Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

WA1 RESOURCES LTD Capital/Financing Update 2024

Nov 14, 2024

66031_rns_2024-11-14_4339c2cb-5a84-4817-b717-d711e075ddba.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX RELEASE

==> picture [142 x 84] intentionally omitted <==

15 NOVEMBER 2024

AMENDMENT TO ASX ANNOUNCEMENT

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) refers to the announcement dated 14 November 2024 titled “West Arunta Project - Luni Drilling Update”.

The attached announcement is amended to include two geological sections (Figures 3 & 4).

ENDS

This Announcement has been authorised for market release by the Board of WA1 Resources Ltd.

For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 E: [email protected] E: [email protected]

==> picture [595 x 66] intentionally omitted <==

ASX RELEASE

==> picture [141 x 84] intentionally omitted <==

15 NOVEMBER 2024

WEST ARUNTA PROJECT LUNI DRILLING UPDATE

Highlights

  • Further assay results received relating to resource definition in the north-eastern zone of Luni

  • These assay results have added high-grade mineralisation and include:

LUAC-0002 from 32m: LUAC-0004 from 34m: LUACD-0001 from 55m: LUDD-0061 from 57.8m: LUDD-0067 from 39.0m: LUDD-0068 from 46.7m: LUDD-0086 from 35.0m: LUDD-0098 from 30.0m: including from 31.9m: LURC-0006 from 41m: LURC-0008 from 40m: LURC-0009 from 40m: including from 43m: LURC-0018 from 35m: LUSD-0007 from 65.0m: including from 77.0m:

19m at 2.4% Nb2O5 25m at 4.4% Nb2O5 21m at 2.1% Nb2O5 12.2m at 2.0% Nb2O5 34.0m at 1.5% Nb2O5 24.3m at 3.1% Nb2O5 19.0m at 2.7% Nb2O5 75.0m at 1.9% Nb2O5 53.1m at 2.2% Nb2O5 5m at 4.1% Nb2O5 29m at 1.7% Nb2O5 78m at 2.0% Nb2O5 58m at 2.4% Nb2O5 21m at 3.1% Nb2O5 40.0m at 3.3% Nb2O5 21.0m at 4.2% Nb2O5

  • Field operations continue at Luni with further assay results expected over the coming months to support an updated Mineral Resource estimate during the first half of 2025

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) is pleased to announce further drilling results at the 100% owned West Arunta Project in Western Australia.

WA1’s Managing Director, Paul Savich, commented:

“These latest assay results from the north-east zone of the deposit further demonstrate the significance of one of the key high-grade areas at Luni. This zone is currently planned to support our early development ambitions and will be an important part of the updated Mineral Resource estimate targeted for the first half of 2025.

==> picture [56 x 66] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | ASX: WA1 LEVEL 2, 55 CARRINGTON ST, NEDLANDS WA 6009 | +61 8 6478 7866 | WWW.WA1.COM.AU

==> picture [594 x 93] intentionally omitted <==

“Once the requisite drilling is completed to inform a Mineral Resource estimate update, sitebased activities will pause with equipment and infrastructure remaining on site to allow for an efficient restart in 2025. Planning is well-advanced for next year’s field activities which will continue to focus on the collection of data that is critical toward technically de-risking Luni and expediting the permitting process.”

Geological Discussion - Luni Niobium Deposit

An extensive drilling campaign at Luni is ongoing. A diamond rig and a reverse circulation ( RC ) rig continue to operate on site. A total of approximately 180 drillholes for over 18,000m of drilling has been completed this year to date (refer to Figure 2).

Assay results within this release relate to four air core drillholes (including one diamond tail), ten diamond drillholes, seven RC drillholes and two sonic drillholes (refer to Table 2). New significant intersections relate to resource drilling completed in the eastern area of Luni at variable spacing, with most holes spaced between 50m to 100m (refer to Figure 1, Figure 3, Figure 4 and Table 1).

==> picture [480 x 353] intentionally omitted <==

Figure 1: Luni north-east plan view with drill collar locations and best new niobium intersections

These drillholes generally demonstrate continuity of the shallow, high-grade niobium mineralisation across this area and provide further confidence in prior broader spaced drilling. A number of the eastern drillholes have defined additional high-grade mineralisation to what was anticipated.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

The orientation of enriched, oxide mineralisation (true width) intersected to date is generally interpreted to be sub-horizontal and coincident with the flat-lying transition between intensely and moderately weathered carbonatite.

Drilling to date has focused on outlining mineralisation in the weathered zone of the Luni carbonatite. The potential for primary mineralisation in the deeper, unweathered zone is considered significant and will be tested at the appropriate time. The deeper transitional and fresh mineralisation remains poorly constrained, and the orientation of mineralisation in these zones is uncertain at this stage. For details of key intersections refer to the annotated images and Table 1.

