PTR MINERALS LTD Interim / Quarterly Report 2020

Oct 30, 2019

65621_rns_2019-10-30_1733b575-1031-4502-9dc8-fdb9c4846722.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ABN 17 106 806 884

PETRATHERM LIMITED

Level 1, 169 Fullarton Road Dulwich SA 5065 T: +61 8 8133 5000 W: www.petratherm.com.au E: [email protected]

==> picture [154 x 54] intentionally omitted <==

ASX ANNOUNCEMENT 31 October 2019

Quarterly Activities Statement – September 2019

Summary

  • The company held $3,607,000 cash at the end of the quarter

  • Two additional tenements granted, EL 6404 and EL 6405, increasing the Company’s tenement holding to 2,852 km[2] over the Mabel Creek Ridge which is prospective for Olympic Dam Style Copper and Gold and related Rare-Earth mineralisation.

  • High-priority gravity/magnetic targets identified, that may be indicative of an Olympic Dam Style Copper-Gold (IOCG) system.

  • The Area 3 Anomaly is a large-amplitude discrete gravity target of at least 3 milligals and comparable in size and magnitude to the Prominent Hill copper-gold deposit gravity response.

  • Ground exploration underway at Yuengroon (Vic), a large holding with several important gold occurrences.

  • The Yuengroon tenement includes a line of magmatic intrusions along a structural suture which has potential for porphyry related copper-gold-silver, similar to the recent spectacular Stavely Minerals, Thursday’s Gossan discovery.

Review of Operations

The Company has continued to strategically develop a project portfolio in world-class mineral provinces. Two further licences (EL’s 6404 & 6405) over the Mabel Creek Ridge, Prospective for Olympic Dam Style Copper and Gold (IOCG) were awarded, increasing the Company’s land holdings to 2,852km[2] (Figure 1), and in Victoria, the Yunegroon Project tenement (EL 6897), prospective for gold and base metals was granted. During the period, the Company’s ground exploration works focused on advancing several IOCG copper and gold targets, to drill ready status.

During the quarter, Petratherm Limited (“the Company/ Petratherm”) had exploration and evaluation costs of $181,000 primarily relating to gravity surveying and Native Title negotiations and heritage surveying at the Mabel Creek Project and evaluation of new project opportunities. Administration costs totalled $115,000, primarily relating to, reporting & compliance, office costs and directors’ fees. The Company held $3,607,000 cash at the end of the quarter. The Company reduced other lower priority project holdings, with an application to surrender EL 6229 (Gilles Downs) lodged. A summary of ground activities during the period is presented below.

1

==> picture [155 x 53] intentionally omitted <==

Mabel Creek Project (EL’s 6332,6333,6404 & 6405) – Targeting Olympic Dam Style, Copper-Gold

The Mabel Creek Project comprises four granted tenements (EL’s 6332, 6333, 6404 & 6405) totalling 2852 km[2] (Figure 1). The Mabel Creek Ridge is an ENE trending zone of shallow covered basement rock, which displays high magnetic and gravity relief along the eastern margin of the Gawler Craton. These geophysical domains are prospective for hydrothermal iron-oxide systems including, copper-gold, magnetite skarn copper and high value rare earth elements (REEs).

BHP’s recent Oak Dam Project (Figure 1) update continues to confirm significant IOCG mineralisation. One of the better BHP drill hole intersections returned 205m @ 2.04 % Cu and 0.43 g/t Au from 1247m and includes 44m @ 5.77% Cu and 1.20 g/t Au from 1408m (refer BHP ASX release 17/10/19 September Quarterly for details). This is a timely reminder that a cluster of IOCG accumulations occur along the eastern margin of the Gawler Craton and re-confirms the regions status as a world-class copper and gold province. There is excellent potential for further IOCG discoveries particularly in the northern areas where only limited historic exploration has occurred.

==> picture [435 x 367] intentionally omitted <==

Figure 1 - Location map of Mabel Creek Project Tenements, IOCG mines and related prospects, overlying a regional reduced to pole aeromagnetic image (compiled from Sth. Aust. Government data).

In August the Company completed a gravity survey over an eastern portion of its Mabel Creek Project tenement holdings. In total 1,124 gravity readings were taken to infill 7 areas which had some previous evidence of gravity

2

==> picture [155 x 53] intentionally omitted <==

and/or magnetic anomalism. Several high-amplitude gravity anomalies (~3Mgal) have been defined, with modelled depths ranging from 130m to 600m.

