Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

WA1 RESOURCES LTD Capital/Financing Update 2025

Nov 16, 2025

66031_rns_2025-11-16_9da15647-3e3c-43fa-b627-01c1b9181157.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX RELEASE

==> picture [141 x 84] intentionally omitted <==

17 NOVEMBER 2025

LUNI NIOBIUM PROJECT HIGH-GRADE INFILL & EXTENSIONS

Highlights

Assay results from infill drilling at Luni continue to exceed expectations, delivering some of the highest-grade niobium intersections to date, including: LUDD-0167 from 70.4m: 67.3m at 5.4% NbNb2O5 O5

67.3m at 5.4% NbNb2O5 30.0m at 9.8% Nb2O5 30.5m at 3.4% Nb2O5 9.7m at 2.4% Nb2O5 15.6m at 2.9% Nb2O5 28.1m at 4.6% Nb2O5

including from 77.0m: LUDD-0151 from 66.5m: LUDD-0153 from 29.3m: LUDD-0157 from 86.0m: LUDD-0168 from 60.1m:

  • In addition, extensions to mineralisation have been defined beyond the current MRE envelope, with assay results from the east of Luni, including:

LUAC-0166 from 39m: 28m at 2.3% Nb2O5

LUAC-0168 from 76m: 73m at 1.8% Nb2O5

LUAC-0171 from 41m: 16m at 1.6% Nb2O5

LUAC-0175 from 110m: 35m at 3.2% Nb2O5

LUAC-0177 from 41m: 8m at 2.5% Nb2O5

and from 79m: 10m at 2.1% Nb2O5

  • Ongoing drilling is targeting improved definition of key parts of the MRE

  • Various field activities continue with pre-development activities progressing

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) is pleased to provide further drilling results and an update on field activities from the 100% owned Luni Niobium Project ( Luni or the Project ) in Western Australia.

WA1’s Managing Director, Paul Savich, commented:

“Infill drilling at Luni continues to surpass our expectations with LUDD-0167 representing the best intersection at Luni to date. This ongoing infill highlights the exceptional nature of the laterally extensive, high-grade blanket of niobium mineralisation, and ultimately strengthens our development ambitions.

“We remain focused on executing critical path activities to de-risk, optimise and expedite the Project. This has meant activities at Luni have expanded and diversified, including the construction of further pre-development siteworks to support detailed studies, which are set to culminate in the delivery of important project milestones in 2026.”

==> picture [56 x 66] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | ASX: WA1 LEVEL 2, 437 ROBERTS ROAD, SUBIACO WA 6008 | +61 8 6478 7866 | WWW.WA1.COM.AU

==> picture [594 x 93] intentionally omitted <==

Drilling Results

An extensive drilling campaign is ongoing at Luni, with a combination of diamond, air core ( AC ) and mud rotary methods utilised for various purposes. Over 83,000m of drilling has now been completed at the Project since discovery.

Drillholes and corresponding assay results reported within this release relate to seven diamond and 28 AC drillholes (refer to Figure 1 and Figure 5 as well as Table 1 and Table 2 for details). Drillholes are variably spaced, with most being between 25m to 200m apart.

The diamond drilling program is focused on resource definition to strengthen confidence in niobium mineralisation captured within the current Mineral Resource estimate ( MRE ). This drilling is generally being undertaken on a 50m by 25m staggered grid pattern in the eastern focus zone.

These resource definition drillholes further support the continuity of high-grade niobium mineralisation and provide increased definition of the geometry, thickness and grade in the eastern area of Luni. Of particular note is drillhole LUDD-0167, which returned the best drilling intercept to date at Luni of 67.3m at 5.4% Nb₂O₅ from 70.4m, including an exceptionally highgrade interval of 30.0m at 9.8% Nb₂O₅ from 77.0m. These results will be used as an input to the next MRE update that will target increasing confidence of the key eastern focus zone at Luni.

==> picture [483 x 354] intentionally omitted <==

Figure 1: Luni eastern plan view with drill collar locations and new niobium intersections

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

AC drilling reported in this announcement was testing for potential extensions to the mineralisation in the eastern area of Luni, proximate to the boundary of the existing MRE. This drilling was also sterilising areas to inform site layouts for potential development scenarios. Drillholes were also completed within the MRE envelope for hydrogeological purposes. This drilling was generally undertaken at 80m to 200m spacing.

A number of step-out AC drillholes on the eastern side of Luni have defined meaningful highgrade niobium mineralisation extensions beyond the existing MRE envelope. This mineralisation is interpreted to be associated with a series of parallel carbonatite dykes separated by variably altered gneiss and syenite units which trend northeast as offshoots from the main carbonatite plug (Figure 2).

