ASX ANNOUNCEMENT

Rox Resources Limited

ASX: RXL

Address: Level 1 34 Colin Street WEST PERTH WA 6005

PO Box 1167 West Perth WA 6872

Ph: (61 8) 9226 0044 Fax: (61 8) 9325 6254

Email: [email protected]

Web:

11 OCTOBER 2016

AIRCORE DRILLING RESULTS FROM FISHER EAST

  • Aircore drilling confirms the Mt Tate, Horatio and Sabre North prospects as priority RC targets

  • 4m @ 0.28% Ni, 179ppm Cu, 43ppb PGE (Mt Tate)

  • 16m @ 0.35% Ni, 109ppm Cu, 23ppb PGE (Horatio)

  • 12m @ 0.20% Ni, 213ppm Cu, 115ppb PGE (Sabre North)

Rox Resources Limited ( ASX: RXL ) (“ Rox ” or “ the Company ”) is pleased to announce recent aircore ( AC ) drilling results from the Fisher East nickel sulphide project 500km north of Kalgoorlie, Western Australia (Figure 1).

www.roxresources.com.au

ABN: 53 107 202 602

Projects:

Mt Fisher: nickel-gold (100%)

Reward: zinc-lead (49%)

Bonya: copper-silver (earning up to 70%)

The program of 2,540 metres consisting of 49 angled holes was designed to better define the target zones at the Mt Tate and Horatio prospects, and to test EM anomalies along strike to the south of Horatio. In addition an encouraging result north of the Sabre prospect has been received. Significant results were:

Mt Tate Prospect

  • 4m @ 0.28% Ni, 179ppm Cu, 43 ppb PGE (Pd+Pt+Au) from 64m in hole FEAC402

  • 2m @ 0.29% Ni, 195ppm Cu, 35 ppb PGE from 60m in hole FEAC406

Horatio Prospect

==> picture [140 x 193] intentionally omitted <==

  • 15m @ 0.24% Ni, 64ppm Cu, 32ppb PGE from 35m in hole FEAC408

  • 16m @ 0.35% Ni, 109ppmCu, 23ppb PGE from 24m in hole FEAC415

Sabre North Prospect

  • 12m @ 0.20% Ni, 213ppm Cu, 115ppb PGE from 58m in hole FEAC447, including 6m @ 0.17% Ni, 344ppm Cu, 184ppb PGE from 58m

Managing Director Ian Mulholland commented, “We continue to highlight the excellent exploration potential of our tenements at Fisher East and these latest results from Mt Tate, Horatio and Sabre North make them high priority RC drill targets.”

“We are confident that we will continue to discover and define more nickel sulphide resources at Fisher East which will underpin our development strategy there.”

RRL1493D-IM

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

“The Fisher East project already has Mineral Resources of 4.2 Million tonnes grading 1.9% Ni (Indicated 3.7 Mt @ 1.9% Ni, Inferred 0.5 Mt @ 1.5% Ni) for 78,000 tonnes of contained nickel metal . With the as-yet to be quantified mineral resource at Sabre, which requires more drilling, and these new results we see a doubling of the resource base as a distinct possibility.”

Full results can be found in Table 1.

==> picture [400 x 525] intentionally omitted <==

Figure 1: Fisher East Prospect Plan

2

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

==> picture [452 x 661] intentionally omitted <==

Figure 2: Sabre North and Mt Tate Prospects showing latest AC drilling results (previous results in smaller font)

3

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

==> picture [456 x 655] intentionally omitted <==

Figure 3: Horatio Prospect showing latest AC drilling results (previous results in smaller font)

4

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Table 1: Aircore Drilling Results

