Sandfire Resources NL ABN 55 105 154 185 Level 1, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: [email protected] Web: www.sandfire.com.au

==> picture [275 x 55] intentionally omitted <==

ASX/Media Release

18 July 2013

DEGRUSSA MINE LIFE EXTENSION AND ORE RESERVE UPDATE

RECENT C4/C5 MINERAL RESOURCE ADDITIONS SCHEDULED INTO DEGRUSSA MINE PLAN

  • Recently announced increase to high-grade underground Inferred Mineral Resources incorporated into the DeGrussa Mine Plan, extending mine life to late 2020.

  • Mineral Resource increase and Mine Plan extension driven by extension to the C4 deposit and significant thickening of the C5 deposit (announced in May 2013):

  • Conductor 4 Mineral Resource increased to 2.1Mt grading 4.8% Cu and 1.7g/t Au for 102,000t contained copper and 119,000oz contained gold (a 31% increase in contained copper); and

  • Conductor 5 Mineral Resource increased to 1.4Mt grading 6.2% Cu and 2.8g/t Au for 88,000t contained copper and 129,000oz contained gold (a 57% increase in contained copper).

  • DeGrussa Ore Reserve update based on depletion to March 2013 – 11.0Mt grading 4.0% Cu and 1.5g/t Au for 439,000t contained copper and 538,000t contained gold:

  • Undergound Ore Reserve – 7.9Mt grading 5.0% Cu and 1.7g/t Au for 393,000t contained copper and 434,000oz contained gold; and

  • Open Pit Ore Reserve (stockpiled at surface) – 3.1Mt grading 1.5% Cu and 1.1g/t Au for 45,000t contained copper and 104,000oz contained gold.

  • Development of the Conductor 4/5 Decline commenced in June to:

  • Access these deeper, high-grade deposits;

  • Facilitate underground drilling positions to upgrade these Inferred Resources to Indicated category and enable conversion to Ore Reserves;

  • Enable targeting of potential extensions of these lenses; and

  • Explore for further orebodies at depth.

Sandfire Resources NL (ASX : SFR : “Sandfire”) is pleased to advise that it has extended the mine life of the 1.5Mtpa DeGrussa Copper-Gold Mine to at least late CY2020 with the announcement of an updated Mine Plan, Mineral Resource and Ore Reserve as at 31 March 2013. This follows the increased Mineral Resource as a result of recently announced exploration success in extending the Conductor 4 and 5 deposits, as reported on 16 May 2013.

Mine Life Extension

The Mine Plan is Sandfire’s internal plan which schedules forecasted production parameters, operating and capital works programs. It is developed with the assistance of both internal Sandfire employees and external consultants and includes both Mineral Resources and Ore Reserves. Table 1 below compares the DeGrussa Mine Plan to the stated Mineral Resource and Ore Reserve by key output and mining tonnes (refer Appendix 1 for full details of the Mineral Resource and Ore Reserve).

==> picture [511 x 79] intentionally omitted <==

ASX/Media Release

18 July 2013

Table 1 – March 2013 Comparison of the Underground Mine Plan, Mineral Resource and Ore Reserve

Tonnes
(Mt)
Copper (%)
Gold (g/t)
Contained
Copper (t)
Contained
Gold (oz)
DeGrussa Underground Mine
Mine Plan 10.5
4.9
1.8
512,000
597,000
Mineral Resource 10.2
5.7
2.1
586,000
688,000
Ore Reserve 7.9
5.0
1.7
393,000
434,000
DeGrussa Underground Mine
by orebody
Tonnes
(Mt)
DG
(Mt)
C1
(Mt)
C4
(Mt)
C5
(Mt)
Mine Plan 10.5
1.6
5.5
1.9
1.5
Mineral Resource 10.2
1.4
5.2
2.1
1.4
Ore Reserve 7.9
1.6
5.3
1.0
-
  • Mine Plan and Ore Reserve include mining dilution.

The Company continues to incorporate Inferred Mineral Resources from Conductor 4 and 5 into its Mine Plan process due to the geological continuity and high copper grade tenor of the deposits.

Work commenced on the Conductor 4/5 access decline during June to develop and access these orebodies from 2014 onwards. As part of this decline development, a drill position will be established to commence grade control drilling into the C4 and C5 orebodies which the Company expects will result in additional conversion of the C4 and C5 Inferred Mineral Resource to Ore Reserve.

The drilling position will also be used to test down-dip extensions of C4 and targets below and down-plunge of C5. Exploration drilling is targeted to commence during the first half of 2014.

Ore Reserve Update

Ore Reserves have been updated based on the March 2013 Mineral Resource model and depletions up to 31 March 2013.

Table 2 – March 2013 Ore Reserve

Tonnes
(Mt)
Copper (%)
Gold (g/t)
Contained
Copper (t)
Contained
Gold (oz)
DeGrussa Mine Ore Reserve, net of depletion
Underground Mine 7.9
5.0
1.7
393,000
434,000
Open Pit - Stockpiles 3.1
1.5
1.1
45,000
104,000
March 2013 - Total 11.0
4.0
1.5
439,000
538,000

The open cut mine was almost complete at the end of March 2013, with Ore Reserves of 3.1Mt grading 1.5% Cu and 1.1g/t Au containing 45,000t Cu and 104,000oz Au, representing chalcocite, sulphide and oxide copper stockpiles.

Management Comment

Sandfire’s Managing Director, Mr Karl Simich, said the inclusion of the additional Inferred Mineral Resources delineated by surface drilling targeting Conductor 4 and 5 earlier this year had enabled the Company to extend the Mine Plan to late 2020, representing a significant return on a relatively limited amount of drilling.

“We will progress our underground exploration push during the second half of 2013 and into 2014 as the new Conductor 4/5 Decline progresses towards these high-grade lenses and facilitates the establishment of suitable underground drilling platforms,” Mr Simich said.