The orientation of enriched, oxide mineralisation (true width) intersected to date is generally subhorizontal and coincident with the transition between intensely and moderately weathered carbonatite. Drilling to date has primarily focused on outlining mineralisation in the weathered zone of the Luni carbonatite. The potential for primary mineralisation in the deeper, unweathered zone is considered significant and is planned to be tested in future drilling programs.

==> picture [483 x 236] intentionally omitted <==

Figure 2: Simplified section A-A' looking west

Site Activities

Two diamond drilling rigs continue to focus on resource definition, comprising infill and extension of the eastern and western Indicated MRE envelopes. The Company and its resource consultants expect to update the MRE in 2026. These drill rigs are also collecting sample for geotechnical and metallurgical purposes.

A specialised water bore drilling rig has recently completed installation of an extensive network of production and monitoring bores across Luni. Pump testing of the production bores is underway and will provide important data to inform hydrogeological aspects of the Project.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

A range of other activities are continuing at site, including the construction of infrastructure to facilitate detailed development studies and improved access to the Project (Figure 3 and Figure 4). Various surveys are also ongoing and capturing data across multiple disciplines.

The primary focus of all activities is to support key mid-term workstreams for the Project including development studies and permitting and approvals workstreams.

==> picture [483 x 228] intentionally omitted <==

Figure 3: Construction of airstrip in progress

==> picture [483 x 208] intentionally omitted <==

Figure 4: Water-containment sump for the commencement of long-term pump testing

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

==> picture [763 x 414] intentionally omitted <==

Figure 5: Luni niobium deposit plan view of completed drilling with grade by width intersections reported to date For previously released results refer to ASX announcements throughout 2023, 2024 and 2025

==> picture [594 x 93] intentionally omitted <==

ENDS

This announcement has been authorised for market release by the Board of WA1 Resources Ltd.

For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 E: [email protected] E: [email protected]

Or visit our website at www.wa1.com.au

Competent Person Statement

The information in this ASX release that relates to Exploration Results is based on information compiled by Mr Andrew Dunn who is a Member of the Australian Institute of Geoscientists. Mr Dunn is an employee of WA1 Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Dunn consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

This ASX release incorporates the results from exploration contained in WA1’s ASX releases up until the date of this announcement. The Company confirms that it is not aware of any new information or data that materially affects the information included in these releases. All material assumptions and technical parameters underpinning these releases continue to apply and have not materially changed.

Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this ASX release will be achieved or proved correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this release and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this release or any effort or omission therefrom. The Company will not update or keep current the information contained in this release or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in this release are subject to change without notice.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

About WA1

WA1 Resources Ltd is an S&P/ASX 300 company based in Perth, Western Australia and trades under the code WA1.

WA1’s objective is to discover and develop Tier-1 assets, including the Luni Niobium Project, in Australia’s underexplored regions and create value for all stakeholders. We believe we can have a positive impact on the remote communities within the lands on which we operate. We will execute our exploration and development activities using a proven leadership team which has a successful track record of exploring in WA’s most remote regions.

Forward-Looking Statements

This ASX release may contain certain “forwardlooking statements” which may be based on forwardlooking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. For a more detailed discussion of such risks and other factors, see the Company’s Annual Reports, as well as the Company’s other ASX releases. Readers should

==> picture [339 x 368] intentionally omitted <==

not place undue reliance on forward-looking information. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Table 1: Drilling Results - Significant Intercepts

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO
(%)
Nd+Pr
(ppm)
NdPr:TREO
(%)
Sc₂O₃
(ppm)
Ta₂O₅
(ppm)
SrO
(%)
Th
(ppm)
U
(ppm)
P₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
LUAC0077 and
and
and
32 40 8 0.28 0.28 600 22 0 214 0.5 55 101 2.1 2.1 NA
44 48 4 0.23 0.19 421 22 0 159 0.3 48 87 1.1 1.1 NA
67 71 4 0.23 0.11 228 21 0 61 0.3 26 47 3.5 2.4 NA
80 84 4 0.26 0.21 446 21 0 89 0.2 39 103 6.1 0.8 NA
LUAC0078 incl
and
32 62 30 0.42 0.25 563 22 3 130 0.3 52 66 4.8 0.9 NA
46 48 2 1.05 0.57 1,273 22 15 220 0.6 80 86 13.6 1.3 NA
67 72 5 0.23 0.05 93 20 0 61 0.1 31 52 1.1 0.2 NA
LUAC0079 45 58 13 0.22 0.14 316 22 0 43 0.1 33 35 8.5 1.3 NA
LUAC0080 and 40 41 1 0.29 0.16 367 22 0 110 0.2 38 57 0.9 2.3 NA
45 47 2 0.22 0.31 694 23 31 98 0.3 37 40 7.8 1.2 NA
LUAC0081 incl
incl
and
incl
32 61 29 0.96 0.20 470 24 54 47 0.5 34 28 6.8 2.0 NA
36 41 5 2.45 0.49 1,203 25 98 88 1.1 66 56 18.3 2.6 NA
46 48 2 1.70 0.20 459 23 54 55 0.5 55 42 9.2 1.4 NA
66 78 12 0.52 0.11 245 23 4 44 0.2 32 22 6.1 0.3 NA
75 77 2 1.07 0.16 350 22 15 43 0.4 53 35 8.4 0.7 NA
LUAC0082 and 37 57 20 0.33 0.28 637 23 14 85 0.4 38 62 6.0 0.9 NA
76 78 2 0.27 0.11 253 23 0 49 0.2 31 27 5.3 0.4 NA
LUAC0166 incl
and
incl
33 73 40 1.71 0.77 1,608 21 35 116 0.7 81 164 17.9 1.2 NA
39 67 28 2.27 0.97 2,046 21 45 165 0.8 104 225 21.0 1.3 NA
79 99 20 0.62 0.29 595 20 4 18 0.2 28 45 6.8 0.3 NA
93 99 6 0.99 0.37 743 20 10 55 0.3 38 85 10.2 0.4 NA
LUAC0167 incl 37 57 20 0.52 0.68 1,473 22 13 139 0.6 63 76 10.1 3.5 NA
38 44 6 1.05 0.63 1,342 21 23 179 0.6 79 118 2.9 2.6 NA

