Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARK MINES LIMITED M&A Activity 2011

Sep 12, 2011

64339_rns_2011-09-12_7a082118-30dd-4e9b-b381-4ea6b6f0a94b.pdf

M&A Activity

Open in viewer

Opens in your device viewer

==> picture [121 x 64] intentionally omitted <==

Ark to acquire advanced Indonesian copper/gold project in company transforming transaction

Ark Mines Ltd is pleased to announce that it has signed an agreement with Fullway Limited to acquire ownership and control of the Masuparia Contract of Work (COW) tenement in Central Kalimantan, Indonesia.

Masuparia COW

  • US$22,000,000 spent on exploration to date

  • 18,000m of diamond drilling completed

  • Ongkang Gold deposit will be in production within twelve months

  • Ark can significantly upgrade Ongkang with limited infill drilling

  • JORC resource on Ongkang will be undertaken upon purchase

  • Project lies within Indonesia’s Ring of Fire

  • Total acquisition cost of AUD$4 million cash and issue of 10 million Ark shares @ 20c

  • An initial placement will be made to make the first payment of $1,000,000 in the next 7 days using existing placement capacity

  • 6 major projects and numerous other targets across 20,840 ha

  • Bonanza Gold grades in the Epithermal Zones

  • Mineralisation deeper than 850m in the Porphyry Gold -Copper Targets

  • Significant mine accommodation and Infrastructure

  • River transport to major port

  • 6[th] Generation Contract of Work

  • Advanced forestry permitting

  • Walk-up operation - established team and all facilities in Jakarta and Kalimantan

  • Ark to continue advancing exploration on NSW projects

Sydney, 13 September 2011: Ark Mines Ltd (ASX: AHK) today announced that it will acquire 100% of Sphere Complex Limited, a company which is the indirect majority owner and controller of PT PMM (99.999575 %)which holds a highly prospective and advanced exploration project, the Masuparia Contract of Work (COW) (“Masuparia”) located in Central Kalimantan, Indonesia.

The project is located in a region well known for copper-gold projects. The Mount Muro, gold project, which has historically produced 1.3 m oz Au, is located 20 kilometres from Masupuria, and the Kelian gold project, which to date has produced 7 million ounces of gold, is in the same region.

The Masuparia project is supported by a fully functioning office in Jakarta, headed by an Australian geologist with 25 years’ experience working in Indonesia, and three senior

==> picture [121 x 64] intentionally omitted <==

Indonesian geologists with a combined 40 years’ experience. There is also an operational base camp at Masuparia with all accommodation, communication and staffing facilities.

Under the terms of the agreement, Ark will acquire the business and COW for $4 million cash, and issue the vendors 10M Ark shares. Ark will be funding this through equity. All personnel currently engaged on the project will continue to operate as part of Ark.

==> picture [447 x 298] intentionally omitted <==

Ark’s Managing Director Roger Jackson said: “This is a very exciting acquisition for Ark, as this advanced project gives us the capability to be producing gold within twelve months*, and the opportunity to define significant resources on the tenement. These are likely to be world class deposits as this is a geologically stunning location.”

“Also encouraging about Masuparia is that it is well serviced by existing infrastructure, and with several mines in the region, toll treatment options are also potentially available. The project is well supported by a talented team of professionals, and with all infrastructure in place in Jakarta and near to the project, this is a walk-up opportunity for Ark.”

The agreement should be finalised within six weeks from today and is subject to shareholder approval and the completion of funding to finalise the purchase and initiate a drilling program at Masuparia.

Mr Jackson added that Ark will remain active in the development of its New South Wales assets, and these are a priority for the company. “We currently have a RC rig operating in New South Wales and we remain committed to the development of these projects. Due to our successes, we propose to raise additional funds (equity) to further drill the Gundabooka,

==> picture [121 x 64] intentionally omitted <==

Babinda and Perserverance Projects This transaction does not alter our program in the Lachlan Fold Belt and we will continue to keep shareholders informed of our progress here.”

  • *Feasibility study completed by PT PMM

==> picture [353 x 227] intentionally omitted <==

Figure 1: Drilling at Masuparia

THE PROJECTS

There are seven advanced projects in Masuparia, with a further nine projects within the eight principal exploration areas, which are significant on the COW. The Ongkang is the most advanced with production likely to commence within twelve months. These are:

  • The Ongkang and 290 Veins – Low Sulphidation targets that require minimal additional drilling to define a substantial gold resource.

