QUARTERLY REPORT FOR THE PERIOD ENDING 31 DECEMBER 2016 HIGHLIGHTS OF THE QUARTER

CORPORATE

Metals X Limited is a diversified group exploring and developing minerals and metals in Australia. It is Australia’s largest tin producer and a significant copper producer with a pipeline of assets from exploration to development including the world class Wingellina Nickel Project.

  • Successful completion of the demerger of Metals X gold assets and listing of Westgold Resources Limited (ASX:WGX) (Westgold) on 1 December 2016. Westgold commenced trading on the ASX on 6 December 2016.

  • Earnings rise as productivity and metal prices improve. Operating EBITDA from the copper and tin divisions for the quarter was $20.8 million (unaudited).

  • Strong balance sheet with closing cash and working capital at the end of the quarter of $112 million plus investments of $15.3 million.

COPPER DIVISION – CASHFLOW POSITIVE AHEAD OF SCHEDULE

CORPORATE DIRECTORY ASX Code: MLX

Level 3, 18–32 Parliament Place West Perth WA 6005 Australia

  • Production of 7,909 tonnes of copper contained in concentrates at an all-in-cost of A$6,272 per tonne of copper or $A2.84/lb Cu (US$2.15/lb).

  • EBITDA of $10.1 million and net cashflow of $7.2 million (unaudited).

  • First exploration results from the recommencement of underground drilling returned excellent ore grade intercepts. Including:

  • » 10 m @ 3.89% Cu from NUG0003, and

  • » 21.6 m @ 2.64% Cu from NUG0012.

TIN DIVISION – STEADY PRODUCTION AND HIGHER RETURNS

PO Box 1959 West Perth WA 6872 Australia

t: +61 8 9220 5700 f: +61 8 9220 5757 [email protected] www.metalsx.com.au

  • Production of 1,768 tonnes of tin contained in concentrates at an all-in-cost of $18,495 per tonne of tin.

  • EBITDA of $10.7 million and net cashflow of $7.7 million (unaudited).

  • Excellent ore sorting results provides a pathway to a 15-20% expansion of tin production.

  • Rentails economics very attractive with partners considering revised development plans and updated feasibility study.

Note: all figures are AUD$ and relate to the December 2016 Quarter unless stated otherwise.

ENQUIRIES

Warren Hallam

[email protected]

Rod Corps

[email protected]

==> picture [152 x 138] intentionally omitted <==

----- Start of picture text -----

NIFTY
CLAUDE HILLS
WINGELLINA
RENISON
RENTAILS
----- End of picture text -----

COPPER DIVISION

NIFTY OPERATIONS (MLX 100%)

Metals X took operational control of the Nifty mine after moving to compulsory acquisition of Aditya Birla Minerals Limited on 1 August 2016. During the December quarter Metals X completed the integration of the Nifty Copper operations into Metals X with excellent progress being made towards reducing operating costs, improving mining practices and opening up additional mining areas.

Copper production for the quarter was 7,909 tonnes of copper contained in concentrates, equivalent to an annualised production rate of over 31,000 tonnes of contained copper. Operating costs continued to improve with all-in-costs of $6,272/t Cu (A$2.84/lb Cu). The average LME copper price for the quarter was $7,044/t Cu ($3.19/lb Cu) resulting in an imputed net cashflow of $7.2 million and an EBITDA of $10.1 million for the operation.

The integration of the corporate office was completed with the realisation of significant non-operational cost savings. Implementation of Metals X policies, procedures and operational standards, and the integration of the management and data systems are close to completion. All operational roles have been deployed to site.

A new Nifty geological model, incorporating available stratigraphy and depletion data, was updated to provide a further picture of the mine geology and mining areas. The geological model is now being utilised at Nifty to assist planning and the development of a five-year production plan. It will also form a basis for an updated resource and reserve model.

The short-term focus at Nifty is to exploit additional ore along strike of already developed mining areas and to review all remaining stoping blocks within the checkerboard with an objective of maximising production whilst minimising dilution.

The immediate strategic objective is to increase mine production to enable a return to continuous production over the next 12 to 18 months. The processing plant currently has 30-40% spare capacity and is operating on a two-weeks-on and one-week-off campaign basis. Increased plant utilisation will significantly reduce overall unit costs and improve free cash flow as there is no requirement for additional plant capital and additional plant feed will incur only incremental operating costs.

Underground drilling commenced during the quarter returning excellent early results from drilling along strike at the 14 level defining strong mineralisation close to previous development. A substaintial tonnage of ore between the open pit and level 14 has now been defined and revised mine designs are currently being devised with the objective of bringing this area into production during the March quarter of 2017. The overall Nifty ore system remains open downplunge and an additional level (25 Level) was developed during the quarter and intercepted ore as expected. Drilling will continue to identify opportunities within close vicinity of current developed areas and down plunge of the existing ore body.

==> picture [505 x 164] intentionally omitted <==

Picture: Nifty Copper Concentrator

QUARTERLY REPORT 2 FOR THE PERIOD ENDING 31 DECEMBER 2016

Quarterly production and costs are tabulated below. The previous quarter only contains two months of data reflecting the date at which Metals X took over operational control:

December 16 Quarter Prev. Quarter Rolling 12-months
Physical Summary Units 271,483
1.68
1,675,277
2.11
Production
Ore Tonnes Mined t 415,004
Ore Grade Mined % Cu 2.09
Copper Concentrator 277,356
1.73
93.86
4,504
4,224
6,236
1,662,690
2.1
96.20
31,499
32,818
6,128
Tonnes Processed t 394,985
Ore Grade Processed % Cu 2.11
Recovery % 94.85
Copper Produced t 7,909
Copper Sold t 8,213
Copper price achieved $ 6,970
Cost Summary 2,204
915
1,505
-
4,625
2,363
1,025
1,122
-
4,510
Mining A$/t Cu 2,153
Processing A$/t Cu 1,027
Admin A$/t Cu 1,043
Stockpile Adj A$/t Cu -
C1 Cash Cost A$/t Cu 4,223
Royalties A$/t Cu 305 253
1,347
122
1
6,348
274
1,343
510
109
6,745
Marketing / Sales costs A$/t Cu 1,229
Sustaining Capital A$/t Cu 367
Reclamation & other Adj A$/t Cu 108
All-in Sustaining Costs A$/t Cu 6,232
Project Start-up costs A$/t Cu - - -
Exploration Costs A$/t Cu 40 64 46
All-in Costs A$/t Cu 6,272 6,412 6,791

QUARTERLY REPORT 3 FOR THE PERIOD ENDING 31 DECEMBER 2016

NIFTY EXPLORATION

At Nifty, after a substantial hiatus under past management, both underground and surface drilling activities recommenced during the quarter. This resumption of drilling operations has already provided encouraging results with significant intercepts returned in the Northern Limb area of the Nifty Syncline, including;

  • 10.00 m at 3.89% Cu from 165.0 m in NUG0003.

