THOR ENERGY PLC

Regulatory Filings Oct 19, 2016

7966_rns_2016-10-19_a5937e8f-6f4b-407e-9b4d-3e5725479984.html

Regulatory Filings

Open in Viewer

Opens in native device viewer

National Storage Mechanism | Additional information

You don't have Javascript enabled. For full functionality this page requires javascript to be enabled.

RNS Number : 9334M

Thor Mining PLC

19 October 2016

19 October 2016

THOR MINING PLC

MOLYHIL TUNGSTEN PROJECT - ASSAYS POINT TO NEW TUNGSTEN DEPOSITS

The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR) is pleased to provide an update regarding positive exploration work conducted at the Company's wholly owned Tungsten-Molybdenum Molyhil Project ("Molyhil") situated in the Northern Territory of Australia.

Highlights

·        In January 2015 Thor produced an updated feasibility study in respect of Molyhil demonstrating a post tax NPV of A$67m (UK£42m) further details of which are provided on the Company's website;

·        Thor is now proactively building its knowledge of the Molyhil project with a view to further enhancing the quality of the existing resource/reserve, increasing the total amount confirmed Tungsten-Molybdenum mineralisation and further improving efficiency with regard to future planned mine activities;

·        One important element of this work has been to identify new areas of Tungsten mineralisation in and around the project, which is the subject of the positive findings in this market announcement;

·        Laboratory assay results have reinforced the prospectivity of several targets following the completion of the exploration drilling program to test for additional tungsten mineralisation satellite to the Company's existing Molyhil tungsten deposit;

·        Prospective host rocks (skarn & calc-silicate, with proximal granite) are confirmed to exist under shallow alluvial cover in each of three prospects tested (Cattle Track, Gap Track, and Think Big);

·        In addition the Company's work has identified elevated tungsten assays at Cattle Track and Gap Track prospects;

·        Finally, the exploration programme has confirmed elevated titanium assays at the Think Big prospect.

Mr Mick Billing, Executive Chairman, commented: 

"I am pleased to report further material progress in our campaign to further enhance the value and project economics of Molyhil. In today's challenging resource environment mineral development companies are ideally placed with advanced projects, and Molyhil falls into that category with a Definitive Feasibility Study already complete.

We are now going about the business of building our knowledge and the inherent value of Molyhil, and today's announcement marks some great progress in this regard. 

The fertility of the Cattle Track and Gap Track prospects has been enhanced.  Whilst the number of holes in each of these targets is, both limited and quite widely spaced, we have identified both geochemical signature and geology indicative of potential mineralisation.  Further drilling on each of these targets is warranted and will be scheduled and additional announcements will therefore follow.

In addition Thor will be providing further updates in the near term with regard to the Company's Pilot Mountain, Nevada project and specifically the efficient route we have identified to significantly increase the in-situ resource at that project.

Finally the Company remains highly proactive in the review of new opportunities.  We hope to provide a further update to market in this regard at the earliest opportunity."

Following the initial on site analyses using hand held XRF analyser, samples were sent for laboratory follow up assay. The laboratory assay process has a lower detection limit of 1 part per million ("ppm") compared with 10ppm for the hand held XRF, and also uses a larger sample size. Trends in tungsten distribution are now apparent in the laboratory assays that were not apparent in the earlier analyses.

The laboratory analyses show tungsten elevated at two to three times background levels in the vicinity of the Molyhil Pinnacle (Cattle track) and along the southern margin of the Gap Track prospect (refer to map). At Gap Track, where a broader spread of data points was collected, a trend of elevated tungsten is apparent which reflects the trend in elevated magnetic response. These are encouraging results albeit at subdued levels.

Due to its low chemical reactivity and high physical density, tungsten does not tend to disperse in the soil and weathered rock profile as much as more reactive metals such as copper.  As a result, any detection of tungsten is considered encouraging and worthy of follow up investigation.

Enquiries:

Mick Billing +61 (8) 7324 1935 Thor Mining PLC Executive Chairman
Ray Ridge +61 (8) 7324 1935 Thor Mining PLC CFO/Company

Secretary
Colin Aaronson/

Daniel Bush/

Richard Tonthat
+44 (0) 207 383 5100 Grant Thornton UK LLP Nominated Adviser
Gerry Beaney/

David Hignell

John Howes
+44 (0) 20 3861 6625 Northland Capital Partners Limited Joint Broker
Nick Emerson /

Andy Thacker
+44 (0) 1483 413 500 SI Capital Joint Broker
Tim Blythe/

 Camilla Horsfall
+44 (0) 207 138 3222 Blytheweigh Financial PR

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

Competent Person's Report

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy.  Mr Bradey is an employee of Thor Mining PLC.  He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.  Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

About Thor Mining PLC

Thor Mining PLC is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.

Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in 2015¹ suggested attractive returns.  Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated Resources Estimate² on 1 of the 4 known deposits. 

