Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IGO LIMITED AGM Information 2003

Nov 19, 2003

65111_rns_2003-11-19_9a19d7fd-c533-40ed-b41b-0a7989a3df97.pdf

AGM Information

Open in viewer

Opens in your device viewer

INDEPENDENCE

Annual General Meeting

19 November 2003

TALK OUTLINE

  • Corporate Vision
  • Long Nickel Mine
  • Operations
  • Exploration Upside
  • Exploration Philosophy
  • Nickel & Gold Targets
  • Growth strategy

INDEPENDENCE AT A GLANCE as at 17.11.03

CORPORATE VISION

VISION:

• To build a major Australian resource house.

EXECUTION:

  • Mining growing reserve base by innovation and exploration
  • Exploration discover & develop new gold & nickel camps
  • Corporate mergers & acquisitions

SHARE STRUCTURE & MARKET CAPITALISATION

Independence shares on issue (M)
Ordinary shares
$(tradable - 50.4M)$
68.5M 50
100
150
200
Feb
Ordinary shares
Contributing shares
Apr
Options
Options 28.7M Unlisted options
Jun
2002
Market
Aug
capital isation
Contributing shares 9.9M Oct
Dec
Feb
Unlisted options 4.6M
111.7M
Apr
2003
Jun⊯
Fully diluted Market Aug
Capitalisation \$105.7M Oct
as at 18/11/03 50M
100M
IGO fully diluted market capitalisation (\$M)

TOP TEN SHAREHOLDERS

Ordinary Shares

Perilya 20.7M 30.4%
ANZ Nominees 2.4M 3.5%
Virtual Genius 2.4M 3.5%
IME 2.0M 2.9%
J Schiller 2.0M 2.9%
Lion Selection 1.5M 2.2%
Rothschild 1.5M 2.2%
Westpac Nominees 0.7M 1.1%
J P Morgan Nominees 0.7M 1.1%
P Parker 0.7M 1.0%
(As at 13.11.03) 34.5M 50.7%

LONG NICKEL MINE GEOLOGICAL SETTING

  • One of the biggest Kambalda deposits, discovered in 1971.
  • Past production: 5.43Mt @ 3.7% Ni >200,000t Ni (\$2.4 billion @ \$12,000/Ni t)
  • Starting reserve: 27,000t Ni
  • Known metal in mine: 113,000t in 2 lava channels

PURCHASE COST / RESOURCE MASSIVE Nit

LONG CASH FLOW STATISTICS TO DATE

Production Aim:

• Safely produce +\$60M net cash after debt repayment and tax over 5 years.

Production Statistics:

  • Nov $02 -$ Sep $03$
  • Cash costs
  • IGO's Ni share
  • Revenue
  • $\bullet$ Operating cash flow
  • $\bullet$ Pre tax profit

  • $= 129,886t \omega 3.8\% Ni$

  • $= A$2.18/lb$ Ni*
  • $= 2,908t$ Ni
  • $= $39.6M$
  • $= $12.5M$
  • $= $8.3M$
  • * Excludes depreciation and amortization

LONG PRODUCTION TO DATE

Ore tonnes & grade

Nickel tonnes

$2003 - 2004$ LONG PRODUCTION PROFILE

  • Safety.
  • Stable, experienced & motivated work force.
  • Maximizing grade, minimizing dilution using innovative geology and geophysics.
  • Cost control.
  • Mine life.
  • Exploration upside.
  • Annual production increase.

LONG SAFETY

Mine start-up to present - ONLY 1 LTI

Reasons:

  • Shifts: $2 \times 10.5$ hrs/day (not 12hrs).
  • Salaried employees risk taking is reduced.
  • Regular safety meetings involving all.
  • Regular compulsory training.
  • Remote controlled equipment reduces exposure hours.
  • Highly experienced workforce.

LONG MINING TEAM

  • 72 full time very experienced mining team.
  • Underground experience
  • Average experience
  • Long experience

1,240 man years 19.4 man years 240 man years

  • Owner operator with almost all of the team on salary.
  • 99% retention rate.

MAXIMIZING HEAD-GRADE REDUCING DILUTION

  • Team work:
  • Integrated geology, engineering and operator approach resulting in good forward planning.
  • Mining method:
  • Jumbo flat-backing
  • Long hole pillar recovery
  • Hand-held mining
  • Innovation:
  • Mining underhand flat-backing trial
  • Geophysics blast hole conductivity logging
    • $-EM$ torch

VISUAL BLAST HOLE LOGGING VS CONDUCTIVITY LOGGING

PORTABLE UNDERGROUND EM SYSTEM (EM TORCH)

  • Very portable
  • Runs on 12 volt batteries
  • 3 different operating systems using same hardware:
Scale Search (m) Target size
Stope $0 - 30m$ $5 \times 10m$
Stope
extensions
$0 - 50m$ $50 \times 50m$
Exploration $0 - 100m$ 100 x 100m

LONG COST CONTROL

  • Gain share bonus employees share in above budget positive cash flow.
  • New mining gear maximizes availability.
  • Daily cost monitoring.
  • Very low personnel turnover.
  • Forward planning.

