==> picture [141 x 84] intentionally omitted <==

9 DECEMBER 2024

WEST ARUNTA PROJECT

BENEFICIATION TESTWORK RESULTS

Highlights

  • Excellent beneficiation results from initial variability testing on a composite sample comprising three drillholes covering over 400m east-west extent in the northeast zone of Luni

  • Locked cycle testing used the previously reported two-stage flotation regime and has returned a high-grade niobium concentrate with high recovery:

Locked cycle concentrate[(][4][th] cleaner[)] 50% Nb2O5 at 58% recovery

Ongoing testwork is aiming to improve understanding of key geometallurgical characteristics of the deposit and pursue opportunities to optimise the beneficiation stage ahead of a detailed variability program

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) is pleased to announce results from continued metallurgical testwork undertaken on niobium mineralisation from Luni at the 100% owned West Arunta Project in Western Australia.

WA1’s Managing Director, Paul Savich, commented:

“This locked cycle testwork was based on samples from over 400m of strike extent across the key northeast zone of Luni. The results largely conform with the previously released single-hole beneficiation testwork and have produced further high-grade niobium concentrate with low impurities, at industry-comparable recovery rates.

“To have achieved this level of success using a two-stage flotation regime and within such a short period of time this year is very encouraging and provides confidence for our ongoing predevelopment workstreams.”

Metallurgical Discussion - Luni Carbonatite

Initial beneficiation testwork (refer to ASX announcement dated 19 June 2024) demonstrated that a two-stage flotation regime can produce a high-grade concentrate at industry-comparable recovery rates from Luni’s mineralisation. The initial testwork used material from a single drillhole.

Since June 2024, the Company has continued testing this two-stage flotation regime at laboratories in Perth. The results reported herein relate to recent beneficiation testwork using a composite of three drillholes from high-grade niobium mineralisation in the northeastern zone of the Luni deposit, which is the ongoing focus of pre-development workstreams .

Within a conventional niobium flowsheet (i.e. used at the three existing operations), flotation is considered the key processing challenge to enable the commercial upgrade of ore to a concentrate. This concentrate must be suitable for refining through intermediate processing steps to create a clean, high-grade concentrate that can then be converted to a ferroniobium end-product.

==> picture [55 x 66] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | ASX: WA1 LEVEL 2, 55 CARRINGTON ST, NEDLANDS WA 6009 | +61 8 6478 7866 | WWW.WA1.COM.AU

==> picture [594 x 93] intentionally omitted <==

Assessing the impact of variable feed on the beneficiation step is imperative to understanding the amenability of niobium mineralisation to processing and for the development of a commercial process flowsheet. These results demonstrate that the two-stage flotation regime can successfully treat a wider portion of mineralisation and provides confidence in progressing to more detailed optimisation and variability programs based on this flowsheet .

Sample Selection

Three diamond holes (LUDD0040, 041 and 045) were drilled in the northeastern zone of Luni (Figure 1). The entire oxide mineralised zone from each drillhole was combined to form three composites hosting varying proportions of niobium bearing and gangue minerals.

==> picture [482 x 354] intentionally omitted <==

Figure 1: Location of drillholes composited for use in reported beneficiation testwork

Limited open cycle flotation tests were conducted on each individual drillhole sample, according to the regime utilised for LUDD23030 (refer to the ASX announcement on 19 June 2024), to assess the impact of the varying mineral compositions. The open cycle tests continued to demonstrate the ability to float the niobium bearing minerals and also provided important insight into how differing gangue mineral proportions respond within this flotation regime.

These three separate samples were then combined to form a blended composite that was taken into the locked cycle test reported herein. This composite sample was chosen as it is believed to be an appropriate representation of the dominant minerals present in this key initial pre-

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

development focus area of Luni (Figure 1). The sample locations are equidistant across an area where resource definition drilling has identified shallow, high-grade niobium mineralisation. This area is the focus of pre-development workstreams and may represent an ideal location for a potential start-up mining scenario.