“These will be utilised to in-fill and upgrade the Inferred Mineral Resources to Indicated category, and also extensional drilling on both deposits, as well as to test the immediate near-mine environment for potential repeats of the mineralisation.

SANDFIRE RESOURCES NL

2

ASX/Media Release

18 July 2013

“We are excited by the opportunities which this underground drilling push may open up in the months ahead and we are confident that the mine life extension achieved to date is just the beginning of a significant new growth phase for DeGrussa,” Mr Simich added. “We intend to maintain a strong focus on organic growth through exploration as we believe this offers our shareholders the greatest and most immediate potential returns.”

JORC Compliance Statement for Underground Mineral Resources and Ore Reserves

A summary of the information used in this release is as follows:

The DeGrussa VHMS (volcanic-hosted massive sulphide) copper-gold deposit is located 900 kilometres north of Perth and 150 kilometres north of Meekatharra in the Peak Hill Mineral Field. The system is hosted within a sequence of metasediments and mafic intrusions situated in the Bryah Basin that have been metamorphosed and structurally disrupted.

The sulphide mineralisation consists of massive sulphide and semi-massive sulphide mineralisation. Primary sulphide minerals present are pyrite, chalcopyrite, pyrrhotite and sphalerite, together with magnetite. The sulphide mineralisation is interpreted to be derived from volcanic activity. The deposit shares characteristics with numerous VHMS deposits worldwide.

DeGrussa is located wholly within Mining Lease 52/1046. This tenement is subject to the Yugunga-Nya (WC99/046) and Gingirana Claims (WC06/002). A Land Access Agreement was executed with both claimant groups in November 2010. Sandfire is required to make royalty payments to the State and affected Native Title Claimants on a periodical basis.

Drilling of the DeGrussa massive sulphide lens (of which there are four defined lenses of mineralisation) and surrounding area is by diamond drill holes of NQ2 diameter core and, to a lesser extent, by Reverse Circulation (RC) face sampling hammer drilling. The nominal drill-hole spacing is less than 80m x 40m in the inferred areas of the Mineral Resource and increases in density as the classification increases to measured where nominal 13m x 20m drill hole spacing is achieved. Drilling has been by conventional diamond drilling with a small number holes aided by the use of navigational drilling tools. RC drilling was completed with a nominal 140mm face sampling hammer and split on a cone or riffle splitter. Drill-hole collar locations were surveyed using RTK GPS, and all holes were down-hole surveyed using high speed gyroscopic survey tools.

Sampling of diamond core was based on geological intervals (standard length 0.5 m to 1.3 m). The core was cut into half or quarter (NQ2) to give sample weights up to 3 kg. RC samples were 1.0m samples down-hole, with sample weights between 3.5kg and 7kg depending on material type. Field quality control procedures involved assay standards, along with blanks and duplicates. These QC samples were inserted at an average rate of 1:15.

The sample preparation of diamond core involved oven drying, coarse crushing of the core sample down to ~10 mm followed by pulverisation of the entire sample to a grind size of 90% passing 75 micron. A pulp sub-sample was collected for analysis by either four acid digest with an ICP/OES, ICP/MS (multi element) finish or formed into fused beads for XRF determination on base metals and a fire assay for Au.

All reported assays have been length weighted. No top-cuts have been applied. A nominal 0.3% Cu lower cut-off is applied. High grade intervals internal to broader zones of sulphide mineralisation are reported as included intervals.

The attitude of the ore bodies at DeGrussa is variable but there is a dominant southerly dip from ~40 to 90 degrees flat-lying and is drilled to grid west with drill holes inclined between -60 and -90 degrees. As such the dominant hole direction is north and with varying intersection angles all results are clearly defined as either down hole or approximate true width.

Density of the massive sulphide orebody ranges from 2.8g/cm3 to 4.9g/cm3, with an average density reading of 3.7g/cm3. Geotechnical and structural readings recorded from diamod drilling include recovery, RQD, structure type, dip, dip direction, alph and beta angles, and descriptive information. All data is stored in the tables Oriented Structure, Geotechnical RQD, Core Recovery, Interval Structure as appropriate.

SANDFIRE RESOURCES NL

3

ASX/Media Release

18 July 2013

A suite of multi-element assays are completed on each mineralised sample and include all economic and typical deleterious elements in copper concentrates. This suite includes Cu, Au, Ag, Zn, Pb, S, Fe, Sb, Bi, Cd and As.

Open Pit Mineral Resources are quoted on a historical model and as such are compliant with the JORC 2004 guidelines.

ENDS

For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800

Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)

