SANDFIRE RESOURCES LIMITED — Interim / Quarterly Report 2016
Feb 24, 2016
65773_rns_2016-02-24_fb10df51-07da-416f-ac11-ed9700d23909.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
==> picture [595 x 89] intentionally omitted <==
25 February 2016
Mr Sebastian Bednarczyk Adviser, Issuers (Perth) ASX Limited Level 40, Central Park 152-158 St Georges Terrace Perth WA 6000
Dear Sebastian,
FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2015 AND APPENDIX 4D
I am pleased to attach the following items for immediate release to the market:
-
ASX release on the Company’s financial results for the 6 months ended 31 December 2015.
-
December 2015 Half Year Report and Appendix 4D.
-
December 2015 Half Year Report Presentation and Operations Update.
-
Appendix 3A.1 Notification of Dividend / distribution.
In addition, Sandfire’s Managing Director and CEO, Karl Simich, is hosting an investor teleconference and live webcast on the December 2015 half year financial results at 10.00am (AWST) / 1.00pm (AEST) , Thursday 25 February 2016.
The webcast and synchronised slide presentation is available through the Company’s website or through BRR Media.
Live date: Thursday, 25 February 2016 Access this website at: http://webcasting.brrmedia.com/broadcast/56ba66a3c23d9659538e20af http://www.sandfire.com.au
Yours sincerely,
Matthew Fitzgerald Chief Financial Officer and Joint Company Secretary
For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800
Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)
==> picture [595 x 36] intentionally omitted <==
25 February 2016
==> picture [595 x 89] intentionally omitted <==
ASX Release
APPENDIX 4D Half year ended 31 December 2015
| Results for Announcement to the Market $’000 |
Up/Down Movement |
|---|---|
| Revenue from ordinary activities 228,322 Net profit for the period 15,674 Net profit for the period attributable to members 16,106 |
Down 13% Down 49% Down 47% |
| Dividend information | Amount per share Franked amount per share |
| Interim dividend per share (cents per share) Conduit foreign income (CFI) component Interim dividend dates Record date for determining entitlements to the interim dividend Payment date for the interim dividend |
2.0 2.0 Nil 10 March 2016 24 March 2016 |
| Net tangible assets Net tangible assets per ordinary security |
2015 2014 |
| $2.25 $1.99 |
|
| Entity over which control has been gained during the period |
Additional Appendix 4D disclosure requirements can be found in the Director’s Report and the 31 December 2015 financial statements and accompanying notes.
This information should be read in conjunction with Sandfire’s reviewed Half-year Financial Report which is enclosed.
For further information contact:
Sandfire Resources NL
Matthew Fitzgerald – CFO and Joint Company Secretary Office: +61 8 6430 3800
==> picture [595 x 36] intentionally omitted <==
==> picture [595 x 86] intentionally omitted <==
Half-Year Financial Report
For the six months ended 31 December 2015
ASX Code: SFR
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 CONTENTS
| CORPORATE INFORMATION | 1 |
|---|---|
| IMPORTANT INFORMATION AND DISCLAIMER | 2 |
| DIRECTORS’ REPORT | 3 |
| AUDITOR INDEPENDENCE DECLARATION | 12 |
| CONSOLIDATED INTERIM INCOME STATEMENT | 13 |
| CONSOLIDATED INTERIM STATEMENT OF COMPREHENSIVE INCOME | 14 |
| CONSOLIDATED INTERIM BALANCE SHEET | 15 |
| CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY | 16 |
| CONSOLIDATED INTERIM STATEMENT OF CASH FLOWS | 17 |
| NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS | 18 |
| DIRECTORS’ DECLARATION | 27 |
| INDEPENDENT AUDITOR’S REVIEW REPORT | 28 |
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 CORPORATE INFORMATION
ABN 55 105 154 185
Directors Derek La Ferla Independent Non-Executive Chairman Karl Simich Managing Director and Chief Executive Officer Paul Hallam Independent Non-Executive Director W John Evans Non-Executive Director Robert Scott Independent Non-Executive Director Maree Arnason Independent Non-Executive Director Management and Company Secretary Mike Spreadborough Chief Operating Officer Matthew Fitzgerald Chief Financial Officer and Joint Company Secretary Robert Klug Chief Commercial Officer and Joint Company Secretary Registered Office and Principal Place of Business Level 1, 31 Ventnor Avenue West Perth WA 6005 Tel: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: [email protected] Web: www.sandfire.com.au Share registry Security Transfer Registrars Pty Ltd 770 Canning Highway Applecross WA 6153 Tel: +61 8 9315 2333 Fax: +61 8 9315 2233 Email: [email protected]
Auditors
Ernst & Young Ernst & Young Building 11 Mounts Bay Road Perth WA 6000
Home Exchange
Australian Securities Exchange Limited Exchange Plaza 2 The Esplanade Perth WA 6000
ASX Code
Ordinary fully paid shares: SFR
- 1 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
IMPORTANT INFORMATION AND DISCLAIMER
Competent Person’s Statement – Exploration Results
The information in this report that relates to Exploration Results is based on information compiled by Mr. Shannan Bamforth who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bamforth is a permanent employee of Sandfire Resources and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bamforth consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Exploration and Resource Targets
Any discussion in relation to the potential quantity and grade of Exploration Targets is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant Mineral Resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.
Forward-Looking Statements
Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.
- 2 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
The directors present their report together with the consolidated financial report of the consolidated entity (referred to as the Group) consisting of the parent entity, Sandfire Resources NL (the Company or Sandfire), and the entities it controlled, for the six months ended 31 December 2015 and the independent auditor’s review report thereon.
1 Directors
The directors of the Company in office during the half-year and until the date of this report are set out below. Directors were in office for the entire period unless otherwise stated.
| Name | Period of Directorship |
|---|---|
| Mr Derek La Ferla | Appointed 17 May 2010 |
| Independent Non-Executive Chairman | |
| Mr Karl M Simich | Appointed Director 27 September 2007 |
| Managing Director and Chief Executive | Managing Director and Chief Executive Officer since 1 July 2009 |
| Officer | |
| Mr W John Evans | Appointed Executive Technical Director 2 October 2007 |
| Non-Executive Director | Non-Executive Director since 1 January 2013 |
| Mr Robert N Scott | Appointed 30 July 2010 |
| Independent Non-Executive Director | |
| Mr Paul Hallam | Appointed 21 May 2013 |
| Independent Non-Executive Director | |
| Ms Maree Arnason | Appointed 18 December 2015 |
| Independent Non-Executive Director |
2 Dividends
Since the end of the financial period, the Board of Directors has resolved to pay a fully franked dividend of 2 cents per share, to be paid on 24 March 2016. The record date for entitlement to this dividend is 10 March 2016. The financial impact of this dividend amounting to $3,137,000 has not been recognised in the Financial Statements for the half year ended 31 December 2015 and will be recognised in subsequent Financial Statements.
The details in relation to dividends announced or paid since 1 July 2014, other than as above, are set out below.
| Amount per share | Franked amount per | Total dividends | ||
|---|---|---|---|---|
| Record date | Date of payment | (cents) | share (cents) | $000 |
| 10 September 2015 | 24 September 2015 | 10 | 10 | 15,685 |
| 12 March 2015 | 26 March 2015 | 3 | - | 4,679 |
| 12 September 2014 | 10 October 2014 | 10 | - | 15,564 |
3 Review and results of operations
3.1 Project review, strategies and future prospects
DEGRUSSA COPPER-GOLD PROJECT, Western Australia (100%)
The DeGrussa Copper Project is located within Sandfire’s 100%-owned Doolgunna Project, a 400 square kilometre tenement package in WA’s Bryah Basin mineral province, approximately 900km north-east of Perth. The Project is located within an established mining district, approximately 150km north of the regional mining hub of Meekatharra and includes the DeGrussa Copper Mine. Including 100%-owned ground and tenements held in joint venture, Sandfire controls a total contiguous exploration portfolio covering a total area of 1,600 square kilometres, including a 65km strike length of prospective VMS horizon.
DeGrussa Copper Mine
Overview
Copper production for the 6 months to 31 December 2015 was 34,280 tonnes and gold production was 17,305 ounces (2014: 31,413 tonnes of copper and 17,737 ounces of gold). A summary of copper and gold production and sales for the period is provided below:
| Grade | Grade | Contained | Contained |
|||
|---|---|---|---|---|---|---|
| Production Statistics | Tonnes | (% Cu) |
(g/t Au) |
Copper (t) |
Gold (oz) |
|
| Concentrator | Mined | 792,209 | 4.7 |
1.7 |
37,405 |
42,014 |
| Milled | 791,670 | 4.8 |
1.6 |
37,577 |
41,777 |
|
| Production | 139,063 | 24.7 |
3.9 |
34,280 |
17,305 |
|
| Copper and gold sales | 124,556 | 24.5 |
3.6 |
30,454 |
14,467 |
Note: Mining, production and sales statistics are rounded to the nearest 0.1% Cu grade and 0.1 g/t Au grade.
