WEST WITS MINING LIMITED Annual Report 2018

Sep 26, 2018

66091_rns_2018-09-26_bc40613a-72e8-488d-a77f-cf1f82032cbb.pdf

Annual Report

Open in viewer

Opens in your device viewer

==> picture [341 x 345] intentionally omitted <==

==> picture [273 x 449] intentionally omitted <==

==> picture [341 x 347] intentionally omitted <==

ANNUAL REPORT For the year ended 30 June 2018

==> picture [341 x 104] intentionally omitted <==

“Transforming world class mineral resource into Gold

ABN 89 124 894 060 West Wits Mining Limited Annual report - 30 June 2018

Contents

Contents
Page
Chairman's letter 1
Review of operations and activities 2
Directors' report 13
Financial statements
Consolidated statement of comprehensive income 24
Consolidated statement of financial position 25
Consolidated statement of changes in equity 26
Consolidated statement of cash flows 27
Notes to the consolidated financial statements 28
Directors' declaration 52
Shareholder information 58
Corporate directory 60

Chairman's letter

Dear Fellow Shareholders,

On behalf of the Board of Directors, I am pleased to present the 2018 Annual Report for West Wits Mining Limited (“the Company” or “West Wits”) (ASX: WWI).

The Company continued its strategic transformation during the 2018 financial period, making significant progress toward achieving its goal of becoming a Junior Gold Producer targeting production of >80,000oz Au per annum.

Management’s key focus during the year was the further development of the Witwatersrand Basin Project (“WBP”) which gained momentum leading into the reporting period and then accelerated substantially. Production on the Kimberley Central Open Pit recommenced in June 2017, delivering free cashflow from October 2017 with proceeds allowing the Company to fund WBP’s broader exploration and development.

This small-scale production project provides a unique opportunity. It has enabled West Wits to preserve capital through organic revenues and, importantly, demonstrates to South African authorities and our stakeholders generally that the Company can deliver a project that provides both employment opportunities and broader benefits through the rehabilitation of historical mine works.

The Mining Right Application over WBP was submitted to the regulator in April 2018, this was a significant milestone for the Company as upon grant it would enable production to be scaled and extended to the broader resource area.

Our geology and engineering consultants have undertaken an exceptional amount of work during the year, increasing the JORC Resource nearly threefold to a sizeable 3.67Moz with an average grade of 3.4g/t (2g/t cut-off). The Company was delighted to announce an exploration target for further resource growth subsequent to the reporting period. Multiple open-pit and underground targets have been identified to date and once the Mining Right has been issued current operations can be quickly extended to new open-pit areas, with relatively low initial capital expenditure. Analysis of WBP’s priority underground target, Kimberley East, demonstrated the robust nature of the resource which restated at an increased average specified grade of 5.0g/t (3.5g/t cut-off) still delivers 450,000 oz Au, and thereby highlights the projects capability of remaining economical through the commodity cycle.

West Wits acquired two tenements in the Pilbara region of Western Australia. The Pilbara area generated a lot of excitement after Novo Resources (TSX-V: NVO) discovery at Purdy’s Reward which compared the conglomerates where the nuggety gold was found with that of those of the Witwatersrand Basin where our flagship project is located. The acquisitions supported our initiatives to raise funds for ongoing activity, extend the Company’s exploration footprint and allowed us to apply our extensive experience of the Witwatersrand style of mineralisation to the Pilbara. The exploration sector is still investing substantial amounts in an effort to gain an understanding of the geology of the area and initial field trips by our team confirmed extensive mineralisastion at surface across the Tambina project area. We are looking forward to progressing plans as funding becomes available.

Progress at the Derewo River Project has been slower than anticipated and a source of frustration to the Board. Management continued its’ approach of working through our local partner, PT Tambang Ray Sejahtra (TRS), who fund current activity and are more equipped to navigate the local regulatory environment. The area has exceptional prospectivity for gold mineralisation however the Board will continue to review the strategy in the subsequent period.

Thank you for your ongoing interest and support of West Wits.

For and on behalf of the Board

==> picture [119 x 57] intentionally omitted <==

Mr Michael Quinert Executive Chairman Melbourne 27 September 2018

1

West Wits Mining Limited Review of operations and activities 30 June 2018

Highlights

  • The Witwatersrand Project Global Mineral Resource Estimate (MRE) grew by 2.3Moz to 34.1 Mt @ 3.4g/t Au for 3.67Moz (at a 2.0 g/t cut-off)

  • 21.2Mt @ 3.51 g/t Au for 2.4Mz is in the Measured & Indicated categories

  • Small-scale operations at WBP delivered 8,270oz of gold production and net proceeds of $1.4m to fund South African operations

  • Submission of the Company’s Mining Right application to the South African regulator for the Witwatersrand Basin Project, a key development milestone

  • Building key partnerships with local community groups to improve the standard of living and provide employment opportunities

  • Acquisition of two tenements in the Pilbara (Australia), both highly prospective for conglomerate hosted gold, with three mining leases on the Tambina Project where initial field trips resulted in very positive sample results of the mineralised conglomerate outcrop

Overview

West Wits Mining (ASX: WWI) (the Company or West Wits) made significant progress at its’ flagship Witwatersrand Basin Project (WBP) over the reporting period. The Company maintained momentum from the end of FY2017 having expanded production and JORC Resource, submitting its Mining Right application and extending West Wits’ exploration footprint to the highly prospective Pilbara region in Western Australia. Progress at the Derewo River Gold Project (Derewo) remains slow, Management’s strategy to work through a local alliance minimises West Wits’ ongoing capital requirement, whilst retaining the upside exposure to the project’s exploration potential.

Delivering on a key objective, work performed during the period enabled management to increase the JORC Mineral Resource Estimate by 2.3Moz, growing the global resource at the Company’s WBP to 3.67Moz. Importantly, 2.4Moz is in the Measured & Indicated categories, increasing confidence in the Resource, which is fundamental when transferring a Resource to a Reserve.

Production re-commenced at WBP’s Kimberley Central Open Pit operation during the period, delivering key benefits to both the Company & local community groups. Total ore processed was approx. 160,000, at an average recovered grade of 1.8g/t which delivered 8,270oz of gold and net-cash proceeds of approx. $1.4m, funding WBP’s on-going exploration and development activities.

Current operations were made possible through a government directive to rehabilitate historical mine works on the Company’s lease area. The directive’s aim is to remove access to illegal miners in the area, rehabilitate the land and facilitate suburban development. Management is well progressed on this objective with Pit 1’s rehabilitation due to be completed in October. Current operations have also enabled West Wits to deepen its’ engagement with the local community by providing both employment on the project and funding for multiple not-for-profit local community support initiatives.

The Company reached an important milestone during the year having submitted to the regulator its’ Mining Right application over WBP’s lease area, approval is anticipated for 4Q FY2019. Once approved, management can extend open-pit operations and begin underground mine development, moving West Wits towards full-scale mining. In the interim two mining permits have also been sought, each covering a 5ha area, which allow open-pit mining whilst the Company’s mining right approval is being determined. The mining permits are forecast to be granted by 2Q FY2019 and are expect to double current production rates.

The acquisition of two tenements (Tambina & Mt Cecelia) in the Pilbara region of Western Australia during the period secured West Wits a foothold in an area highly prospective for conglomerate gold. The Pilbara received international attention after Novo Resources (TSX -V: NVO) discovery at Purdy’s Reward, with comparisons made to the Witwatersrand Basin’s geology. Management is able to leverage its’ extensive Wits expertise to gain an understanding

2

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

of the Pilbara projects geology and advance exploration. Three field trips to Tambina, which has three mining leases, mapped a strike length of 1,300m of gold mineralisation at surface with very positive assay results of rock-chip samples received.

West Wits maintains its’ strategy of partnering with a large, well connected and experienced local group to progress the Indonesian subsidiary’s Derewo Project. The Company’s main project partner, PT Tambang Ray Sejahtra (TRS), has continued to lobby various levels of the Indonesian Government to confirm the Clean and Clear (C&C) certification of the Company’s tenements (IUP’s) and also secure the alluvial site. The Company is optimistic this goal will be achieved albeit frustrated with the level of progress.

Witwatersrand Basin Project, South Africa

1) PRODUCTION – Kimberley Central Open Pit a. Background

Mining of the Kimberley Central Open Pit has been permitted through a government directive to rehabilitate historic mine works across a 1,500m section of Kimberley Reef outcrop. The rehabilitation involves the mining of historical crown pillars through open pit operations which, once backfilled, remove access by illegal miners to the historical mine works and allow for urban development.

West Wits’ strategy has been to partner with a local head contractor, Elandiwave, which is made up of a consortium of seasoned South African mining professionals and includes Wests Wits Black Equity Empowerment (BEE) partner. Under the agreement, West Wits received 60% of net proceeds from Pit 1 & 2, with net proceeds from Pits 3, 4 & 5 split on a 50:50 basis. The agreement also required Elandiwave to fund the initial working capital, which was repaid from net proceeds in the first 4 months of operations.

b. Production

Kimberly Central Open Pit has been operating continuously since recommencing in June 2017, the current mine schedule forecasts production to be completed in February 2019. Average monthly ore production was 13,500t for a total of 165,000t. Monthly production varied considerably over the period due to the nature of small-scale operations, which limits the Mine Planner’s ability to smooth out production for impacts such as the commissioning of new pits or seasonal heavy rain. Despite this, the operations team delivered on Management’s production target range of 10,000 – 15,000t ore per month.

Pit 1, the largest of the five planned pits, was completed in May 2018 having produced approx. 103,000t ore at an average recovered grade of 1.78g/t, delivering 5,890oz with a final strip ratio of 10:1. Pit 2 production was completed in July 2018 (post period) after 10 months of operations, the pit covered a smaller area and produced approx. 39,000t of ore at final strip ratio of 13:1. Combined Pit 1 & 2 production since operations recommenced (June 2017) hit the forecasted 90,000t of targeted high-grade ore (~2g/t) however an incremental 18,400t of lower grade ore (~1g/t) was also produced. This reduced the recovered grade however added to the net proceeds of the project as the low-grade ore is in the hanging wall of the target reefs and had to be mined to access them and therefore only incurs additional transport and processing costs.

Pit 3 (pictured) commenced production in November 2017, near the end of the reporting period the geology team identified a continuation of high-grade Kimberley reef at the western end of the pit which has enabled the extension of planned production by a further 3 months and will make Pit 3 comparable in size to Pit 1. The extension of the reef has required our mine engineers to redesign access to the pit, resulting in a higher stripping ratio from May – August 2018, however this is set to decrease through the remainder of the pit’s life and is expected to deliver material benefits.

April 2018 saw the start of operations at Pit 4, shortly after commencement it was identified that the Kimberley reef band being targeted extended to be in close proximity to the scheduled area of Pit 5. This resulted in the mine engineer extending Pit 4 to encompass the planned Pit 5 area.

3

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

==> picture [317 x 225] intentionally omitted <==

Image: Pit 3 outlining the target bands of the Kimberley Reef, K9A & K9B, and the re-design to enable access to the reef extension (top left of image)

c. Processing

WWI toll treats its ore through third party mills, the majority of production (135,000t) throughout the period was processed at Sibanye Stillwater’s Ezulwini plant located approximately 40km’s away, with a small portion (25,000t) of lower grade ore (0.9 -1.7g/t) processed at the Mogale plant in the five months to March 2018.

Dry ore tonnes paid during the period totaled 143,000t at an average grade of 1.8g/t for total production of 8,270oz Au. Recovered grade is below the targeted 2.0g/t, this is largely attributable to inclusion of low-grade material which operators mine through to access the higher-grade reef. Mine management is continuing to focus on mining methods to limit dilution and ensure grade of production meets the 2.0g/t target.

The Company’s Board intends to continue its’ strategy of toll treating production as there is significant excess milling capacity at multiple plants within close proximity of the project. This enables WWI to obtain highly competitive rates and de-risks the project by reducing capital costs associated with the construction and operation of a plant, including associated management of tailings. Average processing costs were approx. AU$33.50/t, comprising of AU$24.80/t in tolling fees and AU$8.70/t for transport costs to the mill.

d. Rehabilitation

West Wits has made significant progress on a key outcome of the current open-pit project, completing 90% of the rehabilitation of Pit 1 at the time of reporting. To rehabilitate the area under the government directive, operators mine the remnant crown pillars which encompass the historical mine shafts to a depth of 15-30m. The mine shaft is then concrete plugged at the base of the pit, the open-pit area is backfilled and flattened, removing the illegal miners operating in the area access to the old mine works and readies the area for urban development (pictured).

4

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

==> picture [269 x 291] intentionally omitted <==

Image: Historical mine shaft (top left), police clearing the area of illegal miners before Pit 1 commenced operations (top right), and aerial view of Pit 1 in July when rehab was approx. 60% complete (bottom)

e. Proceeds from Operations

Net proceeds from operations attributable to West Wits during the period totaled approx. AU$1.4m, providing funding for on-going exploration and development activities. The average price received for production was AU$1,680. Total costs for the Kimberley Central Open Pit operation, including rehab and after allocation to contract partner Elandiwave, was approx. AU$1,500 (10.4% margin).

The C1 costs averaged approx. AU$1,350/oz (pre-distribution to Elandiwave) with a range of AU$970-2,140/oz per month, which demonstrates the variability associated with small-scale production. Management expects costs to be in the lower quartile of that range when benefiting from economies of scale once the Mining Right application is granted and open-pit operations are extended to multiple targets.

5

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

2) EXPLORATION a) Background

WWI’s WBP comprises of two historic mining centres, Durban Deep and Rand Leases, within the Witwatersrand Basin and forms part of the world’s largest goldfield. Mining has been taking place within these areas since the goldfields were discovered in 1886, during that time up to seven different gold bearing conglomerate horizons were mined from surface down to 3,100m. Total production for the combined Durban Deep and Rand Lease areas was >40 Moz Au at grade exceeding 5 g/t Au and the historical mine had a 12.8Moz Mineral Resource Estimate (JORC 1997) at the time of closure in 2000 (ASX: WWI prospectus 15 November 2007). Harmony Gold Mining (JSE: HAR) reported production of 86,000 oz of gold for FY2017 at its Doornkop Mine situated directly adjacent to WBP’s western boundary.

b) Resource

WWI’s JORC Resource grew by 2.27Moz as result of work performed during the period, the growth represents a significant achievement for the Company and increased the Global Resource to 3.65Moz with 2.4Moz in Measured and Indicated categories.

Table 1 (below) shows the Global JORC Resource announced on 16[th] July 2018[1] and also takes into account depletion resulting from tonnes removed in the Kimberley Central Open Pit operations. A recent resource estimation focused on the K9B band of the Kimberley East Reef package and increased the Global Resource by 395,000oz (Measured +213,000oz, Indicated -255,000oz & Inferred +437,000oz) when compared to the Company’s Resource as at the 30[th] June 2018.

TABLE 1: UPDATED GLOBAL MRE FOR THE WITWATERSRAND BASIN PROJECT AT 2.0G/T CUT-OFF

Category Tonnes (millions) Grade (g/t Au) Ounces Au
Measured 12.01 3.65 1,420,000
Indicated 9.1 3.37 988,000
Measured & Indicated 21.1 3.54 2,418,000
Inferred 13 3.0 1,248,000
Total 33.9 3.4 3,656,000

Notes: The Global MRE set at a 2.0 g/t Au cut-off. Reported in accordance the JORC Code of 2012. Number differences may occur due to rounding errors.

