Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

SANTOS LIMITED Capital/Financing Update 2015

Dec 2, 2015

65872_rns_2015-12-02_88c1427f-4d41-49c7-87d3-5565563cee3d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

3 December 2015

November Drilling Report

  • Unconventional Business

    - **Washington-1 recovers gas and liquids during production test** 
    
    - **Completion options under consideration** 
    
    • Wet Gas Business

      • Willow-1 exploration well expected to spud in early December 2015

Unconventional Business

The Washington-1 unconventional exploration well in PEL 570 reached a total depth of 3,660 metres in October and encountered elevated gas shows in the Permian Source Rocks across the Toolachee, Epsilon and Patchawarra Formations.

In November, the joint venture (Drillsearch 47.5%; Santos 35% and Operator; Sundance Energy 17.5%) tested all three formations with a five-stage hydraulic stimulation campaign. Measurable gas flows to surface were recorded after only seven days with the test lasting for 38 days.

Initial gas flow rates were encouraging with the well also producing hydrocarbon-liquids towards the end of the test. The well has been shut-in to monitor pressure build up while the joint venture considers completion options.

Drillsearch’s proportionate share of the costs of drilling, testing and completing the Washington-1 well are included in the continuing free-carry in PEL 570.

==> picture [284 x 313] intentionally omitted <==

Wet Gas Business

During the month of November, preparation continued for the two-well exploration drilling and testing campaign in PRLs 173 and 174.

The Ensign 932 Rig is on location with the Willow-1 well expected to spud in the second week of December 2015.

For further information please contact:

Dudley White General Manager – Corporate Communications Phone: +61 2 9249 9669 Email: [email protected]

==> picture [596 x 23] intentionally omitted <==

Level 18, 321 Kent Street T +61 2 9249 9600 Sydney, NSW 2000 Australia F +61 2 9249 9630

ABN 73 006 474 844 www.drillsearch.com.au