Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IGO LIMITED Interim / Quarterly Report 2007

Jan 29, 2007

65111_rns_2007-01-29_df804432-5838-4841-8774-02e101d2b497.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

QUARTERLY REPORT FOR THE THREE MONTHS ENDED 31 DECEMBER 2006

GROUP HIGHLIGHTS

  • December quarter NPAT \$24.1 million, a record high for IGO.
  • December half year NPAT (unaudited) \$36.2 million, a record high for IGO.
  • \$78.2 million cash and net receivables (Sep \$67.5 million).
  • 2005/6 final dividend of 7 cents paid during the quarter (\$7.9 million). Interim dividend will be announced when the audit of the half year financials has been completed.
  • IGO and AngloGold Ashanti Australia Limited jointly awarded Explorer of the Year by Gold Mining Journal for the Tropicana gold discovery.
  • IGO included in ASX 200.

OPERATIONS HIGHLIGHTS

  • Production 64,399t at 3.56% Ni (Budget 55,841t @ 4.19%) for 2,289 Ni t. Ore tonnes mined were above budget and head grade achieved for the quarter was below budget, as a decision was made to deliver a lowgrade (2% Ni) parcel of ore to the mill to capitalise on the current high nickel price environment.
  • Cash costs A\$4.37/Ib payable nickel (Budget A\$3.86), Revenue A\$16.01/Ib (Budget A\$10.52/lb).
  • McLeav Shoot 1 continues to extend south of June 2006 reserves by new drill intercepts of 5.0m @ 6.7% Ni (3.5m true width), 7.6m @ 3.2% Ni (6.0m true width) and 3.7m @ 8% Ni (visual estimate, 3.0m true width). Mineralisation remains open to the south. Infill and step-out drilling continuing.
  • Long South exploration decline completed to allow commencement of drilling to test the Long South target.

EXPLORATION MIGHLIGHTS

GOLD Tropicana JV Previously unreleased high-grade results from the Tropicana Prospect include: 30m @ 4.5g/t Au from 62m 21m @ 4.0g/t Au from 12m 29m @ 5.1g/t Au from 57m 33m @ 4.3g/t Au from 83m 29m @ 4.8g/t Au from 113m 20m @ 4.6g/t Au from 86m These results are subsequent to 63m @ 3.0g/t Au already announced. Tropicana Prospect gold mineralisation now defined over a 4km strike length with potential for further extensions to the north-east, south and down-plunge. 3m @ 65.8a/t Au drill intercept at the Beachcomber 1 Prospect, 220km south-west of the Tropicana Prospect, highlights potential for other gold systems on the large joint venture tenure. Dalwallinu New bedrock gold anomaly north of Pithara. Holleton New gold project acquired in Southern Cross province of Western Australia. NICKEL Duketon JV 25m @ 0.73% Ni and 310ppb Pt+Pd drill intercept indicative of potential for disseminated nickel sulphide mineralisation. Storbodsund JV Airborne TEM confirms priority conductors along a 1.7km trend, two associated with known nickel sulphide mineralisation.

CORPORATE

DIVIDEND IGO paid a 7 cent fully franked dividend to shareholders on 17 October
2006. The 2006/7 interim dividend will be announced when the audit of the
December 2006 half year financials has been completed.
agm The 2006 Annual General Meeting was held on 22 November 2006. All
resolutions were passed on a show of hands.
Profit The estimated NPAT for the quarter is \$24.1 million and for the half year
\$36.2 million. The profit figures quoted in this report are subject to audit
and finalisation of estimated nickel prices and USD/AUD exchange
rates. Receivables and sales figures in this report are based on a
nickel price of AU\$43,192/t.
ISSUED CAPITAL At 29 January 2007: 113,195,057 ordinary shares and 5,322,900 unlisted
options.
ASX 200 IGO was added to Standard & Poor's ASX 200 index on 12 January 2007.
CASH AND DEBT

CASH RESERVES

  • \$47.7 million cash (Sep \$46.1m).
  • \$30.5 million nickel revenue in receivables net of creditors (Sep $\overline{a}$ $$21.4m$ ).
  • Total cash and net receivables were \$78.2 million at the end of the $\overline{a}$ quarter.
  • Unhedged receivables have been valued using AU\$43,192/t Ni.

Major cash expenditure during the quarter was:-

  • \$7.9 million shareholders' dividend.
  • \$3.8 million spent on Long and regional exploration.
  • \$6.9 million income tax payment.
  • \$4.3 million new mining equipment purchased. $\overline{a}$

DEBT AT END OF THE QUARTER The Company owed \$2.5 million at the end of the quarter for leased mining
equipment (Sep \$2.9m).
NICKEL SALES PRICE
CALCULATION
Due to the off-take agreement the Company has with WMC Resources Ltd,
nickel sales for any given month are required to be estimated. This is due to
the lag-time between delivery of ore and setting of the price to be received,
which is based on the average LME price prevailing in the third month after
the month of delivery.
The Company is also required to estimate the USD/AUD exchange rate
when calculating sales for any given month, as payment for nickel delivered
is received in US dollars. Therefore, when calculating the quarter's cash flow
and profits, revenue which will be received based on future nickel prices is
estimated using the most up-to-date price information available prior to the
release of the quarterly report. The receivables figure used represents the
estimated final USD nickel payment converted to AUD, also at an estimated
exchange rate.
The effect of the changing nickel price and exchange rate on receivables is
reflected in each quarter's cash flow and profit figures.
2006/7 EXPLORATION EXPENDITURE
& WRITE-OFF
\$3.8 million exploration expenditure was incurred during the quarter. This
includes expenditure on the Long South target exploration decline.
\$1.8 million exploration expenditure was written off during the quarter.
HEDGING Hedged nickel metal remaining at the date of this report was 5,700t at
AU\$17,988/t, which is scheduled to be delivered as follows:
2006/7
900t Average AU\$17,501/t
2007/8
2,400t Average AU\$17,670/t
2008/9
2,400t Average AU\$18,489/t
INVESTMENTS
SOUTHSTAR
DIAMONDS LIMITED (IGO 50%)
Exploration continued on diamond indicator anomalies generated from the
De Beers database, including diamond-bearing intrusives.
Matrix Metals
LIMITED (IGO 18.8%)
Matrix announced that final statutory approval has been received for the Mt
Watson open-cut copper mine and the Leichhardt SXEW copper operations.
Pre-production activities including plant refurbishment and contract letting
are in progress. The \$10 million loan facility from Glencore International AG
became unconditional and is now available for drawdown. See Matrix Metals
Limited's announcements for further details (ASX Code: MRX).
ATLAS IRON LIMITED IGO and Western Australian Resources Ltd ("WAR") retain a 2% gross
royalty on iron ore mined by Atlas, as well as a clawback right if the resource
on the Goldsworthy tenure is more than 5 million tonnes of iron ore. IGO
also has 1 million Atlas fully paid shares.
Atlas Iron Limited announced an indicated resource of 2.16M tonnes $@$
57.0% Fe at South Limb, which is on the Atlas/IGO/WAR Goldsworthy
tenure. See Atlas Iron Limited's announcements for further details (ASX
Code: AGO).

