Quarterly Report • Nov 26, 2019
Quarterly Report
Open in ViewerOpens in native device viewer



01 | Key Achievements

| Increased volume of new permits to €1,017m and project portfolio to €5.6bn exp. sales volume y-t-d |
||
|---|---|---|
| Operational achievements |
Since 30 June 2019, signed 4 forwards sales with total €815m expected sales volume: "Niederkasseler Lohweg" (Dusseldorf), "Westville" (Frankfurt/Main), "Siemens Areal / Schönhofviertel" (Frankfurt/Main), "west.side" (Bonn) |
|
| In Q3, launched construction for projects "Schwarzwaldstrasse" (Herrenberg), final section of "Schumanns Höhe" (Bonn), social housing part of "Marie" (Frankfurt/Main) |
||
| "Schulterblatt Amanda" (Hamburg) + Beethovenpark (1stsect., Augsburg) In Q3, launched sales for projects |
||
| Adjusted revenues increased by 36% to €302.4m (previous year: €222.5m) |
||
| Financial performance & outlook |
Adjusted gross profit margin of 32.7% (previous year: 26.8%) |
|
| Adjusted EBIT significantly up to €56.7m (previous year: €20.6m) |
||
| Adjusted Net Income substantially improved to €46.7m (previous year: -€1.7m) |
||
| FY 2019 outlook confirmed; Despite ongoing sales and construction progress, Q4 revenues and sales volume significantly driven by signed forward sales |

01 | Key Achievements
02 | Portfolio Overview


• In 2019 y-t-d approved new projects of total €1,017m expected sales volume
| Project | Exp. sales volume |
Exp. Units |
|---|---|---|
| Hamburg / Rothenburgsort | €182m | 716 |
| Herrenberg III / Schäferlinde | €56m | 141 |
| Leipzig / Rosa-Luxemburg-Strasse | €116m | 330 |
| Nuremberg / Seetor |
€103m | 199 |
| Nuremberg / Schopenhauerstrasse |
€65m | 101 |
| Nuremberg / Stephanstrasse |
€65m | 461 |
| Regensburg / Marina Bricks | €29m | 50 |
| Rosenheim / Bahnhofsareal Nord | €22m | 151 |
| Erlangen / Kitzmann | €19m | 32 |
| Subtotal as of 09/19 |
€655m | 2,181 |
| Bamberg | €73m | 227 |
| Augsburg | €51m | 102 |
| Nuremberg | €49m | 101 |
| Mönchengladbach | €105m | 303 |
| Essen | €68m | 212 |
| Leipzig | €16m | 75 |
| Total as of 11/19 |
€1,017m | 3,201 |
|



5.0% 1.8% 3.3%
1
under construction
26,7%
pre construction 5.1%
• Building right for 92% of portfolio completed or in process
"Others" include Wiesbaden, Mannheim, Hannover, Potsdam

03 | 9M 2019 Financial Performance

| Results of Operations (€m, adj.*) |
||||
|---|---|---|---|---|
| 9M 2019 | 9M 2018 | Delta | ||
| Revenues | 302.4 | 222.5 | 35.9% | |
| Project cost |
-203.5 | -162.7 | 25.1% | |
| Gross profit | 98.9 | 59.7 | 65.7% | |
| Margin | 32.7% | 26.8% | ||
| Platform cost |
-42.2 | -39.1 | 7.9% | |
| EBIT | 56.7 | 20.6 | 275% | |
| Margin | 18,8% | 9.3% | ||
| Financial Result |
-7.3 | -6.7 | 9.0% | |
| EBT | 49.4 | 13.8 | 357% | |
| Margin | 16.3% | 6.2 | ||
| Taxes | -2.7 | -15.5 | -82.6% | |
| Tax rate |
5.5% | 112% | ||
| Net income | 46.7 | -1.7 | >100% |
• Gross profit margin of 32.7% reflects exceptionally high share of revenue contribution from high margin projects in first nine month 2019
| €m | 9M 2019 | 9M 2018 |
|---|---|---|
| EBIT | 46.3 | 8.3 |
| ppa | 6.4 | 12.3 |
| Non-recurring items |
4.0 | - |
| Adj. EBIT | 56.7 | 20.6 |
*adjusted for ppa and non-recurring items
|



