AI assistant
NORTHERN STAR RESOURCES LTD — Capital/Financing Update 2012
Nov 15, 2012
65447_rns_2012-11-15_1b9e0cbc-9f45-45ac-b314-419e37b7c706.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [178 x 62] intentionally omitted <==
Northern Star confirms plan to double production after strong results expand Ashburton Project High-grade hits to underpin substantial jump in 1Moz resource at what is set to be WA gold miner's second 100,000ozpa operation
Highlights
16 NOVEMBER 2012
� Drilling extends known mineralisation at Ashburton’s key Mt Olympus deposit by another 400m down-plunge, pointing to a substantial increase in current 1Moz resource
- Latest results include:
Code: NST
Board of Directors
-
8.5m @ 9.3g/t Au including 3.0m @ 17.0g/t
-
• 10.0m @ 7.8g/t Au including 3.0m @ 20.1g/t • 4.4m @ 17.4g/t Au including 1.0m @ 74.0g/t
-
6.0m @ 11.6g/t Au
-
8.0m @ 8.5g/t Au including 1.0m @ 55.0g/t
==> picture [166 x 88] intentionally omitted <==
----- Start of picture text -----
Managing Director
Mr Michael Fotios
Non-Executive Director
Mr Peter Farris
Non-Executive Director
Mr Peter O’Connor
----- End of picture text -----
-
19.0m @ 6.2g/t Au
-
26.0m @ 4.2g/t Au including 5.5m @ 7.7g/t
-
40.0m @ 3.2g/t Au
-
10.3m @ 4.8g/t Au
-
5.6m @ 7.7g/t Au
-
7.0m @ 5.7g/t Au
-
Resource upgrade and maiden reserve set for early next year
-
Two of the latest holes intersected between 7m and 26m of sulphides with some visible gold, assays pending
Issued Capital
==> picture [166 x 87] intentionally omitted <==
----- Start of picture text -----
Options 3.5M
Current Share Price
$1.39
Market Capitalisation
$589 million
----- End of picture text -----
Projects Commodities
Zn, Cu, gold
Investments Commodities Venturex (15%) Cu, Zn, Ag & gold
-
Fresh geological modelling of Mt Olympus and West Olympus deposits has identified potential for continuous mineralisation between the two
-
Mt Olympus remains open along strike as well as down plunge
-
Strong potential to grow Mt Olympus resource through further drilling
-
Metallurgical and economic studies well advanced as part of plan to establish a 100,000ozpa project at Ashburton in addition to existing +100,000ozpa operation at Paulsens
Northern Star Resources (ASX: NST) is pleased to announce that its plans to be a 200,000ozpa-plus WA gold producer have been further boosted by an extremely successful drilling program at its Ashburton Project.
The drilling at Ashburton's flagship Mt Olympus deposit returned a host of outstanding results, some of which extended the known limits of the mineralisation by another 400m down plunge (see Figure 1).
Two holes were drilled down plunge with one intersecting 7m of sulphides with visible gold and 26m of sulphides. Assays are pending (see Figure 2) .
ASX ANNOUNCEMENT 16 NOVEMBER 2012
The drilling also returned high-grade resource infill results such as 4.4m at 17.4gpt, including 1m at 74gpt and 8.5m at 9.3gpt, including 3m at 17gpt gold.
As a result of this success, Northern Star expects to increase the one million-ounce resource at Ashburton early next year and to also calculate a maiden sulphide reserve, subject to ongoing economic studies.
This will mark a key milestone in the Company's plan to establish a standalone 100,000ozpa operation at Ashburton, which will operate in parallel with Northern Star's current +100,000ozpa operation at Paulsens.
==> picture [496 x 92] intentionally omitted <==
==> picture [496 x 92] intentionally omitted <==
==> picture [496 x 92] intentionally omitted <==
Figure 1 - Long Section, Mt Olympus significant drill results including substantial down plunge intersections
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 22] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 21] intentionally omitted <==
==> picture [273 x 20] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 19] intentionally omitted <==
==> picture [241 x 18] intentionally omitted <==
Figure 2 - Mt Olympus down-plunge resource extension drilling showing sulphides and visible gold
The prime focus of the geological team has been on developing a structural/lithological model of the controls on mineralisation that allows accurate prediction of ore shoot positions and efficient targeting of drilling. This
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com
ASX ANNOUNCEMENT 16 NOVEMBER 2012
analysis has identified two major factors that have the potential to again substantially grow the known resources;
Firstly it has been identified that Mt Olympus deposit remains open along strike to the East (see Figure 3)
==> picture [379 x 88] intentionally omitted <==
==> picture [379 x 87] intentionally omitted <==
==> picture [379 x 88] intentionally omitted <==
Figure 3 - Plan View, Mt Olympus remain open along strike to the East
Second, it has identified that the Mt Olympus and West Olympus deposits, which are 200m apart, may sit on the same structure and therefore the mineralisation may be continuous (see Figure 4) . Further drilling is planned to investigate whether the linking structure between the two deposits is mineralised. If so, this could substantially improve the economics of the proposed open pit and underground.
