Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

EVOLUTION MINING LIMITED Regulatory Filings 2017

Feb 15, 2017

64885_rns_2017-02-15_878c6e1a-e527-4190-961d-afa4feac4f0f.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

==> picture [434 x 539] intentionally omitted <==

==> picture [198 x 140] intentionally omitted <==

The future of Cowal

16 February 2017

==> picture [107 x 70] intentionally omitted <==

Forward looking statement

  • These materials prepared by Evolution Mining Limited (or “the Company”) include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

  • Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

  • Forward looking statements are based on the Company and its management’s good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.

  • Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the Company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

Cowal mine life extended to 2032

==> picture [107 x 70] intentionally omitted <==

  • Regulatory approval received to extend mine life to 2032

  • Life extension projects approved:

  • E42 Stage H Cutback – additional Life of Mine (LOM) gold production of 1.2Moz

  • Dual Leach Project to increase recoveries by 4 – 6%

  • 31 December 2016 Ore Reserves increased from 2.85Moz to 3.20Moz

  • Ore Reserves increased by 679koz[1 ] or 24% prior to mining depletion of 326koz

  • Stage H reserve conversion cost of less than A$15 per ounce

  • Ore Reserves increased by 2.28Moz[1 ] or 145% prior to mining depletion since asset acquired in July 2015

  • Further upside opportunities:

  • Co-treatment of high-grade oxide stockpiles

  • Potential to increase throughput to 9.0 – 9.5Mtpa

  • Continued drilling to convert significant mineral endowment outside of existing reserves: E46, E41, Galway and Regal deposits

  • This information is extracted from the ASX release entitled “Evolution Approves Projects to Secure Cowal Production to 2032” released to the ASX on 16 February 2017

Building a business that prospers through the cycle

E42 material movement

==> picture [107 x 70] intentionally omitted <==

  • Capital investment in stripping of approximately A$230 million over four years

  • FY18: A$40M, FY19: A$75M, FY20: A$75M, FY21: A$40M

  • Remaining Life of Mine E42 material movement:

==> picture [442 x 298] intentionally omitted <==

Waste (Mt) Ore (Mt) Strip Ratio
103.1 55.6 1.85

Dual leach project

==> picture [107 x 70] intentionally omitted <==

  • Metallurgical test work confirmed leaching of the flotation tailings is expected to improve recoveries by 4 – 6%

  • Resulting increase in gold production of 10 – 14koz per year

  • Capital investment of A$35.0 – A$40.0 million to be spent over FY18 and FY19

  • Commissioning expected in early FY19

  • Incremental additional processing cost expected to be A$1.40/t – A$1.50/t

Proposed process flowsheet

Additional opportunities

==> picture [107 x 70] intentionally omitted <==

  • Board approval received to assess further asset enhancement opportunities including:

  • Co-treatment of high-grade oxide stockpiles to bring forward treatment

    • Increased gold production of 10 – 12koz per annum
  • Secondary crushing

    • Increase throughput to 9.0 – 9.5Mtpa to bring forward treatment of low-grade stockpiles
  • Continued drilling to convert significant mineral endowment outside of existing reserves

==> picture [399 x 289] intentionally omitted <==

----- Start of picture text -----

E46
E46 East
E42
Galway/Regal
Open at depth
E41 West
E41 East
----- End of picture text -----

Cowal gold mineralisation and E42 open pit outline

  • E46, E41, Galway and Regal deposits

==> picture [706 x 479] intentionally omitted <==

----- Start of picture text -----

Transforming a cornerstone asset
July Evolution Feb
2015 Performance 2017
MINING MINING
2024 2032
PERMIT TO + 8 years PERMIT TO
2014 ORE 2016 ORE
1.56Moz [1 ] + 2.28Moz [2 ] 3.20Moz [3 ]
RESERVES RESERVES
2014 MINERAL 2016 MINERAL
3.43Moz [1 ] + 2.24Moz [2] 5.04Moz [3 ]
RESOURCES RESOURCES
July 2015 – December 2016
GOLD
374koz
PRODUCTION
PURCHASE NET MINE ADDITIONAL UPSIDE
PRICE A$703M CASH FLOW A$253M OPPORTUNITIES
DISCOVERY
A$22.2M
SPEND
----- End of picture text -----

