will optimise the systems. After the successful completion of the field trials STRABAG could exclusively carry out Rio Tinto projects using the new systems for a period of five years.
The German STRABAG subsidiary Ed. Züblin AG, Stuttgart, is selectively expanding its range of services in the field of structural timber engineering in Germany: Following the successful integration into the corporate group of Stephan Holzbau GmbH, Gaildorf, and of the operations of Merk-Project GmbH, Züblin also agreed the acquisition of Metsä Wood Merk GmbH, Aichach, now Merk Timber GmbH. Metsä Wood Merk GmbH, a subsidiary of Finland's Metsä Group, is a specialist in the manufacture of large-format cross-laminated timber panels. In 2012, the company had about 100 employees and generated revenues of € 21 million.
Church in Cologne, © Architekten Sauerbruch Hutton
STRABAG AG, Cologne, has acquired the transportation infrastructures activities of Netherlandsbased Janssen de Jong Groep B.V. via its Dutch subsidiary STRABAG B.V. The acquisition will be merged into the STRABAG corporate group. The transaction includes the takeover of the approximately 120 employees as well as all equipment and production facilities of the corporate entities Janssen de Jong Infra' De Asfaltfabriek, Ippel and Infra Quality Support.
After more than seven years of construction, the STRABAG-executed Niagara Tunnel Project was put into operation on 22 March 2013. In the presence of representatives from client Ontario Power Generation, local construction consultants Hatch Mott MacDonald/Hatch Acres and Austrian construction group STRABAG, the tunnel's outlet gate was opened to allow the flow of water through the 10.1 km water supply tunnel near the famous waterfalls on the Niagara River. Following an unhindered 24-hour flow, the € 900 million project of the century was regarded as complete.
Construction of Niagara Tunnel Project
APRIL
EFKON AG – an Austrian subsidiary of STRABAG SE headquartered in Graz/Raaba – reports two new large orders in Germany and Malaysia with a value in the double-digit million euro range. The company received a follow-up order for the delivery of On-Board Modules for the satellite-based truck tolling system in Germany and a large order in Malaysia comprising the delivery of 250,000 electronic toll collection units (OBUs).
Rendering of government building in Potsdam
After four years of tendering, the Brandenburg State Office for Property and Construction has awarded the contract for the planning, construction and operation of a government building in Potsdam to STRABAG Real Estate GmbH. The project with a volume of € 82 million will be executed as a publicprivate partnership over a period of 30 years, not including the nearly two-year period of construction.
Thuringia's Ministry of Economic Affairs has announced that it is planning the construction of a pumped-storage plant in Thuringia together with the STRABAG Group and future investors. After in-depth examination of two sites, current plans envision a pumped-storage plant with a capacity of 640 MW at the Ellrich site and another one with a capacity of 380 MW at Leutenberg/Probstzella – the latter would be enough to annually supply more than 220,000 households with electricity.
STRABAG SE issued a € 200 million corporate bond. The fixed-interest bond with a face value of € 1,000 has a term to maturity of seven years and a coupon of 3.00 % p.a. The issue price has been set at 101.407 %.
A consortium led by STRABAG subsidiary Heilit+Woerner Sp. z o.o. has been awarded the contract from Poland's General Directorate for National Roads and Highways (GDDKiA) to complete the 35 km long section of the A4 motorway between Krzyż and Dębica Pustynia. The contract value amounts to € 236 million, 50 % of which is Heilit+Woerner's share.
With the end of the Annual General Meeting on 14 June 2013, Dr. Hans Peter Haselsteiner resigned from the management board. In the future, he will support the management board as an authorised representative in matters concerning the group's internationalisation and strategic orientation. Dr. Thomas Birtel succeeded him as new CEO of STRABAG SE.
Rendering of new Jena University Hospital, © Woerner & Partner
Jena University Hospital and Ed. Züblin AG as general contractor signed the contract for the construction of the second section of Thuringia's university clinic. By the year 2018, the new buildings to be erected will offer around 49,000 m² of usable space for 15 clinics and institutes, with 710 beds and twelve operating rooms, as well as research and teaching facilities. The total project volume amounts to € 316 million.
JULY
The STRABAG Group has undergone enormous growth in Switzerland over the past few years with the acquisitions of Brunner Erben AG, Astrada AG, Egolf AG, Meyerhans AG and Baunova AG. In order to achieve a homogeneous presence on the Swiss market, these group companies were merged into STRABAG AG, Switzerland, effective retroactively to 1 January 2013. Eggstein AG, which had already been merged into STRABAG AG, Switzerland, in 2010 and which had been renamed Eggstein Swissboring, is now doing business under the STRABAG brand. Under the merger, STRABAG AG, Switzerland, assumed the assets and liabilities of the acquired companies. STRABAG SE continues to hold 100 % of the shares of its subsidiary STRABAG AG, Switzerland.
Four new contracts have increased the order backlog of the STRABAG Group until July 2013 by more than € 230 million. Those projects include the construction of a flood protection dam for € 92 million in Oman, two road construction projects in Oman with a total contract value of € 28 million, production of concrete sleepers for railway construction worth € 88 million in Thailand, as well as planning and construction of an LNG tank in Brunei, worth € 23 million.
Ed. Züblin AG, Stuttgart constructs the building "New Office Airport Stuttgart" on behalf of client Flughafen Stuttgart GmbH. The contract value of the office ensemble, which is being built under a partnership arrangement with a guaranteed maximum price and upon completion will be leased almost entirely to management consulting firm Ernst & Young as its German headquarters, stands at about € 95 million.
Rendering of office ensemble, © Flughafen Stuttgart
Through its German subsidiary, Ed. Züblin AG of Stuttgart, STRABAG has been awarded a large contract by the Deutsche Bahn AG, with an order volume of € 250 million, 60 % of which is Ed. Züblin AG's share. The construction of the 5.9 km tunnel from the Swabian Jura to the tracks of Ulm Central Station will last four-and-a-half years.
Ed. Züblin AG will act as main contractor and build the centrally located cultural quarter for around € 70 million on a vacant plot of land of a former power station until the summer of 2016. The contract involves the renovation of the former machine hall, the construction of a new seven-storey building, the renovation of an existing four-storey building and the demolition and construction of a new two-storey workshop.
Rendering of cultural quarter in Dresden, © moka-studio
Swedish STRABAG Projektutveckling will develop the multi-functional building "Orgelpipan 6" at Stockholm's Citybanan Commuter Station, Sweden's largest and busiest railway terminal. The investment volume is in the triple-digit million euro range. Completion of the project – which will include apartments, a hotel, shopping and servicing facilities – is planned for December 2015.
A consortium led by STRABAG AG won the contract to build the Svilaj-Odžak section of the international motorway corridor 5c in Bosnia. Works on the 10.4 km long section – which already started in October 2013 – include the construction of the roadway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits. Completion is scheduled for December 2014. The contract value amounts to a total of € 84 million, 50 % of which is STRABAG's share.
Acting as general contractor, Ed. Züblin AG was awarded the contract to expand Allianz Campus Unterföhring near Munich. In a consortium together with Munich-based Dobler Metallbau GmbH, it will construct the new building with a gross floor area of 58,000 m². The contract has a value of approx. € 100 million; Züblin's share amounts to 90 %. A DGNB gold certification for the new building is aimed at. A precertification has already been awarded. Completion is planned for autumn of 2015.
Rendering of Allianz Campus, © Auer + Weber + Assoziierte
Züblin A/S, a Danish subsidiary of the STRABAG SE Group, was awarded the contract to build the "Bryghus", a six-storey multi-use building on the site of a former brewery at the Copenhagen waterfront. The value of the contract amounts to about € 140 million. Construction time is scheduled from autumn 2013 to autumn 2017.
Züblin Spezialtiefbau Österreich engaged in the "BioSealing" joint industry project, a European joint project to further investigate the principle of operation of bacteria for the sealing of underground leaks in the ground and in buildings. In total nine companies will invest € 400,000 in the coming years.
Since 1 October 2013, bonds of STRABAG SE are listed in the Corporates Prime segment of the Vienna Stock Exchange's bond trading platform. This new segment comprises bonds from issuers in non-financial sectors with the aim of increasing the transparency of and providing more effective publicity for Austrian bonds and their issuers. The participating companies agree to provide potential bonds buyers with standardised information about their bonds.
STRABAG will build the third section of the Hungarian motorway M4 between Abony and Fegyvernek for about € 106 million. The section has a length of 13.2 km and is part of the 233 km long motorway which links Budapest to the Ukrainian border.
A consortium led by STRABAG signed the contract to build the approx. 10 km long section of the R2 expressway between Pstruša and Kriváň in Slovakia. The contract value amounts to € 178 million, of which STRABAG a.s. holds a 40 % share. A few weeks later, as part of a consortium STRABAG was awarded the contract to build an 11 km long section of the D1 motorway in northern Slovakia between Hricovské Podhradie and Lietavská Lúcka. The order has a total value of € 427 million, of which STRABAG s.r.o. will receive about € 140 million. The construction works comprise eleven bridges, two tunnels as well as all access roads.
Sinaw–Duqm connecting road
STRABAG Oman, LLC was awarded the contract to build a 100 km section of the 400 km long road between the city of Sinaw and the industrial zone in Duqm in southern Oman. The project value amounts to € 88 million.
As part of a consortium, STRABAG AG has been awarded the contract to modernise the 42.2 km long railway section between Vintu de Jos and Simeria in western Romania near the city of Sibiu. The contract value amounts to € 317 million, of which STRABAG will carry out works with a volume of at least € 66 million in the area of track construction, civil engineering, earth works and road construction.
STRABAG SE is building a designer outlet centre near Vancouver International Airport (YVR), Canada, for Vancouver Airport Authority and McArthur-Glen, Europe's leading owner, developer and manager of designer outlets. McArthurGlen Designer Outlet Vancouver Airport foresees the construction of more than 65,000 m² (35,000 m² gross leas-able area) in a prime location on YVR land for more than CAD 100 million (around € 70 million).
Despite the strong presence in its home markets of Austria and Germany, STRABAG sees itself as a European-based company. The group has been active in Central and Eastern Europe for several decades. On the one hand, it is a tradition for the company to follow its clients into new markets. On the other hand, the existing country network with local management and established organisational structures makes it possible to export the technology and equipment and to use them in new regions at low cost and effort. In order to diversify the country risk even further, and to profit from the market opportunities in other parts of the world, STRABAG intends to intensify especially its international business, i.e. its activities in countries outside of Europe. The
company expects its international business to grow to at least 10 % of the output volume by 2016.
In the 2013 financial year, STRABAG SE generated an output volume of € 13.6 billion. The relatively low decline by 3 % over the previous year can be explained by weather-related effects at the start of the year. The group's core markets revealed quite different developments: as STRABAG is a broadly positioned group, the expected market-related decline in Poland following the end of the construction boom there and project-related reductions in Canada, Benelux and Romania were nearly balanced out by increases in e.g. Hungary, Austria and Africa.
| € mln. | 2013 | % of total output volume 2013 |
2012 | % of total output volume 2012 |
∆ % |
∆ absolute |
|---|---|---|---|---|---|---|
| Germany | 5,789 | 43 | 5,779 | 41 | 0 | 10 |
| Austria | 1,982 | 15 | 1,888 | 13 | 5 | 94 |
| Poland | 787 | 6 | 1,139 | 8 | -31 | -352 |
| Czech Republic | 645 | 5 | 646 | 5 | 0 | -1 |
| Russia and neighbouring countries | 561 | 4 | 527 | 4 | 6 | 34 |
| Scandinavia | 510 | 4 | 579 | 4 | -12 | -69 |
| Hungary | 496 | 4 | 393 | 3 | 26 | 103 |
| Benelux | 400 | 3 | 456 | 3 | -12 | -56 |
| Switzerland | 386 | 3 | 425 | 3 | -9 | -39 |
| Slovakia | 340 | 3 | 400 | 3 | -15 | -60 |
| Middle East | 323 | 2 | 305 | 2 | 6 | 18 |
| Romania | 322 | 2 | 372 | 3 | -13 | -50 |
| The Americas | 263 | 2 | 348 | 2 | -24 | -85 |
| Italy | 168 | 1 | 157 | 1 | 7 | 11 |
| Africa | 165 | 1 | 125 | 1 | 32 | 40 |
| Croatia | 134 | 1 | 130 | 1 | 3 | 4 |
| Asia | 103 | 1 | 111 | 1 | -7 | -8 |
| Rest of Europe | 81 | 0 | 83 | 1 | -2 | -2 |
| Slovenia | 67 | 0 | 81 | 1 | -17 | -14 |
| Serbia | 31 | 0 | 72 | 0 | -57 | -41 |
| Bulgaria | 20 | 0 | 27 | 0 | -26 | -7 |
| Total | 13,573 | 100 | 14,043 | 100 | -3 | -470 |
Following our clients
Despite the economic recovery in the US and in the emerging markets, the upswing of the European economy was delayed. After a decline in the previous year, the gross domestic product (GDP) of the 19 Euroconstruct countries stagnated in 2013. As a result, the outlook for private consumption, the labour market and income development remain subdued. Nevertheless, the experts at Euroconstruct expect the economy to grow again at the low rate of 1.4 % already in 2014.
With a decline of 3.0 %, the development of the European construction sector in 2013 again was significantly worse than the economy as a whole. The strongest losses were registered in the countries of Northern and Southern Europe. The reasons for the continuous pressure on the European construction sector include the sovereign debt crisis in several countries as well as the austerity pressure on public budgets and insecurities regarding the future economic development. The situation of the construction industry should improve slightly in 2014, however, as Euroconstruct currently forecasts growth of 0.9 %.
The sovereign debt crisis put a damper especially on the prospects for civil engineering, while the weak macroeconomic environment, the high unemployment and the lack of consumer confidence clouded the outlook for residential construction and the other building construction. While an upswing for residential construction and civil engineering is already expected in 2014, building construction is unlikely to receive new impetus until 2015 with the stabilisation of the macroeconomic environment in Europe.
1) All growth forecasts as well as the particular national construction volumes are taken from the Euroconstruct and EECFA winter 2013 reports. The indicated market share data are based on the data from the year 2012.
Development of construction sector Europe
Residential construction remained greatly affected by the weak European economy in 2013. The banks also were more restrictive in the granting of mortgage loans. Against this backdrop, the sector lost another 2.2 % in the reporting period, although it fell less strongly than building construction and civil engineering. A country-by-country comparison shows that the development remained diversified: while the countries of Central and Northern Europe – above all German-speaking Europe – reported largely positive development, Spain and Portugal continued to register percentage losses in double-digit territory. With a minus of 9.4 %, residential construction in Eastern Europe shrank significantly more strongly overall than in Western Europe (-1.9 %). Starting in 2014, the experts at Euroconstruct forecast low growth of 1.4 % for the 19 member states.
Building construction – and above all commercial and office construction – was also greatly affected by the weak economic performance in Europe in the period under review. In total, the construction volume in this field shrank by 3.4 % in 2013. The development was especially negative in Southern Europe and only a few countries elsewhere were able to report growth. Against the backdrop of a stabilisation of the macroeconomic environment, however, new impetus is expected for this segment in the years to come. A return to growth will likely follow a temporary period of stagnation in 2015, with a trend toward stronger growth in Central and Eastern Europe, compared to Western Europe.
The restrained economic development and the restrictive fiscal policy of the European states are most strongly reflected in the civil engineering sector. Drastic spending cuts led to shifts, reductions or even withdrawals of projects in the field of transportation infrastructures. This resulted in a continuous decline of the construction output in civil engineering, which reached its highest point in 2012 with a minus of 8.2 % and continued into 2013 with a decline of 4.0 %. Particularly affected were the countries of Central and Eastern Europe, where the decline reached 11.9 % in the period under review. In view of Europe's economic recovery, however, a turnaround is already expected in 2014: the experts at Euroconstruct expect to see growth again this year with a plus of 1.2 %. Here, too, the growth in Central and Eastern Europe will likely be higher than in Western Europe because of the region's great need to catch up and due to the allocation of EU funds.
Although the weak economies in the European sales markets kept Germany's 2013 GDP growth at 0.4 % and thus below the previous year's value, the general underlying conditions for the German economy developed favourably over the course of the year. Particularly the low interest rates and the advantageous credit conditions delivered expansive impulses. The increase in private consumption due to rising real incomes should also lead to renewed growth of the GDP in 2014 – Euroconstruct expects a plus of 1.8 %.
After a difficult 2012, the construction output in Germany fell even further in the first quarter of 2013 due in particular to weather-related production shutdowns. Over the course of the year, however, the sector slowly recovered to end 2013 with a slight plus of 0.3 %. Residential construction in particular profited from the real income growth and the favourable financing conditions gaining 1.0 %. Home ownership should remain attractive as an investment alternative so that growth of 2.6 % is already expected for the year to come.
After a drop in 2013, the field of building construction is expected to gain momentum due to the improved sales and profit expectations among the companies. Substantial impetus can be expected from the areas of industrial and warehouse buildings as well as from shopping centres. In this segment, too, renewed growth of 2.4 % is already forecast for 2014.
Following a decline of 4.5 % in 2012, the field of civil engineering recovered in the period under review. On the one hand, it was possible to make up for weather-related losses; on the other hand, additional volume was generated from the clean-up works related to flood damage. This development should continue thanks to the € 5 billion immediate action programme for transportation infrastructures that was agreed in the new coalition agreement – as a result, the civil engineering output is expected to grow by 3.4 % in 2014.
With a market share of 2.1 %, STRABAG is the market leader in Germany. The share of the German road construction market amounts to 9.4 %. With € 5,788.81 million, about 43 % of the group's output volume was generated in the home market of Germany. Most of the output volume comes from the segment North + West. Property and facility services provided in Germany are assigned to the segment International + Special Divisions.
The planned investments in the field of offshore wind were postponed indefinitely by STRABAG due to the adverse political and organisational environment.
Overall construction volume: € 32.59 billion GDP growth: 2013e: 0.4 % / 2014e: 1.7 % Construction growth: 2013e: 0.5 % / 2014e: 1.2 %
Against the backdrop of the global economic recovery, the Austrian economy can expect to see slight yet stable improvement. The structural
problems in the euro area, however, led to a weakening of the global growth impulses. On balance, therefore, the Austrian GDP grew by only 0.4 % in 2013. While exports and investment activities were on the up, consumption growth remained below expectations. However, the GDP is expected to gain another 1.7 % in 2014.
The construction sector has always been considered a stabilising element in the Austrian economy, and moderate growth is expected here for the coming years as well. One uncertainty, however, is the future course of the new government. The construction sector grew by 0.5 % overall in 2013 and growth of 1.2 % is expected for 2014.
The Austrian residential construction market underwent relatively strong growth in 2013 with a plus of 2.0 %, in particular in the greater Vienna area. The positive demographic development, the low interest rates and the increase of real estate prices encouraged this development. However, a downward trend in the granting of building permissions will likely result in a weaker expansion in new building construction in the years to come.
Against the backdrop of the low economic growth, building construction shrank by 1.1 % in the reporting period. Especially affected were
office and industrial buildings. Thanks to positive impulses from the export-oriented industry, however, the experts at Euroconstruct expect to see a general recovery and slight growth of 0.5 % in 2014.
In response to the so-called stability pact – the Austrian government's consolidation project – and the resulting postponement of infrastructure projects, the situation in the civil engineering segment worsened once more with the volume shrinking by 0.6 % in 2013. Investments in rail infrastructure were especially affected by this development. The continued development in the years 2014 and 2015 will greatly depend on large infrastructure projects. In these years, the civil engineering market should again grow by 1.2 % and 1.3 %, respectively.
In 2013, STRABAG generated a total of 15 % of the group output volume, or € 1,981.50 million, in its home market of Austria. Along with Germany and Poland, Austria thus remains one of the group's top three markets. STRABAG generates 5.8 % of total output volume in Austria. In the field of road construction, the market share amounts to 15.9 %.
| Overall construction volume: | € 45.98 billion |
|---|---|
| GDP growth: | 2013e: 1.2 % / 2014e: 2.3 % |
| Construction growth: | 2013e: -8.9 % / 2014e: 3.5 % |
After years of high growth, GDP gains in Poland slowed to 1.2 % in 2013. The reasons for this were, on the one hand, the difficult economic situation of the most important Polish trade partners – above all in the euro area – and, on the other hand, the decline of private consumption in the wake of the high level of unemployment. At the same time, public-sector investments financed out of the EU Structural Funds fell back. With the recent inflow of EU funds in the years 2014–2020, however, the GDP should see renewed stronger growth in the years to come.
With a decline of 8.9 %, the Polish construction industry reacted strongly to the end of the construction boom and the macroeconomic slowdown. However, a return to growth of 3.5 % is being forecast for 2014 – although the overcapacities in the market are unlikely to be completely reduced by that time.
Due to higher interest rates, more restrictive lending and lower household incomes, the residential construction market shrank by 7.7 % in 2013. It is expected, however, that this area will grow slightly especially in the second half of 2014. This expectation is based above all on changes in the construction laws that are supposed to result in stronger funding for new housing and in lower interest rates for housing loans. All in all, growth of 2.9 % should thus again be possible in 2014.
After two strong years of growth, the expectations in building construction had to be adjusted downward. Both the EU funds as well as private funds were exhausted. Especially affected by this negative development were public buildings and the office segment. These areas are expected to stagnate further through 2014 or to achieve just minor growth of 1.3 %, respectively. Building construction should grow significantly once more starting in 2015.
The drastic budget cuts by the Polish government led to a decline in the civil engineering volume by 16.5 % in 2013. Infrastructure spending
Overall construction volume: € 17.45 billion GDP growth: 2013e: -1.5 % / 2014e: 0.8 % Construction growth: 2013e: -8.2 % / 2014e: -4.2 %
was especially hard hit. A recovery is forecast
In Poland, STRABAG is the number two in the construction sector with a market share of 2.5 % and market leader in transportation infrastructures with 8.5 %. The country contributed € 787.30 million, or 6 %, to the group's total output volume in 2013, making it STRABAG's third-
already for 2014.
largest market.
The Czech economy continued its downward trend due to the weak domestic demand in the period under review and shrank by 1.5 %. An additional strain came in the form of the government's austerity measures. The budget deficit could be held in check, but this was done at the expense of economic growth. In view of the GDP growth of 0.8 % that has been forecast for 2014, fiscal policies should become less restrictive, however.
With a decline of 8.2 %, the Czech construction output shrank significantly more strongly than the economy as a whole. The sector has thus steadily lost in volume since 2008 – and is likely to continue to do so: a slight recovery of the construction market is not expected until 2016. The unstable political situation is also having a negative impact on the sector and makes it more difficult to give meaningful forecasts.
In 2013, residential construction was hardest hit by the ongoing recession with a decline of 15.3 %. The high prices weighed on the already weak demand, and the increase of the value added tax had a negative effect on household demand. Starting with next year, however, the declines should already be less strong.
The building construction market remained affected by high insecurities among investors in 2013; in fact, private investments practically came to a standstill. At the same time, statefinanced projects were strongly affected by the government's strict austerity measures. EU subsidies and grants remain the main source for financing in this area, although these funds are currently available only to a limited degree. All in all, building construction fell by 4.5 % in the period under report. Euroconstruct does not expect slight growth again until the year 2015.
The civil engineering business suffered the most from the decline in public investments. This segment has grown negatively since the implementation of austerity measures in 2010 and lost another 9.2 % in the reporting period. Here, too, the political insecurities are a hindrance to private investments.
STRABAG is the number two on the market in the Czech Republic. With an output volume of € 644.66 million, some 5 % of the group's total output volume was accounted for by the Czech market in 2013. The share of the overall construction market amounts to 3.7 %; in road construction the group even holds 16.5 %.
The Russian economy grew by 2.4 % in 2013, somewhat more weakly than in the year before. In view of the economic recovery, however, the economic growth should again climb to 3.7 % in 2014. The construction sector in 2013 was marked, among other things, by the preparations for the Olympic Games in Sochi. In general, it rose by 4.4 % and growth of 4.6 % is forecast for the year to come.
After a crisis-related decline in the years 2008–2010, the residential construction market, which is responsible for around 35 % of the entire construction volume, has grown continuously since 2011 and reached a plus of 4.5 % in the reporting period. Further growth is expected in the years to come.
Other building construction has also registered positive growth since 2011 – the high point was reached in 2011 with a plus of 15.4 %. The sub-segments of commercial and retail, which account for more than 40 %, represent the largest and fastest-growing share: by 2015, annual growth of 5.0–6.6 % is expected here. In the years to come, the experts at Euroconstruct expect growth of 4.0–4.8 % for offices and 3.0–3.3 % for industrial buildings.
In the area of civil engineering, several large projects are currently in preparation. Russia plans to build more than 14,000 km of roads by 2020
| Overall construction volume: | € 161.50 billion |
|---|---|
| GDP growth: | 2013e: 2.4 % / 2014e: 3.7 % |
| Construction growth: | 2013e: 4.4 % / 2014e: 4.6 % |
| Ukraine |
| Overall construction volume: | € 9.43 billion |
|---|---|
| GDP growth: | 2013e: 1.0 % / 2014e: 3.0 % |
| Construction growth: | 2013e: -7.1 % / 2014e: 5.8 % |
and construction is to begin on a high-speed railway network nearly 1,600 km in length between 2013 and 2015. The construction volume in the railway segment is likely to grow by 4.0–8.0 % as a result.
After a decline of the economic performance in the previous year, the economy in Ukraine stagnated in the reporting period with a plus of just 0.2 %. In view of the current political uncertainties in Ukraine, reliable forecasts are neither possible for the general economic climate nor for the development of the construction sector. STRABAG is not active nationwide in Ukraine, merely operating in limited-time engagements on a project-by-project basis. The output volume generated by the company in Ukraine in 2013 amounted to less than 1 % of the annual group output volume.
STRABAG generated an output volume of € 561.30 million in Russia and its neighbouring countries (RANC) in 2013. The share of the total group output volume in the reporting period reached 4.0 %. In the region, STRABAG is almost exclusively active in building construction and civil engineering. The year 2013 was marked by the works related to the Olympic Village in Sochi, which is why the company expects a lower output volume in the RANC region for subsequent years.
| Overall construction volume: | € 28.93 billion | |
|---|---|---|
| GDP growth: | 2013e: -0.3 % / 2014e: 1.1 % | |
| Construction growth: | 2013e: -2.7 % / 2014e: 0.5 % |
The Scandinavian economies exhibited heterogeneous development during the period under review. While Sweden and Norway developed positively with GDP growth above the one-percent mark, the GDP in Denmark remained nearly unchanged. With a minus of 0.3 %, Finland failed to make it out of recession in 2013. All in all, more significant growth rates are first expected in these countries in 2014.
In terms of construction output, the four economies are also quite distinct. Denmark was able to recover in 2013 with growth of 2.4 %, while Sweden – not least due to a lower volume in
Overall construction volume: € 7.4 billion GDP growth: 2013e: 0.3 % / 2014e: 1.3 % Construction growth: 2013e: 1.3 % / 2014e: 7.4 %
With low economic growth of 0.3 %, Hungary managed to get out of recession in the year under review. This slight recovery, however, remains fraught with insecurities as the economic upswing primarily depends on EU funds and state investments.
After seven years of negative growth, Hungary's construction output returned to growth in 2013 with a plus of 1.3 %. This development was driven above all by building construction and civil engineering, while the residential construction market shrank by another 11.0 % in 2013. On the basis of higher EU funds, Euroconstruct expects renewed significant growth of 7.4 % for Hungary's overall construction output in 2014.
As mentioned, building construction managed to reverse the trend in 2013 and grew by 5.0 % – and it should be possible to maintain a similar level in the coming year as well. This growth was driven primarily by EU funds, while private investment activity continued to stagnate. The financing of public buildings will remain dependent on these funds and the government's budget policy.
Civil engineering also grew by 5.0 % during the period under report. This can be explained among other things by the so-called Wekerle Plan that was passed in August 2012, which aims at re-launching postponed projects and at a more efficient use of EU funds. On this basis,
| Overall construction volume: | € 31.28 billion |
|---|---|
| GDP growth: | 2013e: 1.1 % / 2014e: 2.6 % |
| Construction growth: | 2013e: -0.4 % / 2014e: 1.6 % |
| Overall construction volume: | € 26.18 billion |
|---|---|
| GDP growth: | 2013e: 0.3 % / 2014e: 1.7 % |
| Construction growth: | 2013e: 2.4 % / 2014e: 3.3 % |
| Overall construction volume: | € 47.14 billion |
|---|---|
| GDP growth: | 2013e: 1.7 % / 2014e: 2.7 % |
| Construction growth: | 2013e: 3.7 % / 2014e: 3.6 % |
residential construction – registered another decline with -0.4 %. A difference in trends could also be seen in Finland (-2.7 %) and Norway (3.7 %), though STRABAG's low level of activity on these markets make them of only minor importance for the group.
The output volume of STRABAG in Scandinavia amounted to € 510.07 million in 2013. The main activities included infrastructure and residential construction in Sweden. For some time now, STRABAG has put a stronger focus on proprietary project developments.
it was possible to double the number of large infrastructure projects in comparison to the previous year; some 20 large-volume transportation projects should be completed by May 2014. Further growth in civil engineering is also expected in the years to come.
STRABAG noticed the improvement in the
The economies in the Benelux countries tended toward negative growth in 2013. While the Netherlands slid into recession with a GDP minus of 1.3 %, the Belgian economy stagnated with a minimal plus of 0.1 %. However, the experts at Euroconstruct expect an economic recovery already in 2014.
With a decline of the construction output by 5.0 %, the Dutch construction sector developed significantly worse than the economy as a whole. The negative development – all three sub-segments of the construction sector were equally affected – was a result of the weak
Hungarian construction sector in 2013 as well, as it was awarded the contract for two larger infrastructure projects. With an output volume of € 495.94 million, STRABAG is the leading provider on the Hungarian construction market. The company's share of the market as a whole reached 5.3 %; in road construction, STRABAG generates 11.1 % of the overall output volume.
Belgium
| Overall construction volume: | € 38.87 billion |
|---|---|
| GDP growth: | 2013e: 0.1 % / 2014e: 1.1 % |
| Construction growth: | 2013e: -1.3 % / 2014e: 1.2 % |
| Overall construction volume: | € 62.51 billion | |
|---|---|---|
| GDP growth: | 2013e: -1.3 % / 2014e: 0.5 % | |
| Construction growth: | 2013e: -5.0 % / 2014e: 0.4 % |
private consumption, a drop in real estate prices and restrictive state budget measures. Construction output in Belgium fell less strongly, though it still lost 1.3 %, as a positive development in building construction was only partially able to make up for declines in residential construction and civil engineering. For the years to come, Euroconstruct expects renewed growth of the construction output in both markets, with a trend toward stronger growth in the Netherlands.
STRABAG achieved an output volume of € 399.66 million in the Benelux countries in 2013.
| Overall construction volume: | € 52.38 billion |
|---|---|
| GDP growth: | 2013e: 1.9 % / 2014e: 2.1 % |
| Construction growth: | 2013e: 2.8 % / 2014e: 3.6 % |
Driven by strong domestic consumption, the economic development in Switzerland was positive in every respect. Thanks to the renewed rise of industrial production and encouraged by a friendlier European environment, the GDP grew by 1.9 % in 2013. In the years to come, the growth rates should pick up more significantly once again. Switzerland's economic development continued to profit in 2013 from the strong growth of the construction industry, which
gained 2.8 % in the year under review. The strongest factor driving growth was, as in the past, the residential construction market. The order books in the construction industry remain full for the future thanks to the positive demand, high immigration, low unemployment and favourable financing situation. Growth in residential construction is expected to reach 5.0 % in 2014.
