AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Nemetschek SE

Investor Presentation Mar 23, 2021

301_10-k_2021-03-23_ca416b03-dfd0-4ead-9706-2dfddca5d101.pdf

Investor Presentation

Open in Viewer

Opens in native device viewer

Building Lifecycle Intelligence

2020 COMPETENCES & REFERENCES

Contents

GB20_001.30_Referenzbooklet_en.indd 2 22.03.2021 13:15:28

2

Building Lifecycle Intelligence

The Nemetschek Group offers market-leading software solutions for the entire AEC/O lifecycle. As a pioneer of the digital transformation of the building industry and one of the leading corporate groups worldwide, Nemetschek covers the entire lifecycle of building projects and guides its customers into the future of digitalization.

Digitalization

Our solutions improve the digital workflow of all those involved in the building process. This makes it possible to design, build, and manage buildings with greater efficiency, sustainability, and environmental compatibility in terms of resources. We consider the building lifecycle to be a loop in which data is continuously being collected and put to further use. By utilizing the overall "data intelligence", it is possible to optimize the administration of a building and make better decisions for the next project.

Open standards

The Nemetschek Group is committed to open industry standards. For more than 30 years, we have been one of the forerunners when it comes to using the digital working method, Building Information Modeling (BIM), and today we are one of the most important drivers of open standards (OPEN BIM). We would like our customers to be able to use the best software solutions for their individual requirements, and at the same time, be able to collaborate seamlessly with all other disciplines.

Customer orientation

Our unique structure provides our brands in the four segments Design, Build, Manage and Media & Entertainment with the entrepreneurial freedom to develop innovative, customer-oriented solutions in close collaboration with their customers. Most of a product's new functions are the result of actual customer requirements, and our brands are profiting more and more from the synergies of the Group.

COLLABORATION FOR ALL REQUIREMENTS

Every building project is unique, as are the underlying requirements.

The right solution for any type of project and size of enterprise

Our constructed world is diverse. What is required of any construction project varies according to the function, target groups, geographical location and local conditions. But irrespective of whether it is train stations, hospitals, universities, sports stadiums, streets, bridges, tunnels, residential buildings, or new landscapes being built, the Nemetschek Group delivers innovative software solutions for buildings and projects of any type and scale. The requirements of those involved in the building process are almost as varied as the construction and infrastructure projects themselves. A small architecture office works differently than a big construction company with integrated disciplines. The Nemetschek Group offers the right solutions for any size of enterprise – for work that is efficient and sustainable.

Seamless collaboration across all building project stages – with BIM

Nemetschek develops holistic BIM solutions which cover the entire spectrum – from the design stage to construction and building planning, including the awarding of contracts and final billing, all the way to costing, scheduling, operational accounting and quality management at the construction site. The Nemetschek Group is also a reliable partner when it comes to property management, with solutions for the commercial and technical management of properties as well as smart digital solutions for the world of real estate (property technology). Our products, based on open standards and OPEN BIM, make it possible for architects, civil engineers, building clients, and property managers to collaborate with efficiency and foresight throughout the entire building lifecycle.

A new district in Brisbane, Australia, a school in Arizona, USA, and one of the world's largest locks in the Netherlands – the scope of BIM projects is wide, as you will see on the following pages.

OPEN BIM helps bring together stakeholders such as software providers, software users (architects, engineers, and building clients) as well as customers / owners in order to create amazing buildings together. OPEN BIM ensures workflow transparency, longevity, and accessibility of data for constructed buildings, efficiently and seamlessly with no data losses.

Integrated approach for Brisbane's new district

SEGMENTS: Design + Build

NEMETSCHEK BRANDS INVOLVED:

OPEN BIM, end-toend workflows and an integrated design approach: Queen's Wharf is a role model for any modern construction project

One of the most ambitious construction projects in the world, due for completion in 2022, is being built in Australia. The impressive new district, Queen's Wharf, in Brisbane is being created using software solutions from the Nemetschek Group.

tent workflow.

cafés and restaurants, hotels as well as 2,000 apartments. OPEN BIM ensures a consis-

Brisbane is Australia's third largest city. It arose from one of the first European settlements at Queen's Wharf in the early 1800s. This historic site is now being restored and redesigned. The new Queen's Wharf district will extend across more than 26 hectares of land and water and comprises 50 new bars, cafés and restau-

"This is a project of immense scale, extreme complexity and sheer innumerable levels of information."

