23 OCTOBER 2018

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

Meteoric Resources NL (ASX: MEI; “Meteoric” or the “Company”), a Canadian cobalt focussed explorer provides shareholders with an operational update for the three-month period ending 30[th] September 2018.

PROJECT PORTFOLIO

The Company’s Canadian Cobalt Portfolio currently consists of seven cobalt projects; six located in areas in Eastern Ontario historically known for silver and cobalt production, including the Cobalt town region which demonstrate potential for high grade cobalt mineralisation, and one in West Ontario, targeting high-grade cobalt-copper-gold mineralisation.

==> picture [305 x 246] intentionally omitted <==

Figure 1: MEI Canadian Cobalt Portfolio

Throughout the quarter Meteoric has been systematically working through its 2018 Exploration Program, concentrating on target generation across its entire cobalt portfolio. The Company’s work program to date is detailed below:

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

==> picture [390 x 290] intentionally omitted <==

Figure 2: 2018 Exploration Program

West Ontario

Joyce River Co-Cu-Au Project

Meteoric recently reported that the 3D geophysical modelling of the 2012 AeroTEM survey data at the Joyce Project defined nine EM anomalies prospective for Co‐Cu‐Au. All anomalies identified are coincident with regional magnetic highs and outcropping massive sulphide mineralisation mapped across numerous prospects.

The modelled EM plates range in length from 45 to 180m (Ave 94m) and down to a depth of 94m and are coincident with magnetics and outcropping massive sulphide mineralisation, recently mapped by Tony Cormack on a reconnaissance trip the project area.

Joyce is located in North‐Western Ontario and lies within the Uchi Greenstone Belt (see figures 3&4) and covers an area over 4.6km[2] prospective for cobalt‐copper‐gold mineralisation. It contains large areas of mafic and ultramafic intrusive rocks, the host rock type for cobalt, copper and gold mineralisation and contains semi‐massive to massive sulphide mineralisation.

Massive sulphide mineralisation at Joyce is hosted within a foliated sheared pyroxenite‐bearing ultramafic as bands and coarse aggregates of chalcopyrite, pyrrhotite and pyrite as recently mapped by Tony Cormack whilst on reconnaissance. The mafic and ultramafic intrusive rocks were found to be coincident with the high magnetic signatures and modelled AeroTEM anomalies. The intrusive units are interpreted to be poddy in nature, as confirmed by the 3D geophysical model.

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Further field‐based work including rock‐chip sampling has commenced at Joyce, aimed at better defining the extent and quality of all nine polymetallic targets thus enabling a maiden drill program to be defined for the project.

==> picture [354 x 268] intentionally omitted <==

Figure 3: Joyce River Project ‐ 2012 AeroTEM ‐ Strongly Conductive Modelled Plates (Plan View) and massive sulphides

==> picture [348 x 262] intentionally omitted <==

Figure 4: Joyce River Cobalt Project Location - Regional Geology and Structure

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Historic sampling at Joyce completed by prospector Ray Frank in 2008 & 2010 highlighted the presence of high‐grade Cobalt (0.3%); Copper (11.0%) & Gold (8.07g/t), no assaying for nickel was completed. Samples of massive sulphides recently collected by Meteoric will be assayed for Co‐Cu‐Ni‐Au‐Ag‐PGEs.

East Ontario

==> picture [414 x 318] intentionally omitted <==

Figure 5: East Ontario Project Locations

Geophysics Program – Iron Mask, Beauchamp and Mulligan East

In September the Company commenced a 714 line-kilometres airborne VTEM[TM] (Versatile Time Domain Electro Magnetic) Plus program over the Company’s three largest projects, the 100% owned Beauchamp, Mulligan East and Iron Mask Cobalt Projects. The program was carried out by Geotech Limited. VTEM anomalies identified through this geophysics program will be modelled in 3D and followed up with advanced exploration activities including drilling.

The VTEM[TM] Plus system is the latest technology available in the market place, the system is coupled with a high dipole moment transmitter which provides unparalleled resolution and depth of investigation.

Subsequent to the end of the quarter, preliminary data from the VTEM survey has been provided to Meteoric for assessment and approval with final processed data to be available in the coming weeks. 3D Modelling at all three projects will commenced immediately upon receipt of final processed data from Geotech Limited.

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Beauchamp Cobalt Project

The Beauchamp Cobalt Project is located just 40kms north-north-west of the Cobalt Camp. Beauchamp hosts the same major fault structure, the Cross-Lake Fault, which runs directly through the Cobalt Camp. The Cross-Lake fault is interpreted as the controlling structure for cobalt/silver mineralisation in the area and has been the focus of the Company’s airborne geophysical survey.

The project covers an area over 33.5km[2] being prospective for primary cobalt mineralisation, containing large areas of Nipissing Diabase, being the host rock type for cobalt/silver mineralisation.

Burt Cobalt Project

Meteoric’s Burt Cobalt Project has been confirmed to host three major north-south trending faults, identified as being the key hosts of primary cobalt mineralisation throughout the district. These faults represent over 5.7kms of strike length potential for primary cobalt mineralisation

==> picture [331 x 282] intentionally omitted <==

Figure 6: Burt Cobalt Project Location, approximately 7 kilometres along strike from the Island 27 Project

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Lorrain Cobalt Project

Lorrain is located just 9kms south-south-west from the well-known historical mining town of Cobalt and covers an area over 4.9km[2] being highly prospective for primary cobalt mineralisation. The project contains large areas of Nipissing Diabase, being the host rock type for cobalt / silver mineralisation, and has the same major fault structure, the Cross-Lake Fault, which runs directly through the prolific Cobalt Camp (see Figure 7).

