Management's Discussion and Analysis of Financial Condition and Results of Operations

December 31, 2024
(Expressed in U.S. dollars)


SouthGobi Resources Ltd.
Management's Discussion and Analysis

FORWARD-LOOKING STATEMENTS

Except for statements of fact relating to SouthGobi Resources Ltd. and its subsidiaries (collectively, the "Company"), certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "could", "should", "seek", "likely", "estimate" and other similar words or statements that certain events or conditions "may" or "will" occur. Forward-looking statements relate to management's future outlook and anticipated events or results and are based on the opinions and estimates of management at the time the statements are made. Forward-looking statements in this Management's Discussion and Analysis of Financial Condition and Results of Operations ("MD&A") include, but are not limited to, statements regarding:

  • the Company continuing as a going concern and its ability to realise its assets and discharge its liabilities in the normal course of operations as they become due;
  • adjustments to the amounts and classifications of assets and liabilities in the Company's consolidated financial statements and the impact thereof;
  • the Company's expectations of sufficient liquidity and capital resources to meet its ongoing obligations and future contractual commitments, including the Company's ability to settle its trade payables, to secure additional funding and to meet its obligations under each of the JD Zhixing Fund L.P. ("JDZF") convertible debenture (the "Convertible Debenture"), and the 2025 March Deferral Agreement (as defined below) as the same become due, the Company's ability to settle the tax penalty payable of $26.5 million imposed by the Mongolian Tax Authority ("MTA") and a provision for additional late tax penalty of $19.0 million;
  • the Company's anticipated financing needs, operational and development plans and future production levels, including ramp up of the Company's mining operations and capacity in 2025;
  • the results and impact of the Ontario class action (as described under Section 7 of this MD&A under the heading entitled "Regulatory Issues and Contingencies – Lawsuit");
  • the estimates and assumptions included in the Company's impairment analysis and the possible impact of changes thereof;
  • the construction and operation of the Dry Coal Separation System (as defined below) at the Company's Ovoot Tolgoi Mine;
  • the agreement with Ejin Jinda and the payments thereunder (as described under Section 7 of this MD&A under the heading entitled "Regulatory Issues and Contingencies – Toll Wash Plant Agreement with Ejin Jinda");
  • the ability of the Company to enhance the operational efficiency and output throughput of the washing facilities at Ovoot Tolgoi;
  • the ability of the Company to enhance the product value by conducting coal processing and coal washing;
  • the impact of the Company's activities on the environment and actions taken for the purpose of mitigation of potential environmental impacts and planned focus on health, safety and environmental performance;
  • the future demand for coal in China;
  • future trends in the Chinese coal industry;
  • the Company's outlook and objectives for 2025 and beyond (as more particularly described under Section 15 of this MD&A under the heading entitled "Outlook"); and
  • other statements that are not historical facts.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Forward-looking information is based on certain factors and assumptions described below and elsewhere in this MD&A, including, among other things: the current mine plan for the Ovoot Tolgoi mine; mining, production, construction and exploration activities at the Company's mineral properties; the costs relating to anticipated capital expenditures; the capacity and future toll rate of the paved highway; plans for the progress of mining license application processes; mining methods; the Company's anticipated business activities, planned expenditures and corporate strategies; management's business outlook, including the outlook for 2025 and beyond; currency exchange rates; operating, labour and fuel costs; the ability of the Company to raise additional financing; the anticipated royalties payable under Mongolia's royalty regime; the ability of the Company to settle the tax penalty payable of $26.5 million imposed by the MTA and a provision for additional late tax penalty of $19.0 million; the future coal market conditions in China and the related impact on the Company's margins and liquidity; the anticipated demand for the Company's coal products; future coal prices, and the level of worldwide coal production. While the Company considers these assumptions to be reasonable based on the information currently available to it, they may prove to be incorrect. Forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These risks and uncertainties include, among other things: the uncertain nature of mining activities, actual capital and operating costs exceeding management's estimates; variations in mineral resource and mineral reserve estimates; failure of plant, equipment or processes to operate as anticipated; the possible impacts of changes in mine life, useful life or depreciation rates on depreciation expenses; risks associated with, or changes to regulatory requirements (including environmental regulations) and the ability to obtain all necessary regulatory approvals; the potential expansion of the list of licenses published by the Government of Mongolia covering areas in which exploration and mining are purportedly prohibited on certain of the Company's mining licenses; the Government of Mongolia designating any one or more of the Company's mineral projects in Mongolia as a Mineral Deposit of Strategic Importance; the risk that the Company is unable to successfully settle the tax penalty payable of $26.5 million imposed by the MTA and a provision for additional late tax penalty of $19.0 million (as described under Section 1 of this MD&A under the heading entitled "Significant Events and Highlights – Additional Tax and Tax Penalty Imposed by the MTA"); the risk that the import coal quality standards established by Chinese authorities will negatively impact the Company's operations; the risk that Mongolia's southern borders with China will be subject to further closure; the risk that the Company's existing coal inventories are unable to sufficiently satisfy expected sales demand; the possible impact of changes to the inputs to the valuation model used to value the embedded derivatives in the Convertible Debenture; the risk of the Company or its subsidiaries default under its existing debt obligations, including the Convertible Debenture and the deferral agreement signed on March 20, 2025 (the "2025 March Deferral Agreement"); the impact of amendments to, or the application of, the laws of Mongolia, China and other countries in which the Company carries on business; modifications to existing practices so as to comply with any future permit conditions that may be imposed by regulators; delays in obtaining approvals and lease renewals; the risk of fluctuations in coal prices and changes in China and world economic conditions; the outcome of the Class Action (as described under Section 7 of this MD&A under the heading entitled "Regulatory Issues and Contingencies – Lawsuit") and any damages payable by the Company as a result; the risk that the calculated sales price determined by the Company for the purposes of determining the amount of royalties payable to the Mongolian government is deemed as being "non-market" under Mongolian tax law; customer credit risk; cash flow and liquidity risks; risks relating to the Company's decision to suspend activities relating to the development of the Ceke Logistics Park project, including the risk that its investment partner may initiate legal action against the Company for failing to comply with the underlying agreements governing project development; risks relating to the ability of the Company to enhance the operational efficiency and the output throughput of the washing facilities at Ovoot Tolgoi and risks relating to the Company's ability to raise additional financing and to continue as a going concern. Please refer to Section 14 of this MD&A under the heading entitled "Risk Factors" for a discussion of these and other risks and uncertainties relating to the Company and its operations. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements.

December 31, 2024
Page | 3


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Due to assumptions, risks and uncertainties, including the assumptions, risks and uncertainties identified above and elsewhere in this MD&A, actual events may differ materially from current expectations. The Company uses forward-looking statements because it believes such statements provide useful information with respect to the currently expected future operations and financial performance of the Company, and cautions readers that the information may not be appropriate for other purposes. Except as required by law, the Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on the forward-looking statements, which speak only as of the date of this MD&A they should not rely upon this information as of any other date.

December 31, 2024
Page | 4


SouthGobi Resources Ltd.
Management's Discussion and Analysis

TABLE OF CONTENTS

  1. Overview... 7
    Significant Events and Highlights... 7
  2. Selected Annual Information... 11
  3. Overview of Operational Data and Financial Results... 12
  4. Non-IFRS Financial Measures... 18
  5. Properties... 19
    Operating Mine... 19
    Mining Operations... 20
  6. Liquidity and Capital Resources... 20
  7. Regulatory Issues and Contingencies... 29
  8. Environment... 32
  9. Emolument Policy... 33
  10. Outstanding Share Data... 34
  11. Disclosure Controls and Procedures and Internal Controls Over Financial Reporting... 34
  12. Critical Accounting Estimates and Judgments... 35
  13. Recent Accounting Promouncements... 35
  14. Risk Factors... 36
  15. Outlook... 53

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

INTRODUCTION

This MD&A is dated as of March 28, 2025 and should be read in conjunction with the consolidated financial statements of the Company and the notes thereto for the year ended December 31, 2024. The Company's consolidated financial statements have been prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board ("IFRS Accounting Standards").

The consolidated financial statements are presented in the U.S. Dollar, which is the functional currency of SouthGobi Resources Ltd. and its controlled subsidiaries, except as subsequently mentioned.

The functional currency of the Company's Chinese subsidiaries (SouthGobi Trading (Beijing) Co., Ltd., Inner Mongolia SouthGobi Energy Co., Ltd., Inner Mongolia SouthGobi Mining Development Co., Ltd., Inner Mongolia SouthGobi Enterprise Co., Ltd., Inner Mongolia SouthGobi Trading Co., Ltd. and Wuhai SouthGobi Mining Resources Co., Ltd.) was Renminbi ("RMB") and the functional currency of the Company's Mongolian operations (Southgobi Sands LLC ("SGS"), Mazaalai Resources LLC, TST Coal Trans LLC, RDCC LLC, Nariinsukhait Railway LLC and Shiveekhuren Terminal LLC), was the Mongolian Tugrik ("MNT").

All figures in this MD&A are presented in U.S. dollars unless otherwise stated.

Disclosure of a scientific or technical nature in this MD&A in respect of the Company's material mineral projects was prepared by or under the supervision of the individuals set out in the table below, each of whom is a "Qualified Person" as that term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") of the Canadian Securities Administrators:

Property Qualified Persons Field of Expertise Relationship to Company
Ovoot Tolgoi Jaydee Ammugauan Resources Independent Consultant
Ovoot Tolgoi Tao Xu Reserves Independent Consultant
Soumber Jaydee Ammugauan Resources Independent Consultant
Soumber Tao Xu Reserves Independent Consultant

Disclosure of a scientific or technical nature relating to the Ovoot Tolgoi Mine contained in this MD&A is derived from a technical report (the "Ovoot Tolgoi Technical Report") prepared in accordance with NI 43-101 on the Ovoot Tolgoi Mine dated December 2, 2024, prepared by Mr. Jaydee Ammugauan, Mr. Tao Xu and Mr. Larry Li of BAW Mineral Partners Limited ("BAW"). A copy of the Ovoot Tolgoi Technical Report is available under the Company's profile on SEDAR+ at www.sedarplus.ca. BAW has not reviewed or updated the Ovoot Tolgoi Technical Report since the date of publishing.

Disclosure of a scientific or technical nature relating to the Soumber Deposit contained in this MD&A is derived from a technical report (the "Soumber Technical Report") prepared in accordance with NI 43-101 on the Soumber Deposit dated December 2, 2024, prepared by Mr. Jaydee Ammugauan, Mr. Tao Xu and Mr. Larry Li of BAW. A copy of the Soumber Technical Report is available under the Company's profile on SEDAR+ at www.sedarplus.ca. BAW has not reviewed or updated the Soumber Technical Report since the date of publishing.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

1. OVERVIEW

The Company is an integrated coal mining, development and exploration company with 768 employees as at December 31, 2024. The Company's common shares ("Common Shares") are listed for trading on the Hong Kong Stock Exchange ("HKEX") under the stock code 1878 and on the TSX Venture Exchange ("TSX-V") under the symbol SGQ.

The Company owns a 100% interest in the Ovoot Tolgoi open pit coal mine (the "Ovoot Tolgoi Mine"), as well as in the following development projects, the Soumber Deposit and the Zag Suuj Deposit. These projects are located in the Umnugobi Aimag (South Gobi Province) of Mongolia, all of which are located within 150 kilometers ("km") of each other and in close proximity to the China-Mongolian border.

The Ovoot Tolgoi Mine, strategically located approximately 40km from the Shivee Khuren-Ceke crossing at the China-Mongolia border ("Shivee Khuren Border Crossing"), is the Company's flagship asset. The Company commenced mining at the Ovoot Tolgoi Mine in 2008. The Company sells a portion of its coal at the mine-gate to Chinese customers, while the remaining coal inventory is transported to China and sold via its Chinese subsidiaries at the stockyards in Ceke (Ceke, on the Chinese side of the Shivee Khuren Border Crossing, which is a major Chinese coal distribution terminal with rail connections to key coal markets in China) or certain designated locations in China as requested by customers.

Saleable products from the Ovoot Tolgoi Mine primarily consist of SouthGobi standard ("Standard") and SouthGobi premium ("Premium") semi-soft coking coal products. Some higher ash content product is processed and sold as semi-soft coking coal product while some of the unwashed product is sold as a thermal coal product.

Significant Events and Highlights

The Company's significant events and highlights for the year ended December 31, 2024 and the subsequent period to March 28, 2025 are as follows:

  • Operating Results – The Company increased the scale of its mining operations in 2024, as well as implementing various coal processing methods, including screening, wet washing and dry coal processing, which have resulted in improved coal quality and enhanced production volume and growth of coal export volume into China during the year.

In response to the market demand for different coal products, the Company focused on expanding the categories of coal products in its portfolio, including mixed coal, wet washed coal and dry processed coal. In addition, the Company has experienced success with processing its inventory of F-grade coal products through cost-effective screening procedures. As a result of the improvement in the quality of the processed F-grade coal, the Company was able to meet the import coal quality standards established by Chinese authorities and has been exporting this product to China for sale since the first quarter of 2024, further enhancing the Company's coal export volume.

The Company recorded sales volume of 7.0 million tonnes in 2024 compared to 3.6 million tonnes in 2023, while the Company recorded an average realised selling price of $70.4 per tonne in 2024 compared to $93.0 per tonne in 2023. The decrease in the average realised selling price was mainly due to the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products.

December 31, 2024


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

  • Financial Results – The Company recorded a $153.9 million profit from operations in 2024 compared to $75.9 million profit from operations in 2023. The financial results for 2024 were impacted by the expansion of its sales network and diversification of its customer base, and a reversal of additional tax and tax penalty of $48.5 million, which was recorded in the fourth quarter of 2024.

  • Build-Operate-Transfer Agreement – On July 15, 2024, the Company’s wholly-owned Mongolian subsidiary, SGS, entered into a Build-Operate-Transfer agreement (the "BOT Agreement") with Tangshan Shenzhou Manufacturing Group Co., Ltd ("Tangshan"), pursuant to which Tangshan will be responsible for the construction, operation, and quality management of a new dry coal separation system, including key machinery (collectively, the "Dry Coal Separation System") at the Company’s Ovoot Tolgoi Mine in Mongolia, which will be a stand-alone plant separate from the Company’s existing dry processing plant. Tangshan will also be responsible for the construction of all related facilities for the Dry Coal Separation System. Under the BOT Agreement, SGS has the right to supervise and manage the overall work of coal quality assurance and operation, including, but not limited to, the supervision and management of operational safety, production planning, and operations management.

The total consideration payable by the Company over the term of the BOT Agreement is approximately $10.9 million, together with certain additional processing volume-based fees. Subject to the terms as set out therein, the BOT Agreement is effective from July 15, 2024 until October 1, 2029.

  • Additional Tax and Tax Penalty Imposed by the MTA – On July 18, 2023, SGS received an official notice (the "Notice") issued by the MTA stating that the MTA had completed a periodic tax audit (the "Audit") on the financial information of SGS for the tax assessment years between 2017 and 2020, including transfer pricing, royalty, air-pollution fee and unpaid tax payables. As a result of the Audit, the MTA notified SGS that it is imposing a tax penalty against SGS in the amount of approximately $75.0 million. The penalty mainly relates to the different view on the interpretation of tax law between the Company and the MTA. Under Mongolian law, the Company had a period of 30 days from the date of receipt of the Notice to file an appeal in relation to the Audit. Subsequently the Company engaged an independent tax consultant in Mongolia to provide tax advice and support to the Company and filed an appeal letter in relation to the Audit with the MTA in accordance with Mongolian laws on August 17, 2023.

On February 8, 2024, SGS received notice from the Tax Dispute Resolution Council ("TDRC") which stated that, after the TDRC's review, the TDRC issued a decision in relation to SGS' appeal of the Audit, and ordered that the audit assessments set forth in the Notice of July 18, 2023 be sent back to the MTA for review and re-assessment.

On February 22, 2024, SGS received another notice from the MTA stating that the MTA anticipated commencing the re-assessment process on or about March 7, 2024 and the duration of such process will be approximately 45 working days.

On May 15, 2024, SGS received a notice (the "Revised Notice") from the MTA regarding the reassessment result on the Audit (the "Re-assessment Result"). The re-assessed amount of the tax penalty is approximately $80.0 million. In accordance with applicable Mongolian laws, SGS is entitled to file an appeal to the TDRC regarding the Re-assessment Result within a 30-day period from the date of receiving the Revised Notice.

On June 12, 2024, following consultation with its independent tax consultant in Mongolia, SGS submitted an appeal letter to the TDRC regarding the Re-assessment Result, in accordance with applicable Mongolian laws.

December 31, 2024
Page | 8


SouthGobi Resources Ltd.
Management's Discussion and Analysis

On January 10, 2025, SGS received a resolution dated December 19, 2024 (the "Resolution") from the TDRC in response to the appeal letter sent by SGS to the TDRC on June 12, 2024, relating to the Re-assessment Result. As set forth in the Resolution, the TDRC has determined to reduce the re-assessed amount of tax penalty against SGS from approximately $80.0 million to approximately $26.5 million (the "Revised Re-assessment Result"). In accordance with the applicable Mongolian laws, SGS is entitled to file an appeal to the Administrative Court in Ulaanbaatar, Mongolia ("Administrative Court") regarding the Revised Re-assessment Result within a 30-day period from the date of receiving the Resolution. After careful consideration and consultation with the Company's independent tax consultant in Mongolia, the Company has determined not to pursue a further appeal of the Revised Re-assessment Result with the Administrative Court.

As at December 31, 2024, the Company recorded an additional tax and tax penalty in the amount of $45.5 million (2023: $85.1 million), which consists of a tax penalty payable of $26.5 million (2023: $75.0 million) and a provision for additional late tax penalty of $19.0 million (2023: $10.1 million). As a result of the Revised Re-assessment Result, the Company recorded a reversal of additional tax and tax penalty of $48.5 million in 2024 (2023: $nil). To date, the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty. The Company anticipates paying down the outstanding amount of the tax and tax penalty from cash generated from operations in the normal course. According to Mongolian tax law, the Mongolian tax authority has a legal authority to demand payment of the outstanding amount of the Revised Re-assessment Result from the Company at its discretion.

  • 2025 March Deferral Agreement – On March 20, 2025, the Company and JDZF entered into the 2025 March Deferral Agreement pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and payment-in-kind interest ("PIK Interest"), management fees, and related deferral fees in the aggregate amount of approximately $111.6 million which will be due and payable to JDZF on or before August 31, 2025 pursuant to the deferral agreement dated March 19, 2024 and the deferral agreement dated April 30, 2024; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2025 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2025 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2025 under the Convertible Debenture; and (iv) management fees in the aggregate amount of approximately $6.1 million payable to JDZF on May 16, 2025, August 15, 2025, November 15, 2025 and February 15, 2026, respectively, under the amended and restated mutual cooperation agreement (the "Amended and Restated Cooperation Agreement") (collectively, the "2025 March Deferred Amounts").

The effectiveness of the 2025 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2025 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2025 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The Company will be seeking approval of the 2025 March Deferral Agreement from disinterested shareholders at the Company's upcoming annual general meeting ("AGM") of shareholders, which will be held at a future date to be set by the Board.

The principal terms of the 2025 March Deferral Agreement are as follows:

  • Payment of the 2025 March Deferred Amounts will be deferred until August 31, 2026 (the "2025 March Deferral Agreement Deferral Date").
  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2025 March Deferred Amounts,

December 31, 2024
Page | 9


SouthGobi Resources Ltd.
Management's Discussion and Analysis

commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.

  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2025 March Deferred Amounts commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.
  • The 2025 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2025 March Deferred Amounts or related deferral fees. Instead, the 2025 March Deferral Agreement requires the Company to use its best efforts to pay the 2025 March Deferred Amounts and related deferral fees due and payable under the 2025 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2025 March Deferral Agreement and ending as of the 2025 March Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2025 March Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.
  • If at any time before the 2025 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

Changes in Directors and Management

Ms. Chonglin Zhu: Ms. Zhu was appointed as Chief Financial Officer on February 2, 2024.

Mr. Alan Ho: Mr. Ho was redesignated from Chief Financial Officer to a new management position within the Company on February 2, 2024.

Mr. Fan Keung Vic Choi: Mr. Choi was elected as an independent non-executive director at the Company's AGM held on June 27, 2024.

Mr. Mao Sun: Mr. Sun did not stand for the re-election at the AGM and ceased to be an independent non-executive director on June 27, 2024.

  • Going Concern – Several adverse conditions and material uncertainties relating to the Company cast significant doubt upon the going concern assumption which includes the deficiencies in assets and working capital.

Refer to Section 6 of this MD&A under the heading entitled "Liquidity and Capital Resources" and Section 14 of this MD&A under the heading entitled "Risk Factors" for details.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

2. SELECTED ANNUAL INFORMATION

$ in thousands, except per share and per tonne information

Revenue

Profit from operations

Net profit/(loss) attributable to equity holders of the Company

Basic earnings/(loss) per share

Diluted earnings/(loss) per share

Cash from operating activities

Cash used in investing activities

Cash used in financing activities

Coal sales volumes (millions of tonnes) (i)

Average realised selling price (per tonne)

$ in thousands

Cash and cash equivalents

Total working capital deficiency

Total assets

Total non-current liabilities

(i) Coal sales volumes are from the Ovoot Tolgoi Mine.

Year ended December 31,
2024 2023 2022
$ 493,378 $ 331,506 $ 73,084
153,942 75,870 13,572
92,497 908 (30,419)
$ 0.312 $ 0.003 $ (0.110)
0.311 0.003 (0.110)
107,916 160,839 26,137
(123,115) (49,944) (13,037)
(23,821) (72,587) (1,427)
7.02 3.59 1.11
$ 70.40 $ 93.02 $ 65.69

As at December 31,

2024 2023 2022
$ 8,590 $ 47,993 $ 9,255
(228,134) (218,815) (184,665)
429,853 295,738 181,359
97,883 102,900 91,723

Following the reopening of the Ceke Port of Entry in May 2022, the Company experienced increased revenues which was achieved by a higher selling price and a higher tonnage, while profit from operations increased to $13.6 million in 2022.

The Company resumed its major mining operations, including coal mining, in late 2022 and coal washing operations in April 2023. The Company experienced an increase in the average selling price and a higher tonnage in 2023 as compared to 2022, while profit from operations increased to $75.9 million in 2023 as a result of improved market conditions in China, expansion of its sales network and diversification of its customer base.

The Company increased the scale of its mining operations in 2024, as well as implementing various coal processing methods, including screening, wet washing and dry coal processing, which have resulted in improved coal quality and enhanced production volume and growth of coal export volume into China during the year. The Company recorded sales volume of 7.0 million tonnes in 2024 compared to 3.6 million tonnes in 2023, while the Company recorded an average realised selling price of $70.4 per tonne in 2024 compared to $93.0 per tonne in 2023. The decrease in the average realised selling price was mainly due to the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

3. OVERVIEW OF OPERATIONAL DATA AND FINANCIAL RESULTS

Summary of Annual Operational Data

Year ended December 31,
2024 2023
Sales Volumes, Prices and Costs
Premium semi-soft coking coal
Coal sales (millions of tonnes) 0.91 2.08
Average realised selling price (per tonne) $ 105.10 $ 106.91
Standard semi-soft coking coal/ premium thermal coal
Coal sales (millions of tonnes) 2.96 0.53
Average realised selling price (per tonne) $ 71.86 $ 70.58
Standard thermal coal
Coal sales (millions of tonnes) 0.86 -
Average realised selling price (per tonne) $ 38.40 $ -
Processed coal
Coal sales (millions of tonnes) 2.29 0.98
Average realised selling price (per tonne) $ 66.62 $ 75.23
Total
Coal sales (millions of tonnes) 7.02 3.59
Average realised selling price (per tonne) $ 70.40 $ 93.02
Raw coal production (millions of tonnes) 10.20 4.05
Cost of sales of product sold (per tonne) $ 51.37 $ 44.07
Direct cash costs of product sold (per tonne) (i) $ 39.56 $ 30.46
Mine administration cash costs of product sold (per tonne) (i) $ 1.58 $ 1.39
Total cash costs of product sold (per tonne) (i) $ 41.14 $ 31.85
Other Operational Data
Production waste material moved (millions of bank cubic meters) 59.47 25.71
Strip ratio (bank cubic meters of waste material per tonne of coal produced) 5.84 6.36
Lost time injury frequency rate (ii) 0.06 0.17

(i) A non-IFRS financial measure, refer to section 4. Cash costs of product sold exclude idled mine asset cash costs.
(ii) Per 200,000 man hours and calculated based on a rolling 12-month average.

Overview of Annual Operational Data

The Company recorded an average realised selling price of $70.4 per tonne for 2024 compared to $93.0 per tonne for 2023. The decrease was mainly due to the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products. The product mix for 2024 consisted of approximately 13% of premium semi-soft coking coal, 42% of standard semi-soft coking coal/premium thermal coal, 12% of standard thermal coal and 33% of processed coal compared to approximately 58% of premium semi-soft coking coal, 15% of standard semi-soft coking coal/premium thermal coal and 27% of processed coal in 2023.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

The Company's unit cost of sales of product sold was $51.4 per tonne in 2024 compared to $44.1 per tonne in 2023. The increase was due to change in product mix with the Company expanding into certain categories of processed coal with higher production costs.

Summary of Annual Financial Results

$ in thousands, except per share information Year ended December 31,
2024 2023
Revenue (i) $ 493,378 $ 331,506
Cost of sales (i) (360,588) (158,195)
Gross profit excluding idled mine asset costs (ii) 133,286 173,487
Gross profit 132,790 173,311
Other operating expenses, net (3,698) (870)
Administration expenses (13,454) (10,437)
Evaluation and exploration expenses (1,362) (991)
Reversal of/(provision for) additional tax and tax penalty 39,666 (85,143)
Profit from operations 153,942 75,870
Finance costs (37,766) (49,072)
Finance income 3,626 5,084
Share of earnings of joint ventures 3,227 2,840
Share of earnings of associates 587 4
Current income tax expenses (31,119) (33,818)
Net profit attributable to equity holders of the Company 92,497 908
Basic earnings per share $ 0.312 $ 0.003
Diluted earnings per share $ 0.311 $ 0.003

(i) Revenue and cost of sales related to the Company's Ovoot Tolgoi Mine within the Coal Division operating segment. Refer to note 4 of the consolidated financial statements for further analysis regarding the Company's reportable operating segments.
(ii) A non-IFRS financial measure, idled mine asset costs represents the depreciation expense relates to the Company's idled plant and equipment.

Overview of Annual Financial Results

The Company recorded a $153.9 million profit from operations in 2024 compared to $75.9 million profit from operations in 2023. The increase was mainly due to an increase of 3.4 million tonnes of sales volume in 2024 as compared to 2023 and a reversal of additional tax and tax penalty of $48.5 million was recorded in the fourth quarter of 2024.

Revenue was $493.4 million in 2024 compared to $331.5 million in 2023. The financial results were impacted by increased sales volume, as a result of expansion of its sales network, diversification of its customer base and expansion of the categories of coal products in its portfolio.

Cost of sales was $360.6 million in 2024 compared to $158.2 million in 2023. The increase in cost of sales was mainly due to increased sales volume and the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales consists of operating expenses, share-based compensation expense, equipment depreciation, depletion of mineral properties, royalties and idled mine asset costs. Operating expenses in cost of sales reflect the total cash costs of product sold (a Non-IFRS financial measure, refer to Section 4 of this MD&A for further analysis) during the year.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

$ in thousands Year ended December 31,
2024 2023
Operating expenses $ 288,773 $ 114,346
Share-based compensation expense 18 4
Depreciation and depletion 19,924 5,165
Royalties 51,377 38,504
Cost of sales from mine operations $ 360,092 $ 158,019
Cost of sales related to idled mine assets 496 176
Cost of sales $ 360,588 $ 158,195

Operating expenses in cost of sales were $288.8 million in 2024 compared to $114.3 million in 2023. The overall increase in operating expenses was due to the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales related to idled mine assets in 2024 included $0.5 million related to depreciation expenses for idled equipment (2023: $0.2 million).

Other operating expenses were $3.7 million in 2024 (2023: $0.9 million). The increase was due to increased management fee in 2024 and no reversal of impairment on materials and supplies inventories was recorded in 2024 (2023: $5.0 million).

$ in thousands Year ended December 31,
2024 2023
Management fee $ 6,630 $ 4,879
Provision for doubtful trade and other receivables 10 59
Foreign exchange loss, net 134 1,202
Gain on disposal of items of property, plant and equipment, net (261) -
Impairment/(reversal of impairment) on materials and supplies inventories 231 (4,988)
Rental income from short term leases - (68)
Penalty on late settlement of trade payables - 454
Gain on contract offsetting arrangement (3,046) (668)
Other operating expenses, net $ 3,698 $ 870

Administration expenses were $13.5 million in 2024 as compared to $10.4 million in 2023. The change was mainly due to higher daily administration fees and increased salaries and benefits as a result of expansion of operations.

$ in thousands Year ended December 31,
2024 2023
Corporate administration $ 3,688 $ 2,673
Legal and professional fees 2,836 2,483
Salaries and benefits 6,415 4,779
Share-based compensation expense 45 10
Depreciation 470 492
Administration expenses $ 13,454 $ 10,437

The Company continued to minimise evaluation and exploration expenditures in 2024 in order to preserve the Company's financial resources. Evaluation and exploration activities and expenditures in 2024 were

December 31, 2024
Page | 14


SouthGobi Resources Ltd.
Management's Discussion and Analysis

limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.

Finance costs were $37.8 million and $49.1 million in 2024 and 2023 respectively, which primarily consisted of interest expense on the $250.0 million Convertible Debenture.

Summary of Quarterly Operational Data

Quarter Ended 2024 2023
31-Dec 30-Sep 30-Jun 31-Mar 31-Dec 30-Sep 30-Jun 31-Mar
Sales Volumes, Prices and Costs
Premium semi-soft coking coal
Coal sales (millions of tonnes) 0.16 0.10 0.29 0.36 0.54 0.64 0.57 0.33
Average realised selling price (per tonne) $ 89.56 $ 116.48 $ 102.61 $ 111.01 $ 107.59 $ 100.33 $ 103.33 $ 124.72
Standard semi-soft coking coal/ premium thermal coal
Coal sales (millions of tonnes) 1.31 1.09 0.28 0.28 0.29 0.18 0.05 0.01
Average realised selling price (per tonne) $ 69.30 $ 72.54 $ 77.04 $ 76.07 $ 72.41 $ 68.43 $ 67.09 $ 73.52
Standard thermal coal
Coal sales (millions of tonnes) 0.38 0.24 0.12 0.12 - - - -
Average realised selling price (per tonne) $ 36.99 $ 37.20 $ 36.10 $ 47.91 $ - $ - $ - $ -
Processed coal
Coal sales (millions of tonnes) 0.81 0.68 0.51 0.29 0.13 0.33 0.26 0.26
Average realised selling price (per tonne) $ 68.66 $ 63.65 $ 73.04 $ 56.65 $ 77.23 $ 66.03 $ 82.99 $ 78.19
Total
Coal sales (millions of tonnes) 2.66 2.11 1.20 1.05 0.96 1.15 0.88 0.60
Average realised selling price (per tonne) $ 65.72 $ 67.77 $ 77.55 $ 79.52 $ 92.93 $ 85.57 $ 95.34 $ 104.11
Raw coal production (millions of tonnes) 4.19 2.75 2.01 1.25 1.34 1.18 0.97 0.56
Cost of sales of product sold (per tonne) (i) $ 48.92 $ 52.77 $ 61.32 $ 43.36 $ 38.17 $ 42.23 $ 47.76 $ 51.59
Direct cash costs of product sold (per tonne) (ii) $ 37.92 $ 41.74 $ 47.15 $ 30.70 $ 26.20 $ 32.26 $ 33.79 $ 28.95
Mine administration cash costs of product sold (per tonne) (i) $ 1.88 $ 0.94 $ 2.42 $ 1.08 $ 1.83 $ 0.82 $ 1.60 $ 1.48
Total cash costs of product sold (per tonne) (ii) $ 39.80 $ 42.68 $ 49.57 $ 31.78 $ 28.03 $ 33.08 $ 35.39 $ 30.43
Other Operational Data
Production waste material moved (millions of bank cubic meters) 17.48 15.04 14.59 12.36 7.81 7.34 7.73 2.83
Strip ratio (bank cubic meters of waste material per tonne of coal produced) 4.17 5.48 7.27 9.87 5.85 6.24 7.93 5.07
Lost time injury frequency rate (ii) 0.00 0.00 0.00 0.22 0.22 0.21 0.23 0.00

(i) A non-IFRS financial measure, refer to section 3. Cash costs of product sold exclude idled mine asset cash costs.
(ii) Per 200,000 man hours and calculated based on a rolling 12-month average.

Overview of Quarterly Operational Data

The Company experienced a decrease in the average selling price of coal from $92.9 per tonne in the fourth quarter of 2023 to $65.7 per tonne in the fourth quarter of 2024, as a result of the Company facing headwinds in the China coal market in 2024, leading to the Company changing its product mix to sell a greater percentage of lower-priced coal products. The product mix for the fourth quarter of 2024 consisted of approximately 6% premium semi-soft coking coal, 49% standard semi-soft coking coal/premium thermal coal, 14% standard thermal coal and 31% of processed coal compared to approximately 56% premium semi-soft coking coal, 30% standard semi-soft coking coal/premium thermal coal and 14% of processed coal in the fourth quarter of 2023.

The Company sold 2.7 million tonnes for the fourth quarter of 2024, compared to 1.0 million tonnes for the fourth quarter of 2023.

The Company's unit cost of sales of product sold increased from $38.2 per tonne in the fourth quarter of 2023 to $48.9 per tonne in the fourth quarter of 2024. The increase was mainly due to the Company expanding into certain categories of processed coal with higher production costs.

December 31, 2024


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

Summary of Quarterly Financial Results

The Company’s annual financial statements are reported under the IFRS Accounting Standards issued by the International Accounting Standards Board (“IASB”) (“IFRS Accounting Standards”). The following table provides highlights, extracted from the Company’s annual and interim consolidated financial statements, of quarterly financial results for the past eight quarters:

$ in thousands, except per share information 2024 2023
Quarter Ended 31-Dec 30-Sept
Financial Results
Revenue (i) $ 174,640 $ 143,748
Cost of sales (i) (130,119) (111,354)
Gross profit excluding idled mine asset costs (ii) 44,757 32,544
Gross profit including idled mine asset costs 44,521 32,394
Other operating income/(expenses), net (1,194) (294)
Administration expenses (3,627) (3,400)
Evaluation and exploration expenses (314) (1,003)
Reversal off/provision for additional tax and tax penalty 39,666 -
Profit/(loss) from operations 79,052 27,697
Finance costs (6,893) (10,679)
Finance income 3,247 733
Share of earnings of joint ventures 1,206 133
Share of earnings/(loss) of associates 578 (1)
Current income tax expenses (4,899) (7,844)
Net profit/(loss) 72,291 10,039
Basic earnings/(loss) per share $ 0.244 $ 0.034
Diluted earnings/(loss) per share $ 0.228 $ 0.034

(i) Revenue and cost of sales relate to the Company's Ovoid Tolgoi Mine within the Coal Division operating segment. Refer to note 4 of the consolidated financial statements for further analysis regarding the Company's reportable operating segments.
(ii) A non-IFRS financial measure, idled mine asset costs represents the depreciation expense relates to the Company's idled plant and equipment.

Overview of Quarterly Financial Results

The Company recorded a $79.1 million profit from operations in the fourth quarter of 2024 compared to a $42.0 million profit from operations in the fourth quarter of 2023. The financial results for the fourth quarter of 2024 were impacted by the Company recording a reversal of additional tax and tax penalty of $48.5 million during the quarter as a result of the Revised Re-assessment Result.

Revenue was $174.6 million in the fourth quarter of 2024 compared to $88.5 million in the fourth quarter of 2023. The increase was due to: increased sales volume, as a result of expansion of its sales network, diversification of its customer base and expansion of the categories of coal products in its portfolio.

Cost of sales was $130.1 million in the fourth quarter of 2024 compared to $36.6 million in the fourth quarter of 2023. The increase in cost of sales in the fourth quarter of 2024 was mainly due to increased sales volume and the Company expanding into certain categories of processed coal with higher production costs.

Cost of sales consists of operating expenses, share-based compensation expense, equipment depreciation, depletion of mineral properties, royalties and idled mine asset costs. Operating expenses in cost of sales reflect the total cash costs of product sold (a Non-IFRS financial measure, refer to section 4 "Non-IFRS Financial Measures" in this MD&A for further analysis) during the quarter.

December 31, 2024
Page | 16


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Three months ended December 31,
$ in thousands 2024 2023
Operating expenses $ 105,873 $ 26,906
Depreciation and depletion 8,908 1,436
Royalties 15,102 8,254
Cost of sales from mine operations $ 129,883 $ 36,596
Cost of sales related to idled mine assets 236 49
Cost of sales $ 130,119 $ 36,645

Cost of sales related to idled mine assets in the fourth quarter of 2024 included $0.2 million related to depreciation expenses for idled equipment (fourth quarter of 2023: $0.1 million).

Other operating expenses were $1.2 million in the fourth quarter of 2024 (fourth quarter of 2023: other operating income of $4.3 million). A gain on a contract offsetting arrangement of $2.6 million was recorded and offset by management fee of $2.3 million and foreign exchange loss of $1.1 million in the fourth quarter of 2024 (fourth quarter of 2023: reversal of impairment on materials and supplies inventories of $4.7 million and gain on a contract offsetting arrangement of $0.7 million were recorded and offset by management fee of $1.2 million).

Three months ended December 31,
$ in thousands 2024 2023
Management fee $ 2,304 $ 1,229
Provision for/(reversal of) doubtful trade and other receivables 42 (119)
Foreign exchange loss/(gain), net 1,114 (9)
Loss on disposal of items of property, plant and equipment, net 1 -
Impairment/(reversal of impairment) on materials and supplies inventories 317 (4,726)
Rental income from short term leases - (15)
Gain on contract offsetting arrangement (2,584) (668)
Other operating expenses/(income), net $ 1,194 $ (4,308)

Administration expenses were $3.6 million in the fourth quarter of 2024 compared to $3.9 million in the fourth quarter of 2023.

Three months ended December 31,
$ in thousands 2024 2023
Corporate administration $ 928 $ 803
Legal and professional fees 719 994
Salaries and benefits 1,883 1,956
Share-based compensation expense - 1
Depreciation 97 125
Administration expenses $ 3,627 $ 3,879

The Company continued to minimise evaluation and exploration expenditures in the fourth quarter of 2024 in order to preserve the Company's financial resources. Evaluation and exploration activities and expenditures in the fourth quarter of 2024 were limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.

December 31, 2024


SouthGobi Resources Ltd. Management's Discussion and Analysis

Finance costs were $6.9 million in the fourth quarter of 2024 compared to $12.3 million in the fourth quarter of 2023, which primarily consisted of interest expense on the $250.0 million Convertible Debenture.

4. NON-IFRS FINANCIAL MEASURES

The Company has included the non-IFRS financial measure “cash costs” and “idled mine asset costs” in this MD&A to supplement its consolidated financial statements, which have been prepared in accordance with IFRS Accounting Standards. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards.

The Company believes that this measure, together with measures determined in accordance with IFRS Accounting Standards, provides investors with useful information to evaluate the underlying performance of the Company. Non-IFRS financial measures do not have a standardised meaning prescribed under IFRS Accounting Standards and therefore may not be comparable to similar measures employed by other companies. The non-IFRS financial measure is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards.

Cash Costs

The Company uses cash costs to describe its cash production and associated cash costs incurred in bringing the inventories to their present locations and conditions. Cash costs incorporate all production costs, which include direct and indirect costs of production, with the exception of idled mine asset costs and non-cash expenses which are excluded. Non-cash expenses include share-based compensation expense, impairment of coal stockpile inventories, depreciation and depletion of property, plant and equipment and mineral properties. The Company uses this performance measure to monitor its operating cash costs internally and believes this measure provides investors and analysts with useful information about the Company’s underlying cash costs of operations. The Company believes that conventional measures of performance prepared in accordance with IFRS Accounting Standards do not fully illustrate the ability of its mining operations to generate cash flows. The Company reports cash costs on a sales basis. This performance measure is commonly utilised in the mining industry.

The following table provides a reconciliation of the cash costs of product sold disclosed for the three months and year ended December 31, 2024 and December 31, 2023. The cash costs of product sold presented below may differ from cash costs of product produced depending on the timing of coal stockpile inventory turnover and impairment of coal stockpile inventories from prior periods.

Three months ended December 31, Year ended December 31,
$ in thousands, except per tonne information 2024 2023 2024 2023
Cash costs
Cost of sales determined in accordance with IFRS $ 130,119 $ 36,645 $ 360,588 $ 158,195
Less royalties (15,102) (8,254) (51,377) (38,504)
Less non-cash expenses (8,908) (1,436) (19,942) (5,169)
Less non-cash idled mine asset costs (236) (49) (496) (176)
Total cash costs 105,873 26,906 288,773 114,346
Less idled mine asset cash costs - - - -
Total cash costs excluding idled mine asset cash costs 105,873 26,906 288,773 114,346
Coal sales (millions of tonnes) 2.66 0.96 7.02 3.59
Total cash costs of product sold (per tonne) $ 39.80 $ 28.03 $ 41.14 $ 31.85

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Three months ended December 31, Year ended December 31,
2024 2023 2024 2023
$ in thousands, except per tonne information
Cash costs
Direct cash costs of product sold (per tonne) $ 37.92 $ 26.20 $ 39.56 $ 30.46
Mine administration cash costs of product sold (per tonne) 1.88 1.83 1.58 1.39
Total cash costs of product sold (per tonne) $ 39.80 $ 28.03 $ 41.14 $ 31.85

The cash cost of product sold per tonne was increased from $31.9 in 2023 to $41.1 in 2024. The reason for increase was primarily related to change in product mix with the Company expanding into certain categories of processed coal with higher production costs.

Idled Mine Asset Costs

The Company uses idled mine asset costs to describe the cost incurred during idled mine period. Idled mine asset costs include share-based compensation expense, impairment of coal stockpile inventories, depreciation and depletion of property, plant and equipment and mineral properties. The Company uses this performance measure to monitor its gross profit internally and believes this measure provides investors and analysts with useful information about the Company's underlying gross profit. The Company believes that conventional measures of performance prepared in accordance with IFRS Accounting Standards do not fully illustrate the ability of its mining operations to generate cash flows. This performance measure is commonly utilised in the mining industry.

The following table provides a reconciliation of the gross profit disclosed for the three months and year ended December 31, 2024 and December 31, 2023.

Three months ended December 31, Year ended December 31,
2024 2023 2024 2023
$ in thousands, except per tonne information
Idled mine asset costs
Gross profit excluding idled mine asset costs $ 44,757 $ 51,908 $ 133,286 $ 173,487
Less non-cash idled mine asset costs (236) (49) (496) (176)
Gross profit including idled mine asset costs $ 44,521 $ 51,859 $ 132,790 $ 173,311

5. PROPERTIES

The Company currently holds six mining licenses in Mongolia. The mining licenses pertain to the Ovoot Tolgoi Mine (MV-012726), the Soumber Deposit (MV-016869, MV-020436 and MV-020451) and the Zag Suuj Deposit (MV-020676 and MV-020675).

Operating Mine

Ovoot Tolgoi Mine

The Ovoot Tolgoi Mine is located in the southwest corner of the Umnugobi Aimag (South Gobi Province) of Mongolia. The deposit is within the administrative unit of Gurvantes Soum, 320km southwest of the provincial capital of Dalanzadgad and 950km southwest of the nation's capital of Ulaanbaatar. Mining operations at the Ovoot Tolgoi Mine have been carried out in two distinct areas, the Sunset pit to the west and the Sunrise pit to the east.

Saleable products from the Ovoot Tolgoi Mine primarily include the Standard and Premium semi-soft coking coal products. Some higher ash content product is processed and sold as semi-soft coking coal product while some of the unwashed product is sold as a thermal coal product, as and when the market allows. The Company intends to continue to develop markets for both its Premium and Standard semi-soft coking coal

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

brands and to pursue long-term supply offtake with end users in China to complement its existing customer base and to gain best value for the Company's coal in the Chinese market. The Company is committed to further enhancing the quality of its coal products through various types of coal processing method and increasing its market penetration in China.

Resources

A resource estimate for the Ovoot Tolgoi deposit is set out in the Ovoot Tolgoi Technical Report, which was prepared by BAW on behalf of the Company. A copy of the Ovoot Tolgoi Technical Report was filed under the Company's profile on SEDAR+ at www.sedarplus.ca on December 2, 2024.

Reserves

A reserve estimate for the Ovoot Tolgoi deposit is set out in the Ovoot Tolgoi Technical Report, which was prepared by BAW on behalf of the Company. A copy of the Ovoot Tolgoi Technical Report was filed under the Company's profile on SEDAR+ at www.sedarplus.ca on December 2, 2024.

Mining Operations

Mining Method

The mining method employed at the Ovoot Tolgoi deposit could be described as open pit terrace mining utilising large scale hydraulic excavators and shovels and trucks. Terrace mining is utilised where coal seams dip steeply and operating machinery on the coal seam roof and floor is not possible, due to the steep seam dips. Terraces, or benches, are excavated along fixed horizontal horizons and these benches intersect both coal and waste. Coal and waste are mined separately on each bench with dozers being used, as needed, to push coal or waste down to the excavator for loading onto trucks. This mining method allows large scale open pit mining to occur productively in steeply dipping coal seam environments. All waste is dumped ex-pit, as the steep dips preclude in-pit dumping.

Mining Equipment

The key elements of the currently commissioned mining fleet include: one Liebherr 996 (34m³) hydraulic excavators, four Liebherr R9250 (15m³) hydraulic excavators and nineteen MT4400AC (240 tonne capacity) haul trucks, together with various pieces of ancillary equipment.

Workforce

As at December 31, 2024, SGS employed 663 employees in Mongolia. Of the 663 employees, 45 are employed in the Ulaanbaatar office and 618 at the Ovoot Tolgoi Mine site. Of the 663 employees based in Mongolia, 661 (99%) are Mongolian nationals and of those, 242 (37%) are residents of the local Gurvantes, Dalanzadgad, Sevrei and Noyon Soums.

6. LIQUIDITY AND CAPITAL RESOURCES

Liquidity and Capital Management

The Company has in place a planning, budgeting and forecasting process to help determine the funds required to support the Company's normal operations on an ongoing basis and the Company's expansionary plans.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Costs reimbursable to Turquoise Hill Resources Limited ("Turquoise Hill")

Prior to the completion of a private placement with Novel Sunrise Investments Limited on April 23, 2015, Rio Tinto plc ("Rio Tinto") was the Company's ultimate parent company. In the past, Rio Tinto sought reimbursement from the Company for the salaries and benefits of certain Rio Tinto employees who were assigned by Rio Tinto to work for the Company, as well as certain legal and professional fees incurred by Rio Tinto in relation to the Company's prior internal investigation and Rio Tinto's participation in the tripartite committee. Subsequently Rio Tinto transferred and assigned to Turquoise Hill its right to seek reimbursement for these costs and fees from the Company.

On January 20, 2021, the Company and Turquoise Hill entered into a settlement agreement, whereby Turquoise Hill agreed to a repayment schedule in settlement of certain secondment costs in the amount of $2.8 million (representing a portion of the TRQ Reimbursable Amount) pursuant to which the Company agreed to make monthly payments to Turquoise Hill in the amount of $0.1 million per month from January 2021 to June 2022. The Company is contesting the validity of the remaining balance of the TRQ Reimbursable Amount claimed by Turquoise Hill.

As at December 31, 2024, the amount of reimbursable costs and fees claimed by Turquoise Hill (the "TRQ Reimbursable Amount") amounted to $6.3 million (such amount is included in the trade and other payables).

Additional tax and tax penalty imposed by the MTA

On July 18, 2023, SGS received the Notice issued by the MTA stating that the MTA had completed the Audit on the financial information of SGS for the tax assessment years between 2017 and 2020, including transfer pricing, royalty, air-pollution fee and unpaid tax payables. As a result of the Audit, the MTA notified SGS that it is imposing a tax penalty against SGS in the amount of approximately $75.0 million. The penalty mainly relates to the different view on the interpretation of tax law between the Company and the MTA. Under Mongolian law, the Company had a period of 30 days from the date of receipt of the Notice to file an appeal in relation to the Audit. Subsequently the Company engaged an independent tax consultant in Mongolia to provide tax advice and support to the Company and filed an appeal letter in relation to the Audit with the MTA in accordance with Mongolian laws on August 17, 2023.

On February 8, 2024, SGS received notice from the TDRC which stated that, after the TDRC's review, the TDRC issued a decision in relation to SGS' appeal of the Audit, and ordered that the audit assessments set forth in the Notice of July 18, 2023 be sent back to the MTA for review and re-assessment.

On February 22, 2024, SGS received another notice from the MTA stating that the MTA anticipated commencing the re-assessment process on or about March 7, 2024 and the duration of such process will be approximately 45 working days.

On May 15, 2024, SGS received the Revised Notice from the MTA regarding the Re-assessment Result. The re-assessed amount of the tax penalty is approximately $80.0 million. In accordance with applicable Mongolian laws, SGS is entitled to file an appeal to the TDRC regarding the Re-assessment Result within a 30-day period from the date of receiving the Revised Notice.

On June 12, 2024, following consultation with its independent tax consultant in Mongolia, SGS submitted an appeal letter to the TDRC regarding the Re-assessment Result, in accordance with applicable Mongolian laws.

On January 10, 2025, SGS received the Resolution from the TDRC in response to the appeal letter sent by SGS to the TDRC on June 12, 2024, relating to the Re-assessment Result. As set forth in the Resolution, the TDRC has determined to reduce the re-assessed amount of tax penalty against SGS from

December 31, 2024
Page | 21


SouthGobi Resources Ltd.
Management's Discussion and Analysis

approximately $80.0 million to approximately $26.5 million (the “Revised Re-assessment Result”). In accordance with the applicable Mongolian laws, SGS is entitled to file an appeal to the Administrative Court regarding the Revised Re-assessment Result within a 30-day period from the date of receiving the Resolution. After careful consideration and consultation with the Company’s independent tax consultant in Mongolia, the Company has determined not to pursue a further appeal of the Revised Re-assessment Result with the Administrative Court.

As at December 31, 2024, the Company recorded an additional tax and tax penalty in the amount of $45.5 million (2023: $85.1 million), which consists of a tax penalty payable of $26.5 million (2023: $75.0 million) and a provision for additional late tax penalty of $19.0 million (2023: $10.1 million). As a result of the Revised Re-assessment Result, the Company recorded a reversal of additional tax and tax penalty of $48.5 million in 2024 (2023: $nil). To date, the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty. The Company anticipates paying down the outstanding amount of the tax and tax penalty from cash generated from operations in the normal course. According to Mongolian tax law, the Mongolian tax authority has a legal authority to demand payment of the outstanding amount of the Revised Re-assessment Result from the Company at its discretion.

Going concern considerations

The Company’s consolidated financial statements have been prepared on a going concern basis which assumes that the Company will continue to operate until at least December 31, 2025 and will be able to realise its assets and discharge its liabilities in the normal course of operations as they come due. However, in order to continue as a going concern, the Company must generate sufficient operating cash flows, secure additional capital or otherwise pursue a strategic restructuring, refinancing or other transactions to provide it with sufficient liquidity.

Several adverse conditions and material uncertainties cast significant doubt upon the Company’s ability to continue as a going concern and the going concern assumption used in the preparation of the Company’s consolidated financial statements. The Company had a deficiency in assets of $49.8 million as at December 31, 2024 as compared to a deficiency in assets of $141.3 million as at December 31, 2023 while the working capital deficiency (excess current liabilities over current assets) reached $228.1 million as at December 31, 2024 compared to a working capital deficiency of $218.8 million as at December 31, 2023.

Included in the working capital deficiency as at December 31, 2024 are significant obligations, represented by trade and other payables of $169.3 million and the additional tax and tax penalty of $43.8 million.

The Company may not be able to settle all trade and other payables on a timely basis, and as a result any continuing postponement in settling of certain trade and other payables owed to suppliers and creditors may result in potential lawsuits and/or bankruptcy proceedings being filed against the Company. Except as disclosed elsewhere in this MD&A, no such lawsuits or proceedings were pending as at March 28, 2025. However, there can be no assurance that no such lawsuits or proceedings will be filed by the Company’s creditors in the future and the Company’s suppliers and contractors will continue to supply and provide services to the Company uninterrupted.

There are significant uncertainties as to the outcomes of the above events or conditions that may cast significant doubt on the Company’s ability to continue as a going concern and, therefore, the Company may be unable to realise its assets and discharge its liabilities in the normal course of business. Should the use of the going concern basis in preparation of the consolidated financial statements be determined to be not appropriate, adjustments would have to be made to write down the carrying amounts of the Company’s assets to their realisable values, to provide for any further liabilities which might arise and to reclassify non-current assets and non-current liabilities as current assets and current liabilities, respectively. The effects of these adjustments have not been reflected in the consolidated financial statements. If the Company is

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

unable to continue as a going concern, it may be forced to seek relief under applicable bankruptcy and insolvency legislation.

For the purpose of assessing the appropriateness of the use of the going concern basis to prepare the financial statements, management of the Company has prepared a cash flow projection covering a period of 12 months from December 31, 2024. The cash flow projection has considered the anticipated cash flows to be generated from the Company's business during the period under projection including cost saving measures. In particular, the Company has taken into account the following measures for improvement of the Company's liquidity and financial position, which include: (a) entering into the 2025 March Deferral Agreement on March 20, 2025 for a deferral of the 2025 March Deferred Amounts; (b) communicating with vendors in agreeing repayment plans of the outstanding payable; and (c) obtaining an avenue of financial support from an affiliate of the Company's major shareholder for a maximum amount of $127.0 million (equivalent to RMB 900 million) during the period covered in the cash flow projection. Regarding these plans and measures, there is no guarantee that the suppliers would agree the settlement plan as communicated by the Company. Nevertheless, after considering the above, the directors of the Company believe that there will be sufficient financial resources to continue its operations and to meet its financial obligations as and when they fall due in the next 12 months from December 31, 2024 and therefore are satisfied that it is appropriate to prepare the consolidated financial statements on a going concern basis.

Significant uncertainties exist regarding the Company's management's ability to achieve its plans as described above. The continued operation of the Company as a going concern depends on a key factor: the utilisation of the financial support from an affiliate of the Company's major shareholder to settle payables, including the additional tax and tax penalty, in a timely manner.

The outcome of this factor will have a significant impact on the Company's ability to continue operating as a going concern. It is crucial to closely monitor and address these uncertainties to ensure the Company's stability and long-term viability.

Factors that impact the Company's liquidity are being closely monitored and include, but are not limited to, restrictions on the Company's ability to import its coal products for sale in China, Chinese economic growth, market prices of coal, production levels, operating cash costs, capital costs, exchange rates of currencies of countries where the Company operates and exploration and discretionary expenditures.

As at December 31, 2024 and December 31, 2023, the Company was not subject to any externally imposed capital requirements.

Convertible Debenture

In November 2009, the Company entered into a financing agreement with China Investment Corporation (together with its wholly-owned subsidiaries and affiliates, "CIC") for $500 million in the form of a secured, convertible debenture bearing interest at 8.0% (6.4% payable semi-annually in cash and 1.6% payable annually in the Company's Common Shares) with a maximum term of 30 years. The Convertible Debenture is secured by a first ranking charge over the Company's assets, including shares of its material subsidiaries. The financing was used primarily to support the accelerated investment program in Mongolia and for working capital, repayment of debts, general and administrative expenses and other general corporate purposes.

On March 29, 2010, the Company exercised its right to call for the conversion of up to $250.0 million of the Convertible Debenture into approximately 21.5 million shares at a conversion price of $11.64 (CA$11.88).

December 31, 2024
Page | 23


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

Deferral Agreements

On March 19, 2024, the Company and JDZF entered into an agreement (the “2024 March Deferral Agreement”) pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and PIK Interest, management fees, and related deferral fees in the aggregate amount of approximately $96.5 million due and payable to JDZF on or before August 31, 2024 pursuant to certain prior deferral agreements dated March 24, 2023 and October 13, 2023; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2024 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2024 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2024 under the Convertible Debenture; and (iv) management fees in the aggregate amount of $2.2 million payable to JDZF on November 15, 2024 and February 15, 2025, respectively, under the Amended and Restated Cooperation Agreement (collectively, the “2024 March Deferred Amounts”).

The effectiveness of the 2024 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2024 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2024 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The 2024 March Deferral Agreement was approved by the Company’s disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

The principal terms of the 2024 March Deferral Agreement are as follows:

  • Payment of the 2024 March Deferred Amounts are deferred until August 31, 2025 (the “2024 March Deferral Agreement Deferral Date”).
  • As consideration for the deferral of the 2024 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2024 March Deferred Amounts, commencing on the date on which each such 2024 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.
  • As consideration for the deferral of the 2024 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2024 March Deferred Amounts commencing on the date on which each such 2024 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.
  • The 2024 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2024 March Deferred Amounts or related deferral fees. Instead, the 2024 March Deferral Agreement requires the Company to use its best efforts to pay the 2024 March Deferred Amounts and related deferral fees due and payable under the 2024 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2024 March Deferral Agreement and ending as of the 2024 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2024 March Deferral Agreement and ending as of the 2024 March Deferral Agreement to JDZF will not be materially prejudiced as a result of any repayment.
  • If at any time before the 2024 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall

December 31, 2024
Page | 24


SouthGobi Resources Ltd.
Management's Discussion and Analysis

not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

On April 30, 2024, the Company and JDZF entered into an agreement (the "2024 April Deferral Agreement") pursuant to which JDZF agreed to grant the Company a deferral of the remaining $1.1 million of PIK interest which was payable on November 19, 2022 under the Convertible Debenture, the payment of which was deferred pursuant to a certain prior deferral agreement dated November 11, 2022 (the "November 2022 Deferral Agreement") until November 19, 2023, as well as related deferral fees under the November 2022 Deferral Agreement (collectively, the "2024 April Deferred Amounts").

The effectiveness of the 2024 April Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2024 April Deferral Agreement are subject to the Company obtaining the requisite approval of the 2024 April Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The 2024 April Deferral Agreement was approved by the Company's disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

The principal terms of the 2024 April Deferral Agreement are as follows:

  • Payment of the 2024 April Deferred Amounts are deferred until August 31, 2025 (the "2024 April Deferral Agreement Deferral Date").
  • As consideration for the deferral of the 2024 April Deferred Amounts, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2024 April Deferred Amounts, commencing on the date on which each such 2024 April Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.
  • The 2024 April Deferral Agreement does not contemplate a fixed repayment schedule for the 2024 April Deferred Amounts or related deferral fees. Instead, the 2024 April Deferral Agreement requires the Company to use its best efforts to pay the 2024 April Deferred Amounts and related deferral fees due and payable under the 2024 April Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2024 April Deferral Agreement and ending as of the 2024 April Deferral Agreement, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2024 April Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company's operations and business at such time and with the view of ensuring that the Company's operations and business would not be materially prejudiced as a result of any repayment.
  • If at any time before the 2024 April Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

On March 20, 2025, the Company and JDZF entered into the 2025 March Deferral Agreement pursuant to which JDZF agreed to grant the Company a deferral of (i) the cash and PIK Interest, management fees, and related deferral fees in the aggregate amount of approximately $111.6 million which will be due and payable to JDZF on or before August 31, 2025 pursuant to the 2024 March Deferral Agreement and the 2024 April Deferral Agreement; (ii) semi-annual cash interest payment of approximately $7.9 million payable to JDZF on May 19, 2025 under the Convertible Debenture; (iii) semi-annual cash interest payments of approximately $8.1 million payable to JDZF on November 19, 2025 and the $4.0 million in PIK Interest payable to JDZF on November 19, 2025 under the Convertible Debenture; and (iv) management fees in the aggregate amount of approximately $6.1 million payable to JDZF on May 16, 2025, August 15, 2025,

December 31, 2024


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

November 15, 2025 and February 15, 2026, respectively, under Amended and Restated Cooperation Agreement (collectively, the “2025 March Deferred Amounts”).

The effectiveness of the 2025 March Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2025 March Deferral Agreement are subject to the Company obtaining the requisite approval of the 2025 March Deferral Agreement from shareholders in accordance with the requirements of applicable Canadian securities laws and Rule 14.33 and Rule 14A.36 of the Listing Rules. The Company will be seeking approval of the 2025 March Deferral Agreement from disinterested shareholders at the Company’s upcoming AGM of shareholders, which will be held at a future date to be set by the Board.

The principal terms of the 2025 March Deferral Agreement are as follows:

  • Payment of the 2025 March Deferred Amounts will be deferred until the 2025 March Deferral Agreement Deferral Date.
  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to the payment obligations arising from the Convertible Debenture, the Company agreed to pay JDZF a deferral fee equal to 6.4% per annum on the outstanding balance of such 2025 March Deferred Amounts, commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Convertible Debenture.
  • As consideration for the deferral of the 2025 March Deferred Amounts which relate to payment obligations arising from the Amended and Restated Cooperation Agreement, the Company agreed to pay JDZF a deferral fee equal to 1.5% per annum on the outstanding balance of such 2025 March Deferred Amounts commencing on the date on which each such 2025 March Deferred Amounts would otherwise have been due and payable under the Amended and Restated Cooperation Agreement.
  • The 2025 March Deferral Agreement does not contemplate a fixed repayment schedule for the 2025 March Deferred Amounts or related deferral fees. Instead, the 2025 March Deferral Agreement requires the Company to use its best efforts to pay the 2025 March Deferred Amounts and related deferral fees due and payable under the 2025 March Deferral Agreement to JDZF. During the period beginning as of the effective date of the 2025 March Deferral Agreement and ending as of the 2025 March Deferral Agreement Deferral Date, the Company will provide JDZF with monthly updates of its financial status and business operations, and the Company and JDZF will on a monthly basis discuss and assess in good faith the amount (if any) of the 2025 March Deferred Amounts and related deferral fees that the Company may be able to repay to JDZF, having regard to the working capital requirements of the Company’s operations and business at such time and with the view of ensuring that the Company’s operations and business would not be materially prejudiced as a result of any repayment.
  • If at any time before the 2025 March Deferred Amounts and related deferral fees are fully repaid, the Company proposes to appoint, replace or terminate one or more of its chief executive officer, its chief financial officer or any other senior executive(s) in charge of its principal business function or its principal subsidiary, the Company will first consult with, and obtain written consent (such consent shall not be unreasonably withheld) from JDZF prior to effecting such appointment, replacement or termination.

Amendment of Convertible Debenture

On May 13, 2024, the Company and JDZF entered into an amendment agreement (the “Convertible Debenture Amendment”) to amend certain terms of the Convertible Debenture.

Pursuant to the Convertible Debenture Amendment, the Company may, by resolution of the Board of the Company, at any time and from time to time prepay, without penalty, the whole or any part of the principal

December 31, 2024
Page | 26


SouthGobi Resources Ltd.
Management's Discussion and Analysis

amount outstanding under the Convertible Debenture, together with accrued cash interest and PIK interest thereon to the date of prepayment, provided that:

(i) the Company has, not later than three (3) business days prior to the proposed prepayment date, delivered to JDZF an irrevocable written notice, signed by an independent director of the Company and setting out the terms of the prepayment;

(ii) the amount of such prepayment reduces the then outstanding principal amount under the Convertible Debenture by an amount that is (a) not less than $500,000 and (b) if in excess of $500,000, an integral multiple of $500,000; and

(iii) the proposed prepayment date falls on a business day.

The Company did not provide any additional form of consideration to JDZF in connection with the Convertible Debenture Amendment. Aside from the aforementioned amendments, the existing terms of the Convertible Debenture continue in full force and effect and unchanged.

The effectiveness of the Convertible Debenture Amendment is subject to the Company providing notice to, and obtaining acceptance (if required) from the TSX-V and requisite approval from disinterested shareholders of the Company in accordance with the requirements of applicable Canadian securities laws and Listing Rules. The Convertible Debenture Amendment was approved by the Company's disinterested shareholders through a special meeting of shareholders convened on August 28, 2024.

Cash Flow Highlights

$ in thousands Year ended December 31,
2024 2023
Net cash flows from operating activities $ 107,916 $ 160,839
Cash used in investing activities (123,115) (49,944)
Cash used in financing activities (23,821) (72,587)
Effect of foreign exchange rate changes on cash (383) 430
Increase/(decrease) in cash for the year (39,403) 38,738
Cash balance, beginning of year 47,993 9,255
Cash balance, end of year $ 8,590 $ 47,993

Net cash flows from Operating Activities

The Company generated $107.9 million of cash from operating activities in 2024 compared to $160.8 million in 2023. This is primarily due to the decreased profit margin of its coal products.

Cash used in Investing Activities

The Company used $123.1 million of cash in 2024 in investing activities compared to $49.9 million in 2023. In 2024, expenditures on property, plant and equipment totaled $118.6 million (2023: $44.5 million).

Cash used in Financing Activities

Cash used in financing activities was $23.8 million in 2024 (2023: $72.6 million). This is primarily due to Convertible Debenture interest repayment of $23.0 million was made in 2024.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Contractual Obligations and Guarantees

Day-to-day mining, expansionary and sustaining capital expenditures as well as administrative operations give rise to commitments for future minimum payments. As at December 31, 2024, the Company's operating and capital commitments were:

Within 1 year 2-3 years Over 3 years Total
As at December 31, 2024
Capital expenditure commitments $ 1,422 $ 3,829 $ 4,195 $ 9,446
Operating expenditure commitments 1,354 39 172 1,565
Commitments $ 2,776 $ 3,868 $ 4,367 $ 11,011

Ovoot Tolgoi Mine Impairment Analysis

The Company determined that an indicator of impairment existed for its Ovoot Tolgoi Mine cash generating unit as at December 31, 2024. The impairment indicator was the uncertainty of future coal price in China.

Therefore, the Company conducted an impairment test whereby the carrying value of the Company's Ovoot Tolgoi Mine cash generating unit was compared to the recoverable amount (being the "fair value less costs of disposal") using a discounted future cash flow valuation model. The Company's cash flow valuation model takes into consideration the latest available information to the Company, including but not limited to, sales prices, sales volumes, washing production, operating costs and life of mine coal production estimates as at December 31, 2024. The carrying value of the Company's Ovoot Tolgoi Mine cash generating unit was $243.6 million as at December 31, 2024.

Key estimates and assumptions incorporated in the valuation model included the following:

  • Coal resources and reserves as estimated by an independent third-party engineering firm;
  • Sales price estimates from an independent market consulting firm;
  • Forecasted sales volumes in line with production levels as reference to the mine plan;
  • Life-of-mine coal production, strip ratio, capital costs and operating costs; and
  • A post-tax discount rate of 16% based on an analysis of the market, country and asset specific factors.

Key sensitivities in the valuation model are as follows:

  • For each 1% increase/(decrease) in the long term price estimates, the calculated fair value of the cash generating unit increases/(decreases) by approximately $17.3/(17.4) million;
  • For each 1% increase/(decrease) in the post-tax discount rate, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(15.2)/16.1 million;
  • For each 1% increase/(decrease) in the cash mining cost estimates, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(9.9)/9.8 million; and
  • For each 1% increase/(decrease) in Mongolian inflation rate, the calculated fair value of the cash generating unit (decreases)/increases by approximately $(32.8)/31.0 million.

The impairment analysis did not result in the identification of an impairment loss or an impairment reversal and no charge or reversal was required as at December 31, 2024. A decline of 2% (2023: 5%) in the long-term price estimates, an increase of more than 3% (2023: 8%) in the post-tax discount rate, an increase of 4% (2023: 10%) in the cash mining cost estimates or an increase of 24% (2023: 41%) in Mongolian inflation rate may trigger an impairment charge on the cash generating unit. The Company believes that the

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

estimates and assumptions incorporated in the impairment analysis are reasonable; however, the estimates and assumptions are subject to significant uncertainties and judgments.

Financial Instruments

The fair value of financial assets and financial liabilities at amortised cost is determined in accordance with generally accepted pricing models based on discounted cash flow analysis or using prices from observable current market transactions. The fair value of all the financial instruments of the Company approximates their carrying value because of the demand nature or short-term maturity of these instruments, except for the fair values of trade and other payables, interest bearing borrowings, and convertible debenture below their respective carrying amounts given the current financial condition of the Company as described under Section 6 of this MD&A under the heading entitled "Liquidity and Capital Resources".

The fair values of the embedded derivatives within the Convertible Debenture are determined using a Monte Carlo simulation. The risks associated with the Convertible Debenture relate to a potential breach of the Company's obligations under the terms of the Convertible Debenture. The Company mitigates these risks by ensuring its corporate activities comply with all of its contractual obligations under the Convertible Debenture.

$ in thousands As at December 31,
Financial assets 2024 2023
Cash $ 8,590 $ 47,993
Restricted cash 274 423
Trade and other receivables 31,486 7,541
Total financial assets $ 40,350 $ 55,957
$ in thousands As at December 31,
Financial liabilities 2024 2023
Fair value through profit or loss
Convertible debenture - embedded derivatives $ 63 $ 361
Other financial liabilities
Trade and other payables 169,281 60,192
Lease liabilities 2,192 2,991
Convertible debenture - debt host and interest payable 204,855 193,939
Total financial liabilities $ 376,391 $ 257,483

7. REGULATORY ISSUES AND CONTINGENCIES

Lawsuit

In January 2014, Siskinds LLP, a Canadian law firm, filed a class action (the "Class Action") against the Company, certain of its former senior officers and directors, and its former auditors (the "Former Auditors"), in the Ontario Court in relation to the Company's restatement of certain financial statements previously disclosed in the Company's public fillings (the "Restatement").

To commence and proceed with the Class Action, the plaintiff was required to seek leave of the Court under the Ontario Securities Act ("Leave Motion") and certify the action as a class proceeding under the Ontario Class Proceedings Act. The Ontario Court rendered its decision on the Leave Motion on November 5, 2015, dismissing the action against the former senior officers and directors and allowing the action to proceed against the Company in respect of alleged misrepresentation affecting trades in the secondary market for

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

the Company's securities arising from the Restatement. The action against the Former Auditors was settled by the plaintiff on the eve of the Leave Motion.