QUINTON COOPER, PARTNER, COTTEE PARKER

rants, 2,000 apartments in three residential towers and more than 1,000 premium hotel rooms.

Our brands Bluebeam, dRofus, GRAPHISOFT, and Solibri are delivering software solutions for the design, draft and building phase as well as for the entire collaboration of the megaproject.

The project team led by Cottee Parker Architects have been collaborating digitally in order to plan and coordinate the vast amounts of draft data. They have been using Archicad for drafting, dRofus for data administration, Solibri Office for model testing, and Bluebeam Revu for comprehensive digital documentation. "This is a project of immense scale, extreme complexity and sheer innumerable levels of information," says Quinton Cooper, Partner and BIM Manger from Cottee Parker Architects. "Working with a Building Information Modeling approach allows the team to clearly organize all of the project's key information in an easy-to-access, central place."

The owner, Destination Brisbane Consortium, required that Queen's Wharf use the vendor-independent OPEN BIM approach, allowing all parties to work with the tools

2 A project of impressive dimensions and unparalleled esthetics.

1 0There will be space here for 2,000 apartments and more than 1,000 premium hotel rooms.

3 A major construction site right in the center of Brisbane. Design and construction need to work hand in hand.

A successful model: data-driven workflows and close collaboration.

they prefer. Gabor Gulyas, Project Lead and Operations Manager for Digital Engineering at DBM Vircon Project Management, explains that interoperability and a consistent OPEN BIM workflow were essential for this project. "There is no way around it when you consider that up to 300 people are working on the design models at the same time in peak periods, coordinating over 200 different models." DBM Vircon is responsible for the project management of the overall construction project.

Enabled by Archicad from GRAPHISOFT, and following Integrated Design principles, architects and engineers were able to review and check their models in real time. This way, they were able to understand each other's ideas and identify errors before they could occur at the construction site. Cottee Parker relied on Solibri Office for model testing. The tool is used to check design information for errors before it is issued to the contractors at the construction site, which saves time and money.

With Bluebeam Revu, the project team introduced a digital, paperless workflow. The solution, which is used to digitally review and verify documents, also played an important role in terms of optimization within the OPEN BIM process in the case of Queen's Wharf. The planning and data management tool dRofus makes it possible for the team to process its data and consolidate the huge amounts of information coming in from multiple sources. The advantage: All the data is kept in one place and all users can easily access it when needed.

The development of the new district in Brisbane, which started in 2013 and is planned to be completed in 2022, has already won two awards – the prestigious "buildingSMART International Award for Best Design" and a 6-star "Green Star Communities" rating for sustainable development.

SOFTWARE SOLUTIONS USED:
Bluebeam Revu
ARCHICAD
dRofus
Solibri Office
Solibri Anywhere
COLLABORATION CASE STUDY NO. 2
CATEGORY Port, Infrastructure

PROJECT Lock Terneuzen, The Netherlands

PROJECT-DESCRIPTION & CUSTOMERS BENEFITS

REFERENCE

The cloud-based platform Allplan Bimplus makes it possible to use information across all disciplines throughout the entire project lifecycle and ensures seamless collaboration. 10

Cloud-based BIM platform enables implementation of major project

Information management across the entire project lifecycle as the key to success

SEGMENT: Design

NEMETSCHEK BRANDS INVOLVED:

With a length of 427 meters, a width of 55 meters and a depth of 16.4 meters, the new Terneuzen lock in the Netherlands will be one of the largest locks in the world. As of 2023, it will accommodate bigger vessels and extend capacity along the shipping route between Paris and Rotterdam. This inland shipping route is one of the most used waterways and an important connection in Europe. The new lock will enable the smooth flow of inland vessels between the Netherlands, Belgium, and France while providing passage for seagoing vessels. During the massive construction project, it must

Thanks to the BIM management and data management platform Bimplus, it is possible for all the designers to easily review the reinforcement drafts.

"We gain time, efficiency and accuracy by working collaboratively in one BIM model."

