ROX RESOURCES LIMITED Investor Presentation 2020

Apr 14, 2020

65741_rns_2020-04-14_56557c26-f073-4694-9071-471b9d6778b2.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

ASX:RXL
----- End of picture text -----

Investor Presentation Rox Resources Limited April 2020

Alex Passmore – Managing Director

1

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Disclaimers
----- End of picture text -----

Forward-Looking Statements

This presentation has been prepared by Rox Resources Limited. This document contains background information about Rox Resources Limited current at the date of this presentation. The presentation is in summary form and does not purport be all inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.

This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.

This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction.

Competent Person Statements

Exploration Results

The information in this report that relates to previous Exploration Results, was either prepared and first disclosed under the JORC Code 2004 or under the JORC Code 2012 and has been properly and extensively cross-referenced in the text to the date of original announcement to ASX. In the case of the 2004 JORC Code Exploration Results and Mineral Resources, they have not been updated to comply with the JORC Code 2012

Resource Statements

The information in this report that relates to gold Mineral Resources for the Mt Fisher project was reported to the ASX on 11 July 2018 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 11 July 2018, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 11 July 2018 continue to apply and have not materially changed.

This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.

To the fullest extent permitted by law, Rox Resources Limited, its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.

The information in this report that relates to gold Mineral Resources for the Youanmi Gold project was reported to the ASX on 17 April 2019 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 17 April 2019, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 17 April 2019 continue to apply and have not materially changed.

The information in this report that relates to nickel Mineral Resources for the Fisher East project was reported to the ASX on 5 February 2016 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 5 February 2016, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 5 February 2016 continue to apply and have not materially changed.

This presentation may include forward-looking statements. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Rox Resources Limited. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Rox Resources Limited does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward looking statement is based.

The information in this report that relates to nickel Mineral Resources for the Collurabbie project was reported to the ASX on 18 August 2017 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 18 August 2017, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 18 August 2017 continue to apply and have not materially changed.

2

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Disclaimers
----- End of picture text -----

Cautionary Statement – Scoping Study Parameters

The updated Scoping Study released to the ASX on the 10[th] of October 2018 is based on low-level technical and economic assessments, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the updated Scoping Study will be realised.

The updated Scoping Study and the production targets derived from the updated Scoping Study are preliminary in nature as the conclusions are drawn on Inferred Mineral Resources (12%) and Indicated Mineral Resources (88%).

The Indicated Mineral Resources and Inferred Mineral Resources underpinning the conclusions from the updated Scoping Study, including the production targets, have been prepared by a competent person in accordance with the requirements of JORC Code 2012 Edition. This announcement does not include an estimate of Ore Reserves as the supporting modifying factors have not been determined to a sufficient level of confidence.

Some (12%) of the Mineral Resources used in the study are Inferred Mineral Resources. When subset to the Resources in the Mining Plan there are only 4.2% Inferred Resources. There is a lower level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the predictions of expected costs or production rates contained herein, and the production targets themselves, will be realised.

Unless otherwise stated all financial figures are in Australian dollars, are undiscounted and are not subject to inflation or escalation factors. All years are calendar years.

At this stage no toll milling agreement has been negotiated and there is no certainty that an acceptable toll milling agreement can be negotiated.

The forward nickel price and exchange rate assumptions in this report are based on a careful consideration of market forecasts and consensus by a number of third parties. There is no guarantee that this nickel price or exchange rate will be realised.

The Company has concluded that there is a reasonable basis for providing the forward-looking statements included in this report and detailed reasons for that conclusion are contained herein. The Company cautions though that there is no certainty that the forecast financial information or production targets will be realised. Material assumptions underpinning the production target and forecast financial information derived from the production targets are set out in this announcement.