| 10 (Revenue recognition under Instone Group's adjusted results of operations, which is the basis of the Company's forecast, will continue to reflect share deals and asset deals in the same way, i.e. equivalent to the requirements stipulated in IFRS 15 irrespective of an expected IFRS IC decision to exclude share deals from revenue recognition over time in accordance with IFRS 15)

| In € million | 9M 2019 | 9M 2018 |
|---|---|---|
| EBITDA | 59.7 | 21.0 |
| Other non-cash items | -2.8 | -2.8 |
| Taxes paid |
-10.2 | -10.9 |
| Change in working capital |
-78.61 | -35.1 |
| thereof new land plot acquisition payments |
-93.7 | -28.5 |
| Operating cash flow | -32.0 | -27.82 |
| Operating cash flow excl. investments |
61.7 | 0.7 |
1without changes of business acquisition of S&P Stadtbau
2 without reimbursements of IPO costs from former shareholder
| In € million | 9M 2019 | FY 2018 |
|---|---|---|
| Corporate debt |
171.7 | 66.1 |
| Project related debt |
279.8 | 199.5 |
| Financial debt | 451.5 | 265.5 |
| - Cash and cash equivalents |
162.8 | 88.0 |
| Net financial debt |
288.7 | 177.5 |
| EBITDA (adjusted) (LTM) | 88.9 | 50.2 |
| Net debt/adjusted EBITDA |
3.2x | 3.5x |
| Gross corporate debt / adjusted EBITDA less project interest expenses |
2.2x | 1.6x |

04 | Outlook
05 | Appendix



Revenue (adj.) Guidance FY 2019 - 2022
• Midterm revenue guidance fully covered by existing projects
13 | (Revenue recognition under Instone Group's adjusted results of operations, which is the basis of the Company's forecast, will continue to reflect share deals and asset deals in the same way, i.e. equivalent to the requirements stipulated in IFRS 15 irrespective of an expected IFRS IC decision to exclude share deals from revenue recognition over time in accordance with IFRS 15)


| Q3 2019 | €k |
|---|---|
| Cost of materials |
-286,251 |
| Changes in inventories |
+87,344 |
| Indirect sales cost |
-1,778 |
| Capitalized interest on changes in inventories |
-2,804 |
| Total project cost |
-203,490 |
| Q3 2019 | €k |
|---|---|
| Personnel expenses |
-25,412 |
| Other operating income |
+2,388 |
| Other operating expenses |
-24,918 |
| Indirect sales cost |
+1,778 |
| Non-Recurring Costs1 | +3,976 |
| Total platform cost |
-42,188 |


1 including transaction costs from business acquisition and acquisition costs resulting from effects in previous years
|

| In €m | 9M 2019 | 9M 20181 |
|---|---|---|
| Total revenue | 296.4 | 210.2 |
| Changes in inventories | 86.8 | 24.5 |
| 383.2 | 234.7 | |
| Other operating income | 2.4 | 1.3 |
| Cost of materials | -286.1 | -185.2 |
| Staff costs | -25.4 | -22.6 |
| Other operating expenses | -22.0 | -18.7 |
| Depreciation and amortization | -3.0 | -0.4 |
| Earnings from operative activities |
49.1 | 9.1 |
| Income from associated affiliates | 0.0 | -2.2 |
| Other net income from investments | 0.0 | 2.1 |
| Finance income | 1.4 | 1.0 |
| Finance costs | -11.8 | -8.4 |
| Changes of securities classified as financial assets | 0.2 | -0.1 |
| EBT (reported) | 39.0 | 1.6 |
| Income taxes | -0.6 | -11.6 |
| Net income (reported) | 38.5 | -10.0 |
1 Previous year's figure adjusted