SILVY SANTOSA, BIM SPECIALIST, BAM INFRACONSULT

The new lock is to enable the smooth flow of inland vessels between the Netherlands, Belgium, and France while providing passage for seagoing vessels.

be ensured that, among other things, the current shipping routes can still be maintained. In order to do this, Sassevaart, the joint venture responsible for designing and constructing the new Terneuzen Lock in the Netherlands relies on the digital working method Building Information Modeling (BIM) and uses Allplan Bimplus as the data management platform for the reinforcement process, from the drafting through to the implementation. Allplan Bimplus makes it possible to use information across all disciplines throughout the entire project lifecycle. This ensures seamless collaboration. In addition, the integrated static engineering and measuring software, SCIA Engineer, is used on this project. This allows for the planning of structures of any type or size.

Since many complex operations are beeing performed at the same time, the project poses sophisticated technical challenges and allows very little room for error or reworking. The middle lock will remain open for most of the construction period. During this time, a temporary shipping channel will be in operation. As a result of the dredging work, up to 13 million cubic meters of sediment will be removed; this will either be reused or disposed of via pipelines through the construction site. In total, 300,000 cubic meters of concrete will be poured, 32,000 tons of reinforcement steel will be required for strengthening the concrete construction, and 60,000 tons of steel will be installed. In order to coordinate the many concurrent activities, BIM has been adopted as the working method for coordinating the collaborative work between the project stakeholders during all stages of construction. By using the cloud-based BIM management and data management platform Bimplus, it is possible for all the designers to easily review the reinforcement drafts and provide feedback, as well as assign and track tasks for change management.

Silvy Santosa, BIM Specialist at BAM Infraconsult, says: "We gain time, efficiency and accuracy by working collaboratively in one BIM model and gathering and sharing the information on one platform, while also avoiding the loss of information. Therefore, creating and managing the information in our BIM model across the entire project lifecycle is the key to the success of this project. ALLPLAN's digital platform, Allplan Bimplus, plays an important role in the 3D reinforcement process," adds Silvy Santosa.

Allplan Bimplus enables all those involved in the project to access the centralized BIM model and optimize their own processes accordingly. Consequently, the entire team has a much better overview. It is possible to identify clashes in the reinforcement at an early stage. Moreover, this allows for the integration of sequencing, logistics and health and safety requirements during the planning. While the construction process is still underway, Allplan Bimplus has already become an essential part of managing the project.

SOFTWARE SOLUTIONS USED:
Allplan
Allplan Bimplus
SCIA Engineer
COLLABORATION CASE STUDY NO. 3
CATEGORY Educational Facility
REFERENCE
PROJECT
School Building
Holbrook, MA,
USA
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
The use of OPEN BIM at
Holbrook School ensures effi
cient collaboration and allows
architects, engineers and
building experts to work with
the software they prefer.
14

An excellent use of OPEN BIM

Nemetschek solutions enable the construction of a school building awarded for sustainability

Modern campus with characteristic semicircular main building.

SEGMENTS: Design + Build

NEMETSCHEK BRANDS INVOLVED:

Open Building Information Modeling (BIM) – or OPEN BIM for short – paved the way for the designing of a new school for the City of Holbrook, in the State of Massachusetts, USA. The architecture office Flansburgh Architects, based in Boston, was awarded the Leadership in Energy and Environment (LEED) Gold certification for sustainable building for this construction project. In this case, the architects opted for software solutions from the Nemetschek Group such as Vectorworks, Bluebeam and Solibri. OPEN BIM ensured efficient collaboration in the project and, at the same time, allowed architects, engineers and

1 Unmistakable copper plate system for the siding – timeless with natural elegance.

2 The front of the main building forms a semicircle around the campus premises connecting the elementary school with the middle and high schools.

3 The new building measures more than 18,500 square meters, extending across two stories.

building experts to work with the software they prefer. The new school consolidates the three previous Holbrook schools into one building, which can accommodate the more than 1,000 students from preschool to Grade 12. The new building measures more than 18,500 square meters, extending across two stories. The front of the building is a semicircle encompassing the campus premises. It connects the entrance to the elementary school at one end with the entrance to the middle and high schools at the other end of the curve. The jointly used rooms such as the gymnasium, art rooms, cafeteria, media center and auditorium as well as the surrounding academic buildings are directly accessible via this main thoroughfare. The special character of the semicircular building is further underscored by the material of the façade – an unmistakable pre-patinated copper plate system. This building material was chosen for its timeless quality and serves as a natural backdrop for the new campus greenery.