Current & Upcoming Field Activities

Drilling is ongoing at Luni to support the updated Mineral Resource estimate which is expected in the first half of 2025. Following completion of the required drilling, field activities will pause before recommencing in 2025.

There remains a significant backlog of samples from diamond, sonic and RC drilling. Results will continue to be reported progressively in due course.

A number of other key activities have been recently completed, including the field component of detailed flora and fauna surveys, a dedicated program of monitoring bores, and downhole geophysical surveys. In addition, metallurgical testwork programs are ongoing with results expected over coming months.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Figure 2: Luni niobium deposit plan view of completed grid drilling with grade by width intersections to date For previously released results refer to ASX announcements throughout 2023 and 2024

==> picture [594 x 93] intentionally omitted <==

==> picture [480 x 285] intentionally omitted <==

Figure 3: Simplified section A-A’ looking north-west

==> picture [480 x 292] intentionally omitted <==

Figure 4: Simplified section B-B’ looking west

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

ENDS

This Announcement has been authorised for market release by the Board of WA1 Resources Ltd.

For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 E: [email protected] E: [email protected]

Or visit our website at www.wa1.com.au

Competent Person Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Mr. Andrew Dunn who is a Member of the Australian Institute of Geoscientists. Mr. Dunn is an employee of WA1 Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Dunn consents to the inclusion in the announcement of the matters based on her information in the form and context in which it appears.

Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this announcement will be achieved or proved correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

About WA1

WA1 Resources Ltd is an S&P/ASX 300 company based in Perth, Western Australia and trades under the code WA1.

WA1’s objective is to discover and develop tier 1 deposits, including the Luni niobium deposit, in Australia’s underexplored regions and create value for all stakeholders. We believe we can have a positive impact on the remote communities within the lands on which we operate. We will execute our exploration using a proven leadership team which has a successful track record of exploring in WA’s most remote regions.

Forward-Looking Statements

This ASX Release may contain certain “forwardlooking statements” which may be based on forwardlooking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. For a more detailed discussion of such risks and other factors, see the Company’s Prospectus and Annual Reports, as well as the Company’s other ASX Releases.

==> picture [339 x 367] intentionally omitted <==

Readers should not place undue reliance on forward-looking information. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX Release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Table 1: Drilling Results - Significant Intercepts

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TiO₂
(%)
Core
Loss
(m)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LUAC0002 incl
incl
incl
incl
29.0 93.0 64.0 1.11 0.51 1,108 21 50 77 0.4 88 42 5.9 3.0 NA
32.0 51.0 19.0 2.41 0.97 2,131 22 120 64 1.0 126 74 7.1 5.2 NA
74.0 75.0 1.0 2.03 0.39 881 22 14 283 0.4 377 93 9.3 1.5 NA
80.0 82.0 2.0 1.23 0.34 750 22 13 212 0.3 204 64 7.2 1.1 NA
91.0 92.0 1.0 1.16 0.32 679 21 18 60 0.3 91 28 5.8 0.6 NA
LUAC0003 46.0 47.0 1.0 0.30 1.72 4,024 23 11 915 2.1 90 134 13.3 4.0 NA
LUAC0004 incl 29.0 72.0 43.0 2.73 0.74 1,839 25 163 17 1.3 217 34 15.0 0.3 NA
34.0 59.0 25.0 4.36 1.18 2,958 25 264 20 2.0 347 55 23.8 0.3 NA
LUACD0001 and
incl
and
and
29.0 31.0 2.0 0.35 0.11 198 18 29 32 0.1 41 16 0.3 1.9 NA
55.0 88.0 33.0 1.50 0.38 939 26 67 39 0.7 63 49 13.3 0.5 NA
55.0 76.0 21.0 2.06 0.52 1,286 24 88 50 1.0 87 70 17.9 0.6 NA
97.0 102.5 5.5 0.49 0.15 366 26 25 19 0.3 20 24 5.2 0.8 0.0
108.0 121.6 13.6 0.32 0.08 191 25 12 17 0.1 23 38 2.0 0.5 0.0
LUDD0061 incl
and
incl
43.0 50.0 7.0 0.46 0.13 272 19 9 1 0.1 27 20 0.5 0.6 1.4
44.8 45.5 0.7 1.16 0.55 1,115 58 70 0 0.5 77 42 1.8 1.1 0.0
57.8 70.0 12.2 2.05 0.32 696 15 88 39 0.5 39 31 2.9 0.8 0.1
60.0 64.6 4.6 4.92 0.81 1,747 27 186 104 0.9 90 78 7.6 1.8 0.0
LUDD0062 incl
and
incl
and
33.9 42.1 8.2 1.74 0.04 260 3 32 0 0.1 23 13 0.3 0.2 2.7
36.5 42.1 5.6 2.14 0.06 343 4 41 0 0.2 28 17 0.5 0.2 1.6
45.2 60.0 14.8 0.75 0.04 108 7 62 1 0.1 9 7 0.4 0.0 3.3
45.2 50.4 5.2 2.12 0.09 186 13 106 3 0.1 17 14 0.8 0.1 2.0
64.0 66.0 2.0 0.49 0.00 30 - 15 0 0.5 4 3 0.0 0.0 0.0