WWI had previously only considered resources to 400m for the inclusion in published documents. The inclusion of deeper resources within the Kimberley Reef Outcrop (East) – mineralisation between 400-1,500m below surface – was made possible following an evaluation by Bara Engineering Consulting (Pty) Ltd which identified technical means to access these areas.

Effectively, the new MRE captures both historic mining and surface data that has been subjected to an extensive exercise of historical data recapture and validation followed by a new Mineral Resource Estimation (MRE) utilising ordinary kriging. The modern estimation techniques to create domains of higher grade “pay shoots” and lower grade “overbank” areas that are interpreted to result from the primary geological features of the reef. This is crucial as it allows for the identification of large high-grade areas that will be targeted for underground production.

1 The original report was “Global Resource Grows by 428,000oz Au to 3.67Moz at Witwatersrand Basin Project” which was issued with consent of competent persons, Hermanus Berhardus Swart & Dr Andrew J. Tunks and released to the ASX on 16[th] July 2018 and can be found on the Company’s website (https://westwitsmining.com/). All material assumptions and technical parameters underpinning the estimates used to determine the Mineral Resource have not materially changed & the company is not aware of any new information or data that materially effects the information included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially modified.

6

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

TABLE 2: PRIOR YEAR GLOBAL MRE FOR THE WITWATERSRAND BASIN PROJECT AT 2.0G/T CUT-OFF

Category Tonnes (millions) Grade (g/t Au) Ounces Au
Measured 2.21 4.25 302,000
Indicated 5.6 3.3 590,000
Measured & Indicated 7.81 3.57 892,000
Inferred 4.9 3.1 489,000
Total 12.7 3.38 1,381,000

Notes: The Global MRE set at a 2.0 g/t Au cut-off. Reported in accordance the JORC Code of 2012. Number differences may occur due to rounding errors.

West Wits’ released analysis of the declared resource on Kimberley East area, the first underground target area on 31[st] August 2018 (post period) which demonstrated the robust nature of the resource. Utilising differing cut-off grades when re-examining the K9B reef, as may appropriate when mining underground, when the cut-off grade is increased to 3.5g/t (from 2.0g/t) the average grade increases to 5.0g/t for 450,000oz au (from 3.4g/t for 1.2Moz) which illustrates the potential of the K9B reef to support underground mining in a variety of circumstances[2] .

c) Exploration Target

The 31[st] August 2018 ASX release also identified an Exploration Target of between 600,000oz (6.5M tonnes at 3.0g/t) and 1,000,000oz (8.0M tonnes at 4.0g/t) on the same area of the Kimberley East reef package[2] . The target focuses on the K9A reef which sits 10m stratigraphically above the K9B reef and has been extensively mined on the historic Durban Deep portion of the Witwatersrand Basin Project. The Exploration Target is based on an assumed 2.0 g/t cutoff, it utilises previous mining to the west of the area under consideration and the well understood geology of the Kimberley reefs where current open pit mining is taking place at the Kimberley Central Open Pit. The potential quantity and grade of the Exploration Target is conceptual in nature, that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource

2 The original report was “Witwatersrand Basin Project’s Kimberley Reef East Upside Potential” which was issued with consent of competent persons, Hermanus Berhardus Swart & Dr Andrew J. Tunks, it was released to the ASX on 31[st] August 2018 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that materially effects the information included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially modified.

7

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

3) LICENSING a) Mining Right

West Wits currently holds a Prospecting Right over the two lease areas however the Company reached an important milestone during the period having submitted its’ Mining Right application which received formal acceptance from South Africa’s Department of Mineral Resources (DMR) in May 2018 for processing. Once regulatory approval is secured, it opens options to have concurrent mining operations at several locations across the WBP, enabling the production platform to be rapidly scaled. This is a key step in the Board’s strategic plan to transform WWI into a junior miner with successful operations in the Witwatersrand Basin, producing >80,000oz Au per annum.

Securing mining rights is a rigorous process, as the regulator enforces strict environmental standards and ongoing rehabilitation obligations. Moreover, it must be shown to the regulator that West Wits has engaged with numerous stakeholders and community groups to ensure there is full consultation with respect to the proposed mining project and its impacts. To this end, management is fully engaged with nearby communities and other stakeholders. With rehabilitation of Pit 1 & 2’s mined out areas of the Kimberley Central open-pit well underway, we are already demonstrating West Wits ability to deliver on community and stakeholder requirements. Management expects to know the outcome of the approval process by 4Q FY2019.

b) Mining Permit

WWI’s team in South Africa have submitted two mining permit applications to the DMR. Under South Africa’s regulation, a company can apply for a mining permit whilst its’ mining right application is being assessed and each permit allows open-pit mining on a five-hectare area. The areas applied for are Main & South Central and Kimberley West open-pits which were selected primarily for the expected grade, with the earlier believed to be materially higher than the circa 2 g/t Au currently being achieved at the Kimberley Central open pit.

WWI currently anticipates the permit approval process to be completed in November 2018, as the regulator places a heavy emphasis on legacy environmental rehabilitation efforts and community engagement. Notably, however, WWI has already demonstrated to the regulator – with its efforts on Kimberly Central open-pit – that it continues to meet all key obligations.

4) COMMUNITY

West Wits is proactively engaged with communities to build strong, mutually beneficial relationships based on trust and respect, to ensure the success and sustainability of both the local communities and our business.

The Witwatersrand Basin Project is located on the western fringe of Johannesburg, an area with several communities who identify unemployment as a key concern. West Wits is committed to supporting the local population with most of the Company’s initiatives are focused on sustainable job creation through; learning & development programs, supporting new industries and the provision of basic services to the underprivileged & unemployed.

Two of West Wits’ cornerstone community partner groups are the Mandelaville Crisis Centre and the Sol Plaatjie Community Soup Kitchen.

Mandelaville Crisis Centre

The centre was established in 2002 to provide a number of services to combat poverty and works in partnership with government & civil society, to enhance the lives of communities through economic emancipation and moral leadership.

West Wits has sponsored several local community members seeking employment through a market garden program. The project develops skills to not only grow fruit & vegetables, but also sell produce at the Johannesburg market and reinvest the proceeds back into the project to ensure its sustainability. Any excess produce is distributed amongst the disadvantaged in the community.

Management donated three desktop computers to the centre’s computer lab, multiplying the number of students that can be taught in a single class by approximately 50%. The donation has expanded the reach of the various learning

8

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

programs, increasing class sizes and improving computer literacy of the local community to better enhance their prospects of securing jobs in modernised industries.

==> picture [468 x 159] intentionally omitted <==

WWI sponsored Mandelaville Crisis Centre’s Vegetable Project (left) and training at the computer lab (right)

Sol Plaatjie Community Centre – Soup Kitchen

West Wits are building the infrastructure of a local community development center. This includes laying the foundations, installing the toilet block, connecting gas & electricity, converting a sea container into an office block, and more. The center provides meals to the underprivileged and unemployed in the area, with a focus on the young and elderly.

==> picture [437 x 177] intentionally omitted <==

Image: Sol Plaatjie Community Soup Kitchen

Witwatersrand Basin Project

The Kimberley Central Open-Pit project has over 20 local community members in current employment. West Wits’ mining right application submitted to the DMR identified that a minimum of 500-700 employees would be required when the planned mine was at full capacity, making it a major employer in the area.

9

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

==> picture [414 x 203] intentionally omitted <==

Image: WWI employees at Kimberley Central Open-Pit’s 1yr Anniversary celebration

In addition to unemployment, crime is also a key concern of community leaders. A significant contributor is the establishment of the illegal mining communities who perform artisanal mining in the historical mine works. Not only is the mining unregulated and unsafe, the illegal activities also bring other crime problems to the area such as gunviolence over territorial disputes, drugs and prostitution.

One of the key elements of West Wits’ Kimberley Central Open Pit project has been the rehabilitation of historical mineworks near surface to remove access to the old mine shafts by illegal miners. The rehabilitated areas will enable the landowners to extend urban development, including low cost housing, parks and playing fields, providing a safer environment for locals. The company is also working with local stakeholders on the potential development of a market garden precinct on rehabilitated areas, creating an alternative industry with sustainable employment opportunities.

Pilbara, Australia

a) Background

Opportunistically, management acquired two tenements (Tambina & Mt Cecelia) in the Pilbara region of Western Australia during the period, securing a foothold in an area which has recently seen a “21[st] Gold Rush” after Novo Resources (TSX -V: NVO) discovery at Purdy’s Reward. The area forms part of the Lower Fortescue Group which is highly prospective for conglomerate hosted gold and has been commonly compared to the Witwatersrand Basin region. The purchase of each tenement was coupled with a capital raising, securing $2.2m (gross), which enabled the Board to shore up the balance sheet, ensuring ongoing development of the Company’s projects and allow the Company to apply its extensive knowledge and experience from the Witwatersrand Basin to this new frontier.

10

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

==> picture [277 x 214] intentionally omitted <==

Figure: West Wits two assets in the Pilbara, Australia

b) Tambina Project

The Company completed the Tambina acquisition in January 2018, the project comprises of three mining licenses which cover a total area of 102ha. The project is located in the east Pilbara, circa 150km southeast of Port Hedland, and is accessed via a well-maintained road, that services Atlas Iron’s Mt Webber mine, and exploration tracks. The key point of difference with the project is the three mining leases, as it means WWI could fast-track the commencement of any identified opportunity for mining operations materially faster than many peers as most regulatory requirements have been cleared.

Three field trips were performed during the reporting period, including due diligence, with the key purpose of identifying and mapping the gold bearing conglomerate horizons across the area. Assays of 73 rock-chip samples collected from 26 sites during field trips, all returned anomalous results >0.17 g/t Au, while 50 were > 0.5 g/t Au. The best 12 results returned values >6 g/t, with the highest 185 g/t over 2m. The geology team has now mapped gold mineralisation at surface for over 1,300m of strike, the prospective zone is with a series of gossanous conglomerate horizons containing abundant chert clasts.

==> picture [365 x 129] intentionally omitted <==

Photos of sample WWT0020 (Bag 2 of 3): Visible gold in pan concentrate, collection site and sample photo. The Geochemical assay for WWT0020 Bag 2 returned 185g/t.

11

West Wits Mining Limited Review of operations and activities 30 June 2018 (continued)

The Company has assessed options regarding the next phase of project development, including shallow drilling or lowcost trial mining programs. Management is currently prioritising the allocation of resources towards the Witwatersrand Basin Project whilst it’s in this critical phase of the mining right application with small-scale production which delivers free cashflow. However, exploration activity of peers in the region is closely followed by the team and management plans to advance the project as soon as capacity becomes available.

c) Mt Cecelia Project

The Company completed the acquisition of the Mt Cecelia project in December 2017, the project covers an area of 224 sq km and is located in the eastern Pilbara some 150km ENE of Marble Bar. Of critical geological significance is the fact that some 215ha of the project area is comprised of the Hardey Formation of the Lower Fortescue Group, which is highly prospective for conglomerate hosted gold.

The project is currently subject to the granting process for an exploration license. Negotiations are being held with the Native Title Parties to complete the Heritage Agreements, whilst negotiations are progressing, there are several issues that remain unresolved however management is confident of a positive outcome for both parties. Once the exploration license is granted, the geology team is ready to implement the first phase of the exploration program.

Derewo River Project, Indonesia

The Company’s Indonesian subsidiary, PT. Madinah Quarataa’in (PTMQ), which is made up of a business alliance with local groups continues to be frustrated by the regulatory process regarding the Clean & Clear (C&C) certification of the Derewo River Project’s tenements (IUP’s).

Whilst no formal progress has been made beyond the official recommendation for C&C status of the approximate 85,000ha of approximate 127,000ha area covered by PTMQ’s IUP, TRS has continued to navigate the local regulatory process and is currently securing a funding partner to execute the final stages of their plan to both receive the C&C certification and secure the alluvial site.

Management’s strategy has reduced West Wits ongoing capital investment with TRS bearing the cost of procuring the C&C Certificates, reinstatement of the balance of the original IUP’s and securisation of the alluvial site.

The information in this report relates to Mineral Resources is based on information compiled by compiled by Hermanus Berhardus Swart, a Competent Person who is a Professional Natural Scientist registered with South African Council for Natural Scientific Professions accredited (No. 400101/00) and a Fellow of the Geological Society of South Africa, each of which is a “Recognised Professional Organisation” (RPO) that is included in a list that is posted on the ASX website from time to time. Hermanus Berhardus Swart is employed by Dunrose Trading 186 (PTY) Ltd trading as Shango Solutions, which provides services as geological consultants to the Company. Hermanus Berhardus Swart has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Hermanus Berhardus Swart consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears Dr. Tunks (Member Australian Institute Geoscientists) conducted a peer review of the results. Dr Tunks is the Company’s Exploration Director and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Dr Tunks consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.’

12

West Wits Mining Limited Directors' report 30 June 2018

Your Directors present their report on the consolidated entity consisting of West Wits Mining Limited and the entities it controlled at the end of, or during, the year ended 30 June 2018. Throughout the report, the consolidated entity is referred to as the group.