MINING OPERATION

LONG NICKEL MINE IGO 100%

SAFETY

The Lost Time Injury Frequency Rate (LTIFR) since the mine re-opened in October 2002 is 3.6, which compares favourably to the Industry Average of 6.6. There were no Lost Time Injuries during the quarter.

PRODUCTION

Production for the quarter was 64,399t at 3.56% Ni for 2,289 tonnes contained nickel, which was mined by the following methods:

Flat-back 6.991 t@ 2.4% Ni for 165 Nit
Long-hole 31.890 t @ $3.4\%$ Ni for 1.097 Nit
Hand-held 7.389 t @ - 3.3% Ni for 240 Nit
Jumbo Development 18.129 t @ 4.3% Ni for 787 Nit
TOTAL 64.399 t @ -3.6% Ni for 2.289 Nit

Production was from the following sources:

Long 37.143 t @ 3.1% Ni for 1.153 Ni t
McLeay (development) 14.421 t @ 3.8% Ni for 554 Ni t
Victor South 12.835 t @ 4.5% Ni for 582 Ni t
TOTAL 64.399 t @ 3.6% Ni for 2.289 Nit

Cash costs were A\$4.37/lb payable nickel.

The budget for the quarter was 55,841t @ 4.19% Ni for 2,340 tonnes of contained nickel. Highlights in the December Quarter included:

  • Increase in productivity in the Victor South and McLeay production regions. Victor South budgeted to produce 416 Ni t, actual 582 Ni t mined (33% improvement). McLeay budgeted metal production for this period was 474 Ni t, actual 582 Ni t mined, a 16.9% improvement against budget.
  • Completion of infill drilling in McLeay to facilitate improved design and scheduling of production.
  • Long Shaft production areas: Although the ore tonnes mined exceeded budget by 4% the output in terms of metal was at 80% of the schedule. The decrease in Long Shaft head grade can be attributed to an increased proportion of ore won by long-hole mining (40% over budget) and a decrease in high-grade non-mechanised tonnes (-30%).
  • The overall quarterly head grade was also impacted by a deliberate financial decision to deliver a parcel of low grade ore to the contract milling facility. (3,342 t @ 2.0% Ni).
  • Operational costs were slightly above budget (12%) due principally to increased royalty payments (33% of unbudgeted costs). Additional costs were also associated with higher than budgeted ore tonnes delivered to the mill, contract labour and administration costs for long-term maintenance of site buildings.

DEVELOPMENT

Long South Exploration Decline

81m of development in Long South was completed to enable access for the exploration diamond drilling program. The exploration strategy in this region of the mine remains unchanged with the decline development tracking the nickel-bearing trough structure south to facilitate drilling programs.

McLeay Decline

There were 45 metres of capital development in the McLeav decline, but the focus during the quarter was the re-design of development to accommodate the Eddie Fault and the mining of the 500mRL and 515mRL ore drives.

As diamond drilling was taking place in the McLeay 460mRL (the exploration platform for the southern extension of the McLeav ore body) only minor development was completed (27m) in this area during the quarter.

Victor South

Minimal capital development occurred in Victor South as the focus was on developing multiple accesses into the ore positions. Only minor capital development remains and this will be completed during the March quarter.

Long

Production development in Long focused on the 16/4, 16/3, 16/5 and 15/5 ore blocks. Rehabilitation of the northern section of the 14/1 pillars is ongoing, with approximately 250 metres remaining.

QUARTERLY FORECAST

The focus for the March quarter will be:

McLeav

  • Recommencement of capital development to gain access into lower $\bullet$ ore blocks and continue development of return airways.
  • Continuation of stoping on the 500mRL and 515mRL horizons.
  • Commencement of 500mRL South ore drive. $\bullet$
  • Continuation of the development and exploration strategy in the 460mRL drill drive, exploring for extensions of the known ore surfaces as well as new ore surfaces.

Victor South

  • Completion of capital development.
  • Stoping of ore from the 505, 475, 462 and 456mRLs horizons. $\bullet$
  • Establishment of the first ore drive on Shoot 4.

Lona

  • Continued focus on rehabilitation of 14/1 northern pillars and stoping $\bullet$ of the 14/1 southern pillars.
  • Continuation of stoping in the 15/2, 16/4, and 16/3 ore blocks.

EXPLORATION

The McLeav 460 Drill Drive and the Long South Decline were extended during the quarter to allow further drill-testing of McLeay Shoots 1, 2 and 4 beyond the resource limits and to enable exploration drilling at Long South.

The McLeay 460 Drill Drive was extended by 27m and the Long South decline by 144m.

Drilling at McLeay focused on Shoot 1 infill and extension drilling south of the June 2006 reserve limits and testing for higher grade zones in Shoot 4. Mine development, extending the Long South decline, occupied most of the quarter.