A composite of approximately 36kg was prepared for the testwork program and was weighted according to meterage. The composited sample had a head grade of 3.8% Nb2O5. Details of the head assay, drillholes, and composite sample are presented in Table 1, Table 2 and Table 3, respectively.

Testwork Program

The locked cycle results presented herein were generated from testwork undertaken at a reputable laboratory in Perth, under the supervision of WA1 metallurgical staff.

The composite sample was ground to a target of 80% passing 90µm followed by desliming to remove ultra-fine particles. Flotation was then carried out using a two-stage method with an initial phosphate mineral pre-float, followed by direct niobium mineral flotation with four cleaning stages (Figure 2).

==> picture [483 x 117] intentionally omitted <==

Figure 2: Simplified testwork flowsheet

A limited number of open cycle tests were conducted on this composite sample prior to the locked cycle and the results are considered unoptimised. Locked cycle testing is considered more representative of potential larger-scale plant performance. A total of seven cycles were completed in closed circuit to ensure steady state was achieved.

All flotation testwork has been conducted using Perth tap water with future testwork to assess the use of site water.

Testwork Results

The composite locked cycle test returned a concentrate grade of 50.4% Nb2O5 at 57.6% recovery after four stages of cleaning. Refer to Table 1 for the concentrate assay results. There remains potential for additional cleaning to increase the concentrate grade. Final target concentrate specifications for development scenarios will be addressed through future flowsheet development and grade-recovery trade-off analysis.

For comparison, the previously reported locked cycle on a single sample point achieved a concentrate grade of 57.9% Nb2O5 at 53.5% recovery. It is important to note the initial single hole test had an additional cleaning step compared to this composite test. A common characteristic of additional cleaning steps is to increase the concentrate grade with lower recoveries.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

These results continue to demonstrate that high-grade niobium concentrate can potentially be produced at industry comparative recovery rates. Importantly, these tests used process steps adopted at existing niobium operations and were completed under flotation conditions considered practical for this stage of testwork.

Table 1: Niobium concentrate assays from the locked cycle test

Nb2O5 Ta SiO2 CaO Al2O3 P2O5 Fe2O3 SrO U Th Pb
(%) (%) (%) (%) (%) (%) (%) (%) (ppm) (ppm) (%)
Sample Feed
for Composite
Locked Cycle
3.8 <0.1 15.8 29.2 7.9 26.0 5.0 2.3 128 13 0.3
Composite
Locked Cycle
Concentrate
(4thCleaner)
50.4 <0.1 5.5 3.0 5.5 3.1 5.7 7.2 821 217 0.1

Percentages rounded to a single decimal point

Grade-recovery data for the previously reported single hole locked cycle test and the current composite locked cycle test are presented in Figure 3.

==> picture [483 x 273] intentionally omitted <==

----- Start of picture text -----

100
90
Composite locked cycle concentrate
50% Nb2O5 at 58% recovery
80
70
Feed Grade (Composite)
60 Locked Cycle (Composite)
Feed Grade (Single Hole)
50
Locked Cycle (Single Hole)
40
Single hole locked cycle concentrate
30 58% Nb2O5 at 53% recovery
(refer to the ASX announcement on 19 June 2024)
20
0 10 20 30 40 50 60 70 80
Concentrate Grade (%)
Recovery (%)
----- End of picture text -----

Figure 3: Grade recovery chart of the locked cycle (beneficiation step) tests

The locked cycle test also resulted in a 38.5% P2O5 concentrate at 81.6% recovery. The flowsheet used in this testwork program bears similarities to that utilised at the Catalão niobium and phosphate mine located in Brazil. The Company is yet to consider any potential economically viable opportunities to produce a commercial phosphate by-product at Luni.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

WA1’s Niobium Processing Advisor, Clovis Sousa, commented:

“This initial variability testwork has demonstrated the Luni mineralisation from the northeastern zone continues to respond well to this two-stage flotation regime, producing highgrade niobium concentrates with low impurities and strong recovery characteristics.