In building construction, growth was registered in particular with hospitals and with educational and research facilities. After a plus of 1.0 % in this sector, however, the growth is expected to remain moderate for the years to come. While renovation works dominated during the times of the financial crisis, new building construction has again started to grow. In the coming years, these two segments should more or less balance one another out.
In civil engineering, the output volume grew by 6.3 % in 2013. The main factor driving this growth was the Gotthard Tunnel, the 50 km north-south link through the Alps. Following completion of this project, however, lower growth rates are expected for the coming years. Moreover, the further development will depend greatly on upcoming political decisions – such as an increase of the motorway toll or the further financing of the railway network.
Switzerland contributed € 386.22 million, or 3 %, to the group's total output volume in 2013. STRABAG's market share amounts to around 0.8 % overall and 3.0 % in the sub-segment of civil engineering.
| volume | Overall construction volume: | € 4.60 billion | |
|---|---|---|---|
| GDP growth: | 2013e: 0.8 % / 2014e: 2.2 % | ||
| Construction growth: | 2013e: -7.8 % / 2014e: -0.8 % |
Slovakia's economy once again lost momentum in 2013 with GDP growth of just 0.8 %. The growth of the Slovak economy remains highly dependent on foreign demand; nevertheless, domestic consumption also made a contribution in 2013. In the years to come, the Slovak economy should see a return to stronger growth.
The negative trend in the Slovak construction industry continued in 2013 despite the generally positive economic environment. Substantial factors contributing to this development were the continuous low domestic demand as well as financing difficulties – including difficulties related to the supply of EU funds. All in all, the construction output shrank by 7.8 % against this backdrop in 2013. The residential construction market in particular was held back by the weak and uncertain income situation and by the continued high unemployment. In comparison, the field of building construction, which represents more than half of the entire construction output, suffered from the ongoing weak demand from private investors and fell back by 12.0 % in 2013. A continuation of the downward trend is expected for 2014, with a slight upswing starting in the year 2015.
After a strong decline in the previous year, 2013 brought the first signs of recovery in civil engineering. The segment lost only 2.0 % during the period under review – after 25.5 % in the previous year. Thanks to the implementation of longdelayed road construction projects, growth of 10.6 % is forecast for the year 2014. In the long term, the situation should improve again significantly as the need for modern infrastructure is continuously on the rise. The financing of such projects, however, is highly dependent on the supply of EU funds.
STRABAG was not so strongly affected by the collapse in the construction sector in the past financial year as the company generates a large portion of its output volume in Slovakia in civil engineering. In this segment, the company landed two large infrastructure projects at the end of 2013. With a market share of 8.7 % and an output volume of € 340.42 million in 2013, STRABAG is the market leader in Slovakia. In road construction, STRABAG's share even reaches 15.8 %. Slovakia contributed 3 % to the group's total output volume in 2013.
SloVakia
| Overall construction volume: | € 17.90 billion |
|---|---|
| GDP growth: | 2013e: 1.6 % / 2014e: 2.2 % |
| Construction growth: | 2013e: 2.9 % / 2014e: 5.8 % |
The Romanian economy expanded by 1.6 % in 2013, more strongly than in the previous year. This positive trend should continue to accelerate in the years to come until growth reaches about 3.0 % by 2016.
The increasing private and public demand should also deliver positive impetus for the construction sector. After a plus of 2.9 % in 2013, growth of 5.8 % is expected for 2014. In the reporting period, all segments of the construction industry exhibited positive growth rates. While residential construction grew by 3.0 %, building construction profited with growth of 3.9 % in part due to the fact that multinational corporations are increasingly discovering Romania as an attractive location in which to do business.
Since 2009, the civil engineering market has become steadily more important for the Romanian construction market, today accounting for nearly half of the overall construction volume. After growth of 2.3 %, both the upcoming elections as well as the increased use of EU subsidies and grants should provide for an increase in the civil engineering volume by 7.1 % in 2014.
With an output volume of € 321.83 million, corresponding to a market share of 2.1 %, STRABAG took second place on the Romanian construction market in the year 2013. In road construction, the share amounts to a comparable 2.5 %. The rather lively business for the company in Romania can be explained by several large projects in transportation infrastructures that were executed in the past few years.
Overall construction volume: € 172.15 billion GDP growth: 2013e: -1.9 % / 2014e: 0.7 % Construction growth: 2013e: -3.3 % / 2014e: -0.3 %
The recession of the Italian economy continued in 2013 with a decline of the economic performance by 1.9 %. First indications that the trend was reversing came up during the second half of the year, however, and economic researchers expect growth of 0.7 % in 2014 as a result.
The entire Italian construction sector was hard hit by the economic crisis. The construction volume fell by 3.3 % in the year under report and a minus of 0.3 % is forecast for 2014. Residential construction shrank by 2.4 % in 2013, experiencing a decline for the seventh year in a row. However, a return to growth – albeit a small one – with a plus of 0.4 % is expected here for
STRABAG's output volume in Italy amounted to € 168.32 million in 2013. The company is mainly active in tunnelling and road construction in the north of the country, which is why most of the output volume is included in the segment International + Special Divisions.
| Overall construction volume: | € 3.12 billion | |
|---|---|---|
| GDP growth: | 2013e: -0.7 % / 2014e: 0.5 % | |
| Construction growth: | 2013e: -4.3 % / 2014e: -2.1 % |
The Croatian economy – like the country's construction industry – continued to suffer from the ongoing weakness of the European economy. The 2013 GDP exhibited a decline of 0.7 %. Although the outlook for the coming years is again slightly positive – GDP growth of 0.5 % is expected for 2014 –, the difficult financing situation is unlikely to improve in the medium-term for private or public investors. Moreover, the rising unemployment and declining real incomes will continue to slow private consumption.
Despite the negative overall outlook for the Croatian construction industry, individual sectors developed significantly better than the industry as a whole in the past financial year. Against the backdrop of a massive investment programme in infrastructure, civil engineering in particular grew by 6.2 % in the reporting period. For the years 2014 and 2015, the growth is even expected to reach 9.0 % and 14.7 %, respectively. As of 2015, EU subsidies and grants in particular should make a substantial contribution to growth.
By comparison, the residential construction market fell by 13.4 % during the period under review and is even expected to lose 15.6 % in 2014. These losses are primarily due to the massive oversupply of new housing. A slight recovery of the market – beginning with a very low level – is not expected until 2015 at the earliest. Building construction remains weak too. After a loss of 9.2 % in the year 2013, a minus of 6.6 % is expected for 2014.
As market leader, STRABAG achieved an output volume of € 133.45 million in Croatia in the year 2013. Its market share stands at 4.2 % and 7.4 % in the sub-segment of transportation infrastructures.
| Overall construction volume: € 1.46 billion |
|
|---|---|
| GDP growth: | 2013e: -2.4 % / 2014e: -0.2 % |
| Construction growth: | 2013e: -6.0 % / 2014e: 19.7 % |
| Serbia | |
| Overall construction volume: € 2.04 billion |
|
| GDP growth: | 2013e: 2.0 % / 2014e: 3.0 % |
| Construction growth: | 2013e: -9.1 % / 2014e: 10.0 % |
| Bulgaria |
| Overall construction volume: | € 6.04 billion |
|---|---|
| GDP growth: | 2013e: 1.0 % / 2014e: 2.1 % |
|---|---|
| Construction growth: | 2013e: -0.2 % / 2014e: -5.6 % |
Slovenia's GDP shrank by 2.4 % as the country's economy continued to suffer from the consequences of the economic crisis in 2013. Growth is not expected until the year 2015. The ongoing economic difficulties are also affecting the Slovenian construction industry. After declines in double-digit percentage territory in the previous years, the minus of 6.0 % in 2013 is still no reason to speak of a recovery. In view of the low basis, however, growth of already 19.7 % is expected for the year to come.
Residential construction fell back by 16.8 % in 2013 and is expected to shrink by another 3.7 % in the current year. A slight plus is not expected here until 2015. The building construction volume for the period under review was also 14.9 % below the previous year's value but should recover already in 2014 with a plus of 8.5 %. Civil engineering gained 1.1 % in 2013. The realisation of several large projects could lead to considerable growth of 28.5 % in 2014, which could also form the basis for the expected growth of the overall construction output. This forecast, however, must be viewed sceptically as public financing could be influenced by state austerity measures.
STRABAG generated an output volume of € 67.40 million in Slovenia in 2013, placing it among the top three construction companies in the country. STRABAG holds a 5.6 % share of the market as a whole and 3.1 % in transportation infrastructures.
Serbia has had to contend with considerable structural and financial deficits since the beginning of the economic and financial crisis. The economic performance of the country has been fluctuating relatively strongly – including noticeable GDP declines in the years 2009 (-3.5 %) and 2012 (-1.7 %). In 2013, however, the Serbian economy exhibited signs of recovery with growth of 2.0 % as a result of state investments in the export economy and in infrastructure as well as reforms in the public administration. A further improvement is expected for the years to come.
While the Serbian construction sector had grown in 2011 and 2012 due, above all, to state incentives in residential construction and investments in civil engineering, a noticeable decline, at minus 9.1 % of the construction output was registered in 2013. According to Euroconstruct,
Bulgaria
After a strong GDP decline of 5.5 % in 2009, the Bulgarian economy has only slowly recovered with growth rates between 0.4 % and 1.8 %. In 2013, GDP growth also only barely reached the one percent mark. A significant contribution driving this slightly positive trend comes from exports to the EU, with additional positive impetus expected from the increasing exports to non-EU countries as well as from growing domestic demand. As a result, economic growth of 2.1 % should be possible in 2014.
The Bulgarian construction industry has not yet recovered from the enormous losses of the past few years. After a slight drop of 0.2 % in 2013, the sector is expected to shrink by 5.6 % in 2014. The residential construction market should recover slowly after a strong however, this trend should reverse already in 2014 not least due to the recovery of the economy and in response to state investments.
The residential construction market probably hit bottom in the year 2013, and the turnaround in the economy as a whole as well as the positive developments on the labour markets and in household incomes should bring this sector back on a growth path by 2015 at the latest. After a low in 2013, a reversal of the trend is also expected in building construction. In civil engineering, Euroconstruct expects to see doubledigit growth rates – after a pause in 2013 – due to the realisation of several large infrastructure projects in rail, road and pipeline construction.
STRABAG achieved an output volume of € 31.26 million on the Serbian market in 2013.
decline of 5.0 % in 2013, but the uncertain economic situation, high unemployment and weak income development continue to negatively impact home ownership demand.
The building construction segment stood out positively in 2013 with growth of 10.2 %, while the construction output in civil engineering decreased by 4.3 %. In this segment, the completion of a number of road projects will be a damper on future growth, so that Euroconstruct even expects a minus of 9.8 % in 2014. A shift in priorities in favour of public transport could cushion this decline in subsequent years.
STRABAG generated an output volume of € 19.77 million on the Bulgarian market in 2013.
In addition to its main markets in Europe, the STRABAG Group also operates in individual non-European regions in order to be less dependent on the economic underlying conditions of individual markets. Internationally, the group has been present in Asia, Canada, Chile, Africa and the Middle East for many years and decades. All in all, these regions generated € 853.70 million, or 6 % of the group's total output volume in 2013, a share that could rise to at least 10 % in the coming years.
In the non-European markets, STRABAG is
usually active as a general contractor through direct export. The focus in these regions is on civil engineering, industrial and infrastructure projects and tunnelling – areas in which high technological expertise is required. Milestones from the past include the research and development partnership with Rio Tinto in tunnelling, several road construction orders in Oman and the contract to build a designer outlet centre for McArthurGlen in Canada. STRABAG's activities in non-European countries are included – with a few minor exceptions – in the segment International + Special Divisions.
| Total | North + | South + | Inter national + Special |
Total | ∆ Group |
∆ Group |
||
|---|---|---|---|---|---|---|---|---|
| € mln. | 2013 | West | East | Divisions | Other | 2012 | % | absolute |
| Germany | 5,052 | 3,853 | 182 | 1,009 | 8 | 4,544 | 11 | 508 |
| Austria | 1,503 | 6 | 1,088 | 408 | 1 | 1,466 | 3 | 37 |
| Italy | 1,256 | 3 | 1 | 1,252 | 0 | 1,351 | -7 | -95 |
| The Americas | 640 | 57 | 1 | 582 | 0 | 416 | 54 | 224 |
| Poland | 605 | 531 | 53 | 20 | 1 | 700 | -14 | -95 |
| Scandinavia | 585 | 573 | 10 | 2 | 0 | 434 | 35 | 151 |
| Middle East | 585 | 12 | 28 | 545 | 0 | 596 | -2 | -11 |
| Hungary | 573 | 0 | 560 | 13 | 0 | 326 | 76 | 247 |
| Slovakia | 445 | 0 | 439 | 6 | 0 | 331 | 34 | 114 |
| Czech Republic | 364 | 0 | 355 | 8 | 1 | 499 | -27 | -135 |
| Benelux | 351 | 288 | 6 | 57 | 0 | 555 | -37 | -204 |
| Russia and neigh | ||||||||
| bouring countries | 317 | 104 | 212 | 1 | 0 | 635 | -50 | -318 |
| Romania | 308 | 0 | 300 | 8 | 0 | 326 | -6 | -18 |
| Switzerland | 217 | 10 | 159 | 48 | 0 | 268 | -19 | -51 |
| Slovenia | 151 | 0 | 151 | 0 | 0 | 144 | 5 | 7 |
| Rest of Europe | 139 | 14 | 104 | 21 | 0 | 78 | 78 | 61 |
| Africa | 134 | 0 | 22 | 112 | 0 | 236 | -43 | -102 |
| Asia | 112 | 0 | 4 | 108 | 0 | 163 | -31 | -51 |
| Croatia | 77 | 0 | 75 | 2 | 0 | 113 | -32 | -36 |
| Bulgaria | 35 | 0 | 35 | 0 | 0 | 14 | 150 | 21 |
| Serbia | 21 | 0 | 21 | 0 | 0 | 8 | 163 | 13 |
| Total | 13,470 | 5,451 | 3,806 | 4,202 | 11 | 13,203 | 2 | 267 |
The order backlog as at 31 December 2013 grew slightly by 2 % to € 13.5 billion and covers around one year's worth of output volume. The geographic focus shifted somewhat here: large projects such as the Olympic Village in Russia and orders in Benelux had been completed in 2013. In exchange, a large number of new building construction orders in Germany bolstered the order backlog by more than € 500 million.
| Category | Number of construction sites |
as % of number of construction sites |
Order backlog € mln. |
as % of order backlog |
|---|---|---|---|---|
| small orders (€ 0–15 mln.) | 15,007 | 98 | 4,983 | 37 |
| medium-sized orders | ||||
| (€ 15–50 mln.) | 214 | 1 | 2,660 | 20 |
| large orders ( > € 50 mln.) | 94 | 1 | 5,827 | 43 |
| Total | 15,315 | 100 | 13,470 | 100 |
Part of risk management The overall order backlog is comprised of 15,315 individual projects. More than 15,000 of these are small projects with a volume of up to € 15 million each. They account for 37 % of the order backlog; a further 20 % are mediumsized projects with order volumes between € 15 million and € 50 million; 43 % are large projects of € 50 million or more. The high number of individual contracts guarantees that the risk involved with one project does not threaten the group success as a whole. The ten largest projects in the order backlog as at 31 December 2013 added up to 22 % of the order backlog, compared to 24 % at the end of 2012.
| Country | Project | Order backlog € mln. |
as % of total order backlog |
|---|---|---|---|
| Italy | Pedemontana motorway | 1,015 | 7.5 |
| Chile | Alto Maipo hydropower complex | 372 | 2.8 |
| Austria | Koralm Tunnel, Section 2 | 324 | 2.4 |
| Germany | Stuttgart 21, underground railway station | 314 | 2.3 |
| United Arab Emirates | STEP wastewater systems | 189 | 1.4 |
| Germany | Jena University Hospital | 164 | 1.2 |
| Germany | Upper West Berlin | 161 | 1.2 |
| Germany | Albabstieg Tunnel | 149 | 1.1 |
| Italy | Grosseto–Siena expressway | 107 | 0.8 |
| Poland | S8 Opacz–Paszków | 106 | 0.8 |
| Total | 2,903 | 21.6 |
In the 2013 financial year, 21 companies (thereof 14 mergers with fully consolidated companies) were included in the scope of consolidation for the first time. These companies contributed a total of € 47.53 million to the group revenue and
€ -1.72 million to the net income after minorities. As a result of first-time inclusions, current and non-current assets increased by € 28.11 million, current and non-current liabilities by € 13.71 million.
In the 2013 financial year, STRABAG SE generated an output volume of € 13.6 billion. The relatively low decline by 3 % over the previous year can be explained by weather-related effects at the start of the year. The group's core markets revealed quite different developments: as STRABAG is a broadly positioned group, the expected market-related decline in Poland following the end of the construction boom there and project-related reductions in Canada, Benelux and Romania were nearly balanced out by increases in e.g. Hungary, Austria and Africa.
The consolidated group revenue for the 2013 financial year amounted to € 12,475.65 million, which corresponds to a decrease of 4 %. The ratio of revenue to construction output remained unchanged at 92 %. The segment North + West contributed 44 %, South + East 36 % and International + Special Divisions 20 % to the revenue.
The changes in inventories involve mainly the real estate project development business, which
was conducted as actively as in the past. The own work capitalised remained at a very low level.
The expenses for materials, consumables and services used decreased more strongly than the revenue, falling by 5 % to € 8,204.35 million, while the employee benefits expense was down just 2 % to € 2,998.65 million. In total, however, the ratio of these two items versus revenue remained unchanged at 90 % as in the past two years.
The strong decline of the other operating expenses (-9 %) can be explained by the previous year's inclusion of damage compensation payments related to an arbitration ruling on a failed acquisition. The other operating income, which generally also rises or falls with revenue, increased in the past financial year despite the lower revenue. This was in part due to the somewhat higher income from asset disposals. The item also includes income from the fully consolidated concession companies.
| € mln. | 2013 | 2012 | ∆ % |
|---|---|---|---|
| Materials, consumables and services used | 8,204.35 | 8,655.10 | -5 |
| Employee benefits expense | 2,998.65 | 3,051.78 | -2 |
| Other operating expenses | 857.29 | 938.16 | -9 |
| Depreciation and amortisation | 433.34 | 401.17 | 8 |
The share of profit or loss of associates moved into positive territory in the 2013 financial year, namely from € -9.22 million to € 5.78 million. This item was especially influenced by the investment in a cement joint venture and in a project development company which had contributed to a negative result in 2012. The net income from investments, composed of the dividends and expenses of many smaller companies or financial investments, slipped slightly into negative territory, however.
As the 2013 results were no longer burdened by damage compensation payments related to a failed acquisition or by missing revenue for services already rendered in Central and Eastern Europe, the earnings before interest, taxes, depreciation and amortisation (EBITDA) grew by 14 % to € 694.91 million and the EBITDA margin rose from 4.7 % to 5.6 %. Cost developments related to large projects in hydraulic engineering, in the Netherlands and in Sweden, as well as the competitive pressure in railway construction, continued to impact earnings, however.
For its international business, the company had invested in specialty equipment that is now being depreciated over just a few years of construction. Together with the depreciation and amortisation of plant and equipment in the fields of railway construction and in hydraulic engineering, the total depreciation and amortisation expense grew by 8 %. The goodwill impairment contained in this item was nearly unchanged at € 3.99 million in 2013 after € 10.08 million in the year 2012. This resulted in an increase in the earnings before interest and taxes (EBIT) by 26 % to € 261.58 million and an EBIT margin of 2.1 % versus 1.6 % in the previous year.
While negative exchange rate differences amounting to € 11.75 million had still been registered in 2012, the net interest income in the past financial year now contained positive foreign currency effects of € 13.04 million. The result was a net interest income of € -31.54 million compared to € -50.73 million the previous year. This corresponds to a 47 % increase in the profit before tax. The income taxes were thus calculated at € 73.78 million, with a resulting tax rate of 32.1 %.
Earnings owed to minority shareholders amounted to € 42.70 million. The net income after minorities thus came to € 113.56 million in 2013, 87 % higher than in the previous year. The number of weighted outstanding shares decreased due to the – now concluded – buyback of own shares from 104,083,238 to 102,716,850, so that the earnings per share increased by 90 % to € 1.11.
The return on capital employed (ROCE)1) improved to 4.6 % after the low of 4.0 % in the previous year.
Effective tax rate: 32.1 %
Earnings per share: € 1.11
| € mln. | 2013 | % of balance sheet total |
2012 | % of balance sheet total |
|---|---|---|---|---|
| Non-current assets | 4,416.30 | 42 | 4,546.46 | 45 |
| Current assets | 6,144.50 | 58 | 5,591.23 | 55 |
| Equity | 3,238.77 | 31 | 3,162.54 | 31 |
| Non-current liabilities | 2,465.79 | 23 | 2,431.92 | 24 |
| Current liabilities | 4,856.23 | 46 | 4,543.23 | 45 |
| Total | 10,560.79 | 100 | 10,137.69 | 100 |
The balance sheet total of STRABAG SE increased by 4 % to € 10,560.79 million. This was in large part due to the unusually high increase of the cash and cash equivalents from € 1,374.96 million to € 1,711.97 million, resulting in a shift
toward current assets. Conspicuous on the liabilities side is the stable equity ratio at the high level of 30.7 % (2012: 31.2 %) and the higher non-current liabilities as a result of the bond that was issued in the past financial year.
| 2009 | 2010 | 2011 | 2012 | 2013 | |
|---|---|---|---|---|---|
| Equity ratio (%) | 32.2 | 31.1 | 30.3 | 31.2 | 30.7 |
| Net debt (€ mln.) | -596.23 | -669.04 | -267.81 | 154.55 | -73.73 |
| Gearing ratio (%) | -19.2 | -20.7 | -8.5 | 4.9 | -2.3 |
| Capital employed (€ mln.) | 5,042.87 | 5,235.74 | 5,336.45 | 5,322.35 | 5,462.11 |
Unlike the previous year, but as had been usual in the years before that, a net cash position of € 73.73 million was reported as at 31 December 2013. This can be explained by the higher level of cash and cash equivalents.
| € mln. | 2009 | 2010 | 2011 | 2012 | 2013 |
|---|---|---|---|---|---|
| Financial liabilities | 1,509.16 | 1,559.15 | 1,731.96 | 1,649.98 | 1,722.70 |
| Severance provisions | 70.48 | 69.36 | 70.44 | 79.91 | 78.40 |
| Pension provisions | 364.16 | 374.79 | 384.21 | 429.92 | 422.24 |
| Non-recourse debt | -757.08 | -719.89 | -754.18 | -630.31 | -585.11 |
| Cash and cash equivalents | -1,782.95 | -1,952.45 | -1,700.24 | -1,374.96 | -1,711.97 |
| Total | -596.23 | -669.04 | -267.81 | 154.55 | -73.73 |
With a nearly unchanged cash flow from earnings of € 513.03 million, the cash flow from operating activities shot up 158 % to € 693.70 million. This was due to the uncharacteristically high project-related prepayments, which will fall back over the course of the year. The cash flow from investing activities could be contained by 26 % at € -332.38 million. The purchase of specialty equipment needed for certain projects was shifted in part to 2014, and enterprise acquisitions took place to only a minor extent. The cash flow from financing activities was significantly less negative – settling at € -6.49 million instead of € -176.26 million – for two reasons: first, the previous year had been characterised by a significant repayment of bank borrowings and, second, another bond was issued in the 2013 financial year, albeit with a volume of € 200 million compared to € 100 million in the year before.
STRABAG had forecast capital expenditures (cash flow from investing activities) in the amount of approximately € 475 million for the 2013 financial year. In the end, the net capital expenditures totalled € 332.38 million and so remained clearly under budget. The gross investments (CAPEX) before subtraction of proceeds from asset disposals stood at € 420.83 million. This figure includes expenditures on intangible assets and on property, plant and equipment of € 387.36 million, the purchase of financial assets in the amount of € 22.88 million and enterprise acquisitions (changes to the scope of consolidation) of € 10.59 million.
About € 250 million is spent annually as maintenance expenditures related to the equipment fleet in order to prevent inventory obsolescence. The high proportion of expansion expenditures is due to the project-based nature of STRABAG's business: in 2013, the group invested in equipment for large tunnelling projects in Austria and in the international business in particular as well as in the home market of Germany in general.
Expenditures on intangible assets and on property, plant and equipment during the year under report must be seen against amortisation on intangible assets and depreciation on property, plant and equipment in the amount of € 433.34 million. This figure also includes goodwill impairment in the amount of € 3.99 million.
The number one objective for the treasury management of STRABAG SE is assuring the continued existence of the company through the maintenance of constant solvency. This objective is to be reached through the provision of sufficient short-term, medium-term and longterm liquidity.
Liquidity for STRABAG SE means not only solvency in the strict sense but also the availability of guarantees. The building activity requires the constant availability of bid, contract fulfilment, pre-payment and warranty guarantees and/or sureties. The financial scope of action is thus defined on the one hand by sufficient cash and cash credit lines, on the other hand by sufficient surety credit lines.
The management of liquidity risks has become a central element of the corporate management at STRABAG. In practice, liquidity risks come in various forms:
In the past, STRABAG has always oriented its financing decisions according to the risk aspects outlined above and has organised the maturity structure of the financial liabilities in such a way as to avoid a refinancing risk. In this way, the company has been able to maintain a great scope for action, which is of particular importance in a difficult market environment.
The respective liquidity needed is determined by targeted liquidity planning. Based on this, liquidity assurance measures are made and a liquidity reserve is defined for the entire group.
The medium- and long-term liquidity needs have so far also been covered by the issue of corporate bonds. STRABAG SE (and its predecessor FIMAG) has regularly issued bonds on the Austrian market since 2002. In the 2013 financial year, STRABAG successfully issued a € 200 million tranche with a coupon of 3.00 % and a term to maturity of seven years. The proceeds from the issue, which were used for general business purposes, help STRABAG to maintain its financing structure. At present, this leaves four bonds of STRABAG SE with a total volume of € 575 million on the market.
In order to diversify the financing structure, STRABAG SE placed its first bonded loan in the amount of € 140 million in the 2012 financial year. This long-term debt financing instrument is in many ways similar to a bond, with an important difference being that bonded loans are issued directly to institutional investors without using an organised capital market, i.e. an exchange.
The existing liquidity of € 1.7 billion assures the group's liquidity needs. Nevertheless, further bond issues or a refinancing of existing financing instruments are planned, depending on the market situation, in order to maintain a high level of liquidity reserves in the future and to take advantage of favourable market conditions.
STRABAG SE has a total credit line for cash and surety loans in the amount of € 6.7 billion. The credit lines include a syndicated surety credit line in the amount of € 2.0 billion and a revolving syndicated cash credit line of € 0.4 billion with a term until 2017. The group also has bilateral credit lines with banks. With a high degree of diversification, STRABAG creates an adequate risk spread in the provision of the credit lines and secures its comfortable liquidity position.
In June 2013, S&P again confirmed its BBBrating and stable outlook for STRABAG SE. Explaining its decision, S&P cited the leading market position in transportation infrastructures in Central and Eastern Europe, the well-diversified and vertically integrated business, the good access to raw materials and the group's adequately high liquidity.
Total credit line for cash and surety loans: € 6.7 billion
| 2009 | 2010 | 2011 | 2012 | 2013 | |
|---|---|---|---|---|---|
| Interest and other income (€ mln.) | 78.33 | 78.71 | 112.31 | 73.15 | 66.72 |
| Interest and other expense (€ mln.) | -98.22 | -98.39 | -103.77 | -123.87 | -98.26 |
| EBIT/net interest income (x) | -14.2 | -15.2 | 39.2 | -4.1 | -8.3 |
| Net debt/Ebitda (x) |
-0.9 | -0.9 | -0.4 | 0.3 | -0.1 |
| € mln. | Book value 31 December 2013 |
|---|---|
| Bonds | 582.50 |
| Bank borrowings | 1,117.70 |
| Liabilities from finance leases | 22.50 |
| Total | 1,722.70 |
The business of STRABAG SE is divided into four segments, of which there are three operative segments North + West, South + East and International + Special Divisions, and segment Other, which encompasses the group's service companies and central staff divisions.
The segments are comprised as follows:
Germany, Poland, Benelux, Scandinavia, Ground Engineering, Hydraulic Engineering, Offshore Wind
Austria, Switzerland, Hungary, Czech Republic, Slovakia, Adriatic, Rest of Europe, Railway Structures, Environmental Technology, Real Estate Development
Russia and neighbouring countries
International, Tunnelling, Services, Real Estate
Development, Infrastructure Development, Construction Materials
Management board responsibility: Thomas Birtel and Christian Harder Service companies
Construction projects are assigned to one of the segments (see chart below). Of course, projects may also be assigned to more than one segment. This is the case, for example, with PPP projects in which the construction part is assigned to its respective geographic segment, but the concession part is assigned to the concessions unit of International + Special Divisions. In projects which span more than one segment, the commercial and technical responsibility is generally assigned to that segment which has the higher share of the overall project value.
With only a few exceptions, we offer our services in all areas of the construction industry in the individual European markets in which we operate and cover the entire construction value chain. Our services include:
| North + West | South + East | International + Special Divisions |
|
|---|---|---|---|
| Residential Construction | P | P | |
| Commercial and Industrial Facilities | P | P | P |
| Public Buildings | P | P | P |
| Production of Prefabricated Elements | P | P | P |
| Civil Engineering | P | P | P |
| Bridges | P | P | P |
| Power Plants | P | P | P |
| Environmental Technology | P | ||
| Railway Structures | P | ||
| Roads, Earthworks | P | P | P |
| Hydraulic Engineering, Waterways, Dyking | P | P | |
| Landscape Architecture and Development | P | P | |
| Paving | P | P | P |
| Large-Area Works | P | P | P |
| Sports and Recreational Facilities | P | P | |
| Protective Structures | P | P | P |
| Sewer Systems | P | P | P |
| Production of Construction Materials | P | P | P |
| Ground Engineering | P | ||
| Offshore Wind | P | P | |
| Tunnelling | P | ||
| Real Estate Development | P | P | |
| Infrastructure Development | P | ||
| Operation/Maintenance/Marketing of PPP Projects | P | ||
| Property and Facility Services | P |
The segment North + West executes construction services of nearly any kind and size with a focus on Germany, Poland, the Benelux countries and Scandinavia. Ground and hydraulic engineering as well as offshore wind can also be found in this segment.
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Output volume | 6,021.11 | 6,237.17 | -3 | -216.06 |
| Revenue | 5,524.43 | 5,509.53 | 0 | 14.90 |
| Order backlog | 5,451.26 | 4,826.52 | 13 | 624.74 |
| EBIT | 72.54 | -51.32 | n.a. | 123.86 |
| EBIT margin % of revenue | 1.3 | -0.9 | ||
| Employees | 22,695 | 25,108 | -10 | -2,413 |
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Germany | 4,269 | 4,185 | 2 | 84 |
| Poland | 669 | 777 | -14 | -108 |
| Scandinavia | 508 | 575 | -12 | -67 |
| Benelux | 308 | 329 | -6 | -21 |
| Russia and neighbouring countries | 141 | 88 | 60 | 53 |
| Switzerland | 35 | 35 | 0 | 0 |
| Rest of Europe | 22 | 33 | -33 | -11 |
| Austria | 21 | 18 | 17 | 3 |
| Slovenia | 10 | 19 | -47 | -9 |
| The Americas | 9 | 131 | -93 | -122 |
| Italy | 7 | 9 | -22 | -2 |
| Middle East | 7 | 5 | 40 | 2 |
| Asia | 5 | 7 | -29 | -2 |
| Romania | 4 | 6 | -33 | -2 |
| Hungary | 3 | 16 | -81 | -13 |
| Africa | 3 | 1 | 200 | 2 |
| Serbia | 0 | 3 | -100 | -3 |
| Total | 6,021 | 6,237 | -3 | -216 |
The segment North + West generated an output volume of € 6,021.11 million in the 2013 financial year, 3 % below the previous year's level. This is mostly due to the significant market- and weather-related declines in Poland, which after Germany is the second-biggest geographic market in this segment. The revenue remained nearly unchanged at € 5,524.43 million. The earnings before interest and taxes (EBIT) moved into positive territory with € 72.54 million.