Prior to the Holbrook project, Flansburgh Architects were already using BIM on the internal design team for architecture documentation and coordination. "Implementing BIM for coordination was a very intuitive process for us," explains Brian Hores, BIM Manager "OPEN BIM allowed the multidisciplinary design team to use the solution they each liked best."

BRIAN HORES, BIM MANAGER, FLANSBURGH ARCHITECTS

The new school combines Holbrook's three previous schools into one building.

at Flansburgh Architects. "We've been using BIM for years because it provides us with a collaboration model with various types of data. The challenge then lay in extending the collaboration to include the consulting engineers and pass on the models for this specific project to the construction team. That's why we decided to switch to OPEN BIM. This allowed the multidisciplinary design team to use the solution they each liked best."

In the case of the new Holbrook school, Flansburgh Architects opted for Vectorworks for the design. The use of an OPEN BIM process made it possible to import, export and reference the data from all of the consultants and subcontractors. Although the engineers developed structural engineering and TGA models in other software tools, thanks to Vectorworks, it was possible to process the IFC files in an OPEN BIM exchange, ensuring a seamless workflow. Solibri Office was used for quality control and model verification allowing users to detect clashes and avoid errors. Bluebeam was used during the construction process for the documentation of approvals and comments as well as for the overall coordination and the distribution of drawings to the project stakeholders.

Delivered successfully: "The Holbrook project was awarded the LEED Gold certificate. It ranks highly with 35 percent water savings and 34 percent energy savings over comparable projects," says Kent Kovacs, Vice President and Principal in Charge at Flansburgh Architects.

SOFTWARE SOLUTIONS USED:
Vectorworks Designer
Vectorworks Architect
Solibri Office
Solibri Anywhere
Bluebeam Revu
CATEGORY Commercial Building
BRAND Maxon
REFERENCE
PROJECT
Copper Factory
Tulufan,
China

Further Customer Projects

Impressive architecture, state-of-the-art structural engineering, sustainable construction, and efficient management: our clients' projects are diverse.

CATEGORY Residential Building
REFERENCE
PROJECT
The Italiëlaan
Haarlem,
The Netherlands
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
Using BIM, herren 5 archi
tecten were able to seam
lessly collaborate with con
tractors on The Italiëlaan, a
four-building residential park
in Haarlem.

SOLUTION: Vectorworks Architect

WEBSITE: www.vectorworks.net

SEGMENT: Design

SOLUTIONS: Solibri Office, Solibri Anywhere

WEBSITE: www.solibri.com

CATEGORY Residential and Commercial
Buildings
REFERENCE
PROJECT
Battersea Power
Station
London,
Great Britain
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
Retaining the Power Station's
sense of scale and visual dra
ma is key to the project. The
designs respect the integrity
of the historic landmark whilst
also creating a new state-of
the-art events space.
COUNTY
ALLER
mun
CATEGORY Airport, Infrastructure
REFERENCE
PROJECT
The Circle
Zurich,
Switzerland
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
The Circle Zurich Airport was
the largest building con
struction project in Swit
zerland with an investment
sum of around one billion
Swiss francs. Thanks to the
3D design with Allplan, the
project partners were able
to efficiently manage the chal
lenges posed by the building
dimensions.

SOLUTION: Allplan

WEBSITE: www.allplan.com

CATEGORY Cultural Facility
REFERENCE
PROJECT
Zaryadye
Concert Hall
Moscow,
Russia
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
Successful implementation of
the latest BIM technologies
enabled a construction period
of only three and a half years,
including design and con
struction. The unique project
is considered one of the best
concert halls in the world.

SOLUTION: ARCHICAD

WEBSITE: www.graphisoft.com

REFERENCE
PROJECT
Conference Hotel
Travemünde,
Germany
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
Initially, the hotel was designed
to have four full floors. When it
was later decided to add a 5th
floor, the model-based work
was of great use, enabling the
planning to be quickly adapted
to the previously developed
building model.

SOLUTION: DDS-CAD Elektro

WEBSITE: www.dds-cad.net

SEGMENT: Design

SOLUTIONS:

Various structural analysis programs (et al. HO13+ Timber Truss Nodes)

WEBSITE: www.frilo.eu

CATEGORY Commercial Building
REFERENCE
PROJECT
Production Hall
Leutkirch,
Germany
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
HELBER+RUFF have used the
FRILO timber construction pro
grams in the design of many
detailed timber frames. This
shortens the time required for
the design and dimensioning of
truss nodes quite considerably.