McLeav South Infill Drilling

McLeay Shoot 1 southern extension 20m by 20m infill drilling commenced. Results confirm the continuity of the mineralisation at a slightly lower grade than seen at the northern end of the Shoot (Figure 1).

Significant new Shoot 1 intercepts outside June 2006 resources and reserves included:

MDU-167 5.0m @ 6.7% Ni (3.5m true width)
MDU-219 7.6m @ 3.2% Ni (6.0m true width)
MDU-220 6.0 $m$ @ 2.7% Ni (3 $m$ true width)
MDU-231 $3.7m \omega$ 8%Ni Visual Estimate (3.0m true width)

A TEM survey completed in the southern most Shoot 1 holes indicates the system is open to the south past the current drill section at 546080mN.

McLeay Shoot 2 will be drill tested next quarter.

Drilling continues to confirm that McLeay Shoot 4 mineralisation remains variable in thickness and grade, however, thicker zones are present (MDU-220 - 12.7m @ 2.1% Ni (8.0m true width)).

Figure 1: McLeay - Shoot 1 Plan Showing June 06 Reserve Boundary and Significant Intercepts South of the Current Reserve Boundary. Intersection Widths Are Down-Hole Widths.

Long South

The Long South 16-8 Drill Drive recommenced during the quarter and advanced 144m. This extension will provide a drilling platform to test the southern strike continuation of existing sulphide intercepts (Figure 2).

The first hole (LSU-087) out of the 9 hole drill program was completed this quarter intersecting barren contact. The main channel is now interpreted to be down-dip of this hole.

In the March quarter drilling will continue at Long South testing the TEM conductors and other targets after the installation of a new TEM transmitter loop closer to the target area. This will enable much better resolution of the existing TEM anomaly and also provide a much bigger down-hole TEM detection radius around previous and future drill holes.

Figure 2: Long Mine Complex Longitudinal Projection Showing Exploration Targets and June 06 Reserves

LONG NICKEL MINE PRODUCTION SUMMARY

Dec '06 2006/7 Prev.
Note Quarter FY to Date Quarter
Mining Reserve (Dry Tonnes) (Dec '05)
Start of Period 1,062,978 1,114,000 1,387,233
- ROM Production 1 (64, 399) (115, 421) (62, 872)
End of Period 998,579 998,579 1,324,361
Production Details:
Ore Mined (Dry Tonnes) 1 64,399 115,421 62,872
Ore Milled (Dry Tonnes) 64,399 115,421 62,872
Nickel Grade (Head %) 3.56 3.45 4.01
Copper Grade (Head %) 0.26 0.26 0.29
Metal in Ore Production (Tonnes)
Nickel delivered 2 2,289 3,987 2,519
Copper delivered 2 169 295 183
Metal Payable IGO share (Tonnes)
Nickel 1,337 2,325 1,476
Copper 69 119 74
Hedging
Tonnes delivered into Hedge 450 900 972
Average Price (AU\$/t) 17,168 17,168 14,477
Note 1. Production is sourced from both reserves/inventory and outside reserves.
Note 2. The Recovery Rate is fixed with WMC depending on head grade. For grades from 3.0% to 3.5%
recovery is 92%, for grades in excess of 3.5% recovery is 93%.
RevenuelCost Summary A\$'000's A\$'000's
Sales Revenue (incl. hedging) 47,189 80,040 26,862
Cash Mining/Development Costs (7, 917) (15, 673) (7,021)
Other Cash Costs 3 (4,969) (9,426) (3,634)
Depreciation/Amortisation/Rehabilitation (2,290) (4,024) (2,565)
Total Unit Cost Summary A\$/Ib Total Metal
Produced
ASIIb Total Metal
Produced
Cash Mining/Development Costs 1.57 1.78 1.26
Other Cash Costs 3 0.98 1.07 0.65
Depreciation/Amortisation/Rehabilitation 0.45 0.46 0.46
RevenuelCost Summary A\$ilb Payable
Metal
A\$ilb Payable
Metal
Sales Revenue (incl. hedging) 4 16.01 15.62 8.26
Cash Mining/Development Costs 2.68 3.06 2.16
Other Cash Costs 3 1.69 1.84 1.12
Depreciation/Amortisation/Rehabilitation 0.78 0.79 0.79
Note 3. Other Cash Costs include milling, royalties and site administration.
Note 4. Sales Revenue per pound includes nickel price adjustments for prior periods.
Safety and Productivity
- Lost Time Injuries 0 1 0
- Medically Treated IFR 87.7 63.3 53.8
- Nickel Productivity Rate 5 78.3 68.2 74.5
Note 5. Nickel Productivity Rate = Productivity measured as annualised nickel tonnes per full-time-equivalent-employee.
Development/Exploration Drilling Metres Metres
Development 779 2,131 707
Production 798 2,018 2,310
Exploration 4,440 5,529 10,191
6,017 9,678 13,208

REGIONAL GOLD EXPLORATION

Figure 3: IGO Gold Project Locations

TROPICANA JV (IGO 30%, ANGLOGOLD ASHANTI AUSTRALIA LIMITED MANAGER 70%)

The Tropicana Joint Venture comprises approximately 12,260 km2 of largely unexplored tenure over a strike length of 330km along the Yilgarn Craton -Fraser Range Mobile Belt collision zone.

Project Status

  • At Tropicana and Havana, mineralisation has been defined over a 4km strike extent and to a maximum of 500m down-dip. The gold system remains open down-dip along most of the mineralisation's strike length. Surface and aircore geochemical anomalism indicate scope for extensions of mineralisation both to the north and the south of the deposit.
  • Project managers AngloGold Ashanti Australia Ltd ("AGA") are currently conducting a scoping study and are aiming to complete a resource estimate and pre-feasibility study during the second half of 2007.
  • A 50 person camp will be completed by the end of January 2007 enabling a ramp-up in exploration activities. A team of 12 field geologists and 3 Perth-based geologists are now working on the Project.
  • As of mid-February 2 diamond rigs and 2 RC rigs are expected to be drilling double shifts predominantly at Tropicana and Havana. Two aircore ("AC") rigs are scheduled to arrive by early February and will be used to continue testing the numerous other targets on the large joint venture tenure.

