ASX Announcement

13 April 2016

==> picture [595 x 72] intentionally omitted <==

MAIDEN HIGH-GRADE MINERAL RESOURCE FOR MONTY VMS DEPOSIT: 99,000t COPPER AND 55,000oz GOLD

Rapid delineation of high-grade Mineral Resource opens up highly prospective VMS corridor

Highlights

  • Maiden JORC 2012 compliant Mineral Resource estimate completed for the high-grade Monty copper-gold deposit , located on the Springfield Joint Venture with Talisman Mining Limited (ASX: “TLM”), 10km east of the DeGrussa Copper-Gold Mine in WA:

  • Total Indicated and Inferred Mineral Resource of 1.05Mt grading 9.4% Cu and 1.6g/t Au for 99,000t of contained copper and 55,000oz of contained gold ;

  • Includes a high-grade massive sulphide resource of 763,000t grading 12.1% Cu and 2.1g/t Au for 92,000t of contained copper and 52,000oz of contained gold .

  • The Monty mineral deposit encompasses seven massive sulphide lenses, two of which host 87% of the overall contained metal and halo mineralisation.

  • 99% of the Mineral Resource is reported in the Indicated Resource category , available for conversion to Ore Reserves.

  • High-level studies are underway for the Monty deposit to investigate the optimal pathway to unlock the value of the project including an assessment of utilising the nearby 1.6Mtpa DeGrussa plant and infrastructure.

  • Monty is the first VMS discovery outside of the DeGrussa VMS complex and confirms the potential for the overall Doolgunna VMS field to host multiple centres of mineralisation.

  • The Monty discovery has opened up a highly prospective 5km long corridor as a priority focus for ongoing exploration. RC drilling programs are underway to test the interpreted VMS horizon along strike to the north-east and south of the deposit.

Sandfire Resources NL (ASX: SFR; “Sandfire”) is pleased to report a maiden JORC 2012 compliant Indicated and Inferred Resource of 1.05 million tonnes grading 9.4% copper and 1.6g/t gold for the Monty copper-gold deposit, located on the Springfield Joint Venture with Talisman Mining Limited (ASX: TLM; “Talisman”), 10km east of Sandfire’s DeGrussa Copper-Gold Mine in Western Australia (see Figure 4 attached).

Sandfire is manager of the Springfield Joint Venture, which comprises participating interests of Sandfire (70%) and Talisman (30%).

The maiden Monty Mineral Resource – which is estimated to contain 99,000 tonnes of copper metal and 55,000 ounces of gold – is the first deposit to be discovered and delineated outside of the DeGrussa VMS complex discovered in 2009 and 2010.

Sandfire considers the discovery and rapid delineation of the high-grade Monty deposit to be a watershed in its ongoing exploration of the Doolgunna district, providing an important proof of concept for the potential of the region to host multiple centres of VMS copper-gold mineralisation.

==> picture [595 x 36] intentionally omitted <==

High level studies are underway to investigate the optimal pathway to unlock the value of the Monty deposit. In addition, exploration is continuing as a priority both in the vicinity of the deposit, where Sandfire believes there is excellent potential to discover more VMS mineralisation, and at several other emerging prospects within the region.

Maiden Monty Mineral Resource Estimate

The maiden Mineral Resource estimate for the Monty deposit was completed by Sandfire’s in-house geological team. The geological model and Mineral Resource estimate was based on the results of 82 diamond drill holes completed by DDH1 Drilling. The drilling was completed on a nominal 30m by 40m spacing to provide sufficient confidence in the model to progress the project towards a maiden Ore Reserve estimate.

The maiden Monty Mineral Resource estimate is set out in Table 1 below:

Monty Mineral Resource – as at 31 March 2016 Monty Mineral Resource – as at 31 March 2016 Monty Mineral Resource – as at 31 March 2016 Monty Mineral Resource – as at 31 March 2016
Type Mineral Resource
Category
Tonnes Grade Contained Grade Contained
Cu (%) Cu (t) Au (g/t) Gold (oz)
Massive
Sulphide
Indicated 754,000 12.0 91,000 2.1 51,000
Inferred 9,000 20.7 2,000 2.7 1,000
Total 763,000 12.1 92,000 2.1 52,000
Halo Indicated 287,000 2.2 6,000 0.3 3,000
Inferred - - - - -
Total 287,000 2.2 6,000 0.3 3,000
Total Indicated 1,041,000 9.3 97,000 1.6 54,000
Inferred 9,000 20.7 2,000 2.7 1,000
Total 1,050,000 9.4 99,000 1.6 55,000

Numbers are presented at a 1.0% Cu cut-off grade and are rounded.

The geostatistical estimate utilised Ordinary Kriging with specific parameters set for each zone of mineralisation including the discrete high-grade bornite domains. 99 per cent of the tonnes contained in the resource, or 1.04 million tonnes, are classified as Indicated Resources, and are available for conversion to Ore Reserves after completion of the appropriate studies.

An external independent review of the Mineral Resource estimate was completed by Cube Consulting.

Geology

The mineralisation at Monty is contained within a host sequence of sediments (siltstone, sandstone, and conglomerate) and basalts. Mineralisation occurs in multiple sulphide lenses, at different stratigraphic levels, surrounded by disseminated and/or blebby sulphide (halo mineralisation) in chlorite-altered host sequence litho-types.

Based on similarities with the DeGrussa deposit, the Monty deposit is interpreted to be a Volcanogenic Massive Sulphide (“VMS”) deposit that formed during sub-sea floor replacement of the host sequence stratigraphy by mineralising hydrothermal fluids. The host sequence is bounded both above, and below, by dolerite sills.

SANDFIRE RESOURCES NL

Page 2

As illustrated by Figures 1a and 1b below, two major and five subordinate massive sulphide lenses have been modelled (please refer to Appendix 1 notes for comments on rounding).

==> picture [403 x 162] intentionally omitted <==

==> picture [403 x 162] intentionally omitted <==

Figure 1a: Monty resource showing major massive sulphide lenses.