SANDFIRE RESOURCES NL

4

ASX/Media Release

18 July 2013

Appendix 1 – Ore Reserve and Mineral Resource

DeGrussa Mine - Underground
As at 31 March 2013
Ore Reserve Mineral Resource
Reserve
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Resource
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Deposit
DeGrussa Proved
1.2
5.7
1.8
67,000
66,000
Probable
0.4
8.2
2.1
32,000
26,000
Measured
1.0
7.4
2.3
73,000
72,000
Indicated
0.4
9.4
2.4
34,000
28,000
Conductor 1 Proved
1.4
5.4
1.8
76,000
82,000
Probable
3.9
4.4
1.7
174,000
210,000
Measured
1.3
6.5
2.2
86,000
92,000
Indicated
3.7
5.1
1.9
190,000
231,000
Inferred
0.2
4.6
1.8
11,000
14,000
Conductor 4 Probable
1.0
4.3
1.5
43,000
47,000
Indicated
1.0
5.3
1.8
54,000
59,000
Inferred
1.1
4.4
1.7
48,000
60,000
Conductor 5 Probable
-
-
-
-
-
Inferred
1.4
6.2
2.8
88,000
129,000
Stockpiles Proved
<0.1
7.9
3.0
2,000
3,000
Measured
<0.1
7.9
3.0
2,000
3,000
Proved
2.6
5.6
1.8
145,000
151,000
Measured
2.3
6.9
2.2
161,000
167,000
Probable
5.3
4.7
1.7
248,000
282,000
Indicated
5.1
5.4
1.9
278,000
318,000
Inferred
2.8
5.3
2.3
147,000
203,000
Total
7.9
5.0
1.7
393,000
434,000
Total
10.2
5.7
2.1
586,000
688,000
DeGrussa Mine – Open Pit
As at 31 March 2013
Ore Reserve Mineral Resource
Reserve
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Resource
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Deposit
Conductor 1 Probable
-
-
-
-
-
Indicated
0.1
3.9
1.8
2,000
3,000
Stockpiles Proved
3.1
1.5
1.1
45,000
104,000
Measured
3.1
1.5
1.1
45,000
104,000
Proved
3.1
1.5
1.1
45,000
104,000
Measured
3.1
1.5
1.1
45,000
104,000
Probable
-
-
-
-
-
Indicated
-
-
-
-
-
Inferred
-
-
-
-
-
Total
3.1
1.5
1.1
45,000
104,000
Total
3.1
1.5
1.1
48,000
108,000

SANDFIRE RESOURCES NL

5

ASX/Media Release

18 July 2013

DeGrussa Mine - Total
As at 31 March 2013
Ore Reserve Mineral Resource
Reserve
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Resource
category
Tonnes
(Mt)
Copper
(%)
Gold
(g/t)
Contained
Copper (t)
Contained
Gold (oz)
Deposit
DeGrussa Proved
1.2
5.7
1.8
67,000
66,000
Probable
0.4
8.2
2.1
32,000
26,000
Measured
1.0
7.4
2.3
74,000
72,000
Indicated
0.4
9.4
2.4
34,000
28,000
Conductor 1 Proved
1.4
5.4
1.8
76,000
82,000
Probable
3.9
4.4
1.7
174,000
210,000
Measured
1.3
6.5
2.2
86,000
92,000
Indicated
3.8
5.1
1.9
192,000
234,000
Inferred
0.3
4.6
1.8
12,000
15,000
Conductor 4 Probable
1.0
4.3
1.5
43,000
47,000
Indicated
1.0
5.3
1.8
54,000
59,000
Inferred
1.1
4.4
1.7
48,000
60,000
Conductor 5 -
-
-
-
-
Inferred
1.4
6.2
2.8
88,000
129,000
Stockpiles Proved
3.1
1.5
1.1
47,000
107,000
Measured
3.1
1.5
1.1
47,000
107,000
Proved
5.7
3.4
1.4
190,000
256,000
Measured
5.4
3.8
1.6
206,000
271,000
Probable
5.3
4.7
1.7
248,000
282,000
Indicated
5.2
5.4
1.9
280,000
321,000
Inferred
2.8
5.3
2.3
148,000
203,000
Total
11.0
4.0
1.5
439,000
538,000
Total
13.4
4.7
1.9
634,000
795,000

SANDFIRE RESOURCES NL

6

ASX/Media Release

18 July 2013

JORC 2012 MINERAL RESOURCE AND ORE RESERVE ESTIMATION PARAMETERS DEGRUSSA COPPER MINE

Section 1: Sampling Techniques and Data

Criteria Commentary
Sampling
techniques

The deposit was sampled bya combination of surface diamond drill(DD)and reverse circulation(RC)holes.

Sampling is guided by Sandfire DeGrussa protocols and QAQC procedures as per industry standard.

DD samples include both half-core and quarter-core samples of NQ2 core size and RC samples are collected by a cone or riffle splitter using a
face samplinghammer with a nominal 140mm hole.

DD sample size reduction is completed through a Jaques jaw crusher to -10mm and all samples Boyd crushed to -4mm and pulverised via
LM2 to nominal 90% passing -75µm. Pulp size checks are completed.

Underground drilling is prepared by the onsite laboratory Bureau Veritas combines and fuses 0.4g of assay sample plus 9.0g flux into a glass
bead.
Drilling
techniques

The deposit was initially sampled by a combination of surface diamond drill (DD) and reverse circulation (RC) holes totalling 58,622m DD and
22,072m RC used in Definitive Feasibility Study (DFS).

Additional underground 395 NQ2 DD (50,910m) has been completed for Conductor 1 and Degrussa lodes on a nominal grid to 13m on strike
and 20m on dip of orebody within grade control areas.

Near mine exploration drilling including 8 DD (4056.3m) and 7 RC (2166m) surface holes were completed for the Mineral Resource update of
Conductor 4 and Conductor 5 lodes..

All surface drill collars are surveyed using RTK GPS with downhole surveying, except on shallow RC holes by gyroscopic methods.

All underground drill collars are surveyed using Trimble S6 electronic theodolite. Downhole survey is completed by gyroscopic downhole
survey.

Holes are inclined at varying angles for optimal ore zone intersection.

All core where possible is oriented using a highly accurate Reflex ACT II RD orientation tool with stated accuracy of +/-1% in the range 0 to
88°.
Drill sample
recovery

Diamond core recovery is logged and captured into the database with weighted average core recoveries greater than 98%. Surface RC
samplingisgood with almost no wet samplingin the mine area.

Core is meter marked and orientation to check against the driller’s blocks, ensuring that all core loss is taken into account.

At the RC rig sampling systems are routinely cleaned to minimize the opportunity for contamination and drilling methods are focused on
sample quality.
Samples areroutinelyweighed and capturedinto the centralsecured database.

No sample recoveryissues have impacted onpotential sample bias.

