PTR MINERALS LTD — Investor Presentation 2010
Mar 25, 2010
65621_rns_2010-03-25_ac00d32c-ef67-46a0-9135-2bf32098e4f4.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [185 x 64] intentionally omitted <==
PETRATHERM LIMITED ABN 17 106 806 884
Paralana Project technical presentation to Petroleum Exploration Society of Australia
Petratherm’s Exploration Manager, Peter Reid, will today present the latest technical update on the Company’s flagship Paralana Project at the South Australian Basins Symposium being hosted by the Petroleum Exploration Society of Australia in Adelaide.
The presentation is attached.
Yours faithfully
==> picture [95 x 43] intentionally omitted <==
26 March 2010
ASX Code: PTR
Terry Kallis Managing Director
MEDIA CONTACTS:
Terry Kallis Kieran Hall / Tim Hughes
Petratherm Ltd 08 8274 5000 Hughes Public Relations 08 8412 4100
ABN 17 106 806 884
Level 1,129 Greenhill Road Unley SA 5061
T: +61 8 8274 5000 F: +61 8 8272 8141 W: www.petratherm.com.au/ E: [email protected]
The Paralana – Engineered Geothermal Energy Project
PESA SA Basins Symposium Presented by Exploration Manager Peter Reid Friday, March 26, 2010
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 86] intentionally omitted <==
----- Start of picture text -----
Disclaimer
----- End of picture text -----
This presentation has been prepared by Petratherm Limited (Petratherm). The information contained in this presentation is a professional opinion only and is given in good faith.
Certain information in this document has been derived from third parties and though Petratherm has no reason to believe that it is not accurate, reliable or complete, it may not have been independently audited or verified by Petratherm.
Any forward-looking statements included in this document involve subjective judgment and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Petratherm. In particular, they speak only as of the date of this document, they assume the success of Petratherm’s strategies and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document (“Recipients”) are cautioned not to place undue reliance on such forward-looking statements.
Petratherm makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued.
To the extent permitted by law, Petratherm and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Petratherm and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.
All amounts in Australian dollars (AUD) unless stated otherwise.
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Exploring for Heat – Paralana Project
----- End of picture text -----
62uWm[-3] 22uWm[-3 ] Insulator Up to 20 times normal granite: average = 8 times
==> picture [667 x 117] intentionally omitted <==
----- Start of picture text -----
Permian
Mt Painter Basement
Adelaidean
Curnamona
Mt Painter Basement Basement
Normal basement
----- End of picture text -----
==> picture [664 x 103] intentionally omitted <==
- Early modelling indicated 180[o] C 200[o] C at approximately 4 km
==> picture [111 x 27] intentionally omitted <==
Poontana Basin 109[o] C
› Heat flow of 129 mWm[-2] › Modeled 180[o] C-200[o] C at ~ 4 km
==> picture [111 x 27] intentionally omitted <==
(Seismic Line 84 SPG)
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Development Model – Heat Exchanger Within Insulator
----- End of picture text -----
› Higher Permeability
› Chemically Stable › Lower Frac Challenge? › Adelaidean – bedding / joint surfaces
- = Cheaper Power!
==> picture [431 x 336] intentionally omitted <==
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Paralana Project – Commercial Overview
----- End of picture text -----
› Commercially viable at all stages. Small off grid market (5-30MWe) (Heathgate) followed by large on grid development (260 MWe+)
› Expenditure well leveraged for proof of concept, then potentially fully funded to initial commercial demonstration scale 30MW plant
› Funding and expertise from JV Partners, Beach Petroleum (up to 36 per cent for $30m) and TRUenergy (up to 30 per cent for $57m)
› Strong Federal Government grant support - $7 million geothermal drilling fund and $62.762 million REDP grant
==> picture [343 x 321] intentionally omitted <==
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Passive Seismic Array
----- End of picture text -----
==> picture [512 x 362] intentionally omitted <==
MEQ - Array Managed by IESE
==> picture [111 x 27] intentionally omitted <==
Recording Period April 08 – June 09
==> picture [672 x 104] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Pre-stimulation Seismic Events
----- End of picture text -----
Recording Period April 2008
– June 2009
Array detecting small events
==> picture [500 x 364] intentionally omitted <==
==> picture [672 x 60] intentionally omitted <==
Paralana 2 – Drilling
New Weatherford Owned
2000HP Le Tourneau Lightning Rig
57 metres high ~ 10 Stories
Arrived at Port Pirie 11 May 09
85 Semi-Trailer Loads
Spudded June 30, 2009
==> picture [672 x 69] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Paralana 2 - Operations
----- End of picture text -----
-
› Petratherm/Beach – extensive stakeholder and community consultation – Adnyamathanha Community, Beverley
-
Uranium Mine , Epic Pipe line, Arkaroola Village
-
› Beach Petroleum – Manager of Drilling Operations
-
› HSE - no lost time injuries
-
› Only minor shake down issues
-
› Hand-picked experienced drill crew provided
==> picture [261 x 347] intentionally omitted <==
==> picture [672 x 60] intentionally omitted <==
Scenario Planning vs. Murphy’s Law
==> picture [672 x 63] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Paralana 2 – Drilling
----- End of picture text -----
Very Hard Rock Formations – slow ROP 1-3 m/hr
Tested several BHA arrangements to optimise ROP
==> picture [111 x 27] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Paralana 2 - Drilling Completed to 4012 M – 9 Nov 2009
----- End of picture text -----
==> picture [253 x 357] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 11] intentionally omitted <==
==> picture [10 x 10] intentionally omitted <==
First well designed following low-risk, standard operating methods
Steady but slow drilling due to hard formations
Conservatively drilled to ensure success to 4012m
Wireline and LWD logging completed
Well cased and cemented to 3725m
Bottom hole temperature ~ 190[o] C
Inflow zones encountered from 3690m
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Paralana 2 – Reservoir Characteristics
----- End of picture text -----
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 13] intentionally omitted <==
Inflow zones from 3690m
Zr dataing confirms old 1590Ma Reservoir Sequence
Contains numerous fractures and faults
High pressure geothermal brines intersected
2D Seismic suggests fractured reservoir sequence is regionally extensive
==> picture [200 x 359] intentionally omitted <==
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 87] intentionally omitted <==
----- Start of picture text -----
Current Planned Future Work Program
----- End of picture text -----
==> picture [262 x 358] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
==> picture [12 x 12] intentionally omitted <==
1[st] Qtr 2010: Fracture stimulation design
2[nd] Qtr 2010: Fracture stimulation – link into over pressured zone!
4[th] Qtr 2010/1[st] Qtr 2011: Drilling of the Paralana 3 deep producer well
-
2[nd] Qtr 2010: Circulation Test – Proof of Concept
-
Late 2011: Commission first stage 3.75 MW power plant
==> picture [672 x 60] intentionally omitted <==
==> picture [720 x 454] intentionally omitted <==
www.petratherm.com.au