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO
(%)
Nd+Pr
(ppm)
NdPr:TREO
(%)
Sc₂O₃
(ppm)
Ta₂O₅
(ppm)
SrO
(%)
Th
(ppm)
U
(ppm)
P₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
LUAC0167
cont.
and
and
and
and
and
and
61 63 2 0.24 0.28 646 23 0 98 0.4 19 55 23.4 1.4 NA
67 72 5 0.55 0.40 906 23 0 127 0.4 17 38 29.5 0.3 NA
84 85 1 0.25 0.20 466 24 0 49 0.2 36 22 7.5 0.7 NA
90 91 1 0.21 0.34 730 22 0 61 0.2 32 27 11.5 1.1 NA
98 99 1 0.22 0.20 462 23 0 61 0.2 27 17 7.9 0.7 NA
106 151 45 0.27 0.13 292 22 0 31 0.1 25 38 4.3 0.6 NA
LUAC0168 incl 68 153 85 1.60 0.38 813 21 5 212 0.6 74 486 14.7 0.9 NA
76 149 73 1.77 0.40 875 22 4 237 0.6 80 550 14.3 0.8 NA
LUAC0169 incl
incl
and
and
and
and
33 57 24 0.64 0.26 614 23 3 25 0.4 51 41 7.7 0.8 NA
39 40 1 1.03 0.27 650 24 0 24 0.6 33 43 6.0 1.4 NA
45 47 2 1.69 0.69 1,609 23 8 18 1.0 57 79 19.5 0.4 NA
64 65 1 0.22 0.03 48 19 0 49 0.1 26 15 0.5 0.3 NA
89 90 1 0.22 0.06 129 23 0 49 0.2 21 43 2.2 0.3 NA
97 103 6 0.23 0.10 210 22 0 10 0.4 19 46 2.4 0.3 NA
108 110 2 0.25 0.09 204 23 0 18 0.3 21 35 2.6 0.1 NA
LUAC0170 and 32 36 4 0.23 0.17 413 25 0 98 0.1 46 50 0.8 0.6 NA
44 48 4 0.22 0.10 209 21 0 12 0.2 37 23 2.3 1.0 NA
LUAC0171 incl
incl
32 81 49 0.77 0.33 718 22 21 37 0.4 50 50 3.7 1.8 NA
41 57 16 1.63 0.72 1,602 22 59 88 0.8 94 118 8.3 3.3 NA
66 67 1 1.13 0.10 222 21 0 12 0.2 68 26 1.9 0.6 NA
LUAC0173 and 64 72 8 0.23 0.26 636 24 69 104 0.2 62 66 2.1 9.4 NA
80 84 4 0.26 0.33 786 24 46 134 0.1 78 29 0.9 13.0 NA
and 104 108 4 0.32 0.32 799 25 46 171 0.1 91 35 0.8 12.6 NA

