PTR MINERALS LTD Capital/Financing Update 2023

Feb 14, 2023

65621_rns_2023-02-14_3e23c41b-8d5a-4b70-b8e3-27b97cc1c0fc.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [116 x 53] intentionally omitted <==

PETRATHERM LIMITED

ACN 106 806 884 ASX: PTR

www.petratherm.com.au [email protected]

ASX ANNOUNCEMENT

15/02/2023

Meteor Prospect - Exceptional Rare Earth Drill Intersections

HIGHLIGHTS

  • Meteor Prospect drilling has defined a continuous substantial thick blanket of high-grade rare earth mineralisation (> 1000 ppm TREO), starting from a very shallow depth.

  • Mineralisation typically starts from 3 metres depth with substantial intersections up to 38 metres of thickness, averaging 11.5 metres thickness over the Prospect Area. Potential for low-cost favourable free dig mining methods.

  • Significant new drill intercepts include:

  • 22ACCR372 - 38m @ 967 ppm TREO & 39 ppm Sc2O3 from 3m

    • inc. 12m @ 1,690 ppm TREO & 38 ppm Sc2O3 from 18m
  • 22ACCR373 - 27m @ 1,014 ppm TREO & 49 ppm Sc2O3 from 3m inc. 3m @ 1,962 ppm TREO & 84 ppm Sc2O3 from 6m

  • 22ACCR374 - 24m @ 1,594 ppm TREO & 34 ppm Sc2O3 from 6m inc . 6m @ 2,495 ppm TREO & 42 ppm Sc2O3 from 6m

  • 22ACCR379 - 24 m @ 1,030 ppm TREO & 46 ppm Sc2O3 from 6m inc. 3m @ 2,144 ppm TREO & 54 ppm Sc2O3 from 9m

  • 22ACCR381 - 20m @ 921 ppm TREO & 35 Sc2O3 from 3m inc. 9m @ 1,050 ppm TREO & 38 ppm Sc2O3 from 9m

  • 22ACCR386 - 21m @ 1,071 ppm TREO & 55 ppm Sc2O3 from 3m inc. 3m @ 1,716 ppm TREO & 61 ppm Sc2O3 from 6m

  • 22ACCR393 - 21m @ 1,018 ppm TREO & 46 ppm Sc2O3 from 3m inc . 3m @ 2,086 ppm TREO & 54 ppm Sc2O3 from 3m

  • 22ACCR395 - 18m @ 1,121 ppm TREO & 37 ppm Sc2O3 from 6m inc . 3m @ 2,340 ppm TREO & 69 ppm Sc2O3 from 9m

  • 22ACCR396 - 21m @ 1,266 ppm TREO & 43 ppm Sc2O3 from 3m inc. 3m @ 1,947 ppm TREO & 61 ppm Sc2O3 from 12m

  • o 22ACCR404 - 21m @ 1,143 ppm TREO & 58 ppm Sc2O3 from 9m inc . 3m @ 2,200 ppm TREO & 84 ppm Sc2O3 from 12m

  • Mineralisation is open laterally with significant potential for additional mineralisation discoveries.

  • High-value magnet rare earths up to 746 ppm MREO and average 242 ppm MREO (26% of TREO’s).

  • PTR has begun metallurgical leach optimisation trials to test feasibility of using simple heap leach extraction process.

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

www.petratherm.com.au

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

OVERVIEW

Petratherm Limited (ASX: PTR ) is pleased to report rare earth (REE) drill results from the Meteor Prospect, located in the Comet Project Area of the Northern Gawler Craton of South Australia (Figure 1). Drilling was undertaken in December 2022 over the central portion of the prospect and comprised infill grid drilling to 100 metre spacing. 47 vertical air-core holes were drilled through the clay weathering profile with an average hole depth of 26 metres.

A continuous blanket of high-grade, >1000 ppm Total Rare Earth Oxide (TREO), mineralisation starting from shallow depths (3-6 metres), and over substantial vertical thicknesses downhole (up to 38 metres) has been defined.

Commenting on these results, Petratherm’s Chief Executive Officer Mr Peter Reid said:

“The Meteor Prospect results are highly encouraging, demonstrating excellent clay hosted rare earth grades, intercept thicknesses and continuity between drill holes. The mineralisation starts at just a few metres below surface in the soft weathering profile allowing the potential for low-cost free dig mining.

The shallow clay hosted mineralisation has formed over a layered mafic complex and potential remains for additional rare earths in the basement rock below.

The Company intends to advance the high-quality emerging Meteor Prospect and in parallel extend exploration out into new areas with currently only 10% of the project area tested. Excellent upside potential remains to uncover additional REE mineralisation”

Results

In all, 43 drill holes from the current program at the Meteor Prospect (91% of holes drilled) returned significant mineralised REE intercepts. These results are presented in Table 1. As currently defined, the REE mineralisation spans an approximate 2,000 metre by 1,000 metre area and remains open in several directions (Figure 1).

Mineralisation has proven to be highly continuous and several zones contain adjacent drill holes assaying >1000 ppm TREO intervals over thicknesses greater than 20 metres. Three metre composite drill samples were assayed and grades up to 2,829 ppm TREO were reported. Meteor contains good concentrations of high-value magnet rare earths (MREO) averaging 26% of TREO (Table 1), with a highest MREO composite sample returning 746 ppm. Across the prospect the average MREO drill intercept grade is 242 ppm.

These latest results build on the initial drilling at Meteor (refer to PTR ASX releases 20/4/2022 & 28/10/2022) and demonstrate encouraging grades and continuity over the prospect. This new drill data will be used to aid future JORC Resource estimation.

Meteor Prospect Cross-Sections

The drill results presented are 3 metre composite samples from the 100-metre spaced air core drilling program. West-East and North-South cross-sections over the Meteor Prospect show an upper high-grade (1,000 to 2,800 ppm TREO) zone of enrichment within the saprolite clay (Figure 2). This is surrounded by a broader mineralised envelope ranging between 500 to 1000 ppm TREO which often extends below the high-grade pod into the saprolite zone below.

A potentially important feature shown in the West-East cross-section (Figure 2, section A1-A2) is a possible subvertical zone of rare earth enrichment located on the eastern edge of the currently defined mineralised area. Drill hole 22ACCR374 intersected 24m @ 1594ppm TREO from 6m to end of hole. This may be an indication of a primary rare earth zone in the basement rock below or a mineralised structure (fault), providing a possible source for the rare earths. PTR will investigate this further as a potential primary source of rare earths.

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

www.petratherm.com.au

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

==> picture [457 x 647] intentionally omitted <==

Figure 1 Meteor Prospect - Summary Drill Results.

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO) Meteor Prospect - 1 Metre Split Significant REE Intercepts Table (>500 ppm TREO)
Drill Hole From
To
Interval
TREO
metres
metres
metres
ppm
Scandium
Sc2O3
ppm
ppm
% TREO
ppm
% TREO
ppm
% TREO
ppm
% TREO
ppm
%TREO
Praseodymiu
High Value - Magnet Rare Earths (MREO)
Neodymium
Terbium
Dysprosium
Total MREO
Pr6O11
Nd2O3
Tb4O7
DyO3
22ACCR370 6 15 9 513 38 24 5 92 18 2.4 0.5 12.4 2.4 131 25
22ACCR371 9 12 3 600 61 30 5 135 23 2.4 0.4 12.6 2.1 180 30
22ACCR372 3 41 38 967 39 54 6 202 21 2.0 0.2 8.5 0.9 267 28
inc 18 30 12 1690 38 95 6 345 20 2.7 0.2 11.3 0.7 454 27
22ACCR373 3 30 27 1014 49 60 6 221 22 2.4 0.2 10.7 1.1 294 29
inc 6 9 3 1962 84 127 6 478 24 4.1 0.2 17.2 0.9 626 32
inc 18 24 6 1125 50 66 6 232 21 2.7 0.2 10.9 1.0 312 28
22ACCR374 6 30 24 1594 34 89 6 299 19 3.2 0.2 14.9 0.9 406 25
inc 6 12 6 2495 42 146 6 490 20 5.3 0.2 24.3 1.0 666 27
inc 6 9 3 2829 38 170 6 550 19 4.7 0.2 20.7 0.7 745 26
22ACCR375 9 18 9 922 36 49 5 173 19 2.7 0.3 13.4 1.5 238 26
inc 10 17 7 1289 72 74 6 260 20 3.5 0.3 16.1 1.2 354 27
22ACCR376 6 15 9 623 49 31 5 120 19 2.6 0.4 14.3 2.3 168 27
22ACCR377 6 15 9 833 28 45 5 161 19 2.8 0.3 13.8 1.7 223 27
inc 9 12 3 1186 31 63 5 227 19 4.1 0.3 20.7 1.7 315 27
22ACCR378 3 24 21 765 54 39 5 143 19 2.6 0.3 14.0 1.8 199 26
inc 9 15 6 1057 73 48 5 183 17 4.1 0.4 25.8 2.4 261 25
22ACCR379 6 30 24 1030 46 52 5 186 18 3.1 0.3 16.4 1.6 257 25
inc 9 12 3 2144 54 108 5 392 18 7.1 0.3 35.0 1.6 542 25
22ACCR380 6 9 3 516 31 30 6 103 20 1.7 0.3 8.0 1.6 143 28
22ACCR381 3 23 20 921 35 52 6 178 19 2.0 0.2 8.9 1.0 241 26
inc 3 6 3 1051 31 62 6 210 20 2.4 0.2 10.3 1.0 285 27
inc 9 18 9 1050 38 58 6 202 19 2.4 0.2 10.9 1.0 273 26
22ACCR382 6 28 22 1174 51 66 6 224 19 2.6 0.2 11.4 1.0 304 26
inc 9 12 3 2441 92 138 6 474 19 5.9 0.2 23.0 0.9 641 26
22ACCR383 3 15 12 681 40 33 5 128 19 1.9 0.3 9.5 1.4 172 25
22ACCR384 12 15 3 848 61 39 5 152 18 2.9 0.3 16.6 2.0 211 25
22ACCR385 9 12 3 555 38 30 5 110 20 1.8 0.3 8.0 1.4 150 27
22ACCR386 3 24 21 1071 55 52 5 159 15 3.3 0.3 16.2 1.5 231 22
inc 6 9 3 1716 61 92 5 384 22 5.3 0.3 24.1 1.4 505 29
22ACCR387 9 24 15 744 44 40 5 150 20 2.4 0.3 11.5 1.5 204 27
inc 12 15 3 1423 54 83 6 325 23 4.7 0.3 19.5 1.4 432 30
22ACCR388 12 15 3 820 77 36 4 159 19 3.5 0.4 20.1 2.5 219 27
22ACCR389 9 18 9 926 56 44 5 173 19 3.1 0.3 16.8 1.8 237 26
inc 9 12 3 1731 46 85 5 336 19 5.9 0.3 29.2 1.7 456 26
22ACCR390 9 18 9 880 54 43 5 159 18 2.0 0.2 8.6 1.0 212 24
inc 9 12 3 1201 54 54 4 190 16 2.4 0.2 9.2 0.8 256 21
22ACCR391 9 18 9 931 66 46 5 160 17 2.7 0.3 12.6 1.4 221 24
inc 12 15 3 1328 92 65 5 252 19 3.5 0.3 17.8 1.3 338 25
and 27 29 2 743 15 37 5 135 18 1.2 0.2 5.2 0.7 178 24
22ACCR392 12 15 3 1440 61 65 5 257 18 3.5 0.2 18.4 1.3 344 24
22ACCR393 3 24 21 1018 46 51 5 195 19 2.4 0.2 11.5 1.1 260 26
inc 3 6 3 2086 54 111 5 416 20 4.1 0.2 20.1 1.0 551 26
22ACCR394 12 15 3 874 38 45 5 170 19 2.4 0.3 12.6 1.4 230 26
and 21 24 3 870 31 42 5 152 17 1.8 0.2 8.0 0.9 204 23
22ACCR395 6 24 18 1121 37 57 5 211 19 2.5 0.2 10.0 0.9 280 25
inc 9 12 3 2350 69 120 5 458 19 4.7 0.2 18.9 0.8 601 26
22ACCR396 3 24 21 1266 43 64 5 250 20 2.9 0.2 13.9 1.1 331 26
inc 12 15 3 1947 61 92 5 390 20 6.5 0.3 36.8 1.9 525 27
22ACCR399 3 9 6 716 31 31 4 127 18 2.7 0.4 63.7 16.1 224 31
22ACCR400 6 9 3 519 69 16 3 70 13 3.5 0.7 23.5 4.5 113 22
22ACCR401 6 15 9 661 46 29 4 119 18 3.3 0.5 18.7 2.8 170 26
22ACCR402 6 12 6 813 61 36 4 148 18 3.8 0.5 20.4 2.5 208 26
inc 6 9 3 1113 54 53 5 210 19 4.7 0.4 23.0 2.1 291 26
22ACCR403 9 18 9 734 28 37 5 130 18 2.0 0.3 10.1 1.4 179 24
22ACCR404 9 30 21 1143 58 62 5 230 20 3.4 0.3 15.1 1.3 310 27
inc 12 15 3 2200 84 124 6 464 21 5.9 0.3 25.2 1.1 619 28
22ACCR405 12 15 3 820 23 42 5 157 19 2.9 0.4 12.6 1.5 215 26
22ACCR406 6 18 12 709 33 38 5 140 20 2.2 0.3 9.8 1.4 190 27
22ACCR407 6 27 21 688 28 34 5 122 18 1.9 0.3 8.9 1.3 167 24
22ACCR408 6 13 7 813 43 39 5 146 18 3.2 0.4 16.6 2.0 205 25
22ACCR409 9 15 6 762 50 37 5 148 19 3.8 0.5 20.7 2.7 210 27
22ACCR410 6 24 18 657 33 30 5 117 18 2.0 0.3 11.1 1.7 160 24
inc 9 12 3 1242 54 53 4 213 17 4.1 0.3 26.4 2.1 297 24
22ACCR411 6 12 6 763 15 42 6 148 19 2.7 0.3 8.6 1.1 201 26
22ACCR412 9 18 9 688 41 38 6 143 21 2.2 0.3 10.1 1.5 193 28
inc 12 15 3 1000 54 58 6 223 22 2.9 0.3 13.8 1.4 298 30
22ACCR413 6 9 3 801 8 41 5 145 18 1.8 0.2 6.3 0.8 194 24
22ACCR415 6 12 6 591 38 24 4 100 17 3.2 0.5 17.8 3.0 145 25

Table 1 Meteor Prospect Infill Drilling (Dec 2022) - Table of Significant Results

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

www.petratherm.com.au

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

==> picture [454 x 262] intentionally omitted <==

==> picture [241 x 36] intentionally omitted <==

==> picture [462 x 393] intentionally omitted <==

Figure 2 Meteor Prospect – West-East and North-South Cross Sections

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

Next Steps

The Company has begun early-stage metallurgical test work with a range of independent contractors and specialists to determine the nature of the REE mineralisation hosted within the clay dominated weathering profile. This work aims to develop an optimum extraction method using a heap-leach style process to produce a magnet rare earth salt. There is additionally potential to undertake beneficiation processes with simple mechanical separation of the finer clay fraction before leach extraction occurs, that may aid the overall project economics.

As part of the December drill campaign the Southern Zone REE anomaly (PTR ASX release 11/10/22) and other greenfield REE targets were tested (Figure 3). These results will become available for interpretation and reporting in the coming weeks. The Meteor Prospect results are highly encouraging and with less than 10% of its Comet Project holdings tested, there remains large up-side potential for the discovery of additional significant REE occurrences both in the clay weathering profile and the basement rock below.

==> picture [475 x 289] intentionally omitted <==

Figure 3 – Petratherm’s 100% owned Comet Project Tenement Holdings, rare earth and gold prospects.