An especially positive contribution came from the business in German building construction. Improved year-on-year results were also registered in Poland and in transportation infrastructures and the construction materials business in Germany. The cost developments with large projects in hydraulic engineering, a transportation infrastructures project in the Netherlands and a building construction project in Sweden still remain a burden, however.
In comparison, several new large orders helped raise the order backlog to € 5,451.26 million, an increase of 13 % versus the previous year. Particularly positive developments were registered in building construction in Germany: STRABAG subsidiary Ed. Züblin AG assumed the construction of the Upper West highrise complex in Berlin for € 106 million and was awarded the construction contract for a section of Thuringia's new university clinic in Jena with a project value of more than € 170 million. In Germany, the company was also awarded the contracts to build an office building at the Stuttgart Airport for around € 95 million, to establish a cultural quarter in Dresden for € 70 million, and to expand the Allianz Campus in Unterföhring near Munich with a volume of € 100 million (share 90 %). In Denmark, Ed. Züblin AG was chosen to build the multi-use Bryghus building at the Copenhagen waterfront for € 140 million. In Poland, STRABAG companies recently began construction of sections of the A4 and S8 highways. In Sweden, it was possible to acquire the Orgelpipan project, in a prime location in Stockholm, comprising hotels, offices and a residential unit. Finally, a regular client has commissioned the group to build the McArthurGlen Designer Outlet Vancouver Airport in Canada.
The number of employees was down by 10 % to 22,695 in response to the shifting of activities in Chile into the segment International + Special Division. At the same time, an expansion of the workforce in Germany was countered by an expected market-related reduction of the blue-collar and white-collar workforce in Poland.
The company invested in areas with growth potential in 2013: Ed. Züblin AG expanded its range of services in the field of structural timber engineering with the acquisition of Merk Timber GmbH (formerly Metsä Wood Merk GmbH), a German manufacturer of cross-laminated timber; STRABAG B.V. took over the employees, equipment and production facilities of the transportation infrastructures activities of Janssen de Jong Groep in the Netherlands.
The management board expects an output volume of € 6.0 billion in the segment North + West in the 2014 financial year. Further economic stimulus is being provided in Germany by the favourable financing conditions and the positive labour market situation. As a result, building construction and civil engineering showed very positive development; the STRABAG Group started the year 2014 with an order backlog that will cover most of the output volume being forecast for the coming year. The future is likely to bring rising subcontractor prices with stable construction materials prices, however. In the German transportation infrastructures business, policymakers have recognised the investment backlog in public-sector infrastructure, so that a number of tenders are expected which could have a positive impact on the market from the second half of 2014. STRABAG benefits from the fact that its strong decentralised structure in the mass market allows it to respond flexibly to regional fluctuations in demand on the part of the public sector.
The end of the construction boom in Poland was clearly reflected in the output volume of the segment in 2013. Momentum is expected starting in 2014, however: more than 700 km of expressways are planned for realisation in Poland between 2014 and 2020, co-financed in part by the EU.
Scandinavia, which accounts for 8 % of the segment output, is the third-largest region in North + West, with Sweden and Denmark making the most significant contributions to the output volume of just over € 500 million. Both the overall economic environment and the market for tunnelling and infrastructure projects continue to remain stable. Especially in the Stockholm region, the coming years will see the realisation of a number of large infrastructure projects and housing developments. Increasing competitive pressure is expected, however, as internationally operating construction groups are likely to enter this market.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Germany | Stuttgart 21, underground railway station | 314 | 2.33 |
| Germany | New university clinic, Jena | 164 | 1.22 |
| Germany | Upper West high-rise complex, Berlin | 107 | 0.79 |
| Poland | S8 Opacz–Paszków | 106 | 0.79 |
| Denmark | Bryghus multi-use building, Copenhagen |
92 | 0.68 |
| Germany | Aquis, Aachen | 90 | 0.67 |
| Germany | Allianz Campus, Unterföhring | 83 | 0.62 |
The geographic focus of the segment South + East is on Austria, Switzerland, Hungary, the Czech Republic, Slovakia, Russia and neighbouring countries as well as on the region South-East
Europe. Railway structures, environmental technology as well as selected real estate development activities are also handled within this segment.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 4,593.36 | 4,755.74 | -3 | -162.38 |
| Revenue | 4,466.03 | 4,792.43 | -7 | -326.40 |
| Order backlog | 3,805.48 | 4,326.12 | -12 | -520.64 |
| EBIT | 138.23 | 148.89 | -7 | -10.66 |
| EBIT margin % of revenue | 3.1 | 3.1 | ||
| Employees | 21,089 | 22,699 | -7 | -1,610 |
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Austria | 1,630 | 1,573 | 4 | 57 |
| Czech Republic | 546 | 532 | 3 | 14 |
| Russia and neighbouring countries | 410 | 432 | -5 | -22 |
| Hungary | 402 | 293 | 37 | 109 |
| Germany | 336 | 339 | -1 | -3 |
| Switzerland | 325 | 351 | -7 | -26 |
| Slovakia | 301 | 360 | -16 | -59 |
| Romania | 285 | 315 | -10 | -30 |
| Croatia | 114 | 111 | 3 | 3 |
| Poland | 51 | 232 | -78 | -181 |
| Slovenia | 47 | 49 | -4 | -2 |
| Rest of Europe | 46 | 42 | 10 | 4 |
| Serbia | 29 | 66 | -56 | -37 |
| Bulgaria | 17 | 24 | -29 | -7 |
| Middle East | 15 | 7 | 114 | 8 |
| Africa | 12 | 0 | n.a. | 12 |
| Asia | 8 | 7 | 14 | 1 |
| Italy | 6 | 13 | -54 | -7 |
| The Americas | 6 | 6 | 0 | 0 |
| Benelux | 5 | 2 | 150 | 3 |
| Scandinavia | 2 | 2 | 0 | 0 |
| Total | 4,593 | 4,756 | -3 | -163 |
The output volume in the segment South + East decreased to € 4,593.36 million in 2013, down 3 % versus the previous year. A decisive factor was, among other things, the internal shifting of the building construction activities in Poland into the segment North + West. Meanwhile, on a more positive note, growth of the output volume was reported in Hungary and the Czech Republic. The revenue decreased more strongly than the output volume, dropping by 7 % to € 4,466.03 million. The earnings before interest and taxes (EBIT) also fell by 7 % to € 138.23 million. Decisive factors behind this development included amongst others the continued considerable competitive pressure in railway construction. The successful resultimprovement programme of the environmental technology business influenced the EBIT positively, however.
The segment's order backlog fell by 12 % to € 3,805.48 million. This was due to the completion of the large Olympic Village project in Russia, the aforementioned shifting process in Poland and the market-related decline in the Czech Republic. A recovery of the order situation can be seen in Slovakia and in Hungary, on the other hand, where work began on two new motorway projects in each country in 2013. And in Bosnia, a consortium including STRABAG secured the tender to build the Svilaj–Odžak section of the international motorway corridor 5c.
Corresponding to the lower order backlog, the number of employees in the segment decreased by 7 % to 21,089; a declining workforce was registered in nearly all markets, however.
It should be possible to generate an output volume of € 4.7 billion in the segment South + East in the current financial year. In general, the price pressure in transportation infrastructures in Central and Eastern Europe will continue. A lack of financing, especially in the Czech Republic, in Romania and in the Adriatic region, means that very few large public-sector projects are being awarded at this time – with a resulting tougher competition on the price. A more positive outlook, on the other hand, is offered by transportation infrastructures in Slovakia, where several large motorway and expressway projects are currently being tendered, as well as in the area of building construction for private clients in Slovakia and the Czech Republic.
Austria, with a contribution of 35 % to the segment output the largest market in South + East, paints a mixed picture: From today's perspective, the shifting competitive landscape resulting from a competitor's market departure is unlikely to result in a reduction of margin pressure in the transportation infrastructures business or in the Austrian states – where Upper Austria and Carinthia are particularly affected. In the greater Vienna area, meanwhile, STRABAG continues to see itself faced with a stable environment in which it was possible to selectively acquire certain construction projects from the departed competitor.
In Hungary, stabilisation is becoming apparent at a low level: investments from international industrial groups are growing slightly and the long-awaited large projects in road construction are now finally coming up for tender. Older projects continued to have a negative impact in 2013, however.
In the RANC region, acquisition efforts are shifting from building construction in metropolitan areas in Russia to industrial projects as well as projects with special know-how requirements in countries such as Turkmenistan and Kazakhstan, where a STRABAG subsidiary was recently awarded the contract for concrete works for the Astana–Karaganda motorway section.
In Switzerland, STRABAG merged a large portion of its companies in 2013 so that a homogeneous brand presence is now possible. The reorganisation, which is now largely complete, had become necessary due to the strong growth experienced by the group in Switzerland in the past few years.
The railway structures business will remain characterised by overcapacities and a distorted competitive landscape in Germany; additionally, the long winter means that large equipment was hardly used this year.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Hungary | M4 motorway section | ||
| Abony–Fegyvernek | 106 | 0.79 | |
| Russia | Kauchuk residential complex | 105 | 0.78 |
| Slovenia | Ljubljana waste treatment facility | 91 | 0.67 |
| Slovakia | R2 expressway Pstruša–Kriváň | 71 | 0.53 |
| Czech Republic | Road I/11 Rudna | 63 | 0.46 |
| Romania | Modernisation of DN67B | 58 | 0.43 |
| Romania | Rail line Vințu de Jos–Simeria | 54 | 0.40 |
| Romana | ELI-NP laser project research facility | 52 | 0.39 |
The segment International + Special Divisions includes, on the one hand, the field of tunnelling. The concessions business, on the other hand, represents a further important area of business, with global project development activities in transportation infrastructures in particular. Regardless of where the services are rendered, our construction materials business, including our dense network of construction materials operations but with the exception of asphalt, also belongs to this segment. The real estate business, which stretches from project development and planning to construction and operation and also includes the property and facility services business, completes the wide range of services. Additionally, most of the services in non-European markets are also bundled in the International + Special Divisions segment.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 2,822.41 | 2,924.86 | -4 | -102.45 |
| Revenue | 2,458.68 | 2,661.29 | -8 | -202.61 |
| Order backlog | 4,202.28 | 4,038.33 | 4 | 163.95 |
| EBIT | 69.58 | 126.93 | -45 | -57.35 |
| EBIT margin % of revenue | 2.8 | 4.8 | ||
| Employees | 23,575 | 20,426 | 15 | 3,149 |
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Germany | 1,127 | 1,196 | -6 | -69 |
| Middle East | 301 | 293 | 3 | 8 |
| Austria | 295 | 268 | 10 | 27 |
| The Americas | 248 | 211 | 18 | 37 |
| Italy | 155 | 135 | 15 | 20 |
| Africa | 150 | 124 | 21 | 26 |
| Czech Republic | 93 | 109 | -15 | -16 |
| Asia | 90 | 96 | -6 | -6 |
| Hungary | 86 | 80 | 8 | 6 |
| Benelux | 85 | 124 | -31 | -39 |
| Poland | 52 | 118 | -56 | -66 |
| Slovakia | 37 | 39 | -5 | -2 |
| Romania | 31 | 50 | -38 | -19 |
| Switzerland | 22 | 35 | -37 | -13 |
| Croatia | 19 | 18 | 6 | 1 |
| Rest of Europe | 11 | 8 | 38 | 3 |
| Slovenia | 10 | 13 | -23 | -3 |
| Russia and neighbouring countries | 7 | 5 | 40 | 2 |
| Bulgaria | 2 | 2 | 0 | 0 |
| Serbia | 1 | 1 | 0 | 0 |
| Total | 2,822 | 2,925 | -4 | -103 |
In the volatile segment International + Special Divisions, the output volume fell by 4 % to € 2,822.41 million in the 2013 financial year. The greatest share of the output volume was again generated in the markets of Germany, the Middle East and Austria. A decline was registered in the revenue by 8 % to € 2,458.68 million. The earnings before interest and taxes (EBIT) were nearly halved to € 69.58 million. This development is due to the typically volatile business in the segment, particularly in the international business and in tunnelling.
The order backlog grew by 4 % to € 4,202.28 million: new projects were recorded in Chile, where an especially large increase in the order backlog was registered, in Thailand and in Oman, and the order books were further padded in the home market of Germany by the contract to build a new government building in Potsdam under a public-private partnership (PPP) arrangement. In Germany, the STRABAG subsidiary Ed. Züblin AG was also awarded the contract to build a tunnel on the new Wendlingen–Ulm rail line for € 250 million (Ed. Züblin AG's share of the contract amounts to 60 %). In Canada, the group will build the McArthurGlen Designer Outlet Vancouver Airport. At the same time, however, a number of large projects were completed in e.g. Africa, in Austria and in Benelux.
The number of employees grew by a considerable 15 % to 23,575. This can be explained with the organisational adjustment and subsequent shifting of staff in Chile from the segment North + West into the segment International + Special Divisions and with several orders in Africa.
The output volume of the segment International + Special Divisions should remain unchanged at € 2.8 billion in 2014. The earnings are expected to remain satisfactory, even if the price level is ruinously low in some areas. STRABAG has observed that competition in tunnelling in Austria, in Germany and in Switzerland is increasingly being carried out on the price.
The market for concession projects in Europe also remains a challenging one. In this business field, STRABAG is currently working on offers in Belgium, Bosnia-Herzegovina, Ireland, Romania, Germany or Croatia. Competitive pressure is on the rise and, especially in Eastern Europe, the sector is facing political and financial hurdles.
Significant earnings contributions, on the other hand, are expected from the business field real estate development in the year 2014, in particular as a result of the planned sales of construction projects that were completed in 2013. It is also planned to further expand the project development activities in Central and Eastern Europe and in Sweden. PPP building construction still benefits from the continued large investment needs on the part of the public sector. The market for PPP measures in building construction therefore has a chance to further grow in comparison to the restrained development of the previous year, especially as this constellation makes it possible for the client to realise efficiency advantages from an integrated solutions approach, i.e. from the observation of lifecycle costs. STRABAG is moreover in a position to completely cover all specifications in this area, thanks to the inclusion of specialist providers from within the group such as STRABAG Property and Facility Services.
In particular the activities in property management of this service subsidiary contributed to stable development in 2013; STRABAG had acquired a residential property management company and has been able to develop this business within the group.
The price pressure in the European core markets requires STRABAG to diversify more broadly internationally. In addition to selected countries in East Africa, the foreign markets currently being worked by the company include Oman, the United Arab Emirates, Qatar and Saudi Arabia. In Canada – the Niagara Tunnel Project was successfully concluded here in March –, Colombia and the United Kingdom, STRABAG has been working on new order opportunities in the area of concession and infrastructure projects. Looking at specific construction segments, the conclusion of a partnership agreement with mining company Rio Tinto marked the group's consolidation of the mining business. STRABAG is also offering specialty construction services around the world in pipe jacking (a tunnelling technique), in test track construction and in the field of liquefied natural gas (LNG).
The construction materials business will continue to put pressure on the margins of the segment, as the market for concrete is stagnating at a very low level. In Bulgaria, therefore, STRABAG has already ended its engagement in this business field. In many countries, the situation with stone and gravel continues to be modest at best, and the situation in the cement business is also not expected to improve in the short term due to the stagnation in terms of quantities. The developments in bitumen emulsion/road maintenance are satisfactory.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Italy | Pedemontana motorway | 1,015 | 7.54 |
| Chile | Alto Maipo hydropower complex | 372 | 2.76 |
| Austria | Koralm Tunnel, Section 2 | 293 | 2.18 |
| United Arab | |||
| Emirates | STEP wastewater systems | 187 | 1.39 |
| Germany | Albabstieg Tunnel | 149 | 1.10 |
| Italy | Grosseto–Siena expressway | 107 | 0.80 |
| Chile | Candelaria Mine 2011 | 93 | 0.69 |
| Oman | Road Sinaw–Duqm | 87 | 0.65 |
| Oman | Duqm port facility | 77 | 0.57 |
This segment encompasses the group's service companies and central staff divisions.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 136.19 | 124.83 | 9 | 11.36 |
| Revenue | 26.51 | 19.98 | 33 | 6.53 |
| Order backlog | 10.66 | 11.96 | -9 | -1.03 |
| EBIT | 0.06 | -1.97 | n.a. | 2.03 |
| EBIT margin % of revenue | 0.2 | -9.9 | ||
| Employees | 5,741 | 5,777 | -1 | -36 |
The STRABAG Group is subject to a number of risks in the course of its business activities. These risks are identified and assessed using an active risk management system and dealt with using an appropriate risk policy.
The group's goals are defined at all company levels. This is a prerequisite to setting up processes for the timely identification of potential risks standing in the way of the achievement of company objectives. The organisation of STRABAG's risk management builds on project-related jobsite and acquisitions controlling, supplemented by the higher-level assessment and steering management. The risk controlling process includes a certified quality management system, internal group guidelines for the workflow in the operating units, a central administration, controlling, auditing and contract management. Through the establishment of company-wide quality standards in quotation processing and supplemental services management, the centrally organised contract management department can better assert claims for outstanding debt.
The group's internal risk report defines the following central risk groups:
The entire construction industry is subject to cyclical fluctuations and reacts to varying degrees depending on region and sector. Overall economic growth, development of the construction market, the competitive situation, the conditions on the capital markets and technological changes in construction can all result in risks. These risks are continually observed and monitored by the central departments and operating units. Changes in external risks lead to adjustments in STRABAG's organisation, market presence and range of services as well as the adaptation of strategic and operating planning. STRABAG further responds to market risk with geographic and product-related diversification in order to keep the influence on the company's success exerted by an individual market or by the demand for certain services as low as possible. To avoid bearing the entire risk of rising prices by itself, STRABAG makes efforts at signing cost escalation clauses and "cost-plus-fee" contracts in which the client pays a previously agreed margin on the costs of the project.
The operating risks primarily include the complex risks of project selection and execution. STRABAG keeps acquisition lists in order to review the project choice. Business transactions requiring consent are reviewed and approved by business unit and subdivision managers or by division managers according to internal rules of procedure. Depending on the risk profile, bids must be analysed by commissions and reviewed for their technical and economic feasibility. Cost accounting and expense allocation guidelines have been set up to assure a uniform process of costing and to establish a performance profile at our construction sites. Project execution is managed by the construction team on site and controlled by monthly target/performance comparisons; at the same time, our central controlling provides constant commercial backing, ensuring that risks of individual projects do not endanger the continuance of the company.
Under financial risks, STRABAG understands risks in financial matters and in accounting, including instances of manipulation. Special attention is paid to the liquidity and accounting receivables management, which is secured through continuous financial planning and daily status reports. Compliance with internal commercial guidelines is guaranteed by the central accounting and controlling departments, which are also responsible for internal reporting and the periodic planning process. Risks from possible instances of manipulation (acceptance of advantages, fraud, deception or other infringements of the law) are monitored by all business areas in general and by the internal audit department in particular.
See also Corporate Governance Report
In order to convey STRABAG's values and principles, the group drew up its Code of Ethics and internal Compliance Guidelines in 2007. The values and principles contained within these documents are reflected in the guidelines and instructions of the STRABAG companies and divisions. Compliance with these values and principles is expected not only from the members of the management and supervisory boards as well as from other management-level employees but from all group employees. The Compliance Guidelines and the Code of Ethics are designed to guarantee honest and ethical business practices. The Code of Ethics is available for download at www.strabag. com > Investor Relations > Corporate Governance > Code of Ethics.
Detailed information regarding interest risk, currency risk, credit risk and liquidity risk can be found in the Notes under item 25 Financial Instruments.
Risks concerning the design of personnel contracts are covered by the central personnel department with the support of a specialised data base. The company's IT configuration and infrastructure (hardware and software) is handled by the central IT department, controlled by the international IT steering committee.
PEOPLE & WORKPLACE
See chapter "People at STRABAG"
Past experience has shown that having a highly qualified and motivated workforce is an important factor in competition. In order to properly assess the potential of employees, STRABAG uses an IT-supported aptitude diagnostics process, the so-called behaviour profile analysis. In subsequent feedback talks and employee appraisal interviews, employees and their supervisors analyse the results and agree on specific training and further education measures.
STRABAG can exert influence on the management of associated companies through its shareholder position and, if applicable, any existing advisory functions. The shares in asphalt and concrete mixing companies usually involve sector-typical minority holdings. With these companies, economies of scope are at the fore.
The group also operates in countries which experience political instability. Interruptions of construction activity, restrictions on ownership interests of foreign investors, and even dispossession or expropriations could be the consequence of political changes which could have an impact on the group's financial structure.
A review of the current risk situation reveals that the reporting period shows no risks which jeopardised the company's existence, nor were there any visible future risks.
The control structure as defined by the Committee of Sponsoring Organisations of the Treadway Commission (COSO) provides the basis for the description of the key features of the internal control and risk management systems. The COSO framework consists of five related components: control environment, risk assessment, control activities, information and communication, and monitoring. On this basis, the STRABAG Group set up a company-wide risk management system according to generally accepted principles.
The aim of the internal control system is to support management in such a way that it is capable of assuring internal controls in relation to financial reporting which are effective and which are improved on an ongoing basis. The system is geared to the compliance with rules and regulations and to creating conditions which are conducive to performing specific controls in key accounting processes.
Internal audit report in the Corporate Governance Report
The corporate culture determines the control environment in which management and employees operate. STRABAG is constantly working to improve its communication and to convey its corporate values as defined in the STRABAG Code of Ethics in order to guarantee moral standards, ethics and integrity within the company and in our dealings with others.
The implementation of the internal control system in relation to the financial reporting process is done on the basis of internal rules and guidelines. Responsibilities for internal control were adapted to fit the corporate organisation.
The internal audit department carries out periodic, unannounced inspections of all relevant business units as part of its responsibility for monitoring compliance with the law and corporate guidelines in the technical and commercial areas. The internal audit department also monitors the effectiveness of the compliance organisation. During these inspections, the internal audit department analyses the legality and correctness of individual actions. The internal audit department also conducts regular, independent reviews of compliance with internal guidelines in the area of accounting. The head of the internal audit department reports directly to the CEO.
The management identifies and monitors risks relating to the financial reporting process, with a focus on those risks that are typically considered to be material.
The preparation of the financial statements requires regular forecasts, with the inherent risk that the actual future development will deviate from the forecast. This especially affects the following matters/items of the consolidated financial statements: assessment of unfinished construction projects, recognition and measurement of provisions (including social capital), the outcome of legal disputes, the collectability of receivables as well as the recoverability of investments and goodwill. In individual cases, external experts are called in or publicly available sources are considered in order to minimise the risk of a false assessment.
All control activities are applied in the current business process to ensure that errors or deviations in financial reporting are prevented or detected and subsequently corrected. The control activities range from a management review of the period results to specific monitoring of accounts to the analysis of ongoing accounting processes. It is the responsibility of the management to design the levels of hierarchy in such a way that an activity and the control of that activity are not performed by the same person (foureyes principle).
Information and communication
The management regularly updates the rules and regulations for financial reporting and communicates them to all employees concerned. In addition, regular discussions regarding the financial reporting and the rules and regulations in this context take place in various committees. These committees are composed of the corporate management as well as the department head and senior staff from the accounting department. The committee's work aims, IT security control activities represent a cornerstone of the internal control system. The separation of sensitive activities is supported by a restrictive approach to IT access authorisation. For its accounting and financial reporting, the company mainly uses self-developed software which reflects the unique features of the construction sector. The effectiveness of the financial reporting system is further assured through automated IT controls included in the system.
amongst others, at guaranteeing compliance with accounting rules and regulations and to identifying and communicating weak points and potential areas for improvement in the financial reporting process. Accounting employees receive regular training regarding new methods of national and international financial reporting in order to identify risks of unintended misreporting at an early stage.
The management and supervisory boards bear responsibility for the ongoing company-wide monitoring. Additionally, the remaining management levels are responsible for the monitoring of their respective areas of responsibility. Controls and plausibility checks are carried out at regular intervals. The internal audit department is also involved in the monitoring process.
The top management receives monthly summarised financial reports on the development of the output volume, the results of the respective segments and countries, and the liquidity. Financial statements to be published are submitted for final appraisal by the senior accounting staff and the commercial management board members before they are passed on to the audit committee of the supervisory board.
PEOPLE & WORKPLACE
In 2013, STRABAG SE employed an average of 73,100 people in all countries in which it operates (2012: 74,010), of which 28,091 were whitecollar and 45,009 were blue-collar workers. With a minus of 1 %, the number of employees was down only slightly. Large changes in several entities almost completely balanced each other out: on the one hand, the workforce was reduced for market reasons in Poland; on the other hand, new large-scale projects in non-European markets and in Germany resulted in a plus of nearly 1,600 jobs.
In the past financial year, 1,118 blue-collar apprentices (2012: 1,129) and 255 white-collar trainees (2012: 259) were in training with the group. Additionally, 45 technical trainees and 10 commercial trainees were employed as at 31 December 2013.
The percentage of women among group employees averaged 13.6 % (2012: 13.4 %), in group management it was 8.6 % (2012: 8.7 %). With these figures, the company has only partially reached its goal of annually raising the percentage of women within the group.
As a technology group for construction services, the STRAGAG Group does business in a rapidly changing environment. The increasing advances in technology, closer dovetailing with other industries, and continuously growing competitive pressure present the company with enormous challenges. To remain competitive in the long term, the company must come to understand the impact of these developments on its core business and introduce the necessary measures to secure an advantage over the competition. The focus is therefore on an increasing technological orientation and on systematic innovation management.
On the one hand, the STRABAG Group has for years been cooperating with international universities and research institutions. On the other hand, it sees its internal research and development units as giving it a strategic competitive advantage: in overall charge of the planning and execution of research and development projects within the STRABAG Group are the two central divisions Zentrale Technik (ZT) and Gesellschaft zur Optimierung von Technischen Prozessen, Arbeitssicherheit und Qualität (TPA), both of which report directly to the CEO.
ZT is organised as a central division with 750 highly qualified employees at 21 locations. It provides services in the areas of tunnelling, civil and structural engineering, and turnkey construction along the entire construction process: from the early acquisition stage and bid processing to execution planning and site management, ZT offers innovative solutions with regard to construction materials technology, construction management and construction physics, and software solutions. Central topics for innovation activities are sustainable construction and renewable energy. Among other things, the employees at ZT develop methods and tools to control the impact that construction activities have on the environment.
TPA is the STRABAG Group's competence centre for quality management and materialsrelated research and development. Its main tasks include ensuring the quality of the construction materials, structures and services as well as the safety of the processes, and developing and reviewing standards for the handling and processing of construction materials. With lean management, TPA also holds competences for the efficient planning of supply and production chains. TPA has about 900 employees at 130 locations in more than 20 countries, making it one of Europe's largest private laboratory companies.
STRABAG's EFKON AG subsidiary provides the group with expertise in the research and development of intelligent transportation systems in general and electronic toll collection solutions in particular. The company has developed products and solutions in the electronic toll collection segment for multi-lane traffic flow and has already introduced these onto the market. The research focus last year was on the topics of mobile and portable enforcement, microwave communications and image acquisition systems. The technology company headquatered in Raaba near Graz, Austria, is seeing a lot of international demand and was able to achieve an export ratio of 95 % in 2013.
In addition to specific research projects at the group's units and subsidiaries, a large part of the research and development activities takes place at ongoing construction projects – especially involving tunnelling, construction engineering and ground engineering. During construction in these areas, new challenges or concrete questions often arise which require new technological processes or innovative solutions and which contribute to the group's research, development and innovation activity.
The STRABAG Group spent about € 20 million (2012: about € 17 million) on research, development and innovation activities during the 2013 financial year.
Ecological responsibility has been a topic within the group for years and is also anchored in the corporate strategy. As a provider of construction services, STRABAG's activities cause dust and noise and alter the environment. As a zeroemissions construction site will not be a reality in the foreseeable future, it is the company's aim to limit the negative impact on the environment
Energy management helps to lower costs
The topic of energy is of great importance for the STRABAG Group not only for ecological but also for economic reasons. Energy management is an instrument with which it is possible to reduce energy use and, consequently, energy costs within the group over the long term. This requires operational objectives regarding energy use and CO2 emissions as well as the development and realisation of corresponding measures. Pilot projects on this topic have already been implemented at several of the group's operating entities in recent years.
The energy costs for the companies within STRABAG SE's scope of consolidation amounted to nearly € 342.73 million in 2013 (2012: € 347.13 million). Without measures to increase energy efficiency, energy costs can be expected
As in previous years, the carbon footprint for the 2013 financial year refers to the group's full scope of consolidation and includes emissions caused in 60 countries. Within the group, a total of 1,263,900 tonnes of CO2 were emitted during the year under report. This represents a decline of 2 % or more than 24,400 tonnes of CO2 in a year-on-year comparison. The emissions are reported separately for Scopes 1 and 2 as defined by the Greenhouse Gas Protocol. With 53 %, the highest proportion of CO2 emissions – as in the previous year – resulted from that results from our core business to a minimum. To this end, continuous investments are made in processes and technologies to increase the energy efficiency and reduce the environmental impact. For STRABAG, ecological responsibility begins with the planning of buildings and structures and continues through to their construction and services.
to rise in response to price hikes and legislative changes in the next few years. In 2012, therefore, the company launched a comprehensive energy management programme that made its first progress in 2013 with the reduction of energy use by 1.2 %. STRABAG's energy management includes the sum of all measures that are planned or are being implemented to guarantee a minimum use of energy for the required performance. Attempts are made to influence organisational and technical processes, and the group's employees are sensitised to the goal of improving energy efficiency. The positive results of such an energy management can be seen in the reduction of energy costs, the increased potential for tax savings, and the protection of the environment as a result of reduced emissions.
the use of fuels, almost exclusively diesel, within the group. This was followed by electricity and pulverised lignite with 23 % and 12 %, respectively. Germany, Poland and Austria caused the greatest share of these emissions (54 %). This shows that energy consumption is proportional to the generated output volume: with 63 %, these countries are also responsible for the greatest share of the group's output volume in 2013.
More information about ecological responsibility is available at csr.strabag.com (not audited by KPMG)
The energy data for the group are generated by the CarbonTracker software that was developed internally in 2012. CarbonTracker involves the automatic and systematic calculation of energy and carbon data contained within the available group databases. After using the Carbon-Tracker to calculate the group's carbon footprint for 2012, the objective for the coming years was to refine the calculation system so that an exact, up-to-date carbon footprint for each organisational unit can be determined. Some of these goals were already realised in 2013, such as the redesign of the input mask in order to enter the data more easily as well as the new ability to fully track changes through an archiving system capable of filtering by time of change and user. The software is web-based to allow access to the CarbonTracker via the group's intranet system.
| Unit | 2010 | 2011 | 2012 | 2013 |
|---|---|---|---|---|
| MWh | 499,945 | 499,146 | 486,033 | 497,943 |
| thousands of litres | 212,614 | 241,433 | 245,660 | 252,718 |
| heating value in MWh | 705,973 | 658,356 | 565,048 | 560,507 |
| thousands of litres | 25,836 | 21,644 | 17,790 | 16,053 |
| tonnes | 51,452 | 84,318 | 79,107 | 69,602 |
Following data collection, the focus was on data analysis. In order to make the energy and resource use within the STRABAG Group comparable, the company is working on a so-called "energy atlas" which will depict the energy flows by country and organisational entity. Using key performance indicators that show the energy
use and CO2 emissions of individual facilities and units, it will be possible to develop appropriate efficiency measures and to review their effectiveness. These data are to serve as a basis for the definition of concrete energy targets in the future.
