IMAGE RESOURCES NL Capital/Financing Update 2010

Oct 26, 2010

65117_rns_2010-10-26_faf73b5b-8ddf-4225-966b-7e0c744971fa.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ABN 57 063 977 579

ASX Release 27 October 2010

ASX code: IMA

2nd Floor, 16 Ord Street West Perth WA 6005 PO Box 644 West Perth WA 6872 Telephone 08 9485 2410 Facsimile 08 9485 2840 [email protected] www.imageres.com.au

Atlas Measured Resource.

Overall Grade Increases from 6.3%HM to 7.4%HM.

_____________

HIGHLIGHTS

  • Updated Measured plus Indicated Resource estimate for Atlas of 12.1M tonnes @ 7.4%HM, containing 895,000 tonnes HM (2.5%HM cut-off).

  • Overall Grade increase from 6.3%HM to 7.4%HM.

  • Majority of previously released Indicated Resource upgraded to Measured status. Measured Resource is 11.1Mt @ 7.78%HM, 860,000t HM plus an Indicated Resource of 1.1Mt at 3.2%HM, 35,000t HM (2.5 % cut-off).

  • Total contained HM tonnage remains close to the previous estimate of 910,000t.

  • Approximately 65% of Ilmenite Product likely to be of synthetic rutile feed quality.

Atlas Resource Update

Image Resources is pleased to announce that it has upgraded the majority of the JORC compliant resources at its Atlas deposit to a Measured classification. The Measured Resource is now 11.1Mt at 7.78% heavy minerals (HM) plus an Indicated Resource of 1.1Mt at 3.2%HM mainly confined to the northern end of the deposit. Resource estimates at varying cut-off grades for each resource category and total Measured + Indicated Resources are summarised in Table 1. Resources are estimated using a 2.5%HM cut-off based on the scoping study completed in 2008.

The resource estimation was carried out using the results of infill drilling reported in April 2010 which increased drill hole density to an average of 100m line spacing and 20m hole spacing for most of the deposit, see Figure 1.

The infill drilling confirmed the continuity of the high grade core of the deposit, as illustrated by the 5% and 10%HM outlines in Figure 1. The +5%HM zone extends for approximately 5km along strike with widths of between 100m and 300m and contains a 3km–long, up to 200m wide, high-grade (>10%HM) core. This zone of enhanced mineral grades is expected to provide a robust foundation for mining.

Metallurgical testwork on a series of bulk samples from the deposit has been undertaken and preliminary results indicate that approximately 65% of the Ilmenite product may be suitable as synthetic rutile (SR) feed with TiO2 contents of between 58% and 62% and combined U + Th averaging 145ppm, well below the 500ppm cutoff for SR feed. With five SR kilns within trucking distance of Atlas, this appears to be

an attractive potential market for the Atlas ilmenite product. Further work on this and other product qualities is scheduled to be completed before the end of December. Determination of an updated mineralogy has been delayed pending the results of the metallurgical test work and will be the subject of a further announcement when all results have been compiled. However, no significant changes are expected relative to previous announcements.

