ASX/Media Release 30 August 2012
DEGRUSSA PROJECT PICTORIAL UPDATE
Sandfire Resources NL is pleased to provide a pictorial update on the ongoing progress of construction, mining and production at DeGrussa.
-
Mining of open pit Stages 1 and 2 is progressing on schedule with a total of 10.2 million bank cubic metres (bcm) of material mined to date, including:
-
60,000 tonnes of Direct Shipping Ore (DSO) chalcocite at a grade of 30% Cu;
-
2,000,000 tonnes of oxide copper material at a grade of 1.1% Cu.
-
Underground mine development is progressing on schedule with the Evans Decline currently advanced to 1,720 metres from the portal and 270m below surface. A total of 6,200 metres of development has been completed to date and:
-
60,000t of massive sulphide ore at a grade of 4.2% Cu has been mined from the underground mine and is stockpiled on the ROM pad ready for processing.
-
Construction of the 1.5M tonne per annum Concentrator continues on schedule with first ore to be processed in September 2012. Commissioning of selected areas of the Concentrator continues.
62 tonne chalcocite boulder from open pit, averaging 50% Cu (XRF), 7 August 2012 Sandfire personnel L-R: Craig Dawson (GM DeGrussa), John Evans (Technical Director), Martin Reed (Project Manager), Karl Simich (Managing Director), Glen Church (Open Pit Engineer)
ASX / Media Release
30 August 2012
==> picture [510 x 215] intentionally omitted <==
----- Start of picture text -----
10.2Mbcm of material mined from DeGrussa Open Pit
----- End of picture text -----
==> picture [510 x 145] intentionally omitted <==
----- Start of picture text -----
Open Pit, Stage 1
7.4Mbcm
Open Pit, Stage 2
2.8Mbcm
----- End of picture text -----
==> picture [471 x 296] intentionally omitted <==
----- Start of picture text -----
Open Pit Stage 2
----- End of picture text -----
2
ASX / Media Release
30 August 2012
Crushing of direct shipping ore
==> picture [531 x 177] intentionally omitted <==
New half height sea containers being loaded with Direct Shipping Ore at DeGrussa
3
ASX / Media Release
30 August 2012
==> picture [511 x 312] intentionally omitted <==
Paste Plant – tank and equipment installation nearing completion
4
ASX / Media Release
30 August 2012
Process Plant construction
==> picture [176 x 24] intentionally omitted <==
----- Start of picture text -----
Crusher - commissioned
----- End of picture text -----
==> picture [519 x 276] intentionally omitted <==
Coarse ore bin and crusher (background)
==> picture [511 x 319] intentionally omitted <==
5
ASX / Media Release
30 August 2012
Flotation Circuit and Process Water Tank – commissioning under way
==> picture [511 x 313] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
----- Start of picture text -----
SAG mill feed conveyor and scats recycle conveyors
----- End of picture text -----
==> picture [510 x 365] intentionally omitted <==
6
ASX / Media Release
30 August 2012
==> picture [261 x 24] intentionally omitted <==
----- Start of picture text -----
Grinding and Flotation areas – view from ROM pad
----- End of picture text -----
==> picture [510 x 195] intentionally omitted <==
Concentrate shed – nearing completion
==> picture [515 x 236] intentionally omitted <==
==> picture [554 x 244] intentionally omitted <==
7
ASX / Media Release
30 August 2012
==> picture [227 x 24] intentionally omitted <==
----- Start of picture text -----
Regrind mill, cyclones and filter building
----- End of picture text -----
==> picture [498 x 346] intentionally omitted <==
Completing installation of 2MW Generators
==> picture [497 x 331] intentionally omitted <==
8
ASX / Media Release
30 August 2012
DeGrussa Mine (open pit) mineral types
==> picture [360 x 269] intentionally omitted <==
----- Start of picture text -----
Malachite encrusted with calcite
----- End of picture text -----
==> picture [361 x 284] intentionally omitted <==
----- Start of picture text -----
Calcite and crystalline cuprite on goethite
and native copper host
----- End of picture text -----
==> picture [357 x 114] intentionally omitted <==
----- Start of picture text -----
Chrysocolla and malachite on goethite host
----- End of picture text -----
Calcite encrusted chrysocolla
Calcite encrusted chrysocolla growing into cavity
Crystalline cuprite clusters on calcite encrusted goethitic host
Crustiform calcite, cuprite and malachite on goethitic host
9
ASX / Media Release
30 August 2012
ENDS
For further information contact: Sandfire Resources NL Karl Simich – Managing Director/CEO Office: +61 8 6430 3800
Read Corporate Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)
==> picture [443 x 282] intentionally omitted <==
– - Figure 1 DeGrussa Copper Gold Project location
==> picture [207 x 255] intentionally omitted <==
Forward-Looking Statements
Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire’s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.