==> picture [324 x 82] intentionally omitted <==
==> picture [324 x 81] intentionally omitted <==
==> picture [324 x 82] intentionally omitted <==
Figure 4 - Plan View, Mt Olympus and West Olympus potential for structure to link both deposits
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com
ASX ANNOUNCEMENT 16 NOVEMBER 2012
These recent drilling results and geological modelling, coupled with the recently released metallurgical test work (Pressure Oxidation, Bacterial Oxidation and Albion) for sulphide orebodies indicating total gold recovery of 80-90 per cent, significantly strengthen the viability of the Ashburton Project.
"These results are pivotal for Northern Star for three reasons," Managing Director Bill Beament said.
"They reveal there is substantially more gold at Mt Olympus than previously demonstrated, they highlight the significant scope to find a lot more and they show that our plan to double the Company's production by building a 100,000ozpa operation at Ashburton is rapidly moving towards fruition."
Assays received are attached in the appended table. Further announcements will be released regarding the surface drilling as more results become available.
Yours faithfully,
Bill Beament Managing Director Northern Star Resources Ltd
Competent Persons Statements
The information in this announcement that relates to the mineral resource estimation, exploration results, data quality, geological interpretations and potential for eventual economic extraction, is based on information compiled by or under the supervision of Brook Ekers, (Member AIG), who is a fulltime employee of Northern Star Resources Ltd. Mr Ekers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Ekers consents to the inclusion in this announcement of the matters based on this information in the form and context in which it appears.
Forward Looking Statements
Northern Star Resources Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement. To the maximum extent permitted by law, none of Northern Star Resources Limited, its directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this announcement or its contents or otherwise arising in connection with it.
This announcement is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any security, and neither this announcement nor anything in it shall form the basis of any contract or commitment whatsoever. This announcement may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.
| 31 December 2011 | Measured | Measured | Indicated | Indicated | Inferred | Inferred | Total | Total | Total |
|---|---|---|---|---|---|---|---|---|---|
| Tonnes (,000) |
Grade (g/t) |
Tonnes (,000) |
Grade (g/t) |
Tonnes (,000) |
Grade (g/t) |
Tonnes (,000) |
Grade (g/t) |
Oz Au (,000) |
|
| Mt Olympus | 1,712 | 2.5 | 1,533 | 2.3 | 4,956 | 2.8 | 8,201 | 2.6 | 695 |
| Peake | 95 | 5.6 | 794 | 4.2 | 889 | 4.3 | 123 | ||
| **Waugh ** | 347 | 3.6 | 240 | 3.6 | 587 | 3.6 | 68 | ||
| Zeus | 508 | 2.1 | 532 | 2.2 | 1,040 | 2.2 | 72 | ||
| **Electric Dingo ** | 98 | 1.6 | 444 | 1.2 | 542 | 1.3 | 22 | ||
| Romulus | 329 | 2.6 | 329 | 2.6 | 27 | ||||
| Total | 1,712 | 2.5 | 2,581 | 2.5 | 7,295 | 2.8 | 11,588 | 2.7 | 1,007 |
1Table 1 - Ashburton Mineral Resources Inclusive of Reserves - 0.7g/t lower cut used for Mt Olympus and 0.9g/t lower cut for others.
