Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ST BARBARA LIMITED Interim / Quarterly Report 2017

Oct 18, 2016

65749_rns_2016-10-18_28875ccb-ffaf-4d69-8370-f9b3be45122d.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [383 x 108] intentionally omitted <==

----- Start of picture text -----

Quarterly Report / Q1 September 2016
----- End of picture text -----

==> picture [170 x 55] intentionally omitted <==

  • Increased cash flow from operations drives further debt reduction

  • Encouraging exploration results in WA and PNG

  • Record safety performance

Executive Summary

Operations

  • ˃ Consolidated gold production for the September 2016 quarter was 92,547 ounces (Q4 Jun: 92,033 ounces).

  • ˃ Consolidated All-In Sustaining Cost[1] (AISC) was A$935 per ounce (Q4 Jun: A$960 per ounce). The average realised gold price for the quarter was A$1,737 per ounce (Q4 Jun: A$1,680 per ounce). Consistent production, low costs and the higher realised gold price resulted in cash contribution from operations[2] for the quarter of A$83 million (Q4 Jun: A$69 million).

  • ˃ Gwalia (Western Australia) gold production for the quarter was 67,118 ounces (Q4 Jun: 65,098 ounces) at AISC of A$774 per ounce (Q4 Jun: A$836 per ounce). Mined grade for the quarter was 10.4 g/t Au (Q4 Jun: 9.3 g/t Au) with 215 kt milled (Q4 Jun: 233 kt).

  • ˃ Simberi (PNG) gold production for the quarter was 25,429 ounces (Q4 Jun: 26,935 ounces), exceeding the target 100,000 ounces p.a. run rate for the sixth consecutive quarter. AISC was A$1,359 per ounce (Q4 Jun: A$1,266 per ounce). ˃

Health & Safety

  • ˃ The Company-wide Total Recordable Injury Frequency Rate (TRIFR), calculated as a rolling 12 month average, fell to a new record low of 1.8 to 30 September 2016 (Q4 Jun: 2.1).

Exploration

  • ˃ Gwalia (Leonora) WA Two drilling programs are targeting extensions to the Gwalia lode system.

  • ˃ The continued Gwalia Deeps drilling program focussing on extensions below 2,000 metres below surface (mbs) saw the completion of daughter hole GWDD18A, which entered the Mine Sequence at a depth of approximately 2,100 mbs and passed through over 50m of Mine Sequence. Two mineralised intervals interpreted to represent extensions of South West Branch (SWB) and South Gwalia Series (SGS) lodes were encountered.

  • ˃ A program commenced during the quarter targeting northern extensions of the Gwalia Lode system between 1,600 and 1,700 mbs from surface. Two daughter holes GWDD10A and 10B were drilled from an existing parent

==> picture [223 x 41] intentionally omitted <==

hole GWDD10 and successfully intersected 30m and 70m respectively of mineralised Mine Sequence. The position of these intersections confirms the presence of Hangingwall Lode which had only previously been encountered during historic mining above 1,100 mbs.

  • ˃ Pinjin Project (Yilgarn) WA A 28,645 metre aircore drilling program for 514 holes was completed during the September 2016 quarter with encouraging early stage results. The program tested 16 bedrock geochemical and geophysical targets (see summary on page 9 and details in Figures 4.0-4.2 and Table 3). Follow-up Aircore and Reverse Circulation drilling is planned to take place during the next two quarters.

  • ˃ Simberi PNG Results for the last five holes of a ten hole diamond drill program on ML136 targeting high grade trench results at Bekou South were received (details in Figure 6.0 and Table 4), including for SDH369 (all intercepts downhole):

    • 10m @ 5.4 g/t Au from 3m, including

    • 5m @ 10.2 g/t Au (oxide + transition) from 8m,

    • 23m @ 2.4 g/t Au (transition + sulphide) from 24m, and

    • 11m @ 5.8 g/t Au (sulphide) from 66m, including

    • 6m @ 10.1 g/t Au (sulphide) from 67m

  • ˃ Tatau Island PNG A 530 metre diamond drill hole was completed at the Mt Letam gold-copper porphyry prospect targeting a geophysical anomaly (Figure 7.0). Assay results are pending.

  • ˃ Trenching, mapping and drilling commenced at Southwest Tatau Island, during the September 2016 quarter, targeting high grade sulphide-oxide gold mineralisation (see summary on page 10 and details in Figure 8.0). Results were received for the first 24 trenches including:

  • ˃ TATTR178 30m @ 3.4 g/t Au, including

     - 15m @ 5.7 g/t Au
    
  • ˃ TATTR180 15m @ 4.7 g/t Au

  • ˃ Grid soil sampling over six copper-gold porphyry targets located in central Tatau Island will commence during the December 2016 quarter (Figure 5.0).

  • 1 Non-IFRS measure, refer Appendix

  • 2 Non-IFRS measure, refer cash movement table on page 12

St Barbara Limited Level 10, 432 St Kilda Road, Melbourne VIC 3004 T +61 3 8660 1900 F +61 3 8660 1999 ACN 009 165 066 Locked Bag 9, Collins Street East, Melbourne VIC 8003 W www.stbarbara.com.au

==> picture [377 x 37] intentionally omitted <==

Gwalia Ventilation Study

  • ˃ Truck haulage with additional ventilation was identified in June 2016 as the preferred long term materials movement solution for Gwalia, facilitating mining below 1,800 mbs. Additional ventilation also removes the constraint on the number of trucks in the mine.

  • ˃ As announced with the full year results in August, a ventilation PFS was completed during the quarter and a feasibility study is underway to compare the preferred alternative against a ‘do nothing’ base case (see page 6 for details). An investment decision is anticipated in December 2016.

Simberi Strategic Review

  • ˃ The strategic review announced in February 2016 of St Barbara’s PNG assets, including the Simberi mine, has progressed during the quarter.

  • ˃ The purpose of the strategic review is to determine how best to maximise shareholder value from the Simberi assets.

  • ˃ Options under consideration include:

Outlook

  • ˃ Guidance for FY17 is unchanged and summarised as follows:

    • ˃ Forecast Gwalia (Leonora) gold production of between 245,000 and 265,000 ounces at an AISC of between A$850 and A$910 per ounce, with sustaining capex of between A$30 and A$35 million, plus growth capex of between A$10 to A$12 million.

    • ˃ Forecast Simberi gold production of between 95,000 and 105,000 ounces at an AISC of between A$1,330 and A$1,490 per ounce (derived from AISC in Simberi’s functional currency of between US$1,000 to US$1,120 per ounce), with capex of between A$5 and A$6 million.

    • ˃ Forecast exploration expenditure of between A$18 and A$22 million, consisting of:

      • ˃ A$10 to A$12 million at Gwalia

      • ˃ A$8 to A$10 million spilt approximately 30% at Pinjin in WA and 70% on the Simberi Island group in PNG.

  • ˃ continued ownership, exploration and development

  • ˃ potential joint venture arrangements, and

  • ˃ divestment of some or all of the assets.

Bob Vassie

Managing Director and CEO 19 October 2016

  • ˃ Confidential discussions are in progress with a number of third parties regarding a variety of options. An outcome is anticipated during Q2 December 2016.

  • ˃ In the meantime Simberi continues to operate at its target 100,000 ounce per annum run rate.

Finance (unaudited)

  • ˃ Consistent production, low costs and a higher realised gold price resulted in cash contribution from operations[1] for the quarter of A$83 million (Q4 Jun: A$69 million). Total cash at bank increased by A$17 million during the quarter to approximately A$154 million[2] at 30 September 2016 (30 June 2016: A$137 million) after debt repayments in July 2016 of A$56 million.

  • ˃ As announced on Monday 3 October 2016, a further US$55 million in aggregate principal of Senior Secured Notes (equivalent to approximately A$75 million including principal repayment, 3.3% redemption premium and accrued interest) will be repurchased on 31 October 2016, with US$73 million of the Notes remaining on issue at that time. The Company expects its cash balance to exceed the remaining debt in the December 2016 quarter.

Presentation on quarterly report and audio webcast

Bob Vassie, Managing Director & CEO, will brief analysts and institutional investors on the September 2016 Quarterly Report at 11:00 am Australian Eastern Daylight Time (UTC + 11 hours) on Wednesday 19 October 2016. Participation on the conference call is by personal invitation only.

A live audio webcast of the briefing will be available on St Barbara’s website at www.stbarbara.com.au/investors/webcast/ or by clicking here. The audio webcast is ‘listen only’ and does not enable questions. The audio webcast will subsequently be made available on the website.

  • 1 Non-IFRS measure, refer cash movement table on page 12 2 Financial information unaudited

St Barbara Limited Quarterly Report / Q1 September 2016

Page 2 of 14

==> picture [377 x 37] intentionally omitted <==

St Barbara Gold Production & Guidance

Production Summary
Consolidated
Q3 Mar
FY16
Q4 Jun
FY16
Year
FY16
Q1 Sep
FY17
Guidance
FY173
Production
Gwalia
oz
King of the Hills4
oz
Simberi
oz
Consolidated
oz
Mined Grade
Gwalia
g/t
Simberi
g/t
Total Cash Operating Costs1
Gwalia
$/oz
King of the Hills4
$/oz
Simberi
$/oz
Consolidated
$/oz
All-In Sustaining Cost1
Gwalia
$/oz
King of the Hills4
$/oz
Simberi
$/oz
Consolidated
$/oz
66,147
65,098
267,166
67,118
-
-
9,112
-
25,433
26,935
110,286
25,429
245 to 265 koz
-
95 to 105 koz
91,580
92,033
386,564
92,547
10.2
9.3
9.3
10.4
1.35
1.18
1.26
1.05
587
638
609
580
-
-
893
-
1,198
1,164
1,143
1,247
340 to 370 koz
Reserve grade2
8.3
1.3
n/a
-
n/a
850 to 910
-
1,330 to 1,490
757
792
768
763
770
836
783
774
-
-
964
-
1,404
1,266
1,293
1,359
947
960
933
935
985 to 1,075

[1] Non-IFRS measure, refer Appendix.

  • [2] Ore Reserve grade at 30 June 2016, refer Ore Reserve and Mineral Resources Statement (released 23 August 2016).

[3] FY17 guidance announced in Q4 June 2016 quarterly report (released 19 July 2016).

[4] King of the Hills ceased mining in April 2015 and ceased processing in September 2015. It was sold in October 2015 (refer ASX announcement 16 October 2015).

Disclaimer

This report has been prepared by St Barbara Limited (“Company”). The material contained in this report is for information purposes only. This release is not an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this release nor anything contained in it shall form the basis of any contract or commitment.

This report contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing and the sale of gold. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, indicative, should, will, would, expects, plans or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or

trends to differ materially from those expressed in this report. Actual results may vary from the information in this report. The Company does not make, and this report should not be relied upon as, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements.