Directors and company secretary

The following persons held office as Directors of West Wits Mining Limited during the financial year:

Mr Michael Quinert, Executive Chairman Mr Vincent Savage, Executive Director Mr Daniel Pretorius, Non-Executive Director Mr Hulme Scholes, Non-Executive Director Dr Andrew Tunks, Executive Director (appointed 13 March 2018)

The following person held office as company secretary of West Wits Mining Limited during the financial year:

Mr Phillip Hains, Company Secretary

Mr Phillip Hains, Company Secretary Mr Phillip Hains, Company Secretary Mr Phillip Hains, Company Secretary
Mr Michael QuinertExecutive Chairman
Experience and
expertise
Mr Quinert graduated with degrees in economics and law from Monash University
and has over 30 years experience as a commercial lawyer, and over 20 years as a
partner in a Melbourne law firm. He has extensive experience in assisting and
advising public companies on capital raising and market compliance issues.
Other current
directorships
First Au Ltd (ASX: FAU)
Former directorships in
last 3 years
Manalto Limited (ASX: MTL)
Covata Limited (ASX: CVT)
Special responsibilities Member of Audit, Risk & Compliance Committee and Remuneration & Nomination
Committees
Interests in shares and
options
Interest in shares 18,962,990
Interest in options 12,000,000
Mr Hulme ScholesIndependent Non-Executive Director Mr Hulme ScholesIndependent Non-Executive Director Mr Hulme ScholesIndependent Non-Executive Director
Experience and
expertise
Mr Scholes graduated with a BA Law and LLB degree from the University of the
Witwatersrand and is an admitted attorney of the High Court of South Africa. Mr
Scholes specialises in mining and mineral law, has practised exclusively in the field
for 20 years and is regarded as one of South Africa's experts within mining law. He
was a partner of Werksman Attorneys based in Johannesburg from 1999 to 2008
and is currently a senior partner at Malan Scholes Attorneys. He started his
professional career as a learner official for Harmony Gold Mining Co. Limited in the
1980's which provides him with a unique blend of experience.
Other current
directorships
Mr Scholes is currently a Non-Executive Director of Randgold and Exploration
Company Limited (JSE Listing) (JSE: RNG).
Former directorships in
last 3 years
Current:
Non-Executive Director - Randgold and Exploration Company Limited
Special responsibilities Nil
Interests in shares and
options
Interest in shares 1,136,364
Interest in options -

13

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Directors and company secretary (continued)

Directors and company secretary (continued) Directors and company secretary (continued) Directors and company secretary (continued)
Mr Daniel (Niel) PretoriusIndependent Non-Executive Director
Experience and
expertise
Mr Pretorius was appointed Group Legal Council for DRDGold Limited (DRDGold) in
2003 and Chief Executive Officer of DRDGold Ltd in January 2009. He has over 20
years’ experience in the mining industry. Mr Pretorius was present through the
re-focus of DRDGOLD's strategy to exit deep level underground mining, and focus
on surface reclamation through the expansion of their Crown Gold Recoveries
footprint, the acquisition and recommissioning of Ergo, and more recently the
acquisition of the surface gold portfolio of SibanyeStilwater.
Other current
directorships
Mr Pretorius is currently a Executive Director of DRDGold Limited (JSE:DRD).
Former directorships in
last 3 years
Current:
Executive Director: DRDGold Limited (JSE: DRD)
Special responsibilities Nil
Interests in shares and
options
Interest in shares -
Interest in options -
Mr Vin SavageIndependent Non-Executive Director
Experience and
expertise
Mr Savage has over 36 years’ experience in the building and mining industries,
coupled with 21 years working within the insolvency and business advisory sectors.
Mr Savage’s experience has seen him lead company reconstructions, refinancing
and development projects for mining clients throughout Australia and Internationally.
Over
the last three years Mr
Savage has been intimately involved in all
governmental and regulatory issues involving the Derewo River Gold Project as well
as working closely with the Company’s local Indonesian partners.
Other current
directorships
Nil
Former directorships in
last 3 years
Fluence Corporation Limited (ASX: FLC)
Special responsibilities Chair of Audit, Risk & Compliance and Remuneration & Nomination Committees
Interests in shares and
options
Interest in shares 14,194,231
Interest in options 5,000,000

14

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Directors and company secretary (continued)

Dr Andrew TunksExecutive Director Dr Andrew TunksExecutive Director Dr Andrew TunksExecutive Director
Experience and
expertise
Dr Tunks is a highly credentialed geologist with 30 years of local and international
experience, particularly in the gold sector. He has spent many years exploring and
overseeing projectsin developing countries throughout Africa and South America.
Global experience means Dr Tunks can provide expertise in navigating diverse
regulatory systems.
Having begun his career with Western Mining Corporation (WA) Dr Tunks
progressed to senior positions with leading gold producers including the role of Chief
Geologist at both IAMGOLD Corporation and Ranger Minerals (West Africa).
Since then, Dr Tunks has held several executive roles with ASX-listed groups
including CEO of Auroch Minerals, General Manager - Operations at Orinoco Gold
(Brazil) and CEO of A-Cap Resources (Botswana). More recently, he was appointed
MD of Meteoric Resources.
Dr Tunks has lectured on economic and structural geology at University of
Tasmania, published articles in peer-reviewed journals and presented at numerous
conferences. He is a member of the Australian Institute of Geoscientists, holds a
Bachelor of Science (Hons) from Monash and a PhD in geology from the University
of Tasmania.
Other current
directorships
Meteoric Resources NL (ASX: MEI)
Former directorships in
last 3 years
MSM Corporation International Limited (ASX: MSM)
Auroch Minerals Limited (ASX: AOU)
Special responsibilities Nil
Interests in shares and
options
Interest in shares 1,033,449
Interest in options 12,000,000
Mr Phillip HainsCompany Secretary
Experience and
expertise
Mr. Hains is a Chartered Accountant and holds a master of business administration
from RMIT University. Mr Hains has over 20 years’ experience in providing
businesses with accounting, administration, compliance and general management
services.
Other current
directorships
Nil
Former directorships in
last 3 years
Nil
Special responsibilities Nil
Interests in shares and
options
Interest in shares -
Interest in options -

15

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Directors and company secretary (continued)

Meetings of directors

The numbers of meetings of the group's board of Directors and of each board committee held during the year ended 30 June 2018, and the numbers of meetings attended by each Director were:

Full meetings
of directors
Full meetings
of directors
Meetings of committees Meetings of committees Meetings of committees Meetings of committees
Audit Remuneration
A B A B A B
Mr Michael Quinert
Dr. Andrew Tunks
Mr Vincent Savage
Mr Daniel Pretorius
Mr Hulme Scholes
6
1
6
6
5
6
1
6
6
6
4
-
4
-
-
4
-
4
-
-
1
-
1
-
-
1
-
1
-
-

A = Number of meetings attended

B = Number of meetings held during the time the Director held office or was a member of the committee during the year

Principal activities

The economic entity's principal continued activities in the course of the financial year were to explore for gold at the mining tenements situated in Western Australia, South Africa and Papua Province, Indonesia.

There have been no significant changes in the nature of those principal activities during the financial year.

Dividends

The Directors did not pay or declare any dividends during the financial year (2017: Nil). The Directors do not recommend the payment of a dividend in respect of the 2018 financial year.

Review of operations

Information on the operations and financial position of the group and its business strategies and prospects is set out in the review of operations and activities on pages 2 to 12 of this annual report.

Operating results

The consolidated results for the economic entity for the year were as follows:

2018 2017
$'000 $'000
$1.00
Revenue $8,739 $559
Net loss for the year after tax ($1,390) ($571)

The consolidated loss after income tax for the year is $1.390 million (2017: $0.571 million). The net operating and investing cash outflows for the year were $1.215 million (2017: $0.564 million). The cash balance of the economic entity as at the 30 June 2018 was AUD $1.209 million (2017: AUD $0.165 million).

Material business risks

The economic entity operates within the gold mining exploration and development industry. The economic entity is subject to a range of internal and external business risks, many of which lie outside the control of the Board and management. The material identified risks include:

Foreign Exchange: The economic entity’s main business activities are undertaken within South Africa and Indonesia with the vast proportion of expenditure denominated in South African Rand, Indonesian Rupiah and United States Dollars. Each exchange rate is free floating and therefore exposed to currency market fluctuations leaving the potential for negative price movements to impact on operating costs. Management attempts to mitigate some currency risk, where possible, through buying the local currencies when the currencies are weak and keeping those currencies in reserve for future use.

16

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Review of operations (continued)

Material business risks (continued)

Government Policy: Indonesia and South Africa have undergone significant political change over the past 20 years with each political regime continuing to evolve. Management continues to engage with all levels of government, law enforcement agencies and regulators in order to maintain that it acts as a good corporate citizen and adheres to all local rules. However, the overseas jurisdictions in which the economic entity operates are prone to political change and nationalistic focussed policies which could adversely impact upon the Company’s operations.

Indigenous Relationships: Relationships with the economic entity’s local indigenous partners in Indonesia are critical to the success of the economic entity’s operation at Derewo. There are also local laws under which the economic entity must adhere to when working with its indigenous partners. As such the economic entity engages with its indigenous partners on a regular basis to ensure that all requirements and expectations are being met.

Illegal mining operations: The economic entity has experienced many challenges in dealing with illegal mining operations on the tenements. Although the actions of these artisinal miners are contrary to the laws of Indonesia, it is often difficult to have them removed. Their presence on the tenements has caused delays in the economic entity’s exploration and processing activities. The economic entity continues to work with local government agencies to have the miners removed within the boundaries of local & federal laws.

Exploration: The economic entity has a significant amount of historical exploration data which has provided a number of anomalies to assess as possible sources of gold in the region. However, there can be no certainty that these anomalies will involve an economic resource or are in fact the source of gold. Furthermore the terrain and vastness of the tenement package present significant hurdles in undertaking exploration.

Political activism: Anti-government political activism in Papua is ongoing. The economic entity continues to work with all levels of government to minimise any impact, which could be experienced in the future.

Event since the end of the financial year

No matter or circumstance has occurred subsequent to period end that has significantly affected, or may significantly affect, the operations of the group, the results of those operations or the state of affairs of the group or economic entity in subsequent financial years.

Likely developments and expected results of operations

The likely developments in the economic entity’s operations, to the extent that such matters can be commented upon, are covered in the Review of Operations in this annual report and above. In the opinion of the Directors, disclosure of detailed information regarding the expected results of those operations in financial years after the current financial year is not predictable at this stage, or may prejudice the interests of the economic entity; accordingly this information has not been included in this report.

Significant changes in the state of affairs

During the year, the economic entity's share capital increased by $4.9 million as a result of 262 million new ordinary shares issued. These shares were issued:

• under the private placements and share purchase plan taken place during the year to fund the acquisition of 100% interest in the Mt Cecelia and Tambina projects, and working capital;

• to the vendors of Mt Cecelia and Tambina projects as part of considerations; and

• to the directors of the Company to settle outstanding director fees from prior years.

The economic entity also noted a significant increase in revenue from the production activities in South Africa, generating approximately $8.7 million in revenue for the year, refer to the Review of operations and activities section for further details.

In the opinion of the Directors, there were no other significant changes in the state of affairs of the economic entity during the financial year under review not otherwise disclosed in this annual report.

17

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Environmental regulation

The economic entity’s operations are not regulated by any significant environmental regulation under the law of the Commonwealth or of a State or Territory of Australia. The economic entity is regulated by environmental requirements in Indonesia and the Republic of South Africa which requirements are being complied with and monitored on an ongoing basis.

Remuneration report (audited)

The Directors present the West Wits Mining Limited 2018 remuneration report, outlining key aspects of our remuneration policy and framework, and remuneration awarded this year.

(A) Remuneration Policy

Remuneration of all Executive and Non-Executive Directors, and Officers of the economic entity is determined by the remuneration and nomination committee.

The economic entity is committed to remunerating Senior Executives and Executive Directors in a manner that is consistent with "best practice" (including the interests of shareholders) and market-competitive by ensuring fees are appropriate and in line with the market. Remuneration packages are based on fixed component, determined by the Executives' position, experience and performance, and may be satisfied via cash or equity.

Non-Executive Directors are remunerated out of the aggregate amount approved by shareholders and at a level that is consistent with industry standards. Non-Executive Directors do not receive performance based bonuses and prior shareholder approval is required to participate in any issue of equity. No retirement benefits are payable other than statutory superannuation, if applicable.

Remuneration policy versus company financial performance

Over the past ten years since the Company was incorporated, it has listed on the Australian Securities Exchange and acquired mining tenements in South Africa and in Papua Province, Indonesia. Exploration activities commenced in January 2008 within the South African tenements and August 2011 within the Papua Province, Indonesia.

The nature of the economic entity's mining activities is highly speculative and can provide high returns if successful. The speculative nature of these activities and recent global economic trends, have been factors which have affected the economic entity's share price performance and shareholder wealth over the period.

The economic entity's remuneration policy is based on industry practice rather than the economic entity's performance and takes into account the risk and liabilities assumed by the Directors and Executives as a result of their involvement in the speculative activities undertaken by the economic entity. Directors and Executives are fairly compensated for the extensive work they undertake.

No portion of the Directors and key management personnel remuneration was linked to performance during the financial year. No performance-based cash payments or equity were paid/issued during the financial year (2017: Nil).

Use of remuneration consultants

Due to the size and nature of the organisation, the Company has not engaged remuneration consultants to review and measure its policy and strategy. The board reviews remuneration strategy periodically and may engage remuneration consultants in the future to assist with this process.

(B) Remuneration report

(a) Details of remuneration

Key management personnel (KMP) of the group are defined as those persons having authority and responsibility for planning, directing and controlling the major activities of the group, directly or indirectly, including any Director (whether executive or otherwise) of the group receiving the highest remuneration. Details of the remuneration of the KMP of the group are set out in the following tables.

The following person was considered other KMP of West Wits Mining Limited during the financial year:

18

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Remuneration report (audited) (continued)

(B) Remuneration report (continued)

(a) Details of remuneration (continued)

Mr Michael Quinert, Executive Chairman Mr Vincent Savage, Executive Director Mr Daniel Pretorius, Non-Executive Director Mr Hulme Scholes, Non-Executive Director Dr Andrew Tunks, Executive Director (appointed 13 March 2018)

Mr Tim Chapman and Mr Trevor Neale were not considered as key management personnel due to their minimal involvement in the Group's affairs for the year ended 30 June 2018.

Amounts of remuneration

The following table shows details of remuneration expenses recognised for the group's KMP for the year ended 30 June 2018.

2018
Directors
Mr Michael Quinert
Mr Vincent Savage
Mr Daniel Pretorius (1)
Mr Hulme Scholes (1)
Dr Andrew Tunks (2)
Total KMP compensation
Short-term benefits
Post-employment
benefits
Share-based
payments
Cash
salary and
fees
$'000
Cash
bonus
$'000
Non-
monetary
benefits
$'000
Super-
annuation
$'000
Options
$000
Total
$'000
100
-
-
-
129
229
70
-
-
-
57
127
-
-
-
-
-
-
12
-
-
-
-
12
35
-
-
-
47
82
217
-
-
-
233
450

Notes

(1) The amounts disclosed do not include prior years' remuneration waived by Mr Daniel Pretorius and Mr Hulme Scholes.

(2) Dr Andrew Tunks' remuneration covers the period from his appointment as a director of the company (13 March 2018) to 30 June 2018.

The following table shows details of remuneration expenses recognised for the group's KMP for the year ended 30 June 2017.

2017
Directors
Mr Michael Quinert
Mr Vincent Savage
Mr Daniel Pretorius
Mr Hulme Scholes
Other KMP
Mr Tim Chapman
Mr Trevor Neale
Total
Short-term benefits
Post-employment
benefits
Share-based
payments
Cash
salary and
fees
$'000
Cash
bonus
$'000
Non-
monetary
benefits
$'000
Super-
annuation
$'000
Options
$000
Total
$'000
100
-
-
-
-
100
90
-
-
-
-
90
35
-
-
-
-
35
35
-
-
-
-
35
37
-
-
-
-
37
6
-
-
-
-
6
303
-
-
-
-
303

19

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Remuneration report (audited) (continued)

(B) Remuneration report (continued)

(b) Equity issued as part of remuneration for the year ended 30 June 2018

Issue of shares

The number of shares in the Company held during the financial year by each Director and other Key Management Personnel of the Company, including their personally related parties, are set out below.

Shares were granted to Directors and Key Management Personnel for the year as compensation (2017: Nil). On 18 January 2018, shareholders passed resolutions to approve the allotment of shares to Mr Michael Quinert, Mr Hulme Scholes and Mr Vincent Savage in lieu of cash payments to satisfy certain outstanding remuneration payments owed to these directors.