1) Changes in the energy values over past publications result from the ongoing development of the system of data collection. The presentation deviates from the usual presentation of a five-year period as data are only available starting from the year 2010.
The share capital of STRABAG SE amounts to € 114,000,000 and consists of 114,000,000 fully paid-in, no-par value shares with a prorata value of € 1 per share of the share capital. 113,999,997 shares are bearer shares and are traded on the Prime Market Segment of the Vienna Stock Exchange. Three shares are registered shares. Each bearer share and each registered share accounts for one vote (one share – one vote). The nomination rights associated with registered shares No. 1 and No. 2 are described in more detail under item 4.
The Haselsteiner Group (Haselsteiner Familien-Privatstiftung, Dr. Hans Peter Haselsteiner), the Raiffeisen Group (Raiffeisen-Holding Niederösterreich-Wien reg. Gen.m.b.H, BLR-Baubeteiligungs GmbH, "Octavia" Holding GmbH), the UNIQA Group (UNIQA Insurance Group AG, UNIQA Beteiligungs-Holding GmbH, UNIQA Österreich Versicherungen AG, UNIQA Erwerb von Beteiligungen Gesellschaft m.b.H., Raiffeisen Versicherung AG) and Rasperia Trading Limited (controlled by Oleg Deripaska), as shareholder groups of STRABAG SE, have signed a syndicate agreement governing (1) nomination rights regarding the supervisory board, (2) the coordination of voting during the Annual General Meeting, (3) restriction on the transfer of shares and (4) joint development of the Russian market as a core market. The Haselsteiner Group, the Raiffeisen Group together with the UNIQA Group, and Rasperia Trading Limited each have the right to nominate two members of the supervisory board. The syndicate agreement also requires the syndicate partners to exercise their voting rights from syndicated shares unanimously at the Annual General Meeting of STRABAG SE. The syndicate agreement further foresees restrictions on the transfer of shares in the form of mutual pre-emptive rights as well as a minimum shareholding on the part of the syndicate partners.
In accordance with Sec 65 Para 5 of the Austrian Stock Corporation Act (AktG), all rights were suspended for 11,400,000 no-par shares (10 % of the share capital) effective 31 December 2013 as these shares are held by STRABAG SE as own shares as defined in Sec 65 Para 1 No 8 of the Austrian Stock Corporation Act (AktG) (see also item 7).
To the knowledge of STRABAG SE, the following shareholders held a direct or indirect interest of at least 10 % of the share capital of STRABAG SE on 31 December 2013:
• Haselsteiner Familien-Privatstiftung ... 28.6 %
In addition to its 18.8 % interest, core shareholder Rasperia Trading Limited also holds an option, valid until 15 July 2014, to buy a further 6.2 % of STRABAG SE from the other core shareholder groups mentioned above.
In exercising the authorisation by the 7th Annual General Meeting from 10 June 2011 and the renewed authorisation by the 8th Annual General Meeting from 15 June 2012 to acquire own shares in accordance with Sec 65 Para 1 No 8 of the Austrian Stock Corporation Act (AktG), the company by 31 December 2013 acquired 14,000,000 no-par shares, corresponding to 10 % of the share capital (see also item 7).
The remaining shares of the share capital of STRABAG SE, amounting to about 13.0 % of the share capital, are in free float.
Three shares are – as mentioned under item 1 – registered shares entered in the shareholder register. Registered shares No. 1 and No. 3 are held by the Haselsteiner Group and registered share No. 2 is held by Rasperia Trading Limited. Registered shares No. 1 and No. 2 allow their bearers to nominate a member each to the supervisory board of STRABAG SE.
No employee stock option programmes exist.
No further regulations exist beyond items 2 and 4 regarding the nomination and recall of members of the management and supervisory boards or regarding changes to the Articles of Association which do not result directly from relevant law and legislation.
The management board of STRABAG SE, in accordance with Sec 169 of the Austrian Stock Corporation Act (AktG), was authorised by resolution of the 5th Annual General Meeting of 19 June 2009 and with approval by the supervisory board to increase the share capital of the company by up to € 57,000,000 by 19 June 2014, in several tranches if necessary, by issuing up to 57,000,000 registered no-par shares for cash or contributions in kind (in this case also to the partial or full exclusion of the shareholders' subscription rights).
The management board, in accordance with Sec 174 Para 2 of the Austrian Stock Corporation Act (AktG), was further authorised by resolution of the 8th Annual General Meeting of 15 June 2012 and with the approval of the supervisory board to issue financial instruments within the meaning of Sec 174 of the Austrian Stock Corporation Act (AktG) – in particular convertible bonds, income bonds and profit participation rights – with a total nominal value of up to € 1,000,000,000, which may also confer subscription and/or exchange rights for the acquisition of up to 50,000,000 shares of the company and/or may be designed in such a way that they can be issued as equity, also in several tranches and in different combinations, up to five years inclusive from the day of this resolution, also indirectly by way of a guarantee for the issue of financial instruments through an associate or related entity of the company with conversion rights on shares of the company.
The management board was also authorised by resolution of this Annual General Meeting, in accordance with Sec 65 Para 1 No 8 and Para 1a and 1b of the Austrian Stock Corporation Act (AktG), to acquire bearer or registered no-par shares of the company on the stock market or over the counter to the extent of up to 10 % of the share capital during a period of twelve months from 10 July 2012 at a minimum price per share of € 1.00 and a maximum price per share of € 34.00. The purpose of the acquisition
Related parties
Business transactions with related parties are described in item 27 of the Notes.
may not be to trade with own shares. The authorisation can be exercised in full or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Sec 228 Para 3 UGB) or third parties acting on behalf of the company. The management board can decide to acquire shares on the stock exchange but must inform the supervisory board following decision to do so. Over-the-counter purchases require prior approval by the supervisory board. The management board was further authorised, in accordance with Sec 65 Para 1b AktG, for a period of five years from this resolution, to sell or assign its own shares, with approval by the supervisory board, in a manner other than on the stock market or through a public tender, to the exclusion of the shareholders' buyback rights (subscription rights), and to determine the conditions of sale. The authorisation can be exercised in full or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Sec 228 Para 3 UGB) or third parties acting on behalf of the company.
With the exception of the agreements over a syndicated surety loan and a syndicated cash credit line, there exist no significant agreements to which STRABAG SE is party and which would become effective, change or end due to a change of ownership in STRABAG SE following a takeover offer.
No compensation agreements exist between STRABAG SE and its management and supervisory board members or employees in the event of a public takeover offer.
At the beginning of March 2009, an accident occurred during underground construction at the South Lot for the North-South urban metro line in Cologne, resulting in the collapse of the Historical Archive of the City of Cologne and significant portions of two neighbouring buildings. Debris collapsed into a hole which opened next to the North-South construction site at the Waidmarkt crossover junction. Two people were trapped under the rubble, and rescuers were only able to recover their bodies.
Construction on the underground is being carried out by a joint venture (JV) of Bilfinger SE (formerly Bilfinger Berger SE), Wayss & Freytag Ingenieurbau AG and a group company. The JV is led by Bilfinger SE on the technical side and by Wayss & Freytag Ingenieurbau AG on the commercial side. Through its subsidiary Ed. Züblin AG, STRABAG holds a 33.3 % interest in the JV.
The cause of the collapse remains unknown. The public prosecutor's office began an investigation – initially against persons unknown – with three separate experts into possible negligent homicide and endangerment in construction. Two independent proceedings are being conducted by the District Court in Cologne: one to collect evidence as to the cause of the accident and another to establish the damage to the buildings and archives. To prevent a possible lapse of potential claims, the independent proceedings against the JV Nord-Süd-Stadtbahn Köln, Los Süd, were extended to included additional natural persons and legal entities associated with the construction project. This extension is purely for formal reasons and is not connected to any new insights as to the cause of the accident. A model of the building is currently being built to help determine the cause and the damages, with completion expected no sooner than 2014. The model is to help clarify whether there were any mistakes or errors associated with the diaphragm wall set up by the JV.
Merely for the purpose of extending the statute of limitations, the public prosecutor's office in December 2013 opened proceedings against approximately 100 persons associated closely or loosely with the project. This purely precautionary measure does not represent any statement as to the cause of the accident; in this respect, it remains to be seen what the final result of the investigation of the site and the expert report reveal. We continue to believe that this project will not result in any significant damages for the company.
output outlook € 15 bn. 0 2013 2014e 14,0 14,7 13.6 13.6 0 % ebit outlook € 500 mln. 0 2013 2014e 14,0 14,7 261.58 ~≥0 % ≥ 260
More information about the individual markets in the country report
As STRABAG is highly diversified regionally and by construction segments, the movements in the individual markets should more or less balance each other out in the year to come:
While the price pressure continues in transportation infrastructures in Germany, affordable financing conditions present STRABAG with solid demand in building construction in this country. The picture is similar in Austria – in both of these home markets, therefore, the company expects a stable yet highly competitive situation. Poland, the third largest country for STRABAG in terms of output volume, was, as expected, affected by the end of the construction boom, but first impulses in infrastructure construction should be seen again at the end of 2014 thanks to the new EU budgets. A lack of financing in the Czech Republic, Romania and the Adriatic region means that very few large public-sector projects are being awarded at this time – with a resulting tougher competition on the price. A more positive outlook, on the other hand, is offered by transportation infrastructures in Slovakia, where several large motorway and expressway projects are currently being tendered, as well as in the area of building construction in Slovakia and the Czech Republic.
Detailed outlook in the segment reports
In summary, the STRABAG SE management board expects the output volume to remain more or less unchanged versus 2013 at € 13.6 billion. This will likely be composed of € 6.0 billion from the segment North + West, € 4.7 billion from the segment South + East and € 2.8 billion from the segment International + Special Divisions. The rest can be allotted to Other. The segment composition thus remains largely unchanged in comparison to 2013.
Due to the necessary purchase of projectrelated specialty equipment, the net investments (cash flow from investing activities) are expected to rise from € 332.38 million in 2013 to around € 350 million in 2014.
The management board expects an EBIT of at least € 260 million for the current financial year, which corresponds to the forecast value of 2013. Although the realisation of the measures proposed by the internal STRABAG 2013ff task force is beginning to show first successes, STRABAG faces a challenging environment in 2014 with higher price pressure in the European infrastructure construction sector. On the other hand, the company is registering continued solid conditions in building construction for the private sector.
In the subsequent years, the focus will continue to be less on growth of the output volume than on improving the profitability. From today's perspective, the STRABAG SE management board expects the output volume and the revenue to grow again as of 2016 at the earliest. Until then, a strict risk management as well as organisational measures to increase cost efficiency should lead to improved margins. The company aims for an EBIT margin of 3 % in the medium term.
The political developments in Ukraine since February 2014 are having no significant influence on the situation of the STRABAG Group from today's perspective. The company generates less than 1 % of its annual output volume in Ukraine. In Russia, the group expects to generate less than 3 % of its output volume in 2014. As construction is an export non-intensive industry in which most of the services are provided locally, and the STRABAG Group provides its services almost exclusively for private clients, the company does not expect the political developments to have any immediate impact on its business in Russia.
We have audited the accompanying consolidated financial statements of
for the year from 1 January 2013 to 31 December 2013. These consolidated financial statements comprise the consolidated balance sheet as at 31 December 2013, the consolidated income statement/consolidated statement of comprehensive income, the consolidated statement of cash flows and the consolidated statement of changes in equity for the fiscal year 2013 and a summary of significant accounting policies and other explanatory notes.
The company's management is responsible for the group accounting system and for the preparation and fair presentation of these consolidated financial statements in accordance with International Financial Reporting Standards (IFRSs) as adopted by the EU, and the additional requirements pursuant to section 245a UGB (Austrian Business Enterprise Code). This responsibility includes: designing, implementing and maintaining internal control relevant to the preparation and fair presentation of the consolidated financial statements that are free from material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances.
Our responsibility is to express an opinion on these consolidated financial statements based on our audit. We conducted our audit in accordance with laws and regulations applicable in Austria and Austrian Standards on Auditing, as well as in accordance with International Standards on Auditing, issued by the International Auditing and Assurance Standards Board (IAASB) of the International Federation of Accountants (IFAC). Those standards require that we comply with professional guidelines and that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the consolidated financial statements. The procedures selected depend on the auditor's judgement, including the assessment of the risks of material misstatement of the consolidated financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the group's preparation and fair presentation of the consolidated financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the group's internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.
Our audit did not give rise to any objections. In our opinion, which is based on the results of our audit, the consolidated financial statements comply with legal requirements and give a true and fair view of the financial position of the group as at 31 December 2013 and of its financial performance and its cash flows for the year from 1 January to 31 December 2013 in accordance with International Financial Reporting Standards (IFRSs) as adopted by the EU.
Pursuant to statutory provisions, the management report for the group is to be audited as to whether it is consistent with the consolidated financial statements and as to whether the other disclosures are not misleading with respect to the company's position. The auditor's report also has to contain a statement as to whether the management report for the group is consistent with the consolidated financial statements and whether the disclosures pursuant to Section 243a UGB (Austrian Business Enterprise Code) are appropriate.
In our opinion, the management report for the group is consistent with the consolidated financial statements. The disclosures pursuant to Section 243a UGB (Austrian Business Enterprise Code) are appropriate.
Linz, 11 April 2014
KPMG Austria AG Wirtschaftprüfungs- und Steuerberatungsgesellschaft
Dr. Helge Löffler Austrian Chartered Accountants
Mag. Peter Humer Austrian Chartered Accountants
| 31.12.2013 | 31.12.2012 | |
|---|---|---|
| Assets | € | T€ |
| A. Non-current assets: | ||
| I. Property, plant and equipment: |
||
| Other facilities, furniture and fixtures and office equipment | 969,729.15 | 975 |
| II. Financial assets: | ||
| 1. Investments in subsidiaries | 2,217,254,382.60 | 2,143,546 |
| 2. Loans to subsidiaries | 99,756,885.00 | 108,000 |
| 2. Investments in participation companies | 23,583,718.99 | 25,803 |
| 3. Own shares | 236,978,341.46 | 228,115 |
| 4. Other loans | 1,101,397.24 | 1,717 |
| 2,578,674,725.29 | 2,507,181 | |
| 2,579,644,454.44 | 2,508,156 | |
| B. Current Assets: | ||
| I. Accounts receivable and other assets: |
||
| 1. Trade receivables | 628,327.06 | 516 |
| 2. Receivables from subsidiaries | 717,950,041.23 | 632,654 |
| 3. Receivables from participation companies | 6,139,559.43 | 6,132 |
| 4. Other receivables and assets | 95,603,891.61 | 100,897 |
| 820,321,819.33 | 740,199 | |
| II. Cash assets, including bank accounts | 185,448.52 | 9,125 |
| 820,507,267.85 | 749,324 | |
| C. Accruals and deferrals | 9,091,328.00 | 7,448 |
| Total | 3,409,243,050.29 | 3,264,929 |
| 31.12.2013 | 31.12.2012 | |
| Equity and liabilities | € | T€ |
| A. Equity: | ||
| I. Share capital |
114,000,000.00 | 114,000 |
| II. Capital reserves (committed) | 2,148,047,129.96 | 2,148,047 |
| III. Retained earnings: | ||
| 1. Legally required reserves | 72,672.83 | 73 |
| 2. Voluntary reserves | 64,934,787.53 | 34,824 |
| 65,007,460.36 | 34,896 | |
| IV. Reserve for own shares | 236,978,341.46 | 228,115 |
| V. Unappropriated net profit (thereof profit brought forward € 2,280,000.00; | ||
| previous year: T€ 5,908) | 51,300,000.00 | 22,800 |
| 2,615,332,931.78 | 2,547,859 | |
| B. Provisions: | ||
| 1. Provisions for severance payments | 290,457.00 | 316 |
| 2. Provisions for taxes | 13,361,814.89 | 13,362 |
| 3. Other provisions | 27,328,333.00 | 15,164 |
| 40,980,604.89 | 28,841 | |
| C. Accounts payable: | ||
| 1. Bonds | 575,000,000.00 | 450,000 |
| 2. Bank borrowings | 140,000,104.59 | 198,441 |
| 3. Trade payables | 2,167,932.35 | 1,916 |
| 4. Payables to subsidiaries | 9,873,966.78 | 11,469 |
| 5. Other payables (thereof taxes € 369,779.83; previous year: T€ 40; | ||
| thereof social security liabilities € 14,206.62; previous year: T€ 25) | 25,887,509.90 | 26,403 |
| 752,929,513.62 | 688,229 |
| Total | 3,409,243,050.29 | 3,264,929 |
|---|---|---|
| Contingent liabilities | 320,611,515.32 | 253,639 |
| 2013 | 2012 | |
|---|---|---|
| € | T€ | |
| 1. Revenue (Sales) | 59,233,587.19 | 56,826 |
| 2. Other operating income | 11,590,101.55 | 2,273 |
| 3. Cost of materials and services: | ||
| a) Materials | -38,800.30 | -75 |
| b) Services | -13,337,095.78 | -16,083 |
| -13,375,896.08 | -16,158 | |
| 4. Employee benefits (Personnel expense): | ||
| a) Salaries | -5,327,778.97 | -2,259 |
| b) Severance payments and contributions to employee benefit plans | -8,334.57 | -114 |
| c) Statutory social security contributions, as well as payroll-related and other | ||
| mandatory contributions | -239,548.37 | -450 |
| d) Other social expenditure | -164,784.15 | -141 |
| -5,740,446.06 | -2,965 | |
| 5. Depreciation | -5,376.87 | -5 |
| 6. Other operating expenses: | ||
| a) Taxes other than those included in item 15 | -210,103.33 | -95 |
| b) Miscellaneous | -25,223,206.03 | -63,455 |
| -25,433,309.36 | -63,549 | |
| 7. Subtotal of items 1 through 6 (operating result) | 26,268,660.37 | -23,578 |
| 8. Income from investments (thereof from subsidiaries € 105,389,706.99; previous year: T€ 77,028) | 105,389,706.99 | 85,405 |
| 9. Other interest and similar income (thereof from subsidiaries € 34,926,639.73; | ||
| previous year: T€ 27,478) | 35,866,194.85 | 28,693 |
| 10. Income from disposal and write-up of financial assets and marketable securities | 323.04 | 279 |
| 11. Expenses related to financial assets and marketable securities: | ||
| a) Depreciation of investments in subsidiaries | -29,324,108.72 | -4,673 |
| b) Depreciation (other) | -3,258,096.42 | 0 |
| c) Expenses from subsidiaries | -1,084,391.42 | -46,320 |
| d) Miscellaneous | -11,874,188.96 | 0 |
| -45,540,785.52 | -50,994 | |
| 12. Interest and similar expenses (thereof from subsidiaries € 971,802.05; previous year: T€ 75) | -32,802,213.36 | -30,369 |
| 13. Subtotal of item 8 through 12 (financial result) | 62,913,226.00 | 33,014 |
| 14. Results from ordinary business activities | 89,181,886.37 | 9,436 |
| 15. Taxes on income and gains: | ||
| a) Income tax | -169,176.84 | -27 |
| b) Tax allocation | -1,018,353.99 | -2,776 |
| -1,187,530.83 | -2,803 | |
| 16. Net income for the year | 87,994,355.54 | 6,633 |
| 17. Dissolution of retained earnings (voluntary reserves) | 0.00 | 10,259 |
| 18. Allocation to retained earnings (voluntary reserves) | -38,974,355.54 | 0 |
| 19. Profit for the period | 49,020,000.00 | 16,892 |
| 20. Profit brought forward | 2,280,000.00 | 5,908 |
| 21. Unappropriated net profit | 51,300,000.00 | 22,800 |
These 2013 financial statements were prepared in accordance with the Austrian Business Enterprise Code (UGB).
The income statement was prepared in report form using the nature of expense method.
Additional information was provided in the notes as far as was necessary to ensure a true and fair view of the financial position, financial performance and cash flows.
The company is the topmost parent company of the companies within the scope of consolidation of STRABAG SE, Villach. The consolidated financial statements are deposited with the Landes- als Handelsgericht Klagenfurt (District and Commercial Court Klagenfurt).
The company is a large corporation (Kapitalgesellschaft) as defined by Section 221 of the Austrian Business Enterprise Code (UGB).
The financial statements were prepared in accordance with the "principles of orderly accounting" and following the general norm of presenting a true and fair view of the financial position, financial performance and cash flows.
The financial statements were prepared in conformity with the "principle of completeness".
The valuation premise adopted is that of a going concern.
Individual assets and liabilities were valued in accordance with the "principle of individual valuation".
The financial statements were prepared in accordance with the "principle of prudence" by only reporting profit which was realised on the balance sheet date.
All recognisable risks and impending losses which occurred in 2013 or an earlier financial year were taken into consideration.
The previously applied valuation method was kept.
Property, plant and equipment are valued at historical cost less accumulated depreciation.
Low-value assets are depreciated in full in the year in which they are acquired.
Extraordinary depreciation is undertaken where it is necessary to apply the lower value method.
Financial assets are valued at historical cost or a lesser value if one is attributable.
The company has not exercised its option to capitalise deferred taxes in accordance with Section 198 Paragraph 10 of the Austrian Business Enterprise Code.
Trade and other receivables are reported at nominal value. The valuation of foreign currency receivables follows the strict "lowest value principle".
Individual value adjustments are made for recognisable risks.
All recognisable risks and impending losses were taken into account in the calculation of provisions in accordance with the legal framework.
The provisions for severance payments were calculated using recognised financial mathematical principles, an interest rate of 3.0 % (previous year: 3.5 %), and a retirement age of 62 for women (previous year: 62) and 62 for men (previous year: 62).
Liabilities are valued at the amount repayable. Foreign currency liabilities are valued in accordance with the "highest value principle".
The non-current assets are itemised and their changes in the year under report are recorded in the Statement of Changes in Non-Current Assets. (Appendix 1 to the notes).
Due to long-term rentals, letting and leasing, the use of property, plant and equipment not shown in the balance sheet results in an obligation of € 6,757,794.06 (previous year: T€ 6,638) for the 2014 financial year. The sum of all obligations for the next five years is € 33,788,970.30 (previous year: T€ 33,189).
Information on investments can be found in the list of Participations (Appendix 2 to the notes).
The following trade and other receivables have a remaining term of more than one year:
| 31.12.2013 | 31.12.2012 | |
|---|---|---|
| € | T€ | |
| Receivables from subsidiaries | 270,000,667.97 | 264,400 |
| Receivables from participation companies | 872,084.01 | 0 |
| Other receivables and other assets | 19,456,000.00 | 18,556 |
| Total | 290,328,751.98 | 282,956 |
All other reported trade and other receivables have a remaining term of up to one year.
Receivables from subsidiaries involve cash-clearing, financing, routine clearing, the calculation of group allocations and transfers of profits.
The item "Other receivables and other assets" includes income of € 614,670.97 (previous year: T€ 172) which will be cash effective after the balance sheet date.
The fully paid in share capital amounts to € 114,000,000.00 and is divided into 113,999,997 no-par bearer shares and three registered shares.
The management board has been authorised, with the approval of the supervisory board, to increase the share capital of the company by up to € 57,000,000 by 19 June 2014, in several tranches if necessary, by issuing up to 57,000,000 registered no-par shares for cash or contributions in kind (approved capital). In the case of capital increase through contributions in kind, the partial or full exclusion of the shareholders' subscription rights is possible.
The exercise, issue price and conditions of issue shall be determined with the approval of the supervisory board. The supervisory board was authorised to determine the necessary changes to the Articles of Association required upon the issuance of shares from the approved capital.
The management board has also been authorised until 15 June 2017, in accordance with Section 65 Paragraph 1b of the Austrian Stock Corporation Act, to sell or assign its own shares, with approval by the supervisory board, in a manner other than on the stock market or through a public tender, to the exclusion of the shareholders' buyback rights (subscription rights), and to determine the conditions of sale. The authorisation can be exercised in full, or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Section 228 Paragraph 3 of the Austrian Business Enterprise Code) or third parties acting on behalf of the company.
The management board has been authorised, with approval from the supervisory board, until 15 June 2017, to issue financial instruments within the meaning of Section 174 of the Austrian Stock Corporation Act (AktG), in particular convertible bonds, income bonds and profit participation rights with a total nominal value of up to € 1,000,000,000.00 which may also confer subscription and/or exchange rights for the acquisition of up to 50,000,000 shares of the company and/or may be designed in such a way that they can be issued as equity. This can be done also in several tranches and in different combinations and indirectly by way of a guarantee for the issue of financial instruments through an associate or related entity of the company with conversion rights on shares of the company. For the servicing, the management board may use the conditional capital or own shares. The issue amount and issue conditions, as well as the possible exclusion of the shareholders' subscription rights for the issued financial instruments, are to be determined by the management board with the approval of the supervisory board.
Also approved was a conditional increase of the share capital of the company pursuant to Section 159 Paragraph 2 No. 1 of the Austrian Stock Corporation Act (AktG) by up to € 50,000,000.00 through the issue of up to 50,000,000 new bearer shares with no face value (no-par shares) for issue to creditors of financial instruments within the meaning of the authorisation granted to the management board, provided the creditors of financial instruments exercise their subscription and/or exchange rights for shares of the company. The issue amount and the exchange ratio are to be determined based on recognised financial mathematical methods and the price of the shares of the company in a recognised pricing procedure. The newly issued shares of the conditional capital increase carry a dividend entitlement corresponding to that of the shares traded on the stock market at the time of the issue. The management board is authorised, with the approval of the supervisory board, to establish the further details of the implementation of the conditional capital increase. The supervisory board is authorised to pass resolution on any amendments to the Articles of Association resulting from the issue of shares within the scope of the conditional capital
As at 31 December 2013, STRABAG SE had acquired 11,400,000 bearer shares equalling 10 % of the share capital. The corresponding value of the share capital amounts to € 11,400,000. The acquisition took place between July 2011 and May 2013. The average purchase price per share was € 20.79.
Other provisions were made for profit sharing, investment risks and claims.
| € | Remaining | Remaining | Remaining | ||
|---|---|---|---|---|---|
| term < one year |
term > one year |
term > five years |
Book value | Real securities | |
| 1. Bonds | 0.00 | 275,000,000.00 | 300,000,000.00 | 575,000,000.00 | 0.00 |
| Previous year in T€ | 75,000 | 100,000 | 275,000 | 450,000 | 0 |
| 2. Bank borrowings | 104.59 | 116,500,000.00 | 23,500,000.00 | 140,000,104.59 | 0.00 |
| Previous year in T€ | 58,441 | 116,500 | 23,500 | 198,441 | 0 |
| 3. Trade payables | 2,167,932.35 | 0.00 | 0.00 | 2,167,932.35 | 0.00 |
| Previous year in T€ | 1,916 | 0 | 0 | 1,916 | 0 |
| 4. Payables to subsidiaries | 9,873,966.78 | 0.00 | 0.00 | 9,873,966.78 | 0.00 |
| Previous year in T€ | 11,469 | 0 | 0 | 11,469 | 0 |
| 5. Other payables | 25,072,912.31 | 814,597.59 | 0.00 | 25,887,509.90 | 0.00 |
| Previous year in T€ | 25,024 | 1,379 | 0 | 26,403 | 0 |
| Total | 37,114,916.03 | 392,314,597.59 | 323,500,000.00 | 752,929,513.62 | 0.00 |
| Previous year in T€ | 171,850 | 217,879 | 298,500 | 688,229 | 0 |
Payables to subsidiaries involve routine clearing as well as the clearing of tax allocation.
The item "Other payables" includes costs of € 16,388,735.17 (previous year: T€ 14,795) which will be cash effective after the balance sheet date.
The contingent liabilities which must be shown in the balance sheet in accordance with Section 199 of the Austrian Business Enterprise Code (UGB) involve exclusively guarantee and indemnity liabilities.
The contingent liabilities reported include € 278,525,718.45 (previous year: T€ 234,898) in contingent liabilities for affiliated companies.
The company has made an unlimited warranty statement for the benefit of BRVZ Bau- Rechen- u. Verwaltungszentrum Gesellschaft m.b.H., Spittal an der Drau, whereby is commited to fulfil the obligations from the financial futures contracts concluded by the BRVZ Bau- Rechen- u. Verwaltungszentrum Gesellschaft m.b.H., Spittal an der Drau, if necessary.
Performance bonds in the amount of € 386,992,273.68 (previous year: T€ 194,316) exist for construction projects of subsidiaries.
| 2013 | 2012 | |
|---|---|---|
| € | T€ | |
| Domestic revenue | 26,798,880.75 | 25,673 |
| Foreign revenue | 32,434,706.44 | 31,153 |
| Total | 59,233,587.19 | 56,826 |
The company employed on the average 5 employees during the year (previous year: 6 employees).
100 % of the expenses for severance payments were recognised for management board members.
An amount of € 33,665.57 (previous year: T€ 91) for contributions to employee benefit plans is included in the severance payment expenses.
The salaries of the management board members in the 2013 financial year amounted to T€ 4,199 (previous year: T€ 2,590).
Supervisory board member salaries in the period under review amounted to € 135,000.00 (previous year: T€ 135).
The other operating expenses reported mainly include impairments of receivables, surety fees, legal and advisory costs, travel and advertising costs, insurance costs and other general administrative expenses.
Losses on the disposal of financial assets with an amount of € 668,500.00 (previous year T€ 45,660) is included in the item expenses from subsidiaries.
The amount for active deferred taxes pursuant to Section 198 Paragraph 10 of the Austrian Business Enterprise Code (UGB) which may be capitalised is € 0,00 (previous year: T€ 0) because there is no additional tax expense except the minimum tax due to the fiscal losses of the company.
The reported tax expenses involve tax allocations to group members, corporate income tax and foreign tax expenses.
The company is a group parent under Section 9 Paragraph 8 of the Austrian Corporate Income Tax Act (KStG) of 1988 as amended by BGBl. I 180/2004. Tax adjustments (both positive and negative allocations) between the group parent and the company were arranged in the form of tax allocation agreements.
An agreement was concluded with BRVZ Bau- Rechen- u. Verwaltungszentrum Gesellschaft m.b.H., Spittal an der Drau, covering financial and management accounting, operating and cost accounting, payroll accounting, cash management, insurance management and facility management.
The members of the management and supervisory boards are listed separately (Appendix 3 to the notes).
The expenses for the auditor, KPMG Austria AG Wirtschaftsprüfungs- und Steuerberatungsgesellschaft, Linz, for the financial year amount to € 630,500.00 (previous year: T€ 620), of which € 58,000.00 (previous year: T€ 57) are for the audit of the financial statements, € 530,000.00 (previous year: T€ 520) for other audit services and € 42,500.00 (previous year: T€ 43) for miscellaneous services.