This report has been prepared by the Company based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information or opinions contained in this report.

The Company estimates its reserves and resources in accordance with the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves 2012 Edition (“JORC Code”), which governs such disclosures by companies listed on the Australian Securities Exchange.

St Barbara Limited Quarterly Report / Q1 September 2016

Page 3 of 14

==> picture [377 x 37] intentionally omitted <==

==> picture [217 x 107] intentionally omitted <==

----- Start of picture text -----

AISC (Consolidated)
(A$/oz)
992
947 960 935
863
FY16 average A$933/oz
Gold Production
(koz)
----- End of picture text -----

==> picture [241 x 154] intentionally omitted <==

----- Start of picture text -----

111
92 92 92 93
30
9 28 25 27 25
0 0 0
72 64 66 65 67
FY 16 FY 16 FY 16 FY 16 FY 17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun Q1 Sep
Gwalia King of the Hills Simberi Total
----- End of picture text -----

FY17 Production Indicative Quarterly Guidance Profile

==> picture [193 x 128] intentionally omitted <==

----- Start of picture text -----

26% 25% 25%
24%
FY 17 FY 17 FY 17 FY 17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun
Actual Indicative % of annual production (koz)
----- End of picture text -----

Figures displayed to nearest thousand ounces. Reported ounces in associated table

St Barbara Limited Quarterly Report / Q1 September 2016

Page 4 of 14

==> picture [377 x 37] intentionally omitted <==

Gwalia, Leonora, WA

Operations

==> picture [205 x 204] intentionally omitted <==

----- Start of picture text -----

AISC (A$/oz) 836
846
770 774
692 FY16 average A$783/oz
Mined grade (g/t Au)
10.4
10.2
9.3
9.7 FY16 average 9.3 g/t Au
7.9
Reserve grade
8.3 g/t Au June 2016
----- End of picture text -----

Production (koz)

==> picture [208 x 108] intentionally omitted <==

----- Start of picture text -----

72.4
63.5 66.1 65.1 67.1
FY 16 FY 15 FY 16 FY 16 FY 17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun Q1 Sep
----- End of picture text -----

  • ˃ Gwalia gold production for the September 2016 quarter (Q1 FY17) was 67,118 ounces (Q4 Jun: 65,098 ounces), consistent with annual guidance.

  • ˃ Average mined grade for the quarter was 10.4 g/t Au (Q4 Jun: 9.3 g/t Au), which was higher than grade control drilling modelling predicted due to improved stope control with reduced dilution and the presence of high grade shoots.

  • ˃ All In Sustaining Cost (AISC) was A$774 per ounce for the quarter (Q4 Jun: A$836 per ounce), an improvement on the previous quarter primarily due to the higher grade mined and lower volume processed.

  • ˃ International mining equipment manufacturer Atlas Copco has recently completed a three month trial at Gwalia of its latest underground mining truck, the MT65, undertaken in conjunction with underground mining contractor Byrnecut.

  • ˃ The trials indicate the MT65 can reliably haul an approximately 10% higher payload at slightly increased speed and fuel efficiency than the existing MT6020 trucks.

Outlook

  • ˃ FY17 guidance is maintained as follows:

  • ˃ Production of between 245,000 and 265,000 ounces

  • ˃ AISC of between A$850 and A$910 per ounce

  • ˃ Capital expenditure comprising:

    • ˃ Sustaining capex: $30 to $35 million, plus

    • ˃ Growth capex: $10 to $12 million

  • ˃ Annual guidance is maintained, as scheduled grade for the remaining quarters is lower than achieved this quarter, and volumes in Q3 March 2017 and Q4 June 2017 may be impacted by development for the proposed new ventilation shafts (should an investment decision be made).

St Barbara Limited Quarterly Report / Q1 September 2016

Page 5 of 14

==> picture [377 x 37] intentionally omitted <==

Production Summary
Gwalia
Q3 Mar
FY16
Q4 Jun
FY16
Q1 Sep
FY17
Production Summary
Gwalia
Q3 Mar
FY16
Q4 Jun
FY16
Q1 Sep
FY17
Underground ore mined
kt
205
223
203
Grade
g/t
10.2
9.3
10.4
Ore milled[1]
kt
210
233
215
Grade[1]
g/t
10.1
9.0
10.0
Recovery
%
97
97
97
Gold production
oz
66,147
65,098
67,118
All-In Sustaining Cost[2]
A$ per ounce
Mining
Processing
Site services
Stripping and ore inventory
adjustments
By-product credits
Third party refining & transport
Royalties
Total cash operating costs
less operating development
Adjusted cash operating cost
Corporate and administration
Corporate royalty
Rehabilitation
On-site exploration
Capitalised mine & op
development
Sustaining capital expenditure
All-In Sustaining Cost(AISC)
379
408
373
116
123
109
54
69
55
(3)
(3)
2
546
597
539
(2)
(2)
(2)
1
1
1
42
42
42
587
638
580
(50)
(63)
(82)
537
575
498
49
51
53
25
26
25
3
3
4
-
-
-
139
135
163
17
46
31
770
836
774
[1] Includes Gwalia mineralised waste
[2] Non-IFRS measure, refer Appendix

Gwalia Growth Projects – Ventilation Upgrade Study

  • ˃ Truck haulage with additional ventilation was identified in June 2016 as the preferred long term materials movement solution for Gwalia, facilitating mining below 1,800 mbs. Additional ventilation also removes the constraint on the number of trucks in the mine.

  • ˃ As announced with the full year results in August, a ventilation PFS was completed during the quarter and a feasibility study will now compare the following options (all figures approximate at +/-20% study accuracy):

  • ˃ Increase ventilation infrastructure (on surface) and install two 4.5m ventilation shafts to 1,500 mbs in two sections, project capex $65 million, allows mining to at least 2,000 mbs and extendable to 2,200 mbs with additional $10 million capex[1]

  • ˃ ‘Do nothing’ , project capex $nil, allows mining to base of 2016 Reserve at a reduced rate per annum

  • ˃ The Gwalia life of mine plan used for the 2016 Ore Reserves and Mineral Resources includes capital expenditure for the proposed ventilation upgrade.

  • ˃ As a consequence of incorporating the proposed ventilation upgrade, Reserves and Resources at 30 June 2016 increased by 297 koz and 938 koz respectively below 1,740 mbs, and the mine plan was extended from 1,740 mbs to 1,940 mbs (in FY24).

  • ˃ An investment decision is anticipated in Q2 December 2016. The current indicative project timeline involves detailed engineering, preliminary work (including underground development) and procurement to Q4 June 2017, with shaft construction to commence in earnest in Q1 September 2017, and a construction period of two to two and half years.

Gwalia underground ore mined

==> picture [219 x 102] intentionally omitted <==

----- Start of picture text -----

254
242
223
205 203
FY 16 FY 16 FY 16 FY 16 FY 17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun Q1 Sep
kt
----- End of picture text -----

1 The project metrics are based on the PFS and subject to the assumptions contained therein. The results may change as the feasibility studies progress.

St Barbara Limited Quarterly Report / Q1 September 2016

Page 6 of 14

==> picture [377 x 37] intentionally omitted <==

Simberi, Papua New Guinea

==> picture [219 x 179] intentionally omitted <==

----- Start of picture text -----

AISC
1,404
[A$/oz] 1,319 1,359
1,252 1,266
FY16 average A$1,293/oz
Production
[koz]
29.5 28.4
26.9
25.4 25.4
FY 16 FY 16 FY 16 FY 16 FY 17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun Q1 Sep
----- End of picture text -----

Production Summary
Simberi
Q3 Mar
FY16
Q4 Jun
FY16
Q1 Sep
FY17
Production Summary
Simberi
Q3 Mar
FY16
Q4 Jun
FY16
Q1 Sep
FY17
Total ore & waste
mined
kt
2,348
2,527
3,550
Ore mined
kt
723
856
972
Grade
g/t
1.35
1.18
1.05
Ore milled
kt
743
881
967
Grade
g/t
1.3
1.17
1.06
Recovery
%
79
81
77
Gold production
oz
25,433
26,935
25,429
All-In Sustaining Cost[1]
A$ per ounce
Mining
Processing
Site services
Stripping and ore inventory
adjustments
By-product credits
Third party refining &
transport
Royalties
Total cash operating costs
Corporate and administration
Corporate royalty
Rehabilitation
On-site exploration
Capitalised mine & op
development
Sustaining capital expenditure
All-In Sustaining Cost(AISC)
371
401
443
512
460
479
266
258
274
-
-
-
1,149
1,119
1,196
-
-
12
11
11
37
34
40
1,198
1,164
1,247
49
51
53
-
-
-
16
14
20
-
-
-
-
-
-

141
37
39
1,404
1,266
1,359

Operations

  • ˃ Simberi produced 25,429 ounces of gold during the quarter, exceeding the 100,000 ounces p.a. target run rate for the sixth consecutive quarter.

  • ˃ Simberi cash contribution was $19 million[1] for the quarter, resulting from consistent operational performance, low capital expenditure, and gold sales for the quarter of 30,585 ounces due to the timing of gold shipments. The average gold price for the quarter was US$1,334 per ounce (Q4 June: US$1,257 per ounce).

  • ˃ Record results in throughput offset declines in grade and recovery.

  • ˃ Total material moved for the quarter was a new record at 3.6 million tonnes, exceeding the previous record of 2.6 Mt in the September 2015 quarter by 38%. The increase was due to improved equipment utilisation and more efficient pit layouts.

  • ˃ The aerial rope conveyor achieved a new record of 670 kt for the quarter following maintenance measures undertaken in late FY16. Scheduled maintenance in the December quarter is expected to further increase capacity.

  • ˃ Ore milled was a new record by 10%, with 967 kt processed for the quarter (Q4 Jun: 881 kt, also the previous record).

  • ˃ Mining from the new Pigibo pit impacted overall results.

  • ˃ Grade and recovery for Pigibo were lower than from Pigiput and Sorowar.

  • ˃ The upper areas of this pit comprised ore with low density, adversely impacting the quantity of ore processed. It is anticipated that the low density ore has now been mined out.

During the quarter there was a strong focus on removing waste, both at Pigibo and in accessing other new mining areas. The higher strip ratio that resulted (2.7:1 compared with a 2:1 average over previous six quarters) impacted mining costs and AISC.