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com
ASX ANNOUNCEMENT 16 NOVEMBER 2012
| 31 December 2011 | Proved | Proved | Probable | Probable | Total | Total | Total |
|---|---|---|---|---|---|---|---|
| Tonnes (,000) |
Grade (g/t) |
Tonnes (,000) |
Grade (g/t) |
Tonnes (,000) |
Grade (g/t) |
Oz Au (,000) |
|
| Mt Olympus | 248 | 3.6 | 113 | 3.6 | 361 | 3.6 | 42 |
| Peake | 47 | 5.0 | 47 | 5.0 | 8 | ||
| **Waugh ** | |||||||
| Zeus | 38 | 2.4 | 38 | 2.4 | 3 | ||
| **Electric dingo ** | |||||||
| Romulus | |||||||
| Total | 446 | 3.7 | 53 |
2Table 2 - Ashburton Reserves @ A$1600 gold price based on oxide and transitional material only (free milling)
| Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling | Mt Olympus Resource Definition drilling |
|---|---|---|---|---|---|---|---|
| Drill Hole # | Drill type | Grid | Northing | Easting | RL | Azimuth (degrees) |
Dip (degrees) |
| AMODD0013 | DD | MGA94_50 | 7408128 | 592139 | 465.3 | 360 | -51 |
| AMODD0014 | DD | MGA94_50 | 7408185 | 592060 | 464.1 | 360 | -47 |
| AMODD0015 | DD | MGA94_50 | 7408195 | 591940 | 515.3 | 360 | -56 |
| AMODD0016 | DD | MGA94_50 | 7408203 | 592020 | 478.2 | 360 | -44 |
| AMODD0017 | DD | MGA94_50 | 7408195 | 592040 | 469.6 | 360 | -47 |
| AMODD0018 | DD | MGA94_50 | 7408166 | 592060 | 469.6 | 360 | -68 |
| AMODD0019 | DD | MGA94_50 | 7408143 | 592100 | 466.9 | 360 | -41 |
| AMORC0066 | RC | MGA94_50 | 7408279 | 592056 | 434.7 | 360 | -90 |
| AMORC0067 | RC | MGA94_50 | 7408281 | 592076 | 435.6 | 360 | -70 |
| AMORC0068 | RC | MGA94_50 | 7408278 | 592087 | 437.9 | 23 | -84 |
| AMORC0069 | RC | MGA94_50 | 7408278 | 592087 | 437.9 | 23 | -58 |
| AMORC0072 | RCD | MGA94_50 | 7408190 | 592144 | 447.9 | 360 | -81 |
| AMORCD0009 | RCD | MGA94_50 | 7407975 | 592260 | 454.4 | 360 | -60 |
| AMORCD0010 | RCD | MGA94_50 | 7407919 | 592240 | 441.3 | 360 | -60 |
| AMORCD0030 | RCD | MGA94_50 | 7408273 | 592187 | 460.3 | 360 | -55 |
| AMORCD0044 | RCD | MGA94_50 | 7408082 | 592080 | 500 | 360 | -60 |
| AMORCD0045 | RCD | MGA94_50 | 7408197 | 591960 | 514.4 | 360 | -72 |
| AMORCD0046 | RCD | MGA94_50 | 7408197 | 591960 | 514.4 | 360 | -59 |
| AMORCD0047 | RCD | MGA94_50 | 7408144 | 592080 | 471.7 | 360 | -59 |
| AMORCD0048 | RCD | MGA94_50 | 7408071 | 592200 | 473 | 360 | -71 |
| AMORCD0049 | RCD | MGA94_50 | 7408063 | 592180 | 474.8 | 360 | -64 |
| AMORCD0063 | RCD | MGA94_50 | 7408095 | 592160 | 472.6 | 360 | -67 |
| AMORCD0070 | RCD | MGA94_50 | 7408344 | 591940 | 439.7 | 180 | -83 |
| AMORCD0071 | RCD | MGA94_50 | 7408331 | 591940 | 439.7 | 180 | -64 |
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com
ASX ANNOUNCEMENT 16 NOVEMBER 2012
| Mt Olympus Resource Definition Drilling | Mt Olympus Resource Definition Drilling | Mt Olympus Resource Definition Drilling | Mt Olympus Resource Definition Drilling | |||
|---|---|---|---|---|---|---|
| Drill Hole # | Downhole From (m) |
Downhole To (m) |
Downhole Intersection (m) |
Au (g/t) | Oxide/Transitional/Sulphide | |
| AMORCD0009 | including | 237.2 247.5 290.4 294.8 |
240.4 249.9 296.8 295.8 |
3.2 2.4 6.4 1.0 |
3.1 3.2 4.0 8.3 |
Fresh |
| AMORCD0010 | NSI | Fresh | ||||
| AMORCD0030 | NSI | Fresh | ||||