Share holdings

Share holdings
Balance at the Received on Balance at the
start of the Granted as exercise of Purchased on end of the
2018 period remuneration options market period
Directors
Mr Michael Quinert 15,580,647 2,272,727 - 1,109,616 18,962,990
Dr Andrew Tunks - - - 1,033,449 1,033,449
Mr Vincent Savage 11,039,152 2,272,727 - 882,352 14,194,231
Mr Daniel Pretorius - - - - -
Mr Hulme Scholes - 1,136,364 - - 1,136,364
26,619,799 5,681,818 - 3,025,417 35,327,034

Issue of options

The number of options over ordinary shares in the Company held during the financial year by each Director and other Key Management Personnel of the Company, including their personally related parties, are set out below. No options were granted to Directors and Key Management Personnel for the year as compensation.

Option holdings

The number of options over ordinary shares in the parent entity held during the financial years ended 30 June 2018 and 30 June 2017 by each Director and other members of key management personnel of the group, including their personally related parties, is set out below:

Balance at Balance at
start of the Granted as Options Other end of the Vested and
2018 period remuneration Expired changes period exercisable
Options
Mr Michael Quinert 4,500,000 12,000,000 (4,500,000) - 12,000,000 12,000,000
Drr Andrew Tunks - 12,000,000 - - 12,000,000 -
Mr Vincent Savage 2,500,000 5,000,000 (2,500,000) - 5,000,000 5,000,000
Mr Daniel Pretorius - - - - - -
Mr Hulme Scholes - - - - - -
7,000,000 29,000,000 (7,000,000) - 29,000,000 17,000,000

The terms and conditions of each grant of options over ordinary shares affecting remuneration of Directors and other Key Management Personnel in future reporting years are as follows:

20

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Remuneration report (audited) (continued)

(B) Remuneration report (continued)

(b) Equity issued as part of remuneration for the year ended 30 June 2018 (continued)

Issue of options (continued)

Option holdings (continued)

Exercise
Grant date Granted no. price Expiry date Total vested Vested % Exercised
21/11/2017 4,000,000 $0.05 3/12/2022 4,000,000 100% -
21/11/2017 4,000,000 $0.05 3/12/2022 - 0% -
21/11/2017 4,000,000 $0.05 3/12/2022 - 0% -
21/11/2017 4,000,000 $0.05 29/01/2023 4,000,000 100% -
21/11/2017 4,000,000 $0.05 29/01/2023 - 0% -
21/11/2017 4,000,000 $0.05 29/01/2023 - 0% -
21/11/2017 2,000,000 $0.05 29/01/2023 2,000,000 100% -
21/11/2017 1,500,000 $0.05 29/01/2023 - 0% -
21/11/2017 1,500,000 $0.05 29/01/2023 - 0% -
29,000,000 10,000,000

Option holders do not have any rights to participate in any issues of shares or other interests in the Company or any other entity. Option holders hold no voting rights. On exercise, each option is convertible into one ordinary share.

(c) Employment contracts of Directors and Key Management Personnel

At the date of this report, the Company does not have any formalised employment contracts with any director or key management personnel. No Directors and Key Management Personnel are entitled to any termination payments apart from remuneration payable up to and including the date of termination.

(d) Related party transactions

Transactions between related parties are on normal commercial terms and conditions no more favourable than those available to other parties unless otherwise stated. Transactions with related parties are as follows:

2018 2017
$'000 $'000
$1.00
Legal fees that were paid to Quinert Rodda & Associates, a Director related
entity to Mr Michael Quinert 65 5
Legal fees that were paid to Malan Scholes Attorneys, a Director related entity
to Mr Hulme Scholes 27 11
92 16

[End of remuneration report]

Shares under option

At the date of this report, the unissued ordinary shares of West Wits Mining Limited under option are as follows:

Quantity Grant Date Exercise Price Expiry Date
2,000,000 04/11/2015 $0.03 04/11/2018
10,000,000 15/11/2017 $0.05 14/11/2020
10,000,000 21/11/2017 $0.05 30/11/2020
12,000,000 21/11/2017 $0.05 03/12/2022
3,000,000 04/12/2017 $0.05 03/12/2022
17,000,000 21/11/2017 $0.05 29/01/2023

Shares issued as a result of the exercise of options

No options were exercised during the year ended 30 June 2018 (2017: Nil).

21

West Wits Mining Limited Directors' report 30 June 2018 (continued)

Insurance of officers and indemnities

During the financial year the Company entered into an insurance policy to indemnify Directors and Officers against certain liabilities incurred as a Director or Officer, including costs and expenses associated in successfully defending legal proceedings. The contract of insurance prohibits disclosure of the nature of the liability and the amount of the premium. The Company has not otherwise, during or since the financial year, indemnified or agreed to indemnify an Officer or Auditor of the Company or of any related body corporate against a liability incurred as such as Officer or Auditor.

Proceedings on behalf of the company

No person has applied to the Court under section 237 of the Corporations Act 2001 for leave to bring proceedings on behalf of the Company, or to intervene in any proceedings to which the Company is a party, for the purpose of taking responsibility on behalf of the Company for all or part of those proceedings.

No proceedings have been brought or intervened in on behalf of the Company with leave of the Court under section 237 of the Corporations Act 2001.

Rounding of amounts

The Company is of a kind referred to in ASIC Corporations (Rounding in Financial/Directors’ reports) Instrument 2016/191, issued by the Australian Securities and Investments commission, relating to ‘rounding-off’ of amounts in the Directors’ report. Amounts in the Directors’ report have been rounded off in accordance with that instrument to the nearest thousand dollars, or in certain cases, the nearest dollar.

Non-audit services

No fees for non-audit services were paid or payable to the external auditor of the parent entity during the year ended 30 June 2018 (2017: Nil).

Auditor's independence declaration

The lead auditor’s independence declaration as required under section 307C of the Corporations Act 2001 for the year ended 30 June 2018 has been received and is set out on the following page.

This report is made in accordance with a resolution of Directors, pursuant to section 298(2)(a) of the Corporations Act 2001.

On behalf of the directors

==> picture [119 x 56] intentionally omitted <==

Mr Michael Quinert Executive Chairman Melbourne 27 September 2018

22

AUDITOR’S INDEPENDENCE DECLARATION UNDER SECTION 307C OF THE CORPORATIONS ACT 2001 TO THE DIRECTORS OF WEST WITS MINING LIMITED

I declare that, to the best of my knowledge and belief during the year ended 30 June 2018 there have been:

  • no contraventions of the auditor independence requirements as set out in the Corporations Act 2001 in relation to the audit; and

  • no contraventions of any applicable code of professional conduct in relation to the audit.

William Buck Audit (Vic) Pty Ltd ABN 59 116 151 136

J. C. Luckins Director

Dated this 27[th] day of September 2018

West Wits Mining Limited Consolidated statement of comprehensive income For the year ended 30 June 2018

Notes
Revenue
2
Cost of sales of goods
Gross Profit
Corporate administration
Consultancy expenses
Travel and marketing
Bad debt expense
Legal and professional fees
Director and employee expenses
Exploration expenses
Gain on disposal of assets
Depreciation and amortisation expense
Foreign exchange loss
Loss before income tax
Income tax expense
4
Loss for the period
Item that may be reclassified to profit or loss in subsequent year
Exchange differences on translation of foreign operations
Blank
Other comprehensive income (loss) for the period, net of tax
Total comprehensive income (loss) for the period
Loss is attributable to:
Owners of West Wits Mining Limited
Non-controlling interests
Total comprehensive income (loss) for the period is attributable to:
Owners of West Wits Mining Limited
Non-controlling interests
Earnings per share for profit attributable to the ordinary equity
holders of the Company:
Basic earnings per share
7
Diluted earnings per share
7
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
8,739
559
(7,848)
-
891
559
(473)
(377)
(1,020)
(63)
(172)
(92)
-
(185)
(147)
(28)
(363)
(311)
(56)
(8)
-
11
(10)
(20)
(40)
(57)
(1,390)
(571)
-
-
(1,390)
(571)
(311)
650
(311)
650
(1,701)
79
(1,141)
(556)
(249)
(15)
(1,390)
(571)
(884)
138
(817)
(59)
(1,701)
79
Cents
Cents
(0.2)
(0.1)
(0.2)
(0.1)

The above consolidated statement of comprehensive income should be read in conjunction with the accompanying notes.

24

West Wits Mining Limited Consolidated statement of financial position As at 30 June 2018

Notes
ASSETS
Current assets
Cash and cash equivalents
Trade and other receivables
8(a)
Prepayments
Total current assets
Non-current assets
Plant and equipment
Exploration and evaluation, development and mine properties
9
Goodwill
Other non-current assets
Total non-current assets
Total assets
LIABILITIES
Current liabilities
Trade and other payables
8(b)
Total current liabilities
Non-current liabilities
Other financial liabilities
Total non-current liabilities
Total liabilities
Net assets
EQUITY
Share capital
10(a)
Reserves
Accumulated losses
Equity attributable to owners of West Wits Mining Limited
Non-controlling interests
12(b)
Total equity
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
1,209
165
346
240
3
10
1,558
415
16
28
20,181
17,192
110
110
62
70
20,369
17,400
21,927
17,815
2,643
2,393
2,643
2,393
20
14
20
14
2,663
2,407
19,264
15,408
36,089
31,251
(1,003)
(1,979)
(14,370)
(13,229)
20,716
16,043
(1,452)
(635)
19,264
15,408

The above consolidated statement of financial position should be read in conjunction with the accompanying notes.

25

West Wits Mining Limited Consolidated statement of changes in equity For the year ended 30 June 2018

Attributable to owners of
West Wits Mining Limited
Consolidated entity
Share capital
$'000
Other
reserves
$'000
Accumulated
losses
$'000
Total
$'000
Non-
controlling
interests
$'000
Total
equity
$'000
Balance at 1 July 2016
32,537
(3,915)
(12,644)
15,978
(1,082)
14,896
Loss for the period
-
-
(585)
(585)
14
(571)
Other comprehensive income/(loss)
-
723
-
723
(73)
650
Total comprehensive income for the period
-
723
(585)
138
(59)
79
Transactions with owners in their capacity
as owners:
Reclassification of options reserve
(1,286)
1,286
-
-
-
-
Net movement in non-controlling interests in
subsidiaries
-
(73)
-
(73)
579
506
(1,286)
1,213
-
(73)
579
506
Balance at 30 June 2017
31,251
(1,979)
(13,229)
16,043
(635)
15,408
Balance at 1 July 2017
31,251
(1,979)
(13,229)
16,043
(635)
15,408
Loss for the period
-
-
(1,141)
(1,141)
(249)
(1,390)
Other comprehensive income/(loss)
-
257
-
257
(568)
(311)
Total comprehensive income for the
period
-
257
(1,141)
(884)
(817)
(1,701)
Transactions with owners in their
capacity as owners:
Contributions of equity, net of transaction
costs
10(a)
4,838
-
-
4,838
-
4,838
Options issued
10(b)
-
719
-
719
-
719
4,838
719
-
5,557
-
5,557
Balance at 30 June 2018
36,089
(1,003)
(14,370)
20,716
(1,452)
19,264
Attributable to owners of
West Wits Mining Limited
Share capital
$'000
Other
reserves
$'000
Accumulated
losses
$'000
Total
$'000
Non-
controlling
interests
$'000
Total
equity
$'000
32,537
(3,915)
(12,644)
15,978
(1,082)
14,896
Attributable to owners of
West Wits Mining Limited
Share capital
$'000
Other
reserves
$'000
Accumulated
losses
$'000
Total
$'000
Non-
controlling
interests
$'000
Total
equity
$'000
32,537
(3,915)
(12,644)
15,978
(1,082)
14,896
-
-
(585)
(585)
14
(571)
-
723
-
723
(73)
650
-
723
(585)
138
(59)
79
(1,286)
1,286
-
-
-
-
-
(73)
-
(73)
579
506
(1,286)
1,213
-
(73)
579
506
31,251
(1,979)
(13,229)
16,043
(635)
15,408
31,251
(1,979)
(13,229)
16,043
(635)
15,408
-
-
(1,141)
(1,141)
(249)
(1,390)
-
257
-
257
(568)
(311)
-
257
(1,141)
(884)
(817)
(1,701)
4,838
-
-
4,838
-
4,838
-
719
-
719
-
719
4,838
719
-
5,557
-
5,557
36,089
(1,003)
(14,370)
20,716
(1,452)
19,264

The above consolidated statement of changes in equity should be read in conjunction with the accompanying notes.

26

West Wits Mining Limited Consolidated statement of cash flows For the year ended 30 June 2018

Notes
Cash flows from operating activities
Receipts from customers
Payments to suppliers and employees
Interest received
Net cash (outflow) inflow from operating activities
15(a)
Cash flows from investing activities
Payments for property, plant and equipment
Payments for investment in new projects
Payments for exploration
Net cash (outflow) from investing activities
Cash flows from financing activities
Proceeds from issues of shares
Net cash inflow from financing activities
Net increase (decrease) in cash and cash equivalents
Cash and cash equivalents at the beginning of the financial year
Effects of exchange rate changes on cash and cash equivalents
Cash and cash equivalents at end of period
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
8,633
479
(9,151)
(429)
-
2
(518)
52
-
11
(300)
-
(326)
(627)
(626)
(616)
2,263
-
2,263
-
1,119
(564)
165
724
(75)
5
1,209
165

The above consolidated statement of cash flows should be read in conjunction with the accompanying notes.

27

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

1 Summary of significant accounting policies

This note provides a list of all significant accounting policies adopted in the preparation of these consolidated financial statements. These policies have been consistently applied to all the periods presented, unless otherwise stated. The financial statements are for the group consisting of West Wits Mining Limited and its subsidiaries.

(a) Basis of preparation

The financial statements are general purpose financial statements that have been prepared in accordance with Australian Accounting Standards, Australian Accounting Interpretations, other authoritative pronouncements of the Australian Accounting Standards Board and the Corporations Act 2001. The financial statements of the economic entity comply with International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board (IASB).

The financial statements cover the economic entity of West Wits Mining Limited and controlled entities (the “economic entity” or “group”). West Wits Mining Limited is a listed for profit public company, incorporated and domiciled in Australia.

(i) Reporting basis and conventions

The financial statements have been prepared on an accruals basis and are based on historical costs.

The following is a summary of the material accounting policies adopted by the economic entity in the preparation of the financial statements. The accounting policies have been consistently applied, unless otherwise stated.

(b) Going concern

The economic entity reported a net loss for the year after income tax and before eliminating non-controlling interests of $1.39 million (2017: $0.57 million) and net operating cash outflows of $0.52 million (2017: inflow of $0.05 million). At 30 June 2018 the Economic Entity had $1.21 million Cash at Bank (2017: $0.17 million), and net current liabilities of $1.09 million (2017: $1.98 million).

The Economic Entity has commenced gold extraction activities on the Sol Plaatijes project (SPP) since September 2016. The Company also intends to commence extraction activities of gold deposits identified in certain areas of interest at its tenements in Papua in the foreseeable future. The ability of the Company to get unrestricted access to its tenements in Papua has been hampered over the past 12 months by illegal miners onsite. The Indonesian Government has continued to indicate that they will assist in the removal of the illegal miners from the tenements sites. The Company is awaiting a firm date commitment from the Government, for this to commence.