In February 2016, Thor announced the sale of its Spring Hill Gold project³ for A$3.5million, of which A$1.5 remains due for settlement in February 2017, plus a royalty of:

·      A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

·      A$14 per ounce of gold⁴ produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

Notes

·      ¹ Refer ASX and AIM announcement of 12 January 2015

·      ² Refer ASX and AIM announcement of 10 June 2014

·      ³ Refer ASX and AIM announcement of 29 February 2016

·      ⁴ At the date of this announcement gold is trading at approximately A$1,650/oz

Assay results

Hole Id Easting GDA94 Northing GDA94 Sample depth-from (m) Sample depth-to (m) W (ppm) Cu (ppm) Mo (ppm) Fe (ppm) Ti (ppm)
16MAC001 577,893 7,483,253 1.5 2.8 3 30 2 20315 1350
16MAC002 577,897 7,483,300 0 1.5 <1 <10 <1 2795 220
16MAC003 577,900 7,483,348 1.5 3 3 20 1 11725 700
16MAC012 576,901 7,483,103 3 4.5 4 20 <1 23810 940
16MAC013 576,903 7,483,045 3 4.5 6 20 <1 30985 1660
16MAC014 576,899 7,482,999 1.5 3 4 20 <1 15140 1040
16MAC015 576,610 7,483,110 3 4.5 3 20 2 20760 1070
16MAC016 576,599 7,483,052 1.5 3 2 10 <1 61430 1430
16MAC017 576,589 7,482,996 1.5 3 3 50 1 34115 920
16MAC018 576,600 7,482,956 1.5 3 2 <10 <1 18285 1040
16MAC019 576,606 7,482,902 1.5 3 <1 <10 1 39530 1690
16MAC020 576,605 7,482,905 3 4.5 1 <10 4 42520 1870
16MAC021 576,298 7,482,888 6 7.5 5 10 6 26155 510
16MAC022 576,300 7,482,851 3 4.5 4 30 4 41445 1530
16MAC023 576,299 7,482,800 3 4.5 3 20 1 28625 1150
16MAC024 576,208 7,482,899 6 7.5 7 10 3 42175 2550
16MAC025 576,206 7,482,851 7.5 9 3 20 3 61045 2220
16MAC026 576,199 7,482,805 3 4.5 5 20 2 41810 1100
16MAC027 576,099 7,483,200 4.5 6 3 20 <1 38250 2520
16MAC028 576,103 7,483,248 3 4.5 3 40 <1 33075 2280
16MAC029 576,109 7,483,303 3 4.5 8 10 3 26635 2040
16MAC030 582,689 7,480,489 10.5 12 7 30 1 46590 4090
16MAC031 582,702 7,480,612 6 7.5 4 20 2 34205 1220
16MRAB032 583,400 7,480,298 7.5 9 1 30 <1 44750 5160
16MRAB033 583,398 7,480,400 6 7.5 3 10 <1 22735 1690
16MRAB034 583,398 7,480,493 4.5 6 3 10 <1 16545 2070
16MRAB035 583,204 7,480,601 3 4.5 3 20 3 19585 1510
16MRAB036 583,199 7,480,494 3 4.5 5 10 <1 18155 1550
16MRAB037 583,200 7,480,406 6 7.5 3 10 <1 22315 2130
16MRAB038 583,000 7,480,400 4.5 6 2 40 <1 54115 3080
16MRAB039 583,000 7,480,500 9 10.5 2 30 <1 35270 4100
16MRAB040 583,003 7,480,597 9 10.5 2 10 <1 22180 1840
16MRAB041 582,698 7,480,698 7.5 9 3 <10 <1 10855 710
16MRAB042 582,999 7,480,301 7.5 9 9 30 2 33460 1150
16MRAB043 583,202 7,480,301 6 7.5 7 30 2 27680 2000
16MRAB044 583,600 7,480,303 9 10.5 2 40 <1 38920 3160
16MRAB045 583,596 7,480,398 6 7.5 2 20 <1 39690 3250
16MRAB046 575,303 7,481,402 4.5 5 3 30 <1 49425 4970
16MRAB048 575,305 7,481,201 4.5 6 2 20 <1 47525 3900
16MRAB049 575,300 7,481,102 6 7.5 5 20 <1 18435 570
16MRAB050 574,898 7,480,908 4.5 6 3 30 <1 45895 3370
16MRAB051 574,899 7,481,003 3 4.5 2 20 <1 20920 790
16MRAB052 574,898 7,481,101 4.5 6 5 40 <1 31965 2800
16MRAB053 574,897 7,481,200 4.5 6 2 <10 <1 61125 3960
16MRAB054 574,895 7,481,295 4.5 6 1 30 <1 43950 4100
16MRAB055 574,856 7,481,393 7.5 9 2 20 <1 54035 2350
16MRAB056 574,895 7,481,497 1.5 3 <1 220 <1 86605 4200
16MRAB057 574,900 7,481,595 3 4.5 4 <10 <1 16870 2250
16MRAB058 575,305 7,481,504 4.5 6 4 <10 <1 16620 1470
16MRAB059 576,613 7,482,906 1.5 3 2 <10 <1 45370 1520
16MRAB060 576,602 7,482,899 3 4.5 2 <10 <1 37130 1600
16MRAB061 576,602 7,482,906 4.5 6 3 <10 <1 44060 2200
16MRAB062 577,897 7,483,301 1.5 3 3 <10 <1 54520 4900
16MRAB063 576,300 7,482,856 9 10.5 8 60 <1 27575 1760
16MRAB064 576,206 7,482,852 4.5 6 5 <10 1 51265 1810
16MRAB065 576,102 7,483,205 7.5 9 7 <10 <1 29245 1720