- 3 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Review and results of operations
3.1 Project review, strategies and future prospects (continued)
Underground Mining
Total ore production from the underground mine was 792,209 tonnes of ore grading 4.7% Cu.
This reflects an annualised production rate from the underground mine of approximately 1.6Mtpa. The strong performance confirms the new mine production target of 1.6Mtpa and reflects a continued focus on reliable stope design and excavation, as well as mining fleet productivity.
The mined copper grade for the reporting period was higher than planned as a result of positive reconciliations from a number of stopes mined during the period, minor adjustments to the mine schedule and improved drill and blast practices.
The increased mine production performance reflects an overall 7% increase in future annualised mine production with the same mine personnel and mining fleet. Opportunities to further enhance mine production will continue to be explored.
The mine remains in balance between production and back-fill. Given the maturity of production in the C1 and DeGrussa lenses together with C4 now online, opportunities to replace paste back-fill in some stopes with mine waste continue to be identified, thereby reducing overall waste haulage to the surface and allowing a focus on ore haulage.
Total underground development reached 32.8km by the end of the reporting period. The focus of mine development was on the development of the Conductor 4 and 5 declines. The development of the Conductor 1 decline will recommence as required for the extraction of the lower Conductor 1 ore.
During the period, the Conductor 4 decline development advanced 265 metres and the Conductor 5 decline development advanced 264 metres, with all development advance occurring in good ground conditions. The Conductor 4 decline intersected first development ore early in October 2015, allowing stoping to commence. Development within the Conductor 5 lens commenced in January 2016, which will allow Conductor 5 stope production to be brought forward to Q4 FY2016.
A Life-of-Mine update is expected to be released in Q4 FY2016 following completion of diamond drilling in Conductor 5 and subsequent Mineral Resource and Ore Reserve modelling.
Processing
Key metrics for the DeGrussa Concentrator for the 6 month period ended 31 December 2015 included:
-
791,670 tonnes milled at an average head feed grade of 4.7% Cu;
-
Overall copper recovery of 91.2%;
-
Concentrate production of 139,063 tonnes; and
-
Metal production of 34,280 tonnes of contained copper and 17,305 ounces of contained gold.
Mill throughput was maintained at an annualised rate of 1.6Mtpa for most of the reporting period notwithstanding interruptions for planned maintenance including an 8-day shutdown during September. Mill throughput operating rates continue to demonstrate that the capacity of the process plant is close to 1.7Mtpa.
Copper recovery for the reporting period averaged 91.2%, reflecting the positive impact of the processing plant enhancement projects implemented during the 2015 financial year.
Following the successful commissioning of the major enhancement projects completed during FY2015, Sandfire is continuing to investigate opportunities for further improvements in copper recovery. These include examining additional flotation capacity, further improvements in grind optimisation and operating tactic optimisation.
Production Guidance
Copper production for FY2016 is expected to be at the upper end of the range 65,000-68,000 tonnes of contained copper metal and lower end of gold production in the range 35,000-40,000 ounces. Headline C1 cash operating costs are expected to be at the lower end of the range US$0.95-1.05/lb.
Sales & Marketing
Copper Concentrate
A total of 125,216 tonnes of plant concentrate containing 30,454 tonnes of contained copper was sold during the period. Gold sales totalled 14,467 ounces. Shipments were completed from both Port Hedland and Geraldton.
- 4 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Review and results of operations
3.1 Project review, strategies and future prospects (continued)
Infrastructure
DeGrussa Solar Power Project
During the period construction commenced on a 10.6MW solar power station at DeGrussa. Formal approval for the project, which will be the largest integrated off-grid solar and battery storage facility in Australia, followed the establishment of an extensive international consortium to finance, develop, operate and own the facility.
The DeGrussa Solar Photovoltaic (PV) System is expected to set new benchmarks for the use of renewable power for mining and processing operations, establishing DeGrussa as a potential world-leading reference site for the use of renewables to reduce operating costs and improve environmental performance.
The $40 million project will consist of 34,080 solar PV panels covering a total area of over 20 hectares at a site located immediately adjacent to the DeGrussa underground mine and processing plant. The system has been designed with the diesel-fired power station continuing to provide base-load power to the DeGrussa mine with sufficient minimum load to ensure it can respond quickly to meet the power requirements of the process plant and underground mine.
Sandfire signed a final Power Purchase Agreement (PPA) with Neoen, the leading French renewable energy company. Neoen has contracted juwi Renewable Energy Pty Ltd (juwi) to develop and operate the project. Diversified infrastructure and survey solutions company OTOC Limited (ASX: OTC) was awarded the procurement and installation contract for the project via a joint venture with juwi.
The Clean Energy Finance Corporation (CEFC) has committed up to $15 million in finance towards the project, while the Australian Renewable Energy Agency (ARENA) is providing $20.9 million of funding with Neoen contributing most of the balance. Sandfire’s cash contribution to the project will be less than $1 million.
Construction activities at the DeGrussa mine site commenced in July 2015 with installation of the first solar photovoltaic (PV) panels commencing in December 2015. By the end of the reporting period, over 15,000 panels had been installed representing around 50 per cent of the total installation, with the overall construction program on track for delivery of first electricity from the facility in late Q1 of CY 2016.
Feasibility Studies
Oxide Copper Feasibility Study
The Sandfire Oxide Copper Project at DeGrussa has been extensively tested and a Scoping Study undertaken on the basis of a traditional sulphuric acid heap leach combined with a solvent extraction circuit with a strong electrolyte fed to an electro-winning circuit to produce 99.99-99.999% copper cathode.
The investigation of Continuous Vat Leaching (CVL) technology as an alternative to heap leaching and glycine as a potential alternative to a sulphuric acid environment continued during the period. A second round of benchtop testing was completed using new samples collected from site stockpiles to confirm the consistency of the results.
Assay results from this testing have confirmed the potential of this process to provide high recovery of leachable copper. A high level study is underway to understand the economics of this innovative process assuming full commercialisation. It is expected that the next step in the development of this process flowsheet will be the completion of pilot plant testing to allow confirmation of project economics prior to consideration of a full-scale plant.
Doolgunna Exploration
Overview
During the period, Sandfire continued to progress a tightly focused, multi-disciplined exploration campaign to test for extensions to the known cluster of VMS deposits at DeGrussa and to unlock the broader potential of the Doolgunna region for additional VMS and structurally-hosted copper deposits. Key components of the Company’s exploration activity at Doolgunna during the period included:
-
Additional diamond and RC drilling at the high-grade Monty VMS copper-gold discovery, part of the farm-in with Talisman Mining Ltd (Talisman), which significantly enhanced the Company’s understanding of the nature and controls of the mineralisation;
-
Commencement of a resource in-fill drilling program at Monty in November 2015 to establish a maiden JORC Mineral Resource estimate;
-
Continued underground resource definition drilling of the Conductor 5 deposit to allow conversion of the existing Inferred Resource to Indicated and Measured status; and
-
RC and diamond drilling at the Thaduna Copper Project with the aim of targeting gaps in drill coverage over the main orebody between known mineralised intercepts and to test drill methods in order to maintain RC resource definition holes and diamond pre-collars at the proposed trajectory.
- 5 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Review and results of operations
3.1 Project review, strategies and future prospects (continued)
Near-Mine Extensional Exploration
A total of 2,190m of drilling (nine holes) was completed during the period to upgrade the Conductor 5 orebody from an Inferred to Indicated Mineral Resource status, as well as testing the eastern extents of the currently modelled C5 deposit.
Two underground diamond drill holes were completed to test an area south-east of the C5 orebody where DHEM from historical surface drilling was reviewed and a discrete off-hole DHEM anomaly was modelled. Both holes intersected intervals of clast-replacement chalcopyrite and pyrite associated with chlorite alteration coincident with the position of the modelled DHEM plate.
Underground DHEM surveying was completed on both holes, however, local modelling of this data has been constrained by a local stratigraphic conductor (black shale) and by the proximity to the C5 orebody. Two historical surface diamond drill holes in the vicinity will be DHEM surveyed to assist in modelling this area.
DeGrussa Regional Exploration
Springfield Joint Venture
During the period Sandfire reached the $15 million expenditure threshold (project-to-date), which marks the end of its sole-funding stage at Springfield and commencement of the Joint Venture with Talisman. The Talisman Projects comprise the Springfield, Halloween and Halloween West Projects, which abut Sandfire’s DeGrussa-Doolgunna tenements and contain extensions of the lithological sequence which hosts the DeGrussa VMS deposits.
Exploration expenditure at the Talisman Projects is now jointly funded by Sandfire and Talisman on a 70:30 basis. The unincorporated Springfield Joint Venture has been formed with Sandfire being the Manager in accordance with the FarmIn and Joint Venture Agreement entered into on 20 December 2013.
Sandfire and Talisman are in negotiations to replace the existing Farm-In and Joint Venture Agreement with a more detailed agreement. The existing agreement is legally binding and governs the relationship between the parties until a more detailed agreement is reached.