Villach, 11 April 2014
Management Board
Dr. Thomas Birtel
Mag. Christian Harder Dipl.-Ing. Dr. Peter Krammer
Mag. Hannes Truntschnig Dipl.-Ing. Siegfried Wanker
Appendix 1 to the notes: Statement of Changes in Non-Current Assets Appendix 2 to the notes: List of Participations Appendix 3 to the notes: Management and Supervisory Board
| Acquisition and production costs | ||||
|---|---|---|---|---|
| € | Balance 1.1.2013 |
Additions | Disposals | |
| I. Tangible Assets: | ||||
| Other facilities, furniture and fixtures and office equipment | 1,140,556.36 | 191.50 | 1,291.18 | |
| II.Financial Assets: | ||||
| 1. Investments in subsidiaries | 2,185,985,871.59 | 103,082,866.10 | 101,010.13 | |
| 2. Loans to subsidiaries | 108,000,000.00 | 5,791,885.00 | 14,035,000.00 | |
| 3. Investments in participation companies | 34,254,181.58 | 1,038,642.83 | 500,000.00 | |
| 4. Own shares | 228,115,014.03 | 8,863,327.43 | 0.00 | |
| 5. Other loans | 1,716,714.37 | 38,763.44 | 654,080.57 | |
| 2,558,071,781.57 | 118,815,484.80 | 15,290,090.70 | ||
| Total | 2,559,212,337.93 | 118,815,676.30 | 15,291,381.88 |
| Depreciation for the period |
Carrying values 31.12.2012 |
Carrying values 31.12.2013 |
Accumulated depreciation |
Balance 31.12.2013 |
|---|---|---|---|---|
| 5,376.87 | 974,914.52 | 969,729.15 | 169,727.53 | 1,139,456.68 |
| 29,324,108.72 | 2,143,543,276.35 | 2,217,254,382.60 | 71,713,344.96 | 2,288,967,727.56 |
| 0.00 | 108,000,000.00 | 99,756,885.00 | 0.00 | 99,756,885.00 |
| 3,258,096.42 | 25,803,173.58 | 23,583,718.99 | 11,209,105.42 | 34,792,824.41 |
| 0.00 | 228,115,014.03 | 236,978,341.46 | 0.00 | 236,978,341.46 |
| 0.00 | 1,716,714.37 | 1,101,397.24 | 0.00 | 1,101,397.24 |
| 32,582,205.14 | 2,507,178,178.33 | 2,578,674,725.29 | 82,922,450.38 | 2,661,597,175.67 |
| 32,587,582.01 | 2,508,153,092.85 | 2,579,644,454.44 | 83,092,177.91 | 2,662,736,632.35 |
| Name and residence of the company | Interest % |
Equity/negative equity1) |
Result of the last financial year2) |
|---|---|---|---|
| T€ | |||
| Investments in subsidiaries: | |||
| AKA-FinCo Zrt., Budapest | 100.00 | 153) | -43) |
| AKA-HoldCo Zrt., Budapest | 100.00 | 153) | -43) |
| Asphalt & Beton GmbH, Spittal an der Drau | 100.00 | 1,238 | 626 |
| "A-WAY Infrastrukturprojektentwicklungs- und -betriebs GmbH", Spittal an der Drau | 100.00 | 1,366 | 1,284 |
| Bau Holding Beteiligungs AG, Spittal an der Drau | 65.00 | 1,038,742 | -9,721 |
| Baukontor Gaaden Gesellschaft m.b.H., Gaaden | 100.00 | 1,929 | 191 |
| BHG Bitumen d.o.o. Beograd, Belgrad | 100.00 | 203 | 28 |
| BHG Sp.z o.o., Pruszkow | 100.00 | 314 | 92 |
| CESTAR d.o.o., Slavonski Brod | 74.90 | 2,852 | 210 |
| CLS Construction Legal Services GmbH, Köln | 100.00 | 25 | 0 |
| CLS Construction Legal Services GmbH, Wien | 100.00 | 1743) | 1383) |
| CLS CONSTRUCTION SERVICES s. r. o., Bratislava | 100.00 | 26 | 12 |
| CLS CONSTRUCTION SERVICES s.r.o., Prag | 100.00 | 0 | 8 |
| CLS Kft., Budapest | 100.00 | 122 | 35 |
| CLS Legal Sp.z o.o., Pruszkow | 100.00 | 277 | 7 |
| DRP, d.o.o., Ljubljana | 100.00 | 837 | 451 |
| Ed. Züblin AG, Stuttgart | 57.26 | 164,531 | 24,736 |
| Errichtungsgesellschaft Strabag Slovensko s.r.o., Bratislava-Ruzinov | 100.00 | 979 | 499 |
| Erste Nordsee-Offshore-Holding GmbH, Pressbaum | 51.00 | 39,829 | -175 |
| EVN S.r.l., Rom | 100.00 | 895) | -115) |
| Facility Management Holding RF GmbH, Wien | 100.00 | 783) | -33) |
| Flogopit d.o.o., Novi Beograd | 100.00 | -16 | -31 |
| G15 Projekt GmbH, Baar | 100.00 | 40 | 9 |
| GRASTO d.o.o., Ljubljana | 99.85 | 3,971 | 127 |
| Ilbau Liegenschaftsverwaltung GmbH, Hoppegarten | 99.99 | 118,011 | -32,709 |
| Kamen-Ingrad gradnja i rudarstvo d.o.o. u likvidaciji, Zagreb | 51.00 | 4) | 4) |
| Karlovarske silnice, a. s., Ceske Budejovice | 100.00 | 2,355 | 18 |
| KMG - KLIPLEV MOTORWAY GROUP A/S, Kopenhagen | 100.00 | 1,368 | 718 |
| LPRD (LESZCZYNSKIE PRZEDSIEBIORSTWO ROBOT | |||
| DROGOWO)-MOSTOWYCH Sp.z o.o., Leszno | 57.29 | 6,503 | 306 |
| Mazowieckie Asfalty Sp.z o.o., Pruskow | 100.00 | -163) | -33) |
| Mikrobiologische Abfallbehandlungs GmbH, Schwadorf | 51.00 | 1,1623) | 4403) |
| Mineral Abbau GmbH, Spittal an der Drau | 100.00 | -458 | 0 |
| MINERAL ROM S.R.L., Brasov | 26.87 | -2,537 | -456 |
| Norsk Standardselskap 154 AS, Oslo | 100.00 | -13) | -33) |
| Onezhskaya Mining Company LLC, Petrozavodsk | 59.00 | -5,179 | -1,875 |
| OOO CLS Construction Legal Services, Moskau | 100.00 | 227 | 110 |
| OOO "SAT", Moskau | 100.00 | 706 | -57 |
| Panadria mreza autocesta d.o.o. (formerly CROATIA ASFALT d.o.o.), Zagreb | 100.00 | 1 | -2 |
| PBOiUT Slask Sp. z o.o., Katowice | 60.98 | 1,907 | -421 |
| PNM, d.o.o., Ljubljana | 100.00 | 9 | 0 |
| Prottelith Produktionsgesellschaft mbH, Liebenfels | 52.00 | -2,2943) | 663) |
| PRZEDSIEBIORSTWO ROBOT DROGOWYCH Sp.z o.o. W LIKWIDACJI, Choszczno | 100.00 | 4) | 4) |
| SAT REABILITARE RECICLARE S.R.L., Cluj-Napoca | 100.00 | 461 | 374 |
| SAT SANIRANJE cesta d.o.o., Zagreb | 100.00 | 618 | 402 |
1) according to § 224 Para 3 UGB
2) net income / loss of the year
3) Financial statements as of 31.12.2012
4) no statement according to § 241 Para 2 UGB
5) Financial statements as of 30.09.2012
| Name and residence of the company T€ |
Interest % |
Equity/negative equity1) |
Result of the last financial year2) |
|---|---|---|---|
| Investments in subsidiaries: | |||
| SAT SLOVENSKO s.r.o., Bratislava | 100.00 | 1,276 | 190 |
| SAT Ukraine, Brovary | 100.00 | 1,9343) | -323) |
| "SBS Strabag Bau Holding Service GmbH", Spittal an der Drau | 100.00 | 319,748 | 45,582 |
| SF Bau vier GmbH, Wien | 100.00 | -5 | -7 |
| SOOO "STRABAG Engineering Center", Minsk | 60.00 | 923) | 33) |
| STR Irodaház Kft., Budapest | 100.00 | 3,5723) | -2353 |
| STRABAG A/S, Trige | 100.00 | -7513) | -7293) |
| STRABAG AG, Köln | 74.80 | 480,902 | 68,322 |
| STRABAG AG, Zürich | 100.00 | 33,940 | -20,903 |
| "Strabag Azerbaijan" L.L.C., Baku | 100.00 | -26,506 | -11,941 |
| STRABAG Beteiligungen International AG, Spittal an der Drau | 100.00 | 998 | 2 |
| STRABAG Infrastruktur Development, Moskau | 100.00 | 87 | 141 |
| STRABAG Installations pour l´Environenment SARL, Champagne | 100.00 | 1223) | 173) |
| STRABAG Invest GmbH, Wien | 51.00 | -4153) | -23) |
| STRABAG Oy, Helsinki | 100.00 | 1,454 | -667 |
| STRABAG Property and Facility Services a.s., Prag | 100.00 | 3,094 | 42 |
| STRABAG Ray Ltd. Sti., Ankara | 99.00 | 3053) | 2713) |
| STRABAG Real Estate GmbH, Köln | 84.50 | 27,014 | 5,898 |
| Strabag RS d.o.o., Banja Luka | 100.00 | -2193) | -453) |
| STRABAG Sh.p.k., Tirana | 100.00 | 213) | -203) |
| STRABAG-HIDROINZENJERING d.o.o., Split | 100.00 | 2,820 | -230 |
| "STRABAG" d.o.o. Podgorica, Podgorica | 100.00 | 1,4913) | 5153) |
| TOO STRABAG Kasachstan, Almaty | 100.00 | -3813) | -2493) |
| Treuhandbeteiligung MO | 100.00 | 4) | 4) |
| Zweite Nordsee-Offshore-Holding GmbH, Pressbaum | 51.00 | 77,336 | -289 |
| Investments in participation companies: | |||
| A-Lanes A15 Holding B.V., Nieuwegein | 24.00 | 4) | 4) |
| ASAMER Baustoff Holding Wien GmbH, Wien | 20.00 | 4) | 4) |
| ASAMER Baustoff Holding Wien GmbH & Co. KG, Wien | 20.00 | 4) | 4) |
| DYWIDAG Verwaltungsgesellschaft mbH, München | 50.00 | 4) | 4) |
| Klinik für Psychosomatik und psychiatrische Rehabilitation GmbH, Spittal an der Drau | 30.00 | 4) | 4) |
| Moser & C. SRL, Bruneck | 50.00 | 4) | 4) |
| OOO "STRATON", Sotschi | 50.00 | 4) | 4) |
| SRK Kliniken Beteiligungs GmbH, Wien | 25.00 | 4) | 4) |
| Straktor Bau Aktien Gesellschaft, Kifisia | 50.00 | 4) | 4) |
| Syrena Immobilien Holding Aktiengesellschaft, Spittal an der Drau | 50.00 | 4) | 4) |
4) no statement according to § 241 Para 2 UGB
1) according to § 224 Para 3 UGB
2) net income / loss of the year
3) Financial statements as of 31.12.2012
5) Financial statements as of 30.09.2012
Dr. Hans Peter H a s e l s t e i n e r (until 14 June 2013) Dr. Thomas B i r t e l (CEO) Mag. Christian H a r d e r (since 1 January 2013) Dipl.-Ing. Dr. Peter K r a m m e r Mag. Hannes T r u n t s c h n i g Dipl.-Ing. Siegfried W a n k e r
Dr. Alfred G u s e n b a u e r (Chairman) Mag. Erwin H a m e s e d e r (Vice Chairman) Andrey E l i n s o n Mag. Kerstin G e l b m a n n Dr. Gottfried W a n i t s c h e k (until 14 June 2013) Ing. Siegfried W o l f Mag. Hannes B o g n e r (since 14 June 2013)
Dipl.-Ing. Andreas B a t k e (works council) Miroslav C e r v e n y (works council) Magdolna P. G y u l a i n e (works council) Wolfgang K r e i s (works council) Gerhard S p r i n g e r (works council)
Important events
STRABAG postpones its planned investments in the field of gravity-based foundations technology for offshore wind until further notice. The company had planned to spend several hundred million euros over the next few years on the construction of a factory and on special ships to transport self-developed concrete gravity foundations for offshore wind plants. STRABAG's 51 % stake in 14 project companies to develop offshore wind farms remains unaffected by the decision.
The cooperation of STRABAG with the global mining company Rio Tinto is divided into two phases: From 2012 until 2014, STRABAG will carry out field trials at selected construction sites using new excavation systems and technologies and will optimise the systems. After the successful completion of the field trials STRABAG could exclusively carry out Rio Tinto projects using the new systems for a period of five years.
The German STRABAG subsidiary Ed. Züblin AG, Stuttgart, is selectively expanding its range of services in the field of structural timber engineering in Germany: Following the successful integration into the corporate group of Stephan Holzbau GmbH, Gaildorf, and of the operations of Merk-Project GmbH, Züblin also agreed the acquisition of Metsä Wood Merk GmbH, Aichach, now Merk Timber GmbH. Metsä Wood Merk GmbH, a subsidiary of Finland's Metsä Group, is a specialist in the manufacture of large-format cross-laminated timber panels. In 2012, the company had about 100 employees and generated revenues of € 21 million.
Church in Cologne, © Architekten Sauerbruch Hutton
STRABAG AG, Cologne, has acquired the transportation infrastructures activities of Netherlandsbased Janssen de Jong Groep B.V. via its Dutch subsidiary STRABAG B.V. The acquisition will be merged into the STRABAG corporate group. The transaction includes the takeover of the approximately 120 employees as well as all equipment and production facilities of the corporate entities Janssen de Jong Infra' De Asfaltfabriek, Ippel and Infra Quality Support.
After more than seven years of construction, the STRABAG-executed Niagara Tunnel Project was put into operation on 22 March 2013. In the presence of representatives from client Ontario Power Generation, local construction consultants Hatch Mott MacDonald/Hatch Acres and Austrian construction group STRABAG, the tunnel's outlet gate was opened to allow the flow of water through the 10.1 km water supply tunnel near the famous waterfalls on the Niagara River. Following an unhindered 24-hour flow, the € 900 million project of the century was regarded as complete.
Construction of Niagara Tunnel Project
APRIL
EFKON AG – an Austrian subsidiary of STRABAG SE headquartered in Graz/Raaba – reports two new large orders in Germany and Malaysia with a value in the double-digit million euro range. The company received a follow-up order for the delivery of On-Board Modules for the satellite-based truck tolling system in Germany and a large order in Malaysia comprising the delivery of 250,000 electronic toll collection units (OBUs).
Rendering of government building in Potsdam
After four years of tendering, the Brandenburg State Office for Property and Construction has awarded the contract for the planning, construction and operation of a government building in Potsdam to STRABAG Real Estate GmbH. The project with a volume of € 82 million will be executed as a publicprivate partnership over a period of 30 years, not including the nearly two-year period of construction.
Thuringia's Ministry of Economic Affairs has announced that it is planning the construction of a pumped-storage plant in Thuringia together with the STRABAG Group and future investors. After in-depth examination of two sites, current plans envision a pumped-storage plant with a capacity of 640 MW at the Ellrich site and another one with a capacity of 380 MW at Leutenberg/Probstzella – the latter would be enough to annually supply more than 220,000 households with electricity.
STRABAG SE issued a € 200 million corporate bond. The fixed-interest bond with a face value of € 1,000 has a term to maturity of seven years and a coupon of 3.00 % p.a. The issue price has been set at 101.407 %.
A consortium led by STRABAG subsidiary Heilit+Woerner Sp. z o.o. has been awarded the contract from Poland's General Directorate for National Roads and Highways (GDDKiA) to complete the 35 km long section of the A4 motorway between Krzyż and Dębica Pustynia. The contract value amounts to € 236 million, 50 % of which is Heilit+Woerner's share.
With the end of the Annual General Meeting on 14 June 2013, Dr. Hans Peter Haselsteiner resigned from the management board. In the future, he will support the management board as an authorised representative in matters concerning the group's internationalisation and strategic orientation. Dr. Thomas Birtel succeeded him as new CEO of STRABAG SE.
Rendering of new Jena University Hospital, © Woerner & Partner
Jena University Hospital and Ed. Züblin AG as general contractor signed the contract for the construction of the second section of Thuringia's university clinic. By the year 2018, the new buildings to be erected will offer around 49,000 m² of usable space for 15 clinics and institutes, with 710 beds and twelve operating rooms, as well as research and teaching facilities. The total project volume amounts to € 316 million.
JULY
The STRABAG Group has undergone enormous growth in Switzerland over the past few years with the acquisitions of Brunner Erben AG, Astrada AG, Egolf AG, Meyerhans AG and Baunova AG. In order to achieve a homogeneous presence on the Swiss market, these group companies were merged into STRABAG AG, Switzerland, effective retroactively to 1 January 2013. Eggstein AG, which had already been merged into STRABAG AG, Switzerland, in 2010 and which had been renamed Eggstein Swissboring, is now doing business under the STRABAG brand. Under the merger, STRABAG AG, Switzerland, assumed the assets and liabilities of the acquired companies. STRABAG SE continues to hold 100 % of the shares of its subsidiary STRABAG AG, Switzerland.
Four new contracts have increased the order backlog of the STRABAG Group until July 2013 by more than € 230 million. Those projects include the construction of a flood protection dam for € 92 million in Oman, two road construction projects in Oman with a total contract value of € 28 million, production of concrete sleepers for railway construction worth € 88 million in Thailand, as well as planning and construction of an LNG tank in Brunei, worth € 23 million.
Ed. Züblin AG, Stuttgart constructs the building "New Office Airport Stuttgart" on behalf of client Flughafen Stuttgart GmbH. The contract value of the office ensemble, which is being built under a partnership arrangement with a guaranteed maximum price and upon completion will be leased almost entirely to management consulting firm Ernst & Young as its German headquarters, stands at about € 95 million.
Rendering of office ensemble, © Flughafen Stuttgart
Through its German subsidiary, Ed. Züblin AG of Stuttgart, STRABAG has been awarded a large contract by the Deutsche Bahn AG, with an order volume of € 250 million, 60 % of which is Ed. Züblin AG's share. The construction of the 5.9 km tunnel from the Swabian Jura to the tracks of Ulm Central Station will last four-and-a-half years.
Ed. Züblin AG will act as main contractor and build the centrally located cultural quarter for around € 70 million on a vacant plot of land of a former power station until the summer of 2016. The contract involves the renovation of the former machine hall, the construction of a new seven-storey building, the renovation of an existing four-storey building and the demolition and construction of a new two-storey workshop.
Rendering of cultural quarter in Dresden, © moka-studio
Swedish STRABAG Projektutveckling will develop the multi-functional building "Orgelpipan 6" at Stockholm's Citybanan Commuter Station, Sweden's largest and busiest railway terminal. The investment volume is in the triple-digit million euro range. Completion of the project – which will include apartments, a hotel, shopping and servicing facilities – is planned for December 2015.
A consortium led by STRABAG AG won the contract to build the Svilaj-Odžak section of the international motorway corridor 5c in Bosnia. Works on the 10.4 km long section – which already started in October 2013 – include the construction of the roadway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits. Completion is scheduled for December 2014. The contract value amounts to a total of € 84 million, 50 % of which is STRABAG's share.
Acting as general contractor, Ed. Züblin AG was awarded the contract to expand Allianz Campus Unterföhring near Munich. In a consortium together with Munich-based Dobler Metallbau GmbH, it will construct the new building with a gross floor area of 58,000 m². The contract has a value of approx. € 100 million; Züblin's share amounts to 90 %. A DGNB gold certification for the new building is aimed at. A precertification has already been awarded. Completion is planned for autumn of 2015.
Rendering of Allianz Campus, © Auer + Weber + Assoziierte
Züblin A/S, a Danish subsidiary of the STRABAG SE Group, was awarded the contract to build the "Bryghus", a six-storey multi-use building on the site of a former brewery at the Copenhagen waterfront. The value of the contract amounts to about € 140 million. Construction time is scheduled from autumn 2013 to autumn 2017.
Züblin Spezialtiefbau Österreich engaged in the "BioSealing" joint industry project, a European joint project to further investigate the principle of operation of bacteria for the sealing of underground leaks in the ground and in buildings. In total nine companies will invest € 400,000 in the coming years.
Since 1 October 2013, bonds of STRABAG SE are listed in the Corporates Prime segment of the Vienna Stock Exchange's bond trading platform. This new segment comprises bonds from issuers in non-financial sectors with the aim of increasing the transparency of and providing more effective publicity for Austrian bonds and their issuers. The participating companies agree to provide potential bonds buyers with standardised information about their bonds.
STRABAG will build the third section of the Hungarian motorway M4 between Abony and Fegyvernek for about € 106 million. The section has a length of 13.2 km and is part of the 233 km long motorway which links Budapest to the Ukrainian border.
A consortium led by STRABAG signed the contract to build the approx. 10 km long section of the R2 expressway between Pstruša and Kriváň in Slovakia. The contract value amounts to € 178 million, of which STRABAG a.s. holds a 40 % share. A few weeks later, as part of a consortium STRABAG was awarded the contract to build an 11 km long section of the D1 motorway in northern Slovakia between Hricovské Podhradie and Lietavská Lúcka. The order has a total value of € 427 million, of which STRABAG s.r.o. will receive about € 140 million. The construction works comprise eleven bridges, two tunnels as well as all access roads.
Sinaw–Duqm connecting road
STRABAG Oman, LLC was awarded the contract to build a 100 km section of the 400 km long road between the city of Sinaw and the industrial zone in Duqm in southern Oman. The project value amounts to € 88 million.
As part of a consortium, STRABAG AG has been awarded the contract to modernise the 42.2 km long railway section between Vintu de Jos and Simeria in western Romania near the city of Sibiu. The contract value amounts to € 317 million, of which STRABAG will carry out works with a volume of at least € 66 million in the area of track construction, civil engineering, earth works and road construction.
STRABAG SE is building a designer outlet centre near Vancouver International Airport (YVR), Canada, for Vancouver Airport Authority and McArthur-Glen, Europe's leading owner, developer and manager of designer outlets. McArthurGlen Designer Outlet Vancouver Airport foresees the construction of more than 65,000 m² (35,000 m² gross leas-able area) in a prime location on YVR land for more than CAD 100 million (around € 70 million).
Following our clients
Despite the strong presence in its home markets of Austria and Germany, STRABAG sees itself as a European-based company. The group has been active in Central and Eastern Europe for several decades. On the one hand, it is a tradition for the company to follow its clients into new markets. On the other hand, the existing country network with local management and established organisational structures makes it possible to export the technology and equipment and to use them in new regions at low cost and effort. In order to diversify the country risk even further, and to profit from the market opportunities in other parts of the world, STRABAG intends to intensify especially its international business, i.e. its activities in countries outside of Europe. The
company expects its international business to grow to at least 10 % of the output volume by 2016.
In the 2013 financial year, STRABAG SE generated an output volume of € 13.6 billion. The relatively low decline by 3 % over the previous year can be explained by weather-related effects at the start of the year. The group's core markets revealed quite different developments: as STRABAG is a broadly positioned group, the expected market-related decline in Poland following the end of the construction boom there and project-related reductions in Canada, Benelux and Romania were nearly balanced out by increases in e.g. Hungary, Austria and Africa.
| € mln. | 2013 | % of total output volume 2013 |
2012 | % of total output volume 2012 |
∆ % |
∆ absolute |
|---|---|---|---|---|---|---|
| Germany | 5,789 | 43 | 5,779 | 41 | 0 | 10 |
| Austria | 1,982 | 15 | 1,888 | 13 | 5 | 94 |
| Poland | 787 | 6 | 1,139 | 8 | -31 | -352 |
| Czech Republic | 645 | 5 | 646 | 5 | 0 | -1 |
| Russia and neighbouring countries | 561 | 4 | 527 | 4 | 6 | 34 |
| Scandinavia | 510 | 4 | 579 | 4 | -12 | -69 |
| Hungary | 496 | 4 | 393 | 3 | 26 | 103 |
| Benelux | 400 | 3 | 456 | 3 | -12 | -56 |
| Switzerland | 386 | 3 | 425 | 3 | -9 | -39 |
| Slovakia | 340 | 3 | 400 | 3 | -15 | -60 |
| Middle East | 323 | 2 | 305 | 2 | 6 | 18 |
| Romania | 322 | 2 | 372 | 3 | -13 | -50 |
| The Americas | 263 | 2 | 348 | 2 | -24 | -85 |
| Italy | 168 | 1 | 157 | 1 | 7 | 11 |
| Africa | 165 | 1 | 125 | 1 | 32 | 40 |
| Croatia | 134 | 1 | 130 | 1 | 3 | 4 |
| Asia | 103 | 1 | 111 | 1 | -7 | -8 |
| Rest of Europe | 81 | 0 | 83 | 1 | -2 | -2 |
| Slovenia | 67 | 0 | 81 | 1 | -17 | -14 |
| Serbia | 31 | 0 | 72 | 0 | -57 | -41 |
| Bulgaria | 20 | 0 | 27 | 0 | -26 | -7 |
| Total | 13,573 | 100 | 14,043 | 100 | -3 | -470 |
Despite the economic recovery in the US and in the emerging markets, the upswing of the European economy was delayed. After a decline in the previous year, the gross domestic product (GDP) of the 19 Euroconstruct countries stagnated in 2013. As a result, the outlook for private consumption, the labour market and income development remain subdued. Nevertheless, the experts at Euroconstruct expect the economy to grow again at the low rate of 1.4 % already in 2014.
With a decline of 3.0 %, the development of the European construction sector in 2013 again was significantly worse than the economy as a whole. The strongest losses were registered in the countries of Northern and Southern Europe. The reasons for the continuous pressure on the European construction sector include the sovereign debt crisis in several countries as well as the austerity pressure on public budgets and insecurities regarding the future economic development. The situation of the construction industry should improve slightly in 2014, however, as Euroconstruct currently forecasts growth of 0.9 %.
The sovereign debt crisis put a damper especially on the prospects for civil engineering, while the weak macroeconomic environment, the high unemployment and the lack of consumer confidence clouded the outlook for residential construction and the other building construction. While an upswing for residential construction and civil engineering is already expected in 2014, building construction is unlikely to receive new impetus until 2015 with the stabilisation of the macroeconomic environment in Europe.
1) All growth forecasts as well as the particular national construction volumes are taken from the Euroconstruct and EECFA winter 2013 reports. The indicated market share data are based on the data from the year 2012.
Development of construction sector Europe
Residential construction remained greatly affected by the weak European economy in 2013. The banks also were more restrictive in the granting of mortgage loans. Against this backdrop, the sector lost another 2.2 % in the reporting period, although it fell less strongly than building construction and civil engineering. A country-by-country comparison shows that the development remained diversified: while the countries of Central and Northern Europe – above all German-speaking Europe – reported largely positive development, Spain and Portugal continued to register percentage losses in double-digit territory. With a minus of 9.4 %, residential construction in Eastern Europe shrank significantly more strongly overall than in Western Europe (-1.9 %). Starting in 2014, the experts at Euroconstruct forecast low growth of 1.4 % for the 19 member states.
Building construction – and above all commercial and office construction – was also greatly affected by the weak economic performance in Europe in the period under review. In total, the construction volume in this field shrank by 3.4 % in 2013. The development was especially negative in Southern Europe and only a few countries elsewhere were able to report growth. Against the backdrop of a stabilisation of the macroeconomic environment, however, new impetus is expected for this segment in the years to come. A return to growth will likely follow a temporary period of stagnation in 2015, with a trend toward stronger growth in Central and Eastern Europe, compared to Western Europe.
The restrained economic development and the restrictive fiscal policy of the European states are most strongly reflected in the civil engineering sector. Drastic spending cuts led to shifts, reductions or even withdrawals of projects in the field of transportation infrastructures. This resulted in a continuous decline of the construction output in civil engineering, which reached its highest point in 2012 with a minus of 8.2 % and continued into 2013 with a decline of 4.0 %. Particularly affected were the countries of Central and Eastern Europe, where the decline reached 11.9 % in the period under review. In view of Europe's economic recovery, however, a turnaround is already expected in 2014: the experts at Euroconstruct expect to see growth again this year with a plus of 1.2 %. Here, too, the growth in Central and Eastern Europe will likely be higher than in Western Europe because of the region's great need to catch up and due to the allocation of EU funds.
Although the weak economies in the European sales markets kept Germany's 2013 GDP growth at 0.4 % and thus below the previous year's value, the general underlying conditions for the German economy developed favourably over the course of the year. Particularly the low interest rates and the advantageous credit conditions delivered expansive impulses. The increase in private consumption due to rising real incomes should also lead to renewed growth of the GDP in 2014 – Euroconstruct expects a plus of 1.8 %.
After a difficult 2012, the construction output in Germany fell even further in the first quarter of 2013 due in particular to weather-related production shutdowns. Over the course of the year, however, the sector slowly recovered to end 2013 with a slight plus of 0.3 %. Residential construction in particular profited from the real income growth and the favourable financing conditions gaining 1.0 %. Home ownership should remain attractive as an investment alternative so that growth of 2.6 % is already expected for the year to come.
After a drop in 2013, the field of building construction is expected to gain momentum due to the improved sales and profit expectations among the companies. Substantial impetus can be expected from the areas of industrial and warehouse buildings as well as from shopping centres. In this segment, too, renewed growth of 2.4 % is already forecast for 2014.
Following a decline of 4.5 % in 2012, the field of civil engineering recovered in the period under review. On the one hand, it was possible to make up for weather-related losses; on the other hand, additional volume was generated from the clean-up works related to flood damage. This development should continue thanks to the € 5 billion immediate action programme for transportation infrastructures that was agreed in the new coalition agreement – as a result, the civil engineering output is expected to grow by 3.4 % in 2014.
With a market share of 2.1 %, STRABAG is the market leader in Germany. The share of the German road construction market amounts to 9.4 %. With € 5,788.81 million, about 43 % of the group's output volume was generated in the home market of Germany. Most of the output volume comes from the segment North + West. Property and facility services provided in Germany are assigned to the segment International + Special Divisions.
The planned investments in the field of offshore wind were postponed indefinitely by STRABAG due to the adverse political and organisational environment.
Overall construction volume: € 32.59 billion GDP growth: 2013e: 0.4 % / 2014e: 1.7 % Construction growth: 2013e: 0.5 % / 2014e: 1.2 %
Against the backdrop of the global economic recovery, the Austrian economy can expect to see slight yet stable improvement. The structural problems in the euro area, however, led to a weakening of the global growth impulses. On balance, therefore, the Austrian GDP grew by
only 0.4 % in 2013. While exports and investment activities were on the up, consumption growth remained below expectations. However, the GDP is expected to gain another 1.7 % in 2014.
The construction sector has always been considered a stabilising element in the Austrian economy, and moderate growth is expected here for the coming years as well. One uncertainty, however, is the future course of the new government. The construction sector grew by 0.5 % overall in 2013 and growth of 1.2 % is expected for 2014.
The Austrian residential construction market underwent relatively strong growth in 2013 with a plus of 2.0 %, in particular in the greater Vienna area. The positive demographic development, the low interest rates and the increase of real estate prices encouraged this development. However, a downward trend in the granting of building permissions will likely result in a weaker expansion in new building construction in the years to come.
Against the backdrop of the low economic growth, building construction shrank by 1.1 % in the reporting period. Especially affected were
office and industrial buildings. Thanks to positive impulses from the export-oriented industry, however, the experts at Euroconstruct expect to see a general recovery and slight growth of 0.5 % in 2014.
