Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Nova Minerals Ltd Interim / Quarterly Report 2007

Jul 30, 2007

34115_rns_2007-07-30_62389560-6fc1-4478-bdf3-1f3e711ad648.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

Quantum Resources Limited ABN 84 006 690 348

==> picture [58 x 49] intentionally omitted <==

REPORT FOR THE QUARTER ENDED 30 JUNE 2007

INTRODUCTION

Quantum Resources Limited (“Quantum” or “the Company”) is an Australian base metal, uranium and gold explorer with a suite of projects whose tenements cover approximately 20,000 square kilometres in the Northern Territory and Western Australia.

BASE METAL, URANIUM AND GOLD EXPLORATION

The Barrow Creek, Tanami, Mt Peake and Ware Range tenement holdings cover approximately 17,000 square kilometres in the Northern Territory and the Gardner Range tenement holdings cover approximately 650 square kilometres in Western Australia. The Barrow Creek, Tanami, Mt Peake and Ware Range projects are prospective for base metals, uranium and gold. In Western Australia, the Gardner Range project, 150 kilometres southeast of Halls Creek, is prospective for iron oxide copper-gold-uranium (“IOCG”) deposits.

Mine Management Plans containing proposed programmes of RAB/RC drilling and sampling and Radiation Management Plans have been submitted and approved by the Department of Primary Industries, Fisheries and Mines in the Northern Territory for Barrow Creek, Mt Peake and Ware Range. At Gardner Range, a joint airborne geophysical survey is currently being undertaken in conjunction with Cameco Corporation, the large Canadian mining/exploration company (“Cameco”). Drilling of the Mt Mansbridge prospect in Gardner Range is planned subsequent to heritage approval due in August 2007.

Gardner Range (Quantum 100%)

The Company holds tenements in the Gardner Range, 150 kilometres southeast of Hall’s Creek with potential for base metals, uranium and gold. Limited exploration for uranium around the margins of the Gardner Ranges was carried out by BHP Exploration and uranium mineralisation was found to be present. The Company’s tenements are prospective for Olympic Dam-style iron oxide gold-copper-uranium (“IOCG”) deposits and at Mt Mansbridge previous exploration reported uranium up to 980 parts per million (“ppm”).

The tenements are surrounded to the north by Cameco. A joint airborne geophysical survey is being undertaken in conjunction with Cameco. A TEMPEST (EM) survey was completed in July 2007 by Fugro and a Magnetics & Radiometrics survey is currently being undertaken by UTS. This data will greatly assist in our understanding of this region and in the development of targets for drilling and sampling.

Heritage surveys are due for completion in August 2007. Field reconnaissance undertaken this quarter provided valuable information regarding access and identified sites for surface sampling and drilling. A drilling program at Mt Mansbridge will commence following heritage clearance. The drilling will test existing uranium mineralisation anomalies along the unconformity as well as targeting a 60 kilometre long NW-SE significant fault system adjacent to the unconformity.

Ware Range (Quantum 100%)

The Ware Range tenement was granted in December 2006. Previous exploration for base metals, uranium, gold and diamonds included rock chip sampling and limited drilling. Field

Quantum Resources Limited, June 2007 Quarterly Report

Page 1

reconnaissance undertaken this quarter provided valuable information regarding access and identified sites for surface sampling and drilling.

A Mine Management Plan for this programme has been submitted and approved by the Department of Primary Industries, Fisheries and Mines in the Northern Territory. The proposed exploration activities will include a programme of sampling and drilling to investigate the nature of base metal mineralisation associated with the unconformity between the Killi Killi Beds and the Gardiner Sandstone. The sampling programme will include loam sampling of targets over the defined region and stream sediment sampling of the sparse drainage in the region. The drilling programme will include RAB/RC holes traversing over the defined regions and isolated holes where required.

Barrow Creek Project (Quantum earning 80%)

The Barrow Creek Project covers 5,100 square kilometres of the faulted margin of the Georgina Basin to the southeast of Barrow Creek. The setting is similar to the Ngalia Basin to the west which contains sediment-hosted uranium deposits of good grade. Radiometrics indicate that adjacent Proterozoic granites are anomalous in uranium, and adjacent sediments are also anomalous.