  • 26.52 m at 1.32% Cu from 153.5 m in NUG0006.

  • 21.60 m at 2.64% Cu from 117.0 m in NUG0012.

The Northern Limb area already has extensive nearby capital development and, with the benefit of increased geological definition and confidence in grade distribution provided by the drill results, will provide a near-immediate additional source of production upon completion of drilling and geological modelling. As previously mentioned, drilling along strike at the 14 level identified strong mineralisation which is now being designed to bring into production.

==> picture [452 x 331] intentionally omitted <==

Figure 1: Drilling results above the 14 level

The Metal’s X site exploration team have also developed a strategic plan to underpin the recommencement of grassroots exploration activities across the Company’s large landholdings in the Patterson Province. Metal’s X has prioritised targets away from the immediate mine area in preparation for recommencement of exploration activities upon the close of the wet season in early 2017.

QUARTERLY REPORT 4 FOR THE PERIOD ENDING 31 DECEMBER 2016

TIN DIVISION RENISON PROJECT (MLX 50%)

Performance in the December quarter continued to benefit from the improvement in Australian dollar tin prices and the lower cost profile as owner operator. The tin price for the quarter increase by a further 10% during the quarter, trading above $29,000/t by quarter end which compares favourably to the AISC of $18,495/t tin for the quarter. EBITDA for the quarter was $10.7 million (MLX 50% share). Quarterly tin production of 1,768 tonnes of tin represented a 2.9% increase from the prior quarter.

All other production metrics (ore tonnes mined and processed, mined and processed grades and recoveries) remained consistent with the previous quarter, except process tonnes which made record highs for the quarter.

Mine production remains in excess of processed tonnes and a significant stockpile (+30,000 tonnes) of ore has now been accumulated providing additional surety and flexibility.

During the quarter the Joint Venture (JV) completed its testing and evaluation of ore sorting. Previous vendor trials have indicated that approximately 25% of waste can be rejected from the underground ore with tin losses of less than 3%. Ore sorting would enable a cost effective expansion at the Renison tin operation which would result in being able to increase head grade and mining production without the requirement to expand the processing plant. The ore sorter would be installed in a new expanded and purpose built crushing plant. Engineering has been completed and final economic modelling is underway with a decision expected to be made in early 2017.

The conceptual design would require an increase in mine capacity over the next 18 months to 920,000 tonnes while maintaining the processing plant at a rate of approximately 720,000 tonnes. It is anticipated that tin production would be increased by approximately 15-20% from current levels of around 7,100 tonnes and allow additional optimisation of the current resource.

Operating costs for the quarter were slightly higher than the previous quarter (approximately 8.5%) which is within expected operating and timing variability in consideration of the reduction in C1 cost of 37% in the September quarter. The C1 costs for the quarter and AISC were $11,980/t tin and $18,495/t tin respectively, an increase of 8.5% and 6.4% for the quarter.

==> picture [483 x 289] intentionally omitted <==

Picture: Renison Accommodation Village in Zeehan, TAS.

QUARTERLY REPORT 5 FOR THE PERIOD ENDING 31 DECEMBER 2016

Physical outputs for the quarter are summarised below comparing the previous quarter and the rolling 12 month totals:

December 16 Quarter Prev. Quarter Rolling 12-months
Physical Summary Units 199,023
1.26
738,932
1.23
Production
Ore Tonnes Mined t 197,650
Ore Grade Mined % Sn 1.28
Tin Concentrator 188,631
1.28
71.07
0.36
1,718
1,394
24,727
717,330
1.24
70.70
0.36
6,314
6,492
24,021
Tonnes Processed t 190,438
Ore Grade Processed % Sn 1.29
Recovery % 72.33
Tails grade % 0.36
Tin Produced t 1,768
Tin Sold t 1,868
Tin price achieved $ 27,911
Cost Summary 5,953
4,643
984
(551)
11,028
7,811
4,795
1,075
(297)
13,384
Mining A$/t Sn 6,937
Processing A$/t Sn 4,313
Admin A$/t Sn 1,081
Stockpile Adj A$/t Sn (351)
C1 Cash Cost A$/t Sn 11,980
Royalties A$/t Sn 1,623 747
2,320
3,251
(2)
17,344
1,107
2,240
2,836
38
19,605
Marketing / Sales costs A$/t Sn 2,388
Sustaining Capital A$/t Sn 2,478
Reclamation & other Adj A$/t Sn 26
All-in Sustaining Costs A$/t Sn 18,495
Project Start-up costs A$/t Sn - - -
All-in Costs A$/t Sn 18,495 17,344 20,351

QUARTERLY REPORT 6 FOR THE PERIOD ENDING 31 DECEMBER 2016

RENISON EXPLORATION AND DEVELOPMENT

A significant amount of in-mine and extensional drilling was conducted by the Renison Geology team during the quarter, with a second underground drill rig mobilised to site late in the quarter to assist in advancing resource definition work at a series of new targets including Upper Huon North, Mid-South Federal Bassett, and South Bassett.

Better drill results returned this quarter include 7.1 m at 1.93% Sn and 0.13% Cu from 54 m in U5820 and 8 m at 1.67% Sn and 0.21% Cu from 79 m in U5822, both from the Blackwood’s orebody. Blackwood’s is a historical production source that the Renison team are currently re-evaluating in today’s elevated tin price environment.

Encouraging results, such as 11.1 m at 1.24% Sn and 0.61% Cu in U5879, have also been returned from the Upper Federal part of the mine. Upper Federal is a historically significant source of production that the Renison team exploit on an incremental basis as supplementary feed to the main production sources of Lower Federal, Area 4 and CFB, lower in the mine. Such results demonstrate the considerable metal endowment and standalone prospectivity of this large mineralised zone.

Additionally work in re-evaluating remnant mineralisation in the substantial stratabound footwall ore system at the top of the mine is ongoing. This large, historically mined zone with favourable metallurgical characteristics was the basis for the commencement of the current mechanised Renison Bell mine. It has not previously been subject to modern geological modelling techniques and mining review.