CATEGORY Educational Facility
REFERENCE
PROJECT
Campus
Schoonmeersen
Ghent,
Belgium
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
Despite the fact that the
engineering model consists
of over 2600 elements, it
remained well-organised and
easy to use thanks to the
application of layers and the
useful quick-selection tool.

SOLUTION: SCIA Engineer

WEBSITE: www.scia.net

SEGMENT: Design

SOLUTION: RISA-3D

WEBSITE: www.risa.com

CATEGORY Educational Facility
REFERENCE
PROJECT
Student Union
Greensboro, NC,
USA
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
RISA was the clear choice
due to its ability to easily
edit members or boundary
conditions, allowing seamless
evaluation of multiple design
iterations.

CATEGORY Cultural Facility
REFERENCE
PROJECT
Munch Museum
Oslo,
Norway
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
The project utilized dRofus
for room and equipment coor
dination and planning, as well
as collecting product data
and documentation.

SOLUTION: dRofus

WEBSITE: www.drofus.com

CATEGORY Office Building
BRAND SDS/2
REFERENCE
PROJECT
400 West Georgia
Vancouver,
Canada

29

CATEGORY Hotel
REFERENCE
PROJECT
Crown Sydney
Sydney,
Australia
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
When the Covid-19 pandemic
hit Australia, the project team
relied on Revu for remote
collaboration enabling them to
complete the project on time.

SEGMENT: Build

SOLUTION: Revu

WEBSITE: www.bluebeam.com

REFERENCE
PROJECT
Frankfurt FOUR
Frankfurt / Main,
Germany
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
With the use of NEVARIS soft
ware solutions, the construc
tion of the four high-rise build
ings with heights from 100 to
228m was planned, executed,
and managed successfully.

SEGMENT: Build

SOLUTIONS: NEVARIS Build, NEVARIS Finance

WEBSITE: www.nevaris.com

SEGMENT: Build

SOLUTION:

SDS2

WEBSITE: www.sds2.com

CATEGORY Office Building
REFERENCE
PROJECT
400 West Georgia
Vancouver,
Canada
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
The LEED® Platinum office
building was conceived as a
playful aggregation of reflec
tive yet transparent stacked
boxes, which was easy to
plan and visualize with SDS2.

Manage

CATEGORY Healthcare
BRAND Spacewell
REFERENCE
PROJECT
Maria Middelares
Hospital
Ghent,
Belgium

REFERENCE
PROJECT
Gare Maritime
Brussels,
Belgium
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
The goal was to optimize
space and comfort in an
activity-based work environ
ment. Accenture implemented
the solutions from Spacewell
to improve overall space
utilization.

SEGMENT: Manage

SOLUTIONS: Cobundu Space Monitor, Cobundu Comfort

WEBSITE: www.spacewell.com

CATEGORY Office Building
REFERENCE
PROJECT
Think Tank
Karlsruhe,
Germany
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
In Karlsruhe's hi-tech Ost
stadt area, Hoepfner Bräu is
planning a think tank, creating
a remarkable counterpoint
next to the historic Hoepfner
Castle. Hoepfner Bräu runs all
digital property management
processes with iX-Haus.

SEGMENT: Manage

SOLUTION: iX-Haus

WEBSITE: www.spacewell-germany.com

CATEGORY Bridge, Infrastructure
BRAND Maxon
REFERENCE
PROJECT
King Salman
Bridge
United Arab Emirates

36

CATEGORY Sports Facility
REFERENCE
PROJECT
Soccer Stadium
Chengdu,
China
PROJECT
DESCRIPTION
& CUSTOMERS
BENEFITS
A proposed design for the
new football stadium in
Chengdu by Zaha Hadid.
The images were created to
highlight the delicate metallic
skin of the stadium as well as
the connection between the
stadium and the big public
space.