Heritage surveys are completed. A Mine Management Plan for this programme has been submitted and approved by the Department of Primary Industries, Fisheries and Mines in the Northern Territory. A review of Open File Data, regional geology and geophysics has led to proposed exploration activities. These will include a programme of RC drilling or soil sampling traverses over the targets in a NE-SW direction to investigate the nature of the unconformity between the Devonian Dulcie sandstones and the Cambro-Ordivician Tomahawk dolostone- sandstone unit. Individual, photographic and geophysical anomalies shall also be targeted by this programme.

Tanami Project (Quantum earning 80%)

This project area covers 2,400 square kilometres in the Mt Davidson area east of The Granites Gold Mine. Previous exploration was restricted to broadly spaced sampling for gold. Several tenements within this group overlap the boundary between the Proterozoic basement rocks and the younger Lander Trough of the Wiso basin to the north and are prospective for Mississippi Valley Type (MVT) silver-lead-zinc deposits. The trough is also prospective for sediment-hosted uranium deposits similar to those in the Ngalia Basin and calcrete-hosted uranium deposits in younger overlying sediments.

The Company is continuing to actively pursue agreements with native title holders in order to proceed to granting of the tenements.

Mt Peake Project (Quantum earning 80%)

The Mt Peake project area covers 7,700 square kilometres of prospective ground between the Tanami Project to the northwest and Barrow Creek to the southeast. Previous exploration in this area was restricted to widely spaced reconnaissance sampling for gold. Several of these tenements overlie the boundary between the Lander Trough and Proterozoic basement and are highly prospective for sediment-hosted uranium and silverlead-zinc. The tenements also overlie extensive calcrete deposits which are known to be suitable hosts to uranium elsewhere.

A Mine Management Plan for this programme has been submitted and approved by the Department of Primary Industries, Fisheries and Mines in the Northern Territory. A review of Open File Data, regional geology and geophysics has led to proposed exploration activities which will include a programme of RC drilling or soil sampling to investigate the nature of the unconformity and of anomalies in the licences. These will include a programme of

Quantum Resources Limited, June 2007 Quarterly Report

Page 2

RAB/RC drilling or soil sampling traverses. Individual, photographic and geophysical anomalies shall also be targeted by this programme.

GOLD EXPLORATION

In Western Australia, the Whiteheads and Jackson projects are the focus of gold exploration and the Company’s tenement holdings cover approximately 3,000 square kilometres.

Whiteheads Project (Quantum earning 80%)

The Whiteheads Project is located 60 kilometres northeast of Kalgoorlie within the metamorphosed rocks of the Gindalbie Greenstone Belt. The area hosts mafic and felsic volcanics, sediments, and altered intrusive porphyries. The project areas surround the historic Gindalbie Mining Centre to the east which has produced 45,240 ounces of gold at an average grade of 27 g/t gold. The Lindsays Project immediately to the west has now been found to contain a resource of nearly 2 million ounces at approximately 2.4g/t gold.

Numerous significant RAB anomalies on the company’s ground identified from previous drilling will be targeted in the second half of 2007 with follow-up RAB/Aircore drilling.

Jackson Project (Quantum 100%)

The project area covers 756 square kilometres of the Barlee-Marda Greenstone Belt which is located 100 kilometres north of Southern Cross. There is a history of small scale underground gold production in the region.

Assessment of open file reports has been completed with the outcome indicating that there are areas of potential for gold under the cover of recent sediments along the margins of the belts. Previous sampling was ineffective as transported material was collected. Wide spaced RAB drilling would be the preferred method of testing these trends. Laterite sampling is planned, pending completion of a heritage survey.

Other Projects (Quantum 100%)

In the Mellrose, Wiluna, Bullfinch and Big Bell areas magnetic data has been assembled and processed and Aster satellite data has been acquired. This data will be analysed and targets for exploration will be identified.