| AMORCD0044 | 244 | 246.3 | 2.3 | 7.9 | Fresh | |
| AMORCD0045 | 194 237.1 |
195 238.35 |
1.0 1.3 |
3.0 7.1 |
Fresh | |
| AMORCD0046 | 163 176.2 |
165.5 178.4 |
2.5 2.2 |
3.0 6.4 |
Fresh | |
| AMORCD0047 | including | 148.5 189 192 204.7 |
150.5 197 193 210.5 |
2.0 8.0 1.0 5.8 |
3.1 8.5 55.0 3.9 |
Fresh |
| AMORCD0048 | including | 230 272 275.5 284.7 301.5 |
234 298.6 281 290 207.55 |
4.0 26.0 5.5 5.3 6.1 |
5.7 4.2 7.7 7.5 3.0 |
Fresh |
| AMORCD0049 | 217.5 | 236.5 | 19.0 | 6.2 | Fresh | |
| AMORCD0063 | 214.8 223 236.3 |
217 225.5 238 |
2.2 2.5 1.7 |
5.6 3.5 6.4 |
Fresh | |
| AMODD0013 | 99.3 133 146.5 161.4 179 |
101.5 135 157 171.7 181 |
2.2 2.0 10.5 10.3 2.0 |
6.6 3.3 3.0 4.8 3.4 |
Fresh | |
| AMODD0014 | including | 165 169 180 |
172 172 185.1 |
7.0 3.0 5.1 |
5.7 8.5 4.9 |
Fresh |
| AMODD0015 | NSI |
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com
ASX ANNOUNCEMENT 16 NOVEMBER 2012
| Drill Hole # | Downhole From (m) |
Downhole To (m) |
Downhole Intersection (m) |
Au (g/t) | Oxide/Transitional/Sulphide | |
|---|---|---|---|---|---|---|
| AMODD0016 | including including |
75.5 77.0 106.0 107.0 151.9 169.5 |
84.0 80.0 111.6 108.3 158.0 173.2 |
8.5 3.0 5.6 1.3 6.1 3.7 |
9.3 17.0 7.7 18.9 6.7 3.4 |
Fresh |
| AMODD0017 | 82.7 102.0 121.0 180.9 |
85.0 104.0 127.0 183.5 |
2.3 2.0 6.0 2.6 |
3.6 3.9 3.9 5.4 |
Fresh | |
| AMODD0018 | including | 173.0 | 177.4 | 4.4 1.0 |
14.4 74.0 |
Fresh |
| AMODD0019 | 118.0 143.0 |
123.1 146.1 |
5.2 3.1 |
3.3 3.1 |
Fresh | |
| AMORCD0070 | including | 15.0 15.0 |
41.0 23.0 |
26.0 8.0 |
3.1 6.0 |
Transitional |
| AMORCD0071 | including including |
2.0 2.0 19.0 24.0 |
8.0 5.0 36.0 28.0 |
6.0 3.0 17.0 4.0 |
3.7 6.7 3.1 6.3 |
Transitional |
| AMORC0072 | including including including |
120.0 133.0 153.0 161.0 170.0 189.0 232.0 |
125.0 173.0 157.0 163.0 171.0 195.0 234.0 |
5.0 40.0 4.0 2.0 1.0 6.0 2.0 |
3.1 3.2 7.1 7.8 8.8 3.4 3.6 |
Fresh |
| AMORC0066 | including including |
79.0 79.0 85.0 |
89.0 80.0 88.0 |
10.0 1.0 3.0 |
7.8 14.2 20.1 |
Fresh |
| AMORC0067 | 16.0 | 18.0 | 2.0 | 3.9 | Transitional | |
| AMORC0068 | 5.0 24.0 87.0 |
11.0 28.0 96.0 |
6.0 4.0 9.0 |
11.6 4.8 3.0 |
Transitional | |
| AMORC0069 | 65.0 | 68.0 | 3.0 | 5.2 | Fresh |
At a nominal 0.7g /t lower cut off and no upper cut off, with <2m internal dilution. NSI means no significant result
Quality Control – Mt Olympus. All core is logged and cut for sampling. The half core is sampled and sent to SGS Australia Pty Ltd (‘SGS’) in Perth Western Australia for assaying. The remaining half core is stored at Mt Olympus. At SGS, samples are dried then crushed. The reverse circulation samples are crushed material and split with a proportion pulverised. A 50-gram portion of the pulp is treated by Fire Assay method with an Atomic Absorption finish. Northern Star Resources inserts on average one standard and blank every 25 samples. Laboratory standards and blanks are inserted by SGS and several pulp duplicates are also assayed as a determinant of mineralisation variability and to their ISO 9001 standard and a NATA Technical certificate.
Level 1, 1 Puccini Court, Stirling WA 6021 Tel: +61 8 6188 2100 Fax: +61 8 6188 2111
Email: [email protected] Website: www.nsrltd.com