  1. Barrick (Australia Pacific ) Pty Limited estimate depleted to 31 December 2014 - refer to ASX release 26 Aug 2015 entitled “Resources and Reserves Increased at Cowal” available to view at www.asx.com.au 2. Prior to mining depletion

  2. Depleted to 31 December 2016

Reserve changes since acquisition

==> picture [107 x 70] intentionally omitted <==

Cowal Ore Reserve changes December 2014 to December 2016

Cowal Ore Reserve changes
December 2014 to December 2016
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
Reserve ounces (koz)
494
29
87
309
326
900
69
231
3,200
471
2,848
1,555
December 2014
Reserve
Cut-Off Grade &
Stockpiles
Stage G Design
Stage H Design
Mining
Depletion
2015 December
Reserve
Additions
Model
Cut-Off Grade
Design
Stockpiles
Mining
Depletion
2016 December
Reserve

This information is extracted from the ASX releases entitled “Evolution Approves Projects to Secure Cowal Production to 2032” released to the ASX on 16 February 2017 and “Resources and Reserves increased at Cowal” released to the ASX on 26 August 2015 and available to view at www.asx.com.au

Cowal Dec 2016 MROR

==> picture [93 x 66] intentionally omitted <==

Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016 Cowal Gold Mine Ore Reserves - December 2016
Ore Reserve Proved Probable Total
Cut-off (g/t
Au)
Tonnes
(Mt)
Grade
Au (g/t)
Cont Metal
Au (koz)
Tonnes
(Mt)
Grade
Au (g/t)
Cont
Metal
Au (koz)
Tonnes
(Mt)
Grade
Au (g/t)
Cont
Metal
Au (koz)
E42 Oxide 0.40 0.54 0.54 9 0.54 0.54 9
E42 Primary 0.40 72.48 0.94 2,197 72.48 0.94 2,197
Stockpile 0.40 43.70 0.71 994 43.70 0.71 994
Total 43.70 0.71 994 73.02 0.94 2,207 116.71 0.85 3,200
Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016 Cowal Mineral Resources - December 2016
Mineral
Resource
Measured
Tonnes
(Mt)
Grade
Au (g/t)
Cont.
Metal Au
(koz)
Indicated Inferred Total Resource
Grade
Au (g/t)

Cont.
Metal Au
(koz)
Tonnes
(Mt)
Grade
Au (g/t)

Cont. Metal
Au (koz)

Tonnes
(Mt)
Grade
Au (g/t)

Cont.
Metal Au
(koz)
Tonnes
(Mt)
Grade
Au (g/t)

Cont.
Metal Au
(koz)
E42 Oxide - - - 0.58 0.54 10 - - - 0.58 0.54 10
E42 Primary - - - 108.36 0.88 3,073 1.85 0.70 42 110.22 0.88 3,115
E42 Stockpile 43.70 0.71 994 - - - - - - 43.70 0.71 994
E41 Oxide - - - 4.15 1.20 160 0.73 1.85 43 4.87 1.29 203
E41 Primary - - - 7.97 0.91 233 0.40 0.93 12 8.38 0.91 245
E46 Oxide - - - 4.26 1.26 172 0.14 1.39 6 4.40 1.26 179
E46 Primary - - - 1.82 1.42 83 0.09 3.44 10 1.91 1.51 93
GRE46 Oxide - - - 0.66 1.56 33 0.52 1.98 33 1.17 1.74 66
GRE46 Primary - - - 1.92 1.59 98 0.52 2.27 38 2.43 1.73 136
Total 43.70 0.71 994 129.71 0.93 3,861 4.24 1.35 184 177.65 0.88 5,039

Data is reported to significant figures and differences may occur due to rounding Mineral Resources are reported inclusive of Ore Reserves Mineral Resources have been reported above a cut-off grade of 0.40g/t gold and constrained within an A$1,800/oz pit optimisation shell The Cowal Mineral Resource Competent Person is Joseph Booth and the Ore Reserve Competent Person is Jason Floyd

This information is extracted from the ASX release entitled “Evolution Approves Projects to Secure Cowal Production to 2032” released to the ASX on 16 February 2017. Evolution confirms that that it is not aware of any new information or data that materially affects the information included in that release and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed