Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

REGIS RESOURCES LIMITED Capital/Financing Update 2018

Mar 11, 2018

65733_rns_2018-03-11_3c7eb3e6-fd22-48a4-96c7-1871f213f831.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

12 March 2018

==> picture [128 x 40] intentionally omitted <==

Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000

ABN 28 009 174 761

www.regisresources.com Level 1, 1 Alvan Street Subiaco WA 6008 Australia P 08 9442 2200 F 08 9442 2290

REGIS TARGETS UNDERGROUND MINE AT ROSEMONT WITH MAIDEN UNDERGROUND RESOURCE OF 230 Koz

HIGHLIGHTS

  • Maiden Inferred Underground Mineral Resource Estimate (‘MRE’) at Rosemont of 1.4 MT @ 5.1 g/t gold for 230 Koz of gold at a 2.0g/t gold cut-off grade.

  • This is a combination of the two discrete areas drilled to date being Rosemont Main (0.4 MT @ 7.2 g/t for 102 Koz) and Rosemont South ( 1.0 MT @ 4.1 g/t for 128 Koz).

  • The Rosemont Main underground zone resource grade of 7.2 g/t is a particularly pleasing result and reflects the high-grade tenor of gold mineralisation within the broader Rosemont quartz-dolerite.

  • This MRE, comprising the Rosemont Main and South areas, was completed by Independent and highly regarded consultancy group Entech Pty Ltd (‘Entech’). It is the result of a detailed mineralisation domaining study, focused on delineation of primary mineralisation controls within the quartz-dolerite.

  • Drilling completed at Rosemont over the previous six quarters includes 287 RC holes for 48,663m and 11 DD holes for 3,656m. The MRE was based on 296 RC drill holes and 57 diamond holes for 3,301m of drilling intersecting ore.

  • Regis is particularly encouraged that the MRE only represents less than 1.3km of the 4km strike length of the total deposit, and only a maximum of 150m below the final pit design.

  • Infill and extensional drilling is expected to extend the underground MRE through systematic exploration of the more than 2.7km strike length remaining untested.

  • The underground MRE currently only extends 150 meters below the base of the current Ore Reserve pit design. Deeper drilling is planned to define down plunge extensions and target the quartz-dolerite at depths below current drilling.

  • The underground MRE for Rosemont confirms the project has significant potential to deliver high grade mineralisation to the 2.4mtpa Rosemont plant.

  • Completion of a scoping study in to development of Rosemont Underground is imminent.

  • A full mining study and other technical assessments to follow, with a view to supporting a board development decision by the end of the June 2018 quarter.

Regis Executive Chairman, Mark Clark commented:

“The maiden underground resource at Rosemont is a significant milestone for Regis. We are working to prove the underground mining proposition at Rosemont in these two initial, discrete areas. Mining studies are underway and we hope to make a development decision on underground mining by the end of June and then grow the scale of the underground mining inventory and operations from that platform. With underground resource drilling also now underway at Garden Well, the broader underground opportunity for Regis at Duketon is substantial.”

1

==> picture [66 x 21] intentionally omitted <==

ROSEMONT GOLD PROJECT

Background

The Rosemont Project is a fully operational open pit gold mine (commenced in March 2013) with a stand-alone crushing and grinding plant, piping an ore slurry to the Garden Well CIL processing facility. The current open pit mine is expected to continue until at least FY2024.

==> picture [275 x 367] intentionally omitted <==

The geology at Rosemont has gold hosted in the steeply dipping 345° trending Rosemont Dolerite unit intruding into an ultramafic sequence. Gold mineralisation is within a brittle quartzdolerite phase of the Rosemont Dolerite, primarily occurring within discrete, steeply dipping, quartz-dolerite parallel, en-echelon and stacked vein structures. The quartz-dolerite varies from 5 meters, up to 100 meters wide.

Drilling completed at Rosemont over the previous six quarters includes 287 RC holes for 48,663m and 11 DD holes for 3,656m. The majority of this drilling was aimed at increasing data-density and geological understanding in the two zones of this study. RC and diamond drilling in the September and December 2017 quarters helped to further define high grade gold mineralisation in two distinct zones beneath the life of mine open pit designs to a sufficient level to support an underground MRE.

The MRE was completed by independent and highly regarded geological consultancy group Entech Pty Ltd (‘Entech’). It is the result of a detailed mineralisation domaining study, focused on delineation of primary mineralisation controls within the quartz-dolerite.

2

==> picture [66 x 21] intentionally omitted <==

Maiden Underground Resource

A Maiden Underground MRE has been estimated at a 2.0g/t gold lower cut for the Rosemont gold deposit and is reported as follows:

Project Resource
Category
Cut-Off
(g/t)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Metal
(koz)
Rosemont Main Inferred 2.0 0.4 7.19 102
Rosemont South Inferred 2.0 1.0 4.14 128
Total 1.4 5.10 230

The underground MRE will be subject to further infill and extensional drilling with a view to both expanding the Resource and estimating a maiden Ore Reserve.

The discrete areas included in this underground MRE and the delineation between this resource and the existing March 2017 open pit MRE (depleted to the 31 January 2018 mining surface) are shown in the following long section:

==> picture [451 x 153] intentionally omitted <==

All current open pit (depleted to the January 2018 mined surface) and underground MREs at Rosemont are tabled below:

Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Rosemont Mineral Resources
as at 1 February2018
Gold Measured Indicated Inferred Total Resource Competent
Person1
Project Type Cut-Off
(g/t)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold Metal
(koz)
Rosemont Open Pit Open-Pit 0.4 0.7 1.65 40 14.3 1.21 555 1.6 1.76 91 16.7 1.28 686 A
Rosemont Main Underground 2.0 - - - - - - 0.4 7.19 102 0.4 7.19 102 B
Rosemont South Underground 2.0 - - - - - - 1.0 4.14 128 1.0 4.14 128 B
ROSEMONT TOTAL Total 0.7 1.65 40 14.3 1.21 555 3.0 3.32 321 18.1 1.58 916
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted
1. Refer to Competent Person Statement

3

==> picture [66 x 21] intentionally omitted <==

Key Mineral Resource Estimate Metrics

Regis has quoted the maiden underground MRE for the Rosemont Gold Project at a 2.0g/t gold lower cut. The grade-tonnage curve and ounces per vertical meter of the Rosemont Underground MRE split into the two zones are shown below.

==> picture [295 x 193] intentionally omitted <==

The current metal contribution to the MRE from Rosemont Main and South is fairly similar. As can be seen in the grade-tonnage curve Rosemont Main is a higher grade area across the cut-off grade range. Rosemont South is volumetrically greater as it is not spatially constrained given that it currently has a more consistent drilling density along strike than Rosemont Main.

==> picture [297 x 226] intentionally omitted <==

The areas of higher ounces per vertical meter (1,000 – 1,400 ovm) correlate strongly to the areas of highest density of drilling. The areas of lower ounces per vertical meter are expected to be bolstered as infill drilling in undrilled areas along strike and down plunge allow significant opportunity for the underground MRE to be extended.

4

==> picture [66 x 21] intentionally omitted <==

Geology & Cross Sections

Two cross sections below show the nature of gold mineralisation at Rosemont. The locations of these cross sections are also shown on the long section on page 3 of this announcement.