RENISON EXPANSION (RENTAILS) PROJECT

The objective of the Rentails Project is to re-process an estimated 22.5 million tonnes of tailings, at an average grade of 0.45% tin and 0.22% copper, from the historical processing of tin ore. The project has a Measured Resource containing over 100,000 tonnes of tin and 50,000 tonnes of copper.[†]

Metals X completed a Definitive Feasibility Study into the mining and re-processing of the tailings for the recovery of tin and copper in 2009. The financial evaluation estimated total cash cost of sales of $11,875 per tonne of tin after copper credits, assuming a copper price of $6,250/t (the current copper price is approximately $7,700/t). Capital costs, at an accuracy of estimate of +/- 15%, were estimated at approximately $194 million. At current metal prices for both tin and copper the economics of the Rentails Project looks very encouraging.

During the quarter a review of the feasibility study was undertaken to update the capital and operating costs of the 2009 Feasibility Study. The update will be completed early in 2017. However, preliminary analysis indicates that only a minor increase in capital (~2%) and operating costs (~15%) is expected, which would result in a strong business case for the project at prevailing tin prices. Final updates and modelling will be completed during the following quarter at which point it is proposed to consider financing options for the development of the project.

QUARTERLY REPORT 7 FOR THE PERIOD ENDING 31 DECEMBER 2016

NICKEL DIVISION

WINGELLINA NICKEL PROJECT (MLX 100%)

The Wingellina Nickel-Cobalt Project remains one of the largest undeveloped Nickel – Cobalt – Scandium deposits in the world. Since Metals X’s first involvement in the project in 2005 it has accumulated 100% of the project along with a significant highly potential exploration land position straddling the Western Australia – South Australia border near its triple-point with the Northern Territory. This area is referred to as the Central Musgrave Ranges.

Metals X has defined a Mineral Resource estimate of approximately 168 million tonnes containing 1.56 million tonnes of nickel, 122,000 tonnes of cobalt and a significant inventory of scandium and iron.[†] The mineralisation is similar in style to Ambatovy in Madagascar and Moa Bay in Cuba, where Sherritt Gordon developed and have successfully operated High Pressure Acid Leach (HPAL) for over 50 years. There are also numerous other identified mineral accumulations within the area; Metals X has defined a further Inferred Resource (JORC) of 33 million tonnes with a grade of 0.81% Ni, 0.07% Co and 39% Fe2O3, at its Claude Hill Prospect located approximately 25 km to the east of Wingellina.[† ] Many other occurrences of nickel mineralisation remain untested.

==> picture [423 x 230] intentionally omitted <==

In 2009 the Company completed a feasibility study (+/-25%) which concluded a robust 40 year project based on Ore Reserves, producing 40,000 tonnes of nickel and 3,000 tonnes of cobalt per annum at a production cost of US$3.34/lb after cobalt credits.

In mid 2010 Metals X signed a landmark agreement with the Traditional Owners and granted Native Title holders of the Wingellina project which provides consent to undertake mining activities.

In late 2012 Metals X signed an MOU with Samsung C&T to work together to bring the massive Wingellina Ni-Co Project into production. Under the MOU, Samsung C&T would provide its technical expertise in engineering, feasibility studies and construction and would use its financial reputation and capacity to assist Metals X with the financing and development proposals for the Project.

In early 2013 SNC-Lavalin was appointed the Principal Engineer for a Definitive Feasibility Study (DFS) and was awarded the engineering contract for the Processing and plant infrastructure. Due to the deterioration of the nickel price and the strength of the Australian dollar through 2013, the Board of Metals X reassessed the timing of the DFS and, in consultation with Samsung C&T and SNC, made a decision to place the project on hold until the project economics improved.

QUARTERLY REPORT 8 FOR THE PERIOD ENDING 31 DECEMBER 2016

In late 2014 Metals X was invited to pilot test 100 tonnes of Wingellina ore through POSCO’s PosNEP fully upgraded and automated pilot plant in Korea. The purpose of the pilot was to trial an alternative processing route for high iron, low magnesium nickel ores. The trials were successful and discussions are ongoing as to the next steps in the possible commercialisation of the PosNEP process and the Wingellina project. The PosNEP process has the capability of being modularised into smaller production trains of approximately 10,000 tpa contained nickel for which additional trains can be added. In addition the process uses minimal water compared to other processes and recycles the main reagents. Overall this will significantly reduce the capital hurdle by starting production with one to two process trains and building adding additional trains at a subsequent date.

In November 2016, Metals X received EPA approval for the development of the Wingellina project subject to meeting various standard conditions.

Metals X’s objective is to ensure that the project is ready for development once the nickel market improves. The project comprises a significant 40+ year Ore Reserve[†] at a proposed production rate of 40,000 tonnes per annum, a well defined and tested water source for the life of the project, an access and development agreement with the Traditional Owners and EPA approval.

The NT Government, in recognition of the potential benefits of the project to the Territory, has provided a Project Manager to assist in coordinating the approval of various logistic options. The Company is awaiting a final scope from the Project Manager after which it will commence assessing the most optimal logistic options.

==> picture [518 x 291] intentionally omitted <==

Conceptual render of Wingellina pit design and process plant.

QUARTERLY REPORT 9 FOR THE PERIOD ENDING 31 DECEMBER 2016

CORPORATE

Metals X held an Extraordinary General meeting on 24 November 2016 for shareholders to consider a demerger of Metals X gold assets via a capital reduction and in specie distribution of all the shares in Westgold Resources Limited. Shareholders overwhelmingly endorsed the demerger and Westgold commenced trading on 6 December 2016.

As a result of the demerger Peter Cook stepped down to a Non-Executive Director of Metals X to take up the role of Managing Director of Westgold while Warren Hallam, Metals X Executive Director, was appointed as the Managing Director of Metals X.

Metals X has also appointed Mr Stephen Robinson as a Non-Executive Director. Mr Robinson is an experienced Australian mining executive and a Rhodes Scholar. He is currently a Director of independent advisory firm Lincoln Capital Pty Ltd and Non-Executive Chairman of Sumatra Copper and Gold PLC and has held numerous other senior roles with Barrick, Iluka Resources and WMC Resources.

Allan King who has overseen the Renison Tin JV for the past few years, that has seen significant cost reductions and productivity improvements, has accepted the role of Metals X Chief Operating Officer (COO).

Metals X closed the quarter with cash and working capital of $112 million and investments of $15.3 million.