“These results continue to compare well to existing global operations and provide confidence in our ability to potentially produce high-quality end-products in future testwork programs.”

Ongoing & Future Testwork Programs

The Company is progressing beneficiation testwork on additional drillholes from a broader area of the northeastern focus zone. Open cycle tests are ongoing to optimise the flotation regime for varying proportions of gangue minerals and to assess how this may be dealt with in an operational scenario.

==> picture [218 x 268] intentionally omitted <==

==> picture [218 x 32] intentionally omitted <==

----- Start of picture text -----

Figure 4: Niobium flotation during
locked cycle
----- End of picture text -----

Additionally, the Company is continuing open cycle testwork for a variety of other purposes, including collector/reagent selection and the use of site water, ahead of detailed variability testwork planned for next year.

Drilling has been conducted to provide samples for planned detailed metallurgical variability testing, with approximately 30 drillholes completed for this next phase. The drillholes are spatially distributed over the northeastern zone and are planned to build on testwork completed to date.

Using this material, the Company intends to assess metallurgical variability across the northeast focus area to support flowsheet development, initial mine planning and various other workstreams and assessments. It is presently envisaged that investigations on other areas of the Luni deposit will also be undertaken in parallel to the above testwork.

Importantly, it is believed that opportunities exist to optimise the beneficiation process further, which will be considered as process development activities continue. The key identified opportunities potentially exist in the following areas:

  • Comminution;

  • Classification (including desliming);

  • Flotation stages, cell types, reagents and conditions;

  • Use of other beneficiation techniques (i.e. magnetic and gravity separation); and

  • Techno-economic trade-off assessment between concentrate grades and recovery rates (i.e. accepting lower concentrate grades at higher recoveries or vice versa to maximise the economic outcome).

The outcomes of these programs and other future testwork programs will be reviewed and assessed to determine potential flowsheet optionality and optimisations.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

ENDS

This Announcement has been authorised for market release by the Board of WA1 Resources Ltd. For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 E: [email protected] E: [email protected]

Or visit our website at www.wa1.com.au

Competent Person Statement

The information in this announcement that relates to metallurgical testwork results is based on information compiled by Mr. Roy Gordon who is a Member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr. Gordon is a full-time employee of WA1 Resources Ltd and has sufficient experience which is relevant to the information and activities under consideration to qualify as competent to compile and report such information. Mr. Gordon consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this announcement will be achieved or proved correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

About WA1

WA1 Resources Ltd is an S&P/ASX 300 company based in Perth, Western Australia and trades under the code WA1.

WA1’s objective is to discover and develop tier 1 assets, including the Luni niobium deposit, in Australia’s underexplored regions and create value for all stakeholders. We believe we can have a positive impact on the remote communities within the lands on which we operate. We will execute our exploration and development using a proven leadership team which has a successful track record of working in WA’s most remote regions.

Forward-Looking Statements

This ASX Release may contain certain “forwardlooking statements” which may be based on forwardlooking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. For a more detailed discussion of such risks and other factors, see the Company’s Prospectus and Annual Reports, as well as the Company’s other ASX Releases.