==> picture [235 x 262] intentionally omitted <==

==> picture [235 x 262] intentionally omitted <==

The mineralised zones align very closely to the orientation of the quartz-dolerite. This interpretation is supported by open pit mining in fresh rock, structural interpretation of diamond core and lithological/alteration/veining interpretation.

Development Pathway

Regis has engaged Mining Plus Pty Ltd to conduct a mining scoping study, which will now be updated to incorporate the reported Rosemont underground MRE. This update of the study is expected to be finalised shortly. The scoping study is expected to be progressed in to a full mining study along with geotechnical, hydrogeological, infrastructure and other technical assessments in the June 2018 quarter. This work will form the basis for a board decision, planned for late in the June 2018 quarter, on development of the Rosemont underground project.

Exploration Upside at Rosemont

The maiden underground MRE is only estimated for two initial and discrete zones and only extends to a maximum depth of 150 meters below the base of the current Ore Reserve pit design in these areas. There are numerous high-grade intercepts outside of the two zones of this underground MRE. The drilling density in these areas is currently not sufficient to accurately define the orientation, continuity and volumes of mineralisation domains, nor for classification as Mineral Resources. These areas are high priority targets for infill drilling to add to the maiden Resource. This work is active and ongoing. In addition to this continuing infill drilling, further deep drilling is planned with the aim of intercepting the mineralised quartzdolerite at depth and down plunge from the current underground MRE.

5

==> picture [66 x 21] intentionally omitted <==

In the immediate future drilling will continue in the red shaded zone of the Rosemont Main area shown on the long section below with the aim of enabling the extension of the Inferred underground MRE into the target areas.

==> picture [451 x 271] intentionally omitted <==

The existing open pit excavation, operations and infrastructure inhibit drilling some targeted holes from the most ideal collar positions. As is the industry experience with most underground mines it is expected that the final infill drilling phase to reach Indicated Resources for a large portion of the deposit will likely be completed from underground positions.

Further, as can be seen in the conceptual long section below there would be significant opportunity to conduct exploration and resource drilling from a potential underground development between the two zones should underground mining ultimately be commenced on the two current underground resource positions at Rosemont.

==> picture [449 x 139] intentionally omitted <==

6

==> picture [66 x 21] intentionally omitted <==

Other Material Information disclosures required by ASX Listing Rule 5.8 regarding the underground MRE are included below and the JORC Code, 2012 Edition Table 1 disclosures are included in Appendix 1. Other Material Information disclosures required by ASX Listing Rule 5.8 regarding the March 2017 open pit MRE are included in the announcement ‘Mineral Resource and Ore Reserve Statement’ released on 14 July 2017.

ROSEMONT UNDERGROUND MAIDEN MINERAL RESOURCE - Compiled by Entech

Mineral Resource Statement

The Mineral Resource Statement for the Rosemont Underground Maiden Gold Mineral Resource Estimate (MRE) is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition. In the opinion of Entech, the resource evaluation reported herein is a reasonable representation of the global underground gold mineral resources within the Rosemont deposit, based on Reverse Circulation and Diamond Drilling sampling data available as of January 3[rd] , 2018. The underground MRE is completely within fresh rock and is detailed below:

==> picture [426 x 63] intentionally omitted <==

----- Start of picture text -----

Gold Inferred Total Resource
Competent
Project Type Cut-Off Tonnes Gold Grade Gold Metal Tonnes Gold Grade Gold Metal Person1
(g/t) (Mt) (g/t) (koz) (Mt) (g/t) (koz)
Rosemont Main Underground 2.0 0.4 7.19 102 0.4 7.19 102 B
Rosemont South Underground 2.0 1.0 4.14 128 1.0 4.14 128 B
ROSEMONT TOTAL Total 1.4 5.10 230 1.4 5.10 230
----- End of picture text -----

Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding

Interpretations were informed by Reverse Circulation drilling (296 drill holes), with Diamond Drilling (57 drill holes inclusive of diamond tails), for 3,301 m of drilling intersecting ore and a combined total of 251,301 m of drilling from 1,779 drill holes. The MRE contained all drill hole data available at 3 January 2018.

This MRE comprises Inferred Mineral Resources which are unable to have economic considerations applied to them, nor is there certainty that they will be converted to Measured or Indicated Resources through further sampling. The MRE was depleted for all open pit mining activity, surveyed up to 31 January 2018.

Competent Persons Statement

The information in the report to which this statement is attached that relates to the Estimation and Reporting of Gold Mineral Resources at the Rosemont Deposit is based upon information compiled by Mr Andrew Finch BSc., a Competent Person who is a member of the Australian Institute of Geoscientists (MAIG 3827). Mr Finch is a Senior Geological Consultant at Entech Pty Ltd. and an independent consultant to Regis Resources Ltd. Mr Finch has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Finch consents to the inclusion in the report of matters based on his information in the form and context in which it appears.

The information in the report to which this statement is attached that relates to the drilling data at the Rosemont Deposit is based upon information compiled by Mr Jarrad Price, who is a member of the Australian Institute of Mining and Metallurgy. Mr Price is a full time employee of Regis Resources Ltd. Mr Price has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Price consents to the inclusion in the report of matters based on his information in the form and context in which it appears.

Activity **Competent Person ** Identifier Institute
Rosemont Open Pit Resource Jarrad Price A Australasian Institute of Miningand Metallurgy
Rosemont Underground Resource Andrew Finch B Australian Institute of Geoscientists

7

==> picture [66 x 21] intentionally omitted <==

Drilling Techniques

RC drilling was completed with a 139 mm diameter face sampling hammer.

Surface diamond drilling was carried out by using either NQ or HQ32 (triple tube). Core was routinely oriented using a REFLEX ACT III tool.

No information is currently available on historical drilling techniques.

Sampling and Sub-Sampling Techniques

RRL Drilling. 2005 to January 2018.

For the RRL managed drilling, 1 m Reverse Circulation (RC) samples were obtained by cone splitter (2.5 kg – 3.0 kg) and were utilised for lithology logging and assaying. Diamond drill hole (DD) core was utilised for geotechnical and bulk density measurements as well as lithology logging and assaying. Half of the core was sampled with the remainder of the core transferred to permanent storage. The core was predominantly sampled at 1.0 m intervals, with some sampling on geological intervals from 0.2 m to 1.0 m.

Drilling samples were dried, crushed, and pulverised to 85% passing 75 µm and were predominantly Fire Assayed using a 50 g charge at the following certified laboratories: Bureau Veritas, MinAnalytical, Kalassay, Aurum, SGS. Some samples submitted to Kalassay were Fire Assayed using a 40 g charge and Aqua Regia Digest with AAS finish.

Historical Drilling. Prior to 2005.

For historical drilling the samples were dried, crushed, and pulverised to 80% passing 75 µm and were predominantly Fire Assayed using a 50 g charge at the following certified laboratories: ALS, Analabs. 4 m field composites were assayed via Aqua Regia on 50 g pulps using an AAS finish.

Sample Analysis Method

All gold assaying was completed by external commercial laboratories with samples dried, crushed, and then pulverised to 80% or 85% passing 75 µm and assayed using predominantly a 50 g charge for fire assay analysis with AAS finish. Some samples were also assayed using Fire Assay with a 40 g charge and Aqua Regia Digest with AAS finish which are both also acceptable methods. Commercially prepared, predominantly matrix-matched low, medium & high value certified reference Quality Assurance and Quality Control (QAQC) standards were inserted at a rate of 1 in 50 into the sample stream. These techniques are industry standard for gold and considered appropriate.

