AI assistant
XPEDRA RESOURCES LIMITED — Capital/Financing Update 2011
Jun 15, 2011
66100_rns_2011-06-15_f9b64c5e-da9b-4803-b6cb-90849421367a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [116 x 85] intentionally omitted <==
Voyager Commits to 25,000 metres of RC and Diamond Drilling
ASX Release
16 June2011
VOYAGER RESOURCES LIMITED ACN 076 390 451 Level 1 / 33 Richardson Street
WEST PERTH Australia
Tel: +61 8 9200 6264 Fax: +61 8 9200 4469
Contact: Kell Nielsen (Managing Director)
E-mail: [email protected]
Directors / Officers: Matthew Wood Kell Nielsen George Tumur Timothy Flavel Nick Lindsay
Issued Capital: Approximately 967.2 million Shares
Approximately 242.2 million Options
ASX Symbols : VOR, VORO
-
Voyager Resources has entered into two separate drilling service contracts for the commencement of drilling at its Khongor, Khul Morit and Daltiin Ovor Copper and Copper Gold Projects in Mongolia.
-
A Reverse Circulation Drilling rig is scheduled to be mobilised to Khul Morit tomorrow to commence drill testing of high order Induced Polarisation geophysical anomalies and to follow up previously intersected high grade copper in drilling that has returned:
-
27 metres at 2.09% copper from 28.8 metres (KH04), including:
- 12.5 metres at 3.63 % copper from 43.3 metres
-
-
At completion of the RC programme, the rig will transfer to the Daltiin Ovor Copper Gold Project, where Voyager has recently renegotiated the terms of agreement with the Vendors. Previous drilling completed by Voyager in 2010 at Daltiin Ovor returned exceptional results including:
-
3 metres at 50.59 g/t gold, 4.0% copper & 31.3 g/t silver from 6 metres (DL_12_RC)
-
9 metres at 10.45 g/t gold, 0.8% copper & 16.8 g/t silver from 11 metres (DL_04_RC)
-
9 metres at 10.40 g/t gold, 0.9% copper & 14.3 g/t silver from 10 metres (DL_10_08_RC)
-
4 metres at 6.66 g/t gold, 0.6% copper & 6.75 g/t silver from 2 metres (DL_17_RC)
-
A diamond core drilling programme is now scheduled to commence at the Khongor Copper Gold Project by month’s end, drilling is aimed at testing the mineralised system at depth beneath recently completed shallow drilling, that has returned highly encouraging results, including:
-
70.1 metres at 0.6% copper and 0.15 g/t gold (KH0005D), including
- **53.94 metres at 0.7% copper and 0.18 g/t gold** - **11.19 metres at 1.8% copper and 0.57 g/t gold** -
7.0 metres at 2.0% copper, 0.47 g/t gold and 3.4 g/t silver (KH0010D)
-
37.8 metres at 0.8% copper, 0.15 g/t gold and 2.3 g/t silver (KH0024D), including:
- **25.1 metres at 1.1% copper, 0.21 g/t gold and 3.3 g/t silver**
Media: Fortbridge +61 2 9331 0655 Bill Kemmery +61 400 122 449
- 5.4 metres at 1.0% copper, 0.50 g/t gold and 1.9 g/t silver (KH0024D)
Summary
Voyager Resources is pleased to announce that it has entered into a number of service contracts to facilitate the exploration of its key projects located in Mongolia. The focus of this is two initial drill contracts for 20,000 metres of diamond core drilling and a further 5,000 metres of Reverse Circulation (RC) drilling to be completed at the Khul Morit Copper Porphyry Project and the high grade Daltiin Ovor Gold Copper Project ( Figure 1) .
In addition to this, a number of geophysical and geochemical programmes are underway at Khongor and Khul Morit. It is anticipated that these surveys will extend the currently planned drill metres.
==> picture [261 x 12] intentionally omitted <==
----- Start of picture text -----
Figure 1 Voyager Resources Project Locations
----- End of picture text -----
==> picture [487 x 346] intentionally omitted <==
Khongor Copper Gold Project (Voyager 100%)
Drilling is to recommence at Khongor in the last week of June. Ongoing geophysical surveys including a deep penetrating dipole-dipole Induced Polarisation (IP) Geophysical Survey and a more extensive regional IP survey are currently being conducted over the project. This work has already highlighted deep drilling targets within the project. Plans are well advance to commence drill testing of those targets. IP geophysical surveys are effective in targeting deeper mineralisation as seen in similar systems such as Oyu Tolgoi, where the discovery hole (OTD150) intersected similar broad copper intersections to Khongor in the first 188 metres of the hole before intersecting the main mineralised body.