The Study referred to in this announcement is a technical and economic investigation of the viability of the Fisher East Project. It is based on low accuracy technical and economic assessments, (+/- 35% accuracy) and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Study will be realised. The Production Target referred to in this presentation is based on JORC Resources which are approximately 96% Indicated and 4% Inferred. The mine plan has been generated using stope optimisation and averaging of grades over multiple year periods prior to the application of mining dilution. To achieve the outcomes indicated in this study initial funding in the order of A$48 to A$87 million is likely to be required. Investors should note that there is no certainty that Rox will be able to raise funding when needed. It is also possible funding may only be available on terms that may be dilutive to or otherwise effect the value of Rox’s shares.

3

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Investment Highlights
----- End of picture text -----

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

Several advanced Gold and Nickel projects in Western Australia

The company’s flagship project is the Youanmi Gold Project located south of Sandstone in Western Australia. The company has one of the largest land holdings in this area with a prospective strike length of 80km of shear zone

12.4Mt @ 2.97 g/t Au for 1.2Moz gold* – including near surface, free milling, resource of 10Mt @ 1.65 g/t au for 533koz

Recent exploration success at the high-grade Grace Prospect

==> picture [9 x 9] intentionally omitted <==

Best intercepts include: 5m @ 125.7g/t Au, 7m @ 54.5 g/t Au, 2m @ 137.7 g/t Au^ Assays Status: 31 holes received; 78 holes outstanding

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

Targeting initial resource mid-2020

==> picture [235 x 176] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

Recent M&A activity in the belt

Youanmi Main Pit and Plant

==> picture [8 x 8] intentionally omitted <==

RMS $208 million scrip + cash takeover of SPX (350koz Au, high-grade resource) highlights that nearby mills require new sources of high-grade ore

==> picture [9 x 9] intentionally omitted <==

Rox also owns the advanced Fisher East nickel project (78kt contained Ni Metal in resource) with scoping study complete.

*Refer ASX Announcement dated 17 April 2019 - See Appendix for full resource details

^ Refer ASX Announcements 19 November 2019 and 2 April 2020

4

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Corporate Information
----- End of picture text -----

About Rox Resources

Rox Resources Limited (ASX:RXL) owns advanced gold and nickel exploration projects in Western Australia, including the Mt Fisher Gold Project, the Fisher East and Collurabbie Nickel Projects. The Company owns the Youanmi Gold Project with Venus Metals Corporation Limited (“VMC”) through a 50% ownership, with the ability to increase ownership in the mine to 70% (via a further $3m payment).

Capital Structure Capital Structure
ASX Code: RXL
Shares on Issue: 1,458M
Share Price: A$0.022
Unlisted Options: 65.8M
Market Capitalisation: $32.1M
Cash & Receivables*
(at 31 March 2019):
$5.75M
Debt: Nil
Top 20: 18%

==> picture [337 x 163] intentionally omitted <==

* A$3.75 million deferred payment from Teck for Reward sale, plus $0.05 million in ASX listed shares and $1.95 million in cash (as at 31 March 2019)

5

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Asset Summary
----- End of picture text -----

Gold Projects

Nickel Projects

==> picture [10 x 11] intentionally omitted <==

Youanmi Gold Project

==> picture [8 x 8] intentionally omitted <==

Located in WA south of Sandstone

==> picture [8 x 8] intentionally omitted <==

  • 4 JVs with Venus Metals Ltd. Mine area JV Rox holds 50%, earning up to 70%. Venus Metals manages regional projects (other 3 JVs) until Rox moves to 70% on the mine area JV.