SANDFIRE RESOURCES NL

7

ASX/Media Release

18 July 2013

Logging
Geological logging is completed for all holes and representative across the ore body. The lithology, alteration, and structural characteristics of
core are logged directly to a digital format following standard procedures and using Sandfire DeGrussa geological codes. Data is imported into
the central database after validation in LogChief™.

Logging is both qualitative and quantitative depending on field being logged.

All cores arephotographed.

All DD and RC drill holes are fullylogged.
Sub-sampling
techniques and
sample
preparation

Core orientation is completed where possible and all are marked prior to sampling. Half core samples are produced using Almonte Core Saw.
Samples are weighed and recorded. Some quarter core samples have been used and statistical test work has shown them to be
representative.

RC samples are split using a cone or riffle splitter.

A majorityof RC samples are dry. On the occasion that wet samples are encountered, theyare driedprior to splittingwith a riffle splitter.

Underground and open pit sample preparation at the onsite laboratory involves the original sample being dried at 80° for up to 24 hours and
weighed on submission to laboratory. Sample is then crushed through Jaques crusher to nominal -10mm (DD samples only). Second stage
crushing uses Boyd crusher to nominal -4mm (both RC and DD samples). Sample is split to less than 2kg through linear splitter and excess
retained for for metallurgical work. Sample splits are weighed at a frequency of 1/20 and entered into the job results file. Pulverising is
completed using LM2 mill to 90% passing 75%µm. Two lots of packets are retained for on-site laboratory services whilst the pulverised residue
is shipped to Ultra Trace in Perth for further analysis.

Sample preparation at Ultra Trace involves the sample being dried at 80° for up to 24 hours and weighed. DD samples are then crushed
through a Jaques crusher to nominal -10mm. Second stage crushing uses Boyd crusher to a nominal -4mm. All RC samples are Boyd crushed
to -4mm. Samples are then split to less than 2kg through linear splitter and excess retained. Sample splits are weighed at a frequency of 1/20
and entered into the job. Pulverising is completed using LM2 mill to 90% passing 75%µm. Size at a minimum of 1 per batch. 1.5kg of rock
quartz ispulverised at every10th sample.

Sandfire DeGrussa has protocols that cover auditing of sample preparation at the laboratories and the collection and assessment of data to
ensure accurate steps in producing representative samples for the analytical process. Key performance indices include contamination index of
90% (that is 90% blanks pass); Crush Size index of P95-10mm; Grind Size index of P90-75µm and Check Samples returning at worse 20%
precision at 95% confidence interval and bias of 5% or better.

Duplicate analysis has been completed and identified no issues with sampling representatively.

Test work on half-core versus quarter-core has been completed with results confirming that sampling at either core size is representative of the
in situ material.

The sample size is considered appropriate for the Massive Sulphide mineralization style.

SANDFIRE RESOURCES NL

8

ASX/Media Release

18 July 2013

Quality of assay
data and
laboratory tests

Samples submitted to Ultra Trace in Perth are assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and MAD Hotbox 0.15g charge methods
with ICPOES or ICPMS. The samples are digested and refluxed with a mixture of acids including Hydrofluoric, Nitric, Hydrochloric and
Perchloric acids and conducted for multi elements including Cu, Pb, Zn, Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn, Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V,
Sn, W and Ba. The MAD Hotbox method is an extended digest method that approaches a total digest for many elements however some
refractory minerals are not completely attacked. The elements S, Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti, K, Na, V are determined by ICPOES,
and Ag, Pb, As, Sb, Bi, Cd, Se, Te, Mo, Re, Zr, Ba, Sn, W are determined by ICPMS. Samples are analysed for Au, Pd and Pt by firing a 40g
of sample. Lower sample weights are employed where samples have very high S contents. This is a classical FA process and results in total
separation of Au, Pt and Pd in the samples

Samples submitted to the onsite laboratory have 0.4g of sample plus 9.0g flux combined and fused into a glass bead. XRF is used to analyse
for a suite of elements (including Cu, Fe, SiO2, Al, Ca, MgO, P, Ti, Mn, Co, Ni, Zn, As, and Pb). Pulps are dispatched to Ultra Trace in Perth
for ICPOES or ICPMS for extended elements (including Cu, Fe, As, Pb, S, Zn, Fe, Ag, Sb, Bi, Cd, Cl, F, and Hg). Au, Pt, and Pd analysed by
FA/ASS on a 40gassaycharge(assaycharge is variable dependingon Sulphur content).

Handheld XRF units are used as grade control tools to delineate ore boundaries and grades in the field and for exploration for alteration
minerals. These units are fit for thispurpose. Handheld XRF results are not used in the Mineral Resource estimation.

Sandfire DeGrussa QAQC protocol is considered industry standard with standard reference material (SRM) submitted on regular basis with
routine samples.

SRMs and blanks are inserted at a minimum of 5% frequency rate. A minimum of 2% of assays are routinely re-submitted as Check Assays
and Check Samples through blind submittals to external and primary laboratories respectively. Adhoc umpire checks are done.

QAQC data returned is automatically checked against set pass/fail limits within SQL database and are either passed or failed on import. On
import a first pass automatic QAQC report is generated and sent to QAQC Geologists for recommended action.

QAQC data analysis has been completed for all data and demonstrates sufficient accuracy and precision for use in Mineral Resource
estimation.
Verification of
sampling and
assaying

Significant intersections have been verified byalternative company personnel.

There are no twinned holes drilled for the DeGrussa Mineral Resource.

Primary data are captured on field tough book laptops using Logchief™ Software. The software has validation routines and data is then
imported into a secure central database.

Theprimarydata is always kept and is never replaced byadjusted or interpreted data.
Location of data
points

Sandfire DeGrussa Survey team undertakes survey works under the guidelines of best industry practice.

All surface drill collars are accurately surveyed using RTK GPS system within +/-50mm of accuracy (X, Y, Z) with no coordinate transformation
applied to the picked up data.

