Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ACROW LIMITED Management Reports 2012

Jan 2, 2012

64288_rns_2012-01-02_c7accb07-84ee-47e3-a30e-85898ad770b0.pdf

Management Reports

Open in viewer

Opens in your device viewer

December 23, 2011

Noble achieves key milestone in Bibiani growth strategy with opening of on-site assay laboratory

Assay times will be slashed, accelerating drilling programs, resource-reserve calculations and increasing the speed of future exploration drilling programs

Noble Mineral Resources (ASX: NMG) is pleased to advise that its push to grow the gold inventory at its 2.26 million-ounce Bibiani Project in Ghana has been given a huge boost with the completion of its on-site assay laboratory. Commissioning of the new Laboratory has commenced with the first results received and geological assessment of these initial results being processed.

The laboratory, which is owned by Noble and operated by Performance Laboratories (PL) , will slash the time taken to turn around assay results from up to five weeks currently to as little as 24 hours. This will enable Noble to accelerate drilling programs at Bibiani and calculate revised resource and reserve estimates using these results sooner than would be the case under the system that has operated until now.

Noble is set to begin commissioning the refurbished three milliontonne-a-year plant at Bibiani with production ramping up to 150,000ozpa in 2012. Resources stand at 2.26Moz, including reserves of 958,000oz.

Slow assay turnarounds have been a major problem across the Ghanaian mining industry over the past two years or so. The problem stemmed from the combination of a reduction in assaying capacity following the industry downturn in 2009 and the surge in drilling activity over the past two years.

==> picture [285 x 190] intentionally omitted <==

Initial gas delivery enabling commissioning to commence

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

1

==> picture [566 x 98] intentionally omitted <==

Turnaround times at the contract laboratories have averaged just over three weeks and were up to five weeks. To reduce costs, Noble adopted a two-fold process which included first submitting 4m composite spear samples for analysis and then re-submitting those selected split samples containing high enough results. This process often extended the delays to two months. These delays had a flowon impact on Noble’s capacity to calculate resource and reserve estimates in a reasonable timeframe.

Now that the new laboratory, managed by PL, on site at Bibiani is in commissioning phase and once operating at full capacity, the cost of a gold-only sample will be cut to about half the current price. PL has undertaken to return grade control samples within 24 hours and exploration samples within seven days. The contract contains penalty clauses which can be invoked if these deadlines are missed by substantial margins. There are also bonus clauses which apply if the deadlines are met consistently.

The improved response times from the laboratory will allow Noble to plan holes and estimate resources in a much more timely fashion and will assist greatly in the maintenance of full-scale production going forward.

Recent Drill Results

The latest drill results can be seen it the Appendix 1. These results are from the latest of the holes under the Strauss pit to return from the lab, and are essentially infill of the existing drilling there. They confirm the discrete nature of the mineralisation at Strauss, which has developed into seven different mineralised shears in the area of the old pit.

They also demonstrate that there is additional mineralisation outside of these shears that the higher definition grade control drilling will stand a better chance of delineating. This in all probability will lead to the same sorts of upgrades to the resource and reserve that have been enjoyed historically; the Anglo Ashanti annual site records between 1997 and 2005 report a minimum 19% overcall from resource to Mill at Bibiani further enhancing the Bibiani project return.

Authorised by: Wayne Norris Managing Director

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

2

==> picture [566 x 98] intentionally omitted <==

Competent Person’s Statement

The information in this announcement that relates to Mineral Resource and Ore Reserve estimates is based on information compiled by Mr Mark Laing (BE (Mining, Hons), who is a Corporate Member of the Australasian Institute of Mining and Metallurgy. Mr Laing is employed by Noble Mineral Resources Ltd, and has sufficient experience which is relevant to the style of mineralisation being reported herein as Mineral Resources, Ore Reserves and Exploration Results to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Laing consents to the inclusion in this announcement of the matters based on his information in the form and content in which it appears.

About Noble Mineral Resources Limited

Noble Mineral Resources Limited listed on the Australian Stock Exchange on 26th June 2008 with a focus on exploring for large-scale gold deposits in the world-class Ashanti Gold Belt in Ghana, West Africa. In November 2009, the Company entered into an agreement for the acquisition of the Bibiani Gold Mine , a project located in the Sefwi-Bibiani Gold Belt in Ghana, host to over 30 Million Ounces of gold. On July 20th 2010 the final Share Transfer Form was executed to consummate the purchase. Noble’s other primary gold concessions are Exploration Licences at Cape Three Points, Brotet and Tumentu, which cover some 141.3km² and all are located within the world-class Ashanti Gold Belt in south western Ghana. Ghana is the second largest gold producer in Africa and is the 10th largest gold producing nation in the world, with annual production of approximately 2.9 Million Ounces. Noble’s on-going focus will be to expand the drilling program at Bibiani to target new shallow resources near the Bibiani Mine and adjacent tenements while still progressing the Cape Three Points, Brotet and Tumentu Concessions within the Southern extension of the Ashanti Gold Belt. Initial exploration at Cape Three Points will be targeted towards the Satin Mine Project and the Morrison Project , both of which lie in an area of historic underground gold exploration. Noble believes that there is significant potential for the delineation of additional high-grade gold mineralisation relating to the down-plunge and strike extension to these zones. When added to the potential now available at Bibiani it will place Noble in a strong position to achieve its goal in building Australia’s next major gold mining house.