Based on these future activities, the following matters have been considered by the directors in assessing the economic entity’s continuing viability, its ability to continue as a going concern and its ability to pay its debts as and when they fall due,

  • Cash flow will be generated from the SPP with an agreement in place for a minimum processing of 12,000 tonnes per month, which translates to approx. $170,000 per month in West Wits’ share of the proceeds after processing costs.

  • As at the date of this report the Company has the ability to issue up to 172.8 million ordinary shares under ASX listing rules 7.1 and 7.1A. At the share price of $0.019 on 30 June 2018, this would give the Company the ability to raise up to approximately $3.3million.

  • The continued support and payment of creditors and directors on agreed terms between the parties,

  • The ability of economic entity to scale down its operations or redirect exploration expenditure if required, including the ability to defer amounts payable to directors as far as necessary should sufficient working capital not be available, and

Based on the successful execution of the above the Directors are satisfied that the Economic Entity has access to sufficient working capital to enable it to pay its debts as and when they fall due for a period of at least twelve months from the date of this report, and for that reason the financial statements have been prepared on the basis that the economic entity is a going concern, which contemplates the continuity of normal business activity, realisation of assets and the settlement of liabilities in the normal course of business.

28

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

1 Summary of significant accounting policies (continued)

(b) Going concern (continued)

Should the economic entity be unable to continue as a going concern, it may be required to realise its assets and extinguish its liabilities other than in the ordinary course of business, and at amounts that differ from those stated in the financial statements. The financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts or liabilities that might be necessary should the economic entity not continue as a going concern.

(c) New accounting standards and interpretations

During the current year the economic entity adopted all new and revised Australian Accounting Standards and Interpretations applicable to its operations which became mandatory. Adoption of these Standards did not have any effect on the financial position or performance of the economic entity.

Any new, revised or amending Accounting Standards or Interpretations that are not yet mandatory have not been early adopted.

The following Australian Accounting Standards and Interpretations have recently been issued or amended but are not yet effective and therefore have not been adopted by the Group for the annual reporting period ended 30 June 2018:

29

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

1 Summary of significant accounting policies (continued)

(c) New accounting standards and interpretations (continued)

Title of
standard
Nature of change Impact Mandatory
application
date/Date of
adoption by
group
AASB 15
Revenue from
Contracts with
Customers
The AASB has issued a new
standard for the recognition of
revenue. This will replace AASB
118
which
covers
revenue
arising from the sale of goods
and the rendering of services
and AASB 111 which covers
construction contracts.
The new standard is based on
the
principle
that
revenue
is
recognised when control of a
good or service transfers to a
customer.
The standard permits either a
full retrospective or a modified
retrospective approach for the
adoption.
Management
has
considered
the
recognition
and
measurement
requirements of AASB 15 in conjunction
with the existing contracts between the
Group and its customers. Based on this
assessment,
management
concluded
that
there
would
have
been
no
difference
to
the
recognition
and
measurement of revenue had AASB 15
been adopted and applied during the
reporting period, as compared to the
current accounting policy on revenue.
Must be
applied for
financial years
commencing
on or after 1
January 2018.
The Group will
adopt this
standard for
financial year
commencing 1
July 2018.
AASB 16
Leases
AASB
16
was
issued
in
February 2016. It will result in
almost
all
leases
being
recognised
on
the
balance
sheet, as the distinction between
operating and finance leases is
removed.
Under
the
new
standard, an asset (the right to
use
the
leased
item)
and
a
financial liability to pay rentals
are recognised.
The only exceptions are short
term and low-value leases. The
accounting for lessors will not
significantly change.
Management
has
considered
the
recognition
and
measurement
requirements of AASB 16 in conjunction
with
the
existing
operating
lease
agreements between the Group and its
suppliers.
Based
on
this
assessment,
management
concluded
that
there
would have been no material impact to
the financial statements had AASB 16
been adopted and applied during the
period,
as
compared
to
the
current
accounting
policy
on
leases
as
the
Group
does
not
have
any
material
operating lease arrangement in place.
Mandatory
for
financial
years
commencing
on or
after 1
January
2019.
At
this
stage,
the Group does
not
intend
to
adopt
the
standard
before
its
effective date.
The Group will
adopt
this
standard
for
financial
year
commencing 1
July 2019.
AASB 9
Financial
instruments
AASB
9
addresses
the
classification, measurement and
derecognition of financial assets
and
financial
liabilities,
introduces new rules for hedge
accounting
and
a
new
impairment model for financial
assets.
Management
has
considered
the
recognition
and
measurement
requirements of AASB 9 and does not
expect the new standard to affect the
classification and measurement of its
financial instruments as the Group does
not have any long-term financial assets
or derivatives in existence.
Mandatory
for
financial
years
commencing
on or
after 1
January
2018.
At
this
stage,
the Group does
not
intend
to
adopt
the
standard
before
its
effective date.

30

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies

(i) Principles of consolidation

A controlled entity is any entity West Wits Mining Limited has the power to control the financial and operating policies of, so as to obtain benefits from its activities. The economic entity controls an entity when the economic entity is exposed to, or has rights to, variable returns from its involvement with the entity and has the ability to affect those returns through its power to direct the activities of the entity. The existence and effect of potential voting rights that are currently exercisable or convertible are considered when assessing whether the Company controls another entity. Controlled entities are fully consolidated from the date on which control is transferred to the consolidated entity. They are de-consolidated from the date that control ceases.

A list of controlled entities is contained in Note 12 to the financial statements.

All inter-company balances and transactions between entities in the economic entity, including any unrealised profits or losses, have been eliminated on consolidation. Accounting policies of subsidiaries have been changed where necessary to ensure consistencies with those policies applied by the Company.

Where controlled entities have entered or left the economic entity during the year, their operating results have been included/excluded from the date control was obtained or until the date control ceased.

Non-controlling interests in the equity and results of the entities that are controlled are shown as a separate item in the consolidated financial statements.

(ii) Plant and equipment

Depreciation

Each class of plant and equipment is carried at cost less, where applicable, any accumulated depreciation and impairment losses.

The depreciable amount of all fixed assets is depreciated on a straight-line basis over their useful lives to the economic entity commencing from the time the asset is held ready for use.

The depreciation rates used for each class of depreciable assets are:

Plant & Equipment: 10% - 33%

The assets' residual values and useful lives are reviewed, and adjusted if appropriate, at the end of each reporting period.

An item of property, plant and equipment is derecognised upon disposal or when there is no future economic benefit to the consolidated entity. Gains and losses between the carrying amount and the disposal proceeds are taken to profit or loss.

(iii) Financial assets

Trade and other receivables

Trade and other receivables are recognised and carried at amortised cost using effective interest method less a provision for any uncollectible debts.

Impairment

At the end of each reporting period, the economic entity assess whether there is objective evidence that a financial asset has been impaired. Impairment losses are recognised in the statement of profit or loss and other comprehensive income.

The amount of the impairment allowance for financial assets carried at cost is the difference between the asset’s carrying amount and the present value of estimated future cash flows, discounted at the current market rate of return for similar financial assets.

31

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies (continued)

(iv) Intangibles

Intangible assets

Intangible assets acquired as part of a business combination are initially measured at their fair value at the date of the acquisition. Intangible assets acquired separately are initially recognised at cost. Finite life intangible assets are subsequently measured at cost less amortisation and any impairment. The gains or losses recognised in profit or loss arising from the derecognition of intangible assets are measured as the difference between net disposal proceeds and the carrying amount of the intangible asset. The method and useful lives of finite life intangible assets are reviewed annually. Changes in the expected pattern of consumption or useful life are accounted for prospectively by changing the amortisation method or period.

(v) Cash and cash equivalents

Cash and cash equivalents includes cash on hand, deposits held at call with financial institutions, other short-term, highly liquid investments with original maturities of three months or less that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value.

(vi) Provisions

Provisions are recognised when the economic entity has a legal or constructive obligation, as a result of past events, for which it is probable that an outflow of economic benefits will result and that outflow can be reliably measured.

(vii) Employee benefits

Provision is made for the economic entity's liability for employee benefits arising from services rendered by employees up to the end of the reporting period.

Short-term and Long-term employee benefits:

A liability is recognised for benefits accruing to employees in respect of wages and salaries, annual leave, long service leave, and sick leave when it is probable that settlement will be required and they are capable of being measured reliably.

Liabilities recognised in respect of short-term employee benefits, are measured at their nominal values using the remuneration rate expected to apply at the time of settlement. Liabilities recognised in respect of long term employee benefits are measured as the present value of the estimated future cash outflows to be made by the Company in respect of services provided by employees up to reporting date.

(viii)Income tax

Deferred income tax is provided on all temporary differences at the balance date between the tax bases of assets and liabilities and their carrying amounts for financial reporting purposes. No deferred income tax will be recognised from the initial recognition of an asset or liability, excluding a business combination, where there is no effect on accounting or taxable profit or loss.

The amount of benefits brought to account or which may be realised in the future is based on the assumption that no adverse change will occur in income taxation legislation and the anticipation that the Group will derive sufficient future assessable income to enable the benefit to be realised and comply with the conditions of deductibility imposed by the law.

The charge for current income tax expense is based on the profit adjusted for any non-assessable or disallowed items. It is calculated using the tax rates that have been enacted or are substantially enacted by the end of the reporting period.

Deferred income tax assets are recognised to the extent that it is probable that future tax profits will be available against which deductible temporary differences can be utilised.

Deferred tax is calculated at the tax rates that are expected to apply to the period when the asset is realised or liability is settled. Deferred tax is credited in the statement of comprehensive income except where it relates to items that may be credited directly to equity, in which case the deferred tax is adjusted directly against equity.

32

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies (continued)

(ix) Income

Interest income is recognised on a proportional basis taking into account the interest rates applicable to the financial assets.

Other income is recognised when it is received or when the right to receive payment is established.

All income is stated net of the amount of goods and services tax (GST) or value added tax (VAT).

(x) Goods and Services Tax (GST)/ Value Added Tax (VAT)

Income, expenses and assets are recognised net of the amount of GST/VAT, except where the amount of GST/VAT incurred is not recoverable from the Taxation Authority. In these circumstances the GST/VAT is recognised as part of the cost of acquisition of the asset or as part of an item of the expense. Receivables and payables in the statement of financial position are shown inclusive of GST/VAT.

Cash flows are presented in the statement of cash flows on a gross basis, except for the GST/VAT component of investing and financing activities, which are disclosed as operating cash flows.

(xi) Impairment of Assets

At the end of each reporting period, the economic entity reviews the carrying values of its tangible and intangible assets to determine whether there is any indication that those assets have been impaired.

If such an indication exists, the recoverable amount of the asset, being the higher of the asset's fair value less costs to sell and value in use, is compared to the asset's carrying value. Any excess of the asset's carrying value over its recoverable amount is expensed to the statement of profit or loss and other comprehensive income.

Where it is not possible to estimate the recoverable amount of an individual asset, the economic entity estimates the recoverable amount of the cash-generating unit to which the asset belongs.

(xii) Trade and other payables

Liabilities for trade creditors and other amounts are initially recognised at the fair value of the consideration to be paid in the future for goods and services received, whether or not billed to the economic entity. They are subsequently measured at amortised cost.

Payables to related parties are measured at fair value initially then subsequently measured at amortised cost using effective interest method. Interest, when charged by the lender is recognised as an expense on an accruals basis.

(xiii)Leases

The determination of whether an arrangement is or contains a lease is based on the substance of the arrangement and requires an assessment of whether the fulfilment of the arrangement is dependent on the use of a specific asset or assets and the arrangement conveys a right to use the asset.

A distinction is made between finance leases, which effectively transfer from the lessor to the lessee substantially all the risks and benefits incidental to ownership of leased assets, and operating leases, under which the lessor effectively retains substantially all such risks and benefits.

Finance leases are capitalised. A lease asset and liability are established at the fair value of the leased assets, or if lower, the present value of minimum lease payments. Lease payments are allocated between the principal component of the lease liability and the finance costs, so as to achieve a constant rate of interest on the remaining balance of the liability.

Leased assets acquired under a finance lease are depreciated over the asset's useful life or over the shorter of the asset's useful life and the lease term if there is no reasonable certainty that the consolidated entity will obtain ownership at the end of the lease term.

Operating lease payments, net of any incentives received from the lessor, are charged to profit or loss on a straight-line basis over the term of the lease.

33

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies (continued)

(xiv)Foreign currency transactions and balances

Functional and presentation currency

The functional currency of each entity is measured using the currency of the primary economic environment in which that entity operates. The consolidated financial statements are presented in Australian dollars which is the parent entity's functional and presentation currency.

Transaction and balances

Foreign currency transactions are translated into functional currency using the exchange rates prevailing at the date of the transaction. Foreign currency monetary items are translated at the year-end exchange rate. Non-monetary items measured at historical cost continue to be carried at the exchange rate at the date of the transaction. Non-monetary items measured at fair value are reported at the exchange rate at the date when fair values were determined.

Exchange differences arising on the translation of non-monetary items are recognised directly in equity to the extent that the gain or loss is directly recognised in equity; otherwise the exchange difference is recognised in the statement of profit or loss and other comprehensive income.

Economic entity companies

The financial results and position of foreign operations whose functional currency is different from the economic entity’s presentation currency are translated as follows:

  • assets and liabilities are translated at year-end exchange rates prevailing at the end of the reporting period;

  • income and expenses are translated at average exchange rates, which approximate the rate at the date of the transaction, for the period; and

  • retained earnings are translated at the exchange rates prevailing at the date of the transaction.

Exchange differences arising on translation of foreign operations are transferred directly to the economic entity’s foreign currency translation reserve in the statement of financial position. These differences are recognised in the statement of profit or loss and other comprehensive income in the period in which the operation is disposed.

(xv) Exploration and development expenditure

Exploration, evaluation and development expenditure incurred is accumulated in respect of each identifiable area of interest. These costs are only carried forward to the extent that they are expected to be recouped through successful development of the area or where activities in the area have not yet reached a stage that permits reasonable assessment of the existence of economically recoverable reserves. Accumulated costs in relation to an abandoned area are written off in full against profit in the year in which the decision to abandon the area is made.

When production commences, the accumulated costs for the relevant area of interest are amortised over the life of the area according to the rate of depletion of the economically recoverable reserves.

A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area of interest.

Costs of site restoration are provided over the life of the facility from when exploration commences and are included in the costs of that stage. Site restoration costs include the dismantling and removal of mining plant, equipment and building structures, waste removal and rehabilitation of the site in accordance with clauses of the mining permits. Such costs have been determined using estimates of future costs, current legal requirements and technology on an undiscounted basis.

Any changes in the estimates for the costs are accounted on a prospective basis. In determining the costs of site restoration, there is an uncertainty regarding the nature and extent of the restoration due to community expectations and future legislation.

(xvi)Contributed equity

Ordinary shares and unissued share options are classified as issued capital. Ordinary issued capital is recognised at the fair value of the consideration received by the Company.

34

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies (continued)

Any transaction costs directly attributable to the issue of ordinary shares are recognised directly in equity as a reduction of the share proceeds received.