There is a GPS base station on site that has been located by a static GPS survey from two government standard survey marks (SSM)
recommended by Landgate. Downhole survey completed by gyroscopic downhole methods at regular intervals.

Underground drilling collar surveys are carried out using Trimble S6 electronic theodolite and wall station survey control. Re-traverse is carried
out every100 vertical meters within main decline. Downhole surveys are completed by gyroscopic downhole methods at regular intervals.

MGA94 Zone 50grid coordinate system is used.

A 1mground resolution DTM with an accuracyof 0.1m was collected byDigital MappingAustralia usingLiDAR and a vertical medium format

SANDFIRE RESOURCES NL

9

ASX/Media Release

18 July 2013

digital camera (Hasselblad). The LiDAR DTM and aerial imagery were used to produce a 0.1m resolution orthophoto that has been used for
subsequentplanning purposes.
Data spacing
and distribution

No Exploration Results included in this release.

Data spacing and distribution are sufficient to establish the degree of geological and grade continuity appropriate for JORC 2012 classifications
applied.

Samples have been composited to optimal densityweighted 1m lengthsprior togeostatistical analysis and Mineral Resource estimation.
Orientation of
data in relation
to geological
structure

The majorityof the drillholes are orientated to achieve intersection angles as close toperpendicular to the mineralisation aspracticable.

No significant sampling bias occurs in the data due to the orientation of drilling with regards to mineralised bodies.
Sample security
All samples are prepared onsite under the supervision of Sandfire Geological staff.

Samples are transported to the Perth Ultra Trace laboratory by Toll IPEC or Nexus transport companies in sealed bulka bags.

The onsite laboratory receipts received samples against the sample dispatch documents and issues a reconciliation report for every sample
batch.
Audits or
reviews

The sampling techniques and data collection processes are of industry standard and have been subjected to multiple internal and external
reviews. Most recently Cube Consulting Pty completed a review during 17th - 19th December 2012 and found procedures to be consistent with
industrystandard and appropriate with minor recommendations for enhancement aspart of continuous improvement.

Section 2: Not applicable

Section 3: Estimation and Reporting of Mineral Resources

Criteria Commentary
Database
integrity

Sandfire employs SQL as the central data storage system using Datashed software front end. User access to the database is regulated by
specific user permissions. Only the Database Manager can overwrite data.

Existing protocols maximise data functionality and quality whilst minimising the likelihood of error introduction at primary data collection points
and subsequent database upload, storage and retrieval points.

Data templates with lookup tables and fixed formatting are used for collecting primary data on field Toughbook laptops. The software has
validation routines and data is subsequently import it into a secure central database.

An IT contracting company is responsible for the daily Server backups of both the source file data on the file server and the SQL Server
databases. The selected SQL databases are backed up to disk with “Backup Exec” each day and then transferred to tape for long term
storage. This allows for a full recoveryin the event of disaster.

The SQL server database is configured for optimal validation through constraints, library tables, triggers and stored procedures. Data that
fails these rules on import is rejected or quarantined until it is corrected.

Database is centrally managed by a Database Manager who is responsible for all aspects of data entry, validation, development, quality
control and specialistqueries. There is a standard suite of vigorous validation checks for all data.

SANDFIRE RESOURCES NL

10

ASX/Media Release

18 July 2013

Site visits
Competent Person for this update is a full time employee of Sandfire and undertakes regular site visits ensuring industry standards of the
Mineral Resource estimationprocess from samplingthrough to final block model.

Regular site visits were undertaken during this update.
Geological
interpretation

Interpretation is based on geological knowledge acquired through data acquisition from the open pit and underground workings, including
detailed geological core and chip logging, assay data, underground development face mapping of orebody contacts and in-pit mapping. This
information increases confidence in the interpretation of the deposit.

Interpretations have been completed using all available geological logging data from diamond core and reverse circulation drilling.

Interpreted fault planes have been used to constrain the wireframes where applicable.

All development drives are mapped and surveyed and interpretation adjusted as per ore contacts mapped.

Wireframes were constructed using cross sectional interpretations based on logged massive sulphides in combination with Cu, Fe and S
analyses.

The geological interpretation of minerlised boundaries are considered robust and alternative interpretations do not have the potential to
impact significantly on the Mineral Resources. Ongoing site and coporate peer reviews, and external reviews, ensure that the geological
interpretation is robust.

Interpretation has been based on logged massive sulphide in combination with Cu, Fe and S assays and adjusted to mapping in underground
development drives. These wireframes models are used as hard boundaries during the Mineral Resource estimation. Wireframes are also
terminated at known faults.

The primary sulphide mineralisation consists of very continuous massive sulphide to semi-massive sulphide. Discrete lenses of mineralization
external to the massive sulphide occasionally occur within Chlorite Alteration zones which may contain thin lenses of massive sulphides.
Gold is associated with the chalcopyrite rich phases and occurs as a high silver electrum.

Orebodies have either pinched out or are truncated by faults.

Conductor 1, Conductor 4 and Conductor 5 were once a continuous unit but subsequentlyfragmented bythe Shiraz and Merlot faults.
Dimensions
All known DeGrussa deposit mineralisation extends from 733500mE to 734785mE, 7172965mN to 7173590mN and 650m below surface.

The DeGrussa sulphide lode generally strikes towards NE with a strike length of approximately 210m, dipping very steeply towards the south
with a SSE subtle plunge and having a vertical extent of about 200m.

The Conductor 1 lode lies north of DeGrussa and generally strikes NE dipping generally at 70° to the SW. It has a strike length of about
400m with a vertical extent of 370m plunging to SE at about 15°.