The principal gold area is along the Ongkang vein system, which is one of at least six separate goldsilver veins.

Significant drilling has been undertaken but with further exploration upon the purchase and permitting completion, ARK will be aiming for a target of between 600,000 and 1,000,000 tonnes of between 5 and 8 grams of gold. This is anticipated to be done with five diamond drill holes.

Note: The potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a Mineral Resource and that it is uncertain if further exploration will result in the determination of a Mineral Resource.

However the basis for this target is the substantial data obtained from drilling (18,000m +) and two feasibility studies the company has completed.

==> picture [121 x 64] intentionally omitted <==

Significant Intercepts with other metals

  • 6m @420.27 g/t Au 106.67 g/t Ag 1.17% Cu 0.38% Pb 0.75% Zn from 22m to 28m with 2m @ 1162.96 g/t Au.

  • 10m @10.53 g/t Au 74.2 g/t Ag 0.44 % Cu 0.23% Pb 0.55% Zn.

Hole From(m)
To(m)

Interval(m
Au(g/T)
Interval by
Ag(g/T)
North(m)To

East(m)To

Level(m)To
Grade
OND26B
14

28

14
180.79
2531.06
54.26
10620.054

9904.565

231.716
OND23C
66

68

2
49.17
98.34
6
10276

10084.5

147.976
OND04 191
193

2
22.5
45
6.5
10559.198

9980.593

123.123
OND08 242
244

2
13.17
26.34
13
10424.8

10087

126.246
OND10 75 80.4
5.4
12.98 70.092 26.74
10475.66
10067.779 241.299
OND26B
8

10

2
12.5
25
138
10620

9907.671

243.307
OND01 67
71

4
11.05
44.2
9.75
10275.879

10105.676

151.444
OND19 137
138
1 11
11
6 10486.482
10121.933
187.635
OND24A
70
80 10 10.53 105.3 119.56 10330.492
10088.85
163.45
OND01 51
55

4
10
40
11.63
10275.879

10097.676

165.301
OND23C 84
90
6 7.61
45.66
4
10276
10094.5 130.656
OND24B
146

148

2
7
14
7.9
10328.637

10105.357

90.554
OND04 157
161

4
6.3 25.2 39 10559.198 9997.093 151.702
OND25B
6
10 4 6.04
24.16
1.15 10469 10007.167
257.743
OND16 108 110.5
2.5
6
15
1
11297.298

9734.48

318.439
OND08 235
237

2
5.5
11
2
10424.8

10090.5

132.308
OND03 97.7
114

16.3
4.95
80.685
39.72
10422.5

10074.766

212.657
OND27A
54

56

2
4.8
9.6
5.2
10225.9

10163.208

172.089
OND12 130.6
139

8.4
4.4
36.96
205.71
10590.103

10001.079

181.5
OND25B
16

22

6
4.37
26.22
16.3
10469

10011.758

247.747
OND25B
30
40 10 4.31
43.1
4.44
10469
10018.352
233.169
OND03 85.5
89.6

4.1
4.06
16.646
3.45
10422.5

10082.5

229.243
OND23A
104

108

4
3.5
14
2.75
10276

10119.135

124.799
OND23A
62

94

32
3.44
110.08
18.3
10276

10101.137

146.249
OND22 144
148
4 3.26 13.04 3.3 10496.6 10053.647
153.218
OND24A
150

152

2
2.83
5.66
12.9
10328.183

10132.106

101.009
OND24B
196

198

2
2.62
5.24
2.4
10327.036

10124.827

44.529
OND10 148 152
4
2.45 9.8 0.67
10470.006
10035.712
176.748
OND26 4
18
14 2.45 34.3 32.57
10620
9902.233 244.211
OND24A
140

