Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PREDICTIVE DISCOVERY LIMITED Investor Presentation 2013

Oct 17, 2013

65537_rns_2013-10-17_0291e730-d598-481c-a687-a50338b9c7ea.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 207] intentionally omitted <==

targets in Burkina

Disclaimer

This presentation contains only a brief overview of Predictive Discovery Ltd and its associated entities (“PDI or Predictive") and their respective activities. The contents of this presentation, including matters relating to the geology of the projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.

This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Predictive’s control, may cause the actual results, performance and achievements of PDI to differ materially from those expressed or implied in this presentation.

To the maximum extent permitted by law, PDI does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of PDI, and will not be responsible for any loss or damage arising from the use of the information.

The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Predictive or its activities.

Competent Person Statement

The information in this presentation that relates to Exploration Results is based on information compiled by Mr P. A. Roberts, who is a Fellow of the Australian Institute of Geoscientists, and has had sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Roberts is an employee of Predictive and consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears.

==> picture [531 x 24] intentionally omitted <==

PDI October 2013

Page 2

: Focused on high grade in 2012-13 field season

  • Excellent results from Bongou – best combination of grade, continuity, width and metallurgical results

  • High grades from other prospects, especially Solna and Tambiri

  • Other prospects in PDI’s large prospect pipeline mainly on hold

  • New opportunities for PDI in Cote D’Ivoire:

  • Political situation now stabilised and ground now being granted

  • PDI has 2 granted permits and 3 applications, totalling 1700km[2 ]

  • Highly prospective ground with extensive historic workings

  • :

  • Work program based on $1.2M raising

  • Drilling Bongou for extensions (starts 1[st] November)

  • Low key Cote D’Ivoire reconnaissance (commenced)

  • RAB drilling along strike from Bongou (March Quarter 2014)

==> picture [531 x 24] intentionally omitted <==

Page 3

PDI October 2013

ASX:PDI - Corporate Summary

~~Board Members~~
Board
Members
Mr. Phil Harman Non-Executive Chairman Extensive board experience, discovery track record,
senior roles in BHP
Mr. Paul Roberts Managing Director Discovery track record, global exploration
experience, technology leadership
Mr. Phil Henty Non-Executive Director Extensive corporate and stockbroking experience
Mr Tim Markwell Non-Executive Director Fund manager with substantial mining industry and
(New Director) resource analyst experience

Capital Structure

Shares on Issue (ASX:PDI) 235 Million

Share Price A$0.017 Market Cap. (@0.017 ) A$ 4.3 million Cash Position at Sept 30 A$ 1.5 million Enterprise Value A$ 2.8 million Debt Nil Top 20 Shareholders (%) 44%

==> picture [335 x 192] intentionally omitted <==

----- Start of picture text -----

African Lion
Shareholders 9% Lowell
Resources
6% Board and
management
8%
Others
77%
----- End of picture text -----

==> picture [531 x 24] intentionally omitted <==

Page 4

PDI October 2013

==> picture [720 x 150] intentionally omitted <==

==> picture [405 x 357] intentionally omitted <==

West Africa Focus

==> picture [531 x 24] intentionally omitted <==

Page 5

PDI October 2013

Ground position – E. Burkina Faso

==> picture [509 x 323] intentionally omitted <==

  • 100km of

greenstone strike in Samira Hill Belt (Samira Hill 2.5Moz) & 10km in Bangaba Belt

  • Large gold mineralised systems and numerous artisanal workings

  • Pipeline of prospects

==> picture [531 x 24] intentionally omitted <==

Page 6

PDI October 2013

New ground position – Cote D’Ivoire

==> picture [383 x 390] intentionally omitted <==

  • Systematic approach to targeting with Predictore

  • 790 km[2] granted

  • 920 km[2] under application

  • Kokumbo:

o Long history of gold mining o Close to Bonikro

  • Excellent infrastructure

  • Boundiali:

o Along strike from Sissingue & Syama

==> picture [531 x 24] intentionally omitted <==

Page 7

PDI October 2013

New ground position – Cote D’Ivoire

 Kokumbo:

  • Field work has

commenced

  • Substantial historic workings

  • Water supply – historic dam

  • Power line and bitumen road to site

==> picture [235 x 177] intentionally omitted <==

==> picture [235 x 177] intentionally omitted <==

==> picture [181 x 322] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 8

PDI October 2013

Bongou – high grades, continuity, width

==> picture [437 x 318] intentionally omitted <==

 Silicified, quartz veined, pyritic mineralisation

  • High grades on N contact

==> picture [222 x 206] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 9

PDI October 2013

Bongou – high grades, widths, continuity

  • Silicified, quartz veined, pyritic mineralisation

  • High grades on N contact :

