Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

SOUTHERN HEMISPHERE MINING LIMITED Capital/Financing Update 2011

Aug 17, 2011

65877_rns_2011-08-17_7c76adc7-3db4-448b-9c4f-1f6ffcc829b9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [174 x 62] intentionally omitted <==

ASX: SUH

TSX-V: SH

Australian Office: PO Box 598 T: +61 8 9481 2122 West Perth F: +61 8 9481 2322 WA 6872 www.shmining.com.au Chilean Office: Minera Hemisferio Sur SCM Unit 1103, Roger de Flor 2907 Los Condes, Santiago

18 August 2011

FURTHER MAJOR COPPER INTERCEPTS FROM LLAHUIN PORPHYRY PROJECT, CHILE

MORE STRONG RESULTS LAY FOUNDATIONS FOR INITIAL JORC RESOURCE TARGETED BY YEAR-END

Highlights

  • Excellent new results from resource drilling at the Llahuin Copper Project, Chile including:

o Hole LLA-004 175m @ 0.31% Cu with 0.05g/t Au from 0m o Hole LLA-005 199m @ 0.33% Cu with 0.08g/t Au from 1m o Hole LLA-006 61m @ 0.37% Cu with 0.08g/t Au from 0m o Hole LLA-006 36m @ 0.39% Cu with 0.17g/t Au from 187m o Hole LLA-010 210m @ 0.31% Cu with 0.03g/t Au from 0m o Hole LLA-011 220m @ 0.39% Cu with 0.08g/t Au from 0m o Hole LLA-012 205m @ 0.36% Cu with 0.06g/t Au from 0m

  • Best 1m copper interval of 1.80% Cu in hole LLA-011 and best 1m gold interval of 18.6g/t Au in hole LLA-009.

  • Mineralisation remains open both laterally and at depth.

  • Resource drilling programme continuing with further results for holes LLA-013 to LLA-020 expected shortly – initial JORC resource targeted by year-end .

  • Substantial new anomaly identified from recently completed IP survey at Chitigua Breccia Copper Project – major new drilling program to commence shortly .

Llahuin Copper Project

International mining company Southern Hemisphere Mining Limited (“Southern Hemisphere” or the “Company”) is pleased to report further highly encouraging results from resource drilling at the recently acquired Llahuin Copper Project (“Llahuin”), located 250km north of Santiago in Chile at an elevation of 1300 metres.

==> picture [103 x 36] intentionally omitted <==

The latest results, for holes LLA-004 to LLA-012, follow the excellent results for the first three holes reported on 18 July 2011 and confirm the presence of a large-scale porphyry copper-gold system at Llahuin, vindicating the Company’s decision to move directly to a resource drilling program.

The latest results include several broad intersections of copper-gold mineralisation, which has now been defined within a dioritic porphyry located within the Llahuin Amapola group of exploitation licences, which cover a total area of 772 hectares.

According to the type of deposit, alteration, mineralization, geographic location and geological age, the Llahuin mineralization can be defined as a porphyry copper system, rich in gold, similar to the Carmen de Andacollo ore deposit, located 350km north of Santiago, which has a resource of 400 million tonnes grading 0.38% copper plus gold credits . Evidence from all analysis results to date at Llahuin indicates a porphyry deposit with a target copper grade of 0.4% Cu plus molybdenum and gold credits.

Llahuin Drilling Progress

As at 18 August 2011 the Company had completed 19 Reverse Circulation (RC) drill holes for a total depth of 3,733m, and commenced deepening hole LLA-010 with a Diamond Core drill. This included two RC drill holes LLA-008 and LLA-009 located to test a prospective gold area. A schedule of these holes is shown below:

Hole ID
LLA-001
LLA-002
LLA-003
LLA-004
LLA-005
LLA-006
LLA-007
LLA-008
LLA-009
LLA-010
LLA-011
LLA-012
LLA-013
LLA-014
LLA-015
LLA-016
LLA-017
LLA-018
LLA-019
Easting
Northing
RL
Azimuth
Dip
**Depth **
Easting
Northing
RL
Azimuth
Dip
**Depth **
Easting
Northing
RL
Azimuth
Dip
**Depth **
Easting
Northing
RL
Azimuth
Dip
**Depth **
Easting
Northing
RL
Azimuth
Dip
**Depth **
Easting
Northing
RL
Azimuth
Dip
**Depth **
307866 6531823 1342 300 -58.00 208
307819 6531846 1346 300 -58.00 170
307740 6531875 1331 300 -58.00 77
307798 6531911 1332 300 -60.00 244
307823 6531869 1342 300 -60.00 200
307809 6531798 1341 300 -60.00 243
307792 6531969 1323 300 -60.00 192
307352 6532693 1289 270 -60.00 167
307368 6532605 1289 270 -60.00 210
307913 6531801 1344 300 -60.00 210
307776 6531865 1345 300 -60.00 220
307733 6531818 1340 300 -61.00 208
307863 6531871 1345 300 -60.00 203
307942 6531845 1335 300 -60.00 197
307822 6531681 1331 300 -60.00 196
307851 6531773 1335 300 -60.00 198
307695 6531900 1323 300 -60.00 194
307653 6531643 1325 300 -60.00 192
307724 6531657 1324 300 -60.00 204
Total
3733

Table 1Drilling Program to date, Llahuin Project

==> picture [103 x 36] intentionally omitted <==

Holes LLA-001 through to LLA-007 and LLA-010 through to LLA-018 tested the Llahuin Porphyry within the Amapola Group.

Holes LLA-008 and LLA-009 tested an area prospective for gold as evidenced by past artisanal mining activities. This area is located 1km north of the Llahuin Porphyry.

To date analysis results have been received for holes LLA001-LLA012. For hole LLA-009 samples were taken and analysis results received for each alternate metre interval.

==> picture [486 x 366] intentionally omitted <==

Fig. 1Llahuin Copper Drilling Location Map for Holes LLA-001 to LLA-006 & LLA-010 to LLA-012

Refer to attachment for detailed drill results received for LLA004-LLA012.

Refer to 18 July 2011 ASX and TSX-V announcements for Llahuin geological information and analysis results for holes LLA-001 to LLA-003.

==> picture [103 x 36] intentionally omitted <==

==> picture [469 x 332] intentionally omitted <==

Fig. 2 – Cross-section showing holes LLA001-LLA003 and LLA010-LLA011, Llahuin Project

Sampling and Analysis Procedures

From the RC Drill holes, 5kg samples were taken from each metre interval, with the exception of hole LLA-009 where samples were taken for each alternate metre interval. The samples are derived from riffle splitting each metre intercept. The samples were sent to Andes Analytical Assay Ltda (Chile) in Santiago for sample preparation and analysis. Duplicate samples were taken on a 1 in 20 basis.

Analysis was undertaken using atomic absorption spectrometry methods. Andes Analytical Assay Ltda (Chile) is an independent full service commercial laboratory accredited under ISO 9001:2008. Standard samples and repeat analyses were used by the laboratory to provide checks on the assay results.

Chitigua Porphyry Copper Project

The Chitigua Project is located 100km north of Calama at an elevation of 4,000 metres on the Western Fault between the El Abra and Quebrada Blanca mines.

Following 8 July 2011 ASX and TSX-V announcements, which confirmed the potential for a porphyry copper system at the Chitigua Project, the Company has completed an Induced Polarization and Resistivity survey (IP Survey) on the Breccia Zone of the Chitigua Project.

==> picture [103 x 36] intentionally omitted <==

Additionally, an IP survey has commenced over the Chitigua Church zone, which lies 3.5 km to the south west of the Breccia Zone. Interpretation of the results is underway and this will assist with determining future drill-hole locations and enhance the likelihood of a discovery of a major porphyry deposit in the Western Fault system, which is the world’s richest copper metallogenic zone.

An RC rig will commence a further drilling campaign at Chitigua in September with the objective of completing 23 holes to a depth of 300 metres. This program is targeted for completion by year-end.

==> picture [469 x 325] intentionally omitted <==

Fig 3 – IP Survey- Chitigua Breccia Copper Project

Los Pumas Manganese Project

Work is continuing on the Los Pumas Project with the amended Environmental Impact Statement (EIS) being lodged this month with the Arica Regional Committee. Approval is expected in the 1[st] Quarter of 2012.

Further heavy media separation metallurgical test work is currently being undertaken by Transmin Metallurgical Consultants in Lima, Peru with results expected by the 4[th] Quarter of 2011.

==> picture [103 x 36] intentionally omitted <==

However, the current manganese market conditions have reduced the priority of the Los Pumas Manganese Project in the Company’s plans. Accordingly, the Feasibility Study has been delayed but will continue to be progressed in line with the testwork results and EIS approval.

-ENDS-

For further information please contact:

Trevor Tennant – (Managing Director - Southern Hemisphere Mining) +56 (9) 7766 4688. Media Enquiries – Nicholas Read (Read Corporate) + 61 (8) 9388 1474 Media Enquiries – Clark Kent (Corporate Communications) + 1 (416) 883 3838

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. This news release has been prepared by management and no regulatory authority has approved or disapproved the information contained herein.

Competent Person / Qualified Person Statement

Trevor Tennant (Managing Director - Southern Hemisphere), a Member of the Australasian Institute of Mining and Metallurgy, is a ‘Competent Person’ as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and is a ‘Qualified Person’ under National Instrument 43-101 - 'Standards of Disclosure for Mineral Projects'.

Mr. Tennant was responsible for the design and conduct of this exploration drilling campaign, supervised the preparation of the technical information in this release and has the relevant experience and competence of the subject matter.

Mr. Tennant consents to the inclusion of exploration results and other such information in this news release in the form and context in which it appears

Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Total Depth
(m)
Easting
Northing
Collar RL (m)
Hole ID
Azimuth (Deg)
Dip (Deg)
LLA-004 307798 6531911 1332 244 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
206
152
156
157
158
153
154
155
162
163
164
159
160
161
168
169
170
165
166
167
174
175
176
171
172
173
180
181
182
177
178
179
186
187
188
183
184
185
192
193
194
189
190
191
198
199
200
195
196
197
204
205
207
201
202
203
0.317
0.278
0.271
0.246
0.254
0.246
0.306
0.229
0.342
0.220
0.316
0.343
0.231
0.233
0.262
0.257
0.287
0.299
0.411
0.265
0.237
0.388
0.827
0.328
0.197
0.237
0.229
0.203
0.212
0.293
0.263
0.336
0.233
0.125
0.221
0.228
0.172
0.090
0.379
0.231
0.222
0.195
0.213
0.229
0.159
0.198
0.342
0.258
0.318
0.337
0.193
0.174
0.200
0.169
0.141
0.172
0.030
0.050
0.050
0.040
0.050
0.040
0.070
0.050
0.060
0.050
0.040
0.050
0.040
0.030
0.040
0.040
0.060
0.040
0.040
0.040
0.170
0.050
0.010
0.030
0.020
0.040
0.010
0.030
0.040
0.020
0.020
0.020
0.020
0.060
0.010
0.030
0.040
0.020
0.030
0.020
0.020
0.010
0.010
0.020
0.050
0.030
0.030
0.020
0.010
0.020
0.030
0.030
0.030
0.040
0.030
0.030
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
0.208
0.190
0.165
0.169
0.123
0.200
0.235
0.247
0.342
0.265
0.294
0.153
0.129
0.139
0.277
0.181
0.189
0.254
0.245
0.140
0.164
0.169
0.235
0.153
0.168
0.329
0.226
0.235
0.186
0.165
0.144
0.271
0.261
0.212
0.327
0.130
0.162
0.030
0.050
0.030
0.030
0.030
0.060
0.060
0.040
0.130
0.050
0.060
0.030
0.010
0.360
0.050
0.030
0.030
0.040
0.130
0.030
0.020
0.030
0.110
0.030
0.030
0.040
0.030
0.030
0.170
0.160
0.030
0.030
0.020
0.050
0.060
0.030
0.010
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Total Depth
(m)
Easting
Northing
Hole ID
Collar RL (m)
Azimuth (Deg)
Dip (Deg)
LLA-005 307823 6531869 1342 200 300 -58
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
55
56
50
51
52
53
54
45
46
47
48
49
40
41
42
43
44
35
36
37
38
39
30
31
32
33
34
25
26
27
28
29
20
21
22
23
24
15
16
17
18
19
10
11
12
13
14
5
6
7
8
9
1
2
3
4
0.000
0.472
0.610
0.401
0.279
0.212
0.202
0.231
0.210
0.154
0.184
0.425
0.212
0.121
0.143
0.184
0.164
0.161
0.248
0.314
0.287
0.123
0.168
0.137
0.270
0.165
0.211
0.274
0.192
0.092
0.215
0.411
0.523
1.025
0.613
0.417
0.984
0.353
0.367
0.347
0.414
0.298
0.175
0.058
0.067
0.069
0.067
0.091
0.061
0.140
0.275
0.285
0.321
0.337
0.391
0.277
0.090
0.090
0.090
0.140
0.100
0.110
0.080
0.080
0.110
0.100
0.100
0.070
0.110
0.060
0.070
0.080
0.060
0.040
0.060
0.070
0.050
0.110
0.080
0.000
0.000
0.000
0.010
0.080
0.010
0.120
0.010
0.010
0.010
0.010
0.050
0.020
0.050
0.110
0.010
0.010
0.030
0.040
0.050
0.070
0.080
0.060
0.160
0.100
0.070
0.060
0.140
0.090
0.000
0.050
0.050
0.070
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.318
0.409
0.379
0.550
0.383
0.155
0.155
0.406
0.401
0.419
0.442
0.388
0.401
0.306
0.163
0.162
0.425
0.371
0.303
0.266
0.316
0.224
0.431
0.355
0.359
0.439
0.433
0.490
0.315
0.319
0.213
0.175
0.119
0.182
0.260
0.353
0.356
0.134
0.206
0.201
0.290
0.272
0.353
0.383
0.341
0.256
0.357
0.352
0.238
0.309
0.597
0.254
0.371
0.355
0.397
0.418
0.240
0.080
0.140
0.080
0.090
0.060
0.100
0.100
0.010
0.050
0.140
0.150
0.090
0.040
0.010
0.040
0.040
0.030
0.110
0.020
0.010
0.160
1.530
0.100
0.070
0.070
0.100
0.120
0.140
0.070
0.060
0.040
0.020
0.030
0.060
0.080
0.120
0.210
0.050
0.040
0.060
0.070
0.060
0.060
0.060
0.010
0.080
0.050
0.070
0.060
0.230
0.040
0.110
0.070
0.220
0.070
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.328
0.378
0.445
0.430
0.394
0.440
0.378
0.454
0.429
0.454
0.507
0.492
0.471
0.409
0.548
0.382
0.396
0.442
0.436
0.409
0.494
0.323
0.234
0.323
0.290
0.303
0.265
0.424
0.378
0.432
0.345
0.300
0.311
0.255
0.280
0.230
0.295
0.373
0.328
0.320
0.296
0.320
0.265
0.425
0.232
0.276
0.401
0.408
0.294
0.384
0.269
0.406
0.326
0.227
0.495
0.434
0.080
0.090
0.110
0.110
0.090
0.070
0.080
0.110
0.090
0.070
0.070
0.110
0.120
0.080
0.110
0.100
0.080
0.150
0.060
0.100
0.090
0.070
0.110
0.140
0.240
0.070
0.050
0.060
0.030
0.030
0.050
0.040
0.050
0.360
0.120
0.460
0.050
0.210
0.050
0.030
0.050
0.040
0.040
0.050
0.010
0.030
0.030
0.040
0.060
0.040
0.030
0.050
0.060
0.020
0.040
0.040
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Total Depth
(m)
Hole ID
Easting
Northing
Collar RL (m)
Azimuth (Deg)
Dip (Deg)
LLA-005 307823 6531869 1342 200 300 -58
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
172
171
170
169
198
199
200
193
194
195
196
197
188
189
190
191
192
183
184
185
186
187
178
179
180
181
182
173
174
175
176
177
1.022
0.308
0.346
0.523
0.365
0.418
0.273
0.304
0.436
0.333
0.267
0.155
0.361
0.414
0.251
0.285
0.284
0.334
0.289
0.376
0.303
0.371
0.345
0.333
0.296
0.410
0.434
0.477
0.297
0.354
0.665
0.442
0.080
0.030
0.030
0.050
0.080
0.140
0.090
0.060
0.110
0.090
0.090
0.070
0.040
0.050
0.060
0.020
0.070
0.040
0.060
0.040
0.070
0.040
0.040
0.030
0.010
0.050
0.090
0.050
0.050
0.010
0.040
0.020
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Total Depth
(m)
Hole ID
Easting
Northing
Collar RL (m)
Azimuth (Deg)
Dip (Deg)
LLA-006 307809 6531798 1341 243 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
55
51
52
53
54
56
46
47
48
49
50
41
42
43
44
45
36
37
38
39
40
31
32
33
34
35
26
27
28
29
30
21
22
23
24
25
16
17
18
19
20
11
12
13
14
15
6
7
8
9
10
1
2
3
4
5
0.000
0.514
0.572
0.700
0.655
0.610
0.478
0.502
0.519
0.486
0.705
0.532
0.406
0.563
0.426
0.352
0.473
0.274
0.298
0.390
0.340
0.281
0.543
0.255
0.294
1.118
1.273
0.583
0.246
0.243
0.300
0.245
0.312
0.188
0.246
0.164
0.135
0.234
0.240
0.344
0.235
0.257
0.129
0.246
0.221
0.326
0.206
0.221
0.241
0.250
0.321
0.259
0.158
0.091
0.076
0.223
0.000
0.080
0.030
0.000
0.000
0.000
0.130
0.070
0.060
0.050
0.090
0.080
0.050
0.020
0.020
0.040
0.030
0.020
0.010
0.030
0.060
0.020
0.000
0.000
0.030
0.080
0.030
0.010
0.000
0.050
0.050
0.070
0.020
0.020
0.000
0.020
0.140
0.260
0.320
0.210
0.090
0.180
0.180
0.220
0.370
0.100
0.140
0.180
0.240
0.370
0.240
0.000
0.030
0.060
0.100
0.220
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.345
0.264
0.237
0.413
0.169
0.217
0.184
0.140
0.157
0.128
0.134
0.049
0.096
0.162
0.148
0.099
0.069
0.090
0.139
0.101
0.091
0.381
0.167
0.076
0.099
0.117
0.063
0.089
0.114
0.097
0.148
0.160
0.052
0.180
0.126
0.119
0.119
0.049
0.071
0.117
0.192
0.203
0.106
0.111
0.129
0.120
0.259
0.272
0.335
0.199
0.046
0.068
0.043
0.041
0.066
0.193
0.010
0.010
0.020
0.070
0.020
0.020
0.020
0.010
<0.01
<0.01
<0.01
<0.01
0.020
0.050
0.020
0.020
0.020
0.020
0.040
0.080
0.030
0.150
0.020
0.010
<0.01
0.010
<0.01
0.010
<0.01
0.020
0.030
0.020
0.010
0.040
0.030
0.010
0.020
<0.01
0.020
<0.01
0.020
0.020
0.030
0.030
0.030
0.020
<0.01
0.030
0.020
0.010
<0.01
<0.01
<0.01
0.010
0.010
0.020
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.156
0.069
0.120
0.092
0.077
0.064
0.070
0.120
0.115
0.220
0.277
0.207
0.202
0.118
0.056
0.064
0.070
0.114
0.190
0.078
0.048
0.080
0.152
0.263
0.107
0.120
0.145
0.225
0.150
0.209
0.186
0.232
0.136
0.190
0.151
0.146
0.147
0.118
0.183
0.137
0.122
0.158
0.026
0.044
0.104
0.135
0.136
0.080
0.205
0.343
0.084
0.092
0.172
0.903
0.390
0.120
0.030
0.020
0.010
0.030
0.020
0.010
0.020
0.040
0.030
0.110
0.100
0.040
0.040
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.040
0.020
0.020
0.040
0.030
0.020
0.020
0.020
0.020
0.030
0.030
0.020
0.020
0.020
0.020
0.020
0.030
0.020
0.020
0.010
0.010
0.020
0.020
0.030
0.030
0.070
0.030
0.030
0.020
0.040
0.070
0.060
0.030
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Total Depth
(m)
Hole ID
Easting
Northing
Collar RL (m)
Azimuth (Deg)
Dip (Deg)
LLA-006 307809 6531798 1341 243 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
223
224
218
219
220
221
222
213
214
215
216
217
208
209
210
211
212
203
204
205
206
207
198
199
200
201
202
193
194
195
196
197
188
189
190
191
192
183
184
185
186
187
178
179
180
181
182
173
174
175
176
177
169
170
171
172
0.277
0.938
0.078
0.160
0.174
0.212
0.220
0.156
0.195
0.220
0.235
0.180
0.083
0.127
0.199
0.123
0.115
0.098
0.100
0.185
0.281
0.288
0.142
0.261
0.132
0.197
0.092
0.194
0.285
0.168
0.307
0.375
0.379
0.444
0.537
0.633
0.483
1.328
0.841
0.217
0.323
0.303
0.540
0.174
0.138
0.385
0.899
0.271
0.379
0.426
0.237
0.289
0.214
0.258
0.737
0.433
0.150
0.260
0.260
0.140
0.080
0.120
0.080
0.090
0.290
0.190
0.180
0.300
0.150
0.240
0.220
0.380
0.120
0.340
0.420
0.540
0.180
0.200
0.130
0.220
0.250
0.230
0.270
0.060
0.020
0.020
0.010
0.000
0.140
0.060
0.110
0.050
0.040
0.060
0.060
0.040
0.370
0.030
0.150
0.130
0.080
0.030
0.050
0.120
0.180
0.130
0.140
0.120
0.040
0.040
0.040
0.380
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
0.338
0.306
0.317
0.343
0.363
0.259
0.625
0.486
0.602
0.535
0.252
0.222
0.351
0.555
0.331
0.517
0.506
0.563
0.475
0.220
0.120
0.070
0.230
0.200
0.170
0.220
0.320
0.420
0.330
0.130
0.160
0.230
0.460
0.150
0.340
0.340
0.370
0.280
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-007 307792 6531969 1323 192 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
55
56
50
51
52
53
54
45
46
47
48
49
40
41
42
43
44
35
36
37
38
39
30
31
32
33
34
25
26
27
28
29
20
21
22
23
24
15
16
17
18
19
10
11
12
13
14
5
6
7
8
9
1
2
3
4
0.000
0.079
0.082
0.123
0.269
0.129
0.101
0.096
0.110
0.144
0.208
0.128
0.267
0.248
0.233
0.212
0.133
0.086
0.166
0.101
0.114
0.136
0.175
0.211
0.504
0.385
0.261
0.224
0.211
0.282
0.209
0.275
0.228
0.161
0.034
0.090
0.160
0.110
0.144
0.199
0.288
0.305
0.299
0.173
0.139
0.084
0.023
0.020
0.224
0.129
0.067
0.059
0.068
0.175
0.125
0.112
0.020
0.010
0.010
<0.01
0.010
<0.01
0.010
<0.01
<0.01
<0.01
<0.01
0.030
0.020
<0.01
<0.01
<0.01
<0.01
0.220
0.020
<0.01
<0.01
0.010
0.030
0.020
0.020
0.020
0.010
0.010
0.040
0.020
<0.01
0.020
0.020
0.020
0.020
0.020
0.010
0.060
0.030
0.010
0.010
0.020
0.020
0.030
0.030
0.100
0.040
0.350
0.030
0.020
0.020
0.030
0.000
0.030
0.020
0.030
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.113
0.086
0.141
0.161
0.191
0.178
0.210
0.196
0.164
0.106
0.036
0.045
0.044
0.126
0.107
0.104
0.169
0.131
0.237
0.177
0.184
0.179
0.049
0.036
0.096
0.084
0.093
0.096
0.150
0.273
0.080
0.167
0.086
0.232
0.168
0.149
0.219
0.137
0.216
0.163
0.275
0.064
0.139
0.143
0.210
0.225
0.220
0.288
0.321
0.459
0.467
0.319
0.080
0.153
0.166
0.219
0.020
<0.01
0.020
0.010
0.010
0.020
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.010
<0.01
0.010
<0.01
<0.01
<0.01
0.010
0.020
<0.01
<0.01
<0.01
0.010
<0.01
0.010
<0.01
<0.01
0.020
0.020
<0.01
0.010
0.110
0.020
0.020
0.030
0.030
0.020
0.020
0.020
0.030
0.010
0.020
0.020
0.030
0.040
0.030
0.020
0.040
0.070
0.040
0.030
0.030
0.020
0.020
0.030
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.290
0.250
0.178
0.240
0.187
0.216
0.225
0.118
0.286
0.178
0.085
0.118
0.095
0.117
0.134
0.159
0.132
0.184
0.172
0.124
0.136
0.155
0.123
0.357
0.161
0.251
0.147
0.135
0.234
0.479
0.219
0.190
0.131
0.061
0.051
0.091
0.155
0.104
0.077
0.104
0.140
0.191
0.124
0.117
0.109
0.112
0.111
0.114
0.130
0.178
0.158
0.147
0.092
0.191
0.100
0.102
0.030
0.020
0.020
0.030
0.020
0.030
0.030
0.010
0.020
0.020
<0.01
<0.01
<0.01
0.020
0.010
0.020
0.020
0.040
0.010
0.010
0.010
0.010
0.070
0.040
0.020
0.030
0.040
0.040
0.030
0.080
0.020
0.020
<0.01
<0.01
0.010
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.010
0.010
<0.01
<0.01
<0.01
<0.01
<0.01
0.010
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-007 307792 6531969 1323 192 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
172
173
189
190
191
192
184
185
186
187
188
179
180
181
182
183
174
175
176
177
178
171
169
170
0.119
0.115
0.153
0.204
0.062
0.105
0.156
0.213
0.098
0.191
0.084
0.132
0.125
0.175
0.153
0.111
0.076
0.119
0.093
0.166
0.220
0.054
0.052
0.132
0.010
<0.01
<0.01
0.010
0.010
<0.01
<0.01
<0.01
0.010
0.010
0.010
<0.01
<0.01
0.010
0.010
0.010
<0.01
<0.01
<0.01
<0.01
0.020
0.020
0.020
0.020
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-008 307352 6532693 1289 167 270 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
55
56
50
51
52
53
54
45
46
47
48
49
40
41
42
43
44
35
36
37
38
39
30
31
32
33
34
25
26
27
28
29
20
21
22
23
24
15
16
17
18
19
10
11
12
13
14
5
6
7
8
9
1
2
3
4
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.040
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.050
0.020
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.240
0.220
<0.01
<0.01
0.090
<0.01
<0.01
0.050
0.020
0.020
0.020
0.010
<0.01
0.050
<0.01
<0.01
0.020
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
<0.01
0.010
0.010
<0.01
<0.01
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
<0.01
<0.01
<0.01
<0.01
<0.01
0.020
1.080
0.030
0.080
0.010
0.210
0.070
0.120
0.280
0.610
0.160
0.030
0.180
0.050
0.050
0.120
0.120
0.040
<0.01
<0.01
0.030
0.080
0.040
0.070
0.010
0.050
0.050
0.100
0.030
<0.01
<0.01
0.010
0.130
0.050
<0.01
<0.01
<0.01
<0.01
0.050
0.020
<0.01
0.030
0.010
0.010
0.060
0.120
0.020
<0.01
0.010
0.010
0.560
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
0.220
0.020
<0.01
<0.01
<0.01
0.260
0.010
0.020
<0.01
<0.01
<0.01
0.030
0.030
<0.01
0.140
0.020
<0.01
0.070
0.050
0.010
0.060
<0.01
<0.01
0.030
0.020
<0.01
<0.01
<0.01
0.010
<0.01
0.140
<0.01
0.020
0.020
<0.01
0.380
0.650
0.010
<0.01
<0.01
0.050
0.030
0.090
<0.01
0.200
0.030
<0.01
<0.01
0.060
<0.01
0.060
<0.01
<0.01
0.100
0.030
<0.01
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-009 307368 6532605 1289 210 270 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
55
51
52
53
54
56
46
47
48
49
50
41
42
43
44
45
36
37
38
39
40
31
32
33
34
35
26
27
28
29
30
21
22
23
24
25
16
17
18
19
20
11
12
13
14
15
6
7
8
9
10
1
2
3
4
5
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
<0.01
0.210
NA
1.070
NA
NA
NA
18.620
NA
0.290
NA
<0.01
NA
<0.01
NA
0.020
NA
<0.01
NA
<0.01
NA
<0.01
NA
0.010
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
0.010
NA
0.070
NA
0.010
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
0.030
NA
0.020
NA
<0.01
NA
0.090
NA
0.020
NA
0.040
NA
<0.01
NA
0.020
NA
0.050
NA
0.040
NA
0.010
NA
0.040
NA
0.010
NA
0.010
NA
0.390
NA
0.020
NA
0.030
NA
0.030
NA
0.130
NA
0.010
NA
0.020
NA
0.010
NA
0.010
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
<0.01
NA
0.020
NA
<0.01
NA
<0.01
NA
0.010
NA
<0.01
NA
<0.01
NA
0.020
NA
<0.01
NA
0.010
NA
0.010
NA
0.030
NA
0.020
NA
0.210
NA
0.030
NA
0.020
NA
0.040
NA
0.030
NA
0.020
NA
0.010
NA
0.010
NA
0.010
NA
0.010
NA
0.020
NA
0.020
NA
0.010
NA
<0.01
NA
<0.01
NA
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-009 307368 6532605 1289 210 270 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
207
208
209
210
202
203
204
205
206
197
198
199
200
201
192
193
194
195
196
188
189
190
191
187
170
171
172
173
174
175
176
177
178
179
169
180
181
182
183
184
185
186
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
<0.01
NA
0.010
0.020
NA
<0.01
NA
0.070
NA
<0.01
NA
0.010
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
NA
<0.01
<0.01
NA
0.040
NA
<0.01
NA
<0.01
NA
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-010 307913 6531801 1344 210 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
52
53
54
56
55
47
48
49
50
51
42
43
44
45
46
37
38
39
40
41
32
33
34
35
36
27
28
29
30
31
22
23
24
25
26
17
18
19
20
21
13
14
15
16
12
2
3
4
1
5
6
7
8
9
10
11
0.107
0.155
0.193
0.212
0.195
0.198
0.200
0.193
0.175
0.214
0.211
0.202
0.377
0.252
0.281
0.275
0.207
0.167
0.193
0.260
0.224
0.228
0.265
0.232
0.138
0.136
0.225
0.622
0.172
0.229
0.246
0.183
0.246
0.361
0.336
0.182
0.042
0.091
0.103
0.123
0.131
0.199
0.295
0.384
0.305
0.356
0.299
0.286
0.202
0.303
0.393
0.611
0.315
0.393
0.260
0.405
0.030
0.020
0.020
0.020
0.020
0.020
0.020
0.020
0.020
0.020
0.000
0.000
0.000
0.000
0.020
0.000
0.000
0.000
0.000
0.000
0.020
0.050
0.050
0.020
0.020
0.010
0.000
0.010
0.020
0.020
0.010
0.010
0.000
0.000
0.000
0.000
0.000
0.000
0.020
0.000
0.020
0.020
0.000
0.010
0.010
0.000
0.020
0.010
0.010
0.010
0.010
0.010
0.010
0.000
0.020
0.020
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.286
0.349
0.407
0.501
0.337
0.376
0.476
0.337
0.248
0.225
0.210
0.219
0.181
0.143
0.069
0.212
0.323
0.347
0.256
0.238
0.439
0.309
0.597
0.344
0.340
0.331
0.409
0.158
0.087
0.157
0.213
0.301
0.337
0.327
0.305
0.304
0.275
0.656
0.398
0.474
0.397
0.418
0.403
0.284
0.310
0.361
0.373
0.497
0.274
0.532
0.359
0.275
0.327
0.328
0.261
0.637
0.020
0.020
0.000
0.020
0.000
0.020
0.020
0.010
0.000
0.000
0.000
0.020
0.020
0.040
0.080
0.140
0.080
0.040
0.040
0.090
0.050
0.020
0.030
0.030
0.040
0.020
0.040
0.010
0.010
0.020
0.020
0.020
0.030
0.040
0.030
0.020
0.050
0.070
0.030
0.060
0.050
0.060
0.060
0.050
0.050
0.070
0.060
0.050
0.010
0.040
0.000
0.030
0.050
0.040
0.030
0.040
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.424
0.430
0.326
0.435
0.448
0.438
0.346
0.287
0.324
0.250
0.178
0.298
0.209
0.311
0.380
0.379
0.356
0.317
0.329
0.364
0.250
0.184
0.204
0.154
0.233
0.243
0.436
0.486
0.296
0.419
0.565
0.236
0.114
0.238
0.310
0.230
0.463
0.469
0.186
0.102
0.195
0.194
0.121
0.135
0.098
0.187
0.359
0.494
0.437
0.387
0.315
0.178
0.190
0.187
0.135
0.070
0.020
0.030
0.040
0.070
0.060
0.040
0.060
0.040
0.020
0.030
0.000
0.000
0.000
0.050
0.060
0.060
0.050
0.040
0.050
0.030
0.020
0.000
0.020
0.020
0.020
0.300
0.080
0.050
0.080
0.040
0.060
0.030
0.020
0.030
0.030
0.020
0.160
0.060
0.040
0.020
0.010
0.000
0.010
0.010
0.010
0.020
0.040
0.030
0.030
0.040
0.020
0.010
0.010
0.020
0.030
0.060
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-010 307913 6531801 1344 210 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
208
209
210
203
204
205
206
207
198
199
200
201
202
193
194
195
196
197
188
189
190
191
192
183
184
185
186
187
179
180
181
182
170
177
178
169
171
172
173
174
175
176
0.051
0.059
0.229
0.350
0.181
0.035
0.114
0.175
0.130
0.304
0.373
0.368
0.615
0.329
0.566
0.337
0.380
0.650
0.546
0.676
0.646
0.557
0.452
0.669
0.586
0.698
0.557
0.497
0.407
0.306
0.341
0.326
0.233
0.340
0.343
0.287
0.553
0.601
0.160
0.035
0.362
0.391
0.000
0.020
0.040
0.050
0.030
0.110
0.080
0.010
0.030
0.040
0.060
0.030
0.060
0.070
0.080
0.090
0.060
0.070
0.070
0.080
0.080
0.040
0.040
0.020
0.040
0.060
0.050
0.080
0.070
0.020
0.030
0.000
0.010
0.100
0.020
0.040
0.010
0.000
0.000
0.000
0.020
0.000
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-011 307776 6531865 1345 220 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
51
52
53
54
56
55
46
47
48
49
50
41
42
43
44
45
36
37
38
39
40
31
32
33
34
35
26
27
28
29
30
21
22
23
24
25
16
17
18
19
20
11
12
13
14
15
6
7
8
9
10
2
3
4
5
1
0.396
0.369
0.477
0.425
0.438
0.460
0.314
0.244
0.304
0.269
0.250
0.294
0.390
0.321
0.300
0.286
0.314
0.311
0.393
0.295
0.424
0.255
0.258
0.364
0.211
0.386
0.312
0.228
0.360
0.371
0.339
0.286
1.061
0.352
0.347
0.596
0.221
0.282
0.254
0.433
0.628
0.213
0.240
0.198
0.109
0.285
0.709
0.517
0.561
0.632
0.751
0.768
0.760
0.991
0.632
0.459
0.330
0.230
0.190
0.270
0.110
0.200
0.060
0.180
0.190
0.090
0.170
0.040
0.020
0.060
0.030
0.000
0.050
0.030
0.030
0.060
0.070
0.080
0.060
0.390
0.130
0.080
0.120
0.100
0.040
0.120
0.090
0.090
0.030
0.030
0.030
0.060
0.020
0.040
0.060
0.060
0.100
0.060
0.100
0.100
0.030
0.030
0.110
0.080
0.070
0.090
0.080
0.090
0.080
0.120
0.080
0.150
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.269
0.397
0.585
0.334
0.419
0.629
0.449
0.575
0.407
0.378
0.396
0.304
0.339
0.361
0.403
0.317
0.270
0.379
0.528
0.421
0.433
0.413
0.344
0.519
0.471
0.577
0.852
0.857
0.400
0.648
0.567
0.704
0.772
0.455
0.388
0.349
0.365
0.414
0.286
0.409
0.499
0.473
0.276
0.328
0.316
0.457
0.344
0.343
0.312
0.244
0.463
0.329
0.437
0.263
0.297
0.110
0.090
0.170
0.090
0.270
0.200
0.280
0.210
0.130
0.030
0.040
0.100
0.080
0.050
0.080
0.070
0.050
0.040
0.060
0.100
0.070
0.050
0.100
0.060
0.040
0.090
0.030
0.080
0.040
0.040
0.050
0.040
0.060
0.060
0.150
0.050
0.050
0.070
0.080
0.050
0.060
0.070
0.030
0.030
0.020
0.010
0.030
0.070
0.140
0.090
0.070
0.060
0.060
0.070
0.050
0.060
0.030
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.279
0.202
0.269
0.346
0.450
0.261
0.306
0.334
0.502
0.526
0.338
0.299
0.343
0.360
0.346
0.365
0.312
0.281
0.252
0.450
0.330
0.310
0.505
0.193
0.476
0.341
0.342
0.413
0.456
0.388
0.373
0.428
0.238
0.295
0.273
0.363
0.435
0.533
0.564
0.334
0.632
1.796
0.350
0.266
0.321
0.258
0.274
0.311
0.132
0.171
0.390
0.319
0.310
0.377
0.332
0.432
0.040
0.040
0.080
0.070
0.050
0.080
0.080
0.060
0.110
0.070
0.070
0.080
0.080
0.060
0.070
0.040
0.060
0.040
0.030
0.030
0.030
0.070
0.090
0.050
0.110
0.120
0.080
0.160
0.090
0.060
0.080
0.040
0.030
0.070
0.060
0.090
0.090
0.090
0.040
0.050
0.100
0.130
0.040
0.030
0.060
0.050
0.070
0.060
0.020
0.020
0.060
0.060
0.050
0.080
0.050
0.020
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-011 307776 6531865 1345 220 300 -60
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
218
219
220
213
214
215
216
217
208
209
210
211
212
203
204
205
206
207
198
199
200
201
202
193
194
195
196
197
188
189
190
191
192
183
184
185
186
187
178
179
180
181
182
173
174
175
176
177
169
170
171
172
0.358
0.333
0.256
0.220
0.188
0.244
0.331
0.306
0.324
0.222
0.197
0.209
0.243
0.305
0.177
0.316
0.292
0.404
0.254
1.322
0.464
0.538
0.498
0.391
0.581
0.472
0.385
0.325
0.332
0.373
0.305
0.286
0.316
0.322
0.255
0.224
0.265
0.340
0.332
0.264
0.277
0.287
0.525
0.337
0.232
0.321
0.847
0.392
0.361
0.400
0.309
0.354
0.030
0.050
0.050
0.040
0.030
0.000
0.020
0.070
0.100
0.050
0.080
0.050
0.020
0.020
0.030
0.070
0.090
0.080
0.060
0.070
0.020
0.110
0.040
0.200
0.090
0.060
0.030
0.020
0.330
0.070
0.090
0.140
0.160
0.030
0.070
0.060
0.100
0.050
0.040
0.020
0.050
0.050
0.010
0.000
0.030
0.060
0.050
0.060
0.040
0.070
0.030
0.020
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-012 307733 6531818 1340 208 300 -61
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
NA
NA
NA
0.528
0.576
0.473
0.391
0.358
0.365
0.385
0.605
0.813
0.663
0.770
0.744
1.334
1.010
0.242
0.226
0.261
0.435
0.409
0.544
0.538
0.574
0.801
0.763
0.791
0.999
1.058
0.899
0.662
0.737
0.838
0.780
0.598
0.558
0.604
0.739
0.558
0.422
0.118
0.272
0.478
0.510
0.420
0.553
0.776
1.466
0.873
0.399
0.489
0.373
0.196
0.206
0.388
NA
NA
NA
0.170
0.150
0.040
0.020
0.030
0.050
0.200
0.040
0.170
0.150
0.210
0.090
0.120
0.080
0.080
0.070
0.090
0.100
0.110
0.120
0.110
0.040
0.010
0.010
0.050
0.080
0.070
0.160
0.130
0.150
0.040
0.090
0.110
0.120
0.110
0.110
0.140
0.130
0.020
0.010
0.020
0.030
0.020
0.040
0.020
0.030
0.040
0.100
0.020
0.020
0.010
0.000
0.020
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
0.310
0.302
0.847
0.245
0.325
0.411
0.472
0.530
0.394
0.526
0.384
0.419
0.378
0.456
0.377
0.366
0.290
0.429
0.422
0.563
0.463
0.556
0.373
0.324
0.305
0.305
0.433
0.332
0.441
0.369
0.444
0.373
0.367
0.338
0.341
0.279
0.367
0.256
0.060
0.043
0.078
0.019
0.287
0.286
0.130
0.125
0.223
0.265
0.275
0.241
0.291
0.292
0.273
0.226
0.234
0.237
0.060
0.030
0.030
0.010
0.060
0.080
0.080
0.040
0.060
0.010
0.060
0.070
0.080
0.050
0.000
0.070
0.060
0.070
0.110
0.140
0.100
0.030
0.100
0.110
0.010
0.030
0.030
0.140
0.120
0.220
0.110
0.120
0.080
0.020
0.050
0.060
0.070
0.020
0.010
0.020
0.020
0.030
0.090
0.080
0.020
0.020
0.020
0.020
0.040
0.050
0.060
0.060
0.060
0.040
0.060
0.030
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
0.270
0.224
0.211
0.120
0.252
0.325
0.295
0.277
0.338
0.374
0.325
0.229
0.296
0.234
0.308
0.221
0.278
0.221
0.255
0.293
0.347
0.176
0.217
0.214
0.319
0.233
0.253
0.331
0.366
0.312
0.275
0.343
0.393
0.336
0.206
0.258
0.161
0.163
0.225
0.297
0.255
0.292
0.272
0.313
0.243
0.259
0.338
0.219
0.163
0.140
0.259
0.251
0.153
0.106
0.250
0.342
0.030
0.050
0.030
0.020
0.050
0.030
0.060
0.060
0.060
0.070
0.060
0.030
0.080
0.040
0.070
0.030
0.050
0.030
0.020
0.040
0.180
0.020
0.010
0.060
0.020
0.020
0.030
0.030
0.090
0.030
0.040
0.080
0.100
0.070
0.040
0.050
0.030
0.030
0.050
0.060
0.040
0.040
0.030
0.060
0.070
0.070
0.070
0.060
0.030
0.010
0.030
0.010
0.000
0.000
0.010
0.180
Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo) Attachment: RC Drill Results for Llahuin Project(Amapolo)
Hole ID
Easting
Northing
Collar RL (m)
Total Depth
(m)
Azimuth (Deg)
Dip (Deg)
LLA-012 307733 6531818 1340 208 300 -61
From
(m)
Cu
%
To
(m)
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
From
(m)
To (m)
Cu
%
Au
g/t
168
0.364
169
0.214
170
0.180
171
0.122
172
0.090
173
0.197
174
0.311
175
0.323
176
0.313
177
0.274
178
0.200
179
0.197
180
0.258
181
0.278
182
0.235
183
0.208
184
0.222
185
0.243
186
0.299
187
0.189
188
0.207
189
0.164
190
0.090
191
0.157
192
0.103
193
0.142
194
0.262
195
0.093
196
0.050
197
0.131
198
0.253
199
0.363
200
0.444
201
0.194
202
0.273
203
0.165
204
0.274
205
0.223
206
0.027
207
0.125
Note - NA: No Analysis conducted
169
0.040
170
0.010
171
0.020
172
0.000
173
0.030
174
0.030
175
0.080
176
0.060
177
0.060
178
0.090
179
0.040
180
0.070
181
0.070
182
0.080
183
0.050
184
0.070
185
0.080
186
0.070
187
0.050
188
0.010
189
0.030
190
0.030
191
0.020
192
0.040
193
0.010
194
0.020
204
0.020
205
0.040
206
0.020
207
0.020
208
0.000
195
0.040
196
0.020
197
0.000
198
0.040
199
0.030
200
0.090
201
0.080
202
0.010
203
0.020