Ground magnetic & gravity surveys were also commenced in May along with a surface XRF soil geochemical mapping programme.
Khongor Copper Gold Project Background
Khongor comprises a large Induced Polarisation (IP) chargeability anomaly that extends for +1,600 metres by 380 metres that is broadly coincident with mapped copper mineralisation, porphyry style alteration and porphyry dykes. Geological mapping and drilling has indicated that Khongor is geologically similar to the World Class Oyu Tolgoi Copper Gold Deposit that is situated in the same geological terrain approximately 320 kilometres east of Khongor and has a stated Canadian NI 43-101 resource of:
3.75 billion tonnes at 0.98% copper and 0.38 g/t gold in the Measured, Indicated and Inferred categories**
The Khongor Copper Gold Project was previously trenched in 2005 with 5 trench lines being completed for 277 metres. Trenches were set out over 350 metres across five areas of outcropping mineralisation. Trenching returned excellent results, including:
-
18 metres at 1.33% copper and 0.32 g/t gold (Line2)
-
18 metres at 1.84% copper and 0.43 g/t gold (Line3)
Initial drilling conducted over the trenched area intersected broad zones of copper gold mineralisation, including:
-
50 metres at 1.0% copper and 0.3 g/t gold from 64 metres (KPDH09)
-
70.3 metres at 0.7% copper and 0.2 g/t gold from surface (KPDH03)
Drilling has also intersected high grade copper gold mineralisation associated with structurally controlled quartz chalcopyrite stockwork veining, these results include:
-
5 metres at 2.6% copper and 0.87 g/t gold from 44 metres (KPDH07)
-
14.1 metres at 2.4% copper and 0.64 g/t gold from 69.9 metres (KPDH09)
-
9 metres at 2.8% copper and 0.68 g/t gold from 53.3 metres (KPDH13)
Voyager completed twenty four diamond core drill holes at Khongor earlier this year for a total of 3,170 metres, with many intersecting porphyry style copper mineralisation. Drilling focused on extensions to the known mineralised system and shallow geophysical targets external to identified mineralisation. Drilling completed to date has so far confirmed the presence of mineralisation with significant porphyry type primary quartz chalcopyrite stockwork veins within highly altered siltstones and porphyries being intersected. Mineralisation varies from high density stockworks and sheeted veins to a lower density but persistent veins and disseminations occurring over substantial downhole intervals. These results are encouraging and have returned:
-
70.1 metres at 0.6% copper and 0.15 g/t gold (KH0005D), including
-
53.94 metres at 0.7% copper and 0.18 g/t gold
-
11.19 metres at 1.8% copper and 0.57 g/t gold
-
7.0 metres at 2.0% copper, 0.47 g/t gold and 3.4 g/t silver (KH0010D)
-
37.8 metres at 0.8% copper, 0.15 g/t gold and 2.3 g/t silver (KH0024D), including:
-
25.1 metres at 1.1% copper and 0.21 g/t gold and 3.3 g/t silver
-
5.4 metres at 1.0% copper, 0.50 g/t gold and 1.9 g/t silver (KH0024D)
Results to date, have expanded the porphyry copper mineralised zone to an area measuring some 400 by 150 metres in area, doubling the size of mineralisation previously reported. Drilling has also reported mineralisation in drill holes spaced more than 800 metres apart from west to east.
The Khongor copper gold mineralisation occurs within a two kilometre belt of altered and variably mineralised hornfels and monzodiorite related feldspar porphyry intrusions. A central core of localised sheeted and stockworked quartz chalcopyrite veining has been intersected in drilling. The setting and style of mineralisation can be compared to the giant Cadia Ridgeway system in New South Wales and the giant Oyu Tolgoi system in Mongolia.
The Khongor Copper Gold Project is an outstanding growth opportunity for Voyager Resources. Khongor is located in the World Class Oyu Tolgoi Copper Belt of the South Gobi Province of Mongolia and with further exploration has the potential to be a Company making project for Voyager. The commencement of drilling programmes is the first phase of an aggressive exploration programme that will include additional drilling, soil geochemical and geophysical surveys.