  • ˃

[1] Non-IFRS measure, refer Appendix

1 Non-IFRS measure, refer cash movement table on page 12

St Barbara Limited Quarterly Report / Q1 September 2016

Page 7 of 14

==> picture [377 x 37] intentionally omitted <==

Simberi Ore & Waste Mined

==> picture [191 x 136] intentionally omitted <==

----- Start of picture text -----

= 3,550
= 2,606 = 2,417 = 2,348 = 2,527
2,578
1,710 1,541 1,625 1,671
896 876 723 856 972
FY16 FY16 FY16 FY16 FY17
Q1 Sep Q2 Dec Q3 Mar Q4 Jun Q1 Sep
kt
Ore Mined Waste Mined = Total
----- End of picture text -----

Outlook

  • ˃ FY17 guidance is maintained as follows:

  • ˃ Production of between 95,000 and 105,000 ounces

  • ˃ AISC of between A$1,330 and A$1,490 per ounce (derived from AISC in Simberi’s functional currency of between US$1,000 to US$1,120)

  • ˃ Capex of between A$5 and A$6 million (US$4 to US$5 million).

Strategic Review of PNG assets

  • ˃ The strategic review announced in February 2016 of St Barbara’s PNG assets, including the Simberi mine, has progressed during the quarter.

  • ˃ The purpose of the strategic review is to determine how best to maximise shareholder value from the Simberi assets

  • ˃

  • Options under consideration include:

  • ˃ continued ownership, exploration and development

  • ˃ potential joint venture arrangements, and

  • ˃ divestment of some or all of the assets.

  • ˃ Confidential discussions are in progress with a number of third parties regarding a variety of options. An outcome is anticipated during Q2 December 2016.

  • ˃ In the meantime Simberi continues to operate at its target 100,000 ounce per annum run rate.

St Barbara Limited Quarterly Report / Q1 September 2016

Page 8 of 14

==> picture [377 x 37] intentionally omitted <==

Exploration – Results September Quarter

Gwalia Deep Drilling Program, Leonora WA

  • ˃ Resource extension drilling at Gwalia has continued with the objective of increasing the Gwalia Mineral Resource at depth.

  • ˃ The surface drilling program continued, targeting extensions to the Gwalia lode system below 2,000 mbs. The program led to an extension of reserves and resource (announced in the 2016 Ore Reserves and Mineral Resources Statement released on 23 August 2016) and continued with the successful completion of daughter hole GWDD18A, which intersected the Mine Sequence at a depth of approximately 2,100 mbs and the commencement of daughter hole GWDD18B.

  • ˃ 2,000 to 2,200 mbs Drill hole GWDD18A intersected 50m of Mine Sequence containing two intervals of mineralisation interpreted to represent extensions of South West Branch (SWB) and South Gwalia Series (SGS). No adverse geotechnical conditions were noted. Significant intercepts are indicated below with full details set out in Figures 2.0 - 2.3 and Table 1 in the Exploration Figures and Tables appendix.

GWDD18A:

  • ˃ SWB 3.1m @ 7.3 g/t Au from 2,287m ˃ SGS 8.1m @ 6.6 g/t Au from 2,328m including: 3.9m @ 12.3 g/t Au from 2,328m

  • ˃ Following the completion of drill hole GWDD18A drilling of a daughter hole GWDD18B commenced. At the end of the reporting period GWDD18B has reached a downhole depth of 1,900m.

  • ˃ Northern Extension A surface drilling program targeting northern extensions to South West Branch between 1,600 to 1,700 mbs commenced with the completion of two holes from surface utilising historic parent holes intending to test the possible north eastern edge of mineralisation.

  • ˃ Drill hole GWDD10A successfully intersected 30m of mineralised Mine Sequence. Within the Mine Sequence were two intervals of mineralisation interpreted to represent extensions of Hangingwall Lode (HWL) and Main Lode (ML). Drill hole GWDD10B intersected 70m of mineralised Mine Sequence at a downhole depth of 1,620m, interpreted to be HWL (details in Figure 3.0 and Table 2):

  • ˃ Following the completion of drill hole GWDD10B, drilling of a new daughter hole GWDD10C commenced. At the end of the reporting period GWDD10C has reached a downhole depth of 1,474m.

  • ˃ While historic mining of Hangingwall Lode has occurred above 1,100mbs, this drilling confirms its likely depth extension into areas much closer to current development. Remaining planned drilling will aid in interpretation but both lodes plus South West Branch are considered open to the north (refer figure 3.0).

  • ˃ Gwalia Seismic Reflection Exploration Program Further evaluation of extensions to the Gwalia Shear Zone will be undertaken through a seismic geophysical program. The program will utilise sensors placed at strategic positions within recently completed surface drill holes GWDD11N, GWDD17E and GWDD18. This program of work is expected to be carried out during the December 2016 quarter. Refer to Schematic diagram Figure 2.3 in the Exploration Figures and Tables appendix.

Pinjin Project, Yilgarn WA

  • ˃ Exploration continued on the Pinjin project within the Yilgarn Province, WA. The Pinjin Project is located 150 km northeast of Kalgoorlie, comprising a large tenement package of 20 exploration licences (1,358 km[2] ) for 485 blocks (Figure 4.0).

  • ˃ An aircore drilling program comprising 514 holes (PJAC001 to PJAC284; PJAC286 to PJAC515) for 28,645 metres was completed in the September 2016 quarter. The drilling targeted 16 bedrock geochemical and geophysical targets. Results have been received for the remaining holes PJAC286 to PJAC515 (all intercepts downhole, details in Figure 4.2 and Table 3) including:

  • ˃ PJAC331 2m @ 4.9 g/t Au from 51m, including 1m @ 7.9 g/t Au from 51m

  • ˃ PJAC389 1m @ 3.0 g/t Au from 62m

  • ˃ The encouraging early stage results (Figure 4.2) are scheduled to be followed-up with additional Aircore and Reverse Circulation drilling planned during the next two quarters.

Simberi, Tatau & Tabar Islands, Papua New Guinea (ML 136 and EL 609)

GWDD10A:

  • ˃ HWL 1.7m @ 4.4 g/t Au from 1,618m ˃ ML 1.3m @ 2.3 g/t Au from 1,626m GWDD10B: ˃ HWL 4.5m @ 6.5 g/t Au from 1,616m including 0.8m @ 32.3 g/t Au from 1,620m

  • ˃ On Simberi Island (Figure 5.0), final results for a drilling program at Bekou South on ML136 were received.

  • ˃ Exploration continued on EL609 at Tatau Island during the September quarter (Figure 5.0). Drilling was completed at the Mt Letam Au-Cu porphyry prospect. Trenching and drilling commenced at Southwest Tatau targeting several Au prospects.

St Barbara Limited Quarterly Report / Q1 September 2016

Page 9 of 14

==> picture [377 x 37] intentionally omitted <==

Bekou South

  • ˃ A 10 hole (SDH361 to 370) diamond drill program for 684m was completed at Bekou South during the June quarter targeting high grade trench results. Results for the final five holes (SDH366 to SDH370) were received and are highlighted in Figure 6.1 and Table 4. Best results include (all intercepts are downhole):

  • ˃ SDH367 16m @ 2.6 g/t Au (sulphide) from 18m

  • ˃ SDH368 15m @ 4.1 g/t Au (oxide + transition) from 0m, including

  • 3m @ 17.9 g/t Au from 12m

  • ˃ SDH369 10m @ 5.4 g/t Au from 3m, including

  • 5m @ 10.2 g/t Au (oxide + transition) from 8m,

  • 23m @ 2.4 g/t Au (transition + sulphide) from 24m, and

  • ˃ TATTR180 15m @ 4.7 g/t Au, including 5m @ 10.6 g/t Au

  • ˃ TATTR186 15m @ 3.4 g/t Au, including 5m @ 5.1 g/t Au

  • ˃ TATTR195 20m @ 2.5m g/t Au, including 10m @ 4.5 g/t Au

  • ˃ TATTR196 20m @ 2.9 g/t Au, including 5m @ 9.6 g/t Au

  • ˃ A 2,000m diamond drill program targeting narrow, highgrade, sulphide-oxide gold targets at Southwest Tatau commenced during September 2016. To date, a single drill hole (TTD062) was completed for 119 metres. Assay results are pending.

Expenditure September Quarter (unaudited)

  • 11m @ 5.8 g/t Au (sulphide) from 66m, inc.

  • 6m @ 10.1 g/t Au (sulphide) from 67m

  • ˃ The inclusion of Bekou South in the oxide mining life will be considered subject to the Strategic Review.

Tatau Island

  • ˃ A single 530 metre diamond drill hole (TTD061) was completed at the Mt Letam Au-Cu porphyry prospect (Figure 7.0). The diamond drill hole targeted a 400m to 600m wide zone of chargeability and overlapping resistivity defined by historical Induced Polarisation (IP) and Controlled Source Audio-frequency Magnetotellurics (CSAMT) surveys. Drilling intersected 180 metres of predominantly moderate to strong phyllic altered dolerite from 300 metres depth, containing ≥2% disseminated sulphides (locally up to 5%). Assay results are pending. An historical (1990) diamond drill hole RC1100D located approximately 150 metres to the south west testing part of the anomaly returned 172m @ 0.4 g/t Au and approximately 0.1% Cu from 262m to end of hole, including 4m @ 11.2 g/t Au and 0.9% Cu from 364m.

  • ˃ A trenching program was designed at Southwest Tatau to identify the number and determine the strike length of potential narrow high grade mineralised trends. 30 trenches (TATTR177 to TATTR206) were completed during the September quarter for 2,472 metres and 471 samples. The trench sampling results received for TATTR177 to TATTR200 are highlighted in Figure 8.0 and include:

  • ˃ TATTR178 30m @ 3.4 g/t Au, including 15m @ 5.7 g/t Au

  • ˃ TATTR179 15m @ 3.2 g/t Au, including 5m @ 8.4 g/t Au

  • ˃ Expenditure on mineral exploration is shown below:

Australia
Pacific
Gwalia Deep Drilling
Total
Q1 Sep 2016
A$ million
0.6
(expensed)
1.6
(expensed)
1.2
(capitalised)
3.4

Exploration - December 2016 Quarter

  • ˃ The map below shows current and planned target areas for the December 2016 quarter (Q2 FY17).

==> picture [216 x 216] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Page 10 of 14

==> picture [377 x 37] intentionally omitted <==

  • ˃ Exploration in the December 2016 quarter (Q2 FY17) will focus on:

  • ˃ Gwalia Deeps Below 2,000 mbs Continuation of the Gwalia Deeps drilling program on a target area located between 2,000 – 2,200 mbs.

  • ˃ Continuing the surface drilling program targeting Gwalia Northern Extensions between 1,400 and 1,600 mbs.

  • ˃ Undertake a 2D seismic traverse over the Gwalia deposit utilising sensors (geophones) placed at deep positions within surface drill holes. As well as exploration, this will serve the purpose for testing and calibration prior to wider exploration using a new 3D seismic survey method, starting in the greater Gwalia area, in the December 2016 quarter (Q2 FY17).

  • ˃ Further interpret the results of the major aircore drilling program at Pinjin , and design follow-up aircore and Reverse Circulation drilling programs planned to commence during the next two quarters.

  • ˃ Interpret results of TTD061 drill hole completed at Mt Letam , Tatau Island.