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO
(%)
Nd+Pr
(ppm)
NdPr:TREO
(%)
Sc₂O₃
(ppm)
Ta₂O₅
(ppm)
SrO
(%)
Th
(ppm)
U
(ppm)
P₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
LUAC0175 incl
incl
incl
100 180 80 1.79 0.67 1,490 22 9 261 0.7 91 76 6.2 1.0 NA
110 145 35 3.16 1.12 2,511 22 19 500 1.1 158 103 3.0 1.5 NA
150 151 1 1.09 0.42 962 23 0 159 0.4 55 70 2.6 0.8 NA
170 180 10 1.32 0.50 1,184 24 0 114 0.6 58 62 27.5 0.4 NA
LUAC0176 and
and
and
and
44 60 16 0.42 0.19 405 21 4 24 0.2 35 43 0.8 1.1 NA
64 72 8 0.27 0.14 301 22 8 18 0.3 22 43 2.0 1.5 NA
80 96 16 0.24 0.08 175 23 0 33 0.2 10 24 3.6 0.5 NA
112 120 8 0.35 0.13 327 25 0 49 0.3 9 19 7.2 0.4 NA
124 147 23 0.26 0.15 377 25 0 69 0.3 8 19 7.8 0.4 NA
LUAC0177 incl
incl
incl
38 90 52 1.14 0.25 539 21 32 44 0.3 60 25 2.3 2.5 NA
41 49 8 2.50 0.67 1,416 21 86 101 0.9 129 91 2.9 3.4 NA
61 62 1 1.01 0.78 1,526 19 31 49 0.4 91 23 10.7 1.7 NA
79 89 10 2.07 0.26 600 23 12 76 0.2 66 6 4.2 0.5 NA
LUAC0179 and
and
and
35 95 60 0.31 0.34 715 21 12 89 0.3 66 75 5.9 3.1 NA
99 108 9 0.26 0.11 248 23 0 58 0.1 49 32 3.9 0.7 NA
116 117 1 0.21 0.14 316 22 0 49 0.1 41 36 5.3 0.9 NA
128 129 1 0.27 0.14 320 23 0 49 0.1 33 40 5.4 1.1 NA
LUAC0180 and 32 36 4 0.25 0.10 162 16 15 110 0.1 39 18 0.4 2.7 NA
40 52 12 0.32 0.12 247 21 0 118 0.3 33 76 1.4 1.0 NA
LUAC0181 incl
and
39 79 40 0.37 0.16 366 22 0 15 0.2 18 29 2.9 0.7 NA
77 79 2 1.39 0.22 505 23 0 37 0.6 23 37 21.4 0.9 NA
85 97 12 0.54 0.31 740 24 0 9 0.5 18 12 16.0 0.7 NA
incl 89 90 1 1.19 0.75 1,751 23 0 37 0.7 39 10 28.0 1.4 NA

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO
(%)
Nd+Pr
(ppm)
NdPr:TREO
(%)
Sc₂O₃
(ppm)
Ta₂O₅
(ppm)
SrO
(%)
Th
(ppm)
U
(ppm)
P₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
LUAC0181
cont.
and
and
and
and
101 102 1 0.30 0.11 254 23 0 0 0.1 10 12 3.5 0.6 NA
108 109 1 0.21 0.09 229 24 0 12 0.1 6 5 4.7 0.9 NA
117 118 1 0.29 0.07 155 23 0 0 0.1 8 14 2.0 0.6 NA
125 127 2 0.22 0.06 143 23 0 0 0.2 6 11 1.8 0.6 NA
LUAC0186 incl
incl
incl
incl
incl
72 155 83 0.64 0.20 430 22 1 26 0.4 22 25 3.6 1.1 NA
79 81 2 1.76 0.58 1,328 23 8 92 0.7 46 51 1.5 1.7 NA
86 90 4 0.99 0.42 825 20 0 52 0.6 42 46 1.7 1.2 NA
104 105 1 1.08 0.27 562 21 0 37 0.4 36 34 1.2 1.4 NA
112 113 1 1.26 0.23 520 22 0 0 0.4 20 25 1.7 1.0 NA
145 155 10 1.44 0.36 832 23 5 71 0.7 38 49 17.8 1.6 NA
LUDD0151 incl
incl
66.5 125.0 58.5 1.95 0.55 1,378 25 37 236 1.1 79 52 16.3 0.4 0.6
66.5 97.0 30.5 3.37 0.96 2,391 25 69 395 1.8 127 88 27.4 0.7 0.6
116.0 117.0 1.0 1.41 0.33 805 25 31 24 0.5 132 43 10.4 0.1 0
LUDD0152 and
and
incl
and
incl
106.6 110.0 3.4 5.49 0.60 1,252 21 61 52 0.6 495 166 1.6 0.5 1.03
115.9 116.3 0.4 0.23 0.02 36 18 0 0 0.0 21 49 0.0 0.7 0
123.5 127.2 3.7 0.97 0.12 272 23 17 17 0.1 26 48 0.1 0.5 0.6
124.1 125.0 0.9 2.36 0.33 765 23 31 49 0.3 54 105 0.2 0.7 0
130.5 139.0 8.5 0.36 0.15 360 25 9 38 0.5 10 7 4.2 0.0 0.4
131.2 131.5 0.3 1.27 0.60 1,567 26 46 12 1.0 68 40 24.5 0.2 0
LUDD0153 incl
incl
28.8 61.0 32.2 1.02 0.32 784 25 53 47 0.8 78 22 9.2 0.4 0.8
29.3 39.0 9.7 2.40 0.76 1,872 25 136 111 1.7 159 54 20.9 1.2 0.2
42.7 44.1 1.5 1.09 0.30 697 24 36 81 0.5 31 20 8.8 0.3 0
incl 48.0 48.6 0.6 1.12 0.19 454 24 31 49 0.5 30 15 7.8 0.2 0

