ANNUAL GENERAL MEETING 12 NOVEMBER 2015
2 2
DISCLAIMER & COMPETENT PERSONS STATEMENT
This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL") and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.
This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Regis’ control, may cause the actual results, performance and achievements of Regis to differ materially from those expressed or implied in this presentation. To the maximum extent permitted by law, Regis does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of Regis, and will not be responsible for any loss or damage arising from the use of the information. The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Regis or its activities.
The information in this presentation that relates to Exploration Results is extracted from the ASX announcement released 14 October 2015 entitled “Significant Exploration Drilling Results at Duketon ” and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The information in this presentation that relates to Mineral Resources or Ore Reserves is extracted from the Mineral Resource and Ore Reserve Statement released to the Australian Securities Exchange (ASX) on 16 July 2015 and for which Competent Person’s consents were obtained. The Competent Person’s consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original ASX announcement released on 16 July 2015 and, in the case of estimates or Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement.
ASX announcements are available on the Company’s website at www.regisresources.com.au
==> picture [720 x 48] intentionally omitted <==
3 3
ONE YEAR ON
FOCUS AT 2014 AGM
==> picture [332 x 134] intentionally omitted <==
Garden Well February 2014
-
Recovering from flood at GW & RMT
-
Understanding and resolving reconciliation challenges at GW
-
Getting operations to steady state
-
Rebuilding cash position & dividends
-
Rebuilding market confidence
-
Exploration on the backburner
-
Acquisitions not on the agenda
FOCUS AT 2015 AGM
==> picture [332 x 133] intentionally omitted <==
Garden Well November 2015
-
GW reserve updated and performing
-
Operations at steady state and optimisations underway
-
Cash-flow strong, dividend restarted
-
Share price recovery
-
Extensive exploration underway and returning excellent growth potential
-
Two regional acquisitions completed
==> picture [720 x 48] intentionally omitted <==
4 4
REVIEW OF 2015 OPERATIONS
DUKETON OPERATIONS DELIVER STRONG CASHFLOW
==> picture [317 x 364] intentionally omitted <==
----- Start of picture text -----
||||
|---|---|---|
|FY2015|
|Ore mined (Mbcm)|4.65|
|Waste mined (Mbcm)|23.70|
|Stripping ratio (w:o)|5.10|
|Ore mined (Mtonnes)|11.07|
|Ore milled (Mtonnes)|9.84|
|Head grade (g/t)|1.11|
|Recovery (%)|88|
|Gold production (ounces ‘000)|310|
|Cash cost (A$/oz)|826|
|Cash cost inc royalty (A$/oz)|891|
|All in Sustaining Cost (A$/oz)|[1]|994|
----- End of picture text -----
1 AISC calculated on a per ounce of production basis
==> picture [364 x 355] intentionally omitted <==
==> picture [57 x 48] intentionally omitted <==
5 5
CORPORATE
CAPITAL STRUCTURE
SHAREHOLDERS
| CAPITAL STRUCTURE | ||
|---|---|---|
| ASX code | RRL | |
| Shares on issue | 500m | |
| Last price Market capitalisation Daily turnover (no. shares) Unlisted options FINANCIALS Cash & bullion (30 Sept 15) Debt (30 Sept 15) FY15 EBITDA FY15 NPAT FY15 Cash-flow from ops Dividend |
$2.05 A$1,024m 4.1m 13.7m $98m $20m $181M $87M $142m 6cps |
|