JORC Code, 2012 Edition - Table 1 report

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling techniques ·    Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

·    Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

·    Aspects of the determination of mineralisation that are Material to the Public Report.

·    In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.
Aircore and RAB drilling was used (as per hole id designation) to obtain 1.5 metre interval samples. 2kg subsamples were taken for logging, portable XRF analysis and follow up laboratory analysis where appropriate. Chip tray samples were collected and photographed.
Drilling techniques ·    Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). Initially aircore drilling was used but reverted to RAB as a result of difficulty penetrating large rocks within transported cover.
Drill sample recovery ·    Method of recording and assessing core and chip sample recoveries and results assessed.

·    Measures taken to maximise sample recovery and ensure representative nature of the samples.

·    Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.
Little to no sample recovery was generally achieved in the top 1.5 metres of RAB holes. Reasonable sample recovery was obtained thereafter. Sample recovery was not measured.
Logging ·    Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

·    Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

·    The total length and percentage of the relevant intersections logged.
Hole cuttings were logged geologically and photographed.
Sub-sampling techniques and sample preparation ·    If core, whether cut or sawn and whether quarter, half or all core taken.

·    If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

·    For all sample types, the nature, quality and appropriateness of the sample preparation technique.

·    Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

·    Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

·    Whether sample sizes are appropriate to the grain size of the material being sampled.
Subsamples were taken by hand scoop cutting across the entire volume of sample. This is not considered representative but adequate for reconnaissance geochemistry.
Quality of assay data and laboratory tests ·    The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

·    For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

·    Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.
Assay process comprised four acid digest followed by ICP-MS for Mo and W and ICP-OES for Cu, Fe and Ti. The assay process is not considered to be total for W and Mo and may result in a low bias for these elements.

No external QAQC reference materials were included in the assay process. Third party assay will be undertaken on a selection of samples.
Verification of sampling and assaying ·    The verification of significant intersections by either independent or alternative company personnel.

·    The use of twinned holes.

·    Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

·    Discuss any adjustment to assay data.
No significant intersections reported
Location of data points ·    Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

·    Specification of the grid system used.

·    Quality and adequacy of topographic control.
Hand held GPS
Data spacing and distribution ·    Data spacing for reporting of Exploration Results.

·    Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

·    Whether sample compositing has been applied.
Holes were spaced between 50 and 100 metres apart in lines crossing anomalies at 100, 200 or 400 metres apart.

No compositing of samples was undertaken.
Orientation of data in relation to geological structure ·    Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

·    If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.
All holes were vertical which is appropriate for reconnaissance geochemistry.
Sample security ·    The measures taken to ensure sample security. None
Audits or reviews ·    The results of any audits or reviews of sampling techniques and data. None

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement and land tenure status ·    Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

·    The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.
EL22349 100% Thor Mining plc

No known impediments to licence an operation.
Exploration done by other parties ·    Acknowledgment and appraisal of exploration by other parties. No historic data other than the regional aeromagnetic data
Geology ·    Deposit type, geological setting and style of mineralisation. Contact metamorphic skarn hosted tungsten.
Drill hole Information ·    A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

·    If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.
Drill hole summary table provided above. The vertical holes were all located on an essentially level plain thus the collar rl has not been included.

Sample depth varied as a function of cover depth and depth of drill refusal.
Data aggregation methods ·    In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

·    Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

·    The assumptions used for any reporting of metal equivalent values should be clearly stated.
None undertaken.
Relationship between mineralisation widths and intercept lengths ·    These relationships are particularly important in the reporting of Exploration Results.

·    If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

·    If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').
Not applicable
Diagrams ·    Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. Refer to figure 1
Balanced reporting ·    Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. All results provided
Other substantive exploration data ·    Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. No other data
Further work ·    The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

·    Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
The results provided warrant follow up investigation which will most likely comprise further RAB drill geochemistry on a reduced spacing targeting the two area of elevated tungsten so far.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCGGGRPUUPQUMB

Talk to a Data Expert

Have a question? We'll get back to you promptly.