  • 48m at 4.3g/t Au incl. 16m at 9.7g/t Au

  • 26m at 6.9g/t Au incl. 16m at 8.9g/t Au

  • 20m at 4.8g/t Au

  • 10m at 7.4g/t Au

  • Lower grade mineralisation on S. margin

==> picture [441 x 338] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 10

PDI October 2013

Bongou – nearby potential

==> picture [481 x 377] intentionally omitted <==

==> picture [82 x 104] intentionally omitted <==

  • New power

auger geochemistry anomaly larger than Bongou

  • Peak value

  • 4.8g/t Au

  • Altered granite

  • RAB drilling target

==> picture [531 x 24] intentionally omitted <==

Page 11

PDI October 2013

Bongou – along strike potential

 Bongou Structure - 43km of strike held 100% by PDI

 Two RAB drilling targets  Close to other prospects in Laterite Hill Gold Field

==> picture [530 x 352] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

PDI October 2013

Page 12

Bongou Preliminary Metallurgy

  • Rapid gold dissolution in first few hours

  • Free gold and gold

  • on/within pyrite

  • Acceptable cyanide/lime

  • consumption

==> picture [242 x 181] intentionally omitted <==

==> picture [418 x 335] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

PDI October 2013

Page 13

Prospect Pipeline – BIRA Excellent continuity and widths

==> picture [377 x 390] intentionally omitted <==

 Historic drilling results (Anmercosa – an Anglo American subsidiary):

  • 14.5m @3.1g/t Au

  • • 13m @2.5g/t Au

  • 21m @ 1.7g/t Au

  • • 20m @ 1.4g/t Au

  • Open to north and south and at depth

  • New target to west

==> picture [531 x 24] intentionally omitted <==

Page 14

PDI October 2013

Prospect Pipeline – BIRA Excellent continuity and widths

 Historic drilling results

(Anmercosa – an Anglo American subsidiary):

  • 14.5m @3.1g/t Au

  • • 13m @2.5g/t Au

  • 21m @ 1.7g/t Au

  • 20m @ 1.4g/t Au

  • Good continuity

  • Open to depth/along strike

==> picture [451 x 390] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 15

PDI October 2013

==> picture [720 x 150] intentionally omitted <==

Prospect Pipeline - Tambiri Prospect

==> picture [531 x 24] intentionally omitted <==

PDI October 2013

Page 16

Prospect Pipeline – Solna Prospect

 Multiple high grade intercepts:

  • 6m at 20g/t Au

  • 5.6m at 16g/t Au

  • • 7m @ 13g/t Au

  • 2m @ 56g/t Au

 Some continuity issues – requires close spaced drilling

 Excellent preliminary metallurgy (96% in primary ore)

==> picture [488 x 359] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

AMI Sydney June 2013

Page 17

Prospect Pipeline – Dave Moderate gold grades, large system

==> picture [693 x 375] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 18

PDI October 2013

Next Steps

  • Diamond drilling at Bongou commencing 1[st] November

  • RAB program in Laterite Hill Gold Field along strike from Bongou, March Quarter 2014

  • Cote D’Ivoire low key reconnaissance to start

 Tight cost control – dollars focused on advancing Eastern Burkina Faso project

==> picture [225 x 365] intentionally omitted <==

==> picture [531 x 24] intentionally omitted <==

Page 19

PDI October 2013

: Focused on high grade in 2012-13 field season

  • Excellent results from Bongou – best combination of grade, continuity, width and metallurgical results

  • High grades from other prospects, especially Solna and Tambiri

  • Other prospects in PDI’s large prospect pipeline mainly on hold

  • New opportunities for PDI in Cote D’Ivoire:

  • Political situation now stabilised and ground now being granted

  • PDI has 2 granted permits and 3 applications, totalling 1700km[2 ]

  • Highly prospective ground with extensive historic workings

  • :

  • Work program based on $1.2M raising

  • Drilling Bongou for extensions (starts 1[st] November)

  • Low key Cote D’Ivoire reconnaissance (commenced)

  • RAB drilling along strike from Bongou (March Quarter 2014)

==> picture [531 x 24] intentionally omitted <==

Page 20

PDI October 2013

Predictive Discovery Limited West African Gold Explorer

Contact Details:

Level 2, 9 Colin St, West Perth, Western Australia 6005 Telephone: +61 402 857 249 Email: [email protected]

Website:

www.predictivediscovery.com

PDI October 2013

Page 21