==> picture [10 x 11] intentionally omitted <==

Fisher East Nickel Project

==> picture [8 x 8] intentionally omitted <==

Individual deposit names: Camelwood, Musket, Cannonball, Sabre

==> picture [8 x 8] intentionally omitted <==

Located in WA, circa 150km east of Wiluna

==> picture [8 x 8] intentionally omitted <==

Eastern Margin of Mt Fisher Greenstone Belt

==> picture [8 x 8] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

  • Confirmed mineral resource (ASX: 17 April 2019) of 12.4Mt @ 2.97 g/t Au for 1.2Moz of gold – including near surface resource of 10Mt @ 1.65 g/t AU for 533koz

  • Mine area JV (OYG JV) has Resources of 1.2 Moz, Existing Infrastructure and CIP plant (requiring refurbishment)

==> picture [10 x 11] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

Resources of 78kt of contained nickel, scoping study completed (2015, internally updated 2017)

Mt Eureka Nickel

JV with Cullen Resources (Rox can earn up to 75%)

==> picture [8 x 8] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

Mt Fisher Gold

==> picture [8 x 8] intentionally omitted <==

Located in WA east of Wiluna

==> picture [8 x 8] intentionally omitted <==

Located adjacent and to the north of Fisher East nickel. Contains part of the strike extension of the basal contact along which Rox’s nickel deposits occur

==> picture [10 x 10] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

Western Margin of Mt Fisher Greenstone Belt

Mt Eureka Gold

==> picture [8 x 8] intentionally omitted <==

Northern Continuation of Eastern Margin of Mt Fisher Greenstone Belt

==> picture [8 x 8] intentionally omitted <==

JV with Cullen Resources (Rox can earn up to 75%) Located adjacent and north of Mt Fisher

==> picture [8 x 8] intentionally omitted <==

Continuation of Western Margin of Mt Fisher Greenstone Belt

6

==> picture [720 x 80] intentionally omitted <==

The Youanmi Gold Project

  • Gold -

7

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

The Youanmi Gold Project
----- End of picture text -----

Ownership 50% 70%
Acquisition Cost $3.0m
($2.8m
cash,
$0.2m scrip)
Additional $3m
Exploration Spend $2m n/a
Timing On OYG Completion
(on or before 30 June
2019)
On or before 30 June
2021

==> picture [10 x 10] intentionally omitted <==

Rox holds an initial 50% interest in the Youanmi Gold Mine Joint Venture (OYG Joint Venture) with the ability to increase to 70% (any time in the next 2 years) The Project includes Indicated and Inferred JORC2012 Gold Resources 12.4Mt @ 2.97g/t Au for 1.19 million ounces*. Including near surface resource of 10Mt @ 1.65 g/t AU for 533koz and deeps resource of 2.4Mt at 8.5g/t Au for 657koz The Youanmi Mining Centre has produced 670,000 ounces at 5.4g/t Au Closure in 1997 when gold price was A$400/oz – A$450/oz. Very limited exploration over past 10 years Strong potential for the resources in and around historic pits to have economic prospects at the current gold price of A$2,650/oz Rox holds interests in a series of regional JVs. It is earning a 50% interest by spending $1m (both parties can elect to contribute or dilute after this).

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

*Refer ASX Announcement dated 17 April 2019 - See Appendix for full resource details

8

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Site Overview
----- End of picture text -----

==> picture [358 x 269] intentionally omitted <==

Weathered Greenstone (lower angle pit slope)

Host to much of the historically mined gold mineralization

Contains refractory portion of resources (arsenopyrite associated gold mineralization)

Weathered Granite (higher angle pit slope)

Historically not a focus for exploration Contains Grace Deposit

Grace Prospect Trend

Series of quartz, sericite hosted gold lodes in granite / shear zone

9

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Infrastructure
----- End of picture text -----

The Youanmi Project includes a developed underground mine (dewatering required) and surface infrastructure including:

==> picture [10 x 10] intentionally omitted <==

CIP process plant designed to treat 600,000tpa of oxide ore (requiring significant refurbishment)

==> picture [10 x 10] intentionally omitted <==

Tailings disposal facility

==> picture [10 x 10] intentionally omitted <==

Mine offices

==> picture [10 x 10] intentionally omitted <==

Core shed and workshop

==> picture [10 x 10] intentionally omitted <==

Access roads and airstrip

==> picture [10 x 10] intentionally omitted <==

Borefield

==> picture [10 x 10] intentionally omitted <==

Process water available from local aquifers

==> picture [10 x 10] intentionally omitted <==

Mine village with various facilities - well equipped for exploration crews.