Conductor 4 lenses lie to the east of DeGrussa and Conductor1 lodes and are stratigraphically deeper. Strike length is up to 510m with dips
varying between 35°- 45° to the SE and a vertical extent of 3500m

Conductor 5 lenses are east of Conductor 4 and have strike length up to 280m meter strike length dipping at about 45° to the south-
southwest, and a vertical extent of 370m.
Estimation and
modelling
techniques

Block estimation has been completed within Datamine™ Studio 3 Resource Modelling software. Three dimensional mineralisation wireframes
were completed within Surpac™ and Micromine™ software and imported into Datamine™. These wireframes are used as hard boundaries
for the interpolation.

Ordinary Kriging using a local dynamic anisotropy search is used for block grade estimates using uniquely coded 1m composite data for
respective lodes.

SANDFIRE RESOURCES NL

11

ASX/Media Release

18 July 2013

  • All block estimates are based on interpolation into parent blocks. Parent block estimates are then assigned to sub-blocks. Mineral Resource estimation does not include any form of dilution.

  • Block model extends from 733,250mE to 735,250mE, 7,172,850mN to 7,173,750mN and vertical from1, 700mRL to 2,800mRL. Elements estimated include Cu, Au, Ag, Fe, S, Pb, and Zn.

  • Thorough univariate statistical analysis of density weighted, 1m, mineralogy flagged, downhole composites has been completed for all elements and for all lodes and top-cuts established where applicable.


All block estimates are based on interpolation into parent blocks. Parent block estimates are then assigned to sub-blocks. Mineral Resource
estimation does not include any form of dilution.

Block model extends from 733,250mE to 735,250mE, 7,172,850mN to 7,173,750mN and vertical from1, 700mRL to 2,800mRL. Elements
estimated include Cu, Au, Ag, Fe, S, Pb, and Zn.

Thorough univariate statistical analysis of density weighted, 1m, mineralogy flagged, downhole composites has been completed for all
elements and for all lodes and top-cuts established where applicable.

1m composites are extracted with minimum passing of 70% and best fit such that no residuals are created.

Variogram modelling completed within Snowden Supervisor™ software and used to define the characterization of the spatial continuity of all
elements within all lodes and parameters used for the interpolation process. Variogram model are cross-validated to ensure parameters are
accurate.

Quantitative kriging neighborhood analysis (QKNA) using goodness of fit statistics to optimize estimation parameters has been undertaken.
Parameters optimised include block size, searchparameters, number of samples(minimum and maximum)and block descritization.

Ordinary krigged Mineral Resource estimates are checked against an alternate inverse distance weighting estimates and also reconciled with
previous estimates.

No assumptions were made regardingrecoveryof by-products duringthe Mineral Resource estimates.

Estimates includes deleterious or penalty elements Pb, Bi, Zn, As, MgO as well as Magnetic Susceptibility and Pyrite: Pyrrhotite ratio for
metallurgical modelling.

QKNA indicates parent block sizes of X (5m) by Y (5m) by Z (5m) to be suitable for grade control (GC) areas where drillhole ore intercept
spacing varies from 0.2m to 45m averaging 6m. Within Resource Definition areas parent block sizes of X (10m) by Y (10m) by Z (10m) were
found to be adequate for drillhole intercept spacing varying from 8m to 90m averaging at 30m. Parent blocks were sub-blocked to X (0.5m)
by Y (0.5m) by Z (0.5m) ensuring high resolution at ore boundaries when filling wireframes with blocks taking into consideration orebody
geometry.

Directional ranges have been determined from variogram modelling and are used to constrain the search distances used in block
interpolation, incorporating geologists’ interpretation of ore geometry and continuity. Estimation search strategies implemented have sought
to ensure robust estimates while minimising conditional bias. Three search estimation runs are used with initial short-search runs extending
the sample influence in later runs.

Grade restriction applied during interpolation is either as a capping or restricted search or combination of both. Restricted searching during
estimation is applied to restrict the influence of extremegrades from smearingdistant blocks byusinga tighter search ellipsoid.

No selective miningunits were assumed in this estimate

Within the massive sulphides there is a good and consistent correlation between Cu, Fe, S and bulk density which has been analysed
separately for all lodes using multiple regression to fit the density and Cu, Fe, S relationship. The regressed formula is then applied to block
model estimated Cu, Fe and S to assign the estimated block bulk densityvalue.

The geological interpretation wireframes correlate with massive sulphide minerlisation boundaries. The block model has been assigned a
unique mineralisation zone code that corresponds with the geological domain as defined by wireframes. Geological interpretations are used
as hard boundaries duringinterpolation where blocks are estimated onlywith composites havingthe correspondingzone code.

Statistical analysis indicated that outlier management was crucial toprevent severe highgrade smearingthat could result inpotential

SANDFIRE RESOURCES NL

12

ASX/Media Release

18 July 2013

overestimation for some elements. The approach used has been capping or restricted search or the combination of both (Top-cuts and
restricted search were defined followingthorough examinations of histograms,probabilitycurves and the spatial locations of the outliers).

Standard model validation has been completed using visual and numerical methods and formal peer review sessions by key geology staff.

Mineral Resource Model has been validated visually against the input composite/raw drillhole data with sufficient spot checks carried out on a
number of block estimates on sections and plans.

Easting, northing and elevation swath plots have been generated to check input composited assay means for block estimates within swath
windows. Ordinary krigged estimates have also been checked against an alternate inverse distance weighting estimates within the same
swath windows.

A comparison of block volume weighted mean versus the drillhole cell de-clustered mean grade of the composited data was undertaken.

Efficiency models using block Kriging Efficiencies (KE) and Slope of Regression (ZZ) were used to quantitatively measure estimation quality
to ensure the desired level of quality of estimation.