Table 1

Atlas Resources as at 25 October 2010

Category HM
Cut‐off
Tonnes HM HM
Tonnes
Slimes OS
Indicated 5.00 12,227 5.94 727 15.50 13.35
Indicated 4.00 84,557 4.53 3,828 16.04 6.31
Indicated 3.00 649,398 3.52 22,881 18.94 4.46
Indicated 2.50 1,097,361 3.20 35,168 19.18 4.14
Indicated 2.00 1,694,923 2.88 48,848 19.43 3.69
Indicated 1.50 2,231,274 2.60 58,031 19.12 3.92
Indicated 1.00 2,691,628 2.37 63,801 18.91 4.05
Measured 5.00 6,354,819 10.85 689,691 16.27 4.28
Measured 4.00 7,917,947 9.59 759,459 15.96 4.54
Measured 3.00 9,846,988 8.40 826,694 15.76 4.86
Measured 2.50 11,057,905 7.78 859,883 15.70 5.04
Measured 2.00 12,845,355 7.00 899,730 15.74 5.30
Measured 1.50 16,070,616 5.94 955,175 15.75 5.66
Measured 1.00 22,783,967 4.55 1,037,023 15.37 5.84
Total 5.00 6,367,046 10.84 690,416 16.26 4.30
Total 4.00 8,002,504 9.54 763,288 15.96 4.56
Total 3.00 10,496,385 8.09 849,577 15.95 4.84
Total 2.50 12,155,266 7.36 895,043 16.02 4.96
Total 2.00 14,540,278 6.52 948,561 16.17 5.11
Total 1.50 18,301,890 5.54 1,013,184 16.16 5.45
Total 1.00 25,475,594 4.32 1,100,881 15.74 5.65

Slimes: minus 63 micron fraction OS: oversize, plus 1mm fraction

The estimate has been derived from holes drilled using the industry standard aircore drilling techniques. Geological domains were interpreted by Image employees and the geological interpretations were wireframed by an external consultant. The resource modelling was carried out by Mr Lynn Widenbar of Widenbar & Associates using the wireframes and drill data supplied by Image.

When compared to the August 2009 resource the re-estimation has resulted in an overall reduction of approximately 2.4million tonnes of sand and an increase in HM grade from 6.3% to 7.4% using a 2.5%HM cut-off, see Table 2. The HM grade increase has balanced the sand loss with contained HM tonnes within 2% of the 2009 tonnage estimate.

2

Table 2 Comparison to August 2009 Resource

22 October 2010 Resource Total
HM Cut‐off Tonnes HM HM Tonnes Slimes
2.50 12,155,266 7.4 895,043 16.02
03 August 2009 Resource
2.50 14,565,983 6.3 909,791 15.62
Comparison
Difference
‐2,410,717
1.12
‐14,749
0.40
% Diff
‐17%
18%
‐2%
3%

Drilling at Rhea Prospect

In addition to the above resource upgrade, Image is seeking to expand its resource base in the Cooljarloo area, particularly SR quality ilmenite, rutile and zircon.

As part of this strategy, Image has commenced a 6,000m drilling program on 100m line spacings at the Rhea prospect 8km to the east of Atlas and immediately north of the Tiwest Cooljarloo mining operations (Figure 2). Previous wide-spaced drilling combined with detailed magnetic mapping indicates that potential exists for a substantial increase to Image’s resource base in this area. The major target is the north-west trending Rhea strandline. Adjacent to the Rhea target are extensions of TiWest’s Middle Strand resource, which will also be tested.

In addition Image has received funding to test channel targets from the West Australian government as part of the Exploration Incentive Scheme. Five of these targets will be tested in the current program.

The channel drilling will penetrate well into the basement, where in previous releases (3 July 2006) Image has reported the presence of a 2m coal intersection from 18m in hole 210. With historically identified coal resources (e.g. the Wonganderrah coal resource identified by CRA) and other intersections in the area, Image is encouraged to explore the coal potential of this area.

3

==> picture [417 x 680] intentionally omitted <==

Figure 1: Atlas Resource area with drilling and model grade outline at various HM cut-offs.

4

==> picture [417 x 309] intentionally omitted <==

Figure 2: Drilling targets south-east project area Rhea strand

For more information on the company visit www.imageres.com.au

Please direct enquiries to: George Sakalidis Roger Thomson Managing Director Executive Director Phone (08) 9485 2410 Phone (08) 9485 2410 Mob 0411 640 337 Mob 0419 969 183

The information in this report is based on information compiled or reviewed by Paul Leandri BAppSc who is a member of the Australasian Institute of Mining and Metallurgy. Paul Leandri is an employee of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Paul Leandri consents to the inclusion of this information in the form and context in which it appears in this report.

5