Farm-Out Joint Ventures

Wanganoo Joint Venture (Quantum 20%)

The Company’s Dingo Range prospect at Wanganoo is the subject of the Wanganoo joint venture, with Cullen Exploration Pty Ltd acting as managers, earning an 80% interest.

Exploration to date within E53/988 has uncovered a number of untested geochemical and magnetic anomalies which are targets for gold and nickel sulphide mineralisation. These anomalies lie on contacts or within favourable komatiitic host rocks with interpreted strike extents of at least 4 kilometres.

A ground EM (electro magnetic) survey completed earlier identified two conductive targets within prospective ultramafic units. The survey targeted a 4 kilometre long trend of ultramafics within E53/988, where strong nickel (to 6405ppm) and copper (to 3525ppm) anomalies from previous RAB traverses occur on contact komatiite positions. Cullen attempted to drill these targets during the December 2006 quarter, however the drill rig was unable to reach the targets due to drilling conditions.

Quantum Resources Limited, June 2007 Quarterly Report

Page 3

The Company’s joint venture partner has advised there was no field work during the quarter.

Officer Hill Joint Venture

Newmont Australia have joint ventured into EL23150 which is located 34 kilometres southwest of The Callie gold mine, also owned by Newmont. Previous explorers located sporadic mineralization from drilling such 4 metres @ 4.64g/t, numerous short intervals of 1- 4g/t, and several wide intercepts of 0.1-1g/t. The prospect is considered to have excellent potential to host steeply plunging shoots such as those at the Tanami Gold Mine. An apparent fold closure to the east offers the possibility of discovery of Callie-style mineralization at depth. The Company is waiting on a report from its joint venture partner on activities during the quarter.

The technical information in this report has been reviewed and approved by Dr D S Tyrwhitt who is a member of the Australasian Institute of Mining and Metallurgy and has approximately 40 years experience in the industry. Attached is a copy of the Company’s Mining Exploration Entity Quarterly Report in accordance with Listing Rule 5.3.

==> picture [147 x 32] intentionally omitted <==

J I GUTNICK Chairman & Managing Director 31 July 2007

Quantum Resources Limited, June 2007 Quarterly Report

Page 4

Appendix 5B Mining exploration entity quarterly report

___________ -Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity

QUANTUM RESOURCES LIMITED

ABN
84 006 690 348
Consolidated statement of cash flows
ABN
84 006 690 348
Consolidated statement of cash flows
Quarter ended (“current quarter”)
30 June 2007
Quarter ended (“current quarter”)
30 June 2007
30 June 2007
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration and evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
YTD
(12 months)
$A’000
-
(53)
-
-
(137)
-
7
-
-
-
-
(653)
-
-
(710)
-
72
-
-
-
(183) (1,291)
Cash flows related to investing activities
1.8
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material) proceeds from sale
of non-dealing securities
Net investing cash flows
1.13
Total Operating and investing cash flows (carried
forward)
-
-
-
-
-
-
-
154
-
-
-
-
-
-
-
(256)
647
-
154 391
(29) (900)

Appendix 5B Mining exploration entity quarterly report

___________

1.13
Total operating and investing cash flows (brought
forward)
(29) (900)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material) Share/Option issue
costs prior year
Net financing cash flows
-
-
-
-
-
-
-
-
-
-
-
(8)
- (8)
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(29)
158
-
(908)
1,037
-
129 129

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
41
-
1.25 Explanation necessary for an understanding of the transactions
-

Non-cash financing and investing activities

2.1
2.2
Details of financing and investing transactions which have had a material effect on consolidated assets and
liabilities but did not involve cash flows
-
Details of outlays made by other entities to establish or increase their share in projects in which the reporting
entityhas an interest
-

Appendix 5B Mining exploration entity quarterly report

___________

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
- -
- -

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
$A’000
250
-
Total 250

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown in
the consolidated statement of cash flows) to the related items
in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
129 158
- -
- -
- -
Total: cash at end of quarter(item 1.22) 129 158

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning of
quarter
Interest at
end of
quarter
See attached
See attached