In response to the so-called stability pact – the Austrian government's consolidation project – and the resulting postponement of infrastructure projects, the situation in the civil engineering segment worsened once more with the volume shrinking by 0.6 % in 2013. Investments in rail infrastructure were especially affected by this development. The continued development in the years 2014 and 2015 will greatly depend on large infrastructure projects. In these years, the civil engineering market should again grow by 1.2 % and 1.3 %, respectively.
In 2013, STRABAG generated a total of 15 % of the group output volume, or € 1,981.50 million, in its home market of Austria. Along with Germany and Poland, Austria thus remains one of the group's top three markets. STRABAG generates 5.8 % of total output volume in Austria. In the field of road construction, the market share amounts to 15.9 %.
| Overall construction volume: | € 45.98 billion |
|---|---|
| GDP growth: | 2013e: 1.2 % / 2014e: 2.3 % |
| Construction growth: | 2013e: -8.9 % / 2014e: 3.5 % |
After years of high growth, GDP gains in Poland slowed to 1.2 % in 2013. The reasons for this were, on the one hand, the difficult economic situation of the most important Polish trade partners – above all in the euro area – and, on the other hand, the decline of private consumption in the wake of the high level of unemployment. At the same time, public-sector investments financed out of the EU Structural Funds fell back. With the recent inflow of EU funds in the years 2014–2020, however, the GDP should see renewed stronger growth in the years to come.
With a decline of 8.9 %, the Polish construction industry reacted strongly to the end of the construction boom and the macroeconomic slowdown. However, a return to growth of 3.5 % is being forecast for 2014 – although the overcapacities in the market are unlikely to be completely reduced by that time.
Due to higher interest rates, more restrictive lending and lower household incomes, the residential construction market shrank by 7.7 % in 2013. It is expected, however, that this area will grow slightly especially in the second half of 2014. This expectation is based above all on changes in the construction laws that are supposed to result in stronger funding for new housing and in lower interest rates for housing loans. All in all, growth of 2.9 % should thus again be possible in 2014.
After two strong years of growth, the expectations in building construction had to be adjusted downward. Both the EU funds as well as private funds were exhausted. Especially affected by this negative development were public buildings and the office segment. These areas are expected to stagnate further through 2014 or to achieve just minor growth of 1.3 %, respectively. Building construction should grow significantly once more starting in 2015.
The drastic budget cuts by the Polish government led to a decline in the civil engineering volume by 16.5 % in 2013. Infrastructure spending
Overall construction volume: € 17.45 billion GDP growth: 2013e: -1.5 % / 2014e: 0.8 % Construction growth: 2013e: -8.2 % / 2014e: -4.2 %
was especially hard hit. A recovery is forecast
In Poland, STRABAG is the number two in the construction sector with a market share of 2.5 % and market leader in transportation infrastructures with 8.5 %. The country contributed € 787.30 million, or 6 %, to the group's total output volume in 2013, making it STRABAG's third-
already for 2014.
largest market.
The Czech economy continued its downward trend due to the weak domestic demand in the period under review and shrank by 1.5 %. An additional strain came in the form of the government's austerity measures. The budget deficit could be held in check, but this was done at the expense of economic growth. In view of the GDP growth of 0.8 % that has been forecast for 2014, fiscal policies should become less restrictive, however.
With a decline of 8.2 %, the Czech construction output shrank significantly more strongly than the economy as a whole. The sector has thus steadily lost in volume since 2008 – and is likely to continue to do so: a slight recovery of the construction market is not expected until 2016. The unstable political situation is also having a negative impact on the sector and makes it more difficult to give meaningful forecasts.
In 2013, residential construction was hardest hit by the ongoing recession with a decline of 15.3 %. The high prices weighed on the already weak demand, and the increase of the value added tax had a negative effect on household demand. Starting with next year, however, the declines should already be less strong.
The building construction market remained affected by high insecurities among investors in 2013; in fact, private investments practically came to a standstill. At the same time, statefinanced projects were strongly affected by the government's strict austerity measures. EU subsidies and grants remain the main source for financing in this area, although these funds are currently available only to a limited degree. All in all, building construction fell by 4.5 % in the period under report. Euroconstruct does not expect slight growth again until the year 2015.
The civil engineering business suffered the most from the decline in public investments. This segment has grown negatively since the implementation of austerity measures in 2010 and lost another 9.2 % in the reporting period. Here, too, the political insecurities are a hindrance to private investments.
STRABAG is the number two on the market in the Czech Republic. With an output volume of € 644.66 million, some 5 % of the group's total output volume was accounted for by the Czech market in 2013. The share of the overall construction market amounts to 3.7 %; in road construction the group even holds 16.5 %.
The Russian economy grew by 2.4 % in 2013, somewhat more weakly than in the year before. In view of the economic recovery, however, the economic growth should again climb to 3.7 % in 2014. The construction sector in 2013 was marked, among other things, by the preparations for the Olympic Games in Sochi. In general, it rose by 4.4 % and growth of 4.6 % is forecast for the year to come.
After a crisis-related decline in the years 2008–2010, the residential construction market, which is responsible for around 35 % of the entire construction volume, has grown continuously since 2011 and reached a plus of 4.5 % in the reporting period. Further growth is expected in the years to come.
Other building construction has also registered positive growth since 2011 – the high point was reached in 2011 with a plus of 15.4 %. The sub-segments of commercial and retail, which account for more than 40 %, represent the largest and fastest-growing share: by 2015, annual growth of 5.0–6.6 % is expected here. In the years to come, the experts at Euroconstruct expect growth of 4.0–4.8 % for offices and 3.0–3.3 % for industrial buildings.
In the area of civil engineering, several large projects are currently in preparation. Russia plans to build more than 14,000 km of roads by 2020
| Overall construction volume: | € 161.50 billion |
|---|---|
| GDP growth: | 2013e: 2.4 % / 2014e: 3.7 % |
| Construction growth: | 2013e: 4.4 % / 2014e: 4.6 % |
| Ukraine |
| Overall construction volume: | € 9.43 billion |
|---|---|
| GDP growth: | 2013e: 1.0 % / 2014e: 3.0 % |
| Construction growth: | 2013e: -7.1 % / 2014e: 5.8 % |
and construction is to begin on a high-speed railway network nearly 1,600 km in length between 2013 and 2015. The construction volume in the railway segment is likely to grow by 4.0–8.0 % as a result.
After a decline of the economic performance in the previous year, the economy in Ukraine stagnated in the reporting period with a plus of just 0.2 %. In view of the current political uncertainties in Ukraine, reliable forecasts are neither possible for the general economic climate nor for the development of the construction sector. STRABAG is not active nationwide in Ukraine, merely operating in limited-time engagements on a project-by-project basis. The output volume generated by the company in Ukraine in 2013 amounted to less than 1 % of the annual group output volume.
STRABAG generated an output volume of € 561.30 million in Russia and its neighbouring countries (RANC) in 2013. The share of the total group output volume in the reporting period reached 4.0 %. In the region, STRABAG is almost exclusively active in building construction and civil engineering. The year 2013 was marked by the works related to the Olympic Village in Sochi, which is why the company expects a lower output volume in the RANC region for subsequent years.
| Overall construction volume: | € 28.93 billion | |
|---|---|---|
| GDP growth: | 2013e: -0.3 % / 2014e: 1.1 % | |
| Construction growth: | 2013e: -2.7 % / 2014e: 0.5 % |
The Scandinavian economies exhibited heterogeneous development during the period under review. While Sweden and Norway developed positively with GDP growth above the one-percent mark, the GDP in Denmark remained nearly unchanged. With a minus of 0.3 %, Finland failed to make it out of recession in 2013. All in all, more significant growth rates are first expected in these countries in 2014.
In terms of construction output, the four economies are also quite distinct. Denmark was able to recover in 2013 with growth of 2.4 %, while Sweden – not least due to a lower volume in
| Overall construction volume: | € 31.28 billion |
|---|---|
| GDP growth: | 2013e: 1.1 % / 2014e: 2.6 % |
| Construction growth: | 2013e: -0.4 % / 2014e: 1.6 % |
| Overall construction volume: | € 26.18 billion |
|---|---|
| GDP growth: | 2013e: 0.3 % / 2014e: 1.7 % |
| Construction growth: | 2013e: 2.4 % / 2014e: 3.3 % |
| Overall construction volume: | € 47.14 billion |
|---|---|
| GDP growth: | 2013e: 1.7 % / 2014e: 2.7 % |
| Construction growth: | 2013e: 3.7 % / 2014e: 3.6 % |
residential construction – registered another decline with -0.4 %. A difference in trends could also be seen in Finland (-2.7 %) and Norway (3.7 %), though STRABAG's low level of activity on these markets make them of only minor importance for the group.
The output volume of STRABAG in Scandinavia amounted to € 510.07 million in 2013. The main activities included infrastructure and residential construction in Sweden. For some time now, STRABAG has put a stronger focus on proprietary project developments.
Overall construction volume: € 7.4 billion GDP growth: 2013e: 0.3 % / 2014e: 1.3 % Construction growth: 2013e: 1.3 % / 2014e: 7.4 %
With low economic growth of 0.3 %, Hungary managed to get out of recession in the year under review. This slight recovery, however, remains fraught with insecurities as the economic upswing primarily depends on EU funds and state investments.
After seven years of negative growth, Hungary's construction output returned to growth in 2013 with a plus of 1.3 %. This development was driven above all by building construction and civil engineering, while the residential construction market shrank by another 11.0 % in 2013. On the basis of higher EU funds, Euroconstruct expects renewed significant growth of 7.4 % for Hungary's overall construction output in 2014.
As mentioned, building construction managed to reverse the trend in 2013 and grew by 5.0 % – and it should be possible to maintain a similar level in the coming year as well. This growth was driven primarily by EU funds, while private investment activity continued to stagnate. The financing of public buildings will remain dependent on these funds and the government's budget policy.
Civil engineering also grew by 5.0 % during the period under report. This can be explained among other things by the so-called Wekerle Plan that was passed in August 2012, which aims at re-launching postponed projects and at a more efficient use of EU funds. On this basis,
it was possible to double the number of large infrastructure projects in comparison to the previous year; some 20 large-volume transportation projects should be completed by May 2014. Further growth in civil engineering is also expected in the years to come.
STRABAG noticed the improvement in the
The economies in the Benelux countries tended toward negative growth in 2013. While the Netherlands slid into recession with a GDP minus of 1.3 %, the Belgian economy stagnated with a minimal plus of 0.1 %. However, the experts at Euroconstruct expect an economic recovery already in 2014.
With a decline of the construction output by 5.0 %, the Dutch construction sector developed significantly worse than the economy as a whole. The negative development – all three sub-segments of the construction sector were equally affected – was a result of the weak
Hungarian construction sector in 2013 as well, as it was awarded the contract for two larger infrastructure projects. With an output volume of € 495.94 million, STRABAG is the leading provider on the Hungarian construction market. The company's share of the market as a whole reached 5.3 %; in road construction, STRABAG generates 11.1 % of the overall output volume.
Belgium
| Overall construction volume: | € 38.87 billion |
|---|---|
| GDP growth: | 2013e: 0.1 % / 2014e: 1.1 % |
| Construction growth: | 2013e: -1.3 % / 2014e: 1.2 % |
| Overall construction volume: | € 62.51 billion |
|---|---|
| GDP growth: | 2013e: -1.3 % / 2014e: 0.5 % |
| Construction growth: | 2013e: -5.0 % / 2014e: 0.4 % |
private consumption, a drop in real estate prices and restrictive state budget measures. Construction output in Belgium fell less strongly, though it still lost 1.3 %, as a positive development in building construction was only partially able to make up for declines in residential construction and civil engineering. For the years to come, Euroconstruct expects renewed growth of the construction output in both markets, with a trend toward stronger growth in the Netherlands.
STRABAG achieved an output volume of € 399.66 million in the Benelux countries in 2013.
| Overall construction volume: | € 52.38 billion |
|---|---|
| GDP growth: | 2013e: 1.9 % / 2014e: 2.1 % |
| Construction growth: | 2013e: 2.8 % / 2014e: 3.6 % |
Driven by strong domestic consumption, the economic development in Switzerland was positive in every respect. Thanks to the renewed rise of industrial production and encouraged by a friendlier European environment, the GDP grew by 1.9 % in 2013. In the years to come, the growth rates should pick up more significantly once again. Switzerland's economic development continued to profit in 2013 from the strong growth of the construction industry, which
gained 2.8 % in the year under review. The strongest factor driving growth was, as in the past, the residential construction market. The order books in the construction industry remain full for the future thanks to the positive demand, high immigration, low unemployment and favourable financing situation. Growth in residential construction is expected to reach 5.0 % in 2014.
In building construction, growth was registered in particular with hospitals and with educational and research facilities. After a plus of 1.0 % in this sector, however, the growth is expected to remain moderate for the years to come. While renovation works dominated during the times of the financial crisis, new building construction has again started to grow. In the coming years, these two segments should more or less balance one another out.
In civil engineering, the output volume grew by 6.3 % in 2013. The main factor driving this growth was the Gotthard Tunnel, the 50 km north-south link through the Alps. Following completion of this project, however, lower growth rates are expected for the coming years. Moreover, the further development will depend greatly on upcoming political decisions – such as an increase of the motorway toll or the further financing of the railway network.
Switzerland contributed € 386.22 million, or 3 %, to the group's total output volume in 2013. STRABAG's market share amounts to around 0.8 % overall and 3.0 % in the sub-segment of civil engineering.
| volume | Overall construction volume: | € 4.60 billion | |
|---|---|---|---|
| GDP growth: | 2013e: 0.8 % / 2014e: 2.2 % | ||
| Construction growth: | 2013e: -7.8 % / 2014e: -0.8 % |
Slovakia's economy once again lost momentum in 2013 with GDP growth of just 0.8 %. The growth of the Slovak economy remains highly dependent on foreign demand; nevertheless, domestic consumption also made a contribution in 2013. In the years to come, the Slovak economy should see a return to stronger growth.
The negative trend in the Slovak construction industry continued in 2013 despite the generally positive economic environment. Substantial factors contributing to this development were the continuous low domestic demand as well as financing difficulties – including difficulties related to the supply of EU funds. All in all, the construction output shrank by 7.8 % against this backdrop in 2013. The residential construction market in particular was held back by the weak and uncertain income situation and by the continued high unemployment. In comparison, the field of building construction, which represents more than half of the entire construction output, suffered from the ongoing weak demand from private investors and fell back by 12.0 % in 2013. A continuation of the downward trend is expected for 2014, with a slight upswing starting in the year 2015.
After a strong decline in the previous year, 2013 brought the first signs of recovery in civil engineering. The segment lost only 2.0 % during the period under review – after 25.5 % in the previous year. Thanks to the implementation of longdelayed road construction projects, growth of 10.6 % is forecast for the year 2014. In the long term, the situation should improve again significantly as the need for modern infrastructure is continuously on the rise. The financing of such projects, however, is highly dependent on the supply of EU funds.
STRABAG was not so strongly affected by the collapse in the construction sector in the past financial year as the company generates a large portion of its output volume in Slovakia in civil engineering. In this segment, the company landed two large infrastructure projects at the end of 2013. With a market share of 8.7 % and an output volume of € 340.42 million in 2013, STRABAG is the market leader in Slovakia. In road construction, STRABAG's share even reaches 15.8 %. Slovakia contributed 3 % to the group's total output volume in 2013.
SloVakia
| Overall construction volume: | € 17.90 billion |
|---|---|
| GDP growth: | 2013e: 1.6 % / 2014e: 2.2 % |
| Construction growth: | 2013e: 2.9 % / 2014e: 5.8 % |
The Romanian economy expanded by 1.6 % in 2013, more strongly than in the previous year. This positive trend should continue to accelerate in the years to come until growth reaches about 3.0 % by 2016.
The increasing private and public demand should also deliver positive impetus for the construction sector. After a plus of 2.9 % in 2013, growth of 5.8 % is expected for 2014. In the reporting period, all segments of the construction industry exhibited positive growth rates. While residential construction grew by 3.0 %, building construction profited with growth of 3.9 % in part due to the fact that multinational corporations are increasingly discovering Romania as an attractive location in which to do business.
Since 2009, the civil engineering market has become steadily more important for the Romanian construction market, today accounting for nearly half of the overall construction volume. After growth of 2.3 %, both the upcoming elections as well as the increased use of EU subsidies and grants should provide for an increase in the civil engineering volume by 7.1 % in 2014.
With an output volume of € 321.83 million, corresponding to a market share of 2.1 %, STRABAG took second place on the Romanian construction market in the year 2013. In road construction, the share amounts to a comparable 2.5 %. The rather lively business for the company in Romania can be explained by several large projects in transportation infrastructures that were executed in the past few years.
Overall construction volume: € 172.15 billion GDP growth: 2013e: -1.9 % / 2014e: 0.7 % Construction growth: 2013e: -3.3 % / 2014e: -0.3 %
The recession of the Italian economy continued in 2013 with a decline of the economic performance by 1.9 %. First indications that the trend was reversing came up during the second half of the year, however, and economic researchers expect growth of 0.7 % in 2014 as a result.
The entire Italian construction sector was hard hit by the economic crisis. The construction volume fell by 3.3 % in the year under report and a minus of 0.3 % is forecast for 2014. Residential construction shrank by 2.4 % in 2013, experiencing a decline for the seventh year in a row. However, a return to growth – albeit a small one – with a plus of 0.4 % is expected here for
STRABAG's output volume in Italy amounted to € 168.32 million in 2013. The company is mainly active in tunnelling and road construction in the north of the country, which is why most of the output volume is included in the segment International + Special Divisions.
| Overall construction volume: | € 3.12 billion | |
|---|---|---|
| GDP growth: | 2013e: -0.7 % / 2014e: 0.5 % | |
| Construction growth: | 2013e: -4.3 % / 2014e: -2.1 % |
The Croatian economy – like the country's construction industry – continued to suffer from the ongoing weakness of the European economy. The 2013 GDP exhibited a decline of 0.7 %. Although the outlook for the coming years is again slightly positive – GDP growth of 0.5 % is expected for 2014 –, the difficult financing situation is unlikely to improve in the medium-term for private or public investors. Moreover, the rising unemployment and declining real incomes will continue to slow private consumption.
Despite the negative overall outlook for the Croatian construction industry, individual sectors developed significantly better than the industry as a whole in the past financial year. Against the backdrop of a massive investment programme in infrastructure, civil engineering in particular grew by 6.2 % in the reporting period. For the years 2014 and 2015, the growth is even expected to reach 9.0 % and 14.7 %, respectively. As of 2015, EU subsidies and grants in particular should make a substantial contribution to growth.
By comparison, the residential construction market fell by 13.4 % during the period under review and is even expected to lose 15.6 % in 2014. These losses are primarily due to the massive oversupply of new housing. A slight recovery of the market – beginning with a very low level – is not expected until 2015 at the earliest. Building construction remains weak too. After a loss of 9.2 % in the year 2013, a minus of 6.6 % is expected for 2014.
As market leader, STRABAG achieved an output volume of € 133.45 million in Croatia in the year 2013. Its market share stands at 4.2 % and 7.4 % in the sub-segment of transportation infrastructures.
| Overall construction volume: | € 1.46 billion |
|---|---|
| GDP growth: | 2013e: -2.4 % / 2014e: -0.2 % |
| Construction growth: | 2013e: -6.0 % / 2014e: 19.7 % |
| Serbia | |
| Overall construction volume: | € 2.04 billion |
| GDP growth: | 2013e: 2.0 % / 2014e: 3.0 % |
| Construction growth: | 2013e: -9.1 % / 2014e: 10.0 % |
| Bulgaria |
| ישבשאמי | |||
|---|---|---|---|
| Overall construction volume: | € 6.04 billion |
|---|---|
| GDP growth: | 2013e: 1.0 % / 2014e: 2.1 % |
| Construction growth: | 2013e: -0.2 % / 2014e: -5.6 % |
Slovenia's GDP shrank by 2.4 % as the country's economy continued to suffer from the consequences of the economic crisis in 2013. Growth is not expected until the year 2015. The ongoing economic difficulties are also affecting the Slovenian construction industry. After declines in double-digit percentage territory in the previous years, the minus of 6.0 % in 2013 is still no reason to speak of a recovery. In view of the low basis, however, growth of already 19.7 % is expected for the year to come.
Residential construction fell back by 16.8 % in 2013 and is expected to shrink by another 3.7 % in the current year. A slight plus is not expected here until 2015. The building construction volume for the period under review was also 14.9 % below the previous year's value but should recover already in 2014 with a plus of 8.5 %. Civil engineering gained 1.1 % in 2013. The realisation of several large projects could lead to considerable growth of 28.5 % in 2014, which could also form the basis for the expected growth of the overall construction output. This forecast, however, must be viewed sceptically as public financing could be influenced by state austerity measures.
STRABAG generated an output volume of € 67.40 million in Slovenia in 2013, placing it among the top three construction companies in the country. STRABAG holds a 5.6 % share of the market as a whole and 3.1 % in transportation infrastructures.
Serbia has had to contend with considerable structural and financial deficits since the beginning of the economic and financial crisis. The economic performance of the country has been fluctuating relatively strongly – including noticeable GDP declines in the years 2009 (-3.5 %) and 2012 (-1.7 %). In 2013, however, the Serbian economy exhibited signs of recovery with growth of 2.0 % as a result of state investments in the export economy and in infrastructure as well as reforms in the public administration. A further improvement is expected for the years to come.
While the Serbian construction sector had grown in 2011 and 2012 due, above all, to state incentives in residential construction and investments in civil engineering, a noticeable decline, at minus 9.1 % of the construction output was registered in 2013. According to Euroconstruct,
Bulgaria
After a strong GDP decline of 5.5 % in 2009, the Bulgarian economy has only slowly recovered with growth rates between 0.4 % and 1.8 %. In 2013, GDP growth also only barely reached the one percent mark. A significant contribution driving this slightly positive trend comes from exports to the EU, with additional positive impetus expected from the increasing exports to non-EU countries as well as from growing domestic demand. As a result, economic growth of 2.1 % should be possible in 2014.
The Bulgarian construction industry has not yet recovered from the enormous losses of the past few years. After a slight drop of 0.2 % in 2013, the sector is expected to shrink by 5.6 % in 2014. The residential construction market should recover slowly after a strong however, this trend should reverse already in 2014 not least due to the recovery of the economy and in response to state investments.
The residential construction market probably hit bottom in the year 2013, and the turnaround in the economy as a whole as well as the positive developments on the labour markets and in household incomes should bring this sector back on a growth path by 2015 at the latest. After a low in 2013, a reversal of the trend is also expected in building construction. In civil engineering, Euroconstruct expects to see doubledigit growth rates – after a pause in 2013 – due to the realisation of several large infrastructure projects in rail, road and pipeline construction.
STRABAG achieved an output volume of € 31.26 million on the Serbian market in 2013.
decline of 5.0 % in 2013, but the uncertain economic situation, high unemployment and weak income development continue to negatively impact home ownership demand.
The building construction segment stood out positively in 2013 with growth of 10.2 %, while the construction output in civil engineering decreased by 4.3 %. In this segment, the completion of a number of road projects will be a damper on future growth, so that Euroconstruct even expects a minus of 9.8 % in 2014. A shift in priorities in favour of public transport could cushion this decline in subsequent years.
STRABAG generated an output volume of € 19.77 million on the Bulgarian market in 2013.
In addition to its main markets in Europe, the STRABAG Group also operates in individual non-European regions in order to be less dependent on the economic underlying conditions of individual markets. Internationally, the group has been present in Asia, Canada, Chile, Africa and the Middle East for many years and decades. All in all, these regions generated € 853.70 million, or 6 % of the group's total output volume in 2013, a share that could rise to at least 10 % in the coming years.
In the non-European markets, STRABAG is
usually active as a general contractor through direct export. The focus in these regions is on civil engineering, industrial and infrastructure projects and tunnelling – areas in which high technological expertise is required. Milestones from the past include the research and development partnership with Rio Tinto in tunnelling, several road construction orders in Oman and the contract to build a designer outlet centre for McArthurGlen in Canada. STRABAG's activities in non-European countries are included – with a few minor exceptions – in the segment International + Special Divisions.
| Total | North + | South + | Inter national + Special |
Total | ∆ Group |
∆ Group |
||
|---|---|---|---|---|---|---|---|---|
| € mln. | 2013 | West | East | Divisions | Other | 2012 | % | absolute |
| Germany | 5,052 | 3,853 | 182 | 1,009 | 8 | 4,544 | 11 | 508 |
| Austria | 1,503 | 6 | 1,088 | 408 | 1 | 1,466 | 3 | 37 |
| Italy | 1,256 | 3 | 1 | 1,252 | 0 | 1,351 | -7 | -95 |
| The Americas | 640 | 57 | 1 | 582 | 0 | 416 | 54 | 224 |
| Poland | 605 | 531 | 53 | 20 | 1 | 700 | -14 | -95 |
| Scandinavia | 585 | 573 | 10 | 2 | 0 | 434 | 35 | 151 |
| Middle East | 585 | 12 | 28 | 545 | 0 | 596 | -2 | -11 |
| Hungary | 573 | 0 | 560 | 13 | 0 | 326 | 76 | 247 |
| Slovakia | 445 | 0 | 439 | 6 | 0 | 331 | 34 | 114 |
| Czech Republic | 364 | 0 | 355 | 8 | 1 | 499 | -27 | -135 |
| Benelux | 351 | 288 | 6 | 57 | 0 | 555 | -37 | -204 |
| Russia and neigh | ||||||||
| bouring countries | 317 | 104 | 212 | 1 | 0 | 635 | -50 | -318 |
| Romania | 308 | 0 | 300 | 8 | 0 | 326 | -6 | -18 |
| Switzerland | 217 | 10 | 159 | 48 | 0 | 268 | -19 | -51 |
| Slovenia | 151 | 0 | 151 | 0 | 0 | 144 | 5 | 7 |
| Rest of Europe | 139 | 14 | 104 | 21 | 0 | 78 | 78 | 61 |
| Africa | 134 | 0 | 22 | 112 | 0 | 236 | -43 | -102 |
| Asia | 112 | 0 | 4 | 108 | 0 | 163 | -31 | -51 |
| Croatia | 77 | 0 | 75 | 2 | 0 | 113 | -32 | -36 |
| Bulgaria | 35 | 0 | 35 | 0 | 0 | 14 | 150 | 21 |
| Serbia | 21 | 0 | 21 | 0 | 0 | 8 | 163 | 13 |
| Total | 13,470 | 5,451 | 3,806 | 4,202 | 11 | 13,203 | 2 | 267 |
The order backlog as at 31 December 2013 grew slightly by 2 % to € 13.5 billion and covers around one year's worth of output volume. The geographic focus shifted somewhat here: large projects such as the Olympic Village in Russia and orders in Benelux had been completed in 2013. In exchange, a large number of new building construction orders in Germany bolstered the order backlog by more than € 500 million.
| Category | Number of construction sites |
as % of number of construction sites |
Order backlog € mln. |
as % of order backlog |
|---|---|---|---|---|
| small orders (€ 0–15 mln.) | 15,007 | 98 | 4,983 | 37 |
| medium-sized orders | ||||
| (€ 15–50 mln.) | 214 | 1 | 2,660 | 20 |
| large orders ( > € 50 mln.) | 94 | 1 | 5,827 | 43 |
| Total | 15,315 | 100 | 13,470 | 100 |
Part of risk management The overall order backlog is comprised of 15,315 individual projects. More than 15,000 of these are small projects with a volume of up to € 15 million each. They account for 37 % of the order backlog; a further 20 % are mediumsized projects with order volumes between € 15 million and € 50 million; 43 % are large projects of € 50 million or more. The high number of individual contracts guarantees that the risk involved with one project does not threaten the group success as a whole. The ten largest projects in the order backlog as at 31 December 2013 added up to 22 % of the order backlog, compared to 24 % at the end of 2012.
| Country | Project | Order backlog € mln. |
as % of total order backlog |
|---|---|---|---|
| Italy | Pedemontana motorway | 1,015 | 7.5 |
| Chile | Alto Maipo hydropower complex | 372 | 2.8 |
| Austria | Koralm Tunnel, Section 2 | 324 | 2.4 |
| Germany | Stuttgart 21, underground railway station | 314 | 2.3 |
| United Arab Emirates | STEP wastewater systems | 189 | 1.4 |
| Germany | Jena University Hospital | 164 | 1.2 |
| Germany | Upper West Berlin | 161 | 1.2 |
| Germany | Albabstieg Tunnel | 149 | 1.1 |
| Italy | Grosseto–Siena expressway | 107 | 0.8 |
| Poland | S8 Opacz–Paszków | 106 | 0.8 |
| Total | 2,903 | 21.6 |
In the 2013 financial year, 21 companies (thereof 14 mergers with fully consolidated companies) were included in the scope of consolidation for the first time. These companies contributed a total of € 47.53 million to the group revenue and
€ -1.72 million to the net income after minorities. As a result of first-time inclusions, current and non-current assets increased by € 28.11 million, current and non-current liabilities by € 13.71 million.
In the 2013 financial year, STRABAG SE generated an output volume of € 13.6 billion. The relatively low decline by 3 % over the previous year can be explained by weather-related effects at the start of the year. The group's core markets revealed quite different developments: as STRABAG is a broadly positioned group, the expected market-related decline in Poland following the end of the construction boom there and project-related reductions in Canada, Benelux and Romania were nearly balanced out by increases in e.g. Hungary, Austria and Africa.
The consolidated group revenue for the 2013 financial year amounted to € 12,475.65 million, which corresponds to a decrease of 4 %. The ratio of revenue to construction output remained unchanged at 92 %. The segment North + West contributed 44 %, South + East 36 % and International + Special Divisions 20 % to the revenue.
The changes in inventories involve mainly the real estate project development business, which
was conducted as actively as in the past. The own work capitalised remained at a very low level.
The expenses for materials, consumables and services used decreased more strongly than the revenue, falling by 5 % to € 8,204.35 million, while the employee benefits expense was down just 2 % to € 2,998.65 million. In total, however, the ratio of these two items versus revenue remained unchanged at 90 % as in the past two years.
The strong decline of the other operating expenses (-9 %) can be explained by the previous year's inclusion of damage compensation payments related to an arbitration ruling on a failed acquisition. The other operating income, which generally also rises or falls with revenue, increased in the past financial year despite the lower revenue. This was in part due to the somewhat higher income from asset disposals. The item also includes income from the fully consolidated concession companies.
| € mln. | 2013 | 2012 | ∆ % |
|---|---|---|---|
| Materials, consumables and services used | 8,204.35 | 8,655.10 | -5 |
| Employee benefits expense | 2,998.65 | 3,051.78 | -2 |
| Other operating expenses | 857.29 | 938.16 | -9 |
| Depreciation and amortisation | 433.34 | 401.17 | 8 |
The share of profit or loss of associates moved into positive territory in the 2013 financial year, namely from € -9.22 million to € 5.78 million. This item was especially influenced by the investment in a cement joint venture and in a project development company which had contributed to a negative result in 2012. The net income from investments, composed of the dividends and expenses of many smaller companies or financial investments, slipped slightly into negative territory, however.
As the 2013 results were no longer burdened by damage compensation payments related to a failed acquisition or by missing revenue for services already rendered in Central and Eastern Europe, the earnings before interest, taxes, depreciation and amortisation (EBITDA) grew by 14 % to € 694.91 million and the EBITDA margin rose from 4.7 % to 5.6 %. Cost developments related to large projects in hydraulic engineering, in the Netherlands and in Sweden, as well as the competitive pressure in railway construction, continued to impact earnings, however.