Geology and Geological Interpretation

Gold mineralisation within the brittle quartz-dolerite phase of the Rosemont Dolerite primarily occurs within discrete, steeply dipping, quartz-dolerite parallel, en-echelon and stacked vein structures.

Mineralisation, as intersected and observed in diamond drillholes, within the Mineral Resource, contains similar primary controls on mineralisation, orientation and continuity as recently observed and mined in the Rosemont Main Pit.

Interpretations of domain continuity were initially undertaken within Geovia Surpac[TM] software, with mineralisation intercepts correlating to individual domains manually selected prior to creation of a vein model within Leapfrog3D[TM] Geo implicit modelling software. Interpretation was a collaborative process with RRL Geologists to ensure modelling appropriately represented site-based observations and current understanding of geology and mineralisation controls.

8

==> picture [66 x 21] intentionally omitted <==

Gold mineralisation is primarily hosted within a quartz dolerite. Thus, a Quartz-Dolerite geology domain was interpreted using a combination of available lithology logging and assay information.

Following this, a total of five mineralisation domains were defined within Rosemont Main with a further nine mineralisation domains interpreted in Rosemont South.

Mineralisation volume domains were delineated using a combination of:

  • Geological information comprising: Lithology, Veining and Alteration;

  • Nominal lower grade minimum cut-off of 1.0 g/t gold. This value was based on exploratory data analysis of mineralisation sample population as well as visual review of the mineralisation tenor and strike, and dip continuity.

For instances where the intercept gold value was below the nominal cut-off however mineralisation continuity was supported by veining and alteration the intercept was included within the domain due to the commodity and the style of deposit.

Estimation Methodology

Sample data was composited into two meter downhole lengths using a best fit methodology.

Exploratory Data Analysis (EDA) of the capped and declustered composited gold variable within domain groups (Rosemont Main and Rosemont South) was undertaken within Supervisor[TM] software.

Assessment and application of top-capping for the estimate was undertaken on the gold variable within individual domains. Where appropriate, top caps were applied on a grouped domain basis, as outlined below:

Main. Top Cap = 80 g/t Au and 4.52% metal reduction.
South. Top Cap = 30 g/t Au and 0.86% metal reduction.

An Ordinary Kriging (OK) interpolation approach in Geovia Surpac[TM] was selected for all mineralised domains.

Estimation utilised domain boundaries as hard boundaries for whereby only composite samples within that domain were used to estimate blocks coded as within that domain.

Interpolation was undertaken within parent cell estimation blocks of Y: 15 mN, X: 2.5 mE, Z: 15 mRL with sub-celling of Y: 0.9375 mN, X: 0.625 mE, Z: 0.9375 mRL to provide adequate domain volume definition of wireframe geometry. Considerations relating to selection of appropriate block size include: drill hole data spacing, conceptual mining method SMU analysis, variogram continuity ranges and search neighbourhood optimisations.

Validation of the gold variable estimated outcomes was completed through global and local bias analysis (swath plots), statistical and visual comparison (cross and long section) with input data. Complete reconciliation data pertaining to production performance of Rosemont, over time, was not available for underground. The open pit dataset could not be relied upon as an appropriate comparison for validation purposes. Visual validation of the estimate and open pit production dig block outlines in an area of overlap in Rosemont pit provided spatial comparison of estimate outcomes.

The 3D block model was then coded with density, depletions, weathering and classification prior to evaluation for Mineral Resource reporting.

Classification Criteria

Mineral Resources were classified as Inferred to appropriately represent confidence and risk with respect to data quality, drill hole spacing, geological and grade continuity, mineralisation volumes, recent and historical mining activity as well as metal distribution. Additional

9

==> picture [66 x 21] intentionally omitted <==

considerations were the early stage of project assessment and the implications of limited diamond drilling (at this stage) on the understanding of mineralisation controls and selectivity within an underground mining environment.

Inferred Mineral Resources were defined where a low to moderate level of geological confidence in geometry, continuity, and grade, was demonstrated, and were identified as areas where:

  • Drill spacing was averaging a nominal 40 m or less, or where drilling was within 40 m of the block estimate; and

  • Estimation quality was considered low, as delineated by a conditional bias slope < 0.6.

The reported Mineral Resource for the Rosemont underground was constrained at depth by the available drill hole spacing outlined for Inferred classification, nominally 380 m below topography in Rosemont Main and 320 m below topography in Rosemont South.

Upper limit constraints on the Mineral Resources were demarcated by a boundary representative of the following inputs:

  • Existing open pit depletion,

  • Top of fresh rock (nominally 65 m below surface),

  • Life of Mine (LOM) pit design and

To the north and south of LOM designs: 380 m below topographic surface in Rosemont Main (78830 mN – 79205 mN) and 90 m in Rosemont South (77310 mN - 78240 mN).

Cut-Off Grade

The Mineral Resource cut-off grade for reporting of underground global gold resources at Rosemont was 2.0 g/t gold. This was based upon conceptual mining study outcomes at Rosemont, assessment of grade tonnage curves and consideration of comparable size deposits of similar mineralisation style and tenor.

Assessment of Reasonable Prospects for Eventual Economic Extraction

Entech assessed the Rosemont Underground MRE, as reported, to meet Reasonable Prospects for Eventual Extraction based on the following considerations.

Mining

It was assumed that Rosemont Main and South could be potentially mined via medium to small scale mechanised underground mining methods. This assumption was based on conceptual underground mining studies for Rosemont and extraction methodologies utilised in comparable size deposits of similar mineralisation style and tenor.

The MRE extends nominally 380 m and 320 m below topographic surface for Rosemont Main and Rosemont South respectively. Entech considers material at this depth would fall within the definition of ‘reasonable prospect of eventual economic extraction’ within an underground mining framework.

No dilution or cost factors were applied to the estimate.

Metallurgy

It should be noted that Entech has relied on metallurgical studies and mill production data undertaken and provided by RRL. Entech understands that the Rosemont ‘fresh’ material from underground will be milled through the existing plant infrastructure with expected recoveries (based on historical production and recent drilling testwork) averaging 93%.

No metallurgical recovery factors were applied to the Mineral Resources or Resource Tabulations.

10

==> picture [66 x 21] intentionally omitted <==

APPENDIX 1

JORC Code 2012 Edition – Table 1 – Rosemont ~~,~~

Section 1 Sampling Techniques and Data - Compiled by Regis Resources

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
The Rosemont gold prospect maiden underground MRE study was completed
using the sampling of Reverse Circulation (RC – 1,635 holes for 210,108m) and
Diamond (DD – 144 holes for 41,192.8m) drill holes producing mainly 1m samples
on a nominal 20m east spaced holes on 20m north grid spacing, which were in the
majority drilled angled -60 degrees to either mine grid 270 or 090 degrees. 111 RC
holes for 16,631m and 10 DD holes for 3,597m have been drilled since the March
2017 open pit MRE.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Regis drill hole collar locations were picked up by site-based authorised surveyors
using Trimble RTK GPS. Downhole surveying was measured by the drilling
contractors using Reflex EZ-Shot Downhole Survey Instrument or North Seeking
Gyro based tool for DD and Reflex EZ-Shot Downhole Survey Instrument for RC
holes. The surveys were completed every 30m down each drill hole.
Core is aligned and measured by tape, comparing back to down hole core blocks
consistent with industry practice.
Historical drill hole collar location pick up method is unknown. Collar locations
were viewed against a surface DTM created by photogrammetry and against Regis
drill hole collars. 30% of the historical collar locations were deemed to be
inaccurate for RL and out by an average of 3.19m. These collars were draped to
the surface DTM before use in the Resource estimate. Post-draping the
mineralisation, lithological logging and weathering logging conformed to the
accurately picked up drill holes. Downhole survey method is also not recorded for
the historical drilling. 40% of the historical holes only have planned dip and azimuth
recorded. These holes without proper dip and azimuth are generally shallower
(average 59m) and therefore are unlikely to deviate much, as the drill holes that
have downhole survey generally have minimal deviation, especially at the
shallower depths.
Regis drill hole sampling had certified standards and blanks inserted every 25th
sample to assess the accuracy and methodology of the external laboratories, and
field duplicates were inserted every 20th sample (RC only) to assess the
repeatability and variability of the gold mineralisation. Laboratory duplicates were
also completed approximately every 15th sample to assess the precision of the
laboratory as well as the repeatability and variability of the gold mineralisation.