Exploration Results
During the period, Sandfire reported further encouraging results from ongoing drilling being undertaken at the Monty copper-gold discovery, located 10km east of DeGrussa on the Springfield Project.
This work has resulted in the delineation of two mineralised horizons to date – an upper horizon and a lower horizon, with the Lower Zone including a zone of high-grade massive sulphides containing bornite mineralisation. Some of the more significant intersections reported to date from the Monty discovery include:
Lower Zone
-
16.5m @ 18.9% Cu, 2.1g/t Au from 409.5m (TLDD0004A);
-
9.2m @ 11.8% Cu, 2.9g/t Au from 417.0m (TLDD0005);
-
7.9m @ 8.3% Cu, 2.4g/t Au from 363.1m and 4.8m @ 4.9% Cu and 1.1g/t Au from 385.8m (TLDD0009);
-
10.5m @ 18.9% Cu, 3.1g/t Au from 359.7m and 4.7m @ 12.8% Cu, 2.5g/t Au from 373.6m (TLDD0010);
-
8.0m @ 13.3% Cu and 1.8g/t Au from 286.2m down-hole (TLDD0021);
-
5.0m @ 9.8% Cu and 2.9g/t Au from 334.7m (TLDD0040);
-
20.8m @ 14.9% Cu and 1.3g/t Au from 372.7m down-hole (TLDD0042);
-
11.3m @ 6.7% Cu and 2.9g/t Au from 392.2m down-hole (TLDD0043); and
-
13.9m @ 7.2% Cu and 2.3g/t Au from 332.7m (TLDD0046).
Upper Zone
-
18.0m at 5.7% Cu, 2.4g/t Au from 107m and 4.0m grading 4.2% Cu, 0.7g/t Au from 158.0m (TLRC0004); and
-
12.0m at 5.7% Cu and 1.8g/t Au from 133m down-hole (TLRC009).
Bornite Zone
-
21.6m @ 34.4% Cu and 0.4g/t Au from 339.4m down-hole (TLDD0026);
-
25.8m @ 24.1% Cu and 0.5g/t Au from 299.0m down-hole including 14.9m @ 36.7% Cu and 0.4g/t Au from 309m (TLDD0061); and
-
9.6m @ 14.1% Cu and 1.5g/t Au from 292.3m (TLDD0036).
The recent drilling results continue to substantiate initial interpretations of the orientation, grade and extent of the mineralisation at Monty that were based on the initial wide-spaced exploration holes.
- 6 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Review and results of operations
3.1 Project review, strategies and future prospects (continued)
Diamond drilling continued at Monty with drilling increasing to four rigs on double shift during November 2015. Drilling will continue on a targeted 40m x 40m pattern with the results to be used to calculate a maiden Mineral Resource estimate for Monty around the end of the first quarter of CY 2016.
Exploration drilling at Springfield outside of Monty, including within the immediate 5km long Monty VMS Trend, is also continuing, subject to the RC rig being released from drilling pre-collars for the Mineral Resource definition program.
Homer Prospect
Drilling of the Homer trend at Springfield, located approximately 4km east of the DeGrussa Copper Mine, commenced towards the end of the reporting period with an initial RC drill hole to test for the stratigraphic horizon along strike from previous drilling (TLDD0001 and TLDD0003). These drill-holes intersected haematitic exhalite with jasper clasts, which is interpreted to be the C5 target horizon.
Drill hole TLDD0068 was located 3.4km and 2.8km ENE of drill-holes TLDD0001 and TLDD0003 respectively, and was targeted at a base and trace metal geochemical anomaly identified from earlier drilling by Talisman. No base metal sulphides were observed and assays are awaited.
Australian Exploration
Sandfire has a number of exploration joint ventures around Australia including the Borroloola Project; Altia Project; Breena Plains Project; Temora and Currumburrama Project; Wingrunner and Wilga Hill Project; and the Alford Project. Details of these projects can be found on Company’s website www.sandfire.com.au and the Company’s Sandfire December 2015 Quarterly Report ASX announcement, released on 28 January 2016.
International Exploration
WCB Resources – Misima Copper Project, PNG
Sandfire holds a 38.38% interest in WCB Resources Ltd (“WCB”; TSX-V: WCB), a Toronto-listed copper-gold explorer, which it acquired by subscribing for shares in a A$5.9M private share placement. WCB is earning a 70% interest in the Misima Island exploration lease through a joint venture with Pan Pacific Copper (“PPC”), an integrated copper mining and smelting company that is jointly owned by JX Nippon Mining & Metals Corporation and Mitsui Mining & Smelting Company Ltd. The Misima Project is located within a porphyry belt which contains four of the world’s richest primary grade copper and gold porphyries including Grasberg (4.9 billion tonnes @ 0.8% Cu and 0.7g/t Au), Ok Tedi (1.7 billion tonnes @ 0.7% Cu and 0.6g/t Au), Golpu (1 billion tonnes at 0.9% Cu and 0.6g/t Au) and Panguna (1.4 billion tonnes @ 0.5% Cu and 0.6g/t Au)[1] .
Further details can be found in WCB’s News Releases, which are available at the WCB Resources website, www.wcbresources.com.
Tintina Resources – Black Butte Project, USA
Sandfire holds a 57% interest in Vancouver-based copper development company, Tintina Resources (TSX-V: TAU). Tintina’s key asset is a 100% interest in the premier, high-grade Black Butte Copper Project, located near Helena in the State of Montana in the United States. The project is located close to existing road, power and rail infrastructure, with the ability to access a residential workforce located nearby and competitive sources of materials and power.
Located on private ranch land in central Montana, the Black Butte Project copper resource consists of three flat-lying sedimentary hosted copper deposits which have been extensively drilled by Tintina (over 53,000m of diamond drilling).
An Updated Technical Report and Preliminary Economic Assessment (PEA) completed by Tintina in July 2013 was based on reported NI 43-101 Measured and Indicated Resources totalling 15.7 million tonnes grading 3.4% Cu, 0.1% Co and 14g/t Ag for 533,600 tonnes of contained copper and Inferred Resources totalling 2.3 million tonnes grading 2.8% Cu, 0.09% Co and 14g/t Ag for 63,500 tonnes of contained copper (calculated using a 1.6% copper cut-off grade) for the Johnny Lee Upper Zone and Lowry deposits, and a 1.5% Cu cut-off for the Johnny Lee Lower Zone).
The PEA confirmed that the deposit has the potential to underpin a robust underground mining operation with forecast life-of-mine production of ~30,000tpa of copper-in-concentrate over a mine life of ~11 years, based on total mill throughput of 11.8 million tonnes at an average head grade of 3.1% Cu.
Tintina submitted a Mine Operating Permit application for the Johnny Lee copper deposit to the Montana Department of Environmental Quality during the reporting period. The application is a comprehensive document detailing the development plan for this high grade project while safeguarding the environment.
==> picture [486 x 44] intentionally omitted <==
1 Production + Resources, Intierra 2014
- 7 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Review and results of operations
3.1 Project review, strategies and future prospects (continued)
The MOP application will be vetted through a process of Completeness and Compliance with the Montana DEQ until the department deems the application complete and ready for an independent third party Environmental Impact Study. Full details can be found in the Tintina announcements, which are available at Tintina’s website, www.tintinaresources.com.
3.2 Review of financial results
| DeGrussa | ||||
|---|---|---|---|---|
| Copper Mine | OtherA | Group | ||
| 6 | months ended 31 December 2015 | $ million | $ million | $ million |
| Sales revenue | 228.3 | - | 228.3 | |
| Profit (loss) before net finance and income tax | 50.7 | (24.7) | 26.0 | |
| Profit before income tax | 23.0 | |||
| Net profit | 15.7 | |||
| Basic and diluted earnings per share | 10.0 cents |
A Includes the Exploration & Evaluation segment and Other Activities as detailed in Note 5 to the consolidated financial statements.
The DeGrussa Copper Mine contributed profit before net finance and income tax of $50.7 million (2014: $68.1 million) from underground mining and concentrator operations. Other includes the Exploration and Evaluation segment and the Group’s corporate expenses that cannot be directly attributed to the Group’s operating segments, and contributed a loss before net finance and income tax of $24.7 million (2014: loss of $17.8 million).
Dividends of $15.7 million were paid during the period in respect of the 2015 financial year. On 24 February 2016 the directors of the Company announced a dividend on ordinary shares in respect of the six month period ended 31 December 2015. The total of the dividend is $3,137,000 and represents a fully franked dividend of 2 cents per share. The dividend has not been provided for in the financial report for the six month period ended 31 December 2015.
Sales revenue
| DeGrussa Copper Mine | 31 Dec 2015 $ million |
|---|---|
| Revenue from sales of copper in concentrate Revenue from sales of gold in concentrate Revenue from sales of silver in concentrate |
206.0 |
| 20.5 | |
| 1.8 | |
| 228.3 |
Copper sales for the period totalled 30,454 tonnes (contained copper production: 34,280 tonnes) and gold sales totalled 14,467 ounces (contained gold production: 17,305 ounces). Copper represents approximately 90% of revenue derived from the DeGrussa Mine at current metals prices. A total of 12 shipments were completed from Port Headland and Geraldton during the period.