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅ TiO₂
(%)
Core
Loss
(m)
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LUDD0063 incl
incl
32.1 82.0 49.9 0.59 0.24 717 9 0 11 0.3 17 20 6.0 0.3 5.9
32.1 41.4 9.3 1.75 0.80 1,588 15 25 23 0.6 39 47 10.6 0.5 3.4
48.4 49.4 1.0 1.16 0.44 899 41 0 36 0.4 13 25 9.6 0.2 0.2
LUDD0064 incl
and
incl
and
36.0 39.9 3.9 2.03 0.58 1,846 10 171 9 0.5 70 15 1.7 0.8 0.5
37.0 39.9 2.9 2.79 0.77 2,429 13 225 12 0.7 88 19 2.2 0.7 0.5
43.0 54.7 11.7 0.39 0.04 203 8 51 8 0.3 12 9 1.3 0.1 0.3
43.6 45.2 1.6 1.10 0.17 430 13 98 45 0.3 22 42 4.2 0.2 0.1
58.0 63.5 5.5 0.30 0.00 258 - 25 0 0.7 8 1 1.6 0.0 0.0
LUDD0067 incl
incl
and
39.0 73.0 34.0 1.46 0.69 1,524 18 68 47 0.7 65 40 13.4 1.1 4.6
40.0 49.8 9.8 2.35 0.98 2,113 15 100 88 1.0 112 68 15.0 1.6 3.0
53.0 70.0 17.0 1.50 0.62 1,427 20 63 32 0.6 51 29 14.5 0.5 4.0
76.5 80.1 3.6 0.47 0.00 87 - 24 0 0.4 18 3 1.9 0.0 0.0
LUDD0068 incl 46.7 78.0 31.3 2.43 0.68 1,732 20 63 76 1.1 59 61 18.7 0.1 2.7
46.7 71.0 24.3 3.14 0.85 2,039 24 78 99 1.3 72 76 23.0 0.2 2.7
LUDD0086 incl 29.0 67.0 38.0 1.49 0.45 1,129 27 104 18 0.7 96 22 10.5 0.5 0.4
35.0 54.0 19.0 2.65 0.78 1,993 29 180 26 1.3 153 39 19.3 0.4 0.0
LUDD0088 and
and
27.0 41.3 14.3 0.38 0.19 423 24 53 31 0.2 64 14 3.2 3.2 0.2
45.0 49.0 4.0 0.29 0.09 205 28 46 25 0.1 30 11 1.0 3.9 0.0
65.4 73.0 7.6 0.27 0.08 188 27 47 15 0.1 38 6 1.7 3.2 0.0
LUDD0098 incl
incl
30.0 105.0 75.0 1.88 0.61 1,413 29 19 29 1.0 41 36 20.9 0.8 7.7
31.9 85.0 53.1 2.23 0.70 1,633 30 21 31 1.1 45 34 21.6 0.8 6.6
92.0 104.0 12.0 1.55 0.46 1,068 27 13 34 0.6 15 51 13.3 0.9 0.6