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO
(%)
Nd+Pr
(ppm)
NdPr:TREO
(%)
Sc₂O₃
(ppm)
Ta₂O₅
(ppm)
SrO
(%)
Th
(ppm)
U
(ppm)
P₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
LUDD0157 incl
and
and
85.0 102.2 17.2 2.71 1.02 2,608 26 37 195 1.5 217 79 27.1 0.5 0.4
86.0 101.6 15.6 2.95 1.11 2,845 26 40 213 1.6 237 87 29.7 0.6 0.4
106.0 107.0 1.0 0.25 0.10 255 25 0 0 0.5 17 2 3.6 0.0 0
113.0 115.0 2.0 0.25 0.10 251 26 0 0 0.6 23 11 3.9 0.0 0
LUDD0158 incl
incl
and
52.3 81.5 29.2 1.15 0.32 798 25 9 28 0.5 20 12 7.1 0.2 0.3
52.6 54.0 1.4 9.64 1.60 3,981 25 43 44 1.8 225 70 4.0 0.6 0.1
57.3 62.0 4.6 3.23 0.94 2,427 26 38 25 1.9 24 31 28.4 0.2 0.1
87.3 90.0 2.8 0.53 0.10 249 26 0 34 0.1 4 3 3.3 0.0 0
LUDD0167 incl
incl
incl
70.4 137.7 67.3 5.37 1.43 3,677 26 40 227 1.6 259 128 12.6 0.8 2.3
75.4 123.6 48.3 7.37 1.94 5,000 26 55 316 2.1 357 175 16.6 1.1 2.1
77.0 107.0 30.0 9.79 2.76 7,138 26 80 481 2.9 553 268 10.2 1.8 2.1
128.0 129.0 1.0 1.08 0.16 378 24 0 0 0.1 13 16 3.5 0.0 0
LUDD0168 incl
and
incl
incl
incl
incl
59.0 88.2 29.2 4.47 1.25 3,149 25 47 16 1.6 43 55 26.4 0.3 1
60.1 88.2 28.1 4.61 1.29 3,261 25 48 17 1.6 44 57 27.4 0.2 0.8
93.8 148.7 54.9 0.61 0.15 369 25 1 0 0.3 26 14 5.5 0.1 1.3
98.2 102.4 4.2 1.25 0.16 388 25 0 0 0.4 10 4 3.6 0.1 0
117.0 117.5 0.5 1.05 0.33 796 24 31 0 0.5 27 91 20.3 0.1 0
122.0 126.5 4.5 0.89 0.21 523 25 3 0 0.3 14 32 11.2 0.1 0
129.5 133.4 3.9 0.64 0.23 561 24 4 0 0.4 104 25 9.3 0.2 0

Note: 1: Results not displayed above are considered to contain no significant niobium mineralisation. Note 2: 'TREO’ is an abbreviation of Total Rare Earth Oxides, representing a combined group of 16 elements (La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y, Sc). Note 3: Assays for interval 108 to 109m in LUDD0152 have yet to be received. This interval has been assigned to core loss in the meantime. Note 4: The exceptionally high-grade intersection in LUDD0167 was calculated based upon capturing the majority of the >5% Nb₂O₅ mineralisation to provide a more balanced representation of where the majority of the metal content is situated within the broader intersection.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Table 2: Collar locations for drillhole results within this ASX release