Drilling Data/Maps/Plans: A huge historical database with enormous opportunity….

==> picture [10 x 10] intentionally omitted <==

==> picture [289 x 146] intentionally omitted <==

==> picture [289 x 154] intentionally omitted <==

10

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Youanmi Regional Setting
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Youanmi Shear Zone is a major state scale feature Intersection of the YSZ, greenstones and cross cutting structures are highly prospective areas. Together the JVs extend the length of tenure to 40km of strike along the Youanmi Shear Zone Strong exploration upside and discovery potential with extensive tenure covering 637km[2] along the Youanmi Greenstone Belt Penny North Deposit (Spectrum Metals) 28km to south

==> picture [210 x 152] intentionally omitted <==

==> picture [231 x 315] intentionally omitted <==

----- Start of picture text -----

Mine Area
Penny West /
Penny North
Gold Deposit
----- End of picture text -----

11

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Exploration Model – Near Mine
----- End of picture text -----

==> picture [10 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Undulations in the granite / mafic contact along the main lode shear zone (NW trending long lived shear) accommodates dilation zones enabling gold mineralising events

Gold mineralisation is found in:

  • Mafic / granite contact pressure shadow (dilational) areas Youanmi Granite (stock work)

==> picture [8 x 8] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

==> picture [8 x 8] intentionally omitted <==

  • Extension fractures away further out from the shear zone in both mafic (i.e. Commonwealth) and granite

  • Rox has undertaken high resolution geophysics delineating the above zones. Not previously available.

Rox’s drilling program (Jan – March 2020):

  • RC drilling key target areas of Grace and Youanmi South (to expand known 550koz resource)

==> picture [8 x 8] intentionally omitted <==

==> picture [307 x 301] intentionally omitted <==

Refer ASX Announcements 19 Nov ’19, 07 Nov ‘19, 24 Sept ’19

12

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

November 2019 - Drilling Encounters
Exceptional Grades (Grace Prospect)
----- End of picture text -----

==> picture [228 x 320] intentionally omitted <==

==> picture [346 x 218] intentionally omitted <==

Visible Gold Encountered in MLRC020

Refer ASX Announcement 19 Nov ’19

13

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

January 2020 - Grace Cross Section
----- End of picture text -----

==> picture [209 x 295] intentionally omitted <==

==> picture [394 x 280] intentionally omitted <==

Refer ASX Announcement dated 20 January 2020

14

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

February 2020 - Grace along strike
----- End of picture text -----

==> picture [204 x 289] intentionally omitted <==

==> picture [323 x 302] intentionally omitted <==

Refer ASX Announcement dated 18 February 2020

15

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

March / April 2020 - Grace Long Section
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

North plunging high grade shoots within west dipping, north striking mineralized envelope Several mineralized shoots present

==> picture [10 x 10] intentionally omitted <==

==> picture [338 x 163] intentionally omitted <==

==> picture [356 x 248] intentionally omitted <==

16

Refer ASX Announcement dated 2 April 2020

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Youanmi South
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Youanmi South prospect lies near the intersection of the Main Lode Shear Zone and the Youanmi Fault

Prospective for various styles of gold mineralisation along strike to the south

Most of the mineralisation encountered has been quartz / shear zone hosted

Deeply weathered mafic host rock south of granite dome Magnetics and Drone Mag have proven to be successful exploration targeting tools

==> picture [472 x 318] intentionally omitted <==

Refer ASX Announcements 19 Nov ’19, 07 Nov ‘19, 24 Sept ’19

17

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Youanmi Deeps
----- End of picture text -----

Cross Section – 4500N through Youanmi Deeps ^

  • Youanmi main shear deposit is significant and open at depth (‘Youanmi deeps’)