==> picture [403 x 322] intentionally omitted <==

Figure 1b: Monty resource showing subordinate massive sulphide lenses.

SANDFIRE RESOURCES NL

Page 3

The two major massive sulphide lenses contain internal zones of halo mineralisation. External halo mineralisation, surrounding the massive sulphide lenses, is developed in certain locations. Internal and external halo mineralisation has been modelled as seven solids (see Figure 2 below).

==> picture [382 x 153] intentionally omitted <==

==> picture [382 x 153] intentionally omitted <==

Figure 2: Monty resource showing external and internal halo lenses.

All mineralisation types which make up the resource are shown in Figure 3 below.

==> picture [377 x 302] intentionally omitted <==

Figure 3: Monty resource showing all mineralisation types.

SANDFIRE RESOURCES NL

Page 4

The mineralogy of the massive sulphide lenses at Monty typically comprises chalcopyrite, pyrite and pyrrhotite with minor sphalerite and galena. Four drill-holes (three in one area and one in another) intersected intervals of massive sulphide (in the lowermost major massive sulphide lens) that contained appreciable quantities of bornite.

Mineralisation in these bornite-containing zones is of significantly higher tenor than that in the normal (i.e. non-bornite containing) massive sulphide zones. Based on drill-hole geometry and core observations, the bornite zones are interpreted to be approximately orthogonal to lithological layering. The bornite zones have been modelled as two drill delineated domains within the massive sulphide solid.

Further drilling of this bornite zone will be considered as part of future studies to determine if there is a strategic opportunity to mine direct shipping ore (DSO).

A number of geostatistical methodologies have been applied as part of the Mineral Resource estimation to take the local variability of the mineralisation into account and to ensure that the Mineral Resource estimate has been completed to a high standard of accuracy. This local variability in grade and thickness is typical of all the VMS lenses discovered to date at DeGrussa.

Project Development Studies

Sandfire has commenced high-level studies, as Manager of the Joint Venture, to identify the primary value drivers for the Monty deposit and determine the development pathway for the project.

The results of these studies will be used to define the scope of further technical work and the scope of a Feasibility Study. Work programs currently underway include:

  • Metallurgical test work to define ore characteristics including assessment of the suitability of processing with ore from the existing DeGrussa deposits through the existing 1.6Mtpa DeGrussa Concentrator;

  • Drilling for geotechnical and geo-hydrological purposes;

  • Mining studies;

  • Regulatory approvals; and

  • Infrastructure studies.

Ongoing Exploration

The discovery of the high-grade Monty deposit represents a major breakthrough for the ongoing exploration of the Doolgunna region, providing a focal point for exploration activities and confirming the prospectivity of the host corridor which has excellent potential for additional VMS discoveries.

The discovery and delineation of the Monty deposit has provided invaluable information and insights to Sandfire’s geological team which, together with the extensive bank of information accumulated over the past six years at DeGrussa, will help to refine and target ongoing exploration programs.

A number of exploration activities are either already underway or planned to commence in the Monty area over the coming months including:

  • Systematic aircore drilling to accurately delineate the interpreted VMS horizon along the prospective host horizon;

  • Reverse Circulation drilling (with diamond tails if required) within the interpreted VMS horizon along strike from Monty to inform the interpretation of the host stratigraphy;

  • Diamond drilling to test the areas down-dip and down-plunge of the Monty deposit;

SANDFIRE RESOURCES NL

Page 5

  • DHEM surveys of all RC and diamond drill-holes as part of this new phase of exploration following completion of the resource definition drill-out; and

  • Development of a structural geology model to provide additional context regarding the location and geological setting of Monty.

While the Monty area remains Sandfire’s priority exploration focus in the near term, the Company has a number of other highly promising exploration opportunities in the Greater Doolgunna region, both within the Springfield Joint Venture and on Sandfire’s 100%-owned ground. These include:

  • The Homer Corridor , located ~4km east of DeGrussa, where a thick exhalative package has been intersected in previous drilling and follow-up deep RC drilling and DHEM surveying is planned (within the Springfield JV);

  • The Homestead Prospect , located 12km south-west of DeGrussa, where initial first-pass aircore drilling has identified anomalism within the interpreted host horizon. Additional in-fill aircore drilling will be completed to accurately define the prospective VMS horizon and provide samples to inform geochemical vectoring before targeted RC drilling and DHEM surveys are undertaken (Sandfire 100%); and

  • The Southern Volcanics , where systematic aircore drilling is planned to accurately define the prospective VMS horizon (within the Springfield JV).

Management Comment

Sandfire’s Managing Director, Mr Karl Simich, said the rapid delineation of an exceptionally highgrade resource at Monty containing almost 100,000 tonnes of copper and 55,000 ounces of gold within nine months of its discovery was an outstanding achievement by the Company’s exploration team.

“With an average Mineral Resource grade of 9.4% copper and 1.6g/t gold – including a high-grade massive sulphide component grading 12.1% copper and 2.1g/t gold – Monty stands out as one of the highest grade VMS deposits discovered anywhere in the world in the past three decades.

“The discovery and rapid delineation of this exceptional deposit, which commences some 100 metres below surface in an area of thick cover, has been a significant geological and technical achievement by our team. It is important to remember that this was a blind discovery in an area which had already had significant previous exploration, and it was made by using a combination of sophisticated geophysics, geochemistry and structural geology – building on the excellent work carried out by Talisman historically in this area.

“The Mineral Resource drill-out, which was undertaken by up to four drill rigs using state-of-the-art navigational drilling techniques, has highlighted both the exceptional grade and tenor and the internal complexity and variability of the Monty mineralisation – similar to what we see at the DeGrussa VMS lenses.

“The result is a Mineral Resource which has been estimated to a high degree of confidence and independently checked and audited. Importantly, 99 per cent of the Mineral Resource tonnage is classified in the Indicated category, providing a solid foundation for subsequent project development studies, which have already commenced.