==> picture [339 x 368] intentionally omitted <==

Readers should not place undue reliance on forward-looking information. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX Release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Table 2: Collar location of drillholes (metallurgical sample)

Hole ID Drill Type Easting Northing RL Dip Azimuth Depth
(m) (Degrees) (Degrees) (m)
LUDD0040 DD 437396 7540687 381 -60 180 89.3
LUDD0041 DD 437596 7540710 382 -60 180 115.9
LUDD0045 DD 437193 7540599 382 -60 180 70.8

Table 3: Composite sample details (metallurgical sample)

Hole ID From To Interval Weighting
(m) (m) (m) (%)
LUDD0040 62.3 78.2 15.9 31
LUDD0041 86.0 111.0 25.0 48
LUDD0045 39.3 50.1 10.8 21

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

CRITERIA COMMENTARY COMMENTARY
Sampling
techniques



Geological information and metallurgical testwork samples
referred to in this ASX Announcement were derived from diamond
drilling.
Core samples were collected with a diamond drill rig and were PQ3
core diameter.
The core was logged and photographed onsite and then
transported to Bureau Veritas in Perth for cutting and sampling.
Core was sampled for metallurgical testwork in its entirety to
preserve sample integrity and maximise sample mass.
At Bureau Veritas, the core was selected and composited based on
assays from RC twin samples, pXRF analysis of intervals and/or
geological logging to identify the mineralised zones and domains.
The mineralised core was composited in its entirety within the
selected domains.
Drilling techniques Diamond holes were drilled with PQ3 (83mm) rods. PQ core was
triple tubed to enable increased core recovery.
Drill sample
recovery

The composite for the metallurgical testwork program reported
covered the below intervals, noting there was some core loss:
Composite
From
To
Interval
Core Loss
(m)
(m)
(m)
(m)
LUDD0040
62.3
78.2
15.9
4.4
LUDD0041
86.0
111.0
25.0
3.4
LUDD0045
39.3
50.1
10.8
0.0
Additional laboratory assays were undertaken on the samples
submitted for the testwork and showed good alignment to the
resource definition assays.
Logging

All samples used for the metallurgical testwork were geologically
logged to a detail level to support the metallurgical studies.
The samples were logged qualitatively and quantitatively in nature
for geology, alteration, and mineralisation by the Company’s
geological personnel. Drill logs were recorded digitally and have
been verified.
Detailed loggingof the diamond core was completed on site.
Sub-sampling
techniques and
sample
preparation


At Bureau Veritas, the entire individual drill hole composites were
stage crushed to P100 3.35mm, blended and homogenised and
subsequently split into charges.
Stage crushing was undertaken to minimise fines generation that
may affect metallurgical testwork, whilst reducing top size which
enabled representative sub-sampling to occur.
The individual drill hole composites were dispatched to the
laboratory where the testwork composite was prepared from
individual drill hole composites.
Quality of assay
data and
laboratory tests

All assays reported were conducted by ALS Metallurgy by fused
bead XRF, Leco and ICP-MS.
Standard laboratory QAQC was undertaken and monitored by the
laboratoryand mass balances for each test reported bythe

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
laboratory were reconciled against the feed grade. This is
subsequentlyreviewed byWA1 upon receipt of results.
Verification of
sampling and
assaying
▪ Mineralised intersections have been verified against the downhole
geology and pXRF analysis.
▪ Logging and sampling data was recorded digitally in the field.
Location of data
points
▪ Drillhole collars were initially surveyed and recorded using a
handheld GPS. Drill collars are then surveyed with DGPS system at
appropriate stages of the program.
▪ All co-ordinates are provided in the MGA94 UTM Zone 52 co-
ordinate system with an estimated horizontal accuracy of ±0.008m
and an estimated vertical accuracy of ±0.015m for the DGPS system.
▪ Azimuth and dip of the drillholes is recorded after completion of the
hole using a gyro. A reading is taken every 30m with an assumed
accuracyof ±1 degree azimuth and ±0.3 degree dip.
Data spacing and
distribution
▪ See drillhole table for hole position and details.
Orientation of data
in relation to
geological
structure
▪ The orientation of the oxide-enriched mineralisation is interpreted
to be sub-horizontal and derived from weathering of primary
mineralisation. The orientation of primary mineralisation is poorly
constrained due to the limited number of drillholes that have
penetrated to depth.
▪ See drillhole table for details regarding the orientation of the
drillhole.
▪ Drillholes were designed based on interpretation from modelled
geophysical data and results from drilling to date.
▪ Oxide mineralisation is currently interpreted as a sub horizontal
oxide unit.
Sample security ▪ Sample security is not considered a significant risk with WA1 staff
present during collection.
▪ All geochemical samples were collected and logged by either WA1
staff or the laboratory.
Audits or reviews ▪ The program and data is reviewed on an ongoing basis by senior
WA1personnel.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