(xvii)Share-based payments

Equity settled share-based payments are measured at fair value at the date of grant. Fair value for shares and listed options is measured using market value. Fair value for unlisted options is measured by use of the Black-Scholes model. The expected life used in the model has been adjusted, based on management's best estimate for the effects of non-transferability or exercise restrictions.

The Black-Scholes option pricing model also takes into account the exercise price, the term of the option, the impact of dilution, the share price at grant date and expected price volatility of the underlying share, the expected dividend yield and the risk free interest rate for the term of the option, together with non-market vesting conditions.

(xviii)Earnings per share

Basic earnings/(losses) per share is determined by dividing the result from ordinary activities after related income tax expense by the weighted average number of ordinary shares outstanding during the financial year. Diluted earnings/(losses) per share are equivalent to basic earnings/(losses) per share as the potentially dilutive securities are excluded from the computation of diluted earnings/(losses) per share because the effect is anti-dilutive.

(xix)Rounding of amounts

The economic entity is of a kind referred to in ASIC Corporations (Rounding in Financial/Directors’ Reports) Instrument 2016/191, issued by the Australian Securities and Investments Commission, relating to ‘rounding-off’. Amounts in this report have been rounded off in accordance with that instrument to the nearest thousand dollars, or in certain cases, the nearest dollar.

(xx) Critical Accounting Estimates and Assumptions

Exploration and evaluation costs have been capitalised on the basis that the consolidated entity will commence commercial production in the future, from which time the costs will be amortised in proportion to the depletion of the mineral resources. Key judgements are applied in considering costs to be capitalised which includes determining expenditures directly related to these activities and allocating overheads between those that are expensed and capitalised. In addition, costs are only capitalised that are expected to be recovered either through successful development or sale of the relevant mining interest. Factors that could impact the future commercial production at the mine include the level of reserves and resources, future technology changes, which could impact the cost of mining, future legal changes and changes in commodity prices. To the extent that capitalised costs are determined not to be recoverable in the future, they will be written off in the period in which this determination is made.

The Directors evaluate estimates and judgements incorporated into the financial statements based on historical knowledge and best available current information and that capitalised exploration costs are expected to be recovered either through successful development or sale of the relevant mining interest.

The value attributed to share options issued is an estimate calculated using an appropriate mathematical formula based on an option pricing model. The choice of models and the resultant option value require assumptions to be made in relation to the likelihood and timing of the conversion of the options to shares and the value of volatility of the price of the underlying shares.

In order to apply the appropriate accounting approach for an acquisition transaction, the Group is required to determine whether the acquisition is of a business (and therefore within the scope of IFRS 3 Business Combinations ), or is of an asset or group of assets that do not constitute a business and is therefore outside the scope of IFRS 3, which includes judgements and estimates applied by management.

(xxi)Dividends

Provision is made for the amount of any dividend declared, being appropriately authorised and no longer at the discretion of the entity, on or before the end of the reporting period but not distributed at the end of the reporting period.

35

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

1 Summary of significant accounting policies (continued)

(d) Accounting policies (continued)

(xxii)Revenue recognition

Revenue is measured at the fair value of the consideration received or receivable. Amounts disclosed as revenue are net of returns, trade allowances, rebates and amounts collected on behalf of third parties.

The group recognises revenue when the amount of revenue can be reliably measured, it is probable that future economic benefits will flow to the entity and specific criteria have been met for each of the group's activities as described below. The group bases its estimates on historical results, taking into consideration the type of customer, the type of transaction and the specifics of each arrangement.

The specific accounting policies for the group’s main types of revenue are explained in note 2.

Interest income

Interest income is recognised using the effective interest method. When a receivable is impaired, the group reduces the carrying amount to its recoverable amount, being the estimated future cash flow discounted at the original effective interest rate of the instrument, and continues unwinding the discount as interest income. Interest income on impaired loans is recognised using the original effective interest rate.

Dividends

Dividends are recognised as revenue when the right to receive payment is established. This applies even if they are paid out of pre-acquisition profits. However, the investment may need to be tested for impairment as a consequence, refer note .

Revenue from mining production

Revenue from mining production is brought to account when the significant risks and rewards of ownership have transferred to the buyer and selling prices are known or can be reasonably estimated.

2 Revenue

The group derives the following types of revenue:

The group derives the following types of revenue:
Operating activities
Revenue
Other Income
Total revenue from continuing operations
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
8,600
557
139
2
8,739
559

3 Operating segments

(a) Segment results

The economic entity operates in one operating segment being mining and exploration, and its activities can be divided into 3 reportable segments based on reports received and reviewed by the Board.

The three reportable segments are based on 3 distinct geographical locations, South Africa, Indonesia and Australia. Mining and exploration activities are carried out only on the South African and Indonesian segments; whereas the Australian segment reflects only the administrative arm of the business that supports the mining and exploration activities in the other two geographical locations.

36

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

3 Operating segments (continued)

(a) Segment results (continued)

Consolidated entity
2018
External sales
Other income
Total
Segment Result
Depreciation and amortisation
South
Africa
Indonesia Australia
Total
$'000
$'000
$'000
$'000
8,600
-
-
8,600
138
-
1
139
8,738
-
1
8,739
(146)
(190)
(1,054)
(1,390)
-
(9)
(1)
(10)
(17,096)
(10,885)
(244)
(28,225)

There was no impairment charge or other significant non-cash item recognised in 2018.

The segment information provided to the strategic steering committee for the reportable segments for the year ended 30 June 2017 is as follows:

Consolidated entity
2017
External sales
Other income
Total
Segment Result
Depreciation and amortisation
Disposal of assets
South
Africa
Indonesia Australia
Total
$'000
$'000
$'000
$'000
557
-
-
557
-
-
2
2
557
-
2
559
19
(191)
(399)
(571)
-
(20)
-
(20)
-
11
-
11
(7,713) (11,313)
31
(18,995)

There was no impairment charge or other significant non-cash item recognised in 2017.

(b) Segment assets

Segment assets are measured in the same way as in the financial statements. These assets are allocated based on the operations of the segment and the physical location of the asset.

South Africa
Indonesia
Australia
Total segment assets
Consolidated entity
30 June
2018
30 June
2017
$'000
$'000
8,216
8,194
9,592
9,544
4,119
77
21,927
17,815

(c) Segment liabilities

Reportable segments' liabilities are reconciled to total liabilities as follows:

37

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

3 Operating segments (continued)

(c) Segment liabilities (continued)

South Africa
Indonesia
Australia
Total segment liabilities
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
772
310
1,862
1,531
29
566
2,663
2,407

(d) Other segment information

During the year ended 30 June 2018, there was one major customer who contributed to more than 10% of the group's revenue.

4 Income tax expense

(a) Income tax expense

(a) Income tax expense
Consolidated entity
30 June 30 June
2018 2017
$'000 $'000
Income tax expense - -
(b) Numerical reconciliation of income tax expense to prima facie tax payable
Consolidated entity
30 June 30 June
2018 2017
$'000 $'000
Loss from continuing operations before income tax expense (1,390) (571)
Tax at the Australian tax rate of 27.5% (2017 - 27.5%) 382 157
Tax effect of amounts which are not deductible (taxable)
in calculating taxable income:
Non-allowable expenses 2 2
Subtotal 384 159
Current year tax benefit not recognised (384) (159)
Income tax expense - -

(b) Numerical reconciliation of income tax expense to prima facie tax payable

(c) Tax losses

Unused tax losses for which no deferred tax asset has been recognised
Potential tax benefit @ 27.5% (2017: 27.5%)
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
4,215
2,533
1,159
697

38

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

5 Key management personnel disclosures

The aggregate compensation made to Directors and other members of key management personnel of the group is set out below:

Short-term employee benefits
Share-based payments
Consolidated entity
30 June
2018
$000
30 June
2017
$000
217
303
233
-
450
303

(a) Transactions with other related parties

The following transactions occurred with related parties:

The following transactions occurred with related parties:
Consolidated entity
30 June 30 June
2018 2017
$000 $000
Sales and purchases of goods and services
Legal fees that were paid to Quinert Rodda & Associates, a Director related
entity to Mr Michael Quinert 71 5
Legal fees that were paid to Malan Scholes Attorneys, a Director related entity to
Mr Hulme Scholes 25 11

6 Remuneration of auditors

During the year the following fees were paid or payable for services provided by the auditor of the parent entity, its related practices and non-related audit firms:

Remuneration of the auditor of the parent entity for:
Audit services and review of financial statements
Remuneration of other auditors of subsidiaries for:
Audit services and review of financial statements
Total remuneration for audit and other assurance services
Consolidated entity
2018
$
2017
$ 47,500
40,000
15,000
10,000
62,500
50,000

7 Earnings per share

(a) Basic earnings per share

Attributable to the ordinary equity holders of the company Consolidated entity
30 June
2018
Cents
30 June
2017
Cents
(0.23)
(0.13)

39

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

7 Earnings per share (continued)

(b) Diluted earnings per share

(b) Diluted earnings per share
Attributable to the ordinary equity holders of the company
(c) Reconciliation of earnings used in calculating earnings per share
The earnings and weighted average of ordinary shares used in the calculation of
basic earnings per share are as follows.
From operations
Add back profit/(loss) attributable to non-controlling interest
(d) Weighted average number of shares used as the denominator
Weighted average number of ordinary shares used as the denominator in
calculating basic earnings per share
Consolidated entity
30 June
2018
Cents
30 June
2017
Cents
(0.23)
(0.13)
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
(1,141)
(571)
(249)
(14)
(1,390)
(585)
Consolidated entity
2018
Number
2017
Number
603,927,248
456,203,370

The outstanding share options as at 30 June 2018 are considered to be anti-dilutive and therefore were excluded from the diluted weighted average number of ordinary shares calculation.

8 Financial assets and financial liabilities

(a) Trade and other receivables

Trade receivables
Other receivables
Consolidated entity
30 June
2018
30 June
2017
Current
$'000
Current
$'000
55
10
291
230
346
240

40

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

8 Financial assets and financial liabilities (continued)

(b) Trade and other payables

Current liabilities
Trade payables
Accrued expenses
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
1,453
1,156
1,190
1,237
2,643
2,393

Trade payables are unsecured and are usually paid within 30 days of recognition.

9 Exploration and evaluation, development and mine properties

Consolidated entity
Derewo River
Gold Project
$'000
Rand & DRD
Leases
$'000
At 1 July 2016
Cost or fair value
9,338
6,748
Year ended 30 June 2017
Opening net book amount
9,338
6,748
Acquisition during the year
175
464
Exploration expenses capitalised
(188)
655
Closing net book amount
9,325
7,867
Consolidated entity
Year ended 30 June 2018
Opening net book amount
9,325
7,867
Acquisition during the year
-
-
Exploration expenses capitalised
250
76
Foreign exchange translation
gian/(loss)
(178)
(105)
Closing net book amount
9,397
7,838
Exploration expenditure - capitalised
Exploration expenditure - non-capitalised*
Derewo River
Gold Project
$'000
Rand & DRD
Leases
$'000
9,338
6,748
Tambina
Gold Project
$'000
Mt Cecelia
Project
$'000
Total
$'000
-
-
16,086
9,338
6,748
175
464
(188)
655
-
-
16,086
-
-
639
-
-
467
9,325
7,867
-
-
17,192
9,325
7,867
-
-
250
76
(178)
(105)
-
-
17,192
1,847
1,099
2,946
-
-
326
-
-
(283)
9,397
7,838
1,847
1,099
20,181
30 June 2018
30 June 2017
$'000
$'000
326
639
56
8
382
647

*These costs were expensed as incurred as they were not related to areas of interests.

41

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

9 Exploration and evaluation, development and mine properties (continued)

(a) Acquisition of Northern Reserves Pty Ltd

On 15 November 2017, the group completed the acquisition of Northern Reserves Pty Ltd ("Northern Reserves") via the issue of 52,000,000 new ordinary shares at a deemed price of $0.017 per share and 10,000,000 unlisted options at nil consideration. Prior to the completion, the group executed a Share Purchase Agreement with the vendors of Northern Reserves and 3,000,000 new ordinary shares at a deemed price of $0.017 per share were issued as the part of the consideration. A further 45,000,000 million shares and a cash payment of $75,000 will be issued upon achievement of certain milestones upon the grant of the license application and commencement of a reverse circulation-percussion drilling program within the area comprised in the license application. Northern Reserves is the holder of one application in the Pilbara region, called the Mt Cecelia Project (EL 45/5045) that is targeting high-grade conglomerate gold mineralisation associated with the Lower Fortescue Group.

The acquisition was not considered a business combination as defined in AASB 3 Business combination as Northern Reserves was not considered to be carrying on a business. As such the acquisition has been treated as an asset acquisition with the fair value of the asset being the consideration. The acquisition also has contingent consideration, as at 30 June 2018, to be paid upon achieving certain milestones as discussed above.

No other transaction costs have been incurred by the group in the completion of this transaction. The acquisition of this asset is capitalised and measured at cost. The recoverability of the carrying amount of deferred exploration and evaluation expenditure is dependent on the successful development and commercial exploitation, or alternatively the sale, of the respective area of interest.

(b) Acquisition of Tambina Gold Project

On 30 January 2018, the group completed the acquisition of Tambina Gold Project via the issue of 70,000,000 new ordinary shares at a deemed price of $0.022 per share. A total non-refundable cash payment of $300,000 was paid to the vendor. The vendor is entitled to a further 30,000,000 fully paid ordinary West Wits shares upon the satisfaction of certain milestones and the grant of an aggregate net smelter royalty of 2% of net revenue from production within the three mining leases.

The acquisition was not considered a business combination as defined in AASB 3 Business combination as Tambina Gold Project was not considered to be carrying on a business. As such the acquisition has been treated as an asset acquisition with the fair value of the asset being the consideration.

No other transaction costs have been incurred by the group in the completion of this transaction. The acquisition of this asset is capitalised and measured at cost. The recoverability of the carrying amount of deferred exploration and evaluation expenditure is dependent on the successful development and commercial exploitation, or alternatively the sale, of the respective area of interest.

(c) Derewo River Gold Project

As at 30 June 2018, the carrying value of the asset meets the criteria of AASB 6 with carrying value being lower the expected recoverability of the asset on successful development and commercial exploitation which the Group has been making progress. Management continues to evaluate different avenues to materialise the return of investment. As of the date of this report, there has been no formal decision made by the group which might affect the carrying value of this asset.