“The focus of these studies will be to determine the best way of unlocking the value of this strategic deposit which will include leveraging off the existing processing plant and infrastructure we have at DeGrussa. At the same time, we are continuing with an extensive exploration program, both in the immediate Monty area and further afield, with the objective of discovering more high-value coppergold deposits.”

SANDFIRE RESOURCES NL

Page 6

“We have long believed that the Doolgunna field contains multiple VMS deposits, and we now have definitive proof of that theory,” Mr Simich continued. “We are confident that this is just the beginning of a new chapter of exploration success at DeGrussa and, with the recent breakthrough at Monty, we intend to leave no stone unturned to find more.”

ENDS

For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800

Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)

Figure 4: Sandfire’s Greater Doolgunna Project, showing the Springfield Project (Joint Venture) and location of the Monty and Homer prospects.

==> picture [482 x 189] intentionally omitted <==

SANDFIRE RESOURCES NL

Page 7

Appendix 1 – Mineral Resource

Monty Project Mineral Resource - Total as at 31 March 2016
Mineralisation
Style
Resource
category
Tonnes
(t)
Copper
(%)
Gold
(g/t)
Contained
Copper(t)
Contained
Gold(oz)
Massive Sulphides Measured
-
-
-
-
-
Indicated
754,000
12.0
2.1
91,000
51,000
Inferred
9,000
20.7
2.7
2,000
1,000
Halo Measured
-
-
-
-
-
Indicated
287,000
2.2
0.3
6,000
3,000
Inferred
-
-
-
-
-
Total Measured
-
-
-
-
-
Indicated
1,041,000
9.3
1.6
97,000
54,000
Inferred
9,000
20.7
2.7
2,000
1,000
Total
1,050,000
9.4
1.6
99,000
55,000
Monty Project Mineral Resource – Massive Sulphides as at 31 March 2016
Zone Resource
category
Tonnes
(t)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
MSL1 Measured
-
-
-
-
-
Indicated
245,000
15.2
1.9
37,000
15,000
Inferred
-
-
-
-
-
MSL2 Measured
-
-
-
-
-
Indicated
451,000
10.8
2.3
49,000
33,000
Inferred
-
-
-
-
-
MSL3 Measured
-
-
-
-
-
Indicated
-
-
-
-
-
Inferred
7,000
20.4
2.5
1,000
1,000
MSL4 Measured
-
-
-
-
-
Indicated
-
-
-
-
-
Inferred
2,000
21.7
3.3
500*
200*
MSL5 Measured
-
-
-
-
-
Indicated
13,000
7.6
1.8
1,000
1,000
Inferred
-
-
-
-
-
MSL6 Measured
-
-
-
-
-
Indicated
29,000
7.0
1.8
2,000
2,000
Inferred
-
-
-
-
-
MSL7 Measured
-
-
-
-
-
Indicated
16,000
8.3
2.2
1,000
1,000
Inferred
-
-
-
-
-
Total Measured
-
-
-
-
-
Indicated
754,000
12.0
2.1
91,000
51,000
Inferred
9,000
20.7
2.7
2,000
1,000
Total
763,000
12.1
2.1
92,000
52,000

SANDFIRE RESOURCES NL

Page 8

Monty Project Mineral Resource - Halo as at 31 March 2016
Zone Resource
category
Tonnes
(t)
Copper
(%)
Gold
(g/t)
Contained
Copper(t)
Contained
Gold (oz)
Halo Measured
-
-
-
-
-
Indicated
287,000
2.2
0.3
6,000
3,000
Inferred
-
-
-
-
-
Total Measured
-
-
-
-
-
Indicated
287,000
2.2
0.3
6,000
3,000
Inferred
-
-
-
-
-
Total
287,000
2.2
0.3
6,000
3,000

Notes:

  • Mineral Resource is based on a copper cut-off of 1.0%.

  • Calculations have been rounded to the nearest 1,000 t, 0.1 % copper grade and 1,000 t copper metal, 0.1 g/t gold grade, 1,000 oz gold metal, differences may occur due to rounding.

  • Calculations have been rounded to the nearest 100 t copper metal and 100 oz gold (due to copper metal being less than 1,000 t and contained gold metal being less than 1,000 oz), differences may occur due to rounding.

SANDFIRE RESOURCES NL

Page 9

JORC 2012 MINERAL RESOURCE PARAMETERS MONTY PROJECT

Section 1: Sampling Techniques and Data

Criteria JORC Code Explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken
as limiting the broad meaning of sampling.

The Monty Mineral Resource area has been sampled by a combination of
diamond (DD), reverse circulation (RC) and aircore (AC) drillholes.

The Mineral Resource evaluation considered only DD data from historic and
recent drilling of PQ3, HQ, HQ2, HQ3, NQ2 and NQ core sizes for a total
32,653m.

None of the historic DD drilling intersected mineralisation. These have only been
included in the density evaluation of the deposit in the waste zones.

Sampling method used for recent DD drilling is half-core samples of HQ2 and
NQ2 core sizes.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.

Sampling and sample preparation method for recent drilling followed guidelines
established by Sandfire as per industry standard.
Aspects of the determination of mineralisation that are Material to the
Public Report.

The determination of mineralisation is based on observed amount of sulphides
and lithological differences.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.

DD core samples submitted to the laboratory are stage crushed firstly to -10mm
via Jaw Crusher and homogenised through Rotary Splitting Devise (RSD). These
are further crushed through Boyd crusher to -4mm to produce less than 2.5kg sub
samples which are pulverised using LM2/LM5 mill to 90% passing 75µm.

0.3g and 0.15g charge portions of the sub-sample are collected and used for
Mixed 4 Acid Digest (MAD) and MAD Hotbox methods respectively with
ICPOES/MS.

A 40g portion of the sub-sample is used for Pb collection Fire Assay.

SANDFIRE RESOURCES NL

Page 10

Criteria JORC Code Explanation Commentary
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).

All DD core used for the Mineral Resource estimation is HQ2 and NQ2 core
sizes. 124 drillholes were completed for a total of 32,653m with inclination
between -38º to -66º to achieve intersections at the required depth. The minority
of the drillholes are almost to the northwest.

All recent DD drill collar locations are surveyed using RTK GPS with downhole
surveys completed using high speed gyroscopic survey tools at regular intervals.

All core where possible is oriented using a Reflex ACT II RD orientation tool with
stated accuracy of +/-1% in the range 0 to 88°.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.

Diamond core recovery is logged and captured into the database with overall
weighted core recoveries greater than 97%.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.

Appropriate measures have been taken to maximise sample recovery and to
ensure the representative nature of recent samples. This includes diamond core
being reconstructed into continuous intervals on angle iron racks for orientation
and reconciled against core block markers.

Samples are routinely weighed and captured into the central database.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material

No known sample recovery issues have impacted on potential sample bias.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.

Geological logging is completed for all holes and representative across the
orebody. The lithology, alteration and structural characteristics of core are logged
directly to a digital format following procedures and using Sandfire NL geologic
codes.

Data is imported into Sandfire NL’s central database after validation in
LogChief™.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.

Logging is both qualitative and quantitative depending on the field being logged.

All core is photographed.
The total length and percentage of the relevant intersections logged.
All drillholes are fully logged.

SANDFIRE RESOURCES NL

Page 11

Criteria JORC Code Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
Core orientation is completed where possible and all are marked prior to sampling.
Half core samples are produced using an Almonte or a Corewise Pty Ltd Core Saw.

All samples are weighed and recorded.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.

No RC or AC sample is included in this Mineral Resource estimate.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.

Sample preparation for the initial exploration drilling was completed at Bureau
Veritas laboratory in Perth and the majority of the infill Mineral Resource drilling
were completed at the onsite laboratory:
o
Sample preparation at the onsite laboratory involves weighing and drying the
original sample at 80° for up to 24 hours. Samples are then crushed through
Jaques crusher to nominal -10mm followed by a second stage crushing
through Boyd crusher to nominal -4mm. Samples are split to less than 2kg
through linear splitter and excess retained. Sample splits are weighed at a
frequency of 1:20 and entered into the job results file. Pulverising is completed
using a LM2 mill to 90% passing 75%µm. Pulp fines test is completed at a
minimum of 1:20. A 1.5kg barren wash is performed after pulverising each
mineralised. Pulversed packets are shipped externally to Bureau Veritas
laboratory in Perth for analysis. Coarse rejects are retained for QC checks.
o
Sample preparation at the Bureau Veritas laboratory in Perth involves
weighing and drying the original sample at 80° for up to 24 hours. DD samples
are first crushed through a Jaques crusher to nominal -10mm. A second stage
crushing is completed via Boyd crusher to a nominal -4mm. Samples are then
split to less than 2.5kg through linear splitter and excess retained. Sample
splits are weighed at a frequency of 1:20 and entered into the job. Pulverising
is completed using a LM5 mill to 90% passing 75%µm. Grind size checks are
completed at a minimum of 1 per batch. A 1.5kg barren quartz wash is
pulverised after mineralised samples. Coarse rejects are stored and returned
to Sandfire.

SANDFIRE RESOURCES NL

Page 12

Criteria JORC Code Explanation Commentary
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.

Sandfire has protocols that cover auditing of sample preparation at the laboratories
and the collection and assessment of data to ensure accurate steps are used in
producing representative samples for the analytical process. Key performance
indices include:
o
Contamination index of 90% (that is 90% blanks pass);
o
Crush Size index of P95-10mm; Grind Size index of P90-75µm and;
o
Check Samples returning at worst 20% precision at 90% confidence and bias
of 5% or better.

Weekly onsite laboratory inspections are completed to ensure the laboratory
conforms to standards.

Additional grind size checks are completed via check laboratories.

The analytical laboratories conduct their own internal QC checks to ensure
representativeness of the sub-sampling stages.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.

Sampling is to industry standard.

No field duplicates have been taken.
Whether sample sizes are appropriate to the grain size of the material
being sampled.

The sample sizes are considered appropriate for the massive sulphide Cu-Ag-Zn
mineralisation style.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.

Primary assays are analysed through Bureau Veritas laboratory (Primary
laboratory) in Perth using Mixed 4-Acid Digest (MAD) and X-ray fluorescence
(XRF) analytical methods:
o
Base metal and extra element analysis are via MAD ICPOES/MS using 0.3g
charge and 0.15g charge MAD Hotbox methods. The samples are digested
and refluxed with a mixture of acids including Hydrofluoric, Nitric, Hydrochloric
and Perchloric acids and conducted for multi elements including Cu, Pb, Zn,
Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn, Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V, Sn, W and
Ba. The MAD Hotbox method is an extended digest method that approaches
a total digest for many elements however some refractory minerals are not
completely attacked. The elements S, Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti,
K, Na, V are determined by ICPOES, and Ag, Pb, As, Sb, Bi, Cd, Se, Te, Mo,
Re, Zr, Ba, Sn, W are determined by ICPMS. Samples are analysed for Au,
Pd and Pt by firing a 40g portion of the sample with ICPMS finish. Lower
sample weights are employed where samples have very high S contents.
o
The XRF analytical protocol comprises the fusion of 0.4g sample into a glass
bead with a 9g flux comprising of 1% Tantalum Oxide;12.825 Sodium Nitrate
and 0.5% Lithium Bromide)– 66:34 LT;LM+1% Ta. XRF is used to analyse

SANDFIRE RESOURCES NL

Page 13

Criteria JORC Code Explanation Commentary
for a suite of elements including Cu, Fe, SiO2, Al, Ca, K, MgO, P, S, Ti, Mn,
Co, Zn, As and Pb. XRF results are used for comparative studies only and
have not been used for the Mineral Resources estimate.

Selected coarse rejects are analysed through the primary laboratory to test the
precision at the initial sample splitting stage. These follow the same analytical
protocol described above.