| OPERATIONS SNAPSHOT Duketon operations (WA) 10Mtpa McPhillamys project (NSW) 2.2Moz Resources 7.6Moz |
≈290kozpa resource |
|
| Reserves | 2.0Moz |
==> picture [297 x 121] intentionally omitted <==
----- Start of picture text -----
Australian insto
5%
11% 28% Newmont
9%
North American insto
13%
Directors and mgt
19%
15% UK & Europe insto
Asian insto
Other (retail)
----- End of picture text -----
SHARE PRICE & VOLUME
==> picture [313 x 110] intentionally omitted <==
----- Start of picture text -----
2.5 35
30
2
25
1.5 20
1 15
10
0.5
5
0 0
Share price (A$) Volume (Millions)
----- End of picture text -----
==> picture [720 x 93] intentionally omitted <==
----- Start of picture text -----
Reserves 2.0Moz
----- End of picture text -----
6 6
BALANCE SHEET
NET CASH POSITION BUILDING STRONGLY
==> picture [517 x 239] intentionally omitted <==
----- Start of picture text -----
120
100
80
60
Cash
40
Debt
20
Net cash/(debt)
-
Jun-14 Sep-14 Dec-14 Mar-15 Jun-15 Sep-15
-20
-40
-60
$ Millions
----- End of picture text -----
Strong build in cash-flow since flood affected operations in March 2014 quarter
-
Debt peaked at $61m in the June 2014 quarter
-
Debt now paid down to $20m – due June 2017
-
Cash and bullion $98m (Sept 2015)
Net cash has increased by $125m over last 15 months
==> picture [720 x 48] intentionally omitted <==
7 7
PRODUCTION GUIDANCE 2016
GUIDANCE
Production: 275,000 – 305,000 ounces Cost: AISC A$970 – A$1,070/oz Expansion capital: A$15-20 million
GUIDANCE MID-POINT STATISTICS*
==> picture [479 x 242] intentionally omitted <==
----- Start of picture text -----
||||||
|---|---|---|---|---|
|Moolart|Rosemon|Garden|Total|
|Well|t|Well|
|Ore mined (Mtonnes)|2.8|2.2|5.6|10.6|
|Ore milled (Mtonnes)|2.9|2.3|5.0|10.1|
|Head grade (g/t)|0.89|1.23|0.92|0.98|
|Recovery (%)|91|93|88|91|
|Gold production (ounces|
|75|85|130|290|
|‘000)|
|Cash cost (A$/oz)|820|840|900|860|
|Cash cost inc royalty|880|910|970|930|
|(A$/oz)|
|All in Sustaining Cost|950|1,070|1,040|1,020|
|(A$/oz)|
----- End of picture text -----
2016F operating cash-flow ≈ A$150m at mid-point AISC and current (A$1,550/oz) gold price
==> picture [206 x 395] intentionally omitted <==
==> picture [57 x 48] intentionally omitted <==
- Errors in summation may occur in this table due to rounding
8 8
FY2016 Q1 OPERATING RESULTS
| Moolart Well Rosemont Garden Well Total Ore mined (bcm ) 364,919 324,866 577,414 1,267,199 Waste mined (bcm) 1,307,763 2,698,439 1,846,448 5,852,650 Stripping ratio (w:o) 3.58 8.31 3.20 4.62 Ore mined (tonnes) 743,521 736,851 1,519,127 2,999,499 Ore milled (tonnes) 712,364 639,300 1,209,319 2,560,983 Head grade (g/t) 0.92 1.35 0.94 1.04 Recovery (%) 89.5 92.2 84.3 88.2 Gold production (ounces) 18,861 25,567 30,988 75,416 Cash cost (A$/oz) 812 721 910 821 Cash cost inc royalty (A$/oz) 879 785 977 888 All in Sustaining Cost (A$/oz) 959 903 1,040 973 |
||
==> picture [720 x 48] intentionally omitted <==
9 9
GARDEN WELL KPIs
==> picture [720 x 455] intentionally omitted <==
10 10
AQCUISITIONS FOR GROWTH
==> picture [428 x 402] intentionally omitted <==
----- Start of picture text -----
10km
Moolart Well
Rosemont
Gloster Tenure
Garden Well
Duketon Mining JV Tenure
Regis Tenure
Major Shear Zone
Gold Project
----- End of picture text -----
- Compliant with 1996 JORC Code and Guidelines (refer ASX announcement 16 July 2015)
MOOLART WELL AREA
-
Mine life 3 years
-
Successful reserve replacement of production in recent years through oxides and satellites
Recent strategic transactions to further bolster this operation:
-
Acquisition of 365koz Resource* Gloster gold deposit for $1.5m + royalty
-
Duketon Gold Exploration Joint Venture:
-
373km[2] of gold prospective tenure mostly proximal to MW
-
Regis spending $1m over 2 years to earn 75%
==> picture [57 x 48] intentionally omitted <==
11 11
EXPLORATION UPDATE
SIGNIFICANT RESULTS AT DUKETON IN SEPT15Q
-
Completed 45,517m of exploration drilling on >10 projects and prospects
-
Further significant results at a number of projects:
-
Baneygo – 12km south of Rosemont mill
-
High grade results continue, resource estimation in Dec15Q
-
Idaho – 2.2km north of Baneygo
- Reconnaissance regional drilling – significant results
-
Early indications of potential of >12km Rosemont-Baneygo shear
-
Tooheys Well – 2.5km south of Garden Well mill
- Very high grade results, drilling continuing to find extent
-
Coopers – 11km south of Moolart Well mill
- Significant results continue, resource estimation Dec15Q
-
Rosemont south underground
-
Significant results show continuity of gold mineralization
-
Appears high grade shoot plunging north not south as previously thought
-
-
Commenced 20,000m drill out of Gloster Gold Deposit
-
Executed formal agreements for Duketon Gold JV – fieldwork to commence
==> picture [720 x 48] intentionally omitted <==
12 12
DUKETON NEAR TERM GROWTH
==> picture [427 x 400] intentionally omitted <==
CURRENT MINE LIVES
| Project Mine Life Garden Well 7 years Rosemont 6 years Moolart Well 3 years |
Mill tpa |
|---|---|
| ≈ 5 MT | |
| ≈ 2 MT | |
| ≈ 3 MT |
MINE LIFE EXTENSION OPPORTUNITIES
| Project | Status | |
|---|---|---|
| Gloster | Resource pending, then DFS | |
| Coopers | Resource pending | |
| Erlistoun | Scheduling | |
| Baneygo | Resource pending | |
| Tooheys Well | Further drilling | |
| Rosemont U/G | Diamond drilling | |
| GW stage 6 | Drilling & study |
-
Proximity to mill capacity
-
Known gold hosting structures Shallow & poorly tested ► Strong extension expected
==> picture [720 x 48] intentionally omitted <==
13 13
BANEYGO GOLD PROJECT
EXCITING HIGH GRADE RESULTS POINT TO NEW DUKETON PROJECT
-
12km south of Rosemont
-
Gold hosted in Quartz Dolerite similar to Rosemont
-
Baneygo 43koz Au Resource 2004 in 4 small deposits
-
Regis drilled on 40m traverses 330 RC holes for 31,100m
-
Highly significant new gold mineralisation defined over 3km strike outside 2004 Resource
-
Diamond drilling completed for geotechnical and metallurgical purposes
-
Resource update Dec 15Q
Historical drilling grey Regis drilling green and red
==> picture [389 x 48] intentionally omitted <==
14 14
BANEYGO DRILL RESULTS
| Hole No | Hole No | Northing (mN) Easting (mE) Hole Depth (m) From (m) To (m) Interval (m) Gold g/t |
|---|---|---|
| RRLBYRC002 | 6907462 431925 114 50 83 33 8.35 |
|
| RRLBYRC023 | 6906712 432197 102 35 42 7 8.96 |
|
| RRLBYRC024 | 6906721 432235 168 87 110 23 2.55 |
|
| RRLBYRC034 | 6906092 432357 78 28 42 14 6.95 |
|
| RRLBYRC082 | 6907458 431914 72 6 41 35 1.46 |
|
| RRLBYRC084 | 6907547 431914 108 60 83 23 3.05 |
|
| RRLBYRC086 | 6907627 431901 120 68 85 17 3.73 |
|
| RRLBYRC100 | 6906639 432240 138 54 69 15 1.97 |
|
| RRLBYRC107 | 6907319 432000 114 69 74 5 12.34 |
|
| RRLBYRC114 | 6907502 431914 120 53 90 37 8.73 |
|
| RRLBYRC117 | 6907430 431961 102 84 86 2 87.49 |
|
| RRLBYRC128 | 6906677 432238 117 78 86 8 8.03 |
|
| RRLBYRC142 | 6906492 432313 124 95 105 10 6.36 |
|
| RRLBYRC162 | 6907668 431897 117 76 95 19 4.31 |
|