  • ˃ Continue trenching, mapping and diamond drilling on Southwest Tatau Island targeting higher grade sulphide-oxide potential.

  • ˃ Subject to weather, complete an airborne LiDAR (Light Detection and Ranging) survey over part or all of Tatau and Big Tabar Islands to generate an accurate and detailed digital terrain model.

  • ˃ Commence grid based regional soil sampling over six gold-copper porphyry targets on Tatau Island , to be analysed for a suite of multi-elements.

  • ˃ Complete an airborne aeromagnetic survey over Back Creek EL8214 in central NSW.

Health & Safety

  • ˃ The Company-wide Total Recordable Injury Frequency Rate (TRIFR), calculated as a rolling 12 month average, decreased from 2.1 at 30 June 2016 to a record low 1.8 for the twelve months ended 30 September 2016.

  • ˃ The continued improvements to safety performance can be attributed to a greater focus on field based safety interactions, and ongoing monitoring and communication of lessons learned from previous incidents.

  • ˃ Total interest bearing liabilities at 30 September 2016 were A$169 million (30 June 2016: A$229 million), which comprised US$168 million senior secured notes and A$1 million of lease liabilities. A$/US$ exchange rate at 30 September 2016 was 0.7674[1] (30 Jun 2016: 0.7452).

  • ˃ As announced on 3 October 2016, the Company will repurchase a further US$55 million in aggregate principal of its US 144A Senior Secured Notes on 31 October 2016. The Notes will be repurchased at a 3.3% premium to par value, which is the optional redemption price effective from October 2016. Net payments for the repurchase are anticipated to amount to approximately US$57 million (approx. A$75 million), consisting of principal repayment, premium and accrued interest.

  • ˃ Combined, the two Note repurchases of US$40 million in July and US$55 million in October will reduce future interest expense by approximately US$8 million (A$11 million) per annum.

  • ˃ By 31 October 2016, St Barbara will have repurchased a cumulative US$177 million in aggregate principal of the original US$250 million of Notes issued by St Barbara in March 2013, with US$73 million of the Notes remaining on issue at that time. The Company intends to use excess cash to extinguish the remaining Notes during the balance of FY17.

  • ˃ The Company expects its cash balance to exceed the remaining debt in the December 2016 quarter.

  • ˃ Hedging in place at the date of this quarterly report comprises:

  • ˃ 26,000 ounces of gold forward contracts to be delivered in monthly instalments between October and December 2016 at US$1,260 per ounce (this hedge announced 18 March 2016)

  • ˃ 50,000 ounces of gold forward contracts to be delivered in monthly instalments between January and June 2017 at US$1,338 per ounce (this hedge announced 4 July 2016).

  • ˃ These two hedges reduce US dollar gold price risk associated with repayment of the remaining US Senior Secured Notes, and the remaining ounces to be delivered represent less than 30% of anticipated gold production for the remainder of FY17.

Finance (unaudited)

  • ˃ 93,893 ounces of gold were sold in the September quarter, at an average realised gold price of A$1,737 per ounce (Q4 Jun: 89,023 ounces at A$1,680 per ounce).

  • ˃ Cash at bank at 30 September 2016 was $154 million after total payments during the quarter of A$56 million for the US$40 million Notes buy back in July 2016.

1 Reuters

St Barbara Limited Quarterly Report / Q1 September 2016

Page 11 of 14

==> picture [377 x 37] intentionally omitted <==

  • ˃ Cash movements for the September 2016 quarter are summarised in the following table:
Cash movements & balance Q3 Q4 Q1
A$M Mar Jun Sep
(unaudited) FY16 FY16 FY17
Leonora - operating cash flow[1] 63 60 64
Simberi - operating cash flow[1] 8 9 19
Rehabilitation , land (1) - (1)
management & corporate capex
Corporate costs (4) (4) (4)
Corporate royalties (2) (2) (2)
Exploration[2] (3) (5) (3)
Working capital movement (9) 3 2
Cash flows before finance costs 52 61 75
Net interest and finance costs (1) (10) (2)
US debt repayment (37) (28) (56)
Net movement for quarter 14 23 17
Cash balance at start of quarter 100 114 137
Cash balance at end of quarter 114 137 154

Senior Secured Notes US$M

˃ Issued March 2013 250
˃ Repurchased FY15 (54)
˃ Repurchased FY16 (28)
˃ Balance remaining at 30 June 2016 168
˃ Repurchased Q1 Sep 2016 (40)
˃ Balance remaining at 30 Sep 2016 128
˃ Repurchase due 31 Oct 2016 (55)
˃ Balance anticipated at 31 Oct 2016 73
˃ Coupon 8.875% p.a.
˃ Redemption date 15 April 2018
˃ S&P rating B
˃ Moody’s rating B2

Corporate

  • ˃ Notice of St Barbara’s 2016 Annual General Meeting will be issued on 21 October 2016, and includes full details of the Annual General Meeting to be held on Wednesday 30 November 2016 in Melbourne.
Share Capital
Issued shares
Opening balance 30 June 2016
Issued 25 Aug 2016 (employee
rights vested)3
Closing balance 30 Sep 2016
Unlisted employee rights
Opening balance 30 June 2016
Issued
Vested3
Lapsed3
Closing balance 30 Sep 2016
Comprises rights expiring:
30 June 2017
30 June 2018
Closing balance 30 Sep 2016
495,102,525
2,228,570
497,331,095
24,034,288
Nil
(2,228,570)
(1,878,073)
19,927,645
15,953,028
3,974,617
19,927,645

ASX & ADR

The Company’s shares are listed on ASX (ASX:SBM) and through American Depositary Receipts (ADR OTC: STBMY) traded in the USA.

Scheduled Future Reporting

Date Report 30 November Annual General Meeting (Melbourne) Late January December 2016 Quarterly Report Late February Half Year Financial Report

[Dates are tentative and subject to change]

1 Net of sustaining capex 2 Includes Gwalia deep drilling

3 Refer ASX Appendix 3B released 25 August 2016

St Barbara Limited Quarterly Report / Q1 September 2016

Page 12 of 14

==> picture [377 x 37] intentionally omitted <==

Corporate Directory

St Barbara Limited ABN 36 009 165 066

Board of Directors

Tim Netscher ..................................... Non-Executive Chairman Bob Vassie ........................................ Managing Director & CEO Kerry Gleeson ....................................... Non-Executive Director David Moroney ..................................... Non-Executive Director

Shareholder Enquiries

Computershare Investor Services Pty Ltd

GPO Box 2975 Melbourne Victoria 3001 Australia Telephone (within Australia) 1300 653 935 Telephone (international) +61 3 9415 4356 Facsimile +61 3 9473 2500 www-au.computershare.com/investor

Executives

Bob Vassie ........................................ Managing Director & CEO Garth Campbell-Cowan .......................... Chief Financial Officer

American Depositary Receipt enquires: BNY Mellon Depositary Receipts www.bnymellon.com/shareowner

Registered Office

Level 10, 432 St Kilda Road

Melbourne Victoria 3004 Australia

Telephone +61 3 8660 1900 Facsimile +61 3 8660 1999 Email [email protected] Website www.stbarbara.com.au

Investor Relations Contact

Investor Relations Contact
Rowan Cole, Company Secretary + 61 3 8660 1900
Substantial Shareholders % of Holdings1
Van Eck Associates Corporation 17.4%
M&G Investment Management Ltd 8.4%
Hunter Hall Investment Management Ltd 5.4%
Vinva Investment Management 5.2%

Australian Securities Exchange (ASX) Listing code “SBM”

American Depositary Receipts (ADR OTC code “STBMY”) through BNY Mellon, www.adrbnymellon.com/dr_profile.jsp?cusip=852278100 Financial figures are in Australian dollars (unless otherwise noted).

Financial year commences 1 July and ends 30 June.

1 As notified by the substantial shareholders to 30 September 2016

St Barbara Limited Quarterly Report / Q1 September 2016

Page 13 of 14

==> picture [377 x 37] intentionally omitted <==

Appendix

Non-IFRS Measures

  • ˃ The Company supplements its financial information reporting determined under International Financial Reporting Standards (IFRS) with certain non-IFRS financial measures, including cash operating costs and All-In Sustaining Cost. We believe that these measures provide additional meaningful information to assist management, investors and analysts in understanding the financial results and assessing our prospects for future performance.

  • ˃ Cash Operating Costs are calculated according to common mining industry practice using The Gold Institute (USA) Production Cost Standard (1999 revision).

  • ˃ All-In Sustaining Cost (AISC) is based on Cash Operating Costs, and adds items relevant to sustaining production. It includes some, but not all, of the components identified in World Gold Council’s Guidance Note on Non-GAAP Metrics - All-In Sustaining Costs and All-In Costs (June 2013).

  • ˃ AISC is calculated on gold production in the quarter.

  • ˃ For underground mines, amortisation of operating development is adjusted from “Total Cash Operating Costs” in order to avoid duplication with cash expended on operating development in the period contained within the “Mine & Operating Development” line item.

  • ˃ Rehabilitation is calculated as the amortisation of the rehabilitation provision on a straight-line basis over the estimated life of mine.

Competent Persons Statement

Exploration Results

  • ˃ The information in this report that relates to Exploration Results for Simberi and Pinjin is based on information compiled by Dr Roger Mustard, who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Mustard is a full-time employee of St Barbara and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Mustard consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Love consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Mineral Resource and Ore Reserve Estimates

  • ˃ The information in this report that relates to Mineral Resources or Ore Reserves is extracted from the report titled ‘Ore Reserves and Mineral Resources Statements 30 June 2016’ released to the Australian Securities Exchange (ASX) on 23 August 2016 and available to view at www.stbarbara.com.au and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.

  • ˃ The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 23 August 2016 and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original ASX announcement.

  • ˃ Competent Person Mr Tim Richards is entitled to participate in St Barbara’s long term incentive plan, details of which are most recently included in the 2016 Directors’ and Financial Report released to the ASX on 23 August 2016. In 2014 increase in Ore Reserves was one of the performance measures under that plan.

  • ˃ Full details are contained in the ASX release dated 22 August 2016 ‘Ore Reserves and Mineral Resources Statements 30 June 2016’ available at www.stbarbara.com.au.