Highlights during the quarter

AGA maintained a high level of activity during the quarter with the focus being the on-going delineation of the extensive Tropicana and Havana mineralised zones and follow-up AC drilling of regional surface geochemical anomalies

  • Completion of 50m x 100m infill drilling at Tropicana Zone. Results $\bullet$ include:
  • 26m @ 3.0a/t Au from 57m (TPRC121) $\Omega$
  • 17m @ 3.1q/t Au from 212m (TPD050) $\circ$
  • 15m @ 3.1g/t Au from 183m (TPD052) $\sim$
  • Completion of 100m x 100m definition of Havana Zone and 50m x 50m infill of high-grade zones. New drill results subsequent to the 63m @ 3.0g/t Au and 30m @ 2.3g/t Au released on 6 November include:
  • $\circ$ 30m @ 4.5a/t Au from 62m (TPRC174)
  • $\circ$ . 21m @ 4.0q/t Au from 12m (TPRC167)
  • 29m @ 5.1g/t Au from 57m (TPRC261) $\alpha$
  • 33m @ 4.3q/t Au from 83m (TPRC262) $\alpha$
  • 29m @ 4.8a/t Au from 113m (TPRC272) $\sim$
  • 20m @ 4.6g/t Au from 86m (TPRC276) $\sim$
  • Discovery of significant bedrock mineralisation at Beachcomber 1, 220 km south-west of the Tropicana Prospect. (Refer to IGO's announcement of 9 November 2006). The discovery AC hole included an intersection of:
  • o 4m @ 43.5g/t Au from 24m (ZSAC0087, 4m composite). Analysis of 1m re-samples from this intersection returned 3m @ 65.8g/t Au g/t from 25m

A full listing of drill holes results for Tropicana and Havana is provided in Tables 1 and 2.

Details

During the quarter the following drilling was completed:

  • 234 AC/RAB holes for 23.125m
  • 116 RC holes for 16.525m
  • 21 diamond holes for 3.483m.

Most of this drilling was focused on infilling the Tropicana and Havana Zones. Several lines of RC were aimed at testing IP anomalies south and northwest of Havana, and the Hat Trick Prospect north of the Tropicana Zone. Aircore drilling tested numerous regional prospects south of Tropicana including Beachcomber, Ambrosia, Grasshopper, Pink Flamingo, Barracuda and Cork Screw. Results for much of this drilling have yet to be received.

Tropicana Zone

o RC and diamond infill drilling was completed on a 50m x 100m spacings on selected sections to test the down-dip extent of highgrade zones.

As can be seen from Figure 4 much of the Tropicana Zone remains open down-dip.

(m) Contours and Interpreted Faults

Havana Zone

RC and diamond drilling on a 100m x 100m grid was completed and infill drilling on a 50m x 50m grid over the core high grade zone was approximately 60% complete during the quarter.

This drilling has now defined the core high-grade zone (>50 gram meter contour) over an area of up to 300m wide x 500m down-plunge where it remains open (Figures 4-6). The majority of the Havana Zone remains open down-dip.

Figure 5: Tropicana JV - Havana A-A Cross Section Showing Significant Drill Hole Results (Refer to Figure 4 for Location)

Figure 6: Tropicana JV - Havana B-B Cross Section Showing Significant Drill Hole Results (Refer to Figure 4 for Location)

Hat Trick

Aircore testing of the Hat Trick auger anomaly located 1.6km north of Tropicana returned mineralised intersections including 4m @ 0.6g/t Au and 4m @ 0.7g/t Au. Several follow-up RC holes and one diamond hole were completed during the quarter however results are yet to be received.

Beachcomber 1/Ambrosia Prospects

New discoveries were made at the Beachcomber 1 and Ambrosia prospects. both located approximately 220km south of Tropicana. Regional vertical aircore drilling on 1,000m x 200m spacing at Beachcomber 1 returned 4m @ 43.5g/t Au from 24m (ZSAC0087, 4m composite). Analysis of 1m resamples from this intersection returned 3m @ 65.8q/t Au q/t from 25m (Figure 7).

At Ambrosia, aircore results included 2m @ 1.1g/t from 54m (ZSAC0127).

Figure 7: Tropicana JV - Regional Geochemical Gold Anomalies and Location of the Beachcomber 1 Drill Intercept

Joint Venture Background

The Tropicana project was generated by Independence Group NL and was one of the projects contained in the Company's 2002 IPO prospectus. The project was joint ventured to AngloGold Ashanti Australia Limited on 30 January 2002.

The Tropicana Prospect, comprising the Tropicana and Havana Zones is the first discovery within this extensive tenement package and the Joint Venture partners are targeting a multi-million ounce gold deposit. Extensive extension and infill drilling is currently underway to bring the target to a JORC-compliant resource level.

In addition to the high level of activity at the Tropicana Prospect, regional surface sampling and follow-up drilling are continuing at a number of regional locations throughout the project area.