HOLE PROSPECT EAST NORTH RL DEPTH FROM TO INTERVAL **Nippm ** **Cuppm ** **PGEppb **
FEAC402 Mt Tate 359769 7027033 565 68 64 68 4 2777 179 43
FEAC403 Mt Tate 359798 7027046 564 78 NSR
FEAC404 Mt Tate 359825 7027058 564 49 NSR
FEAC405 Mt Tate 359850 7026854 566 82 NSR
FEAC406 Mt Tate 359883 7026909 565 70 60 62 2 2871 195 35
FEAC407 Mt Tate 359914 7026927 565 93 NSR
FEAC408 Horatio 361285 7024793 562 69 35 50 15 2380 64 32
FEAC409 Horatio 361328 7024817 561 60 NSR
FEAC410 Horatio 361309 7024567 560 54 NSR
FEAC411 Horatio 361443 7024646 560 78 NSR
FEAC412 Horatio 361483 7024452 558 50 NSR
FEAC413 Horatio 361427 7024420 558 60 28 32 4 2022 94 37
FEAC414 Horatio 361566 7024069 554 54 NSR
FEAC415 Horatio 361550 7023933 554 56 24 40 16 3535 109 23
FEAC416 Horatio 361583 7023951 554 75 NSR
FEAC417 Horatio 361619 7023629 556 48 NSR
FEAC418 Horatio 361664 7023644 556 52 NSR
FEAC419 Horatio 361707 7023669 555 54 NSR
FEAC420 Horatio 361776 7023465 556 51 NSR
FEAC420 Horatio 361776 7023465 560 51 NSR
FEAC421 MTVTEM_06 362224 7022219 560 42 19 42 23 5206 45 8
FEAC422 MTVTEM_06 362275 7022253 560 56 NSR
FEAC423 MTVTEM_06 362326 7022281 561 51 NSR
FEAC424 MTVTEM_06 362311 7022085 561 47 NSR
FEAC425 MTVTEM_06 362337 7021954 561 39 NSR
FEAC426 MTVTEM_06 362389 7021979 567 42 NSR
FEAC427 Hawkeye 365129 7016463 567 23 NSR
FEAC428 Hawkeye 365224 7016514 566 21 NSR
FEAC429 Hawkeye 365330 7016591 566 34 NSR
FEAC430 Hawkeye 365381 7016613 566 31 NSR
FEAC431 Hawkeye 365441 7016646 566 14 NSR
FEAC432 Hawkeye 365485 7016672 566 18 NSR
FEAC433 Hawkeye 365549 7016712 561 47 NSR
FEAC434 Regional 363065 7019380 560 32 NSR
FEAC435 Regional 363169 7019429 560 79 NSR
FEAC436 Regional 363276 7019489 560 85 NSR
FEAC437 Regional 363584 7019656 559 43 NSR
FEAC438 Regional 363696 7019726 558 45 NSR
FEAC439 Regional 363779 7019787 558 36 NSR
FEAC440 Horatio 361815 7023036 558 60 NSR
FEAC441 Horatio 361840 7023052 559 57 NSR

5

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

FEAC442 Regional 362010 7022822 554 42 NSR
FEAC443 Horatio 361548 7024065 567 50 28 40 12 2104 42 42
FEAC444 Tomahawk 359903 7026784 566 56 NSR
FEAC445 Tomahawk 359962 7026817 555 76 NSR
FEAC446 Sabre North 358654 7028378 555 69 64 69 5 2091 25 8
FEAC447 Sabre North 358696 7028406 546 75 58 70 12 2037 213 115
FEAC448 Cutlass 357565 7029947 546 16 NSR
FEAC449 Cutlass 357603 7029971 546 40 NSR
FEAC450 Cutlass 357635 7029998 546 13 NSR

Notes to Table:

  • Grid coordinates GDA94: Zone 51, Collar positions determined by hand held GPS.

  • All holes have a dip of -60 degrees towards 240 degrees azimuth.

  • Hole azimuths planned to be as listed above. Hole deviations may result in hole paths slightly different to those intended. No downhole surveys undertaken.

  • Drilling by aircore technique, with 1 metre samples collected and laid out. Other information in Appendix: Section 1.

  • 3-5kg sample preparation by pulp mill to nominal P80/75um.

  • Analysis by a combination of Four Acid Digest with a multi-element ICP-OES finish (Intertek code 4A/OE-multi element) and Fire Assay for Au-Pt-Pd (code FA25). Au, Pt and Pd were analysed by 25 gram fire assay with a mass spectrometer finish.

  • Samples shown as “*” were not assayed for Au, Pt or Pd.

  • Cut-off grade minimum 2m @ 2,000ppm Ni with 2m internal dilution. Holes shown as NSR (no significant result) do not have any 2m intervals >2,000ppm Ni present.

  • Values for Pt and Pd which were below the detection limit of 1ppb were set to zero for the purpose of intersection calculation.

ENDS

For more information:

Shareholders/Investors Ian Mulholland Managing Director Tel: +61 8 9226 0044 [email protected]

Media

Tony Dawe Professional Public Relations Tel: + 61 8 9388 0944 [email protected]

6

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

About Rox Resources

Rox Resources Limited is an emerging Australian minerals exploration company. The company has three key assets at various levels of development with exposure to gold, nickel, zinc, lead, and copper, including the Mt Fisher Gold Project (WA), Myrtle/Reward Zinc-Lead Project (NT), and the Bonya Copper Project (NT).