Both the plaintiff and the Company appealed the Leave Motion decision to the Ontario Court of Appeal. On September 18, 2017, the Ontario Court of Appeal dismissed the Company's appeal of the Leave Motion to permit the plaintiff to commence and proceed with the Class Action. Concurrently, the Ontario Court of Appeal granted leave for the plaintiff to proceed with their action against the former senior officers and directors in relation to the Restatement.

The Company filed an application for leave to appeal to the Supreme Court of Canada in November 2017, but the leave to appeal to the Supreme Court of Canada was dismissed in June 2018.

In December 2018, the parties agreed to a consent Certification Order, whereby the action against the former senior officers and directors was withdrawn and the Class Action would only proceed against the Company.

To date, counsel for the plaintiffs and defendant have completed: (i) all document production and (ii) defence oral examinations for discovery. Counsel for the plaintiffs have served their expert reports on liability and damages.

Counsel for the plaintiffs and defendant have entered into a good faith procedural agreement (the "Procedural Agreement"). The parties have engaged the services of an experienced neutral former Chief Justice of Ontario (the "Mediator") to act as a mediator to assist the parties in resolving all pre-trial matters as set out in the Procedural Agreement. The parties have agreed to a pre-trial mediation before the Mediator, which was scheduled for April 2025 with an intention to have the case ready for trial by April 25, 2025. However, the mediation has been adjourned to the summer of 2025 as the parties continue to work with the Mediator to resolve outstanding procedural disputes. The Court has not yet scheduled trial dates. The Company continues to urge a trial as early as possible.

The Company firmly believes that it has a strong defense on the merits and will continue to vigorously defend itself against the Class Action through independent Canadian litigation counsel retained by the Company for this purpose. Due to the inherent uncertainties of litigation, it is not possible to predict the final outcome of the Class Action or determine the amount of potential losses, if any. However, the Company has determined that a provision for this matter as at December 31, 2024 was not required.

Toll Wash Plant Agreement with Ejin Jinda

In 2011, the Company entered into an agreement with Ejin Jinda, a subsidiary of China Mongolia Coal Co. Ltd., to toll-wash coal from the Ovoot Tolgoi Mine. The agreement had a duration of five years from the commencement of the contract and provided for an annual washing capacity of approximately 3.5 million tonnes of input coal.

Under the agreement with Ejin Jinda, which required the commercial operation of the wet washing facility to commence on October 1, 2011, the additional fees payable by the Company under the wet washing contract would have been $18.5 million. At each reporting date, the Company assesses the agreement with Ejin Jinda and has determined it is not probable that this $18.5 million will be required to be paid. Accordingly, the Company has determined that a provision for this matter as at December 31, 2024 was not required.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Special Needs Territory in Umnugobi

On February 13, 2015, the Soumber mining licenses (MV-016869, MV-020436 and MV-020451) (the "License Areas") were included into a special protected area (to be further referred as Special Needs Territory, the "SNT") newly set up by the Umnugobi Aimag's Civil Representatives Khural (the "CRKh") to establish a strict regime on the protection of natural environment and prohibit mining activities in the territory of the SNT.

On July 8, 2015, SGS and the chairman of the CRKh, in his capacity as the respondent's representative, reached an agreement (the "Amicable Resolution Agreement") to exclude the License Areas from the territory of the SNT in full, subject to confirmation of the Amicable Resolution Agreement by the session of the CRKh. The parties formally submitted the Amicable Resolution Agreement to the appointed judge of the Administrative Court for her approval and requested a dismissal of the case in accordance with the Law of Mongolia on Administrative Court Procedure. On July 10, 2015, the judge issued her order approving the Amicable Resolution Agreement and dismissing the case, while reaffirming the obligation of CRKh to take necessary actions at its next session to exclude the License Areas from the SNT and register the new map of the SNT with the relevant authorities. Mining activities at the Soumber property cannot proceed unless and until the Company obtains a court order restoring the Soumber mining licenses and until the License Areas are removed from the SNT.

On July 24, 2021, SGS was notified by the Implementing Agency of Mongolian Government that the license area covered by two mining licenses (MV-016869 and MV-020451) are no longer overlapping with the SNT. The Company will continue to work with the Mongolian authorities regarding the license area covered by the mining license (MV-020436).

On December 7, 2023, the Citizen representative Khural of Gurvantes soum held a meeting and passed a resolution (the "Gurvantes Soum Resolution") claiming that the License Areas were part of local special needs protection area. A request letter was sent to Mineral Resources and Petroleum Authority of Mongolia ("MRPAM") on January 4, 2024.

On January 11, 2024, MRPAM issued an official letter to the Citizen representative Khural of Gurvantes soum and concluded that request was not reasonable and the License Areas will not be registered on the Cadastre mapping system.

On June 18, 2024, the Court of First Instance in Umnugobi Province reviewed the above subject matter in which SGS is the plaintiff and Citizen's Representative Meetings of Gurvantes soum is the defendant. The Court of First Instance determined that the claims made by Citizen's Representative Meetings of Gurvantes soum relating to the License Areas as set forth in the Gurvantes Soum Resolution were invalid. Citizen's Representative Meetings of Gurvantes soum has since applied to the Court of Appeals for an appeal of the Court of First Instance's decision.

On September 12, 2024, the Court of Appeals reviewed the appeal made by Citizen's Representative Meetings of Gurvantes soum and determined that the appeal was invalid. Citizen's Representative Meetings of Gurvantes soum did not apply to the Supreme Court of Mongolia for an appeal of the Court of Appeals' decision upon the expiry of the application deadline. As a result, the decision made by the Court of Appeals is final and conclusive.

Tax Legislation

Mongolian tax, currency and customs legislation is subject to varying interpretation, and changes which can occur frequently. Management's interpretation of such legislation as applied to the transactions and activity of the Company may be challenged by the relevant authorities. The MTA may take a more assertive position

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

in their interpretation of the legislation and assessments, and it is possible that transactions and activities that have not been challenged in the past may be challenged by tax authorities. As a result, significant additional taxes, penalties and interest may be assessed. Fiscal periods remain open to review by the authorities in respect of taxes for five calendar years preceding the year of review. Under certain circumstances reviews may cover longer periods. The Mongolian tax legislation does not provide definitive guidance in certain areas, specifically in areas such as VAT, withholding tax, corporate income tax, personal income tax, transfer pricing and other areas. From time to time, the Company adopts interpretations of such uncertain areas that reduce the overall tax rate of the Company. As noted above, such tax positions may come under heightened scrutiny as a result of recent developments in administrative and court practices. The impact of any challenge by the tax authorities cannot be reliably estimated; however, it may be significant to the financial position and/or the overall operations of the entity.

Management believes that its interpretation of relevant legislation is appropriate and the Company's positions related to tax and other legislation will be sustained. However, the Company may be impacted if such unfavourable event occurs. Management regularly performs re-assessment of tax risk and its position may change in the future as a result of the change in conditions that cannot be anticipated with sufficient certainty at present.

As of December 31, 2024, the Company has recorded an additional tax and tax penalty in the amount of $45.5 million (2023: $85.1 million) and the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty, as more particularly detailed under section 6 "Liquidity and Capital Resources" of this MD&A under the heading entitled "Additional tax and tax penalty imposed by the MTA".

On March 19, 2025, SGS received correspondence from the Administrative Court requesting supplemental information regarding a court proceeding initiated by certain officers of the MTA ("MTA Officials") against the TDRC. Upon further enquiry, SGS obtained a copy of an order dated March 7, 2025 issued by the Administrative Court regarding commencement of court proceedings brought by the MTA Officials. The MTA Officials are petitioning the court to overturn the TDRC's ruling that reduced SGS's tax penalty from approximately $80.0 million to approximately $26.5 million. The Company has recognised a reversal of additional tax and tax penalty of $48.5 million in the consolidated financial statements, reflecting the TDRC's binding decision as of the reporting date.

Based on preliminary advice from the Company's independent Mongolian legal counsel and tax consultants: (i) SGS has not been named as a third party defendant to these proceedings; (ii) The TDRC's Revised Reassessment Result remains legally enforceable unless formally overturned by the court; and (iii) SGS's acceptance of the TDRC's decision makes the ruling final under Mongolian tax law.

Due to the inherent uncertainties surrounding legal proceedings, the ultimate resolution of this matter cannot be predicted with certainty. Should the court rule in favour of the MTA Officials, any resulting adjustments to the provision or recognition of additional liabilities would be accounted for in the period when such determination is made.

8. ENVIRONMENT

The Company is subject to the Environmental Protection Law of Mongolia ("EPL") and has the following duties with respect to environmental protection:

  • To comply with the EPL and the decisions of the government, local self-governing organisations, local governors and Mongolian state inspectors;
  • To comply with environmental standards, limits, legislation and procedures and to supervise their implementation within the organisation;

December 31, 2024


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

  • To keep records on toxic substances, adverse impacts, and waste discharged into the environment; and
  • To report on measures taken to reduce or eliminate toxic chemicals, adverse impacts, and waste.

In addition to those duties imposed on them by the EPL, mining license holders are required to prepare an initial environmental impact assessment analysis before the mine comes into production. The mining license holders must also annually develop and implement an environmental management plan (including reclamation measures) in co-operation with the Ministry of Environment, Green Development and Tourism, which should take into account the results of the environmental impact assessment. The Company received approval of its detailed Environmental Impact Assessment and Environmental Management Plan from the Mongolian Ministry of Environment for the mining operation at the Ovoot Tolgoi Mine in 2007 and renewed in 2016.

The Company has implemented a number of internal policies to embrace responsibility for the impact of its business activities on the environment. By conducting studies, carefully designing mine plans, implementing pollution control recommendations from internal and external sources, monitoring the effects of mining on mining areas and carefully designing mine closure plans, the Company seeks to minimise the impact of its activities on the environment.

The Company established an environmental policy in 2008. The environmental policy affirms the Company's commitment to environmental protection. The Company monitors its operations to ensure that it complies with all applicable environmental requirements, and takes actions to prevent and correct problems if needed. In accordance with new provisions specified in Mongolian laws and regulations, in 2014 the Company developed a protection strategy jointly with professional organisation. This strategic plan can serve as a policy document directed to protection of biological diversity, ecosystem balance and its preservation, and support species dwelling nearby the Ovoot Tolgoi mine area.

The Board maintains a Health, Environment, Safety and Social Responsibility Committee (the "HESS Committee"), which is composed of independent non-executive and executive directors and a senior management member. The primary objective of the HESS Committee is to assist the Board in fulfilling its oversight responsibilities by monitoring and reviewing performance, and recommending for approval policies and management systems, with respect to health, environmental, safety and social responsibility related matters affecting the Company. The HESS Committee also reviews any incidents that may occur and provides guidance on how to prevent any recurrences.

  1. EMOLUMENT POLICY

The emolument policy of the executives of the Company is administered by the Compensation and Benefits Committee on the basis of merit, qualifications and competence and approved by the Board. The emolument policy for the rest of the employees is determined on a department-by-department basis with the executive in charge of each department determining the emoluments for senior employees and managers in the department and the emoluments for non-senior employees being determined by an appropriately designated manager. The emolument policy for non-executives is administered in conjunction with the human resources department and is done on the basis of merit, qualifications and competence.

The emolument policy for the directors of the Company is administered by the Compensation and Benefits Committee and approved by the Board, having regard to comparable market statistics.

The Company has also adopted an equity incentive plan to incentivise directors and eligible employees. Details of the plan are set out in note 29 of the Company's consolidated financial statements for the year ended December 31, 2024.

December 31, 2024
Page | 33


SouthGobi Resources Ltd.
Management's Discussion and Analysis

10. OUTSTANDING SHARE DATA

The Company is authorised to issue an unlimited number of Common Shares without par value and an unlimited number of preferred shares without par value. As at March 28, 2025, approximately 296.7 million Common Shares were issued and outstanding. There are also incentive share options outstanding to acquire approximately 1.2 million unissued Common Shares with an exercise price HK$1.41. There are no preferred shares outstanding.

As at March 28, 2025, to the best of the Company's knowledge:

  • JDZF holds a total of approximately 85.7 million Common Shares representing approximately 28.9% of the issued and outstanding Common Shares;
  • Land Grand International Holding Limited holds a total of approximately 46.4 million Common Shares representing approximately 15.6% of the issued and outstanding Common Shares; and
  • Voyage Wisdom Limited holds a total of approximately 25.8 million Common Shares representing approximately 8.7% of the issued and outstanding Common Shares.

11. DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROLS OVER FINANCIAL REPORTING

Disclosure controls and procedures are designed to provide reasonable assurance that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarised and reported within the time periods specified in the securities legislation and include controls and procedures designed to ensure that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted under securities legislation is accumulated and communicated to the Company's management, including its Chief Executive Officer ("CEO") and Chief Financial Officer ("CFO"), as appropriate to allow timely decisions regarding required disclosure.

Management, including CEO and CFO of the Company, has evaluated the effectiveness of the design and operation of the Company's disclosure controls and procedures. As of December 31, 2024, CEO and CFO of the Company have each concluded that the Company's disclosure controls and procedures, as defined in NI 52-109 - Certification of Disclosure in Issuer's Annual and Interim Filings, are effective to achieve the purpose for which they have been designed.

Internal controls over financial reporting are designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements in accordance with IFRS Accounting Standards. Management is also responsible for the design of the Company's internal control over financial reporting in order to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS Accounting Standards.

The Company's internal controls over financial reporting include policies and procedures that: pertain to the maintenance of records that, in reasonable detail accurately and fairly reflect the transactions and disposition of assets; provide reasonable assurance that transactions are recorded as necessary to permit preparation of the financial statements in accordance with IFRS Accounting Standards and that receipts and expenditures are being made only in accordance with authorisation of management and directors of the Company; and provide reasonable assurance regarding prevention or timely detection of unauthorised acquisition, use or disposition of assets that could have a material effect on the financial statements.

Because of their inherent limitations, internal controls over financial reporting can provide only reasonable assurance and may not prevent or detect misstatements. Furthermore, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in law or the degree of compliance with the policies may deteriorate.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Management assessed the effectiveness of internal controls over financial reporting using the Internal Control – Updated Integrated Framework (2013) issued by the Committee of Sponsoring Organisations of the Treadway Commission. Based on this evaluation, management concluded that the Company's internal controls over financial reporting were effective as of December 31, 2024.

There has been no significant change in the Company's internal controls over financial reporting that occurred during the most recently completed quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.

12. CRITICAL ACCOUNTING ESTIMATES AND JUDGMENTS

The preparation of consolidated financial statements in conformity with IFRS Accounting Standards requires the Company to establish accounting policies and to make estimates and judgments that affect both the amount and timing of the recording of assets, liabilities, revenues and expenses.

A detailed summary of all of the Company's material accounting policies is included in Note 3 to the Company's consolidated financial statements for the year ended December 31, 2024.

The following new IFRS Accounting Standards and interpretations were adopted by the Company on January 1, 2024. Refer to Note 2.4 of the Company's consolidated financial statement of the year ended December 31, 2024 for details.

Amendments to IAS 1
Amendments to IAS 7 and IFRS 7
Amendments to IFRS 16
Int 5 (Revised)

Presentation of Financial Statements and Classification of Liabilities as Current or Non-current and Non-current Liabilities with Covenants
Supplier Finance Arrangements
Lease liabilities in a Sale and Leaseback
Interpretation 5 (Revised) Presentation of Financial Statements – Classification by the Borrower of a Term Loan that Contains a Repayment On Demand Clause

Refer to Note 3.19 of the Company's consolidated financial statements of the year ended December 31, 2024 for information regarding the significant accounting judgments and estimates.

13. RECENT ACCOUNTING PRONOUNCEMENTS

The following new and revised IFRS Accounting Standards, potentially relevant to the Company's consolidated financial statements, have been issued, but are not yet effective and have not been early adopted by the Company.

IFRS 18
IFRS 19
Amendments to IAS 21
Amendments to IFRS 9 and IFRS 7
Amendments to IFRS 9 and IFRS 7
Amendments to IFRS 10 and IAS 28
Amendments to IFRS Accounting Standards

Presentation and Disclosure in Financial Statements⁴
Subsidiaries without Public Accountability: Disclosures⁴
Lack of Exchangeability²
Amendments to the Classification and Measurement of Financial Instruments³
Contracts Referencing Nature-dependent Electricity³
Sale or Contribution of Assets between an Investor and its Associate or Joint Venture¹
Annual Improvements to IFRS Accounting Standards - Volume 11³

¹ Effective for annual periods beginning on or after a date to be determined.
² Effective for annual periods beginning on or after 1 January 2025.
³ Effective for annual periods beginning on or after 1 January 2026.
⁴ Effective for annual periods beginning on or after 1 January 2027.

The Company is currently assessing the effect of these new accounting standards and amendments.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

IFRS 18 Presentation and Disclosures in Financial Statements

IFRS 18 Presentation and Disclosure in Financial Statements, which was issued by the IASB in April 2024 supersedes IAS 1 and will result in major consequential amendments to IFRS Accounting Standards including IAS 8 Basis of Preparation of Financial Statements (renamed from Accounting Policies, Changes in Accounting Estimates and Errors). Even though IFRS 18 will not have any effect on the recognition and measurement of items in the consolidated financial statements, it is expected to have a significant effect on the presentation and disclosure of certain items. These changes include categorisation and sub-totals in the statement of profit or loss, aggregation/disaggregation and labelling of information, and disclosure of management-defined performance measures. The Company is currently evaluating the full impact of IFRS 18 on its financial statement presentation and disclosures. Further updates will be provided as the assessment progresses.