Selected pulp rejects submitted are analysed by Intertek Genalyis Laboratory
Services (Check Laboratory) as QC checks against the primary Bureau Veritas
laboratory results. Analysis include:
o
Multi-element 4-Acid Digest with ICPOES/MS instrument finish. In cases
where copper concentration exceeds the upper limit of 2% Cu, they are re-
assayed by an ore grade ICPOES analytical method. Elements analysed
include Ag, Al, As, Ba, Bi, Ca, Cd, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, Li,
Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Re, S, Sb, Sc, Se, Si, Sr, Ta, Th, Ti, U, V, W,
Y, Zn and Zr;
o
Sodium Peroxide Fusion in zirconia crucible with hydrochloric acid. Elements
analysed by ICPOES/MS. This method is useful in identifying elements
hosted in the minerals that may be resistant to acid digestions. Elements
analysed under this method include Ca, As, Cu, Fe, K, Mg, Mn, Pb, S, Si, Ti
and Zn; and
o
50g Pb collection Fire Assay in new pots with ICPMS finish for Au, Pt and Pd.

A third laboratory, MinAnalytical Laboratory Services Australia (Umpire
Laboratory) analysed selected pulp rejects (Umpire Checks) submissions on a
quarterly basis. Analysis include:
o
Multi-element 4-Acid Digest with ICPOES/MS instrument finish for Ag, Al, As,
Ba, Bi, Ca, Cd, Co, Cr, Cu, Fe, K, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc, Sr,
Te, Ti, V, Zn and Zr;
o
Sodium Peroxide Fusion in zirconia crucible with hydrochloric acid with
ICPOES/MS finish. Elements analysed include Cu, Fe, Si, Al, Ca, K, Mg, S,
Ti, Mn and Zn; and
o
Pb collection Fire Assay for Au, Pt and Pd using specially formulated flux to
accommodate a variety of sample matrices. Some reduction in sample charge
sometimes occur due to the fusion of difficult sample matrices.

All the analytical methods are considered appropriate for the mineralisation style
and the intended purposes.

SANDFIRE RESOURCES NL

Page 14

Criteria JORC Code Explanation Commentary
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.

No handheld XRF determined element concentrations have been used in the
Mineral Resource estimate.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.

Sandfire Quality Control (QC) protocol is considered industry standard with
Certified Reference Materials (CRM) submitted on regular basis with routine
samples.

CRMs and blanks are inserted at a minimum of 5% frequency rate. A minimum of
2% of assays are routinely re-submitted as Check Samples and Check Assays
through blind submittals to the primary and secondary laboratory respectively.
Additionally, Umpire Checks are completed on quarterly basis through a third
laboratory.

QC data returned is automatically checked against set pass/fail limits within SQL
database and are either passed or failed on import on a batch to batch basis. On
import a first pass automatic QC report is generated and sent to QAQC Geologists
for recommended action. Results of all QC samples for every laboratory batch
received are analysed to determine assay accuracy and repeatability.

Only data that demonstrate sufficient accuracy and precision of assays are used
for Mineral Resource updates.

The participating laboratories conduct their own internal quality checks including
the use of certified reference materials and/or in house controls, blanks and
replicates. These quality results are reported along with sample results in the final
reports. Sandfire has not verified the laboratoryinternal QC data.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.

Significant intersections have been verified by alternative company personnel and
the Competent Person.
The use of twinned holes.
There are no twinned holes drilled for the Mineral Resource.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.

Drillhole data are captured on field tough book laptops using Logchief™ Software.
The software has validation routines and data is then imported into a secure central
database.
Discuss any adjustment to assay data.
The primary data for drilling is always kept and is never replaced by adjusted or
interpreted data.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.

Collar coordinates for all recent drill holes are accurately surveyed using RTK GPS
system within +/-50mm accuracy (X,Y,Z).

Different downhole survey methods are used for the recent drilling including

SANDFIRE RESOURCES NL

Page 15

Criteria JORC Code Explanation Commentary
Eastman Single Shot (ESS) and high speed gyroscopic downhole methods
(GYRO). The ESS surveys are completed by the drilling companies. GYRO
surveys are completed by Surtron Technologies with different sets of instruments.
The GYRO surveys completed by SPT GyroTracer Directional™ 42 mm (north
seeker) instrument supercedes all other surveys.
Specification of the grid system used.
Coordinate and azimuth are reported in MGA 94 Zone 50.
Quality and adequacy of topographic control.
Topographic control was established from aerial photography using a series of
surveyed control points.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
No Exploration Results are included in this release.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.

Data spacing and distribution are sufficient to establish the degree of geological
and grade continuity appropriate for JORC 2012 classifications applied.
Whether sample compositing has been applied.
No sample compositing is applied during the sampling process.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.

All drillholes are oriented to achieve high angles of intersection.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.

No orientation based sampling bias is known at this stage.
Sample
security
The measures taken to ensure sample security.
Appropriate security measures are taken to dispatch samples to the laboratory.
Chain of custody of samples is being managed by Sandfire. Samples are stored
onsite and transported to the laboratory by a licenced transport company in sealed
bulka bags. The laboratory receipts received samples against the sample dispatch
documents and issues a reconciliation report for every sample batch.

The laboratory stores the excess material (coarse residue) and return to Sandfire
after 30 days unless instructed otherwise.

The laboratory returns all pulp samples within 60 days.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data.
Sandfire sampling techniques and data collection processes are of industry
standard and have been subjected to multiple internal and external reviews. Cube
Consulting Pty completed a review during 18th- 20thFebruary 2014 and found
procedures to be consistent with industry standard and appropriate with minor
recommendations for enhancement as part of continuous improvement.

SANDFIRE RESOURCES NL

Page 16

Section 2: Not applicable

Section 3: Estimation and Reporting of Mineral Resources

Criteria Commentary
Database
integrity
Measures taken to ensure that data has not been corrupted by, for
example, transcription or keying errors, between its initial collection and
its use for Mineral Resource estimation purposes.

Sandfire employs SQL as the central data storage system using Datashed
software front end. User access to the database is regulated by specific user
permissions.