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅ TiO₂
(%)
Core
Loss
(m)
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LUDD0098
cont.
and
incl
110.0 141.8 31.8 0.53 0.18 411 23 4 22 0.2 9 30 4.0 0.4 2.4
116.0 122.0 6.0 1.30 0.37 855 31 7 11 0.4 11 19 9.0 0.2 0.0
LUDD0100 incl
incl
incl
incl
and
and
incl
and
incl
28.0 97.9 69.9 0.74 0.55 1,144 24 20 183 0.4 77 38 13.9 0.8 6.1
31.0 40.0 9.0 1.18 1.31 2,350 22 65 95 0.7 99 57 12.5 0.7 1.5
61.0 63.1 2.1 1.52 0.65 1,468 21 18 145 0.7 102 59 27.0 0.6 0.0
68.0 77.0 9.0 1.22 0.36 846 23 12 157 0.4 82 34 15.9 0.4 2.2
93.0 93.5 0.5 1.31 0.26 586 44 7 331 0.5 191 49 9.0 0.7 0.0
103.4 104.2 0.7 0.41 0.27 576 29 9 179 0.2 72 31 7.9 0.4 0.0
108.6 123.0 14.4 0.41 0.07 162 28 3 32 0.2 23 17 3.7 0.1 1.8
108.6 109.6 1.1 1.67 0.30 668 40 4 105 0.7 138 75 22.0 0.1 0.0
131.1 147.0 15.9 0.50 0.16 350 22 4 95 0.2 51 59 4.8 0.4 0.9
131.1 132.0 0.9 1.24 0.11 236 23 5 61 0.3 40 31 2.7 0.4 0.0
LURC0006 incl
incl
33.0 136.0 103.0 0.76 0.41 790 22 18 34 0.1 54 27 4.7 0.3 NA
41.0 46.0 5.0 4.08 2.51 5,040 20 115 98 0.7 367 59 17.6 0.7 NA
50.0 71.0 21.0 1.31 0.38 743 20 22 47 0.1 102 21 5.4 0.1 NA
LURC0008 and
incl
34.0 35.0 1.0 0.30 0.06 67 12 25 20 0.0 25 5 0.1 2.3 NA
40.0 94.0 54.0 1.13 0.69 1,333 21 30 19 0.8 29 13 12.1 0.1 NA
40.0 69.0 29.0 1.74 1.09 2,108 20 49 7 1.1 39 21 18.0 0.1 NA
LURC0009 and
incl
incl
29.0 31.0 2.0 0.22 0.04 58 14 25 45 0.0 28 11 0.1 3.1 NA
40.0 118.0 78.0 1.99 0.75 1,767 23 17 31 0.9 60 53 20.6 0.7 NA
43.0 101.0 58.0 2.43 0.91 2,149 23 20 38 1.1 78 69 25.5 0.8 NA
108.0 113.0 5.0 1.31 0.34 785 23 9 13 0.3 8 9 7.1 0.5 NA
LURC0015 30.0 51.0 21.0 0.40 0.32 636 21 7 38 0.3 31 33 2.8 0.4 NA

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅ TiO₂
(%)
Core
Loss
(m)
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LURC0015
cont.
incl
and
and
and
incl
37.0 38.0 1.0 2.56 1.35 2,823 21 23 38 1.4 91 136 16.5 0.5 NA
56.0 65.0 9.0 0.30 0.13 276 22 1 28 0.1 19 18 2.9 0.4 NA
80.0 96.0 16.0 0.41 0.11 252 22 2 9 0.3 10 8 2.4 0.2 NA
101.0 118.0 17.0 0.45 0.13 268 21 2 11 0.4 15 15 2.4 0.1 NA
109.0 110.0 1.0 1.86 0.12 222 19 2 20 0.3 35 4 1.0 0.1 NA
LURC0016 incl
incl
and
incl
31.0 61.0 30.0 0.92 0.31 722 23 10 53 0.4 17 16 6.3 0.7 NA
34.0 40.0 6.0 2.61 0.79 1,887 24 25 40 1.2 44 27 16.7 2.0 NA
45.0 46.0 1.0 1.18 0.27 607 23 6 71 0.4 15 9 6.7 0.1 NA
65.0 98.0 33.0 0.41 0.12 279 24 3 20 0.2 9 7 3.2 0.5 NA
67.0 69.0 2.0 1.22 0.19 450 23 2 95 0.2 39 10 4.4 0.5 NA
LURC0017 incl
incl
and
incl
and
and
and
40.0 76.0 36.0 1.04 0.42 973 23 29 16 0.9 23 23 13.0 0.2 NA
41.0 55.0 14.0 1.92 0.74 1,746 24 52 20 1.7 35 34 17.7 0.1 NA
61.0 62.0 1.0 1.08 0.26 610 23 20 6 1.0 26 18 20.2 0.2 NA
80.0 89.0 9.0 0.75 0.21 461 21 13 12 0.4 47 10 9.6 0.2 NA
83.0 84.0 1.0 1.67 0.42 1,022 24 24 13 0.7 49 14 20.1 0.1 NA
94.0 99.0 5.0 0.45 0.13 291 22 16 4 0.3 22 4 5.3 0.0 NA
104.0 124.0 20.0 0.33 0.12 245 22 6 3 0.5 11 3 3.4 0.0 NA
129.0 130.0 1.0 0.27 0.10 215 21 6 1 0.6 6 3 2.6 0.0 NA
LURC0018 incl
and
35.0 77.0 42.0 1.86 0.59 1,508 26 110 36 1.1 115 36 16.8 0.1 NA
35.0 56.0 21.0 3.14 1.04 2,642 26 198 37 1.9 205 66 27.9 0.2 NA
82.0 93.0 11.0 0.36 0.08 196 24 30 7 0.4 29 2 2.8 0.0 NA
LUSD0003 30.0 58.0 28.0 0.40 0.20 508 18 0 14 0.3 16 35 4.1 0.6 1.3
incl 43.0 44.0 1.0 1.15 0.33 809 24 0 12 0.5 21 64 11.4 0.5 0.0

