Seadrill Limited Capital/Financing Update 2017

Feb 28, 2017

9186_rns_2017-02-28_2e0158b9-52b6-4017-a341-b429b6dfbd5d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Rig type/Name Generation/
type 1
Built Water depth
(feet)
Drilling depth
(feet)
Location Current contract
Client Start Expire Dayrate US\$
Semi-submersibles
West Alpha 2 4th-HE 1986 2,000 23,000 Norway Norway - - -
West Venture 2 5th-HE 2000 2,600 30,000 Norway Norway - - -
West Phoenix 2 6th-HE 2008 10,000 30,000 UK UK - - -
UK Total6 Feb-17 May-17 145,000
UK Nexen May-17 Sep-17 Undisclosed
West Hercules 6th-HE 2008 10,000 35,000 Norway Norway - - -
West Sirius 3 6th-BE 2008 10,000 35,000 GoM GoM 23 Jul-14 Jul-17 See note 23
West Taurus 6th-BE 2008 10,000 35,000 Spain Spain - - -
West Eminence 6th-HE 2009 10,000 30,000 Spain Spain - - -
West Aquarius 3 6th-HE 2009 10,000 35,000 Canada Hibernia Oct-15 Apr-17 615,000
Canada Statoil20 May-17 Jul-17 200,000
Options Statoil20 Jul-17 Sep-17 200,000
Sevan Driller 4 6th-BE 2009 10,000 40,000 Singapore Singapore - - -
West Orion 6th-BE 2010 10,000 35,000 Namibia Namibia - - -
West Pegasus 6th-HE 2011 10,000 35,000 Mexico Mexico - - -
West Capricorn 3 6th-BE 2011 10,000 35,000 GoM BP 10, 19 Jul-12 Jul-19 316,000
West Eclipse 6th-BE 2011 10,000 40,000 Angola ExxonMobil 16, 28 Jun-16 Jun-18 340,000
West Leo 3 6th-HE 2012 10,000 35,000 Spain Spain - - See note 34
Sevan Brasil 4 6th-BE 2012 10,000 40,000 Petrobras 27, 8
Brazil
Jul-12 Jul-18 264,000
Sevan Louisiana 4 6th-BE 2013 10,000 40,000 LLOG 17
GoM
May-14 May-17 350,000
West Rigel 2 6th-HE 2016 10,000 40,000 Under construction at Jurong - - - -
Sevan Developer 4, 15 6th-BE 2016 10,000 40,000 Under construction at COSCO - - - -
Drillships
West Navigator 2 Ultra-deepwater 2000 7,500 35,000 Norway Norway - - -
West Polaris 3 Ultra-deepwater 2008 10,000 35,000 Angola ExxonMobil 28 Mar-13 Feb-18 490,000
West Capella 3 Ultra-deepwater 2008 10,000 35,000 Spain Spain - - See note 30
West Gemini Ultra-deepwater 2010 10,000 35,000 Angola Total 28 Oct-13 Oct-17 656,000
West Auriga 3 Ultra-deepwater 2013 12,000 40,000 GoM BP 22 Oct-13 Oct-20 562,000
West Vela 3 Ultra-deepwater 2013 12,000 40,000 GoM BP 21 Nov-13 Nov-20 564,000
West Tellus Ultra-deepwater 2013 12,000 40,000 Brazil Petrobras 8 Apr-15 Oct-19 324,000
West Neptune Ultra-deepwater 2014 12,000 40,000 GoM LLOG 24 Dec-14 Dec-17 573,000
West Saturn Ultra-deepwater 2014 12,000 40,000 Spain Spain - - -
Cote d'Ivoire Ophir May-17 Jun-17 155,000
West Jupiter Ultra-deepwater 2014 12,000 40,000 Nigeria Total Dec-14 Dec-19 Undisclosed
West Carina Ultra-deepwater 2015 12,000 40,000 Brazil Petrobras 8 Jun-15 Jun-18 481,000
West Draco Ultra-deepwater 2017 12,000 40,000 Under construction at Samsung - - - -
West Dorado Ultra-deepwater 2017 12,000 40,000 Under construction at Samsung - - - -
West Aquila Ultra-deepwater 2018 12,000 40,000 Under construction at DSME - - - -
West Libra Ultra-deepwater 2019 12,000 40,000 Under construction at DSME - - - -
Rig type/Name Generation/
type 1
Built Water depth
(feet)
Drilling depth
(feet)
Location Current contract
Client Start Expire Dayrate US\$
Jack-ups
West Epsilon 2 Heavy-duty - HE 1993 400 30,000 Norway Norway - - -
West Elara 2 Heavy-duty - HE 2011 450 40,000 Norway Statoil 9, 12 Mar-12 Mar-17 318,000
Norway Statoil 9 Mar-17 Jun-17 138,000
Statoil 9
West Linus 2 Heavy-duty - HE 2014 450 40,000 Options
Norway
ConocoPhillips 9, 25, 14 Jun-17
May-14
Aug-17
May-19
138,000
326,000
Options ConocoPhillips 9 May-19 May-21 326,000
West Defender 5 BE 2007 350 30,000 Mexico PEMEX Aug-14 Aug-18 116,000
Mexico PEMEX Sep-18 Jan-23 155,500
West Resolute BE 2007 350 30,000 Sharjah Sharjah - - -
West Prospero BE 2007 400 30,000 Malaysia Malaysia - - -
West Courageous 5 BE 2007 350 30,000 Mexico PEMEX Sep-14 Aug-18 116,000
Mexico PEMEX Sep-18 Nov-23 155,500
West Triton BE 2008 375 30,000 Sharjah Sharjah - - -
West Vigilant BE 2008 350 30,000 Malaysia Malaysia - - -
West Intrepid 5 BE 2008 350 30,000 Mexico PEMEX May-14 Aug-18 116,000
Mexico PEMEX Sep-18 May-23 155,500
West Ariel BE 2008 400 30,000 Republic of Congo ENI31 Jul-16 Feb-18 120,000
West Cressida BE 2009 375 30,000 Thailand PTTEP Apr-16 Apr-17 64,500
West Freedom BE 2009 350 30,000 Venezuela Cardon IV33 Jan-17 Mar-17 42,500
Venezuela Cardon IV32 Apr-17 Sep-17 225,000
West Callisto BE 2010 400 30,000 Saudi Arabia Saudi Aramco Jan-17 Nov-18 120,000
West Leda BE 2010 375 30,000 Malaysia Malaysia - - -
West Mischief BE 2010 350 30,000 Abu Dhabi NDC Mar-16 Aug-17 See note 26
AOD l BE 2013 400 20,000 Saudi Arabia Saudi Aramco Jul-16 Jun-19 102,900
AOD ll BE 2013 400 20,000 Saudi Arabia Saudi Aramco Jul-16 Jun-19 102,900
AOD lll BE 2013 400 20,000 Saudi Arabia Saudi Aramco Jan-17 Dec-19 102,900
West Tucana BE 2013 400 30,000 Angola Cabina Gulf Oil Company Limited 28 Jun-15 Jun-17 223,000
West Telesto BE 2013 400 30,000 Malaysia Malaysia - - -
West Castor BE 2013 400 30,000 Mexico ENI 33 Dec-16 Dec-17 110,000
Options ENI 33 Jan-18 Dec-18 115,000
Options ENI 33 Jan-19 Dec-19 121,000
West Oberon 5 BE 2013 400 30,000 Mexico PEMEX May-14 Aug-18 130,000
Mexico PEMEX Sep-18 Oct-22 171,500
West Titania 5 BE 2014 400 35,000 Mexico PEMEX Jan-15 Aug-18 130,000
Mexico PEMEX Sep-18 Oct-21 171,500
West Titan BE 2016 400 30,000 Under construction at Dalian - - - -
West Proteus BE 2017 400 30,000 Under construction at Dalian - - - -
West Rhea BE 2017 400 30,000 Under construction at Dalian - - - -
West Tethys BE 2017 400 30,000 Under construction at Dalian - - - -
West Hyperion BE 2017 400 30,000 Under construction at Dalian - - -
West Umbriel BE 2018 400 30,000 Under construction at Dalian - - - -
West Dione BE 2018 400 30,000 Under construction at Dalian - - - -
West Mimas BE 2018 400 30,000 Under construction at Dalian - - - -
Rig type/Name Generation/ Built Water depth Drilling depth Location
type 1 (feet) (feet) Current contract
Client Start Expire Dayrate US\$
Tender rigs
T15 3 Barge 2013 6,500 30,000 Thailand Chevron Jul-13 Jul-19 110,000
T16 3 Barge 2013 6,500 30,000 Thailand Chevron Aug-13 Aug-19 110,000
West Vencedor 3 Semi-tender 2010 6,500 30,000 Singapore Singapore - - -
Indonesia ConocoPhillips Mar-17 Jul-17 115,000
Options ConocoPhillips Jul-17 Sep-18 115,000

Footnotes: 1) HE - Harsh environment BE - Benign environment 2) Owned by North Atlantic Drilling Ltd in which Seadrill Limited owns 70.4 percent 3) Owned by Seadrill Partners in which Seadrill Limited owns 46.6 percent 4) Owned by Sevan Drilling Ltd in which Seadrill Limited owns 50.1 percent 5) Owned by SeaMex in which Seadrill Limited owns 50.0 percent 6) A mobilization fee of £4m will be payable after mobilization and will be taken to income over the contract term 8) Daily rates partly received in Brazilian Real. Assumed US\$/BRZ foreign exchange rate 3.25 9) Daily rates partly received in Norwegian kroner. Assumed NOK/US\$ foreign exchange rate 8.25 10) For West Capricorn a mobilization fee of US\$30 million will be received during the original contract period. 12) For West Elara a mobilization fee of US\$24 million will be taken to income over the contract period. 14) For West Linus a mobilization fee of US\$24 million will be taken to income over the contract period. 15) Delivery originally deferred for 12 months with mutually agreed options, three 6 month options have been exercised to April 2017, one further mutually agreed option to extend the delivery date for up to a total of 36 months from October 2014. 16) For West Eclipse a mobilization fee was received upfront. 17) For Sevan Louisiana a mobilization fee of US\$32.5 million was received upfront 18) For West Leo a mobilization fee of US\$18 million will be taken to income over the contract period. 19) In May 2016 the West Capricorn was down-manned and placed on an extended standby rate of \$316,000 per day with expected recommencement of work in late 2017 at the full operating rate of \$526,000 per day 20) In addition Seadrill Partners will provide fuel and additional services at a fixed rate 21) For West Vela a mobilization fee of US\$37.5 million will be taken to income over the contract period. 22) For West Auriga a mobilization fee of US\$37.5 million will be taken to income over the contract period. 23) West Sirius received a notice of termination. In accordance with the cancellation provisions, Seadrill Partners will receive payments over the remaining contract term. 24) For West Neptune a mobilization fee of US\$37.5 million will be taken to income over the contract period. 25) For West Linus we will receive an additional compensation of US\$12,430 per day over the initial 5 year contract period. 26) The West Mischief received notice of early termination for convenience in January 2017. The customer is required to provide 180 days notice period paid at full operating rate and a subsequent 30 days reimbursed at standby rate. 27) The daily rate includes performance bonus based on a 95% utilization. 28) An element of the daily rate will be payable to our JV partner. 30) In accordance with the cancellation for convenience provisions in the West Capella contract, Seadrill Partners is entitled to a payment of approximately \$125 million in two equal installments. 31) For West Ariel a rate of \$120,000 per day applies whilst the rig is in non-operating flotel mode. 32) For West Freedom a rate of \$42,500 per day applies whilst the rig is in non-operating flotel mode. 33) West Castor rate includes the provision of certain onshore logistics services

34) In December 2016 Seadrill Partners received notice of cancellation by reason of alleged force majeure from Tullow Oil. Seadrill Partners disputes the claim and will enforce all its rights as per the contract and governing law.

The information contained in this Fleet Update report (the "Information") is as of the date of the report only and is subject to change without notice to the recipient. Seadrill Limited assumes no duty to update any portion of the Information.

DISCLAIMER. NEITHER SEADRILL LIMITED NOR ITS AFFILIATES MAKE ANY EXPRESS OR IMPLIED WARRANTIES (INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE) REGARDING THE INFORMATION CONTAINED IN THIS REPORT, WHICH INFORMATION IS PROVIDED "AS IS."

No Unauthorized Publication or Use. All information provided by Seadrill Limited in this report is given for the exclusive use of the recipient and may not be published, redistributed or retransmitted without the prior written consent of Seadrill Limited.

Client Contract Duration, Timing and Dayrates and Risks Associated with Operations. The duration and timing (including both starting and ending dates) of the client contracts are estimates only, and client contracts are subject to cancellation, suspension and delays for a variety of reasons, including some beyond the control of Seadrill Limited. Also, the dayrates set forth in the report are estimates based upon the full contractual operating dayrate. However, the actual average dayrate earned over the course of any given contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond the control of Seadrill Limited. Our client contracts and operations are generally subject to a number of risks and uncertainties, and we urge you to review the description and explanation of such risks and uncertainties in previous prospectus. The dayrates do not include revenue for mobilizations, demobilizations, upgrades, shipyards or recharges.