The Cross-Lake fault is interpreted as the controlling structure for cobalt / silver mineralisation in the Cobalt Camp area and formed the target for the Company’s ground-based geophysics programs carried out in the quarter and the Company is currently reviewing as part of its wider target generation program to identify targets for the maiden drill program.

==> picture [372 x 279] intentionally omitted <==

Figure 7: Lorrain Cobalt Project located 9 kilometres south-south-west of the Cobalt, Ontario

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Mulligan Cobalt Project

Meteoric commenced its maiden drill program at the Mulligan Project which comprised 11 diamond drill holes for a total of 970m. Whilst most of the drill holes intersected the targeted fault / vein structures, results (Table 1) indicate that the system lacks the geological scale and metal grades to host sufficient polymetallic mineralisation to support modern day mining techniques.

==> picture [246 x 325] intentionally omitted <==

Figure 8: Mulligan Maiden Drilling Program – Collar locations and geophysical anomalies

==> picture [497 x 166] intentionally omitted <==

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Competent Persons Statement

The information in this announcement that relates to exploration and exploration results is based on information compiled and fairly represented by Mr Tony Cormack who is a Member of the Australasian Institute of Mining and Metallurgy and a consultant to Meteoric Resources NL. Mr Cormack has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which has been undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cormack consents to the inclusion in this report of the matters based on this information in the form and context in which it appears. Additionally, Mr Cormack confirms that the entity is not aware of any new information or data that materially affects the information contained in the ASX releases referred to in this report.

Contact

Dr Andrew Tunks - Managing Director Victoria Humphries – Investor Relations Managing Director NWR Communications M +61 400 205 555 M +61 431 151 676 [email protected] [email protected]

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

APPENDIX 1

TENEMENT HOLDINGS AS AT 30 SEPTEMBER 2018

AUSTRALIA

Tenement Nature of
Interest
Project Ownership
(%)
Change in
Quarter
E80/4235 Granted ELIZABETH HILLS
(Webb JV)
19% -
E80/4407 Granted ANGAS HILL (Webb
JV)
19% -
E80/4506 Granted WEBB DIAMONDS
(Webb JV)
Rights to
13%
-
E80/4737 Granted WEBB DIAMONDS
(Webb JV)
18.5% -
E80/4815 Granted LAKE MACKAY (Webb
JV)
18.5% -
E80/5071 Granted WEBB DIAMONDS
(Webb JV)
18.0% Granted
E80/5121 Application WEBB DIAMONDS
(Webb JV)
18.5% -
EL23764 Granted WARREGO NORTH 49% -
EL30701 Granted R29 BABBLER 49% -
MLC217 Granted PERSEVERANCE 68.43% -
MLC218 Granted PERSEVERANCE 68.43% -
MLC219 Granted PERSEVERANCE 68.43% -
MLC220 Granted PERSEVERANCE 68.43% -
MLC221 Granted PERSEVERANCE 68.43% -
MLC222 Granted PERSEVERANCE 68.43% -
MLC223 Granted PERSEVERANCE 68.43% -
MLC224 Granted PERSEVERANCE 68.43% -
MLC57 Granted PERSEVERANCE 68.43% -
EL28620 Granted BARKLY 30% -

CANADA

Claim No. Province Project Ownership
%
Change in
Quarter
1131335 to
1131337
Quebec MIDRIM/LAFORCE 100% -
1131339 to
1131341;
1131345
Quebec MIDRIM/LAFORCE 100% -
2402370 to
2402386
Quebec MIDRIM/LAFORCE 100% -
2412147 to
2412207
Quebec MIDRIM/LAFORCE 100% -

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

2499867 to
2499896
Quebec MIDRIM/LAFORCE 100% -
2499900 to
2499960
Quebec MIDRIM/LAFORCE 100% -
2500063 to
2500089
Quebec MIDRIM/LAFORCE 100% -
2500771 to
2500776
Quebec MIDRIM/LAFORCE 100% -
2501091 to
2501095
Quebec MIDRIM/LAFORCE 100% -
2505025 to
2505027
Quebec MIDRIM/LAFORCE 100% -
2505037 to
2505039
Quebec MIDRIM/LAFORCE 100% -
2505048 to
2505053
Quebec MIDRIM/LAFORCE 100% -
2505823 to
2505827
Quebec MIDRIM/LAFORCE 100% -
4284365 to
4284371
Ontario IRON MASK 100% -
4278666
and
4280538
Ontario MULLIGAN 100% -
504371-
504383
Ontario JOYCE RIVER 100% -
518751-
518760
Ontario JOYCE RIVER 100% -
5285516-
4285519
Ontario LORRAIN 100% -
504371-
504383
Ontario JOYCE RIVER 100% -
518751-
518760
Ontario JOYCE RIVER 100% -
4285516-
4285519
Ontario LORRAIN 100% -

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651