The base metals market commonly works on Quotational Periods (QP) for the final pricing of metal content shipped to smelters for treatment and refining. The Group’s QP settlements are usually completed within a range of 1 to 4 months following the month of shipment, at which time the market price of metal content is derived and the value of final sales becomes fixed. Price adjustment gains and losses are recorded at the conclusion of the QP and disclosed separately in the Consolidated Income Statement.
Operations costs
| DeGrussa Copper Mine | 31 Dec 2015 $ million 31 Dec 2014 $ million |
|---|---|
| Mine operations costs Employee benefit expenses Freight, treatment and refining expenses Changes in inventories of finished goods and work in progress |
57.6 56.6 19.5 17.0 43.7 40.9 (13.4) (10.6) |
| 107.4 103.9 |
Operating costs are predominantly driven by the physical quantity of ore moved in mining and processing operations, irrespective of variations in the copper content of that ore. Mine operations costs, which include costs incurred in underground mining and plant operations on site, have increased marginally in dollar terms however have reduced in unit terms with an overall increase in mine and plant throughput to 1.6mtpa.
- 8 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Principal activities, operating and financial review (continued)
3.2 Review of financial results (continued)
Freight, treatment and refining expenses have increased by 7% from the prior period as a result of prevailing concentrate smelting market conditions, which has seen treatment and refining expenses increase.
Employee benefit expenses have increased by 15% from the prior period as a result of: an increase in employee incentive payments driven by higher production rates; an increase in employee numbers; and an increase in the Company’s long service leave provision.
The Group has provided cost guidance for the 2016 Financial Year in the range US$0.95-1.05 per pound of payable copper production (after gold and silver credits).
Royalties
Royalties are levied at 5.0% for copper sold as concentrate and 2.5% for gold, plus native title payments. As DeGrussa’s production value is heavily weighted towards copper production, the combined royalty rate approximates the 5% level (net of allowable deductions).
Exploration and evaluation
Significant exploration and evaluation activities continued in and around the DeGrussa Copper Mine with the objective of discovering further ore bodies and lenses to establish a copper-gold VMS camp. For the period ended 31 December 2015 the Group’s Exploration and Evaluation segment contributed a loss before net financing expense and income tax of $18.9 million (2014: $14.3 million). In accordance with the Group’s accounting policy, exploration and evaluation expenditure is expensed as incurred.
Exploration and evaluation expenditure comprises expenditure on the Group’s projects, including:
-
Near-mine and Doolgunna regional exploration, which include a number of joint venture earn-in arrangements, most significantly the Springfield Joint Venture with Talisman Mining Ltd;
-
Other Australian exploration projects;
-
Expenditure arising on the consolidation of the Group’s controlled entities, including the Group’s investment in Tintina Resources Inc; and
-
Losses arising on the Group’s equity accounted investments, including the Group’s investment in WCB Resources Ltd.
Depreciation and amortisation
| Depreciation and | |||
|---|---|---|---|
| WDV | WDV | amortisation |
|
| December 2015 | June 2015 |
during the period |
|
| $ million | $ million |
$ million |
|
| Mine Development | 221.4 | 202.6 |
26.9 |
| Property, plant and equipment | 211.4 | 216.3 |
17.2 |
| Total depreciation and amortisation | 44.9 |
Income tax expense
Income tax expense of $7.3 million for the period is based on the corporate tax rate of 30% on taxable income of the Group, adjusted for differences in tax and accounting treatments. Cash tax payments during the period amounted to $5.5 million. As at 31 December 2015, the Group has an $8.8 million current tax payable due in late February 2016 with respect to the financial year ended 30 June 2015.
Financial Position
Net assets of the Group increased by $5.4 million to $353.2 million during the reporting period.
Cash balance
Group cash on hand was $51.2 million as at 31 December 2015 (the Company $43.1 million), including $6.3 million held in a Debt Service Reserve Account (DSRA) to cover the March 2016 scheduled facility repayment plus interest costs.
Trade and other receivables
Trade and other receivables include remaining funds from the sale of concentrate subject to provisional pricing and quotational periods at the time of sale.
- 9 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Principal activities, operating and financial review (continued)
3.2 Review of financial results (continued)
Inventories
Finished goods inventories (plant concentrate) have increased by $13.4 million since 30 June 2015 due to a planned December 2015 sale completing shipment in early January 2016. Ore stockpiles and consumables are within with normal operating ranges.
Mine properties
Further investment of $35.1 million has been made in underground mine development to establish decline and development access to the sulphide ore bodies ahead of stoping activities.
Property, plant and equipment
Property, plant and equipment at cost increased by $7.5 million to $308.2 million at the end of the period.
Investments – WCB Resources Ltd
The Group accounts for its investment in WCB Resources Ltd (WCB: TSX.V: WCB) using the equity method of accounting. For the period, the Group has recognised $306,000 (2014: $1,102,000) in equity accounted losses after income tax.
Investments – Tintina Resources Inc
On 18 November 2015, the Group increased its stake in North American copper development company Tintina Resources Inc (“Tintina”; TSX-V: TAU) to 57% from 36%, by acquiring a further 21% interest. The additional shareholding, comprising 47,244,095 shares, was acquired by Sandfire in an off-market transaction at an average price of C$0.0831 per share, for total consideration of C$3,926,000 ($4,160,000).
In accordance with AASB 10 it was determined that the Group obtained control of Tintina on the date of acquisition and the Group has therefore applied the acquisition method of accounting (see note 6). The assets, liabilities, income and expenses of Tintina are included in the consolidated financial statements as at and for the period ended 31 December 2015, from the date the Group gained control, being 18 November 2015.
Tintina contributed $1,009,000 (2014: $nil) in losses to the Group’s result for the six month period ended 31 December 2015. $577,000 (2014: $nil) of these losses are attributable to the members of the parent entity.
The Group’s investment in Tintina was previously accounted for using the equity method of accounting. The Group recognised $1,132,000 (2014: $688,000) in equity accounted losses after income tax during the period.
Refer to note 6 to the consolidated financial statements for details.
Current and deferred tax liabilities
Taxable profit on operations during the period has exceeded the carried forward balance of tax losses and tax credits resulting in the Group booking a current income tax liability of $10.7 million at period end. In addition the Group has booked a net deferred tax liability position at balance date which predominantly relates to the differing tax depreciation and amortisation rates of mining assets and equipment compared to accounting rates.
Interest bearing liabilities – finance facilities
The Group’s financing arrangements are provided under a secured loan facility with ANZ and are secured by a fixed and floating charge over the Group’s assets, including the DeGrussa Project and the broader Doolgunna Project, and a mining mortgage over the Project tenements.
The DeGrussa Project Loan Facility includes two facilities: an $85.0 million Revolver Facility, initially fully-drawn, which can be paid or redrawn as required and which must be fully repaid by 31 December 2017; and a $40.0 million Amortising Facility with fixed repayments of $5.0 million per quarter for six quarters (commenced on 30 June 2015), followed by $2.0 million per quarter for five quarters (ending 31 December 2017).
The balance of the Group’s finance facility as at 31 December 2015 was $75 million, following payment of $10 million against the Amortising Facility ($25 million at balance date) and $35 million against the Revolver Facility ($50 million at balance date).
Cash Flows
Operating activities
Net cash inflow from operating activities was $47.6 million for the period. Net cash flow from operating activities prior to exploration and evaluation activities was $66.2 million for the period.
- 10 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
3 Principal activities, operating and financial review (continued)
3.2 Review of financial results (continued)
Investing activities
Net cash outflow from investing activities was $39.9 million for the period. This included payments for property, plant and equipment purchases ($8.8 million); payments for mine development ($35.1 million); and net cash inflow from the Group’s investment into Tintina Resources Inc ($3.7 million).
Financing activities
Net cash outflow from financing activities of $63.6 million for the period includes finance facility repayments ($45.0 million); payment of interest and other costs of finance ($1.8 million); and dividend payments ($15.9 million).
3.3 Corporate
Investment in Tintina Resources Inc
On 18 November 2015, the Group increased its stake in North American copper development company Tintina Resources Inc (“Tintina”; TSX-V: TAU) to 57% from 36%, by acquiring a further 21% interest. The additional shareholding, comprising 47,244,095 shares, was acquired by Sandfire in an off-market transaction at an average price of C$0.0831 per share, for total consideration of C$3,926,000 ($4,160,000).
Sandfire is Tintina’s largest shareholder (57%). Other strategic shareholders include Electrum Strategic Metals LLC (~16%).
Refer to note 6 to the consolidated financial statements for details.
Board and management
The Company announced the appointment of Ms Maree Arnason as independent non-executive director on 18 December 2015.