No meaningful reconciliation data is available at this time.
Moisture
Tonnages are estimated on a dry basis.
Cut-off
parameters

Based upon data review a notional lower cut-offs of 0.3% Cu for Oxides Copper and 1.0% Cu for Massive Sulphides appear to be a natural
grade boundary between ore and trace assay values.
Mining factors or
assumptions

The upper portion of the DeGrussa deposit was mined by open pit completed in two stages. The approximate dimensions of the open pit at
completion were 600m length, 500m wide and 140m deep. Mining comprised of conventional backhoe excavator methods with ore being
mined in 5m benches on 2.5m flitches.

The underground mining method is long-hole open stoping (both transverse and longitudinal) with minor areas of jumbo cut and fill or uphole
benching in some of the narrower areas. The primary method of backfill will be paste fill. The sequence will aim for 100% extraction of the
orebody.

Detailed mineplans are inplace and miningis occurring
Metallurgical
factors or
assumptions

Sulphide mineralisation consists of massive sulphide, semi-massive sulphide and minor stringer zone mineralisation. Distinct iron sulphide
mineralogy (and quantity) tends to define metallurgical response. Properties within the different ore types are relatively consistent across the
ore bodies and appear to follow similar comminution parameters and flotation responses. The sulphide minerals are amenable to recovery by
flotation. The dominant valuable component is copper, which is contained predominantly in chalcopyrite with minor assemblages of
chalcocite mineralisation.

Assumptions are based on DFS metallurgical test work and ongoing monitoring of the DeGrussa processing plant ramp up.

Target recoveryis 90% of Cu.
Environmental
factors or
assumptions

The DeGrussa project is constructed with a fully lined Tailings Storage Facility and all Sulphide material mined from the operation will be
processed in the concentrator, eliminating any PAF on the waste dumps.
Bulk density
Regular and systematic specific gravity measurements are taken on representative number of diamond drill core according to a formal
protocol. This data is included in the database. Within the massive sulphides bulk density varies from 2.8 g/cm3 to 4.9 g/cm3, with an
average densityreadingof 3.7g/cm3. Average densityof 2.8 is assigned to waste blocks.

SANDFIRE RESOURCES NL

13

ASX/Media Release

18 July 2013


In areas of the deposit where there are limited Archimedean measurements regressed formula is based on downhole gamma gamma data
(Conductor 4 and Conductor 5). The gamma data has been appropriately calibrated with Archimedean data. Archimedean data will replace
downholegamma when more measurements are taken from future drilling.

This is not a bulkproject.

Densities vary within the massive sulphides minerlisation and have consistent correlation with Cu, Fe and S. Regressed formula of density is
used to calculate densities into blocks based on block estimated Cu, Fe and S. Within the semi-massive sulphides and waste zones average
densities have been assigned.
Classification
Mineral Resources have been classified into Measured, Indicated and Inferred categories based on drill hole intercept spacing, geological
confidence, grade continuity and estimation quality. A combination of these factors guides the manual digitising of strings on drill sections to
construct envelopes that are used to control the Mineral Resource categorization. This process allows review of the geological
control/confidence on the deposit.

Blocks classified as Measured are blocks are within areas having drill hole intercept spacing less than 30m by 20m and estimated with a
minimum of 8 samples with no more than 4 samples from any single drillhole.

Indicated Mineral Resources are blocks within areas with drill hole intercept spacing of less than 90m by 60m, estimated with minimum 6
samples with no more than 4 samples from a single drillhole.

Mineral Resource classification has appropriately taken into account data spacing, distribution, reliability, quality and quantity. Confidence in
predicting grade continuity,geological confidence and estimationqualityhave also been taken into account.

Thegeological model and Mineral Resource estimation reflect the Competent Person’s view of the deposit.
Audits or reviews
This Mineral Resource has not been audited externally.

The process for geological modelling, estimation and reporting of Mineral Resources is industry standard and has been subject to an
independent external review. Cube Consulting Pty undertook a review during 17th - 19th December 2012 and found the process to be
industrystandard with minor recommendations aspart of continuous improvement.
Discussion of
relative accuracy/
confidence

Mineral Resources has been reported in accordance with the guidelines of the 2012 edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves and reflects the relative accuracyof the Mineral Resources estimates.

The statements relates toglobal estimates of tonnes andgrade.

Existing operating reports of achieved production verse estimate is positive. Further data will be monitored as the mine ramps up to full scale
operations.

Section 4: Estimation and Reporting of Ore Reserves

Criteria Commentary
Mineral
Resource
estimate for
conversion to
Ore Reserves

The Underground Ore Reserve estimate is based on the Mineral Resource estimate carried out by Sandfire Resource NL in March 2013.

The Mineral Resources are reported inclusive of Ore Reserve.

SANDFIRE RESOURCES NL

14

ASX/Media Release

18 July 2013

Site visits
A site visit was conducted by the competent person.

The site visit included underground inspections as well visual inspection of core.
Study status
Definitive Feasibility Study.
Cut-off
parameters
Three cut-off grades have been calculated based on current and forecasted costs and modifying factors, forecast for a period of three years.
These cut-off values are;
o
Fully Costed - cut-off includes all operating costs associated with the extraction and processing of ore material,
o
Incremental - cut-off grade applies to all material that does not require any additional development, and
o
Marginal – cut-off applies to material that will be mined in the process of gaining access to economic material.
Mining factors
or assumptions

Ore Reserves have been calculated by generating detailed mining shapes for each stoping block as well as development. All mining dilution
has been designed into the Reserve shapes and interrogated. Mining recovery factors have been applied post geological interrogation to
generate the final diluted and recovered Ore Reserve.

All mining methods are currently being applied on site and are in line with the parameters set out in the Feasibility Study.

Stope sizes have been created to suit the Mineral Resource. As the Mineral Resource changes in width and dip the mining method changes
from large multi lift stopes to echelon retreat single access stopes.

Mining dilution has been applied to each mining shape with 0.5 m of over break applied to the footwall and hangingwall. When mining shapes
come into contact with geotechnically complicated zones additional dilution is designed to ensure the stability of the mining shapes is
sustained.