Hole No. Northing Easting RL Azimuth Dip E.O.H From To Intercepts
(m) (m) (m) (degr) (degr) (m) (m) (m)
Tropicana Zone RC Drill Holes
TPRC118 6763461 650855 337 313 $-61$ 150 85 93 8m @ 3.5g/t Au
TPRC121 6763726 650873 335 319 $-59$ 117 31 57 26m @ 3.0 g/t Au
Incl. 42 55 13m @ 3.9 g/t Au
TPRC201 6763037 649936 345 316 $-63$ 147 71 79 8m @ 2.6 g/t Au
Tropicana Zone Diamond Drill Holes
TPD014 6763459 651280 341 320 $-60$ 331 231 268 37m @ 2.0 g/t Au
TPD031 6763530 650785 341 314 $-60$ 120 32 47 15m @ 2.1 g/t Au
TPD048 6763496 651032 341 312 $-59$ 226 152 178 26m @ 1.9 g/t Au
Incl. 158 178 20m @ 2.3 g/t Au
TPD050 6763320 650926 342 312 $-59$ 249 212 231 19m @ 2.9 g/t Au
Incl. 212 229 17m @ 3.1 g/t Au
TPD051 6763213 650891 343 319 $-60$ 250 207 223 16m @ 2.4 g/t Au
TPD052 6763107 650714 345 314 $-54$ 251 183 198 15m @ 3.1 g/t Au
Incl. 194 198 4m @ 8.8 g/t Au
TPD054 6763001 650537 346 312 $-603$ 258 190 203 13m @ 1.9 g/t Au
Incl. 195 203 8m @ 2.8 g/t Au
TPD065 6763730 651011 341 45 $-60$ 206 78 112 34m @ 1.9 g/t Au
Incl. 79 99 20m @ 2.2 g/t Au
TPD066 6763694 650976 341 45 $-61$ 212 103 134 31m @ 1.8 g/t Au
Incl. 113 134 21m @ 2.0 g/t Au
TPRC110D 6763149 650460 340 319 $-59$ 123 89 110 21m @ 1.3 g/t Au
Incl. 104 107 3m @ 4.0 g/t Au
TPRC196D 6763072 650184 346 317 $-63$ 150 87 101 14m @ 2.1 g/t Au
Table 1: Tropicana Prospect - Tropicana Zone
---------------------------------------------- --

Table 2: Tropicana Prospect - Havana Zone
------------------------------------------- -- -- -- -- -- -- --

Hole No. Northing
(m)
Easting
(m)
RL
(m)
Azimuth
(degr)
Dip
(degr)
E.O.H
(m)
From
(m)
To
(m)
Intercepts
Havana Zone RC Drill Holes
TPRC279 6761760 649520 354 313 $-61$ 120 36 49 13m @ 3.1 g/t Au
TPRC280 6761702 649578 356 319 $-61$ 162 63 67 4m @ 3.5 g/t Au
70 103 33m @ 3.0 g/t Au
Incl. 86 96 10m @ 7.4 g/t Au
TPRC281 6761676 649600 356 312 $-57$ 174 35 43 8m @ 2.0 g/t Au
71 87 16m @ 1.3 g/t Au
90 109 19m @ 5.4 g/t Au
Incl. 91 107 16m @ 6.3 g/t Au
TPRC282 6761644 649636 357 309 $-64$ 190 122 137 15m @ 3.8 g/t Au
Incl. 122 128 6m @ 3.5 g/t Au
Incl. 132 136 4m @ 8.5 g/t Au
TPRC283 6761605 649671 357 313 $-60$ 196 138 144 6m @ 2.8 g/t Au
TPRC284 6761569 649706 359 315 $-62$ 200 72 81 9m @ 4.8 g/t Au
lnct. 72 80 8m @ 5.3 g/t Au
Havana Zone Diamond Drill Holes
TPD026 6763284 650889 338 318 $-58$ 301 186 216 30.0m @ 2.3 g/t Au
Incl. 200 215 15.0m @ 3.5 g/t Au
TPD040 6761817 649953 356 310 $-57$ 334 290 302 12m @ 2.3 g/t Au
TPD063 6761841 649647 355 141 $-72$ 228 66 96 30m @ 1.5 g/t Au
152 166 14m @ 6.4 g/t Au
TPD064 6762171 649883 352 138 $-75$ 340 246 279 33m @ 2.6 g/t Au
Incl. 257 279 22m @ 3.6 g/t Au
TPD088 6761888 650024 361 314 $-59$ 357 311 323 12m @ 1.4 g/t Au
Incl. 314 319 5m @ 2.3 g/t Au
TPD089 6761835 649795 362 315 $-56$ 255 212 226 14m @ 1.6 g/t Au
TPD092 6761569 649777 365 312 $-56$ 263 146 158 12m @ 2.3 g/t Au
Incl. 148 153 5m @ 4.5 g/t Au
193 208 15m @ 1.3 g/t Au
TPD094 6761322 649742 366 314 $-51$ 289 176 186 10m @ 2.0 g/t Au
Incl. 176 183 7m @ 2.5 g/t Au
TPD100 6760968 649388 359 315 $-57$ 306 232 238 6m @ 2.2 g/t Au
TPD112 6761870 649689 355 311 $-60$ 223 82 96 14m @ 1.0 g/t Au
137 161 24m @ 1.5 g/t Au
Incl. 147 154 7m @ 2.4 g/t Au
TPRC172D 6762029 650024 354 314 $-61$ 397 35 37 2m @ 5.4 g/t Au
TPRC208D 6762294 650042 355 311 $-58$ 336 251 265 14m @ 2.1 g/t Au
Table 2: Tropicana Prospect - Havana Zone (continued)
------------------------------------------------------- -- -- --

ÜALWALLINU (IGO 100%)

The Dalwallinu Project is situated at the southern margin of the Murchison Province of the Yilgarn Block in Western Australia between the Boddington Gold Mine (+20M oz resource) and the Mt Gibson Gold Mine (+1M oz). The project, which covers a strike length of 70km, was generated from in-house structural analysis. Initial road-side sampling delineated several surface gold anomalies, all of which lie within freehold farming ground and are not subject to native title

At Pithara, the first target tested, previously announced drilling returned high-grade intercepts including 7m @ 21.8g/t Au from 20m and 9m @ 6.3g/t Au from 19m.

The most recent round of work comprised a large aircore drilling program testing the potential of the Pithara structural corridor on wide-spaced traverses covering around 15km of potential strike to the north and south of the prospect area. The program was aimed at identifying broad zones of alteration and/or gold anomalism that may be used as vectors to other mineralised positions along the structure.

At the end of the quarter the aircore program was approximately 90% complete with 508 holes for 12,804m being drilled. The remaining three traverses are scheduled to be completed in late January.

Approximately 30% of the analytical results have been received to date and have highlighted an area of gold anomalism in basement 7km north of the Pithara Prospect. Hole DTR466 returned 4m @ 176ppb Au from 36-40m (EOH) in oxidised basement clays. This location has about 20m of surface cover and corresponds with a major structural trend and flexure evident in aeromagnetic data. The anomalism is supported by DTR461 drilled 300m further to the east which returned 35ppb Au from 40-43m (EOH).