COPPER HEDGING

During the quarter Metals X took advantage of the upsurge in copper prices in December to hedge 1,500 tonnes of copper per month for January through to June 2017 by establishing a collar structure to preserve the prices over approximately half of its expected production. The company has granted calls at A$8,100 per tonne of LME Copper and brought puts at A$7,500 per tonne of LME copper.

ISSUED CAPITAL

As a result of the demerger 3,388,155 performance rights vesting during the period. The issued capital of Metals X as of 31 December 2016 was 609,340,903 shares.

MAJOR SHAREHOLDERS

The current major shareholders of the Company are:

APAC Resources (HKEX:1104) 12.86%
Blackrock Group 12.84%
Jinchuan Group 7.22%
Ausbil Investment Management 5.27%

COMPETENT PERSONS STATEMENTS

† Please refer to Metals X (ASX:MLX) announcement of 18 August 2016 for full details of Mineral Resource and Ore Reserve Estimates.

The information in this report that relates to Exploration Targets, Exploration Results and Mineral Resources is compiled by Metals X technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the Australian Institute of Geoscientists. Mr Russell is a contractor to the company, and has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Russell consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

The information in this report that relate to Ore Reserves has been compiled by Metals X technical employees under the supervision of Mr Michael Poepjes BEng (Mining Engineering), MSc (Min. Econ) M.AusIMM. Mr Poepjes is a full-time employee of the company. Mr Poepjes has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as de ned in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Poepjes consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Poepjes is eligible to participate in short and long term incentive plans and holds performance rights in the Company as has been previously disclosed. Mr Poepjes is eligible to participate in short and long term incentive plans of the company.

QUARTERLY REPORT 10

FOR THE PERIOD ENDING 31 DECEMBER 2016

RENISON TIN PROJECT

==> picture [525 x 670] intentionally omitted <==

----- Start of picture text -----

Intercept
Lode Hole Intercept N Intercept E Intercept (True Width) From (m) Dip Azi
RL
Blackwood U5817 66,829 44,254 1,781 2.1m at 1.47% Sn and 0.04% Cu 69.0 -6 78
2.1m at 1% Sn and 0.26% Cu 78.1
U5818 66,801 44,231 1,782 3.5m at 1.02% Sn and 0.1% Cu 54.5 -11 70
U5819 NSI
U5820 66,780 44,235 1,779 7.1m at 1.93% Sn and 0.13% Cu 54.0 -14 91
4.8m at 3.07% Sn and 0.14% Cu 73.0
U5821 66,758 44,237 1,805 1.6m at 2.7% Sn and 0.14% Cu 63.2 10 111
1m at 1.91% Sn and 0.14% Cu 86.9
U5822 66,742 44,255 1,780 8.8m at 1.67% Sn and 0.21% Cu 79.0 -11 92
3.2m at 1.18% Sn and 0.97% Cu 99.2
U5823 66,728 44,264 1,812 3m at 3.8% Sn and 0.07% Cu 92.9 8 100
U5824 66,722 44,256 1,777 2.4m at 1.18% Sn and 0.26% Cu 87.9 -13 105
U5833 66,593 44,302 1,779 2.9m at 2.13% Sn and 0.29% Cu 72.7 -18 43
CFB U5779 NSI
U5782 66,200 44,498 1,480 3m at 2.11% Sn and 0.72% Cu 42.0 -27 90
U5785 66,221 44,490 1,530 3.6m at 1.28% Sn and 0.08% Cu 43.0 36 82
U5788 NSI
U5790 66,245 44,492 1,542 3.7m at 1.51% Sn and 0.64% Cu 100.8 3 87
U5800 66,334 44,475 1,536 2.3m at 0.98% Sn and 0.08% Cu 120.4 -0 45
U5801 NSI
U5802 66,373 44,458 1,517 2.1m at 1.03% Sn and 0.55% Cu 142.5 -7 29
U5803 NSI
U5804 NSI
U5806 66,362 44,450 1,590 2.4m at 0.76% Sn and 0.83% Cu 138.0 22 28
U5889 66,013 44,485 1,492 1.4m at 1.3% Sn and 0.18% Cu 19.0 -26 65
2.8m at 1.37% Sn and 0.16% Cu 33.0
2.3m at 1.56% Sn and 1.4% Cu 44.4
U5890 NSI
U5891 65,989 44,493 1,487 2.4m at 0.96% Sn and 1.59% Cu 28.3 -29 115
2m at 0.8% Sn and 0.15% Cu 35.0
U5892 66,038 44,509 1,474 3.4m at 1.33% Sn and 0.41% Cu 140.0 -9 68
U5893 NSI
----- End of picture text -----

APPENDIX 1 – SIGNIFICANT EXPLORATION RESULTS FOR THE QUARTER 11

RENISON TIN PROJECT (CONTINUED)

==> picture [525 x 710] intentionally omitted <==

----- Start of picture text -----

Intercept
Lode Hole Intercept N Intercept E Intercept (True Width) From (m) Dip Azi
RL
U5894 65,956 44,504 1,517 1.5m at 3.88% Sn and 0.04% Cu 126.5 8 55
U5895 NSI
U5896 65,937 44,461 1,488 1m at 1.29% Sn and 0.16% Cu 92.0 -6 119
U5897 65,908 44,446 1,506 1.2m at 3.23% Sn and 0.12% Cu 77.5 4 139
U5898 NSI
U5899 NSI
U5900 65,911 44,480 1,472 0.6m at 3.03% Sn and 1.26% Cu 124.7 -12 126
Flinders U5825 66,690 44,270 1,790 1.3m at 2.79% Sn and 0.69% Cu 105.3 -7 91
2m at 1.82% Sn and 0.4% Cu 114.6
U5826 NSI
U5827 66,586 44,318 1,751 1.8m at 0.56% Sn and 0.15% Cu 93.2 -33 55
U5828 NSI
U5829 66,541 44,334 1,748 1.1m at 1.66% Sn and 0.19% Cu 95.5 -35 89
U5830 NSI
U5831 NSI
U5832 66,425 44,343 1,769 0m at 0% Sn and 0% Cu - -20 107
U5834 66,573 44,312 1,775 0.7m at 2.19% Sn and 0.29% Cu 71.3 -22 61
U5835 NSI
U5836 66,437 44,350 1,776 2.1m at 2.35% Sn and 0.28% Cu 67.0 -13 96
Huon Flexure U4757 NSI
U4758 NSI
U4759 NSI
U4760 NSI
U4761 66,985 44,378 1,557 2.4m at 0.81% Sn and 1.29% Cu 59.4 37 78
U4762 NSI
U4764 NSI
U4765 67,041 44,359 1,583 2.8m at 3.51% Sn and 0.25% Cu 75.9 56 30
U4766 NSI
U5814 66,953 44,408 1,494 2m at 1.16% Sn and 0.17% Cu 78.9 -15 93
U5815 67,026 44,426 1,466 1m at 1.62% Sn and 0.2% Cu 111.5 -25 71
Mid Federal U5850 NSI
South
U5851 NSI
U5852 65,401 44,534 1,547 1.4m at 1.25% Sn and 0.17% Cu 141.8 -33 130
Upper Federal U5867 65,765 44,340 1,983 2.8m at 1.18% Sn and 1.06% Cu - - 103
----- End of picture text -----