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅ TiO₂
(%)
Core
Loss
(m)
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LUSD0003
cont.
incl
and
and
incl
incl
54.8 55.7 1.0 1.09 0.39 947 26 0 0 0.4 17 11 11.3 0.1 0.0
62.5 77.0 14.5 0.35 0.07 301 15 0 0 0.2 8 5 3.9 0.2 0.9
85.0 122.0 37.0 0.47 0.06 262 11 0 0 0.6 13 3 3.6 0.1 2.0
87.1 90.0 3.0 0.99 0.00 435 - 0 0 0.2 34 7 3.0 0.0 0.1
110.0 111.0 1.0 1.11 0.00 277 - 0 0 0.7 19 2 6.0 0.0 0.0
LUSD0007 incl 65.0 105.0 40.0 3.25 0.81 2,059 23 29 114 1.1 110 54 18.3 0.3 1.4
66.0 73.0 7.0 4.59 1.24 3,181 29 54 253 1.3 191 87 23.7 0.4 0.0
incl 77.0 98.0 21.0 4.20 1.07 2,679 25 43 125 1.5 134 63 24.5 0.3 0.4

Note: 1: Results not displayed above are considered to contain no significant niobium mineralisation. Note 2: 'TREO’ is an abbreviation of Total Rare Earth Oxides, representing a combined group of 16 elements (La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y, Sc). Note 3: LUACD-0001 had the upper part (0-82m) of the hole completed with AC drilling and the lower part (82-121.6m) completed with diamond drilling.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Table 2: Collar locations for drillhole results within this release

Hole ID Drill
Type
Easting Northing RL Dip Azimuth Depth
(m) (Degrees) (Degrees) (m)
LUAC0002 AC 437452 7540598 381 -90 - 93
LUAC0003 AC 438000 7540465 381 -90 - 87
LUAC0004 AC 437745 7540756 381 -90 - 72
LUACD0001 AC/DD 438100 7540870 381 -90 - 121.6
LUDD0061 DD 436952 7540546 381 -90 - 72.2
LUDD0062 DD 436847 7540554 381 -90 - 69.5
LUDD0063 DD 436847 7540454 381 -90 - 84.5
LUDD0064 DD 436845 7540647 381 -89 - 63.5
LUDD0067 DD 437349 7540650 381 -89 - 80.1
LUDD0068 DD 437247 7540652 381 -89 - 80
LUDD0086 DD 437861 7540749 381 -90 - 68.1
LUDD0088 DD 437654 7540843 381 -90 - 74
LUDD0098 DD 437847 7540655 381 -90 - 142.3
LUDD0100 DD 437749 7540658 381 -90 - 147.4
LURC0006 RC 438100 7540770 381 -90 - 136
LURC0008 RC 437700 7540370 381 -90 - 94
LURC0009 RC 438004 7540668 381 -90 - 118
LURC0015 RC 437697 7540471 381 -90 - 118
LURC0016 RC 437796 7540470 381 -90 - 98
LURC0017 RC 437495 7540369 381 -90 - 130
LURC0018 RC 437743 7540752 38 -90 - 94
LUSD0003 SD 437799 7540396 381 -90 - 122
LUSD0007 SD 437451 7540698 381 -90 - 107

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

CRITERIA COMMENTARY
Sampling
techniques

Geological information referred to in this ASX announcement was
derived from Reverse Circulation (RC), Diamond (DD), Sonic (SD)
and Air Core (AC) drilling programs.

For most RC metres drilled a 2-3kg sample (split) was sampled into
a calico bag via the rig mounted cone splitter. For samples where
splitting by cone splitter was not suitable, a procedure was
developed whereby the entire sample was collected and sent to
the lab for later crushing and splitting. This replaced earlier field
sampling methods for wet/damp RC samples.

Entire material for each interval of the AC drilling were collected
and submitted to the laboratory for processing.

AC and RC samples were collected over 1m intervals.

HQ3, PQ3 sized core samples were collected with a diamond drill
rig. The sonic rig was utilised to obtain 98mm diameter core
samples.

The HQ3 core was logged and photographed onsite and then
transported to ALS Perth for sampling and assaying.

The PQ3 and Sonic core was 1ogged and photographed onsite and
then transported to Nagrom in Perth for sampling and assaying.