Appendix 5B Mining exploration entity quarterly report

___________

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue
price
per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs,
redemptions
- - - -
-
-
-
-
-
-
-
-
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs
351,113,528 351,113,528 - -
-
-
-
-
-
-
-
-
7.5
+Convertible debt
securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured, converted
- - - -
-
-
-
-
-
-
-
-
7.7
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
7.10
Expired during
quarter
1,400,000
43,748,673
32,875,597
68,378,151
8,600,000
-
43,748,673
32,875,597
68,378,151
-
Exercise price
$0.08
$0.10
$0.10
$0.05
$0.07
Expiry date
24/03/2010
31/10/2010
30/04/2012
30/11/2012
19/10/2011
- - - -
- - - -
- - - -
7.11
Debentures
(totals only)
- -
7.12
Unsecured notes
(totals only)

Appendix 5B Mining exploration entity quarterly report

___________

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Law or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

==> picture [57 x 78] intentionally omitted <==

Sign here: ............................................................ Date: 31 July 2007 (Company Secretary)

Print name: Peter J. Lee

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 Appendix 5B has been prepared in accordance with Australian Equivalents of International Financial Reporting Standards (AIFRS).

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

Appendix 5B Mining exploration entity quarterly report

Mining exploration entity quarterly report

QUANTUM RESOURCES LIMITED ABN 84 006 690 348

For Quarter Ended 30.06.2007 (referred to in this Statement as the "Current Quarter")

ADDITIONAL INFORMATION

Item 1.23 Payments to Other Entities

Some of the Directors of the Company are also Directors of AXIS Consultants Pty. Ltd. ("AXIS"). The Company does not consider AXIS to be a related party.

Item 7.7 Options

Listed

43,748,673 Options maturing 31 October 2010 at an exercise price of $0.10 per Option. The Options are exercisable any time after 1 January 2002. Each option will convert to one fully paid ordinary share.

32,875,597 Options maturing 30 April 2012 at an exercise price of $0.10 per Option. The options are exercisable any time after 1 January 2003. Each option will convert to one fully paid ordinary share.

68,378,151 Options maturing 30 November 2012 at an exercise price of $0.05 per option. The options are exercisable any time after 1 July 2003. Each Option will covert to one fully paid share.

Unlisted

1,400,000 options maturing 24 March 2010, issued under the 1999 Employee Share Option Plan, have an exercise price of $0.08 per option. Upon exercise, each option will convert to one fully paid ordinary share. These options cannot be exercised until after 24 March 2003 and only at that time if the Company’s share price on the ASX has increased by a factor of 20% over the price of the shares at the time the options were issued.

8,600,000 options maturing 19 October 2011, issued under the 2005 Employee Share Option Plan, have an exercise price of $0.07 per option. Upon exercise, each option will convert to one fully paid ordinary share. These options cannot be exercised until after 19 October 2008 other than in the case of a change of control.

QUANTUM RESOURCES LIMITED

ACN 006 690 348

CHANGES IN INTERESTS IN MINING TENEMENTS

6.1 Interests in
mining
tenements
relinquished,
reduced or
lapsed
Tenement
reference
Nature of Interest
(note(4))
Interest at
beginning of
quarter
Interest at end of
quarter
Goongarrie
E 29/504
Jackson
E 77/1051
Kalgoorlie North
M 26/813
P 26/3097
P 26/3098
P 26/3099
P 26/3100
P 26/3102
P 26/3103
Surrendered
Surrendered
Lapsed
Lapsed
Lapsed
Lapsed
Lapsed
Lapsed
Lapsed
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Menzies North
E 29/474
St Ives
E 15/741
E 15/782
Surrendered
Surrendered
Surrendered
100.00%
100.00%
100.00%

QUANTUM RESOURCES LIMITED

ACN 006 690 348

CHANGES IN INTERESTS IN MINING TENEMENTS

.

6.2 Interests in mining tenements aquired or increased

Tenement
reference
Nature of Interest
(note(4))
Interest at
beginning
of quarter
Interest at
end of
quarter
Kalgoorlie North
P 26/3363
P 26/3364
P 26/3365
P 26/3366
P 26/3367
P 26/3368
Granted
Granted
Granted
Granted
Granted
Granted
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%