APPENDIX 1 – SIGNIFICANT EXPLORATION RESULTS FOR THE QUARTER 12

==> picture [525 x 313] intentionally omitted <==

----- Start of picture text -----

Intercept
Lode Hole Intercept N Intercept E Intercept (True Width) From (m) Dip Azi
RL
U5868 65,766 44,330 1,984 2.2m at 0.8% Sn and 0.1% Cu - 18 291
U5869 NSI
U5870 NSI
U5871 NSI
U5872 65,741 44,341 1,980 5.4m at 1.01% Sn and 0.89% Cu 4.0 -16 117
U5873 65,742 44,338 1,987 5.2m at 0.72% Sn and 0.31% Cu 2.3 27 116
U5874 NSI
U5875 NSI
U5876 65,722 44,337 1,979 9.6m at 1.05% Sn and 0.56% Cu 5.1 -15 124
U5877 65,701 44,337 1,988 5.8m at 1.44% Sn and 0.7% Cu 5.2 23 114
U5878 65,704 44,329 1,981 6.9m at 1.07% Sn and 0.53% Cu 0.4 -15 115
U5879 65,702 44,341 1,966 11.1m at 1.24% Sn and 0.61% Cu 5.0 -51 102
U5880 65,707 44,322 1,983 2.3m at 1.18% Sn and 0.14% Cu 0.2 7 296
U5881 65,686 44,336 1,979 9.6m at 1.17% Sn and 0.37% Cu 2.0 -17 89
----- End of picture text -----

NIFTY COPPER OPERATIONS

==> picture [525 x 393] intentionally omitted <==

----- Start of picture text -----

Intercept
Lode Hole Intercept N Intercept E Intercept (True Width) From (m) Dip Azi
RL
Northern NUG0002 7,603,879.0 352,854.0 -9.4 10.45m at 2.14% Cu 165.1 14 156
Limb
14.00m at 2.48% Cu 182.0
NUG0003 7,603,918.8 352,846.3 -19.5 9.00m at 0.55% Cu 131.0 22 152
10.00m at 3.89% Cu 165.0
NUG0004 7,603,909.8 352,860.1 -47.1 3.80m at 1.52% Cu 156.0 29 149
3.90m at 2.91% Cu 162.0
5.30m at 1.19% Cu 170.7
NUG0006 7,603,918.5 352,823.8 6.6 2.97m at 2.26% Cu 117.1 12 163
26.52m at 1.32% Cu 153.5
NUG0007 7,603,926.0 352,824.9 -12.3 4.00m at 1.51% Cu 113.9 20 159
10.80m at 1.90% Cu 133.2
9.30m at 0.86% Cu 147.0
NUG0008 7,603,934.9 352,826.6 -23.6 3.20m at 1.55% Cu 112.0 28 155
7.00m at 2.00% Cu 136.0
9.30m at 0.84% Cu 146.9
NUG0012 7,603,933.0 352,797.0 4.0 3.20m at 2.26% Cu 97.2 14 175
21.60m at 2.64% Cu 117.0
NUG0015 7,603,924.3 352,783.7 7.4 14.45m at 1.58% Cu 104.9 11 183
----- End of picture text -----

APPENDIX 1 – SIGNIFICANT EXPLORATION RESULTS FOR THE QUARTER 13

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION SECTION 1 SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections.)

==> picture [772 x 27] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
Sampling techniques • Nature and quality of sampling (eg cut channels, random chips, or specific specialised • Diamond Drilling
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or specifc specialised

Diamond Drilling
Drilling techniques
Drill sample recovery
industry standard measurement tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not
be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fre assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by what method, etc).

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fne/coarse material.
The bulk of the data used in resource calculations at Renison has been gathered from diamond
core. Three sizes have been used historically NQ2 (45.1mm nominal core diameter), LTK60
(45.2mm nominal core diameter) and LTK48 (36.1mm nominal core diameter), with NQ2
currently in use. This core is geologically logged and subsequently halved for sampling. Grade
control holes may be whole-cored to streamline the core handling process if required.
NQ and HQ core sizes have been recorded as being used at Mount Bischof. This core is
geologically logged and subsequently halved for sampling.
There is no diamond drilling for the Rentails Project.

Face Sampling
Each development face / round is horizontally chip sampled at Renison. The sampling
intervals are domained by geological constraints (e.g. rock type, veining and alteration /
sulphidation etc.). Samples are taken in a range from 0.3m up to 1.2m in waste. All exposures
within the orebody are sampled. A similar process would have been followed for historical
Mount Bischof face sampling.
There is no face sampling for the Rentails Project.

Sludge Drilling
Sludge drilling at Renison is performed with an underground production drill rig. It is an
open hole drilling method using water as the fushing medium, with a 64mm (nominal) hole
diameter. Sample intervals are ostensibly the length of the drill steel. Holes are drilled at
sufcient angles to allow fushing of the hole with water following each interval to prevent
contamination.
There is no sludge drilling for the Mount Bischof Project.
There is no sludge drilling for the Rentails Project.

RC Drilling
RC drilling has been utilised at Mount Bischof.
Drill cuttings are extracted from the RC return via cyclone. The underfow from each interval is
transferred via bucket to a four tiered rife splitter, delivering approximately three kilograms
of the recovered material into calico bags for analysis. The residual material is retained on the
ground near the hole. Composite samples are obtained from the residue material for initial
analysis, with the split samples remaining with the individual residual piles until required for
re-split analysis or eventual disposal.
There is no RC drilling for the Renison Project.
There is no RC drillingfor the Rentails Project.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 14

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary

Percussion Drilling

This drilling method was used for the Rentails project and uses a rotary tubular drilling cutter
which was driven percussively into the tailings. The head of the cutting tube consisted of a
50mm diameter hard tipped cutting head inside which were ftted 4 spring steel fngers which
allowed the core sample to enter and then prevented it from falling out as the drill tube was
withdrawn from the drill hole.