For its international business, the company had invested in specialty equipment that is now being depreciated over just a few years of construction. Together with the depreciation and amortisation of plant and equipment in the fields of railway construction and in hydraulic engineering, the total depreciation and amortisation expense grew by 8 %. The goodwill impairment contained in this item was nearly unchanged at € 3.99 million in 2013 after € 10.08 million in the year 2012. This resulted in an increase in the earnings before interest and taxes (EBIT) by 26 % to € 261.58 million and an EBIT margin of 2.1 % versus 1.6 % in the previous year.
While negative exchange rate differences amounting to € 11.75 million had still been registered in 2012, the net interest income in the past financial year now contained positive foreign currency effects of € 13.04 million. The result was a net interest income of € -31.54 million compared to € -50.73 million the previous year. This corresponds to a 47 % increase in the profit before tax. The income taxes were thus calculated at € 73.78 million, with a resulting tax rate of 32.1 %.
Earnings owed to minority shareholders amounted to € 42.70 million. The net income after minorities thus came to € 113.56 million in 2013, 87 % higher than in the previous year. The number of weighted outstanding shares decreased due to the – now concluded – buyback of own shares from 104,083,238 to 102,716,850, so that the earnings per share increased by 90 % to € 1.11.
The return on capital employed (ROCE)1) improved to 4.6 % after the low of 4.0 % in the previous year.
Effective tax rate: 32.1 %
Earnings per share: € 1.11
| € mln. | 2013 | % of balance sheet total |
2012 | % of balance sheet total |
|---|---|---|---|---|
| Non-current assets | 4,416.30 | 42 | 4,546.46 | 45 |
| Current assets | 6,144.50 | 58 | 5,591.23 | 55 |
| Equity | 3,238.77 | 31 | 3,162.54 | 31 |
| Non-current liabilities | 2,465.79 | 23 | 2,431.92 | 24 |
| Current liabilities | 4,856.23 | 46 | 4,543.23 | 45 |
| Total | 10,560.79 | 100 | 10,137.69 | 100 |
The balance sheet total of STRABAG SE increased by 4 % to € 10,560.79 million. This was in large part due to the unusually high increase of the cash and cash equivalents from € 1,374.96 million to € 1,711.97 million, resulting in a shift
toward current assets. Conspicuous on the liabilities side is the stable equity ratio at the high level of 30.7 % (2012: 31.2 %) and the higher non-current liabilities as a result of the bond that was issued in the past financial year.
| 2009 | 2010 | 2011 | 2012 | 2013 | |
|---|---|---|---|---|---|
| Equity ratio (%) | 32.2 | 31.1 | 30.3 | 31.2 | 30.7 |
| Net debt (€ mln.) | -596.23 | -669.04 | -267.81 | 154.55 | -73.73 |
| Gearing ratio (%) | -19.2 | -20.7 | -8.5 | 4.9 | -2.3 |
| Capital employed (€ mln.) | 5,042.87 | 5,235.74 | 5,336.45 | 5,322.35 | 5,462.11 |
Unlike the previous year, but as had been usual in the years before that, a net cash position of € 73.73 million was reported as at 31 December 2013. This can be explained by the higher level of cash and cash equivalents.
| € mln. | 2009 | 2010 | 2011 | 2012 | 2013 |
|---|---|---|---|---|---|
| Financial liabilities | 1,509.16 | 1,559.15 | 1,731.96 | 1,649.98 | 1,722.70 |
| Severance provisions | 70.48 | 69.36 | 70.44 | 79.91 | 78.40 |
| Pension provisions | 364.16 | 374.79 | 384.21 | 429.92 | 422.24 |
| Non-recourse debt | -757.08 | -719.89 | -754.18 | -630.31 | -585.11 |
| Cash and cash equivalents | -1,782.95 | -1,952.45 | -1,700.24 | -1,374.96 | -1,711.97 |
| Total | -596.23 | -669.04 | -267.81 | 154.55 | -73.73 |
With a nearly unchanged cash flow from earnings of € 513.03 million, the cash flow from operating activities shot up 158 % to € 693.70 million. This was due to the uncharacteristically high project-related prepayments, which will fall back over the course of the year. The cash flow from investing activities could be contained by 26 % at € -332.38 million. The purchase of specialty equipment needed for certain projects was shifted in part to 2014, and enterprise acquisitions took place to only a minor extent. The cash flow from financing activities was significantly less negative – settling at € -6.49 million instead of € -176.26 million – for two reasons: first, the previous year had been characterised by a significant repayment of bank borrowings and, second, another bond was issued in the 2013 financial year, albeit with a volume of € 200 million compared to € 100 million in the year before.
STRABAG had forecast capital expenditures (cash flow from investing activities) in the amount of approximately € 475 million for the 2013 financial year. In the end, the net capital expenditures totalled € 332.38 million and so remained clearly under budget. The gross investments (CAPEX) before subtraction of proceeds from asset disposals stood at € 420.83 million. This figure includes expenditures on intangible assets and on property, plant and equipment of € 387.36 million, the purchase of financial assets in the amount of € 22.88 million and enterprise acquisitions (changes to the scope of consolidation) of € 10.59 million.
About € 250 million is spent annually as maintenance expenditures related to the equipment fleet in order to prevent inventory obsolescence. The high proportion of expansion expenditures is due to the project-based nature of STRABAG's business: in 2013, the group invested in equipment for large tunnelling projects in Austria and in the international business in particular as well as in the home market of Germany in general.
Expenditures on intangible assets and on property, plant and equipment during the year under report must be seen against amortisation on intangible assets and depreciation on property, plant and equipment in the amount of € 433.34 million. This figure also includes goodwill impairment in the amount of € 3.99 million.
The number one objective for the treasury management of STRABAG SE is assuring the continued existence of the company through the maintenance of constant solvency. This objective is to be reached through the provision of sufficient short-term, medium-term and longterm liquidity.
Liquidity for STRABAG SE means not only solvency in the strict sense but also the availability of guarantees. The building activity requires the constant availability of bid, contract fulfilment, pre-payment and warranty guarantees and/or sureties. The financial scope of action is thus defined on the one hand by sufficient cash and cash credit lines, on the other hand by sufficient surety credit lines.
The management of liquidity risks has become a central element of the corporate management at STRABAG. In practice, liquidity risks come in various forms:
In the past, STRABAG has always oriented its financing decisions according to the risk aspects outlined above and has organised the maturity structure of the financial liabilities in such a way as to avoid a refinancing risk. In this way, the company has been able to maintain a great scope for action, which is of particular importance in a difficult market environment.
The respective liquidity needed is determined by targeted liquidity planning. Based on this, liquidity assurance measures are made and a liquidity reserve is defined for the entire group.
The medium- and long-term liquidity needs have so far also been covered by the issue of corporate bonds. STRABAG SE (and its predecessor FIMAG) has regularly issued bonds on the Austrian market since 2002. In the 2013 financial year, STRABAG successfully issued a € 200 million tranche with a coupon of 3.00 % and a term to maturity of seven years. The proceeds from the issue, which were used for general business purposes, help STRABAG to maintain its financing structure. At present, this leaves four bonds of STRABAG SE with a total volume of € 575 million on the market.
In order to diversify the financing structure, STRABAG SE placed its first bonded loan in the amount of € 140 million in the 2012 financial year. This long-term debt financing instrument is in many ways similar to a bond, with an important difference being that bonded loans are issued directly to institutional investors without using an organised capital market, i.e. an exchange.
The existing liquidity of € 1.7 billion assures the group's liquidity needs. Nevertheless, further bond issues or a refinancing of existing financing instruments are planned, depending on the market situation, in order to maintain a high level of liquidity reserves in the future and to take advantage of favourable market conditions.
STRABAG SE has a total credit line for cash and surety loans in the amount of € 6.7 billion. The credit lines include a syndicated surety credit line in the amount of € 2.0 billion and a revolving syndicated cash credit line of € 0.4 billion with a term until 2017. The group also has bilateral credit lines with banks. With a high degree of diversification, STRABAG creates an adequate risk spread in the provision of the credit lines and secures its comfortable liquidity position.
In June 2013, S&P again confirmed its BBBrating and stable outlook for STRABAG SE. Explaining its decision, S&P cited the leading market position in transportation infrastructures in Central and Eastern Europe, the well-diversified and vertically integrated business, the good access to raw materials and the group's adequately high liquidity.
Total credit line for cash and surety loans: € 6.7 billion
| 2009 | 2010 | 2011 | 2012 | 2013 | |
|---|---|---|---|---|---|
| Interest and other income (€ mln.) | 78.33 | 78.71 | 112.31 | 73.15 | 66.72 |
| Interest and other expense (€ mln.) | -98.22 | -98.39 | -103.77 | -123.87 | -98.26 |
| EBIT/net interest income (x) | -14.2 | -15.2 | 39.2 | -4.1 | -8.3 |
| Net debt/Ebitda (x) |
-0.9 | -0.9 | -0.4 | 0.3 | -0.1 |
| € mln. | Book value 31 December 2013 |
|---|---|
| Bonds | 582.50 |
| Bank borrowings | 1,117.70 |
| Liabilities from finance leases | 22.50 |
| Total | 1,722.70 |
The company's revenues grew by € 2.40 million year-on-year from € 56.83 million to € 59.23 million due largely to an increase in the intra-group allocations.
| 2013 | 2012 |
|---|---|
| 59,234 | 56,826 |
| 86,118 | 11,112 |
| 145.4 | 19,6 |
| 3.5 | 0.4 |
| 2.6 | 0.3 |
The earnings before interest and taxes (EBIT) increased significantly by € 75.01 million in comparison to the previous year from € 11.11 million to € 86.12 million. The growth results from the substantial improvement of both the operating result and the net income from investments.
In contrast to the year before, the operating result was not impacted by any extraordinary expenses in the past financial year; in the previous year, earnings had been affected negatively particularly by the damage compensation expenses related to the Cemex arbitration.
Further earnings improvements could be achieved through savings in the internal group services and through a strong reduction in the impairment of receivables from subsidiaries.
The positive development of the operating result was supported by the continued growth of the revenues and through the receipt of income
The balance sheet total of STRABAG SE, at € 3.4 billion in 2013, grew slightly in comparison to the previous year (€ 3.3 billion), with substantial changes among only a few balance sheet items.
1) ROS = EBIT / revenues 2) ROE = EBT / ø equity 3) ROI = EBIT / ø total capital from the extension of the option for Transtroy Holding Limited.
It was possible to significantly grow the income from investments in the financial year. These, in addition to the lower expenses for financial assets, contributed to a significant increase in the net income from investments.
The improved earnings resulted in significantly improved profitability figures.
The interest income reached a positive total of € 3.06 million, which was achieved through changes to the transfer of the external interest expense for financial assistance given to subsidiaries.
Overall, the company generated a net profit of € 87.99 million for the 2013 financial year, compared to € 6.63 million in the previous year.
The increase in the financial assets, in particular with investments in affiliated companies, result mainly from capital increases and shareholder contributions to subsidiaries.
The loans to affiliated companies were affected by the partial repayment of the loan to STRABAG AG, Cologne by € 14.04 million and by the addition of a new loan to TOO STRABAG Kazakhstan, Almaty, in the amount of € 5.79 million.
The growth in the number of own shares resulted from the continued buyback of no-par bearer shares of stock, which was concluded in the year under report. The company now holds 10% of the share capital.
The increased receivables from affiliated companies involved the partial transfer the liquidity gained from bond financing to subsidiaries.
Among the other provisions, the increase of € 11.00 million over the previous year can be explained with a loss provision for the subsidiary in Azerbaijan.
The increase among the bonds in the amount of € 125.00 million is the result of a € 200.00 million bond issued in 2013 and of a € 75.00 million bond repayment.
| 2013 | 2012 |
|---|---|
| 387,476 | 384,937 |
| 133,650 | 22,983 |
| 76.7 | 78.0 |
| 14.8 | 15.1 |
The net debt on 31 December 2013 amounted to € 387.48 million, which corresponds to only slight growth versus the previous year (€ 384.94 million) as the higher interest-bearing liabilities were almost completely balanced out by the growth in cash and cash equivalents. Due to the positive growth of the equity, the gearing ratio was down from 15.1% in the previous year to 14.8% in the year under report.
The working capital grew by € 110.67 million
from € 22.98 million in 2012 to € 133.65 million in 2013. This is mainly due to the decrease in current liabilities among the bank borrowings and because no bond repayments are due for the following financial year.
The equity ratio fell slightly to 76.7% from 78.0% the year before due to a further increase of the total capital.
| T€ | 2013 | 2012 |
|---|---|---|
| Cash flow from operating activities | 139,594 | 57,529 |
| Cash flow from investing activities | -106,682 | -43,296 |
| Cash flow from financing activities | 44,444 | 141,997 |
The cash flow from operating activities in the amount of € 139.59 million is largely the result of cash flow from earnings. With the clear growth in current provisions and the cash inflows from the reduction in receivables from subsidiaries, the changes in the working capital resulted in even more significant positive effects.
In the year under report, the cash flow from investing activities saw an outflow of € 106.68 million in cash and cash equivalents, which were used for capital increases and for shareholder contributions to subsidiaries.
The issue of a new bond led to a significant inflow in the amount of € 200.00 million in the cash flow from financing activities. After deducting a bond repayment, the dividend, and the repayment of current bank borrowings, the cash flow from financing activities showed an increase in cash and cash equivalents by € 44.44 million in 2013.
1) Net debt = interest-bearing liabilities + non-current provisions – cash and cash equivalents 2) Working capital = current assets – cash and cash equivalents – current liabilities
The business of STRABAG SE is divided into four segments, of which there are three operative segments North + West, South + East and International + Special Divisions, and segment Other, which encompasses the group's service companies and central staff divisions.
The segments are comprised as follows:
Germany, Poland, Benelux, Scandinavia, Ground Engineering, Hydraulic Engineering, Offshore Wind
Austria, Switzerland, Hungary, Czech Republic, Slovakia, Adriatic, Rest of Europe, Railway Structures, Environmental Technology, Real Estate Development
Russia and neighbouring countries
International, Tunnelling, Services, Real Estate
Development, Infrastructure Development, Construction Materials
Management board responsibility: Thomas Birtel and Christian Harder Service companies
Construction projects are assigned to one of the segments (see chart below). Of course, projects may also be assigned to more than one segment. This is the case, for example, with PPP projects in which the construction part is assigned to its respective geographic segment, but the concession part is assigned to the concessions unit of International + Special Divisions. In projects which span more than one segment, the commercial and technical responsibility is generally assigned to that segment which has the higher share of the overall project value.
With only a few exceptions, we offer our services in all areas of the construction industry in the individual European markets in which we operate and cover the entire construction value chain. Our services include:
| North + West | South + East | International + Special Divisions |
|
|---|---|---|---|
| Residential Construction | P | P | |
| Commercial and Industrial Facilities | P | P | P |
| Public Buildings | P | P | P |
| Production of Prefabricated Elements | P | P | P |
| Civil Engineering | P | P | P |
| Bridges | P | P | P |
| Power Plants | P | P | P |
| Environmental Technology | P | ||
| Railway Structures | P | ||
| Roads, Earthworks | P | P | P |
| Hydraulic Engineering, Waterways, Dyking | P | P | |
| Landscape Architecture and Development | P | P | |
| Paving | P | P | P |
| Large-Area Works | P | P | P |
| Sports and Recreational Facilities | P | P | |
| Protective Structures | P | P | P |
| Sewer Systems | P | P | P |
| Production of Construction Materials | P | P | P |
| Ground Engineering | P | ||
| Offshore Wind | P | P | |
| Tunnelling | P | ||
| Real Estate Development | P | P | |
| Infrastructure Development | P | ||
| Operation/Maintenance/Marketing of PPP Projects | P | ||
| Property and Facility Services | P |
The segment North + West executes construction services of nearly any kind and size with a focus on Germany, Poland, the Benelux countries and Scandinavia. Ground and hydraulic engineering as well as offshore wind can also be found in this segment.
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Output volume | 6,021.11 | 6,237.17 | -3 | -216.06 |
| Revenue | 5,524.43 | 5,509.53 | 0 | 14.90 |
| Order backlog | 5,451.26 | 4,826.52 | 13 | 624.74 |
| EBIT | 72.54 | -51.32 | n.a. | 123.86 |
| EBIT margin % of revenue | 1.3 | -0.9 | ||
| Employees | 22,695 | 25,108 | -10 | -2,413 |
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Germany | 4,269 | 4,185 | 2 | 84 |
| Poland | 669 | 777 | -14 | -108 |
| Scandinavia | 508 | 575 | -12 | -67 |
| Benelux | 308 | 329 | -6 | -21 |
| Russia and neighbouring countries | 141 | 88 | 60 | 53 |
| Switzerland | 35 | 35 | 0 | 0 |
| Rest of Europe | 22 | 33 | -33 | -11 |
| Austria | 21 | 18 | 17 | 3 |
| Slovenia | 10 | 19 | -47 | -9 |
| The Americas | 9 | 131 | -93 | -122 |
| Italy | 7 | 9 | -22 | -2 |
| Middle East | 7 | 5 | 40 | 2 |
| Asia | 5 | 7 | -29 | -2 |
| Romania | 4 | 6 | -33 | -2 |
| Hungary | 3 | 16 | -81 | -13 |
| Africa | 3 | 1 | 200 | 2 |
| Serbia | 0 | 3 | -100 | -3 |
| Total | 6,021 | 6,237 | -3 | -216 |
The segment North + West generated an output volume of € 6,021.11 million in the 2013 financial year, 3 % below the previous year's level. This is mostly due to the significant market- and weather-related declines in Poland, which after Germany is the second-biggest geographic market in this segment. The revenue remained nearly unchanged at € 5,524.43 million. The earnings before interest and taxes (EBIT) moved into positive territory with € 72.54 million.
An especially positive contribution came from the business in German building construction. Improved year-on-year results were also registered in Poland and in transportation infrastructures and the construction materials business in Germany. The cost developments with large projects in hydraulic engineering, a transportation infrastructures project in the Netherlands and a building construction project in Sweden still remain a burden, however.
In comparison, several new large orders helped raise the order backlog to € 5,451.26 million, an increase of 13 % versus the previous year. Particularly positive developments were registered in building construction in Germany: STRABAG subsidiary Ed. Züblin AG assumed the construction of the Upper West highrise complex in Berlin for € 106 million and was awarded the construction contract for a section of Thuringia's new university clinic in Jena with a project value of more than € 170 million. In Germany, the company was also awarded the contracts to build an office building at the Stuttgart Airport for around € 95 million, to establish a cultural quarter in Dresden for € 70 million, and to expand the Allianz Campus in Unterföhring near Munich with a volume of € 100 million (share 90 %). In Denmark, Ed. Züblin AG was chosen to build the multi-use Bryghus building at the Copenhagen waterfront for € 140 million. In Poland, STRABAG companies recently began construction of sections of the A4 and S8 highways. In Sweden, it was possible to acquire the Orgelpipan project, in a prime location in Stockholm, comprising hotels, offices and a residential unit. Finally, a regular client has commissioned the group to build the McArthurGlen Designer Outlet Vancouver Airport in Canada.
The number of employees was down by 10 % to 22,695 in response to the shifting of activities in Chile into the segment International + Special Division. At the same time, an expansion of the workforce in Germany was countered by an expected market-related reduction of the blue-collar and white-collar workforce in Poland.
The company invested in areas with growth potential in 2013: Ed. Züblin AG expanded its range of services in the field of structural timber engineering with the acquisition of Merk Timber GmbH (formerly Metsä Wood Merk GmbH), a German manufacturer of cross-laminated timber; STRABAG B.V. took over the employees, equipment and production facilities of the transportation infrastructures activities of Janssen de Jong Groep in the Netherlands.
The management board expects an output volume of € 6.0 billion in the segment North + West in the 2014 financial year. Further economic stimulus is being provided in Germany by the favourable financing conditions and the positive labour market situation. As a result, building construction and civil engineering showed very positive development; the STRABAG Group started the year 2014 with an order backlog that will cover most of the output volume being forecast for the coming year. The future is likely to bring rising subcontractor prices with stable construction materials prices, however. In the German transportation infrastructures business, policymakers have recognised the investment backlog in public-sector infrastructure, so that a number of tenders are expected which could have a positive impact on the market from the second half of 2014. STRABAG benefits from the fact that its strong decentralised structure in the mass market allows it to respond flexibly to regional fluctuations in demand on the part of the public sector.
The end of the construction boom in Poland was clearly reflected in the output volume of the segment in 2013. Momentum is expected starting in 2014, however: more than 700 km of expressways are planned for realisation in Poland between 2014 and 2020, co-financed in part by the EU.
Scandinavia, which accounts for 8 % of the segment output, is the third-largest region in North + West, with Sweden and Denmark making the most significant contributions to the output volume of just over € 500 million. Both the overall economic environment and the market for tunnelling and infrastructure projects continue to remain stable. Especially in the Stockholm region, the coming years will see the realisation of a number of large infrastructure projects and housing developments. Increasing competitive pressure is expected, however, as internationally operating construction groups are likely to enter this market.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Germany | Stuttgart 21, underground railway station | 314 | 2.33 |
| Germany | New university clinic, Jena | 164 | 1.22 |
| Germany | Upper West high-rise complex, Berlin | 107 | 0.79 |
| Poland | S8 Opacz–Paszków | 106 | 0.79 |
| Denmark | Bryghus multi-use building, Copenhagen |
92 | 0.68 |
| Germany | Aquis, Aachen | 90 | 0.67 |
| Germany | Allianz Campus, Unterföhring | 83 | 0.62 |
The geographic focus of the segment South + East is on Austria, Switzerland, Hungary, the Czech Republic, Slovakia, Russia and neighbouring countries as well as on the region South-East
Europe. Railway structures, environmental technology as well as selected real estate development activities are also handled within this segment.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 4,593.36 | 4,755.74 | -3 | -162.38 |
| Revenue | 4,466.03 | 4,792.43 | -7 | -326.40 |
| Order backlog | 3,805.48 | 4,326.12 | -12 | -520.64 |
| EBIT | 138.23 | 148.89 | -7 | -10.66 |
| EBIT margin % of revenue | 3.1 | 3.1 | ||
| Employees | 21,089 | 22,699 | -7 | -1,610 |
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Austria | 1,630 | 1,573 | 4 | 57 |
| Czech Republic | 546 | 532 | 3 | 14 |
| Russia and neighbouring countries | 410 | 432 | -5 | -22 |
| Hungary | 402 | 293 | 37 | 109 |
| Germany | 336 | 339 | -1 | -3 |
| Switzerland | 325 | 351 | -7 | -26 |
| Slovakia | 301 | 360 | -16 | -59 |
| Romania | 285 | 315 | -10 | -30 |
| Croatia | 114 | 111 | 3 | 3 |
| Poland | 51 | 232 | -78 | -181 |
| Slovenia | 47 | 49 | -4 | -2 |
| Rest of Europe | 46 | 42 | 10 | 4 |
| Serbia | 29 | 66 | -56 | -37 |
| Bulgaria | 17 | 24 | -29 | -7 |
| Middle East | 15 | 7 | 114 | 8 |
| Africa | 12 | 0 | n.a. | 12 |
| Asia | 8 | 7 | 14 | 1 |
| Italy | 6 | 13 | -54 | -7 |
| The Americas | 6 | 6 | 0 | 0 |
| Benelux | 5 | 2 | 150 | 3 |
| Scandinavia | 2 | 2 | 0 | 0 |
| Total | 4,593 | 4,756 | -3 | -163 |
The output volume in the segment South + East decreased to € 4,593.36 million in 2013, down 3 % versus the previous year. A decisive factor was, among other things, the internal shifting of the building construction activities in Poland into the segment North + West. Meanwhile, on a more positive note, growth of the output volume was reported in Hungary and the Czech Republic. The revenue decreased more strongly than the output volume, dropping by 7 % to € 4,466.03 million. The earnings before interest and taxes (EBIT) also fell by 7 % to € 138.23 million. Decisive factors behind this development included amongst others the continued considerable competitive pressure in railway construction. The successful resultimprovement programme of the environmental technology business influenced the EBIT positively, however.
The segment's order backlog fell by 12 % to € 3,805.48 million. This was due to the completion of the large Olympic Village project in Russia, the aforementioned shifting process in Poland and the market-related decline in the Czech Republic. A recovery of the order situation can be seen in Slovakia and in Hungary, on the other hand, where work began on two new motorway projects in each country in 2013. And in Bosnia, a consortium including STRABAG secured the tender to build the Svilaj–Odžak section of the international motorway corridor 5c.
Corresponding to the lower order backlog, the number of employees in the segment decreased by 7 % to 21,089; a declining workforce was registered in nearly all markets, however.
It should be possible to generate an output volume of € 4.7 billion in the segment South + East in the current financial year. In general, the price pressure in transportation infrastructures in Central and Eastern Europe will continue. A lack of financing, especially in the Czech Republic, in Romania and in the Adriatic region, means that very few large public-sector projects are being awarded at this time – with a resulting tougher competition on the price. A more positive outlook, on the other hand, is offered by transportation infrastructures in Slovakia, where several large motorway and expressway projects are currently being tendered, as well as in the area of building construction for private clients in Slovakia and the Czech Republic.
Austria, with a contribution of 35 % to the segment output the largest market in South + East, paints a mixed picture: From today's perspective, the shifting competitive landscape resulting from a competitor's market departure is unlikely to result in a reduction of margin pressure in the transportation infrastructures business or in the Austrian states – where Upper Austria and Carinthia are particularly affected. In the greater Vienna area, meanwhile, STRABAG continues to see itself faced with a stable environment in which it was possible to selectively acquire certain construction projects from the departed competitor.
In Hungary, stabilisation is becoming apparent at a low level: investments from international industrial groups are growing slightly and the long-awaited large projects in road construction are now finally coming up for tender. Older projects continued to have a negative impact in 2013, however.
In the RANC region, acquisition efforts are shifting from building construction in metropolitan areas in Russia to industrial projects as well as projects with special know-how requirements in countries such as Turkmenistan and Kazakhstan, where a STRABAG subsidiary was recently awarded the contract for concrete works for the Astana–Karaganda motorway section.
In Switzerland, STRABAG merged a large portion of its companies in 2013 so that a homogeneous brand presence is now possible. The reorganisation, which is now largely complete, had become necessary due to the strong growth experienced by the group in Switzerland in the past few years.
The railway structures business will remain characterised by overcapacities and a distorted competitive landscape in Germany; additionally, the long winter means that large equipment was hardly used this year.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Hungary | M4 motorway section | ||
| Abony–Fegyvernek | 106 | 0.79 | |
| Russia | Kauchuk residential complex | 105 | 0.78 |
| Slovenia | Ljubljana waste treatment facility | 91 | 0.67 |
| Slovakia | R2 expressway Pstruša–Kriváň | 71 | 0.53 |
| Czech Republic | Road I/11 Rudna | 63 | 0.46 |
| Romania | Modernisation of DN67B | 58 | 0.43 |
| Romania | Rail line Vințu de Jos–Simeria | 54 | 0.40 |
| Romana | ELI-NP laser project research facility | 52 | 0.39 |
The segment International + Special Divisions includes, on the one hand, the field of tunnelling. The concessions business, on the other hand, represents a further important area of business, with global project development activities in transportation infrastructures in particular. Regardless of where the services are rendered, our construction materials business, including our dense network of construction materials operations but with the exception of asphalt, also belongs to this segment. The real estate business, which stretches from project development and planning to construction and operation and also includes the property and facility services business, completes the wide range of services. Additionally, most of the services in non-European markets are also bundled in the International + Special Divisions segment.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 2,822.41 | 2,924.86 | -4 | -102.45 |
| Revenue | 2,458.68 | 2,661.29 | -8 | -202.61 |
| Order backlog | 4,202.28 | 4,038.33 | 4 | 163.95 |
| EBIT | 69.58 | 126.93 | -45 | -57.35 |
| EBIT margin % of revenue | 2.8 | 4.8 | ||
| Employees | 23,575 | 20,426 | 15 | 3,149 |
| ∆ 2012–2013 |
∆ 2012–2013 |
|||
|---|---|---|---|---|
| € mln. | 2013 | 2012 | % | absolute |
| Germany | 1,127 | 1,196 | -6 | -69 |
| Middle East | 301 | 293 | 3 | 8 |
| Austria | 295 | 268 | 10 | 27 |
| The Americas | 248 | 211 | 18 | 37 |
| Italy | 155 | 135 | 15 | 20 |
| Africa | 150 | 124 | 21 | 26 |
| Czech Republic | 93 | 109 | -15 | -16 |
| Asia | 90 | 96 | -6 | -6 |
| Hungary | 86 | 80 | 8 | 6 |
| Benelux | 85 | 124 | -31 | -39 |
| Poland | 52 | 118 | -56 | -66 |
| Slovakia | 37 | 39 | -5 | -2 |
| Romania | 31 | 50 | -38 | -19 |
| Switzerland | 22 | 35 | -37 | -13 |
| Croatia | 19 | 18 | 6 | 1 |
| Rest of Europe | 11 | 8 | 38 | 3 |
| Slovenia | 10 | 13 | -23 | -3 |
| Russia and neighbouring countries | 7 | 5 | 40 | 2 |
| Bulgaria | 2 | 2 | 0 | 0 |
| Serbia | 1 | 1 | 0 | 0 |
| Total | 2,822 | 2,925 | -4 | -103 |
In the volatile segment International + Special Divisions, the output volume fell by 4 % to € 2,822.41 million in the 2013 financial year. The greatest share of the output volume was again generated in the markets of Germany, the Middle East and Austria. A decline was registered in the revenue by 8 % to € 2,458.68 million. The earnings before interest and taxes (EBIT) were nearly halved to € 69.58 million. This development is due to the typically volatile business in the segment, particularly in the international business and in tunnelling.
The order backlog grew by 4 % to € 4,202.28 million: new projects were recorded in Chile, where an especially large increase in the order backlog was registered, in Thailand and in Oman, and the order books were further padded in the home market of Germany by the contract to build a new government building in Potsdam under a public-private partnership (PPP) arrangement. In Germany, the STRABAG subsidiary Ed. Züblin AG was also awarded the contract to build a tunnel on the new Wendlingen–Ulm rail line for € 250 million (Ed. Züblin AG's share of the contract amounts to 60 %). In Canada, the group will build the McArthurGlen Designer Outlet Vancouver Airport. At the same time, however, a number of large projects were completed in e.g. Africa, in Austria and in Benelux.
The number of employees grew by a considerable 15 % to 23,575. This can be explained with the organisational adjustment and subsequent shifting of staff in Chile from the segment North + West into the segment International + Special Divisions and with several orders in Africa.
The output volume of the segment International + Special Divisions should remain unchanged at € 2.8 billion in 2014. The earnings are expected to remain satisfactory, even if the price level is ruinously low in some areas. STRABAG has observed that competition in tunnelling in Austria, in Germany and in Switzerland is increasingly being carried out on the price.
The market for concession projects in Europe also remains a challenging one. In this business field, STRABAG is currently working on offers in Belgium, Bosnia-Herzegovina, Ireland, Romania, Germany or Croatia. Competitive pressure is on the rise and, especially in Eastern Europe, the sector is facing political and financial hurdles.
Significant earnings contributions, on the other hand, are expected from the business field real estate development in the year 2014, in particular as a result of the planned sales of construction projects that were completed in 2013. It is also planned to further expand the project development activities in Central and Eastern Europe and in Sweden. PPP building construction still benefits from the continued large investment needs on the part of the public sector. The market for PPP measures in building construction therefore has a chance to further grow in comparison to the restrained development of the previous year, especially as this constellation makes it possible for the client to realise efficiency advantages from an integrated solutions approach, i.e. from the observation of lifecycle costs. STRABAG is moreover in a position to completely cover all specifications in this area, thanks to the inclusion of specialist providers from within the group such as STRABAG Property and Facility Services.