Coomberdale is located approximately 60km west-north-west of the Dalwallinu Project. Auger, maglag and rock chip sampling has defined a north-north-west trending gold anomalous corridor over a strike length of 3 km. Further auger testing of the gold anomalous corridor is planned for the March quarter following completion of access agreements. It is planned to infill the known gold anomalies to a 100m x 50m spacing, and to sample potential extensions on step-out lines of 200m x 50m and 400m x 50m.

The Cobar project comprises 6 exploration licences covering prospective basin margin faults in the Cobar mining district in NSW. Cobar is one of the most endowed metallogenic provinces in Australia and includes mines such as the Peak Gold Mine (Au), Elura (Zn-Pb-Ag), CSA (Cu-Pb-Zn-Ag), New Occidental (Au), Tritton (Cu) and the Hera discovery (Au-Pb-Zn).

An extensive program of regional surface sampling has identified a number of gold and base metal targets.

During the quarter first pass RAB drilling totalling 3,946m was completed over five priority target areas including Queen of Sheba (Au), Princess Leia (Au), Earl of Sussex (Pb, Zn, Ag), Prince William (Au) and Sir Lancelot (Au). Anomalous Au, Ag and Pb results at two prospects require drilling follow-up.

A further RAB program is planned for the March quarter to test additional target areas and follow-up results arising from the drilling completed to date.

COOMBERDALE $(IGO 100\%)$

CORAR $(IGO 100\%)$

MT PADBURY Assays were received for a RAB drilling program following up previous (IGO 90%) intercepts at the Woods Creek Prospect including 17m @ 1.0g/t Au and 4m @ 3.8q/t Au. The best intercepts returned from the most recent drilling included 4m @ 1.6g/t Au and 8m @ 1.8 g/t Au. Discussions are currently taking place with a number of parties regarding a potential joint venture over this project. HOLLETON IGO has reached agreement to purchase Perilya Limited's interest in the (IGO ACQUIRING 90-100%) Holleton Gold Project, which is located 80km south-southwest of Southern Cross in Western Australia. As consideration for the purchase IGO will pay Perilya \$250,000 cash and a \$5/oz royalty of gold mined by IGO to a maximum of 100,000oz. The Holleton Project comprises numerous tenements and tenement applications covering an area of 1,257 $km2$ over the Holleton greenstone belt in the Southern Cross Province of the Archaean Yilgarn Craton. The Southern Cross Province contains a number of plus 1 million ounce gold resource deposits including: Westonia (2.3M oz), Yilgarn Star (1.7M oz) Southern Cross (1.5M oz) $\bullet$ Marvel Loch-Nevoria (1.2M oz). Recorded historic production from the Holleton project comprises about 52,000t of ore for 16,000oz gold from several small open-cut and underground mines. Gold mineralisation in the historic workings is generally hosted in an amphibolite or gabbro host and is associated with quartz reefs and granite-pegmatite. Alteration style is similar to the Southern Cross belt comprising proximal diopside-microcline and distal biotite assemblages. A small heap leach operation owned by a private company is currently producing from within the project area. Perilya have defined a number of prospect areas in the vicinity of the mining centre which have vet to be adequately followed up, including the Columbus Prospect where previous RC intercepts include 19m @ 1.4g/t Au. IGO's main interest in the project is the large area of interpreted amphibolite facies greenstone under cover that has yet to be subject to any effective exploration for gold. The bulk of the known greenstone in the project comprises the Gabanintha Formation which is the principal host for most gold mines in the Murchison and Southern Cross Provinces. The Holleton greenstone belt has similarities to the Westonia belt and it is inferred that these belts are structurally connected. A number of magnetic and nonmagnetic domes intrude the belt providing favourable structural positions for gold mineralisation. Exploration of this new project will commence immediately upon finalisation of the documentation with Perilya.

REGIONAL NICKEL EXPLORATION

Figure 8: IGO Nickel Project Locations

RAVENSTHORPE OPTION (IGO EARNING 51%-EXCLUDING NICKEL LATERITE AND IRON)

IGO is earning a 51% interest in Traka Resources Limited's ("Traka") Ravensthorpe Nickel Project by spending \$5 million on exploration and/or development (excluding nickel laterite and iron ore rights).

The project covers about 60 kilometres of prospective ultramafic stratigraphy along strike from the RAV8 nickel sulphide deposit, which produced 443,000t at 3.46% Ni for 15,350t Ni (Tectonic Quarterly Report 30 June 2005).

As reported last quarter 4 RC holes of a 14 hole program testing conductors at Mt Short have been completed. The remaining 10 holes could not be completed with RC drilling due to the potential for high water flows to affect cropping areas, and as a result will be completed with diamond tails. The diamond rig has commenced testing the remaining 10 EM targets.

On-going TEM surveys are also testing several areas of prospective ultramafic stratigraphy including:

  • Carlingup covering a prospective zone with a strike extent of 5.5km where limited previous drilling has returned nickel sulphide intercepts including 6m @ 1.0% Ni between 157m-163m in RAVC162 (B1 prospect).
  • Extensions to the Mt Short area including zones of gossanous ultramafic which returned up to 0.63% Ni and 0.83% Cu in a single line of RAB drilling in 1977.
  • The Gap covering a strike length of up to 6.5km containing multiple soil geochemical anomalies with supporting rockchip samples up 0.75% Ni and 0.06% Cu.

Whilst the focus of exploration on the project is to discover a new standalone deposit, a scoping study to give an initial and very preliminary appraisal of the viability of mining the shallow nickel mineralisation located at the RAV1, RAV 4, RAV 4 West and RAV 5 Prospects in the Jerdacuttup area has commenced. Exploration and wide spaced drilling on these prospects by former exploration companies and more recently by Traka and IGO has confirmed the presence of nickel gossans at surface and nickel sulphide mineralisation extending to depth.