Sample intervals for the diamond and sonic holes were constrained
to major geological boundaries. Broad zones of sampling were
nominally1m in length,wherepossible.
Drilling techniques
RC holes were drilled with a diameter of 146mm or 143mm face
sampling hammer.

AC holes were drilled with 127mm face sampling blade bit.

Sonic holes were drilled using a 4-inch core barrel to generate a
98mm diameter sample.

Diamond holes were drilled using HQ3 (61mm) and PQ3 (85mm)
equipment. HQ and PQ core was drilled with the triple tube
method to enable increased core recovery.
Drill sample
recovery

RC sample recoveries were visually estimated for each metre and
recorded as dry, moist or wet in the sample table. Onsite sample
weighing was carried out to monitor split performance and sample
recovery.

Recoveries for dry samples were generally good. Where RC
drillholes encountered water, samples were recorded as moist, with
some intervals having lower recoveries through the mineralised
zone. These samples are still considered to be reasonably
representative based on review of the quality control data and
observations of the onsite geologist.

AC bulk samples were collected and weighed on site. Bulk sample
weights were used as a proxy for sample recovery. Estimated
recoveries ranged from ~40% to full recovery in the mineralised
zones.

Any core loss could be a combination of naturally occurring cavities
and/or material that has not been recovered by drilling. Diamond
core recoverywasgenerallymoderate through the mineralised

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
zone and the holes were triple tubed to aid the preservation of the
core integrity, see Table 1.

Less optimal sample recovery was observed in select AC, RC and
diamond drillholes, typically associated with increased
groundwater and where the units are highly-weathered and friable.

Sonic drilling generally returned high sample recoveries. Core was
measured and the sample recovery was calculated for each drill
run.

The Company is continuously assessing and developing
improvements to its drilling procedures with different
methodologies trialled to enhance sample recovery for the drilling
conditions encountered.
Logging ▪ AC and RC drill chips were logged for geology, alteration, and
mineralisation by the Company’s geological personnel. Drill logs
were recorded digitally and have been verified.
▪ Logging of drill chips is qualitative and based on the presentation of
representative chips retained for all 1m sample intervals in the chip
trays.
▪ The metre interval samples were analysed on the drill pad by
handheld pXRF to assist with logging and the identification of
mineralisation.
▪ Detailed loggingof sonic and diamond core was completed on site.
Sub-sampling
techniques and
sample
preparation
▪ A majority of RC samples were collected from the drill rig splitter
into calico bags.
▪ In all holes the 1m intervals within the cover sequence were
composited by the site geologist into 4m samples from spoil piles
using a scoop.
▪ Single metre samples were collected and assayed from
approximately 16m depth or as determined by the site geologist.
▪ During the program, the sampling procedure was updated so that
RC samples in the mineralised zone that the site geologist deemed
were not adequately sub-sampled through the cone splitter had the
entire material submitted to the laboratory for crushing (-2mm) and
sub-sampling through a riffle splitter. Coarse crushed sampled
duplicates were taken to monitor splitting performance.
▪ All of the AC bulk samples were submitted to ALS Adelaide for
drying, weighing, jaw crushing and riffle splitting to produce a
sample for pulverisation and assay. Duplicate samples taken at rate
of 1:15 to monitor splitting. All samples for assays were pulverised to
a nominal 85% passing 75 microns. Approximately 200-300 grams of
this material was retained (master pulp). Master pulps were
transported to ALS in Perth for analysis.
▪ Industry prepared independent Certified Reference Materials
(CRMs) were inserted at a frequency of approximately one in 20
samples.
▪ At ALS, the core was cut and sampled by two methods being either:
a) competent HQ3 core was sawn in half, with one half sent for assay
and the remainder retained, or; b) friable core the entire core was
sampled.
▪ HQ3 friable core was whole core sampled. Samples were singlepass

