ORPHEUS SECURES ADDITIONAL SIGNIFICANT KINTAP COAL PROJECT IN SOUTH KALIMANTAN
-
Heads of Agreement (“HOA”) signed with PT Citra Bara Prima (“CBP”) over a ~195 hectare coal production project in South Kalimantan
-
Located adjacent to one of PT Arutmin’s major operating coal mines and approximately 10km from Orpheus’ Kintap ADK project
-
Exploration target of 2Mt – 4.5Mt with a drilling program planned to commence by end September to establish a JORC resource
-
Mining planned to commence by end October using nearby existing infrastructure.
Orpheus Energy (ASX:OEG) today announced that it has secured a 50% equity ownership in an additional tenement with a coal production Licence in South Kalimantan Province – Tanah Laut Regent Decree No. 545/06/IUP.OP/DPE/2011 - under its joint venture agreement with strategic alliance partner PT Mega Coal International (“Mega”). All legal due diligence has been successfully completed.
The CBP tenement covers an area of approximately 195 hectares, and has been previously mined and drilled. Orpheus’ technical team has conducted desktop analysis on earlier exploration results, identifying a minimum of two coal seams varying in thickness from 4 to 12 metres, near surface.
Orpheus currently has an exploration target of 2.0Mt to 4.5Mt and has planned a 12 hole drilling program, each to a total depth of 100m, to delineate a JORC resource, expected to commence by end September 2012.
The CBP project is located approximately 10km south-west of Orpheus’ ADK project and is close to the river side barge loading facility at SKJM, located less than 5km away.
During the upcoming CBP drilling program, Orpheus will be developing its preliminary mine plan so that the project can rapidly move into production, planned to be by end October 2012. At this stage, it is anticipated that the CBP project will be mined at a rate of 50,000tpm, when in steady-state production.
==> picture [596 x 76] intentionally omitted <==
==> picture [596 x 99] intentionally omitted <==
==> picture [477 x 339] intentionally omitted <==
Figure 1: South Kalimantan Kintap Area
The HOA provides that Orpheus pays a purchase price of US$0.50 per tonne of JORC black coal resource. This is payable to PT Mega Coal in the following structure:
- Stage 1: ~US$200,000 as a deposit prior to the establishment of a JORC resource; Stage 2: On completion of Orpheus’ successful drilling program generating a JORC resource, Orpheus will pay Mega US$0.50 per tonne in cash, scrip or combination of both, at Orpheus’ election.
Executive Chairman Wayne Mitchell said, “The CBP transaction is very important for Orpheus as it is the next step in our strategy of bringing additional Kintap area satellite mines into production. CBP already has a production licence, which means we can quickly start mining and exporting coal. In addition to our coal already coming out of ADK, Orpheus will soon be mining 100,000tpm from the South Kalimantan area.”
Orpheus and Mega Coal will now move to execute a Joint Venture Agreement over the CBP project.
ASX Release Page 2
==> picture [596 x 99] intentionally omitted <==
For further information, please contact: David Smith Email: [email protected] Phone +61 2 9922 3930 www.orpheusenergy.com.au
Released through:
Sam Sloane Six Degrees Investor Relations +61 2 9230 0661 or +61 412 845 920
Cautionary Note:
This release may contain forward-looking statements that are based upon management’s expectations and beliefs in regards to future events. These statements are subjected to risk and uncertainties that might be out of control of Orpheus Energy Limited and may cause actual results to differ from the release. Orpheus Energy Limited takes no responsibility to make changes to these statements to reflect change of events or circumstances after the release.
Competent Person’s Statement:
The statements above apply in respect of the information in this announcement that relates to exploration targets and mineral resources. The information is based on, and accurately reflects information compiled by Wes Harder, who is a Member of the Australasian Institute of Mining and Metallurgy. Wes Harder is a Director of Orpheus Energy Limited and is a Geologist who has sufficient experience which is relevant to the style of coal mineralisation and type of deposit under discussion and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Wes Harder consents to the inclusion in the report of the material, based on his information, in the form and context in which it appears.
*** JORC- Exploration Target**
It is common practice for a company to comment and discuss its exploration in terms of target and size type. The information in this announcement relating to exploration targets should not be misunderstood or misconstrued as an estimate of mineral resources or ore reserves. The potential quantity and grade is conceptual nature, there has been insufficient work completed to define a mineral resource and it is uncertain if further exploration will result in the determination of a mineral resource.
ASX Release Page 3