AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Vår Energi ASA

Earnings Release Dec 18, 2025

3780_rns_2025-12-18_102de7fa-b523-40bd-b39d-dcb47eb2f628.html

Earnings Release

Open in Viewer

Opens in native device viewer

Sustaining long term production with ten high quality project sanctions in 2025

Sustaining long term production with ten high quality project sanctions in 2025

Sandnes, Norway, 18 December 2025: Vår Energi (OSE: VAR, "the Company") is

progressing the portfolio of early-phase projects, sanctioning a total of ten

development projects this year. These developments form part of

the Company's early-phase portfolio of around 30 high quality projects. The

projects are adding high value barrels to sustain production of between 350 and

400 thousand barrels of oil equivalent per day (kboepd) towards 2030 and beyond.

The Company has recently sanctioned the Previously Produced Fields in the

Greater Ekofisk Area (PPF), Eldfisk North Extension, Mikkel Flow Conditioning

Unit (FCU), Johan Castberg Isflak and Increased Oil Recovery (IOR) projects and

the first phase of the Balder Next project¹. Final investment decisions on the

following projects were reached earlier this year: Balder Phase VI, Fram Sør,

Gudrun Low Pressure Project and Snorre Gas Export.

Nick Walker, CEO of Vår Energi, said:

"Sanctioning ten projects this year, up from eight targeted at the start of the

year, shows the pace at which we are delivering. We are moving from resources to

reserves faster, creating significant value for our shareholders and

underpinning our ability to sustain production at 350 to 400 kboepd towards 2030

and beyond. We have delivered transformational growth this year, the Company is

de-risked and we have never been in a stronger position. Adding these projects

with low-risk, high-returns and short pay-back time, we are strengthening the

outlook for delivering long term value".

In total, the ten sanctioned projects add significant proved plus probable

(2P) reserves of around 160 million barrels of oil equivalent (mmboe) net to Vår

Energi. The projects demonstrate strong economics, with

an average portfolio rate of return of above 30% and breakeven price

of around USD 30 per barrel.

[1]The first phase of the Balder Next project consists of the debottlenecking at

Jotun FPSO to increase production capacity and drilling of new production wells.

The next phase will include the decommissioning of the Balder Floating

Production Unit (FPU) and development of additional wells.

Contact

Investor relations

Ida Marie Fjellheim, VP Investor relations

+47 905 09 291

[email protected]

Media

Liv Jannie Omdal, VP Communications

+47 97667137

[email protected]?? ([email protected]%E2%80%AF%E2%80%AF)

About Vår Energi

Vår Energi is a leading independent upstream oil and gas company on the

Norwegian Continental Shelf (NCS). To learn more, please visit varenergi.no

Talk to a Data Expert

Have a question? We'll get back to you promptly.