11

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Results of the QAQC sampling were considered acceptable for an Archaean gold
deposit.
Historical drill hole sampling had field duplicates inserted every 20th sample for all
samples that returned >1g/t Au to assess the repeatability and variability of the
gold mineralisation. ALS and Analabs tested standards and blanks as well as
assay duplicates to assess the precision of the laboratory as well as the
repeatability and variability of the gold mineralisation. Field composite values were
compared to the single meter re-split values. Screen fire assay and fire assay
results were compared as were LeachWell and fire assay. Some mineralised core
samples were also sent to other laboratories for umpire assaying. Results of all
the historical QAQC sampling were considered acceptable for an Archaean gold
deposit.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases, more explanation may be required, such as where there
is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information.
For the Regis managed drilling 1m RC samples were obtained by cone splitter
(2.5kg – 3.0kg) and were utilised for lithology logging and assaying. Diamond core
was used for geotechnical and bulk density measurements as well as lithology
logging and assaying. Half of the core was sampled with half of the core being kept
in storage. The core has predominantly been sampled at 1m intervals, with some
sampling on geological intervals (0.2m – 1.0m).
The Regis managed drilling samples were dried, crushed and pulverised to get
85% passing 75µm and were predominantly Fire Assayed using a 50g charge
(Bureau Veritas, MinAnalytical, Kalassay, Aurum and SGS), with some Fire Assay
with a 40g charge and Aqua Regia Digest with AAS finish (Kalassay).
For historical drilling the samples were dried, crushed and pulverised to get 80%
passing 75µm and were predominantly Fire Assayed using a 50g charge (ALS and
Analabs), with the 4m field composites being assayed via Aqua Regia on 50g pulps
using an AAS finish.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
RC drilling completed with a 139mm diameter face sampling hammer.
Surface diamond drilling carried out by using either NQ or HQ32 (triple tube).
Core is routinely orientated by REFLEX ACT III tool.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
RC recovery was visually assessed, with recovery being excellent except in some
wet intervals which are recorded on logs. <1% of the overall mineralised zones
have been recorded as wet.
DD core was measured and compared to the drilled intervals, and recorded as a
percentage recovery. Recovery in the oxidised rock was poor, and excellent in
fresh and mineralised zones.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
RC samples were visually checked for recovery, moisture and contamination. The
drilling contractor utilised a cyclone and splitter to provide uniform sample size,
and these were cleaned routinely (cleaned at the end of each rod and more

12

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
frequently in wet conditions). A booster was also used in conjunction with the RC
drill rig to ensure dry samples are achieved.
The target zones for DD were predominantly highly competent fresh rock, where
the DD method provided high recovery.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
Sample recoveries for RC drilling are visually estimated to be medium to high. No
significant bias is expected although no recovery and grade correlation study was
completed.
The DD drill sample recovery in the transitional and fresh rock zones is very high,
and no significant bias is expected. Recoveries in the oxidised rock were lower.
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Lithology, alteration, veining, mineralisation and, on some holes, magnetic
susceptibility were logged from the RC chips and saved in the database. Chips
from every interval are also placed in chip trays and stored in a designated building
at site for future reference.
Lithology, alteration, veining, mineralisation, density and geotechnical information
were logged from the DD core and saved in the database. Half core from every
interval is also retained in the core trays and stored in a designated building at site
for future reference.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
All logging is qualitative except for magnetic susceptibility and geotechnical
measurements. Wet and dry photographs were completed on the core.
The total length and percentage of the relevant intersections logged.
All drill holes are logged in full.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
Core was half cut with a diamond core saw with the same half always sampled
and the surplus retained in the core trays. Non-competent clay zones are sampled
as whole core where necessary due to difficulty in cutting.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
The RC drilling utilised a cyclone and cone splitter to consistently produce 0.5kg
to 3.0kg dry samples.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Samples are dried, crushed and then pulverised to 85% passing 75µm (80%
passing 75µm for the historical drilling). This is considered acceptable for an
Archaean gold deposit.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
For the Regis managed drilling field duplicates (RC) were inserted every 20th
sample to assess the repeatability and variability of the gold mineralisation.
Laboratory duplicates were also completed roughly every 15th sample to assess
the repeatability and variability of the gold mineralisation.
Historical drill hole sampling had field duplicates inserted every 20th sample for all
samples that returned >1g/t Au to assess the repeatability and variability of the
gold mineralisation. ALS and Analabs tested standards and blanks as well as
assay duplicates to assess the precision of the laboratory as well as the
repeatability and variability of the gold mineralisation. Field composite values were
compared to the single meter re-split values. Screen fire assay and fire assay
results were compared as were LeachWell and fire assay. Some mineralised core
sampleswere also sent to other laboratoriesforumpire assaying. Results ofall

13

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
the historical QAQC sampling were considered acceptable for an Archaean gold
deposit.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Field RC duplicates were taken at the rig from a second chute on the cone splitter
allowing for the duplicate and main sample to be the same size and sampling
method. Field duplicates are taken every 20th sample. Laboratory duplicates
(sample preparation split) were also completed roughly every 15th sample.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
Sample sizes (1.5kg to 3kg) are considered to be a sufficient size to accurately
represent the gold mineralisation based on the mineralisation style (hypogene),
the width and continuity of the intersections, the sampling methodology, the coarse
gold variability and the assay ranges for the gold.
Field duplicates have routinely been collected to ensure monitoring of the sub-
sampling quality. Acceptable precision and accuracy is noted in the field
duplicates albeit the precision is marginally acceptable and consistent with a
coarse gold Archaean gold deposit.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
All gold assaying was completed by external commercial laboratories with samples
dried, crushed and then pulverised to 80% or 85% passing 75µm and assayed
using predominantly a 50g charge for fire assay analysis with AAS finish. Some
samples were also assayed using Fire Assay with a 40g charge and Aqua Regia
Digest with AAS finish with a 40g charge which are both also acceptable methods.
These techniques are industry standard for gold and considered appropriate.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
A handheld magnetic susceptibility meter (KT-10) was used to measure magnetic
susceptibility for some RC samples, and is recorded in the logging spread sheets.
The results were not used in the delineation of mineralised zones or lithologies.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
Certified Reference Material (CRM or standards) were inserted (every 25th sample
for RC and every 20thsample for DD) to assess the assaying accuracy of the
external laboratories. Blanks were inserted every 25thsample for both RC and
DD. Field duplicates were inserted every 20th sample for RC only to assess the
repeatability from the field and variability of the gold mineralisation. Laboratory
duplicates were also completed approximately every 15th sample to assess the
precision of assaying.
Evaluation of both the Regis submitted standards, and the internal laboratory
quality control data, indicates assaying to be accurate and without significant drift
for significant time periods. Excluding obvious errors, the vast majority of the CRM
assaying report shows an overall mean bias of less than 5% with no consistent
positive or negative bias noted. Duplicate assaying shows high levels of
correlation and no apparent bias between the duplicate pairs. Field duplicate
samples show marginally acceptable levels of correlation and no relative bias.
Results of the QAQC sampling were considered acceptable for an Archaean gold
deposit. Substantial focus has beengiven to ensuringsampling procedures met