Khul Morit Copper Gold Project
(Voyager Earning 80%)
A Reverse Circulation (RC) Drilling Rig is to be mobilised to Khul Morit tomorrow to commence drill testing high order Induced Polarisation (IP) geophysical anomalies ( Figure 2) and to follow up previously intersected high grade copper in drilling that has returned:
27 metres at 2.09% copper from 28.8 metres (KH04), including:
• 12.5 metres at 3.63 % copper from 43.3 metres
This is the initial programme of a planned 10,000 metres of RC and diamond drilling to be completed at Khul Morit in 2011. In addition to the drilling, geophysical crews are on site and have commenced an Induced Polarisation survey over the entire licence area.
Figure 2 Khul Morit Induced Polarisation Anomaly and Drill Hole Locations
==> picture [498 x 251] intentionally omitted <==
Figure 3 Khul Morit Insert – Drill Hole Locations
==> picture [507 x 323] intentionally omitted <==
Khul Morit Copper Project Background
The Khul Morit Copper Gold Project is located in the Edrene Island Arc Terrain, which is one of a number of tectonic terrains that extend across the Gobi and southern regions of Mongolia, which have been proven to host a number of mineralised porphyry systems, including the giant Oyu Tolgoi Deposit.
Only limited exploration has been conducted over the project to date, results have been highly encouraging and support Voyager’s belief that Khul Morit has the potential to host a significant copper porphyry system.
Previous exploration at Khul Morit has defined two large high order Induced Polarisation (IP) chargeability anomalies that extend for at least 800 and 2,500 metres, with the larger anomaly remaining open to the east. The anomalies are broadly coincident with mapped mineralised copper bearing quartz tourmaline breccias, porphyry style alteration and porphyry dykes.
Drilling to date has focused on the peripheral area to the smaller IP anomaly within a 1.5 kilometre diameter volcanic breccia body, which is affected by argillic-tourmaline-sericite-silica alteration and has revealed an intense altered rhyolite porphyry breccia. A 60 metre thick secondary chalcocite enrichment zone coincident with high sulphidation mineralisation was also intersected on the periphery of the IP anomaly in diamond core drilling, this zone returned:
-
27 metres at 2.09% copper from 28.8 metres (KH04), including:
-
12.5 metres at 3.63 % copper from 43.3 metres
Exploration programmes are well advanced with work commencing in May, further mobilisation of geophysical crews and the RC rig are scheduled for this week. Voyager plans to undertake the following detailed exploration during 2011:
-
A gradient array IP geophysical survey covering the project area,
-
at least 100 line kilometres of shallow and deep penetrating Dipole-Dipole or Pole-Dipole IP geophysical surveys over the identified gradient IP anomalies,
-
a comprehensive gravity survey at 200 by 100 metre spacing for approximately 4,000 stations over the project area,
-
an infill ground magnetics survey at 100 metre line spacing for approximately 1,000 line kilometres,
-
a detailed surface geochemistry programme and
-
complete at least 10,000 metres of Reverse Circulation and diamond core drilling.
Khul Morit is located in the World Class Copper Belt of the South Gobi Province of Mongolia which hosts the giant Oyu Tolgoi Copper Gold Deposits. Khul Morit is an exceptional porphyry copper project that has the potential to be a company making asset for Voyager with further exploration.
Daltiin Ovor Copper Gold Project (Voyager Earning 80%)
Exploration was suspended on the Daltiin Ovor Copper Gold Project during the later part of 2010 and early 2011 as Voyager focused on acquiring the Khongor Copper Gold Project. Upon completion of the Khongor agreement and commencement of exploration, Voyager set about successfully renegotiating the terms of the Daltiin Ovor Project to the Company’s advantage with this being completed in May 2011.
Voyager plans to recommence exploration on the project utilising the recently contracted RC drilling rig to mobilise to site after completion of drilling at Voyager’s Khul Morit Project, located approximately 300 kilometres SSE of Daltiin Ovor.
RC drilling completed by Voyager in 2010 returned exceptional results, including:
-
3 metres at 50.59 g/t gold, 4.0% copper & 31.3 g/t silver from 6 metres (DL_12_RC)
-
9 metres at 10.45 g/t gold, 0.8% copper & 16.8 g/t silver from 11 metres (DL_04_RC)
-
9 metres at 10.4 g/t gold, 0.9% copper & 14.3 g/t silver from 10 metres (DL_10_08_RC)
-
4 metres at 6.66 g/t gold, 0.6% copper & 6.75 g/t silver from 2 metres (DL_17_RC)
Drilling was targeted at testing historic trench results ( Figure 4 ), including:
-
12 metres at 8.7 g/t gold, 24 g/t silver and 0.67% copper
-
14 metres at 2.58 g/t gold
-
15 metres at 5.4 g/t gold, 22 g/t silver and 0.5% copper
-
11.4 metres at 8.8 g/t gold, 14 g/t silver and 0.63% copper
The planned RC programme is designed to test strike extensions, down dip continuity of the intersected mineralisation that currently remains open to the north west and south east.