4 Significant events after the balance date
Dividends
On 24 February 2016 the directors of the Company announced a dividend on ordinary shares in respect of the six month period ended 31 December 2015. The total amount of the dividend is $3,137,000, which represents a fully franked dividend of 2 cents per share. The dividend has not been provided for in the half-year financial report for the six month period ended 31 December 2015.
Acquisition of Aeris’ Temora and Currumburrama Exploration Projects
The Company executed an agreement with Aeris Resources Ltd (Aeris; previously Straits Resources Ltd) on 6 October 2015 to acquire Aeris’ Temora and Currumburrama Exploration Projects located in New South Wales, including all of Aeris’ legal and beneficial interest in EL6845, EL5864 and EL5792 including the rights and benefits which Aeris is entitled to under heritage agreements and native title contracts, and all mining information which is relevant to the Tenements.
Under the terms of the Agreement, which settled on 4 January 2016, Sandfire issued Aeris 470,240 ordinary fully paid shares as consideration for the acquisition of the Tenements.
5 Rounding
The amounts contained in this report and in the financial report have been rounded to the nearest $1,000 (unless otherwise noted) under the option available to the Company under ASIC Class Order 98/0100. The entity is a Company to which the class order applies.
- 11 -
HALF-YEAR FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015 DIRECTORS’ REPORT
6 Auditor independence declaration
We have obtained the following independence declaration from our auditors, Ernst & Young.
==> picture [483 x 390] intentionally omitted <==
==> picture [483 x 53] intentionally omitted <==
Signed in accordance with a resolution of the directors:
==> picture [126 x 45] intentionally omitted <==
Derek La Ferla Non-Executive Chairman
==> picture [171 x 40] intentionally omitted <==
Karl Simich Managing Director and Chief Executive Officer
Dated at West Perth this 24[th] day of February 2016.
- 12 -
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
CONSOLIDATED INTERIM INCOME STATEMENT
| Note Sales revenue 5 Realised and unrealised price adjustment losses Other income Changes in inventories of finished goods and work in progress Mine operations costs Employee benefit expenses Freight, treatment and refining expenses Royalties expense Exploration and evaluation expenses Depreciation and amortisation expenses Water ingress expenses Share of net loss of equity accounted investments 9 Impairment expense 9 Reversal of impairment 6,9 Administrative expenses Profit before net finance expense and income tax Finance income Finance expense Net finance expense Profit before income tax Income tax expense 7 Net profit for the period Attributable to: Equity holders of the parent Non-controlling interests Earnings per share (EPS): Basic and diluted EPS attributable to ordinary equity holders of the parent (cents) |
31 Dec 2015 $000 31 Dec 2014 $000 |
|---|---|
| 228,322 261,772 (16,392) (11,157) 501 4,311 13,440 (10,602) (57,593) (56,570) (26,369) (21,614) (43,746) (40,860) (9,631) (12,220) (14,613) (9,025) (44,923) (42,052) - (7,683) (1,438) (1,706) (1,171) - 2,045 - (2,465) (2,315) |
|
| 25,967 50,279 1,047 2,622 (4,051) (8,029) |
|
| (3,004) (5,407) |
|
| 22,963 44,872 (7,289) (14,309) |
|
| 15,674 30,563 |
|
| 16,106 30,563 (432) - |
|
| 15,674 30,563 |
|
| 10.0 19.6 |
The consolidated interim income statement should be read in conjunction with the accompanying notes.
- 13 -
CONSOLIDATED INTERIM STATEMENT OF COMPREHENSIVE INCOME
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
| Net profit for the financial period Other comprehensive income Items that may be reclassified to profit or loss in subsequent periods: Foreign currency translation differences – net of income taxes Change in fair value of investments in equity securities – net of income tax Other comprehensive income for the period, net of tax Total comprehensive income for the period, net of tax Attributable to: Equity holders of the parent Non-controlling interests |
31 Dec 2015 $000 31 Dec 2014 $000 |
|---|---|
| 15,674 30,563 (1,482) 1,264 - 118 |
|
| (1,482) 1,382 |
|
| 14,192 31,945 |
|
| 14,430 31,945 (238) - |
|
| 14,192 23,189 |
The consolidated interim statement of comprehensive income should be read in conjunction with the accompanying notes.
- 14 -
CONSOLIDATED INTERIM BALANCE SHEET AS AT 31 DECEMBER 2015
| Note ASSETS Cash and cash equivalents 8 Trade and other receivables Inventories Other current assets Total current assets Receivables Inventories Mine properties Property, plant and equipment Investments accounted for using the equity method 9 Other financial assets Exploration and evaluation assets Total non-current assets TOTAL ASSETS LIABILITIES Trade and other payables Interest bearing liabilities 10 Income tax payable Provisions Total current liabilities Trade and other payables Interest bearing liabilities 10 Provisions Deferred tax liabilities Total non-current liabilities TOTAL LIABILITIES NET ASSETS EQUITY Issued capital Reserves Retained profits Equity attributable to equity holders of the parent Non-Controlling interest TOTAL EQUITY |
31 Dec 2015 $000 30 Jun 2015 $000 |
|---|---|
| 51,194 107,154 12,233 9,813 46,448 30,951 2,502 1,931 |
|
| 112,377 149,849 |
|
| 157 179 11,698 11,698 221,389 202,588 211,441 216,293 768 7,644 157 1,254 5,301 5,233 |
|
| 450,911 444,889 |
|
| 563,288 594,738 |
|
| 38,768 39,115 17,367 20,493 10,773 13,128 3,341 3,220 |
|
| 70,249 75,956 |
|
| 171 294 58,253 99,536 28,987 22,860 52,449 48,314 |
|
| 139,860 171,004 |
|
| 210,109 246,960 |
|
| 353,179 347,778 |
|
| 225,520 225,520 5,505 7,580 115,099 114,678 |
|
| 346,124 347,778 7,055 - |
|
| 353,179 347,778 |
The consolidated interim balance sheet should be read in conjunction with the accompanying notes.
- 15 -
CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
| Note For the six months ended 31 Dec 2015 At 1 Jul 2015 Profit for the period Other comprehensive income Total comprehensive income for the period Transactions with owners in their capacity as owners: Share based payments recognised Warrants reserve Dividends 11 Acquisition of subsidiary 6 At 31 Dec 2015 |
Issued capital $000 Share based payments reserve $000 Foreign currency translation reserve $000 Available for sale reserve $000 |
Warrants reserve $000 Retained profits $000 Total $000 Non- controlling interest $000 Total equity $000 |
|---|---|---|
| 225,520 5,801 1,779 - |
- 114,678 347,778 - 347,778 |
|
| - - - - |
- 16,106 16,106 (432) 15,674 |
|
| - - (1,676) - |
- - (1,676) 194 (1,482) |
|
| - - (1,676) - |
- 16,106 14,430 (238) 14,192 |
|
| - 385 - - |
- - 385 - 385 |
|
| - - - - |
(784) - (784) - (784) |
|
| - - - - |
- (15,685) (15,685) - (15,685) |
|
| - - - - |
- - - 7,293 7,293 |
|
| 225,520 6,186 103 - |
(784) 115,099 346,124 7,055 353,179 |
| Note For the six months ended 31 Dec 2014 At 1 Jul 2014 Profit for the period Other comprehensive income Total comprehensive income for the period Transactions with owners in their capacity as owners Exercise of options Share issue costs net of income tax Transfer from share- based payments reserve on exercise of options Expiry of options Dividends 11 At 31 Dec 2014 |
Issued capital $000 Share based payments reserve $000 Foreign currency translation reserve $000 Available for sale reserve $000 Warrants reserve $000 Retained profits $000 Total $000 Non- controlling interest $000 Total equity $000 |
|---|---|
| 219,391 8,109 - - - 64,308 291,808 - 291,808 - - - - - 30,563 30,563 - 30,563 - - 1,264 118 - - 1,382 - 1,382 |
|
| - - 1,264 118 - 30,563 31,945 - 31,945 1,445 - - - - - 1,445 - 1,445 (6) - - - - - (6) - (6) 252 (252) - - - - - - - - (1,591) - - - 1,591 - - - - - - - - (15,564) (15,564) - (15,564) |
|
| 221,082 6,266 1,264 118 - 80,898 309,628 - 309,628 |
The consolidated interim statement of changes in equity should be read in conjunction with the accompanying notes.