Hole ID Drill
Type
Easting Northing RL
(m)
Dip
(Degrees)
Azimuth
(Degrees)
Depth
(m)
LUAC0076 AC 438134 7541202 384 -90 0 141
LUAC0077 AC 438140 7541129 383 -90 0 90
LUAC0078 AC 438142 7541043 383 -90 0 99
LUAC0079 AC 437793 7541142 383 -90 0 90
LUAC0080 AC 437849 7541083 383 -90 0 67
LUAC0081 AC 438003 7540895 383 -90 0 78
LUAC0082 AC 437910 7541020 383 -90 0 99
LUAC0166 AC 438200 7540797 382 -90 0 99
LUAC0167 AC 438297 7540697 383 -90 0 151
LUAC0168 AC 438300 7540808 383 -90 0 153
LUAC0169 AC 438294 7540898 383 -90 0 114
LUAC0170 AC 438299 7540998 383 -90 0 63
LUAC0171 AC 438299 7541098 383 -90 0 81
LUAC0172 AC 438299 7541196 383 -90 0 108
LUAC0173 AC 438199 7541193 383 -90 0 129
LUAC0174 AC 438295 7540301 385 -90 0 141
LUAC0175 AC 438298 7540400 385 -90 0 180
LUAC0176 AC 438302 7540500 385 -90 0 147
LUAC0177 AC 438402 7541193 383 -90 0 90
LUAC0178 AC 438400 7540998 383 -90 0 99
LUAC0179 AC 438399 7540793 383 -90 0 138
LUAC0180 AC 438299 7540595 383 -90 0 132
LUAC0181 AC 438402 7540598 383 -90 0 138
LUAC0182 AC 438402 7540400 383 -90 0 132
LUAC0183 AC 438405 7540194 384 -90 0 93
LUAC0184 AC 438403 7539994 384 -90 0 93
LUAC0185 AC 438404 7539797 385 -90 0 108
LUAC0186 AC 438598 7540799 383 -90 0 155
LUDD0151 DD 437649 7540723 382 -89 104 125.0
LUDD0152 DD 437650 7540772 382 -89 76 141.5
LUDD0153 DD 437650 7540817 382 -90 0 68.0
LUDD0157 DD 437551 7540729 382 -90 0 120.0
LUDD0158 DD 437550 7540669 382 -90 0 90.0
LUDD0167 DD 437548 7540708 382 -89 328 144.8
LUDD0168 DD 437494 7540717 382 -75 180 148.7

Note: Drillholes excluded from this table were not targeting mineralisation and were drilled for purposes other than resource definition.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

CRITERIA COMMENTARY
Sampling
techniques

Geological information referred to in this ASX announcement was
derived from Air Core (AC) and Diamond (DD) drilling programs.

For most AC holes, four metre composite samples were collected,
however where Nb mineralisation was expected then one metre
samples were collected. Both the composite and single metre
samples were sampled using the scoop method where nominally
1.5 to 3kg samples were submitted. Some assays from AC scoop
samples may be considered of insufficient quality to use in a
Mineral Resource estimate (MRE).

HQ3 and PQ3 sized core samples were collected with a diamond
drill rig.

The HQ3 and PQ3 core was logged and photographed onsite and
then transported to Nagrom in Perth for sampling and assaying.

Sample intervals for DD holes were constrained to major geological
boundaries. Broad zones of sampling were nominally 1m in length,
wherepossible.
Drilling techniques
AC holes were drilled with a HQ-sized face sampling blade bit.

DD holes were drilled using HQ3 (61mm) and PQ3 (83mm)
equipment. HQ and PQ core was drilled with the triple tube
method to enable increased core recovery.
Drill sample
recovery

AC sample recoveries were considered generally to be good with
lesser recoveries associated with higher groundwater content.

Any core loss could be either from material that has not been
recovered by drilling and/or naturally occurring cavities in the
formation. DD core recovery was generally moderate to excellent
through the mineralised zone and the holes were triple tubed to
aid the preservation of core integrity, see Table 1.

Assays for the interval of 108m to 109m in LUDD0152 have not been
received. This has been temporarily denoted as core loss until they
are completed.

The Company is continuously assessing and developing
improvements to its drilling procedures with different
methodologies trialled to enhance sample recovery for the drilling
conditions encountered.
Logging ▪ AC drill chips were logged for geology, alteration, and mineralisation
by the Company’s geological personnel. Drill logs were recorded
digitally and have been verified.
▪ Logging of drill chips is qualitative and based on the presentation of
representative chips retained for all 1m sample intervals in the chip
trays.
▪ The metre interval samples were analysed at the drill site by
handheld pXRF to assist with logging and the identification of
mineralisation.
▪ Detailed loggingof diamond core was completed onsite.
Sub-sampling
techniques and
▪ All of the AC samples were submitted to Nagrom for drying, jaw
crushing (2mm) and riffle splitting (samples >3kg) to produce a
sample forpulverisation and assay. Duplicate samples were taken at