This ASX announcement has been approved by Petratherm’s Board of Directors and authorised for release by Petratherm’s Chairman Derek Carter.

For further information contact :

Peter Reid (Chief Executive Officer) Tel: 0435 181 705 E: [email protected]

Competent Persons Statement: The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Peter Reid, who is a Competent Person, and a Member of the Australian Institute of Geoscientists. Mr Reid is not aware of any new information or data that materially affects the historical exploration results included in this report. Mr Reid is an employee of Petratherm Ltd. Mr Reid has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Reid consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

www.petratherm.com.au

ASX RELASE 15 February 2023

==> picture [74 x 34] intentionally omitted <==

Hole ID Easting
MGA94
Z53

Northing
MGA94
Z53
RL
metres
Dip
Deg.
Azimuth
Deg.
EOH
Depth
metres
22ACCR370 442691 6707725 160 -90 0 30
22ACCR371 442693 6707525 160 -90 0 22
22ACCR372 442590 6707521 160 -90 0 41
22ACCR373 442591 6707621 160 -90 0 30
22ACCR374 442592 6707724 160 -90 0 30
22ACCR375 442593 6707826 161 -90 0 25
22ACCR376 442592 6707925 161 -90 0 30
22ACCR377 442595 6708023 161 -90 0 27
22ACCR378 442494 6707921 161 -90 0 25
22ACCR379 442494 6707721 160 -90 0 30
22ACCR380 442292 6707532 159 -90 0 20
22ACCR381 442296 6707724 160 -90 0 23
22ACCR382 442290 6707928 161 -90 0 28
22ACCR383 442494 6707524 161 -90 0 18
22ACCR384 442393 6707529 159 -60 180 49
22ACCR385 442393 6707626 160 -60 180 23
22ACCR386 442399 6707723 160 -60 180 34
22ACCR387 442391 6707824 161 -60 180 30
22ACCR388 442394 6707923 161 -60 180 28
22ACCR389 442394 6708020 160 -90 0 30
22ACCR390 442197 6708020 160 -90 0 30
22ACCR391 442190 6707919 160 -90 0 29
22ACCR392 442194 6707821 160 -90 0 20
22ACCR393 442191 6707723 160 -90 0 24
22ACCR394 442194 6707619 160 -90 0 24
22ACCR395 442196 6707515 159 -90 0 30
22ACCR396 442196 6707424 159 -90 0 26
22ACCR399 442097 6707318 159 -90 0 15
22ACCR400 441991 6707420 158 -90 0 30
22ACCR401 441892 6707524 158 -90 0 15
22ACCR402 442090 6707527 159 -90 0 23
22ACCR403 442091 6707722 159 -90 0 27
22ACCR404 442092 6707924 159 -90 0 30
22ACCR405 441984 6707725 159 -90 0 27
22ACCR406 441991 6707621 158 -90 0 22
22ACCR407 441990 6707521 159 -90 0 30
22ACCR408 441992 6707323 158 -90 0 13
22ACCR409 441993 6707224 159 -90 0 30
22ACCR410 441893 6707324 158 -90 0 30
22ACCR411 441892 6707718 159 -90 0 22
22ACCR412 441577 6708583 158 -90 0 26
22ACCR413 441500 6708415 157 -90 0 18
22ACCR415 441494 6708016 156 -90 0 19

Table 2 – Meteor Prospect Infill Drilling (Dec 2022) – Drill Hole Collars

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 9] intentionally omitted <==

www.petratherm.com.au

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

EL 6443 & EL 6633 (Comet Project) JORC Table 1

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse Au that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine
nodules) may warrant disclosure of detailed
information.

A total of 47 drill holes were
drilled at the Meteor
prospect and infilled previous
high-grade intercepts down
to 100 metres spacing.

During the program, samples
were collected as three metre
composite intervals from one
metre drill samples stored
individually in green bags.

Composite samples were
collected using a “spear” tool
to collect representative
samples from green bags.
Composite samples were an
average weight of 1.6 kg.