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
crushed to fine crush specifications of 90% passing 3.15mm with
750g of material taken via a splitter directly from the Boyd crusher.
All samples for assays were pulverised to a nominal 85% passing 75
microns. Approximately 200-300 grams of this material was retained
(master pulp). A subsample for assay was obtained using a spatula
from the master pulp.
▪ Friable PQ3 and sonic core was whole core sampled, underwent two
stage crushing with the first pass through a jaw crusher and then a
roller crusher both with a close side setting of 3mm. Then sub-
sampled through Rotary Sample Divider (RSD) for assay with 1 in 15
duplicate samples. Then pulverised to 85% passing 75 microns with
an aliquot taken for analysis. The remainder of coarse crushed
material was retained for future metallurgical testwork.
▪ HQ3 samples were submitted to ALS Laboratories for elemental
analyses via Lithium Borate Fusion (ME-MS81D) with overlimit
determination via ALS method ME-XRF30.
▪ PQ3 and sonic samples were submitted to Nagrom for elemental
analyses by lithium borate fusion for major and minor elements with
XRF reading. REEs were digested by sodium peroxide fusion and
ICP-MS determination.
▪ The core, RC and AC samples are considered appropriate for use in
resource estimation.
Quality of assay
data and
laboratory tests
▪ HQ3, RC and AC samples were submitted to ALS Laboratories in
Perth for 32 element analyses via Lithium Borate Fusion (ME-MS81D)
and major elements determined by ME-ICP06 method. Overlimit
determination of Nb and REEs occurred via ME-XRF30 or ME-
XRF15b method.
▪ PQ3 and sonic samples were submitted to Nagrom in Perth for 28
element analyses by lithium borate fusion for major and minor
elements with XRF reading (XRF106). REEs (18 elements) were
analysed by sodium peroxide fusion and ICP-MS determination
(ICP004_MS).
▪ Standard laboratory QAQC was undertaken and monitored by the
laboratory and then by WA1 geologists upon receipt of assay results.
▪ CRMs were inserted by WA1 at a rate of one for every 20 samples.
The CRM results have passed an internal QAQC review. Blanks were
also inserted to identify any contamination.
▪ Quartz flushes are inserted into the high-grade zones to minimise
any potential material carry over. One in five quartz flushes have
been analysed to understand if any carry over occurs in the high-
grade zones.
▪ The laboratory standards have been reviewed by the company and
havepassed internalQAQC checks.
Verification of
sampling and
assaying
▪ Results have been uploaded into the Company’s database by an
external consultant and then checked and verified.
▪ Analytical QC is monitored by assessing internal and laboratory
inserted standards as well as repeat assays.
▪ Performance of coarse crush duplicates indicate that the splitting of
the material in the laboratory performed well.
▪ Assays for duplicates from RC drillingsuggest fair togood

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
performance of the rig mounted cone splitter.
▪ Assays from the riffle split duplicates from the AC bulk samples
indicate that subsampling performed well.
▪ Mineralised intersections have been verified against the downhole
geology.
▪ Any variance in grade from the twin drilling to date is expected and
may be attributable to a combination of short-range geological and
grade variability, as well as differences in drilling, sampling, core
recovery, preparation methods, and downhole sample location
control.
▪ Logging and sampling data was recorded digitally in the field.
▪ Significant intersections are inspected by senior Company
geologists.
▪ Previously selected samples have been sent to Intertek for umpire
laboratory analysis with results showing a strong correlation to the
primarylaboratory.
Location of data
points
▪ Drillhole collars were initially surveyed and recorded using a
handheld GPS. Drill collars will be then surveyed with a DGPS
system at appropriate stages of the program.
▪ All co-ordinates are provided in the MGA94 UTM Zone 52 co-
ordinate system with an estimated horizontal accuracy of ±3m and
an estimated vertical accuracy of ±5m for the handheld GPS.
▪ Azimuth and dip of the drillholes is recorded after completion of the
hole using a gyro. A reading is taken at least every 30m with an
assumed accuracyof ±1 degree azimuth and ±0.3 degree dip.
Data spacing and
distribution
▪ See drillhole table for hole position and details.
▪ Data spacing is actively being assessed and will be considered for its
suitability in Mineral Resource estimation.
▪ Drillhole spacing is mostly in the range of 200x200m to 100x50m
spacing east-west and north-south.
▪ Closer spaced RC drilling to test variability was done previously at
nominal 30m spacings on 240m long traverses in north-west and
south-west directions.
Orientation of data
in relation to
geological
structure
▪ The orientation of the oxide-enriched mineralisation is interpreted
to be sub-horizontal and derived from eluvial processes upgrading
mineralisation. The orientation of primary mineralisation is poorly
constrained due to the limited number of drillholes that have
sufficiently tested this position.
▪ See drillhole table for hole details and the text of this
announcement for discussion regardingthe orientation of drillholes.
Sample security ▪ Sample security is not considered a significant risk with WA1 staff
present during collection.
▪ All geochemical samples were collected and logged by WA1 staff
and delivered to either Nagrom in Perth or ALS Laboratories in
Perth or Adelaide.
▪ Sample tracking is carried out by consignment notes, submission
forms and the laboratorytrackingsystem.
Audits or reviews ▪ The program and data are reviewed on an ongoing basis by senior
WA1personnel.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