14

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
industry best practise to ensure acceptable levels of accuracy and precision were
achieved in a coarse gold environment.
Verification of
sampling and
assaying
The~~v~~erification of significant intersections by either independent or alternative
company personnel.
No independent personnel have visually inspected the significant intersections.
Numerous highly qualified and experienced company personnel from exploration
and production positions have visually inspected the significant intersections.
The use of twinned holes.
Areas of close spaced drilling supports the location (width) and grade of the
mineralised zone.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
All geological and field data is entered into LogChiefTMor excel spreadsheets with
lookup tables and fixed formatting (and protected from modification) thus only
allowing data to be entered using the Regis geological code system and sample
protocol. Data is then emailed to the Regis database administrator for validation
and importation into a SQL database using Datashed.
Discuss any adjustment to assay data.
Any samples not assayed (i.e. destroyed in processing, listed not received) have
had the assay value converted to a -9 in the database. Any samples assayed
below detection limit (0.01 ppm Au) have been converted to 0.005 ppm (half
detection limit) in the database.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Regis drill hole collar locations were picked up by site-based authorised surveyors
using Trimble RTK GPS, calibrated to a base station (expected accuracy of
20mm).
Downhole surveying (magnetic azimuth and dip of the drill hole) was measured by
the drilling contractors in conjunction with Regis personnel using Reflex EZ-Shot
Downhole Survey Instrument or North Seeking Gyro based tool for DD and Reflex
EZ-Shot Downhole Survey Instrument for RC holes. The surveys were completed
every 30m down each drill hole. Magnetic azimuth is converted to AMG azimuth
in the database and then local grid, and local azimuth is used in the Resource
estimation.
Specification of the grid system used.
The grid system is AMG Zone 51 (AGD 84) for surveying pickups, with modelling
and estimation completed on a local grid.
Quality and adequacy of topographic control.
The topographic surface has been derived from a combination of the primary drill
hole pickups, end of January 2018 pit pickups and the pre-existing
photogrammetric contouring. This surface has been used to deplete the open cut
and underground MRE’s. Another surface has been created that separates the
open cut MRE from the underground MRE.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
The drilling has an effective spacing of 20 meters (east) by 20 meters (north) for
the majority of the deposit.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
The data spacing and distribution is sufficient to demonstrate spatial and grade
continuity of the mineralised domains to support the definition of Inferred and
Indicated Mineral Resources under the 2012 JORC code once all other modifying
factors have been addressed.

15

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation Commentary
Whether sample compositing has been applied. No sample compositing has been applied in the field within the mineralised zones.
Orientation of Whether the orientation of sampling achieves unbiased sampling of possible The deposit is sub-vertical dipping to the west and east so drilling is predominantly
data in relation structures and the extent to which this is known, considering the deposit type. orientated to best suit the mineralisation locally (mine grid east with a 50 to 60
to geological degree dip when the mineralisation dips west, mine grid west with a 50 to 60
structure degree dip when the mineralisation dips east) to be roughly perpendicular to both
the strike and dip of the mineralisation. Intercepts are close to true-width in some
cases, and are not true width where the mineralisation is at its steepest.
If the relationship between the drilling orientation and the orientation of key It is not believed that drilling orientation has introduced a sampling bias.
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample The measures taken to ensure sample security. Samples are securely sealed and stored onsite, until delivery to Perth via contract
security freight Transport, who then deliver the samples directly to the laboratory. Sample
submission forms are sent with the samples as well as emailed to the laboratory,
and are used to keep track of the sample batches.
Audits or The results of any audits or reviews of sampling techniques and data. No audits on sampling techniques and data have been completed.
reviews

16

==> picture [66 x 21] intentionally omitted <==

Section 2 Reporting of Exploration Results - Compiled by Regis Resources

Section 2 Reporting of Exploration Results - Compiled by Regis Section 2 Reporting of Exploration Results - Compiled by Regis Resources
(Criteria listed in theprecedingsection also applyto this section.)
Criteria JORC Code explanation Commentary
Mineral tenement Type, reference name/number, location and ownership including agreements The Rosemont gold mine comprises M38/237, M38/250 and M38/343, an area of
and land tenure or material issues with third parties such as joint ventures, partnerships, 16.83 km2(1,683 hectares).
status overriding royalties, native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting along with any known
Normal Western Australian state royalties apply and a further 2% NSR royalty
exists to a third party.
impediments to obtaining a licence to operate in the area. Current registered holders of the tenements are Regis Resources Ltd and Duketon
Resources Pty Ltd (100% owned by Regis). There are no registered Native Title
Claims.
Exploration done Acknowledgment and appraisal of exploration by other parties. The Rosemont gold deposit was discovered in the 1980s and was partially mined
by other parties as a shallow oxide open pit by Aurora Gold Limited in the early 1990s. Reported
production was 222kt at 2.65g/t for 18,600 ounces of gold. The ground was then
acquired by Johnsons Well Mining who defined a Resource at Rosemont in the
late 1990’s. The Resource at Rosemont has been held outright by Regis since
2006. Regis has conducted further drilling at Rosemont and defined a maiden
open-pit gold Reserve in November 2011.
Geology Deposit type, geological setting and style of mineralisation. Rosemont gold deposit is hosted in a quartz dolerite zone of a dolerite sill intruding
ultramafic and argillaceous sedimentary units of the western limb of the Erlistoun
Syncline in the Duketon Greenstone Belt. Gold mineralisation is associated with
brittle fracturing and quartz albite sericite carbonate sulphide alteration within the
quartz dolerite. Most gold occurs below the weathered profile in saprock and fresh
rock with the upper saprolite being leached of gold. The mineralisation trends NNW
over a strike length of 4.9km and mostly dips steeply to the west, with some zones
dipping steeply to the east.
Drill hole A summary of all information material to the understanding of the exploration Not applicable as there are no exploration results reported as part of this
Information results including a tabulation of the following information for all Material drill statement.
holes: Other relevant drill hole information can be found in Section 1 – “Sampling
easting and northing of the drill hole collar techniques, “Drilling techniques” and “Drill sample recovery”.
elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the information is
not Material and this exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why this is the case.