IFRS 19 Subsidiaries without Public Accountability: Disclosures

The adoption of IFRS 19 is optional. IFRS 19 specifies the disclosure requirements that the Company is permitted to apply to substitute the disclosure requirements in other IFRS Accounting Standards. The Company's shares are listed and traded on HKEX and TSX-V. Therefore, it has public accountability according to IFRS 19 and does not qualify for electing to apply the standard to prepare its financial statements.

14. RISK FACTORS

There are certain risks involved in the Company's operations, some of which are beyond its control. These risks can be broadly categorised into: (i) risks relating to the Company's ability to continue as a going concern; (ii) risks relating to the Common Shares; (iii) risks relating to the economic operation of the Company's Ovoot Tolgoi Mine; (iv) risks relating to the Company's projects in Mongolia; and (v) risks relating to its business and industry. The risk factors identified below could have a material adverse impact on the Company's business, operations, results of operations, financial condition and future prospects and could cause actual events to differ materially from those described in forward-looking statements relating to the Company. Additional risks and uncertainties not presently known, or not expressed or implied below, or that are presently deemed immaterial, could also harm the Company's business, operations, results of operations, financial condition and future prospects. Some of the following statements are forward-looking and actual results may differ materially from the results anticipated in these forward-looking statements. Refer to "Forward-Looking Statements".

Risks Relating to the Company's Ability to Continue as a Going Concern

Unless the Company acquires additional sources of financing and/or funding in the short term, the ability of the Company to continue as a going concern is threatened

The Company's consolidated financial statements have been prepared on a going concern basis, which assumes that the Company will continue operating until at least December 31, 2025 and will be able to realise its assets and discharge its liabilities in the normal course of operations as they come due. However, certain adverse conditions and material uncertainties cast doubt upon the ability of the Company to continue as a going concern. These include:

  • the Company has a working capital deficiency (excess current liabilities over current assets) of $228.1 million as at December 31, 2024;
  • the Company has an obligation to pay JDZF under the Convertible Debenture and the associated deferral agreements;

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

  • the trade and other payables of the Company remain high due to liquidity constraints. Refer to Section 6 of this MD&A under the heading entitled "Liquidity and Capital Resources – Liquidity and Capital Management – Going Concern Considerations"; and
  • the Company has other current liabilities which require settlement in the short-term, including trade and other payables of $169.3 million and an additional tax and tax penalty of $43.8 million.

This could result in adjustments to the amounts and classifications of assets and liabilities in the Company's consolidated financial statements and such adjustments could be material. If the Company is unable to continue as a going concern, it may be forced to seek relief under applicable bankruptcy and insolvency legislation, which may negatively affect the price and volatility of the Common Shares and any investment in such shares could suffer a significant decline or total loss in value.

If the Company is unable to continue as a going concern it may be forced to seek relief under applicable bankruptcy and insolvency legislation.

If the Company seeks relief under applicable bankruptcy and insolvency legislation, its business and operations will be subject to certain risks, including but not limited to, the following:

  • an insolvency filing by or against the Company will cause an event of default under the JDZF Convertible Debenture;
  • an insolvency filing by or against the Company may adversely affect its business prospects, including its ability to continue to obtain and maintain the contracts necessary to operate its business on competitive terms;
  • there can be no assurance as to the Company's ability to maintain or obtain sufficient financing sources for operations or to fund any reorganisation plan and meet future obligations;
  • there can be no assurance that the Company will be able to successfully develop, prosecute, confirm and consummate one or more plans of reorganisation that are acceptable to the applicable courts and its creditors, equity holders and other parties in interest; and
  • the value of the Common Shares could be reduced to zero as result of an insolvency filing.

Due to the inherent uncertainties of litigation, it is not possible to predict the final outcome of the Class Action or determine the amount of any potential losses, if any.

The Company is subject to litigation risks. In the normal course of the Company's business, it may become involved in, named as a party to, or be the subject of, various legal proceedings, including, without limitations, mining laws, environmental laws, labour laws, and anti-corruption and anti-bribery laws in the jurisdictions in which the Company operates. Defense and settlement costs associated with legal claims can be substantial, even with respect to claims that are frivolous or have no merit. Due to the inherent uncertainty of the litigation process, the resolution of any particular legal proceeding to which the Company is or may become subject could have a material adverse impact on its business, operations, results of operations, financial condition and future prospects.

The Company is currently a defendant in the Class Action (as more particularly described in Section 7 "Regulatory Issues and Contingencies" of this MD&A). The Company firmly believes that it has a strong defense on the merits and will continue to vigorously defend itself against the Class Action through independent Canadian litigation counsel retained by the Company for this purpose. Due to the inherent

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

uncertainties of litigation, it is not possible to predict the final outcome of the Class Action or determine the amount of potential losses, if any.

In the event the Company incurs any liability in connection with the Class Action, it maintains insurance with respect thereto. While the Company believes that such insurance coverage is in an amount that would be sufficient to cover any amounts the Company may be required or determines to pay with respect thereto, there can be no assurance that such coverage will be adequate to do so, and, if so, any amounts not so covered would be required to be paid by the Company. The Company's ability to continue as a going concern will be impacted to the extent it is required to pay any amounts in connection with the Class Action, which would have a material adverse effect on the business and operations of the Company and may negatively affect the price and volatility of the Common Shares and any investment in such shares could suffer a significant decline or total loss in value.

Risks Relating to the Common Shares

Future issuances or sales, or perceived possible issuances or sales, of substantial amounts of Common Shares in the public market could materially and adversely affect the prevailing market price of the Common Shares and the Company's ability to raise capital in the future.

The market price of the Common Shares could decline as a result of future sales of substantial amounts of the Common Shares or other securities relating to the Common Shares in the public market, including sales by its substantial Shareholders, or the issuance of new Common Shares, or the perception that such sales or issuances may occur. Future sales, or perceived possible sales, of substantial amounts of the Common Shares could also materially and adversely affect the Company's ability to raise capital in the future at a time and at a price favourable to it, and Shareholders may experience dilution in their holdings upon issuance or sale of additional Common Shares or other securities in the future.

Future stock market conditions may change.

There are risks involved with any equity investment. The market price of the Common Shares may rise or fall depending upon a range of factors and stock market conditions, which are unrelated to the Company's future financial performance. Movements on international stock markets, local interest rates and exchange rates, domestic and international economic and political conditions, as well as government, taxation and other policy changes may affect the stock market. As the Company is a listed company on the HKEX and the TSX-V, its Common Share price will also be subject to numerous influences including broad trends in the stock market and the share prices of individual companies or sectors.

Risks Relating to the Economic Operation of the Company's Ovoot Tolgoi Project

There can be no assurance that the mine plan developed for the Ovoot Tolgoi Mine will ultimately be viable or profitable due to the inherent operational risks.

As a result of work performed by BAW, the Company revised its estimate of total resources at the Ovoot Tolgoi deposit from those described in the 2024 Technical Report, has revised its estimate of total reserves for the Ovoot Tolgoi deposit and prepared a new mine plan. There are no assurances, however, that the Company will execute its mine plan and realise on the estimates for the Ovoot Tolgoi deposit. It is not unusual in the mining industry for mining operations to experience unexpected problems during commercial production, resulting in delays and requiring more capital than anticipated. Actual costs and economic returns may differ materially from the Company's estimates. Risks associated with the operation of mines include, but are not limited to, the following:

  • Unusual or unexpected geological formations;

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

  • Unstable ground conditions that could result in cave-ins or landslides;
  • Floods;
  • Power outages;
  • Restrictions or interruptions in supply of key materials;
  • Restrictions or interruptions to coal exports into China;
  • Labour disruptions or shortages;
  • Social unrest in adjacent areas;
  • Equipment failure;
  • Fires and explosions;
  • Changes to applicable law; and
  • Inability to obtain suitable or adequate machinery, equipment, or labour.

In addition, risks particular to the Company's mine plan include:

  • Ability to generate sufficient sales volumes at economical realised prices;
  • Maintaining an adequate water supply to the mine site to permit the continued operations of the wash plant as planned;
  • Achieving satisfactory yields from wet washing operations;
  • Successful conversion of resources into reserves during the life of mine; and
  • Success in enhancing the operational efficiency and the output throughput of the wet wash plant.

Any of the risks noted above could have a material adverse impact on the Company's financial performance, cash flow and results of operations, which may negatively affect the price and volatility of the Common Shares and any investment in such shares could suffer a significant decline or total loss in value.

Risks Relating to the Company's Projects in Mongolia

The Company does not currently maintain insurance in relation to its ongoing mining operations

For certain aspects of the Company's business operations, insurance coverage, in particular business interruption insurance, is restricted or prohibitively expensive. As of the date hereof, in consideration of aging profile of the mining equipment and the continuous engagement of third-party mining contractors, the Company did not renew the insurance policies relating to the mining property and commercial general liability and will renew any necessary insurance policies at the appropriate time.

Should any liability arise for which is it not insured or insurance coverage is inadequate to cover the entire liability, they could reduce or eliminate the Company's actual or prospective profitability, result in increasing costs and a decline in the value of the Common Shares and could materially and adversely affect the Company's business and results of operations.

Legislation in Mongolia may be subject to conflicting interpretations, which may have adverse consequences on the Company's business.

The Mongolian legal system shares several of the qualitative characteristics typically found in a developing country and many of its laws, particularly with respect to matters of taxation, are still evolving. A transaction or business structure that would likely be regarded under a more established legal system as appropriate and relatively straightforward might be regarded in Mongolia as outside the scope of existing Mongolian law or regulation. As a result, certain business arrangements or structures and certain tax planning mechanisms may carry significant risks. In particular, when business objectives and practicalities dictate the use of arrangements and structures that, while not necessarily contrary to settled Mongolian law, are

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

sufficiently novel within a Mongolian legal context, it is possible that such arrangements may be challenged resulting in their invalidation.

The legal system in Mongolia has inherent uncertainties that could limit the legal protections available to the Company, which include: (i) inconsistencies between laws; (ii) limited judicial and administrative guidance on interpreting Mongolian legislation; (iii) substantial gaps in the regulatory structure due to delay or absence of implementing regulations; (iv) the lack of established interpretations of new principles of Mongolian legislation, particularly those relating to business, corporate and securities laws; (v) a lack of judicial independence from political, social and commercial forces; and (vi) bankruptcy procedures that are not well developed and are subject to abuse. The Mongolian judicial system has relatively little experience in enforcing the laws and regulations that currently exist, leading to a degree of uncertainty as to the outcome of any litigation; it may be difficult to obtain swift and equitable enforcement, or to obtain enforcement of a judgment by a court of another jurisdiction.

In addition, while legislation has been enacted to protect private property against expropriation and nationalisation, due to the lack of experience in enforcing these provisions and political factors, these protections may not be enforced in the event of an attempted expropriation or nationalisation. Expropriation or nationalisation of any of the Company's assets, or portions thereof, potentially without adequate compensation, could materially and adversely affect its business and results of operations.

Application of and amendments to legislation could adversely affect the Company's mining rights in its projects or make it more difficult or expensive to develop its projects and carry out mining.

The 2006 Minerals Law (as defined under the heading "DEFINITIONS AND OTHER INFORMATION – Defined Terms and Abbreviations" in the Company's most recently filed Annual Information Form), which preserves to a limited extent some of the substance of the former 1997 minerals legislation, was drafted with the assistance of legal experts in the area of mining legislation and was widely regarded as progressive, internally consistent and effective legislation. However, the 2006 Minerals Law has been subsequently amended and the potential for political interference has increased and the rights and security of title holders of mineral tenures in Mongolia has been weakened. Certain provisions of the 2006 Minerals Law are ambiguous and it is unclear how they will be interpreted and applied in practice. Examples of such provisions include those relating to the designation of a mineral deposit as a Mineral Deposit of Strategic Importance (as defined under the heading "DEFINITIONS AND OTHER INFORMATION – Defined Terms and Abbreviations" in the Company's most recently filed Annual Information Form). Refer to the risk factor entitled "The Government of Mongolia could determine that any one or more of the Company's projects in Mongolia is a Mineral Deposit of Strategic Importance" below.

In addition, the introduction of new Mongolian laws and regulations and the interpretation of existing ones may be subject to policy changes reflecting domestic political or social changes. For example, on July 16, 2009, the Parliament of Mongolia enacted the Mining Prohibition in Specified Areas Law (the "Specified Areas Law") that prohibits minerals exploration and mining in areas such as headwaters of rivers and lakes, forest areas as defined in the Law of Forests of Mongolia of May 17, 2012, as amended, and areas adjacent to rivers and lakes as defined in the Law of Mongolia on Water enacted on May 17, 2012, as amended.

Pursuant to the Specified Areas Law, the Government of Mongolia has defined the boundaries of certain areas in which exploration and mining is purportedly prohibited. A list of licences has been prepared that overlap with the prohibited areas described in the law based on information submitted by water authority agencies, forest authority agencies and local authorities for submission to the Government of Mongolia.

Portions of the mining licence in respect of the Ovoot Tolgoi Mine and the exploration licence pertaining to the Zag Suuj Deposit are included on the list of specified areas described in the Specified Areas Law.

December 31, 2024
Page | 40


SouthGobi Resources Ltd.
Management's Discussion and Analysis

In regard to the Ovoot Tolgoi Mining Licence, the potential area which may be affected is a relatively small area which represents approximately 3% of the entire area of the mining licence and does not contain any reserves or resources or immovable assets. Accordingly, the loss of the potentially affected area would not materially and adversely affect the existing operations.

Activities historically carried out on the other licences referred to above include drilling, trenching and geological reconnaissance. The Company has no immovable assets located in any of the potentially affected areas of these licences and the loss of any or all of these potentially affected properties would not materially and adversely affect the existing operations.

The Mining Prohibition in Specified Areas Law has not been adequately enforced to date mainly due to compensation issues due to the licence holders.

In order to address the issues facing its implementation, in February, 2015 the Parliament of Mongolia adopted an amendment to the Law on Implementation of the Mining Prohibition in Specified Areas Law (the "Amended Law on Implementation"). The Amended Law on Implementation provides an opportunity for license holders covered within the scope of application of the Mining Prohibition in Specified Areas Law to continue their mining operations subject to advance placement of funds to cover 100% of the future environmental rehabilitation costs. A model contract and a specific Government regulation on this requirement will be adopted by the Government. The license holders must also apply within 3 months after the amendment to the Law on Implementation comes into effect for permission to the Mineral Resource Authority of Mongolia ("MRAM") to resume activities. The Company submitted its application with respect to its mining licenses before the deadline set on June 16, 2015 and hasn't yet received any communication from MRAM on the status of its application.

Pursuant to the Mongolian Law "To prohibit mineral exploration and mining operations at headwaters of rivers, water protection zones and forested areas", the Government administrative agency has notified the Company that special license area 12726A is partly overlapping with a water reservoir. The Company has inspected the area together with the Cadastral Division of the Mineral Resource Authority as well as through the cadastral registration system of the Ministry of Environment, it is determined that 29 hectares of Sukhait Bulag is partly overlapping with a water reservoir, of which has been partly handed over. (Resolution No.6/7522 issued on September 29, 2015 by the Head of Cadastral Division of the Mineral Resource Authority).

In accordance with Article 22.3 of Law of Mongolia on Water, 5,602.96 hectares of land, including Sukhaityn Bulag, Uvur Zadgai, and Zuun Shand pertaining to exploration license 9443X, which was converted to mining license MV-0125436 in January 2016, is overlapping with a protected area boundary. The overlapping area has been officially handed over to the local administration. (Resolution No.688 issued on September 24, 2015 by the Head of Cadastral Division of the Mineral Resource Authority) In connection with the nullification of Annex 2 of the Government order No.194 "On determining boundary" issued on June 5, 2012, area around the water reservoir located at MV-016869 license area was annulled from the Specified Area Law.

Therefore, mining license 12726A was removed from the list of licenses that overlaps with the prohibited areas described in the law.

There has been limited development of the law during 2016 while two exploration licenses of the Company (13779X and 5267X) were converted to mining licenses (MV-020676 and MV-020675) in November 2016. The Company will continue to monitor the developments and ensure that it follows the necessary steps in the Amended Law on Implementation to secure its operations and licenses and is fully compliant with Mongolian law.

December 31, 2024
Page | 41


SouthGobi Resources Ltd.
Management's Discussion and Analysis

There can be no assurance that future political and economic conditions in Mongolia will not result in the Government of Mongolia adopting different policies in relation to foreign development and ownership of mineral resources. Any such changes in government or policy may result in changes in laws affecting ownership of assets, environmental protection, labour relations, repatriation of income, return of capital, investment agreements, income tax laws, royalty regulation, government incentive and other areas, each of which may materially and adversely affect the Company's ability to undertake exploration and development activities in the manner currently contemplated. Any restrictions imposed or charges levied or raised (including royalty fees) under Mongolian law for the export of coal could harm the Company's competitiveness.

The Company's ability to carry on business in Mongolia is subject to political risk.

The Company's ability to efficiently conduct its exploration and development activities is subject to changes in government policy or shifts in political attitudes within Mongolia that are beyond the Company's control.

Government policy may change to discourage foreign investment, nationalisation of mining industries may occur or other government limitations, restrictions or requirements not currently foreseen may be implemented. There is no assurance that the Company's assets will not be subject to nationalisation, requisition or confiscation, whether legitimate or not, by any authority or body. The provisions under Mongolian law for compensation and reimbursement of losses to investors under such circumstances may not be effective to restore the value of the Company's original investment.

In addition, Mongolia may experience political instability. Such instability could have a material adverse effect on economic or social conditions in Mongolia and may result in outbreaks of civil unrest, which could materially and adversely affect the Company's business and results of operations.

The Government of Mongolia could determine that any one or more of the Company's projects in Mongolia is a Mineral Deposit of Strategic Importance if it meets legal requirements.

Under the 2006 Minerals Law, the State Great Khural of Mongolia (the "Parliament of Mongolia") has wide discretion to designate mineral deposits to be Mineral Deposits of Strategic Importance. The Government of Mongolia is empowered to participate on an equity basis with the licence holder in the exploitation and/or mining of each Mineral Deposit of Strategic Importance on terms to be negotiated between the Government of Mongolia and such licence holder. Details of any mineral reserves must be filed by the relevant licence holder with the Government of Mongolia, and those deposits on the Strategic Deposits List represent most of the largest and highest profile deposits in Mongolia. In addition to deposits currently on the Strategic Deposits List and the additional Tier 2 Deposits List, the Parliament of Mongolia may at any time designate other deposits not yet currently on such Lists to be Mineral Deposits of Strategic Importance, add such deposits to either the Strategic Deposits List or the Tier 2 Deposits List and, in the former case, commence negotiations with the relevant licence holder with respect to the terms under which the Government of Mongolia will take an interest in such deposit. While the Government of Mongolia is in the process of adding the exact location and coordinates for each Mineral Deposit of Strategic Importance, a number of deposits on the Strategic Deposits List are identified by name only with no indication of the latitude and longitude coordinates for the deposit, and it is therefore not always possible to precisely determine the intended geographic area covered by each designated Mineral Deposit of Strategic Importance or to accurately determine whether or not any given licence area is within, or overlaps, a Mineral Deposit of Strategic Importance. In July 2014, the Mongolian Parliament made an amendment to the Minerals Law and redefined the term of "Mineral Deposit of Strategic Importance". According to the Minerals Law, the Mineral Deposit of Strategic Importance means "a deposit which can affect national security, national economic and social development or a deposit that can produce more than five percent of Mongolian GDP in a year".

December 31, 2024
Page | 42


SouthGobi Resources Ltd.
Management's Discussion and Analysis

Under the 2006 Minerals Law, the size of the Government of Mongolia's participation is determined largely by the level of state funding which has been provided for the exploration and development of any deposit, with the Government of Mongolia entitled to participate up to 50% in the event that there has been state funding of such deposit and up to 34% if there has not. However, the 2006 Minerals Law is very vague as to the details and method by which the Government of Mongolia will take its interest and the final arrangements in respect of the Government of Mongolia's interest in each Mineral Deposit of Strategic Importance, including the amount of compensation to be paid to the licence holder and the actual form of the Government of Mongolia's interest are subject to negotiation between the Government of Mongolia and the licence holder. In 2015, the Parliament of Mongolia adopted an amendment to the 2006 Minerals Law providing for the possibility for the Government to collect a special royalty on Mineral Deposits of Strategic Importance in lieu of holding an equity stake in such deposit. It stipulates that the parties can agree to transfer to the licence holder the state's share in the Mineral Deposit of Strategic Importance upon the approval of an authorised Government body, with the licence holder agreeing to pay a special royalty at a percentage (not to exceed 5%) to be approved by the Government.

The 2006 Minerals Law also contains provisions requiring any company which holds a Mineral Deposit of Strategic Importance to list no less than 10% of its shares on the Mongolian Stock Exchange. This particular provision of the 2006 Minerals Law has not yet been enforced and it is not clear how it will work in practice.

In recent years there have been a number of proposed amendments to the 2006 Minerals Law suggested by various parties, many of which have centered on amending the 2006 Minerals Law to increase the Government of Mongolia's participating interest in excess of 50%. While the 2006 Minerals Law provides that the interest of the Government of Mongolia should take the form of an equity interest, based on past practice, and depending on the results of individual negotiations, the interest may be in the form of production or profit sharing or some other arrangement negotiated between the licence holder and the Government of Mongolia. There can be no assurance that legislation will not be enacted which further strengthens the Government of Mongolia's right to participate in privately held mineral resources in Mongolia.

None of the deposits covered by the Company's existing mining licences or exploration licences are currently designated as Mineral Deposits of Strategic Importance. However, there can be no assurance that any one or more of these deposits will not be so designated in the future, in which case the Company's business and results of operations may be materially and adversely affected.

Risks relating to the Company's business and industry

Some of the Company's projects may not be completed as planned; costs may exceed original budgets and may not achieve the intended economic results or commercial viability.

The Company's business strategy depends largely on expanding its production capacity at the Ovoot Tolgoi Mine and further developing its other coal projects into commercially viable mines. Whether a mineral deposit will be commercially viable depends on a number of factors, including: (i) the particular attributes of the deposit, such as size, grade and proximity to infrastructure; (ii) commodity prices, which are highly cyclical; and (iii) government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of mineral resources and environmental protection.

The Company's projects are subject to both (i) technical risk in that they may not perform as designed, or (ii) operational redesign or modification as a result of on-going evaluation of the projects. Increased development costs, lower output or higher operating costs may all combine to make a project less profitable than expected at the time of the development decision. This would have a negative impact on the Company's business and results of operations. No assurance can be given that the Company would be

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

adequately compensated by third party project design and construction companies (if not performed by the Company) in the event that a project did not meet its expected design specification.

The Company's coal reserves and resources are estimates based on a number of assumptions, and the Company may produce less coal than its current estimates.

The coal reserve and resource estimates are based on a number of assumptions that have been made by the Qualified Persons in accordance with NI 43-101. Reserve and resource estimates involve expressions of judgment based on various factors such as knowledge, experience and industry practice, and the accuracy of these estimates may be affected by many factors, including quality of the results of exploration drilling and analysis of coal samples, as well as the procedures adopted by and the experience of the person making the estimates.

The Company notes that, in general, mineral resource and reserve estimates are always subject to change based on new information. Specifically, should the Company encounter mineralisation different from that predicted by past drilling, sampling and similar examination, mineral resource and/or reserve estimates may have to be adjusted downward. In addition, the rank of coal ultimately mined may differ from that indicated by drilling results. There can be no assurance that coal recovered in laboratory tests will be duplicated under on-site conditions or in production-scale operations. In the event that the actual level of impurities is higher than expected or the coal mined is of a lower quality than expected, the demand for, and realisable price of, the Company's coal may decrease. Short term factors relating to reserves, such as the need for orderly development of coal seams or the processing of new or different quality coals, may also materially and adversely affect the Company's business and results of operations.

The inclusion of reserve and resource estimates should not be regarded as a representation that all these amounts can be economically exploited and nothing contained herein (including, without limitation, the estimates of mine lives) should be interpreted as assurance of the economic lives of the Company's coal reserves and resources or the profitability of its future operations.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty that may attach to inferred mineral resources, there is no assurance that mineral resources will be upgraded to proven and probable ore reserves. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorised as mineral reserves.

The Company's results of operations are subject, to a significant extent, to economic, political and legal developments in China.

The Company expects that a majority if not all of the coal sales from the Ovoot Tolgoi Mine will be made to customers based in China. Accordingly, the economic, political and social conditions, as well as government policies, of China may affect its business. The Chinese economy differs from the economies of most developed countries in many respects, including: (i) structure; (ii) level of government involvement; (iii) level of development; (iv) growth rate; (v) control of foreign exchange; and (vi) allocation of resources. The Chinese economy has been transitioning from a planned economy to a more market-oriented economy. For the past two decades, the Chinese government has implemented economic reform measures emphasising the utilisation of market forces in the development of the Chinese economy. Changes in the Chinese's political, economic and social conditions, laws, regulations and policies could materially and adversely affect the Company's business and results of operations.

The interests of the Company's principal stakeholders, JDZF, Land Grand and Voyage Wisdom, may differ from those of the other stakeholders.

December 31, 2024
Page | 44


SouthGobi Resources Ltd.
Management's Discussion and Analysis

As at March 28, 2025, to the best of the Company's knowledge:

  • JDZF holds a total of 85.7 million Common Shares representing approximately 28.9% of the issued and outstanding Common Shares;
  • Land Grand holds a total of approximately 46.4 million Common Shares representing approximately 15.7% of the issued and outstanding Common Shares; and
  • Voyage Wisdom holds a total of approximately 25.8 million Common Shares representing approximately 8.7% of the issued and outstanding Common Shares.

Accordingly, the Company's principal stakeholders may have the ability to substantially affect the outcome of matters submitted to Shareholders of the Company for approval, including, without limitation, the election and removal of directors, amendments to the Company's articles of incorporation and bylaws and the approval of any business combination. This may delay or prevent an acquisition of the Company or cause the market price of the Common Shares to decline. The interests of each of these principal stakeholders may conflict with the interests of other Shareholders and there is no assurance that any of these principal stakeholders will vote its Common Shares in a way that benefits minority Shareholders. While no Shareholder has the ability to elect a majority of the Board unilaterally, both JDZF and Land Grand have been granted contractual director appointment rights. In addition, the Company's principal stakeholders may have an interest in pursuing acquisitions, divestitures and other transactions that, in the judgment of management, could enhance its equity or debt investment, even though such transactions might involve risks to other Shareholders and may negatively affect prevailing market prices of the Common Shares.

Subject to compliance with applicable securities laws, the principal stakeholders may sell some or all of their Common Shares in the future. No prediction can be made as to the effect, if any, such future sales of Common Shares will have on market prices of the Common Shares prevailing from time to time. However, the future sale of a substantial number of Common Shares by our principal stakeholders, or the perception that such sales could occur, could adversely affect prevailing market prices of the Common Shares.

Tax and royalty legislation in Mongolia is subject to varying interpretations and changes which may have a significant impact on the Company's financial position.

Mongolian tax, currency, customs and royalty legislation is subject to varying interpretations and changes, which can occur frequently. The interpretation by the Company's management of such legislation as applied to the transactions and activity of the Company may be challenged by the relevant authorities.

The Mongolian tax authorities may be taking a more assertive position in their interpretation of the legislation and assessments, and it is possible that transactions and activities that have not been challenged in the past may be challenged by tax authorities. As a result, significant additional taxes, penalties, interest or royalties may be assessed. Fiscal periods remain open to review by the authorities in respect of taxes for five calendar years preceding the year of review. Under certain circumstances reviews may cover longer periods.

The Mongolian tax legislation does not provide definitive guidance in certain areas, specifically in areas such as value-added tax, withholding tax, corporate income tax, personal income tax, transfer pricing and other areas. From time to time, the Company adopts interpretations of such uncertain areas that reduce the overall tax rate of the Company. As noted above, such tax positions may come under heightened scrutiny as a result of recent developments in administrative and court practices. The impact of any challenge by the tax authorities cannot be reliably estimated; however, it may be significant to the financial position and/or the overall operations of the entity in question.

The royalty regime in Mongolia is evolving and has been subject to change since 2012. On June 23, 2021, the Government of Mongolia issued a new resolution in connection with the royalty regime. From July 1,

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

2021 onwards, the royalty payable is to be calculated based on the reference price as determined by the Government of Mongolia, and the reference to the contract sales price will be removed.

There can be no assurance, however, that the Government of Mongolia will not disagree with the methodology employed by the Company in determining the calculated sales price and require that the royalty payable be calculated based on the Mongolian government's reference, which could have a material adverse effect on the business and operations of the Company and may negatively affect the price and volatility of the Common Shares.

As of December 31, 2024, the Company has recorded an additional tax and tax penalty in the amount of $45.5 million and the Company has paid the MTA an aggregate of $1.7 million in relation to the aforementioned tax penalty, as more particularly detailed under section 6 "Liquidity and Capital Resources" of this MD&A under the heading entitled "Additional Tax and Tax Penalty Imposed by MTA".

Management believes that its interpretation of the relevant legislation is appropriate and the Company's positions related to tax, royalty and other legislation will be sustained. Management believes that tax, royalty and legal risks are remote at present. Management performs regular re-assessment of tax risk and its position may change in the future as a result of the change in conditions that cannot be anticipated with sufficient certainty at present.

Licences and permits are subject to renewal and various uncertainties and the Company may only renew its exploration licences a limited number of times for a limited period of time.

The Company's activities are subject to extensive licensing and permitting requirements. The Company strives to obtain all required licenses and permits on a timely basis and to comply with all such licenses and permits at all times. However, there can be no assurance that the Company will obtain and maintain all required licenses and permits or that it will not face delays in obtaining all required licenses and permits, renewals of existing licenses and permits, additional licenses and permits required for existing or future operations or activities, or additional licenses and permits required by new legislation. The Company notes the following with respect to its ability to obtain and maintain applicable licenses and permits:

  • Certain provisions of the Law on Land of Mongolia enacted on June 7, 2002, as amended (the "Land Law of Mongolia") and the 2006 Minerals Law provide for the revocation of previously granted land use rights, mineral exploration licenses or mining licences on the grounds that the affected area of land has been designated as SNT. The Land Law of Mongolia grants the discretion to declare an area of land for special needs purposes to local governing authorities and identifies various broad categories which qualify as special needs. The 2006 Minerals Law requires the local governing authority that designates an area of land as a special needs territory to compensate within one year the licence holder whose rights or licence status are affected. The failure to pay the compensation within the one year period would allow the licence holder to resume its operations. If any of the Company's land use rights or mining licences in Mongolia are revoked because the underlying land is declared as special needs territory, there is no assurance that the Company will receive adequate compensation and its business and results of operation might be adversely and materially affected.

  • On February 13, 2015, the License Areas were included into a special protected area (referred to as a Special Needs Territory or "SNT") newly set up by the Umnugobi Aimag's CRKh to establish a strict regime on the protection of natural environment and prohibit mining activities in the territory of the SNT.

  • On July 8, 2015, SGS and the Chairman of the CRKh, in his capacity as the respondent's representative, reached an agreement (the "Amicable Resolution Agreement") to exclude the License Areas from the territory of the SNT in full, subject to confirmation of the Amicable Resolution Agreement by the session of the CRKh. The parties formally submitted the Amicable

December 31, 2024
Page | 46


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

Resolution Agreement to the appointed judge of the Administrative Court for her approval and requested a dismissal of the case in accordance with the Law of Mongolia on Administrative Court Procedure. On July 10, 2015, the judge issued her order approving the Amicable Resolution Agreement and dismissing the case, while reaffirming the obligation of CRKh to take necessary actions at its next session to exclude the License Areas from the SNT and register the new map of the SNT with the relevant authorities. Mining activities at the Soumber property cannot proceed until the License Areas are removed from the SNT.

  • On July 24, 2021, SGS was notified by the Implementing Agency of Mongolian Government that the license area covered by two mining licenses (MV-016869 and MV-020451) are no longer overlapping with the SNT. The Company will continue to work with the Mongolian authorities regarding the license area covered by the mining license (MV-020436). There is no assurance that the Company will receive adequate compensation and its business and results of operation might be adversely and materially affected.
  • On December 7, 2023, the Citizen representative Khural of Gurvantes soum held a meeting and passed a resolution claiming that the License Areas were part of local special needs protection area. A request letter was sent to MRPAM on January 4, 2024.
  • On January 11, 2024, MRPAM issued an official letter to the Citizen representative Khural of Gurvantes soum and concluded that request was not reasonable and therefore the License Areas will not be registered on the Cadastre mapping system.
  • On June 18, 2024, the Court of First Instance in Umnugobi Province reviewed the above subject matter in which SGS is the plaintiff and Citizen's Representative Meetings of Gurvantes soum is the defendant. The Court of First Instance determined that the claims made by Citizen's Representative Meetings of Gurvantes soum relating to the License Areas as set forth in the Resolution were invalid. Citizen's Representative Meetings of Gurvantes soum has since applied to the Court of Appeals for an appeal of the Court of First Instance's decision.
  • On September 12, 2024, the Court of Appeals reviewed the appeal made by Citizen's Representative Meetings of Gurvantes soum and determined that the appeal was invalid. Citizen's Representative Meetings of Gurvantes soum did not apply to the Supreme Court of Mongolia for an appeal of the Court of Appeals' decision upon the expiry of the application deadline. As a result, the decision made by the Court of Appeals is final and conclusive.

The inability to obtain or maintain licenses and permits with respect to its mining operations, of any delay with respect to the obtaining of licenses and permits, could have a material adverse impact on the Company's financial performance, cash flow and results of operations.

Prolonged periods of severe weather conditions could materially and adversely affect the Company's business and results of operations.

Severe weather conditions may require the Company to evacuate personnel or curtail operations and may cause damages to the project site, equipment or facilities, which could result in the temporary suspension of operations or generally reduce the Company's productivity. Severe weather conditions have not caused any delay or damages to the Company's operations to date. However, there can be no assurance that severe weather will not occur. Any damages to the Company's projects or delays in its operations caused by prolonged periods of severe weather could materially and adversely affect its business and results of operations.

The Company's business and results of operations are susceptible to the cyclical nature of coal markets and are vulnerable to fluctuations in prices for coal.

The Company expects to derive substantially all of its revenue and cash flow from the sale of coal. Therefore, the market price of the Common Shares, the Company's ability to raise additional financing and maintain ongoing operations and its financial condition and results of operations will be directly related to

December 31, 2024
Page | 47


SouthGobi Resources Ltd.
Management's Discussion and Analysis

the demand for, and price of, coal and coal-related products. Coal demand and price are determined by numerous factors beyond the Company's control, including the international demand for steel and steel products, the availability of competitive coal supplies, international exchange rates, political and economic conditions in Mongolia, China and elsewhere in the world, milder or more severe than normal weather conditions, and production costs in major coal producing regions. The Chinese and international coal markets are cyclical and have in the past exhibited significant fluctuations in supply, demand and prices from year to year. There has been significant price volatility on the coal spot market. An oversupply of coal in China or a general downturn in the economies of any significant markets for the Company's coal and coal-related products could materially and adversely affect its business and results of operations. In addition, the Company's dependence on Asian markets may result in instability in its operations due to political and economic factors in those Asian jurisdictions which are beyond the Company's control. The combined effects of any or all of these factors on coal prices or volumes are impossible for the Company to predict.

If realised coal prices are below the full cost of production of any of the Company's future mining operations and remain at such a level for any sustained period, the Company could experience increased losses and may decide to discontinue operations, which could require the Company to incur closure costs and result in further reduced revenues.

The Company's coal mining activities are subject to operational risks, including equipment breakdown.

The Company's coal mining operations are subject to a number of operational risks, some of which are beyond its control, which could delay the production and delivery of coal. These risks include unexpected maintenance or technical problems, periodic interruptions to its mining operations due to inclement or hazardous weather conditions and natural disasters, industrial accidents, power or fuel supply interruptions and critical equipment failure, including malfunction and breakdown of its shovels, upon which its coal mining operations are heavily reliant and which would require considerable time to replace. These risks and hazards may result in personal injury, damage to, or destruction of, properties or production facilities, environmental damage, business interruption and damage to its business reputation. In addition, breakdowns of equipment, difficulties or delays in obtaining replacement shovels and other equipment, natural disasters, industrial accidents or other causes could temporarily disrupt the Company's operations, which in turn may also materially and adversely affect its business, prospects, financial condition and results of operations.

The Company's future financial performance depends, in part, on the successful operation of the wash plant at the Ovoot Tolgoi Mine, which is subject to various risks

Because the Company's current mine plan is predicated, in part, on incorporating a coal washing and process systems, the Company's future financial performance will depend on the successful operation of the wash plant at the Ovoot Tolgoi mine. The operating performance of the wash plant, and the related cost of operation and maintenance, may be adversely affected by a variety of risk factors, including, but not limited to, the following:

  • Maintaining an adequate water supply and power supply to the mine site to permit the continued operations of the wash plant as planned;
  • Achieving satisfactory yields from wet washing operations;
  • The Company successfully enhancing the operational efficiency and the output throughput of the wet wash plant;
  • The Company successfully negotiating an agreement with the wash plant operator regarding the operation of the wash plant;
  • Unexpected maintenance and replacement expenditures;

December 31, 2024


SouthGobi Resources Ltd.
Management’s Discussion and Analysis

  • Shutdowns due to the breakdown or failure of the wash plant’s equipment;
  • Labour disputes; and
  • Catastrophic events such as fires, explosions, severe storms or similar occurrence affecting the wash plant facility or third parties providing services to the wash plant.

Any of the risks noted above could have a material adverse impact on the operational performance or cost of operations of the wash plant, which in turn could have a material adverse effect on the Company’s financial performance, cash flow and results of operations.

The unavailability or shortage of reliable and sufficient coal transportation capacity that meets Mongolian authority regulations will reduce the Company’s coal revenue by causing it to reduce its production volume or impairing its ability to supply coal to its customers.

The Company anticipates that the majority of its coal production from the projects in Mongolia will be exported to China. Inadequate transportation infrastructure, or restrictions on or delays in coal exports to China, is likely to affect the pricing terms on which it can sell the coal to customers and the willingness and ability of such customers to purchase coal from it. Customers are likely to factor in any delays and the costs and availability of transportation in determining the price they are prepared to pay to purchase the Company’s coal. Therefore, its mining operations are anticipated to be highly dependent on road and rail services in Mongolia and China.

The opening hours of the Shivee Khuren Border Crossing also affect the Company’s ability to expedite the movement of its coal shipments. There can be no assurance that there would be any other cost effective means of transporting the coal to the Company’s primary market in China. As a result, the Company may experience difficulty expediting the movement of its coal shipments and/or significant cost escalation for the transportation services, which could affect its production and reduce its profitability.

In China, rail and road infrastructure and capacity has in the past been affected by extreme weather conditions, earthquakes, delays caused by major rail accidents, the COVID-19 pandemic, the diversion of rolling stock needed to deliver emergency food relief and seasonal congestion during public holidays. There can be no assurance that these problems will not recur or that new problems will not occur. In any of these circumstances, the customers may not be able to take delivery of the Company’s coal, which may lead to delays in payment, or refusal to pay, for the Company’s coal and, as a result, the Company’s business and results of operations could be materially and adversely affected.

The Company’s prospects depend on its ability to attract, retain and train key personnel.

Recruiting, retaining and training qualified personnel is critical to the Company’s success. The number of persons skilled in the acquisition, exploration and development of mining properties is limited and competition within the mining industry for such persons is intense, in particular, Mongolian law requires that at least 90% of a mining company’s employees be of Mongolian nationality. This provision of the law, coupled with the large number of active mining projects in Mongolia, further limits the number of available personnel and increases competition for skilled personnel. The reputation and capability to operate continuously over the longer term are key factors in also attracting key personnel to its business. The Company is reinforcing its core values of ethical behavior in dealing with all its stakeholders from senior management down in order to ensure the Company attracts the right people to its business. As the Company’s business activity grows, it will require additional key financial, administrative, mining, marketing and public relations personnel as well as additional operations staff. If the Company is not successful in attracting such key personnel, or retaining existing key personnel, its business and results of operations could be materially and adversely affected.

December 31, 2024
Page | 49


SouthGobi Resources Ltd.
Management's Discussion and Analysis

In addition, the Company's ability to train operating and maintenance personnel is a key factor for the success of its business activities. If the Company is not successful in recruiting, training and retaining such personnel, its business and results of operations could be materially and adversely affected.

Competition in the coal industry may hinder development plans and adversely affect the Company's coal sales if it is not able to compete effectively.

Continued growth in mining and mineral exploration activities in Mongolia could create an increasing demand for mining equipment and related services. Shortages of, or higher costs for, equipment and services could restrict the Company's ability to carry out the exploration, development and production activities, increase its costs of operations and adversely affect its future plans.

The Company intends to sell a majority of the coal it produces in China. Competition in the Chinese coal industry is based on many factors, including, among others, price, production capacity, coal quality and characteristics, transportation capability and costs, blending capability and brand name. The Company's coal business will most likely compete in China with other large Chinese and international coal mining companies. Due to location, some of the Company's Chinese competitors may have lower transportation costs than the Company does. The Chinese coal market is highly fragmented and the Company faces price competition from some small local coal producers that produce coal for significantly lower costs than the Company due to various factors, including their lower expenditure on safety and regulatory compliance. Some of the Company's international competitors, including the Mongolian coal producers, may have greater coal production capacity as well as greater financial, marketing, distribution and other resources than the Company does, and may benefit from more established brand names in international markets. The Company's future success will depend on its ability to respond in an effective and timely manner to competitive pressure.

There are a number of risks associated with the Company's operation plan, dependence on a limited number of customers and inability to attract additional customers.

The current operation plan contemplates significant operational funding in the Company's mining operations as well as equipment maintenance in order to achieve the Company's revenue and cash flow targets. Such expenditures and other working capital requirements may require the Company to seek additional financing. There is no guarantee that the Company will be able to secure other sources of financing. If the Company is unable to continue as a going concern, it may be forced to seek relief under applicable bankruptcy and insolvency legislation.

The Company has been selling its coal products since 2008. The Company had 78 active customers with the largest customer representing approximately 15%, the second largest customer representing approximately 7%, the third largest customer representing approximately 5% and the remaining customers accounting for 73% of the Company's total sales for the year ended December 31, 2024. In order to mitigate this risk, the Company is attempting to modify its sales strategy in order to expand its existing customer base. With certain of its customers, the Company has accepted payment for coal deliveries in the form of bank instruments, in lieu of cash. There can be no assurance, however, that the Company will be able to satisfy or comply with the funding conditions of such instruments following completion of the coal delivery or the bank that issues the instrument will be capable of paying all or any portion of the proceeds to the Company, which could have a material adverse effect on the business and operations of the Company and may negatively affect the price and volatility of the Common Shares.

The Company still expects to sell the majority of the coal from its Mongolian mining operations to customers in China. Chinese law requires specific authorisation to be obtained by entities responsible for the import of coal into China. In the event that the Company's customers, or the agents of such customers who are responsible for importing coal into China on their behalf, fail to obtain and retain the necessary

December 31, 2024
Page | 50


SouthGobi Resources Ltd.
Management's Discussion and Analysis

authorisations, their ability to import coal into China may be affected, which could materially and adversely affect the Company's business and results of operations.

There are significant uncertainties as to the outcomes of the above events or conditions that may cast significant doubt on the Company's ability to continue as a going concern and, therefore, the Company may be unable to realise its assets and discharge its liabilities in the normal course of business. Should the use of the going concern basis in preparation of the consolidated financial statements be determined to be not appropriate, adjustments would have to be made to write down the carrying amounts of the Company's assets to their realisable values, to provide for any further liabilities which might arise and to reclassify non-current assets and non-current liabilities as current assets and current liabilities, respectively. The effects of these adjustments have not been reflected in the consolidated financial statements.

Failure to maintain an effective system of internal controls may result in material misstatements of the Company's financial statements or cause the Company to fail to meet its reporting obligations or fail to prevent fraud.

Effective internal controls are necessary for the Company to provide reliable financial reports and prevent fraud. If the Company fails to maintain an effective system of internal controls, the Company may not be able to report its financial results accurately or prevent fraud; and in that case, Shareholders and investors could lose confidence in the Company's financial reporting, which would harm the Company's business and could negatively impact the price of the Common Shares.

If the Company suffers any future material weaknesses in its internal controls and procedures or fails to maintain the adequacy of its internal controls and procedures, the Company could be the subject of regulatory scrutiny, penalties or litigation, all of which would harm the Company's business and could negatively impact the price of the Common Shares.

The Company cannot provide assurances that the Company will not experience potential material weaknesses in its internal controls. Even if the Company concludes that its internal controls over financial reporting provide reasonable assurance regarding the reliability of financial reporting and the preparation of consolidated financial statements for external purposes in accordance with IFRS Accounting Standards, because of their inherent limitations, internal control over financial reporting may not prevent or detect fraud or misstatements. These inherent limitations include the realities that judgments in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by individual acts, by collusion of two or more individuals or by unauthorised override of controls. Failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm the Company's results of operations or cause the Company to fail to meet its future reporting obligations.

The Company's operations are exposed to risks in relation to environmental protection and rehabilitation.

The operations of coal mines involve substantial environmental risks and hazards and the Company's operations are subject to laws and regulations relating to the environment, health and safety and other regulatory matters in Mongolia and China.

The risk of environmental liability is inherent in the operation of the Company's business. Environmental hazards may occur in connection with the Company's operations as a result of human negligence, force majeure, or otherwise. Claims may be asserted against the Company arising out of its operations in the normal course of business, including claims relating to land use, safety, health and environmental matters. The Company is not insured against environmental liabilities and there can be no assurance that environmental liabilities would not materially and adversely affect its business and results of operations.

December 31, 2024
Page | 51


SouthGobi Resources Ltd.
Management's Discussion and Analysis

In addition, the Company is subject to reclamation requirements. The Company's mine will eventually close. The key tasks in relation to the closure of the mines involves (i) long-term management of permanent engineered structures (for example, spillways, roads, waste dumps); (ii) achievement of environmental closure standards; (iii) orderly retrenchment of employees and contractors; and (iv) relinquishment of the site with associated permanent structures and community development infrastructure and programs to new owners. The successful completion of these tasks is dependent on the Company's ability to successfully implement negotiated agreements with the relevant government, community and employees. The consequences of a difficult closure range from increased closure costs and handover delays to ongoing environmental impacts and corporate reputation damage if desired outcomes cannot be achieved, which could materially and adversely affect the Company's business and results of operations.

The Company currently does not own a coal storage facility at the Ceke border. As a result of potential stricter requirements for coal storage facilities which may be adopted by the local government in the future, the Company may not be able to secure enough storage space at the Ceke border, which could have a material adverse effect on the business and operations of the Company and may negatively affect the price and volatility of the Common Shares. As part of its focus on capital preservation, the Company has decided to suspend indefinitely all further development activities relating to the previously announced Ceke Logistics Park Project until further notice. The Company may be at risk of becoming subject to litigation proceedings initiated by its investment partner in the Ceke Logistics Park Project for failing to comply with the underlying agreements governing project development. Due to the inherent uncertainty of the litigation process, the resolution of any particular legal proceeding to which the Company may become subject could have a material adverse impact on its business, operations, results of operations, financial condition and future prospects.

Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. The Company may experience increased costs of production arising from compliance with environmental laws and regulations. Should the Company fail to comply with current or future environmental laws and regulations, the Company may be required to pay penalties or take corrective actions, any of which may have a material adverse effect on its results of operations and financial condition.

Foreign currency fluctuations could affect expenses and any future earnings.

The Company is exposed to foreign exchange fluctuations with respect to the MNT, Chinese Renminbi, Hong Kong dollars, and Canadian dollars. The Company's financial results are reported in United States dollars. The salaries for local laborers in Mongolia are paid in local currency. Sales of coal into China have been and may continue to be settled in United States dollars and Renminbi. The Company has a subsidiary in Hong Kong where some expenses are incurred in Hong Kong dollars. Since the Company's headquarters is in Canada, a minor portion of its expenses are in Canadian dollars and the Company holds a portion of its cash in Canadian dollars. As a result, its financial position and results are impacted by the exchange rate fluctuations between the aforementioned currencies and the United States dollar.

Information in this MD&A regarding future plans reflects current intentions and is subject to change.

Whether the Company ultimately implements the business strategies described in this MD&A will depend on a number of factors including, but not limited to: the political situation in Mongolia and China; the availability and cost of capital; current and projected coal prices; coal markets; costs and availability of drilling services, costs and availability of heavy equipment, supplies and personnel; success or failure of activities in similar areas to those in which the Company's projects are situated; and changes in estimates of project completion costs. The Company will continue to gather information about its projects, and it is possible that additional information will cause it to alter its schedule or determine that a project should not

December 31, 2024
Page | 52


SouthGobi Resources Ltd.
Management's Discussion and Analysis

be pursued at all. Accordingly, the Company's plans and objectives may change from those described in this MD&A.

15. OUTLOOK

Global geopolitical landscape has been evolving continuously. The recent trade tensions between China and the United States are expected to reshape international coal market. As a countermeasure against the new US tariffs on Chinese imports, Chinese government imposed additional custom duties in return, including for US coal products. The surging US import price and escalating uncertainty on trades between both countries may lead to a shift in import sources. Chinese users may seek to increase imports from other countries like Australia, Russia, Canada and Mongolia, which are more stable and reliable sources of coal, to meet its demand.

Strengthening collaboration between the Chinese and Mongolian governments continue to enhance their trade ties, particularly in energy and resources sectors. Initiatives aimed at improving infrastructure, such as roads and railways, will facilitate smoother logistics for coal exports from Mongolia to China. This provides favourable conditions for Mongolia to capture the growing demand from Chinese markets.

However, the recent challenges faced by China's property market and prudent infrastructure investment, have resulted in an overall decline in its steel demand and production, which led to a corresponding reduction in coking coal demand.

The Company remains cautiously optimistic regarding the Chinese coal market, as coal is still considered to be the primary energy source which China will continue to rely on in the foreseeable future. Coal supply and coal import in China are expected to be limited due to increasingly stringent requirements relating to environmental protection and safety production, which may result in volatile coal prices in China. The Company will continue to monitor and react proactively to the dynamic market.

With the continuous assistance and support from JDZF, the Company will focus on expanding its market reach and customer base in China to improve the profit margin earned on its coal products.

The Company has been increasing the scale of its mining operations since 2023, as well as implementing various coal processing methods, including screening, wet washing and dry coal processing, which have resulted in enhanced production volumes and growth of coal export volumes into China in 2024.

In 2025, the Company will continue to ramp up its mining operations and coal processing capacity to seize the opportunity in expanding its market share.

In the medium term, the Company will continue to adopt various strategies to enhance its product mix in order to maximise revenue, expand its customer base and sales network, improve logistics, optimise its operational cost structure and, most importantly, operate in a safe and socially responsible manner.

The Company's objectives for the medium term are as follows:

  • Enhance product mix – The Company will focus on improving the product mix by: (i) improving mining operations; (ii) utilising the Company's dry and wet coal processing plants; and (iii) trading and blending different types of coal to produce blended coal products that are economical to the Company.
  • Expand market reach and customer base – The Company will endeavor to increase sales volume and sales price by: (i) expanding its sales network and diversifying its customer base; (ii) increasing its coal logistics capacity to resolve the bottleneck in the distribution channel; and (iii) setting and adjusting the sales price based on a more market-oriented approach in order to maximise profit while maintaining sustainable long-term business relationships with customers.

December 31, 2024


SouthGobi Resources Ltd.
Management's Discussion and Analysis

  • Increase production and optimise cost structure – The Company will aim to increase coal production volume to take advantage of economies of scale. The Company will also focus on reducing its production costs and optimising its cost structure through engaging sizable third-party contract mining companies to enhance its operation efficiency, strengthening procurement management, ongoing training and productivity enhancement.
  • Operate in a safe and socially responsible manner – The Company will continue to maintain the highest standards in health, safety and environmental performance and operate in a corporate socially responsible manner.

In the long term, the Company will continue to focus on creating and maximising shareholders value by leveraging its key competitive strengths, including:

  • Strategic location – The Ovoot Tolgoi Mine is located approximately 40km from China, which represents the Company's main coal market. The Company has an infrastructure advantage, being approximately 50km from a major Chinese coal distribution terminal with rail connections to key coal markets in China.
  • A large reserves base – The Ovoot Tolgoi Deposit has mineral reserves of at least 82.3 million tonnes.
  • Several growth options – The Company has several growth options including the Soumber Deposit and Zag Suuj Deposit, located approximately 20km east and approximately 150km east of the Ovoot Tolgoi Mine, respectively.
  • Bridge between China and Mongolia – The Company is well-positioned to capture the resulting business opportunities between China and Mongolia, and have a strong operational record for the past decade in Mongolia. The Company will seek assistance and support from its two largest shareholders, which are both experienced coal mining enterprises in China.

March 28, 2025

December 31, 2024