CRITERIA COMMENTARY
Mineral tenement
and land tenure
status
▪ All work completed and reported in this ASX Announcement was
completed on E80/5173 which is 100% owned by WA1 Resources Ltd.
▪ The Company also currently holds four further granted Exploration
Licences and 48 Exploration Licence Applications within the
province.
Exploration done
by other parties
▪ The West Arunta Project has had limited historic work completed
within the Project area, with the broader area having exploration
focused on gold, base metals, diamonds and potash.
▪ Significant previous explorers of the Project area include Beadell
Resources and Meteoric Resources. Only one drill hole (RDD01) had
been completed within the tenement area by Meteoric in 2009
(located approximately 17km south-west of the Luni deposit), and
more recently additional drilling nearby the Project has been
completed by Encounter Resources Ltd.
▪ Most of the historic work was focused on the Urmia and Sambhar
Prospects with historic exploration (other than RDD01) being limited
to geophysical surveys and surface sampling.
▪ Historical exploration reports are referenced within the WA1
Resources Ltd Prospectus dated 29 November 2021 which was
released by ASX on 4 February 2022.
▪ Encounter Resources are actively exploring on neighbouring
tenements and have reported intersecting similar geology,
includingcarbonatite rocks.
Geology ▪ The West Arunta Project is located within the West Arunta Orogen,
representing the western-most part of the Arunta Orogen which
straddles the Western Australia-Northern Territory border.
▪ Outcrop in the area is generally poor, with bedrock largely covered
by Tertiary sand dunes and spinifex country of the Gibson Desert. As
a result, geological studies in the area have been limited, and a
broader understanding of the geological setting is interpreted from
early mapping as presented on the MacDonald (Wells, 1968) and
Webb (Blake, 1977 (First Edition) and Spaggiari et al., 2016 (Second
Edition)) 1:250k scale geological map sheets.
▪ The West Arunta Orogen is considered to be the portion of the
Arunta Orogen commencing at, and west of, the Western Australia-
Northern Territory border. It is characterised by the dominant west-
north-west trending Central Australian Suture, which defines the
boundary between the Aileron Province to the north and the
Warumpi Province to the south.
▪ The broader Arunta Orogen itself includes both basement and
overlying basin sequences, with a complex stratigraphic, structural
and metamorphic history extending from the Paleoproterozoic to
the Paleozoic (Joly et al., 2013).
▪ Luni carbonatite was intruded into a paragneiss unit. Fluids from
the carbonatite have significantly altered the paragneiss and
previous intrusions.
▪ Subsequent weathering led to volume loss and collapse to create a
depression in the landscape. This formed a local depocenter where

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
material was transported to and deposited in.
▪ The carbonatite is enriched in Nb and REEs and has undergone
further enrichment through eluvialprocesses.
Drill hole
Information
▪ Refer to Table 2 for drill hole details.
Data aggregation
methods
▪ Selected significant intercepts are calculated by the Weighted
Averaged method (by length) using a 0.2% Nb₂O₅ lower cut off, with
a maximum of 3m of consecutive internal dilution. The_Including_
intersections were calculated using a 1% Nb2O5lower cut off, with a
maximum of 3m of consecutive internal dilution.
▪ Core loss and metallurgical samples awaiting assays are treated as
an interval with the same average grade as the overall intersection.
Namely, average grade of the intersection is equal to sum of grade x
interval lengths assayed divided by the sum of the lengths of the
intervals that were assayed. Then the intersection width is the from
depth minus the start depth of the intersection.
▪ TREO is equal to the sum of the concentrations of Ce2O3, La2O3,
Nd2O3, Pr6O11, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3,
Yb2O3, Lu2O3, Y2O3and Sc2O3
▪ No metal equivalents have been reported.
Relationship
between
mineralisation
widths and
intercept lengths
▪ The oxide mineralisation intersected is sub-horizontal therefore the
majority of vertical drilling intercepts are interpreted be at or close-
to true thickness. The orientation of the transitional and primary
mineralisation remains poorly constrained and true thickness of the
intercepts remain unknown.
Diagrams ▪ Refer to figuresprovided within this ASX announcement.
Balanced
reporting
▪ All relevant information has been included and provides an
appropriate and balanced representation of the results.
Other substantive
exploration data
▪ All meaningful data and information considered material and
relevant has been reported.
▪ Mineralogical assessments have been undertaken on a select
number of samples.
▪ Metallurgical testwork is ongoing.
Further work ▪ Ongoing drilling is aiming to infill the high-grade Nb zones in the
north-east and south-west areas of the Luni deposit.
▪ Further interpretation of drill data and assay results will be
completed over the coming months, including ongoing
petrographic and mineralogical analysis.
▪ Preliminary metallurgical and engineering factors are under
consideration and in progress.
▪ Work on theproject is ongoingon multiple fronts.

==> picture [595 x 64] intentionally omitted <==