The Prospects being evaluated have been drilled to varying degrees of confidence (none to Indicated Resource JORC standard) but in each case sulphide mineralisation in disseminated and massive sulphide form occurs as broad sheet-like bodies on a gently south to south-east dipping basal contact of ultramafic rocks on quartzites.

Whilst the exploration focus at Ravensthorpe is to discover new stand-alone deposits the sustained increases in the nickel price being experienced may now make these prospects viable as shallow open pit resources.

The results for the Mine Scoping Study are expected in the March quarter.

IGO has an agreement with Mawson Resources Ltd, a TSXv listed company, to earn a 70% interest in their Storbodsund Project in Sweden. Government reports indicate that five historic holes intersected mineralisation averaging 2.3% Ni and 0.6% Cu over thicknesses of 0.6 to 2.7m. Mineralisation is located at the contact between a gabbro and a granitoid footwall.

During the September quarter a heliborne TEM survey was flown over the entire interpreted prospective gabbroic host. This survey resulted in the identification of 16 conductive responses. Field checks and detailed interpretation have focused investigations on four priority conductors along a 1.7km long trend, including two corresponding to known mineralisation (Figure 9).

A fixed loop ground TEM survey along the trend of interest was completed in early January 2007. Results are yet to be interpreted. It is anticipated that drill testing of any targets delineated from the ground TEM survey will take place in March.

Figure 9: Storbodsund Nickel Project - Airborne TEM Anomalies Adjacent to the Historic Nickel Discovery and Planned Ground TEM Survey Coverage

STORBODSUND JV - SWEDEN (IGO EARNING 70%)

ÜBKETON NICKEL JOINT VENTURE (IGO MANAGER EARNING 70% NICKEL RIGHTS

The Duketon Nickel JV covers approximately 60kms of strike of ultramafic rich stratigraphy in the Duketon Greenstone Belt. The belt is considered prospective for Ni-Cu-PGE mineralisation and has not been subjected to modern nickel sulphide exploration techniques.

Final 1m split assay results have been received for the anomalous nickel geochemistry intersected at the Bulge prospect reported last quarter (36m) @ 0.65% Ni from 40m) as indicated below:

25m @ 0.73% Ni, 298ppm Cu and 310ppb Pt+Pd from 40m including 4m @ 1.07% Ni, 119ppm Cu and 237ppb Pt+Pd.

This intersection was associated with iron oxides within a weathered ultramafic unit (Figure 10). Further drilling is planned to test the anomalous horizon for disseminated nickel sulphide mineralisation in the primary zone 80m down dip and on two sections 200m south and 200m north along strike.

EM surveying has commenced on the Bandya trend which comprises the southern strike extension of the Bulge ultramatic horizon. By the end of the quarter 5.3 strike km of the ultramafic trend had been covered by the survey with the remaining 6.4 strike km to be completed in early 2007.

Figure 10: Duketon JV - Bulge Prospect Cross Section Showing Anomalous Nickel Intercept

CULLEN JOINT VENTURE (IGO MANAGER EARNING 65-70% NICKEL RIGHTS)

The Cullen JV is situated immediately south of BHP Billiton's AK47 Ni-Cu sulphide discovery. IGO is systematically testing the strike extension of the AK47 ultramafic stratigraphy for Ni-Cu sulphides using a combination of exploration methods.

Assays were received for samples from two holes testing EM targets on the Irwin Bore tenement (E53/925) and one hole on the Mt Tate tenement (E53/1096). No significant nickel results were recorded from any of the samples. IGO has subsequently withdrawn from the Mt Tate tenement. A decision on the Irwin Bore tenement will be made following completion of TEM surveys testing ultramafic stratigraphy on the adjacent tenement E53/1040.

WILUNA NICKEL JV (IGO OPTION TO EARN UP TO 70% NICKEL SULPHIDE RIGHTS)

IGO has entered into an option agreement with Agincourt Resources Limited ("AGC") over a portion of their extensive tenement package located on the northern end of Agnew-Wiluna Greenstone Belt. The Agnew-Wiluna Greenstone Belt is one of the most highly endowed nickel sulphide belts in the world, containing such deposits as Mt Keith (2.3M Ni t resource), Leinster (1.7M Ni t). Cosmos group (0.4M Ni t) and Honeymoon Well (1M Ni $t$ ).

The AGC tenure covers approximately 40kms of strike of the ultramafic trend immediately north of Honeymoon Well and the Wedgetail Deposit (resource of 1Mt @ 6.9% Ni) (Figure 11).

A number of prospect areas are currently being evaluated.

At Bodkin, where previous drilling has returned a number of nickel sulphide intercepts including 0.3m @ 6.6% Ni, a further 3 to 4 RC holes will be drilled in early 2007 to test an EM plate modelled from down-hole data collected by IGO and also to test for a potential plunge extension to known mineralisation (Figure 12).

Access to the high priority target area at Lake Way, which includes ultramafic stratigraphy along strike from the Honeymoon Well and Wedgetail deposits, has been prevented due to wet conditions on the lake. IGO continues to monitor conditions on the lake and will commence exploration of this target area as soon as conditions allow.

Figure 11: Wiluna Nickel Option: Tenure and Bodkin Prospect Location Over Aeromagnetic Image

Figure 12: Wiluna Nickel Option - Bodkin Cross Sections Showing Anomalous Nickel Sulphide Intercepts and Down-hole TEM Conductor

LAKE LEFROY PROJECT (EXCALIBUR & YAMARNA JV'S-IGO EARNING 80%, ANGLOGOLD ASHANTI-IGO EARNING UP TO 100%, GLADIATOR JV - IGO EARNING $70\%$

IGO has a licence agreement with Anglo American to use its proprietary Low Temperature SQUID Sensor (SQUID) in parts of the Yilgarn Block. The SQUID sensor is able to detect conductors, possibly representing massive nickel sulphide mineralisation, beneath areas of conductive overburden far more effectively than competing systems.

Four Joint Ventures covering interpreted prospective stratigraphy east of Kambalda, beneath Lake Lefroy which cannot be explored with conventional EM systems, are being explored using the SQUID.