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

The Youanmi deeps ore body is partially refractory

==> picture [9 x 9] intentionally omitted <==

  • Rox is investigating the potential for the sale of a gold concentrate from Youanmi deeps ore

  • Transactions such as Blackham / Polymetals offtake agreement indicate the market for gold concentrates has developed over recent times with several potential off takers available to Rox

==> picture [9 x 10] intentionally omitted <==

  • Reduces capital requirement (Bacox/Biox circuit) and operating risk (maintenance)

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

  • Studies have been completed by previous operators looking at re-opening the underground. This was most recently done by Apex Minerals in 2007 when that company was looking at trucking Youanmi deeps ore to Wiluna

==> picture [9 x 9] intentionally omitted <==

The capital to re-open operations at the underground mine was estimated historically at $12m a potentially attractive option given in-situ resources of 658koz at 8.5g/t Au^

Some dewatering infrastructure (large diameter pipelines) already in place

==> picture [9 x 9] intentionally omitted <==

  • *Refer Apex Minerals NL ASX Announcement dated 05 December 2007. See Appendix for full resource details ^ Refer ASX Announcement 19 April 2019

==> picture [231 x 294] intentionally omitted <==

18

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Key Points – Youanmi GP
----- End of picture text -----

Key Strengths

Milestones

==> picture [11 x 11] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

Following the discovery of Grace Prospect the Youanmi Gold Project potentially offers a path to production via a high-grade small starter project followed by a larger longer life milling operation.

Excellent opportunity for Rox to efficiently deploy its capital into a prospective and fertile gold system.

The realization that there are strong zones of gold mineralisation in the Youanmi granite opens up Rox tenure to vast tracks of unexplored ground

March 2020  Drilling out of Grace Prospect (RC)

 Data / Project Evaluation

April 2020 May 2020

 Diamond drilling at grace Prospect (metallurgy and ore characterization)

 Maiden Resource for Grace  Concept / scoping studies  Air core drilling regional targets on Rox tenure

June 2020

19

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Mt Fisher Project
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Rox’s nickel portfolio is centered on high-grade sulfide related nickel deposits. Fisher East was discovered in 2012 by Rox.

Some of the better intersections^ seen at Fisher East include:

==> picture [10 x 10] intentionally omitted <==

MFEC071 – 4m @ 8.4% Ni from 178m, incl 2m @ 14.7%

==> picture [10 x 10] intentionally omitted <==

MFEC072 – 5m @ 8.4% Ni from 205m, incl 3m @ 12.1%

Rox has tenure over an 80km long strike length prospective horizon.

Resources of 78kt of contained nickel* at the project have been estimated on three of the deposits over a strike length of this horizon of 3km.

==> picture [324 x 310] intentionally omitted <==

^ Refer ASX Announcement 30 July 2014

*Refer ASX Announcement 05 February 2016.

20

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Geological Framework
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Mt Fisher is located within an Archean greenstone belt to the east of the Norseman-Wiluna and Yandal belts in Western Australia. These are host to some of the largest nickel and gold deposits globally.

Mt Fisher is a similar age and metamorphic grade and has the requisite rock types to host similar deposits.

Nickel mineralization is predominantly found on the eastern side of the belt where ultramafic komatiite flows are preserved. The nickel deposits are at the ‘basal contact’ position of the flows. Remobilized nickel sulphide mineralisation is also evident in certain zones. This type of high-grade material is a key focus for Rox’s exploration team.

The western side of the belt is highly prospective for gold. Lithology, structure and weathering are primary controls. Rox is following up a 10km-long, +1g/t Au anomaly at Mt Fisher.