Existing protocols maximise data functionality and quality whilst minimising the
likelihood of error introduction at primary data collection points and subsequent
database upload, storage and retrieval points.

The primary data for historic drilling was collected using LogChief™ software. The
historic master database was then supplied to Sandfire in SQL format which was
then imported into the Sandfire relational SQL drilling database.
Data validation procedures used.
Data templates with lookup tables and fixed formatting are used for collecting
primary data on field Toughbook laptops. The software has validation routines
and data is subsequently imported into a secure central database.

The SQL server database is configured for optimal validation through constraints,
library tables, triggers and stored procedures. Data that fails these rules on import
is rejected or quarantined until it is corrected.

Database is centrally managed by a Database Manager who is responsible for all
aspects of data entry, validation, development, quality control and specialist
queries. There is a standard suite of vigorous validation checks for all data.

The supplied historic database was subjected to standard validation checks using
SQL and DataShed relational database.
Site Visits Comment on any site visits undertaken by the Competent Person and the
outcome of those visits.

The Competent Person for this Mineral Resource update is a full time employee
of Sandfire Resources NL and undertakes regular site visits.
If no site visits have been undertaken indicate why this is the case.
Site visits are undertaken.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.

The interpretation is based only on recent DD drilling on a nominal 40m × 30m
spacing outlining Cu-Au-Zn mineralisation associated with massive sulphide and
halo-style mineralisation and is based on a fully validated drill data.

Where massive sulphide domain wireframes terminate between drillholes they do
not extend more than half way between the mineralised and barren intercepts thus
preventing excessive extrapolated of mineralisation.

This interpretation is considered geologically and volumetrically realistic and is
considered fit for purpose for estimating Mineral Resources in the
Indicated/Inferred categories
Nature of the data used and of any assumptions made.
All geological modelling was undertaken using Leapfrog Mining v2.6. In order to
model the massive sulphide lenses, points were snapped to contacts between
massive sulphide and the surroundinghost sequencerocks. Isotropic,implicit

SANDFIRE RESOURCES NL

Page 17

Criteria Commentary
interpolation was used to construct surfaces for these contacts. Where required,
polylines were used to guide interpolation in a geologically realistic manner and
to ensure that the upper and lower contacts converged, and crossed, at drill-
indicated terminations of massive sulphide units. The output surfaces included
drillhole contact points, such that the surfaces honored all drillhole data.
Domaining between upper and lower contacts was undertaken to create solids
between contact surfaces. A similar process was used to create the internal halo
solids and external halo solids.

Seven (7) 3D wireframes solids have been modelled that encapsulate the massive
sulphide mineralisation. Some of these solids contain internal zones of halo
mineralisation. Five (5) internal halo solids have been modelled to constrain these
zones.
The effect, if any, of alternative interpretations on Mineral Resource
estimation.

The geological interpretation of the mineralised boundaries are considered robust
and alternative interpretations do not have the potential to impact significantly on
the Mineral Resources at the time. The interpretation has undergone site and
corporate peer reviews ensuring that the geological interpretation is robust.
The use of geology in guiding and controlling Mineral Resource
estimation.

The interpreted wireframe models are used as hard boundaries for the Mineral
Resource estimate.
The factors affecting continuity both of grade and geology.
Mineralisation at Monty is contained within a host sequence of sediments
(siltstone, sandstone, conglomerate) and basalts in multiple sulphide lenses, at
different statigraphic levels, surrounded by disseminated and/or blebby sulphide
(halo mineralisation) in chlorite-altered host sequence litho-types. Based on
similarities with the DeGrussa deposit, the Monty deposit is interpreted to be a
Volcanogenic Massive Sulphide (VMS) deposit that formed during sub-sea floor
replacement of host sequence stratigraphy by mineralising hydrothermal fluids.

The host sequence is bounded both above, and below, by dolerite sills. These
dolerite sills are interpreted to post-date mineralisation.

The massive sulphide mineralisation typically comprises chalcopyrite ± pyrite ±
pyrite ± pyrrhotite ± sphalerite. In isolated areas within the lowermost massive
sulphide lense, bornite is present which have been constrained by incorporating
continuity characteristics into two sub-domains. These have not been extended
beyond 20m (½ drill-spacing) beyond drill intersections.

The regolith profile at Monty comprises transported cover, saprolite (>25%
weathering) followed by saprock (<25% weathering). Mineralisation at Monty does
not extend to surface, terminating at a depth of approximately 72m from surface.
At this depth the regolith comprises saprock (<25% weathering) with weathering
affecting the rock mass. This interval only extends for an interval of approximately
10m (to 82m below surface).
Dimensions The extent and variability of the Mineral Resource expressed as length
(along strike or otherwise), plan width, and depth below surface to the
upper and lower limits of the Mineral Resource.

All known Monty deposit mineralisation extends from 743,400mE to 743,800mE,
7,170,800mN to 7,171,300mN and 600m below surface.

The Montymassive sulphide mineralisationgenerallystrikes northeast and

SANDFIRE RESOURCES NL

Page 18

Criteria Commentary
steeply dips to the northwest between 70-85°.
Estimation and
modelling
techniques
The nature and appropriateness of the estimation technique(s) applied
and key assumptions, including treatment of extreme grade values,
domaining, interpolation parameters and maximum distance of
extrapolation from data points. If a computer assisted estimation method
was chosen include a description of computer software and parameters
used.

The Mineral Resource estimation was completed within Datamine™ Studio 3
Resource Modelling software.

The Mineral Resource database was uniquely flagged with mineralised zone
codes as defined by the wireframe boundaries and then composited into 1m
density weighted lengths. The composite drillhole data was used for statistical and
geostatistical analysis.

Histograms, log-probability plots and mean variance plots were considered in
determining the appropriate cut-offs for each mineralised zone. The points of
inflexion in the upper tail of the distribution on the log-probability plots as well as
their spatial locations were examined to help identify outliers and decide on the
treatments applied. All grade values greater than the cut-off grade are set to the
cut-off value (capped).