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

CRITERIA COMMENTARY
sample
preparation
rate of ~1:15 in ore zones to monitor splitting. All samples for assay
were pulverised to a nominal 85% passing 75 microns.
Approximately 200-300 grams of this material was retained as a
master pulp.
▪ Industry prepared independent Certified Reference Materials
(CRMs) were inserted at a frequency of approximately one in 20
samples.
▪ Except for drillholes LUDD0167 and LUDD0168, friable HQ3 and PQ3
core was whole core sampled while a core saw was used to obtain
half core samples for competent material, at Nagrom. Sample was
then processed as described below.
▪ For LUDD0167 and LUDD0168, a different method of sampling the
friable core was undertaken. This involved the core saw to produce
two half core samples per interval. Both half core samples were
dried and weighed prior to crushing.
▪ All diamond core samples underwent two-stage crushing with the
first pass through a jaw crusher and then a roller crusher with close
side settings of 6mm and 3mm, respectively. Material was then sub-
sampled through Rotary Sample Divider (RSD) for assay with 1 in 15
duplicate samples and pulverised to 85% passing 75 microns with
an aliquot taken for analysis. The remainder of coarse crushed
material was retained for future metallurgical testwork.
▪ HQ3 and PQ3 samples were analysed at Nagrom for elemental
analyses by lithium borate fusion for major and minor elements with
XRF reading. REEs were digested by sodium peroxide fusion and
ICP-MS determination.
▪ The core samples are considered appropriate for use in resource
estimation. Some AC assays may be considered not appropriate for
use in resource estimation.
Quality of assay
data and
laboratory tests
▪ HQ3 and PQ3 samples were submitted to Nagrom in Perth for 28
element analyses by lithium borate fusion for major and minor
elements with XRF reading (XRF106). REEs (18 elements) were
analysed by sodium peroxide fusion and ICP-MS determination
(ICP004).
▪ Standard laboratory QAQC was undertaken and monitored by the
laboratory and then by WA1 geologists upon receipt of assay results.
▪ CRMs were inserted by WA1 at a rate of one for every 20 samples.
The CRM results have passed an internal QAQC review. Blanks were
also inserted to identify any contamination.
▪ Quartz flushes are inserted into the high-grade zones to minimise
any potential material carry over. One in five quartz flushes have
been analysed to understand if any carry over occurs in the high-
grade zones.
▪ The laboratory standards have been reviewed by the company and
havepassed internalQAQC checks.
Verification of
sampling and
assaying
▪ Assay results have been uploaded into the Company’s database by
an external consultant and then checked and verified.
▪ Analytical QC is monitored by assessing internal and laboratory
inserted standards as well as repeat assays.
▪ Performance of coarse crush duplicates indicate that the splittingof

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

CRITERIA COMMENTARY
the material in the laboratory performed to expectations.
▪ Assays from riffle split duplicates for the AC samples indicate that
subsampling performed well.
▪ Mineralised intersections have been verified against downhole
geology.
▪ Any variance in grade from twin drilling to date is expected and may
be attributed to a combination of short-range geological and grade
variability, as well as differences in drilling, sampling, core recovery,
preparation methods, and downhole sample location control.
▪ Logging and sampling data was recorded digitally in the field.
▪ Significant intersections are inspected by senior Company
geologists.
▪ Previously selected samples have been sent to Intertek, Bureau
Veritas and Nagrom for umpire laboratory analysis with results
showing a strong correlation to the primary laboratory.
▪ Additional batches of samples have been submitted for umpire
laboratoryanalysis.
Location of data
points
▪ Drillhole collars were initially surveyed and recorded using a
handheld GPS and then surveyed with a DGPS system.
▪ All co-ordinates are provided in the MGA94 UTM Zone 52 co-
ordinate system with an estimated horizontal accuracy of ±0.3m and
an estimated vertical accuracy of ±0.3m collected via DGPS.
▪ Azimuth and dip of the diamond drillholes are recorded after
completion of the hole using a gyro. A reading is taken at least every
30m with an assumed accuracy of ±1 degree azimuth and ±0.3
degree dip. Down-hole surveys were not conducted on AC holes.
Data spacing and
distribution
▪ See drillhole table for hole position and details.
▪ Data spacing is actively being assessed and will be considered for its
suitability in Mineral Resource estimation.
▪ Diamond drillhole spacing is mostly in the range of 100x50m to
50x25m spacing east-west and north-south.
▪ AC drill spacing was variable.
▪ Closer spaced RC drilling to test variability was completed previously
at nominal 30m spacings on 240m long traverses in north-west and
south-west directions.
Orientation of data
in relation to
geological
structure
▪ The orientation of the oxide-enriched mineralisation is interpreted
to be sub-horizontal and derived from eluvial processes upgrading
mineralisation. There is a component of reworking of the weathered
mineralisation. The orientation of primary mineralisation is poorly
constrained due to the limited number of drillholes that have
sufficiently tested this position.
▪ See drillhole table for hole details and the text of this
announcement for discussion regardingthe orientation of drillholes.
Sample security ▪ Sample security is not considered a significant risk with WA1 staff
present during collection.
▪ All geochemical samples were collected and logged by WA1 staff
and delivered via couriers to Nagrom in Kelmscott.
▪ Sample tracking is carried out by consignment notes, submission
forms and the laboratorytrackingsystem.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

CRITERIA COMMENTARY
Audits or reviews ▪ The program and data are reviewed on an ongoing basis by senior
WA1 personnel.
▪ External consultant, RSC Consulting, provide reviews of data quality
on an ongoingbasis.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

CRITERIA COMMENTARY
Mineral tenement
and land tenure
status
▪ All work completed and reported in this ASX Announcement was
undertaken on E80/5173 which is 100% owned by WA1 Resources
Ltd.
▪ The Company also holds an extensive package of Exploration
Licences, both granted and in application, across the Arunta
Province in Western Australia and the Northern Territory.
Exploration done
by other parties
▪ The West Arunta Project has had limited historic work completed
within the Project area, with the broader area having exploration
focused on gold, base metals, diamonds and potash.
▪ Previous explorers of the Project area include Beadell Resources and
Meteoric Resources. Only one drill hole (RDD01) had been
completed within the tenement area by Meteoric in 2009 (located
approximately 17km south-west of the Luni deposit), and more
recently additional drilling nearby the Project has been completed
by Encounter Resources Ltd.
▪ Most of the historic work was focused on the Urmia and Sambhar
Prospects with historic exploration (other than RDD01) being limited
to geophysical surveys and surface sampling.
▪ Historical exploration reports are referenced within the WA1
Resources Ltd Prospectus dated 29 November 2021 which was
released by ASX on 4 February 2022.
▪ Encounter Resources are exploring on neighbouring tenements and
report intersectingsimilargeology,includingcarbonatite rock types.
Geology ▪ The West Arunta Project is located within the West Arunta Orogen,
representing the western-most part of the Arunta Orogen which
straddles the Western Australia-Northern Territory border.
▪ Outcrop in the area is generally poor, with bedrock largely covered
by Tertiary sand dunes and spinifex country of the Gibson Desert. As
a result, geological studies in the area have been limited, and a
broader understanding of the geological setting is interpreted from
early mapping as presented on the MacDonald (Wells, 1968) and
Webb (Blake, 1977 (First Edition) and Spaggiari et al., 2016 (Second
Edition)) 1:250k scale geological map sheets.
▪ The West Arunta Orogen is considered to be the portion of the
Arunta Orogen commencing at, and west of, the Western Australia-
Northern Territory border. It is characterised by the dominant west-
north-west trending Central Australian Suture, which defines the
boundary between the Aileron Province to the north and the
Warumpi Province to the south.
▪ The broader Arunta Orogen itself includes both basement and
overlyingbasin sequences,with a complex stratigraphic,structural

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

CRITERIA COMMENTARY
and metamorphic history extending from the Paleoproterozoic to
the Paleozoic (Joly et al., 2013).
▪ The Luni carbonatite was intruded into a paragneiss unit. Fluids
from the carbonatite have significantly altered the paragneiss and
previous intrusions.
▪ Subsequent weathering led to volume loss and collapse to create a
depression in the landscape. This formed a local depocenter where
material was transported to and deposited in.
▪ The carbonatite is enriched in Nb, P and REEs and has undergone
further enrichment through eluvialprocesses.
Drill hole
Information
▪ Refer to Table 2 for drill hole details.
Data aggregation
methods
▪ Selected significant intercepts are calculated by the Weighted
Averaged method (by length) using a 0.2% Nb₂O₅ lower cut off, with
a maximum of 3m of consecutive internal dilution. The_Including_
intersections were calculated using a 1% Nb2O5lower cut off, with a
maximum of 3m of consecutive internal dilution.
▪ The very high-grade intersection in LUDD0167 was calculated based
upon capturing the majority of the >5% Nb2O5mineralisation to
highlight where the majority of the metal content is situated within
the broader intersection.
▪ Core loss is treated as an interval with the same average grade as
the overall intersection. Namely, average grade of the intersection is
equal to sum of grade times by interval lengths assayed divided by
the sum of the lengths of the intervals that were assayed. Then the
intersection width is the from depth minus the start depth of the
intersection. Core loss is provided for each intersection in Table 1.
▪ TREO is equal to the sum of the concentrations of Ce2O3, La2O3,
Nd2O3, Pr6O11, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3,
Yb2O3, Lu2O3, Y2O3and Sc2O3
▪ No metal equivalents have been reported.
Relationship
between
mineralisation
widths and
intercept lengths
▪ The oxide mineralisation intersected is sub-horizontal therefore the
majority of vertical drilling intercepts are interpreted be at or close-
to true thickness. The orientation of the transitional and primary
mineralisation remains poorly constrained and true thickness of the
intercepts remain unknown.
Diagrams ▪ Refer to figuresprovided within this ASX announcement.
Balanced
reporting
▪ All relevant information has been included and provides an
appropriate and balanced representation of the results.
Other substantive
exploration data
▪ All meaningful data and information considered material and
relevant has been reported.
▪ Mineralogical assessments have been undertaken on a samples
from across the deposit.
▪ Metallurgical testwork is ongoing.
Further work ▪ Further drilling is ongoing and planned.
▪ Interpretation of drill data and assay results will continue to be
completed, including ongoing petrographic and mineralogical
analysis.
▪ Review of data from different methods of core sampling.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

CRITERIA COMMENTARY
▪ Metallurgical and engineering factors are under continued
consideration with mine design studies commenced.
▪ Work on theproject is ongoingon multiple fronts.

==> picture [595 x 64] intentionally omitted <==