17

==> picture [66 x 21] intentionally omitted <==

Data aggregation In reporting Exploration Results, weighting averaging techniques, maximum This release is in relation to a maiden underground Mineral Resource estimate,
methods and/or minimum grade truncations (e.g. cutting of high grades) and cut-off with no exploration results being reported.
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
Relationship These relationships are particularly important in the reporting of Exploration The Rosemont drill holes were drilled at -50º to -60º to mine grid east and west,
between Results. and the mineralised zone is sub-vertical. The intercepts reported are close to true
mineralisation
widths and
intercept lengths
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be
width in some cases, and are not true width where the mineralisation is steepest.
a clear statement to this effect (e.g. ‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts This release is in relation to a maiden underground Mineral Resource estimate,
should be included for any significant discovery being reported These should with no exploration results being reported.
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not practicable, Not applicable as there are no exploration results reported as part of this
reporting representative reporting of both low and high grades and/or widths should be statement.
practiced to avoid misleading reporting of Exploration Results.
Other substantive Other exploration data, if meaningful and material, should be reported including No other material exploration data to report.
exploration data (but not limited to): geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.
Further work The nature and scale of planned further work (e.g. tests for lateral extensions Drilling is ongoing testing for underground potential at Rosemont.
or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the See the body of the announcement.
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.

18

==> picture [66 x 21] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources - Compiled by Entech PTY LTD

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary
Database Measures taken to ensure that data has not been corrupted by, for example, Geological metadata is centrally stored in a SQL database managed using
integrity transcription or keying errors, between its initial collection and its use for Mineral
DataShed Software. Regis Resources Ltd (“RRL”) employ a database
Resource estimation purposes. administrator responsible for the integrity of data imported and modified within the
system. All geological and field data is entered into LogChiefTMor excel spread
sheets with lookup tables and fixed formatting (and protected from modification)
thus only allowing data to be entered using the RRL geological code system and
sample protocol. Data is then emailed to the RRL database administrator for
validation and importation into a SQL database using Datashed. Sample numbers
are unique and pre-numbered calico sample bags are used.
Data validation procedures used. Following importation, the data goes through a series of digital and visual checks
for duplication and non-conformity, followed by manual validation by a company
geologist and database administrator.
Jarrad Price, Resource Geologist and full-time employee of RRL, is the Competent
Person responsible for the veracity of drill hole data underpinning the Rosemont
Underground Mineral Resources.
Entech understands RRL have suitable processes and due diligence in place to
ensure acceptable integrity of the drill hole data underpinning the Mineral
Resource. Entech utilised the drill hole data as supplied with basic data audits and
visual verification undertaken as part of the Entech due diligence process.
The drill hole data, as supplied by RRL and utilised for the Mineral Resource was
considered in good standing and incorporates drilling results available up to and
including January 3rd, 2018.
Site visits Comment on any site visits undertaken by the Competent Person and the The competent person has not made a site visit to Rosemont as part of this study.
outcome of those visits. All exploration and resource development drilling programmes are subject to
review by experienced senior RRL technical staff. These reviews have been
completed from the commencement of drilling and continue to the present.
If no site visits have been undertaken indicate why this is the case. For the purposes of this MRE Entech were of the opinion the mineralisation
interpretations and estimations could be undertaken utilising the experience of
RRL project, resource and structural geologists in combination with core photos of
the limited diamond drilling data available within the MRE area. There is currently
no underground exposure within the MRE area to inspect/verify mineralisation
controls. The Rosemont Maiden Underground MRE project area is currently
undergoing significant drilling for resource infill and testing of MRE mineralisation
domain interpretations. During these drilling programs Entech will be undertaking
a site visit with the primary focus being to observe, review and document drilling
and sampling practices along with enhancing understanding of the mineralisation
controls and aid interpretation prior to subsequent MRE updates.

19

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Due to Rosemont being an operational mine with successful mine to mill
reconciliation, the input data is not viewed as a potential risk to the MRE at this
time.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological interpretation of
the mineral deposit.
Lithology, structure and alteration were considered the predominant controls on
mineralisation. Geological and structural modelling of the mineralisation controls
within the Quartz Dolerite is currently underway, with preliminary observations
from drilling and production data available at the time of the Mineral Resource
Estimate (MRE).
Entech relied on database derived geological and assay data, input from RRL
geologists familiar with the Rosemont geology, current structural understanding of
the Quartz Dolerite mineralisation controls, existing open pit dig block data,
historical mineralisation wireframes and mining voids to evaluate geological,
structural and mineralisation continuity.
Factors which limited the confidence of the geological interpretation included;
absent or subjective lithological data on historical drill holes, RC sampling
representing the majority of mineralised drill intercepts, limited oriented structural
data within the mineralised zones of the Quartz Dolerite and a significant portion
of the drilling being down dip to interpreted mineralisation.
Factors which aided the confidence of the geological interpretation included;
recent structural analysis using available drill hole and open pit production data,
analysis of lithological, veining and alteration controls, close spaced drill data
within the upper Rosemont Main portion of the MRE along with geometry and
continuity observations from open pit production dig blocks.
Entech considers confidence is moderate for the geological interpretation,
geometry and continuity of the structures within the MRE. Locally at Rosemont
the mineralisation is almost exclusively contained within the brittle, sub-vertical
quartz dolerite phase of the Rosemont Dolerite. Mining to date supports the
geometry and continuity implied in the MRE.
Nature of the data used and of any assumptions made.
Mineralisation interpretations were informed by 296 reverse circulation (RC
inclusive of grade control) and 57 diamond drill (DD inclusive of diamond tails)
holes, structural observations and open pit dig block outlines.
Interpretation of mineralisation domains was based on a combination of geological
logging (lithology, veining and alteration) and a nominal cut-off grade of 1.0 g/t
gold. A host Quartz-Dolerite geology domain was interpreted using a combination
of available lithology logging and assay information. Following this, a total of 5
domains were defined within Rosemont Main with a further 9 domains interpreted
in Rosemont South. Areas within the Quartz Dolerite and exclusive to the
mineralised domains were delineated as a background / waste domain (999). For
instances where the intercept fell below the nominal cut-off but continuity was
supported by veining / alteration or was required for continuity in the instance of
down dip drill orientation the intercept was included within the domain due to the
commodity and the style of deposit.

20

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Assumptions with respect to mineralisation orientation and continuity within the
underground MRE were drawn directly from:

Recent structural analysis using available drill hole and open pit
production data

Analysis of lithological, veining and alteration controls

Close spaced drill data within the upper Rosemont Main portion of the
MRE
These assumptions were then tested with geostatistical analysis of the composite
data without domain boundaries applied and subset comparison for both the
Rosemont Main and Rosemont South areas.
The effect, if any, of alternative interpretations on Mineral Resource estimation.
Alternative mineralisation geometries were considered during interpretation, with
less robust, lower continuity outcomes being derived. An alternative estimate to
the deterministic domain interpretation was completed using an unconstrained
dynamic anisotropy (DA) to establish local and global variance.
The use of geology in guiding and controlling Mineral Resource estimation.
A model of the lithology, in particular the host Quartz Dolerite unit, was generated
prior to the mineralisation domain interpretation commencing. The mineralisation
geometry has a strong relationship with the lithological interpretation and structure,
especially in transitional and fresh material. Mineralisation domain orientation is
predominantly aligned to the host Quartz Dolerite with geometry and continuity
concurring with the current structural understanding of mineralisation controls at
Rosemont. No interpretation was undertaken above the top of fresh rock horizon.
A limited number of structural observations from diamond drilling in Rosemont
South were utilised in interpretation of mineralised domains.
Weathering surfaces were interpreted by RRL Geologists from drill logging and
extended laterally beyond the limits of the Mineral Resource model. The top of
fresh rock represents the upper limit of the interpreted mineralisation, Quartz
Dolerite host and underground MRE.
The factors affecting continuity both of grade and geology.
A brittle sub-vertical quartz dolerite localises and controls the gold mineralisation
in the more hypogene-controlled transitional and fresh horizons. There is also a
direct correlation between gold and veining, particularly with laminated and cloudy
quartz carbonate veins.
A major regional flexure in the Baneygo Shear offsets the mineralisation and
separates it into a main and north zone (excluded from this MRE).
Dimensions The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and lower
limits of the Mineral Resource.
The Quartz-Dolerite host unit within the underground mineral resource area is
mineralised over a strike length of 2,600 m, with plan widths ranging from 0.5 to
50 m. Depth below topography to the upper limit of the quartz-dolerite is 60 m, with
the lower limit of the quartz-dolerite being 500 m below surface.
Domains in Rosemont Main (5 domains in total) are mineralised over a 400 m
strike length,withplan widths beinghighlyvariable and rangingfrom 0.1 – 8 m.

