Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TERRACOM LIMITED Capital/Financing Update 2017

Sep 4, 2017

65910_rns_2017-09-04_86ce6d98-9fb4-4011-b17d-7ea5b773865a.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [131 x 154] intentionally omitted <==

==> picture [173 x 103] intentionally omitted <==

5 September 2017

ASX Announcement

Further Extension to Blair Athol Mine Life

TerraCom Limited ( TerraCom or the Company ) ( ASX:TER ) is pleased to announce a further upgrade to the Blair Athol Mine JORC Reserve and Resources.

Independent experts Xenith Consulting Pty Ltd (Xenith) and TerraCom have conducted further work since the last announcement in November 2016 and has been able to upgrade the total Blair Athol Mine JORC Reserves to 15.6mt and increase the JORC Measured Resource to 21.9mt . The coal reserves and resources have been estimated in accordance with the standards outlined in the JORC code (JORC, 2012) and the Coal Guidelines 2014.

Further work since TerraCom completed the acquisition of the Blair Athol Mine, which included the detailed assessment of all boreholes using historical data on site has enabled Xenith to extend the Reserves by 2.1mt adding one extra year to mine life , which now totals 8 years based on ~2 million tonnes per annum (mtpa), which is derived from the Reserves estimate presented in this announcement.

The JORC Resource has improved in confidence with the JORC Measured Resource increasing 9.5mt from 12.4mt to 21.9mt.

TerraCom are in the process of further developing this increased JORC Measured Resource and plan to convert the economic areas of the Measured Resource into Reserves which could add an additional three to five years onto the Blair Athol Mine Life (based on 2mtpa which is derived from the Reserves estimate presented in this announcement). The coal reserves and resources have been estimated in accordance with the standards outlined in the JORC code (JORC, 2012) and the Coal Guidelines 2014.

Chairman Mr Wal King stated that “this reserve upgrade is significant for the Blair Athol Mine as it enables the mine plan to be extended to 8 years at ~2mtpa”.

Mr King went on to say that “the measured resource upgrade is significant as it has the potential to increase the mine life for a further 3 to 5 years”.

1

Reserves

Coal reserves have been estimated in accordance with the requirements of the 2012 edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code). The estimate was compiled by a Competent Person from Xenith Consulting and has been signed off accordingly.

The total open cut coal reserves for Blair Athol Mine are presented in Table 1 .

Table 1 - Blair Athol Mine Open Cut Reserves Estimate

**Coal Reserve (Mt ROM) *** 3 Seam 4 Upper 4 Lower TOTAL
Proved Nil 8.6 5.4 14
Probable 0.5 0.7 0.3 1.6
Total Coal Reserve 0.5 9.3 5.8 15.6

* Tonnages and qualities in the above table are expressed on a “ROM” basis, incorporating the effects of mining losses and dilution, and on a 17.0% ROM moisture basis.

The marketable coal for Blair Athol Mine is thermal product only. Estimates have been made for the most likely split of the ROM coal to bypass or to process in the Coal Preparation Plant (CPP) to blend together to produce an export quality thermal coal at 12.5% ash on an air-dried basis (adb). This has formed the basis of an estimate of Marketable reserves that correspond to the ROM reserve estimates. Therefore, Marketable Coal Reserves are a sub-set of Coal Reserves.

All Marketable Reserves tonnages have been expressed on a Washed Moisture Basis, which varies depending on the proportion of Bypass coal and is typically 17.7%.

Table 2 - Blair Athol Open Cut Marketable Coal Reserve Estimate

Type Marketable Coal Reserve
**(Mt Product) ***
3 Seam 4 Upper 4 Lower TOTAL
Washed Proved - 1.3 3.9 5.2
Probable - 0.3 0.2 0.5
Washed Subtotal - 1.6 4.1 5.7
Bypass Proved - 6.7 0.1 6.7
Probable 0.5 0.4 0.0 0.9
Bypass Subtotal 0.5 7.1 0.1 7.6
Product Proved - 8.0 4.0 11.9
Probable 0.5 0.7 0.2 1.4
Total Marketable Coal
Reserve
0.5 8.6 4.2 13.3

*Total Marketable Coal is nominally at 12.5% ash (adb).

Maps relating to the JORC estimate can be found in Appendix 1 and Table 1 can be found in Appendix 2. For a full list of the drill hole dataset, please go to below link:

http://terracomresources.com/australian-projects/blair-athol-operations/

2

Resources

Coal resources have been estimated in accordance with the requirements of the 2012 edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code). The estimate was compiled a Competent Person from Xenith Consulting and has been signed off accordingly.

The Coal Resource Estimate carried out in July and August 2017 for the Blair Athol Coal Mine was focused on the Seam 4 Measured and Indicated resource areas. In comparison with the previous JORC Estimate from 2016, this update incorporates 41 additional points of observation (‘PoB’) intersecting the Seam 4 Upper, and 31 PoB intersecting Seam 4 Lower.

In this update 2017, the Total Coal Resource remains 44 mt as estimated in October 2016.

Considering the two Seam 4 plies (4U, 4L), this update shows an upgrade of 9.5 mt into the Measured resource category, and 3 mt into the Indicated category.

The table below shows the comparison between the 2016 and 2017 Resources estimations.

Table 3- Resource Comparison Table – Seam 4.

Seam Category 2017 (mt) 2016 (mt) Comparison
4U Measured 13.1 6.8 + 48%
4U Indicated 6 5 + 17%
4U Inferred 10 17
4L Measured 8.8 5.6 + 36 %
4L Indicated 3 3 + 21 %
4L Inferred 3 7
TOTAL (4U+4L) 44 44

Table 4- Resource Table Seam 3.

Seam Category Seam Category 2017 (Mt)
N3H Indicated 0.3
N3J Indicated 0.2
Total 0.5

The tonnes have been estimated by applying an insitu density with standard bed moisture of 17%.

The coal at Blair Athol is a low rank, medium - high volatile, low ash, low sulphur thermal coal. Air dried moisture is on average approximately 6%. On an air dried basis (adb) the specific energy typically ranges between 21 and 26 MJ/kg, while the raw ash (adb) ranges between 13 - 20 % for the 4 Upper seam and 22 – 25 % for the 4 Lower seam. The specific energy for seam 3 is 27MJ/kg and the raw ash (adb) is 9.1%

3

Competent Persons Statement - Reserves

This Reserves Estimate has been prepared by Mr John Cawte. The estimates of Open Cut Coal Reserves for the Blair Athol coal mine as at 30 September 2016 presented in this report have been carried out under the guidelines of the 2012 edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code).

John Cawte is an employee of Xenith Consulting Pty Ltd. He has a Bachelor in Mining Engineering from University of Queensland and a Diploma of Business. He has over 20 years of experience in mining in the open cut coal mining industry that is relevant to the style of mineralisation and type of deposit described in the report, and the type of activity involved in the estimation of the coal reserves. John Cawte is a member of the Australasian Institute of Mining and Metallurgy and qualifies as a Competent Person under the JORC Code.

John Cawte consents to the release of this announcement

Competent Persons Statement - Resources

The information in this report relating to exploration results and coal resources is based on information compiled by Mr Troy Turner who is a member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of Xenith Consulting Pty Ltd.

Mr Turner is a qualified geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as Competent Person as defined in the 2012 Edition of the “ Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves .”

Neither John Cawte, Troy Turner, nor Xenith Consulting Pty Ltd has any material interest or entitlement, direct or indirect, in the securities of TerraCom Limited or any associated companies. Fees for the preparation of this report are on a time and materials basis only.

Troy Turner consents to the release of this announcement

JORC Reserves Note

The depletion limits are adopted from the survey completed at the cessation of mining by Rio Tinto so no arithmetic adjustments have been made to take into account post-survey as there has been no change.

Small differences may be present in the totals due to tonnes information being rounded so as to reflect the usual uncertainty associated with the estimate.

Forward Looking Statement

This Announcement contains certain "forward ‐ looking statements". The words "anticipate", "believe", "expect", "project", "forecast", "estimate", "likely", "intend", "should", "could", "may", "target", "plan", "consider", "foresee", "aim", "will" and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future production, resources, reserves, sales, capital expenditure, earnings and financial position and performance are also forward ‐ looking statements. Such forward ‐ looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are outside the control of TerraCom.

4

Appendix A. MAPS

==> picture [440 x 656] intentionally omitted <==

5

==> picture [452 x 674] intentionally omitted <==

6

==> picture [451 x 673] intentionally omitted <==

7

==> picture [451 x 675] intentionally omitted <==

8

==> picture [451 x 675] intentionally omitted <==

9

Appendix B. JORC CODE, 2012 EDITION – TABLE 1 FOR BLAIR ATHOL RESERVE

This Appendix details section 4 of the JORC Code 2012 Edition Table 1. Section 5 Estimation and Report of Diamonds and Other Gemstones’ has been excluded as they are not applicable to this deposit and estimation.

Section 1 – Sampling Techniques and Data


Criteria

JORC Code explanation
CP Comments
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.

In recent drilling programs the core was refrigerated until geophysical
correction of lithology logs was completed.

Seams were sampled on both a subsection and whole seam basis on site
after refrigeration and geophysical correction.

Chip samples were taken at the rig and double bagged.

Samples were bagged and dispatched to ACIRL in 200 litre drums.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
_is oriented and if so, by what method, etc). _

Both Rotary chip and Wireline core and Conventional core drilling
techniques have been used.

Core diameters range from 63.5 mm to 200 mm.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.

Point of observation boreholes for resource estimates have been limited to
core holes with greater than 95% coal seam recovery, unless unbiased
sampling results could be confirmed through core photographs.

Boreholes lithology logs were corrected to geophysics to ensure an
accurate seam interval and depth.

Coal seam core recovery has been evaluated by comparing logged coal
seam thickness and geophysically corrected coal seam thickness.

If sample mass was below 95% a separate exercise interrogating the linear
recovery via photos and logs was undertaken to decide whether the
sample could be included and not bias the results.

10

Criteria JORC Code explanation CP Comments
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length andpercentage of the relevant intersections logged.

Geological logging has been completed on chip and core samples taken
from exploration drill holes.

Geological logs have been corrected to Geophysics where the data is
available.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-
half sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.

Sampled on site and transported to the laboratory in drums.

ACIRL complies with NATA (Accreditation No: 15784) Australian standards
relevant to coal sampling and sample preparation.

All samples were crushed to 11.2mm before analysis which is the industry
standard.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) andprecision have been established.

ACIRL complies with NATA (Accreditation No: 15784) and complies with the
requirements of ISO/IEC 17025:2005 and Australian standards for Coals
and Coke.

The Geophysical logging companies were “Weatherford” (“Precision
Energy Services”), “Borehole Wireline”, “Auslog”, “Reeves Wireline” and
“BAC Portalogger”.

Industry standard is to have internal calibration procedures to ensure
accuracyofgeophysical logging.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• Checks as part of NATA/ ISO9002 compliance were completed.
• Verification of data as per the relevant Australian standards.
• Data for raw wash and composite analysis was checked by evaluating
known coal quality relationships to check for data outliers and possible
errors.
• M Resources on behalf of Xenith completed a desktop review of coal
quality data including checking the validity of the results.
• Volumetric core recoveries were checked where mass data was available. If
seams had less than 95% recovery,the corephotos were checked for bias.
Location of Accuracy andquality of surveys used to locate drill holes(collar and down-
Surveyed borehole collar locations wereprovided from thegeological

11

Criteria JORC Code explanation CP Comments
data points hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
database (GDB) and spreadsheets. It is assumed that it was the mine site
surveyor in line with common practice.

Grid System: Map Grid of Australia(MGA) Zone 55, AGD 84)

Topography surface is high resolution DTM patched with survey data in
areas of recent topographychanges.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.

The average drill hole spacing (holes included in the model) is
approximately 100m.

The data spacing is believed to be sufficient. There is also a large number
of supporting data from open holes and non-POB cored holes that helps
establish continuity and confidence in the classifications.

Where multiple samples have been taken over a seam the coal qualities
have been composited weighted against thickness and Insitu Relative
Density.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.

One fault has been included in the geological model.

Rotary chip and core holes with insufficient core recovery have been
included in the model as structural control.

Areas with structure have been previously drilled and mined in places.
Drilling has occurred to delineate major fault for seam 3 mining. No
obvious biased result.
Sample
security
The measures taken to ensure sample security.
Sample security was by chain of custody between Blair Athol site personnel
and ACIRL laboratory.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data.
ACIRL undertook internal audits and checks in line with the Australian
standards and their NATA certification at the time of testing.

All coal quality data has been reviewed by M Resources as part of the due
diligenceprocess

12

Section 2 - Reporting of Exploration Results


Criteria

JORC Code explanation
CP Comments CP Comments
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Time Active Tenement ID Company Name
2017 - 2024 ML 1804 Orion Mining Pty Ltd Blair Athol
1979 - 2012 ML 1804 Qld Coal Pty Ltd Blair Athol
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other parties.
The borehole table in Appendix B includes the company responsible for the drill
hole (source).
Geology Deposit type, geological setting and style of mineralisation.
The early Permian Blair Athol coal measures were formed in a small intra-
cratonic basin called the Blair Athol Basin on the western edge of the Bowen
Basin.

The Blair Athol basin covers an approximate area of 25 km2.

The Blair Athol coal measures were deposited in an alluvial depositional
environment resulting in interbedded sandstones, siltstones and coals.

The Blair Athol Coal seams comprise four main coal seams. Historically
underground mining occurred in three of the main seams (Seams 1 to 3).
• The targeted seams in this report are Seam 4 (average thickness between 3 and 5
m depending on seam splits and convergence), and Seam 3 (average thickness
between 37.2 m).
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar

A full list of drillholes can be found in Appendix B, including the POB used in the
resource estimate.

All drillholes have been modelled vertically. The shallow depths suggest that drill
hole deviations do not have material influence on the model.

13

Criteria JORC Code explanation CP Comments
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract
from the understanding of the report, the Competent Person
should clearly explain why this is the case.
Data aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.

All seams where multiple coal quality samples were taken were given a
composite coal quality value. This composite value was generated within the ABB
Minescape software and was weighted on thickness and insitu RD. Insitu RD was
only weighted against thickness.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
_length, true width not known’). _

The drill hole density is suitable to establish continuity of the deposit in all
directions. Regional trends are established and identified structure is delineated.

The seams a relatively flat lying within the Blair Athol Basin. The seam dip
increases towards the basin edges to 5 – 8 degrees.

Drill holes have been drilled vertically with minor deviations being recorded.

Average drill hole spacing (holes included in the model) is approximately 100m.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.

All appropriate Figures are included in the main body of report.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.

All available applicable exploration data has been collated and reported.

It is understood further hard copy data will become available for review once the
ownership change is formalised.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk

No other exploration data was utilised in the resource estimation

14

Criteria JORC Code explanation CP Comments
samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Further work The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.

Further exploration for in-pit coal quality and for Seam 3 remnant areas is
planned for late 2017.

Section 3 Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation CP Comments
Database
integrity
Measures taken to ensure that data has not been corrupted by, for example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation purposes.
Data validation procedures used.

Lithology data has been collected, geophysically corrected and validated
by Blair Athol Mine personnel, and stored in a geological database
Minescape GDB.

The data has then been imported into Minescape geological modelling
module (‘Stratmodel’) where additional data checks were completed by
Xenith.
Site visits Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.
If no site visits have been undertaken indicate why this is the case.

No exploration activity is being conducted at this site at the moment. The
data presented in this report has been supplied by Blair Athol Coal and
represents historical exploration activities.

A site visit was undertaken on the 12thJune 2013 to evaluate the
historical data and to obtain missing borehole information. A second site
visit was carried out in late July 2017 in order to review drillhole data
intersecting Seam 4.

Troy Turner is familiar with the Blair Athol mine and its geology after
working as a geologist at the mine for a number of years.

Troy Turner visited site twice during a previous process in early 2013 and
followed upin July2017.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological interpretation
of the mineral deposit.
Nature of the data used and of any assumptions made.
The effect, if any, of alternative interpretations on Mineral Resource
estimation.

There is a high level of confidence in the geological model. Particularly
the structural model due to the large number of drill holes.

Default coal quality values have been assigned small parting intervals
(stone bands) that were not sampled:
o Inherent moisture: 4%
o Ash: 85%

15

Criteria JORC Code explanation CP Comments
The use of geology in guiding and controlling Mineral Resource estimation.
The factors affecting continuity both of grade and geology.
o Density (in-situ): 2.2 g/cc
o Calorific Value: 5 MJ/kg

One fault has been identified and modelled within this deposit. The
nature and extent of this fault is well known due to the borehole density
in the vicinityof the structure.
Dimensions The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and
lower limits of the Mineral Resource.

The target seam in this report is seam No. 4 with a thickness of between
3 and 5 m. This seam splits into an upper and a lower ply (4U, 4L) which
coalesce in the Southwest part of the basin.

The seams No. 1 to No. 3 are already largely mined out.

Previous mining activities have mined out some of seam No. 4 and
placed overburden over some areas of the seam.

The depth of cover of this resource varies due to the presence of
overburden dumps from previous seams extractions. Due to this the
depth of cover can range from 0 – 70 m.

Dimension of the resource: The No. 4 seam exists over approximately 4 x
5 km, but the main part of the resource is in the Southwest over an area
of approximately 300ha.
Estimation and
modelling
techniques
The nature and appropriateness of the estimation technique(s) applied and
key assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and parameters used.
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.
The assumptions made regarding recovery of by-products.
Estimation of deleterious elements or other non-grade variables of economic
significance (eg sulphur for acid mine drainage characterisation).
In the case of block model interpolation, the block size in relation to the
average sample spacing and the search employed.
Any assumptions behind modelling of selective mining units.
Any assumptions about correlation between variables.
Description of how the geological interpretation was used to control the
resource estimates.
Discussion of basis for using or not using grade cutting or capping.
Theprocess of validation, the checking process used, the comparison of model

ABB Minescape Stratmodel was used to create the geological model and
to estimate the resources.

Interpolation was done using the Finite Element Method (FEM):
o Order 1 for surfaces
o Order 0 for thicknesses
o Order 0 for trend

Schema name: BAC_201707

Minimum interval thickness: 0.15 m

Seams modelled: No. 3 seams, No.4 seams and L3 seam.

Seam relationships: Conformable

Seam Continuity: Pinched

Compound seams: 26 compound seams.

Compound minimum separation 0.00 m.

No additional survey data used.

One fault modelled: R1s_fault_0410. North-Northwest reverse fault.

Grid Spec: All. (20m cell size).

16

Criteria JORC Code explanation CP Comments
data to drill hole data, and use of reconciliation data if available.
Moisture Whether the tonnages are estimated on a dry basis or with natural moisture,
and the method of determination of the moisture content.

17 % in situ moisture has been used to estimate resource tonnages.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters applied.
No maximum ash cut-offs were applied, as all seams are below 50% ash.
Mining factors
or assumptions
Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is
always necessary as part of the process of determining reasonable prospects
for eventual economic extraction to consider potential mining methods, but
the assumptions made regarding mining methods and parameters when
estimating Mineral Resources may not always be rigorous. Where this is the
case, this should be reported with an explanation of the basis of the mining
assumptions made.

Blair Athol Mine is an operating open cut mine with mining
recommencing in June 2017 and Terracom issuing ASX releases regarding
the 6 month production profile.

Both Open cut and underground operations have taken place at Blair
Athol in the past.

A 15:1 bcm/t cut-off has been used for open cut potential areas in this
resource estimate.

A minimum thickness of 1.8m has been applied to potential underground
areas.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical amenability.
It is always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical treatment processes
and parameters made when reporting Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation
of the basis of the metallurgical assumptions made.

Blair Athol has been an operating mine selling washed and raw coal
product on a large scale since 1984. There is no indication of a significant
change in coal properties that would affect the current metallurgical
process.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue disposal
options. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider the
potential environmental impacts of the mining and processing operation.
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the
status of early consideration of these potential environmental impacts should
be reported. Where these aspects have not been considered this should be
reported with an explanation of the environmental assumptions made.

The Blair Athol Coal Mine has a current environmental authority in place
which includes the management of waste rock and process waste. A
Plan of Operations is also in place along with supporting financial
assurance. The financial assurance which addresses the cost to
undertake site rehabilitation has been approved by the Queensland
Government. The Environmental Authority and Plan of Operations
identify mitigation measures to address potential impacts identified for
this operation.

A current Environmental Authority update is being considered by the
DEP to include mineral processing in the EA, this is due to be confirmed
bymid-September.
Bulk density Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness of the samples.
The bulk density for bulk material must have been measured by methods that

The in situ Relative Density was calculated using the “Preston Sanders”
equation.

Samples were assigned an Insitu moisture value of 17%. This is the same
as used byRio Tinto in theprevious resource estimate.

17

Criteria JORC Code explanation CP Comments
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
Discuss assumptions for bulk density estimates used in the evaluation process
of the different materials.
Classification The basis for the classification of the Mineral Resources into varying
confidence categories.
Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence
in continuity of geology and metal values, quality, quantity and distribution of
the data).
Whether the result appropriately reflects the Competent Person’s view of the
deposit.
• The resource polygons were restricted according to:
o
Distance between POBs;
o
Base of weathering surface;
o
Mined out areas for each seam.
• The Measured category has a drill holes spacing (i.e. quality data points
and infill drilling) of no more than 150 m, and the maximum distance
between drill holes considered POB is 300 m. Resources are extrapolated
to a maximum of 250 m from each POB and a minimum of three
intersecting points are required to define the area.
• Within the Indicated and Inferred resource areas, the distance between
drill holes does not exceed 180 m. Resources are extrapolated to a
maximum of 500 m from each POB in the Indicated category, and 1,000 m
in the Inferred category.
• Distance between POBs as described above, in addition to the large
number of open holes, provides a high level of confidence in seam
structure and continuity. The number of quality data points provides a
good understandingof the level of variabilityin the coalquality.
Audits or
reviews
The results of any audits or reviews of Mineral Resource estimates. • No results of 3rdparty audits or reviews have been completed.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence level
in the Mineral Resource estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the relative accuracy of the
resource within stated confidence limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors that could affect the
relative accuracy and confidence of the estimate.
The statement should specify whether it relates to global or local estimates,
and, if local, state the relevant tonnages, which should be relevant to
technical and economic evaluation. Documentation should include
assumptions made and the procedures used.
These statements of relative accuracy and confidence of the estimate should
be compared withproduction data, where available.
• Xenith has assigned measured, indicated and inferred resources.
• There is a high level of confidence in both the geological model and the
resource estimate, given the extensive amount of structural and coal
quality data from the 28 years of operation.
• Factors that could affect accuracy include not modelled faults.

18

Section 4 - Estimation and Reporting of Ore reserves

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation CP Comments
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral Resource estimate used as a basis for the
conversion to an Ore Reserve.

Clear statement as to whether the Mineral Resources are reported
additional to, or inclusive of, the Ore Reserves.
The JORC Coal Resource estimate for Blair Athol Mine (dated 30
September 2016) has been used as the basis for the conversion
to Coal Reserves estimate for Blair Athol Mine.
The Resource estimate is:
Measured: 21.9Mt
Indicated: 9.5Mt
Inferred: 13Mt
The Coal Resources estimate are inclusive of the Coal Reserves
estimate.
Site visits
Comment on any site visits undertaken by the Competent Person and
the outcome of those visits.

If no site visits have been undertaken indicate why this is the case.
A site visit was undertaken by Mr John Cawte of Xenith Consulting,
the Competent Person, on 5 October 2016. The site visits
confirmed that there was no active mining being conducted at the
time. The mine itself was in care and maintenance with seams
sealed to prevent spontaneous combustion. The modelled
topography appears to fit with the actual mine surface. The mine
has just now recommenced operations and as such a further site
visit was not deemed necessary
Study status
The type and level of study undertaken to enable Mineral Resources
to be converted to Ore Reserves.

The Code requires that a study to at least Pre-Feasibility Study level
has been undertaken to convert Mineral Resources to Ore Reserves.
Such studies will have been carried out and will have determined a
mine plan that is technically achievable and economically viable, and
that material Modifying Factors have been considered.
Blair Athol mine has been an active mine, which ceased active
production at the end of 2012, and prior to that time had been in
operation for over 30 years. As this is a continuation of such
activities, no further studies have been carried out. Further to this,
the recommencement of the operations is anticipated to start at
essentially the same position that the previous operator left off,
mining the same seam in a similar manner.
Cut-off
parameters

The basis of the cut-off grade(s) or quality parameters applied.
An economic pit limit for opencut operations has been determined
and used as the limit of reserve. The economic limit is based upon

19

Criteria JORC Code explanation CP Comments
a margin rank and measured in terms of Relative Profit Margin
(RPM), which is simply the margin to cost ratio. The economic limit
is determined at approximately 6-8% RPM, however establishment
of a practical pit arrangement was also a major consideration.
Mining factors
or assumptions

The method and assumptions used as reported in the Pre-Feasibility
or Feasibility Study to convert the Mineral Resource to an Ore
Reserve (i.e. either by application of appropriate factors by
optimisation or by preliminary or detailed design).

The choice, nature and appropriateness of the selected mining
method(s) and other mining parameters including associated design
issues such as pre-strip, access, etc.

The assumptions made regarding geotechnical parameters (eg pit
slopes, stope sizes, etc), grade control and pre-production drilling.

The major assumptions made and Mineral Resource model used for
pit and stope optimisation (if appropriate).

The mining dilution factors used.

The mining recovery factors used.

Any minimum mining widths used.

The manner in which Inferred Mineral Resources are utilised in mining
studies and the sensitivity of the outcome to their inclusion.

The infrastructure requirements of the selected mining methods.
Mining methodology considered for this estimate is:

Use of a combination of doze and dragline to move old
spoil into the adjacent strip or dump. The strip width
selected is nominally 70m

Drilling and Blasting (D&B) of the insitu (ie. non-spoil)
waste

A horizon of 50m of unswelled equivalent waste is
allocated to the dragline.

Remaining waste is removed by truck and excavator

Coal mining including scalping the top 0.25m to enable
clean mining of the 4 Upper Seam, which in turn enables it
to be bypassed if the insitu ash is < 15.5% ash (adb).
Scalped coal and 4 Lower Seam are sent to the Coal
Preparation Plant (CPP) for washing. 3 Seam has no other
plies to consider and has standard loss and dilution
methods applied.

Parting > 0.2m thick is stripped separately.
The stripping methodology for 4 Seam is a continuation of the
methodology previously engaged. The remnant 3 Seam is exposed
with dragline and coal mined in a conventional manner and hauled
out via a ramp.
Batter allowances that have been taken into account are:

Highwall (hard): 70o

Boxcut Lowwall / Endwall (hard): 70o

Spoil Lowwall & Angle of Repose: 37o

Spoil Highwall: 45o
Loss & Dilution factors used are:

20

Criteria JORC Code explanation CP Comments

Roof Loss 3 Seam: 0.3m

Roof Loss 4 Seam: 0.15m

Floor Loss: 0.1m

Roof Dilution: 0.05m

Floor Dilution:0.05m

Dilution density: 2.2 t/bcm

Dilution ash: 80%
The existing infrastructure is suitable for the methodology
described.
Inferred Resource is within the defined economic open cut limit,
however it is not anticipated to be recovered until the final stages
of the mining schedule. As such, the reported reserves estimate is
not reliant on the inferred resource within the economic limit.
Metallurgical
factors or
assumptions

The metallurgical process proposed and the appropriateness of that
process to the style of mineralisation.

Whether the metallurgical process is well-tested technology or novel
in nature.

The nature, amount and representativeness of metallurgical test work
undertaken, the nature of the metallurgical domaining applied and the
corresponding metallurgical recovery factors applied.

Any assumptions or allowances made for deleterious elements.

The existence of any bulk sample or pilot scale test work and the
degree to which such samples are considered representative of the
orebody as a whole.

For minerals that are defined by a specification, has the ore reserve
estimation been based on the appropriate mineralogy to meet the
_specifications? _
The existing Blair Athol CPP is suitable to process the target seams
and has done so up to the cessation of mining. The yield modelling
is based on F1.60 cut point that is expected to be within the
operating parameters of the CPP.
Environmental
The status of studies of potential environmental impacts of the mining
and processing operation. Details of waste rock characterisation and
the consideration of potential sites, status of design options
considered and, where applicable, the status of approvals for process
residue storage and waste dumps should be reported.
The vast majority of economic open cut pit is located where
disturbance already exists or partially rehabilitated areas exist. The
cemetery that exists in the south east of the deposit has a 50m
standoff around it and is not disturbed. The South Eastern Drain
needs diverting into a diversion that has already been approved
and construction commenced by Rio Tinto. Therefore the impact to
the environment will be incrementally minimal.

21

Criteria JORC Code explanation CP Comments
Infrastructure
The existence of appropriate infrastructure: availability of land for plant
development, power, water, transportation (particularly for bulk
commodities), labour, accommodation; or the ease with which the
infrastructure can be provided, or accessed.
The existing infrastructure is suitable for the methodology
described. The train load-out and stockpile facilities are now
owned by GS Coal Pty Ltd and managed by Glencore in conjunction
with the neighbouring mine, Clermont mine. It is expected that the
Blair Athol Mine will continue to utilise the train loadout and
stockpile area in conjunction with Clermont Mine, subject to
agreement with Glencore.
Costs
The derivation of, or assumptions made, regarding projected capital
costs in the study.

The methodology used to estimate operating costs.

Allowances made for the content of deleterious elements.

The derivation of assumptions made of metal or commodity price(s),
for the principal minerals and co- products.

The source of exchange rates used in the study.

Derivation of transportation charges.

The basis for forecasting or source of treatment and refining charges,
penalties for failure to meet specification, etc.

The allowances made for royalties payable, both Government and
private.
The approach taken is described below.
Most cost have been developed and built up from a first principles
basis. The unit costs used are:

Rehabilitation: $35,000 / ha

Drill and Blast: $0.80 / bcm

Rip Parting: $1.30 / bcm

Truck & Excavator Main Waste: $3.30 / bcm

Truck & Excavator Thin Parting: $4.50 / bcm

Dragline Waste: $0.95 / bcm

Dozer Push: $1.25 / bcm

ROM Coal Mining: $3.90 / ROM t

Product Coal Haulage: $0.80 / ROM t

Pit Services: $1.60 / ROM t

Sustaining Capital: $1.50 / ROM t

Overhead Costs: $8.00 / Prod t
Some costs have been provided by TerraCom such as stockpile
management, CPP and loadout costs which may be dependent on
third parties:

CPP operating Costs: $4.23 / ROM t

Stockpile M’ment / Loadout $3.95 / ROM t
Rail and port costs have been provided by TerraCom which may be
dependent on third parties:

Rail: $11.33 / Prod t

Port / Demurrage: $5.61 / Prod t
Royalty charges are applied as follows:

upto and including $100per tonne: 7.0%

22

Criteria JORC Code explanation CP Comments

over $100 up to including $150 per tonne: 12.5%

above $150 per tonne: 15.0%

Research Levy: 0.2385%
Revenue
factors

The derivation of, or assumptions made regarding revenue factors
including head grade, metal or commodity price(s) exchange rates,
transportation and treatment charges, penalties, net smelter returns,
etc.

The derivation of assumptions made of metal or commodity price(s),
for the principal metals, minerals and co-products.
The product coal for Blair Athol Mine is a low energy, high
moisture bituminous coal. The coal price applied for the thermal
product is AUD$68.50/t. This is the price based upon the upper
range of the discount factor applied to the long term Consensus
Economics Forecast (July 2017) on a real dollar basis. The long term
forecast Newcastle price is: US$65 (Nominal). A CPI rate of 2% was
used to revert the long term price to US$59.60 (real). The US
Exchange rate is assumed as US$0.75/AUD.
Market
assessment

The demand, supply and stock situation for the particular commodity,
consumption trends and factors likely to affect supply and demand
into the future.

A customer and competitor analysis along with the identification of
likely market windows for the product.

Price and volume forecasts and the basis for these forecasts.

For industrial minerals the customer specification, testing and
acceptance requirements prior to a supply contract.
The Blair Athol thermal product has an ash of 12.5% (adb) and CV
of 5320kcal/kg (nar) and is the basis of the pricing scenario advice
from MResources.
The thermal coal sales price forecast is based upon the NEWC 6000
NAR index. An index that has become fully established since the
closure of Blair Athol is the NEWC 5500 NAR, created mainly for
high ash Hunter Valley thermal coal which typically have a higher
CV than the Blair Athol product. Historical ratios between the 5500
and 6000 indices typically show a relativity of 80 – 85%.
The Blair Athol product is well known amongst traditional north
Asian buyers. The low ash, very low total sulphur and a HGI value
readily accepted in the market as well as potential freight saving
factors would favourably support the price which may be offset by
the trace elements present that may limit certain target markets or
necessitate blending. Accounting for these aspects, the discount
factor could be in the range of 80% to 85% of the Newcastle 6000
Benchmark dependingon the market conditions.
Economic
The inputs to the economic analysis to produce the net present value
(NPV) in the study, the source and confidence of these economic
inputs including estimated inflation, discount rate, etc.

NPV ranges and sensitivity to variations in the significant assumptions
_and inputs. _
The deposit was assessed using a margin rank analysis. A cutoff of
6-8% has been adopted as the economic limit.

23

Criteria JORC Code explanation CP Comments
Social
The status of agreements with key stakeholders and matters leading
to social licence to operate.
Rio Tinto have been operating Blair Athol for over 30 years and
have the mine in care and maintenance. Glencore is operating the
neighbouring mine, Clermont Mine. Both companies continue to
operate as a good corporate citizens.
Other
To the extent relevant, the impact of the following on the project
and/or on the estimation and classification of the Ore Reserves:

Any identified material naturally occurring risks.

The status of material legal agreements and marketing arrangements.

The status of governmental agreements and approvals critical to the
viability of the project, such as mineral tenement status, and
government and statutory approvals. There must be reasonable
grounds to expect that all necessary Government approvals will be
received within the timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third party on which
extraction of the reserve is contingent.
The existing landform at Blair Athol Mine still requires a significant
amount of rehabilitation over and above the areas planned to be
disturbed in this current mining plan. The financial assurance
calculation has been accepted at face value as it has been
developed by Rio Tinto using a government approved financial
assurance calculator and accepted by DEHP. As part of the sale
agreement to TerraCom, the environmental bond of $80,000,000
will be placed in an account to be released to TerraCom by DEHP
upon the successful rehabilitation of the disturbed areas.
Therefore the economic viability of the areas to be mined is
somewhat independent of the rehabilitation liability that is
outstanding.
Classification
The basis for the classification of the Ore Reserves into varying
confidence categories.

Whether the result appropriately reflects the Competent Person’s view
of the deposit.

The proportion of Probable Ore Reserves that have been derived from
Measured Mineral Resources (if any).
All Measured resource within the economic limit of the open cut
pit has been classified as Proved reserve.
All Indicated resource within the economic limit of the open cut pit
has been classified as Probable reserve.
The reserve estimation and classification reflects the competent
person’s view of the deposit.
Audits or
reviews

The results of any audits or reviews of Ore Reserve estimates.
No audits or reviews of the reserve have been conducted.
Discussion of
relative
accuracy/
confidence

Where appropriate a statement of the relative accuracy and
confidence level in the Ore Reserve estimate using an approach or
procedure deemed appropriate by the Competent Person. For
example, the application of statistical or geostatistical procedures to
quantify the relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate, a qualitative
discussion of the factors which could affect the relative accuracy and
_confidence of the estimate. _
The depletion limits are adopted from the survey completed at the
cessation of mining by Rio Tinto. No arithmetic adjustments have
been made to take into account post-survey as there has been no
change.
Small differences may be present in the totals due to the tonnage
information being rounded so as to reflect the usual uncertainty

24

Criteria JORC Code explanation CP Comments

The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be
relevant to technical and economic evaluation. Documentation should
include assumptions made and the procedures used.

Accuracy and confidence discussions should extend to specific
discussions of any applied Modifying Factors that may have a material
impact on Ore Reserve viability, or for which there are remaining
areas of uncertainty at the current study stage.

It is recognised that this may not be possible or appropriate in all
circumstances. These statements of relative accuracy and confidence
of the estimate should be compared with production data, where
_available. _
associated with the estimate.

25

ABOUT TERRACOM – www.terracomresources.com

TerraCom has fully commissioned the Baruun Noyon Uul (BNU) coking coal mine in the South Gobi of Mongolia. Export shipments under a 5.5 year offtake agreement have commenced on schedule. The company’s goal is to become one of the largest and highest quality coking coal producers in Mongolia, providing exceptional value for its steel-producing customers.

TerraCom completed the acquisition of the Blair Athol Coal Mine in May 2017. The acquisition included the mining lease, related licenses, land, site infrastructure, active contracts and all mining plant & equipment, including a dragline, to deliver TerraCom’s forecast production schedule and the progressive rehabilitation.

The acquisition of the Blair Athol Coal Mine is a significant milestone for TerraCom, bringing the following benefits:

  • Progressive rehabilitation of one of Queensland’s oldest coal mines;

  • The resumption of coal mining and export sales from the Blair Athol Coal mine providing the local, state and federal economies with increased economic activity, employment, royalties and taxation; and

  • Forecast positive cash flow through a low overhead structure and operational efficiencies.

TerraCom plans to commence over 50 hectares of site rehabilitation while bringing the mine back into production. The operation, under TerraCom management, is planned to deliver approx. 2Mtpa over 8 years[1] and ongoing progressive rehabilitation.

In order to support further growth and expansion, TerraCom continues to evaluate cash generative assets for potential acquisition. The Company is evaluating the acquisition of a hard coking coal mine in Kalimantan, Indonesia, a 500,000 tpa operation located in close proximity to road, barge and port infrastructure connecting it to the seaborne coal market.

Addionally, TerraCom is focused on developing two priority projects in Queensland, Australia: the large thermal coal Northern Galilee Project and the high energy prime thermal coal Springsure Project.

1- Refer to this ASX Announcement for further information and clarification on the Blair Athol production forecast. The material assumptions underpinning the Blair Athol production target in this ASX Announcement continues to apply and has not materially changed.

Please contact Nathan Boom, on +61 2 4268 6258 or at [email protected] for further information.

==> picture [136 x 39] intentionally omitted <==

Nathan Boom Company Secretary

26