  • ˃ The information in this report that relates to Exploration Results for Gwalia and the Leonora region is based on information compiled by Mr Robert Love, who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Love is a full-time employee of St Barbara and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to

St Barbara Limited Quarterly Report / Q1 September 2016

Page 14 of 14

==> picture [383 x 106] intentionally omitted <==

----- Start of picture text -----

Quarterly Report / Q1 September 2016
----- End of picture text -----

==> picture [170 x 55] intentionally omitted <==

Exploration Figures and Tables

Figure 1.0: Leonora: Summary of Gwalia Extension Drilling, Plan View

Figure 2.0: Gwalia Deeps Drilling Program Q1 FY17 Results, Plan View

==> picture [422 x 295] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Figures and tables i

==> picture [377 x 37] intentionally omitted <==

Figure 2.1: Gwalia Deeps Drilling Program Q1 FY17 Results, Long Section (looking west)

==> picture [442 x 309] intentionally omitted <==

Figure 2.2: Gwalia Deeps Drilling Program Q1 FY17 Results, Cross Section (looking north)

==> picture [444 x 310] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables ii

==> picture [377 x 37] intentionally omitted <==

Figure 2.3: Gwalia Deeps Seismic Program Q2 FY17

==> picture [438 x 346] intentionally omitted <==

Figure 3.0: Gwalia schematic Lode plan ~1540 – Northern Extension

==> picture [436 x 305] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables iii

==> picture [377 x 37] intentionally omitted <==

Figure 4.0: Pinjin Project Aircore Drilling Location Map

==> picture [354 x 511] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables iv

==> picture [377 x 37] intentionally omitted <==

Figure 4.1: Pinjin Project Aircore Drilling Results Map (Enlargement A) - maximum gold in bedrock

==> picture [454 x 332] intentionally omitted <==

Figure 4.2: Pinjin Project Aircore Drilling Results Map (Enlargement B) - contour of maximum gold in bedrock

==> picture [455 x 332] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables v

==> picture [377 x 37] intentionally omitted <==

Figure 5.0: Tabar Islands Location Map, Papua New Guinea

==> picture [504 x 676] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables vi

==> picture [377 x 37] intentionally omitted <==

Figure 6.0 Bekou South Drill Location Map, Simberi ML 136, Papua New Guinea

==> picture [504 x 676] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables vii

==> picture [377 x 37] intentionally omitted <==

Figure 7.0: Mt Letam Cross Section showing TTD061, Tatau Island, Papua New Guinea

==> picture [466 x 312] intentionally omitted <==

Figure 8.0: Southwest Tatau Trench and Drill Location Map, Tatau Island, Papua New Guinea

==> picture [468 x 342] intentionally omitted <==

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables viii

==> picture [377 x 37] intentionally omitted <==

Table 1: Gwalia Deeps Significant Intercepts– Leonora Operations, Gwalia Mine

Hole Id
Down-hole
Mineralised Intersection
North East RL Metres
Below
Dip/ Gold
grade
Lode Azimuth From To Interval
m m m Surface degrees m m m g/t Au
GWDD18A 5,100 10,078 3,269 2,096 SWB -37/283 2,286.9 2,290.0 3.1 7.3
GWDD18A 5,107 10,044 3,244 2,122 SGS -34/282 2,327.8 2,335.9 8.1 6.6
including 2,327.8 2,331.2 3.9 12.3

NOTES:

High grade cuts have not been applied. Dip and Azimuth angles estimated at intercept depth. Coordinates and Azimuth referenced to Gwalia Local Mine Grid Reported intercepts are all down hole lengths.

Table 2: Northern Extension Significant Intercepts– Leonora Operations, Gwalia Mine

Hole Id
Down-hole
Mineralised Intersection
North East RL Metres
Below
Dip/ l Gold
grade
Lode Azimuth From To Interva
m m m Surface degrees m m m g/t Au
GWDD10A 6,224 9,185 3,930 1,445 HWL -37/236 1,617.8 1,619.5 1.7 4.4
GWDD10A 6,220 9,180 3,925 1,450 ML -37/236 1,626.1 1,627.0 1.3 2.3
GWDD10B 6,303 9,170 3,912 1,462 HWL -42/261 1,615.7 1,620.1 4.5 6.5

NOTES:

High grade cuts have not been applied. Dip and Azimuth angles estimated at intercept depth. Coordinates and Azimuth referenced to Gwalia Local Mine Grid Reported intercepts are estimated true width.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables ix

==> picture [377 x 37] intentionally omitted <==

Table 3: Pinjin Aircore Significant Intercepts – Yilgarn, WA

Hole Id North East RL Dip/ Total
Depth
Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection

Azimuth
From
m
To
m
Interval
m
Gold
grade
**Auppb **
m m m degrees
PJAC008 6658703 448411 343 -60/270 61 54 56 2 727
PJAC009 6658700 448500 343 -60/270 59 40 42 2 605
PJAC018# 6655099 452406 339 -60/270 66 44 45 1 1140
PJAC020 6655101 451976 339 -60/270 67 38 47 9 1965
including# 38 39 1 6450
PJAC033 6654703 453106 327 -90/360 59 50 51 1 1230
PJAC040 6654304 452803 325 -90/360 55 39 40 1 585
47 53 6 653
PJAC049# 6654299 453700 325 -90/360 56 50 51 1 1330
PJAC058#^ 6653603 454106 323 -90/360 59 47 48 1 1540
PJAC059^ 6653603 454205 324 -90/360 54 45 46 1 906
PJAC061 6653600 454408 324 -90/360 68 53 54 1 786
PJAC062# 6653600 454505 325 -90/360 77 41 42 1 1210
PJAC070 6653604 454355 324 -60/270 59 53 54 1 843
PJAC072# 6654699 452853 326 -60/270 59 51 52 1 1840
PJAC094 6656500 446098 353 -60/270 47 35 36 1 726
44 45 1 620
PJAC178 6647600 457096 337 -60/270 44 34 35 1 542
PJAC263 6688601 471545 342 -60/270 79 77 78 1 4730
PJAC300 6656500 446153 360 -60/270 41 28 29 1 790
PJAC306 6656692 446002 359 -60/270 59 33 34 1 1430
PJAC311 6655245 451252 356 -60/270 56 41 42 1 695
PJAC326 6654959 451902 356 -60/270 80 51 52 1 614
PJAC327^ 6654956 452002 355 -60/270 62 53 54 1 1560
PJAC331^ 6654958 452400 356 -60/270 68 45 46 1 1330
51 53 2 4895
including 51 52 1 7880
PJAC335^ 6654834 451849 356 -60/270 77 42 43 1 539
PJAC338^ 6654834 452151 356 -90/360 56 44 45 1 594
47 49 2 760
PJAC341^^ 6654837 452103 357 -90/360 56 47 54 7 3507
Including^ 47 48 1 11500
PJAC350^ 6655252 451900 355 -60/270 68 52 53 1 733
PJAC352 6654959 452047 355 -60/270 67 49 50 1 2140
PJAC366 6650040 455793 370 -60/270 77 59 60 1 545
PJAC370 6650051 456200 341 -60/270 67 40 41 1 573
PJAC377 6654551 452556 348 -60/270 71 69 71 2 708
PJAC380^ 6654547 452849 352 -60/270 71 62 63 1 507

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables x

==> picture [377 x 37] intentionally omitted <==

Hole Id North East RL Dip/ Total
Depth
Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection

Azimuth
From
m
To
m
Interval
m
Gold
grade
**Auppb **
m m m degrees
PJAC382^ 6654540 453051 354 -60/270 67 49 50 1 908
PJAC384 6654547 453253 357 -60/270 68 59 60 1 1660
PJAC385^ 6654546 453354 333 -60/270 65 58 59 1 4870
PJAC389 6654550 453747 333 -60/270 66 62 63 1 3010
PJAC391^ 6654550 453948 333 -60/270 72 60 61 1 721
^ 64 65 1 603
PJAC394 6654549 454243 329 -60/270 81 76 77 1 745
PJAC406^ 6654843 453345 334 -60/270 95 38 40 2 1269
PJAC421 6654417 452598 333 -90/360 53 38 40 2 883
PJAC440 6654143 452446 332 -90/360 53 45 46 1 764
PJAC451 6654142 454443 336 -60/270 77 38 39 1 796
41 42 1 560
58 59 1 644
PJAC456 6654145 452600 336 -90/360 44 36 37 1 978
PJAC469 6653247 453048 336 -60/270 89 59 61 2 627
PJAC475 6649643 455901 340 -60/270 87 82 83 1 698
PJAC495 6649303 456294 335 -60/270 58 33 34 1 1510

NOTES:

Coordinates and Azimuth referenced to MGA94 zone 51 Grid. Reported intercepts are all down hole lengths.

- previously reported in June 2016 quarterly report.

^ - transported, ^^ combined transported and in-situ, otherwise in-situ.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xi

==> picture [377 x 37] intentionally omitted <==

Table 4: Bekou South Significant Intercepts – Simberi Island, Papua New Guinea

Hole Id North
m
East
m
RL
m
Dip/
Azimuth
degrees
Total
Depth
Lode Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection
Down-hole
Mineralised Intersection
From
m
To
m
Interval
m
Gold grade
g/t Au
SDH366 206647 43535 23.3 -55 / 275 83.5 OX 0 5 5 1.4
SDH367 206679 44059 8.3 -55 / 226 62.0 OX 0 5 5 0.9
SU 18 34 16 2.6
including SU 23 24 1 10.6
SDH368 206720 44037 22.4 -55 / 235 52.0 OX,TR 0 15 15 4.1
including OX,TR 12 15 3 17.9
TR,SU 21 45 24 1.2
including SU 38 42 4 2.1
SDH369 206765 44045 26.9 -56 / 237 78.8 OX,TR 3 13 10 5.4
including OX,TR 8 13 5 10.2
including OX 9 10 1 34.5
TR,SU 24 47 23 2.4
including TR 24 26 2 4.2
and TR,SU 34 37 3 8.5
including SU 35 36 1 17.1
SU 66 77 11 5.8
including SU 67 73 6 10.1
including SU 68 69 1 34.3
SDH370 206789 44000 28.0 -56 / 272 77.0 OX,TR 0 21 21 0.7
including TR 15 18 3 1.7

NOTES:

Coordinates and Azimuth referenced to Tabar Island Grid (TIG). Reported intercepts are all down hole lengths.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xii

==> picture [377 x 37] intentionally omitted <==

LEONORA - JORC Code, 2012 Edition – Table 1

Contents

Drilling: Section 1 Sampling Techniques and Data

Section 2 Reporting of Exploration Results

Drilling - Section 1 Sampling Techniques and Data

Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data
(Criteria in this section applyto all succeedingsections.)
Criteria Commentary
Sampling techniques
Half-core sampling of NQ2 diamond drilling with boundaries defined geologically. Samples are mostly one metre in length
unless a significant geological feature warrants a change from this standard unit. The upper or right-hand side of the core
is submitted for sample analysis, with each one metre of half core providing between 2.5 – 3 kg of material as an assay
sample.
Drilling techniques
Diamond drilling using NQ2 (50.6mm) sized core (standard tubes). Holes have been surveyed using a single shot electronic
camera. All core is orientated using a Reflex ACT II RD orientation tool.
Drill sample recovery
Core is metre marked and orientated and checked against drillers blocks to ensure that any core loss is accounted for.