Mt Fisher Gold-Nickel Project (100% + Option to Purchase)

The Mt Fisher project is located in the highly prospective North Eastern Goldfields region of Western Australia and in addition to being well endowed with gold, the project hosts several nickel sulphide deposits. The total project area is 675km[2] , consisting of a 600km[2] area 100% owned by Rox and an Option to purchase 100% of a further 75km[2] of nickel and gold prospective ground.

Discovery of, and drilling at the Camelwood, Cannonball and Musket nickel prospects has defined a JORC 2012 Mineral Resource (ASX:RXL 5 February 2016) of 4.2Mt grading 1.9% Ni reported at 1.0% Ni cut-off (Indicated Mineral Resource: 3.7Mt grading 1.9% Ni, Inferred Mineral Resource: 0.5Mt grading 1.5% Ni) comprising massive and disseminated nickel sulphide mineralisation, and containing 78,000 tonnes of nickel. Higher grade mineralisation is present in all deposits (refer to ASX announcement above), and is still open at depth beneath each deposit. Additional nickel sulphide deposits continue to be discovered (e.g. Sabre) and these will add to the resource base. Exploration is continuing to define further zones of potential nickel sulphide mineralisation.

Drilling by Rox has also defined numerous high-grade gold targets and a JORC 2004 Measured, Indicated and Inferred Mineral Resource (ASX:RXL 10 February 2012) of 973,000 tonnes grading 2.75 g/t Au reported at a 0.8 g/tAu cut-off exists for 86,000 ounces of gold (Measured: 171,900 tonnes grading 4.11 g/t Au, Indicated: 204,900 tonnes grading 2.82 g/t Au, Inferred: 596,200 tonnes grading 2.34 g/t Au) aggregated over the Damsel, Moray Reef and Mt Fisher deposits.

A joint venture has been signed with Doray Minerals Limited (“Doray”) to explore the Mt Fisher gold tenements (ASX:RXL 16 May 2016), with Doray required to spend $1 million within the first year. Following that Doray can spend $4 million over a further two years to earn a 51% interest, and increase its interest to 75% by expenditure of a further $5 million over an additional two years.

Reward Zinc-Lead Project (49% + Farm-out Agreement diluting to 30%)

Rox has signed an Earn-In and Joint Venture Agreement with Teck Australia Pty Ltd. (“Teck”) to explore its highly prospective 670km[2] Myrtle/Reward zinc-lead tenements, located 700km south-east of Darwin, Northern Territory, adjacent to the McArthur River zinc-lead mine.

The first deposit explored, Myrtle, has a current JORC 2004 zinc-lead Mineral Resource (ASX:RXL 15 March 2010) of 44 Mt @ 5.0% Zn+Pb reported at a 3.0% Zn+Pb cut-off (Indicated: 5.8 Mt @ 3.6% Zn, 0.9% Pb; Inferred: 37.8 Mt @ 4.2% Zn, 1.0% Pb).

Drilling at the Teena zinc-lead prospect from 2013 to 2015 discovered significant zinc-lead mineralisation over thicknesses exceeding 20m over a strike length of at least 1.3km (ASX:RXL 5 August 2013, 26 August 2013, 18 September 2013, 11 October 2013, 27 October 2014, 10 November 2014, 15 December 2014, 29 September 2015, 9 November 2015, 17 November 2015, 17 December 2015).

Teena has a JORC 2012 Inferred zinc-lead Mineral Resource (ASX:RXL 1 June 2016) of 58 Mt @ 12.7% Zn+Pb (11.1% Zn, 1.6% Pb) at a 6% Zn+Pb% cut-off, and is the most significant new discovery of zinc in Australia since Century in 1990.

Under the terms of the Agreement, Teck has earned a 51% interest, with Rox holding the remaining 49%. Teck has elected to earn a further 19% (for 70% in total) by spending a total of $15m by 31 August 2018 (ASX:RXL 21 August 2013).

Bonya Copper Project (51% + Farm-in Agreement to earn up to 70%)

Rox (51%) is exploring the Bonya Copper Project located 350km east of Alice Springs, Northern Territory, in joint venture with Arafura Resources Limited (49%) (ASX:ARU). Outcrops of visible copper grading up to 34% Cu and 27 g/t Ag are present, with the style of mineralisation similar to the adjacent Jervois copper deposits (see ASX:KGL). Drill testing has intersected visible copper mineralisation at three prospects, with massive copper sulphides intersected at the Bonya Mine prospect, including 38m @ 4.4% Cu and 11m @ 4.4% Cu (ASX:RXL 20 October 2014, 5 November 2014, 1 December 2014).