42

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

10 Equity

(a) Share capital

(a) Share capital
30 June
2018
Shares
30 June
2017
Shares
30 June
2018
$'000
30 June
2017
$'000
Ordinary shares
Ordinary shares - fully paid
717,847,679
456,203,370
36,089
31,251
Total share capital
717,847,679
456,203,370
36,089
31,251
(i)
Movements in ordinary share:
Details
Number of
shares
(in thousands)
$'000
Balance at 1 July 2016
456,203
31,251
Shares issued during the year
-
-
Less: Transaction costs arising on share issue
-
-
Balance at 30 June 2017
456,203
31,251
Shares issued during the year
261,644
4,915
Less: Transaction costs arising on share issue
-
(77)
Balance at 30 June 2018
717,847
36,089
Date
Details
No. of shares
Unit price ($)
$'000
27/10/2017
Issue of ordinary shares as part of the consideration
for the acquisition of Northern Reserves
3,000,000
0.017
51
2/11/2017
Issue of ordinary shares under private placement
44,117,647
0.017
750
15/11/2017
Issue of ordinary shares as part of the consideration
for the acquisition of Northern Reserves
52,000,000
0.017
884
16/11/2017
Share purchase plan
64,117,572
0.017
1,090
24/11/2017
Issue under private placement
14,318,181
0.022
315
4/12/2017
Issue under private placement
8,409,091
0.022
185
30/01/2018
Issue of ordinary shares as part of the consideration
for the acquisition of Tambina project
70,000,000
0.022
1,540
30/01/2018
Issued of ordinary shares to directors
5,681,818
0.018
100
261,644,309
4,915
30 June
2018
Shares
30 June
2017
Shares
30 June
2018
$'000
30 June
2017
$'000
717,847,679
456,203,370
36,089
31,251
36,089
31,251
Number of
shares
(in thousands)
$'000
456,203
31,251
-
-
-
-
456,203
31,251
261,644
4,915
-
(77)
717,847
36,089
$'000
51
750
884
1,090
315
185
1,540
100
4,915

(ii) Ordinary shares

Ordinary shares participate in dividends and the proceeds on winding up of the parent entity in proportion to the number of shares held. At shareholders meetings each ordinary share is entitled to one vote when a poll is called, otherwise each shareholder has one vote on a show of hands. The fully paid ordinary shares have no par value and the company does not have a limited amount of authorised capital.

43

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018

(continued)

10 Equity (continued)

(b) Options

Opening balance
Options issued
Options expired
Closing balance
30 June
2018
Options
30 June
2017
Options
30 June
2018
$'000
30 June
2017
$'000
31,000,000
61,000,000
1,286
1,286
52,000,000
-
719
-
(29,000,000)
(30,000,000)
-
-
54,000,000
31,000,000
2,005
1,286

During the financial year 2018, the following unlisted options were issued:

Grant
date
Details
15/11/2017
Issue of options as part of the consideration for the
acquisition of Northern Reserves
22/11/2017
Issued options to directors
22/11/2017
Issued options to consultants
4/12/2017
Issued options to consultants
No. of shares
10,000,000
17,000,000
22,000,000
3,000,000
52,000,000
Share-based
payment
expense
$'000
164
233
283
39
719

As at 30 June 2018, the following unlisted options are in existence:

Series Issued
4/11/2015
15/11/2017
4/12/2017
4/12/2017
4/12/2017
30/01/2018
Quantity
Grant date
Expiry date
Exercise price
($)
Fair value at
grant date per
option ($)
2,000,000
4/11/2015
4/11/2018
0.03
0.015
10,000,000
15/11/2017
14/11/2020
0.05
0.017
10,000,000
21/11/2017
30/11/2020
0.05
0.017
12,000,000
21/11/2017
3/12/2022
0.05
0.019
3,000,000
4/12/2017
3/12/2022
0.05
0.019
17,000,000
21/11/2017
29/01/2023
0.05
0.017
54,000,000

No options were exercised during the year (2017: nil)

11 Share-based payments

During the year 2018, the Group issued:

• 10,000,000 options to the vendors of the Northern Reserves transaction as part of consideration;

• 17,000,000 options to the directors as remuneration after receiving shareholder approval at the General Meeting held on 18 January 2018; and

  • 15,000,000 options to consultants in exchange for services rendered.
Grant date
15/11/2017
21/11/2017
21/11/2017
4/12/2017
21/11/2017
Quantity
Exercise
price ($)
Expiry
date
Vested No.
Vested %
Exercised
10,000,000
0.05
14/11/2020
10,000,000
100%
-
10,000,000
0.05
30/11/2020
10,000,000
100%
-
12,000,000
0.05
3/12/2022
4,000,000
33%
-
3,000,000
0.05
3/12/2022
1,000,000
33%
-
17,000,000
0.05
29/01/2023
6,000,000
35%
-
52,000,000

44

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

11 Share-based payments (continued)

The options are expensed at grant date to profit and loss. The expense amount was calculating using Black-Scholes valuation model and the inputs used to determine the fair value at grant date are as follows:

Fair value
Share Expected per
price at Risk-free life of option at
Grant grant Expected rate options Exercise Dividend grant
date date ($) volatility (%) (%) (years) price ($) yield date ($)
15/11/2017 0.029 88% 1.93% 3 0.05 - 0.017
21/11/2017 0.028 88% 1.93% 3 0.05 - 0.017
21/11/2017 0.028 88% 2.17% 5 0.05 - 0.017
4/12/2017 0.026 109% 2.17% 5 0.05 - 0.019

12 Interests in other entities

(a) Material subsidiaries

The group’s principal subsidiaries at 30 June 2018 are set out below. Unless otherwise stated, they have share capital consisting solely of ordinary shares that are held directly by the group, and the proportion of ownership interests held equals the voting rights held by the group. The country of incorporation or registration is also their principal place of business.

Place of

Place of
business/ Ownership interest held
country of Ownership interest held by non-controlling Principal
Name of entity incorporation by the group interests activities
2018 2017 2018 2017
% % % %
West Wits Mining SA Mining &
(Pty) Ltd South Africa 90.0 90.0 10.0 10.0 Exploration
Mining &
West Wits MLI (Pty) Ltd South Africa 74.0 74.0 26.0 26.0 Exploration
Mining & Mineral
Reclamation Services Mining &
(Pty) Ltd South Africa 74.0 74.0 26.0 26.0 Exploration
West Wits Monarch Mining &
(Pty) Ltd South Africa 100.0 100.0 - - Exploration
NuGold Company Ltd Mining &
(Hong Kong) Hong Kong 100.0 100.0 - - Exploration
Mining &
PT. NuGold Indonesia Indonesia 100.0 100.0 - - Exploration
PT. Madinah Mining &
Qurrata'ain Indonesia 64.0 64.0 36.0 36.0 Exploration

(i) Significant restrictions

Cash held by all South Africa subsidiaries is subject to exchange control regulations governed by the South African Reserve Bank (SARB). Ongoing approval by SARB is crucial to the transfer of cash funds into and out of South Africa. The cash and cash equivalents balance held in South Africa is AUD325,612 (2017: AUD111,175).

45

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

12 Interests in other entities (continued)

(b) Non-controlling interests (NCI)

Set out below is summarised financial information for each subsidiary that has non-controlling interests that are material to the group. The amounts disclosed for each subsidiary are before inter-company eliminations.

Summarised balance sheet
Current assets
Current liabilities
Current net assets
Non-current assets
Non-current liabilities
Non-current net assets
Net assets
Accumulated NCI
Summarised statement of comprehensive income
Profit for the period
Other comprehensive income
Total comprehensive income
Profit/(loss) allocated to NCI
< blank header row >
Summarised cash flows
Cash flows from operating activities
Cash flows from investing activities
Cash flows from financing activities
Net increases/(decrease) in cash and cash equivalents
South Africa
Indonesia
30 June
2018
$'000
30 June
2017
$'000
30 June
2018
$'000
30 June
2017
$'000
637
327
16
118
771
310
1,844
1,519
(134)
17
(1,828)
(1,401)
7,579
7,868
5,126
9,172
-
5,399
18
6,445
7,579
2,469
5,108
2,727
7,445
2,486
3,280
1,326
1,125
990
(350)
(50)
South Africa
Indonesia
30 June
2018
$'000
30 June
2017
$'000
30 June
2018
$'000
30 June
2017
$'000
(146)
19
(190)
(191)
(305)
-
(263)
(64)
(451)
19
(453)
(255)
(68)
56
(182)
(38)
South Africa
Indonesia
30 June
2018
$'000
30 June
2017
$'000
30 June
2018
$'000
30 June
2017
$'000
901
463
(115)
(166)
(596)
(379)
-
159
-
-
39
-
305
84
(76)
(7)

(c) Transactions with non-controlling interests

There have been no transactions with non-controlling interests during the year 2018 (2017: nil).

13 Commitments

The CFO Solution provides Accounting, Company Secretarial and Administrative services at a rate of $10,000 per month plus GST. This commitment may be terminated with 3 months' notice from either party. This agreement has a 12-month rolling term until termination notice is communicated from either party.

46

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

14 Contingent liabilities and contingent assets

(a) Contingent liabilities

The group had contingent liabilities at 30 June 2017 in respect of the Dead Rent liability in Indonesia.

In 2012 the Company’s Indonesian subsidiary PTMQ, submitted applications for Clean and Clear title on IUP’s to the Indonesian Government. To date, the Clean and Clear title has not been granted.

As part of the administrative grant process, the Company is required to pay Dead Rent on all IUP’s held. The Company is of the opinion that a Dead Rent liability exist when:

  • Clean and Clear is granted on the IUP’s

  • On the actual titles granted

  • Only on the calculated area confirmed

  • From the point of time title is granted

  • At a rate appropriate for the period

At 30 June 2017 there was no clarity on the quantification of the variables to which a liability could be reliably measured. Also, if for some reason the Government denies the Company’s grant of title, no Dead Rent would be payable.

Due to the above factors, the Company is of the opinion that it could not reliability measure the extent of the actual liability for Dead Rent and as such a Contingent liability existed.

During the process of the 2017 Audit, the Company’s Indonesian auditors disagreed with the Company’s assessment that a Contingent Liability exists. They were of the opinion that a current liability of IDR 23,595,400,656 or AUD 2,308,238 existed as at 30 June 2017.

During the year ended 30 June 2018, management has received documentation and advice from local authorities which indicated the dead rent liability to be approximately $250,000. This amount was recognised as accrued liability as at 30 June 2018, and capitalised under exploration expenditure for the Derewo River Gold Project.

Subsequent to the recognition of this liability, as at 30 June 2018 other than the obligation to issue equity as disclosed in Note 9(a)(b), the group had no contingent liabilities.

(b) Contingent assets

The group had no contingent assets at 30 June 2018.

47

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

15 Cash flow information

(a) Reconciliation of loss after income tax to net cash inflow from operating activities

Loss for the year
Adjustment for
Depreciation and amortisation
Loss borne by parent
Share-based payments
Net gain on sale of non-current assets
Net exchange differences
Change in operating assets and liabilities:
(Increase) decrease in accounts receivable
Decrease in other current assets
Increase in accounts payable
Decrease in otherliabilities
Net cash inflow (outflow) from operating activities
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
(1,390)
(659)
10
20
-
(15)
655
-
-
(11)
40
64
(106)
38
17
8
250
609
6
(1)
(518)
52

16 Parent entity financial information

(a) Summary financial information

The individual financial statements for the parent entity show the following aggregate amounts:

Balance sheet
Current assets
Non-current assets
Total assets
Current liabilities
Total liabilities
Shareholders' equity
Issued capital
Reserves
Share-based payments
Retained earnings
Profit or loss for the year
Total comprehensive income
30 June
2018
$'000
30 June
2017
$'000
905
93
21,147
17,386
22,052
17,479
28
589
28
589
(22,024)
(16,891)
36,089
31,251
2,005
1,286
(16,184)
(15,648)
21,910
16,890
(711)
(392)
(711)
(392)

(b) Guarantees entered into by the parent entity

West Wits Mining Ltd has not entered into any guarantees, in the current or previous financial year, in relation to the debts of its subsidiaries (2017: Nil).

48

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

16 Parent entity financial information (continued)

(c) Contingent liabilities of the parent entity

The parent entity did not have any contingent liabilities as at 30 June 2018 or 30 June 2017. For information about guarantees given by the parent entity, please see above.

(d) Contractual commitments for the acquisition of property, plant or equipment

At 30 June 2018, West Wits Mining Ltd had not entered into any contractual commitments for the acquisition of property, plant and equipment (2017: nil).

17 Events occurring after the reporting period

No matter or circumstance has occurred subsequent to period end that has significantly affected, or may significantly affect, the operations of the group, the results of those operations or the state of affairs of the group or economic entity in subsequent financial years.

18 Capital management

The economic entity's policy is to maintain a strong and flexible capital base to maintain investor, creditor and market confidence and to sustain future development of the business. The board monitors the return on capital, which the economic entity defines as total shareholders’ equity attributable to members of West Wits Mining Limited divided by the quantity of shares on issue.

The economic entity is not subject to externally imposed capital requirements.

19 Financial risk management

The economic entity's activities expose it to a variety of financial risks: market risk, credit risk and liquidity risk. Management have established risk management policies to identify and analyse the risks faced by the company and the group, to set appropriate risk limits and controls, and to monitor risk and adherence to limits. Risk management policies and systems are reviewed regularly to reflect changes in market conditions and the economic entity's activities.

Risk management is overseen by the Audit, Risk and Compliance Committee.

(a) Market risk

(i) Foreign exchange risk

The economic entity is exposed to currency risk on sales and purchases that are denominated in a currency other than the respective functional currency of each company within the group.

The economic entity also has exposure to foreign exchange risk in the currency cash reserves it holds to meet subsidiary loan requirements. This is kept to an acceptable level by buying foreign currency at spot rates only to fund short term cash requirements.

The economic entity's exposure to foreign exchange risk has not changed from the previous year. The economic entity does not make use of derivative financial instruments to hedge foreign exchange risk.

The carrying amount of the economic entity's foreign currency denominated monetary assets and monetary liabilities at the reporting date is as follows:

Assets
Liabilities
Total exposure
30 June 2018
30 June 2017
ZAR
'000
IDR
'000
ZAR
'000
IDR
'000
80,536
101,314,735
82,154
97,567,807
(6,678)
(19,661,409)
(6,749)
(15,650,789)
73,858
81,653,326
75,405
81,917,018

49

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

19 Financial risk management (continued)

(a) Market risk (continued)

The following significant exchange rates applied during the year:

Currency Average Rate Average Rate 30 June spot rate
2018 2017 2018 2017
.
ZAR 9.9203 10.2473 10.1620 10.0255
IDR 10,562.31 9,980.72 10,610.74 10,222.91
Sensitivity

The economic entity is exposed to the South African Rand (ZAR) and Indonesian Rupiah (IDR). The average annual movement in the AUD/ZAR and AUD/IDR exchange rate over the last 5 years was 3% for ZAR and 4% for IDR (2017: 4% for ZAR and 3% for IDR) based on the year-end spot rates. A 3% strengthening of the ZAR and a 4% strengthening of the IDR against the AUD at 30 June would have increased/(deceased) equity and loss by the amounts show below. This analysis assumes that all other variables, in particular interest rates, remain consistent. The analysis is performed on the same basis for 2017.

Impact on other components of Impact on other components of
Consolidated entity Impact on post-tax profit equity
2018 2017 2018 2017
$'000 $'000 $'000 $'000
Sensitivity result (11) (25) 494 585
The effect on equity is to the Foreign Currency Reserve and Accumulated Losses.

(ii) Price risk

Exposure

The Group is exposed to the risk of fluctuations in prevailing market commodity prices on gold. The Group’s has not established a formal policy to manage this risk. Management maintain a tight control over the production costs and work closely with its key contractors to ensure that any fluctuation in the gold price is reflected in the production costs.

(b) Credit risk

Credit risk refers to the risk that a counter party will default on its contractual obligations resulting in financial loss to the economic entity.

Surplus cash is invested with financial institutions of appropriate credit worthiness and the amount of credit exposure to any one counter party is limited.