Sample recovery is rarely less than 100%. Where minor core loss does occur it is due to drilling conditions and not ground
conditions.
Logging
All SBM holes are logged primarily for lithology, alteration and vein type/intensity which are key to modelling gold grade
distributions. Validation of geological data is controlled via the use of library codes and reliability and consistency of data
is monitored through regular peer review.

All logging is qualitative.
Sub-sampling
techniques and
sample preparation

SBM half core is cut using a core saw before being sent to SGS laboratory in Kalgoorlie where the entire sample is crushed
to achieve particle size <4mm followed by complete pulverisation (90% passing 75m).
Quality of assay data
and laboratory tests

SBM samples were analysed for gold using fire assay with a 50g charge and analysis by flame Atomic Absorption
Spectrometry (AAS). QC includes insertion of 3 commercial standards (1 per 20 samples), barren material used for blank
control samples, use of barren flush material between designated high grade samples during the pulverising stage, re-
numbered sample pulp residues re-submitted to original laboratory, and sample pulp residues submitted to accredited
umpire laboratory, submission of residual (duplicate) half core from ore intervals. The analysis of gold was sound and re-
analysis of pulps showed acceptable repeatability with no significant bias.
Verification of
sampling and
assaying

Sampling data is recorded electronically in spread sheets which ensure only valid non-overlapping data can be recorded.
Assay and down hole survey data are subsequently merged electronically. All drill data is stored in a SQL database on
secure company server.
Location of data
points

Collars for surface holes are recorded by DGPS. Upon completion of underground drill holes an authorised surveyor will
pick up the collar by placing a survey rod into the hole to measure azimuth and dip. This process may also occur while the
hole is in progress by surveying the drill rods in the hole.

All coordinates and Azimuth are specified in using the Gwalia Local Mine Grid (LE_SGMG). The two-point transformation
of MGA_51 to LE_SGMG is detailed below:
Grid
Azimuth
MGAE 1
MGAN 1
MGAE 2
MGAN 2
GridE 1
GridN 1
GridE 2
GridN 2
Rotation
Scale
LE_SGMG
Sons of
Gwalia
Mine Grid
15.13
337371.157
6800342.586
340246.451
6799408.751
7200.281
6987.844
10219.711
6836. 814
344.522
1
Grid Azimuth MGAE 1 MGAN 1 MGAE 2 MGAN 2 GridE 1 GridN 1 GridE 2 GridN 2 Rotation
LE_SGMG
Sons of
Gwalia
Mine Grid
15.13
337371.157
6800342.586
340246.451
6799408.751
7200.281
6987.844
10219.711
Data spacing and
distribution

Surface drilling is spaced on an approximate 60m x 80m below 1620 metres below surface Drilling data is sufficient to
establish down plunge continuity for all lodes.
Orientation of data in
relation to geological
structure

Sampling is perpendicular to lode orientations and is sound based on past production and underground mapping.
Sample security
Company personnel or approved contractors only allowed on drill sites; drill samples are only removed from drill site by
approved contractors to the company’s secure core logging/processing facility; cut core is consigned to accredited
laboratories for sample preparation and analysis.
Audits or reviews
Regular reviews of core logging and sampling are completed through SBM mentoring and auditing. Additionally, regular
laboratory inspections are conducted by SBM personnel. Inspections are documented electronically and stored on secure
company server. No significant issues were identified.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xiii

==> picture [377 x 37] intentionally omitted <==

Drilling - Section 2 Reporting of Exploration Results

Criteria Commentary
Mineral tenement and
land tenure status

SBM has 100% ownership of the two tenements M37/25 and M37/333 over the Gwalia deposit.
Exploration done by other
parties

Western Mining Corporation (WMC) and Sons of Gwalia (SGW), have previously completed deep diamond drilling
below 1,100 metres below surface
Geology
Gold mineralisation occurs as a number of stepped, moderately east dipping, foliation parallel lodes within strongly
potassic altered mafic rocks which extend over a strike length of approximately 500 metres and to a vertical depth of
at least 2,200 metres below surface. The deposit exhibits significant down-plunge continuity but is interrupted at
approximately 1,200 metres below surface (mbs) by a cross cutting post-mineralisation doleritic dyke, with a
horizontal width of approximately 30 metres.
Drill hole Information
Drill hole information is included in intercept table outlining mid-point co-ordinates including vertical hole depth and
composited mineralized intercepts lengths and depth.
Data aggregation
methods

Down hole intercepts are reported as length weighted averages. No high grade cut is applied.
Relationship between
mineralisation widths and
intercept lengths

Down hole length is reported for all holes; true width is not immediately known until further drilling is completed and
the orebody modelled.
Diagrams
Appropriate diagrams are included within the body of the report
Balanced reporting
Details of all holes material to Exploration Results have been reported in the intercept table.
Other substantive
exploration data

These holes test the deepest limits of mineralisation and no other data is available
Further Work
Further exploration drill holes are planned
Balanced reporting
Details of all holes material to Exploration Results have been reported in the intercept table.
Other substantive
exploration data

Data is included in the body of the report
Further Work
Follow-up drilling is planned and is discussed in the body of the report

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xiv

PINJIN - JORC Code, 2012 Edition – Table 1

==> picture [377 x 37] intentionally omitted <==

Contents

Drilling: Section 1 Sampling Techniques and Data

Section 2 Reporting of Exploration Results

Drilling - Section 1 Sampling Techniques and Data

Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data
(Criteria in this section applyto the succeedingsection.)
Criteria Commentary
Sampling techniques
Sampling was conducted via Aircore drilling on 50m, 100m, or 200m drilling spacing with line spacing’s of 400m,
1000m or as individual lines. Where possible all holes were drilled to blade refusal.

Aircore samples were collected from a rig mounted cyclone by bucket and were then placed directly on the ground in
rows of ten.

Drill spoil was sampled with a scoop to generate 4m composite samples of approximately 3kg. An additional end of
hole multi-element sample was taken from each hole that reached blade refusal in Archaean bedrock.

Representative specimens of end of hole rock chips were stored in plastic chip trays for future reference.

The 3kg composite samples were submitted to Bureau Veritas Minerals Pty Ltd, Perth where they were sorted and
dried, crushed to 10mm and pulverized to -75µm. A 40g charge of pulverized sample was then digested with aqua
regia with a gold analysis by ICP-MS to a detection limit of 1ppb. The same digested sample was also tested for
arsenic by ICP-AES to 1ppm detection limit.

Composite samples that return anomalous Au values were subsampled on a metre by metre basis. These samples
were submitted to Bureau Veritas Minerals Pty Ltd, Perth where they were sorted and dried, crushed to 10mm and
pulverized to -75µm. A 40g charge of pulverized sample was then analyzed for Au, Pd & Pt by Fire Assay with an ICP
finish to a detection limit of 1ppb.

The EOH Aircore samples were submitted to Genalysis and were prepared in the same manner. A 10g charge of
pulverized sample was then digested by four acid digestion with analysis by the Scott Halley technique (ICP-OES &
ICP-MS to ultra-trace levels) via 4A/OM20 method for 60 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Dy,
Er, Eu, Fe, Ga, Gd, Ge, Hf, Ho, Ln, K, La, Li, Lu, Mg, Mn, Mo, Na, Nb, Nd, Ni, P, Pb, Pr, Rb, Re, S, Sb, Sc, Se, Sm, Sn, Sr,
Ta, Tb, Te, Th, Ti, Tl, Tm, U, V, W, Y, Yb, Zn & Zr). A separate 50g charge of pulverized sample was then analyzed for
Au byFire Assaywith an MS finish to a detection limit of 1ppb.
Drilling techniques
Aircore drilling was carried out using a three and a half inch blade bit to refusal, generally at the fresh rock interface.
Drillingwas carried out byChallenge Drillingwho utilised a Challenger R/A 150 Rigwith 750 cfm and 350psi.
Drill sample recovery
Sample recoveries were considered good, but quantitatively not recorded.

The drill cyclone and sample buckets were cleaned regularly, in particular after wet ground was encountered. The
cyclone was also cleaned several times duringthe course of each hole and after the completion of each hole.
Logging
All drill holes were logged in full for lithology, alteration, weathering/regolith and colour.

Aircore loggingis bothqualitative andquantitative
Sub-sampling techniques
and sample preparation

Aircore samples were collected as both dry and wet samples using a sample scoop.

All Aircore composite samples were sorted, dried, crushed and pulverized to produce a 40g charge prior to digestion
by aqua regia.

All Aircore 1m re-split samples were sorted, dried, crushed and pulverized to produce a 40g charge prior to analyses
by Fire Assay with ICP finish.

EOH samples were sorted, dried, crushed and pulverized to produce a 10g charge for digestion by four acid digest
(multi element) and a 50g charge for analyses by Fire Assay with MS finish (Au).

Aircore samples were collected at 1m intervals and composited in 4m samples using a scoop to sample individual
metre samples. 1m re-splits were also sampled using the scoop method.

QC procedures for 4m composite and 1m re-split samples involved the use of certified reference material at a ratio of
1:50. No field duplicates or blanks were inserted into the sample stream.

EOH samples inserted no QC samples.

Bureau Veritas inserted certified standards and replicates and lab repeats.

Genalysis inserted certified standards,blanks and lab repeats.
Quality of assay data and
laboratory tests

The composite samples used a 40g charge with an aqua regia digest which is considered appropriate for analysis of
the regolith dominated sample medium.

EOH samples using non Au analytical methods underwent a complete four acid digest.

The Au analytical method for 1m re-split and EOH samples used 40g & 50g fire assay techniques respectively which
are appropriate to detect Au mineralisation.

Certified reference material was inserted into the sample stream at a ratio of 1:50.

No field duplicates were taken and no blanks were inserted.

Bureau Veritas inserted certified standards and replicates and lab repeats.

Genalysis inserted certified standards,blanks and lab repeats.
Verification of sampling
and assaying

Primary geological and sampling data were recorded in hard copy before being digitised into made for purposed excel
spreadsheets. Data was then transferred into the St Barbara corporate DataShed database where it was validated by
an experienced database geologist.

No adjustments to assaydata were made.
Location of data points
All drill collars were surveyed by a handheld GPS with accuracy of ±3m for easting and northings, and ±10m for
elevation coordinates.

All locations were captured in MGA94 zone 51grid.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xv

==> picture [377 x 37] intentionally omitted <==

Criteria Commentary
Data spacing and
distribution

Aircore drilling was conducted on 50m, 100m or 200m drill spacing’s and a line spacing of 400m, 1000m or as
individual lines.

Aircore results reported are based on and 1m re-splits of the original 4m composite.
Orientation of data in
relation to geological
structure

The drilling comprised a mix of inclined and vertical holes. Inclined holes were drilled with a dip and azimuth of -
60/270 to test the interpreted east dipping stratigraphy. Due to the early stage of the project there is not yet any
understand of the primary orientation of mineralisation.