Under the Farm-in Agreement Rox has earned a 51% interest in the copper, lead, zinc, silver, gold, bismuth and PGE mineral rights at Bonya after spending $500,000 (ASX:RXL 16 December 2014). Rox has elected to earn a further 19% (for 70% in total) by spending a further $1 million by 10 December 2016.

7

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Competent Person Statements:

The information in this report that relates to new Exploration Results for the Fisher East Project is based on information compiled by Mr Ian Mulholland BSc (Hons), MSc, FAusIMM, FAIG, FSEG, MAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Geoscientists. Mr Mulholland has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mulholland is a full time employee and Managing Director of the Company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Resource Statements

The information in this report that relates to nickel Mineral Resources for the Fisher East project was reported to the ASX on 5 February 2016 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 5 February 2016, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 5 February 2016 continue to apply and have not materially changed.

The information in this report that relates to zinc-lead Mineral Resources for the Reward project was reported to the ASX on 15 March 2010 (JORC 2004) and 1 June 2016 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcements of 15 March 2010 and 1 June 2016, and that all material assumptions and technical parameters underpinning the estimates in the announcements of 15 March 2010 and 1 June 2016 continue to apply and have not materially changed.

The information in this report that relates to gold Mineral Resources for the Mt Fisher project was reported to the ASX on 10 February 2012 (JORC 2004). Rox confirms that it is not aware of any new information or data that materially affects the information included in the announcement of 10 February 2012, and that all material assumptions and technical parameters underpinning the estimates in the announcement of 10 February 2012 continue to apply and have not materially changed.

General

In the case of any Exploration Results and Mineral Resources reported under the 2004 JORC Code, they have not been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

8

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Appendix

The following information is provided to comply with the JORC (2012) requirements for the reporting of the aircore drilling result on tenements E53/1218 and E53/1802.

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation
Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
The program of Aircore drilling entailed 49 holes for 2,540m.
Drill holes were angled at -600and directed to intersect geology as
close to perpendicular as possible. Hole azimuths and dips are
listed in the text. Sampling was undertaken by collecting 2-5
metre composite samples and single 1m intervals.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Drillhole locations were picked up by handheld GPS. Logging of
drill samples included lithology, weathering, texture, moisture and
contamination. Sampling protocols and QAQC are as per industry
best practice procedures.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information
Aircore drilling was sampled (scooped) using a combination of
composite sampling (2m to 5m) and single 1m sampling.
Samples were sent to Intertek Genalysis in Kalgoorlie, crushed to
10mm, dried and pulverised (total prep) in LM5 units (Some
samples > 3kg were split) to produce a sub-sample.
The pulps were then sent to Perth for analysis by a Four Acid
Digest with a multi-element ICP-OES finish (for elements including
Ni, Cu, Co, Cr, Mg, Fe. Intertek code: 4A/OE-multi-element) and
Fire Assay for Au-Pt-Pd (Intertek code FA25/MS). Au, Pt and Pd
were analysed by 25 gram fire assay with a mass spectrometer
finish.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Drilling technique was aircore (AC) with hole diameter of 85mm.
Maximum hole depth was 93m.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed
Aircore recoveries were logged and recorded in the database.
Overall recoveries were good and there were no significant
recovery problems.
Measures taken to maximise sample recovery and
ensure representative nature of the samples
Aircore samples were collected from the rig-mounted cyclone by
bucket and placed directly on the ground in rows of 10. Samples
were visually checked for recovery, moisture and contamination
and notes made in the logs.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
There is no observable relationship between recovery and grade,
and therefore no sample bias.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Detailed geological logs were carried out on all drill holes, and this
data was stored in the database.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
Logging of aircore chips recorded lithology, mineralogy,
mineralisation, weathering, colour, and other sample features.
Sample spoils were photographed.
The total length and percentage of the relevant
intersections logged
All holes were logged in full.

9

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Criteria JORC Code explanation
Commentary
Sub-sampling
techniques and sample
preparation