INCREASING MINE LIFE AT LONG

Category Start-up Oct 2002 June 2003
Resources 1,233,000t @ 5.6% Ni 1,368,600t @ 6.0% Ni
(69,000t Ni) (82,700t Ni)
746,000t @ 3.6% Ni 688,000t @ 4.0% Ni
Reserves
(26,800t Ni) (27,300t Ni)
Mine life 5 years 6 years
  • $\bullet$ +20% nickel tonne resource increase & 20% mine life increase.
  • IGO believes a minimum of 12,000t Ni will be converted to reserves in 2003 / 2004 increasing mine life to 8 years.
  • Further reserve increases are likely.

IN SITU MASSIVE Ni t

LONG COMPLEX JUNE 2003 RESERVES RESOURCES & PILLARS

FUTURE HIGH-GRADE ORE VICTOR SOUTH

LONG/VICTOR COMPLEX FLY THROUGH

INDEPENDENCE GOLD NL

ANNULAL PRODUCTION PROFILE GOAL

Location Current Goal Haulage
Ni t Ni t
Long 4,700 4,700 Shaft
Gibb South 600 Decline
Victor South 4,800 Decline
Long South* 4,500 Shaft & Decline
TOTAL 5,500 14,000
  • 160,000tpa $@$ 3.3% Ni increasing to 370,000tpa $@$ 3.8% Ni.
  • Shaft and Decline haulage capacity under utilized. * Yet to be proven up

IND) ZPINDENCE

AUSTRALIAN REGIONAL NICKEL & GOLD EXPLORATION STRATEGY

Looking for new mineral camps:

  • undercover, at depth and
  • in lightly or unexplored terrains

WMC DIAMOND DIVISION DATABASE - 100% IGO

  • $\bullet$ 24,000 samples.
  • \$40M replacement cost.
  • Cannot be duplicated due to Native Title.
  • Exclusive to IGO until August 2009.
  • WMC 1.5% gross royalty.

Numerous untested gold, nickel etc anomalies

NICKEL EXPLORATION

CHROMITE MORPHOLOGY & CHEMISTRY

Independence can distinguish chromite grains that:

  • form in ultramafics which carried nickel sulphides.
  • precipitate with nickel sulphides
  • (also picks up Ni rich meteorites and kimberlites).

COSMOS EXAMPLE

  • Kambalda, Cosmos, Widgiemooltha and other nickel camps rediscovered using this technique.
  • 40 new nickel targets defined with potential new surface nickel sulphides.

ANOMALOUS IRONSTONE & NICKEL CHROMITE TARGET INDEPENDENCE

Potential for new outcropping nickel sulphide camps

MUSGRAVE GRAVITY

MUSGRAVE JV - DE ROSE HILL NICKEL ANOMALIES INDEPENDENCE

GOLD EXPLORATION

EXAMPLE OF DATABASE AU ANOMALY

Kanowna Belle example

  • Anomaly generated before Kanowna Belle was discovered.
  • Other anomalous belts not $\bullet$ followed up: Jundee Bronzewing

NEW GOLD PROVINCE EXAMPLE – TROPICANA JV

INDEPENDENCE

TROPICANA EAST SECTION 142800N

TROPICANA PROJECT LOCATION

NEW GOLD PROVINCE EXAMPLE - NAMBI

NEW GOLD PROVINCE EXAMPLE - MT ISDELL

NEW GOLD PROVINCE EXAMPLE - WACKILINA

EXPLORATION/ ACQUISITION FOCUS

Nickel:

  • Delineate an additional +50,000t Ni metal.
  • Production cost <US\$2 /lb Ni.

Gold:

  • Delineate 2 x +500,000oz gold deposits.
  • Production cost <Aus\$350/oz.

Exploration Budget:

• Approx. \$4M per year: Ni - \$2M

Au - \$2M

PLANNED DEC 03 QTR EXPLORATION

LONG NICKEL MINE

• Commencing 8,000m 25 hole DDH surface and underground drill program testing 7 targets including Long South

REGIONAL EXPLORATION

  • Tropicana West geochem survey
  • $\bullet$ Wackilina drilling
  • NiS and Au prospect pegging
  • $\bullet$ Musgrave geochem & TEM survey
  • Goldsworthy drilling
  • Thadoona $-$ EM survey
  • Prairie Downs EM survey

SUMMARY

Independence is now cash flow positive

AUSTRALIAN NICKEL COMPANIES MKT CAP / MASSIVE Nit

GROWTH STRATEGY

  • The company plans to continue increasing shareholder wealth by:
  • $\triangleright$ profitable mining
  • Exploration discoveries
    • $\triangleright$ scientific advances
  • $\triangleright$ mergers & acquisitions
    • $\triangleright$ quality management

It is our goal to grow Independence into a major Australian mining house