Daltiin Ovor Copper Gold Project Background
Voyager has the right to earn 80% of the Daltiin Ovor Copper Gold Project. Daltiin Ovor is located 600 km south west of the Mongolian capital of Ulaanbaatar ( Figure 1 ) and is situated within the Bayankhongor Gold Belt in south central Mongolia. The project has been previously trenched and drilled with reported skarn related gold, silver and copper mineralisation being identified in three separate skarn exposures located over a strike length of approximately 900m. Previous trenching has returned highly encouraging results, including:
-
12 metres at 8.7 g/t gold, 24g/t silver & 0.67% copper (KBT01)
-
11.4 metres at 8.8 g/t gold, 14 g/t silver & 0.63% copper (K2)
-
15 metres at 5.4 g/t gold, 22 g/t silver & 0.5% copper (K1)
-
10 metres at 7.80 g/t gold (KBT-04)
-
4.3 metres at 11.7 g/t gold, 11 g/t silver & 0.91% copper (K2)
-
5 metres at 3.4 g/t gold, 7.4 g/t silver & 0.27% copper (KBT03)
-
2.2 metres at 14.6 g/t gold, 31 g/t silver & 0.79% copper (K3)
A further trench (K4) was completed at the Ridge Zone (1.5 km northeast of previous drilling and trenching) where rock chip sampling returned anomalous gold and copper results, trenching returned significant results, including:
♦ 2.3 metres at 9.6 g/t gold, 21 g/t silver and 0.64% (K4)
Voyager completed approximately 2,000 metres of RC drilling in 2010, returning exceptional results, including:
-
3 metres at 50.59 g/t gold, 4.0% copper & 31.3 g/t silver from 6 metres (DL_12_RC)
-
9 metres at 10.45 g/t gold, 0.8% copper & 16.8 g/t silver from 11 metres (DL_04_RC)
-
9 metres at 10.4 g/t gold, 0.9% copper & 14.3 g/t silver from 10 metres (DL_10_08_RC)
-
4 metres at 6.66 g/t gold, 0.6% copper & 6.75 g/t silver from 2 metres (DL_17_RC)
Drilling completed by Voyager indicated that the mineralisation is shallow dipping as opposed to the previous interpretation from mapping that indicated the system was steeply dipping. Mineralisation also remains open to the northwest and southeast.
Kell Nielsen Managing Director
Competent Persons Statement
Mr Nielsen is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Nielsen is the Managing Director of Voyager Resources Limited and consents to the inclusion in this release of the matters based on his information and information presented to him in the form and context in which it appears.
Exploration Target Statement
*This work has not resulted in the definition of any resource which is compliant with the JORC Code but has identified an Exploration Target. With further exploration, this target has potential for between 100Mt to 200Mt of mineralisation at a grade of 0.7 to 1.0% copper within the drilled and surrounding area. The potential quantity and grade is conceptual in nature and there has been insufficient exploration to define a Mineral Resource in accordance to the JORC Code. As such it is uncertain if further exploration will result in the determination of a Mineral Resource. Further Voyager Resources cautions that in order to achieve this target, substantial exploration is required to further geologically map, detect, trench and drill test the defined conceptual target. On this basis, Voyager Resources considers that further work is warranted beyond that previously conducted.
Note on Oyu Tolgoi Resource Statement
**The resource quoted for the Oyu Tolgoi copper gold development was referenced from Table 1.4.1 “Oyu Tolgoi Mineral Resource Summary, 31[st] March 2010” from the report labelled “Oyu Tolgoi Technical Report June 2010” by AMEC Minproc and was released by Ivanhoe Mines Limited on the 7[th] June 2010.
Figure 4 Daltiin Ovor Schematic Geology, with Selected Trenching and Drilling Results
==> picture [498 x 342] intentionally omitted <==
Table 1 – Khongor Project Drilling Results
==> picture [503 x 444] intentionally omitted <==
Table 2 – Khul Morit Previous Drilling Results
==> picture [505 x 185] intentionally omitted <==
Table 3 – Daltiin Ovor 2010 Drilling Results