144

4
2.31
9.24
14.7
10328.632

10126.967

108.383
OND01 20.7
24.6
3.9 2.22
8.658
11.08 10275.879 10082.501
191.585
OND01 87
97

10
2.1
21
3.38
10275.879

10117.176

131.526
OND09 9.1
15.2

6.1
2.05 12.505 14.11
10230.171

10150.85
216.839
OND01 4.9 10.8 5.9 1.79 10.561 10 10275.879 10075.101
204.402
OND24A
18

28

10
1.74
17.4
10
10331

10059.176

206.148
OND26A
8

20

12
1.72
20.64
50.97
10620

9902.972

239.892
OND19 111.86
120

8.14
1.67
13.5938
5.34
10491.137

10126.929

208.096
OND03 142
155.1

13.1
1.61
21.091
11
10422.5

10056.72

173.958
OND02 0.01
3.8

3.79
1.6
6.064
5
10282.6

9998.852

195.75
OND23A
52

58

6
1.35
8.1
7.53
10276

10086.353

163.868
OND08 268 274.6 6.6 1.3 8.58 3.75 10424.8 10072.85 101.737
OND24A
108

116

8
1.28
10.24
6.1
10329.718

10109.872

133.012
OND05 85
91

6
1.26
7.56
6.83
10620.4

9936.9

201.66
OND24B
88

122

34
1.19
40.46
4.45
10329.757

10088.935

129.195
OND25B
56
72
16
1.18 18.88 3.54
10468.986
10030.055 206.635
OND01 75
83

8
1.13
9.04
7.75
10275.879

10110.676

142.784
OND25A
54

94

40
1.06
42.4
17.32
10469

10045.847

177.607
OND23C 98 114
16
1.04
16.64
5.82
10276
10104
114.201
OND19 94
102

8
0.93 7.44 5.23 10495.145 10131.111
225.064
OND24A
86

104

18
0.82
14.76
5.99
10330.095

10100.217

146.999
OND25A
98
106 8 0.67
5.36
4.2
10469
10061.551
154.425
OND17 67 83.92
16.92
0.63
10.6596
1.07
11386.501

9774.634

361.134
OND23B
62

72

10
0.59
5.9
4.06
10276

10084.5

147.976
Figure 2: Ongkang Significant Drill Intercepts

==> picture [121 x 64] intentionally omitted <==

  • The Rina Project that has drill intercepts of Porphyry Copper – Gold mineralisation of 750m + , 10m from surface, and broad zones (+ 100m) of + 0.25% Cu, and 0.5 g/t Au. The hole was terminated due to rig capacity. The petrology indicates better grades at depth and into the core of the Porphyry.
Hole From(m) To(m) Interval(m) Cu % **Aug/t **
RDH - 02 2 312 310 0.18 0.32
including 140 312 172 0.26 0.50
RDH - 08 0 500 500 0.11 0.18
including 214 326 112 0.21 0.38
RDH - 09 5 135 130 0.22 0.23
RDH - 14 78 862.8 785 0.15 0.18
including 104 312 208 0.17 0.26
and 202 256 54 0.20 0.40
and 513 864 341 0.19 0.18
RDH 15 231 342 111 0.23 0.29

Figure 3: Rina Significant Drill Intercepts

==> picture [402 x 317] intentionally omitted <==

Figure 4: Rina Drill Locations and Magnetic Susceptibility Contour

==> picture [121 x 64] intentionally omitted <==

  • G. Menyawang Project , a large High Sulphidation target with potential for oxide gold in silica cap (Yanacocha model); enargite copper – gold beneath silica cap (Lepanto model ) and porphyry copper – gold at depth (FSE model).

  • The Kaka Project that has stratiform copper mineralisation outcropping at surface and spectacular trench results.

==> picture [421 x 259] intentionally omitted <==

==> picture [441 x 282] intentionally omitted <==

==> picture [121 x 64] intentionally omitted <==

  • The Balai Deder –Torajan project has potential for Kelian style (+ 5 M oz) mesothermal gold mineralisation in altered andesite.

  • Tosa – Ucang – Kunyi and Kiwi – Kea project areas have potential for Mt Muro style ( +1.5M oz Au – Ag) epithermal gold silver mineralisation in quartz and hydrothermal breccias.

KIWI PROSPECT: SIGNIFICANT DRILLHOLE RESULTS

KIWI PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KIWI PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KIWI PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KIWI PROSPECT: SIGNIFICANT DRILLHOLE RESULTS
HOLE NO. FROM TO SIGNIFICANT Au (ppm)
KID08 52.00 70.00 18 m@ 0.57 Au
KID 16B 6.00 22.00 16 m@ 1.09 Au
KID 20 64.00 76.00 12 m@ 0.63 Au
88.00 91.00 3 m@ 0.87 Au
KID 26 0.00 4.00 4 m@ 1.43 Au
19.00 28.00 9 m@ 0.72 Au
KID 27 1.00 4.00 3 m@ 1.17 Au
KID 27A 1.00 12.00 11 m@ 1.20 Au
KID30 46.00 52.00 6 m@ 1.08 Au