| RRLBYRC166 | 6907193 431993 42 12 30 18 3.36 |
|
| RRLBYRC178 | 6906130 432346 74 29 42 13 10.79 |
|
| RRLBYRC201 | 6907495 431882 54 22 36 14 5.46 |
|
| RRLBYRC220 | New | 6906318 432277 33 13 21 8 10.69 |
| RRLBYRC229 | 6906166 432329 53 39 43 4 24.01 |
|
| RRLBYRC243 | Sept | 6906651 432279 174 147 157 10 6.11 |
| RRLBYRC278 | 15Q | 6906627 432329 243 208 219 11 16.65 |
| RRLBYRC315 | 6907523 431916 103 69 87 18 4.73 |
|
| RRLBYRC319 | 6907481 431931 123 94 101 7 12.01 |
|
| RRLBYRC322 | 6907602 431914 114 82 107 25 3.27 |
>50gm intersections are tabled
All coordinates are AGD 84. All holes were drilled at -60 ° to 254 °
All Intercepts calculated using a 0.5g/t lower cut, no upper cut, maximum 2m internal dilution. All assays determined on 1m split samples by fire assay
==> picture [55 x 47] intentionally omitted <==
15 15
BANEYGO GOLD PROJECT
Baneygo
A$1,400/oz pit shells based on recent Regis drilling
Baneygo Beacon
Block Model g/t Au
Baneygo South
$1,400/oz pit shells capturing significant drilling outside existing historical Resources in the 3km area tested
Sydney Mint
==> picture [55 x 47] intentionally omitted <==
15
16 16
ROSEMONT TO BANEYGO
REGIONAL SCALE OPPORTUNITY
==> picture [713 x 433] intentionally omitted <==
----- Start of picture text -----
REGIONAL SCALE OPPORTUNITY
Rosemont
Rosemont-Baneygo trend 20km, significant
intercepts but poorly tested.
Quartz dolerite host rock at Rosemont
continues to Baneygo and further south
22m @ 2.6g/t, f 22m Recent RC drilling around Baneygo.
10km
Garden
King John New discovery Idaho
Well
3m @ 7.7g/t, f 41m RRLIHRC002 5m @ 3.22g/t Au from 24m
4m @ 8.5g/t, f 28m
RRLIHRC004 6m @ 3.16g/t Au from 46m
RRLIHRC008 22m @1.82g/t Au from 28m
10m @ 1.8g/t, f 22m including 6m @ 5.16g/t Au from 44m
8m @ 1.9g/t, f 14m
20km corridor requires further drilling
13m @ 4.9g/t, f 17m Idaho
•
Previous drilling max 100m deep with
33m @ 8.4g/t, f 50m most only 50m deep
11m @ 7.3g/t, f 21m
•
21m @ 9.3g/t, f 16m Erlistoun Up to 800m gaps between drill lines
Continue to test strike continuation north to
Baneygo
Rosemont on 400m traverses
22m @ 2.5g/t, f 26m
5m @ 4.6g/t, f 7m
2m @ 12.6g/t, f 13m
----- End of picture text -----
17 17
IDAHO GOLD PROSPECT
New Gold discovery Idaho 2km north of Baneygo
Idaho Gold Prospect
Baneygo Gold Deposit
North
Block Model g/t Au
==> picture [87 x 97] intentionally omitted <==
==> picture [98 x 45] intentionally omitted <==
==> picture [55 x 47] intentionally omitted <==
17
18 18
ROSEMONT DEEPS
==> picture [720 x 261] intentionally omitted <==
----- Start of picture text -----
South North
500mRL
300mRL
100mRL
High Grade Southern shoot where 6 hole DD
programme was completed originally thought High Grade Central shoot under
to be plunging south. New interpretation has Rosemont Main pit plunging north
shoot plunging north
----- End of picture text -----
- Further drilling to be designed in Dec15Q to test southern and central high grade shoots
==> picture [720 x 48] intentionally omitted <==
19 19
McPHILLAMYS (NSW)
FOCUS ON KEY INFRASTRUCTURE BEFORE MOVE TO PFS
==> picture [367 x 348] intentionally omitted <==
-
250km west of Sydney
-
Gold resource 2.2Moz 100% Regis owned
-
Conceptual studies show viable project
-
Current focus on key infrastructure
-
Will then move to PFS Well established gold mining district • Cadia +40Moz Newcrest • Cowal +3Moz Evolution • Northparkes +2Moz* China Moly
-
Intrinsic portfolio value • Large undeveloped gold resource in Australia – rare and getting rarer!
-
• Low stripping ratio and geological continuity at depth give the in pit resource significant leverage to gold price upside
-
• Medium term development proposition
==> picture [57 x 48] intentionally omitted <==
- Recent quoted resources from public information
20 20
RECAP
-
Duketon operations steady state and optimising
-
Strong cash-flow underpinning dividends and growth
-
Minimal capital reinvestment required at the Duketon operations
-
Continued exciting exploration results at Duketon
-
Including Baneygo, Idaho, Tooheys Well & Coopers
-
Pointing to extensions of mine life at all three operations
-
Advantage of processing capacity – “ex-capex” developments
-
Bolt on acquisitions to leverage off processing capacity
-
Work continuing to secure infrastructure required for McPhillamys project
Regis business is robust, generating strong free cash-flow with growth opportunities both organic and external
==> picture [720 x 48] intentionally omitted <==
21 21
JORC COMPLIANT MINERAL RESOURCES 31 MARCH 2015
Group Mineral Resources
| Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | Group Mineral Resources | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| as at 31 March 2015 | |||||||||||||||
| Gold | Measured | Indicated | Inferred | Total Resource | Competent Person4 |
||||||||||
| Project | Type | Cut-Off (g/t) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | 0.4 | 3.0 | 0.89 | 87 | 29.2 | 0.75 | 706 | 15.0 | 0.62 | 300 | 47.3 | 0.72 | 1,093 | A |
| Garden Well1 | Open-Pit | 0.4 | 2.7 | 0.63 | 54 | 73.8 | 0.90 | 2,131 | 10.2 | 0.88 | 288 | 86.7 | 0.89 | 2,473 | B |
| Rosemont1 | Open-Pit | 0.4 | 5.4 | 1.31 | 228 | 20.1 | 1.27 | 824 | 2.8 | 1.78 | 160 | 28.3 | 1.33 | 1,212 | B |
| Duketon Main Deposits | Sub Total | 11.1 | 1.03 | 369 | 123.2 | 0.92 | 3,661 | 28.0 | 0.83 | 748 | 162.3 | 0.92 | 4,777 | ||
| Erlistoun | Open-Pit | 0.4 | - | - | - | 5.7 | 1.34 | 247 | 1.1 | 1.00 | 37 | 6.9 | 1.28 | 284 | A |
| Dogbolter | Open-Pit | 0.4 | - | - | - | 2.8 | 1.11 | 102 | 0.4 | 1.02 | 13 | 3.2 | 1.10 | 115 | A |
| Petra | Open-Pit | 0.4 | - | - | - | 1.2 | 1.08 | 42 | 0.1 | 1.09 | 2 | 1.3 | 1.08 | 44 | A |
| Anchor | Open-Pit | 0.4 | - | - | - | 0.2 | 1.75 | 9 | 0.1 | 0.95 | 2 | 0.2 | 1.53 | 11 | A |
| King John3 | Open-Pit | 1.0 | - | - | - | - | - | - | 0.7 | 3.19 | 72 | 0.7 | 3.20 | 72 | C |
| Russells Find3 | Open-Pit | 1.0 | - | - | - | - | - | - | 0.4 | 3.86 | 55 | 0.4 | 4.28 | 55 | C |
| Baneygo3 | Open-Pit | 0.5 | - | - | - | - | - | - | 0.8 | 1.67 | 43 | 0.8 | 1.67 | 43 | C |
| Reichelts Find3 | Open-Pit | 1.0 | - | - | - | 0.1 | 3.69 | 17 | - | - | - | 0.1 | 3.69 | 17 | C |