CRITERIA COMMENTARY
Mineral tenement
and land tenure
status
▪ All work completed and reported in this ASX Announcement was
completed on E80/5173 which is 100% owned by WA1 Resources Ltd.
▪ The Company also currently holds an extensive package of
Exploration Licences (both granted and applications) within the
area of the West Arunta Project.
Exploration done
by other parties
▪ The West Arunta Project has had limited historic work completed
within the Project area, with the broader area having exploration
focused on gold, base metals, diamonds and potash.
▪ Significant previous explorers of the Project area include Beadell
Resources and Meteoric Resources. Only one drill hole (RDD01) had
been completed within the tenement area byMeteoric in 2009

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
(located approximately 17km southwest of the Luni deposit), and
more recently additional drilling nearby the Project has been
completed by Encounter Resources Ltd.
▪ Most of the historic work was focused on the Urmia and Sambhar
Prospects with historic exploration (other than RDD01) being limited
to geophysical surveys and surface sampling.
▪ Historical exploration reports are referenced within the WA1
Resources Ltd Prospectus dated 29 November 2021 which was
released by ASX on 4 February 2022.
▪ Encounter Resources are actively exploring on neighbouring
tenements and have reported intersecting similar geology,
includingcarbonatite rocks.
Geology ▪ The West Arunta Project is located within the West Arunta Orogen,
representing the western-most part of the Arunta Orogen which
straddles the Western Australia-Northern Territory border.
▪ Outcrop in the area is generally poor, with bedrock largely covered
by Tertiary sand dunes and spinifex country of the Gibson Desert. As
a result, geological studies in the area have been limited, and a
broader understanding of the geological setting is interpreted from
early mapping as presented on the MacDonald (Wells, 1968) and
Webb (Blake, 1977 (First Edition) and Spaggiari et al., 2016 (Second
Edition)) 1:250k scale geological map sheets.
▪ The West Arunta Orogen is considered to be the portion of the
Arunta Orogen commencing at, and west of, the Western Australia-
Northern Territory border. It is characterised by the dominant west-
north-west trending Central Australian Suture, which defines the
boundary between the Aileron Province to the north and the
Warumpi Province to the south.
▪ The broader Arunta Orogen itself includes both basement and
overlying basin sequences, with a complex stratigraphic, structural
and metamorphic history extending from the Paleoproterozoic to
the Paleozoic(Jolyet al.,2013).
Drill hole
Information
▪ Refer to Table 2 for drill hole details.
Data aggregation
methods
▪ Not applicable as drilling results are not being reported in this
announcement.
▪ No metal equivalents have been reported.
Relationship
between
mineralisation
widths and
intercept lengths
▪ Not applicable as drilling results are not being reported in this
announcement.
Diagrams ▪ Refer to figuresprovided within this ASX announcement.
Balanced
reporting
▪ All relevant information has been included and provides an
appropriate and balanced representation of the results.
Other substantive
exploration data
▪ All meaningful data and information considered material, relevant
and complete has been reported.
Further work ▪ Further interpretation of drill data and assay results will be
completed over the comingmonths,includingongoing

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
petrographic and mineralogical analysis.
▪ Planning and implementation of further metallurgical and
exploration drilling is in progress and analysis of existing drill
samples is ongoing.
▪ Further metallurgical studies are in progress and engineering
factors are under consideration.
▪ Work on theproject is ongoingon multiple fronts.

==> picture [595 x 64] intentionally omitted <==