Deterministic high-grade wireframes to restrict the influence of the high-grade
bornite intercepts within the massive sulphide were modelled by factoring in the
continuity characteristics of the bornite mineralisation using an Indicator
Probability approach.

Variography studies included analysing series of fans in three principal directions
of horizontal, across-strike vertical and dip planes. The selected strike, plunge and
dip directions were used to locate the three directions for which experimental
variogram models were fitted. The nugget variance was modelled first by the use
of down-hole variograms based on 1m lag, reflecting the downhole composite
spacing. Variograms were estimated by fitting spherical models in the three
principal directions using the nugget variance modelled.

Quantitative Kriging Neighbourhood Analysis (QKNA) using goodness of fit
statistics was completed to optimise estimation parameters.

Elements estimated include Cu, Au, Ag, Fe, S, Pb and Zn.

Grade estimation of the Monty deposit was completed using the geostatistical
method ofOrdinaryKriging (OK).
The availability of check estimates, previous estimates and/or mine
production records and whether the Mineral Resource estimate takes
appropriate account of such data.

This a maiden Mineral Resource estimate.
The assumptions made regarding recovery of by-products.
No assumptions are made regarding recovery of by-products during the Mineral
Resource estimation.
Estimation of deleterious elements or other non-grade variables of
economic
significance
(e.g.
sulphur
for
acid
mine
drainage
characterisation).

Estimates includes deleterious or penalty elements Pb, Bi, Zn, As, and MgO.
In the case of block model interpolation, the block size in relation to the
average sample spacing and the search employed.

The estimated grades are based on interpolation into three dimensional parent
blocks of sizes X=20m by Y=10m by Z=10m sub-blocked into X=1m by Y=1m by
Z=1m sizes. Sub-blocks are assigned parent block estimates.

The block size is the optimum based on QKNA and takes into consideration the
mineralisationdrill holeintercept spacing that arewithin 40m.

SANDFIRE RESOURCES NL

Page 19

Criteria Commentary

Given that the orientation of mineralisation varies within the Monty deposit and to
preserve the orientation of mineralisation, “Dynamic Anisotropy” option of
Datamine Studio3™ was used. This option, allows orienting the search volume
precisely such that it follows the trend of the mineralisation.

Directional ranges are determined from variogram modelling and are used to
constrain the search distances. The search neighborhood strategy implemented
involves the use of two estimation search runs with initial short-search set to
approximately 75% of the variogram range of the element being estimated (within
40m, in the majority of cases) and extending the sample influence in later runs.
To estimate a block, a minimum of 3 and maximum 15 composites are used.

All blocks are interpolated after the second pass. Searches have not exceeded
1½ of the range of continuity.

High grade restriction of the bornite intercept within the massive sulphide zone
was achieved by the use of a tightly constrained wireframe that was modelled to
respect the continuity characteristics of the bornite mineralisation.
Any assumptions behind modelling of selective mining units.
No selective mining units have been assumed in this current Mineral Resource.
Any assumptions about correlation between variables.
Within the massive sulphides there is a very good and consistent correlation
between Cu, Fe, S and density which has been analysed separately for the top
and bottom zones using multiple regression to fit the density, Cu, and S
relationship.

Due to multicollinearity issues, Fe was removed from the regression models.

The regressed formula was then applied to the block model estimated S and Cu
values to assign densities for each block.

The bornite sub-domains are assigned their average Archimedean measured core
densityvalues due tolimited data tofit aregression.
Description of how the geological interpretation was used to control the
resource estimates.

The block model is assigned unique mineralisation zone codes that correspond
with the interpreted geological zones as defined by wireframes. This enabled each
mineralisation zone to be estimated separately using only corresponding
composite data.
Discussion of basis for using or not using grade cutting or capping.
Statistical analysis in conjunction with the spatial configuration of samples were
used to assist in identifying outliers and decide on the treatments applied. High-
grade restrictions are either as a top-cut or deterministic high grade spatial
restriction (bornite sub-domains) to minimise the smoothing of very high-grades
in areas not supported by data.
The process of validation, the checking process used, the comparison of
model data to drill hole data, and use of reconciliation data if available.

Standard model validation is completed using visual and numerical methods:
o
Checks to ensure the block model is appropriately flagged with domain
codes as defined by wireframes;
o
Assessment of wireframe - block model variance for all domains;
o
Interrogation of block model on screen comparing individual block model
grades with input data values;
o
Assessment of block model estimate global mean variances to the
declustered input data composite mean grades for each mineralised zone;
o
Assessment ofthe estimation krigingvariance and theoreticalslope of

SANDFIRE RESOURCES NL

Page 20

Criteria Commentary
regression for individual model blocks within each geological domain to
monitor the degree of smoothing and to control conditional bias;
o
Assessment of swath plots of the estimated block grades and composite
mean grades by eastings, northings and elevations; and
o
Peer reviews.

This is a maiden Mineral Resource estimate; there is no reconciliation data
available for use as a check on the estimates.
Moisture Whether the tonnages are estimated on a dry basis or with natural
moisture, and the method of determination of the moisture content.

Tonnages are estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters applied.
Based upon data review a notional lower cut-off of 1% Copper appear to be a
natural grade boundary between ore and trace assay values.
Mining factors
or assumptions
Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is
always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider potential mining
methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an
explanation of the basis of the mining assumptions made.

It is anticipated that the Monty Mineral Resource will be accessed through
underground mining using open stoping and fill methods.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical
amenability. It is always necessary as part of the process of determining
reasonable prospects for eventual economic extraction to consider
potential metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous. Where this is the case,
this should be reported with an explanation of the basis of the
metallurgical assumptions made.

The current Mineral Resource does not include any matallurgical assumptions.