A significant proportion of the targeted magnetic features within the joint ventures have not yet bee covered with the SQUID.

Work completed on the various JV areas during the quarter is summarised below:

Excalibur JV

Two diamond tails were drilled to test the very strong conductor previously reported beneath conductive lake sediments.

The first hole (LLRCD 002) terminated at 231.3m after passing through the modelled target depth of 190m. Thin graphitic shale horizons were intersected at the target depth at the contact between an ultramafic volcanic unit and an underlying basalt. No nickel sulphides were intersected and it is possible that the graphitic shale was the source of the conductor. DHEM surveying of this hole could not be completed as the probe could not be lowered below the pre-collar depth.

The second hole (LLRCD001) designed to test the strongest part of the target approximately 170m down-dip from LLRC002, intersected a monotonous sequence of ultramafic volcanics and then passed into a basaltic footwall with minor intercalated graphitic horizons before being terminated at 420m. DHEM surveying of the hole identified a conductor however a further assessment of all datasets is required before it can be determined if the anomaly defined in the surface SQUID EM survey has been adequately explained.

Yamama JV

The Yamarna JV covers magnetic stratigraphy in two areas north and south of an interpreted dome located beneath a salt lake 10km east of Kambalda. A SQUID TEM survey commenced on both areas during the quarter and at quarter's end the program was approximately 33% complete. A number of possible bedrock conductors have been identified. A detailed appraisal of the results will be undertaken once the survey is complete.

AnaloGold Ashanti JV

Further SQUID TEM surveying was completed on an AngloGold Ashanti JV tenement, covering the eastern flank of the dome targeted by the Yamarna JV. Survey results are awaiting interpretation.

Gladiator JV

The Gladiator JV commenced in December 2006 (see Gladiator Resources Limited's announcement dated 12 December 2006).

Work to date by IGO includes a review of open-file data and prioritisation of target areas.

Due to rain in January affecting access to the salt lakes, continuation of the SQUID EM on each of the JV areas is unlikely to occur before March.

OTHER

GOLDSWORTHY PROJECT (IGO 80%)

Magnetite Target

An intense magnetic anomaly (95,000nT) is situated within the project tenure. Previous drilling of the anomaly by Rio Tinto delineated magnetitebearing BIF and ultramafic rock.

IGO intended to test the iron ore potential of the magnetic anomaly with one RC hole and two RC/diamond tail holes.

The RC component of the program was completed, however the two diamond tails could not be completed due to very difficult ground conditions including unconsolidated cobble beds at the bedrock interface.

One of the RC pre-collars (DGRC016) returned assay results including 22m @ 1800ppm Cu, 60ppb Au and 106ppb Pt in a pyrite and chalcopyrite bearing gabbro.

IGO is currently assessing the significance of these results, particularly the highly anomalous platinum values.

Gravity Target

IGO has been evaluating a significant gravity anomaly and 3 RC holes were completed on the target during the quarter. The first hole comprised a 100m extension of the previously drilled 200m RC hole on the main gravity target. This hole intersected similar quartzites and wackes to those encountered in the initial drilling and failed to intersect any dense feature that would explain the gravity anomaly. A subsequent attempt to extend the hole from 300m to 500m with a diamond tail failed due to difficult ground conditions. A further 3 RC holes drilled approximately 2km to the west-south-west on an east-west trend in the gravity feature intersected significant thicknesses of epidotealtered dolerite/gabbro intercalated with variable quartz wacke and dark quartzite. It is possible that a significant thickness of stacked

doleritic/gabbroic sills may be the source of the gravity anomaly in this position.

In light of the anomalous platinum intersected within the gabbro in DGRC016 further sampling and analysis for PGE's is being undertaken on all of the gabbros intersected on the project to date.

PROJECTS RELINQUISHED OR AVAILABLE FOR JOINT VENTURE

Results from the following projects do not meet with the company's project investment criteria and exploration has ceased accordingly.

Nickel Projects Mi Tate JV: - E53/1096 has been handed back to JV partner as targets
have all been tested
GOLD PROJECTS Mt Padbury: -- JV partner being sought

MARCH QUARTER PROGRAM

REGIONAL NICKEL EXPLORATION Ravensthorpe: Diamond drill testing targets at Mt Short and ongoing EM
at Mt Short and Carlingup, scoping study over RAV 1,
RAV 4, RAV 4 West and RAV 5
Duketon: Drill testing nickel anomalism at the Bulge Prospect. EM
at Bandya
Quondong: Infill EM over anomalies and RC drill test
Royal North: Drill testing down-hole EM conductor
Cullen JV EM testing ultramafic stratigraphy
Lefroy: Ongoing SQUID surveying
AngloGold Ashanti,
on -
Yamarna and Gladiator JV's
Wiluna: Drill testing Bodkin conductor and EM testing Lake Way
prospect
Starbodsund: Ground EM and ground magnetic testing of airborne EM
anomalies
REGIONAL GOLD EXPLORATION Tropicana: Diamond, RC and aircore drilling and regional surface
geochemistry, scoping study over Tropicana and Havana
Cobar: Interpretation of results and Phase 2 drill testing
Holleton: Target generation and first pass surface sampling
Dalwallinu: RAB drilling to test anomalous surface geochemistry and
prospective structure
Coomberdale: Auger infill of existing anomalies and testing of potential
strike extensions
IGO EMAIL SERVICE website: igo.com.au. To receive copies of ASX announcements including quarterly reports via
email, please register for Email Alerts via the Investor Centre page of the

INDEPENDENCE GROUP NL

CHRISTOPHER M. BONWICK MANAGING DIRECTOR

Note: The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Christopher M Bonwick who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Christopher Bonwick has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Christopher Bouwick consents to the inclusion in the report of the matters based on his information in the form and context in which it appears

Forward-Looking Statements: This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning
Independence Group NL's planned exploration program and ot reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

PO Box 893 SOUTH PERTH WA 6951 T: (08) 9367 2755 F: (08) 9367 3288 E: [email protected]

W: www.igo.com.au