- 16 -
CONSOLIDATED INTERIM STATEMENT OF CASH FLOWS
FOR SIX MONTHS ENDED 31 DECEMBER 2015
| Note Cash flows from operating activities Cash receipts Cash paid to suppliers and employees Income tax paid Payments for exploration and evaluation Interest received Net cash inflow from operating activities Cash flows from investing activities Payments for exploration and evaluation assets Proceeds from sale of property, plant and equipment Payments for property, plant and equipment Payments for mine properties Acquisition of subsidiary, net of cash acquired Payments for investments Refund of security deposits and bonds Net cash outflow from investing activities Cash flows from financing activities Proceeds from the conversion of options to shares Share issue costs Repayment of borrowings Repayment of finance lease liabilities Interest and other costs of finance paid Cash dividend paid to equity holders Net cash outflow from financing activities Net decrease in cash and cash equivalents Net foreign exchange differences Cash and cash equivalents at the beginning of the period Cash and cash equivalents at the end of the period 8 |
31 Dec 2015 $000 31 Dec 2014 $000 |
|---|---|
| 217,473 259,614 (146,585) (147,644) (5,509) - (18,552) (12,509) 800 874 |
|
| 47,627 100,335 |
|
| (68) - 403 13 (8,780) (17,168) (35,137) (31,169) 3,696 - - (15,931) 22 35 |
|
| (39,864) (64,220) |
|
| - 1,445 - (8) (45,000) (30,000) (971) (546) (1,810) (3,839) (15,851) (14,997) |
|
| (63,632) (47,945) |
|
| (55,869) (11,830) (91) - 107,154 57,590 |
|
| 51,194 45,760 |
The consolidated interim statement of cash flows should be read in conjunction with the accompanying notes.
- 17 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
1 Corporate information
Sandfire Resources NL (the Company or Sandfire) is a for profit company domiciled and incorporated in Australia whose shares are publicly traded on the Australian Stock Exchange (ASX). The nature of the operations and principal activities of the Company are described in the directors’ report. The interim consolidated financial statements of Sandfire and its subsidiaries (the Group) for the six months ended 31 December 2015 were authorised for issue in accordance with a resolution of the directors on 24 February 2016.
2 Basis of preparation and changes to the Group’s accounting policies
Basis of preparation
The interim consolidated financial statements for the six months ended 31 December 2015 are condensed general purpose financial statements and have been prepared in accordance with AASB 134 Interim Financial Reporting and the Corporations Act 2001.
The interim consolidated financial statements do not include all the information and disclosures required in the annual financial statements, and should be read in conjunction with the Group’s annual financial statements as at 30 June 2015. The annual report of the Group as at and for the year ended 30 June 2015 is available on request from the Company’s registered office or at www.sandfire.com.au.
The Group’s interim consolidated financial statements have been prepared on a going concern basis which contemplates the continuity of normal business activities and the realisation of assets and the settlement of liabilities in the ordinary course of business.
Accounting policies, accounting standards and interpretations
The accounting policies applied by the Group in the preparation of the interim consolidated financial statements are consistent with those applied by the Group in the preparation of the annual consolidated financial statements for the year ended 30 June 2015, except for the adoption of new and amended standards and interpretations as of 1 July 2015.
Certain comparative amounts have been reclassified to conform to the current year’s presentation. The Group has reclassified $2,464,000 in realised metal adjustment losses to sales revenue for the comparative period ended 31 December 2014 to better reflect the nature of the expense. This has resulted in sales revenue reducing to $261,772,000 from $264,236,000 and resulted in a realised and unrealised price adjustment loss of $11,157,000 from a loss of $13,621,000.
New standards, interpretations and amendments thereof, adopted by the Group
From 1 July 2015 the Group has adopted all Australian Accounting Standards and Interpretations effective for annual periods beginning on or before 1 July 2015. The adoption of new and amended standards and interpretations had no impact on the financial position or performance of the Group.
Early adoption of standards
The Group did not early adopt any accounting standards, interpretations or amendments, issued and available for early adoption, during the half-year.
3 Critical accounting estimates and judgements
The preparation of financial reports requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates.
In preparing the interim consolidated financial statements, the significant judgements made by management in applying the Group’s accounting policies and the key sources of estimation uncertainty were consistent with those that applied to the annual consolidated financial statements as at and for the year ended 30 June 2015.
4 Information about subsidiaries
The interim consolidated financial statements of the Group include:
| Country of incorporation Name Note Tintina Resources Inc 6 Canada Sandfire BC Holdings (Australia) Pty Ltd (i) Australia Sandfire BC Holdings Inc (ii) Canada SFR Copper & Gold Peru S.A. Peru |
% equity interest |
|---|---|
| 31 Dec 2015 31 Dec 2014 |
|
| 57.19 35.96 100.00 100.00 100.00 100.00 100.00 100.00 |
(i) The wholly owned subsidiary was formed and incorporated by the Company on 21 August 2014.
(ii) The wholly owned subsidiary was formed and incorporated by the Company on 28 August 2014.
- 18 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
4 Information about subsidiaries (continued)
Associates
The Group has a 38.28% interest in WCB Resources Ltd (31 Dec 2014: 38.38%). Refer to note 9 for details.
5 Segment information
The Group has two operating segments as follows:
-
The DeGrussa Copper Mine, a copper-gold mine located in the Bryah Basin mineral province of Western Australia, approximately 900 kilometres north-east of Perth and 150 kilometres north of Meekatharra. The DeGrussa Copper Mine generates revenue from the sale of copper-gold products to customers in Asia; and
-
Exploration and evaluation, which includes exploration and evaluation of the mineral tenements in Australia and overseas, including exploring for potential repeats of the DeGrussa Volcanogenic Massive Sulphide (VMS) mineralised system at the Doolgunna Project and the Group’s investment in Tintina Resources Inc (Tintina) and WCB Resources Ltd (WCB).
Other activities include the Group’s corporate office, which includes all corporate expenses that cannot be directly attributed to the operation of the Group’s operating segments.
Segment information that is evaluated by key management personnel is prepared in conformity with the accounting policies adopted for preparing the financial statements of the Group.
| Income statement for the six months ended 31 Dec 2015 Sales revenue Realised and unrealised price adjustment loss Other income Changes in inventories of finished goods and work in progress Mine operations costs Employee benefit expenses Freight, treatment and refining expenses Royalties expense Exploration and evaluation expenses Depreciation and amortisation expenses Share of net loss of equity accounted investments Impairment expense Reversal of impairment Administrative expenses Profit (loss) before net finance and income tax Finance income Finance expense Profit before income tax Income tax expense Net profit for the period |
DeGrussa Mine $000 Exploration & evaluation $000 Other activities $000 |
Group $000 |
|---|---|---|
| 228,322 - - |
228,322 | |
| (16,392) - - |
(16,392) | |
| - 501 - |
501 | |
| 13,440 - - |
13,440 | |
| (57,593) - - |
(57,593) | |
| (19,485) (4,072) (2,812) |
(26,369) | |
| (43,746) - - |
(43,746) | |
| (9,631) - - |
(9,631) | |
| - (14,613) - |
(14,613) | |
| (44,712) (102) (109) |
(44,923) | |
| - (1,438) - |
(1,438) | |
| - (1,171) - |
(1,171) | |
| - 2,045 - |
2,045 | |
| - - (2,465) |
(2,465) | |
| 50,203 (18,850) (5,386) |
25,967 | |
| 1,047 | ||
| (4,051) | ||
| 22,963 | ||
| (7,289) | ||
| 15,674 |
- 19 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
5 Segment information (continued)
| Income statement for the six months ended 31 Dec 2014 Sales revenue Realised and unrealised price adjustment loss Other income Changes in inventories of finished goods and work in progress Mine operations costs Employee benefit expenses Freight, treatment and refining expenses Royalties expense Exploration and evaluation expenses Depreciation and amortisation expenses Water ingress expenses Share of net loss of equity accounted investments Administrative expenses Profit (loss) before net finance and income tax Finance income Finance expense Profit before income tax Income tax expense Net profit for the period |
DeGrussa Mine $000 Exploration & evaluation $000 Other activities $000 |
Group $000 |
|---|---|---|
| 261,772 - - (11,157) - - 4,311 - - (10,602) - - (56,570) - - (17,033) (3,484) (1,097) (40,860) - - (12,220) - - - (9,025) - (41,836) (97) (119) (7,683) - - - (1,706) - - - (2,315) |
261,772 (11,157) 4,311 (10,602) (56,570) (21,614) (40,860) (12,220) (9,025) (42,052) (7,683) (1,706) (2,315) |
|
| 68,122 (14,312) (3,531) |
50,279 2,622 (8,029) |
|
| 44,872 (14,309) |
||
| 30,563 |
Adjustments and eliminations
Finance income, finance costs and taxes are not allocated to individual segments as they are managed on a Group basis.
Segment assets
The Group does not separately disclose assets for its operating segments, as a majority of Group assets are attributable to the DeGrussa Copper Mine segment and the Group does not consider assets attributable to the exploration and other activities segments to be material.
Information about geographical areas and products
The Group’s sales revenue arises from sales to customers in Asia. For the 6 month period ended 31 December 2015, a majority of the product was sent to China for processing (92%), and a portion was sent to Philippines (8%). During the six month period ended 31 December 2014, a majority of the product was sent to China for processing (88%); a portion was sent to Japan (8%); and Indonesia (4%). The revenue information is based on the location of the customer’s operations.
Three customers (2014: four customers) individually accounted for more than ten percent of total revenue during the period. Sales revenue from these major customers ranged from 17% to 26% (2014: 11% - 40%) of total revenue, contributing approximately 67% of total revenue (2014: 83%).