21

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Depth below surface to the upper and lower limits of Rosemont Main are 230 m
and 380 m respectively.
Domains in Rosemont South (9 domains in total) are mineralised over a 930 m
strike length, with plan widths being highly variable and ranging from 0.1 – 6 m.
Depth below surface to the upper and lower limits of Rosemont South are 90 m
and 310 m respectively.
Mineralisation within the model which did not satisfy the classification criteria for
the MRE remained unclassified.
Estimation and
modeling
techniques
The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and parameters used.
Interpretations of domain continuity were initially undertaken within Geovia
SurpacTMsoftware, with mineralisation intercepts correlating to individual domains
manually selected prior to creation of a vein model within LeapfrogTMGeo implicit
modelling software. Interpretation was a collaborative process with RRL
Geologists to ensure modelling appropriately represented observations and
current understanding of geology and mineralisation controls. Domain
interpretations utilised all available drilling.
Sample data was composited to a two-meter downhole length using a best fit
method. Top caps were applied prior to block grade estimation, with the maximum
distance of possible extrapolation within each domain, based on variogram
analysis, limited to 90 m, 48 m and 80 m for Rosemont Main, Rosemont South and
the Background Waste estimates respectively.
Exploratory Data Analysis (EDA) and Variography analysis of the capped and
declustered composited gold variable within domain groups (Rosemont Main,
Rosemont South, 999 Domain) was undertaken within SupervisorTMsoftware.
An Ordinary Kriging (OK) interpolation approach in Geovia SurpacTMwas selected
for all interpreted domains with a high-grade restriction applied to domains 302,
303 and 999 (background waste). Domain 999 and a check estimate utilised
Dynamic Anisotropy (DA) to account for frequent inflections in the geometry of
quartz-dolerite unit.
All estimates exclusive of the DA check estimate utilised domain boundaries as
hard boundaries for grade estimation wherein only composite samples within that
domain are used to estimate blocks coded as within that domain except for a
limited number of selected samples on the transitional / fresh interface. Informing
samples on the transitional / fresh interface displayed no statistical bias relative to
the mineralisation domains, aided in domain delineation and provided a reduction
in edge effect associated with the domain truncation at the top of fresh rock.
Other estimation parameters including: estimate block size and search
neighbourhoods were derived through KNA.
The availability of check estimates, previous estimates and/or mine production
records and whether the Mineral Resource estimate takes appropriate account
of such data.
Two Check Estimates were undertaken using the following approaches: Inverse
Distance Squared (constrained by individual mineralisation domains), and
Ordinary Kriging (unconstrained) utilising Dynamic Anisotropy within the host
quartz-dolerite.

22

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Mine production data (dig block outlines) from the current Rosemont open pit was
utilised as a visual cross reference of each estimate.
The~~a~~ssumptions made regarding recovery of by-products.
There were no assumptions made with respect to by-products.
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
No estimation was made for deleterious elements or other non-grade variables.
In the case of block model interpolation, the block size in relation to the average
sample spacing and the search employed.
Block dimensions for interpolation were Y: 15 mN, X: 2.5 mE, Z: 15 mRL with sub-
celling of Y: 0.9375 mN, X: 0.625 mE, Z: 0.9375 mRL to provide adequate domain
volume definition and honour wireframe geometry. Considerations relating to
appropriate block size include: drill hole data spacing, conceptual mining method
SMU analysis, variogram continuity ranges and search neighbourhood
optimisations.
Only diamond and reverse circulation data was utilised during the estimate.
Average sample spacing is variable ranging from 40 to 70 meters, with a nominal
40 meter spacing maintained for all classified domains.
A multi-pass search strategy was utilised for all estimates to allow sufficient
estimate definition of the defined domains. A limit of 5 samples per drillhole was
utilised to prevent over-representation of down-dip drilling with minimum and
maximum samples for all domains set at 4 and 14 respectively. Search criteria
within individual domains is outlined below:

Rosemont Main: First Pass (Isotropic) of 45 m; Second Pass (Isotropic)
of 90 m. A high-grade restriction was also utilised for domains 302 and
303 to prevent local over-estimation in areas of low sample density
adjacent to high grade sub-populations.

Rosemont South: First Pass (Isotropic) of 16 m; Second Pass (Isotropic)
of 32 m; Third Pass (Isotropic) of 48 m.

Background Waste (999): Dynamic Anisotropy Search; First Pass of 53
meters (Isotropic in the estimate plane with a 1:4 ratio across strike);
Second Pass of 80 m (Isotropic in the estimate plane with a 1:3 ratio
across strike). A high-grade restriction was also utilised for the waste
domain to prevent local over-estimation in areas of low sample density
adjacent to high grade sub-populations.

Dynamic Anisotropy Check Estimate (Encompassing all composite data
within the Quartz-Dolerite): First Pass of 53 m (Isotropic in the estimate
plane with a 1:4 ratio across strike); Second Pass of 80 m (Isotropic in
the estimate plane with a 1:3 ratio across strike).
Any assumptions behind modelling of selective mining units.
No selective mining units were assumed in this estimate.
Any assumptions about correlation between variables.
No correlated variables have been investigated or estimated.

23

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Description of how the geological interpretation was used to control the resource
estimates.
Apart from the check estimate, all domain estimates were based on mineralisation
domain constraints constructed using a combination of geological logging
(lithology, veining and alteration) and a nominal cut-off grade of 1.0 g/t gold. All
domains including the host quartz-dolerite are truncated at the top of fresh rock
surface. The mineralisation constraints have been used as hard boundaries for
grade estimation wherein only composite samples within that domain are used to
estimate blocks coded as within that domain except for a limited number of
selected samples on the transitional / fresh interface.
The Dynamic Anisotropy check estimate did not utilise mineralisation domain hard
boundaries and thus contained all composites within the Quartz Dolerite inclusive
of the background / waste composites and was constrained by the quartz-dolerite
unit.
Discussion of basis for using or not using grade cutting or capping.
Assessment and application of top-capping for the estimate was undertaken on
the declustered gold variable within individual domains. Top caps, where
appropriate, were applied on a grouped domain basis, as outlined below;

Rosemont Main. Top Cut = 80 g/t Au and 4.52% metal reduction.