It is envisaged that the DeGrussa processing plant will be used to treat the ore
and preliminary test work reflecting the DeGrussa flowsheet has been completed
by ALS Metallurgy on 4 discrete areas identified to date (upper portion, wide high
grade zones, narrow very high grade zones and halo style zones). All testing to
date has validated that the DeGrussa plant is a viable option for the treatment of
the Monty ore with high recoveries expected.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue
disposal options. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to
consider the potential environmental impacts of the mining and
processing operation. While at this stage the determination of potential
environmental impacts, particularly for a greenfields project, may not
always be well advanced, the status of early consideration of these
potential environmental impacts should be reported. Where these
aspects have not been considered this should be reported with an
explanation of the environmental assumptions made.

No environmental assumptions have been made at this stage.

SANDFIRE RESOURCES NL

Page 21

Criteria Commentary
Bulk density Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or dry, the
frequency of the measurements, the nature, size and representativeness
of the samples.

Water immersion is the current methodology used in the measurement of densities
from DD core. Regular and systematic density measurements are taken on
representative number of diamond drill core according to a formal protocol. This
data is included in the database.

Overall, a total of 6,307 Archimedian density measurements have been completed
within the Mineral Resource area within the sulphide and the non-sulphide bearing
rocks for the various weathering profiles. The breakdown is as follows:
o
A total of 5,993 measurements completed by Sandfire with readings from 1.1
g/cm3to 4.7 g/cm3averaging at 2.9 g/cm3and
o
A total of 314 density determinations completed historically by Talisman
Resources at Monty. These measurements were undertaken in non-sulphide
bearing zones with the majority in weathered rock. Measurements range from
1.1 g/cm3to 3.1 g/cm3averaging at 1.8 g/cm3.

Within the halo and massive sulphides density varies from 2.4 g/cm3to 4.7 g/cm3,
with an average density reading of 3.6 g/cm3.

Within the non-sulphide bearing waste rocks density varies from 1.1 g/cm3to 2.8
g/cm3, with an average density reading of 2.6 g/cm3. Following the evaluation of
waste rock density data, the following average densities are assigned:
o
An average density of 1.7 g/cm3assigned to the saprolite waste rock; and
o
An average of 2.8 g/cm3assigned to fresh waste rock.

To test the methodology and accuracy of the density measurements, regular
samples totalling about 540 samples were submitted to an independent laboratory
for measurements. The results of the external checks are very consistent with the
Sandfire measurements.
The bulk density for bulk material must have been measured by methods
that adequately account for void spaces (vugs, porosity, etc), moisture
and differences between rock and alteration zones within the deposit.

The density determinations have accounted for void spaces, moisture and
differences between alteration zones.
Discuss assumptions for bulk density estimates used in the evaluation
process of the different materials.

The regolith profile at Monty comprises transported cover, saprolite (>25%
weathering) flowed by saprock (<25% weathering). At approximately 72m below
surface, the regolith comprises saprock with weathering affecting the rock mass.
This interval only extends for an interval of approximately 10m (to approximately
82m below surface) below which the nature of the saprock changes with
weathering only occurring adjacent to fractures but otherwise not affecting the rock
mass. Fracture related weathering of the Monty mineralisation extends to depths
of up to 185m from surface.

Modelling of top of fresh rock and the base at which oxidation occurs along
fractures accounted for these variations and are used in the Mineral Resource
evaluation process.

SANDFIRE RESOURCES NL

Page 22

Criteria Commentary
Classification The basis for the classification of the Mineral Resources into varying
confidence categories.

The current Mineral Resource has been classified into Indicated and Inferred
categories following the guidelines of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012).
The classification is based on drillhole orebody intercept spacing, geological
confidence, grade continuity and estimation quality.

Indicated Mineral Resources are within areas with drill hole intercept spacing of
within 40m by 30m.
Whether appropriate account has been taken of all relevant factors (i.e.
relative confidence in tonnage/grade estimations, reliability of input data,
confidence in continuity of geology and metal values, quality, quantity
and distribution of the data).

The Mineral Resource classification has appropriately taken into account data
spacing, distribution, reliability, quality and quantity of input data as well as the
confidence in predicting grade and geological continuity.
Whether the result appropriately reflects the Competent Person’s view of
the deposit.

The Mineral Resource reflects the Competent Person’s view of the deposit.
Audits or
reviews
The results of any audits or reviews of Mineral Resource estimates.
The Sandfire Monty Database has been subject to an independent data and assay
audit. Maxwell Geoservices completed an audit in January 2016 and found the
SQL database to be of industry standard, with minor issues noted such as
unmatched data, missing data and noted minor schema limitations.

The process for geological modelling, estimation and reporting of Mineral
Resources is industry standard and has been subject to an independent external
review. Cube Consulting Pty undertook a review of the estimation in April 2016
and found the process to be of industry standard with no fatal issues noted.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence
level in the Mineral Resource estimate using an approach or procedure
deemed appropriate by the Competent Person. For example, the
application of statistical or geostatistical procedures to quantify the
relative accuracy of the resource within stated confidence limits, or, if
such an approach is not deemed appropriate, a qualitative discussion of
the factors that could affect the relative accuracy and confidence of the
estimate.

The Mineral Resource has been reported in accordance with the guidelines of the
2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves and the relative accuracy is reflected in the
categorisation into Indicated and Inferred.
The statement should specify whether it relates to global or local
estimates, and, if local, state the relevant tonnages, which should be
relevant to technical and economic evaluation. Documentation should
include assumptions made and the procedures used.

The statements relates to global estimates of tonnes and grade.
These statements of relative accuracy and confidence of the estimate
should be compared with production data, where available.

At this stage there is no production data to assess the relative accuracy and
confidence of the Mineral Resource. The precision of the estimate is globally
acceptable assuming that more detailed grade control drilling will be undertaken
at the production stage.

SANDFIRE RESOURCES NL

Page 23

Competent Person’s Statement – Mineral Resources

The information in this report that relates to Mineral Resources is based on information compiled by Mr. Ekow Taylor who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Taylor is a permanent employee of Sandfire Resources and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Taylor consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward-Looking Statements

Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.

Exploration and Resource Targets

Any discussion in relation to the potential quantity and grade of Exploration Targets is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant Mineral Resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.

SANDFIRE RESOURCES NL

Page 24