There is no percussion drilling for the Renison Project.

There is no percussion drilling for the Mount Bischof Project.

All geology input is logged and validated by the relevant area geologists, incorporated into
this is assessment of sample recovery. No defned relationship exists between sample
recovery and grade. Nor has sample bias due to preferential loss or gain of fne or coarse
material been noted.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length andpercentage of the relevant intersections logged

Diamond core is logged geologically and geotechnically.

RC chips are logged geologically.

Development faces are mapped geologically.

Logging is qualitative in nature.

All holes are logged completely, all faces are mapped completely.
Sub-sampling techniques and
sample preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether rifed, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity
of samples.

Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for feld duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

Drill core is halved for sampling. Grade control holes may be whole-cored to streamline the
core handling process if required.

Samples are dried at 90°C, then crushed to <3mm. Samples are then rife split to obtain a
sub-sample of approximately 100g which is then pulverized to 90% passing 75um. 2g of the
pulp sample is then weighed with 12g of reagents including a binding agent, the weighed
sample is then pulverised again for one minute. The sample is then compressed into a
pressed powder tablet for introduction to the XRF. This preparation has been proven to be
appropriate for the style of mineralisation being considered.

QA/QC is ensured during the sub-sampling stages process via the use of the systems of an
independent NATA / ISO accredited laboratory contractor.

The sample size is considered appropriate for the grain size of the material being sampled.

The un-sampled half of diamond core is retained for check sampling if required.

For RC chips regular feld duplicates are collected and analysed for signifcant variance to
primaryresults.
Quality of assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision
have been established.

Assaying is undertaken via the pressed powder XRF technique. Sn, As and Cu have a detection
limit 0.01%, Fe and S detection limits are 0.1%. These assay methodologies are appropriate for
the resource in question.

All assay data has built in quality control checks. Each XRF batch of twenty consists of one
blank, one internal standard, one duplicate and a replicate, anomalies are re-assayed to
ensure quality control.

Specifc gravity / density values for individual areas are routinely sampled during all diamond
drillingwhere material is competent enough to do so.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 15

==> picture [772 x 26] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
Verification of sampling and • The verification of significant intersections by either independent or alternative company • Anomalous intervals as well as random intervals are routinely checked assayed as part of
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Verifcation of sampling and
The verifcation of signifcant intersections by either independent or alternative company

Anomalous intervals as well as random intervals are routinely checked assayed as part of
assaying personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verifcation, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
the internal QA/QC process.

Virtual twinned holes have been drilled in several instances across all sites with no signifcant
issues highlighted. Drillhole data is also routinely confrmed by development assay data in
the operating environment.

Primary data is loaded into the drillhole database system and then archived for reference.

All data used in the calculation of resources and reserves are compiled in databases
(underground and open pit) which are overseen and validated by senior geologists.

Noprimaryassays data is modifed in anyway.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.

Specifcation of the grid system used.

Quality and adequacy of topographic control.

All data is spatially oriented by survey controls via direct pickups by the survey department.
Drillholes are all surveyed downhole, currently with a GyroSmart tool in the underground
environment at Renison, and a multishot camera for the typically short surface diamond
holes.

All drilling and resource estimation is undertaken in local mine grid at the various sites.

Topographic control is generated from remote sensing methods in general, with ground based
surveys undertaken where additional detail is required. This methodology is adequate for the
resource inquestion.
Data spacing and distribution
Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufcient to establish the degree of geological
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifcations applied.

Whether sample compositing has been applied.

Drilling in the underground environment at Renison is nominally carried-out on 40m x 40m
spacing in the south of the mine and 25m, x 25m spacing in the north of the mine prior to
mining occurring. A lengthy history of mining has shown that this data spacing is appropriate
for the Mineral Resource estimation process and to allow for classifcation of the resource as
it stands.

Drilling at Mount Bischof is variably spaced. A lengthy history of mining has shown that
this data spacing is appropriate for the Mineral resource estimation process and to allow for
classifcation of the resource as it stands.

Drilling at Rentails is usually carried out on a 100m centres. This is appropriate for the Mineral
resource estimation process and to allow for classifcation of the resource as it stands.

Compositing is carried out based upon the modal sample length of each individual domain.
Orientation of data in relation
to geological structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.

Drilling intersections are nominally designed to be normal to the orebody as far as
underground infrastructure constraints / topography allows.

Development sampling is nominally undertaken normal to the various orebodies.

It is not considered that drilling orientation has introduced an appreciable sampling bias.
Sample security
The measures taken to ensure sample security.

At Renison, Mount Bischof and Rentails samples are delivered directly to the on-site
laboratory by the geotechnical crew where they are taken into custody by the independent
laboratorycontractor.
Audits or reviews
The results of any audits or reviews of sampling techniques and data

Site generated resources and reserves and the parent geological data is routinely reviewed
bythe Metals X Corporate technical team.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 16

SECTION 2 REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding section also apply to this section.)

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Mineral tenement and land
tenure status

Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area.

All Tasmania resources are hosted within 12M1995 and 12M2006. Both tenements are
standard Tasmanian mining leases.

No native title interests are recorded against the Tasmanian tenements.

Tasmanian tenements are held by the Bluestone Mines Tasmania Joint Venture of which
Metals X has 50% ownership.

No royalties above legislated state royalties apply for the Tasmanian tenements.

Bluestone Mines Tasmania Joint Venture operates in accordance with all environmental
conditions set down as conditions for grant of the mining leases.

There are no known issues regardingsecurityof tenure.
Exploration done by other
parties

Acknowledgment and appraisal of exploration by other partie

The Renison and Mount Bischof areas have an exploration and production history in excess
of 100 years.

Bluestone Mines Tasmania Joint Venture work has generally confrmed the veracity of historic
exploration data.
Geology
Deposit type, geological setting and style of mineralisation.

Renison is one of the world’s largest operating underground tin mines and Australia’s largest
primary tin producer. Renison is the largest of three major Skarn, carbonate replacement,
pyrrhotite-cassiterite deposits within western Tasmania. The Renison Mine area is situated
in the Dundas Trough, a province underlain by a thick sequence of Neoproterozoic-Cambrian
siliciclastic and volcaniclastic rocks. At Renison there are three shallow-dipping dolomite
horizons which host replacement mineralisation.