Given the nature of Aircore drilling into the regolith profile, any sampling bias is considered minimal as the drilling
seldompenetrated more than a few metres into fresh rock.
Sample security
Only trained company personnel were allowed to collect the samples; all samples were held within a secure company
location before dispatch to Bureau Veritas or Genalysis in Perth for Au and multi-element analysis.
Audits or reviews
No audits or reviews of sampling protocols have been completed.

Drilling - Section 2 Reporting of Exploration Results

Drilling- Section 2 Reporting of Exploration Results Drilling- Section 2 Reporting of Exploration Results
(Criteria listed in theprecedingsection also applyto this section.)
Criteria Commentary
Mineral tenement and
land tenure status

SBM has 100% ownership of the 20 tenements comprising the Pinjin Project. These include: E28/2234, E28/2283,
E28/2284, E31/0999, E31/1000, E31/1005, E31/1007, E39/1718, E28/2218, E28/2245, E28/2250, E28/2264,
E28/2357, E28/2375, E28/2445, E31/1056, E31/1082, E28/2246, E28/2247 and E28/2494.
Exploration done by other
parties

There has been numerous historical holders of the project area which covers over ~1,358 square kilometres.

Exploration has been conducted by numerous companies including but not limited to Newmont Pty Ltd, Endeavour
Minerals, WMC, Goldfields Exploration Pty Ltd, Anglo American, Gutnick Resources, Carpentaria Exploration
Company, BHP, Uranez, Placer Exploration Ltd, Jacksons Minerals Limited, Anglo Australian Resources, Troy Resources
NL, Saracen, Hawthorn Resources and Renaissance Minerals Limited.
Geology
SBM is targeting Archean orogenic gold mineralisation near major regional faults.

The tenement package covers Archaean greenstones within the highly prospective Eastern Goldfields Province of the
Yilgarn Craton. The Pinjin project covers portions of the prospective Laverton and Keith-Kilkenny Tectonic Zones
which pass through the eastern and western portions respectively.
Drill hole Information
Drill hole information for holes returning significant results have been reported in the intercept table. Included in the
intercept table are collar position obtained by GPS pickup, hole dip and azimuth acquired from hand held compass
and clinometer, composited mineralised intercepts lengths and depth as well as hole depth. Metres below surface
(mbs) for intercepts were calculated for the start of the intercept.
Data aggregation
methods

Broad down hole intercepts are reported as length weighted averages using a cut-off of 500ppb Au with intercepts
above 1000 ppb Au highlighted. Such intercepts may include internal material below cut-off but no more than 2
sequential meters of such material and except where the average drops below the cut-off. Selvage is only included
where its average grade exceeds 500 ppb Au.

No high grade cut is applied.

No metal equivalent values are used for reportingexploration results.
Relationship between
mineralisation widths and
intercept lengths

Down hole length is reported for all holes; true width is not known as the orientation of mineralisation is not fully
understood.
Other substantive
exploration data

Included in the body of the report.
Diagrams
Diagrams show all drill holes material and immaterial to Exploration Results.
Balanced reporting
Details of all holes material to Exploration Results have been reported in the intercept table, and all other drill holes
drilled during the reporting period are highlighted on diagrams included in the report.
Other substantive
exploration data

Data is included in the body of the report.
Further Work
Further exploration aircore drill holes are planned and is discussed in the body of the report.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xvi

==> picture [377 x 37] intentionally omitted <==

SIMBERI - JORC Code, 2012 Edition – Table 1

Contents

Drilling: Section 1 Sampling Techniques and Data Section 2 Reporting of Exploration Results Trenching: Section 1 Sampling Techniques and Data Section 2 Reporting of Exploration Results Surface Sampling: Section 1 Sampling Techniques and Data Section 2 Reporting of Exploration Results

Drilling - Section 1 Sampling Techniques and Data

Drilling- Section 1 Sampling Techniques and Data Drilling- Section 1 Sampling Techniques and Data
(Criteria in this section applyto the succeedingsection.)
Criteria Commentary
Sampling techniques
Diamond Drilling - Sampled using PQ (85mm), HQ (63.5mm) or HQ3 (61.1mm) and on occasion NQ2 (50.5mm) or NQ3
(45mm) sized core using standard triple tubes. Half core was sampled on nominal 1-metre intervals with the upper or
left - hand side of the core prepped on-site to produce a 200gm pulp sample. A 50gm charge was then extracted from
the 200gmpulpfor Au fire assayand ICP - AES base metal analysis.
Drilling techniques
Diamond Drilling comprised PQ (85mm), HQ (63.5mm) or HQ3 (61.1mm) and on occasion NQ2 (50.5mm) or NQ3
(45mm) core recovered using 1.5m to 3m barrels. When ground conditions permit, an ACT Digital Core Orientation
Instrument was used bythe contractor to orientate the core.
Drill sample recovery
Diamond drilling recovery percentages were measured by comparing actual meters recovered per drill run versus
meters measured on the core blocks. Recoveries averaged over >90% with increased core loss present in fault zones
and zones of strongalteration. No relationshipexists between sample recoveryandgrade.
Logging
Diamond holes are qualitatively geologically logged for lithology, structure and alteration and qualitatively and
quantitatively logged for veining and sulphides. Diamond holes are geotechnically logged with the following
attributes qualitatively recorded - strength, infill material, weathering and shape. Whole core together with half core,
were photographed when wet.

All holes are fullylogged.
Sub-sampling techniques
and sample preparation

Diamond core was sampled largely on 1 metre intervals. Core was cut with the upper or left-hand side of the core
routinely submitted for total pulverisation (85% passing 75 µm). Quality control of sub-sampling consisted of
insertion of blank control samples and coarse reject duplicates ,both at a ratio of 1:20 samples. The samples were
fully prepared at the company’s on-site sample preparation facility on Simberi Island with 200g pulps sent to ALS
Laboratory in Townsville.

Pulpresidues are stored in Townsville for future re-assayif required.
Quality of assay data and
laboratory tests

Half Core samples were analysed for gold using fire assay with a 50g charge and analysis by flame atomic absorption
spectrometry. Base metals were analysed by Aqua Regia digestion using Inductively Coupled Plasma Atomic Emission
Spectroscopy (ICP-AES). QC included insertion of certified reference material (1 in 20); insertion of in-house blank
control material (1 in 20); and the insertion of reject residues (1 in 20). QAQC results were assessed as each
laboratory batch was received and again on a quarterly basis. Results indicate that pulveriser bowls were adequately
cleaned between samples. Overall,the analysis ofgold was sound.
Verification of sampling
and assaying

Sampling data is recorded electronically which ensures only valid non-overlapping data can be recorded. Assay and
downhole survey data are subsequently merged electronically. All drill data is stored in a SQL database on secure
companyserver. No twin holes have been completed.
Location of data points
All Simberi Island collars were surveyed by in-house surveyors using DGPS using Tabar Island Grid (TIG) which is based
on WGS84 ellipsoid and is GPS compatible (RC holes reported in this period are still pending pickup by dGPS). Tatau
and Tabar Island collars were surveyed by hand held GPS. All holes were downhole surveyed using either a Reflex or
Ranger single shot camera with the first reading at about 15m and then approximately every 30m increments to the
bottom-of-the hole.
Data spacing and
distribution

Drilling data is not yet sufficient to establish continuity of the lodes and therefore the drill spacing is irregular and
broad spaced.
Orientation of data in
relation to geological
structure

Where surface mapping and sampling has contributed to understanding of outcropping geological structures, drilling
and sampling has been undertaken orthogonal to the mapped structure.
Sample security
Only company personnel or approved contractors are allowed on drill sites; drill core is only removed from drill site to
secure core logging/processing facility within the gated exploration core yard; core is promptly logged, cut and
prepped on site. The 200gmpulps are then consigned to ALS in Townsville for Au-base metal analysis.
Audits or reviews
No audits or reviews of sampling protocols have been completed.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xvii

==> picture [377 x 37] intentionally omitted <==

Drilling - Section 2 Reporting of Exploration Results

Criteria Commentary
Mineral tenement and
land tenure status

SBM has 100% ownership of the two tenements over the Simberi Islands; ML136 on Simberi Island, and EL609 which
covers the remaining area of Simberi Island, as well as Tatau Island and Big Tabar Island. A 4 sub-block ELA2462 is under
application.
Exploration done by
other parties

CRA, BHP, Tabar JV (Kennecott, Nord Australex and Niugini Mining), Nord Pacific, Barrick and Allied Gold have all
previously worked in this area. Nord Pacific followed by Allied Gold were instrumental in the discovery and delineation
of the 5 main oxide and sulphide deposits at Simberi.
Geology
The Simberi gold deposits are low sulphidation, intrusion related adularia-sericite epithermal gold deposits. The
dominant host rocks for mineralisation are andesites, volcanoclastics and lesser porphyries. Gold mineralisation is
generally associated with sulphides or iron oxides occurring within a variety of fractures, such as simple fracture in-fills,
single vein coatings and crackle brecciation in the more competent andesite units, along andesite/polymict breccia
contact margins as well as sulphide disseminations. On Tatau and Big Tabar Islands, located immediately south of
Simberi, potential also exists forporphyryCu-Au,epithermalquartz Au-Agand carbonate-base metal Au mineralisation.
Drill hole Information
Drill hole information is included in intercept table outlining collar position obtained by DGPS pickup, hole dip and
azimuth acquired from a downhole surveying camera as discussed in section 1, composited mineralized intercepts
lengths and depth as well as hole depth. Metres below surface (Mbs) for intercepts were calculated by measuring the
distance between the midpoint of the intercept and a Lidar surveybased topographic surface.
Data aggregation
methods

Broad down hole intercepts are reported as length weighted averages using a cut-off of 0.5 g/t Au and a minimum
grade*length of 5gmpt. Such intercepts may include material below cut-off but no more than 5 sequential meters of
such material and except where the average drops below the cut-off. Selvage is only included where its average grade
exceeds 0.5 g/t Au.

Using the same criteria for included sub-grade, supplementary cut-offs, of 2.5g/t Au, 5.0g/t Au and 10g/t Au, may be
used to highlight higher grade zones and spikes within the broader aggregated interval. Single assays intervals are
reported only where ≥5.0g/t Au and ≥1m down hole. In core holes, core loss is assigned zero grade. No high grade cut
is applied.