Conceptual Model - Mt Fisher Greenstone Belt

==> picture [304 x 198] intentionally omitted <==

21

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Fisher East Resources
----- End of picture text -----

==> picture [720 x 254] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

Total Mineral Resource of 4.2 Mt @ 1.9% Ni , for 78,000 tonnes Ni metal* Potential to increase current resources and to identify new resources

* See Appendix for Mineral Resource details

22

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Fisher East Nickel Conceptual Plan
----- End of picture text -----

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Updated Scoping Study1 based on new Conceptual Mining
Study by CSA – stope optimisations, detailed mine
schedule – optimum mining rate was 500 ktpa
Other parameters same as previous Scoping Study in
20152
Two possible cases examined:
Build a concentrator on site (Concentrator Case)
Truck ore to nearby plant (Toll Mill Case)
Resources in Mining Plan of 2.9Mt @ 1.7% Ni are ~96%
Concentrator Toll Mill
Mining Inventory 2.9Mt @ 1.7% Ni 2.9Mt @ 1.7% Ni
Mine Life 6 years 6 years
Annual Production 7,300t Ni in conc 7,300t Ni in conc
Pre-Production Capital A$87m A$48m
Operating Cash Costs US$3.14/lb US$3.42/lb
All In Sustaining Costs US$3.57/lb US$3.83/lb
Net Cash Flow A$146.5m A$102.3m
NPV A$79.2 A$58.2
IRR 44% 55%

Resources in Mining Plan of 2.9Mt @ 1.7% Ni are ~96% Indicated

See Appendix for source data

==> picture [10 x 10] intentionally omitted <==

Next stage is to expand resource and then undertake prefeasibility level work

Please refer Scoping Study announcement dated 10 October 2018.

Please note Cautionary Statements regarding Scoping Studies and the Cautionary Statement regarding Forward Looking Statements on slides 2 & 3.

==> picture [10 x 10] intentionally omitted <==

Robust on current assumptions: US$7.50/lb Ni Price and 0.75 AUDUSD exchange rate

Estimate is accurate to ±35%

The Company is not aware of any new information that materially affects the information included in the relevant announcement.

1 ASX:RXL 10 October 2018; 2 ASX:RXL 17 February 2015

23

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Key Points – Mount Fisher
----- End of picture text -----

Key Strengths

Milestones

==> picture [11 x 11] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

Large land holding with a significant existing nickel resource discovered by Rox

Several targets for near term resource growth along strike from existing deposits

March 2020  VTEM and Air core drilling regional targets

April 2020

 Data evaluation

==> picture [11 x 11] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

Further greenfields targets along the length of the prospective stratigraphy (80km in strike length)

Gold prospectivity in the central and western parts of the belt to be followed up

H2 2020

 RC drilling to add to resource position

  • Re-engage with offtake partners

24

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Conclusion
----- End of picture text -----

==> picture [12 x 12] intentionally omitted <==

Gold sector is enjoying strong AUD gold price which is expected to continue

==> picture [12 x 12] intentionally omitted <==

Nickel price expected to recover / outperform over the medium to long term with as EV / battery thematic plays out

==> picture [12 x 12] intentionally omitted <==

The recent discovery of Grace Prospect at the significant Youanmi Gold Project has significantly enhanced the overall project

==> picture [12 x 12] intentionally omitted <==

Rox is actively exploring its exciting portfolio of mineral properties for gold and nickel in highly prospective WA greenstone belts

==> picture [12 x 12] intentionally omitted <==

Rox has commanding positions in these belts where recent M&A activity has occurred

==> picture [12 x 12] intentionally omitted <==

Rox’s exploration programs are well funded

==> picture [12 x 12] intentionally omitted <==

The company’s management team is committed to delivering on milestones

25

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

ASX:RXL
----- End of picture text -----

Rox Resources Limited Level 1, 34 Colin Street, West Perth, WA, 6005 AUSTRALIA T: (08) 9226 0044 F: (08) 9322 6254 E: [email protected] W: www.roxresources.com.au

26

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Appendix – Mineral Resource Estimate
----- End of picture text -----

The information in this report that relates to gold Mineral Resources for the Youanmi Gold project was reported to the ASX on 17 April 2019 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 17 April 2019, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 17 April 2019 continue to apply and have not materially changed.