==> picture [121 x 64] intentionally omitted <==

KEA PROSPECT: SIGNIFICANT DRILLHOLE RESULTS

KEA PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KEA PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KEA PROSPECT: SIGNIFICANT DRILLHOLE RESULTS KEA PROSPECT: SIGNIFICANT DRILLHOLE RESULTS
HOLE NO. FROM TO SIGNIFICANT Au(ppm)
KED 07 37.00 61.00 24 m@ 0.62 Au
KED 08 22.00 58.00 36 m@ 0.47 Au
KED 10A 0.00 16.00 16 m@ 2.06 Au
6.00 7.00 1 m@ 23.67 Au
KED 14 1.00 2.00 1 m@ 3.86 Au
40.00 46.00 6 m@ 0.57 Au
KED 15A 0.00 79.00 79 m@ 0.44 Au
31.00 79.00 48 m@ 0.61 Au
46.00 67.00 21 m@ 0.75 Au
KED 17 43.00 58.00 15 m@ 0.84 Au
43.00 46.00 3 m@ 1.26 Au
55.00 58.00 3 m@ 1.68 Au
KED 17A 19.00 28.00 9 m@ 0.59 Au
55.00 58.00 3 m@ 4.33 Au
73.00 79.00 6 m@ 0.65 Au
KED 18 19.00 28.00 9 m@ 0.95 Au
25.00 28.00 3 m@ 1.47 Au
KED 19 6.00 13.00 7 m@ 0.82 Au
25.00 31.00 6 m@ 0.96 Au
85.00 88.00 3 m@ 1.56 Au
KED 19A 0.00 85.00 85 m@ 0.34 Au

Watts, Griffis and McOuat

GAR KAL / GAR_08_Ongkang_Prospect.cdr

==> picture [439 x 587] intentionally omitted <==

----- Start of picture text -----

11,500N
17 LEGEND
BP drill hole
Batu Putih
Zone 16 South Pacific Resources drill hole
15
Known gold zones
Potential gold zones
Quartz stringer zones
Pervasive silicification (silica cap)
11,000N Probable extensions requiring drilling
Clay-pyrite ±silicification
Weak to moderate chlorite ±epidote
Mafic to intermediate dyke
11
18
26,A,B 05/06
12
GMR-03 & GMR-04
290°Zone 22,A 04 19 GMR-05 10,500N
10
25,A,B
08
Ongkang Zone
GMR-01 20/21 03,A,B
Southern Stockwork Zone
24,A,B GMR-06
02
01
23,A,B,C,D 09
27,A
07
13/14
Mursani Vein
BASELINE
----- End of picture text -----

==> picture [39 x 9] intentionally omitted <==

----- Start of picture text -----

Figure 11.
----- End of picture text -----

==> picture [381 x 67] intentionally omitted <==

----- Start of picture text -----

TRUE NORTH GOLDEN ARROW RESOURCES LTD.
MASUPARIA COPPER-GOLD PROPERTY
Kapuas and Murung Raya Regencies, Central Kalimantan Province
Republic of Indonesia
200m Map of Ongkang Prospect
----- End of picture text -----

– Figure 5: Ongkang structural vein study known and potential gold zones

==> picture [121 x 64] intentionally omitted <==

==> picture [451 x 297] intentionally omitted <==

Figure 6: COW Location in Central Kalimantan

==> picture [121 x 64] intentionally omitted <==

==> picture [450 x 498] intentionally omitted <==

Figure 7: Locations of Projects on Masuparia

==> picture [121 x 64] intentionally omitted <==

==> picture [394 x 236] intentionally omitted <==

Figure 8: Masuparia Base Camp

==> picture [121 x 64] intentionally omitted <==

TABLES TO DRILL RESULTS

Note: True widths in this instance cannot be determined

Hole No Easting Easting Northing Northing Depth to
EOH m
Depth to
EOH m
Depth to
EOH m
Dip Dip Azimuth Azimuth Azimuth
OND26B 170940mE 39485mN 74 60 240
Figure 9: Ongkang Significant drill intercept collar locations
Hole No From To **Aug/t ** **Ag g/t ** **Cuppm ** **Pbppm ** **Znppm **
OND26B 20m 22m 95.83 116.00 290 33 88
22m 24m 2.02 34.00 156 41 125
24m 26m 1162.96 170.00 3060 1080 2060
Numbers of drill holes at the specific Projects
Tosa 20
Kiwi Kaka Kea 100
Menyawang 20
Rina 50
Ongkang 50