SEGMENT: Media & Entertainment

SOLUTION: Cinema 4D

WEBSITE: www.maxon.net

PICTURE CREDITS

Cover and inside, page 30: Crown Sydney, Sydney, Australia; Architects: Bates Smart; Engineering office: Robert Bird Group; Visualization: Floodslicer; Image: Samantha Roberts

Pages 4 and 23: The Circle, Airport Zurich, Switzerland; Architects: rlc ag; Image: Flughafen AG Zurich

Pages 4 and 14 – 17: New Holbrook School, Holbrook, USA; Architects: Flansburgh Architects

Page 4: Cordeel Headquarters, Temse, Belgium; Engineering office: Ney & Partners; Image: Limeparts-Drooghmans and Studio PSG Villanova Icône, Paris, France;

Architects: Hamonic + Masson & Associés

Kingaroy Hospital, Australia; Architects: Conrad Gargett Queensferry Crossing, Edinburgh, Great Britain;

General planner: Leonhardt, Andrä und Partner; Image: Liam Anderstrem

Van Roey Group Headquarters, Rijkevorsel, Belgium; Building management: Van Roey Services

Parramatta, Sydney, Australia;

Architects: McGregor Coxall; Image McGregor Coxall

Al Janoub Stadium, Al Wakrah, Qatar; Engineering office: AECOM High-rise Aglaya, Rotkreuz, Switzerland;

Precast elements: Nägele Betonfertigteil- und Transportbetonwerk Lake Stage, Bregenz, Austria; Engineering office: ZT-Büro Lener

Visualization: Exorbitart, Benjamin Springer

Pages 6 – 9: Queen's Wharf, Brisbane, Australia; Architects: Cottee Parker; Images: Destination Brisbane Consortium

Pages 10 – 13: Lock Terneuzen, The Netherlands; Engineering office: BAM Infraconsult; Images: Van der Kloet Foto & Videoproducties and Nieuwe Sluis Terneuzen

Pages 18 – 19: Tulufan Copper Factory, China; Visualization: Slashcube, Thomas Vournazos

Pages 20 – 21: Ülemiste Rail Terminal, Tallinn, Estonia; Architects: 3+1 Architects

Pages 22 – 23: The Italiëlaan, Haarlem, The Netherlands; Architects: heren5 architecten; Image: Luuk Kramer Battersea Power Station, London, Great Britain; Architects: Wilkinson Eyre; BIM consultant: Evolve Consultancy

Pages 24 – 25: Concert Hall Zaryadye, Moscow, Russia; Architects: CPU Reserve; Image: Iliya Ivanov Conference Hotel, Travemünde, Germany; Architects: Kruse Architekten

Production Hall, Leutkirch, Germany; Engineering office: HELBER + RUFF; Image: Rainer Retzlaff

Pages 26 – 27: Campus Schoonmeersen, Gent, Belgium; Architecture and engineering office: Bureau Partners

Student Union, Greensboro, USA; Engineering office: Stewart Munch Museum, Oslo, Norway; Administration: Municipality Oslo; Image: Tove Laluten

Pages 28 – 29 and 31: 400 West Georgia, Vancouver, Canada; Steel detailer: Supermetal

Page 31: Frankfurt FOUR, Frankfurt / Main, Germany; Engineering office: Hölscher Wasserbau GmbH

Pages 32 – 33: Maria Middelares Hospital, Ghent, Belgium; Provider: AZMM

Pages 34 – 35: Gare Maritime, Brussels, Belgium; Building management: Accenture

Think Tank, Karlsruhe, Germany; Architects: Schneider + Schumacher; Owner: Hoepfner Bräu Friedrich Hoepfner Verwaltungsgesellschaft

Pages 36 – 37: King Salman Brigde, United Arab Emirates; Visualization: Slashcube, Thomas Vournazos

Page 38 : Chengdu Soccer Stadium, China; Visualization: Slashcube, Thomas Vournazos

Nemetschek SE Konrad-Zuse-Platz 1 81829 Munich

Tel.: +49 89 540459-0 Fax: +49 89 540459-414 investorrelations@nemetschek .com www.nemetschek .com

NOTE: The printed Annual Report is accompanied by a non-certified editorial report about the Nemetschek Group, which can also be downloaded as a separate PDF.

40

Nemetschek SE Konrad-Zuse-Platz 1 81829 Munich Tel.: +49 89 540459-0 Fax: +49 89 540459-414 [email protected] www.nemetschek.com

Talk to a Data Expert

Have a question? We'll get back to you promptly.