| In €m | 30/09/2019 | FY 2018 | |
|---|---|---|---|
| Non-current assets | 21.3 | 2.8 | |
| Inventories | 547.8 | 404.4 | |
| Contract assets | 156.6 | 158.5 | |
| Other receivables | 26.6 | 33.0 | |
| Cash and cash equivalents | 162.8 | 88.0 | |
| Current assets | 893.8 | 683.8 | |
| Total assets | 915.2 | 686.6 | |
| Total equity | 285.8 | 246.7 | |
| Financial liabilities | 321.7 | 177.7 | |
| Other provisions and liabilities | 17.3 | 8.5 | |
| Deferred tax liabilities | 34.9 | 32.2 | |
| Non-current liabilities | 373.9 | 218.4 | |
| Financial liabilities | 129.8 | 87.8 | |
| Trade payables | 73.6 | 78.3 | |
| Other provisions and liabilities | 52.1 | 55.1 | |
| Current liabilities | 255.5 | 482.7 | |
| Total equity and liabilities | 915.2 | 686.6 |
7
9
8

| In €m | 9M 2019 | 9M 20181 | |
|---|---|---|---|
| Consolidated earnings | 38.5 | -10.0 | |
| Other non-cash income and expenses | 7.2 | 33.5 | |
| Decrease / increase of inventories, contract assets, trade receivables and other assets |
-60.3 | 197.5 | |
| Increase / decrease of contract liabilities, trade payables and other liabilities |
-7.2 | -208.4 | |
| Income taxes paid | -10.2 | -10.9 | |
| 10 | Cash flow from operating activities | -32.0 | 1.7 |
| 11 | Cash flow from investing activities | -33.7 | 2.1 |
| Free cash flow |
-65.7 | 3.8 | |
| Increase of issued capital incl. contributions to capital reserves | 0.0 | 150.5 | |
| Increase from other neutral changes in equity | 0.0 | -9.1 | |
| Repayment of shareholder loans / Payout to non-controlling interests | 0.0 | -28.3 | |
| Cash proceeds from borrowings | 392.7 | 49.4 | |
| Cash repayments of borrowings | -246.4 | -82.7 | |
| Interest paid | -5.9 | -4.3 | |
| 12 | Cash flow from financing activities | 140.5 | 75.7 |
| Cash change | 74.8 | 79.5 | |
| Cash and cash equivalents at the beginning of the period |
88.0 | 73.6 | |
| Cash and cash equivalents at the end of the period |
162.8 | 153.2 |
11
1 Previous year's figure adjusted



Future growth fully funded
|

| In € million | Q3 19 | Q2 19 | Q1 19 | Q4 18 | Q3 18 | Q2 18 | Q1 18 |
|---|---|---|---|---|---|---|---|
| Volume of sales contracts |
183.1 | 69.0 | 62.8 | 206.2 | 104.2 | 120.0 | 30.0 |
| Project Portfolio (as of) |
5,384.1 | 5,091.7 | 4,790.2 | 4,763.2 | 3,620.3 | 3,589.1 | 3,408.5 |
| thereof already sold (as of) |
1,261.1 | 1,128.7 | 1,061.1 | 998.2 | 971.9 | 867.8 | 779.9 |
| In units | Q3 19 | Q2 19 | Q1 19 | Q4 18 | Q3 18 | Q2 18 | Q1 18 |
|---|---|---|---|---|---|---|---|
| Volume of sales contracts |
380 | 120 | 170 | 459 | 245 | 273 | 56 |
| Project Portfolio (as of) |
12,233 | 11,628 | 11,041 | 11,041 | 8,924 | 8,863 | 8,355 |
| thereof already sold (as of) |
2,944 | 2,684 | 2,564 | 2,395 | 2,283 | 2,038 | 1,849 |
(Unless otherwise stated, the figures are quarterly values)

| Project | City | Adj. Revenues (€m) |
|
|---|---|---|---|
| Quartier Stallschreiber Strasse / Luisenpark |
Berlin | 68.2 | |
| Wohnen am Kurpark / Wilhelm IX |
Wiesbaden | 40.3 | |
| Marienkrankenhaus | Frankfurt/Main | 34.5 | |
| Heeresbäckerei | Leipzig | 30.5 | |
| City Prag – Wohnen im Theaterviertel |
Stuttgart | 24.6 | |
| Franklin | Mannheim | 18.4 | |
| Niederkasseler Lohweg | Dusseldorf | 18.4 | |
| Sebastianstrasse / Schumanns Höhe |
Bonn | 15.1 | |
| Rebstock | Frankfurt/Main | 14.9 | |
| west.side | Bonn | 12.4 | |
| Others | 25.1 | ||
| Total | 302.4 |
|