A Differential GPS was used
to record the location of each
drill hole. The accuracy of this
GPS is +/- 5cm.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
_method, etc.). _
• Drill method consisted of
Aircore. Hole diameters are 78
mm.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may have
occurred due to preferential loss/gain of fine/coarse
material.
• Aircore drilling methods were
utilised throughout the
duration of the program.
• Hole diameters are 78mm.
• A Geologist was on site for
every drill hole to ensure that
sample recoveries were
appropriate.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to
• All samples were geologically
logged by the on-site
geologist.

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 10] intentionally omitted <==

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

Criteria JORC Code explanation Commentary
support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
• Geological logging is
qualitative.
• Representative chip trays
containing 1 m geological sub-
samples were collected.
• All drillholes were geologically
logged.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
• Samples averaging 1.6 kg were
collected for laboratory assay.
• It is considered representative
samples were collected.
• Laboratory sample preparation
includes drying and pulverizing
of submitted sample to target
of p80 at 75 um.
• Duplicate samples have been
introduced into the sample
stream by the Company.
• Standard samples were
introduced into the sample
stream by the Company, and
the laboratory also completed
standard assays.
• Laboratory analytical charge
sizes are standard sizes and
considered adequate for the
material beingassayed.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
• Bureau Veritas in Adelaide was
used for analytical work.
Samples were analysed in the
following manner:
• Lithium Borate Fusion assayed
by Inductively Coupled Plasma
Atomic emission spectroscopy
(ICP-AES) and Mass
Spectrometry (ICP-MS) for 23
elements.
• For laboratory samples, the
Company has introduced
QA/QC samples at a ratio of
one QA/QC sample for every
20 drill samples. The
laboratory introduces
additional QA/QC samples
(blanks,standards,checks).
Verification
of sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
• The Company has queried the
results with Bureau Veritas to
verify the accuracy of the
results.
• No twinned holes were drilled
in theprogram.

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 10] intentionally omitted <==

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary Commentary Commentary
and electronic) protocols.
Discuss any adjustment to assay data.
• Rare earth element analyses
were originally reported in
elemental form but have been
converted to relevant oxide
concentrations as in the
industry standard.
• TREO = La2O3+ CeO2+ Pr6O11+
Nd2O3+Sm2O3+ Eu2O3+ Gd2O3
+ Tb4O7+ Dy2O3+ Ho2O3+
Er2O3+ Tm2O3+ Yb2O3+ Lu2O3
+ Y2O3
• MREO = Pr6O11+ Nd2O3+
Dy2O3+ Tb4O7
Element Name Element Oxide
Oxide Factor
Ce
CeO2
1.2284
Dy
Dy2O3
1.1477
Er
Er2O3
1.1435
Eu
Eu2O3
1.1579
Gd
Gd2O3
1.1526
Ho
Ho2O3
1.1455
La
La2O3
1.1728
Lu
Lu2O3
1.1371
Nd
Nd2O3
1.1664
Pr
Pr6O11
1.2082
Sc
Sc2O3
1.5338
Sm
Sm2O3
1.1596
Tb
Tb4O7
1.1762
Th
ThO2
1.1379
Tm
Tm2O3
1.1421
U
U3O8
1.1793
Y
Y2O3
1.2699
Yb
Yb2O3
1.1387
Element Name Element Oxide Oxide Factor
Ce CeO2 1.2284
Dy Dy2O3 1.1477
Er Er2O3 1.1435
Eu Eu2O3 1.1579
Gd Gd2O3 1.1526
Ho Ho2O3 1.1455
La La2O3 1.1728
Lu Lu2O3 1.1371
Nd Nd2O3 1.1664
Pr Pr6O11 1.2082
Sc Sc2O3 1.5338
Sm Sm2O3 1.1596
Tb Tb4O7 1.1762
Th ThO2 1.1379
Tm Tm2O3 1.1421
U U3O8 1.1793
Y Y2O3 1.2699
Yb Yb2O3 1.1387
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All maps and locations are in
UTM grid (GDA94 Z53) and
have been measured by a
differential GPS with a lateral
accuracy of ± 5 cm and a
vertical accuracy ±5 cm.
Data
spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.