In particular the activities in property management of this service subsidiary contributed to stable development in 2013; STRABAG had acquired a residential property management company and has been able to develop this business within the group.
The price pressure in the European core markets requires STRABAG to diversify more broadly internationally. In addition to selected countries in East Africa, the foreign markets currently being worked by the company include Oman, the United Arab Emirates, Qatar and Saudi Arabia. In Canada – the Niagara Tunnel Project was successfully concluded here in March –, Colombia and the United Kingdom, STRABAG has been working on new order opportunities in the area of concession and infrastructure projects. Looking at specific construction segments, the conclusion of a partnership agreement with mining company Rio Tinto marked the group's consolidation of the mining business. STRABAG is also offering specialty construction services around the world in pipe jacking (a tunnelling technique), in test track construction and in the field of liquefied natural gas (LNG).
The construction materials business will continue to put pressure on the margins of the segment, as the market for concrete is stagnating at a very low level. In Bulgaria, therefore, STRABAG has already ended its engagement in this business field. In many countries, the situation with stone and gravel continues to be modest at best, and the situation in the cement business is also not expected to improve in the short term due to the stagnation in terms of quantities. The developments in bitumen emulsion/road maintenance are satisfactory.
| Country | Project | Order backlog € mln. |
Percentage of total group order backlog % |
|---|---|---|---|
| Italy | Pedemontana motorway | 1,015 | 7.54 |
| Chile | Alto Maipo hydropower complex | 372 | 2.76 |
| Austria | Koralm Tunnel, Section 2 | 293 | 2.18 |
| United Arab | |||
| Emirates | STEP wastewater systems | 187 | 1.39 |
| Germany | Albabstieg Tunnel | 149 | 1.10 |
| Italy | Grosseto–Siena expressway | 107 | 0.80 |
| Chile | Candelaria Mine 2011 | 93 | 0.69 |
| Oman | Road Sinaw–Duqm | 87 | 0.65 |
| Oman | Duqm port facility | 77 | 0.57 |
This segment encompasses the group's service companies and central staff divisions.
| € mln. | 2013 | 2012 | ∆ 2012–2013 % |
∆ 2012–2013 absolute |
|---|---|---|---|---|
| Output volume | 136.19 | 124.83 | 9 | 11.36 |
| Revenue | 26.51 | 19.98 | 33 | 6.53 |
| Order backlog | 10.66 | 11.96 | -9 | -1.03 |
| EBIT | 0.06 | -1.97 | n.a. | 2.03 |
| EBIT margin % of revenue | 0.2 | -9.9 | ||
| Employees | 5,741 | 5,777 | -1 | -36 |
The STRABAG Group is subject to a number of risks in the course of its business activities. These risks are identified and assessed using an active risk management system and dealt with using an appropriate risk policy.
The group's goals are defined at all company levels. This is a prerequisite to setting up processes for the timely identification of potential risks standing in the way of the achievement of company objectives. The organisation of STRABAG's risk management builds on project-related jobsite and acquisitions controlling, supplemented by the higher-level assessment and steering management. The risk controlling process includes a certified quality management system, internal group guidelines for the workflow in the operating units, a central administration, controlling, auditing and contract management. Through the establishment of company-wide quality standards in quotation processing and supplemental services management, the centrally organised contract management department can better assert claims for outstanding debt.
The group's internal risk report defines the following central risk groups:
The entire construction industry is subject to cyclical fluctuations and reacts to varying degrees depending on region and sector. Overall economic growth, development of the construction market, the competitive situation, the conditions on the capital markets and technological changes in construction can all result in risks. These risks are continually observed and monitored by the central departments and operating units. Changes in external risks lead to adjustments in STRABAG's organisation, market presence and range of services as well as the adaptation of strategic and operating planning. STRABAG further responds to market risk with geographic and product-related diversification in order to keep the influence on the company's success exerted by an individual market or by the demand for certain services as low as possible. To avoid bearing the entire risk of rising prices by itself, STRABAG makes efforts at signing cost escalation clauses and "cost-plus-fee" contracts in which the client pays a previously agreed margin on the costs of the project.
The operating risks primarily include the complex risks of project selection and execution. STRABAG keeps acquisition lists in order to review the project choice. Business transactions requiring consent are reviewed and approved by business unit and subdivision managers or by division managers according to internal rules of procedure. Depending on the risk profile, bids must be analysed by commissions and reviewed for their technical and economic feasibility. Cost accounting and expense allocation guidelines have been set up to assure a uniform process of costing and to establish a performance profile at our construction sites. Project execution is managed by the construction team on site and controlled by monthly target/performance comparisons; at the same time, our central controlling provides constant commercial backing, ensuring that risks of individual projects do not endanger the continuance of the company.
Under financial risks, STRABAG understands risks in financial matters and in accounting, including instances of manipulation. Special attention is paid to the liquidity and accounting receivables management, which is secured through continuous financial planning and daily status reports. Compliance with internal commercial guidelines is guaranteed by the central accounting and controlling departments, which are also responsible for internal reporting and the periodic planning process. Risks from possible instances of manipulation (acceptance of advantages, fraud, deception or other infringements of the law) are monitored by all business areas in general and by the internal audit department in particular.
See also Corporate Governance Report
In order to convey STRABAG's values and principles, the group drew up its Code of Ethics and internal Compliance Guidelines in 2007. The values and principles contained within these documents are reflected in the guidelines and instructions of the STRABAG companies and divisions. Compliance with these values and principles is expected not only from the members of the management and supervisory boards as well as from other management-level employees but from all group employees. The Compliance Guidelines and the Code of Ethics are designed to guarantee honest and ethical business practices. The Code of Ethics is available for download at www.strabag. com > Investor Relations > Corporate Governance > Code of Ethics.
Detailed information regarding interest risk, currency risk, credit risk and liquidity risk can be found in the Notes under item 25 Financial Instruments.
Risks concerning the design of personnel contracts are covered by the central personnel department with the support of a specialised data base. The company's IT configuration and infrastructure (hardware and software) is handled by the central IT department, controlled by the international IT steering committee.
PEOPLE & WORKPLACE
See chapter "People at STRABAG"
Past experience has shown that having a highly qualified and motivated workforce is an important factor in competition. In order to properly assess the potential of employees, STRABAG uses an IT-supported aptitude diagnostics process, the so-called behaviour profile analysis. In subsequent feedback talks and employee appraisal interviews, employees and their supervisors analyse the results and agree on specific training and further education measures.
STRABAG can exert influence on the management of associated companies through its shareholder position and, if applicable, any existing advisory functions. The shares in asphalt and concrete mixing companies usually involve sector-typical minority holdings. With these companies, economies of scope are at the fore.
The group also operates in countries which experience political instability. Interruptions of construction activity, restrictions on ownership interests of foreign investors, and even dispossession or expropriations could be the consequence of political changes which could have an impact on the group's financial structure.
A review of the current risk situation reveals that the reporting period shows no risks which jeopardised the company's existence, nor were there any visible future risks.
The control structure as defined by the Committee of Sponsoring Organisations of the Treadway Commission (COSO) provides the basis for the description of the key features of the internal control and risk management systems. The COSO framework consists of five related components: control environment, risk assessment, control activities, information and communication, and monitoring. On this basis, the STRABAG Group set up a company-wide risk management system according to generally accepted principles.
The aim of the internal control system is to support management in such a way that it is capable of assuring internal controls in relation to financial reporting which are effective and which are improved on an ongoing basis. The system is geared to the compliance with rules and regulations and to creating conditions which are conducive to performing specific controls in key accounting processes.
Internal audit report in the Corporate Governance Report
The corporate culture determines the control environment in which management and employees operate. STRABAG is constantly working to improve its communication and to convey its corporate values as defined in the STRABAG Code of Ethics in order to guarantee moral standards, ethics and integrity within the company and in our dealings with others.
The implementation of the internal control system in relation to the financial reporting process is done on the basis of internal rules and guidelines. Responsibilities for internal control were adapted to fit the corporate organisation.
The internal audit department carries out periodic, unannounced inspections of all relevant business units as part of its responsibility for monitoring compliance with the law and corporate guidelines in the technical and commercial areas. The internal audit department also monitors the effectiveness of the compliance organisation. During these inspections, the internal audit department analyses the legality and correctness of individual actions. The internal audit department also conducts regular, independent reviews of compliance with internal guidelines in the area of accounting. The head of the internal audit department reports directly to the CEO.
The management identifies and monitors risks relating to the financial reporting process, with a focus on those risks that are typically considered to be material.
The preparation of the financial statements requires regular forecasts, with the inherent risk that the actual future development will deviate from the forecast. This especially affects the following matters/items of the consolidated financial statements: assessment of unfinished construction projects, recognition and measurement of provisions (including social capital), the outcome of legal disputes, the collectability of receivables as well as the recoverability of investments and goodwill. In individual cases, external experts are called in or publicly available sources are considered in order to minimise the risk of a false assessment.
All control activities are applied in the current business process to ensure that errors or deviations in financial reporting are prevented or detected and subsequently corrected. The control activities range from a management review of the period results to specific monitoring of accounts to the analysis of ongoing accounting processes. It is the responsibility of the management to design the levels of hierarchy in such a way that an activity and the control of that activity are not performed by the same person (foureyes principle).
Information and communication
The management regularly updates the rules and regulations for financial reporting and communicates them to all employees concerned. In addition, regular discussions regarding the financial reporting and the rules and regulations in this context take place in various committees. These committees are composed of the corporate management as well as the department head and senior staff from the accounting department. The committee's work aims, IT security control activities represent a cornerstone of the internal control system. The separation of sensitive activities is supported by a restrictive approach to IT access authorisation. For its accounting and financial reporting, the company mainly uses self-developed software which reflects the unique features of the construction sector. The effectiveness of the financial reporting system is further assured through automated IT controls included in the system.
amongst others, at guaranteeing compliance with accounting rules and regulations and to identifying and communicating weak points and potential areas for improvement in the financial reporting process. Accounting employees receive regular training regarding new methods of national and international financial reporting in order to identify risks of unintended misreporting at an early stage.
The management and supervisory boards bear responsibility for the ongoing company-wide monitoring. Additionally, the remaining management levels are responsible for the monitoring of their respective areas of responsibility. Controls and plausibility checks are carried out at regular intervals. The internal audit department is also involved in the monitoring process.
The top management receives monthly summarised financial reports on the development of the output volume, the results of the respective segments and countries, and the liquidity. Financial statements to be published are submitted for final appraisal by the senior accounting staff and the commercial management board members before they are passed on to the audit committee of the supervisory board.
PEOPLE & WORKPLACE Human resources
In 2013, STRABAG SE employed an average of 73,100 people in all countries in which it operates (2012: 74,010), of which 28,091 were whitecollar and 45,009 were blue-collar workers. With a minus of 1 %, the number of employees was down only slightly. Large changes in several entities almost completely balanced each other out: on the one hand, the workforce was reduced for market reasons in Poland; on the other hand, new large-scale projects in non-European markets and in Germany resulted in a plus of nearly 1,600 jobs.
In the past financial year, 1,118 blue-collar apprentices (2012: 1,129) and 255 white-collar trainees (2012: 259) were in training with the group. Additionally, 45 technical trainees and 10 commercial trainees were employed as at 31 December 2013.
The percentage of women among group employees averaged 13.6 % (2012: 13.4 %), in group management it was 8.6 % (2012: 8.7 %). With these figures, the company has only partially reached its goal of annually raising the percentage of women within the group.
As a technology group for construction services, the STRAGAG Group does business in a rapidly changing environment. The increasing advances in technology, closer dovetailing with other industries, and continuously growing competitive pressure present the company with enormous challenges. To remain competitive in the long term, the company must come to understand the impact of these developments on its core business and introduce the necessary measures to secure an advantage over the competition. The focus is therefore on an increasing technological orientation and on systematic innovation management.
On the one hand, the STRABAG Group has for years been cooperating with international universities and research institutions. On the other hand, it sees its internal research and development units as giving it a strategic competitive advantage: in overall charge of the planning and execution of research and development projects within the STRABAG Group are the two central divisions Zentrale Technik (ZT) and Gesellschaft zur Optimierung von Technischen Prozessen, Arbeitssicherheit und Qualität (TPA), both of which report directly to the CEO.
ZT is organised as a central division with 750 highly qualified employees at 21 locations. It provides services in the areas of tunnelling, civil and structural engineering, and turnkey construction along the entire construction process: from the early acquisition stage and bid processing to execution planning and site management, ZT offers innovative solutions with regard to construction materials technology, construction management and construction physics, and software solutions. Central topics for innovation activities are sustainable construction and renewable energy. Among other things, the employees at ZT develop methods and tools to control the impact that construction activities have on the environment.
TPA is the STRABAG Group's competence centre for quality management and materialsrelated research and development. Its main tasks include ensuring the quality of the construction materials, structures and services as well as the safety of the processes, and developing and reviewing standards for the handling and processing of construction materials. With lean management, TPA also holds competences for the efficient planning of supply and production chains. TPA has about 900 employees at 130 locations in more than 20 countries, making it one of Europe's largest private laboratory companies.
STRABAG's EFKON AG subsidiary provides the group with expertise in the research and development of intelligent transportation systems in general and electronic toll collection solutions in particular. The company has developed products and solutions in the electronic toll collection segment for multi-lane traffic flow and has already introduced these onto the market. The research focus last year was on the topics of mobile and portable enforcement, microwave communications and image acquisition systems. The technology company headquatered in Raaba near Graz, Austria, is seeing a lot of international demand and was able to achieve an export ratio of 95 % in 2013.
In addition to specific research projects at the group's units and subsidiaries, a large part of the research and development activities takes place at ongoing construction projects – especially involving tunnelling, construction engineering and ground engineering. During construction in these areas, new challenges or concrete questions often arise which require new technological processes or innovative solutions and which contribute to the group's research, development and innovation activity.
The STRABAG Group spent about € 20 million (2012: about € 17 million) on research, development and innovation activities during the 2013 financial year.
Ecological responsibility has been a topic within the group for years and is also anchored in the corporate strategy. As a provider of construction services, STRABAG's activities cause dust and noise and alter the environment. As a zeroemissions construction site will not be a reality in the foreseeable future, it is the company's aim to limit the negative impact on the environment
Energy management helps to lower costs
The topic of energy is of great importance for the STRABAG Group not only for ecological but also for economic reasons. Energy management is an instrument with which it is possible to reduce energy use and, consequently, energy costs within the group over the long term. This requires operational objectives regarding energy use and CO2 emissions as well as the development and realisation of corresponding measures. Pilot projects on this topic have already been implemented at several of the group's operating entities in recent years.
The energy costs for the companies within STRABAG SE's scope of consolidation amounted to nearly € 342.73 million in 2013 (2012: € 347.13 million). Without measures to increase energy efficiency, energy costs can be expected
As in previous years, the carbon footprint for the 2013 financial year refers to the group's full scope of consolidation and includes emissions caused in 60 countries. Within the group, a total of 1,263,900 tonnes of CO2 were emitted during the year under report. This represents a decline of 2 % or more than 24,400 tonnes of CO2 in a year-on-year comparison. The emissions are reported separately for Scopes 1 and 2 as defined by the Greenhouse Gas Protocol. With 53 %, the highest proportion of CO2 emissions – as in the previous year – resulted from that results from our core business to a minimum. To this end, continuous investments are made in processes and technologies to increase the energy efficiency and reduce the environmental impact. For STRABAG, ecological responsibility begins with the planning of buildings and structures and continues through to their construction and services.
to rise in response to price hikes and legislative changes in the next few years. In 2012, therefore, the company launched a comprehensive energy management programme that made its first progress in 2013 with the reduction of energy use by 1.2 %. STRABAG's energy management includes the sum of all measures that are planned or are being implemented to guarantee a minimum use of energy for the required performance. Attempts are made to influence organisational and technical processes, and the group's employees are sensitised to the goal of improving energy efficiency. The positive results of such an energy management can be seen in the reduction of energy costs, the increased potential for tax savings, and the protection of the environment as a result of reduced emissions.
the use of fuels, almost exclusively diesel, within the group. This was followed by electricity and pulverised lignite with 23 % and 12 %, respectively. Germany, Poland and Austria caused the greatest share of these emissions (54 %). This shows that energy consumption is proportional to the generated output volume: with 63 %, these countries are also responsible for the greatest share of the group's output volume in 2013.
More information about ecological responsibility is available at csr.strabag.com (not audited by KPMG)
The energy data for the group are generated by the CarbonTracker software that was developed internally in 2012. CarbonTracker involves the automatic and systematic calculation of energy and carbon data contained within the available group databases. After using the Carbon-Tracker to calculate the group's carbon footprint for 2012, the objective for the coming years was to refine the calculation system so that an exact, up-to-date carbon footprint for each organisational unit can be determined. Some of these goals were already realised in 2013, such as the redesign of the input mask in order to enter the data more easily as well as the new ability to fully track changes through an archiving system capable of filtering by time of change and user. The software is web-based to allow access to the CarbonTracker via the group's intranet system.
| Unit | 2010 | 2011 | 2012 | 2013 |
|---|---|---|---|---|
| MWh | 499,945 | 499,146 | 486,033 | 497,943 |
| thousands of litres | 212,614 | 241,433 | 245,660 | 252,718 |
| heating value in MWh | 705,973 | 658,356 | 565,048 | 560,507 |
| thousands of litres | 25,836 | 21,644 | 17,790 | 16,053 |
| tonnes | 51,452 | 84,318 | 79,107 | 69,602 |
Following data collection, the focus was on data analysis. In order to make the energy and resource use within the STRABAG Group comparable, the company is working on a so-called "energy atlas" which will depict the energy flows by country and organisational entity. Using key performance indicators that show the energy
use and CO2 emissions of individual facilities and units, it will be possible to develop appropriate efficiency measures and to review their effectiveness. These data are to serve as a basis for the definition of concrete energy targets in the future.
1) Changes in the energy values over past publications result from the ongoing development of the system of data collection. The presentation deviates from the usual presentation of a five-year period as data are only available starting from the year 2010.
The share capital of STRABAG SE amounts to € 114,000,000 and consists of 114,000,000 fully paid-in, no-par value shares with a prorata value of € 1 per share of the share capital. 113,999,997 shares are bearer shares and are traded on the Prime Market Segment of the Vienna Stock Exchange. Three shares are registered shares. Each bearer share and each registered share accounts for one vote (one share – one vote). The nomination rights associated with registered shares No. 1 and No. 2 are described in more detail under item 4.
The Haselsteiner Group (Haselsteiner Familien-Privatstiftung, Dr. Hans Peter Haselsteiner), the Raiffeisen Group (Raiffeisen-Holding Niederösterreich-Wien reg. Gen.m.b.H, BLR-Baubeteiligungs GmbH, "Octavia" Holding GmbH), the UNIQA Group (UNIQA Insurance Group AG, UNIQA Beteiligungs-Holding GmbH, UNIQA Österreich Versicherungen AG, UNIQA Erwerb von Beteiligungen Gesellschaft m.b.H., Raiffeisen Versicherung AG) and Rasperia Trading Limited (controlled by Oleg Deripaska), as shareholder groups of STRABAG SE, have signed a syndicate agreement governing (1) nomination rights regarding the supervisory board, (2) the coordination of voting during the Annual General Meeting, (3) restriction on the transfer of shares and (4) joint development of the Russian market as a core market. The Haselsteiner Group, the Raiffeisen Group together with the UNIQA Group, and Rasperia Trading Limited each have the right to nominate two members of the supervisory board. The syndicate agreement also requires the syndicate partners to exercise their voting rights from syndicated shares unanimously at the Annual General Meeting of STRABAG SE. The syndicate agreement further foresees restrictions on the transfer of shares in the form of mutual pre-emptive rights as well as a minimum shareholding on the part of the syndicate partners.
In accordance with Sec 65 Para 5 of the Austrian Stock Corporation Act (AktG), all rights were suspended for 11,400,000 no-par shares (10 % of the share capital) effective 31 December 2013 as these shares are held by STRABAG SE as own shares as defined in Sec 65 Para 1 No 8 of the Austrian Stock Corporation Act (AktG) (see also item 7).
To the knowledge of STRABAG SE, the following shareholders held a direct or indirect interest of at least 10 % of the share capital of STRABAG SE on 31 December 2013:
• Haselsteiner Familien-Privatstiftung ... 28.6 %
In addition to its 18.8 % interest, core shareholder Rasperia Trading Limited also holds an option, valid until 15 July 2014, to buy a further 6.2 % of STRABAG SE from the other core shareholder groups mentioned above.
In exercising the authorisation by the 7th Annual General Meeting from 10 June 2011 and the renewed authorisation by the 8th Annual General Meeting from 15 June 2012 to acquire own shares in accordance with Sec 65 Para 1 No 8 of the Austrian Stock Corporation Act (AktG), the company by 31 December 2013 acquired 14,000,000 no-par shares, corresponding to 10 % of the share capital (see also item 7).
The remaining shares of the share capital of STRABAG SE, amounting to about 13.0 % of the share capital, are in free float.
Three shares are – as mentioned under item 1 – registered shares entered in the shareholder register. Registered shares No. 1 and No. 3 are held by the Haselsteiner Group and registered share No. 2 is held by Rasperia Trading Limited. Registered shares No. 1 and No. 2 allow their bearers to nominate a member each to the supervisory board of STRABAG SE.
No employee stock option programmes exist.
No further regulations exist beyond items 2 and 4 regarding the nomination and recall of members of the management and supervisory boards or regarding changes to the Articles of Association which do not result directly from relevant law and legislation.
The management board of STRABAG SE, in accordance with Sec 169 of the Austrian Stock Corporation Act (AktG), was authorised by resolution of the 5th Annual General Meeting of 19 June 2009 and with approval by the supervisory board to increase the share capital of the company by up to € 57,000,000 by 19 June 2014, in several tranches if necessary, by issuing up to 57,000,000 registered no-par shares for cash or contributions in kind (in this case also to the partial or full exclusion of the shareholders' subscription rights).
The management board, in accordance with Sec 174 Para 2 of the Austrian Stock Corporation Act (AktG), was further authorised by resolution of the 8th Annual General Meeting of 15 June 2012 and with the approval of the supervisory board to issue financial instruments within the meaning of Sec 174 of the Austrian Stock Corporation Act (AktG) – in particular convertible bonds, income bonds and profit participation rights – with a total nominal value of up to € 1,000,000,000, which may also confer subscription and/or exchange rights for the acquisition of up to 50,000,000 shares of the company and/or may be designed in such a way that they can be issued as equity, also in several tranches and in different combinations, up to five years inclusive from the day of this resolution, also indirectly by way of a guarantee for the issue of financial instruments through an associate or related entity of the company with conversion rights on shares of the company.
The management board was also authorised by resolution of this Annual General Meeting, in accordance with Sec 65 Para 1 No 8 and Para 1a and 1b of the Austrian Stock Corporation Act (AktG), to acquire bearer or registered no-par shares of the company on the stock market or over the counter to the extent of up to 10 % of the share capital during a period of twelve months from 10 July 2012 at a minimum price per share of € 1.00 and a maximum price per share of € 34.00. The purpose of the acquisition
Related parties
Business transactions with related parties are described in item 27 of the Notes.
may not be to trade with own shares. The authorisation can be exercised in full or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Sec 228 Para 3 UGB) or third parties acting on behalf of the company. The management board can decide to acquire shares on the stock exchange but must inform the supervisory board following decision to do so. Over-the-counter purchases require prior approval by the supervisory board. The management board was further authorised, in accordance with Sec 65 Para 1b AktG, for a period of five years from this resolution, to sell or assign its own shares, with approval by the supervisory board, in a manner other than on the stock market or through a public tender, to the exclusion of the shareholders' buyback rights (subscription rights), and to determine the conditions of sale. The authorisation can be exercised in full or in part or in several partial amounts for one or several purposes by the company, a subsidiary (Sec 228 Para 3 UGB) or third parties acting on behalf of the company.
With the exception of the agreements over a syndicated surety loan and a syndicated cash credit line, there exist no significant agreements to which STRABAG SE is party and which would become effective, change or end due to a change of ownership in STRABAG SE following a takeover offer.
No compensation agreements exist between STRABAG SE and its management and supervisory board members or employees in the event of a public takeover offer.
At the beginning of March 2009, an accident occurred during underground construction at the South Lot for the North-South urban metro line in Cologne, resulting in the collapse of the Historical Archive of the City of Cologne and significant portions of two neighbouring buildings. Debris collapsed into a hole which opened next to the North-South construction site at the Waidmarkt crossover junction. Two people were trapped under the rubble, and rescuers were only able to recover their bodies.
Construction on the underground is being carried out by a joint venture (JV) of Bilfinger SE (formerly Bilfinger Berger SE), Wayss & Freytag Ingenieurbau AG and a group company. The JV is led by Bilfinger SE on the technical side and by Wayss & Freytag Ingenieurbau AG on the commercial side. Through its subsidiary Ed. Züblin AG, STRABAG holds a 33.3 % interest in the JV.
The cause of the collapse remains unknown. The public prosecutor's office began an investigation – initially against persons unknown – with three separate experts into possible negligent homicide and endangerment in construction. Two independent proceedings are being conducted by the District Court in Cologne: one to collect evidence as to the cause of the accident and another to establish the damage to the buildings and archives. To prevent a possible lapse of potential claims, the independent proceedings against the JV Nord-Süd-Stadtbahn Köln, Los Süd, were extended to included additional natural persons and legal entities associated with the construction project. This extension is purely for formal reasons and is not connected to any new insights as to the cause of the accident. A model of the building is currently being built to help determine the cause and the damages, with completion expected no sooner than 2014. The model is to help clarify whether there were any mistakes or errors associated with the diaphragm wall set up by the JV.
Merely for the purpose of extending the statute of limitations, the public prosecutor's office in December 2013 opened proceedings against approximately 100 persons associated closely or loosely with the project. This purely precautionary measure does not represent any statement as to the cause of the accident; in this respect, it remains to be seen what the final result of the investigation of the site and the expert report reveal. We continue to believe that this project will not result in any significant damages for the company.
output outlook € 15 bn. 0 2013 2014e 14,0 14,7 13.6 13.6 0 % ebit outlook € 500 mln. 0 2013 2014e 14,0 14,7 261.58 ~≥0 % ≥ 260
More information about the individual markets in the country report
As STRABAG is highly diversified regionally and by construction segments, the movements in the individual markets should more or less balance each other out in the year to come:
While the price pressure continues in transportation infrastructures in Germany, affordable financing conditions present STRABAG with solid demand in building construction in this country. The picture is similar in Austria – in both of these home markets, therefore, the company expects a stable yet highly competitive situation. Poland, the third largest country for STRABAG in terms of output volume, was, as expected, affected by the end of the construction boom, but first impulses in infrastructure construction should be seen again at the end of 2014 thanks to the new EU budgets. A lack of financing in the Czech Republic, Romania and the Adriatic region means that very few large public-sector projects are being awarded at this time – with a resulting tougher competition on the price. A more positive outlook, on the other hand, is offered by transportation infrastructures in Slovakia, where several large motorway and expressway projects are currently being tendered, as well as in the area of building construction in Slovakia and the Czech Republic.
Detailed outlook in the segment reports
In summary, the STRABAG SE management board expects the output volume to remain more or less unchanged versus 2013 at € 13.6 billion. This will likely be composed of € 6.0 billion from the segment North + West, € 4.7 billion from the segment South + East and € 2.8 billion from the segment International + Special Divisions. The rest can be allotted to Other. The segment composition thus remains largely unchanged in comparison to 2013.
Due to the necessary purchase of projectrelated specialty equipment, the net investments (cash flow from investing activities) are expected to rise from € 332.38 million in 2013 to around € 350 million in 2014.
The management board expects an EBIT of at least € 260 million for the current financial year, which corresponds to the forecast value of 2013. Although the realisation of the measures proposed by the internal STRABAG 2013ff task force is beginning to show first successes, STRABAG faces a challenging environment in 2014 with higher price pressure in the European infrastructure construction sector. On the other hand, the company is registering continued solid conditions in building construction for the private sector.
In the subsequent years, the focus will continue to be less on growth of the output volume than on improving the profitability. From today's perspective, the STRABAG SE management board expects the output volume and the revenue to grow again as of 2016 at the earliest. Until then, a strict risk management as well as organisational measures to increase cost efficiency should lead to improved margins. The company aims for an EBIT margin of 3 % in the medium term.
The political developments in Ukraine since February 2014 are having no significant influence on the situation of the STRABAG Group from today's perspective. The company generates less than 1 % of its annual output volume in Ukraine. In Russia, the group expects to generate less than 3 % of its output volume in 2014. As construction is an export non-intensive industry in which most of the services are provided locally, and the STRABAG Group provides its services almost exclusively for private clients, the company does not expect the political developments to have any immediate impact on its business in Russia.
We have audited the accompanying financial statements, including the accounting system, of
for the fiscal year from 1 January 2013 to 31 December 2013. These financial statements comprise the balance sheet as of 31 December 2013, the income statement for the fiscal year ended 31 December 2013, and the notes.
The Company's management is responsible for the accounting system and for the preparation and fair presentation of these financial statements in accordance with Austrian Generally Accepted Accounting Principles. This responsibility includes: designing, implementing and maintaining internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances.
Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with laws and regulations applicable in Austria and Austrian Standards on Auditing. Those standards require that we comply with professional guidelines and that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the Company's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.
Our audit did not give rise to any objections. In our opinion, which is based on the results of our audit, the financial statements comply with legal requirements and give a true and fair view of the financial position of the Company as of 31 December 2013 and of its financial performance for the year from 1 January 2013 to 31 December 2013 in accordance with Austrian Generally Accepted Accounting Principles.
Pursuant to statutory provisions, the management report is to be audited as to whether it is consistent with the financial statements and as to whether the other disclosures are not misleading with respect to the Company's position. The auditor's report also has to contain a statement as to whether the management report is consistent with the financial statements and whether the disclosures pursuant to Section 243a UGB (Austrian Business Enterprise Code) are appropriate.
In our opinion, the management report is consistent with the financial statements. The disclosures pursuant to Section 243a UGB (Austrian Business Enterprise Code) are appropriate.
Linz, 11 April 2014
KPMG Austria AG Wirtschaftsprüfungs- und Steuerberatungsgesellschaft
Dr. Helge Löffler Austrian Chartered Accountants
Mag. Peter Humer Austrian Chartered Accountants
We confirm to the best of our knowledge that the consolidated financial statements give a true and fair view of the assets, liabilities, financial position and profit or loss of the group as required by the applicable accounting standards and that the group management report gives a true and fair view of the development and performance of the business and the position of the group, together with a description of the principal risks and uncertainties the group faces.
We confirm to the best of our knowledge that the separate financial statements give a true and fair view of the assets, liabilities, financial position and profit or loss of the parent company as required by the applicable accounting standards and that the management report gives a true and fair view of the development and performance of the business and the position of the company, together with a description of the principal risks and uncertainties the company faces.
Villach, 11 April 2014
Management Board
Dr. Thomas Birtel CEO Responsibility Central Divisions and Central Staff Divisions (except BRVZ) as well as Divisions 3L RANC1) and 3M RANC
Mag. Christian Harder CFO Responsibility Central Division BRVZ
Mag. Hannes Truntschnig Responsibility Segment International + Special Divisions
Dipl.-Ing. Dr. Peter Krammer Responsibility Segment North + West
Dipl.-Ing. Siegfried Wanker Responsibility Segment South + East (except Divisions 3L RANC and 3M RANC)
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.