| Project | City | Volume (€m) | Units |
|---|---|---|---|
| Niederkasseler Lohweg |
Dusseldorf | NA1 | 221 |
| Quartier Stallschreiber Strasse / Luisenpark |
Berlin | 55.1 | 100 |
| Marienkrankenhaus | Frankfurt/Main | 40.5 | 42 |
| Sebastianstrasse / Schumanns Höhe |
Bonn | 26.6 | 61 |
| Wohnen am Kurpark / Wilhelms IX | Wiesbaden | 23.4 | 34 |
| Schulterblatt | Hamburg | 15.3 | 67 |
| Theaterfabrik | Leipzig | 14.7 | 50 |
| Schwarzwaldstrasse | Herrenberg | 14.7 | 36 |
| Kantstrasse 55-57 (property) |
Leipzig | 11.5 | 4 |
| Marina Bricks | Regensburg | 10.0 | 20 |
| Others | 103.12 | 35 | |
| Total | 314.9 | 670 |
1 The parties to the contract have agreed not to disclose the purchase price. 2Figure includes volume from project "Niederkasseler Lohweg".

| Project | City | Exp. Sales Volume (€m) |
Units | |
|---|---|---|---|---|
| City-Prag – Wohnen im Theaterviertel |
Stuttgart | ~110 | ~250 | |
| Sebastianstrasse / Schumanns Höhe |
Bonn | ~68 | ~185 | |
| Schwarzwaldstrasse | Herrenberg | ~48 | ~115 | |
| West.side | Bonn | ~35 | ~115 | |
| Marina Bricks | Regensburg | ~29 | ~50 | |
| Theaterfabrik | Leipzig | ~20 | ~75 | |
| Marie (social housing part) |
Frankfurt/Main | ~11 | ~55 | |
| Friedrich-Ebert-Strasse | Leipzig | ~10 | ~15 | |
| Fregestrasse | Leipzig | ~2 | ~5 | |
| Total | ~333 | ~865 |

| Project | City | Sales volume (€m) |
Units | |
|---|---|---|---|---|
| Marienkrankenhaus | Frankfurt | 109.9 | 92 | |
| Beethovenpark | Augsburg | 101.4 | 309 | |
| Schulterblatt "Amanda" | Hamburg | 77.2 | 100 | |
| Quartier Stallschreiber Strasse / Luisenpark |
Berlin | 33.6 | 40 | |
| Schwarzwaldstrasse | Herrenberg | 33.5 | 78 | |
| Others | ~94.4 | 137 | ||
| Total | ~450.0 | 756 |

| Project | Location | Sales volume (expected) |
Land plot acquired |
Building right obtained |
Sales started |
Construction started |
|---|---|---|---|---|---|---|
| Hamburg | ||||||
| Schulterblatt "Amanda" |
Hamburg | Mio 94 € |
||||
| Kösliner Weg |
Norderstedt-Garstedt | 102 Mio € |
||||
| Sportplatz Bult |
Hannover | 120 Mio € |
||||
| Rothenburgsort | Hamburg | Mio 182 € |
||||
| Berlin | ||||||
| Quartier Stallschreiber Straße / Luisenpark |
Berlin | 236 Mio € |
||||
| Wendenschlossstr | Berlin | Mio 55 € |
||||
| Rote Kaserne West |
Potsdam | Mio 49 € |
||||
| NRW | ||||||
| Sebastianstraße / Schumanns Höhe |
Bonn | 69 Mio € |
||||
| Niederkasseler Lohweg |
Dusseldorf | NA | ||||
| Dusseldorf Unterbach / Wohnen am Hochfeld |
Dusseldorf | Mio 157 € |
||||
| west.side | Bonn | Mio 186 € |
||||
| Gartenstadtquartier | Dortmund | 100 Mio € |
25 |
a) Status as of 30.09.2019 b) Semi-filled circle means that the milestone has yet been achieved for sections of the project (land plot acquisition, start of sales or construction). Concerning the building right the semi-filled circle means that the zoning process has been initiated. No circle for "land plot acquired" means that the land has not yet been purchased but secured by contract.