The Company recognises the Bibiani , Cape Three Points, Brotet and Tumentu concessions are relatively under explored, highly prospective projects and aims to rapidly redefine JORC-compliant resources for development.

ASX Code: NMG www.nobleminres.com.au

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

3

==> picture [566 x 98] intentionally omitted <==

Figure 1 – Bibiani location plan showing Lab Site

==> picture [450 x 516] intentionally omitted <==

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

4

==> picture [566 x 98] intentionally omitted <==

Appendix 1 – Recent drill results, latest Strauss-Gap infill drilling

Interval Aug/t Hole From Comments
2
2
1
1
1
1
2
1
1
1
4
1
1
1
1
1
1
14.15
6.00
5.32
4.17
3.17
3.00
2.66
2.15
1.93
1.53
1.50
1.30
1.25
1.22
1.21
1.17
1.16
ST11_053
ST11_022
ST11_022
ST11_034
ST11_045
ST11_021
ST11_034
ST11_046
ST11_017
ST11_027
ST11_041
ST11_019
ST11_036
ST11_045
ST11_045
ST11_033
ST11_019
36m
61m
126m
106m
114m
73m
94m
67m
45m
152m
7m
138m
36m
53m
81m
10m
135m
Strauss infill holes
















1 1.13 ST11_021 128m

All assays are bottle roll cyanide leach on a 1kg charge and do not include any fire assays of non-Cn soluble residue. Analysis has been undertaken by Intertek Laboratories Ltd at their laboratory in Tarkwa, Ghana.

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

5

==> picture [566 x 98] intentionally omitted <==

Appendix 2a – March 2010 JORC Mineral Resource Estimate

TONNAGE GRADE CONT'D GOLD
0.5 g/t cut-off
Tonnes (Aug/t) Ounces
Measured 6,560,000 2.05 430,000
Indicated 13,370,000 1.77 760,000
BIBIANI MAIN PIT
Total M&I 19,920,000 1.86 1,190,000
Inferred 13,060,000 1.89 790,000
Total 32,980,000 1.87 1,980,000

Global Mineral Resource Estimate based on a cut-off grade of 0.5g/t

Appendix 2b – November 2011 JORC Resource Estimate

TONNAGE GRADE CONT'D GOLD
SATELLITE AREAS 0.4 g/t cut-off
Tonnes (Aug/t) Ounces
Measured - 0.00 -
AHEMAN Indicated 607,500 0.73 14,300
Inferred - 0.00 -
Measured 1,748,000 1.68 94,400
WALSH-STRAUSS
PRELIMINARY
Indicated 2,430,000 1.12 87,500
Inferred 6,000 1.69 300
Measured - 0.00 -
GRASSHOPPER Indicated 433,200 1.25 17,400
Inferred 4,800 1.20 200
Measured - 0.00 -
OLD TAILINGS* Indicated 2,860,200 0.70 64,000
Inferred - 0.00 -
Total 8,089,700 1.07 278,100

Global Mineral Resource Estimate based on a cut-off grade of 0.4g/t * Cut-off grade 0.0g/t

TOTAL RESOURCES = 41.1Mt @ 1.71 g/t (2.26Moz)

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

6

==> picture [566 x 98] intentionally omitted <==

Appendix 3 – Proved and Probable Ore Reserves as at June 2011

Bibiani Main Pit Proved and Probable Ore Reserves – June 2011
Oxide Fresh Fill Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 5,020 2.17 349 5,020 2.16 349
Probable 360 1.34 16 6,280 2.02 407 340 1.73 19 6,980 1.97 441
Total 360 1.34 16 11,300 2.08 756 340 1.73 19 12,000 2.05 790
Derived from Measured and Indicated Mineral Resources using a cut‐off grade of 0.6g/t

Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves as at October 2011

Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011 Bibiani Walsh to Grasshopper Satellite Pits Proved and Probable Ore Reserves – October 2011
Oxide Transition Sulphide Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs Kt g/t Kozs
Proved 181 1.30 8 132 1.70 7 753 2.22 54 1,065 2.00 69
Probable 448 1.39 20 172 1.71 9 102 2.05 7 722 1.56 36
Total 628 1.36 28 303 1.70 17 855 2.20 61 1,787 1.82 105
Derived from Measuredand Indicated Resources using a cut‐off grade of 0.5g/t

Tailings Deposits Probable Ore Reserves as at November 2011

Bibiani Tailings Deposits Probable Ore Reserves Bibiani Tailings Deposits Probable Ore Reserves Bibiani Tailings Deposits Probable Ore Reserves – November 2011
Deposit Tonnes Grade Cont’dGold
Kt Au (g/t) Kozs
Dams1&2 850 0.74 20
Levees 6 &7 2,030 0.65 43
Total 2,880 0.68 63

TOTAL RESERVES = 16.7Mt @ 1.79 g/t (958,000oz)

Suite 3c, South Shore Centre 85 South Perth Esplanade South Perth, WA 6151

Email [email protected] Web www.nobleminres.com.au

Telephone +61 (0)8 9474 6771 Facsimile +61 (0)8 9474 6772

7