As at 31 December 2015 and 30 June 2015, no material assets or liabilities were located outside Australia.
- 20 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
6 Business combinations
Acquisition of additional interest in Tintina Resources Inc
On 18 November 2015, the Group increased its stake in North American copper development company Tintina Resources Inc (“Tintina”; TSX-V: TAU) to 57% from 36%, by acquiring a further 21% interest. The additional shareholding, comprising 47,244,095 shares, was acquired by Sandfire in an off-market transaction at an average price of C$0.0831 per share, for total consideration of C$3,926,000 ($4,160,000).
In accordance with AASB 10 the Group determined that it obtained control of Tintina on the date of acquisition and the Group has applied the acquisition method of accounting. The assets, liabilities, income and expenses of Tintina are included in the consolidated financial statements as at and for the period ended 31 December 2015, from the date the Group gained control, being 18 November 2015. The Group’s investment in Tintina was previously accounted for using the equity method of accounting (see note 9).
Acquisition date fair value of equity interest
The fair value of the existing equity interest at the date of acquisition was assessed to be $6,125,000. An amount of $2,045,000 was recognised in the financial statements, being the difference between the carrying value and the fair value of the existing investment at the date of gaining control. This amount is recognised within the reversal of impairment line in the consolidated statement of profit or loss.
An amount of $501,000 was also recycled from the FCTR on disposal of the equity accounted investment. This is recognised within the finance income line in the consolidated statement of profit or loss.
Assets acquired and liabilities assumed
The provisional fair values of the identifiable assets and liabilities of Tintina as at the date of acquisition were:
| in $000 Assets Cash and cash equivalents Trade and other receivables Other current assets Total current assets Mine properties Property, plant and equipment Total non-current assets Total assets Liabilities Trade and other payables Total liabilities Total identifiable net assets at fair value Non-controlling interest measured at fair value Fair value of previously held equity interest Purchase consideration transferred |
Provisional Fair value recognised on acquisition |
|---|---|
| 7,856 | |
| 44 | |
| 128 | |
| 8,028 | |
| 10,364 | |
| 14 | |
| 10,378 | |
| 18,406 | |
| 828 | |
| 828 | |
| 17,578 | |
| (7,293) | |
| (6,125) | |
| 4,160 |
The fair values of the identifiable assets and liabilities of Tintina as at the date of acquisition are based on a provisional assessment, due to the close proximity of the acquisition date to the reporting date.
The Group has elected to measure the non-controlling interests in the acquiree at fair value using Tintina’s share price as a primary input.
The acquired business contributed net losses to the consolidated group of $576,000 from 18 November 2015 to 31 December 2015. If the transaction had occurred on 1 July 2015, the consolidated profit for the six months ending 31 December 2015 would have been $12,617,000. This amount has been calculated using the subsidiary’s results for the period 1 July 2015 to 18 November 2015.
- 21 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
7 Income tax
The Group calculates the period income tax expense using the tax rate that would be applicable to expected total annual earnings, that is, the estimated average annual effective income tax rate applied to the pre-tax income of the interim period. The major components of income tax expense in the consolidated interim income statement are:
| Income taxes Current income tax expense Deferred income tax expense related to origination and reversal of temporary differences Under (over) provision in prior periods Income tax expense Income tax expense (benefit) recognised in other comprehensive income Total income tax Note 8 Cash and cash equivalents Cash at bank and on hand Debt service reserve account (i) |
31 Dec 2015 $000 31 Dec 2014 $000 |
|---|---|
| 5,876 12,496 1,551 2,083 (138) (270) |
|
| 7,289 14,309 - - |
|
| 7,289 14,309 |
|
| 31 Dec 2015 $000 30 Jun 2015 $000 |
|
| 44,894 100,154 6,300 7,000 |
|
| 51,194 107,154 |
(i) Under the terms and conditions of the Group’s DeGrussa Project Loan Facility (see Note 10), the Group must maintain a cash debt service reserve amount equal to or greater than the next quarter’s scheduled amortisation payment and projected interest payment and as such this cash is restricted.
| Note 9 Investments accounted for using the equity method Group’s carrying investment value - Tintina Resources Inc (i) Group’s carrying investment value - WCB Resources Ltd (ii) |
31 Dec 2015 $000 30 Jun 2015 $000 |
|---|---|
| - 5,267 768 2,377 |
|
| 768 7,644 |
(i) Tintina Resources Inc
On 18 November 2015, the Group increased its stake in North American copper development company Tintina Resources Inc (“Tintina”; TSX-V: TAU) to 57% from 36%, by acquiring a further 21% interest.
The additional shareholding, comprising 47,244,095 shares, was acquired by Sandfire in an off-market transaction at an average price of C$0.0831 per share, for total consideration of C$3,926,000 ($4,160,000).
In accordance with AASB 10 it was determined that the Group obtained control of Tintina on the date of acquisition and the Group has therefore applied the acquisition method of accounting (see note 6). The Group’s investment in Tintina was previously accounted for using the equity method of accounting.
Reconciliation of the carrying amount of the equity accounted Tintina investment is set out below.
| Note As at 1 July 2015 Group’s share of losses after income tax Group’s share of other comprehensive income – currency translation differences As at 18 November 2015 Reversal of impairment 6 Fair value of previously held equity investment Derecognition of previously held equity investment on gaining control As at 31 December 2015 |
$000 |
|---|---|
| 5,267 | |
| (1,132) | |
| (55) | |
| 4,080 | |
| 2,045 | |
| 6,125 | |
| (6,125) | |
| - |
- 22 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
9 Investments accounted for using the equity method (continued)
(ii) WCB Resources Inc
The Group performed its impairment test as at 31 December 2015 to determine whether there is objective evidence that the investment in WCB is impaired. The Group considers the relationship between the investment’s market capitalisation and its carrying amount, among other factors, when reviewing for indicators of impairment. As a result, the Group has recognised an impairment loss of $1,152,000 with respect to its investment in WCB, representing the difference between the Group’s carrying amount of the investment and the recoverable amount, calculated as the fair value less costs of disposal. The fair value of WCB has been categorised to level 2 of the Group’s fair value hierarchy, as detailed in note 12, and has been estimated using the closing share price of WCB at 31 December 2015. The share price of WCB as at 31 December 2015 was C$0.035 per share.
| 10 Interest bearing liabilities Current interest bearing loans and borrowings Obligations under finance leases and hire purchase contracts DeGrussa Project Loan Facility Capitalised finance establishment costs (net of amortisation) offset against Loan Facility Total current interest bearing loans and borrowings Non-current interest bearing loans and borrowings Obligations under finance leases and hire purchase contracts DeGrussa Project Loan Facility Capitalised finance establishment costs (net of amortisation) offset against Loan Facility Total non-current interest bearing loans and borrowings The Group has access to the following facilities: DeGrussa Project Loan Facility Working Capital Facility Bond Facility Facilities utilised at reporting date: DeGrussa Project Loan Facility Working Capital Facility Bond Facility Facilities not utilised at reporting date: DeGrussa Project Loan Facility Working Capital Facility Bond Facility |
31 Dec 2015 $000 30 Jun 2015 $000 |
|---|---|
| 431 740 17,000 20,000 (64) (247) |
|
| 17,367 20,493 |
|
| 471 771 58,000 100,000 (218) (1,235) |
|
| 58,253 99,536 |
|
| 110,000 120,000 25,000 25,000 100 100 |
|
| 135,100 145,100 |
|
| 75,000 120,000 - - 28 28 |
|
| 75,028 120,028 |
|
| 35,000 - 25,000 25,000 72 72 |
|
| 60,072 25,072 |
Finance facilities
The Group’s financing arrangements are provided under a secured loan facility with ANZ and are secured by a fixed and floating charge over the Group’s assets, including the DeGrussa Project and the broader Doolgunna Project, and a mining mortgage over the Project tenements.
DeGrussa Project Loan Facility
The facility, which was designed to underpin the Group’s construction and development of its DeGrussa Copper Mine in Western Australia, was restructured during the financial year ended 30 June 2015. The restructured facility includes two facilities: an $85 million Revolver Facility, initially fully-drawn, which can be paid or redrawn as required and which must be fully repaid by 31 December 2017; and a $40 million Amortising Facility with fixed repayments of $5 million per quarter for six quarters (commenced on 30 June 2015), followed by $2 million per quarter for five quarters (ending 31 December 2017). The previous repayment schedule required full repayment of the facility by 31 December 2015.
- 23 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
10 Interest bearing liabilities (continued)
Working Capital Facility
As part of the restructure to the DeGrussa Project Loan Facility, the Company also reduced its existing working capital facility with ANZ from $50 million to $25 million. The facility, which can be drawn down up to the value of saleable copper concentrate inventories held by the Company at the mine and ports, is designed to reduce the potential cash flow impact of timing of concentrate shipments and cash receipts. The facility was undrawn at the date of this report.