Rosemont South. Top Cut = 30 g/t Au and 0.86% metal reduction.
A high-grade restriction was also utilised for domains 302, 303 and the background
waste domain (999) to prevent local over-estimation in areas of low sample density
adjacent to high grade sub-populations.
The process of validation, the checking process used, the comparison of model
data to drill hole data, and use of reconciliation data if available.
Validation of the gold estimate outcomes was completed by global and local bias
analysis (swath plots), statistical and visual comparison (cross and long section)
with input data. Complete reconciliation data pertaining to production performance
of Rosemont, over time, was not available for underground and as an open pit
dataset could not be relied upon as an appropriate comparison for validation
purposes. Visual validation of the estimate and open pit production dig block
outlines in an area of overlap in Rosemont pit provided spatial comparison of
estimate outcomes.
Moisture Whether the tonnages are estimated on a dry basis or with natural moisture,
and the method of determination of the moisture content.
The tonnages were estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or quality parameters applied.
The Mineral Resource cut-off grade for reporting of underground global gold
resources at Rosemont was 2.0 g/t gold. This was based upon conceptual
underground economic evaluations at Rosemont, and consideration of
comparable size deposits of similar mineralisation style and tenor.
Mining factors
or
assumptions
Assumptions made regarding possible mining methods, minimum mining
dimensions and internal (or, if applicable, external) mining dilution. It is always
necessary as part of the process of determining reasonable prospects for
eventual economic extraction to consider potential mining methods, but the
assumptions made regarding mining methods and parameters when estimating
Mineral Resources may not always be rigorous. Where this is the case, this
It was assumed that Rosemont could be potentially mined via medium to small
scale mechanised underground mining methods. This assumption was based on
conceptual economic evaluations and extraction methodologies utilised in
comparable size deposits of similar mineralisation style and tenor.
No dilution or cost factors were applied to the estimate.

24

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
should be reported with an explanation of the basis of the mining assumptions
made.
The MRE extends nominally 380 m below surface. Entech considers material at
this depth suitable to have a reasonable prospect of eventual economic extraction
within an underground mining framework.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding metallurgical amenability. It
is always necessary as part of the process of determining reasonable prospects
for eventual economic extraction to consider potential metallurgical methods,
but the assumptions regarding metallurgical treatment processes and
parameters made when reporting Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of
the basis of the metallurgical assumptions made.
It should be noted that Entech has relied on metallurgical studies and mill
production data undertaken and provided by RRL. Based on this data Entech
understands that the Rosemont ‘fresh’ material from underground would be treated
within the existing plant infrastructure with expected recoveries averaging 93%.
No metallurgical recovery factors were applied to the Mineral Resources or
Resource Tabulations.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process residue disposal
options. It is always necessary as part of the process of determining reasonable
prospects for eventual economic extraction to consider the potential
environmental impacts of the mining and processing operation. While at this
stage the determination of potential environmental impacts, particularly for a
greenfields project, may not always be well advanced, the status of early
consideration of these potential environmental impacts should be reported.
Where these aspects have not been considered this should be reported with an
explanation of the environmental assumptions made.
It has been assumed that current or similar operational approaches, protocols and
facilities applied to environmental factors at Rosemont continue for the duration of
the project life.
Bulk density Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness of the samples.
The bulk density values were derived from 1,150 measurements taken on the core.
60 were measured for RRL by an independent laboratory (ALS AMMTEC) via
water immersion method with wax coating, 695 are pre-RRL measurements being
completed by an independent laboratory (Australian Assay Laboratories) via water
immersion method with wax coating. The remainder (395) have been completed
onsite by water immersion method on fresh rock core. All generations of
measurements compare closely.
There is little variation of bulk density values within each oxidation profile, therefore
mean values have been applied to each horizon. Transported and oxide is
1.75 t/m3, saprock (transitional) is 2.35 t/m3, and fresh is 2.76 t/m3.
The bulk density for bulk material must have been measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
The oxide and transitional bulk density samples have all been measured by
external laboratories using wax coating to account for void spaces. Onsite
measurements by water immersion method are only conducted on competent
transitional and fresh core, with an extra measurement after water immersion to
ensure the sample has not taken in water.
Discuss assumptions for bulk density estimates used in the evaluation process
of the different materials.
Little spatial variation is noted for the bulk density data within lithological and
weathering boundaries and therefore an average bulk density has been assigned
for tonnage reporting based on weathering coding.
Classification The basis for the classification of the Mineral Resources into varying confidence
categories.
Mineral Resources were classified based on geological and grade continuity
confidence, geological domaining, estimation quality parameters, and nominal drill
spacing.

25

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation
Commentary
Inferred Mineral Resources were defined where a low to moderate level of
geological confidence in geometry, continuity and grade was demonstrated, and
were identified as areas where:

Drill spacing was averaging a nominal 40 m or less, or where drilling was
within 40 m of the block estimate; and

Estimation quality was considered low, as delineated by a conditional
bias slope < 0.6.
The reported Mineral Resource for underground was constrained at depth by the
available drill hole spacing outlined for Inferred classification, nominally 380 m
below topography in Rosemont Main and 320 m below topography in Rosemont
South. Upper limit constraints on the Mineral Resources were demarcated by a
wireframe boundary utilising: existing depletion, top of fresh rock (nominally 65 m
below surface), Life of Mine (LOM) pit design, 380 m below topographic surface in
Rosemont Main (78830 mN – 79205 mN) and 90 m in Rosemont South (77310
mN-78240 mN).
Whether appropriate account has been taken of all relevant factors (ie relative
confidence in tonnage/grade estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution of the
data).
Consideration has been given to all factors material to the Mineral Resource
outcomes, including but not limited to: confidence in volume and grade delineation,
quality of data underpinning Mineral Resources, mineralisation continuity
experienced during open pit operations and variability of alternate volume
interpretations and grade interpolations (sensitivity analysis).
In addition to the above factors the classification process considered nominal drill
hole spacing and estimation quality (conditional bias slope, number of samples,
distance to informing samples).
Whether the result appropriately reflects the Competent Person’s view of the
deposit.
The delineation of Inferred Mineral Resources appropriately reflects the
Competent Person’s view on the deposit.
Audits or
reviews
The results of any audits or reviews of Mineral Resource estimates.
Internal Audits and peer review were undertaken by Entech with a focus on
independent resource tabulation, block model validation, verification of technical
inputs, and approaches to domaining,interpolation, and classification.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative accuracy and confidence level in
the Mineral Resource estimate using an approach or procedure deemed
appropriate by the Competent Person. For example, the application of statistical
or geostatistical procedures to quantify the relative accuracy of the resource
within stated confidence limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors that could affect the relative
accuracy and confidence of the estimate.
Variances to the tonnage, grade, and metal of the Mineral Resource estimate is
expected with further definition drilling. It is the opinion of the Competent Person
that these variances will not significantly affect economic extraction of the deposit.
.
The statement should specify whether it relates to global or local estimates, and,
if local, state the relevant tonnages, which should be relevant to technical and
economic evaluation. Documentation should include assumptions made and the
procedures used.
The Mineral Resource statement relates to global tonnage and grade estimates.
No formal confidence intervals nor recoverable resources were undertaken or
derived.

26

==> picture [66 x 21] intentionally omitted <==

Criteria JORC Code explanation Commentary
These statements of relative accuracy and confidence of the estimate should be
With respect to underground Mineral Resources estimated at Rosemont, the
compared with production data, where available. geological interpretation for lithology and mineralisation domains were adequate
for the estimation of Inferred Mineral Resources.

27