| Duketon Satellite Deposits | Sub Total | - | - | - | 10.1 | 1.28 | 416 | 3.6 | 1.96 | 223 | 13.6 | 1.46 | 640 | ||
| Duketon | Total | 11.1 | 1.03 | 369 | 133.2 | 0.95 | 4,077 | 31.5 | 0.96 | 971 | 175.9 | 0.96 | 5,417 | ||
| McPhillamys | Total | 0.4 | - | - | - | 69.2 | 0.94 | 2,087 | 3.9 | 0.98 | 123 | 73.2 | 0.94 | 2,210 | B |
| Regis | Grand Total | 11.1 | 1.03 | 369 | 202.5 | 0.95 | 6,164 | 35.5 | 0.96 | 1,094 | 249.1 | 0.95 | 7,627 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
All Mineral Resources are reported inclusive of Ore Reserves to JORC Code 2012 unless otherwise noted
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t
-
Reported under JORC Code 2004
-
Refer to Group Competent Person Notes
==> picture [720 x 48] intentionally omitted <==
22 22
JORC COMPLIANT ORE RESERVES 31 MARCH 2015
Group Ore Reserves
| Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | Group Ore Reserves | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| as at 31 March 2015 | ||||||||||||
| Gold | Proved | Probable | Total Ore Reserve | Competent Person3 |
||||||||
| Project | Type | Cut-Off (g/t)2 |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
Tonnes (Mt) |
Gold Grade (g/t) |
Gold Metal (koz) |
|
| Moolart Well1 | Open-Pit | > 0.4 | 2.7 | 0.93 | 79 | 3.9 | 0.92 | 115 | 6.5 | 0.92 | 194 | D |
| Garden Well1 | Open-Pit | > 0.4 | 2.7 | 0.63 | 54 | 31.9 | 0.93 | 955 | 34.5 | 0.91 | 1,009 | D |
| Rosemont1 | Open-Pit | > 0.4 | 4.4 | 1.34 | 188 | 8.9 | 1.36 | 387 | 13.2 | 1.35 | 574 | D |
| Duketon Main Deposits | Sub Total | 9.7 | 1.03 | 321 | 44.6 | 1.02 | 1,456 | 54.3 | 1.02 | 1,777 | ||
| Erlistoun | Open-Pit | > 0.5 | - | - | - | 3.8 | 1.48 | 181 | 3.8 | 1.48 | 181 | D |
| Dogbolter | Open-Pit | > 0.5 | - | - | - | 0.3 | 1.57 | 16 | 0.3 | 1.57 | 16 | D |
| Petra | Open-Pit | > 0.5 | - | - | - | 0.6 | 1.26 | 25 | 0.6 | 1.26 | 25 | D |
| Anchor | Open-Pit | > 0.5 | - | - | - | 0.1 | 2.07 | 6 | 0.1 | 2.07 | 6 | D |
| Duketon Satellite Deposits | Sub Total | - | - | - | 4.8 | 1.47 | 229 | 4.8 | 1.47 | 229 | ||
| Regis | Grand Total | 9.7 | 1.03 | 321 | 49.4 | 1.06 | 1,685 | 59.1 | 1.06 | 2,006 |
Notes
The above data has been rounded to the nearest 100,000 tonnes, 0.01 g/t gold grade and 1,000 ounces. Errors of summation may occur due to rounding.
-
Mineral Resources and Ore Reserves are reported inclusive of ROM Stockpiles at cut-off grade of 0.4 g/t
-
Cutoff grades vary according to oxidation and lithology domains. Refer to Group Ore Reserves Lower Cut Notes
-
Refer to Group Competent Person Notes
==> picture [720 x 48] intentionally omitted <==