| Project | Sales volume |
Land plot acquired |
Building right |
Sales | Construction | |
|---|---|---|---|---|---|---|
| Location | (expected) | obtained | started | started | ||
| Rhine-Main | ||||||
| Wiesbaden-Delkenheim Lange Seegewann , |
Wiesbaden | 92 Mio € |
||||
| Siemens-Areal | Frankfurt | 546 Mio € |
||||
| St Marienkrankenhaus |
Frankfurt am Main |
210 Mio € |
||||
| Rebstock 1 2 BF |
Frankfurt am Main |
50 Mio € |
||||
| Friedberger Landstraße |
Frankfurt am Main |
324 Mio € |
||||
| Elisabethenareal Frankfurt |
Frankfurt am Main |
58 Mio € |
||||
| Wiesbaden - Wohnen am Kurpark |
Wiesbaden | Mio 103 € |
||||
| Steinbacher Hohl Frankfurt a. M , |
Frankfurt am Main |
Mio 42 € |
||||
| Gallus | Frankfurt am Main |
Mio 41 € |
||||
| Westville | Frankfurt am Main |
Mio 592 € |
||||
| Leipzig | ||||||
| Heeresbäckerei | Leipzig | 122 Mio € |
||||
| Semmelweisstraße | Leipzig | Mio 73 € |
||||
| Parkresidenz | Leipzig | 250 Mio € |
||||
| Rosa-Luxemburg-Straße | Leipzig | Mio 114 € |
26 |
a) Status as of 30.09.2019 b) Semi-filled circle means that the milestone has yet been achieved for sections of the project (land plot acquisition, start of sales or construction). Concerning the building right the semi-filled circle means that the zoning process has been initiated. No circle for "land plot acquired" means that the land has not yet been purchased but secured by contract.

| Project | Location | Sales volume (expected) |
Land plot acquired |
Building right obtained |
Sales started |
Construction started |
|---|---|---|---|---|---|---|
| Baden-Wurttemberg | ||||||
| City-Prag - Wohnen im Theaterviertel |
Stuttgart | 126 Mio € |
||||
| Franklin | Mannheim | Mio 69 € |
||||
| Schwarzwaldstraße | Herrenberg | 48 Mio € |
||||
| S`LEDERER | Schorndorf | 87 Mio € |
||||
| Neckartalterrassen | Rottenburg | Mio 140 € |
||||
| Schäferlinde | Herrenberg | 56 Mio € |
||||
| Bavaria South | ||||||
| Therese | Munich | 136 Mio. € | ||||
| Ottobrunner Straße 90/92 | Munich | 83 Mio. € | ||||
| Beethovenpark | Augsburg | 147 Mio. € | ||||
| Bavaria North | ||||||
| Schopenhauerstraße | Nuremberg | 65 Mio. € | ||||
| Stephanstraße | Nuremberg | 65 Mio. € | ||||
| Seetor | Nuremberg | 103 Mio. € | ||||
27 |
a) Status as of 30.09.2019 b) Semi-filled circle means that the milestone has yet been achieved for sections of the project (land plot acquisition, start of sales or construction). Concerning the building right the semi-filled circle means that the zoning process has been initiated. No circle for "land plot acquired" means that the land has not yet been purchased but secured by contract.

| March 19, 2020 | Publication of annual report 2019 |
|---|---|
| May 28, 2020 | Publication of quarterly group statement as of 31 March 2020 |
| June 9, 2020 | Annual General Meeting |
| August 27, 2020 | Publication of group interim report as of 30 June 2020 |
| November 26, 2020 | Publication of quarterly group statement as of 30 September 2020 |
Thomas Eisenlohr (Head of Investor Relations) Instone Real Estate Group AG Grugaplatz 2-4, 45131 Essen T +49 201 45355-365 | F +49 201 45355-904 [email protected] / [email protected] www.instone.de