A mining recovery of 95% has been applied to all stopes. This mining recovery is applied to allow for any ore loss due to mining related issues
such as but not limited to; under break due to poor drilling and blasting techniques, stope bridging or freezing or material being left in stopes
due inaccessibility.

Minimum mining width for stoping is 4m.

All Inferred Mineral Resources included in the Ore Reserve shapes have had all grade stripped and are hence assumed to be waste.

Infrastructure for the miningmethod is currentlyinstalled or beinginstalled and has been accounted for in the costing.
Metallurgical
factors or
assumptions

The enrichment of the sulphide ore is by traditional crushing, grinding, flotation and filtration to produce a high grade high purity concentrate
suitable for further pyrometallurgical enrichment. ROM ore is crushed in a jaw crusher and stored in a crushed ore bin. Feeders underneath
the crushed ore bin reclaim ore and introduce it into a SAG and Ball mill circuit (SAB) whereby the ore is reduced to a size suitable for
flotation. The flotation circuit consists of roughing, scavenging, concentrate regrind, cleaning, scavenging cleaning and recleaning stages to
increase the grade of the concentrate to ~25% copper. The concentrate is then thickened and filtered to nominal moisture of ~10%.

Assumptions are based on DFS metallurgical test work and ongoing monitoring of the DeGrussa processing plant ramp up.

Target recoveryis 90% of Cu.
Environmental
DeGrussa is currently compliant with all environmental regulatory requirements. To the best of the Competent Person’s knowledge all sites for
waste rock are compliant and their design and construction have complied with all environmental regulations,permits and recommendations.
Infrastructure
All infrastructures required for the processing and mining of the Ore Reserve is in place and operating.
Costs
All costs used in the generation of the Ore Reserve have been based on current modelling of the life of mine plan.

A revenue reduction factor of 19.6% has been applied which included all transport, smelting, refining and royalty payments.

Exchange rates have been sourced from Sandfire Resources NL’s current financial modellingdata.

SANDFIRE RESOURCES NL

15

ASX/Media Release

18 July 2013

Revenue
factors

Revenue has been based on a copper price of USD 7823 and a USD to AUD exchange rate of 0.94. This information is seen as a
representative of current economic forecast for the period.
Market
assessment

Sandfire is a low cost copper concentrate producer.

Selling into global market for custom concentrates.

Pricing is fundamentally on value of contained metals the main metal being copper with gold and small silver credits.

The price of copper being set based on the LME which is a mature, well established and publically traded exchange.

Sandfire produces a clean concentrate, low in deleterious elements.

Sandfire's DeGrussa copper concentrate has a grade similar to the average grade most non-Chinese smelters feed at and notably above the
common feed grade for Chinese smelters.

Sandfire relies upon independent expert publications (CRU, Wood Mac, Metal Bulletin) and other sources (bank reports, trader reports,
conferences, other trade publications) in forming a view about future demand and supply and the likely effects of this on both metal prices and
concentrate prices.

the current market for copper is defined by weak global demand and rising mine supply leading to an expected cooper surplus at least thru to
2016, however the long run marginal cost of new mine capacity and production is likely to underpin the market at around US$3/lb

"Clean" copper concentrates with copper grades between 23 and 28% are expected to continue to be in demand and Sandfire forsees
continued demand for its concentrate.

At the last tender Chinese smelters directly or indirectly via traders offered competitively for SFR concentrates.

There is still significant interest in spot and long term sales opportunities for Sandfire concentrates.

Chinese smelters are still at low levels of utilisation and more smelter capacity is being built.

The break even TC/RC for smelters varies somewhere between 60/6 and 80/8, therefore strong buying interest is expected should the spot
TC/RCget above these levels effectivelycappingTC/RC costs at around the 90/9 level.
Economic
No NPV’s have been generated as part of the Ore Reserve assessment, however all material contained within the Reserve is deemed to
generatepositive cash flow based on the economic inputparameters.
Social
To the best of the Competent Persons knowledge all agreements are in place and are current with all key stakeholders including traditional
owner claiments.
Other
DeGrussa is currently compliant with all legal and regulatory requirements. To the best of the Competent Person’s knowledge, there is no
reason to assume any governmentpermits and licenses or statutoryapprovals will not begranted.
Classification
The Ore Reserve has been broken into Proven and Probable categories.

Only Measured material has been converted to a Proven Ore Reserve.

Indicated material has been converted to a Probable Ore Reserve.

The Competent Person believes the classification of the Underground Mineral Resource and hence the conversion to Ore Reserve is
appropriate.
Audits or
reviews

The Ore Reserve has been peer reviewed internally and is in line with current industry standards.
Discussion of
relative

The Ore Reserve has been completed to a DFS standard; hence confidence in the resulting figures is high. Mining Operations have

SANDFIRE RESOURCES NL

16

ASX/Media Release

18 July 2013

accuracy/ demonstrated the assumptions made are correct. confidence  All modifying factors have been applied to designed mining shapes on a global scale as current local data reflects the global assumptions.

Competent Person’s Statement – Mineral Resources and Open Pit Ore Reserves

The information in this report that relates to Mineral Resources and Open Pit Ore Reserves is based on information compiled by Mr. Ekow Taylor who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Taylor is a permanent employee of Sandfire Resources and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Taylor consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Competent Person’s Statement – Underground Ore Reserves

The information in this report that relates to Underground Ore Resources is based on information compiled by Mr Shane McLeay who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr. McLeay is a permanent employee of Entech Pty Ltd and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McLeay consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward-Looking Statements

Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forwardlooking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.

Exploration and Resource Targets

Any discussion in relation to the potential quantity and grade of Exploration Targets is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant Mineral Resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.

SANDFIRE RESOURCES NL

17