Mount Bischof is the second of three major Skarn, carbonate replacement, pyrrhotite-
cassiterite deposits within western Tasmania. The Mount Bischof Mine area is situated within
the Dundas Trough, a province underlain by a thick sequence of Neoproterozoic- Cambrian
siliciclastic and volcaniclastic rocks. At Mount Bischof folded and faulted shallow-dipping
dolomite horizons host replacement mineralisation with fuid interpreted to be sourced
from the forceful emplacement of a granite ridge and associated porphyry intrusions
associated with the Devonian Meredith Granite, which resulted in the complex brittle /
ductile deformation of the host rocks. Lithologies outside the current mining area are almost
exclusively metamorphosed siltstones. Major porphyry dykes and faults such as the Giblin
and Queen provided the major focus for ascending hydrothermal fuids from a buried ridge
of the Meredith Granite. Mineralisation has resulted in tin-rich sulphide replacement in the
dolomite lodes, greisen and sulphide lodes in the porphyry and fault / vein lodes in the major
faults. All lodes contain tin as cassiterite within sulphide mineralisation with some coarse
cassiterite as veins throughout the lodes.

The Rentails resource is contained within three Tailing Storage Facilities (TSF’s) that have
been built up from the processing of tin ore at the Renison Bell mine over the period 1968
to 2013.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 17

==> picture [772 x 26] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
Drill hole Information • A summary of all information material to the understanding of the exploration results • Excluded results are non-significant and do not materially affect understanding of the
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Drill hole Information
A summary of all information material to the understanding of the exploration results

Excluded results are non-signifcant and do not materially afect understanding of the
including a tabulation of the following information for all Material drill holes:
»
easting and northing of the drill hole collar
»
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
»
dip and azimuth of the hole
»
down hole length and interception depth
»
hole length.

If the exclusion of this information is justifed on the basis that the information is not Material
and this exclusion does not detract from the understanding of the report, the Competent
Person should clearlyexplain whythis is the case.
Renison deposit.
Data aggregation methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and cut-of grades are usually Material and
should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in detail.

The assumptions used for anyreportingof metal equivalent values should be clearlystated.

Results are reported on a length weighted average basis.

Results are reported above a 4%m Sn cut-of.
Relationship between
mineralisation widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this efect (eg‘down hole length, true width not known’).

Interval widths are true width unless otherwise stated.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be included
for any signifcant discovery being reported These should include, but not be limited to a plan
view of drill hole collar locations and appropriate sectional views.

No new discoveries reported.
Balanced reporting
Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.

Presented above.

Excluded results are non-signifcant and do not materially afect understanding of the
Renison deposit.
Other substantive exploration
data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.

No relevant information to be presented.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 18

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.

Exploration assessment and normal mine extensional drilling continues to take place at
Renison.

Exploration assessment continues to progress at Mount Bischof.

Project assessment continues to progress at Rentails.

APPENDIX 2 – JORC 2012 TABLE 1 – TIN DIVISION 19

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION SECTION 1 SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections.)

==> picture [772 x 27] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
Sampling techniques • Nature and quality of sampling (eg cut channels, random chips, or specific specialised • The deposit has been drilled and sampled using various techniques with diamond and reverse
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Sampling techniques
Nature and quality of sampling (eg cut channels, random chips, or specifc specialised

The deposit has been drilled and sampled using various techniques with diamond and reverse
Drilling techniques
Drill sample recovery
industry standard measurement tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not
be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fre assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by what method, etc).

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fne/coarse material.
circulation drilling utilised for mineral estimation. This information comes from surface and
underground and is on variable spacing along and across strike. The total metres within the
immediate vicinity of the Deposit are 143,497m. The holes are drilled on most occasions to
intersect as near as possible perpendicularly the synclinal east plunge mineralisation.

The drilling programs have been ongoing since initial discovery to both expand the
mineralisation and provided control for mining. The hole collars were surveyed by Company
employees / contractors with the orientation recorded. Down holes survey is recorded using
appropriate equipment. The diamond core was logged for lithology and other geological
features.

The diamond core varied from HQ to NQ in diameter and mineralised intervals and adjacent
locations were sampled by cutting the core in 1/2 based on observation from the core
photographs. The RC samples were collected from the cyclone of the rig and spilt at site to
approximate 2 to 3kg weight. The preparation and analysis was undertaken at an accredited
commercial laboratory with the core dried, pulverised and split to produce a 30gm sample for
assay by fre assay with either atomic absorption fnish or gravimetric determination.

The drilling was completed using a combination of surface and underground drilling. In
general the orientation of the drilling is appropriate given the given the strike and dip of the
mineralisation.

The core recovery is recorded in the database and in most instances was in excess of 95%.
This was assessed by measuring core length against core run. There is no record of the
quantity (weight) of RC chips collected per sample length.

The ground condition in the mineralised zone is very competent. In areas of less competent
material core return is maximised by controlling drill speed. RC samples from less competent
material are identifed in the log.

Whilst no assessment has been made, the competency of the material sampled would tend
topreclude any potential issue of samplingbias.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant intersections logged

The routine logging of core and chips describes the general geology features including
lithology, mineralisation, alteration etc. For the majority of holes this information is sufcient
and appropriate to apply mineralisation constraints. Some core drilling is orientated and
structural measurements of bedding, joints, veins etc. has been undertaken as well as
facture densities.

Geological logging has recorded both summary and detailed lithology, mineralisation content,
alteration, some angle to core axis information, vein type, incidence and frequency, magnetic
content

The entire length of all holes, apart from surface casing, was logged.

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION 20

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Sub-sampling techniques and
sample preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether rifed, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity
of samples.

Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for feld duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

All core to be sampled was halved using a mechanical saw.

RC chip samples are collected via a cyclone which is cleaned with air blast between samples.
The samples is rifed to collect between 2 and 3kg. Most samples are dry with any moisture
noted on the logs.

Field sub-sampling for chip samples appears appropriate as is the method of generating
halved core. Procedures adopted in the laboratories are industry standard practises including
that in the mine site facility.

In feld rifes are cleaned between sampling using compressed air. The diamond cutting
equipment is cleaned during the process using water. All laboratories adopt appropriate
industry practises to reduce sample size homogeneously to the required size.

No feld duplicate information was observed.

The style of mineralisation and high sulphide content does not rely on grain size as being
infuential on grade. Thus there is confdence in the overall grade of the deposit being fairly
represented bythe sampling.
Quality of assay data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision
have been established.

The assay techniques are appropriate for the determination of the level of mineralisation in
the sample. The technique was 4 acid digest with ICP fnish.