The Area 2 target is a gravity anomaly of approximately 3 milligals within a broader zone of regional higher gravity. Figure 2 depicts a gradient gravity image highlighting the target area along with a reduced to pole magnetic image of the same area. The aeromagnetic image contains a discrete highly magnetic body however the gravity body appears to have a larger extent. Depth to basement estimates suggests the target may start at about 150 metres.

==> picture [134 x 11] intentionally omitted <==

----- Start of picture text -----

Area 2 - 1VD Gravity Image
----- End of picture text -----

==> picture [392 x 229] intentionally omitted <==

----- Start of picture text -----

mGal/
----- End of picture text -----

==> picture [143 x 11] intentionally omitted <==

----- Start of picture text -----

Area 2 - RTP Magnetic Image
----- End of picture text -----

==> picture [391 x 229] intentionally omitted <==

Figure 2 - Area 2 Anomaly – 1VD Gravity Image (top) and RTP Magnetic Image (bottom). Gravity stations yellow dots. Gravity anomaly is an approximate 3 milligal anomaly within a larger area of increased gravity anomalism. Note discrete high intensity magnetic body partly coincides with gravity target.

3

==> picture [155 x 53] intentionally omitted <==

The Area 3 Anomaly is a discrete, NNW trending, high-amplitude gravity anomaly, approximately 2.5 kilometres in length and approximately 3 milligals in magnitude (Figure 3). The target has a comparable size and magnitude of gravity to the Prominent Hill copper-gold deposit. The 3D model suggests the top of the body is at about 160m depth and may be associated with a partly coincident magnetic body extending at depth (Figure 4).

The Area 5 Anomaly is a broad multi-peak, high-amplitude gravity anomaly, which is semi-coincident with a moderately strong (500nT) magnetic anomaly. The 3D model indicates the top of the gravity anomaly occurs at a depth of around 130m (Figure 5).

Significantly, the offset in the gravity and magnetic anomalies observed in the 3D models could be indicative of zonation within a magnetite-haematite system (e.g. IOCG style alteration). Both models show, the non-magnetic gravity anomalies positioned shallower and/or to one side of the magnetic feature, which is typical of an IOCG style system.

To date, on the Gawler Craton of South Australia, economic concentrations of copper and gold have only been associated with non-magnetitic, haematite enriched bodies, and hence these gravity targets are a priority for drill testing. Also, of note, the inversion models demonstrate a high average density contrast (≥ 0.1 g/cm[3] ) for each body which may also be indicative of an IOCG style system.

==> picture [372 x 11] intentionally omitted <==

----- Start of picture text -----

1VD Gravity Image RTP Magnetic Image
----- End of picture text -----

==> picture [266 x 371] intentionally omitted <==

----- Start of picture text -----

mGal/
----- End of picture text -----

==> picture [260 x 374] intentionally omitted <==

Figure 3 - Area 3 Anomaly – 1VD Gravity Image (left) and RTP Magnetic Image (right). Gravity stations yellow dots. Gravity anomaly is approximately 3 milligals in magnitude and mostly not magnetic.

4

==> picture [155 x 53] intentionally omitted <==

==> picture [353 x 308] intentionally omitted <==

==> picture [351 x 318] intentionally omitted <==

Figure 4 - 3D Inversion Models of Area 3 Anomalies showing the relationship between the magnetic and gravity bodies.

5

==> picture [155 x 53] intentionally omitted <==

==> picture [343 x 303] intentionally omitted <==

==> picture [345 x 321] intentionally omitted <==

Figure 5 - 3D Inversion Models of Area 5 Anomalies showing the relationship between the deep magnetic body and shallower gravity target.

6

==> picture [155 x 53] intentionally omitted <==

Petratherm have recently completed heritage access to extend the initial gravity survey across the western portion of the Mabel Creek Project. Upon completion of the second phase of gravity surveying, which got underway just after the reporting period in October, gravity anomalies will be defined and ranked with existing targets ahead of drill testing.

Yuengroon (EL 6897) - Victoria Gold and Copper Potential

In early October, just after the reporting period, the Company’s Yuengroon Project Tenement (EL 6897) was granted by the Victoria State Government (figure 6). The area secured covers a highly prospective ground position over a portion of the Bendigo Zone, covering the historic northern Wedderburn Goldfield and extends westwards to cover sizable strike extensions of several major crustal faults, with several important historical gold occurrences spatially associated. The western areas have only been lightly explored and are mostly under shallow cover.

The recent resurgence in interest in Victorian Goldfields, largely stems from the spectacular success of Kirkland Lake Gold’s Fosterville operations, with production forecast to increase to over 500,000 ounces in 2020 and reach over 570,000 ounces by 2021 (reference: Kirkland Lake Gold Press Release 11/12/2018).

Wedderburn Goldfield Area

Recorded historical gold production from the Wedderburn field is 140,000 Oz. These finds came mainly from alluvial workings but also included some shallow reef mining down to the water table which occurs at approximately 20 metres depth. Very little modern drilling has occurred to test for depth extensions of the reef systems below the water table.

Golden Jacket Mine

The Golden Jacket Fault which extends through the tenement area for approximately 12 kilometres is associated with two notable recorded local historic mine occurrences (Figure 6). The Golden Jacket Mine comprises a shallow small historic shaft reef mine worked to 46 metres depth. Total recorded production was 171.7 tonnes of ore which produced 1,385 Oz of gold. Whilst only a small historic working the grade is exceptional, running at an average of 250.1 g/t Au. The Nine Mile Reef (Figure 6) is a larger historical mine, which was worked down to 131 metres depth and mined 43,571 tonnes of ore producing 16,236 Oz of gold (average grade 11.6 g/t Au) (reference: Victorian State Government GeoVic database).

Moondyne Gold Prospect

Further west the historic Moondyne Mine Area is spatially linked with the O’Connor Fault (Figure1) and comprises a line of shallow sub-cropping quartz reef workings which extend for approximately 1.2 kilometres before being blanketed by shallow younger cover sediment. This line of quartz reefing was worked on a small scale during the 1930’s depression years with a number of shallow shafts sunk to an approximate maximum depth of 20 metres. Limited historical production data (389 tonnes), returned an average grade of 10.9 g/t Au (reference: Geological Survey of Victoria Record 24913, 1933). The immediate host rock is described as clay rich and soft to mine with abundant iron stained pitting evident in the wall rock. The widespread clay alteration and pitting, potentially after primary sulphides, along with the extensive strike length of worked reef, are positive indications that this prospect could have good upside potential. The workings have never undergone systematic modern exploration, never been drilled, and remain open at depth and along strike.

7

==> picture [155 x 53] intentionally omitted <==

Base Metal Potential

A prominent north-northwest (NNW) trending line of intrusive bodies and some other discrete satellite bodies are evident from the aeromagnetic data across the tenement (Figure 7). In the light of the recent success of ASX listed Stavely Minerals (ASX: SVY), Thursday’s Gossan copper-gold-silver drill intersections (reference: SVY ASX release 26/9/2019), this intrusive suture zone will be closely evaluated for copper-gold-silver and other base-metals resulting from porphyry and related magmatic fault hosted metal accumulations.

Over the last 6 months, prior to granting of the licence, Petratherm has been busy undertaking land access preparations. To date, the landholder consultation process has opened up two prospective corridors on the tenement currently totalling 150 km2 along the Golden Jacket and O’Connor Fault trends which will allow ground exploration activities to start immediately. The prospective corridors are mostly under shallow cover making the ground conducive to XRF soil geochemistry as the first targeting tool (Figure 8). This work, along with vein mapping and sampling where outcrop exists, will be used to identify anomalous sites for later potential drill testing.

==> picture [451 x 288] intentionally omitted <==

----- Start of picture text -----

Moondyne
Golden Jacket
North
Wedderburn
Nine Mile
----- End of picture text -----

Figure 6 – EL6897 (Yuengroon) Location Map, showing historical mine sites and known major faults.

8

==> picture [155 x 53] intentionally omitted <==

==> picture [388 x 262] intentionally omitted <==

----- Start of picture text -----

Intrusions
----- End of picture text -----

Figure 7 – EL6897 (Yuengroon) Reduced to Pole, Aeromagnetic Image. Note major NNW trending suture zone with nested series of intrusive bodies (high magnetic intensity bodies). This zone and other discrete bodies will be explored for porphyry and related magmatic fault hosted copper-gold-silver and other base-metals.

Figure 8 – Petratherm Geologist, Emmett D’Urso, undertaking soil and rock chip sampling around historical Wedderburn Goldfield Area, Victoria.

==> picture [252 x 327] intentionally omitted <==

9

END

==> picture [155 x 53] intentionally omitted <==

==> picture [118 x 33] intentionally omitted <==

Donald Stephens Director

For further information please contact:

Peter Reid

Exploration Manager Tel: (08) 8133 5000

Competent Persons Statement: The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Peter Reid, who is a Competent Person, and a Member of the Australian Institute of Geoscientists. Mr Reid is not aware of any new information or data that materially affects the historical exploration results included in this report. Mr Reid is an employee of Petratherm Ltd. Mr Reid has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Reid consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

10

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Name of entity

PETRATHERM LIMITED

ABN
17 106 806 884
Quarter ended (“current quarter”)
17 106 806 884 30 September 2019
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other (Joint Venture Repayments)
1.9
Net cash from / (used in) operating
activities
(181)
(115)
13
(181)
(115)
13
(283) (283)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
  • See chapter 19 for defined terms. 01/09/2016

Appendix 5B Page 1

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
(d) other non-current assets
2.2
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
- -
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
- -
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
3,890
(283)
3,890
(283)
  • See chapter 19 for defined terms. Appendix 5B Page 2

01/09/2016

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
4.3
Net cash from / (used in) investing
activities (item 2.6 above)
4.4
Net cash from / (used in) financing
activities (item 3.10 above)
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
-
-
-
-
-
-
3,607 3,607
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
607
3,000
790
3,100
3,607 3,890
6.
Payments to directors of the entity and their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to these parties included in
item 1.2
31
6.2
Aggregate amount of cash flow from loans to these parties
included in item 2.3
-
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
31
-
6.1 Directors’ remuneration
  • See chapter 19 for defined terms. 01/09/2016

Appendix 5B Page 3

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

7. Payments to related entities of the entity and their Current quarter
associates $A'000
7.1 Aggregate amount of payments to these parties included in -
item 1.2
7.2 Aggregate amount of cash flow from loans to these parties -
included in item 2.3
7.3 Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
8.
Financing facilities available
Add notes as necessary for an understanding of the
position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
-
-
8.2
Credit standby arrangements
-
-
8.3
Other (please specify)
-
-
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or
are proposed to be entered into after quarter end, include details of those facilities as well.
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
- -
- -
- -
9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
9.5
Administration and corporate costs
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
578
-
-
-
97
-
675
  • See chapter 19 for defined terms. Appendix 5B Page 4

01/09/2016

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and
location
Nature of interest Interest at
beginning
of quarter
Interest
at end of
quarter
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
Refer to Appendix 1
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
Refer to Appendix 1

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Sign here: ............................................................ Date: 31 October 2019 (Director and Company secretary)

DONALD STEPHENS Print name: .........................................................

Notes

  1. The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

  2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. See chapter 19 for defined terms. 01/09/2016

Appendix 5B Page 5

APPENDIX 1

Changes in Interests in Mining Tenements For Quarter Ended 30 September 2019

Tenement
Reference
Nature of Interest Interest at
beginning
of Quarter
Interest at
beginning
of Quarter
Interest
at end of
Quarter
10.1 Interests in mining EL 6229 Application to surrender lodged on 100% 0%
tenements relinquished, 21/07/2019
reduced or lapsed
10.2 Interests in mining EL 6404 Exploration licence granted 0% 100%
tenements acquired or 12/09/2019
increased
EL 6405 Exploration licence granted 0% 100%
12/09/2019

30/10/2019

Page 1 of 2

APPENDIX 1

ASX Additional Information

List of mining tenements as at 30 September 2019

Tenement No. Project Area Area (km2) Registered
holder/
Applicant
Company
Interest
GEL 156 Paralana 489 MNGI Pty Ltd 79%
EL 5306 Walparuta 26 Petratherm Ltd 100%
EL 6332 Mt Willoughby 838 Petratherm Ltd 100%
EL 6333 Mt Barry 641 Petratherm Ltd 100%
EL 6404 Mt Willoughby-extended 456 Petratherm Ltd 100%
EL 6405 Mt Barry-extended 917 Petratherm Ltd 100%

Page 2 of 2