METEORIC RESOURCES NL Capital/Financing Update 2018

Jul 4, 2018

65311_rns_2018-07-04_25f47a1e-db3c-4250-aaf9-71edf2b1d9db.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [185 x 49] intentionally omitted <==

5 July 2018

MULLIGAN MAIDEN DRILL PROGRAM FINALISED

  • 16-hole maiden drill program (1,570m NQ) confirmed for the Mulligan Cobalt Project

  • 7 high chargeability polymetallic anomalies to be drill tested

  • 3D induced polarisation anomalies modelled to a depth of 500m below surface

  • Award of drilling contract and mobilisation to site expected in the coming weeks

Meteoric Resources NL (ASX: MEI; “Meteoric” or “the Company”), a Canadian cobalt focussed explorer, announces the finalisation of a 16-hole maiden drill program (see Figure 1 & Table 1) for its 100% owned Mulligan Cobalt Project, located in East Ontario, Canada.

The Company recently completed a closely spaced (100m x 25m), ground based Induced Polarisation (IP) survey across the entire Mulligan Cobalt Project. Data from the geophysical survey was modelled in 3D to support the design of the 16-hole maiden drill hole program at the Project.

1,570 metres of NQ diamond core drilling has been planned to test the 7 highly chargeable IP modelled anomalies. Award of the drilling contract and mobilisation to site is expected to commence in the coming weeks. All drilling will be angled diamond holes designed to intersect the IP anomalies between 30 to 90 meters below surface.

==> picture [495 x 292] intentionally omitted <==

----- Start of picture text -----

Planned drill collar
----- End of picture text -----

Figure 1: Oblique view of the Mulligan Cobalt Project 16 Hole (1,570m NQ) Maiden Drill Program and IP inversion model. Drill hole position are approximate. The two isolated holes are positioned to test beneath existing working that have only a weak IP anomaly.

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

==> picture [441 x 597] intentionally omitted <==

----- Start of picture text -----

1
2
3 4
6
5
9
10 & 16
11
12
13 & 15
14
7
8
----- End of picture text -----

Figure 2: Plan view of the Mulligan Cobalt Project 16 Hole (1,570m NQ) Maiden Drill Program and IP inversion model

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

HOLE ID NORTHING EASTING ELEVATION AZIMUTH DIP DEPTH
MD001 5301550 602295 237 90 -50 70
MD002 5301550 602290 237 90 -60 90
MD003 5301410 602495 237 280 -50 80
MD004 5301410 602535 237 280 -60 130
MD005 5301070 602620 237 270 -60 70
MD006 5301190 603030 237 270 -60 60
MD007 5300690 602350 237 270 -60 60
MD008 5300595 602450 237 270 -50 130
MD009 5301000 602910 237 270 -60 100
MD010 5300980 602910 237 270 -60 100
MD011 5300960 602910 237 270 -60 100
MD012 5300910 602540 237 270 -60 110
MD013 5300880 602540 237 270 -60 110
MD014 5300850 602540 237 270 -60 110
MD015 5300880 602560 237 270 -60 130
MD016 5300980 602930 237 270 -60 120
Total: 1570

Table 1: 16 Hole / 1,570m Maiden NQ Diamond Drill Program for Mulligan Cobalt Project, Ontario Canada. Note hole numbers are indicative only and change depending on order in which holes are drilled.

Meteoric Resources MD, Dr Andrew Tunks commented:

The finalisation of the drill program is a culmination of the hard work our team has put in on the ground in Canada, led by our cobalt expert Tony Cormack, since the beginning of the field season and we are very excited to be commencing our maiden drilling program at Mulligan. We have diligently and systematically been working through target generation across our entire Canadian cobalt portfolio and whilst we kick off with drilling at Mulligan, we will continue to advance our other projects through both air and ground geophysics programs

“As I have said many times before, drilling for an exploration company like Meteoric is truly the most exciting stage, as it is the only through drilling, that you can make a discovery.

Next Steps

Airborne Geophysical programs are scheduled to commence at Iron Mask and Mulligan East, with ground geophysics at Burt, Joyce Lake and Lorrain set to follow. These programs will generate drill targets that will be ranked and drill tested over the coming months.

Contact

Dr Andrew Tunks - Managing Director Victoria Humphries – Investor Relations Managing Director NWR Communications M +61 400 205 555 M +61 431 151 676 [email protected] [email protected]

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651

==> picture [185 x 49] intentionally omitted <==

Competent Persons Statement

The information in this announcement that relates to exploration and exploration results is based on information compiled and fairly represented by Mr Tony Cormack who is a Member of the Australasian Institute of Mining and Metallurgy and a consultant to Meteoric Resources NL. Mr Cormack has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which has been undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cormack consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

WWW.METEORIC.COM.AU • ASX: MEI •ABN 64 107 985 651