No metal equivalent values are used for reportingexploration results.
Relationship between
mineralisation widths
and intercept lengths

Down hole length is reported for all holes; true width is not known as the orientation of the orebody is not fully
understood.
Diagrams
Diagrams show all drill holes material and immaterial to Exploration Results.
Balanced reporting
Details of all holes material to Exploration Results have been reported in the intercept table, and all other drill holes
drilled duringthe reporting period are highlighted on diagrams included in the report.
Other substantive
exploration data

Included in the body of the report. Core holes are routinely measured for bulk density determinations to be used for
future resource modelling.
Further work
Included in the body of the report.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xviii

==> picture [377 x 37] intentionally omitted <==

Trenching - Section 1 Sampling Techniques and Data

Criteria Commentary
Sampling techniques
Sampling of trenches was done over measured intervals of between 1 and 5 meters dependent on geology. A geo-pick
was used to collect a continuous channel sample from the trench faces across the designated interval with the samples
collected in calico bags. Samples (3 to 5kg) were prepped on-site (jaw crushed, disk mill pulverised and then split) to
produce a 200g pulp sample. A 25g charge was then extracted from the pulp for Au analyses by Aqua Regia digestion
followed by an Atomic Absorption Spectroscopy (AAS) instrument finish.
Trenching/Benching
techniques

Trenches were created by both hand and mechanical techniques. Hand trenches were dug using spades, crowbars and
shovels to depths of between 1 and 2 meters. Creek channel sampling is conducted in the same manner as trenches,
where continuous exposure of bedrock is made by hand clearing of vegetation and cover. Mechanised trenches were
dug by an excavator or dozer exposing up to 5 meters of trench wall.
Drill sample recovery
N/A
Logging / Mapping
All trenches were qualitatively geologically mapped for lithology, structure and alteration.
Sub-sampling
techniques and sample
preparation

Samples are routinely submitted for total pulverisation (85% passing <75 µm) at the company onsite sample
preparation facility on Simberi Island.

200g pulps are sent to St Barbara’s Simberi Laboratory where a 25g sub-sample is taken.

For Banesa trench samples, the 200g pulps were sent to ALS, Townsville for analysis.
Quality of assay data
and laboratory tests

The Mine Lease samples were analysed for gold at the Simberi Lab using Aqua Regia digestion with a 25g charge and
analysis by Atomic Absorption Spectrometry.

The West Simberi and Banesa samples were analysed for gold at ALS (Townsville) via 50g fire assay and AAS finish
(Method Au26). At Banesa, Cu, Ag, As, Fe, Mo, Pb, S, Sb and Zn were analysed via Nitric Aqua Regia Digestion and ICP-
AES Finish (Method ME-ICP41).

QC included the insertion of two in house blanks at the start of each batch of trench samples, the insertion of certified
copper-gold standards (1:100) as well as the collection of field duplicates (1:100).
Verification of sampling
and assaying

Sampling data is recorded electronically which ensures only valid non-overlapping data can be recorded. Assay and
trench survey data are subsequently merged electronically. All data is stored in a SQL database on secure company
server.
Location of data points
All trenches were initially surveyed by a handheld GPS to capture the trench start point. The GPS used the Tabar Island
Grid (TIG) which is based on WGS84 ellipsoid. The path of the trench from the initial start point to the end was surveyed
by Tape & Compass method. Trench interval coordinates were then generated using basic trigonometry.

Selected recent trenches have been picked up using dGPS.
Data spacing and
distribution

Trench data spacing is irregular and broad spaced.
Orientation of data in
relation to geological
structure

Where preceding surface mapping and sampling of trenches has contributed to understanding of outcropping
geological structures, trenching and sampling has been undertaken to extend the strike length of the mapped structure.
However, in many of the areas the lode orientation is poorly understood.
Sample security
Only company personnel or approved contractors are allowed on drill sites; drill core is only removed from drill site to
secure core logging/processing facility within the gated exploration core yard; core is promptly logged, cut and prepped
on site. The 200gm pulps are then consigned to ALS in Townsville for Au-base metal analysis.
Audits or reviews
No audits or reviews of sampling protocols have been completed.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xix

==> picture [377 x 37] intentionally omitted <==

Trenching - Section 2 Reporting of Exploration Results

Criteria Commentary
Mineral tenement and
land tenure status

SBM has 100% ownership of the two tenements over the Simberi Islands; ML136 on Simberi Island, and EL609 which
covers the remaining area of Simberi Island, as well as Tatau Island and Big Tabar Island. A 4 sub-block ELA2462 is under
application.
Exploration done by
other parties

CRA, BHP, Tabar JV (Kennecott, Nord Australex and Niugini Mining), Nord Pacific, Barrick and Allied Gold have all
previously worked in this area. Nord Pacific followed by Allied Gold was instrumental in the discovery and delineation of
the 5 main oxide and sulphide deposits at Simberi.
Geology
The Simberi gold deposits are low sulphidation, intrusion related adularia-sericite epithermal gold deposits. The
dominant host rocks for mineralisation are andesites, volcanoclastics and lesser porphyries. Gold mineralisation is
generally associated with sulphides or iron oxides occurring within a variety of fractures, such as simple fracture in-fills,
single vein coatings and crackle brecciation in the more competent andesite units, along andesite/polymict breccia
contact margins as well as sulphide disseminations. On Tatau and Big Tabar Islands, located immediately south of
Simberi, potential also exists for porphyry Cu-Au, epithermal quartz Au-Ag and carbonate-base metal Au mineralisation.
Trench/Bench
Information

Included in the report text and annotated on diagrams.
Data aggregation
methods

Broad trench intercepts are spikes within the broader aggregated interval using a cut-off of 0.5 g/t Au and a minimum
gradelength of 5gmpt. Such intercepts may include material below cut-off but no more than 5 sequential meters of
such material and except where the average drops below the cut-off. Selvage is only included where its average grade
exceeds 0.5 g/t Au.

Using the same criteria for included sub-grade, supplementary cut-offs, of 2.5g/t Au, 5.0g/t Au and 10g/t Au, may be
used to highlight higher grade zones and spikes within the broader aggregated interval. Single assays intervals are
reported only where ≥1.0g/t and ≥5m trench length is intercepted. No high grade cut is applied.

At Banesa, the same method is applied to aggregate gold grades using a 0.5 g/t cut-off grade and minimum
grade
length of 5gmpt with no more than 5m of internal dilution and similar selvage restrictions. Within the
corresponding Au intercept, Cu grades are reported if above 0.1% Cu. For defining copper intercepts a minimum of
0.1% Cu cut-off grade over 5m is used to define copper aggregated intervals with the corresponding gold grade
reported where it is above 0.1g/t Au. Gold grades below this are not reported. Such intercepts may include material
below cut-off but no more than 10 sequential meters of such material and except where the average drops below the
cut-off. Selvage is only included where its average grade exceeds 0.1 %Cu. Supplementary copper grades above 0.2%
Cu and/or 0.5 g/t Au are used to highlight higher gold or copper grade zones within the broad zone. No high grade cut is
applied.

No metal equivalent values are used for reporting exploration results.
Relationship between
mineralisation widths
and intercept lengths

Trench intercepts are sampled along the length of the trench and are reported for all trenches; true width is not
reported.
Diagrams
Diagrams show all trenches material and immaterial to Exploration Results.
Balanced reporting
Details of all trenches material to Exploration Results have been reported in the text, and all other trenches dug during
the reporting period are highlighted on diagrams included in the report.
Other substantive
exploration data

Included in the body of the report.
Further work
Included in the body of the report.

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xx

==> picture [377 x 37] intentionally omitted <==

Surface Sampling - Section 1 Sampling Techniques and Data

(Criteria in this section applyto all succeedingsections.) (Criteria in this section applyto all succeedingsections.)
Criteria Commentary
Sampling techniques
Soil samples were collected by first digging through the organic A horizon until the B horizon was reached
(Approximately 40cm depth). A bulk sample of approximately 3kg was then collected in a calico bag.
Drilling techniques
N/A
Drill sample recovery
N/A
Logging
All rock chip, float and soil samples were qualitatively logged for lithology, alteration, weathering and colour.
Sub-sampling techniques
and sample preparation

Rock chip, float and soil samples were fully prepared at the company’s on-site sample preparation facility on Simberi
Island with 200g pulps sent to ALS Laboratory in Townsville for analysis.
Quality of assay data and
laboratory tests

Rock chip, float and soil samples were analysed for gold by ALS Townsville using Aqua Regia digestion with a 50g
charge and analysis by Inductively Coupled Plasma Mass Spectroscopy. Base metals were analysed using Inductively
Coupled Plasma Atomic Emission Spectroscopy (ICP-AES). QC included insertion of field duplicates (1:100) and low
level gold standards (1:100).
Verification of sampling
and assaying

N/A
Location of data points
All sampling sites were surveyed by a hand held GPS using Tabar Island Grid (TIG) which is based on WGS84 ellipsoid
and is GPS compatible.
Data spacing and
distribution

The sampling programs were designed to test the West Simberi catchment areas such that further stages of
exploration could be planned.
Orientation of data in
relation to geological
structure

N/A
Sample security
Only trained company personnel were allowed to collect the samples; All samples were held within a secure company
building before dispatch to ALS in Townsville for Au-base metal analysis.
Audits or reviews
No audits or reviews of sampling protocols have been completed.

Surface Sampling - Section 2 Reporting of Exploration Results

(Criteria listed in theprecedingsection also applyto this section.) (Criteria listed in theprecedingsection also applyto this section.)
Criteria Commentary
Mineral tenement and
land tenure status

SBM has 100% ownership of the two tenements over the Simberi Islands; ML136 on Simberi Island, and EL609 which
covers the remaining area of Simberi Island, as well as Tatau Island and Big Tabar Island. A 4 sub-block ELA2462 is under
application.
Exploration done by
other parties

CRA, BHP, Tabar JV (Kennecott, Nord Australex and Niugini Mining), Nord Pacific, Barrick and Allied Gold have all
previously worked in this area. Nord Pacific followed by Allied Gold was instrumental in the discovery and delineation of
the 5 main oxide and sulphide deposits at Simberi.
Geology
The Simberi gold deposits are low sulphidation, intrusion related adularia-sericite epithermal gold deposits. The
dominant host rocks for mineralisation are andesites, volcanoclastics and lesser porphyries. Gold mineralisation is
generally associated with sulphides or iron oxides occurring within a variety of fractures, such as simple fracture in-fills,
single vein coatings and crackle brecciation in the more competent andesite units, along andesite/polymict breccia
contact margins as well as sulphide disseminations. On Tatau and Big Tabar Islands, located immediately south of
Simberi, potential also exists for porphyry Cu-Au, epithermal quartz Au-Ag and carbonate-base metal Au mineralisation.
Drill hole Information
N/A
Data aggregation
methods

N/A
Relationship between
mineralisation widths
and intercept lengths

N/A
Diagrams
Figures show all sample sites material and immaterial to Exploration Results.
Balanced reporting
All trench and soils sample locations with any significant results are shown in Figures.
Other substantive
exploration data

Included in the body of the report.
Further work
Included in the body of the report.

End of report

St Barbara Limited Quarterly Report / Q1 September 2016

Exploration Figures and tables xxi