The full reports can be viewed at https://www.asx.com.au/asxpdf/20190410/pdf/44467pvy382w9q.pdf, https://www.asx.com.au/asxpdf/20190417/pdf/444d2m1002jb0b.pdf and https://www.asx.com.au/asxpdf/20190415/pdf/4449mz7wr6c2t1.pdf). Rox is of the view that as the resource estimate is JORC 2012 compliant, was prepared in the last 12 months, indicates the Modifying factors which remain relevant, and the estimate was prepared by a well-known and industry respected Competent Person, the Mineral Resource estimate can be relied upon. At this stage Rox is unaware of the work programs on which the estimates were based. There are no more estimates or data relevant to the reported mineralisation available to Rox.

Near Surface Near Surface Near Surface Near Surface Near Surface Youanmi Deeps Youanmi Deeps Youanmi Deeps Youanmi Deeps Youanmi Deeps
COG (g/t Au) Tonnes
(Mt)
Au (g/t) Gold (oz) COG (g/t
Au)
Tonnes
(Mt)
Au (g/t) Gold (oz)
Indicated 0.5 4.72 1.76 266,200 Indicated 4 0.808 8.1 210,200
Inferred 0.5 5.36 1.55 266,500 Inferred 4 1.605 8.7 447,700
Total 0.5 10.07 1.65 532,700 Total 4 2.413 8.5 657,900

27

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Appendix – Mineral Resources
----- End of picture text -----

Fisher East Nickel, ASX:RXL 5 February 2016

Deposit Category Tonnes (Mt) Ni% Ni (kt)
Camelwood Indicated 1.7 2.0 34.0
Inferred 0.3 1.5 5.0
Total 2.0 1.9 39.0
Cannonball Indicated 0.24 2.9 7.0
Inferred 0.02 1.9 0.3
Total 0.26 2.8 7.3
Musket Indicated 1.8 1.7 30.0
Inferred 0.1 1.5 1.5
Total 1.9 1.7 31.6
TOTAL Indicated 3.7 1.9 71.0
Inferred 0.5 1.5 7.0
Total 4.1 1.9 78.0

Olympia Nickel-Copper-PGE, ASX:RXL 18 August 2017

Tonnes
(kt)
Ni % Cu % Co ppm **Pd ppm ** **Pt ppm ** *NiEq % ** NiEq (kt) Pd+Pt
(koz)
573 1.6 1.2 820 1.5 0.85 2.2 13.5 43.0

Olympia: 1.0% Ni block cut-off grade. Values may not sum due to rounding.

Information provided as required by section 50 of the JORC Code 2012

*NiEq = (Ni grade x Ni price x Ni recovery + Cu grade x Cu price x Cu recovery) / (Ni price x Ni recovery) Where Ni price = US$13,000/t, Cu price = US$6,300/t (as of 10 October 2018)

Ni recovery = 85%, Cu recovery = 85%

Metallurgical recoveries based on results from deposits with similar mineralogy, e.g. Savannah (83% recovery for both Ni and Cu), and Nova (88% recovery for both Ni and Cu). In general, the metallurgical recoveries of nickel and copper are similar, so the factors cancel each other out in the metal equivalent calculation. In addition, metallurgical recoveries at the Fisher East project average 88% for nickel. It is the Company’s reasonable opinion that all metals in the metal equivalent will be able to be recovered and sold, as they are at Savannah and Nova.

Fisher East: 1.0% Ni block cut-off grade. Values may not sum due to rounding.

28

==> picture [720 x 80] intentionally omitted <==

----- Start of picture text -----

Appendix – Mineral Resources
----- End of picture text -----

Mt Fisher Gold, ASX:RXL 11 July 2018

==> picture [336 x 221] intentionally omitted <==

0.8 g/tAu block cut-off grade. Values may not sum due to rounding.

29