Table 1 Rina Drill Collar locations

Hole
Number
RDH-02
RDH-08
RDH-09
RDH-14
RDH-15
Hole Hole TOTAL
**Azimuth ** **Inclination ** DEPTH(M)
Easting Northing NE
171745.00 9937050.00 90 -60.0 312.0
171855.00 9937020.00 4 -62.0 500.0
171845.00 9937000.00 190 -64.0 254.5
171877.41 9936975.75 345 -75.0 863.0
171974.78 9937064.82 250 -75.0 900.0

Table 2 Kiwi drill collar locations

Hole
Number
KID-08*
KID-16B
KID-20
KID-26
KID-27
KID-27A
KID-30
Easting Northing Hole Hole TOTAL
**Azimuth ** **Inclination ** DEPTH(M)
NE
178354 9935234 240 -60 70
178834 9935076 120 -60 100
178985 9935190 0 -60 99
179458 9935213 0 -60 79
179517 9935194 0 -60 48
179513 9935200 0 -60 58
179516 9935158 0 -60 58

==> picture [121 x 64] intentionally omitted <==

Table 3 Kea drill collar locations

Hole Hole Hole TOTAL
Easting Northing
**Number ** **Azimuth ** **Inclination ** DEPTH(M)
NE
KED10A 178997 9935760 80 -60 67
KED14 179112 9935827 360 -90 88
KED15A 179081 9935862 30 -60 79
KED17 179036 9935919 360 -90 94
KED17A 179036 9935919 30 -60 88
KED-18 179205 9936073 110 -60 73
KED19 178920 9935990 360 -90 88
KED19A 178920 9935990 30 -60 85

==> picture [121 x 64] intentionally omitted <==

COW details

Company: PT Pasifik Masao Mineral Shareholders: Golden Arrow Resources Ltd (BVI) 85% PT Sinarcaya Mineralindo (Indonesian Partner) 15% COW Signed: 28 April 1997 (6th Generation) Location: Kapuas and Murung Raya Regencies, Central Kalimantan, Indonesia Original Area: 1,068 sq.kms. (106,848 hectares) Current Area: 208.55 sq.kms. (20,855 hectares) COW Timetable: General Survey Period – 1 year + 1 year extension Exploration Period – 3 years + 2 years extension Feasibility Study Period – 1 year + 2 year extension Construction Period – 3 years Production Period – 30 years + possible 2x10 year extensions Current Phase: Feasibility Period Year 3+ which expires on 27 April 2012

==> picture [121 x 64] intentionally omitted <==

Tenement Description:

The Masuparia COW comprises of one exploration and mining block with an area of 208.55 km[2] (20,855 hectares) bounded by the following coordinates:

Corner Longitude Latitude
Masuparia COW Block 1
1 113° 59’ 30.0” 0° 28’ 30.0” South
2 114° 08’ 00.0” 0° 28’ 30.0” South
3 114° 08’ 00.0” 0° 32’ 00.0” South
4 114° 07’ 26.0” 0° 32’ 00.0” South
5 114° 07’ 26.0” 0° 37’ 00.0” South
6 114° 02’ 00.0” 0° 37’ 00.0” South
7 114° 02’ 00.0” 0° 33’ 30.0” South
8 113° 59’ 30.0” 0° 33’ 30.0” South

NOTE

Ark will require:

  • A Forrest Permit before commencing drilling

  • An AMDAL (environmental Permit) to complete the feasibility study

  • To apply for a Mining permit to commence mining

ENDS

About Ark Mines

Ark Mines Ltd (Ark) is a publicly listed company with five highly prospective tenements in the Lachlan Fold Belt, in the central west of New South Wales. Ark’s exploration efforts are focussed on gold and base metals, whilst potential for “rare earth” and iron provide Ark with a diversified suite of valued commodities.

FURTHER INFORMATION: Roger Jackson, Managing Director, Ark Mines Limited :+61400 408 550

Released through Ben Jarvis, Six Degrees Investor Relations: +61413150448

The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves has been compiled by Robert Pyper B.Sc FAusIMM GAICD, who is a Fellow of The Australasian Institute of Mining and Metallurgy and who has more than ten years experience in the field of activity being reported on. Mr Pyper has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Pyper consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears