23 December 2003

The Manager Company Announcements Office Australian Stock Exchange Limited PO Box H224 Australia Square SYDNEY NSW 2000

Dear Sir

COYOTE GOLD PROJECT

The Directors of Tanami Gold NL (Tanami Gold) wish to update shareholders and the market on the Coyote Gold Project (Coyote) following the announcement on 24 November 2003 that Tanami Gold was the successful bidder for the acquisition of AngloGold Australia Limited's (AngloGold) Western Tanami Project including the Coyote gold deposit.

The acquisition of Coyote and related tenement package will be a major development for the Company as the resources acquired combined with the Company's existing resources at Larranganni, located 35 kilometres to the north of Coyote, will enable the Company to complete a bankable feasibility study aimed at commencing production in late 2004/early 2005.

Tanami Gold has estimated a JORC compliant constrained mineral resource at Coyote as follows:

Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Junces
2,240,000 -5.4 $^{\circ}$ 389,000 $^{\circ}$ 1 $130,000$ 5.5 23,000 2.370,000 .000
(Danaad am a Lak dii layinn aik all and a ciantable tan aik linni 95 akta. 100 akta dii

(Based on a 1g/t Au lower cut-off and a variable top cut from $25g/t$ to $100g/t$ Au)

At shallow depths there are a number of intercepts which will provide highgrade ore blocks to the mill shortly after start up. Some typical downhole intersections are as follows:

8 metres œ. 32.4 g/t Au from $\parallel$ 31 metres
11 metres $\omega$ 7.9 g/t Au from $\frac{1}{2}$ 52 metres
7 metres œ, $132$ g/t Au from 44 metres
17 metres œ, $4.2$ g/t Au from $34$ metres
13 metres @. 10.3 g/t Au from 52 metres
14 metres w, $8.9$ g/t Au from $\frac{3}{2}$ 23 metres
10 metres ω, 4.3 $g/t$ Au from 42 metres
6 metres @, 18.8 g/t Au from $\frac{1}{28}$ metres
4 metres w. 15.5 g/t Au from $\pm 60$ metres
3 metres w. 20.7 g/t Au from 31 metres
3 metres W) 24 g/t Au from 64 metres

Within the resource, significant intersections at depth provide down plunge potential for additional ounces to be delineated. The depth extension potential is highlighted by the downhole intersections included in Schedule 1.

Tanami Gold NL

Metallurgical testwork completed by AngloGold indicates that +95% recovery can be expected with over 60% of the gold to be recovered through a gravity circuit. Given the distribution of coarse gold as seen in the drill core, and with drilling on 25 to 50 metre spaced sections by 40 metres hole spacing, it is probable that small scale fold/faults, typically gold bearing, may have been missed in the drilling completed by AngloGold.

LARRANGANNI DEPOSITS

The Company's 100% owned Kookaburra and Sandpiper deposits at Larranganni, 35 kilometres north of Coyote, provides an additional JORC compliant constrained mineral resource of 160,000 ounces as detailed below:

Indicated Inferred Total
Fonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Junces
1,500,000 -2.78 134,000 200,000 3.89 25,000 1,700,000 2.93 160,000
.

(Based on a 1 g/t Au lower cut-off and a 25 g/t Au top cut).

When added to the Coyote mineral resource, the Company has a combined JORC compliant resource of 572,000 ounces which forms the basis for the commencement of a mining operation (see Figure 2).

REGIONAL EXPLORATION UPSIDE

In addition to the Coyote deposit, Tanami Gold will also acquire 1,500 km2 of highly prospective leases from AngloGold, which contain advanced exploration prospects and greenfield geochemical and conceptual lithostructural targets. The Roadrunner, Pebbles and Rabies prospects are located within 12 kilometres of Coyote and offer immediate potential for additional resources (see Figure 3). It is anticipated that follow-up drill programs will commence on a number of these prospects at the start of the 2004 field season.

In addition to the Kookaburra and Sandpiper deposits at Larranganni, there is potential to develop several of the small oxide deposits in the Larranganni area that are currently held in joint venture with Barrick Gold.

FEASIBILITY AND MINING

The Coyote deposit is a very significant undeveloped high quality resource based upon extensive RC percussion and diamond drilling which has allowed over 90% of the resource to be classified in the indicated resource category under the JORC Code. Given the quality of the resource, minimal drilling will be required during the bankable feasibility study, to take the resource to a mineable reserve.

Tanami Gold's Board and senior management have extensive experience in gold mining operations and together with specialist consultants, the Company is well placed to complete a bankable feasibility study leading to a decision to commence mining.

Yours faithfully Tanami Gold NL

auch Widow

Denis Waddell Managing Director

ASX_TAM_23Dec2003

Note:

This information, so far as it pertains to Ore Reserves or Identified Mineral Resources is based on and accurately reflects, information compiled by Martin Kavanagh and other members of the Australasian Institute of Mining and Metallurgy and/or the Australian Institute of Geoscientists, each of whom has had at least five years relevant experience in relation to the mineralisation being reported on to qualify as a Competent Person as defined in the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves.

SCHEDULE 1

SIGNIFICANT INTERSECTIONS AT DEPTH

8 metres @ 20.5 g/t Au from 170 metres
5 metres @ 10.6 g/t Au from 220 metres
3 metres @ 28.4 g/t Au from 188 metres
11 metres $^\text{\textregistered}$ 75.6 g/t Au from 204 metres
19 metres @ $21.2$ g/t Au from newspaperscence
194 metres
5 metres @ 18.1 g/t Au from 134 metres
8 metres @ 20.5 g/t Au from 170 metres
3 metres @ 16.8 g/t Au from 269 metres
4 metres @ 111.4 g/t Au from 239 metres
3 metres @ 8.8 g/t Au from 248 metres
2 metres @ 27.4 g/t Au from 172 metres
1 metre @ 34.2 g/t Au from 208 metres
3 metres @ 17.5 g/t Au from 233 metres
3 metres @ 8.9 g/t Au from 434 metres
1 metre
.
Interneteration
$^\text{\textregistered}$ 11.6 g/t Au
radoodooka.commu
from 294 metres
4 metres @ 17.9 g/t Au from 168 metres
3 metres @ 106 g/t Au from 211 metres
1 metre
.
Distribution of the final of the
@ 12.4 g/t Au from 242 metres
1 metre @ 38.3 g/t Au from 381 metres
1 metre @, 42 g/t Au from 234 metres
19 metres @ 21.2 g/t Au from 174 metres
1 metre @, 33.2 g/t Au from 190 metres

FIGURE

FIGURE

FIGURE دی