Drill holes were completed on
100 metre spaced grids
infilled around previous 200
metre spaced lines drilled
during the last phase of
drilling.
The data spacing and
distribution is thought to be
sufficient to establish the
degree of geological and
grade continuity appropriate
for a JORC mineral resource.

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 10] intentionally omitted <==

www.petratherm.com.au

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

Criteria JORC Code explanation Commentary
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.

The mineralisation is
horizontal in basic form. As
such, no sampling bias is
introduced by the drill hole
orientation.
Sample
security
The measures taken to ensure sample security.
Company staff and
contractors collected
laboratory samples.

Samples submitted were
transported and delivered by
Company staff or contractors
to Bureau Veritas Adelaide.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.

No independent audit of data
has been completed to date.

Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.



EL 6443 Comet and EL 6633
Gina are located 80km south
south-west of Coober Pedy
overlapping Ingomar and
Commonwealth Hill Pastoral
Stations.
The tenements are located
within the Woomera
Prohibited Area (Amber Zone)
and the Far North Prescribed
Wells Area.
Native Title Holder:
SCD2011/001 Antakirinja
Matu-Yankunytjatjara.
The tenement is in good
standing and no known
impediments exist.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.

Previous exploration work
includes;
Surface Geochemical
Sampling:Calcrete
Airborne Geophysics:
Magnetics & Radiometrics.
Ground Geophysics:
Magnetics and Gravity.
Exploration Drilling: 202

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 10] intentionally omitted <==

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

Criteria JORC Code explanation Commentary
Mechanised Auger, 103
Aircore, 9 Rotary Air, 27
Reverse Circulation & 3
Diamond.
Geology Deposit type, geological setting and style of
mineralisation.

The tenements are within
the Northern Gawler Craton,
South Australia

Petratherm are exploring for
gold and REE’s.

This release refers to REE
mineralisation hosted in
clays within the weathered
saproliteprofile.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.

The type of drilling
performed comprised
vertical shallow holes to an
approximate average depth
of 30 metres. The drilling
reduced the drill hole
spacing from 200m
completed during the
previous phase to 100m
spacing over the “central”
part of the prospect. The
drilling is designed to
provide enough confidence
in geochemical and
geological modelling to allow
for the calculation of a JORC
resource by an independent
party. All drillhole
information pertaining to
results within this release
are tabulated in Table’s 1 &
2 at the end of the release.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short lengths
of high-grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.

All reported drill results are
true results as reported by
Bureau Veritas.

All results above 500 ppm
TREO are reported in Table 1
of Significant Intercepts.

A cut off value of 500 ppm
TREO was used and values
below 500pm are only
included when said interval
of no more than 3 metres is
situated between a
continuous run of samples
with greater than 500 ppm +
TREO.

==> picture [483 x 6] intentionally omitted <==

==> picture [483 x 10] intentionally omitted <==

www.petratherm.com.au

ASX RELEASE 15 Feb 2022

==> picture [82 x 38] intentionally omitted <==

Criteria JORC Code explanation Commentary

No assumptions of metal
equivalent values were made
or used.
Relationship
between
mineralisatio
n widths and
intercept
lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).

47 Drill holes were drilled
vertically at -90 degrees. Any
relationship between
mineralisation widths and
intercepts lengths is not
known.

Five holes were drilled at -60
degrees to 180 south.

TREO values reported are
down hole length.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.

See Figures in main body of
release attached.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.

Results from 47 drill holes
were assayed. Samples were
digested using Lithium
Borate Fusion and were
assayed by ICP-MS and ICP-
AES. All results above a cut
off 500 ppm TREO are
reported in the Table 1 of
Significant Intercepts. All
sample locations where REE
grades are below 500 ppm
TREO are also shown in the
Figure 1 in the release.
Other
substantive
exploration
data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.

See attached ASX Release.
Geological observations are
included in that report.
Further work The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.

See attached release.

www.petratherm.com.au

==> picture [483 x 6] intentionally omitted <==