Bond Facility
The bond facility is drawn in the form of bank guarantees to the relevant State Government Department for environmental restoration and property managers for security deposits and does not involve the provision of funds.
| Note 11 Dividends paid and proposed Cash dividends to the equity holders of the parent: Final dividend for 2015: 10 cents per share (2014: 10 cents per share) Dividends on ordinary shares proposed (not recognised as a liability as at 31 December) First dividend for 2016: 2 cents per share (2015: 3 cents per share) (i) |
31 Dec 2015 $000 31 Dec 2014 $000 |
|---|---|
| 15,685 15,564 |
|
| 3,137 4,679 |
- (i) Since the end of the financial period, the Board of Directors has resolved to pay an unfranked dividend of 2 cents per share, to be paid on 24 March 2016. The record date for entitlement to this dividend is 10 March 2016. The financial impact of this dividend amounting to $3,137,000 has not been recognised in these interim consolidated financial statements and will be recognised in subsequent financial statements.
12 Financial assets and liabilities
The Group’s principal financial liabilities comprise loans and borrowings and trade and other payables. The main purpose of these financial liabilities is to finance the Group’s operations. The Group’s principal financial assets comprise trade and other receivables, and cash and short-term deposits that arise directly from its operations. The Group also holds unquoted equity securities in the form of warrants and available-for-sale investments.
Risk management activities
The Group’s activities expose it to a variety of financial risks such as:
-
Market risk consisting of interest rate risk, foreign currency exchange risk, commodity price risk and equity price risk;
-
Credit risk; and
-
Liquidity risk.
The risk management activities of the Group are consistent with those of the previous financial year unless otherwise stated.
Carrying amounts and fair values
The carrying amount of all financial assets and all financial liabilities, except for the Group’s secured bank loan, recognised in the balance sheet approximates their fair value. The fair value of the Group’s secured bank loan is represented by the face value of the liability, prior to capitalised finance establishment costs (see note 10 for details).
- 24 -
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
NOTES TO THE HALF-YEAR FINANCIAL REPORT
12 Financial assets and liabilities (continued)
The following table shows the fair values of financial assets and financial liabilities, other than cash and cash equivalents, including their levels in the fair value measurement hierarchy as at 31 December 2015.
| Note Financial assets measured at fair value Available for sale investments – listed investments Trade receivables (i) Other financial assets – unquoted equity securities (ii) Financial liabilities measured at fair value Trade payables (i) |
Level 1 $’000 Level 2 $’000 Level 3 $’000 Total $’000 |
|---|---|
| 157 - - 157 - 4,088 - 4,088 - - - - |
|
| 157 4,088 - 4,245 |
|
| - 3,124 - 3,124 |
(i) Trade receivables/payables includes the embedded derivative for concentrate sale contracts that are still subject to price adjustments where the final consideration to be received/paid will be determined based on prevailing London Metals Exchange (LME) metal prices at the final settlement date. The embedded derivative for sales that are still subject to price adjustments at balance date is fair valued by estimating the final settlement price using the LME forward metals prices at balance date. The receivable/payable represents the present value of expected proceeds to be received/expected funds to be paid, determined using the prevailing forward metal prices at reporting date.
(ii) Unquoted equity securities relate to the fair value of the Group’s warrants held as part of the investment in WCB Resources Inc (WCB) and Tintina Resources Inc (Tintina). The fair value of the warrants held in WCB as at 31 December 2015 was $nil (30 June 2015: $241,000). The fair value of the warrants held in Tintina were transferred to the warrants reserve on the date the Group gained control of Tintina, being 18 November 2015.
The fair value of the financial instruments as at 30 June 2015 are summarised in the table below:
| Financial assets measured at fair value AFS quoted equity shares Trade receivables (i) Unquoted equity securities (ii) Financial liabilities measured at fair value Trade payables (i) |
Level 1 $’000 Level 2 $’000 Level 3 $’000 Total $’000 |
|---|---|
| 175 - - 175 - 6,359 - 6,359 - - 1,079 1,079 |
|
| 175 6,359 1,079 7,613 |
|
| - 1,861 - 1,861 |
Reconciliation of recurring fair value measurements within Level 3 of the fair value hierarchy
| Note As at 1 July 2015 Re-measurement recognised in other comprehensive income during the period Net unrealised loss recognised in the income statement during the period (i) Reclassification to equity warrants reserve on obtaining control (ii) As at 31 December 2015 |
$’000 |
|---|---|
| 1,079 (54) (241) (784) |
|
| - |
(i) The unrealised loss recognised during the period is disclosed and included as part of finance expenses.
(ii) The fair value of the warrants held in Tintina as at 18 November 2015 was $784,000 (30 June 2015: $838,000). In line with the Group’s accounting policies, the fair value of the Tintina warrants were transferred to the warrants reserve on the date the Group gained control of Tintina.
There were no transfers between Level 1 and Level 2 fair value measurements and no transfers into or out of Level 3 fair value measurements, during the period ended 31 December 2015 or the comparative period ended 30 June 2015.
- 25 -
NOTES TO THE HALF-YEAR FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
12 Financial assets and liabilities (continued)
Fair value hierarchy
All financial instruments for which fair value is recognised or disclosed are categorised within the fair value hierarchy, based on the lowest level input that is significant to the fair value measurement as a whole, as follows:
-
Level 1 - Quoted (unadjusted) market prices in active markets for identical assets or liabilities.
-
Level 2 - Valuation techniques for which the lowest level input that is significant to the fair value measurement is directly or indirectly observable.
-
Level 3 - Valuation techniques for which the lowest level input that is significant to the fair value measurement is unobservable.
For financial instruments that are recognised at fair value on a recurring basis, the Group determines whether transfers have occurred between Levels in the hierarchy by re-assessing categorisation (based on the lowest level input that is significant to the fair value measurement as a whole) at the end of each reporting period.
Valuation techniques of unquoted equity securities
The fair value of the Group’s unquoted equity securities, represented by the warrants held by the Group as part of the investment in WCB Resources Inc, are valued at each reporting date using the Black-Scholes option valuation methodology. The Black-Scholes option valuation methodology requires management to make certain assumptions about the model inputs, including risk-free rate; expected volatility; expected life; and dividend yield.
The following table describes the significant unobservable inputs to the valuation and the impact a change in the share price volatility has on the fair value of the warrants.
As at 31 December 2015:
| Other financial assets – unquoted equity securities As at 30 June 2015: Other financial assets – unquoted equity securities |
Valuation technique Significant unobservable input Percentage applied Sensitivity of the input to fair value |
|---|---|
| Black-Scholes Option Pricing Model Volatility 90% 10% increase (decrease) in the volatility would not result in a material increase (decrease) in fair value |
|
| Valuation technique Significant unobservable input Percentage applied Sensitivity of the input to fair value |
|
| Black-Scholes Option Pricing Model Volatility 90% 10% increase (decrease) in the volatility would result in increase (decrease) in fair value by $357,000 |
13 Events subsequent to reporting date
Dividends
On 24 February 2016 the directors of the Company announced a dividend on ordinary shares in respect of the six month period ended 31 December 2015. The total amount of the dividend is $3,137,000, which represents a fully franked dividend of 2 cents per share. The dividend has not been provided for in the half-year financial report for the six month period ended 31 December 2015.
Acquisition of Aeris’ Temora and Currumburrama Exploration Projects
The Company executed an agreement with Aeris Resources Ltd (Aeris; previously Straits Resources Ltd) on 6 October 2015 to acquire Aeris’ Temora and Currumburrama Exploration Projects located in New South Wales, including all of Aeris’ legal and beneficial interest in EL6845, EL5864 and EL5792 including the rights and benefits which Aeris is entitled to under heritage agreements and native title contracts, and all mining information which is relevant to the Tenements.
Under the terms of the Agreement, which settled on 4 January 2016, Sandfire issued Aeris 470,240 ordinary fully paid shares as consideration for the acquisition of the Tenements.
- 26 -
DIRECTORS’ DECLARATION FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
In accordance with a resolution of the directors of Sandfire Resources NL, I state that:
In the opinion of the directors:
-
(a) The financial statements and notes of Sandfire Resources NL for the half-year ended 31 December 2015 are in accordance with the Corporations Act 2001, including:
-
(i) Giving a true and fair view of the consolidated entity’s financial position as at 31 December 2015 and of its performance for the half-year ended on that date; and
-
(ii) Complying with AASB 134 Interim Financial Reporting and the Corporations Regulations 2001
-
(b) There are reasonable grounds to believe that the Company will be able to pay its debts as and when they become due and payable.
Signed in accordance with a resolution of the directors:
==> picture [126 x 45] intentionally omitted <==
Derek La Ferla Non-Executive Chairman
==> picture [171 x 40] intentionally omitted <==
Karl Simich Managing Director and Chief Executive Officer
Dated at West Perth this 24[th] day of February 2016.
- 27 -
INDEPENDENT AUDITOR’S REVIEW REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
==> picture [483 x 682] intentionally omitted <==
- 28 -
INDEPENDENT AUDITOR’S REVIEW REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2015
==> picture [483 x 680] intentionally omitted <==
- 29 -