The economic entity generally has no substantial exposure to credit risk as it's trade receivables predominantly relate to VAT refunds from the South African Revenue Service. The economic entity's maximum exposure to credit risk at the end of the reporting period is set out in the table below. The carrying amount of the financial assets represents the maximum credit risk exposure.

Cash and cash equivalents
Trade and other receivables
Consolidated entity
30 June
2018
$'000
30 June
2017
$'000
1,209
165
346
240
1,555
405

50

West Wits Mining Limited Notes to the consolidated financial statements 30 June 2018 (continued)

19 Financial risk management (continued)

(b) Credit risk (continued)

Trade and other receivables are further detailed as follows:

Other
Trade receivables receivables Total
Year 30 days 60 days 90 days 90+ days
$000 $000 $000 $000 $000 $000
2018 121 122 55 39 9 346
2017 24 70 - 50 96 240

Outstanding receivables have not been impaired as West Wits Limited management believe that the receivables are recoverable.

(c) Liquidity risk

Prudent liquidity risk management implies maintaining sufficient assets to meet liabilities as they fall due.

The economic entity is exposed to liquidity risk via the quantity and type of financial assets and liabilities it holds. The board ensures that the economic entity can meet its financial obligations as they fall due by maintaining sufficient reserves of cash, continuously monitoring forecast and actual cash flows, matching the maturity profiles of financial assets and liabilities, and identifying when they need to raise additional funding from the equity markets.

The economic entity’s exposure to liquidity risk has remained unchanged from the previous year.

  • (i) Maturities of financial instruments
Contractual maturities of financial liabilities
At 30 June 2018
Financial assets - cash flows realisable
Cash and cash equivalents
Trade and other receivables
Financial liabilities due to payment
Trade and other payables
Loans and other financial liabilities
Net inflow/(outflow) on financial instruments
Due
within 1
year
Due
within 1
to 5 years
Over 5
years
Total
contractual
cash
flows
Carrying
amount
(assets)/
liabilities
$'000
$'000
$'000
$'000
$'000
1,209
-
-
1,209
1,209
346
-
-
346
346
1,555
-
-
1,555
1,555
(2,643)
-
-
(2,643)
(2,643)
-
(20)
-
(20)
(20)
(2,643)
(20)
-
(2,663)
(2,663)
(1,088)
(20)
-
(1,108)
(1,108)

Fair value

The fair value of financial assets and liabilities equals to the carrying amounts shown in the statement of financial position due to the short-term nature of those financial assets and liabilities.

51

West Wits Mining Limited Directors' declaration 30 June 2018

In the Directors' opinion:

  • (a) the financial statements and notes set out on pages 24 to 51 are in accordance with the Corporations Act 2001 , including:

  • (i) complying with Accounting Standards, the Corporations Regulations 2001 and other mandatory professional reporting requirements, and

  • (ii) give a true and fair view of the financial position as at 30 June 2018 and of the performance for the year ended on that date of the company and the economic entity; and

  • (iii) comply with International Financial Reporting Standards as disclosed in Note 1

  • (b) the Chairman and Chief Finance Officer have each declared that:

  • (i) the financial records of the company for the financial year have been properly maintained in accordance with section 286 of the Corporations Act 2001;

  • (ii) the financial statements and notes for the financial year comply with the Accounting Standards; and

  • (iii) the financial statements and notes for the financial year give a true and fair view.

  • (c) in the Directors' opinion there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable.

This declaration is made in accordance with a resolution of the Board of Directors.

==> picture [119 x 56] intentionally omitted <==

Mr Michael Quinert Executive Chairman Melbourne 27 September 2018

52

West Wits Mining Limited

Independent auditor’s report to members

Report on the Audit of the Financial Report

Opinion

We have audited the financial report West Witts Mining Limited. (the Company and its controlled entities (the Group)), which comprises the consolidated statement of financial position as at 30 June 2018, the consolidated statement of comprehensive income, the consolidated statement of changes in equity and the consolidated statement of cash flows for the year then ended, and notes to the financial statements, including a summary of significant accounting policies and other explanatory information, and the directors’ declaration.

In our opinion, the accompanying financial report of the Group, is in accordance with the Corporations Act 2001 , including:

(i) giving a true and fair view of the Group’s financial position as at 30 June 2018 and of its financial performance for the year then ended; and

(ii) complying with Australian Accounting Standards and the Corporations Regulations 2001 .

Basis for Opinion

We conducted our audit in accordance with Australian Auditing Standards. Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Financial Report section of our report. We are independent of the Group in accordance with the auditor independence requirements of the Corporations Act 2001 and the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110 Code of Ethics for Professional Accountants (the Code) that are relevant to our audit of the financial report in Australia. We have also fulfilled our other ethical responsibilities in accordance with the Code.

We confirm that the independence declaration required by the Corporations Act 2001 , has been provided on the date of this report.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.

Material Uncertainty Related to Going Concern

We draw attention to Note 1 in the financial report, which indicates that the Group incurred a net loss of $1,390,000 during the year ended 30 June 2018 and, as of that date, the Group’s current liabilities exceeded its current assets by $1,085,000. As stated in Note 1, these events or conditions, along with other matters as set forth in Note 1, indicate that a material uncertainty exists that may cast significant doubt on the Company’s ability to continue as a going concern. Our opinion is not modified in respect of this matter.

Other Matter

The audit report for 30 June 2017 was qualified on a going concern basis due to the consolidated entity’s non-recognition of a provision of $2,308,238 for Dead Rent on all IUP’s held in relation to mining permits held in Indonesia. This situation indicated the existence of a material uncertainty that cast significant doubt on the consolidated entity’s ability to continue as a going concern. During the current year, the consolidated entity has been able to quantify their Dead Rent liability to a value of approximately $250,000 and has recorded this as a liability.

Key Audit Matters

Key audit matters are those matters that, in our professional judgement, were of most significance in our audit of the financial report of the current period. These matters were addressed in the context of our audit of the financial report as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on these matters.

CARRYING VALUE OF EXPLORATION AND EVAUATION ASSETS CARRYING VALUE OF EXPLORATION AND EVAUATION ASSETS
Area of focus
Refer also to notes 1 and 9
How our audit addressed it
The Group has incurred exploration costs for
their gold mining projects in South Africa and
Indonesia over a number of years. There is a
risk that the accounting criteria associated with
the capitalisation of exploration and evaluation
expenditure may no longer be appropriate.
An impairment review is only required if an
impairment trigger is identified.
Due to the nature of the gold industry, indicators
of impairment could include:
Changes to exploration plans;
Loss of rights to tenements;
Changes to reserve estimates;
Costs of extraction and production; or
Exchange rate factors.
Our audit procedures included:
Areview of the directors’ assessment of the
criteria for the capitalisation of exploration
expenditure and evaluation of whether there
are any indicators for impairment to
capitalised cost;
Understanding and vouching the underlying
contractual entitlement to explore and
evaluate each area of interest, including an
evaluation of the requirement to renew that
tenement at its expiry;
Examining project spend per each area of
interest and comparing this spend to the
minimum expenditure requirements set out
in the underlying tenement expenditure
plan; and
Examining project spend to each area of
interest to ensure that it is directly
attributable to that area of interest.
We also assessed the adequacy of the Group’s
disclosures in respect of exploration costs.
ACQUISITION OF EXPLORATION AND EVALUATION ASSETS
Area of focus
Refer also to notes 1 and 9
How our audit addressed it
On 25 October 2017, the Group completed the
acquisition of Northern Reserves Pty Ltd
(Northern) for an initial consideration of $1.1
million funded by way of ordinary shares and
share options. Subsequent issues of shares will
be granted on competition of certain milestones
per the term of the purchase agreement.
On 30 January 2018 the Group completed the
acquisition of the Tambina Gold Project for an
initial consideration of $1.84 made up of
ordinary shares and cash payments.
Subsequent issues of shares will be granted on
competition of certain milestones per the term of
the purchase agreement.
The Acquisitions have been treated by
management as asset acquisitions.
Determining the appropriate accounting
treatment for the transactions was complex and
required significant judgements and estimates
by the Group.
Our audit procedures included:
Examining the legal documentation
associated with the purchases to
understand the key terms and conditions of
the acquisitions; and
Examining the treatment of the initial
purchase consideration and the deferred
consideration for each acquisition was in
accordance with the requirements of
Australian Accounting Standards.
We also assessed the adequacy of the Group’s
disclosures in respect of the acquisitions in the
financial report.

Other Information

The directors are responsible for the other information. The other information comprises the information included in the Group’s annual report for the year ended 30 June 2018 but does not include the financial report and the auditor’s report thereon.

Our opinion on the financial report does not cover the other information and accordingly we do not express any form of assurance conclusion thereon.

In connection with our audit of the financial report, our responsibility is to read the other information and, in doing so, consider whether the other information is materially inconsistent with the financial report or our knowledge obtained in the audit or otherwise appears to be materially misstated.

If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.

Responsibilities of the Directors for the Financial Report

The directors of the Company are responsible for the preparation of the financial report that gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001 and for such internal control as the directors determine is necessary to enable the preparation of the financial report that gives a true and fair view and is free from material misstatement, whether due to fraud or error.

In preparing the financial report, the directors are responsible for assessing the ability of the Group to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless the directors either intend to liquidate the Group or to cease operations, or has no realistic alternative but to do so.

Auditor’s Responsibilities for the Audit of the Financial Report

Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with Australian Auditing Standards will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these financial statements.

A further description of our responsibilities for the audit of these financial statements is located at the Auditing and Assurance Standards Board website at:

http://www.auasb.gov.au/auditors_responsibilities/ar1.pdf

This description forms part of our independent auditor’s report.

Report on the Remuneration Report

Opinion on the Remuneration Report

We have audited the Remuneration Report included in the directors’ report for the year ended 30 June 2018.

In our opinion, the Remuneration Report of West Wits Mining Limited, for the year ended 30 June 2018, complies with section 300A of the Corporations Act 2001 .

Responsibilities

The directors of the Company are responsible for the preparation and presentation of the Remuneration Report in accordance with section 300A of the Corporations Act 2001 . Our responsibility is to express an opinion on the Remuneration Report, based on our audit conducted in accordance with Australian Auditing Standards.

William Buck Audit (Vic) Pty Ltd ABN 59 116 151 136

J. C. Luckins Director

Melbourne, 27 September 2018

West Wits Mining Limited Shareholder information 30 June 2018

The shareholder information set out below was applicable as at 21 September 2018.

A. Distribution of ordinary fully paid shares

All ordinary shares carry one vote per share.

Class of equity security
Holding
1 - 1000
1,001 - 5,000
5,001 - 10,000
10,001 - 100,000
100,001 and over
Ordinary shares
No. of
Holders
Total Units
37
3,258
34
127,121
119
1,145,020
315
15,484,851
481
701,087,429
986
717,847,679

There were 334 holders of less than a marketable parcel of ordinary shares.

B. Ordinary fully paid shareholders

Top Twenty Ordinary fully paid shareholders

The names of the twenty largest holders of quoted equity securities are listed below:

Name
DRD GOLD LTD
STRAT PLAN PL
KASTIN PL
J P MORGAN NOM AUST LTD
DEBT MGNT ASIA CORP
CITICORP NOM PL
EGAVAS CONS SVCS PL
REALSTAR FINANCE PL
O'MEARA DENIS WILLIAM
JOHN WARDMAN & ASSOC PL
GREGORACH PL
SUNSET CAP MGNT PL
NEALE TREVOR IAN
CCI S/F PL
CELTIC CAP PL
I E PROPS PL
SLEIGH CHRISTOPHER N
RICHARDSON ANNE MAREE
O'MEARA DAMON PATRICK
MOSMAN GATE PL
Ordinary shares
Number held
%
47,812,500
6.66
22,524,352
3.14
18,925,370
2.64
14,691,069
2.05
14,500,000
2.02
13,824,638
1.93
13,750,246
1.92
13,312,108
1.85
11,509,092
1.60
10,700,000
1.49
10,184,132
1.42
10,000,000
1.39
9,662,021
1.35
9,051,201
1.26
8,884,902
1.24
8,162,390
1.14
7,882,352
1.10
7,672,727
1.07
7,672,727
1.07
7,672,727
1.07
268,394,554
37.41

58

West Wits Mining Limited Shareholder information 30 June 2018

(continued)

B. Ordinary fully paid shareholders (continued)

Unlisted Options

Unlisted Options
Exercise Number of
Class Quantity Price Expiry Date Holders
Unlisted options issued on 4 November 2015 2,000,000 $0.03 4 November 2018 1
Unlisted options issued on 15 November 2017 10,000,000 $0.05 14 November 2020 8
Unlisted options issued on 4 December 2017 10,000,000 $0.05 30 November 2020 1
Unlisted options issued on 4 December 2017 12,000,000 $0.05 3 December 2022 1
Unlisted options issued on 4 December 2017 3,000,000 $0.05 3 December 2022 1
Unlisted options issued on 30 January 2018 17,000,000 $0.05 29 January 2023 2

C. Substantial holders

Substantial holders in the company are set out below:

Shareholders

DRD GOLD LTD

Number
held %
47,812,500 6.66%

Shareholder enquiries

Shareholders with enquiries about their shareholdings should contact the share registry:

Security Transfer Registrar 770 Canning Highway, Applecross WA 6153 Phone: +61 8 9315 0933 Fax: +61 8 9315 2233 Email: [email protected]

Change of address, change of name, consolidation of shareholdings

Shareholders should contact the Share Registry to obtain details of the procedure required for any of these changes.

Annual report

Shareholders do not automatically receive a hard copy of the Company’s Annual Report unless they notify the Share Registry in writing. An electronic copy of the Annual Report can be viewed on the company’s website www.westwitsmining.com.

Tax file numbers

It is important that Australian resident Shareholders, including children, have their tax file number or exemption details noted by the Share Registry.

CHESS (Clearing House Electronic Subregister System)

Shareholders wishing to move to uncertified holdings under the Australian Securities Exchange CHESS system should contact their stockbroker.

Uncertified share register

Shareholding statements are issued at the end of each month that there is a transaction that alters the balance of an individual/company’s holding.

Listing rule 4.10.19 disclosure

The company has used the cash and assets in a form readily convertible to cash that it had at the time of admission in a way consistent with its business objectives.

59

West Wits Mining Limited Corporate directory

Directors

Secretary

Principal registered office in Australia

Share and debenture register

Auditor

Solicitors

Bankers

Website

Mr Michael Quinert Executive Chairman Mr Vincent Savage Executive Director Mr Daniel Pretorius Non-Executive Director Mr Hulme Scholes Non-Executive Director Dr Andrew Tunks (appointed 13 March 2018) Executive Director Mr Phillip Hains Level 3, 62 Lygon Street Carlton VIC 3053 Australia Security Transfer Registrars 770 Canning Highway Applecross WA 6153 +61 8 9315 0933 William Buck Level 20, 181 William Street Melbourne VIC 3000 Quinert Rodda & Associates Suite 1, Level 6, 50 Queen Street Melbourne VIC 3000 National Australia Bank Level 2, 330 Collins Street Melbourne VIC 3000

http://www.westwitsmining.com/

60