AI assistant
SKY METALS LIMITED — Capital/Financing Update 2014
Oct 2, 2014
65807_rns_2014-10-02_7fbc4dc7-15a1-43cc-9a5f-c8ad9e64dc7e.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [568 x 20] intentionally omitted <==
==> picture [228 x 56] intentionally omitted <==
3 October 2014
The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000
(4 pages by email)
Dear Madam
BAGHEERA EAST-1 EXPLORATION WELL UPDATE 1
The Directors of Planet Gas Limited ('Planet Gas') are pleased to announce the commencement of drilling of exploration well ‘Bagheera East-1’ within PEL 514 in the South Australian Cooper Basin.
BAGHEERA EAST-1 EXPLORATION WELL
Spud Date:
2 October 2014
Planned Total Depth:
2,510 metres
Current Depth:
218 metres as at 0600hrs on 03/10
Operations:
Drilling ahead 12¼” surface hole
Participating Interest: Senex Energy Limited 80% (Operator) Planet Gas 20% (free carried)
About Bagheera East-1 exploration well
The Bagheera East-1 vertical exploration well is located in the northwest of PEL 514. The Telopea Field and the Keleary Field are located 13 kilometres and 10 kilometres respectively southeast of Bagheera East (see Figures 1 and 2).
From the Dundinna 3D seismic survey analysis, the Bagheera East prospect is a structural trap mapped as a four-way dip closure.
Planet Gas Limited[ ABN][ 46 098 952 035]
Level 2, 66 Hunter Street Sydney NSW 2000 Australia T +61 2 9300 3322 F +61 2 9221 6333
==> picture [568 x 26] intentionally omitted <==
The exploration well will be drilled to a total depth of approximately 2,510 metres to test the oil potential of the Tinchoo Formation with the Poolowanna and Birkhead Formations and the Hutton Sandstone as secondary targets.
The drilling program forms part of a second farm-in agreement with Senex Energy Limited ('Senex') of May 2013. Planet Gas holds a 20% project interest in PEL 514 while Senex holds an 80% interest and is the operator. The Planet Gas project interest, including the drilling and completion of Bagheera East-1, is free carried by Senex.
For further information, contact Anthony McClure or Peter Nightingale on +61 2 9300 3322.
Yours sincerely
==> picture [105 x 65] intentionally omitted <==
Peter J. Nightingale Director
pjn7847
2
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
==> picture [490 x 91] intentionally omitted <==
Figure 1: Location of Bagheera East Field
3
==> picture [490 x 99] intentionally omitted <==
==> picture [490 x 99] intentionally omitted <==
==> picture [490 x 99] intentionally omitted <==
==> picture [490 x 99] intentionally omitted <==
Figure 2: Location of Bagheera East-1 Well
4