If core, whether cut or sawn and whether quarter, half
or all core taken.
Not applicable since no core drilled.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
Samples were scooped directly from drill sample piles. Most of
the samples were dry. Some of the samples were collected wet,
and these were noted in the drill logs and database.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
The sample preparation followed industry best practice. This
involved oven drying and then pulverisation of the entire sample
in an LM5 or equivalent pulverising mill to a grind size of 85%
passing 75 micron.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
At this stage of the exploration, field QC involves the review of
laboratory supplied certified reference material, in house
controls, blanks, splits and duplicates. These QC results are
reported by the laboratory with final assay results.
Anomalous samples were checked against logging and field
observations. Selected samples were re-analysed to confirm
anomalous results.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
No field duplicates were taken.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
The sample sizes are considered more than adequate to ensure
that there are no particle size effects.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
A complete four-acid digest followed by multi-element ICP/OES
analysis (Intertek analysis code 4A/OE) was undertaken. The four
acid
digest
involves
hydrofluoric,
nitric,
perchloric
and
hydrochloric acids and is considered a “complete” digest for most
material types, except certain chromite minerals. Select samples
were also analysed with a 25 gram Fire Assay with a mass
spectrometer finish for Au-Pt-Pd (Intertek code FA25/MS).
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
No geophysical or portable analysis tools were used to determine
assay values stored in the database.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
Internal laboratory control procedures involve duplicate assaying
of randomly selected assay pulps as well as internal laboratory
standards. All of these data are reported to the Company and
analysed for consistency and any discrepancies.
Verification of
sampling and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The Company’s Exploration Manager has visually inspected and
verified the significant drill intersections.
The use of twinned holes.
No aircore holes were twinned in the current program.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Primary data was collected using a standard set of Excel templates
on Toughbook laptop computers in the field. These data are
transferred to Geobase Pty Ltd for data verification and loading
into the database.
Discuss any adjustment to assay data.
No adjustments or calibrations have been made to any assay data.
Location of data
points
Accuracy and quality of surveys used to locate drillholes
(collar and down-hole surveys), trenches, mine workings
and other locations used in
Mineral Resource
estimation.
Drill hole locations have been established using a field GPS unit.
Specification of the grid system used.
The grid system is MGA_GDA94, zone 51 for easting, northing and
RL.
Quality and adequacy of topographic control.
The topographic surface was generated from surveyed drill collar
positions and also digital terrain models generated from low level
airborne geophysical surveys.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
The drill hole spacing along section lines is variable. The section
lines were spaced at approximately 200m intervals.

10

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Criteria JORC Code explanation
Commentary
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Data from aircore drilling is not suitable for estimation of Mineral
Resources.
Whether sample compositing has been applied.
Sample compositing occurred over 4-5 metre intervals for non-
mineralised material, and selected mineralised intervals were
assayed at a one and two metre (composite) intervals.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
Aircore drill lines were positioned so that drilling was essentially
perpendicular to strike.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
No sampling bias is believed to have been introduced.
Sample security The measures taken to ensure sample security.
Sample security is managed by the Company. After preparation in
the field samples are packed into polyweave bags and despatched
to the laboratory. For a large number of samples these bags were
transported by the Company directly to the assay laboratory. In
some cases the sample were delivered to a transport contractor
who then delivered the samples to the assay laboratory. The assay
laboratory audits the samples on arrival and reports any
discrepancies back to the Company. No such discrepancies
occurred.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
No review of the sampling techniques has been carried out. The
database is compiled by an independent contractor and is
considered by the Company to be of sufficient quality to support
the results reported. In addition, from time to time, the Company
carries out its own internal data audits.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties,
native
title
interests,
historical
sites,
wilderness or national park and environmental settings.
The drilling program was conducted within Exploration Licenses
E53/1218 and E53/1802. Rox Resources owns 100% of E53/1218
and holds an option to purchase E53/1802.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
The tenements are in good standing and no known impediments
exist.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other
parties.
Previous exploration by other parties identified anomalous
geochemical values and/or geophysical targets, and this program
has followed these up and better defined the anomalies.
Geology Deposit
type,
geological
setting
and
style
of
mineralisation.
The geological setting is of an Archaean aged komatiite system.
Mineralisation is usually situated at ultramafic contacts. The
rocks are strongly talc-carbonate altered. Metamorphism is mid-
upper Greenschist. The target is analogous to Kambalda style
nickel sulphide deposits.

11

ROX RESOURCES LIMITED - ASX RELEASE 5 October 2016

Criteria JORC Code explanation
Commentary
Drill hole Information A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
Refer to Table 1.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques,
maximum
and/or
minimum
grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
All reported assay intervals have been length weighted. No top
cuts have been applied.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
Not applicable. All sample intervals were 1m.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Not applicable. No metal equivalents stated.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
No definite relationships between mineralisation widths and
intercept lengths are known from this drilling due to the highly
weathered nature of the material sampled.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Refer to the Figures in the text.
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
All results with at least 2m > 2,000ppm Ni are reported, in
addition, selected anomalous holes are indicated where
significant within the context of adjacent results.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious or contaminating
substances.
Other exploration data is not meaningful in context of the
aircore drilling results being reported.
Further work The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions,
including
the
main
geological
interpretations and future drilling areas, provided this
information is not commercially sensitive
Further follow-up aircore and RC drilling, and electro-magnetic
surveying is planned.