No geophysical tools were utilised to ascertain grade

Standard and Blanks are included with all samples sent for analysis in the rate of between
1 in 20 and 1 in 30. The most recent reporting covering the majority of holes used in the
estimate provide support for the quality of the Cu assays.
Verifcation of sampling and
assaying

The verifcation of signifcant intersections by either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verifcation, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

The extensive data set has been review by various parties including Maxwell Geoscience and
DataGeo and the intersections within the mineralisation have been confrmed.

None observed but there is a signifcant amount of closely spaced supportive drilling results.

Field data is captured electronically, validated by responsible geologist and stored on
corporate computer facilities. Protocols for drilling, sampling and QA/QC are contained with
the company operating manuals. The information generated by the site geologist is loaded
into a database by the company database manager and undergoes further validation at this
point against standard acceptable codes for all variables.

No adjustments to the raw assaydata has been made.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.

Specifcation of the grid system used.

Quality and adequacy of topographic control.

The collar positions were resurveyed by the Company surveyor or their contractors from a
known datum. The survey is on a known local grid with demonstrated control. The orientation
and dip at the collars is checked (aligned) by the geologist and down hole recording of
azimuth and dip are taken at 30m intervals on most occasion using appropriate equipment.

The regional grid is GDA 94 Zone 50 and the drilling is laid out on a local grid.

Topographic control is from surface survey.

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION 21

==> picture [772 x 26] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
Data spacing and distribution • Data spacing for reporting of Exploration Results. • The majority of drilling utilised is on 40m x 20m grid specifically targeting lithological and
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Data spacing and distribution
Data spacing for reporting of Exploration Results.

The majority of drilling utilised is on 40m x 20m grid specifcally targeting lithological and

Whether the data spacing and distribution is sufcient to establish the degree of geological
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifcations applied.

Whether sample compositing has been applied.
hence mineralisation sequence defnition.

The geological sequence is well understood from the mining which supports the current drill
spacing as adequate for both grade continuity assessment and lithological modelling.

The sampling refects the geological conditions. For mineral resource estimation a 1m
composite length was chosen given that this is the dominant sample length in dataset.
Orientation of data in relation
to geological structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.

Given the shape of the sequence the drilling as best as practically possible orientated to
intersect the sequence perpendicularly. This is limited to drill sites from underground and
surface.

No sampling bias is considered to have been introduced.
Sample security
The measures taken to ensure sample security.

The samples once collected and numbered are stored in the lockable site core yard chain.
Batches of samples with each sample bag security tied and with sample number on the bag
and inside on metal tags transported by commercial contractors to Perth. Upon receipt at the
laboratory the samples are checked against the dispatch sheets to ensure all samples are
present.
Audits or reviews
The results of any audits or reviews of sampling techniques and data

Database management companies have over the past 2 years audited the drill hole database
and found is representative of the information contained.

SECTION 2 REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding section also apply to this section.)

==> picture [772 x 17] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Mineral tenement and land
tenure status

Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area.

State Royalty of 5% applies to all tenements.

NCO consists of 92 tenements including 33 exploration licenses, 20 mining leases, 6
miscellaneous licenses and 33 prospecting licenses, all held directly by the Company.

There are no known issues regarding security of tenure.

There are no known impediments to continued operation.
Exploration done by other
parties

Acknowledgment and appraisal of exploration by other partie

NCO has a long history of exploration. The deposit was discovered during regional exploration
by WMC in 1982. Since that time a signifcant exploration efort has been undertaken by WMC,
and subsequentlyStraits Resources Limited and Aditya Birla Minerals Limited.

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION 22

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Geology
Deposit type, geological setting and style of mineralisation.

The Nifty deposit is hosted within the folded late-Proterozoic Broadhurst Formation which is
part of the Yeneena Group. The Broadhurst Formation is between 1,000m to 2,000m thick
and consists of a stacked series of carbonaceous shales, turbiditic sandstones, dolomite and
limestones. The Broadhurst Formation hosts all known signifcant base metal occurrences
including the Nifty copper mine and the Maroochydore, Rainbow and Warrabarty prospects.

The Broadhurst Formation deposit is unconformably overlain by the Isdell Formation which
consists of an approximately 1000 m thick sequence of carbonate rocks, siltstones and
shales. The sequence below the Broadhurst Formation consists of the Coolbro Sandstone, a
4,000 m thick sequence of sandstones with minor siltstones, volcanics, conglomerates and
shales.

The Nifty copper deposit is a structurally and lithologically controlled, stratabound body of
massive, disseminated and vein-style chalcopyrite. Structurally, the dominant feature at the
Nifty copper mine is the Nifty Syncline which strikes approximately southeast-northwest
and plunges at about 6-12 degrees to the southeast. The copper mineralisation occurs as
a structurally controlled, chalcopyrite-quartz-dolomite replacement of carbonaceous and
dolomitic shale within the folded sequence. The copper mineralisation is largely confned to
the keel of the syncline and the northern limb.
Drill hole Information
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
»
easting and northing of the drill hole collar
»
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
»
dip and azimuth of the hole
»
down hole length and interception depth
»
hole length.

If the exclusion of this information is justifed on the basis that the information is not Material
and this exclusion does not detract from the understanding of the report, the Competent
Person should clearlyexplain whythis is the case.

Excluded results are non-signifcant and do not materially afect understanding of the Nifty
deposit.
Data aggregation methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and cut-of grades are usually Material and
should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in detail.

The assumptions used for anyreportingof metal equivalent values should be clearlystated.

Results are reported on a length weighted average basis.

Results are reported above a 5%m Cu cut-of.

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION 23

==> picture [772 x 16] intentionally omitted <==

----- Start of picture text -----

Criteria JORC Code Explanation Commentary
----- End of picture text -----

Criteria JORC Code Explanation Commentary
Relationship between
mineralisation widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this efect (eg‘down hole length, true width not known’).

Interval widths are downhole width unless otherwise stated.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be included
for any signifcant discovery being reported These should include, but not be limited to a plan
view of drill hole collar locations and appropriate sectional views.

Presented in the body of the text above.
Balanced reporting
Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.

Presented above.

Excluded results are non-signifcant and do not materially afect understanding of the Nifty
deposit.
Other substantive exploration
data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.

No relevant information to be presented.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.

Ongoing surface and underground exploration activities will be undertaken to support
continuing mining activities at NCO.

APPENDIX 3 – JORC 2012 TABLE 1 – COPPER DIVISION 24